north eastern hydraulic and allied research institute...

108

Upload: others

Post on 14-Mar-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)
Page 2: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

North Eastern Hydraulic and Allied Research Institute (NEHARI) was established in the year 1996 under Brahmaputra Board, as a follow up of historic 'Assam Accord' inked on the auspicious day – 15th August (Independence Day of India) – in the year 1985 in presence of then, Hon'ble Prime Minister of India Late Shri Rajiv Gandhi. The Institute is situated in sprawling campus of 44 hectares at Rudreswar in North Guwahati at a distance of 25 km from the main city, far from the madding crowd of the city, on the hillock with a panoramic view. The Institute was set up as pioneer laboratory of North Eastern Region for testing of soil, rock, concrete and construction materials for development of water resources and other projects. The Institute has adequate facility for simulating / understanding river behaviour through physical models.

Mandate

Undertaking field and laboratory investigations, research and development work of basic and applied types in 'Geo-mechanics', 'Concrete Technology', 'Soil Characteristics', 'Construction Materials' and associated issues for development of Hydropower, Irrigation and Flood Control Projects.

Activities

o Hydraulic Physical Model Testing for Erosion problem study and River training

o Soil mechanics

o Rock mechanics

o Concrete technology

o Construction material testing

o Geophysical investigations at site

o Sediment/Silt analysis

NEHARI has patronage of Central Soil and Material Research station (CSMRS), New Delhi and Central Water and Power Research Station (CWPRS), Pune – Internationally recognised apex Institutes in the field of laboratory testing of soil and construction materials and development of physical and mathematical models in the field of water resources. Experts/technical hands of NEHARI have initially been imparted training on the subject by both the above mentioned premier Institutes. During this short span of time, since its inception, NEHARI has successfully completed laboratory testing of soil and materials during investigation and also during execution of a number of projects in the water resources development.

Noteworthy among them are Lower Subansiri Hydro-electric Project, Middle Subansiri Hydro-electric Project, Lower Siang Project, Middle Siang Project, Dibang Dam Project, Laskar Mintu Project of Meghalaya, Tuirini, Tuipal and Kolodyne H.E. Projects of Mizoram, Dikhu Hydel Project of Nagaland and others. Test reports prepared by NEHARI have been appreciated by CSMRS.

Three model studies and several testing of soil, rock and concrete samples have already been carried out in NEHARI for various organisations / project authorities in the N. E. Region like North East Electric Power Corporation, Central Water Commission, North Eastern Council, National Hydro Power Corporation and State Governments of Assam, Manipur, Meghalaya and Mizoram. In addition to the above, model studies of Majuli for long term solution for floods and erosion problem and Jiabhareli River at Chowkighat for construction of bridge at the National Highway have also been completed.

North Eastern Hydraulic and Allied Research Institute (NEHARI)

Page 3: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

P R E F A C E

It is a matter of great pleasure in bringing out 'Annual Report of Brahmaputra Board'for the year 2015-16. This report contains regular features such as activities undertaken,achievements both in physical and financial terms and plans for the future.The 59th & 60th Meeting of Brahmaputra Board and 8th Meeting of High PoweredReview Board of Brahmaputra Board were held during the year.The noteworthy achievements during the year is the completion of all works of Avulsionof Brahmaputra at Dholla-Hatighuli Phase-IV and consistent gain in landmass area ofMajuli Island on account of sustained efforts of Brahmaputra Board to protect thepious and unique river island of the world from erosion. The anti-erosion works forprotection of Mankachar, Kalair-alga international border area from erosion of riverBrahmaputra have been started during the year.The above achievements could not have been possible without constant support,guidance, advice and timely decisions of Ministry of Water Resources, RiverDevelopment and Ganga Rejuvenation, Government of India. I express my deepgratitude to Ministry of Water Resources, River Development and Ganga Rejuvenation,Government of India.The Comptroller and Auditor General of India have carried out extensive auditing ofvarious units of Brahmaputra Board during the year. The guidance of Comptrollerand Auditor General of India brought satisfaction and instilled sense of confidencefor satisfactory financial management of Brahmaputra Board. I am grateful to thePrincipal Director of Audit, Scientific Departments, Comptroller and Auditor Generalof India, Kolkata and look for constant support in future.It is a matter of pride to state that the achievements attained by Brahmaputra Boardduring the year 2015-16 are solely by hard works and sustained efforts put in by officialsof Brahmaputra Board. It gives me pleasure to acknowledge and appreciate theirsincere efforts in ensuring smooth functioning of Brahmaputra Board.

‚àÿ◊fl ¡ÿÃ

ÿÍ. ¬Ë. Á‚¥„U. P. Singh

+vªÉIÉ,Chairman

New Delhi26th September, 2016

I

(U. P. Singh) IASChairman

Page 4: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

Chapter – I General Page No 1.1 Brahmaputra and Barak Valleys and the Rivers of Tripura1.2 Establishment of Brahmaputra Board and its Functions 1.3 High Powered Review Board Meeting 1.4 Board Meetings 1.5 Organizational set up of Brahmaputra Board

Chapter- II General Review 2.1 Administration and Organization 2.2 Finance, Accounts and Audit 2.3 Review of progress of works during 2015-16

Chapter-III Achievement of Brahmaputra Board during the year 2015-163.1 Progress of Survey and Investigation and Preparation of Master Plans,

Detailed Project Reports (DPR) for Drainage Development Schemes and DPRs of Multi-Purpose Projects

3.2 Drainage Development Schemes (DDS) 3.3 Survey and Investigation of Water Resources Projects 3.4 Construction Activities 3.5 Flood Management and Anti-erosion Schemes 3.6 Appraisal and Monitoring of Schemes under Flood Management

Programme of Government of India Chapter- IV Non-field Activities of the Brahmaputra Board

4.1 Complaint Committee on Sexual Harassment and Gender Justice 4.2 Vigilance and Disciplinary cases 4.3 Participation in Seminar / Symposium / Workshop / Training 4.4 Progressive use of Hindi 4.5 Formulation of Citizen’s Charter 4.6 Implementation of Right to Information Act-2005 (RTI) 4.7 Observance of Swachh Bharat Abhiyan 4.8 Mass Awareness Activities under Tribal Sub-Plan (IEC activities)

Chapter- V Activities on Persons with Disabilities 5.1 Implementation of various provisions of persons with disabilities 5.2 The details of sanctioned posts and the number of persons with disabilities in

various posts in group ‘A’, ‘B’, and ‘C’ against 3% vacancies Chapter- VI Important Meetings during the year 2015-16

6.1 Meeting of High Powered Review of Brahmaputra Board 6.2 Meetings of Brahmaputra Board 6.3 Meetings of Standing Committee of Brahmaputra Board 6.4 Important meetings/events attended by Chairman/Vice-Chairman,

Brahmaputra Board during the year 2015-16 Chapter- VII Annual Accounts and Audit by C&AG Office

7.1 Statement of Accounts7.2 Significant Accounting policies and Notes on Accounts 7.3 Separate Audit Report on the Accounts of the Brahmaputra Board for the

year 2015-2016 Annexure

ANNUAL REPORT OF THE BRAHMAPUTRA BOARD 2015- 2016CONTENT

II

81-8383-84

84848488

88-8989

89-9192

92-93

94-9898-102102-104104-108

108-110

114114114114

116116116116119119

119

120120

115

120-121121-122

122-123

124124-125146-151152-154

155-166

Page 5: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

Annexure No. Title Page No.

I Composition of the Brahmaputra Board

II Composition of the High Powered Review Board

III Organizational Chart of Brahmaputra Board

IV Statement of Regular Sanctioned Strength and numbers of Officers / Staff in position along with the status of SC, ST, OBC and DA as on 31.03.2016

V List of Officer and Staff undergone Training / Seminar / Workshop during 2015-2016

VI List of Officers on deputation to other organization

VII RTI Annual Return Information System for the year 2015-2016

VIII Status of Master Plans

IX Status of Drainage Development Schemes

X Status of Multipurpose Projects

LIST OF ANNEXURES

III

155-156

157

158

159-160

161

162

163

164

165

166

Page 6: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

LIST OF PHOTOGRAPHS AND PLATES

IV

l. No. Description Page No

1. Jurisdiction Map of Brahmaputra Board

2. 8th Meeting of High Powered Review Board (HPRB) of Brahmaputra Board at Habitat Centre, New Delhi on 19.6.2015

3. 55th Meeting of Standing Committee of Brahmaputra Board held at New Delhi on 25.02.2016

4. 59th Meeting of Brahmaputra Board held at Guwahati on 03.07.2015

5. 60th Meeting of Brahmaputra Board held at New Delhi on 03.03.2016

6. Protection of Balat Village in Meghalaya on River Umngi

7. Protection work at Majuli Island

8. Location map of Hydroelectric Projects under Brahmaputra Board (North-East India Rivers and Identified Dam Sites)

9.Mass Awareness Activities by hording banner on water conservation in Tribal areas under the Tribal Sub-Plan in tribal populated State January & February 2016

10.Hindi Fortnight observed by Brahmaputra Board from 15.09.2015 to 28.09.2015 in the Board’s HQ at Guwahati

11. Vigilance Awareness Week 2015 observed by Brahmaputra Board from 26.10.2015 to 31.10.2015

85

86

86

87

87

111

112

113

117

118

118

Page 7: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

GLOSSARY FOR ABBREVIATIONS AND UNITSABBREVIATIONS

B & B Brahmaputra & BarakBTC Bodoland Territorial CouncilCEA Central Electricity AuthorityCWC Central Water CommissionCWPRS Central Water & Power Research StationCSMRS Central Soil & Material Research StationDA Differently ableDDS Drainage Development SchemeDPR Detailed Project ReportEFC Expenditure Finance CommitteeEIA Environmental Impact AssessmentEMP Environmental Management PlanGoI Government of IndiaGSI Geological Survey of IndiaIMD India Meteorological DepartmentMoWRRD&GR Ministry of Water Resources, River Development

and Ganga RejuvenationMP Multipurpose NE North EasternNEC North Eastern Council NH National HighwayNEHARI North Eastern Hydraulic & Allied Research InstituteNEEPCO North Eastern Electric Power CorporationNHPC National Hydroelectric Power CorporationNOC No Objection CertificatePAP Project Affected PeopleR&R Rehabilitation & Resettlement SC Scheduled CasteSFC Standing Finance CommitteeSoI Survey of IndiaST Scheduled Tribe

V

Page 8: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

BCM Billion Cubic MeterCu. m Cubic MeterCumec Cubic Meter per SecondCusec Cubic Feet per Secondft. Feetha Hectareha m Hectare metrekm Kilometerm Metrem. ha Million HectaresMW Mega Watt` Rupeessq km Square Kilometre

UNITS

VI

Page 9: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

Page 10: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

Chapter – I

General

1.1 Brahmaputra and Barak Valleys and the Rivers of Tripura1.1.1 Brahmaputra Valley and its flood problems

Brahmaputra, a trans-boundary river is the one among the mightiest rivers of Asia. River Brahmaputrais called Yarlung Tsangpo in Tibet. It emerges from Angsi Glacier, on the northern side of the Himalayasin Burang County in southwestern part of Tibet Autonomous Region (TAR) at an altitude of 4877 m. Itflows through southern Tibet in the east direction for a longer length, at an average height of 4000 m.At its easternmost point, the river bends around Mount Namcha Barwa and forms the Yarlung TsangpoCanyon. The total length of Brahmaputra River from its source to outfall at Bay of Bengal is 2906 km :1625 km in Tibet Autonomous Region, 918 km in India (278 km in Arunachal Pradesh and 640 km inAssam) and 363 km in Bangladesh. The river drains an area of 5,80,000 sq km ( Tibet AutonomousRegion of China – 293000 sq km, India – 240,000 sq km and Bangladesh – 47,000 sq km).

