nm-dms enhancements list status martin bass
DESCRIPTION
NM-DMS Enhancements List Status Martin Bass. ABB Annual Users’ Group Meeting August 27 – 31, 2006. Enhancement List Status – The Numbers. List developed at 2006 Focus Group List prioritized via e-mail votes Input received from 17 utilities Votes received from 11 utilities - PowerPoint PPT PresentationTRANSCRIPT
© A
BB
Ltd
. -
1 -
NM-DMS Enhancements List StatusMartin Bass
ABB
Annual Users’ Group Meeting
August 27 – 31, 2006
© A
BB
Inc
. -
2 -
Enhancement List Status – The Numbers
List developed at 2006 Focus Group List prioritized via e-mail votes Input received from 17 utilities Votes received from 11 utilities List contains 49 enhancements Top 10 contains 13 items (ties for 4th, 6th and 9th place) ABB has reviewed list ABB plans to implement 14 features this year (Release
3), and 2 more next year (Release 4)
© A
BB
Inc
. -
3 -
Top Ten Enhancements - Summary
Rank Description Status
1 Outage history should be available from Ormap
2 Ability to drag outage symbol in partially restored outages to the new outage location. Crew should also move with the outage
Planned for Release 3
3 List of customers that will be affected by an outage
Planned for Release 3
4 Ability to add user-defined columns to all OMI status dialogs and forms (including tag status)
Planned for Release 4
4 OMI Call Status, Outage Status, add additional columns (user defined columns)
Planned for Release 4
© A
BB
Inc
. -
4 -
Top Ten Enhancements - Summary
Rank Description Status
6 Ability to go back to a specific time/date and play back operations
6 Landbase performance. Allow the loading of specific Landbase layers into memory
Planned for Release 3
8 Capability to add custom procedures to other objects
9 Ability to show all crews in outage status dialog Planned for Release 3
9 Landbase - flag in database to say that this specific file should be loaded into memory permanently
© A
BB
Inc
. -
5 -
Top Ten Enhancements - Summary
Rank Description Status
9 Cursor should be positioned in first text entry field when a dialog pops up
Planned for Release 3
9 New 'outage complete' flag and validation procedure
9 Easier way to associate isolation operations done through Ormap to an outage
© A
BB
Inc
. -
6 -
Other Enhancements Planned for Release 3
Rank Description
13 Display additional device category information in outage status - fuse, recloser, circuit breaker
17 DSCADA freeze time window - there are cases where the SCADA clock can be a different time to DMS time. The users want to be able to prevent calls that came in from freezing if they came in after the device operation
20 Default the 'Exact match' in Ormap search dialog to unchecked (or make a preference)
25 Remove limit of viewing 1st 100 in show affected customers when needed
© A
BB
Inc
. -
7 -
Other Enhancements Planned for Release 3
Rank Description
25 Ability to blank out field time stamp in operation confirmation dialog, rather than defaulting to current time/date. Operator is required to enter field time/date (e.g. gray out OK button until field is populated)
31 Ability to do bulk ETR updates via OMI outage status dialog
31 Longer field size for OMI_Connect and cadops.ss.server_names preference (application limit?)
41 Isolated kVA dialog needs to exclude abandoned transformers
43 Percent kVA downstream
© A
BB
Inc
. -
8 -
Planned Enhancement Details
© A
BB
Inc
. -
9 -
Drag Outage Symbol
Currently, partially restored outages show the outage symbol at location of original outage
Confusing when outage is not shown at isolation point
Was originally done by design, because there could be multiple isolation points
© A
BB
Inc
. -
10 -
Initial Outage
Outage at Open Switch
© A
BB
Inc
. -
11 -
Partial Restore With Two Open Fuses
Close Switch – Outage Partially Restored
Open fuses before closing switch
© A
BB
Inc
. -
12 -
Move Outage Symbol
Enhancement will allow outage to be moved to either of the two open fuses
Outage will still show in outage history as being at switch
OMI locate from outage status will locate to new location
Entry in Outage Log should show which user performed the operation
© A
BB
Inc
. -
13 -
Move Outage Symbol
Different ways being considered: Drag outage symbol in Ormap
Use standard device selection to allow user to pick:
© A
BB
Inc
. -
14 -
Move Outage Symbol
Different ways being considered: Use something similar to candidate outages list (comes up when
removing jumper)
User would select one isolation device from list, determined by tracing:
© A
BB
Inc
. -
15 -
Customers That Will Be Affected by an Outage
Existing operation confirmation dialog shows list of affected transformers
Could be modified to show customers in a separate tab
© A
BB
Inc
. -
16 -
Customers That Will Be Affected by an Outage
Existing operation confirmation dialog shows list of affected transformers
Could be modified to show customers in a separate tab
Tab would allow list to be saved to an Oracle table
Free format text field allows planned outage to be specified
Would like a process to be executed afterwards – Oracle stored procedure Tab Here
© A
BB
Inc
. -
17 -
Customers That Will Be Affected by an Outage
Or, could create a switching plan in simulation mode
Execute switching plan
Generate list of customers
Switching plan approach currently planned for Release 4, could be copied back to Release 3
© A
BB
Inc
. -
18 -
Landbase Performance
Allow the loading of specific landbase layers into memory
Used for layers that will be on all the time, such as county or state outlines.
