nis himlung himal expedition

9
Himlung Himal Expedition CGEY NIS Global NIS France NIS HIMLUNG HIMAL EXPEDITION Cap Gemini Ernst & Young’s Sponsoring Project April 2001

Upload: cicely

Post on 11-Jan-2016

28 views

Category:

Documents


1 download

DESCRIPTION

NIS HIMLUNG HIMAL EXPEDITION. April 2001. Cap Gemini Ernst & Young’s Sponsoring Project. Ambitious objectives. This expedition will be the first French attempt on this remote more than 7,000m peak, located the border between China and Nepal - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: NIS  HIMLUNG HIMAL  EXPEDITION

NIS Himlung Himal Expedition

CGEY

NIS Global

NIS France

NIS HIMLUNG HIMAL EXPEDITION

Cap Gemini Ernst & Young’s Sponsoring Project

April 2001

Page 2: NIS  HIMLUNG HIMAL  EXPEDITION

NIS Himlung Himal Expedition

CGEY

NIS Global

NIS France

Ambitious objectives...• This expedition will be the first French attempt on this

remote more than 7,000m peak, located the border between China and Nepal

• Depending on conditions, reach an unknown peak, once up there, via a more than 2 km ridge higher than 7,000 m. This peak has never been reached.

• One member of the team, specialised in extreme skiing, also forecasts to downhill skiing from the peak, which would also be a very first try.

• No external or professional assistance starting from base camp (4.850 m)

Page 3: NIS  HIMLUNG HIMAL  EXPEDITION

NIS Himlung Himal Expedition

CGEY

NIS Global

NIS France

Location of the Expedition

Annapurna

Himlung Himal

Page 4: NIS  HIMLUNG HIMAL  EXPEDITION

NIS Himlung Himal Expedition

CGEY

NIS Global

NIS France

Some Project’s details...

• Himlung Himal peak: 7,126 m Next to Annapurna

• Expedition will start on 15th April 2001 and will last 8 weeks

• Equipment: more than 500 Kg

carried by the team

Page 5: NIS  HIMLUNG HIMAL  EXPEDITION

NIS Himlung Himal Expedition

CGEY

NIS Global

NIS France

The team

• The team is composed of 10 people 6 men and 4 women ranging in age from 29 (O. Soudieux – NIS France) to 49

• No professional in the team ! Some of them already had very high-altitude experiences

(more than 7000 and 8000m summits)

• All are mountaineers and mountains are their passion.

Page 6: NIS  HIMLUNG HIMAL  EXPEDITION

NIS Himlung Himal Expedition

CGEY

NIS Global

NIS France

Timeframe

Direct or via Annapurna trekkingDirect or via Annapurna trekking

Return Return TrekkingTrekking

Katmandou3 days

Katmandou3 days

Walk to Base Camp (4850m)

9 days

Walk to Base Camp (4850m)

9 days

High Altitude Acclimation& Summit

3 to 5 weeks

High Altitude Acclimation& Summit

3 to 5 weeks

ExpeditionExpedition

Bus1 dBus1 d

April 15thApril 15th June 10thJune 10th

Page 7: NIS  HIMLUNG HIMAL  EXPEDITION

NIS Himlung Himal Expedition

CGEY

NIS Global

NIS France

Budget

• Individual materials• Shared equipment (Gamow bag, ropes…)

• Nepal Agency Summit rights + visa materials transport from/to base camp

• Plane (people + cargo)

• High Altitude Food

TOTAL

334.000 FF

40.250 FF

141.450 FF

55.500 FF

20.000 FF

590,700 FF

Page 8: NIS  HIMLUNG HIMAL  EXPEDITION

NIS Himlung Himal Expedition

CGEY

NIS Global

NIS France

Himal Himlung expedition & public communications

• Before the expedition

French television reporting, on Saturday March 3rd Two reports published yet,

in "Dauphine Libéré", a local newspaper Expedition description on www.clubalpin.com

• After the expedition

An official conference at Grenoble to present the expedition with pictures

At least three other articles are foreseen after the expedition, including 2 in national audience specialised magazines ("Montagne

Magazine" & " Trek Magazine")

Page 9: NIS  HIMLUNG HIMAL  EXPEDITION

NIS Himlung Himal Expedition

CGEY

NIS Global

NIS France

Cap Gemini Ernst & Young

CGEY NIS: the sponsor of

choice !CGEY NIS

Questions ?

[email protected]