March 15, 2015

NEWARK UNITED METHODIST CHURCH Renewing Our Foundation (ROF)

CHURCH CONFERENCE- Phase A ( 2016)-Preliminary Project Approval

3/15/15 1

Page 2: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark

Renewing Our Foundation

  By the grace God has given me, I laid a foundation as an expert builder, and someone else is building on it. But each one should be careful how he builds. For no one can lay any foundation other than the one already laid, which is Jesus Christ.

1 Corinthians 3: 10-11 NIV 3/15/15 2

Page 3: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark

Today’s Topics •  Recap of ROF Project Accomplishments

•  Status of ROF Finances/Pledge Campaign

•  Plans for ROF Phase A (2015)

•  ROF Building Committee’s Phase A (2016) Project recommendation:

•  Scope & cost •  Financing plan

•  Congregational preliminary approval for Phase A (2016)

3/15/15 3

Page 4: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark

ROF PURPOSE

•  Maintain and extend the life of our historic building and its component systems

•  Reconfigure and renovate the building facility to better serve and support the church's ministries and programs

3/15/15 4

Page 5: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark

ROF Phase A Project BUILDING COMMITTEE

•  CHAIR Pete Schmalz •  FINANCE/CO-CHAIR Butch Read

•  PLEDGE CAMPAIGN Deede Cataldi •  STAFF/EDUCATION Rob Cappiello

•  ENGR/DESIGN Jim Mylin

•  ENGR/CONSTRUCTION Jerry Swalley •  SONSPIRIT/IT Sam Chamberlain

•  COMMUNICATIONS Donna Hitchner •  AT-LARGE Eric Hottenstein

•  PRESCHOOL Cathy Drew •  EX-OFFICIO David Palmer

3/15/15 5

Page 6: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark

ROF Phase A Project ARCHITECTS

•  DALEY + JALBOOT Architects LLP Philadelphia, PA

•  Tom Daley •  Chris Greene

3/15/15 6

Page 7: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark

ROF GOALS

•  Improve Building Systems (e.g. Heating, A/C, Electrical,

Roof)

•  Improve Security & Entries Into Building

•  Improve Navigation/ Building Wayfinding

•  Maximize Utilization Of Spaces

•  Improve Lavatories – Make Handicap Accessible

•  Integrate Sustainable Design / Systems

•  Reconfigure & Expand Administrative Offices

•  Respect Historic Character Of Building

•  Improve Utilization Of Exterior Space

•  Address Parking Deficiencies/Limited Handicap Spaces 3/15/15 7

Page 8: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark

ROF Accomplishments

• 2013 •  Gas-fired steam boiler & piping/radiator replacement (Building front section) & controls •  Handicap-accessible (HC) Cokesbury Lobby lavatory renovations •  Serving kitchen near Heritage Hall •  Main Street/Chapel/Wesley Lobby HC door replacement •  Upgrades to Christian Education office •  Existing elevator controls upgrade •  Fire alarm replacement

•  2014 •  Gas-fired hot water boiler replacement (Ed. Wing) •  Educational Wing flat roof replacement

3/15/15 8

Page 9: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark

ROF Funding Status •  Costs to Date

•  Pre-project $ 171,000 (D&J Master Plan, Walsh Capital Campaign)

•  2013 Project (incl. design) $ 982,000 •  2014 Project (incl. design) $ 153,000

Total $1,306,000 •  Funding

•  Pre-Campaign Contributions $ 46,000 •  Campaign Contrib. (through Feb ‘15) $ 1,035,000

•  Pledged- $1,004,000 •  Non-pledged- $ 31,000

•  2015 Campaign Contrib. (projected) $ 195,000 •  DE Energy Grant $ 29,000

Total $1,305,000

3/15/15 9

Page 10: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark

ROF Cash Status (2013 & 2014 Projects)

•  Assets

•  Cash on Hand $ 229,000 •  Projected Pledge Contributions* $ 195,000 •  DE Energy Grant $ 29,000

•  Total $ 453,000

•  Liabilities •  Remaining Project Expenses $ 5,000 •  M&T Bridge Loan $ 25,000 •  Congregational Notes $ 425,000

