VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 May 24, 2019 U. S. Nuclear Regulatory Commission 10CFR50.90 Serial No. 19-210 Attention: Document Control Desk NAPS/DPM RO' Washington, DC 20555-0001 Docket Nos. 50-338/339 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 PROPOSED LICENSE AMENDMENT REQUEST License Nos. NPF-4/7 OPEN PHASE PROTECTION PER NRC BULLETIN 2012-01 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION By letter dated April 30, 2018 (Serial No. 18-072), Virginia Electric and Power Company (Dominion Energy Virginia) submitted a license amendment request (LAR) to add operability requirements, required actions, and surveillance requirements (SR) to the Technical Specifications (TS) for the 4160V emergency bus negative sequence voltage (open phase) protection function. In a March 1, 2019 e-mail from Mr. Randy Hall (NRG) to Mr. Craig Sly (Dominion Energy Virginia), the NRG technical staff requested additional information regarding the proposed LAR. Dominion's response to these requests for additional information (RAls) is provided in Attachment 1 to this letter. In addition to Dominion's response to the RAls, the following information is provided in the Attachments to this letter: - Attachment 2 provides the discussion of a proposed administrative note to TS SR 3.3.5.4 - Attachment 3 provides marked-up Technical Specifications pages - Attachment 4 provides proposed Technical Specifications pages - Attachment 5 provides drawings illustrating the connection of PT fuses, BE1- 47N relays, and the ABB-60 relay for the Unit 1 H bus - Attachment 6 provides one-line diagrams highlighting the power feed from the transformers/switchyard to the safety related buses - Attachment 7 provides proposed UFSAR Revision for Open Phase Protection per NRG Bulletin 2012-01 - Attachment 8 provides the Logic Diagram for the Negative Sequence Voltage Relay Scheme - Attachment 9 provides the Visual Representation for the Response to RAI- EEOB-15 The addition of the administrative note in TS SR 3.3.5.4 was discussed with Mr. Randy Hall and other NRG staff during the RAI clarification phone call that was held on April 16, 2019. ::l t;7 ;vii<..

Upload: others

Post on 28-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

VIRGINIA ELECTRIC AND POWER COMPANY

RICHMOND, VIRGINIA 23261

May 24, 2019

U. S. Nuclear Regulatory Commission

10CFR50.90

Serial No. 19-210 Attention: Document Control Desk NAPS/DPM RO' Washington, DC 20555-0001 Docket Nos. 50-338/339

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 PROPOSED LICENSE AMENDMENT REQUEST

License Nos. NPF-4/7

OPEN PHASE PROTECTION PER NRC BULLETIN 2012-01 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION

By letter dated April 30, 2018 (Serial No. 18-072), Virginia Electric and Power Company (Dominion Energy Virginia) submitted a license amendment request (LAR) to add operability requirements, required actions, and surveillance requirements (SR) to the Technical Specifications (TS) for the 4160V emergency bus negative sequence voltage (open phase) protection function.

In a March 1, 2019 e-mail from Mr. Randy Hall (NRG) to Mr. Craig Sly (Dominion Energy Virginia), the NRG technical staff requested additional information regarding the proposed LAR. Dominion's response to these requests for additional information (RAls) is provided in Attachment 1 to this letter.

In addition to Dominion's response to the RAls, the following information is provided in the Attachments to this letter:

- Attachment 2 provides the discussion of a proposed administrative note to TS SR 3.3.5.4

- Attachment 3 provides marked-up Technical Specifications pages

- Attachment 4 provides proposed Technical Specifications pages

- Attachment 5 provides drawings illustrating the connection of PT fuses, BE1-47N relays, and the ABB-60 relay for the Unit 1 H bus

- Attachment 6 provides one-line diagrams highlighting the power feed from the transformers/switchyard to the safety related buses

- Attachment 7 provides proposed UFSAR Revision for Open Phase Protection per NRG Bulletin 2012-01

- Attachment 8 provides the Logic Diagram for the Negative Sequence Voltage Relay Scheme

- Attachment 9 provides the Visual Representation for the Response to RAI-EEOB-15

The addition of the administrative note in TS SR 3.3.5.4 was discussed with Mr. Randy Hall and other NRG staff during the RAI clarification phone call that was held on April 16, 2019. ::l t;7 ~

;vii<..

Page 2: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

Serial No. 19-210 Docket Nos. 50-338/339

RAI Response - Open Phase Protection LAR Page 2 of 3

The information provided in this letter does not affect the conclusions of the significant hazards consideration or the environmental assessment included in the April 30, 2018 LAR.

Should you have any questions or require additional information, please contact Ms. Diane E. Aitken at (804) 273-2694.

Respectfully,

t~-Mark D. Sartain Vice President Nuclear Engineering and Fleet Support

COMMONWEAL TH OF VIRGINIA ) )

COUNTY OF HENRICO )

The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Mr. Mark D. Sartain, who is Vice President - Nuclear Engineering and Fleet Support, of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that company, and that the statements in the document are true to the best of his knowledge and belief.

Aclmowledged before me this Z'{s/j, day of :1~ , 2019.

