New York State Department of Transportation 12:28 Tuesday, June 18, 2019 1 US Customary Contracts Let April 1, 2017 to March 31, 2019 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER New York State Department of Transportation 12:28 Tuesday, June 18, 2019 1 US Customary Contracts Let April 1, 2017 to March 31, 2019 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER SPEC CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM YEAR REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ ---- -------- -------- --------- -------- ------- PRICE BIDDERS CLEARING AND GRUBBING / ACRE ------- -------- 201.07 08 01 2018Q3 1 21.00 $169,260 $8,060.00 $8,060.00 2018Q4 1 1.00 $3,704 $3,703.70 $20,401.23 02 2018Q1 1 1.00 $6,450 $6,450.00 $22,246.00 2019Q1 1 2.00 $2,000 $1,000.00 $8,000.00 03 2017Q3 2 4.00 $51,500 $12,875.00 $12,992.00 2018Q1 2 2.00 $4,310 $2,155.00 $6,468.33 2018Q3 1 1.00 $5,000 $5,000.00 $9,333.33 04 2017Q2 1 12.00 $93,600 $7,800.00 $7,850.00 05 2018Q3 1 2.00 $31,110 $15,555.15 $18,518.38 2018Q4 1 2.00 $50,000 $25,000.00 $13,266.67 2019Q1 1 2.00 $18,000 $9,000.00 $6,000.00 06 2018Q2 1 2.00 $15,576 $7,788.00 $6,796.00 08 2018Q2 2 9.00 $172,500 $19,166.67 $20,833.48 09 2017Q2 1 132.00 $3,960 $30.00 $30.00 10 2017Q3 1 3.00 $225,000 $75,000.00 $51,666.67 2017Q4 1 1.00 $5,000 $5,000.00 $5,766.67 2018Q2 1 6.00 $180,000 $30,000.00 $26,666.67 11 2017Q4 1 1.00 $10,680 $10,680.10 $23,563.37 2018Q1 1 1.00 $2,870 $2,870.00 $1,485.00 2018Q3 2 3.00 $9,000 $3,000.00 $8,177.78 2018Q4 1 1.00 $5,000 $5,000.00 $6,666.67 2019Q1 1 12.00 $192,000 $16,000.00 $12,000.00 --------- ------------ --------------- ---------- ---------- 26 221.00 $1,256,520 $5,685.61 $5,420.74 ----------------------------------------------------------------------------------------------------------------------------------

Upload: others

Post on 30-Nov-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

New York State Department of Transportation 12:28 Tuesday, June 18, 2019 1
US Customary Contracts Let April 1, 2017 to March 31, 2019
WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER
New York State Department of Transportation 12:28 Tuesday, June 18, 2019 1
US Customary Contracts Let April 1, 2017 to March 31, 2019
WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER
SPEC CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM YEAR REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ ---- -------- -------- --------- -------- ------- PRICE BIDDERS CLEARING AND GRUBBING / ACRE ------- --------
201.07 08 01 2018Q3 1 21.00 $169,260 $8,060.00 $8,060.00 2018Q4 1 1.00 $3,704 $3,703.70 $20,401.23
02 2018Q1 1 1.00 $6,450 $6,450.00 $22,246.00 2019Q1 1 2.00 $2,000 $1,000.00 $8,000.00
03 2017Q3 2 4.00 $51,500 $12,875.00 $12,992.00 2018Q1 2 2.00 $4,310 $2,155.00 $6,468.33 2018Q3 1 1.00 $5,000 $5,000.00 $9,333.33
04 2017Q2 1 12.00 $93,600 $7,800.00 $7,850.00
05 2018Q3 1 2.00 $31,110 $15,555.15 $18,518.38 2018Q4 1 2.00 $50,000 $25,000.00 $13,266.67 2019Q1 1 2.00 $18,000 $9,000.00 $6,000.00
06 2018Q2 1 2.00 $15,576 $7,788.00 $6,796.00
08 2018Q2 2 9.00 $172,500 $19,166.67 $20,833.48
09 2017Q2 1 132.00 $3,960 $30.00 $30.00
10 2017Q3 1 3.00 $225,000 $75,000.00 $51,666.67 2017Q4 1 1.00 $5,000 $5,000.00 $5,766.67 2018Q2 1 6.00 $180,000 $30,000.00 $26,666.67
11 2017Q4 1 1.00 $10,680 $10,680.10 $23,563.37 2018Q1 1 1.00 $2,870 $2,870.00 $1,485.00 2018Q3 2 3.00 $9,000 $3,000.00 $8,177.78 2018Q4 1 1.00 $5,000 $5,000.00 $6,666.67 2019Q1 1 12.00 $192,000 $16,000.00 $12,000.00 --------- ------------ --------------- ---------- ---------- 26 221.00 $1,256,520 $5,685.61 $5,420.74 ----------------------------------------------------------------------------------------------------------------------------------
New York State Department of Transportation 12:28 Tuesday, June 18, 2019 2
US Customary Contracts Let April 1, 2017 to March 31, 2019
WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER
SPEC CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM YEAR REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ ---- -------- -------- --------- -------- ------- PRICE BIDDERS CLEARING AND GRUBBING / SY ------- --------
201.07000004 08 03 2018Q1 1 625.00 $5,438 $8.70 $9.45 2019Q1 1 70.00 $473 $6.75 $7.93
04 2018Q4 1 544.00 $5,984 $11.00 $39.00
05 2018Q4 1 1,000.00 $4,400 $4.40 $5.63
06 2019Q1 1 10.00 $720 $72.00 $144.00
09 2019Q1 1 30.00 $2,100 $70.00 $116.67 --------- ------------ --------------- ---------- ---------- 6 2,279.00 $19,114 $8.39 $16.78 ---------------------------------------------------------------------------------------------------------------------------------- CLEARING AND GRUBBING AND TREE TRIMMING / EACH
201.07010004 08 04 2017Q2 1 1.00 $75 $75.00 $208.33 2017Q3 1 14.00 $2,800 $200.00 $526.33 2017Q4 1 1.00 $5,000 $5,000.00 $5,573.33 2018Q2 2 5.00 $7,400 $1,480.00 $2,346.67 2018Q4 3 6.00 $13,100 $2,183.33 $1,975.00 2019Q1 1 1.00 $10,000 $10,000.00 $5,241.67 --------- ------------ --------------- ---------- ---------- 9 28.00 $38,375 $1,370.54 $1,499.12 ---------------------------------------------------------------------------------------------------------------------------------- CLEAR GRUBBING, EM/STBY, R 3 (1.1 - 3.0) / ACRE
201.07030063 08 07 2017Q2 1 1.00 $1,000 $1,000.00 $1,750.00 --------- ------------ --------------- ---------- ---------- 1 1.00 $1,000 $1,000.00 $1,750.00 ---------------------------------------------------------------------------------------------------------------------------------- CLEAR GRUB, DMD/RESP, R3 (1.1-3.0) / ACRE
201.07030064 08 01 2018Q3 1 2.00 $10,000 $5,000.00 $5,000.00 --------- ------------ --------------- ---------- ---------- 1 2.00 $10,000 $5,000.00 $5,000.00
New York State Department of Transportation 12:28 Tuesday, June 18, 2019 2
US Customary Contracts Let April 1, 2017 to March 31, 2019
WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER
SPEC CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM YEAR REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ ---- -------- -------- --------- -------- ------- PRICE BIDDERS CLEARING AND GRUBBING / SY ------- --------
201.07000004 08 03 2018Q1 1 625.00 $5,438 $8.70 $9.45 2019Q1 1 70.00 $473 $6.75 $7.93
04 2018Q4 1 544.00 $5,984 $11.00 $39.00
05 2018Q4 1 1,000.00 $4,400 $4.40 $5.63
06 2019Q1 1 10.00 $720 $72.00 $144.00
09 2019Q1 1 30.00 $2,100 $70.00 $116.67 --------- ------------ --------------- ---------- ---------- 6 2,279.00 $19,114 $8.39 $16.78 ---------------------------------------------------------------------------------------------------------------------------------- CLEARING AND GRUBBING AND TREE TRIMMING / EACH
