50
Rightsizing Streets aka Road Diets Gary Toth Project for Public Spaces NJ Complete Streets Summit October 21, 2013

Upload: njbikeped

Post on 14-Jul-2015

56 views

Category:

Technology


1 download

TRANSCRIPT

Page 1: Nj complete streets oct 2013 gary toth

Rightsizing Streets aka Road Diets

Gary Toth

Project for Public Spaces

NJ Complete Streets SummitOctober 21, 2013

Page 2: Nj complete streets oct 2013 gary toth

2

34 years at the New Jersey Department of Transportation

6 Years Director of Transportation Initiatives at PPS

Invested Career working at the community/agency interface

Page 3: Nj complete streets oct 2013 gary toth

We shape our streets, thereafter our streets shape us. –adapted from Winston Churchill

Contrasting 1

Page 4: Nj complete streets oct 2013 gary toth

We have been Building Transportation Through Communities, not communities through transportation

Slide courtesy of Dan Burden

Page 5: Nj complete streets oct 2013 gary toth

PROJECT FOR PUBLIC SPACES

Pre-Automobile EraStreet design HAD to accommodate all users

Page 6: Nj complete streets oct 2013 gary toth

Pre-Automobile EraCity streets served as public places for economic and social

interaction

PROJECT FOR PUBLIC SPACES

Page 7: Nj complete streets oct 2013 gary toth

Graphic courtesy of Andy SingerPROJECT FOR PUBLIC SPACES

Page 8: Nj complete streets oct 2013 gary toth

We stopped viewing Streets as Places

PROJECT FOR PUBLIC SPACES

Page 9: Nj complete streets oct 2013 gary toth

Proximity

Speed

Accessibility

Focus on high speed mobility

Slide Courtesy of Chris Sinclair, Renaissance Planning Group

Page 10: Nj complete streets oct 2013 gary toth

A 21st Century Main StreetIs it a successful street?

Page 11: Nj complete streets oct 2013 gary toth
Page 12: Nj complete streets oct 2013 gary toth
Page 13: Nj complete streets oct 2013 gary toth

So what do we do?

PROJECT FOR PUBLIC SPACES

Page 14: Nj complete streets oct 2013 gary toth

PROJECT FOR PUBLIC SPACES

Rightsizing

Page 15: Nj complete streets oct 2013 gary toth

PROJECT FOR PUBLIC SPACESCharlotte Observer, June 2004

Page 16: Nj complete streets oct 2013 gary toth

PROJECT FOR PUBLIC SPACES

Slide courtesy of Dan Burden

Page 17: Nj complete streets oct 2013 gary toth

PROJECT FOR PUBLIC SPACES

This 5-lane Main Street was converted to…This 5-lane Main Street was converted to…

Pottstown PAPottstown PA

This:This: One less travel lane; bike lanes; parallel to back-in One less travel lane; bike lanes; parallel to back-in diagonal parking on one side; new pavementdiagonal parking on one side; new pavement

Slide courtesy of Dan Burden

Page 18: Nj complete streets oct 2013 gary toth

PROJECT FOR PUBLIC SPACES

East Boulevard

Charlotte

Page 19: Nj complete streets oct 2013 gary toth

PROJECT FOR PUBLIC SPACES

Page 20: Nj complete streets oct 2013 gary toth

PROJECT FOR PUBLIC SPACES

Reinvented Edgewater DriveOrlando, Florida

Page 21: Nj complete streets oct 2013 gary toth

Crash Rate

12.6

8.4

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

Cra

sh R

ate

(per

MV

M)

Before After

1 crash every 1 crash every 2.5 days2.5 days

34% Reduction

(146 per yr)(146 per yr)

1 crash every 1 crash every 4.2 days4.2 days

(87 per yr)(87 per yr)

Page 22: Nj complete streets oct 2013 gary toth

Injury Rate

3.6

1.2

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

Inju

ry R

ate

(per

MV

M)

Before After

68% Reduction

1 injury every 1 injury every 9 days9 days

(41 per yr)(41 per yr) 1 injury every 1 injury every 30 days30 days

(12 per yr)(12 per yr)