On its course from Kobo to Dhubri in Assam, about 26 important tributaries on its north bank andabout 13 on south bank join the river. Some of the north bank tributaries originate from snow cladHimalayas and others from the lower Himalayas. The total annual flow of the river is about 573 BCMat Jogighopa, which is 29% of the total surface flow of the country. Average width of theBrahmaputra Valley is 80 km, out of which the river itself occupies about 1.5 km to 25 km.

The River is braided and unstable in its entire reach in Assam except for a few places. The instability ofthe river is attributed to high sediment charge, steep slope and transverse gradient. Apart from these,the entire area is in a seismic zone and quite often receives earthquake shocks of moderate to severeintensity. The problem further gets aggravated due to landslides caused by high rainfall. Somemanmade avoidable actions in the form of shifting cultivation and non-scientific commercialexploitation of forest, etc. have also accelerated the process of soil erosion in the catchments. The siltbrought in the process gets deposited as the river descends into the plains with sudden reduction inslope, with the consequent reduction in the flow velocity and its sediment carrying capacity. Due toheavy deposition of silt, the river has frequently changed its course at different locations. Excessive siltdeposition has also given rise to braiding and meandering pattern in the alignment of the riversystem. ‘Majuli Island’, the largest inhabited river island is located in the Brahmaputra in upper Assam.

The left bank tributaries of the river Brahmaputra pass through stable reaches with flat slopes andcarry lesser sediment load of finer size. By hypsometric analysis of the tributaries, it is seen that theNorth bank tributaries indicate relatively young stage while the South bank tributaries indicate amature stage. This has given rise to inherent tendency of river Brahmaputra to shift its course towardssouth and the river flows by the side of hills at many places along its bank.

The flood in Brahmaputra Valley is a recurring phenomenon and has been causing large scaledevastations every year. The reasons for flood can be summarized as below:

81

Page 11: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

(a) Inadequate capacity of the river channel due to braided nature thereby spilling of floodwaterover the banks

(b) Drainage congestion at the outfall of tributaries during the high stage of the main river, and,

(c) Excessive silt load in the river due to soil erosion and large scale landslides in the hillycatchments.

Crops grown in the Brahmaputra Valley are paddy, jute, mustard, pulses, wheat and sugarcane.Paddy and jute are mainly grown and harvested during monsoon period. Out of four types ofpaddy crops viz. the Ahu, Sali, Bao and Boro, which constitute about 92% of the cropped area, thefirst two namely Ahu and Sali are generally affected by floods. The maximum area affected due tofloods in the Brahmaputra Valley (including Barak) during the period 1953-2006 was approximately4.00 m. ha. The flood damage includes crop damage and the permanent loss of land due toerosion. A number of lives are also lost during each flood.

The flood and river management measures adopted so far in the valley are mostly of short termstructural measures such as construction of embankments, permeable and impermeable spurs,revetments etc. and are area specific only. The poor maintenance of the flood managementstructures generally causes unexpected miseries to the people in case of their failure. The efficacy ofthese measures especially in the river system of Brahmaputra, which is highly aggrading / degradingin different reaches, is also debatable. As such, there is a need for constructing storage reservoirs incombination with other structural / non-structural measures. The latter can be decided after studyingthe river behaviour using scientific tools.

For management of floods, erosion control and improvement of drainage congestion, BrahmaputraBoard has prepared Master Plans of the Brahmaputra main stem and its 39 tributaries and for MajuliIsland. There is also a need to implement the various recommendations made in the Master Plans ofBrahmaputra sub-basin prepared by Brahmaputra Board. The regional Task Forces “B” for floodmanagement in N.E. Region has also submitted its report to the Ministry of Water Resources, whichshould be taken into consideration for early implementation in a time bound manner.

1.1.2 Barak ValleyThe river Barak is a part of the Ganga-Brahmaputra-Meghna system and is the second largest riverof the N.E. Region having eight major tributaries. It originates from a hill east of Mouthana at anelevation of about 2840 m in the southern slopes of Nagaland / Manipur. The Barail, Patkai andLussai hills bound the sub-basin on its three sides. Total catchment area of the Barak sub-basin up toIndo-Bangladesh border is 41,704 sq km out of which 751 sq km lies in Myanmar. The annual flowfrom Indian catchment is 29.6 BCM at Badarpurghat. The length of the river from its source uptoBhanga in Cachar district is 532 km after which the Barak bifurcates into two branches known asthe Surma and the Kushiara. These two branches enter Bangladesh and again join to form a singleriver channel and flow up to Bhairab Bazar where it meets with Meghna in Bangladesh.

The river Barak is joined by a number of hill streams on both its banks. Flood occurs frequently in thisvalley causing extensive damage to lives and properties. In order to manage the problem of flood,erosion and drainage congestion, various measures have been taken from time to time by way ofconstruction of embankments, bank protection and drainage improvement works etc. Thesemeasures have provided adequate protection to the people of the valley against low and mediumfloods. In case of high floods, embankments are not able to withstand heavy pressure, consequentlynumber of breaches occur which cause devastating floods in the valley. In order to deal with the

82

Page 12: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

problems of floods, bank erosion and drainage congestion, Brahmaputra Board has prepared MasterPlans for the Barak sub-basin and Dhaleswari, one of the major tributaries of Barak.

1.1.3 Rivers of TripuraThere are eight important rivers in Tripura. These rivers cause flood frequently in the State. Based oninvestigation and data collected from state Government and various other Central Agencies,Brahmaputra Board has prepared Master Plans for all these rivers and these have been approvedby the Central Government. The Master Plans envisage various structural and non-structural measuresto tackle flood, erosion and drainage congestion problems. The Feni flows through the “No man’sland” of Indo-Bangla border and its right bank falls in India. The Master Plan of Feni River is underpreparation.

1.1.4 Rivers of MeghalayaMinistry of Water Resources, RD&GR through Office Memorandum No. 19/2/2010-B&B/3563-3580 dated3rd September 2010 constituted a ‘Joint Team’ under the Chairmanship of Chief Engineer (P&D)(now Chief Engineer-I), Brahmaputra Board on matter related to Integrated Water ResourcesDevelopment in the State of Meghalaya. The ‘Joint Committee’ identified 18 rivers of Meghalayafor preparation of Master Plans. Master Plans of 9 rivers out of these have already been formulatedby Brahmaputra Board and are in various stages of approval of Government of India. Out of theremaining 9 Master Plans, one Master Plan has been circulated amongst the Board members and 5Master Plans are under preparation.

1.1.5 Rivers of Sikkim and West Bengal draining into Brahmaputra River BasinTeesta, Jaldhaka and Torsa – Raidak are three river systems of Sikkim and West Bengal and fall intoriver Brahmaputra. Master Plans for all the three sub-basins have been formulated. These threeMaster Plans have been approved by Board. These Master Plans are being submitted for approvalof Government of India after compliance of observations of Ministry of Water Resources, RD & GR.

1.1.6 Imphal River in ManipurThe Imphal River emerges in the highlands in the state of Manipur to the west of Kangpolpi andflows towards the south. Brahmaputra Board has planned for formulation of a Master Plan of ImphalRiver and the process for carrying out ‘Survey and Investigation’ of the sub-Basin has been initiated.Presently 4 (Four) Anti-Erosion & Flood Control Schemes on Imphal river are identified.Process forformulation of DPR has been initiated.

1.2 Establishment of Brahmaputra Board and its FunctionsThe Brahmaputra Board, a statutory body, was set up under an Act of Parliament called the‘Brahmaputra Board Act, (Act 46 of 1980)’ under the Ministry of Irrigation (now Ministry of WaterResources, RD&GR). The jurisdiction of Brahmaputra Board includes both the Brahmaputra andBarak Valleys and covers all the States of the North Eastern Region, Sikkim and part of West Bengalfalling under Brahmaputra basin. The Board consists of 21 Members under the chairmanship of theChairman, Brahmaputra Board (4 full time Members and 17 part time Members), representing sevenstates of the North Eastern Region, North Eastern Council, concerned Ministries viz. Ministry of WaterResources, Agriculture, Finance, Power & Surface Transport and Departments of the Government ofIndia viz. Central Water Commission, Geological Survey of India, India Meteorological Departmentand the Central Electricity Authority. List of Members of the Board appointed under clause (A), (B),(C), (D) & (E) of sub-section (3) of section (4) is at Annexure-I

83

Page 13: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

���

Since creation of the Ministry of Development of North Eastern Region (DoNER) and inclusion ofSikkim and part of West Bengal within the jurisdiction of Brahmaputra Board, the Secretary of DoNER,the Secretary, I&FCD, Sikkim, the Secretary, Irrigation and Waterways Department, West Bengal, theChief Engineer (B&BB), CWC, Shillong and Adviser (NE), Planning Commission are invited as SpecialInvitees in the Board meetings.

The Board started functioning with its Headquarters at Guwahati from 11.01.1982. As per sub-section(2) of section (3) of the Brahmaputra Board Rules, 1981 Board has established a Liaison Office atNew Delhi.

A High Powered Review Board to oversee the work of the Brahmaputra Board was constituted withthe Union Minister of Water Resources as the Chairman and Chief Ministers of Assam, ArunachalPradesh, Manipur, Meghalaya, Mizoram, Nagaland and Tripura and Union Minister or a CabinetMinister duly authorized by him and Ministers of State for Finance, Transport, Power, Agriculture,Central Water Commission as Members, the Chairman, Brahmaputra Board as the Member-Secretary,Member (RM), CWC as a permanent invitee. List of Members of the High Powered Review Boardappointed by the Government of India vide Resolution No. 2(17)/80/FC/460 dated 19.03.1982 andas amended vide Resolution No.23/8/925-ER dated 01.10.1992 is at Annexure-II.

1.2.1 Functions of the Brahmaputra BoardThe main functions of Brahmaputra Board stipulated in the Act are –

(a) ‘Survey & Investigations’ in Brahmaputra & Barak Valley and preparation of Master Plans for controlof floods, bank erosion and improvement of drainage in the Brahmaputra Valley and activitiesconnected therewith, including development and utilization of water resources of the BrahmaputraValley for irrigation, hydropower, navigation and other beneficial purposes,

(b) Formulation of programmes, in consultation with State Government(s), for construction /implementation, in phases, of dams and other projects identified in the Master Plans,approved by Government of India,

(c) Preparation of Detailed Project Reports and estimates including apportionment of cost amongStates in respect of the dams and other projects,

(d) Finalization of standards and specifications for construction, operation and maintenance ofsuch dams and other projects and

(e) Construction, operation and maintenance of Multipurpose and other Water Resources Projects,identified in the Master Plans, on approval of Government of India

1.3 Meeting of High Powered Review BoardThe 8th meeting of ‘High Powered Review Board’ of Brahmaputra Board was held during the year2015-16 on 19.06.2015 at India Habitat Centre, Lodhi Road, New Delhi.

1.4 Meetings of Brahmaputra BoardThe 59th and 60th meetings of Brahmaputra Board were held during the year 2015-2016. The 59th

Meeting of Brahmaputra Board was held on 03.07.2015 at Guwahati and the 60th meeting ofBrahmaputra Board was held on 03.03.2016 at CWC, New Delhi

1.5 Organizational Set-up of Brahmaputra BoardA chart showing the existing organizational set up of the Board is given at Annexure-III.

84

Page 14: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)
Page 15: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)
Page 16: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)
Page 17: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

Page 18: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

2.1 Administration and Organization

The offices of the Board located at Basistha, Guwahati-29 till 7th January, 2016 are as follows -

i) Secretariat of Brahmaputra Board

ii) Office of the Chief Engineer -I

iii) Office of the Chief Engineer -II

iv) Office of the Superintending Engineer, Guwahati Circle

v) Office of the Executive Engineer, Guwahati Division

In view of the present work load of Brahmaputra Board and to achieve focus, efficiency, speed and ease ofdischarging of business, the following wings / departments based on the broad activities are created inheadquarters office in supersession of Office Order No. BB/3103/04/Pt-I/5 dated 10.08.2012 vide Office OrderNo. BB/3103/04/Pt-I/27 dated 07.01.2016.

