non-renewable energy projects when plotted at 11x17 20 … · non-renewable energy projects on...

1
P A C I F I C Scale 1:2,000,000 when plotted at 11x17 Uranium Mining Site 13. Aurora Mining Claims Ruby Pipeline Pipeline Right-of-Way Authorized Oil & Gas Lease BLM District Boundary BLM Administered Land USFS Administered Land Department of Defense Indian Reservation PRINEVILLE SALEM EUGENE COOS ROSEBURG BAY BURNS VALE MEDFORD LAKEVIEW 13 R o gu e R iver D e s c h u tes W i l l a m e t t e R i v e r J o h n D ay Rive r S n ake River O w y h e e R i v e r R i v e r C O L U M B I A R IV E R O C E A N Astoria Tillamook Portland Portland Salem Newport Florence Eugene Coos Bay Roseburg Grants Pass Medford Klamath Falls Lakeview Burns Vale John Day Baker City La Grande Pendleton Madras Prineville Bend The Dalles 20 20 40 Miles 0 20 20 40 Kilometers 0 There are no current federal connections with the Mist Gas Field or the Coos Basin Area of Mutual Interest. M16-08-03 Map Accuracy NON-RENEWABLE ENERGY PROJECTS on Lands with a Federal Interest 1 Oregon, September 2016 1 Includes only those projects that have been officially entered into BLM’s LR2000 land recordation system. That includes projects that are wholly on federal lands or partially on federal lands via a “connected action”. Any project wholly on private lands is excluded, with the possible exception of split estates. Note: Missing numbers can be found on other maps No warranty is made by the Bureau of Land Management as to the accuracy, reliability, or completeness of these data for individual or aggregate use with other data. Original data were compiled from various sources. This information may not meet National Standards. This product was developed through digital means and may be updated without notification.

Upload: others

Post on 18-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NON-RENEWABLE ENERGY PROJECTS when plotted at 11x17 20 … · NON-RENEWABLE ENERGY PROJECTS on Lands with a Federal Interest 1 Oregon, September 2016 1Includes only those projects

PA

CI F

I C

Scale 1:2,000,000 when plotted at 11x17

Uranium Mining Site 13. Aurora Mining Claims

Ruby Pipeline

Pipeline Right-of-Way

Authorized Oil & Gas Lease

BLM District Boundary BLM Administered Land USFS Administered Land Department of Defense Indian Reservation

P R I N E V I L L E

S A L E M

E U G E N E

C O O S RO S E BURG

B AY

B U R N S VA L E

MEDFORD

L A K E V I E W

13

Rogue

River D

esch

utes

Will

amet

te

Rive

r

John D

ay

River

Snak

e

Riv

er

Ow

yhee

Rive

r

Riv

er

COLUMBIA

RIVER

OC

E A

N

Astoria

Tillamook PortlandPortland

Salem

Newport

Florence Eugene

Coos Bay

Roseburg

Grants Pass

Medford Klamath

Falls Lakeview

Burns

Vale

John Day

Baker City

La Grande

Pendleton

Madras

Prineville

Bend

The Dalles

20 20 40 Miles0

20 20 40 Kilometers0

There are no current federal connections with the Mist Gas Field or the Coos Basin Area of Mutual Interest. M16-08-03

Map Accuracy

NON-RENEWABLE ENERGY PROJECTS on Lands with a Federal Interest 1

Oregon, September 2016

1Includes only those projects that have been officially entered into BLM’s LR2000 land recordation system. That includes projects that are wholly on federal lands or partially on federal lands via a “connected action”. Any project wholly on private lands is excluded, with the possible exception of split estates.

Note: Missing numbers can be found on other maps

No warranty is made by the Bureau of Land Management as to the accuracy, reliability, or completeness of these data for individual or aggregate use with other data. Original data were compiled from various sources. This information may not meet National Standards. This product was developed through digital means and may be updated without notification.