•  Total $ 455,000

* When received, Contributions as % of Pledges = 97%

3/15/15 10

Page 11: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark

ROF GOALS ADDRESSED TO DATE

•  Improve Building Systems (e.g. Heating, A/C, Electrical,

Roof)

•  Improve Security & Entries Into Building

•  Improve Navigation/ Building Wayfinding

•  Maximize Utilization Of Spaces

•  Improve Lavatories – Make Handicap Accessible

•  Integrate Sustainable Design / Systems

•  Reconfigure & Expand Administrative Offices

•  Respect Historic Character Of Building

•  Improve Utilization Of Exterior Space

•  Address Parking Deficiencies/Limited Handicap Spaces 3/15/15 11

Page 12: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark

ROF Phase A (2015) Project

Scope: Photovoltaic (PV) Solar Installation

on Education Wing Flat Roof

3/15/15 12

Page 13: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark

4/17/2014 CHURCH CONFERENCE

RESOLUTION DISCUSSION: •  Discussion ensued on the motion as presented and questions of whether the economic analysis of the solar installation had fully considered:

•  the full cost of ownership, including maintenance and replacement costs, and •  a “lease vs. buy” option

•  An amendment to the resolution was offered and passed by the church conference attendees.

3/15/15 13

Page 14: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark

Renewing Our Foundation- Resolution #5 (Amended)

Newark United Methodist Church

Newark, DE 19711 Church Conference 4/27/14

To better support the mission and ministries of Newark United Methodist Church, the Renewing Our Foundation (ROF) Building Committee moves that the Church

•  approve the Phase A-2 (Summer 2014) design and construction bid estimate as described in the Report to the Church Conference on 4/27/14, and •  authorize the awarding of the construction contracts for the Phase A-2 (Summer 2014) continued renovation of the church building at 69 E. Main Street, and

•  request the ROF Building Committee to evaluate “lease vs. buy” options for the PV solar installation and select the option which has the greatest economic benefit, and •  if a “buy” option is selected, authorize borrowing up to $132,000 of NUMC Endowment Fund principal to finance the installation of the PV solar installation. Each year, for the next 20 years, a payment is to be made to the NUMC Endowment Fund to replace the borrowed principal and provide an investment return. The yearly payment will be funded by the energy rebate, utility savings, and SERC’s monies recovered through the operation of the solar installation in the prior year. 

3/15/15 14

Page 15: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark

Phase A (2015) Project

•  Revisited Question: Is “Lease” vs. “PPA” vs. “Purchase” Preferred?

•  Analysis (w/ Schiller & Hersh & PV installers):

•  Purchase Power Agreement (PPA): •  NUMC system size too small to qualify

•  Lease •  NUMC, as non-profit, does not qualify for incentives to make it economically attractive to bank (leasing costs vs. savings: a “wash”)

•  Purchase •  Yearly maintenance requirements & costs minimal •  PV panels (25 yr warranty) & inverters (10-15 yr warranty) very durable; replacement costs minimal •  Attractive “green” energy reductions and economics

•  “Purchase” continues as preferred option

3/15/15 15

Page 16: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark

Renewing Our Foundation- Resolution #5 (Amended)

Newark United Methodist Church

Newark, DE 19711 Church Conference 4/27/14

To better support the mission and ministries of Newark United Methodist Church, the Renewing Our Foundation (ROF) Building Committee moves that the Church

•  approve the Phase A-2 (Summer 2014) design and construction bid estimate as described in the Report to the Church Conference on 4/27/14, and •  authorize the awarding of the construction contracts for the Phase A-2 (Summer 2014) continued renovation of the church building at 69 E. Main Street, and

•  request the ROF Building Committee to evaluate “lease vs. buy” options for the PV solar installation and select the option which has the greatest economic benefit, and •  if a “buy” option is selected, authorize borrowing up to $132,000 of NUMC Endowment Fund principal to finance the installation of the PV solar installation. Each year, for the next 20 years, a payment is to be made to the NUMC Endowment Fund to replace the borrowed principal and provide an investment return. The yearly payment will be funded by the energy rebate, utility savings, and SERC’s monies recovered through the operation of the solar installation in the prior year. 

