next generation combat vehicle cross functional team rcv ... · 5/1/2020  · next generation...

7
NGCV Cross Functional Team UNCLASSIFIED POC: Next Generation Combat Vehicle Cross Functional Team RCV Program Update 21 May 2020 Mr. Benton Gady– RCV PdM MAJ Cory Wallace – RCV Requirements Lead Agenda Program Overview High Level Characteristic Overview Anticipated GFE Desired Autonomy Levels Draft Acquisition Strategy OPSEC #4079:DISTRIBUTION STATEMENT A: Approved for public release; distribution unlimited

Upload: others

Post on 15-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Next Generation Combat Vehicle Cross Functional Team RCV ... · 5/1/2020  · Next Generation Combat Vehicle Cross Functional Team RCV Program Update 21 May 2020 Mr. Benton Gady–

NGCV Cross Functional Team UNCLASSIFIED

UNCLASSIFIEDPOC: AS OF:Use or disclosure of data contained on the page is subject to restrictions on title page.

Next Generation Combat Vehicle Cross Functional Team RCV Program Update

21 May 2020

Mr. Benton Gady– RCV PdMMAJ Cory Wallace – RCV Requirements Lead

Agenda• Program Overview• High Level Characteristic Overview• Anticipated GFE• Desired Autonomy Levels• Draft Acquisition Strategy

OPSEC #4079:DISTRIBUTION STATEMENT A: Approved for public release; distribution unlimited

Page 2: Next Generation Combat Vehicle Cross Functional Team RCV ... · 5/1/2020  · Next Generation Combat Vehicle Cross Functional Team RCV Program Update 21 May 2020 Mr. Benton Gady–

NGCV Cross Functional Team UNCLASSIFIED

UNCLASSIFIEDPOC: AS OF:Use or disclosure of data contained on the page is subject to restrictions on title page.

RCV/MET-D Experiment Schedule

MAJ Cory W. Wallace 14 MAY 2020 X

FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26

Design

Build

Test

Log

Contract

PH IMUMT Validation

PH IICO Level

PH IIIAWet Gap &MMP

PH IIIBDOTMLPFExcursion

Legend- Soldier Touch

Point- Contract Award

- Acquisition Event

- Industry Demonstration

- Platform Deliveries

REPRFP

REP

ATEC

RFP

SHAKEDOWN

SHAKEDOWNATEC PH II Soldier Operational Exercise

Surrogate CO, OFF & DEF

Soldier Operational ExerciseSurrogate PLT, Recon Focused

Payload DevelopmentPH II Vehicle Reset

SHAKEDOWNIntegration/ System Improvements

Contractor-led WG Crossing PH II Vehicles+ 4 Adv. RCV (M)Purchase 4 x RCV (M)

PH IIIA Vehicle Reset

Software/ Autonomy Updates SHAKEDOWN

ATEC

PH IIIB Soldier Operational ExerciseSurrogate CO, Comb. Arms Breach

VE2METD PLT

VE1

VE #3 PH II Reqs

VE #5 PH II MSN

VE #4PH IIIB Reqs

VE #6PH IIIB MSN

MS B MS B

PH II SurrogatesPH IIIA RCV (M)

Heavy RCV • 4 MPF

DBW Platforms

Notional COVID Impact

1

2

3

Decision Points

Does MUM-T, in its current state increase a unit’s effectiveness? If so, proceed as planned.

Can the Army begin a PoR in FY23 given the current state of technology?

Are amphibious capabilities a reasonable threshold requirement for the PoR?

1) If the Army has yet to do so, can the Army begin a PoR for RCV (L) and RCV (M) after PH IIIB?

2) Does the RCV (H) require a clean sheet design or is a DBW MPF adequate?