My Commission Expires: "W}~ :31, Z.02:, \

~~~ Notary Public

Commitments contained in this letter: None

Attachments:

DIANE E. AITKEN NOTARY PUBLIC REG. #7763114

COMMONWEALTH OF VIRGINIA MY COMMISSION EXPIRES MARCH 31, 2022

1. Response to NRC Request for Additional Information Regarding the Proposed License Amendment Request - Open Phase Protection per NRC Bulletin 2012-01

2. Discussion of Proposed Administrative Note to TS SR 3.3.5.4

3. Marked-up Technical Specifications pages

4. Proposed a Technical Specifications pages

5. Drawings Illustrating the Connection of PT Fuses, BE1-47N Relays, and the ABB-60 Relay for the Unit 1 H Bus

6. One-line Diagrams Highlighting the Power Feed from the Transformers/Switchyard to the Safety Related Buses

7. Proposed UFSAR Revision for Open Phase Protection per NRC Bulletin 2012-01

8. Logic Diagram for Negative Sequence Voltage Relay Scheme

Page 3: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

Serial No. 19-210 Docket Nos. 50-338/339

RAI Response - Open Phase Protection LAR Page 3 of 3

9. Visual Representation for the Response to RAI-EEOB-15

cc: U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, GA 30303-1257

State Health Commissioner Virginia Department of Health James Madison Building - y!h floor 109 Governor Street Suite 730 Richmond, VA 23219

Mr. J. R. Hall NRC Senior Project Manager - North Anna U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 B-1A 11555 Rockville Pike Rockville, MD 20852-2738

Ms. K. R. Cotton Gross NRC Project Manager- Surry U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738

NRC Senior Resident Inspector North Anna Power Station

I

J

Page 4: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

Attachment 1

Serial No. 19:-21 O Docket Nos. 50-338/339

Response to NRC Request for Additional Information Regarding the

Proposed License Amendment Request Open Phase Protection per NRC Bulletin 2012-01

Virginia Electric and Power Company (Dominion Energy Virginia)

North Anna Power Station Units 1 and 2

Page 5: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

Serial No. 19-210 Docket Nos. 50-338/339

Attachment 1 Page 1,of 15

RESPONSE TO NRC REQUEST FOR ADDITIONAL INFORMATION NORTH ANNA POWER STATION UNITS 1 AND 2

By letter dated April 30, 2018 (Serial No. 18-072), Virginia Electric and Power Company (Dominion Energy Virginia) submitted a license amendment request (LAR) to add operability requirements, required actions, instrument settings, and surveillance requirements to the Technical Specifications (TS) for the 4160V emergency bus negative sequence voltage (open phase) protection function.

In a March 1, 2019 e-mail from Mr. Randy Hall (NRC Project Manager) to Mr. Craig Sly (Dominion Energy Virginia Corporate Regulatory Affairs), the NRC technical staff requested additional information regarding the proposed LAR. The request for additional information (RAI) and Dominion's response are provided below.

NRC Comment: Regulatory Requirements and Guidance Documents

Title 10 of the Code of Federal Regulations (10 CFR) Part 50.36(c)(2), "Limiting conditions for operation, 11 provides the requirement for the establishment of TS limiting conditions for operation (LCO). Paragraph 50.36(c)(2)(ii) requires that a TS LCO of a nuclear reactor be established for each item meeting one or more of the criteria listed. Criterion 3 applies to this LAR, which states: "A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident [OBA] or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier. 11

10 CFR Part 50.36(c)(3), "Surveillance requirements, 11 states, "Surveillance requirements are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met. 11

RAI-EEOB-1:

In the LAR, Attachment 2, the licensee proposed to revise SR 3.3.5.1 as follows [change is shown in BOLD below]:

SR 3.3.5. 1 ---------------------------------f\/()T~-----------------------------------Verification of setpoint is not required.

Perform TADOT for LCO 3.3.5.a and LCO 3.3.5.b UVIDV Functions.

Page 6: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

Serial No. 19-21 O Docket Nos. 50-338/339

Attachment 1 Page 2 of 15

Please clarify whether UV/DV abbreviations have been defined in the TS elsewhere. If not, please provide the description of the abbreviation "UV/OV" In TS.

Dominion Response:

The UV/DV abbreviations have not been defined in the TS elsewhere. SR 3.3.5.1 has been revised to remove the UV/DV abbreviation. Marked-up and proposed TS pages for SR 3.3.5.1 are provided in Attachments 3 and 4, respectively.

RAI-EEOB-2:

In the LAR, Attachment 1, Page 5, the licensee stated:

While many OPCs would be addressed by the existing UV relays, some consequential OPCs are not readily detectable by the existing station electrical protection scheme at North Anna Units 1 and 2.

Please clarify what is meant by "consequential-,, in the above sentence.

Dominion Response:

North Anna considers consequential OPCs as OPC events that result in either a trip of, or damage to, ESF equipment prior to the equipment being able to perform its design function.

RAI-EEOB-3:

In the LAR, Attachment 1, Page 15, the licensee stated:

The negative sequence relay [BE1-47NJ includes an inverse timing characteristic feature that is adjustable from 01 to 99 [time dial] in increments of 1. The timing is based on the percent difference from the nominal system voltage. The calculated results show that with a time dial setting of 10.0, the negative sequence voltage relay was secure (i.e., would not issue an alarm) for the simulated unbalanced faults on the medium-voltage and low-voltage systems. The time dial setting of 10. 0 provides sufficient time to allow existing overcurrent relaying to trip on the unbalanced fault condition. ·

Please demonstrate that the BE1-47N relay time coordination with downstream protective devices is bounding (a sample calculation may be useful in this response).

Page 7: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

Serial No. 19-210 Docket Nos. 50-338/339

Attachment 1 Page 3 of 15

Please explain why the time dial setting of the BE1-47N relay does not need to be specified in TS.

Dominion Response:

A calculation has been performed to Ce{Tlpare the BE1-47N relay performance at a time dial of 10 against existing overcurrent trip times of ESF equipment. Results of the calculation indicate that the OPC protection will coordinate with existing overcurrent devices.

No coordination with existing Under Voltage or Degraded Voltage is required. Actuation of the OPC protection (provided by the BE1-47N relays), Under Voltage protection, or Degraded Voltage protection, will separate the ESF bus from the degraded power source.

The BE1-47N relays operate with an. inverse time characteristic, which results in a range of time delays for OPC events. Inclusion of the allowable values for the full range of time delays would not be practical. The North Anna Technical Requirements Manual is being revised to incorporate the setpoint for the BE1-47N relay. The setpoint includes the time dial setting.

RAI-EEOB-4:

In the LAR, Attachment 1, Page 17, the licensee stated:

A feature that blocks actuation of the voltage unbalance (open phase) protection function is also included in the logic scheme. This feature enhances the reliability of the protection system and prevents the protection scheme from automatically starling and loading an EOG in the event of a failed fuse on a PT or failed PT. To achieve this feature, one ASEA Brown Boveri (ABB) 60 relay will be installed per bus in the new voltage unbalance circuit.

The ABB-60 balance relay is a differential voltage monitoring relay. It receives two different voltage source inputs and compares them to each , other. When the voltage of one input changes with respect to the other · beyond the setpoint, the relay will energize, and only its set of contacts will change state.

A Cutler Hammer ARD relay will be installed downstream of the ABB-60 relay. One output from the ARD relay will be used to block the negative sequence two-out-of-three circuits from energizing. This relay will also

Page 8: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

Serial No. 19-210 Docket Nos. 50-338/339

Attachment 1 Page 4 of 15

send a signal to an existing spare annunciator window to indicate a 4KV PT fuse is blown.

Please provide the connection/schematic diagrams(s) illustrating the connection of PT fuses, BE1-47N and ABB-60 relays, as described above, for one of the 4160 V safety­related busses.

Dominion Response:

The portions of the station drawings which illustrate the connection of PT fuses, BE1-47N relays, and ABB-60 relay for Unit 1 H bus are provided in Attachment 5.

RAI-EEOB-5:

In the LAR, Attachment 1, Page 10, the licensee considered open phase conditions at the following locations:

Single open phase without a ground connection Single open phase with a 350 ohm grounded connection Single open phase with a solid grounded connection

Please describe whether the 350 ohm grounded connection represents a high impedance ground fault connection, as mentioned in NRG Bulletin 2012-01, and how this value was calculated

Dominion Response:

The total fault impedance of a high resistance fault was calculated based on an empirical model as discussed in the Surry Open Phase Condition Detection Analysis calculation and IEEE paper, "Typical Expected Values of the Fault Resistance in Power Systems." Using the most conservative method discussed in the IEEE paper, a total fault impedance of 173.4 ohms was calculated. This value was doubled to 346.8 ohms and rounded to 350 ohms for use in North Anna's calculation.

Page 9: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

RAI-EEOB-6:

Serial No. 19-21 O Docket Nos. 50-338/339

Attachment 1 Page 5 of 15

In the LAR, Attachment 1, Page 10-11, the licensee stated that analysis was performed for OPCs at the following locations:

High side terminals of the Switchyard Transformer TX-1 High side terminals of the Switch yard Transformer TX-2 High side terminals of the Switch yard Transformer TX-3 High side terminals of the RSST A Transformer High side terminals of the RSST B Transformer 0

High side terminals of the RSST C Transformer High side terminals of the Unit 1 Generator (Main) Step-up Transformer (GSU-1) High side terminals of the Unit 2 Generator (Main) Step-up Transformer (GSU-2)

Please provide a justification for why open phase conditions were not considered on the low side of above transformers; or not considered credible.

Dominion Response:

For the Switchyard Transformers, the low side of transformers TX-1, TX-2, and TX-3 equate to the high side of the RSSTs. It is expected that the analysis results in these cases would be similar or equivalent to those for the high side of the RSSTs.

For the RSSTs, any OPC event on the low side of the RSSTs trips the existing Under Voltage relays. In these cases, OPC protection would not be required. This was validated in EMTP-RV when developing case studies.

For the GSUs, the low side of the GSUs is terminated to a rigid isophase bus, so an OPC is not considered credible.

RAI-EEOB-7:

In the LAR, Attachment 1, Page 11, the licensee provided a description of various generating conditions and loading conditions (and large motor starts), considered for performing the OPC analysis.

The relationships between various generating conditions and loading conditions considered are not clear to the NRG staff. For each generating condition, please list the corresponding loading conditions considered. Also, explain how for each of the generating and loading conditions considered, the large motor start scenarios were also considered. ·

Page 10: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

Dominion Response:

Serial No. 19-21 O Docket Nos. 50-338/339

Attachment 1 Page 6 of 15

A list of conditions modeled for performing the OPC analysis for the BE1-47N relay is included in Attachments 1 & 2 of the North Anna Open Phase Analysis Calculation. All combinations of loading conditions and generating conditions were considered with and without a SI/CDA signal or large motor start. Reactor Coolant Pump motor start was the large motor start chosen for offline cases and a tandem Main Feedwater motor start was the large motor start chosen for online cases. These motor cases were selected based on the most severe impact on the electrical system.

The following chart provides examples of plant configurations coincident with the OPC event:

Generating Bus Loading 51/CDA Large Motor Start Condition Initiation Offline Minimum No No

Loading Offline Minimum No Yes

Loading Offline Minimum Yes No

Loading Offline Normal Loading No No Offline Normal Loading No Yes Offline Normal Loading Yes No Online Minimum No No

Loading Online Minimum No Yes

Loading Online Minimum Yes No

Loading Online Normal Loading No No Online Normal Loading No Yes Online Normal Loading Yes No

Page 11: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

RAI-EEOB-8:

In the LAR, Attachment 1, Page 13, the licensee stated:

Serial No. 19-210 Docket Nos. 50-338/339

Attachment 1 Page 7 of 15

For cases where the voltage unbalance is greater than 5%, the results indicate that the BE1- 47N relays trip and isolate the motor loads before the integrated (/2

x t)[sic] values reach 20 pu [per unit] and before the motor load's associated overcurrent relay trips (when applicable).

Please describe the relationship between the percentage voltage, unbalance and negative sequence current. Quantify the time duration for which the motor may be operated from the OPC source before the negative sequence current heating capability of the motor is exhausted, and before the motor associated overcurrent trips (A sample calculation may be useful in this response).

Dominion Response:

Continuous duty motors are susceptible to additional heating during an open phase condition due to negative sequence current. Induction motors have a withstand capability against unbalanced voltages which is calculated using an integrated per-unit negative sequence current (b) squared times time (~ in seconds (I/ x t). An evaluation performed in the North Anna Open Phase Analysis Calculation determined that a conservative value of 20 pu (40pu/2 motor starts) should be used to ensure all motors have enough thermal capability to perform their design functions.

The EMTP-RV simulations conservatively do not include the effect of motor cooling. Continuous duty induction motors are capable of continuous operation under low levels of voltage unbalance. According to NEMA MG-1, for a voltage unbalance between 1 % and 5% (percent of motor nameplate voltage), the motor horsepower should be de-rated to account for the additional heating. Operation of the motor with a voltage unbalance above 5% is not recommended. Therefore, for a voltage unbalance greater than 5%, the BE1-47N · relays should isolate the motor loads from the OPC condition prior to the / 2

2 x t value reaching 20 pu.

To validate this condition was met for the BE1-47N relays, a model was created in EMTP-RV to calculate the time until the /2

2 x t value for each monitored motor reached 20 pu. This value was compared to the trip time of the BE1-47N relay for each event modeled. 1

Page 12: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

RAI-EEOB-9

In the LAR, Attachment 1, Page 13, the licensee stated:

Serial No. 19-210 Docket Nos. 50-338/339

Attachment 1 Page 8 of 15

The BE1-47N relays did not actuate for many ungrounded open phase events on the high voltage side of switchyard transformers TX-1 and TX-2. For these conditions, the analysis determined that thermal damage may occur to the Auxiliary Feedwater (AFW) Pump Motors and Inside Recirculation Spray (ISRS) Pump Motors if they are operated continuously under accident loading conditions. For these cases, the Alstom open phase detection relays will detect the open phase event and initiate a trip of its associated transformer within 5 seconds to provide protection to the downstream loads and to be within the time frames considered in the accident analysis.

Please confirm that the non-Class 1 E Alstom Open Phase detection/protection at switch yard transformers TX-1 and TX-2 is not in the scope of this LAR.

Dominion Response:

Dominion confirms that the non-Class 1 E Alstom Open Phase detection/protection at switchyard transformers TX-1 and TX-2 is not in the scope of this LAR.

RAI-EEOB-10

In the LAR, Attachment 1, Page 13-14, the licensee stated:

BE1-47N relays did not actuate for ungrounded open phase events on the high voltage side of GSU 1 and GSU 2 when Class 1 E Bus is aligned and Units are offline. For these conditions, additional analysis was performed to determine if thermal damage may occur to the AFW Pump Motors and ISRS Pump Motors if they are operated continuously under accident loading conditions. Further analysis documents that the AFW and ISRS pump motor insulation will be capable of performing their design function on the most limiting case. Therefore no additional protection is required for this condition.

Please clarify in the first sentence, whether the words "Units are offline" should actually be "after a Unit is tripped." Please provide a more detailed description of the analysis described above. (A sample calculation may be useful in this response).

Page 13: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

Dominion Response:

Serial No. 19-210 Docket N,.os. 50-338/339

Attachment 1 Page 9 of 15

The OPC events on the high side of the GSUs were evaluated with the unit already offline. When the Main Generator is online, an OPC on the high side of its associated GSU is expected to actuate the generator's negative sequence current protection, which will trip the unit. For Unit 1, the resulting configuration is equivalent to 0% backfeed operation, which is evaluated. For Unit 2, the resulting configuration will isolate the OPC from the station.