3/15/15 16

Page 17: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark

PV Solar Purchase Economics •  Minimum System Description

•  Array Size: (Qty: 100) 250 Watt (W) modules •  Array Rating: 25 kW (Direct Current) •  Initial System Output: 30,760 kWh/yr

•  System Economics •  Fund with NUMC Endowment Principal •  Cost Estimate $ 120,000 •  20 yr Return Estimate

•  Energy Rebate (Yr 6) $ 30,000 •  Utility Savings $ 108,000 •  Solar Renewable Energy Credits (SREC’s) $ 16,000

$ 154,000

•  Simple Net Return on Solar $ 34,000

•  Return w/ Reinvested Yrly Savings (@ 5%) $ 140,000

3/1 5/15 17

Page 18: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark

PV Solar Installation Schedule •  System Performance Specification 3/30/15 •  Request for Bids 4/15/15 •  Receive Bids 5/15/15 •  Evaluate Bids/Award Contract 6/01/15 •  System Design/Permit/Procure 7/15/15 •  System Installation 8/15/15 •  System Commission/Start-up 9/15/15

3/1 5/15 18

Page 19: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark

ROF Phase A (2016) Project

3/15/15 19

Page 20: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark

Phase A (2016) Project Objectives

•  Complete next step in Master Plan (including continuing infrastructure improvements)

•  Extend a more visible and welcoming “open door” to the community from DE Ave.

•  Facilitate easier access to encourage participation to ultimately grow and strengthen the many facets of NUMC’s ministries

3/15/15 20

Page 21: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark

Phase A (2016) Project Scope

• Recommended Major Elements: •  New Delaware Ave. entry lobby

•  Chair lift-handicap accessibility •  Parking upgrades-Delaware Ave. lot & east side handicapped

•  Surface renovation and reconfiguration for additional spaces

•  Heritage Hall upgrades •  Increase flexibility and usability for enhanced SonSpirit and fellowship experiences

•  Sanctuary Lighting improvements •  Improved illumination, “scene” settings, and easier maintenance

3/15/15 21

Page 22: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark
Page 23: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark
Page 24: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark
Page 25: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark

Phase A (2016) Project Scope

• Recommended Major Elements: •  New Delaware Ave. entry lobby

•  Chair lift-handicap accessibility •  Parking upgrades-Delaware Ave. lot & east side handicapped

•  Surface renovation and reconfiguration for additional spaces

•  Heritage Hall upgrades •  Increase flexibility and usability for enhanced SonSpirit and fellowship experiences

•  Sanctuary Lighting improvements •  Improved illumination, “scene” settings, and easier maintenance

3/15/15 25

Page 26: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark
Page 27: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark

Phase A (2016) Project Scope

• Recommended Major Elements: •  New Delaware Ave. entry lobby

•  Chair lift-handicap accessibility •  Parking upgrades-Delaware Ave. lot & east side handicapped

•  Surface renovation and reconfiguration for additional spaces

•  Heritage Hall upgrades •  Increase flexibility and usability for enhanced SonSpirit and fellowship experiences

•  Sanctuary Lighting improvements •  Improved illumination, “scene” settings, and easier maintenance

3/15/15 27

Page 28: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark
Page 29: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark
Page 30: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark
Page 31: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark

Phase A (2016) Project Scope

• Recommended Major Elements: •  New Delaware Ave. entry lobby

•  Chair lift-handicap accessibility •  Parking upgrades-Delaware Ave. lot & east side handicapped

•  Surface renovation and reconfiguration for additional spaces

•  Heritage Hall upgrades •  Increase flexibility and usability for enhanced SonSpirit and fellowship experiences

•  Sanctuary lighting improvements •  Improved illumination, “scene” settings, and easier maintenance

3/15/15 31

Page 32: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark
Page 33: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark

Phase A (2016) Project Funding Plan

•  Cost estimate

•  Lobby Entry $ 479,000 •  Parking Lots $ 168,000 •  Heritage Hall $ 56,000 •  Sanctuary Lighting $ 66,000 •  FF&E & Technology $ 18,000 •  Misc.-Allowance & Escalation $ 50,000 •  Architect & Engineering Fees $ 88,000 •  7% Contingency $ 65,000 Total $ 990,000

3/15/15 33

Page 34: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark

Phase A (2016) Project Funding Plan (cont.)

