new zealand guidelines for assessing & managing asbestos ... · • finish final manuscript: 21...
TRANSCRIPT
New Zealand Guidelines for Assessing & Managing Asbestos in Soil
Our plan has changed (slightly)…
Booklet??Industry Home, Property & Business Owners
Co-branding and co-authorship
Preliminary Site Investigation
Will DSI generate >0.01f/mL in air?
Detailed Site Investigation
Tier 1 (WA Guideline) or
Tier 2 (NEPM) Risk Assessment
Remedial Options Assessment
Remedial Action Plan / Site Validation Plan
Class B Asbestos Work
>10m2 or 10 tonnes of Non-
Friable Asbestos or ACM in
Soil Removed or Managed
Class A Asbestos Work
Friable Asbestos in Soil
Removed or Managed
Unlicensed Asbestos Work
≤ WA Tier 1 for ACM, AF/FA
<10m2 or 10 tonnes of Non-
Friable Asbestos or ACM in
Soil Removed or Managed
Asbestos Removal / Management Control Plan
Air Monitoring and Clearance Inspection
Decontamination (equipment, plan, personnel) / PPE / Off-Site Soil or Waste DisposalSliding scale depending on risk
Site Validation ReportSoil testing, monitoring results, disposal records, Clearance Certificate.
Feeds into the Long Term Site Plan
SQEP
SQEP
Licensed Asbestos Removalist
SQEP
SQEP
Council (TLA and/or RC)
SQEP
SQEP
SQEP
Council (TLA and/or RC)
Licensed Asbestos Removalist
Independent Assessor
Licensed Asbestos Removalist
Asbestos-Related Work
YES: Sampling and Identification is
Asbestos-Related WorkAdditional Control by Licensed Asbestos
Removalist & Independent Assessor
Initial
CSM
Update
CSM
Update
CSM
Final
SM
PLANNING OF REMEDIATION, REUSE & MITIGATION WORK
NEW ZEALAND GUIDELINES FOR ASSESSING & MANAGING ASBESTOS IN SOIL ROLES
NES
National Environmental
Standard for Assessing and
Managing Contaminants in
Soil to Protect Human
Health
&
CLMG
Contaminated Land
Management Guidelines
HSWA
Health & Safety At Work
(Asbestos) Regulations
2016
&
ACOP
Approved Code of Practice:
Management and Removal
of Asbestos
LEGISLATION
CLMG 1
HSWA 10
CLMG 1 & 5
CLMG 2
CLMG 1
CLMG 1
HSWA 41
CLMG 1
HSWA 13
CLMG 1
HSWA 27 & 28
HSWA 32
HSWA 39, 40, 52 & 53
HSWA 41, 43 & 51
Resource and/or Land Use Consent for Proposed Works
SITE INVESTIGATION
DO THE PLANNED WORK
Asbestos Management Plan
OFF-SITE
REMOVALON-SITE REUSE
Does the PSI suggest asbestos is or
may be present?No Further Action
Does the DSI show asbestos is
present?No Further Action
Changing Land Use Trigger Soil Disturbance Trigger Workplace Trigger Observational Trigger
SQEP
NO
NO
NO
YESYES
YES
WORKSHOP FEEDBACK:
- Flow Chart
- Process reflects Contaminated Land processes
- Lab testing
- Non-PCBU work
- Training
- Tier 1 Health Risk Asbestos in Soil Triggers
- Tier 2 Health Risk Assessment Process
- Remediation Decontamination
- Class A, Class B, Permitted Activity / Unlicensed
- Control Plan
- PSI / DSI Process
- Long Term Site Management Plan
- Off-site Disposal
- Legislative Review
Next Steps & Timeline:
• Finish final manuscript: 21 Oct 2016 ☺
• Editing: Oct 2016
• Final peer-review: Oct/Nov 2016
• Graphics & Proofing: Nov 2016
• Booklet: Oct/Nov 2016
• Printing & Publication: Dec 2016
• Formal Release: Mar 2017
Thank You