Next Generation Warning Tool(NGWT)

Jason Tuell

Systems Engineering Center

Office of Science and Technology

Page 2: Next Generation Warning Tool (NGWT) Jason Tuell Systems Engineering Center Office of Science and Technology

Overview

• Background

• Near term solution

• Strategic solution

• Implementation considerations

• Summary

Page 3: Next Generation Warning Tool (NGWT) Jason Tuell Systems Engineering Center Office of Science and Technology

Background

• Need to create integrated warning tool– Responsive streamlined software system in sync with

WFO forecast, watch/warning process– Minimize training, support resources

• Need to address significant shortcomings in WWA application

• Provide foundation for future requirements– Allow long fuse warnings to leverage the digital

forecast process– Anticipate changes in formats and allow greater

geographical specificity

Page 4: Next Generation Warning Tool (NGWT) Jason Tuell Systems Engineering Center Office of Science and Technology

Near term solution

• Minimize the pain – make current version of WWA tolerable – more responsive to operations– More than 50% of OB3, OB4 WWA development

effort targeted at improving usability– Field engaged in “test driving” OB3, OB4 WWA

• OB3 test drive 4 November – OB3 WWA well received by regional representatives

• OB4 test drive 18-19 February - OB4 WWA identified as significant improvement

• Keep Watch-by-County and VTEC on track

Page 5: Next Generation Warning Tool (NGWT) Jason Tuell Systems Engineering Center Office of Science and Technology

Near term – the painHigh level Build Deliverables Category

OB2.2Editable final transmit window Usability

OB3.0Duplicate NWR products

VTEC problems found in DT&E testing

Redefine Upgrade/Downgrade function

WBC/WCN Site Backup

Follow-up/clear transmission

Spell Checker

Usability

VTEC

VTEC

WBC

Usability

Usability

OB3.1Apply QC of editable transmit window

New VTEC requirements (e.g. test and experimental product designations)

OB3.2Correction/Amendment functionality

Usability

VTEC

Usability

Usability

OB4.0WBC/WCN Redesign

Forecaster identification interface

TPC/JTWC/CPHC headlines in IFPS

WWA WSO Intersite coordination

Regenerate NWR Messages

Preview display function

WBC

Other

Other

Other

Other

Usability

G

G

G

G

Page 6: Next Generation Warning Tool (NGWT) Jason Tuell Systems Engineering Center Office of Science and Technology

Strategic solution

• Objective: Improve watch/warning tools– Optimize utility and flexibility for WFO operations– Keep what works well, re-design what doesn’t– Make software sync with the forecasting process– Anticipate future requirements and concepts of

operation• Strategy

– Use disciplined software development approach which identifies user needs and design constraints early in the process

– Create dedicated, cross functional team to define requirements through use cases

• Review governing policies in parallel– Spiral development – build some, test some, field some

– used with great success in Rapid Prototype Project

Page 7: Next Generation Warning Tool (NGWT) Jason Tuell Systems Engineering Center Office of Science and Technology

Implementation considerations

• Separate meteorological from formatting tools– Meteorological tools will allow forecasters to focus on

the what, where and when of warnings– Formatting tools will focus on how content is delivered

to customers

• Dissemination methods and contents to be flexible to accommodate alternative technologies– XML, GIS, graphics?

Page 8: Next Generation Warning Tool (NGWT) Jason Tuell Systems Engineering Center Office of Science and Technology

Summary

• Next Generation Warning Tool commitment made to field to overcome shortcomings in current software

• Team approach critical to success of defining and developing tool– Need regional representatives to the

requirements definition team

• Prototyping the best method to deliver capability that the field wants