nicholas tedesco portfolio

45
TEDESCO PORTFOLIO PORTFOLIO

Upload: nicholas-tedesco

Post on 17-Feb-2016

219 views

Category:

Documents


2 download

DESCRIPTION

Architecture Portfolio

TRANSCRIPT

Page 1: Nicholas Tedesco Portfolio

TEDESCOPORTFOLIOPORTFOLIO

Page 2: Nicholas Tedesco Portfolio

5 NICHOLAS J TEDESCOPROJECTSPROJECTS

Page 3: Nicholas Tedesco Portfolio

123

PASADENA LOW RISE DEVELOPMENT

LINCOLN HEIGHTS CHARTER HIGH SCHOOL

COLLAPSE OF SUBURBIA

BUILT

4 RESIDENTIAL BATHROOM REMODEL

DESIGN PROJECTS

WORK EXPERIENCE

5 DUTTON ARCHITECTS | INGLISH STUDIO

Page 4: Nicholas Tedesco Portfolio

DESIGN PROJECTS

Page 5: Nicholas Tedesco Portfolio

1 LINCOLN HEIGHTS CHARTER HIGH SCHOOLPROJECTPROJECT

Page 6: Nicholas Tedesco Portfolio

LINCOLN HEIGHTS CHARTER HIGH SCHOOLLOCATION | LINCOLN HEIGHTS, CA

EVERY SCHOOL NEEDS A FIELD. FURTHERMORE, EVERY COMMUNITY NEEDS A RECREATIONAL SPACE. LINCOLN HEIGHTS HAS A RECREATIONAL AREA THAT IS NEXT TO THE PROPOSED SITE FOR THE NEW HIGH SCHOOL; HOWEVER, IT IS CURRENTLY DIFFICULT TO ACCESS AND IT IS UNDER-UTILIZED. BY RETRO-FITTING THE FIELD AREA, THE SCHOOL AS WELL AS THE FIELD BENEFIT. THUS, THE AIM OF THE PROJECT IS TO INTEGRATE THE FIELD AND THE HIGH SCHOOL. FURTHERMORE, THIS SAME IDEA OF INTEGRATION INFLUECED THE CLASSROOM DESIGN. CLASSROOMS WERE DESIGNED IN CLUSTERS THAT ATTACH TO A SHARED ATRIUM SPACE. THE INTERIOR OF THE CLUSTERS CAN BE CHANGED TO ALLOW FOR SHARED LEARNING BETWEEN DIFFERENT SUBJECTS.

FIELD ACCESS

CURRENT PROPOSED

Page 7: Nicholas Tedesco Portfolio

EXTEND TO COMMUNITY

SUSTAINABILITY | DIRT REMOVAL

LARGER PROJECT

PROPOSED SITE INTENDED SITE LA RIVER REMEDIATION PROJECT

IF THE HIGH SCHOOL WAS RESTRAINED BY THE SITE BOUNDRIES.

HIGH SCHOOL OPENS UP AND REACHES OUT TO ITS SURROUNDINGS.

RESULT OF BREAKING SITE BOUNDRIES.

PROPOSED SITE. THE SITE FOR THE SCHOOL IS 16FT. HIGHER THAN THE RECREATIONAL PARK AND FIELD THAT IS DIRECTLY NEXT TO IT.

DIRT REMOVAL REQUIRED FOR SUBTERANEAN PARKING. IT WOULD BE EXPENSIVE TO RE-MOVE THIS AMOUNT OF DIRT AND IT IS NOT SUSTAINABLE TO DO SO.

INSTEAD OF REMOVING A LARGE AMOUNT OF DIRT FOR SUBTERANEAN PARKING, A SMALL AMOUNT IS REMOVED FOR A RAMP. PARKING IS MOVED TO THE FIELD AND REMOVED DIRT IS USED TO EXTEND THE SIDEWALK. THE MONEY SAVED FROM NOT HAVING SUBTERANEAN PARKING IS USED TO RETROFIT THE NEIGHBORING FIELD AND REC. CENTER.

Page 8: Nicholas Tedesco Portfolio

SITE PLAN

Page 9: Nicholas Tedesco Portfolio

COMMUNITY | SCHOOL SPACE

CLUSTER ARRANGEMENTS

ATRIUM FUNCTIONS

SHARED SPACE LIGHT VENTILATION

Page 10: Nicholas Tedesco Portfolio

SITE PLAN

LONGITUDINAL SECTION

ROOF PLAN

Page 11: Nicholas Tedesco Portfolio

SECOND FLOOR PLAN 1-CLASSROOM 2-LIBRARY 3-DINING 4-ATRIUM OPEN TO BELOW 5-ADMINISTRATION 6-COURTYARD 7-GREEN ROOF

1

1

1

1

1

1

2

3

4

4

4

4

4

1

5 5

6

6

7

Page 12: Nicholas Tedesco Portfolio

FLASHING

4” RIGID INSULATION

WPM

METAL DECK

STAINLESS STL. GUTTER

METAL CLIP SYSTEM

FIXING BATTENS

METAL PANELS

DROP CEILING

PRIMARY STL.