RAI-EEOB-11

In the LAR, Attachment 1, Page 15, the licensee provided a Table which summarizes the minimum and maximum Negative Sequence Voltages calculated at each of safety related buses (1H, 1J, 2H, and 2J) for open phase locations at TX-1, TX-2, TX-3, RSST­A, RSST-B, RSST-C, GSU 1-1H, GSU 1-2J, GSU 2-1J, and GSU 2-2H.

Please explain why two open phase locations have been considered for each GSU (e.g., GSU 1-1 H, GSU 1-2J), whereas according to the LAR, Attachment 1, Page 11, only one open phase location has been considered on high side of each GSU. For the various operating conditions, please provide one-line diagrams highlighting the power feed from the above transformerslswitchyard to the safety related buses.

Dominion Response:

One location is considered for each GSU (OPC on the high side of the GSUs). Two plant configurations are considered based on possible Station Service Bus to Emergency Bus cross-tie configurations. The one-line diagrams highlighting the power feed from the above transformers/switchyard to the safety related buses is provided in Attachment 6.

RAI-EEOB-12

In the LAR, Attachment 1, Page 40, the licensee stated:

A UFSAR change request has been initiated to revise · the UFSAR to describe the voltage unbalance analysis and detection/protection scheme implemented by this modification.

For any portions of the UFSAR change that are within the scope of this LAR, please provide a proposed markup of the UFSAR change.

Page 14: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

Dominion Response:

Serial No. 19-210 Docket Nos. 50-338/339

Attachment 1 Page 10 of 15

Proposed markup of the North Anna UFSAR within scope of this LAR is provided in Attachment 7.

RAI-EEOB-13

In the LAR, Attachment 1, Page 20, the licensee stated:

For single ungrounded open phase events on the high side of transformers GSU 1 and GSU 2, there is insufficient negative sequence voltage to actuate the BE1-47N relays. However the negative sequence voltage is greater than 1 % when the open phase event is coincident with a pre-existing 3% switchyard unbalance.

Please provide the basis for the pre-existing 3% switchyard unbalance assumption.

Dominion Response:

ANSI C84.1-2001 discusses how electric supply systems should be designed and operated to limit maximum voltage unbalance to 3%. This value was used in the North Anna Open Phase Analysis Calculation to represent the maximum expected switchyard unbalance seen by the station prior to the OPC condition.

RAI-EEOB-14

Please provide a logic diagram and provide a discussion that clearly demonstrate the negative sequence voltage relay scheme (detection, alarm, and protection), including the feature that blocks actuation of the negative sequence voltage (open phase) protection using the ABB 60 (voltage balance) relay. Also discuss how that scheme interfaces with the existing undervoltage (UV) and degraded voltage (DV) relay protection schemes, which trip the offsite power circuits at the ESF bus level and initiate the EOG starts.

Dominion Response:

A logic diagram is provided in Attachment 8 to illustrate the negative sequence voltage relay scheme and how it interfaces with the existing undervoltage relay protection scheme. The logic diagram provided is for Emergency Bus 1 H; Emergency Buses 1 J, 2H, and 2J are similar. A description of the scheme is provided below.

Page 15: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

Serial No. 19-21 O Docket Nos. 50-338/339

Attachment 1 Page 11 of 15

The open phase protection system is being implemented on each of the four Emergency Buses. The system consists of three Basler BE1-47N negative sequence relays, with each relay detecting all three phases, connected to each of the emergency bus (1 H, 1 J, 2H, and 2J) potential transformers (PTs). The three negative sequence relays each contain an auxiliary relay, which is used to develop a two-out-of-three logic scheme. This requires two or more relays to sense a voltage imbalance greater than 4% (i.e., an OPC) to initiate protection of the emergency bus.

The open phase detection scheme is inserted into the existing undervoltage protection circuit for each Emergency Bus. The initiation of an undervoltage or open phase actuation, requires that the emergency bus is being fed from an off-site power source. The parallel input (undervoltage and open phase) feeds an additional parallel circuit containing 52 contacts of each source of offsite power.. To include this logic in the protection scheme, wiring is installed to 52 contacts at the respective breakers that supply offsite power to the emergency bus.

Additionally, a feature that blocks the open phase system protection actuation is also included in the logic scheme. This feature enhances the reliability of the protection system and prevents the protection scheme from actuating in the event of a failed or degraded 4kV bus PT or blown PT fuse. To achieve this feature, one ABB 60 voltage balance relay is installed per bus. The relay compares 4kV Emergency Bus PT voltages with 480V Emergency Bus PT voltages. Relay contact outputs specific to e.ach voltage source actuate if the given source lowers to the voltage difference setpoint. The 480V PT source output contact is not used; however, the relay may activate that contact for a 480V bus transient, fault, or other event on the 480V system that causes that voltage input to the relay to reach the setpoint. If a 4kV PT failure occurs, the relay senses a voltage imbalance and opens an auxiliary relay contact which blocks the open phase protection system. One relay contact is also used to operate a white light on the front of the relay panel that will alert operators that open phase protection is disabled.

In summary, actuation of the open phase protection scheme for any given Emergency Bus requires the following conditions to be present:

• A voltage imbalance greater than 4% has been sensed by two-out-of-three negative sequence relays,

• The protection scheme is not blocked due to a failed or degraded 4kV bus PT, and

• The Emergency Bus is being fed from the normal or alternate offsite supply breaker.

When the above conditions exist for an emergency bus, an auxiliary relay is energized. The auxiliary relay actuates an overhead annunciator in the Main Control Room and will also close a contact, thereby energizing an existing undervoltage protection auxiliary relay for the associated bus. This auxiliary relay trips the bus normal supply breaker or

Page 16: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

Serial No. 19-210 Docket Nos. 50-338/339

Attachment 1 Page 12 of 15

alternate supply breaker, starts the EOG, and transfers following the same process as the undervoltage/degraded voltage protection scheme. Tripping the emergency bus normal or alternate supply breaker is an adequate response to an open phase event, since it separates safety related and important to safety loads from the degraded offsite source and provides these loads with a reliable source of power from an EOG.

RAI-EEOB-15

In the LAR, Attachment 1, Page 16, the licensee stated:

For open phase conditions on Transformers TX-3, RSST A, RSST B, and RSST C (Delta-Wye Transformers) the minimum negative sequence voltage on the impacted emergency buses is above the minimum possible setting for the BE1- 47N relay. The minimum observed negative sequence voltage was 12.318V (17. 78%), located on Bus 1H for an open phase condition on RSST C.

Please confirm whether the above negative sequence voltage of 12.318 V (17. 78%) can be considered as Analytic Limit for calculating various margins with respect to the nominal 4% pickup setting of the BE1-47N relay.

Dominion Response:

The BE1-47N relays are calculated to always trip at > 3.538V. For OPCs at TX-3 and RSSTs A/8/C, the lowest negative sequence voltage observed is 12.31 SV, which ensures the OPC is detected. A 4% setpoint was chosen for the BE1-47N relay and calculated to have a ±1.106% maximum uncertainty. The BE1-47N relay may detect the OPC from 2.005V to 3.538V. Voltages below 2.005V will not result in a trip of the BE1-47N relays. A visual representation of this response is provided in Attachment 9.

RAI-EEOB-16

In the LAR, Attachment 1, Page 12-13, the licensee stated:

This thermal capability also has to consider that Class 1 E motors restart on the EDGs after tripping from the unhealthy source. To account for this motor starting sequence, a total thermal limit (12 x t)[sic] of less than or equal to 20 per unit (pu) (40 pu/2 starts) for Class 1 E motors during the open phase event concurrent with a LOCA is used as a bounding condition to ensure the motors have enough thermal capability to perform their safety functions.

Page 17: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

Serial No. 19-210 Docket Nos. 50-338/339

Attachment 1 Page 13 of 15

Please describe the basis for the assumption "a total thermal limit (/2 x t) of less than or equal to 20 per unit (pu) (40 pu/2 starts) for Class 1 E motors.

Dominion Response:

The basis for using 20 pu as a limit for the I/ x t thermal capacity is from a Surry calculation, as summarized below:

No standards exist which describe the permissible negative sequence load current operation for induction motors. However, a few guidelines for motors have been suggested as follows:

o An IEEE 1985 IAS paper suggests that (l2)2t :5 120 pu for short-time operation.

o An IEEE 1958 PAS paper suggests (!2)2t = 40 pu.

o The Westinghouse protective relaying book indicates, "No standards have been established for the 1/t short-time capability of a motor, although 1/t = 40 pu is regarded as a conservative value."

o A 1979 technical paper authored by General Electric application engineers, suggested that (1 2)2t can be estimated (based on an empirical relationship) using the safe stall (locked rotor) time and inrush current (i.e., LRA) of the motor. They proposed that (!2)2t capability~ (1/3) x (LRA)2 x Motor Safe Stall Time. The table below is developed following this guideline; assuming that the LRA = 6 x FLA, or 6 per unit.

Motor Safe Stall Time (seconds) (/2ft= 20 240 10 120 7.5 90 5 60 3.33 140

The motor (/2/t =240, 120, 90, 60, and 40 curves have been plotted with the aid of the ETAP Star Module. If the actual (or estimated) motor safe-stall time and LRA are known, similar (!2)2t curves can be developed fbr any induction motor. The motor "hot" safe-stall time should be used since the open-phase scenario can occur when the motor is running and operating at or near its rated temperature.

However, for North Anna Power Station, the hot safe-stall time of every motor is not available in existing motor vendor data. Therefore, a conservative value of(l2)2t = 40pu was used. This represents a hot safe stall time of 3.33 seconds.

Page 18: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

Serial No. 19-210 Docket Nos. 50-338/339

Attachment 1 Page 14 of 15

Based on a survey of industry guidelines, the (12/t heating capability of an induction motor was conservatively assumed to be equal to or greater than 40 pu.

RAI-EICB-1

In the LAR, the licensee proposed to add new Surveillance Requirements (SR) 3.3.5.3.c, as follows [changes are shown in BOLD below]:

SR 3. 3. 5. 3 --------------------NO TE----------------------------­

Negative Sequence Voltage is calculated

as a percentage of nominal voltage.

Perform CHANNEL CAL/BRA TION with Allowable Values as follows:

c. Negative Sequence Voltage~ 2.894 % and S 5.106 % for LCO 3.3.5.a and LCO 3.3.5.b Functions

In the LAR, Attachment 1, Page 16, the licensee provided the maximum uncertainty (i.e., the Channel Statistical Allowance, or CSA) for the Basler BE1-47N relay at the 4 kV emergency buses, which was calculated to be ± 1.106% of span. The instruction manual for the Basler BE1-47N Negative Sequence Voltage Relay stated that, "Pickup accuracy is within ± 1 unit of the percent setting of the negative sequence voltage." The LAR indicates that a 4% relay pickup setting, with a time dial setting of 10. 0, would be implemented for the relay settings.

The NRG staff notes that a similar license amendment for Surry to modify the plant Technical Specifications to address surveillance requirements for an identical manufacturer and model number negative sequence voltage relay used a 6% relay pickup setting with a ± 2.4% CSA. This LAR specifies a CSA of ± 1. 106% for North Anna with identical relays. It is unclear if the small operating margin provided by this CSA sufficiently accounts for all the uncertainties that could lead to spurious trips of the power supply system as a result of routine fluctuations in power conditions.

Please provide a description regarding each of the uncertainties included within the proposed CSA of± 1. 106% of span, such as instrument accuracy, calibration accuracy, drift, etc. The description should demonstrate that the setpoint plus-or-minus the calculated total performance uncertainty would not result in frequent spurious trips.

Page 19: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

' Serial No. 19-210

Docket Nos. 50-338/339 Attachment 1

Page 15 of 15

This information is needed to enable the NRG staff to verify the requirements of 10 CFR 50.36(c)(2) and implementing guidance within Regulatory Guide 1.105 are met regarding the selection of the setpoints and allowable values to protect against an unbalanced voltage potentially leading to an open phase condition.

Dominion Response:

North Anna BE1-47N Channel Statistical Allowance Calculation included the following uncertainties:

• Rack Calibration Accuracy of ±1 % (based on BE1-47N pickup uncertainty)

• Process Measurement Uncertainty of ±0.365%. This was determined by taking the PT uncertainty of 0.3% and taking into account phase errors as defined in IEEE C57.13-2016.

• Sensor Measuring and Test Equipment Uncertainty of ±0.3%

The differences between the uncertainty bands at North Anna and Surry can be attributed to the variations in the Process Measurement Uncertainty. This can be explained by the different PT designs and IEEE C57.13 editions used at each station. North Anna used the 2016 edition of IEEE C57.13 and Surry used the 2008 edition of IEEE C57.13.

Page 20: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

Attachment 2

Serial No. 19-21 O ,, Docket Nos. 50-338/339

Discussion of Proposed Administrative Note to TS SR 3.3.5.4

Virginia Electric and Power Company (Dominion Energy Virginia)

North Anna Power Station Units 1 and 2

l

Page 21: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

Serial No. 19-21 O Docket Nos. 50-338/339

Discussion of Proposed Administrative Note to TS SR 3.3.5.4 ·

The proposed administrative note to TS SR 3.3.5.4 is for clarification purposes only. ESF Response Times are only applicable to under voltage and degraded voltage functions. Neg.ative sequence relays have an inverse time characteristic and the response times will

vary depending on the amplitude.

The negative sequence relays are subject to the performance of the Trip Actuating Device Operational Test (TADOT) and channel calibration in accordance with the Surveillance

Frequency Control Program

Page 22: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

Attachment 3

Serial No. 19-210 Docket Nos. 50-338/339

Marked-up Technical Specifications pages

Virginia Electric and Power Company (Dominion Energy Virginia)

North Anna Station Units 1 and 2

Page 23: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

Technical Specification Marked-up Page from _ Original LAR submittal, dated April 30, 2018 LOP EOG Start Instrumentation

3.3. 5

ACTIONS

CONDITION REQUIRED ACTION COMPLETION TIME

C. Required Action and C.1 Enter applicable Inmediately associated Completion Condition(s) and Time not met. Required Action(s) for

the associated EOG made inoperable by LOP EOG start instrumentation.

SURVEILLANCE REQUIREMENTS

SURVEILLANCE FREQUENCY

SR 3.3.5.1 --------------------NOTE-------------Verification of setpoint is not required.

Perform TADOT for LCO 3.3.5.b~ _nctions. the Surveillance

J' Frequency Control --~~~~~~~~~~~~~~~~~~~~~---1 Program S ~ 3 ,3,S-, 1--- K Se« nc..i<,+ t -f.or wta.r~vp

3 '** .See t"\e...)!;+ f>".1t. of.or ,w-h .. \IIJ\,c11.d.,vf SR 3.3.5.\ ·Perform CHANNEL CA[IBRATION with

Allowable Values as follows:

a. Loss of voltage Allowable Values ~ 2935 V and~ 3225 V with a time delay of 2 ±1 seconds for LCO 3.3.5.a and LCO 3.3.5.b Functions.

b. Degraded voltage Allowable Values ~ 3720 V and~ 3772 V with:

1. A time delay of 7.5 ±1.5 seconds l'lith a Safety Inject ion (SI) signal for LCO 3.3.5.a Function; and

2. A time delay of 56 ±7 seconds without an SI signal for LCO 3.3.5.a and LCO 3.3.5.b Functions.

(_, -h.{t, ' t.. I)

In accordance with the Surveillance Frequency Control Program

~ J.. '6i'fl• a.1AJ. !::.. S. to(:/t, .(:.,, r ·-

U..o 3,3,6'o. O,\A~ LCO 3,3.s~ ~\A,~-\t.i-101tS

North Anna Units 1 and 2 3.3.5-2 Amendments 262/243

r

Page 24: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

Technical Specification Marked-up Page from Original LAR submittal, dated April 30, 2018 LOP EOG Start Instrumentation

3. 3. 5

SURVEILLANCE REQUIREMENTS

SR 3.3.5. '1

SURVEILLANCE

erify ESF RESPONSE TIMES are within limit for LCO 3.3.5.a and LCO 3.3.5~b Functions.

FREQUENCY

In accordance with J the Surveillance · Frequency Control Program

->t S'1.. 3 .3. 5, J. . f'JC:,T~·~-----~ V((~ ~u·.~-tle» o.(: ~+~~11d5 V}o+ ~~LVr#

-.::z:-"" 6',(..(_0 ,~vt(. ti?. u., jf.11)

~ Su.. r'v e·, \~O\.vtC. <..

~re9'i>4r1<..y (.o .,.__{ rc>I -?e.r~"'- TA uo -r ~ r Lto 3.3,rC\ °""J.. L(o 3,"".?,.S--b /Jej.a.t,v.z S~v~(.(,. (ro ..:l,.,.. .,..,... ~e,{°1 Fv.1A<J:o ~

*** SR 3.3.5.4 NOTE

North Anna Units 1 and 2

~ - 4 #6T~~·~~~~~..__._,... /Jtju.itV/; Seil((,4,\(,e. V"l~t., is C.C\lc.v(.fttld Q...S o.. ~.a.(<-<..V\."t<je o+ Y\.Ov.tt,lVl~I · vol-\-~e. __ _,.;;,. ____________ -----