(A) Headquarters office with the following wings –

Chapter - II

General Review

88

Sl.No

(a) Wing(b) Short Name (c) Head

Broad Functions

1 (a) Administration and Secretariat

(b) A&S (c) Secretary

Overall Administration, Establishment related matters in respect of all regular and work charge staff, Meetings of the Brahmaputra Board, High Powered Review Board (HPRB), Standing Committee and all other Committees. All residual matters not assigned to other wings, Liaison work, RTI matters, Trainings, Services and running of officers of Brahmaputra Board, Liaison Office at Delhi. All services and supplies in the offices, including the office equipments with the exception of central air-conditioning, lift and building maintenance. Other activities as assigned from time to time.

2 (a) Finance and Accounts

(b) F&A (c) Financial Adviser

Finance, Accounts and Audit. Disbursement of funds to field offices, scrutiny & financial concurrence on proposals. Payments of salary to staff in Headquarters, medical, TA, LTC etc.; providing expenditure related information; monitoring activities relating to accounts in the field to ensure efficiency. Computerization of accounts. Co-ordination with all external Audit and settlement of audit paras. Other activities as assigned from time to time.

3 (a) Vigilance Cell (b) V(c) CVO

Vigilance, complaints, investigations, inquiries. Monitoring of Settlement of Grievances. Other activities as assigned from time to time.

4 (a) Planning (b) P(c) Chief Engineer-I

Master Plans including Survey, Investigation and Collection of all data needed; River and Basin Studies; Planning; Design and Preparation of Detailed Project Report (DPR) of Multipurpose Projects; Planning and preliminary design of Drainage Development Schemes; Co-ordination and Liaison with States and keep track of all

offices

Page 19: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

relevant activities in relevant organizations in relevant Stated / Countries; monitoring of FMP Schemes being implemented by States; NEHARI. Other activities as assigned from time to time.

5 (a) Works (b) W(c) Chief Engineer-II

Execution of all Drainage Development Schemes, Anti-erosion Schemes, raised Platforms including the related Court Cases, arbitrary to works and contracts; maintenance of properties of the Board but excluding day to day running of offices / guest houses etc. Other activities as assigned from time to time.

(B) Office of the Superintending Engineer, Guwahati Circle

(C) Office of the Executive Engineer, Guwahati Division

The existing sanctioned strength of officers and staff, their position and the position of SC/ST/OBCand PH as on 31.03.2016 are at Annexure- IV.

2.2 Finance, Accounts and Audit

Brahmaputra Board is provided funds under ‘grants-in-aid’ by Government of India for its worksand establishment. Brahmaputra Board has a Financial Advisor to render advice on all mattersrelating to finance maintenance of accounts and to conduct internal audits of Brahmaputra Board.There is a ‘Finance Wing’ consisting of a Deputy Financial Adviser, Senior Accounts Officer, AccountsOfficers and other supporting staff to assist him in these works. Each field division is provided with aDivisional Accountant to maintain proper accounts of field works and advise the Executive Engineersin accounts matters.

The fund allocations to the divisions and their expenditure are maintained and controlled by theFinance wing on monthly / quarterly / annual basis.

2.3 Review in progress of works during 2015-16

2.3.1 Survey & Investigation and preparation / updating of Master Plan

a) Data collections for Bugi, Dareng and Umsohryngkew have been completed and preparationsof draft Master Plan of Bugi is in final stage. However, draft Master Plan of Dareng andUmsohryngkew are prepared and submitted to Joint Team constituted by MoWRRD&GR forpreparation / updation of Master Plan.

b) Updating of Master Plans of Kapili-Kalong, Noa-Nadi, Puthimari, Dhansiri (s) are under process.Jaldhaka and Tangani are under preparation as per observation of MoWR, RD&GR.

2.3.2 Drainage Development Schemes (DDS):

Preparation of DPR of Pota Kollong, Nelli, Kalamonijan DDS are completed. TAC accorded byCWC for Nelli and Kalamonijan DDS.

2.3.3 Survey & Investigation and preparation of DPR of Multipurpose Projects including Mini-Micro Projects

a) Kulsi MP Project: DPR completed & submitted to MoWR,RD&GR on June, 2014 by BrahmaputraBoard. Compliance of observation from CEA / CWC is being done.

b) Noa-Dehing Dam Project: DPR completed & submitted to MoWR,RD&GR on March, 2014 byBrahmaputra Board. Hydrological data collection continued. Compliance of observation fromCEA / CWC is being done.

arbitration of

89

States

Page 20: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

c) Simsang (Someswari) Dam Project: Hydrological data collection continued. Topographicalsurvey, Geological investigation and construction material survey are in progress.

d) Jiadhal Dam Project: Hydrological data collection continued. Infrastructural development,Geological investigation and construction material survey are in progress.

e) Killing Dam Project: Hydrological data collection continued. Layout prepared and submittedto CWC for finalization. Observations received from CWC are being attended. Infrastructuraldevelopment, Topographical survey, Geological investigation and construction material surveyare in progress.

2.3.4 Feasibility studies for channelization of river Brahmaputra- Mathematical model studies etc.Mathematical Model study is being taken up by IIT, Guwahati :

Sanctioned Amount: Rs 254.06 Lakh. Amount Released upto March 2016: Rs 55.35 Lakh.

Status upto March 2016: Development of both 1D and 2D models are in progress. Different numericalschemes have been successfully implemented for simulating 1D and 2D flow. Performance of theseschemes has been compared. After successful run of these schemes, their applicability in complexbathymetry has been tested and time required, robustness etc of each of these schemes are inprogress. While performance of all 1D models are satisfactory, performance of 2D model overcomplex bathymetry requires more investigation to increase robustness as well as accuracy of themodel regime. Target for completion: February, 2019.

2.3.5 Execution of Drainage Development Schemea) Barbhag DDS: CWC cleared the revised DPR for Rs. 1480 lakh. The works of construction of

embankment and re-sectioning of channel were completed. Construction of sluice regulatorand its associated work is going on and progress up to March, 2016 is 13.50%.

b) Amjur DDS: Revised DPR is under appraisal of CWC. On receipt of Techno-economic clearancefrom CWC, construction of sluice will be taken up. 33.50% of works completed.

c) Jengrai DDS: Revised estimate for Rs. 523.24 lakh has been cleared by CWC. Tendering processhas been started. 27.00% works completed.

d) Jakaichuk DDS: Construction of sluice works are in progress. 93.00% works completed.

2.3.6 New Drainage Development Scheme proposed to be taken up for execution during XII PlanDemow DDS: DPR costing Rs 12.78 crore was techno-economically cleared by CWC in 2008. Thescheme was handed over to the State Government of Assam for execution in XI plan. In 2012, theState Government of Assam returned the scheme expressing inability to execute and requestedBrahmaputra Board for execution. The DPR was updated to Rs 22.2315 crore in Nov. 2015 andresubmitted to CWC for approval. CWC, Guwahati office checked the DPR and forwarded totheir Chief Engineer’s office at Shillong in April 2016 for approval with a comment for vetting of thedesign through Design Directorate of CWC, New Delhi.

2.3.7 Flood Control & Anti erosion worksa) Protection of Majuli Island from floods and erosion works:

Expenditure of Rs. 115.53 crore has been incurred under Phase-II & III up to March 2016 onprotection of Majuli Island with physical progress 92.19%. With the implementation of works

90

Page 21: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

under various phases, the land mass of Majuli Island has increased from 502.21 sq km in theyear 2004 to 524.29 sq km in the year 2016 as per satellite imagery. The works under Phase-II &III are targeted for completion by March 2017.

b) Restoration of original channels of Dibang and Lohit Rivers at Dhola-Hatighuli (Avulsion ofBrahmaputra at Dholla-Hatighuli Phase-IV):

Works completed in March 2016 with an expenditure of Rs. 55.61 crore.

Outcome: 11villages under Doomduma Revenue Circle in an area of about 1500 ha gotprotection from floods, from the year 2004 onwards.

c. Protection of Balat Village in Meghalaya on River Umngi.

Part –I of scheme amounting Rs. 5.63 crore were taken up for implementation within the AAprovision. 83.14% physical progress achieved with expenditure Rs. 4.81crore up to March 2016.

d. Anti-erosion works for protection of Mankachar, Kalair alga international border area fromerosion of river Brahmaputra Assam: MoWR, RD&GR entrusted Brahmaputra Board to take upprotection measures in the area. Accordingly, Brahmaputra Board prepared DPR for protectionof the area and the scheme had been Techno-economically cleared by CWC for an amountof Rs. 23.79 crore. The Technical Advisory Committee, Brahmaputra Board (TAC-BB) during theirsite visit on 11.02.2016 has suggested realignment of the retirement bund. Accordingly workhas been taken up by Board. The overall expenditure on the Scheme is Rs. 2.15 Crore up toMarch, 2016 with physical progress- RCC porcupine works- 80%, Bank revetment works- 0.14%and construction of embankment-retirement works- 8.36 %.

e. An anti-erosion measure in Maslabari in Assam near International Border- Tender forimplementation of the scheme is under progress.

f. Emergent Anti-erosion works (Generic Schemes)-

Preparation of DPR for A/E works at Langkaih in Mizoram- On request of Government ofMizoram, field survey for preparation of DPR for A/E works at Langkaih River in Mizoram hasbeen completed. DPR will be prepared during 2016-17

2.3.8 Raised Platform

18 raised platforms have been completed by Brahmaputra Board. One raised platform atBarbalarchar in Dhubri District in Assam has been completed in 2015-16.

���

91

Page 22: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

3.1 Progress of Survey and Investigation and Preparation of Master Plans, Detailed Project Reports(DPR) for Drainage Development Schemes and DPRs of Multi-Purpose Projects

3.1.1 Preparation of Master Plans

The Brahmaputra Board had taken up preparation of Master Plans of the main stem of theBrahmaputra and Barak along with 68 major tributaries of Brahmaputra, including Majuli IslandRiver Dhaleswari and rivers of Meghalaya & Manipur and Tripura in three Parts.

Chapter – III

Achievement of Brahmaputra Board during 2015-16

Part River Number Status

Part-I Main stem Brahmaputra River

1 Approved by Government of India

Part-II Master Plan on Barak River and its tributaries except Dhaleswari

1 Approved by Government of India

Part-III Master Plan on tributaries of the Brahmaputra and rivers of Tripura including Majuli Island and Dhaleswari

68 o Approved by Government of India-47 Master Plans

o Approved by Board and submitted to MoWR, RD&GR for Approval of Government of India. Further observation of MoWR, RD&GR are being attended by Board- 8 Master Plans

o Draft Master Plan completed and under process of submission to MoWR, RD&GR for Approval of Government of India-1 Master Plan

o Draft Master Plan are in the process to place in Board for approval- 4 Master Plan

o New Master Plan- 8 Sub-basinsTotal 70

All 57 Master Plans identified upto XI Plan has been completed by Brahmaputra Board. Out of above, 49Master Plans have been approved by the Government of India and remaining 8 Master Plans are undermodification for obtaining approval from the Ministry of Water Resources, RD&GR, Government of India.

During the year 2015-16

A) Draft Master Plan of Ganol Sub-basin has been completed in 2015 and is under process ofapproval of Brahmaputra Board. Draft Master Plans of Waikhyrwi, Umtrew, Dareng & Bugihave been completed. However, recent observations of Ministry of Water Resources, RD&GRduring November 2015 are being incorporated in the above Master Plans of Meghalaya also.

B) 8 Master Plans approved by Board and under process of approval of the Government of Indiaare returned to Board for meeting up observation in 2015 and now these are being attendedby Brahmaputra Board.

the Government of India

the Government of India

Approved by the Government of India

RD&GR for Approval of the Government

Approval of the Government

92

Page 23: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

Master Plans of Imphal River in Manipur, Feni River in Tripura and 2 Master Plans in the State of Mizoramnamely, Tuichang and Kolodyne are identified for preparation during XII Plan.

