*All alternatives cause no additional flooding

Figure 1. Environmental Dredging Pilot on the

Passaic River

Figure 1. Environmental Dredging Pilot on the

Passaic River

Bioturbation = 6”

Erosion = 6”

Consolidation/

Isolation = 12”

Sand Cap Armored Sand CapMudflat

Reconstruction Cap

Habitat = 12”

Isolation = 12”

Armor = 18”

Filter = 6”

Consolidation/

Isolation = 18”

MHW

MLW

CD

F B

ou

nd

ary

Sub-grade Cell

Placed Dredged Material

Final Cap

Not to Scale

Water Treatment

Plant

Existing Surface

Contaminated Sediment Veneer

Final Grade

CDF Boundary:

Double walled, filled

sealed sheetpile

Considered:

• Onsite thermal

treatment (Decon)

• Offsite domestic

thermal treatment

(KS, TX)

• Offsite international

thermal treatment

(Canada)

*All alternatives cause no additional flooding