nicole feliciano (team lead) john figueira (team member) noor husain (team member) kyle grotjohn...
DESCRIPTION
Team Members Nicole Feliciano (Team Lead) Home Town: Aiea, Hi Favorite Hobby: Puzzles Interesting Fact: Don’t have a middle name Noor Husain (Team Member) Home Town: Kuwait Favorite Hobby: Reading Interesting Fact: Fluent Arabic, Persian, EnglishTRANSCRIPT
• NICOLE FELICIANO (TEAM LEAD)• JOHN FIGUEIRA (TEAM MEMBER)• NOOR HUSAIN (TEAM MEMBER)• KYLE GROTJOHN (TEAM MEMBER)• DR. ALBRIGHT (FACULTY ADVISOR)• JENIFER MILLER ( INDUSTRY ADVISOR)• DR. KENNEDY (CUSTOMER)• DR. NUXOLL (CLASS ADVISOR)
Stoplight PizzaWind Belt Generator
Introduction
Team MembersProject BackgroundBlock DiagramDesign ChallengesRisks Milestones Conclusion
Team Members
Nicole Feliciano (Team Lead) Home Town: Aiea, Hi Favorite Hobby: Puzzles Interesting Fact: Don’t have a middle name
Noor Husain (Team Member) Home Town: Kuwait Favorite Hobby: Reading Interesting Fact: Fluent Arabic, Persian,
English
Team Members (Cont.)
Kyle Grotjohn (Team Member) Hometown: Riverside, CA Favorite Hobby: Messing with my bike Interesting Fact: I love cheesecake
John Figueira (Team Member) Hometown: Kapolei, Hi Favorite Hobby: Building models Interesting Fact: I really like free things, especially
food
Background
Developing Countries More efficient and smaller wind power
Remote applicationsWind Belt
Faraday’s Law Narrows Bridge
Block Diagram
Design Challenges
Placement of Magnets & Coils Must be stable
One end of designMembrane Tension
Loss of power Tension adjustment at end
Stator vs. Coils Cost vs. efficiency
Coils for cost Creating Coils
Particular design Many prototypes and sealant
Risks
Risks Severity Likelihood
Magnet strength too low Moderate Moderate
Frame does not support tension High Moderate
The coils do not cause an adequate magnetic field
High Moderate
Rectifier/Battery burn out due to too much charge
Moderate Moderate/Low
Milestones
Number Description Completion Date
1 Project Proposal 8/31/2012
2 Due: Functional Specification, first complete draft (ver 0.9) 9/21/2012
3
September Program Reviews Due: Functional Specification, advisor-approved draft (ver 0.95) Complete website Submit part list for approval
9/28/2012
4 Due: Functional Specification, final draft (ver 1.0) Project Support from Craig Henry and Allen Hansen
10/05/2012
5 Due: Project Business Assessment 10/12/2012
7 October Program Reviews 10/26/2012
8 First Prototype constructed 10/31/2012
9 Due: Design Document, first complete draft (ver 0.9) 11/02/2012
10 Due: Design Document, advisor-approved draft (ver 0.95) Deadline: Team Meeting with Peter Rachor
11/09/2012
11 Due: Design Document, final draft (ver 1.0)Final Budget 11/16/2012
12 November Program Reviews Due 11/30/12
Conclusion
Team Stoplight Pizza
Importance/Background
Design and Challenges
Risks and Milestones