WPM

RIGID INSULATION

20 GA. GALV. METAL SHEETING

6” STL. STUDS 4” STL. STUDS

5/8” GYPSUM BOARD

MAIN STRUCTURAL COLUMN

GUTTER

EDGE CLIP

PAINTED TUBE STL. FRAME

AUTOMATED DOOR PISTON

T. STL. FRAME SUPPORT

POLYCARBONATE CLIP

DOOR TRUSS FRAME AT BOTH SIDES

EXTRUDED POLYCARBONATE

5” CONCRETE SLOPE 1/4” PER FT.

ROOF DETAIL

DETAIL 3

DETAIL 2

FLASHING

STAINLESS STL. GUTTER

WPM

FIXING BATTENS

RIGID INSULATION

6” STL. STUDS

WPM

4” RIGID INSULATION

METAL DECK

PRIMARY STL.

METAL CLIP SYSTEM

METAL PANELS

RIGID INSULATION

6” STL. STUDS

METAL CLIP SYSTEM

METAL CLIP SYSTEM

METAL PANEL

METAL PANEL

WPM

FIXING BATTENS

DETAIL SECTION

ROOF DETAIL

DETAIL 2

Page 13: Nicholas Tedesco Portfolio

FLASHING

WPM

METAL DECK

METAL CLIP SYSTEM

FIXING BATTENS

METAL PANELS

DROP CEILING

CONCRETE

DRAINAGE MAT

GLASS RAILING

EARTH

GRASS

WPM

WPM

PRIMARY STL.

6” STL. STUDS

4” STL. STUDS

DUCT

PRIMARY STL.

5/8” GYPSUM BOARD

INSULATION

EDGE CLIP

PAINTED TUBE STL. FRAME

T. STL. FRAME SUPPORT

POLYCARBONATE CLIP

DOOR TRUSS FRAME AT BOTH SIDES

EXTRUDED POLYCARBONATE

HANGAR DOOR

AUTOMATED DOOR PISTON

5” CONCRETE SLOPE 1/4” PER FT.

GUTTER

EARTH

DETAIL CHUNK

Page 14: Nicholas Tedesco Portfolio
Page 15: Nicholas Tedesco Portfolio
Page 16: Nicholas Tedesco Portfolio

CLOSED

MOVING

OPEN

CONCEPT DIAGRAM

Page 17: Nicholas Tedesco Portfolio

2PASADENA LOW RISE DEVELOPMENTPROJECTPROJECT

UNIT MODEL

Page 18: Nicholas Tedesco Portfolio

N

SITE PLAN

4 UNIT LOW RISE DEVELOPMENTLOCATION | PASADENA, CACONCEPT | DESIGN UNITS THAT CAN TRANSFORM AND ADAPT TO PEOPLE’S CHANGING LIVES.

MANY OF THE WALLS IN THE UNITS CAN MOVE TO ENLARGE SPACES OR CREATE NEW SPACES. THE UNITS ARE MADE FROM PREFABRICATED MODULES. THERE IS A SLEEPING, EATING, LIVING, AND PARKING MODULE. EACH OF THESE MOD-ULES IS CREATED FROM A KIT OF PARTS. CLIENTS CAN CHOOSE THE PARTS THEY MOST DESIRE BEFORE CONSTRUCTION.

Page 19: Nicholas Tedesco Portfolio

MODULE CATALOGUE OF PARTS ASSEMBLY

PARKING

LIVING

EATING

SLEEPING

VENTILATION DAY-LING PANEL

SOLAR ROOF

SLIDING WALL VENTILATION DAY-LING PANEL

SOLAR ROOF

SLIDING WALL

VENTILATION DAY-LING PANEL

SLIDING WALL

SOLAR ROOF

Page 20: Nicholas Tedesco Portfolio

FLOOR 2

NORTH ELEVATION

1

1

2

2

3

34

44

4

5 5

5 5

6

75

UNIT C

UNIT D

Page 21: Nicholas Tedesco Portfolio

FLOOR 1

LONGITUDINAL SECTION

UNIT A AND B ARE IDENTICAL. UNIT C AND D ARE IDENTICAL. THEY ARE REPRESENTED IN TWO DIFFERENT FORMS.1-LIVING 2-KITCHEN 3-DINING 4-BATHROOM 5-BEDROOM 6-EXTENDED BALCONY 7-OFFICE

1

1

UNIT A

2

2

3

3

4

4

4

4 4

4

5

5 5

5

6

66

75

UNIT B

UNIT C

UNIT D

5

5

Page 22: Nicholas Tedesco Portfolio

GROUND FLOOR UNIT INTERIOR RENDER

Page 23: Nicholas Tedesco Portfolio

EXTERIOR RENDER

Page 24: Nicholas Tedesco Portfolio
Page 25: Nicholas Tedesco Portfolio

3COLLAPSE OF SUBURBIAPROJECTPROJECT

Page 26: Nicholas Tedesco Portfolio

N

48 UNIT MID RISE BUILDINGLOCATION | CULVER CITY, CACONCEPT | ALLOW USERS THE SAME AMENITIES THAT SUBURBIA OFFERS IN THE CITY. THE PROJECT CHALLENGED THE STAN-DARD MID RISE LIVING MODEL AND WAS INFLUENCED BY THE RELATIONSHIP BETWEEN THE CAR AND THE UNIT.