3.1.2 Current Assignment for Preparation of Master Plans:A meeting was convened under the Chairmanship Dr R C Laloo, Hon’ble Minister of Forest andEnvironment, Government of Meghalaya on 22nd June 2010 in Shillong to discuss the follow up actionson matters related to Integrated Water Resources Development in the State of Meghalaya. Shri VincentPala, Hon’ble Minister of State, Ministry of Water Resources, RD&GR, Government of India was ChiefGuest in the meeting. The Hon’ble Minister of State, MoWR, RD&GR, Government of India desired inthe meeting for preparation of Master Plans of all rivers of Meghalaya by Brahmaputra Board. Such adecision was communicated by MoWR, RD&GR to Brahmaputra Board through letter No: 19/2/2010-B&B/3114 dated 28 July 2010. In pursuance to the above, a ‘Joint Team’ under the Chairmanship ofChief Engineer (P&D) (now Chief Engineer-I), Brahmaputra Board was constituted by MoWR, RD&GRthrough Office Memorandum No: 19/2/2010-B&B/3563-3580 dated 3rd September 2010.

� The following are rivers of Meghalaya identified for preparation of Master Plans –

1. Waikhyrwi

2. Umtrew

3. Ganol

4. Bugi

5. Dareng

6. Umsohryngkew

7. Umiew

8. Myntdu9. Lubha

� Master Plan of Imphal River in Manipur

� Master Plan of Feni River in Tripura

� Proposal for inclusion of 2 Master Plans in Mizoram i.e. (1) Tuichang and (2) Kolodyneis under consideration

� Imphal River Master Plan: Process for Survey & Investigation is on. Target: 2018-19.

� Updating of 8 Master Plans for which MoWR, RD&GR has given its comments: Therevised dates for submission of the Master Plans to MoWR,RD&GR are as below-

1) Tangani and Jaldhaka: 15th October 2016

2) Teesta: 15th November 2016

3) Sankosh - Raidak: 31st December 2016

4) Torsa -Kaljani: 31st January 2017

5) Um-N-Got: 28th February 2017

6) Simsang: 31st March 2017

7) Kynshi: Submission to MoWR, RD&GR: 30th April 2017

A pictogram of the status of Master Plans is given at Annexure – VIII

93

Page 24: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

Field Activities of Brahmaputra Board during the year 2015-16:

3.2 Drainage Development Schemes (DDS)

Brahmaputra Board identified 41 drainage congested areas based upon studies carried out under49 approved Master Plans. During 2015-16 the DPR of Kalamonijan and Nelli have been approved.The modified DPRs of Pola, Dharmanagar and Larsing have been submitted and awaiting forapproval. DPR of Pota-Kolong is completed and under compliance of observations of CWC. Therevised DPR of Demow was submitted to CWC for Techno economical examination.

3.2.1 Completed Drainage Development Schemes:

� Harang Drainage Development Scheme

The scheme located in Barak Valley on the border of Bangladesh near Badarpur with estimatedcost of Rs. 30.49 crore. Total expenditure is Rs. 30.22 crore. The scheme has been completedphysically in all respects during March, 2011. The scheme has already been handed over toWater Resources Department, Government of Assam. The scheme benefits 11850 ha ofchronically drainage congested areas in Barak Valley, Assam for agriculture.

� East of Barpeta Drainage Development Scheme

The original estimate of the project was for Rs. 1.34 crore and it was revised to Rs. 2.96 crore.The scheme was taken up for execution in March, 2009 and completed in June, 2011. Expenditureincurred against this scheme is Rs. 2.67 crore. The scheme has already been handed over toWater Resources Department, Government of Assam. The scheme benefits 2852 ha of chronicallydrainage congested areas in Assam for agriculture.

3.2.2 Under Execution Drainage Development Schemes:

� Jakaichuk Drainage Development Scheme

The scheme was taken up for execution by Brahmaputra Board in 2008. The progress of workwas held up in November, 2010 due to objection of the local inhabitants on non-existence ofan overflow section in the sluice. Subsequently, an overflow section has been provided in thesluice and the work of sluice has been resumed. Physical progress of work upto March, 2016 is93% at an expenditure of Rs. 2.33 crore. The scheme is targeted for completion during 2016-17.The scheme benefits 2308 ha for agriculture.

� Borbhag Drainage Development Scheme

Brahmaputra Board took up the execution of Borbhag Drainage Development Scheme duringthe year 2006. Two components of the work - (1) Raising and strengthening of embankmentand (2) Re-sectioning of channel have already been completed in March 2012. The DPR hasbeen revised to Rs. 14.80 crore incorporating revised design of sluice. The work of remainingpart of the scheme, i.e. construction of the sluice is in progress and 13.50% progress wasachieved upto March 2016 with an expenditure of Rs. 8.04 crore. The scheme benefits 4000 haof chronically drainage congested areas in Assam for agriculture.

� Amjur Drainage Development Scheme

Techno-economic clearance of the scheme for an amount of Rs. 14.15 crore was received inJanuary, 2006. The execution of Amjur DDS was taken up in the year 2006-07. Out of the two

94

Page 25: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

components i.e. sluice regulator and embankment, the work for ‘Raising and Strengthening’of existing embankment was taken up first and completed. The design of sluice was entrustedto CWC and the revised estimate as per approved design of CWC for Rs. 56.37 crore is underappraisal of CWC. Construction of sluice will be started after getting approval from CWC.Expenditure of Rs. 15.52 crore incurred upto March, 2016. The scheme will benefit 7200 ha ofdrainage congested areas in Cachar District, Assam for agriculture.

� Jengrai Drainage Development Scheme

Techno-economic clearance of the scheme for an amount of Rs. 1.49 crore was received in2006. The scheme was taken up by Brahmaputra Board in 2006-07. Out of the two componentsi.e. sluice regulator and embankment, the work for ‘Raising and Strengthening’ of existingembankment was taken up first and completed. The design of sluice regulator has been doneby IIT, Guwahati and DPR of the scheme had to be revised as per the design drawings ofsluice. The revised DPR of the scheme amounting to Rs. 5.23 crore has been techno-economicallycleared by CWC. The work for construction of sluice has been allotted and the work is inprogress. Expenditure incurred upto March, 2016 is Rs. 1.04 crore. The work is targeted to becompleted in March 2018. The scheme benefits 1400 ha of drainage congested areas

� Demow Drainage Development Scheme

On receipt of techno-economic clearance from CWC, the DPR of Demow DrainageDevelopment Scheme was submitted to Government of Assam for implementation. However,Government of Assam requested to take up the execution of the scheme through byBrahmaputra Board. The detailed design and construction drawing of the sluice regulator hasbeen done by Brahmaputra Board and the cost estimate of the scheme has been updated forRs. 22.23 crore which is presently under examination of CWC.

� The status, in brief, in respect of identified 41 Drainage congested areas are given below-

Sl.No.

Name of DrainageScheme

Tributary / Sub-basin Basin

Area affected (sq.km)

State Status (As on 31.03.2016)

I) Schemes cleared by CWC

1 Harang Barak Barak 242

Assam

Execution completed and handed over to WRD, Government of Assam

2 East of Barpeta

Beki-Manas Aie.

Brahmaputra 180

3 Borbhag Pagladiya Brahmaputra 56 Scheme is under execution 4 Amjur Barak Barak 52.5 Revised DPR submitted to

CWC for approval 5 Jengrai Subansiri Brahmaputra 18 Scheme is under execution 6 Jakaichuk Jhanji Brahmaputra 100 7 Kailashahar Manu Manu-deo 18 Tripura The scheme is deleted in its

present form during the 57th Brahmaputra Board on 5th June, 2013

8 Singla Barak Barak 322 Assam Execution suspended due to inability of State Government to provide requisite land inability of the State Government

95

Page 26: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

II)

Sl. No.

Name of Drainage Scheme

Tributary / Sub-basin Basin

Area affected (sq.km)

State Status (As on 31.03.2016)

) S h l d b C C9 Rudrasagar Gumti Gumti 22 Tripura Handed over to State Government of Tripura for execution

10 Demow Disang Brahmaputra 226 Assam Handed over to Govt. of Assam for execution. However, on request of Govt. of Assam the scheme is included in work programme of XII plan. DPR was sent to CWC for Techno-economic clearance on 03.11.2015. Regional office CWC has recommended to CE office, Shillong for approval.

11 Kalamonijan Kopili (Jugijan & Lankajan)

Brahmaputra 100 Assam Techno-economic clearance accorded by CWC in March 2015. For taking up execution of the scheme interaction with Govt. of Assam is made for issuing NOC.

12 Nelli Kopili Brahmaputra 32 Assam DPR techno-economically cleared by CWC on 29.03.2016. For taking up execution of the scheme, interaction with Govt. of Assam is made for issuingNoC.

I) Schemes submitted to CWC & Approval awaited

1 Pola Pola Barak 71 Assam Modified DPR submitted to CWC on 19.08.15 duly incorporating point wise reply to the observation raised by CWC. CWC has given some more observation on 26.10.2015, which is under compliance. Subsequently, DPR costing Rs 21.7162 crore was submitted to the CWC, Shillong on 01.07.2016 for techno-economic clearance.)

2 Dharmanagar Juri Juri 20 Tripura Modified DPR submitted to CWC on 28.11.2013 for Techno-economic clearance. Necessary design & Drawing of joint of flood wall along with cost

was

d

96

Page 27: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

III)

gestimate is prepared and submitted to CWC along with reply to the observation raised by CWC. Reply of observation was sent to CWC on 16.03.2016 for acceptance.

3 Larsing Barak Barak 35 Assam It is proposed to modify the DPR as per present site condition and field office is directed to submit modified DPR on 16.03.2016.

4 Mori Kolong / Pota Kolong

Na-noi Brahmaputra 100 Assam Preparation of DPR is completed and submitted to CWC. DPRs are under appraisal of CWC. Observations of CWC are being attended.

I) Schemes under compliance of observation of Central Water Commission

1 Sonai Kapili Brahmaputra 63 Assam Field office is directed to submit feasibility report

2 Deroi Disang Brahmaputra 194 Assam DPR’s under preparation and at compilation stage

3 Depota Depota Brahmaputra 28.36 Assam Preparation of DPR is completed and submitted to CWC

II) Schemes under preparation of DPR / Awaited from Filed Office

1

Laura-Jamira-Sessa

Buridehing Brahmaputra 300

Assam

Scheme is under formulation of Brahmaputra Board. Field office asked to submit DPR on 01.03.2016

2 Punir Barak Barak 31

Assam

Under process of formulation of the scheme on the basis of new field survey and investigation

3 Ghiladhari Ghiladhari Brahmaputra 144 Assam Joint field visit with state Govt. officials is proposed

4 Tingrai Buridehing Brahmaputra 11 Assam Field office asked to submit the status

5 Haria-Nanoi Nanoi Brahmaputra NA Assam Scheme is under formulation of Brahmaputra Board

III) Schemes under process of deletion

1 Konwarpur Demow Brahmaputra 112 Assam Under process of deletion 2 Badri Barak Barak 33 Assam Under process of deletion 3 Mora-

Dikrong Dikrong Brahmaputra 26 Assam Under process of deletion

Sl. No.

Name of Drainage Scheme

Tributary / Sub-basin Basin

Area affected (sq.km)

State Status (As on 31.03.2016)

) S h l d b C C

IV)

V)

Nanai Nanai

was

condition and field office was

Field office was directed to

was

97

Page 28: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

3.2.3 Preparation of Detailed Project Reports (DPRs) for Drainage Development Schemes:During the year 2015-16, the achievements made by Board in respect of preparation of DrainageDevelopment Schemes are as under-

� Kolamonijan DDS: The scheme was cleared by CWC for Rs 482.43 lakh in March, 2015.