~~~~~~~~-NOTE~~~~~~~~­

ESF RESPONSE TIMES are only applicable to Loss of Voltage and Degraded Voltage Functions

3.3.5-3 Amendments 262/243

Page 25: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

Attachment 4

Proposed Technical Specifications pages

Virginia Electric and Power Company (Dominion Energy Virginia)

North Anna Power Station Units 1 and 2

Serial No. 19-210 Docket Nos. 50-338/339

Page 26: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

LOP EOG Start Instrumentation 3.3.5

SURVEILLANCE REQUIREMENTS

SR 3.3.5.1

SR 3.3.5.2

SR 3.3.5.3

SURVEILLANCE

--------------------NOTE----------------Verification of setpoint is not required.

Perform TADOT for LCO 3.3.5.a and LCO 3.3.5.b Loss of Voltage/Degraded Voltage Functions.

--------------------NOTE----------------Verification of setpoint is not required.

Perform TADOT for LCO 3.3.5.a and LCO 3.3.5.b Negative Sequence Relay Functions.

--------------------NOTE----------------Negative Sequence Voltage is calculated as a percentage of nominal voltage.

Pefform CHANNEL CALIBRATION with Allowable Values as follows:

a. Loss of voltage Allowable Values ~ 2935 V and~ 3225 V with a time delay of 2 ±1 seconds for LCO 3.3.5.a and LCO 3.3.5.b Functions.

b. Degraded voltage Allowable Values ~ 3720 V and~ 3772 V with:

1. A time delay of 7.5 ±1.5 seconds with a Safety Injection (SI) signal for LCO 3.3.5.a Function; and

2. A time delay of 56 ±7 seconds without an SI signal for LCO 3.3.5.a and LCO 3.3.5.b Functions.

c. Negative Sequence Voltage~ 2.894% and~ 5.106% for LCO 3.3.5.a and LCO 3.3.5.b Functions.

North Anna Units 1 and 2 3.3.5-3

FREQUENCY

In accordance with the Surveillance Frequency Control Program

In accordance with the Surveillance Frequency Control Program

In accordance with the Surveillance Frequency Control Program

Amendments

Page 27: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

LOP EDG Start Instrumentation 3.3.5

SURVEILLANCE REQUIREMENTS

SR 3.3.5.4

SURVEILLANCE

--------------------NOTE----------------ESF Response Times are only applicable to Loss of Voltage and Degraded Voltage Functions.

Verify ESF RESPONSE TIMES are within limit for LCO 3.3.5.a and LCO 3.3.5.b Functions.

North Anna Units 1 and 2 3.3.5-4

FREQUENCY

In accordance with the Surveillance Frequency Control Program

Amendments

Page 28: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

Attachment 5

Serial No. 19-21 O Docket Nos. 50-338/339

Drawings Illustrating the Connection of PT Fuses, BE1 -47N Relays, and the ABB-60 Relay for the Unit 1 H B"us

..

· Virginia Electric and Power Company (Dominion Energy Virginia)

North Anna Power Station Units 1 and 2

Page 29: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

tJl l~

.:I ~U2-3Hllll ... ~I

. I 1 PllJ

O

i , ,1 ,,,~ " L :'1J:, , ~-,~<" 1 ,l '1.,Ll.~l .,,,,,__~•U• I 1.!!U . _!

,., "'f .,,: ''" ., • 1 ~ , L --"'--i--' .. -..µ,,f ' ' •. ,., .... , ---- -- - " ' ,, ·"' ,., ·•·. ~ •· .,:r,. r ,, • ••. :

-- ··1 ., l J •:. --- --, ' ' 1 "''!"'t"-, ~- ' -~----"---- " : : ' ~,. .., i 1' i i ~!;;.'! ~-'"·· i :__i, c,';,,. - ,.';,,. i !' '~:: "!;;~"' i i

I;:~ TA.v,Sl(t1!j

"" '

..... !!!:,l

2 I .cot.:TFIC''i 1E..S1-10q T :£HS~liN I r' ' T 11~- l 1

l~t\•H•fil.'• l\•£.E•tn.l• 1 I fSk.•(111 'y' I

! !. bll~r 'y ~11.;Jt 1~ ! l f ' 12f :

: "! _______ -- : ---• --- """a.---' ! }·-------, """, ;;,,, , e,:, •• ,. I ,__ ""'." ' ' .,.,,,. j "r~ IEl<'illU~ ') •L ,._ "~ rX!.

;:{@> rn{,;,, - o ~·,y,

IP<oiiJU)r.

,ti_,

! 3t fi_-=:;_1,1--1 ~i .,., ... ! i

I :~~'\ f_: l ES!C tLA ~u:

.:.-;l•IHJ· i : n1u.1. IIE;r : : t 'fll;':;, I : L_ ___ .. l :2 I NIii( ~ ___ j _______ __ _!

:;:lEu, "'' "'" ~ f!:Tu

@"l,.l:ll~',, ;.R!)~tfiVU ~ 25,,,

_!_ .J 2 tt~IJ !!:Y!! 104 -.; ~

11tG'.2j"' TRl,t.-SffNT

l•El'-Ctl•:!t/?m.J ~

Nm 19·6

M-J,, 01.X:..02

Plk){IO fESIUCl!I

z•--·;:,,1011,u .. ,rt~,, ... ,,.n

--lf-o:~l;g.'.1:;· J<>--ir"· ,~~~:~;;; r<>--it-• ~~""I;

~t-,14~

Hl•

""'

<l60V EMERGENCY Bu'S 'lH' UNOERVOLTAGE/VOLMGE UNBALANCE CKT - IENliH03 !OAA'IGE CABLEI

1"7f-ot 'i" .. f::;.1i :J<>--it-•:;-;,;:'d.,.'.~' ro-{t-,au<Ola{

--lt-o•a:;,,...i'. i;oit.

~f-oisr""4

)o-jf-o• ~~~·;..~

'a---1)-u •;;,\'f~ "-ir"•~ :.,OoR(

1ll:l.l:1:.:.

·-u--,l~INJ$U,,Q

:<>-;If-<>~" VON!.

1-Jt-<>:1<> ·~1~...., •o-::lf-c, ....... _

= ·C(-)• 1l,~IIUl!>l·c..<-l'I

lo-JI-<>~-

~<>-! t-o• ~":i't;::. '-ir"• \O::g:; --lt-1,,;• .. l

ill.:.lt:IZ:

1<>-;1-<> ,~ r,,i~ !Jo<~

~°*"":,.;:,o­]<>-!t-o~1"'~t'\IC,

·.-.i+-o·•~"<

1~~~:;:· 1:i-r..,:111~1·1.~·.lh

,...,~~ ?""l

JO-,t-o• ~;:,:~ ro-jt-• ~ .. ,;go·:; -ii-,~ ~~.,,c.

dJl•[rtl•

1o;,-.., .. ~1~ :lo<.

;:::o-;tt-oi .. !l'l'K

l<>-i}-ol'IT~l~~o<(;

•""ff-<> ... ~·-~

"ft•J• \."Wl,:.<IU1!>>·~?:-)1

lri&l3:,.ll. :;:,:fNI

·--- ,,..-•o-i}-o: 111,~·c:.r-:.,i...,

»-H-""•"-'~ --11->u ?:I<(

--ti-->••?~

~

l·EbJi0,2<11

(;t11.tl2

6)1 ~ !2!j~"

11'GJl1'.li, r~IE,,,rf ~II

. ~ .. ""r"

1-!hai~-<•11

l6·Jt1

M

~ t. fCR "IQit:S ~O f<O'Ef'IE!<C(S Oft.<IWINc.S -St£ ll71">·1't,·::U !.. F"Of< TU'lli: lD l<l!P CHAAAC"1£AISTJCS SEE Yfl" ~'1-em-~OOil!i ). CONr;.crs Ottir,,(jE SlAlC lHSU,N[~IJIJSLT ... t1EN THE DlffE!lfH:E'.

6f"T'o1£[fl U!.C ,11 ~NO LINE O rs [QU-t. ca CRCMc:A ?H.1H Tkt SE"TPOIHT. T11£F.E:1."'l'C°"T,.:JSIIES;I :r; l~COtlOt.FIERT><E C!;NOlt [:W Cl.£rl~S. DM..T Tkt CC.WACTS RO./,Tl'.'IG ro LIN!:,, .:IRC u-;;[O.

PRIORITY ORAWING

~Dominion IIIUCl.EAJl ENCU<t:f.RJNQ

RICf1NOND,YUIC.llU,1L

o.c. ELEl<ENTAR¥ O!AGRAM m0v EMERG BUS 'lH' UNOERVOLTAGE

NORlH ANNA POWER STATION - UN!l l

:,";'~::,;:;-,t--:• l_,1"}'1715-FE-21TA .. 5

l.f.l"Ol -u 1=-t• -.: I.N.C~nll•(lnrt!.IKIIO 1~1 i,-1

M

RI~ TD USIN!i FOR OESl~I \l"J.AK OECK DNIS.FOR ~-ai;,: P£N~ll<C

,1

Page 30: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

k=;,:,c~!xf.,llll1:1:~'~u'i!l!O:m fill3{!

n !l'J1.'IQ AH!llNJWJB 70

YlttTtltllA0 0110111<.,I~ '0~11!;1:a"lollDH:I IIY;n:inH

uo1u1woa~

~NIMV!IC A.LIYOl!ld

1:111·~3-S.llll ~11S]J l/l'!:l:ltl:l3':JUl"IO,.KIQ'ln

.111. $11,a tl;WJ lol'1!:l'J'IIC: 1'131:l"t

l!JNt1'Vl:l0'1Jl<]~J3!J

'J!S :i·.:: i., HS oca1 •33..,.1.10,. '1'>!'111'1Cl'I :i:tt J~.ca':" 1:10 1,;, 1Hi~~r,,l11 un>iu ~,s,,,as ,.., or"' NO 1J)}IQ<1 'lll:UNDJ

JfJI-IJTA 31'1JS .. fT~SNl t,;t'll'IG>JSJ.>.,Jt<O;- J':'1'.l>:I 11'1".(

Ot•:>U.·lf9•<;L.£il !IO:J3t:l"J,.'t,Cl'tC!N'trnr;:~J,JO

lmi l.lrOIIO.,, S'W)r Cit(? 3::rA3Q ',I

110::-0::i-.n-u

YI "U.'fl'd 't!lJ.VM l.NJWdtnOl 11V' 't>

'OllON SmNO ».n1 7d\' ~3"1~f?l~J ~.{ ~ "llO J.1YltktO'ldd¥3HJ. H.1.IM'S.00 J'tllt\1--rt' X~

-17.w1

J•"''-"lo-j~. ),J',y!.~<>-1~

·~~i;s~~l:!!•c-Jt-<,1

I I

' ' I I

' ' ' I I I

ll-! .... ~-+--==_J'- ~~~

,,,...-;1<>-lj-.,,1

= OL2)fUN1"7rH-ir :1'96l2)t'U}ll't!r1~

-'t.li!')l'UNl°'r~

-Z .. 'Z)lllM";-U-~

... ;..,zrJ.J,r,~rt'

-m )("J.!;r;-H-r

...;rr ••..s:,u--11-<>11

_;;; ;,:~~1,,,,o-i1-1o ,....,,,~l ) .... ,,,.....t-.

-'J)'\lNl•o-lf-ot.

-· "'n't~i-.:,

)IJYdS~~ l~,-,. = -:»;v.r."'Zr-1-tr

"'1fi:~~'i,--,,, Jl(W,5~j°'*t'

:,OOiitv.Ls: .. ~

~Pi~~h-#·~ JIJVd'!.~-i\----r

c,~· ILII ,., L • _. • ..,.,.. -~~;:i:1;~~1

Clil ~~'"}{~!~~ till~~~=~~ ,aova11u,,1~1---;'.:

~-~~~~

= l?IYdS~

tH15'J·~ '"'11)~~1!~..,.-ff-( l)ll-l~t:ff{1"'rf"T

= -MLZ.YUNIC,,-·if-.;o

1UJ,;i.e~d!M1-...t-.o 1ii~oll'~ifilcv,1"'-t"'

~~~!<>z--0--p

nmm -J<9>1'UNI~

["i*?

-i."9)11.L~~

-)~ >f"U.'il-z,#-r

0.Ul'Jl::.JJN

•••(101..---·•: ·-·

.. ,, ... 1 7 J

Page 31: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

XIZ·,J·Sllll

<180'/ E,1,1ERGENCY St.'S IH-fE~'5i102(CRMIGE CABL.£)

... ,w [~--------1---------------------

j~}·"' 18)-•m ,~,) -· "'·"" .... ! 11115-C~·llll ...

~,ti,1

r ,----------------------------------­n-2W] 2---------+-...-----------------------

Lc

46CV E.\IIEFLENCY-BUS 1H!~'EJSHO:!(~ CA&.£)

IA-------------------------1a( a------------;,--------------------------­"~'l c----------""--,--.-----------------------

48(){ EMER:iENCY SUS IJI-IE.JSJ03 {PU~ OOL£)

~,----------...--------------------------­,.,.1,-----------1---------------------------­Le----------+---------------------------

NOT(S: l...4H(C:...,JP'Loc;01•r.oi~u..i.t!ZMeUOCIH(Aw!!.t

i, .. Vt.11 10 D~. 1111'>-·~·UIC tui,i: , .. ~ ~ll'.C'I '!;ICC Cf" REUi~ l'.Q• lHI "'4 ~l'1olttl C.O,,fl,Cf nnllOl'M("1•

<t ~m ~.t:~·~!~ki~u;·in:~!'d1~.;t~~l)

AC ELEl<ENTMY DIAGIW-1 ,a~v SWGR BUSES

IH, !J, IHI. ! IJI NORTH A~~A PCTJER STATlON • UNIT l

M

P/l!.leti t:J USl:G FOR OESIC.~ \IOOX 0;9:( ClHIS f,JA I/ORJI P[lltlltiG

'I e I l

J

Page 32: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

--------------------------------------

r------------------------------------------------------· -- - - . ---- i I I

D TO Ill ~2illlY/120Y PT, SEE1l715·FE·Z1ESH.I

3 2

·..5QE_ [Ni;[: .. ) lSHZ-r----- pl

PE 1 $' Ji 19· 121.,.,s,c- J 35{_ I ~Tvn• (ZJA I

PS j JINCTE3) [

ABB27N 27~ L--- - \:LI TOOO IH .2

CN!J:TE '5~!S' PE JQ .!

PD

-coi,

TS47

~ R011 15HZA

J. ~x AB~7N~7A

TOOO IH3 ~ <NOTE S~"i5

Po 3 0 .i,

D

C C UNE 8- IEJSH02 60- II-it

.J/(Wv BUS"' 1H ,. UNOER\IO\..TAGf CKT· lf/VSH07 ,ft (ORANoE.CACLt:)

B

A

ABB· 60 E A8.B· 6C L[NE S - LINE A

6e·lHI K C 1-EE-~60- IHll iSW1 r------ fil'.!!.

tJ 14

t5 16

'-£_-_.;:~ .. ;-- 17 lB

8ASL£R BE1•47N

~

12 II

8 4i7• IHI BASI.EA SE I· 4 7N

..!l;!!!_

~ 47·1H2 S.:.SLEA BE1·'47N

.!m!.

4160V BUS "IH" VOLTAGE UNBALANCE CKT 1ENSH0CJ * ( ORANGE CABLE I

,J\l INTLK LTR ~~ (FE-2!TI

'J<,-1...i 1->~1 !NTLK -- 27NX- tENSH03

~<r-J f--)1 IFE-21Tl

y.,f+)"'O SPARE

27A- JH3 CNOTE 51

~ INTLK LTT ~/:-! (FE-2lTl

'J<,-1...i f->~l INTLK l"I 15 · 27NX-1ENSH03 o-(<r-J f-l)-0 IFE-21Tl

4-f.> )J SPARE

27C- IH3 1r..OTE 5>

6-<t-i r>~ ~~~~~~~~

~f-yf-)~ !~~~~-;~~~;i~03•

6-<t-i H-~,~~:~:~:~~ H<tj,#~ !~~~-;~~~;::NSH0)•

~ INTL.K UAA· 1ENSH121J e't') 11715-FE-ZITA

~ lf:TLIC 6(1X- lENSH03 'r'-' 1171S-FE-21TA

LINE A· 6G· 1KI

3

.c::~ m:~.~;s \-1__,, ~J? '-"' ,-,,,---, J 1 NTLK

• 27NX- 1ENSH03 ~ f->~ 1FE-21Tl 4:>-h SPARE

278- lH3 CNOTE 51

.l!llUS: r. AU 63/JtPMD'rr ~ lS LDO.n:t> Jq" iH.!: SWG.1\ UH· L?SS arMD'l..1SC: N01'.b i _fl<EflX _;.u "11',t _><U>III~ "'11\l {\It Cl\1/:Ull" NIJM~l1',-3. ONE PHASE OF A 3 PHASE RELAY. 4. FOR CONT SEE DWG 11715-ESK-11CB.

REFERE>•<CE DRAW ING: l. DC ELEM DIAG 4l6~V DIER BUS ~ IH­

UNDERVOL T AGE

~... -

11715-FE-21Ti:i

lJli'cominion PRIORITY DRAWING NUClEAn ENO.INEERlNG

RICHMOND,YlRGINIA.

''" 11715-ESK- l lR 18 .osc,,i C,1,i'Lu.- IJ,._ESS 0111ERWJSE NOTIO !iii 1 0~ I

2

B

A

PC•ECIG./'C\

PRIOR TO USING FOR DESIGN WORK CHECK DM1S FOR WORK PENDING

I I I I I I I ----------------------'-------------------------------------------------------------------------------------------------------~

Page 33: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

__.. ::-,.-·.'Vll.:'11:X. .. ,rc:1,.,~

. :1 A--+--!' 8 __ .._+--11&

l c--...,6-0-V"---I C 4801/ EM£R BlJS ~HI'" EMER SUS ·1t(

___ Jt0:111::>t.SIC.-DbC

~.-"-,!.-­·a--...... r-1

Et,1EAGENCY GEN 'IJ~ SYNCHRONIZ.O.TION

I'&:

LOCATION c-ioss REFEl'IEN::E '1'A8Lf

PAIORITV DRAWING

~Dominion IIIJCU.Aft l!NClfll:t:fflNG.

RICJ1NOIIO.,i1n0Jt1I#.

4160V A':. ELEr£NTARY DIAGRAM EMrnGENCY SUSSES 1H & !J

EMERGENCY GENERATORS IH & lJ SYNC NOllTH ANNA POWER STAl!ON - um 1

11715-FE-21E 31 lN.rn.cw""'isr_.,,n [~• Ill I

M

Page 34: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

Attachment 6

Serial No. 19-210 Docket Nos. 50-338/339

One-line Diagrams Highlighting the Power Feed from the Transformers/Switchyard to the Safety Related Buses ·

Virginia Electric and Power Company (Dominion Energy Virginia)

North Anna Power Station Units 1 and 2

Page 35: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

bS Bat -3.:H3I l It

E

A

,o./l.ll!.l"'-'01117 lG-l'Wt-2111'1 U,4' tt1e:un.ae,,i

1•111 I t2SVOC

~ 8ATI 21-111

6 5

' ' r-"

I I I I I I

: I

' I I I I I

: I I I ! -------.._--_,=..c,.-'--1> I

(" j ~: u1L ~Ill ,,..... ,,.....,

VOl.T Af"C VOLT Rtt:l I

' ' ' ' I I I I

: UNIT~UN.IT -------_J I ~ 2

: !

--------------------------------------------------------------------------------------------------- ----------················································

2

NOTES:

GEN 2

GEN. LINK

,. 1~·~~r~i"5.~~·~6'.".1~.~=~g,~r 0

2• i~o~~rJ~~ke~H~J!'ff. ffKlP SH I

PRIORITY DRAWING

NUClf!AII !';NQINl::f!AING IIICHIIOND,VIRQINlA

ONE LINE DIAGRAM ELECTRICAL DISTRIBUTION SYSTEM

NORTH ANNA POWER STATION UNITS l &. 2

Jl(VtsUJl'(fl~la-ll-111'1'11 IIP. rt-JUltl

--·--····················---------~~-I~-:?.~~~~~-~~~-~:~~~-~~~-~=~-~~~-:~~-~~-~~~~~--

Page 36: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

Attachment 7

Serial No. 19-210 Docket Nos. 50-338/339

Proposed UFSAR Revision for Open Phase Protection per NRC Bulletin 2012a01

Virginia Electric. and Power Company (Dominion Energy Virginia)

North Anna Power Station Units 1 and 2

Page 37: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

I-UH. INJ-UKIVIA I IUN UNL Y

Revision 54.05--U dated online 03/14/19 · NAPS UFSAR 7.3-10 No changes for this page. Page provided for reference only.

5. Containment recirculation air coolers-The air coolers cooling water flow is indicated in the

control room. The cooling water exit temperatures are provided to the plant computer. The

sensors are outside the reactor containment.

6. Sump instrumentation-The containment sump wide range instrumentation consists of

redundant level sensors designed to operate in a post accident environment. LT-RS 151 A-1,

LT-RS151A-2, LT-RS151B-1, and LT-RS151B-2 sump wide range level transmitters are

qualified in accordance with IEEE Std 323-1974, to meet post accident conditions, including

submergence. The indicators are located in the control room.

7.3.1.3.4 Digital Circuitry

The ESF logic racks are discussed in detail in Reference 3. The description includes the

considerations and provisions for physical and electrical separation as well as details of the

circuitry. Reference 3 also covers certain aspects of on-line test provisions, provisions for test

points, considerations for the instrument power source, considerations for accomplishing physical

separation, and provisions for ensuring instrument qualification. The outputs from the analog

channels are combined into actuation logic as shown in Figure 7.2-5 (Tavg), Figure 7.2-6

(pressurizer pressure and water level), Figure 7 .2-7 (steam flow, pressure, and differential

pressure), Figure 7.2-9 (ESP actuation), and rigure 7.3-1 (auxiliary feedwater).

To facilitate ESP actuation testing, two cabinets ( one per train) are provided that enable the

operation of safety features actuation devices on a group-by-group basis until the actuation of all

devices has been checked. Final actuation testing is discussed in detail in Section 7 .3 .2.

7.3.1.3.5 Engineered Safety Features Actuation Devices

The outputs of the solid-state logic protection system (the slave relays) are energized to

actuate, as are the switchgear and motor control centers for all ESP-actuated devices. The

following descriptions and referenced diagrams explain and illustrate the manner in which the

engineered safety features are actuated by the ESF actuation signals. Unit protection features and

emergency diesel-generator start-up and loading are also described and illustrated. Should an

accident occur coincident with a station electrical blackout, the ESF loads are sequenced onto the

diesel generators. This loading is discussed in Chnpter 8. The design meets the requirements of

General Design Criterion 35.

1. Figure 7 .3-2 is a .general illustration of the relationship of unit trip signals. The interrelation

of tripping between the generator, turbine, and reactor is as follows:

a. A generator trip will result in a turbine trip.

b. A turbine trip after the generator is on line will result in a generator trip.

c. A turbine trip at a preset minimum power will result in a reactor trip.

d. A reactor trip will result in a turbine trip.

The information contained in the electronic version of the SAR may be different from the Information found in the hardcopy version of the SAR. Such differences ere intentional and are the result of approved changes to the SAR that have not yet been submilled to the NRG.

Page 38: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

FOR INFORMATION ONLY

Revision 54.05--Updated online 03/14/19 NAPS UFSAR 7.3-11

2. Figure 7.3-3 illustrates the signal interfaces of ESF actuation and actuated devices. These

interfaces are the basis of the ESF system terminology and logic, and the actuation signals

are shown in relation to each other as well as the actuated systems.

3. Figures 7.3-4 and 7.3-5 illustrate that there are two paths provided to actuate the

ESP-actuated devices: the first, when emergency bus power is not interrupted; the second,

when there is a loss of emergency bus power. Should there be a loss of power, the equipment

is staiied sequentially.

4. Figure 7.3-6 illustrates the concepts used to adjust and sequence the loads on diesel

, generators. The inputs will be combined by the logic circuit as required, to initiate the

appropriate sequence and loading of the diesel generator for given accident input conditions.

The resultant blocks represent typical actions taken on equipment assigned to the emergency

bus. Detailed logic for specific loads is shown in Reference Drawings I I and 12, and

Figures 7.3-5, 7.3-7 and 7.3-8.

5. Reference Drawing 13, Figure 7.3-1, and Figure 7.3-7 illustrate the development of the loss

of reserve station service power signal for both Units 1 and 2. Also shown are the resultant

actuation of the service water pumps, and the stmi of auxiliary steam generator feed pumps.

6. Figures 7.3-5 and 7.2-9 illustrate the 'auto-stmi signals for an emergency diesel generator.

The emergency diesel generator starts whenever the respective emergency bus voltage is less

than 74%, whenever the bus voltage drops below 90% and remains there for 60 seconds or

longer, ~enever a safety injection actuation signal is initiated. This is described in Section 8.3. ]~ whenever the bus phase voltage unbalance results in >4% negative sequence

voltage (ie open phase condition), Also shown in Figure . - are t 1e resu tants, s 1ou t e emergency us vo tage contmue to

decay below 71 % nominal. These resultants are the automatic trip of specified loads.

Also illustrated is the subsequent restoration of voltage to the emergency bus, after the

emergency diesel-generator supply breaker is closed. Refer to Reference Drawing 12

( containment depressurization) and Reference Drawing 11 (safety injection) for the

subsequent restmi of the affected ESF actuation devices.

7. Figure 7.3-8 illustrates the equipment that is tripped on a signal from the containment

depressurization actuation (CDA) signal. This is done to remove unnecessary loads from the

emergency diesel generators.

8. Figure 7.3-9 is a diagram of the undervoltage signal for the normal station service buses.

When voltage drops below 70% on 2/3 station service buses (1 A, 1 B, or 1 C), the reactor is

tripped, providing the reactor power level is greater than P-7.

Undervoltage on the station service bus results in the following:

a. Main feedwater pump trips.

b. Reactor coolant pump trips.

The information contained In the electronic version of the SAR may be different from the Information round in the hardcopy version of the SAR. Such differences are intentional and are the result of approved changes to the SAR that have not yet been submitted to the NRC,

Page 39: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

FOR INFORIVIA TION ONLY

Revision 54.05--Updated online 03/14/19 NAPS UFSAR 7.3-16

b. Depression of the CLOSE push button.

c. Containment isolation signal.

Figure 7.3-2 illustrates and describes the turbine and generator trips.

7.3.1.3.5.3 Auxiliary Feedwater System Description and Operation. Figures 7.3-1, 7.3-12, and

Reference Drawings 13, 19 and 20 illustrate the operation of the auxiliary steam generator

feedwater pumps system.

A turbine-driven auxiliary feedwater pump, FW-P-2, and two motor-driven auxiliary

feedwater purnps, FW-P-3A, 3B, receive suction from the emergency condensate storage tank