201.07010004 08 04 2017Q2 1 1.00 $75 $75.00 $208.33 2017Q3 1 14.00 $2,800 $200.00 $526.33 2017Q4 1 1.00 $5,000 $5,000.00 $5,573.33 2018Q2 2 5.00 $7,400 $1,480.00 $2,346.67 2018Q4 3 6.00 $13,100 $2,183.33 $1,975.00 2019Q1 1 1.00 $10,000 $10,000.00 $5,241.67 --------- ------------ --------------- ---------- ---------- 9 28.00 $38,375 $1,370.54 $1,499.12 ---------------------------------------------------------------------------------------------------------------------------------- CLEAR GRUBBING, EM/STBY, R 3 (1.1 - 3.0) / ACRE
201.07030063 08 07 2017Q2 1 1.00 $1,000 $1,000.00 $1,750.00 --------- ------------ --------------- ---------- ---------- 1 1.00 $1,000 $1,000.00 $1,750.00 ---------------------------------------------------------------------------------------------------------------------------------- CLEAR GRUB, DMD/RESP, R3 (1.1-3.0) / ACRE
201.07030064 08 01 2018Q3 1 2.00 $10,000 $5,000.00 $5,000.00 --------- ------------ --------------- ---------- ---------- 1 2.00 $10,000 $5,000.00 $5,000.00 ----------------------------------------------------------------------------------------------------------------------------------
New York State Department of Transportation 12:28 Tuesday, June 18, 2019 3
US Customary Contracts Let April 1, 2017 to March 31, 2019
WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER
SPEC CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM YEAR REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ ---- -------- -------- --------- -------- ------- PRICE BIDDERS CONTAM MATER & HAZ WAST DISP SOLID <500P / LB ------- --------
202.02100163 08 02 2019Q1 1 10.00 $2,000 $200.00 $343.33
10 2019Q1 1 100.00 $2,000 $20.00 $155.00 --------- ------------ --------------- ---------- ---------- 2 110.00 $4,000 $36.36 $172.12 ---------------------------------------------------------------------------------------------------------------------------------- CONTAM MAT HAZ WAST DISP SOLID 501-2000P / LB
202.02100263 08 02 2019Q1 1 500.00 $50,000 $100.00 $68.33
04 2018Q4 1 1,025.00 $41,000 $40.00 $36.00
10 2019Q1 1 500.00 $10,000 $20.00 $41.67 --------- ------------ --------------- ---------- ---------- 3 2,025.00 $101,000 $49.88 $45.38 ---------------------------------------------------------------------------------------------------------------------------------- CONTAM MAT HAZARD WAST DISP SOLID >2000P / LB
202.02100363 08 02 2019Q1 1 2,000.00 $100,000 $50.00 $42.67
10 2019Q1 1 2,000.00 $10,000 $5.00 $14.00 --------- ------------ --------------- ---------- ---------- 2 4,000.00 $110,000 $27.50 $28.33 ---------------------------------------------------------------------------------------------------------------------------------- CONTAM MAT & HAZRD WAST DISP LIQU <100G / GAL
202.02200163 08 02 2019Q1 1 100.00 $15,000 $150.00 $166.67
10 2019Q1 1 100.00 $5,000 $50.00 $66.67 --------- ------------ --------------- ---------- ---------- 2 200.00 $20,000 $100.00 $116.67
New York State Department of Transportation 12:28 Tuesday, June 18, 2019 3
US Customary Contracts Let April 1, 2017 to March 31, 2019
WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER
SPEC CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM YEAR REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ ---- -------- -------- --------- -------- ------- PRICE BIDDERS CONTAM MATER & HAZ WAST DISP SOLID <500P / LB ------- --------
202.02100163 08 02 2019Q1 1 10.00 $2,000 $200.00 $343.33
10 2019Q1 1 100.00 $2,000 $20.00 $155.00 --------- ------------ --------------- ---------- ---------- 2 110.00 $4,000 $36.36 $172.12 ---------------------------------------------------------------------------------------------------------------------------------- CONTAM MAT HAZ WAST DISP SOLID 501-2000P / LB
202.02100263 08 02 2019Q1 1 500.00 $50,000 $100.00 $68.33
04 2018Q4 1 1,025.00 $41,000 $40.00 $36.00
10 2019Q1 1 500.00 $10,000 $20.00 $41.67 --------- ------------ --------------- ---------- ---------- 3 2,025.00 $101,000 $49.88 $45.38 ---------------------------------------------------------------------------------------------------------------------------------- CONTAM MAT HAZARD WAST DISP SOLID >2000P / LB
202.02100363 08 02 2019Q1 1 2,000.00 $100,000 $50.00 $42.67
10 2019Q1 1 2,000.00 $10,000 $5.00 $14.00 --------- ------------ --------------- ---------- ---------- 2 4,000.00 $110,000 $27.50 $28.33 ---------------------------------------------------------------------------------------------------------------------------------- CONTAM MAT & HAZRD WAST DISP LIQU <100G / GAL
202.02200163 08 02 2019Q1 1 100.00 $15,000 $150.00 $166.67
10 2019Q1 1 100.00 $5,000 $50.00 $66.67 --------- ------------ --------------- ---------- ---------- 2 200.00 $20,000 $100.00 $116.67 ----------------------------------------------------------------------------------------------------------------------------------
New York State Department of Transportation 12:28 Tuesday, June 18, 2019 4
US Customary Contracts Let April 1, 2017 to March 31, 2019
WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER
SPEC CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM YEAR REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ ---- -------- -------- --------- -------- ------- PRICE BIDDERS CONTAM MAT & HAZ WAST DISP LIQU 101-500G / GAL ------- --------
202.02200263 08 02 2019Q1 1 250.00 $25,000 $100.00 $116.67
10 2019Q1 1 250.00 $7,500 $30.00 $40.00 --------- ------------ --------------- ---------- ---------- 2 500.00 $32,500 $65.00 $78.33 ---------------------------------------------------------------------------------------------------------------------------------- CONTAM MATER HAZARD WAST DISP LIQU >500G / GAL
202.02200363 08 02 2019Q1 1 750.00 $67,500 $90.00 $93.33
10 2019Q1 1 750.00 $11,250 $15.00 $28.33 --------- ------------ --------------- ---------- ---------- 2 1,500.00 $78,750 $52.50 $60.83 ---------------------------------------------------------------------------------------------------------------------------------- REMOVAL OF SUBSTRUCTURES / CY
202.19 08 01 2017Q3 1 919.00 $68,925 $75.00 $98.67 2018Q1 1 50.00 $22,500 $450.00 $591.67 2018Q4 1 281.00 $22,480 $80.00 $133.33
02 2017Q4 1 280.00 $22,400 $80.00 $71.67 2019Q1 1 240.00 $7,848 $32.70 $54.23
03 2017Q4 1 35.00 $3,696 $105.60 $138.20 2018Q1 1 522.00 $19,418 $37.20 $55.73 2019Q1 1 402.00 $21,507 $53.50 $111.17
04 2017Q2 1 385.00 $30,800 $80.00 $195.00 2017Q4 3 394.00 $36,140 $91.73 $105.73 2018Q4 1 95.00 $11,020 $116.00 $478.67 2019Q1 1 59.00 $23,600 $400.00 $550.00
05 2017Q3 1 560.00 $56,000 $100.00 $115.00 2017Q4 1 225.00 $3,375 $15.00 $56.67 2018Q4 1 2,620.00 $301,300 $115.00 $136.91
06 2017Q4 2 584.00 $41,528 $71.11 $92.70
New York State Department of Transportation 12:28 Tuesday, June 18, 2019 4