� Pola DDS: Under compliance of observation of CWC raised on 26.10.2015. (Subsequently, DPRcosting Rs 21.7162 crore was submitted to the CWC, Shillong on 01.07.2016 for techno-economicclearance.)

� Dharmanagar DDS: Under compliance of observation of CWC.

� Mori Kolong / Pota Kolong DPRs are under appraisal of CWC. Observations of CWC are beingattended.

� Kolamonijan and Nelli already been cleared by CWC.

A pictogram of the status of Drainage Development Scheme is given at Annexure- IX.3.3 ‘Survey and Investigation’ of Water Resources Projects

� ‘Survey & Investigation’ and Preparation of Detailed Project ReportsBrahmaputra Board took up ‘Survey & Investigation’ of 14 of Multipurpose Projects inBrahmaputra and Barak Basin and in the south flowing rivers of Meghalaya.

3.3.1 Detailed Project Reports (DPRs) CompletedOn completion of Survey & Investigation, Detailed Project Reports (DPRs) in respect of followingProjects have been completed and the Projects are under commissioning by various Agencies –

Sl. No.

Name of Drainage Scheme

Tributary / Sub-basin Basin

Area affected (sq.km)

State Status (As on 31.03.2016)

) S h l d b C C4 Sukhsagar Gumti Gumti 50 Tripura Under process of deletion 5 Mora-

Pichalamukh Dikrong Brahmaputra 8 Assam Under process of deletion

6 Pakania Ranganadi Brahmaputra 16 Assam Under process of deletion 7 Namdang Dikhow Brahmaputra 10 Assam Under process of deletion 8 Sisapathar Dikrong Brahmaputra 12 Assam Under process of deletion 9 Gelabil Bhogdoi Brahmaputra 5 Assam Under process of deletion 10 West of

Barpeta Beki-Manas-Aie

Brahmaputra 23 Assam Under process of deletion

11 Ghagra Barak Barak 65 Assam Under process of deletion 12 Bherekibeel Maridhal Brahmaputra Assam Under process of deletion 13 Khatra Barnadi Brahmaputra 15 Assam Field office asked to submit

the status14 Batha Nanoi Brahmaputra 40 Assam Field office asked to submit

the status I) Schemes already deleted

1 Joysagar Kopili-Kolong

Brahmaputra 55 Assam Dropped on approval of Board in 53rd meeting of BB2 Rangsai Jinjiram Brahmaputra 147 Assam

3 Sessa Puthimari Brahmaputra 59 Assam

VI)

98

Page 29: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

Sl.No Project Implementing Agency/Organization/Government 1 Siang Dam Project

(3 dams) Handed over to NHPC during the year 2000. NHPC informed that SiangLower was handed over to M/s Joy prakash Associates Ltd. (JAL) on 31.03.2009. Siang Middle to M/s Reliance Energy Ltd. (REL) and for Siang Upper, Government of Arunachal Pradesh allocated to M/s NHPC in February 2009 for preparation of PFR. Further details on progress of commissioning of these projects have not been received

2 Subansiri Dam Project (3 dams)

Handed over to NHPC during the year 2000. As stated by NHPC the Lower Subansiri is targeted for completion within the year 2017. Subansiri Middle and Subansiri Upper were handed over to M/s Jindal Power Ltd. on 04.02.2011. Further details on progress of commissioningof these projects have not been received

3 Tipaimukh Dam Project Handed over to NEEPCO and subsequently handed over to NHPC from NEEPCO

4 Pagladiya Dam Project The work of Pagladiya Dam Project under execution in Brahmaputra Board is held up due to non-completion of zirat survey

5 Bairabi Dam Project Handed to Government of Mizoram. The Government of Mizoram allotted the work of execution for Bairabi Dam Project to M/s Sikaria Power Ltd., Kolkata on 10.08.2012. It has been intimated by Government of Mizoram that Bairabi Dam Project will be completed within seven years.

3.3.2 Partially Completed Detailed Project Reports (DPRs)

The following four Water Resources Projects located in Arunachal Pradesh and Meghalaya, under‘Survey & Investigation’ in Brahmaputra Board were handed over to the Agency / State Governmentfor completion of the balance Survey & Investigation works and subsequent commissioning.

Sl. No. Name of Project Implementing Agency 1. Debang Dam project National Hydroelectric Power Corporation

2. Lohit Dam Project (On completion of 'Survey & Investigation') Government of Arunachal Pradesh

3. Kynshi Stage-I Dam project Government of Meghalaya 4. Kynshi Stage-II Dam project Government of Meghalaya

3.3.3 Projects under ‘Survey & Investigation’ and Formulation of Detailed Project Reports

The following Five Water Resources Projects are presently under ‘Survey & Investigation’/preparationof DPR in Brahmaputra Board-

Sl.No. Name of Project Location 1. Kulsi Multipurpose Project Assam on border with Meghalaya Declared as

National Project2. Noa-Dehing Dam Project Arunachal Pradesh

3. Simsang Dam Project Meghalaya 4. Jiadhal Dam Project Assam on border with Arunachal Pradesh 5. Killing Dam Project Assam Meghalaya border

Jai P

99

Page 30: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

� Kulsi Multipurpose Project

The project site is located about 1.5 Km downstream of Ukium, a border village of Assam andMeghalaya. Brahmaputra Board took up the survey and investigation work of Kulsi M.P. project forHydro Power, Irrigation and flood moderation in the basin in the year 1997. The installed capacity ofthe project is estimated as 58 M.W. with a gross command area of about 26000 ha. This project hasbeen declared as ‘National Project’ by Government of India. The DPR of the project has beencompleted in May, 2014 and submitted to MoWR, RD&GR for approval. The observations of CWCand CEA on the DPR are under compliance.

� Noa-Dehing Dam Project

The Project site is located about 4 Km upstream of Miao Town in Changlang District of ArunachalPradesh. The investigation of this project was started in December, 1996. The installed capacity ofthe project is estimated at 75 MW. Field activities under the project have already been completedexcept collection of hydro-met data collection. This project also declared as ‘National Project’. TheDPR was completed in March, 2014 and submitted to MoWR, RD&GR for approval. The observationsof CWC and CEA on the DPR are under compliance.

� Simsang (Someswari) Multipurpose project

The project is located on the Simsang River with the dam site at Rongkhandi near NangwalbibraTownship under East Garo hills District of Meghalaya. The survey and investigation work of thisproject was taken up by Brahmaputra Board in the last part of the year 1997. The installed capacityof this project is estimated at 65 MW (tentative). The target for completion of the DPR of this projectis 2016-17.

� Present status-

o Topographical survey mostly completed

o Pre-feasibility report prepared

o Geological investigation in progress - 26 bore holes completed in dam area

o Construction material survey completed

o Two alternate layouts of water conductor system have been proposed by the Board andsubmitted to the CWC for finalization of one of the alternatives for further investigation.

� Jiadhal Dam Project

Jiadhal Dam project is located about 5 Km upstream of Jiadhalmukh which is Assam-ArunachalBorder area. Investigation of this project was taken up in November, 2002. The installed capacity ofthe project is estimated at 70 MW (tentative). CWC Design team has been requested for a field visitto finalize the layout and other project parameters of the project. The target for completion of theDPR of this project is 2016-17.

100

Page 31: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

� Present status-

o Topographical survey in progress

o Geological investigation in progress

o Construction materials survey in progress

o EIA& EMP studies are in progress

o Two alternate layouts of the project have been proposed by the Board and submitted to theCWC for finalization of one of the alternatives.

� Killing Dam Project

The project site is located at Assam-Meghalaya Border area. Brahmaputra Board started Survey &Investigation of this project in November, 2003. The installed capacity of the project is estimated at85 MW. The target for completion of the DPR of this project is 2016-17.

The investigation and data collection for preparation DPR of Killing Dam project was held up onaccount of NOC issued in favour of NEEPCO by the Government of Assam on 25.07.2013 and byGovernment of Meghalaya on 26.09.2012 to undertake survey and investigation work andpreparation of DPR. The Ministry of Power, Govt. of India requested MoWR, RD&GR, to hand overthe project to NEEPCO on 28.11.2013. The MoWR, RD&GR, decided to complete the remainingworks of Killing Dam Project by Brahmaputra Board through D.O. letter dated 3rd August 2015 as itis thought to be appropriate for Brahmaputra Board to finish the remaining works and completethe DPR, which was accepted by Ministry of Power through letter dated 2nd September 2015.

� Present status-

The design team of CWC visited project sites of Killing MP Project on 20th December, 2009 andreviewed the proposed layout. It was suggested by the CWC to carry out optimization studiesbased on tentative costs at different dam heights for finalization of the project parameters.Accordingly the studies have been carried out and submitted to CWC for vetting. CWC has broadlyagreed to the proposal submitted by the Board and suggested some additional studies/investigations. The additional studies/investigations are in progress.

At present, hydrological studies for preparation of DPR are in progress and lay out plan of theproject is under finalization.

A pictogram of the status is given at Annexure- X.

3.3.4 Survey & Investigation of Mini Hydel projects

The Brahmaputra Board has taken up the following 3 (three) Mini Hydel projects in Meghalaya for‘Survey & Investigation’ and preparation of Detailed Project Reports (DPRs)-

Sl. Name of Project Status 1 Myntang Mini Hydel Project (20 MW) Survey & Investigation has been continued 2 Umkhen Stage-I Mini Hydel Project (5 MW) Survey & Investigation discontinued from

May, 2015 3 Umkhen Stage-II Mini Hydel Project (4 MW)

101

Page 32: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

Hydrological and Preliminary Power Potential Studies in respect of these projects have been carried out.‘Survey and Investigation’ and preparation of DPRs of these projects are targeted to be accomplished bythe year 2017-18. Hydrological observations are continuing. During August, 2012 a team of geologists headedby the Director, Engineering Geology Division, NER, Shillong visited the dam sites and approved the feasibilityof all the three project sites prima-facie. They have suggested for some more topographical and river surveyworks for further studies.

3.4 Construction Activities

3.4.1 Pagladiya Dam Project

This project meant for flood moderation to benefit an area of 40000 ha, irrigation to 54,160 ha andincidental power generation of 3 MW, is proposed across Pagladiya River at Thalkuchi in BaksaDistrict which falls under Bodoland Territorial Autonomous Districts (BTAD) in Assam. The projectenvisages construction of 25 m high and 21 km long earth dam with a concrete spillway. TheGovernment of India had sanctioned the project in January, 2001 at an estimated cost of Rs. 542.90crore for construction by Brahmaputra Board.

� Works carried out since 2001

� Pre-construction survey, investigations, studies, design, drawings etc.

� Taking possession of land (956 ha) for Resettlement & Rehabilitation (R&R) purpose

� Construction of project roads, offices, etc.

� Preparation of technical specifications & tender document

� Pre-qualification of contractors for main works

Out of 3238 ha of land required for execution of Pagladiya Dam Project, 956 ha of land acquired byGovernment of Assam was made available to Brahmaputra Board. Due to inability of Governmentof Assam to acquire the balance 2282 ha of land for R&R purpose, the work was held up and as perdecision of 53rd Meeting of Brahmaputra Board, all activities are closed with effect from 31st May2013. The Government of Assam has been requested to take over and make necessary arrangementfor protection of 956 ha of land from unauthorized occupation. 26 personnel engaged for watchand ward of 956 ha of land has been disengaged from 1st June 2013.

3.4.2 Construction of Raised Platforms

On receipt of request from Government of Assam, Brahmaputra Board constructed Raised Platformto facilitate shelter for the flood affected people and livestock during flood with basic amenities ofWater Supply and Sanitation as per guideline of ‘Flood Proofing Programme’.

18 raised platforms have been completed by Brahmaputra Board.

The list of places / Locations of Raised Platform constructed by Brahmaputra Board is as under-

102

Page 33: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

Sl.No

Name No. District Date of Completion

Date of handing over to State Govt.