SUBURBIA WAS NOT LITERALLY PUT INTO THE CITY, BUT IT WAS ADAPTED TO THE CITY AND THE CHANGING LOS ANGELES CULTURE. SOME OF THE AMENITIES IN THE UNITS INCLUDE PARKING IN YOUR DWELLING SPACE, PRIVATE GREEN SPACE, AND OPEN AIR SPACE. AFTER DRIVING INTO A CAR ELEVATOR, CARS CAN PULL INTO THE UNITS. ELECTRIC CARS CAN PLUG IN TO THE DWELLING SPACE. AS PEOPLE IN LOS ANGELES OFTEN USE THEIR CARS AS A SECOND OFFICE, THE CAR WAS BROUGHT INTO THE DWELLING SPACE TO ADAPT TO THIS PHENOMENON AND TO USE AS ADDITIONAL PROGRAM.

SITE PLAN

Page 27: Nicholas Tedesco Portfolio

OLD MODEL URBAN SUBURBIA UNIT

SUBURBIA STACKED

CONCEPT DIAGRAMS

Page 28: Nicholas Tedesco Portfolio

AGGREGATION DIAGRAM

2 BED UNIT

1 BED UNIT

Page 29: Nicholas Tedesco Portfolio

TRANSVERSE SECTION

Page 30: Nicholas Tedesco Portfolio

1 BED UNIT

1- LIVING 2- KITCHEN 3- DINING 4- BATHROOM 5 - BEDROOM 6- PRIVATE YARD 7- PARKING IN UNIT8- CAR ELEVATOR 9- ELEVATOR 10 - STAIR

12

3

4

5

6

789

10

Page 31: Nicholas Tedesco Portfolio

FLOOR 2

2 BED UNIT

FLOOR 1

6

324

1

5

5

44

789

10

Page 32: Nicholas Tedesco Portfolio

FLOOR PLAN

Page 33: Nicholas Tedesco Portfolio

GROUND FLOOR

Page 34: Nicholas Tedesco Portfolio

WEST ELEVATION

Page 35: Nicholas Tedesco Portfolio
Page 36: Nicholas Tedesco Portfolio
Page 37: Nicholas Tedesco Portfolio
Page 38: Nicholas Tedesco Portfolio

BUILT

Page 39: Nicholas Tedesco Portfolio

RESIDENTIAL BATHROOM REMODEL4PROJECTPROJECT

Page 40: Nicholas Tedesco Portfolio

uASC PARKING DAY

RESIDENTIAL BATHROOM REMODELLOCATION | VENTURA, CA

A NEWER AND MORE OPEN BATHROOM WAS DESIRED BY THE CLIENT. THE ENTIRE BATHROOM WAS DEMOLISHED. DEMO INCLUDED THE SHOWER AREA, ALL OF THE TILE, DRY WALL, COUNTERS, AND DIVIDER WALL. A NEW TUB WAS INSTALLED AND HALF WALLS WERE INSTALLED AROUND THE TUB. THE TILING AROUND THE TUB AS WELL AS THE FLOORS WAS ALL RE-DONE.NEW FIXTURES WERE INSTALLED AS WELL AS NEW BASEBOARD AND CHAIR RAIL.

Page 41: Nicholas Tedesco Portfolio
Page 42: Nicholas Tedesco Portfolio

WORK EXPERIENCE

Page 43: Nicholas Tedesco Portfolio

5DUTTON ARCHITECTS | INGLISH STUDIOPROJECTPROJECT

Page 44: Nicholas Tedesco Portfolio

PLANS,EXISTING & PROPOSED

A2.1

639 S. Spring St #4ALos Angeles, CA. 90014

TEL: 323.668.2600FAX: 323.668.2800

•••• ••••

PHOTOGRAPHY STUDIO REMODELLOCATION | WEST HOLLYWOOD, CA

A PHOTOGRAPHER FOR VOGUE ACQUIRED A BUILDING IN WEST HOLLYWOOD, PREVIOUSLY USED FOR FURNITURE MANU-FACTURING, AND DESIRED TO TURN IT INTO A PHOTOGRAPHY STUDIO. ALL INTERIOR WALLS AND ELEMENTS WERE DEMOL-ISHED. THE EXTERIOR WALLS WERE KEPT INTACT. THE CEILING AND BRICK WALLS WERE PAINTED WHITE AND BLEACHED PLYWOOD ELEMENTS WERE ADDED TO THE SPACE THAT HOUSED NEW PROGRAMS.

Page 45: Nicholas Tedesco Portfolio