US Customary Contracts Let April 1, 2017 to March 31, 2019
WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER
SPEC CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM YEAR REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ ---- -------- -------- --------- -------- ------- PRICE BIDDERS CONTAM MAT & HAZ WAST DISP LIQU 101-500G / GAL ------- --------
202.02200263 08 02 2019Q1 1 250.00 $25,000 $100.00 $116.67
10 2019Q1 1 250.00 $7,500 $30.00 $40.00 --------- ------------ --------------- ---------- ---------- 2 500.00 $32,500 $65.00 $78.33 ---------------------------------------------------------------------------------------------------------------------------------- CONTAM MATER HAZARD WAST DISP LIQU >500G / GAL
202.02200363 08 02 2019Q1 1 750.00 $67,500 $90.00 $93.33
10 2019Q1 1 750.00 $11,250 $15.00 $28.33 --------- ------------ --------------- ---------- ---------- 2 1,500.00 $78,750 $52.50 $60.83 ---------------------------------------------------------------------------------------------------------------------------------- REMOVAL OF SUBSTRUCTURES / CY
202.19 08 01 2017Q3 1 919.00 $68,925 $75.00 $98.67 2018Q1 1 50.00 $22,500 $450.00 $591.67 2018Q4 1 281.00 $22,480 $80.00 $133.33
02 2017Q4 1 280.00 $22,400 $80.00 $71.67 2019Q1 1 240.00 $7,848 $32.70 $54.23
03 2017Q4 1 35.00 $3,696 $105.60 $138.20 2018Q1 1 522.00 $19,418 $37.20 $55.73 2019Q1 1 402.00 $21,507 $53.50 $111.17
04 2017Q2 1 385.00 $30,800 $80.00 $195.00 2017Q4 3 394.00 $36,140 $91.73 $105.73 2018Q4 1 95.00 $11,020 $116.00 $478.67 2019Q1 1 59.00 $23,600 $400.00 $550.00
05 2017Q3 1 560.00 $56,000 $100.00 $115.00 2017Q4 1 225.00 $3,375 $15.00 $56.67 2018Q4 1 2,620.00 $301,300 $115.00 $136.91
06 2017Q4 2 584.00 $41,528 $71.11 $92.70
(item continued)
New York State Department of Transportation 12:28 Tuesday, June 18, 2019 5
US Customary Contracts Let April 1, 2017 to March 31, 2019
WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER
SPEC CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM YEAR REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ ---- -------- -------- --------- -------- ------- PRICE BIDDERS REMOVAL OF SUBSTRUCTURES / CY ------- --------
202.19 08 06 2018Q2 1 100.00 $12,000 $120.00 $156.67 2018Q4 2 457.00 $43,485 $95.15 $120.01 2019Q1 1 106.00 $16,218 $153.00 $167.10
07 2017Q4 1 525.00 $47,775 $91.00 $98.48 2018Q1 1 4.00 $660 $165.00 $211.67 2018Q2 1 543.00 $27,150 $50.00 $73.33
08 2017Q2 1 354.00 $123,900 $350.00 $419.55 2017Q4 1 387.00 $193,500 $500.00 $286.67 2018Q1 2 546.00 $116,870 $214.05 $305.00 2018Q2 1 6.00 $1,350 $225.00 $459.67 2019Q1 2 724.00 $83,900 $115.88 $125.82
09 2018Q1 2 318.00 $23,050 $72.48 $97.78 2018Q2 1 243.00 $12,150 $50.00 $83.33 2018Q3 1 397.00 $1,985 $5.00 $43.33 2019Q1 1 511.00 $40,880 $80.00 $113.33
10 2018Q4 1 412.00 $144,200 $350.00 $500.00
11 2017Q2 1 224.00 $51,520 $230.00 $253.33 2019Q1 1 820.00 $221,400 $270.00 $253.33 --------- ------------ --------------- ---------- ---------- 41 14,328.00 $1,854,531 $129.43 $157.14 ---------------------------------------------------------------------------------------------------------------------------------- RMV STEEL SUP STR SLAB W SHR CONN TY A / SF
202.2201 08 02 2019Q1 2 5,638.00 $190,667 $33.82 $38.68
05 2019Q1 2 26,769.00 $183,770 $6.87 $11.78
06 2018Q1 2 2,670.00 $105,600 $39.55 $64.60
08 2018Q2 1 1,680.00 $126,000 $75.00 $103.33
09 2017Q4 1 3,389.00 $25,418 $7.50 $22.63
New York State Department of Transportation 12:28 Tuesday, June 18, 2019 5
US Customary Contracts Let April 1, 2017 to March 31, 2019
WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER
SPEC CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM YEAR REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ ---- -------- -------- --------- -------- ------- PRICE BIDDERS REMOVAL OF SUBSTRUCTURES / CY ------- --------
202.19 08 06 2018Q2 1 100.00 $12,000 $120.00 $156.67 2018Q4 2 457.00 $43,485 $95.15 $120.01 2019Q1 1 106.00 $16,218 $153.00 $167.10
07 2017Q4 1 525.00 $47,775 $91.00 $98.48 2018Q1 1 4.00 $660 $165.00 $211.67 2018Q2 1 543.00 $27,150 $50.00 $73.33
08 2017Q2 1 354.00 $123,900 $350.00 $419.55 2017Q4 1 387.00 $193,500 $500.00 $286.67 2018Q1 2 546.00 $116,870 $214.05 $305.00 2018Q2 1 6.00 $1,350 $225.00 $459.67 2019Q1 2 724.00 $83,900 $115.88 $125.82
09 2018Q1 2 318.00 $23,050 $72.48 $97.78 2018Q2 1 243.00 $12,150 $50.00 $83.33 2018Q3 1 397.00 $1,985 $5.00 $43.33 2019Q1 1 511.00 $40,880 $80.00 $113.33
10 2018Q4 1 412.00 $144,200 $350.00 $500.00
11 2017Q2 1 224.00 $51,520 $230.00 $253.33 2019Q1 1 820.00 $221,400 $270.00 $253.33 --------- ------------ --------------- ---------- ---------- 41 14,328.00 $1,854,531 $129.43 $157.14 ---------------------------------------------------------------------------------------------------------------------------------- RMV STEEL SUP STR SLAB W SHR CONN TY A / SF
202.2201 08 02 2019Q1 2 5,638.00 $190,667 $33.82 $38.68
05 2019Q1 2 26,769.00 $183,770 $6.87 $11.78
06 2018Q1 2 2,670.00 $105,600 $39.55 $64.60
08 2018Q2 1 1,680.00 $126,000 $75.00 $103.33
09 2017Q4 1 3,389.00 $25,418 $7.50 $22.63
(item continued)
New York State Department of Transportation 12:28 Tuesday, June 18, 2019 6
US Customary Contracts Let April 1, 2017 to March 31, 2019
WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER
SPEC CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM YEAR REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ ---- -------- -------- --------- -------- ------- PRICE BIDDERS RMV STEEL SUP STR SLAB W SHR CONN TY A / SF ------- --------
202.2201 08 09 2018Q1 1 1,045.00 $10,032 $9.60 $22.53
10 2017Q4 1 24,656.00 $1,734,550 $70.35 $83.45 2018Q1 1 2,368.00 $189,440 $80.00 $80.00 2018Q3 1 2,805.00 $417,945 $149.00 $174.33 --------- ------------ --------------- ---------- ---------- 12 71,020.00 $2,983,421 $42.01 $52.32 ---------------------------------------------------------------------------------------------------------------------------------- RMV STEEL SUP STR SLAB W SHR CONN TY B / SF
202.2202 08 01 2017Q4 1 5,800.00 $146,740 $25.30 $25.10 2018Q4 1 4,159.00 $124,770 $30.00 $33.32
02 2018Q1 1 11,275.00 $225,500 $20.00 $20.00
03 2018Q4 1 22,704.00 $249,744 $11.00 $18.67
04 2017Q2 1 23,319.00 $233,190 $10.00 $16.00
06 2018Q1 1 7,408.00 $259,280 $35.00 $19.83 2019Q1 2 13,611.00 $202,598 $14.88 $18.76
08 2018Q1 1 1,000.00 $457,000 $457.00 $302.33 2019Q1 1 3,982.00 $163,262 $41.00 $50.00
11 2019Q1 1 7,825.00 $156,500 $20.00 $88.33 --------- ------------ --------------- ---------- ---------- 11 101,083.00 $2,218,584 $21.95 $28.70 ---------------------------------------------------------------------------------------------------------------------------------- RMV STEEL SUP STR SLAB WO SHR CONN TY A / SF