1 Bejartari 1 Kamrup 25.03.2010 06.06.2011 2 Salmarapam (Toptola) 1 Morigaon 09.04.2011 20.05.2012 3 Garapar 1 Morigaon 09.04.2011 20.05.2012 4 Kapahtoli - 2 Nos 1 Tinsukia 5 Matmora 1 Dhemaji 28.03.2007 12.10.2007 6 Kharubhuj 1 Goalpara

7 3 nos along L/B of Brahmaputra from Guimara-Nahira area 3 Kamrup 2006 16.03.2010

8 Ulubari 1 Morigaon 03.11.2006 20.03.2008 9 Salekpathalighat 1 Jorhat (Majuli) Dec’ 2009 31.05.2012 10 Jiakur 1 Kamrup 28.02.2013 09.04.2013 11 Tulsimukh-Kochgaon 1 Nagaon 29.04.2014 12 Atoichuk 1 Jorhat (Majuli) August 2013 24.09.2013 13 Dakhinpat 1 Jorhat (Majuli) 14 Kharkharijan 1 Jorhat (Majuli) 15 Ratanpur Miri 1 Jorhat (Majuli) Nov’ 2015 16 Barbalarchar 1 Dhubri Dec’ 2015 Total 18

3.4.3 North Eastern Hydraulic and Allied Research Institute (NEHARI)

North Eastern Hydraulic and Allied Research Institute (NEHARI) was established in the year 1996 underBrahmaputra Board, as a follow up of historic ‘Assam Accord’ inked on the auspicious day – 15thAugust (Independence Day of India) – in the year 1985 in presence of then, Hon’ble Prime Minister ofIndia Late Shri Rajiv Gandhi. The Institute is situated in sprawling campus of 44 ha at Rudreswar inNorth Guwahati at a distance of 25 km from the main city, far from the maddening crowd of thecity, on the hillock with a panoramic view . The Institute was set up as pioneer laboratory of NorthEastern Region for laboratory testing of soil, rock, concrete and construction materials fordevelopment of water resources and other projects. The Institute has adequate facility for simulating/ understanding river behavior through physical models.

� MandateUndertaking field and laboratory investigations, research and development work of basic and appliedtypes in ‘Geo-mechanics’, ‘Concrete Technology’, ‘Soil Characteristics’, ‘Construction Materials’ andassociated issues for development of Hydropower, Irrigation and Flood Control Projects.

� Activitieso Hydraulic Physical Model Testing for erosion problem study & river training

o Soil mechanics

o Rock mechanics

o Concrete technology

o Construction material testing

o Geophysical investigations at site

o Sediment/Silt analysis

103

Page 34: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

Proposal for Model Studies for construction of Bridge connecting Dhubri and Phulbari over riverBrahmaputra is under negotiation. Further, Model Studies for the proposed phase-V work for diversionof rivers Dibang & Lohit to their original courses at Dholla-Hatighuli has been initiated.

NEHARI has patronage of Central Soil and Material Research station (CSMRS), New Delhi and CentralWater and Power Research Station (CWPRS), Pune – Internationally reorganized apex Institutes inthe field of laboratory testing of soil and construction materials and development of physical andmathematical models in the field of water resources. Experts/technical hands of NEHARI haveinitially been imparted training on the subject by both the above mentioned premier Institutes.During a short span of time, since its inception, NEHARI has successfully completed laboratory testingof soil and materials during investigation and also during execution of a number of projects in thewater resources development. Noteworthy among them are Lower Subansiri Hydro-electric Project,Middle Subansiri Hydro-electric Project, Lower Siang Project, Middle Siang Project, Dibang DamProject, Laskar Mintudo Project of Meghalaya, Tuirini, Tuipal and Kolodyne H.E. Project of Mizoram,Dikhu Hydel Project of Nagaland and others. Test reports prepared by NEHARI have been appreciatedby CSMRS.

3.5 Flood Management and Anti-erosion Schemes

(Implementation of Anti-erosion Measures)

3.5.1 Anti-erosion Measures Completed

Brahmaputra Board has successfully completed the following anti-erosion measures in Assam andNagaland -

o Protection of Nagrijuli, Rangia Town, Mukalmua and Barbhag area from floods and erosionof river Puthimari

o Anti-Erosion measures to protect Kushiabil & Durgajan village at Dimapur of river Dhansiri(S)in Nagaland

On completion, above schemes have been handed over to respective States for routinemaintenance.

3.5.2 Implementation of Anti-erosion Measures underway

� Protection of Majuli from floods and erosion

Majuli is the largest inhabited River Island in the world. It is situated between latitudes 26º45’N and27º10’N, and longitudes between 93º40’E and 94º35’E. Majuli has been the cultural capital and thecradle of Assamese civilization since the 16th century. Sankardeva, a pioneer of the medieval-ageneo-vaishnavite movement, preached a monotheist form of Hinduism called as Vaishnavism andestablished monasteries and hermitages known as satras. The satras preserve antiques like weapons,utensils, jewellery and other items of cultural significance. The inhabitants of Majuli are mostly tribals- predominantly from the Mishing, Deori and Sonowal Kacharis tribes. Majuli is also famous forpottery.

Majuli Island has constantly been subjected to erosion by the mighty Brahmaputra. Responsibility forundertaking anti-erosion works for protection of Majuli Island was given to Brahmaputra Board inthe year 1999. Physical activities on the ground started in the year 2004.

104

Page 35: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

The total area of the land mass of Majuli Main Island was 502.21 sq km in the year 2004. Since the year2004, with regular implementation of anti-erosion / bank protection measures by Brahmaputra Board,the total area of Majuli Island has increased to 524.29 sq km till the year 2016. Currently, works underPhase-II & III are under execution. Works - such as construction of four spurs, river bank revetments in5 locations, closing of breach at Samahia-Ati, laying permeable RCC porcupine screens/spurs/dampeners, construction of 5 Raised Platforms in low lying flood vulnerable areas, construction ofnose of 2 check bunds, tie bunds at 2 locations have been completed. Balance works of RCCporcupine ordered. Works of repair & restoration of 3 spurs (Spur-1,3&4) and remaining works of onespur (spur-2) are to be initiated after flood and targeted to be completed by March, 2016.

� Financial Implication

Expenditure incurred by Brahmaputra Board on undertaking measures for protection of Majuli Islandfrom floods and erosion since January 2004 under various Phases is detailed below-

Sl. No.

Description Estimated Cost

(Rs. in crore)

Actual Expenditure (Rs. in crore)

Remarks

1 Immediate Measures (Year 2004-2005)

6.22 6.09 Completed

2 Phase- I (Years 2005-2011)

56.07 52.63 Completed

3 Emergent Measures (Year 2008)

4.99 4.75 Completed

4 Phase-II & Phase-III 115.99 115.53 (up-to March, 2016)

92.19% of physical progress has been achieved. The scheme is targeted to be completed by March, 2017.

5 Phase-IV Rs. 35.00 crore has been approved by MoWR, RD&GR, RD&GR through letter No. 2/3/2012-B (Vol.I)/494-512 dated 28.04.2014 for additional work. The estimate for protection of Majuli Island Phase-IV amounting to Rs. 213.61 crore submitted to CWC has now been divided into two parts. Phase-IV-Part-A, 58.7 km reach from Tekeliphuta to Sumoimari has been Techno-economically cleared by CWC for an amount of Rs. 124.12 crore in February, 2016. It is proposed to take up works of Phase-IV-Part-A within the approved amount of Rs. 35.0 crore. The estimate for Phase-IV-Part-B from Sumoimari to Malual is under preparation as per recommendations of Mathematical Model Study carried out by CWPRS.

Total 183.27 179.00 � Outcome

The following are the major achievements –

o Raising and Strengthening of 96.2 km of Embankment

o Prior to implementation of protection measures, there has been continuous loss of land of MajuliIsland. Since implementation of protection measures by Brahmaputra Board, trend of land lossgot reversed. Particulars on net gain of land mass in Majuli Island are tabulated below –

105

4

Page 36: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

Year Area of Majuli Island (in sq km)

Net Area reclaimed (in sq km)

2004 502.21 - 2008 506.37 4.16 2011 520.26 13.89 2013 522.73 2.47 2014 523.88 1.15 2016 524.29 0.41

Total land mass gained from 2004 to 2016 22.08

� Plan Ahead

Ministry of Water Resources, RD&GR, Government of India has constituted a ‘Standing Committeeof Experts’ under the Chairmanship of Member (River Management), Central Water Commission toundertake visits to the work sites, advice / recommend and monitor implementation of protectionmeasures. Based upon recommendations of 8th visit of ‘Standing Committee of Experts’,Brahmaputra Board has formulated a scheme – Protection of Majuli Island from Floods and Erosion-Phase-IV – at the estimated cost of Rs. 213.61 crore for implementation during the 12th Five YearPlan. The estimate for Protection of Majuli Island Phase-IV amounting to Rs. 213.61 crore submittedto CWC has now been divided into two parts. Phase-IV-Part-A, 58.7 km reach from Tekeliphuta toSumoimari has been Techno-economically cleared by CWC for an amount of Rs. 124.12 crore inFebruary, 2016. It is proposed to take up works of Phase-IV-Part-A within the approved amount ofRs. 35.0 crore. The estimate for Phase-IV-Part-B from Sumoimari to Malual is under preparation as perrecommendations of mathematical model study carried out by CWPRS.

� Avulsion of Brahmaputra at Dhola-Hatighuli (Restoration of Dibang and Lohit Rivers)

Avulsion of left bank of River Lohit occurred, at confluence of Lohit with Dibang - near Dhola-Hatighuli located in Dumdooma, Civil Sub-division of Tinsukia district - in the year 1989, due tobreach in Saikhowa Bund. Gradual widening of the channel with time was threatening existence ofmore areas of Tinsukia and Dibrugarh Districts of Assam, situated all along the newly developedchannel. Initially significant combined flow of Dibang and Lohit rivers started to flow through AnantaNala to Dangari – a tributary of river Dibru. Since the year 2000 the Balu Nala became dominantand almost entire diverted flow of Lohit and Dibang Rivers started passing through Balu Nala.Gradual widening of the channel with time was threatening existence of more areas of Tinsukiaand Dibrugarh Districts of Assam, situated all along the newly developed channel.

The scheme “Avulsion of Brahmaputra at Dhola-Hatighuli (Measures for diversion of River Dibang toits original course) with ancillary anti-erosion measures” prepared by Government of Assam wasapproved by Ministry of Water Resources, Government of India in the Technical Advisory Committee(TAC) meeting held in May, 2002 and the Brahmaputra Board was entrusted with the responsibility forexecution of the scheme. Total expenditure of Rs 77.48 crore has so far been incurred by BrahmaputraBoard on execution of works envisaged under Phase-I, Phase-II, Phase-III and Phase-IV.

With construction of ‘Tie-Bund’, the land earlier used to form part of main channel of Dibang Riveris now completely protected from floods and erosion. The inhabitants of deserted areas havereturned back and restarted cultivation in a big way.

106

Page 37: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

11 villages under Doomduma Revenue Circle in an area of about 1500 ha got protection fromfloods, since the year 2004 onwards, on construction of retirement bund at Hatighuli area on Leftbank of Lohit river.

Sl.No.

Description Estimated Cost

Actual Expenditure Remarks

1 Phase-I (January 2003 to July 2004)

10.47 8.87 Completed

2 Phase- II (January 2004 to July 2004)

5.22 4.54 Completed

3 Phase-III (March 2007 to July 2007)

8.47 8.46 Completed

4 Phase-IV (December 2013)

54.43 55.61 (upto March 2016)

Completed

Total 78.59 77.48

(Rs. in crore)

� Protection of Balat Village in Meghalaya on River Umngi.

Part –I of scheme amounting Rs. 5.63 crore are taken up for implementation. Physical progressachieved is 83.14% and financial progress achieved up to March 2016 is Rs. 4.81crore. For takingup the balance work of the scheme (i.e. bank revetment), Brahmaputra Board requested MoWR,RD&GR for revision of Administrative Approval and Expenditure Sanction to Rs. 10.18 crore.