•  Project Cost Estimate $ 990,000 •  Funding Plan Recommendation Estimate

•  ROF Capital Campaign Extension (2/3 yr) $ 420,000 •  Walsh Associates Support (-$25,000)

•  Loan Financing $ 570,000 •  Considering Options

•  M&T Bank @ ~3 to 4% for 25 yr* •  Member Notes @ > CD rates for 10 yr

•  Total $ 990,000

* ~ $35,000/yr P&I payments from Operating Budget and/or Building/Debt Reduction Fund (Note: last two FY ave. contributions to Bldg Fund Acctà$17K)

3/15/15 34

Page 35: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark

Phase A (2016) Project Schedule

•  Contractor Mobilization

•  May 2016 •  Construction Start

•  June 2016 •  Parking Lot Construction Completion

•  September 2016 •  Building Construction Completion

•  March 2017

3/15/15 35

Page 36: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark

Phase A (2016) Project Approval Steps

DATE 1.  Congregational- Preliminary Approval Today 2.  Dist. Bd. Of Church Loc. & Bldg.- Prelim. Approval Apr. 2015 3.  Building Committee –Detail design/est./financing Dec. 2015 4.  Dist. Bd. Of Church Loc. & Bldg.- Final Approval Jan. 2016 5.  Congregational- Final Approval Jan. 2016

Detailed Design/Const. Bids/Cap. Campaign Results/Loan Plan and Costs

6.  Award Bids/Execute Project Mar. 2016

3/15/15 36

Page 37: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark

ROF GOALS ADDRESSED IN PHASE A (2015 & 2016)

•  Improve Building Systems (e.g. Heating, A/C, Electrical,

Roof)

•  Improve Security & Entries Into Building

•  Improve Navigation/ Building Wayfinding

•  Maximize Utilization Of Spaces

•  Improve Lavatories – Make Handicap Accessible

•  Integrate Sustainable Design / Systems

•  Reconfigure & Expand Administrative Offices

•  Respect Historic Character Of Building

•  Improve Utilization Of Exterior Space

•  Address Parking Deficiencies/Limited Handicap Spaces

3/15/15

37

Page 38: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark

ROF PROGRAM- DISCUSSION &

QUESTIONS

3/15/15 38

Page 39: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark

ROF CHURCH CONFERENCE

3/15/15 RESOLUTION

3/15/15 39

Page 40: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark

ROF Phase A (2016) Project Today’s Project Approvals Requested

•  Affirm: ROF Phase A (2016) Project Building Committee Membership

•  Preliminarily Approve: Phase A (2016) Scope/Cost Estimate/Funding Plan

•  Approve: ROF Capital Campaign Extension in Fall 2015 supported by Walsh & Associates (Cost est. ~ $25K)

•  Approve: Detailed design & construction bid requests by Daley & Jalboot (Cost est. ~ $68K)

3/15/15 40

Page 41: NEWARK UNITED METHODIST CHURCH Renewing Our Foundation …newark-umc.org/wp/wp-content/uploads/2015/03/ROF-031515-Churc… · To better support the mission and ministries of Newark

Renewing Our Foundation- Resolution #6

Newark United Methodist Church Newark, DE 19711

Church Conference 3/15/15 To better support the mission and ministries of Newark United Methodist Church, the Renewing Our Foundation (ROF) Building Committee moves that the Church

•  affirm the ROF Phase A (2016) Building Committee membership as specified in the Report to the Church Conference on 3/15/15, •  preliminarily approve the Phase A (2016) project scope, estimate, and funding plan as described in the Report to the Church Conference on 3/15/15, •  approve an ROF Capital Campaign Extension (supported by Walsh & Associates) to be conducted in Fall 2015, and •  approve Daley and Jalboot to complete detailed design and solicit construction bids for the ROF Phase A (2016) project.

3/15/15 41