202.2301 08 01 2018Q1 1 11,803.00 $247,863 $21.00 $21.50
06 2018Q1 1 1,400.00 $35,000 $25.00 $35.83 --------- ------------ --------------- ---------- ---------- 2 13,203.00 $282,863 $21.42 $23.02
New York State Department of Transportation 12:28 Tuesday, June 18, 2019 6
US Customary Contracts Let April 1, 2017 to March 31, 2019
WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER
SPEC CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM YEAR REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ ---- -------- -------- --------- -------- ------- PRICE BIDDERS RMV STEEL SUP STR SLAB W SHR CONN TY A / SF ------- --------
202.2201 08 09 2018Q1 1 1,045.00 $10,032 $9.60 $22.53
10 2017Q4 1 24,656.00 $1,734,550 $70.35 $83.45 2018Q1 1 2,368.00 $189,440 $80.00 $80.00 2018Q3 1 2,805.00 $417,945 $149.00 $174.33 --------- ------------ --------------- ---------- ---------- 12 71,020.00 $2,983,421 $42.01 $52.32 ---------------------------------------------------------------------------------------------------------------------------------- RMV STEEL SUP STR SLAB W SHR CONN TY B / SF
202.2202 08 01 2017Q4 1 5,800.00 $146,740 $25.30 $25.10 2018Q4 1 4,159.00 $124,770 $30.00 $33.32
02 2018Q1 1 11,275.00 $225,500 $20.00 $20.00
03 2018Q4 1 22,704.00 $249,744 $11.00 $18.67
04 2017Q2 1 23,319.00 $233,190 $10.00 $16.00
06 2018Q1 1 7,408.00 $259,280 $35.00 $19.83 2019Q1 2 13,611.00 $202,598 $14.88 $18.76
08 2018Q1 1 1,000.00 $457,000 $457.00 $302.33 2019Q1 1 3,982.00 $163,262 $41.00 $50.00
11 2019Q1 1 7,825.00 $156,500 $20.00 $88.33 --------- ------------ --------------- ---------- ---------- 11 101,083.00 $2,218,584 $21.95 $28.70 ---------------------------------------------------------------------------------------------------------------------------------- RMV STEEL SUP STR SLAB WO SHR CONN TY A / SF
202.2301 08 01 2018Q1 1 11,803.00 $247,863 $21.00 $21.50
06 2018Q1 1 1,400.00 $35,000 $25.00 $35.83 --------- ------------ --------------- ---------- ---------- 2 13,203.00 $282,863 $21.42 $23.02 ----------------------------------------------------------------------------------------------------------------------------------
New York State Department of Transportation 12:28 Tuesday, June 18, 2019 7
US Customary Contracts Let April 1, 2017 to March 31, 2019
WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER
SPEC CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM YEAR REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ ---- -------- -------- --------- -------- ------- PRICE BIDDERS RMV STEEL SUP STR SLAB WO SHR CONN TY B / SF ------- --------
202.2302 08 01 2018Q1 1 18,125.00 $344,375 $19.00 $20.00
11 2019Q1 1 127,855.00 $2,045,680 $16.00 $17.17 --------- ------------ --------------- ---------- ---------- 2 145,980.00 $2,390,055 $16.37 $17.52 ---------------------------------------------------------------------------------------------------------------------------------- RMV CON SUPER STR SUP CON SL W SH CONN / SF
202.24 08 02 2019Q1 2 7,008.00 $151,490 $21.62 $24.10
08 2018Q1 1 19,624.00 $637,780 $32.50 $28.17 --------- ------------ --------------- ---------- ---------- 3 26,632.00 $789,270 $29.64 $27.10 ---------------------------------------------------------------------------------------------------------------------------------- DEBRIS REM (UNCONTAM), HAUL WITHIN 15 MI / CY
202.25000163 08 11 2018Q4 1 94.00 $39,574 $421.00 $523.67 --------- ------------ --------------- ---------- ---------- 1 94.00 $39,574 $421.00 $523.67 ---------------------------------------------------------------------------------------------------------------------------------- NATUR DEBR REM UNCONTAM HAUL WITHIN 15MI / TON
202.25001163 08 02 2019Q1 1 38,300.00 $2,336,300 $61.00 $80.33
10 2019Q1 1 35,000.00 $1,540,000 $44.00 $51.00 --------- ------------ --------------- ---------- ---------- 2 73,300.00 $3,876,300 $52.88 $66.33 ---------------------------------------------------------------------------------------------------------------------------------- NATUR DEBR REM UNCONTAM HAUL 15.1 - 30MI / TON
202.25001263 08 02 2019Q1 1 28,000.00 $2,100,000 $75.00 $93.33
10 2019Q1 1 18,100.00 $1,448,000 $80.00 $86.67 --------- ------------ --------------- ---------- ---------- 2 46,100.00 $3,548,000 $76.96 $90.72
New York State Department of Transportation 12:28 Tuesday, June 18, 2019 7
US Customary Contracts Let April 1, 2017 to March 31, 2019
WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER
SPEC CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM YEAR REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ ---- -------- -------- --------- -------- ------- PRICE BIDDERS RMV STEEL SUP STR SLAB WO SHR CONN TY B / SF ------- --------
202.2302 08 01 2018Q1 1 18,125.00 $344,375 $19.00 $20.00
11 2019Q1 1 127,855.00 $2,045,680 $16.00 $17.17 --------- ------------ --------------- ---------- ---------- 2 145,980.00 $2,390,055 $16.37 $17.52 ---------------------------------------------------------------------------------------------------------------------------------- RMV CON SUPER STR SUP CON SL W SH CONN / SF
202.24 08 02 2019Q1 2 7,008.00 $151,490 $21.62 $24.10
08 2018Q1 1 19,624.00 $637,780 $32.50 $28.17 --------- ------------ --------------- ---------- ---------- 3 26,632.00 $789,270 $29.64 $27.10 ---------------------------------------------------------------------------------------------------------------------------------- DEBRIS REM (UNCONTAM), HAUL WITHIN 15 MI / CY
202.25000163 08 11 2018Q4 1 94.00 $39,574 $421.00 $523.67 --------- ------------ --------------- ---------- ---------- 1 94.00 $39,574 $421.00 $523.67 ---------------------------------------------------------------------------------------------------------------------------------- NATUR DEBR REM UNCONTAM HAUL WITHIN 15MI / TON
202.25001163 08 02 2019Q1 1 38,300.00 $2,336,300 $61.00 $80.33
10 2019Q1 1 35,000.00 $1,540,000 $44.00 $51.00 --------- ------------ --------------- ---------- ---------- 2 73,300.00 $3,876,300 $52.88 $66.33 ---------------------------------------------------------------------------------------------------------------------------------- NATUR DEBR REM UNCONTAM HAUL 15.1 - 30MI / TON
202.25001263 08 02 2019Q1 1 28,000.00 $2,100,000 $75.00 $93.33
10 2019Q1 1 18,100.00 $1,448,000 $80.00 $86.67 --------- ------------ --------------- ---------- ---------- 2 46,100.00 $3,548,000 $76.96 $90.72 ----------------------------------------------------------------------------------------------------------------------------------
New York State Department of Transportation 12:28 Tuesday, June 18, 2019 8