CN-TK-1, which is encased in concrete for tornado missile protection.

Pi gu re 7. 3-1 and Reference Drawing 13 illustrate the start and stop of the motor-driven

auxiliary feedwater pumps FW-P-3A & -3B. Reference Drawing 19 and Figtfre 7.3-12 illustrate

the operation of the turbine-driven auxiliaiy feedwater pump FW-P-2.

Auxiliaiy feed pump motors can be manually started providing:

1. Control switch is in START either at the control board or at the auxiliary shutdown panel,

with the transfer switch in the appropriate position.

2. No motor electrical faults are present, that is, lockout relay is reset. IL"

!or phase voltage unbalance

3. No undervoltage has occurred on the bus in the previous 25 seconds.

Immediate automatic starting will take place if the following conditions exist:

1. Control switch at the control board or the auxiliary shutdown panel is in AUTO with transfer

switch in appropriate position.

2. No electrical faults are present. or phase voltage unbalance

3. The bus has no undervoltage signal present.

4. No safety injection signal is present.

5. Occurrence of any of the following:

a. All main feed pumps tripped.

b. Low-low steam generator level on two out of three channels of any steam generator. (This

is the same setpoint used for reactor trip.)

c. Loss of reserve station power.

d. AMSAC initiated.

In addition to the start demand signals a, b, c and d above, there is also a delayed auto staii (

in the event a safety injection signal is initiated. This start is delayed 20 seconds to maintain an

acceptable voltage profile from the offsite source. In the event of an undervoltage signal

The information contained in the electronic version of the SAR may be different from the

Information found in the hardcopy version of the SAR. Such differences are intentional and are the result or approved·changes to the SAR that have not yet been submitted to the NRC.

Page 40: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

FOR INFORMATION ONLY

Revision 54.05--Updated online 03/14/19 NAPS UFSAR 7.3-34

jNo changes for this page. Page provided for reference only.

Table 7.3-2

ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION

Functional Unit

1. Safety Injection

a. Manual Initiation

b. Automatic Actuation

c. Containment Pressure-High

d. Pressurizer Pressure-Low-Low

Channels to Trip

1

1

2

2

e. Differential Lines-High

Pressure Between Steam 2/steam line twice and 1 /3 steam lines

f. Steam Flow in Two Steam Lines-High

Coincident with either

Tavg-Low-Low

or, coincident with

Steam Line Pressure-Low

2. Containment Spray

a. Manual

I/steam line any 2 steam lines

1 Tavg any 2 loops

1 pressure any 2 lines

1 set

b. Automatic Actuation Logic 1

c. Containment Pressure-High-High 2

d. Refueling Water Storage Tank (RWST) 2

Level-Low Coincident with Containment

Pressure High-High

3. Contaimnent Isolation

a. Phase "A" Isolation

l) Manual

2) From Safety Injection Automatic Actuation Logic

c. Phase "B" Isolation

1) Manual

2) Automatic Achmtion Logic

3) Contaim11ent Pressure-High-High

The information contained in Iha electronic version of the SAR may be different from !he

information found In !he hardcopy version or !he SAR. Such differences are intentional and are !he result of approved changes lo the SAR !hat have not ye! been submilted lo !he NRC.

1

1

1 set

1

2

Minimum Channels Operable

2

2

2

2

2/steam line

I/steam line

1 Tavg any 2loops

1 pressure any 2 lines

2 sets

2

3

2

2

2

2

2

3

Page 41: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

FOR INFORMATION ONLY

Revision 54.05--Updated online 03/14/19 NAPS UFSAR 7.3-35

!No changes for this page. Page provided for reference only.

Table 7.3-2 (continued)

ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION

Functional Unit

4. Steam Line Isolation

Channels to Trip

a. Manual I/steam line

b. Automatic Actuation Logic 1

c. Containment Pressure-Intermediate High-High 2

d. Steam Flow in Two Steam Lines-High 1/steam line any 2 steam lines

Coincident with either

Tavg-Low-Low

or, coincident with

Steam Line Pressure-Low

5. Turbine Trip & Feedwater Isolation

a. Steam Generator Water Level-High-High

b. Automatic Actuation Logic and Actuation Relays

1 Tavg any 2 loops

1 pressure any 2 lines

2/loop

1

Minimum Channels Operable

2/steam line

2

2

1/steam line

1 Tavg any 2 loops

1 pressure any 2 lines

2/loop

2

c. Safety Injection (SI) See # 1 above (All SI initiating functions and requirements)

6. Auxiliaiy Feedwater Pump Start

a. Manual Initiation

b. Automatic Actuation Logic

c. Steam Generator Water Level-Low-Low

d. Safety Injection (SI)

e. Station Blackout

f. Main Feed Pump Trip

7. Switchover to Containment Sump

1

1

2/steam

2

2

2/steam generator generator

See # I above (All SI initiating functions ~nd requirements)

I/bus on 1/bus on 2 busses

I/pump

2 busses

I/pump

a. Automatic Actuation Logic and Actuation Relays 1 2

3 b. Refueling Water Storage Tank (RWST) 2

Level-Low-Low

The information contained in the electronic varsion of the SAR may be different from the

information found in the hardcopy version of the SAR. Such differences are Intentional and are

the result of approved changes to the SAR that have not yet been submllted lo the NRC.

Page 42: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

l""UK INl"UKIVIA I IUI\I UNL Y

Revision 54.05--Updated online 03/14/19 NAPS UFSAR 7.3-36

Table 7.3-2 (continued)

ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION

Functional Unit Channels to Trip

8. Engineered Safety Feature Actuation System Interlocks

a. Pressurizer Pressure, P-11

b. Low-Low Tavg• P-12

c. Reactor Trip, P-4

9. Loss of Power

a. 4.16 Kv Emergency Bus Undervoltage

(Loss of Voltage)

b. 4.16 K v Emergency Bus Undervoltage

(Grid Degraded Voltage)

/,\

2

2

1

2/bus

2/bus

c. 4.16 Kv Emergency Bus Negative 2/bus Sequence Voltage (Phase Voltage Unbalance / Open Phase Condition)

The information contained In the electronic version of the SAR may be different from the information found in the hardcopy version of the SAR. Such differences are Intentional and are lhe result of approved changes to Iha SAR thal have not yat been submllted lo the NRC.

Minimum Channels Operable

2

2

2

2/bus

2/bus

2/bus

Page 43: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

FOR INFORMATION ONLY

Figure 7.3-1 LOGIC DIAGRAM MOTOR DRIVEN STEAM GENERA TOR AUXILIARY FEED PUMPS

S0Uf<CE Mm!JTC:R

TRA[N o

f..'01:'.:-:

c:,cnTJCN

~n .,..1rrnr::: E.:....:=:UR!CCL H.IJ_ T

F[J FIJMI' IRlP ( ALL f't.Ia?:;: "':'RlPt'l:tii

2/'3 LO'li'- L:•~i LEVEL ANY £TEAM GEN

f.ESERVE' STAT L'):-,.J POl,,,'EP, N07 A\'/:1:LASLE

Si::aFETY H, .. IECT:nN SlGNAL T~r1:N ti

1H Bus Neg. Sequence I Phase Voltage Unbalance

IH BlJJ UtlOEH\'Ot, T 1-'IGE UR DEG::>,,1-"\[ED '/OL Tt'.G=°

:RANSFEFi SW) rel-I -:-u .. LCC:A:.... •

c~ PUX. FC. PjMf • Af.lTJ AFTER ST .ART ..

PUX:. FC.. P~MF MOTO=t 570:)PEG

L~ .C:IJX. F0. ~'llf'~f -.~tro 11FTEF. STC\RT" >=========:::.../.'!..

TR!!NSF~~ S\i' l TCH TO ·R.EMJTE'

MGTQR ;:LET. FAIJ_ TS

LiJGtC FOR FW-::C-~ SHC'wltl. LOa::IC =·::R F'ti-P-3e s:MIU'1R.

~- LOC.AT JrJN :.:n~oo:.. ·A~· f~f.fl: . .is I U AllXJLll:ifi" 5HlJTOOWr..: r~ANEL.

53, JiHE~ POSIT IO.\ OF TF.ANSFEF. ~·1·HTC".H iS ~;.:"'.;".

g.1. F{ANS=EA S"-'lTCH CHA~.GED rHll'1 "_l:C~",- • rn "REt/.mF~

g '..:l:W~OL P.EMAJMS c..OCAL L!Nlll :....(CKO·r R~LA'f A- :wGR. RESE-.

~5. L.lGI-HS AT "AS" 0\LY LLUMlNATE: i,,i]T'-1 TF-.C:iM:FE; SWlTCH [N 'LCCAL ''.

The information contained in the electronic version of the SAR may be different from the information found in the hardcopy version of the SAR. Such differences are intentional and are the result of approved changes to the SAR that have not yet been submitted to the NRG.

:osT,OL ACT:o~

rs A',1:<. FG PUMP •s-~HT·

TR(ll\5F"ER C:\-11 TOaf TO ·F.EMOIE"

cs AUX. FD f'U:·W 'ST,'\=?T'

f!: tiU:,<. ;:c, PUMP­•·ouro~

T=--tAh!SFER Si·1:TCl­-o ·LOC~L'

i::. AJX. FD Plil-1? "AJTO"'

cs AU:.<. nJ PU'·t? ·s:-op•

cs ,"'tlX. =-t PliMF­~~mp•

AJX. rJ PL!~W MOllJF\ :.:Tr1HI

AJX. r::, r·u:-1;, Ml.:lOP. STOP

MUN Ji OR

L

I:..

L

A,

A:

l.

2..

i'J (1)

< ...... er., -· 0 ::I lJl ..j:::.

0 lJl

I I

e 'O 0.. $lJ ..... (1)

0.. 0 2.. -· ::I (1)

0 l,.) --~ --'-D

z > ""O (/)

e >-rj (/.)

> i'J

-...J l,.) I

l,.)

-...J

Page 44: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

FOR INFORMATION ONLY

Figure 7.3-5 LOSS AND RESTORATION OF EMERGENCY BUS

47

SOURCE

Emergency Bus Negative Sequence VOitage >4%

CONDITION

EMERGENCY BUS VOLTAGE (90%

T.D. (!nverseiy

Proponional)

T.D.

56 SEC

T.D.

2 SEC

RESULTANT

E.MER»EICY etJS VOlTlGE (76 'l

)-------------------1!>1 ::::~L ~~::::~~ ' s.arn, •ILJlCTIDI

TRIP R£5E RVE r--;::::::;:;;::::;;:::=:::::::===i------'-----, 5TAi ~'£i5'f~\/1CE

!IUIC,IMJIERCUISllli 8PEA><ER5 " LOSS DF ElilE.IUiEICY IUS VOLTAGE

T.D.

2.3 SEC f-----..... ---------------t-~., FO• ESF .Clll&TEO

47

CD ~

0 (') 0 r--0 z

(7ft

CHARGING PUMP A BREAKER CLOSED

Emergency Bus Negativ_l----------~ Sequence Voltage >4%

Emergency Bus Negative>--'---------, Sequence Voltage <4%

'UtEIIGEICY DUS 1

,otUGE •0111UL ) 951

_. HO AUTO REST4RT EXCEPT t"il THE CASE OF' CC'HiTAIH'lr.lEN T AIR RECIRCULATIQ"I ~.u~s- CNL'f 0,..£ OF' THE '""0 r•NS ON Tt-iE H 8U5 H4S AUTO A:ESTA.AT CA?AB1L1T1ES

The information contained in the electronic version of the SAR may be different from the information found in the hardcopy version of the SAR. Such differences are intentional and are the result of approved changes to the SAR that have not yet been submitted to the NRG.

~--=O=f=Vl=CE=S======-----~ ~ -~Et. TlllP CftAIGUIG

~:ii:.,tc Ul,U[I ~

TRIP CROM FAN5

TilP BORIC ACIO TAMI NUTUS r

l--_J========"=----------,-----~~;~;E::cssu11zu

~ < -· C/:) -· 0 :::i V, .i:,,.

0 V,

I I

~ 0... a (1)

0... 0 e. s· (i)

0 w -....... .i:,,. -....... \0

_j

Page 45: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

FOR INFORMATION ONLY

1gure 7 3 6 -DIESEL LOAD AND SEQUENCING CONDITIONING CONCEPT

INPUT LOGIC

..... -SAFETY INJECTION ..... ~

CONTAINMENT DEPRESSURIZATION

,_ -IIN9ERV8LTA6E Sil

. ~

~ EME;RGEIIG¥ eas ..... COMB I HES APPLY ----- -LOSS OF RESE!lVE INPUTS TIME STATION SERVICE POWER .... -

AS DELAYS .....

REQUIRED AS l REQUIRED

/ .....

Undervoltage or phase ~

voltage unbalance on Emergency Bus -

( ~

lundervoltage or phase voltage unbalance

NOTES= I, THIS DRAWING IS A GENERAL

..... 0 <')

R 0 z

BLOCK DIAGRAM, LOGIC IS. SHOWN ON SUBSEQUENT DIESEL LOAD AND SEQUENCE CONDITIONIIIG CONCEPT OJA.GRAMS/ IN 7.3.

2. THE RESULTANTS SHOWN REFER TO TYPICAL OPERATIONS OF THE BREAKERS WHICH CONNECT SIGNIFICANT LOADS TO THE EMERGENCY BUS.

3 THIS RESULTANT REFERS TO EMERGE:NCY SUS LOADS WHICH WILL NOT REO.UIRE ANY DELI BERATE BREAKER OPERATIONS FOR ANY COMBINATION OF THE INPUTS SHOWN.

The information contained in the electronic version of the SAR may be different from the information found in the hardcopy version of the SAR. Such differences are intentional and are the result of approved changes to the SAR that have not yet been submitted to the NRG.

lundervoltage or phase I voltage unbalance

TYPICAL ) RESULTANTS

TRIP ON ll1lBER','0lTAG~ it FOLLOWED BY A Tl ME NOTE 2 DELAY RESTART UPON VOLTAGE RESTORATION

RUCCELERATE NOTE 3 LOADS ALREADY

011 BUS

TRIP ON NOTE 2 ~

TRIP 011 NOTE 2 SAFETY FEAlURES

ACTUATION

DELAYED START ON NOTE 2 SAFETY FEAlURES

ACTUATION

& u:,

5· ::s V, .i:,.

0 V,

I I

C: 'O 0.. e (1)

0.. 0 e. 5" (1)

0 w -...... .i:,. -...... \0

Page 46: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

Revision 54.05--Updated online 03/14/19 NAPS UFSAR 8.3-4

The 4160V emergency _switchgear is arranged in two separate systems designated H and J.

The H bus is associated with train A, while the J bus is associated with train B. The buses are

physically as well as electrically, separated from each other in different missile-protected areas on

the bottom floor of the service building as shown in Reference Drawing 18. The 4160V H and

J buses are arranged as shown in Reference Drawing 4. The 4160V buses are rated 1200A serving

emergency loads through breakers equipped to protect the loads from overcurrent. The 480V

emergency switchgear is also separated and located in missile-protected areas.

The 480V emergency switchgear buses H and J are arranged as shown in Reference

Drawing 5. These buses are rated at 2000A with breakers equipped with overcurrent protection

for the loads. The 480V motor control centers are shown in Reference Drawings 6 through 11

and 19.

The 480V emergency buses are equipped with normally open back feed breakers and an

electrical connection which can be powered by a portable generator during a Beyond Design

Basis Event.

The loads on the H and J buses on either the 4160V or the 480V level are typically

redundant and are sized based on their required functions or the required functions of their

