nfr information day
DESCRIPTION
NFR information day. Norwegian experiences from earlier calls and the new instruments By Dr. Per Olaf Brett, DNV Research Pre-contract phase Project execution Project aftermath Ideas – impulses - afterthought. EU project experience. FP 5 Call process-closing FP 6 Call process-initiation - PowerPoint PPT PresentationTRANSCRIPT
NFR EU FP6 seminar på HøvikSlide 1
NFR information day
• Norwegian experiences from earlier calls and the new instruments
By Dr. Per Olaf Brett, DNV Research
• Pre-contract phase• Project execution• Project aftermath
Ideas – impulses - afterthought
NFR EU FP6 seminar på HøvikSlide 2
EU project experience
• FP 5 Call process-closing• FP 6 Call process-initiation• FP 7 Call process-strategising• TRESHIP (FP5 Network)• THEMES (FP5 Network)• ERAMAR (FP5 Network)• EVIMAR and ERASTAR• ADVANCES (FP5 Added
Value Network)• INTEGRATION (FP5 Shared
cost RTD and demonstration project)
• LOGBASED (FP 6 STREP)• Several FP6 initiatives (CA’s,
IP’s, STREP’s, and NoE’s)
NFR EU FP6 seminar på HøvikSlide 3
Pre-contract phase
• Is this of interest?
• Is it worth the hassle!
• Where to look?
• Who to talk to?
• Hasn't this been done before?
• What has already been done?
• What instrument to choose?
• Do the commission really mean what they say?
• What are the odds?
• How to leverage the application (proposal)
NFR EU FP6 seminar på HøvikSlide 4
Project execution
• Co-ordinator or partner?• Many or few project partners?• Small, medium and or large
firms?• Outsourcing the
administration?• Distributed production (work
packages) or team work (action oriented research)?
• Structure – methodology – theory
• Documentation of findings and results
• Communication media and distribution channels
NFR EU FP6 seminar på HøvikSlide 5
Project aftermath
• No more energy left!• Work done syndrome!• Continuation – for what
purpose, with whom?• Get on with the next
project!• What have we learnt –
failures and successes?• What can we do different
next time?• Will there be a next
time?