Page 23: Nj complete streets oct 2013 gary toth

15.7%

7.5%9.8% 8.9%

29.5%

19.6%

0.0%

5.0%

10.0%

15.0%

20.0%

25.0%

30.0%

35.0%

Pe

rce

nt

of

Ve

hic

les

Tra

ve

lin

g o

ve

r 3

6 M

PH

Before AfterBefore BeforeAfter

North End Middle South End

After

Speeding Analysis

Page 24: Nj complete streets oct 2013 gary toth

On-Street Parking Utilization

29%

41%

0%

5%

10%

15%

20%

25%

30%

35%

40%

45%

Par

kin

g U

tiliz

atio

n P

erce

nta

ge

Before After

Page 25: Nj complete streets oct 2013 gary toth

Pedestrian Volumes

2,136

2,632

0

500

1000

1500

2000

2500

3000

Nu

mb

er o

f P

edes

tria

ns

Before After

23% Increase

Page 26: Nj complete streets oct 2013 gary toth

Bicycle Volumes

375

486

0

100

200

300

400

500

600

Nu

mb

er o

f B

icyc

les

Before After

30% Increase

Page 27: Nj complete streets oct 2013 gary toth

PROJECT FOR PUBLIC SPACES

Prospect Park WestNew York City

Page 28: Nj complete streets oct 2013 gary toth

PROJECT FOR PUBLIC SPACES

Prospect Park West New York City

Page 29: Nj complete streets oct 2013 gary toth

PROJECT FOR PUBLIC SPACES

Prospect Park West New York City

Page 30: Nj complete streets oct 2013 gary toth

PROJECT FOR PUBLIC SPACES

Prospect Park West New York City

Page 31: Nj complete streets oct 2013 gary toth

PROJECT FOR PUBLIC SPACES

Prospect Park West New York City

Page 32: Nj complete streets oct 2013 gary toth

PROJECT FOR PUBLIC SPACES

Pine and Spruce StreetsPhiladelphia

Page 33: Nj complete streets oct 2013 gary toth

PROJECT FOR PUBLIC SPACES

Pine and Spruce StreetsPhiladelphia

• 44% decline in reportable crashes• 34% decline in crashes resulting in a trip to the

hospital• 58% decline in pedestrian crashes• No change in number of car trips

• Bike trips doubled• Mean car speed stayed the same

• Top range of speeds dropped

Page 34: Nj complete streets oct 2013 gary toth

PROJECT FOR PUBLIC SPACES

PPS Rightsizing Web Resourcehttp://www.pps.org/reference/rightsizing/

Page 35: Nj complete streets oct 2013 gary toth

What Are We Learning fromRightsizing Streets Case Studies

Page 36: Nj complete streets oct 2013 gary toth

PROJECT FOR PUBLIC SPACES

Some Roads May Be More Safe with Less Space for Cars?

Page 37: Nj complete streets oct 2013 gary toth

PROJECT FOR PUBLIC SPACES

Page 38: Nj complete streets oct 2013 gary toth

PROJECT FOR PUBLIC SPACES

Rightsized Streets Will Often Carry More People

Page 39: Nj complete streets oct 2013 gary toth

Rightsized Streets May Slow You Down But Often Get You There Faster

Page 40: Nj complete streets oct 2013 gary toth

PROJECT FOR PUBLIC SPACES

Page 41: Nj complete streets oct 2013 gary toth

PROJECT FOR PUBLIC SPACES

Page 42: Nj complete streets oct 2013 gary toth

PROJECT FOR PUBLIC SPACES

Page 43: Nj complete streets oct 2013 gary toth

Rightsized Streets Make Better Use Space for Cars That is Very Often Not

Fully Used

Page 44: Nj complete streets oct 2013 gary toth

PROJECT FOR PUBLIC SPACES

Streets as Places Finishes the Job of Rightsizing

Reallocate Street Space (aka Complete Streets) Streets as Places!

Page 45: Nj complete streets oct 2013 gary toth

PROJECT FOR PUBLIC SPACES

Complete Streets An Approach for Accomodating All Users

Cars

Alignment + Cross-Section + Intersection + Roadside

Bikes

Pedestrians

Buses

Trucks/freight

Page 46: Nj complete streets oct 2013 gary toth

Traditional Highway Design Approach

Traffic Volume + Area Type (urban, rural) + Role in Network

Functional Classification

Design Speed + Design Vehicle

Alignment + Cross-Section + Intersection + Roadside

Page 47: Nj complete streets oct 2013 gary toth

Placed Based Approach

Corridor/CommunityCorridor/Community

PlacePlace

RoadwayRoadway

Traveled WayTraveled Way IntersectionsIntersections RoadsideRoadside

Page 48: Nj complete streets oct 2013 gary toth

PROJECT FOR PUBLIC SPACESMade possible by funding from the Department of Health and Human Services through the Los Angeles County Department of Public Health.

Page 49: Nj complete streets oct 2013 gary toth

“Lowly, unpurposeful and random as they may appear,

sidewalk contacts are the small change from which a city’s

wealth of public life may grow”. Jane Jacobs─

Page 50: Nj complete streets oct 2013 gary toth

Gary Toth

Director of Transportation Initiatives

Project for Public Spaces

609-397-3885

[email protected]

http://www.pps.org/pdf/bookstore/How_to_Engage_Your_Transportation_Agency_AARP.pdf