associated components (e.g. a motor on a safety-related pump). The safety-related buses and their

loads are shown in Reference Drawings l through 11 and 19.

There are other interconnections between buses, buses and loads, and buses and sources on

the emergency 4160V system. The interconnection between bus and supply will be described for

the H bus only since the J bus is identical, with the exception of the reserve station service

transformer and transfer bus used nd s noted i t e fi llo in a· ra 1. or open phase condition undervoltage, overcurrent, or open phase condition.

The H bus is connecte to t 1 reserve stat10n service transformer

through a feeder breaker from the tr nsformer to transfer bus F and tw reakers in series between

the transfer bus and the emerge cy bus. The feeder breake · rom the transformer trips on

overcurrent; transfer bus underv tage; both 34.5 kV bre rs (powering the transformer) open;

or reserve station service transfo mer pilot wire, diffe · 1tial, or overcurrent. The breaker from the

transfer bus trips due to overcu rent; undervoltage on either of the transfer or emergency buses; a

trip of the feeder breaker fro the transformer to the transfer bus; or transformer pilot wire,

differential, or overcurren . The feeder breaker in the emergency bus will trip due to an

emergency bus -un<lervoltag ~-The emergency diesel generator starts when a safety

injection signal is received, at approximately 74% voltage on the bus for 2 seconds, er-a 90%

degraded voltage level exists for 56 second . Following the safety injection start signal, the

emergency diesel generator will load if a 9 o degraded voltage level exists for 7.5 seconds. The

emergency diesel generator breaker close on the isolated bus at 95% generator voltage if certain

conditions are met. The load breakers a omatically trip on overcurrent or electrical fault and lock

out, which prevents the breaker fro being reclosed manually or automatically. Most of the

4160V load breakers also trip on ndervoltage ith time controlled reclosing when voltage is

, or when an open phase condition is detected. [ADD TEXT FROM INSERT A HERE]

The information contained in the electronic version of !he SAR may be different from the information found in the hardcopy version of the SAR. Such differences are intenllonal and are the result of approved changes to the SAR that have not yet been submllled to the NRC.

or phase voltage unbalance

Page 47: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

Insert A

An open phase condition causes a voltage unbalance on the system which is detected via emergency bus negative sequence voltage relays. The negative sequence voltage relays include an inverse time characteristic which introduces a trip time delay based on the magnitude of the negative sequence voltage above the nominal setting of 4%. A time dial setting is used which results in a typical trip time delay of less than 6 seconds for any open phase condition sensed at an emergency bus.

Page 48: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

!"UK 11\ll"UKI\IIA I IUl'I! Ul'IIL Y

Revision 54.05--Updated online 03/14/19 NAPS UFSAR 8.3-5

restored on the bus. When a load breaker control switch is in the automatic position, the breaker

will automatically close, as dictated by system requirements. All loads served by the stub bus,

c01mected to the emergency bus, are shed due to undervoltage and may be manually reconnected.

The stub bus tie breaker is tripped and locked out when a containment depressurization actuation

signal exists. The 480V emergency buses and motor control centers have no means of

interconnections. Some 480V feeder breakers, in the motor control centers, automatically shed

their loads on loss of offsite power to reduce emergency diesel generator loading.

On Unit 1, normal to emergency bus ties have been installed and, with the Unit 1 main

generator breaker, provides two independent offsite power sources to each emergency bus. These

bus ties exist between emergency bus 1 H and the normal 4160V bus 1 B and between the normal

4160V bus 2B and emergency bus 11. These bus ties have a normally open breaker at each bus. In

conjunction with this modification, the administrative tie between emergency buses lH and l.T

was removed.

On Unit 2, normal to emergency bus ties have been installed which provide an independent

offsite power source to each emergency bus. These bus ties exist between emergency bus 2H and

the normal 4160V bus 2C and between the normal 4160V bus lA and emergency bus 21. These

bus ties have a normally open breaker at each bus. a degraded voltage, loss of voltage, or open phase condition,

On either degraded voltage or loss ofvoltag&, an emergency bus will automatically transfer

from its normally connected reserve station service transformer to the diesel generator. Manual

transfer capability to the normal station service bus is also provided.

On Unit 2, the feeder breakers from the normal source (main generator) to the normal buses

trip on overcurrent; undervoltage on the normal bus; turbine stop valve differential; generator

differential; generator negative phase sequence; generator loss of field; generator ground;

generator backup; generator overexcitation; generator leads differei1tial; transmission line (A, B,

or C) differential overcurrent; main transformer sudden pressure; turbine intercept and reheat

valve differential; or generator power circuit breakers open. Tripping these breakers will, in turn,

provide a permissive to close the breaker from the preferred power source (RSSTs) if there is no

overcurrent on the normal bus and no undervoltage on the preferred source. The normal source

feeder breakers that have tripped are locked open.

On Unit 1, the various main generator faults discussed above cause the tripping of the main

generator breaker rather than the main feeder breakers from the normal source to the normal

buses. The conditions of overcurrent, undervoltage on the normal bus, transmission line

differential overcurrent, or sudden pressure, still trip the main feeder breakers. The main

generator breaker trips associated with main generator faults or reactor trips allow power to be

provided to the normal buses from the 500-kV switchyard instead of transferring to the preferred

source as discussed on page 8.3-3.

To alleviate potential low-voltage profile conditions of the reserve station service system

during combined unit operation using only the reserve station service system transformers, a

The Information contained in the electronic version of \he SAR may be different from the Information found in the hardcopy version al the SAR. Such differences are intentional and are the resull of approved changes lo the SAR that have not yet been submitted to the NRC.

Page 49: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

I v,, 11\11 v1,rn1M I IVl\1 Vl'\JL. I

Revision 54.05--Updated online 03/14/19 NAPSUFSAR 8.3-6

load-shedding scheme to certain non-safety-related secondary plant electrically driven equipment

has been incorporated. When used, this scheme sends tripping signals to specific pieces of

equipment based on the position of a "unit start-up" switch and the status of certain plant

equipment. The tripping signal will trip specified running equipment and will defeat the auto-stmi

capability of nonrunning equipment.

For the system to function, the operator places a two-position control switch in either the

Unit 1 or Unit 2 start-up position. The particular equipment to be tripped by the switch positions

will depend on the operating status of the main feedwater pumps, while other equipment will

always receive a trip signal when load shedding is initiated.

The load-shedding scheme will initiate whenever the Unit 1 and Unit 2 normal (A, B, or C)

bus is being fed from its associated reserve station service transformer, unless the operator has

specifically defeated load shedding. To ensure the requirements of GDC-17 are met, load

shedding should be enabled when (1) one unit is on-line and the other is in stmiup, (2) both units

are on-line, or (3) both units are in startup. It may be necessary to defeat the load shed circuit for

short periods to support maintenance activities. This will be procedurally controlled.

The equipment that is tripped any time load shedding is initiated is given in Table 8.3-1.

The other equipment powered by a particular reserve station service transformer is selectively

tripped depending on the unit start-up switch position and the status of the feed water pump in that

unit. This results in six possible combinations of equipment to be tripped in addition to the

equipment that is normally tripped for load shedding. The combinations are given in Tables 8.3-2,

8.3-3, and 8.3-4. or open phase condition sensed

An undervoltage sen ed on the preferred source feed trips the preferred source supply

breakers, which, in turn, tr' and lock open the preferred source feeder breakers to the emergency

buses. An. undervoltage ~ on the emergency buses trips the preferred feeder breaker to the

emergency buses and the associated emergency bus preferred supply breakers. These two

breakers, which tie the transfer buses with the emergency buses, are in series so that a stuck

breaker does not affect the clearing of the emergency buses from outside power sources before the

coru1ection of the diesel generators to the emergency buses.

Safety-related loads that may be transferred manually from one emergency bus to the other

are charging pump C (CH-P-1 C) and containment recirculation cooler fan C (HV-F-1 C).

Channel 1 of the ex core neutron flux monitor system (AMP-NM-1) can be powered from an

emergency bus on the other unit.

The charging pump C is normally operated as either:

1. Running, in case pump A or B (CH-P-lA or CH-P-IB, respectively) is out for maintenance

or otherwise not preferred to be in operation.

2. Available (not rmming) when either pump A or B is running.

The informallon contained in the electronic version of the SAR may be different from the Information found In the hardcopy version or the SAR. Such differences are Intentional and are the result or approved changes lo the SAR that have not yel been submllled lo the NRG.

Page 50: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

Revision 54.05--Updated online 03/14/19 NAPS UFSAR 8.3-7

Even though charging pump C may be powered from either the H or J emergency buses

through breakers 15H7 or 1517, respectively, interconnection of the buses cannot occur. These

breakers are electrically interlocked to prevent inadve1iant, simultaneous closing of both breakers.

To prevent overloading of the diesel generators, interlocks prevent automatic operation of

two charging pumps on an emergency bus that has experienced an undervoltage or phase voltage unbalance

During a safety injection signal with no loss of power, the A and B charging pumps, if

available, will automatically staii, but the diesel generators, even though staiied with the safety

injection signal, will not be connected to their respective buses so they cannot be overloaded.

Normally only one charging pump (A or B) is required to run, with the other remaining pump (A

or B) in the automatic mode. The C pump is normally a "swing" pump - available to be manually

staiied when the A or B pump is unavailable (or it is not desired to operate them). If the C pump is

to be considered an operable pump, it will be running, since the C pump gets no automatic starts.

The elementary diagram numbers showing the breaker interlocks mentioned above

are 11715-ESK-SAL, 5AM, SAN, and SAP and are contained in Reference I.

The indicators for each of the three charging pumps are as follows:

1. Green, red, and amber breaker position indication lights, located locally at switchgear, on the

main control board and the auxiliary shutdown panel.

2. Ammeters, located on the main control board.

3. Annunciation on the main control board including "86 lockout trip" for all four breakers

associated with the tluee pumps.

4. Charging pump flow on main board and auxiliaiy shutdown panel.

5. Computer inputs include "breaker closed" for all four breakers associated with the tlu·ee

pumps.

The requirements of the single-failure criterion have been satisfied by providing three

full-sized pumps and proper control design so that there will always be one pump available, even

with a pump out for maintenance.

Three containment recirculation cooler fans are used for contairunent ventilation. The A and

B fans are powered from the H and J emergency busses, respectively. The C fan can be powered

from either the Hor J emergency bus through breaker positions 14H7 or 14J7, respectively. Even

though contairunent recirculation cooler fan C may be powered from either H or J emergency

busses, the interconnection of the busses can not occur. There is only one breaker, and it has to be

