The largest construction & real estate conglomerate Company Profile
No.23 in 2018
Rating “A”
Global Contractor
No.1 in 2018
3
SOLUTIONS
IBS ( Industrialized Building System)
Innovation of Equipment
Construction Management
New Building Materials
Smart Construction
CHALLENGES
Higher Requirement of Green Construction
Complexity and Difficulty of Construction
Shorter Construction Duration
Shortage of Labor
Cost Control
1 IBS ( Industrialized Building System )
5
1. IBS
Design based on BIM
6
1.IBS
Precast concrete components
7
1. IBS
Prefabrication of steel structure
8
1. IBS
Modularization of components
2 Smart Construction
10
Digital Manufacture
Virtual Construction
Intelligent Monitoring
2. Smart Construction
11
Digital Processing Technology
2. Smart Construction
BIM CNC Machine Transportation Installation
Based on BIM
Import the model directly
into CNC machine to start
the manufactory.
Precise and efficient
12
Virtual Construction Technology
Based on BIM
Virtual construction
process
Easy to understand
2.Smart Construction
13
传感器 无线传输数据采集 云平台 监控终端Sensor DAQ
Wireless
Transmission
Cloud
Platforms
Monitoring
Terminal 传感器 无线传输数据采集 云平台 监控终端
Intelligent Monitoring – Foundation Pit Monitoring System
2. Smart Construction
14 Global Navigation Satellite System
2. Smart Construction
Intelligent Monitoring – Verticality Monitor
15
Smart
Site
Attendance Recording, Working Tracking,
Face Reorganization, Digital NCR Control
……
On-site Management
BIM 5D
Cost statistics
……
Business Management
VR Safety Accident Experience
VR Construction MOS Training
……
Construction Training
Daily Progress Record,
Weekly Schedule Model
Schedule Lag Analysis
……
Schedule Management
Material Transfer Tracking
Material Construction Record
……
Material Management
Air quality monitoring
Noise monitoring
……
Green Construction
2. Smart Construction
16 Display personnel location information in real time
On-Site Management
2. Smart Construction
Attendance Record with face recognition system
Real-time labor distribution diagram 2 Open a new NCR
3 NCR Closing Process Tracking
1 Identify deffects
4 Output the data for saving
1 2
4 3
NCR
Control
Mobile APP
Start an NCR
NCR Statics and
Data Output
Transfer to Person in
Charge
Close the NCR
with Evidence
17
Build
Model
Generate Drawings
Produce Paste QR
code Transfer Tracking
Install Tracking
Visual Display
2. Smart Construction
Tracking material transfer process.
Automatically record the installation completion time
Check the construction schedule with real completion time.
Material Tracking
18
Safety Management – Virtual Reality Technology
VR Safety Training
Emergency rescue skills
Risk-free experience
Gaming-style, more
attractive
2. Smart Construction
19
System working principle
diagram
Site environment
monitoring screen
View real-time
environment data On-site spray facility
2. Smart Construction
Air quality monitoring
Noise monitoring
Automated control
Real-time Data transfer
Environmental Protection
Temperature monitoring
Wind monitoring
3 New Building Materials
21
3. Building materials innovation
Self-healing concrete
Self-repairing and
regeneration
use microfiber
22
3. Building materials innovation
Polycarbonate panel
Low energy consumption
Improved impact resistance
23
3. Building materials innovation
Self-luminous cement
Translucent wood Anti-seismic reinforcement
4 Innovation of Equipment
25
4. Construction machinery innovation
Working Platform
High Bearing Capacity
Integrate Platform
Modular
26
27
Key Technology:
Rail power supply
Switching system
Centralized dispatch control
4. Construction machinery innovation
Vertical Transportation – Multi-Cage Hoist
28
4. Construction machinery innovation
save climbing time
Save space on
working platform
Save cost
Vertical Transportation – Rotary Tower Crane
29
4. Construction machinery innovation
Vertical Escape Device – Magnetic Sliding Pole
5 Construction Management
31
Core Wall
Concrete Slab
Steel Frame
Metal Deck
Fireproofing Facade
5. Construction Management – Compact Overlapping Management
32
Mat Foundation ( - L6 )
Start 2016-4-2
Ground Floor
Core Wall ( L92 )
27 days
10 weeks
17 months
Crown 2018-06-30
5 months
5. Construction Management – Compact Overlapping Management
33
5. Construction Management – Compact Overlapping Management
Building 500 ≥ height ≥ 400 Core Topping Out Completion
Signature Tower 26 months 3 years
Average Durations for 17 Others 40 months 6 years