New database settings will be added to specify which layers are in memory
© A
BB
Inc
. -
19 -
Show All Crews in Outage Status Dialog
If more than one crew assigned to an outage, outage status dialog currently shows earliest crew in most advanced state, e.g.: Crew Martin is Arrived at 10:00 am
Crew Bill is Enroute at 9:00 am
Dialog will show crew Martin, because he is Arrived
© A
BB
Inc
. -
20 -
Show All Crews in Outage Status Dialog
Outage status dialog will be modified to show a tree of crews Implement an 'Expand' function to show multiple entries for the
same outage so that assigned crews can be shown
Expanded list should allow operations on crews to be performed, such as ETA, status change, etc
An indicator should show whether the outage has multiple crews assigned so that the user doesn’t have to expand
© A
BB
Inc
. -
21 -
Device Category in Outage Status
Display additional device category information in outage status - fuse, recloser, circuit breaker
Additional column will be added
Existing column, showing ‘DEVICE’, ‘SERVICE TRANSFORMER’, ‘CUSTOMER’, ‘SOURCE’ will remain, but can be turned off
© A
BB
Inc
. -
22 -
DSCADA Freeze Time Window
Current ASCII SCADA interface causes existing downstream outages to be frozen when an open operation is received
Intent is to prevent loss of nested outage information
© A
BB
Inc
. -
23 -
Separate Outages Before SCADA Operation
© A
BB
Inc
. -
24 -
Frozen Outages after SCADA Operation
© A
BB
Inc
. -
25 -
DSCADA Freeze Time Window
Additional calls received after SCADA operation, but with a timestamp earlier than SCADA operation are also made part of frozen outage
However, if the SCADA clock is behind DMS time, calls do not freeze as they should
Solution: Add a time window to apply to calls so that they freeze
© A
BB
Inc
. -
26 -
Default 'Exact Match' in Ormap Locate to Unchecked
Currently box defaults to Exact Match being checked
Add preference to default to unchecked, as many searches are not exact
Enter should initiate the search
If the search yields only one result, Ormap should locate automatically
© A
BB
Inc
. -
27 -
Remove 1st 100 Limit in Affected Customers
Initial list will show 100
Count still needed
Scrolling down would automatically fetch the next 100
Also add a ‘next page’ button
And a ‘fetch all’ button
© A
BB
Inc
. -
28 -
Blank Out Operation Confirmation Field Time
Blank out field time stamp in operation confirmation dialog, rather than defaulting to current time/date
Operator is required to enter field time/date (e.g. gray out OK button until field is populated).
Time entry should allow calendar dialog for time entry or keyboard
Keyboard entry should be configurable to not require entry of seconds.
Colon should be optional Behavior controlled by a user
preference
© A
BB
Inc
. -
29 -
Bulk ETR updates via Outage Status Dialog
Outage Completion Dialog can be used to restore multiple outages and assign bulk ETR updates
However, duplication of functionality between newer Outage Detail dialog and Outage Completion Dialog
Confusing for operators to use two different dialogs for same (or similar) purpose
Solution: Allow multiple outages to be selected
Support ETR dialog display/entry for selected outages
© A
BB
Inc
. -
30 -
Bulk ETR updates via Outage Status Dialog
Need to enable ETOR button for multi-select
© A
BB
Inc
. -
31 -
Isolated kVA to Exclude Abandoned Xfmrs
Isolated kVA dialog in Ormap shows transformers that are not electrically connected Used for data debugging Add checkbox and filter out transformers with the abandoned attribute set in the load table
(new attribute) Add second checkbox to filter out transformers that have zero (or negative!) number of
customers Should not show planned additions. If it does, add a checkbox to filter them out The dialog will be resizable
© A
BB
Inc
. -
32 -
Percent kVA Downstream
Relic from 3.0 UNIX version
For old version, click on a line device to get connected kVA information per traced feeder Total kVA
Downstream kVA
Percent kVA
Solution: Add traced kVA information Right Mouse menu option