NKS2 Meeting 2007/07/18. K. Futatsukawa. Condense. Data Jun2007 raw data dctdc.param : run by run Other parameter : tdc calibration, adc offset hodo, tagb, taggertime : rough Condition 2 charged particle (2track) Doing Now -- 60 % finished. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: NKS2 Meeting 2007/07/18

K. Futatsukawa

NKS2 Meeting

2007/07/18

Page 2: NKS2 Meeting 2007/07/18

Condense

• DataJun2007 raw data

• dctdc.param : run by runOther parameter : tdc calibration, adc offset

hodo, tagb, taggertime : rough

• Condition2 charged particle (2track)

• Doing Now -- 60 % finished