1

2

3

PH II MOTS Built

4

4

Page 3: Next Generation Combat Vehicle Cross Functional Team RCV ... · 5/1/2020  · Next Generation Combat Vehicle Cross Functional Team RCV Program Update 21 May 2020 Mr. Benton Gady–

NGCV Cross Functional Team UNCLASSIFIED

UNCLASSIFIEDUse or disclosure of data contained on the page is subject to restrictions on title page.POC: AS OF:

Conceptual RCV (L) and RCV (M) Characteristics

Mobility T: Maintain pace w/ organic formation; silent drive; amphibious w/ a kitO: Silent drive X>10 Km; amphibious w/o kits

T: Maintain pace w/ organic formation; silent drive for 5Km @ 10 Kph; amphibious w/ a kitO: Silent drive X>10 Km; amphibious w/o kits

Transportability T: One RCV (L) per CH47 Sling Load; air droppable O: Base chassis transportable by UH60 for 10 NM

T: One RCV (M) per C130H for 1800 NMO: CH47 sling load; air droppable

Lethality T: Defeats troops and trucks, 1 x ATGMO: Multiple ATGMs w/ autonomous reload; loitering munitions

T: Defeats medium armor threats at 2+Km; Two ATGMsO: IWS defeats troops; Four ATGMs w/ modular capability for multiple missile types (AP/ ADA).

Sensor Package

T: TeUAS w/ modular payloads; support AiDTR; 360 SAO: TeUAS (become untethered); sensors better than 3G FLIR; color night vision; marsupial robot

T: TeUAS w/ modular payloads; support AiDTR; 360 SAO: TeUAS (become untethered); sensors better than 3G FLIR; color night vision; marsupial robot

SurvivabilityT: Protected sensors, integrated CBR defense, recover from cyber attacks/EMS (T=O)O: Med ballistic protection for sensors

T: Protect sensors and lethality systems; recover from cyber attacks/EMS (T=O)O: Med ballistic protection w/ modular armor capability

Modularity T: Remove lethality system and transition to any MMP; IOP 3.0 compliant (T=O); VICTORY 1.8 compliant (T=O); MOSA compliant (T=O)O: Remove weapon system in less than 1 hour; transition to any MMP in less than 1.5 hrs

T: Remove lethality system and transition to any MMP ; IOP 3.0 compliant (T=O); VICTORY 1.8 compliant (T=O); MOSA compliant (T=O)O: Remove system in less than 3 hour; transition to any MMP in less than 1.5 hrs

Silent Watch T: Conduct silent watch with all critical systems powered; Start engine w/o cycling power (T=O)O: 24 hours

T: Conduct silent watch with all critical systems powered; Start engine w/o cycling power (T=O)O: 36 hours

Signature Management

T: Minimized thermal and electronic signature; heat emitting signatures will be located in the rear of the vehicle and not observable from the air (T=O)O: Thermal and electronic signature not visible within 100m; secondary “skin” camouflage

T: Minimized thermal and electronic signature; heat emitting signatures will be located in the rear of the vehicle and not observable from the air (T=O)O: Thermal and electronic signature not visible within 100m; secondary “skin” camouflage

RCV (L) RCV (M)

Page 4: Next Generation Combat Vehicle Cross Functional Team RCV ... · 5/1/2020  · Next Generation Combat Vehicle Cross Functional Team RCV Program Update 21 May 2020 Mr. Benton Gady–

NGCV Cross Functional Team UNCLASSIFIED

UNCLASSIFIEDUse or disclosure of data contained on the page is subject to restrictions on title page.POC: AS OF:

Project OriginSpring 2020

MUMT PH IMAR-APR20

MUMT PH IIQ2FY22

MUMT PH IIIBQ3FY24

Shoot/ Survive

Move

Communicate

Sustain

•Limited ATR OTM•Automated Threat Detection

•Teleop w/ OD (static)•Way point navigation / OD (static) /OA

•Point and Go Exploratory Planner / OD (static) /OA

•Way point navigation (Higher Speed) / OD/OA

•Point and Go Exploratory Planner (Lower Speed) / OD/OA

•Formation Control (L/F, wedge, etc)•Limited tactical behaviors•Dynamic planner switching

•ATR OTM in Limited Vis•M42 demo•Automated Threat Detection

•X > 2km mesh network•Lost comms maneuver behavior options (return, rally point, continue)