����� Anti-erosion works for protection of Mankachar, Kalair-alga international border area fromerosion of river Brahmaputra, Assam-

The Mankachar and Kalair Alga International Border area is located on the south bank of riverBrahmaputra in South Salmara, Mankachar District on the westernmost border of Assam. Thesouth bank of River Brahmaputra,is subjected to severe erosion at up-stream of SishumaraBorder out Post (BOP) of Border Security Force (BSF) adjacent to Indo-Bangla border since 2004-05. On the request of BSF, Assam Public Works Department (APWD) constructed 4 spurs withlength of 385m, 245m, 110m and 100m between the Sishumara BOP and Kukradanga in astretch of 2 km in 2006. Due to erosion in subsequent years, major portions of these spurs goteroded. APWD took up repair works of the damaged portions of the spurs in 2009-10. Also,CPWD had taken some measures for protecting the IBB Link Road.

The MoWR, RD&GR entrusted Brahmaputra Board to take up protection measures in the area.Accordingly, Brahmaputra Board prepared DPR for protection of the area and the schemehad been Techno-economically cleared by CWC for an amount of Rs. 23.79 crore. The schemewas included for execution in the EFC for the ‘River basin Management’ scheme during XIIFive Year Plan. Administrative Approval and Expenditure Sanction was received for Rs. 23.79crore in July 11, 2014. Brahmaputra Board has initiated the execution of the work in 2015.

In the meanwhile, the erosion of Brahmaputra washed away 470m length of the Indo BanglaBorder (IBB) Link road in July 2015, thereby hampering activities of BSF in the area. This breachneeds to be plugged and Board has taken up the work of construction of retirement bund forplugging the breach in 2016.

107

Page 38: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

The Technical Advisory Committee - Brahmaputra Board (TAC-BB) during their site visit on11.02.2016 has suggested realignment of the retirement bund. Accordingly, work has beentaken up by Board.

The overall expenditure on the Scheme is Rs. 2.15 Crore up to March, 2016 with physical progressi) RCC porcupine works- 80%, ii) Bank revetment- 0.14%, iii) Retirement bund- 6.03%.

����� Anti-erosion measure in Maslabari in Assam near International Border- Tender forimplementation of the scheme is under progress.

3.5 Appraisal and Monitoring of Schemes under Flood Management Programme of Governmentof India

The Brahmaputra Board is entrusted with monitoring of scheme under Flood ManagementProgramme in respect of entire North Eastern Region including Sikkim and part of West Bengalfalling under Brahmaputra Basin since X Plan. Details of scheme undertaken by Governmentof India under Flood Management Programme and monitored by Brahmaputra Board is shownbelow –

� During X Plan

���During XI Plan

Sl. No. Name of State Nos of schemes Central Grant released (Rs. in crore)

1 Assam 100 744.901 2 Arunachal Pradesh 21 78.7705 3 Manipur 22 65.0315 4 Mizoram 2 3.4025 5 Tripura 11 20.91115 6 Meghalaya 0 0 7 Nagaland 11 28.965 8 Sikkim 28 82.859 9 West Bengal 6 13.394

Total 201 1038.235

Sl. No. Name of State Nos of schemes Central Grant released (Rs. in crore)

1 Assam 44 78.8182 2 Arunachal Pradesh 7 16.3755 3 Manipur 4 7.911 4 Mizoram 3 6.1980 5 Tripura 7 12.7635 6 Meghalaya 2 2.635 7 Nagaland 1 3.897 8 Sikkim 3 8.595 9 West Bengal 3 9.01 Total 74 146.2032

108

Page 39: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

Initially appraisal of schemes under Flood Management Programme of Government of India waswith Central Water Commission and monitoring of progress of such schemes was with BrahmaputraBoard.

Subsequently, it was decided that appraisal as well as monitoring of Flood Management Programmeschemes of North Eastern Region may be assigned to Brahmaputra Board. In pursuance to decisioncontained in letter No: 5/6/2011-RMCD/660-92 dated 1st February 2012. Brahmaputra Board undertookappraisal of schemes under Flood Management Programme. During joint visits of officials ofBrahmaputra Board and Water Resources Departments, scopes of some of the schemes werechanged and some proposals were even considered unnecessary after visit of project sites and thusdropped.

Subsequently, the appraisal of schemes under Flood Management Programme of Government ofIndia was entrusted back to Brahmaputra and Barak Organization, Central Water Commission,Shillong through letter No: 5/6/2012-RMCD/4756-4824 dated 30.11.2012 by Central Water Commission.

Status on appraisal of schemes under Flood Management Programme initiated by BrahmaputraBoard during the brief period February 2012 to July 2013 is tabulated below –

Sl. No. Name of State No. of schemes received

Appraised by Brahmaputra

Board

Returned to State

Government

Submitted to Regional office

of CWC 1 Assam 87 60 4 23

2 Arunachal Pradesh 2 0 2 0

3 Manipur 0 - - -

4 Mizoram 0 - - -

5 Tripura 0 - - -

6 Meghalaya 6 0 1 5

7 Nagaland 1 0 1 -

8 Sikkim 44 34 10 0

9 West Bengal 11 6 4 1

Total 151 100 22 29

109

Page 40: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

110

� Plan Proposal for XII five Year Plan

The following new Anti-Erosion Schemes were included in Plan Proposal of Brahmaputra Board for implementation during the XII five Year Plan-

Sl.No. Description Estimated Cost (Rs. In

crore)

Remarks

1 Protection of Majuli Island from flood and erosion phase-IV

200.13 As per advice of Technical Advisory Committee of Brahmaputra Board, the scheme is divided into two parts on priority basis. Work prioritized under phase-IV A for Rs. 124.12 crore has been Techno-economically cleared by CWC.

2 Avulsion of Brahmaputra River at Dhola-Hatighuli phase-V – Restoration of original courses of rivers Dibang and Lohit to their original courses

381.18 The proposal formulated based upon recommendation of 8th visit of Standing Committee of Experts is under appraisal in Central Water Commission. CWC in their observation wants for model studies to ascertain the efficacy of the scheme.

3 Protection of Balat Village from erosion of River Umngi in Meghalaya

10.18 Approval of TAC accorded for Rs. 10.18 crore. AA accorded for Rs. 5.62 crore for phase-1. Physical progress achieved up to March 2016 is 83.14%

4 Protection of Mankachar, Kalair-Alga international border area from erosion of river Brahmaputra in Assam

23.79 Works are under execution. 12% physical progress achieved up to March 2016

5 Anti-erosion measures in Maslabari near international border area in Assam

5.76 Administrative Approval and Expenditure Sanction accorded to execute within the sanction provision for execution of Mankachar Kalair-Alga. Tendering process started.

213.61

Page 41: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)
Page 42: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)
Page 43: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)
Page 44: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

Page 45: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

Chapter- IV

Non-field Activities of Brahmaputra Board during the year 2015-16

4.1 Complaint Committee on Sexual Harassment and Gender Justice

In pursuance of the Hon’ble Supreme Court’s order passed in connection with the writ petition(Criminal) No.666-70 of 1992 in the case of Visakha - Vs - State of Rajasthan and others, a ComplaintMechanism to deal with such cases in the Board was constituted with seven Committee Membersincluding a Chairperson and Member Secretary. The Committee came into force from 31.12.1997.

During the year the committee did not hold any meeting as there was no complaint from anyemployee.

4.2 Vigilance and Disciplinary Cases

Board has a vigilance wing headed by a Superintending Engineer as Chief Vigilance Officer withExecutive Engineer (Vigilance), one Asstt. Executive Engineer (Vig.) and one Jr. Engineer (Vig.). Thebreak-up of vigilance / disciplinary cases in respect of different categories of officers and staff isgiven below-

Table Showing Vigilance and Disciplinary Cases during the year 2015-16 (As on 31.03.16)

Sl.No. Particulars of cases

Category of Officer/staff Remarks Group ‘A’ Group ‘B’ Group ‘C’

1 No. of cases pending in the beginning of the year 06 02 -

2 No. of cases added during the year 29 07 -

3 No. of cases disposed during the year 21 03 -

4 No. of cases pending at the end of the year 14 06 -

4.2.1 Vigilance Week

The Brahmaputra Board observed the Vigilance Awareness Week 2015 from 26th October, 2015 to31st October, 2015. A debate competition on “Preventive Vigilance as a tool of Good Governance”and a seminar on “Vigilance is the Weapon against Corruption” were organized during the VigilanceWeek. The function was well attended and wide publicity was given.

4.3 Participation in Seminar / Symposium / Workshop / Training

4.3.1 The list of Officers / Officials deputed for training and those participated in Seminar/ Symposium /Workshop / Training during the year 2015-16 is furnished at Annexure-V.

4.3.2 The list of officers on deputation to other organization during the year 2015-16 is furnished atAnnexure-VI

114

Page 46: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

4.4 PROGRESSIVE USE OF OL HINDI

1. Hindi Fortnight celebration : With a view to promote the Official Language Hindi in the officialactivities and to create an congenial atmosphere of Hindi amongst the officers and staff of theBoard, Hindi Fortnight was celebrated in the Board HQ, Guwahati from 15th September to 28th

September 2015 in the Board’s HQ at Guwahati. On the occasion, 5 competitions in Hindi viz,-Noting/Drafting, Computer Typing, Dictation, Street Drama, Essay writing etc were organized andparticipants were given cash prizes. A total of Rs. 15,300/- cash prizes were given for the events.

2. Hindi Day programme also organized in 12 field offices under the Board on different dates between15th September to 28th September 2015.

3. Hindi Correspondence: The Board achieved an overall target of progress upto 58.47% during theyear in comparison to 58.22% of the last year in originating correspondence in Hindi. Various measureswere adopted to increase the progress in a regular way. The Board also suggested all concerned totake all possible follow up actions in this regard.

4. Hindi Workshop: Concerted efforts are being made for successful implementation of the Officiallanguage Policy of the Government of India and to create awareness amongst the employees toexecute their skill in using Hindi in office work 3(three) Hindi Workshops were organized during theyear as mentioned below :

Date Training Hours Number of nomination Number of participated 28.05.2015 6 Hrs. 40 40 23.09.2015 3 Hrs. 19 19 28.12.2015 3 Hrs. 13 13

17.03.2016 3 Hrs. 20 20

Total 15 Hrs. 92 nos. 92 nos.

5. Town Official Language Implementation Committee’s meeting: The Secretary, Brahmaputra Boardattended TOLIC meeting (PSU) held at Guwahati Refinery on 24.07.2015. The Board also organizedan official language exhibition on 16.12.2015 at Guwahati Refinery Training Centre.

6. Meeting of the Official language Implementation Committee (OLIC): Review of the progressive useof official language Hindi in the HQ as well as field offices were made in the OLIC meetings andmeasures were identified for the effective implementation of Hindi. 3 (three) Sub Committee’smeeting were also organized in Nagaon Division, Majuli Division and Rangia Division on 24.07.2015,27.08.2015 and 28.08.2015.

7. Award/Reward: Refinery Official Language Citation was given to Brahmaputra Board by the TownOfficial Language Implementation Committee (PSU) at Guwahati Refinery on 16.12.2015 to theVice Chairman, Brahmaputra Board for the outstanding implementation of the Brahmaputra Boardin the field of official language. In this connection, Hindi officer, Brahmaputra Board was alsoawarded by a certificate.

8. Hindi Parangat Training: Brahmaputra Board organized regular Hindi Parangat Training in associationwith Hindi Teaching Scheme, Government of India, in its HQ at Guwahati. All together 30 officers/staff nominated for training which is going on from 01.01.2016 upto session ending on 30.05.2016.