US Customary Contracts Let April 1, 2017 to March 31, 2019
WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER
SPEC CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM YEAR REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ ---- -------- -------- --------- -------- ------- PRICE BIDDERS NATUR DEBR REM UNCONTAM HAUL 30.1 - 45MI / TON ------- --------
202.25001363 08 02 2019Q1 1 4,500.00 $544,500 $121.00 $158.67
10 2019Q1 1 3,600.00 $720,000 $200.00 $183.33 --------- ------------ --------------- ---------- ---------- 2 8,100.00 $1,264,500 $156.11 $169.63 ---------------------------------------------------------------------------------------------------------------------------------- HOUSEHLD MANMD DEBR REM HAUL WITHIN 15MI / TON
202.25002163 08 02 2019Q1 1 10.00 $1,500 $150.00 $1,316.67
10 2019Q1 1 10.00 $3,000 $300.00 $350.00 --------- ------------ --------------- ---------- ---------- 2 20.00 $4,500 $225.00 $833.33 ---------------------------------------------------------------------------------------------------------------------------------- HOUSEHLD MANMD DEBR REM HAUL 15.1 - 30MI / TON
202.25002263 08 02 2019Q1 1 10.00 $1,600 $160.00 $1,330.00
10 2019Q1 1 10.00 $4,000 $400.00 $416.67 --------- ------------ --------------- ---------- ---------- 2 20.00 $5,600 $280.00 $873.33 ---------------------------------------------------------------------------------------------------------------------------------- HOUSEHLD MANMD DEBR REM HAUL 30.1 - 45MI / TON
202.25002363 08 02 2019Q1 1 10.00 $1,700 $170.00 $1,350.00
10 2019Q1 1 10.00 $5,000 $500.00 $500.00 --------- ------------ --------------- ---------- ---------- 2 20.00 $6,700 $335.00 $925.00 ---------------------------------------------------------------------------------------------------------------------------------- Debris Removal Form Bodies of Water / TON
202.29000110 08 02 2019Q1 1 100.00 $247,500 $2,475.00 $2,558.33
10 2019Q1 1 100.00 $100,000 $1,000.00 $866.67 --------- ------------ --------------- ---------- ---------- 2 200.00 $347,500 $1,737.50 $1,712.50
New York State Department of Transportation 12:28 Tuesday, June 18, 2019 8
US Customary Contracts Let April 1, 2017 to March 31, 2019
WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER
SPEC CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM YEAR REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ ---- -------- -------- --------- -------- ------- PRICE BIDDERS NATUR DEBR REM UNCONTAM HAUL 30.1 - 45MI / TON ------- --------
202.25001363 08 02 2019Q1 1 4,500.00 $544,500 $121.00 $158.67
10 2019Q1 1 3,600.00 $720,000 $200.00 $183.33 --------- ------------ --------------- ---------- ---------- 2 8,100.00 $1,264,500 $156.11 $169.63 ---------------------------------------------------------------------------------------------------------------------------------- HOUSEHLD MANMD DEBR REM HAUL WITHIN 15MI / TON
202.25002163 08 02 2019Q1 1 10.00 $1,500 $150.00 $1,316.67
10 2019Q1 1 10.00 $3,000 $300.00 $350.00 --------- ------------ --------------- ---------- ---------- 2 20.00 $4,500 $225.00 $833.33 ---------------------------------------------------------------------------------------------------------------------------------- HOUSEHLD MANMD DEBR REM HAUL 15.1 - 30MI / TON
202.25002263 08 02 2019Q1 1 10.00 $1,600 $160.00 $1,330.00
10 2019Q1 1 10.00 $4,000 $400.00 $416.67 --------- ------------ --------------- ---------- ---------- 2 20.00 $5,600 $280.00 $873.33 ---------------------------------------------------------------------------------------------------------------------------------- HOUSEHLD MANMD DEBR REM HAUL 30.1 - 45MI / TON
202.25002363 08 02 2019Q1 1 10.00 $1,700 $170.00 $1,350.00
10 2019Q1 1 10.00 $5,000 $500.00 $500.00 --------- ------------ --------------- ---------- ---------- 2 20.00 $6,700 $335.00 $925.00 ---------------------------------------------------------------------------------------------------------------------------------- Debris Removal Form Bodies of Water / TON
202.29000110 08 02 2019Q1 1 100.00 $247,500 $2,475.00 $2,558.33
10 2019Q1 1 100.00 $100,000 $1,000.00 $866.67 --------- ------------ --------------- ---------- ---------- 2 200.00 $347,500 $1,737.50 $1,712.50 ----------------------------------------------------------------------------------------------------------------------------------
New York State Department of Transportation 12:28 Tuesday, June 18, 2019 9
US Customary Contracts Let April 1, 2017 to March 31, 2019
WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER
SPEC CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM YEAR REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ ---- -------- -------- --------- -------- ------- PRICE BIDDERS IMPERVIOUS EMBANKMENT IN-PLACE / CY ------- --------
203.01990006 08 07 2019Q1 1 180.00 $6,876 $38.20 $54.64
08 2017Q2 1 81.00 $4,050 $50.00 $90.00 --------- ------------ --------------- ---------- ---------- 2 261.00 $10,926 $41.86 $65.61 ---------------------------------------------------------------------------------------------------------------------------------- IMPERVIOUS EMBKT IN PLC (SOIL-BENTNT MX) / CY
203.01990108 08 06 2018Q4 1 65.00 $14,950 $230.00 $201.33
09 2017Q2 1 52.00 $7,800 $150.00 $441.67 2018Q1 2 27.00 $10,110 $374.44 $281.48 --------- ------------ --------------- ---------- ---------- 4 144.00 $32,860 $228.19 $303.15 ---------------------------------------------------------------------------------------------------------------------------------- UNCLASSIFIED EXCAVATION AND DISPOSAL / CY
203.02 08 01 2017Q2 6 21,219.00 $458,214 $21.59 $28.63 2017Q3 1 1,840.00 $36,800 $20.00 $20.80 2018Q1 3 7,334.00 $299,992 $40.90 $46.59 2018Q2 3 26,215.00 $458,863 $17.50 $22.56 2018Q3 4 61,218.00 $1,270,289 $20.75 $85.20 2018Q4 4 14,342.00 $352,852 $24.60 $28.02
02 2017Q2 2 380.00 $29,642 $78.01 $94.34 2017Q3 2 615.00 $45,347 $73.73 $68.77 2017Q4 3 10,534.00 $193,675 $18.39 $18.70 2018Q1 9 52,217.00 $1,172,179 $22.45 $22.97 2018Q3 1 388.00 $36,860 $95.00 $57.77 2018Q4 1 6,000.00 $94,500 $15.75 $22.92 2019Q1 7 16,754.00 $363,611 $21.70 $24.11
03 2017Q2 1 339.00 $50,850 $150.00 $117.50 2017Q3 3 130,368.00 $1,103,786 $8.47 $8.07 2017Q4 2 1,471.00 $33,895 $23.04 $27.41 2018Q1 6 6,174.00 $265,746 $43.04 $37.58
New York State Department of Transportation 12:28 Tuesday, June 18, 2019 9
US Customary Contracts Let April 1, 2017 to March 31, 2019
WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER
SPEC CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM YEAR REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ ---- -------- -------- --------- -------- ------- PRICE BIDDERS IMPERVIOUS EMBANKMENT IN-PLACE / CY ------- --------