•Automated PACE plan

•CL III & V status update to OCU•Vehicle health report

•2km automated mesh network•Automated frequency hopping if jammed

•1-2Km automated mesh network

•1Km automated mesh network

•Automated PMCS•CL III & V status update to OCU•Vehicle health report

•CL V status update to OCU

Autonomous Capabilities

•Remoted sensors/RWS to RCV controller

•Remoted sensors/RWS to RCV controller

•Teleop w/ OD (static)•Way point navigation / OD (static) /OA

•Point and Go Exploratory Planner / OD (static) /OA

•Teleop w/ Obstacle detection•Way point navigation (Higher Speed) / OD/OA

•Point and Go Exploratory Planner (Lower Speed) / OD/OA

Augmented Teleoperation Semi-Autonomous

22 APR 20MAJ Cory Wallace

Page 5: Next Generation Combat Vehicle Cross Functional Team RCV ... · 5/1/2020  · Next Generation Combat Vehicle Cross Functional Team RCV Program Update 21 May 2020 Mr. Benton Gady–

NGCV Cross Functional Team UNCLASSIFIED

UNCLASSIFIEDUse or disclosure of data contained on the page is subject to restrictions on title page.POC: AS OF:

Government Furnished Equipment

• Autonomy Software• Radios• Warfighter Machine Interface Software

• AiDT/R• Guns and missiles (industry provides turrets)

• TeUAS• A-PNT• Hostile Fire Detection

Anticipated GFE Potential GFE

22 APR 20MAJ Cory Wallace

Page 6: Next Generation Combat Vehicle Cross Functional Team RCV ... · 5/1/2020  · Next Generation Combat Vehicle Cross Functional Team RCV Program Update 21 May 2020 Mr. Benton Gady–

NGCV Cross Functional Team UNCLASSIFIED

UNCLASSIFIEDPOC: AS OF:Use or disclosure of data contained on the page is subject to restrictions on title page.

Acquisition Strategy

Benton Gady, 586-393-0539 6

Follow DoDI 5000.02 – ACAT I program Contract strategy to use integration vendor – integrate Control Station, Network, Platform,

Software, and Payloads Separate competitive subcontract for RCV vehicle platforms – RCV(L) and RCV(M) Government furnished robotics software, radios, warfighter-machine interface software, and

some payloads integrated through Modular Open Systems Approach (MOSA) based architecture

MS B entry dependent upon: • Technology Readiness Level (TRL) 6 for all critical technology elements• DOTMLPF-P analysis complete and approved at appropriate levels by appropriate authorities

•RCV(L) MS B in FY23•RCV(L) FUE in FY28•RCV(M) MS B in FY24•RCV(M) FUE in FY30

01 APR 20

FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

Milestones - RCV(L)

RCV (L) Main Program Path

Milestones - RCV(M)

RCV (M) Main Program Path

DRFPRDP MS B MS C FRPDP 2 DP 3 Acq KP #1 Acq KP #2 Acq KP#3 FUE IOC

AROC AROC

Initial DraftProgram Plan

ITRA CDD ADM PRR

PCA OTRR FMR

Milestone B Docs

CDD Validated Final CDD

AoA

Contract PrepRFP Prop

Rec

Design/IntegrateAward CDR

BuildTRR

Test (DT) LRIPLRIP Award

Full Rate Production

OT&E

LOG Development

DRFPRDP MS B MS C

AROC ADM AROC PCA

ITRACDDMilestone B Docs

CDD Validated Final CDD

Contract PrepRFP Prop

RecAward

Design/IntegrateCDR

BuildTRR

Test (DT)LRIP Award

LRIP

LOG Development

Page 7: Next Generation Combat Vehicle Cross Functional Team RCV ... · 5/1/2020  · Next Generation Combat Vehicle Cross Functional Team RCV Program Update 21 May 2020 Mr. Benton Gady–

NGCV Cross Functional Team UNCLASSIFIED

UNCLASSIFIEDPOC: AS OF:Use or disclosure of data contained on the page is subject to restrictions on title page.

Questions?