physically taken out of one cubicle and inse1ied into the other osition. , undervoltaqe, or phase voltaqe unbalance.

All three containment recircu 1011 ans are tnppe y a contamment, epressurization

actuation (CDA) signal-er undervoltage. Fans A and B are available to be manually restarted

when the CDA signal is reset and after a 30 seconds. delay on restoration of voltage. fan C is

The information contained in the electronic version of the SAR may be different from the information found in Iha hardcopy version of the SAR. Such differences are intentional and are Iha result of approved changes to the SAR that have not yet been submllled to lhe NRC.

Page 51: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

rvn ll'lr-vn1v1M 11v1,i Vf'IL r

Revision 54.05--Updated online 03/14/19 NAPS UFSAR 8.3-8

INo changes.for this page. Page provided for reference only.

available to be manually restaiied when the CDA signal is reset and on restoration of voltage. The

elementary diagrams showing the breaker controls are 1 l 715-ESK-6B, -6C, -6D, and -6E and ai·e

contained in Re Ference 1 .

The indicators for each of the three containment recirculation cooler fans are as follows:

1. Green, red, and amber breaker position indicating lights, located on the ventilation panel in

the main control room.

2. Annunciation on the main control board of breaker trip for each of the fan breakers.

3. Computer inputs for each fan breaker.

The requirements of single-failure criterion have been satisfied by providing proper control

design to ensure that intercmmection of the emergency busses will not occur.

Channel 1 of the Excore Neutron Flux Monitor System can be operated using either Unit 1

or Unit 2 emergency power. The option to use power from the opposite unit was provided to

ensure that indication for this parameter would be available in the Fuel Building following a fire

in the Control Room, Emergency Switchgear Room, Cable Tunnel, or Cable Vault.

For Unit 1, the transfer to Unit 2 power is made in the Unit 2 Emergency Switchgear Room.

A breaker in the Unit 1 Emergency Switchgear Room protects the Unit 1 Emergency Power

System from faults caused by a fire in the Unit 2 Emergency Switchgear Room. The Unit 2 design

is similar.

The transfer switches cannot be positioned to connect Unit 1 and Unit 2 Emergency Power

Systems.

The identification of safety-related equipment enables plant personnel to recognize

safety-related components. The emergency buses are color coded with the H bus designated as

orange and the J bus designated as purple, and all cables associated with these buses that have

safety-related functions are also color coded. The equipment is related to its associated bus by the

alphanumeric equipment mark number; that is, the I-I bus feeds A, C, E, etc., designated

equipment, and the J bus feeds B, D, F, etc., designated equipment.

The controls for the 4160V and 480V emergency switchgear breakers are powered from the

battety (125V de) distribution switchboards, as described in Section 8.3.2. The supplies are

separate to ensure the redm1dancy of the control power for proper actuation of the breakers and

are arranged so that the distribution board I is associated with bus H and board III with bus J.

The emei·gency switchgear is energized during normal operation, but not all equipment is

continuously running. Because this situation exists, it becomes necessary to ensure that the

equipment will work when it is needed. Therefore, tests of the entire system or components are

conducted at specified intervals in accordance with Technical Specification. requirements. The

entire standby system is tested after installation to verify the staiiing speed and load ability. After

The information contained In the electronic version of the SAR may be different from the information found In the hardcopy version of the SAR. Such differences are intentional and are the result of approved changes to Iha SAR that have not yel been submilled to the NRC.

Page 52: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

Revision 54.05--Updated online 03/14/19 NAPS UFSAR 8.3-9

acceptance, the standby power systems are operated on a routine test schedule. Automatic starting of the diesel generators, an essential part of the safety-related systems, is tested in accordance with Technical Specifications.

Load Shedding and/or auto-start blocking of large 4160V motors is provided when the normal or "G" buses are being fed from the reserve station service transformers, to alleviate potential low-voltage profile conditions on the emergency buses during unit emergency (SI or CDA) conditions. This scheme is in addition to and separate from the load shedding previously described in this section.

• For the condition of bus 2A being fed from RSST "A" during a Unit 1 SI or CDA, loads 2-SD-P-lA and 2-SD-P-2A will be shed.

• For the conditions of bus 2B being fed from RSST "B" during a Unit 1 SI or CDA, loads 2-SD-P-IB, 2-FW-P-lBl, 2-FW-P-1B2 and 2-CN-P-IB will be shed.

• All circulating water pumps of either unit experiencing an SI or CDA will be tripped when both buses 1 G and 20 are being fed from the same source.

Automatic starting of the Condensate, Bearing Cooling, Component Cooling and Steam Generator Feed Pumps will be blocked during an SI or CDA when bus alignments are such that staiiing one or more of the pumps will degrade the voltage on the emergency bus.

The voltage correction mechanism on the Load Tap Changers for Reserve Station Service Transformers A, B, and C receives a signal to provide instantaneous voltage correction upon the occurrence of an SI signal on either unit. The signal will last for the duration of the event.

The equipment capacities are specified to meet the plant requirements and are shown in

Reference Drawings 2 through I 1 and 19. , or phase voltage unbalance causes >4% negative sequence voltage on the bus (relay trip time is < 10 sec and inversely proportional to the

Emergency Diesel Generators magnitude of the 'negative sequence voltage).

The emergency diesel generator, being a vital pa1i of the emergency onsite power system, is discussed in detail below.

There are two 100%-capacity diesel generators for each unit. The diesel generators will

automatically staii when a safety injection signal is received, a 90% degraded voltage level for 56 seconds is sensed on the bus, -er-approximately 74% voltage for 2 seconds exists on the bus. Following the safety injection start signal, the emergency diesel generator will load if a 90% degraded voltage level exists for 7.5 seconds. When approximately 74% voltage is sensed for 2 seconds, or if the degraded voltage condition exists, the emergency bus is isolated and load shedding begins. The generator output breaker automatically closes onto the bus when the generator output voltage reaches 95% of nominal, either of the normal offsite power supply breakers are open, limited residual voltage remains on the bus, and the generator differential auxiliary relay is reset. An additional permissive exists for the emergency diesel generators output breakers requiring either of the bus-tie breakers to be open. Residual voltage on the Emergency

The information conlelned In the eleclronlc version of the SAR may be dilferenl from lhe information found in the hardcopy version of lhe SAR. Such differences are inlenlional and are the result of approved changes lo lhe SAR lhal have nol yel been submilled lo the NRC.

Page 53: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

Revision 54.05--Updated online 03/14/19 NAPS UFSAR 8.3-10

undervoltage, degraded voltage, and phase voltage unbalance

Bus is sensed by a relay that allows breaker closur only after the residual voltage has dissipated

to approximately 1050V. The undervoltage ~m:d-d-egradecl vclttt-ge relaying schemes that initiate

load-shedding are defeated when the diesel generator output breaker closes onto an isolated bus.

This is necessary to prevent voltage drops encountered during the diesel-loading sequence

from causing load shedding to recur.

The following conditions will render the diesel generators incapable of responding to an

emergency start signal discussed above:

1. Shutdown relay not reset.

2. Diesel generator (87) differential relay not reset.

3. Batte1y failure ( 100% loss of de power).

4. Clogged or air-bound fuel ~il lines.

5. Injection racks not open.

6. Air distributor valves sticking or low air pressure (less than 175 psig).

7. Air-start valves fail.

8. Improper governor setting or governor failure.

9. Improper set or faulty overspeed relay.

10. Engine firing on lube oil.

11. Control Room selector switch in MAN LOCAL.

These conditions are annunciated either directly based on the situation or indirectly via a

start failure alarm in the diesel generator room and via an emergency diesel generator (EDG)

Trouble Alarm in the main control room. The diesel will also fail to start if the air stmi manual

isolation valves are closed. These valves are locked in the open position and are checked

periodically to ensure that they will not prevent the diesel generator from stmting.

A listing of all equipment on the bus, including loading and unloading by manual or

automatic action, time of each event, size of load, identification of redundant equipment, and

length ohirhe each load is required is shown in Table 8.3-6 for the H bus and Table 8.3-7 for the

J bus. The schedules were set up in order to ensure that the emergency diesel-generator loading

satisfies Position 2 of Safety Guide 9. The sequence of events used in the development of the

schedules is as follows, where T0 = 0 seconds: (1) safety injection signal occurs at

T0 - 50 seconds, (2) loss of preferred power source is sensed by undervoltage relays at T0 seconds,

and (3) the CDA signal occurs at T0 + 55 seconds. Tables 8.3-6 and 8.3-7 show two Unit 1

scenarios as examples. While these scenarios do not bound worst-case EDG loading, they show

the sequencing of loads for these events. Engineering controls and incorporates load additions

into worst-case voltage profile and load calculations to ensure EDG ratings are not exceeded.

The information contained In the electronic version of the SAR may be different from the informalion found in the hardcopy version of the SAR. Such differences are intentional and are the result of approved changes lo the SAR that have not yet been submitted lo the NRC.

Page 54: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

Attachment 8

Serial No. 19-210 Docket Nos. 50-338/339

Logic Diagram for Negative Sequence Voltage Relay Scheme

Virginia Electric and Power Company (Dominion Energy Virginia)

North Anna Power Station Units 1 and 2

Page 55: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

Ll'iOl:fl \'U..11'1:iE

62C '\

.. \ =t:./'J ----------'L'""··,-'A ~ ,:_

IH ED:; El<R _____ /-·;3REA.>f;;/7· Jc,H~ \

RAI-EEOB-14 - Logic Diagram

Page 1 of 1

1P.IP tllFl'.AL Al\C, tl..TEJ!Ne.1E (.-,'; _ ----Bl>! E!1EfltiENC1' EJ.;S 8FS.~ERS:.

{'--···: ST~RT El)j. ·:LOSE EIX; !!KP.

~ l .. ,:,H<.j~------------ ·, C.,P.Ef,' J-----------,,e-, _______ j I i

C, l '-----~ ..,.,_-... ,1 ..... S.AF.£r_':-" :r~·::r~c-r~.

1 (-"V_•V_~L:-------------1, ~16-W.l>L "'klNN A '-----·--·-·-·-

'-...._,_. . ...-· '-·--- ----·- .. ___ ,..,.. ----+-i-

1 l

·, --~SEC ~

~ /" ~1~·, Eli('1G8iCY BiiS"'-., i ( ~ )L------------~· F>'>JLEO PT Oil L ~ "--- F.l)Jllll FUSE ./

,,,..--...., ~l--' ---f.:-j

\ •.<155 ,A Ac

L_L\-

\ 6 4l':2

~------1----------~AJ~~ L_;_

/~ ~J"/7 L-------------------1::'7 A \ [ J

Notes: 1. This diagram is shown for 1 H bus. Buses 1 J, 2H, and 2J are similar.

Page 56: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

Attachment 9

Serial No. 19-21 O Docket Nos. 50-338/339

Visual Representation for the Response to RAI-EEOB-15

Virginia Electric and Power Company (Dominion Energy Virginia)

North Anna Power Station Units 1 and 2

Page 57: North Anna, Units 1 and 2, Response to Request for Additional … · 2019-06-26 · Serial No. 19-210 Docket Nos. 50-338/339 Attachment 1 Page 1,of 15 RESPONSE TO NRC REQUEST FOR

17.78% ,,j ~ (12.318V}

Note: The BE1-47N relays are calculated to always trip when Voltages are shown on a Line to Neutral Base seeing> 3.538V. For OPCs at TX-3 and RSSTs A/B/C, Margin to Trip the lowest negative sequence voltage seen is 12.318V, which ensures the OPC is detected •

., , 5.106%

,i ~ (3.538V} ,,j ~

The Alstom OPC relays will detect the OPC and Alstom OPC relays required initiate a trip of its associated transformer in

A 4% setpoint was chosen for the BE1-47N relay and calculated to have a tl.106% maximum uncertainty. The BE1-47N relay may detect the OPC in these cases.

tl.106% __ ! __ _ these cases.

4.6% ,:~ (3.187V) ,h

,, 2.894%

,h (2.005V) All equipment is expected to be able to perform their design functions below this value. No protection is required in these cases.

The BE1-47N relays may trip when seeing> -