203.01990006 08 07 2019Q1 1 180.00 $6,876 $38.20 $54.64
08 2017Q2 1 81.00 $4,050 $50.00 $90.00 --------- ------------ --------------- ---------- ---------- 2 261.00 $10,926 $41.86 $65.61 ---------------------------------------------------------------------------------------------------------------------------------- IMPERVIOUS EMBKT IN PLC (SOIL-BENTNT MX) / CY
203.01990108 08 06 2018Q4 1 65.00 $14,950 $230.00 $201.33
09 2017Q2 1 52.00 $7,800 $150.00 $441.67 2018Q1 2 27.00 $10,110 $374.44 $281.48 --------- ------------ --------------- ---------- ---------- 4 144.00 $32,860 $228.19 $303.15 ---------------------------------------------------------------------------------------------------------------------------------- UNCLASSIFIED EXCAVATION AND DISPOSAL / CY
203.02 08 01 2017Q2 6 21,219.00 $458,214 $21.59 $28.63 2017Q3 1 1,840.00 $36,800 $20.00 $20.80 2018Q1 3 7,334.00 $299,992 $40.90 $46.59 2018Q2 3 26,215.00 $458,863 $17.50 $22.56 2018Q3 4 61,218.00 $1,270,289 $20.75 $85.20 2018Q4 4 14,342.00 $352,852 $24.60 $28.02
02 2017Q2 2 380.00 $29,642 $78.01 $94.34 2017Q3 2 615.00 $45,347 $73.73 $68.77 2017Q4 3 10,534.00 $193,675 $18.39 $18.70 2018Q1 9 52,217.00 $1,172,179 $22.45 $22.97 2018Q3 1 388.00 $36,860 $95.00 $57.77 2018Q4 1 6,000.00 $94,500 $15.75 $22.92 2019Q1 7 16,754.00 $363,611 $21.70 $24.11
03 2017Q2 1 339.00 $50,850 $150.00 $117.50 2017Q3 3 130,368.00 $1,103,786 $8.47 $8.07 2017Q4 2 1,471.00 $33,895 $23.04 $27.41 2018Q1 6 6,174.00 $265,746 $43.04 $37.58
(item continued)
New York State Department of Transportation 12:28 Tuesday, June 18, 2019 10
US Customary Contracts Let April 1, 2017 to March 31, 2019
WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER
SPEC CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM YEAR REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ ---- -------- -------- --------- -------- ------- PRICE BIDDERS UNCLASSIFIED EXCAVATION AND DISPOSAL / CY ------- --------
203.02 08 03 2018Q2 2 2,983.00 $83,603 $28.03 $37.51 2018Q3 1 18,391.00 $211,497 $11.50 $16.63 2018Q4 1 340.00 $13,600 $40.00 $56.33 2019Q1 3 4,413.00 $106,423 $24.12 $26.51
04 2017Q2 2 85,135.00 $873,450 $10.26 $18.47 2017Q3 2 631.00 $46,212 $73.24 $153.09 2017Q4 4 1,827.00 $32,470 $17.77 $18.67 2018Q1 1 299.00 $22,126 $74.00 $64.30 2018Q2 3 2,058.00 $102,141 $49.63 $76.88 2018Q3 1 11,470.00 $401,450 $35.00 $32.02 2018Q4 5 4,239.00 $174,815 $41.24 $46.46 2019Q1 3 3,092.00 $83,055 $26.86 $26.18
05 2017Q2 4 12,303.00 $161,719 $13.14 $16.94 2017Q3 2 7,181.00 $94,004 $13.09 $40.00 2017Q4 3 3,874.00 $218,029 $56.28 $49.24 2018Q1 7 3,860.00 $106,355 $27.55 $27.72 2018Q2 3 162.00 $12,150 $75.00 $77.09 2018Q3 4 32,335.00 $1,169,222 $36.16 $47.20 2018Q4 4 8,054.00 $176,605 $21.93 $22.81 2019Q1 9 45,864.00 $494,740 $10.79 $15.49
06 2017Q2 1 86.00 $4,300 $50.00 $36.30 2017Q3 3 581.00 $18,309 $31.51 $37.11 2017Q4 2 898.00 $18,171 $20.24 $20.68 2018Q1 4 3,793.00 $162,042 $42.72 $47.18 2018Q2 2 368.00 $14,080 $38.26 $39.42 2018Q4 3 18,317.00 $166,567 $9.09 $14.26 2019Q1 3 422.00 $10,750 $25.47 $36.34
07 2017Q2 1 120.00 $10,362 $86.35 $140.43 2017Q4 2 33,629.00 $226,207 $6.73 $8.86 2018Q1 4 29,262.00 $246,329 $8.42 $10.86 2018Q2 2 4,394.00 $84,135 $19.15 $17.44 2018Q3 1 4.00 $2,960 $740.00 $570.00
New York State Department of Transportation 12:28 Tuesday, June 18, 2019 10
US Customary Contracts Let April 1, 2017 to March 31, 2019
WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER
SPEC CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM YEAR REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ ---- -------- -------- --------- -------- ------- PRICE BIDDERS UNCLASSIFIED EXCAVATION AND DISPOSAL / CY ------- --------
203.02 08 03 2018Q2 2 2,983.00 $83,603 $28.03 $37.51 2018Q3 1 18,391.00 $211,497 $11.50 $16.63 2018Q4 1 340.00 $13,600 $40.00 $56.33 2019Q1 3 4,413.00 $106,423 $24.12 $26.51
04 2017Q2 2 85,135.00 $873,450 $10.26 $18.47 2017Q3 2 631.00 $46,212 $73.24 $153.09 2017Q4 4 1,827.00 $32,470 $17.77 $18.67 2018Q1 1 299.00 $22,126 $74.00 $64.30 2018Q2 3 2,058.00 $102,141 $49.63 $76.88 2018Q3 1 11,470.00 $401,450 $35.00 $32.02 2018Q4 5 4,239.00 $174,815 $41.24 $46.46 2019Q1 3 3,092.00 $83,055 $26.86 $26.18
05 2017Q2 4 12,303.00 $161,719 $13.14 $16.94 2017Q3 2 7,181.00 $94,004 $13.09 $40.00 2017Q4 3 3,874.00 $218,029 $56.28 $49.24 2018Q1 7 3,860.00 $106,355 $27.55 $27.72 2018Q2 3 162.00 $12,150 $75.00 $77.09 2018Q3 4 32,335.00 $1,169,222 $36.16 $47.20 2018Q4 4 8,054.00 $176,605 $21.93 $22.81 2019Q1 9 45,864.00 $494,740 $10.79 $15.49
06 2017Q2 1 86.00 $4,300 $50.00 $36.30 2017Q3 3 581.00 $18,309 $31.51 $37.11 2017Q4 2 898.00 $18,171 $20.24 $20.68 2018Q1 4 3,793.00 $162,042 $42.72 $47.18 2018Q2 2 368.00 $14,080 $38.26 $39.42 2018Q4 3 18,317.00 $166,567 $9.09 $14.26 2019Q1 3 422.00 $10,750 $25.47 $36.34
07 2017Q2 1 120.00 $10,362 $86.35 $140.43 2017Q4 2 33,629.00 $226,207 $6.73 $8.86 2018Q1 4 29,262.00 $246,329 $8.42 $10.86 2018Q2 2 4,394.00 $84,135 $19.15 $17.44 2018Q3 1 4.00 $2,960 $740.00 $570.00
(item continued)
New York State Department of Transportation 12:28 Tuesday, June 18, 2019 11
US Customary Contracts Let April 1, 2017 to March 31, 2019
WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER
SPEC CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM YEAR REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ ---- -------- -------- --------- -------- ------- PRICE BIDDERS UNCLASSIFIED EXCAVATION AND DISPOSAL / CY ------- --------
203.02 08 07 2019Q1 2 30,098.00 $270,248 $8.98 $10.55
08 2017Q2 5 40,901.00 $1,206,780 $29.50 $36.52 2017Q3 5 5,237.00 $619,303 $118.26 $106.85 2017Q4 4 8,043.00 $349,978 $43.51 $51.65 2018Q1 7 38,959.00 $2,331,479 $59.84 $82.60 2018Q2 7 38,165.00 $1,203,950 $31.55 $39.00 2018Q3 5 450.00 $85,267 $189.48 $207.02 2018Q4 2 2,435.00 $204,160 $83.84 $126.17 2019Q1 3 7,336.00 $164,091 $22.37 $23.99
09 2017Q2 3 201.00 $8,764 $43.60 $61.54 2017Q3 3 5,298.00 $145,377 $27.44 $25.97 2017Q4 2 5,548.00 $123,891 $22.33 $44.34 2018Q1 6 13,339.00 $235,495 $17.65 $14.82 2018Q2 3 2,428.00 $40,469 $16.67 $18.00 2018Q3 2 1,210.00 $22,748 $18.80 $34.15 2019Q1 5 9,355.00 $265,250 $28.35 $29.71
10 2017Q2 2 367.00 $23,895 $65.11 $41.56 2017Q3 6 31,636.00 $1,227,450 $38.80 $35.80 2017Q4 2 1,544.00 $68,681 $44.48 $95.00 2018Q1 3 19,140.00 $1,346,860 $70.37 $63.85 2018Q2 6 92,987.00 $2,390,120 $25.70 $33.12 2018Q3 6 2,590.00 $221,510 $85.53 $98.28 2018Q4 1 1,320.00 $303,600 $230.00 $200.00 2019Q1 2 516.00 $96,972 $187.93 $195.16
11 2017Q2 1 21,803.00 $1,090,150 $50.00 $91.67 2017Q3 3 3,986.00 $203,200 $50.98 $127.12 2017Q4 2 2,076.00 $260,804 $125.63 $168.16 2018Q1 4 7,379.00 $477,235 $64.67 $67.74 2018Q3 6 26,932.00 $1,762,270 $65.43 $105.05 2018Q4 4 1,596.00 $741,152 $464.38 $322.98 2019Q1 1 44,348.00 $4,434,800 $100.00 $103.33 --------- ------------ --------------- ---------- ---------- 263 1,165,016.00 $33,740,925 $28.96 $38.33
New York State Department of Transportation 12:28 Tuesday, June 18, 2019 11
US Customary Contracts Let April 1, 2017 to March 31, 2019
WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER
SPEC CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM YEAR REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ ---- -------- -------- --------- -------- ------- PRICE BIDDERS UNCLASSIFIED EXCAVATION AND DISPOSAL / CY ------- --------
203.02 08 07 2019Q1 2 30,098.00 $270,248 $8.98 $10.55
08 2017Q2 5 40,901.00 $1,206,780 $29.50 $36.52 2017Q3 5 5,237.00 $619,303 $118.26 $106.85 2017Q4 4 8,043.00 $349,978 $43.51 $51.65 2018Q1 7 38,959.00 $2,331,479 $59.84 $82.60 2018Q2 7 38,165.00 $1,203,950 $31.55 $39.00 2018Q3 5 450.00 $85,267 $189.48 $207.02 2018Q4 2 2,435.00 $204,160 $83.84 $126.17 2019Q1 3 7,336.00 $164,091 $22.37 $23.99
09 2017Q2 3 201.00 $8,764 $43.60 $61.54 2017Q3 3 5,298.00 $145,377 $27.44 $25.97 2017Q4 2 5,548.00 $123,891 $22.33 $44.34 2018Q1 6 13,339.00 $235,495 $17.65 $14.82 2018Q2 3 2,428.00 $40,469 $16.67 $18.00 2018Q3 2 1,210.00 $22,748 $18.80 $34.15 2019Q1 5 9,355.00 $265,250 $28.35 $29.71
10 2017Q2 2 367.00 $23,895 $65.11 $41.56 2017Q3 6 31,636.00 $1,227,450 $38.80 $35.80 2017Q4 2 1,544.00 $68,681 $44.48 $95.00 2018Q1 3 19,140.00 $1,346,860 $70.37 $63.85 2018Q2 6 92,987.00 $2,390,120 $25.70 $33.12 2018Q3 6 2,590.00 $221,510 $85.53 $98.28 2018Q4 1 1,320.00 $303,600 $230.00 $200.00 2019Q1 2 516.00 $96,972 $187.93 $195.16
11 2017Q2 1 21,803.00 $1,090,150 $50.00 $91.67 2017Q3 3 3,986.00 $203,200 $50.98 $127.12 2017Q4 2 2,076.00 $260,804 $125.63 $168.16 2018Q1 4 7,379.00 $477,235 $64.67 $67.74 2018Q3 6 26,932.00 $1,762,270 $65.43 $105.05 2018Q4 4 1,596.00 $741,152 $464.38 $322.98 2019Q1 1 44,348.00 $4,434,800 $100.00 $103.33 --------- ------------ --------------- ---------- ---------- 263 1,165,016.00 $33,740,925 $28.96 $38.33 ----------------------------------------------------------------------------------------------------------------------------------
New York State Department of Transportation 12:28 Tuesday, June 18, 2019 12
US Customary Contracts Let April 1, 2017 to March 31, 2019
WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER
SPEC CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM YEAR REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ ---- -------- -------- --------- -------- ------- PRICE BIDDERS UNCLAS EXCAV AND DISPEM/STBY S R 1 / CY ------- --------
203.02010063 08 07 2017Q2 1 1.00 $90 $90.00 $95.00 --------- ------------ --------------- ---------- ---------- 1 1.00 $90 $90.00 $95.00 ---------------------------------------------------------------------------------------------------------------------------------- UNCLAS EXCAV AND DISP DMD/RESP S R 1 / CY
203.02010064 08 01 2018Q3 1 50.00 $2,750 $55.00 $55.00 --------- ------------ --------------- ---------- ---------- 1 50.00 $2,750 $55.00 $55.00 ---------------------------------------------------------------------------------------------------------------------------------- UNCLAS EXCAV AND DISPEM/STBY S R 2 / CY
203.02020063 08 07 2017Q2 1 101.00 $3,232 $32.00 $36.00 --------- ------------ --------------- ---------- ---------- 1 101.00 $3,232 $32.00 $36.00 ---------------------------------------------------------------------------------------------------------------------------------- UNCLAS EXCAV AND DISP DMD/RESP S R 2 / CY
203.02020064 08 01 2018Q3 1 375.00 $15,000 $40.00 $40.00 --------- ------------ --------------- ---------- ---------- 1 375.00 $15,000 $40.00 $40.00 ---------------------------------------------------------------------------------------------------------------------------------- UNCLAS EXCAV AND DISPEM/STBY S R 3 / CY
203.02030063 08 07 2017Q2 1 656.00 $11,808 $18.00 $19.00 --------- ------------ --------------- ---------- ---------- 1 656.00 $11,808 $18.00 $19.00 ---------------------------------------------------------------------------------------------------------------------------------- UNCLAS EXCAV AND DISP DMD/RESP S R 3 / CY
203.02030064 08 01 2018Q3 1 651.00 $16,275 $25.00 $25.00 --------- ------------ --------------- ---------- ---------- 1 651.00 $16,275 $25.00 $25.00
New York State Department of Transportation 12:28 Tuesday, June 18, 2019 12
US Customary Contracts Let April 1, 2017 to March 31, 2019
WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER
SPEC CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM YEAR REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ ---- -------- -------- --------- -------- ------- PRICE BIDDERS UNCLAS EXCAV AND DISPEM/STBY S R 1 / CY ------- --------
203.02010063 08 07 2017Q2 1 1.00 $90 $90.00 $95.00 --------- ------------ --------------- ---------- ---------- 1 1.00 $90 $90.00 $95.00 ---------------------------------------------------------------------------------------------------------------------------------- UNCLAS EXCAV AND DISP DMD/RESP S R 1 / CY
203.02010064 08 01 2018Q3 1 50.00 $2,750 $55.00 $55.00 --------- ------------ --------------- ---------- ---------- 1 50.00 $2,750 $55.00 $55.00 ---------------------------------------------------------------------------------------------------------------------------------- UNCLAS EXCAV AND DISPEM/STBY S R 2 / CY
203.02020063 08 07 2017Q2 1 101.00 $3,232 $32.00 $36.00 --------- ------------ --------------- ---------- ---------- 1 101.00 $3,232 $32.00 $36.00 ---------------------------------------------------------------------------------------------------------------------------------- UNCLAS EXCAV AND DISP DMD/RESP S R 2 / CY
203.02020064 08 01 2018Q3 1 375.00 $15,000 $40.00 $40.00 --------- ------------ --------------- ---------- ---------- 1 375.00 $15,000 $40.00 $40.00 ---------------------------------------------------------------------------------------------------------------------------------- UNCLAS EXCAV AND DISPEM/STBY S R 3 / CY
203.02030063 08 07 2017Q2 1 656.00 $11,808 $18.00 $19.00 --------- ------------ --------------- ---------- ---------- 1 656.00 $11,808 $18.00 $19.00 ---------------------------------------------------------------------------------------------------------------------------------- UNCLAS EXCAV AND DISP DMD/RESP S R 3 / CY
203.02030064 08 01 2018Q3 1 651.00 $16,275 $25.00 $25.00 --------- ------------ --------------- ---------- ---------- 1 651.00 $16,275 $25.00 $25.00 ----------------------------------------------------------------------------------------------------------------------------------
New York State Department of Transportation 12:28 Tuesday, June 18, 2019 13
US Customary Contracts Let April 1, 2017 to March 31, 2019
WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER
SPEC CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM YEAR REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ ---- -------- -------- --------- -------- ------- PRICE BIDDERS ICE DRILL AND BLASTING, EM/STBY R 1 / CRWD ------- --------
203.02950163 08 07 2017Q2 1 1.00 $3,000 $3,000.00 $4,000.00 --------- ------------ --------------- ---------- ---------- 1 1.00 $3,000 $3,000.00 $4,000.00 ---------------------------------------------------------------------------------------------------------------------------------- ICE DRILL AND BLASTING, EM/STBY R 2 / CRWD
203.02950263 08 07 2017Q2 1 3.00 $7,500 $2,500.00 $3,250.00 --------- ------------ --------------- ---------- ---------- 1 3.00 $7,500 $2,500.00 $3,250.00 ---------------------------------------------------------------------------------------------------------------------------------- EXPLOSIVES, EM/STBY R 1 (0 TO 50) / LB
203.02960163 08 07 2017Q2 1 2.00 $400 $200.00 $200.00 --------- ------------ --------------- ---------- ---------- 1 2.00 $400 $200.00 $200.00 ---------------------------------------------------------------------------------------------------------------------------------- EXPLOSIVES, EM/STBY R 2 (51 TO 150) / LB
203.02960263 08 07 2017Q2 1 51.00 $1,020 $20.00 $20.00 --------- ------------ --------------- ---------- ---------- 1 51.00 $1,020 $20.00 $20.00 ---------------------------------------------------------------------------------------------------------------------------------- EXPLOSIVES, EM/STBY R 3 (151 TO 300) / LB
203.02960363 08 07 2017Q2 1 151.00 $151 $1.00 $3.00 --------- ------------ --------------- ---------- ---------- 1 151.00 $151 $1.00 $3.00 ---------------------------------------------------------------------------------------------------------------------------------- PAVEMENT EXCAVATION / SF
203.02990006 08 10 2017Q3 2 28,630.00 $121,215 $4.23 $6.65
11 2018Q3 1 262,517.00 $3,347,092 $12.75 $12.75 --------- ------------ --------------- ---------- ---------- 3 291,147.00 $3,468,307 $11.91 $12.15
New York State Department of Transportation 12:28 Tuesday, June 18, 2019 13
US Customary Contracts Let April 1, 2017 to March 31, 2019
WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER
SPEC CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM YEAR REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ ---- -------- -------- --------- -------- ------- PRICE BIDDERS ICE DRILL AND BLASTING, EM/STBY R 1 / CRWD ------- --------
203.02950163 08 07 2017Q2 1 1.00 $3,000 $3,000.00 $4,000.00 --------- ------------ --------------- ---------- ---------- 1 1.00 $3,000 $3,000.00 $4,000.00 ---------------------------------------------------------------------------------------------------------------------------------- ICE DRILL AND BLASTING, EM/STBY R 2 / CRWD
203.02950263 08 07 2017Q2 1 3.00 $7,500 $2,500.00 $3,250.00 --------- ------------ --------------- ---------- ---------- 1 3.00 $7,500 $2,500.00 $3,250.00 ---------------------------------------------------------------------------------------------------------------------------------- EXPLOSIVES, EM/STBY R 1 (0 TO 50) / LB
203.02960163 08 07 2017Q2 1 2.00 $400 $200.00 $200.00 --------- ------------ --------------- ---------- ---------- 1 2.00 $400 $200.00 $200.00 ---------------------------------------------------------------------------------------------------------------------------------- EXPLOSIVES, EM/STBY R 2 (51 TO 150) / LB
203.02960263 08 07 2017Q2 1 51.00 $1,020 $20.00 $20.00 --------- ------------ --------------- ---------- ---------- 1 51.00 $1,020 $20.00 $20.00 ---------------------------------------------------------------------------------------------------------------------------------- EXPLOSIVES, EM/STBY R 3 (151 TO 300) / LB
203.02960363 08 07 2017Q2 1 151.00 $151 $1.00 $3.00 --------- ------------ --------------- ---------- ---------- 1 151.00 $151 $1.00 $3.00 ---------------------------------------------------------------------------------------------------------------------------------- PAVEMENT EXCAVATION / SF
203.02990006 08 10 2017Q3 2 28,630.00 $121,215 $4.23 $6.65
11 2018Q3 1 262,517.00 $3,347,092 $12.75 $12.75 --------- ------------ --------------- ---------- ---------- 3 291,147.00 $3,468,307 $11.91 $12.15 ----------------------------------------------------------------------------------------------------------------------------------
New York State Department of Transportation 12:28 Tuesday, June 18, 2019 14
US Customary Contracts Let April 1, 2017 to March 31, 2019
WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER
SPEC CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM YEAR REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ ---- -------- -------- --------- -------- ------- PRICE BIDDERS EMBANKMENT IN PLACE / CY ------- --------
203.03 08 01 2017Q2 5 6,698.00 $79,637 $11.89 $23.64 2017Q3 1 4,400.00 $22,000 $5.00 $12.08 2017Q4 1 266.00 $1,197 $4.50 $31.50 2018Q1 3 1,685.00 $52,140 $30.94 $64.64 2018Q2 3 20,841.00 $265,730 $12.75 $11.96 2018Q3 1 143,656.00 $1,336,001 $9.30 $9.30 2018Q4 3 4,262.00 $73,258 $17.19 $21.96 2019Q1 1 23.00 $1,265 $55.00 $77.50
02 2017Q2 1 3.00 $240 $80.00 $123.00 2017Q3 2 134.00 $6,553 $48.90 $60.19 2017Q4 3 1,760.00 $17,238 $9.79 $14.67 2018Q1 7 15,208.00 $312,495 $20.55 $24.06 2018Q3 1 88.00 $5,456 $62.00 $24.00 2018Q4 1 4,550.00 $34,125 $7.50 $13.00 2019Q1 4 43,958.00 $886,420 $20.17 $20.29
03 2017Q3 2 139,491.00 $2,009,894 $14.41 $16.47 2017Q4 2 181.00 $12,337 $68.16 $42.77 2018Q1 4 3,255.00 $76,005 $23.35 $25.69 2018Q2 3 1,043.00 $18,429 $17.67 $21.57 2018Q3 2 1,114.00 $17,170 $15.41 $11.43 2019Q1 3 1,100.00 $22,537 $20.49 $25.47
04 2017Q2 2 184,207.00 $1,024,926 $5.56 $16.37 2017Q4 4 3,908.00 $109,835 $28.11 $28.38 2018Q1 1 12.00 $2,292 $191.00 $149.46 2018Q2 2 126.00 $3,500 $27.78 $24.71 2018Q3 1 188.00 $3,760 $20.00 $23.67 2018Q4 4 846.00 $47,305 $55.92 $49.24 2019Q1 1 1,033.00 $13,429 $13.00 $28.92
05 2017Q2 4 8,773.00 $146,837 $16.74 $20.38 2017Q3 1 724.00 $18,100 $25.00 $31.50 2017Q4 4 5,810.00 $10,668 $1.84 $4.76 2018Q1 4 2,332.00 $43,468 $18.64 $19.04
New York State Department of Transportation 12:28 Tuesday, June 18, 2019 14
US Customary Contracts Let April 1, 2017 to March 31, 2019
WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER
SPEC CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM YEAR REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ ---- -------- -------- --------- -------- ------- PRICE BIDDERS EMBANKMENT IN PLACE / CY