115

Page 47: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

4.5 Formulation of Citizen Charter

The Citizen’s Charter in respect of Brahmaputra Board has been prepared and uploaded in theofficial website www.brahmaputraboard.gov.in

4.6 Implementation of Right to Information Act 2005 (RTI)

In pursuance of Government of India, MoWR, RD&GR letter No. 31/15/2004-IT/B&B/200 dated.22.12.2005, the Right to Information Act, 2005 had been introduced in Brahmaputra Board on31.12.2005. After introduction of the Right to Information Act-2005, the Brahmaputra Board hadnotified all relevant information pertaining to Brahmaputra Board and also published the same inits website as a part of administration and implementation of the Act. The information in the websiteis being updated from time to time complying the directives and provision of the Right to InformationAct - 2005.

The Annual Return Information System for the year, 2015-16 is at Annexure-VII.

4.7 Observance of Swachh Bharat Abhiyan and Mass Awareness Activities under Tribal Sub-Plan forWater Conservation during the year 2015-16.

The Prime Minister of India had given a call for “Swachh Bharat” as a mass movement to realizeGandhiji’s dream of a clean India by the 150th birth anniversary of Mahatma Gandhi in 2019.Brahmaputra Board had participated in the “Swachh Bharat Mission” (Clean India campaign) andaction taken as follows –

A) During the month of June, 2015 Swachh Bharat Abhiyan was observed in the Brahmaputra Boardand following works are carried out:-

i) On 22nd &23rd June, 2015 –upkeep cleaning of offices including common area, premises, toiletsetc.

ii) On 24th & 25th June, 2015- weeding out old files/ records in the offices of headquarters

iii) On 26th June, 2015- upkeep & cleaning of the areas outside the offices including parkinglots area.

iv) On 22nd December, 2015 cleaning of corridors from stacking of unused office furniture

v) On 23rd to 26th December, 2015 regular cleaning and proper upkeep of office premises

4.8 Mass Awareness activities on Water Conservation under Tribal Sub plan (IEC activities):

Brahmaputra Board being the nodal organization for the North-East States has conducted MassAwareness activities on Water Conservation under Tribal Sub plan (IEC activities). The activities areproposed like- (a) Preparation of pamphlet, leaflet etc. (b) Specific emphasis on the need of Tribalby hoarding of banner and (c) Special awareness meeting & On-the-spot Art competition in thestates of Nagaland, Mizoram, Arunachal Pradesh and Meghalaya were conducted during January& February 2016.

���

116

Page 48: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)
Page 49: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)
Page 50: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

Chapter – V

Activities of Persons with Disabilities[The Persons with Disabilities (Equal Opportunities, Protection of Rights and Full Participation) Act, 1995]

5.1 Implementation of various provisions of persons with disabilitiesThe physically challenged persons are given facilities, concession and relaxation at the time of test/ interview as per rules. The relevant rosters as prescribed by the Government are also maintainedfor indicating the reservation of disabled persons. 3% of posts / vacancies (1% each for Orthopaed,Blind & Hearing Handicapped) are reserved to be filled up from differently able persons. Therecruitment of physically challenged is under process for fulfillment of three percent quota for thecategory by Brahmaputra Board. Periodic reports on the progress achieved are being sent regularlyto the Ministry of Water Resources, RD&GR. The Brahmaputra Board is looking forward for improvingthe existing facilities / concessions available to the disabled persons. Board is ready to give preferenceto products / manufactures of disabled persons for its official uses whenever such products cometo the notice of the Board.

5.2 The details of sanctioned posts and the number of persons with disabilities in various posts ingroup A, B, and C against 3% vacancies are as below -

Establishment – Administration and FinanceThe sanctioned and filled positions as on 31.03.2016 in Brahmaputra Board are furnished in thefollowing table –

As on 31.03.2016Sl. No.

Group of posts

Sanctioned Strength

Post reserved for disabled persons

Present position

Remarks.

1 Group A 81 Nil Nil There is no direct recruitment post in Group – A.

2 Group B 188 4 Nil The Total direct recruitment post of Group – B is 139

3 Group C 359 8 7 The Total direct recruitment post of Group – C is 273

Total 628 12 7

Sl. No. Post Sanctioned Post Post filled up Post vacant

1. Group – A 81 56 25

2. Group – B 188 156 32

3. Group- C 359 246 113

Total 628 458 170

Detail status of the above list is shown in the enclosed Annexure-III.���

119

Page 51: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

Chapter – VI

Meetings during the year 2015-16

Important Meetings of the Brahmaputra Board

6.1 Meeting of High Powered Review Board

The 8th meeting of ‘High Powered Review Board’ of Brahmaputra Board was held during the year2015-16 on 19.06.2015 at India Habitat Centre, Lodhi Road, New Delhi.

The following important decisions were taken in the 8th meeting of ‘High Powered Review Board’ ofBrahmaputra Board

1. Confirmation of the minutes of the 7th Meeting of High Powered Review Board held on 11thFebruary, 2015 at Shillong

2. Restructuring of Brahmaputra Board into North-East Brahmaputra River Rejuvenation Authority(NEBRRA)

3. Follow up of National Projects under Brahmaputra Board: Kulsi and Noa-Dihing

4. View points of the States - Arunachal Pradesh, Assam, Nagaland, Manipur, Meghalaya, Mizoram,Sikkim and Tripura

5. Review of the protection of Majuli Island from flood and erosion

6.2 Meetings of Brahmaputra Board

The 59th and 60th meetings of Brahmaputra Board were held during the year 2015-2016. The 59th

Meeting of Brahmaputra Board was held on 03.07.2015 at Guwahati and the 60th meeting ofBrahmaputra Board was held on 03.03.2016 at CWC, New Delhi.

The following important decisions were taken by Brahmaputra Board in its 59th meeting ofBrahmaputra Board-

(a) Confirmation of the Minutes of 58th Meeting of Brahmaputra Board held on 27th June, 2014 atGuwahati Assam

(b) Implementation of recommendations of Master Plans by State Governments

(c) Status of schemes – both currently under implementation as well as under formulation inBrahmaputra Board

(d) Approval of Annual Accounts of Brahmaputra Board for the year 2014-15

(e) Approval of Annual Report of Brahmaputra Board for the year 2014-15

(f) Ratification of the decisions / approval given by the 54th Meeting of Standing Committee ofBrahmaputra Board

(g) Agenda of Member States-Assam, Mizoram and West Bengal

(h) Discussion on the adequacy of hydro-logical and hydro-meteorological stations in Brahmaputraand Barak basins

120

Page 52: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

The following important decisions were taken by Brahmaputra Board in its 60th meeting ofBrahmaputra Board-

(a) Confirmation of the Minutes of 59th Meeting of Brahmaputra Board held on 3rd July, 2015 atGuwahati, Assam

(b) Physical and Financial Progress for the Year 2015-16

(c) Status of Master Plan prepared by the Brahmaputra Board- Preparation, Finalization andImplementation upto January 2016

(d) Status of works/ projects under implementation including works/ projects in different States.

(e) Status of works/ projects under formulation including works/ projects in different States

(f) Status of Grievances and their redressal

(g) Status of Vigilance cases and action taken thereof

(h) Status of Staff – Sanctioned and in-position

(i) Status of annual salary expenditure on staff

(j) Status of Court Cases in Brahmaputra Board

(k) Decision taken by Chairman, Brahmaputra Board under the provision of the Delegation ofPower Rule, 1996 of Brahmaputra Board- Re-designation of Officers of Headquarters underBrahmaputra Board

(l) Ratification of the decision/approval of 55th Meeting of Standing Committee of BrahmaputraBoard

(m) Agenda of Member States- Assam, Manipur, Sikkim and West Bengal

(n) Discussion on the adequacy of hydrological and hydro-meteorological stations in Brahmaputraand Barak basins

(o) Implementation of New Pension Scheme (NPS) to the employees of Brahmaputra Board

(p) Decision on Tender Procedure in making the process efficient

6.3 Meeting of Standing Committee

The 54th and 55th meetings of Standing Committee of Brahmaputra Board were held during the year2015-2016. The 54th Meeting of Standing Committee of Brahmaputra Board was held on 02.07.2015at Brahmaputra Board, Basistha, Guwahati and the 55th meeting of Standing Committee ofBrahmaputra Board was held on 25.02.2016 at O/o the Mission Director, National Water Mission,Lodhi Road, New Delhi. The decision / approval of the 54th and 55th meetings of Standing Committeeof Brahmaputra Board were ratified in the 59th and 60th meeting of Brahmaputra Board respectively.

The following are the important matters discussed during 54th meeting of Standing committee -

(a) Status of the ongoing activities of Brahmaputra Board

(b) Budget Estimates of Brahmaputra Board for the year 2015-16

(c) Action Plan of Brahmaputra Board for the year 2015-16

121

Page 53: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

The following are the important matters discussed during 55th meeting of Standing Committee -(a) Status of the ongoing activities of Brahmaputra Board

(b) Modification of Clause 2 of Delegation of Power Rules 1996 of Brahmaputra Board- a) Delegationof Financial Power and b) Decisions on Tender Procedure in making process efficient

(c) 2nd Revised Estimate of Investigation of Jiadhal Dam Project

(d) Estimate for construction of Raised Platform at Satrakanara GP of Baghbor LAC

6.4 Important meetings/ events attended by Chairman / Vice Chairman, Brahmaputra B o a r dduring the year 2015-16 are as follows-

Sl. No Meeting / events Attended by Chairman Vice Chairman

1. Meeting of Committee to review the function of various Committees / Boards at New Delhi on 14.05.2015

Chairman

2. Visited Majuli Island from 19th to 23rd May, 2015 with Standing Committee of Experts on Majuli Island

Chairman

3. 8th Meeting of High Powered Review Board of Brahmaputra Board on 19th June, 2015 at India Habitat Centre, New Delhi

Chairman

4. Meeting to review the progress of work done for the last one year on 20.06.2015 at Conference Hall, CWC, New Delhi taken by Hon’ble Minister, WR, RD&GR

Chairman

5. 54th Meeting of Standing Committee of Brahmaputra Board held on 2nd July, 2015 at Guwahati

Chairman

6. 59th Meeting of Brahmaputra Board held on 3rd July, 2015 at Guwahati

Chairman

7. Discussion on e-Governance issues Chairman

8. Follow up meeting of the review meeting held on 20.06.2015 at CWC on 22.09.2015 under the Chairmanship of the Hon’ble Minister, WR, RD&GR

Chairman

9. Visited Majuli Island & Mankachar Kalair-Alga area of Dhubri District on 16.10.2015

Chairman Accompanied by Vice

Chairman 10. Second meeting of Executive Council of NERIWALM

held on 29.10.2015 held at New Delhi Vice Chairman as delegated by Chairman

11. Review Meeting on “National Model Study of river Brahmaputra with emphasis on Climate Change (a collaboration project of IIT, Guwahati and Brahmaputra Board) at New Delhi on 26.11.2015

Vice Chairman

12. Seminar on Assessment of Seepage Losses and Lining of canals conducted by BIS, New Delhi at Guwahati on 22.01.2016

Vice Chairman

CWC, New Delhi taken byHon’ble Minister, WR, RD&GR

122

Page 54: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

Sl. No Meeting / events Attended by Chairman Vice Chairman

1. Visited Mankachar Kalair-Alga area, Dhubri with 1st TAC- Brahmaputra Board constituted by MoWR, RD&GR, RD&GR on 11th February, 2016

Vice Chairman

2. Meeting of 1st TAC, Brahmaputra Board constituted by MoWR, RD&GR, RD&GR held on 12th & 13th February, 2016

Vice Chairman

3. Follow up / review of progress of 2015-16, new initiatives undertaken and action plan for 2016-17 held on 19.02.2016 at CWC, Sewa Bhawan, New Delhi under the Chairmanship of Hon’ble Minister, WR, RD&GR

Chairman Vice Chairman

4. 55th Meeting of Standing Committee held on 25th

February, 2016 at CGO Complex, Lodhi Road, New Delhi

Chairman Vice Chairman

5. 60th Meeting of Brahmaputra Board held on 3rd March, 2016 at Conference Hall, CWC, New Delhi

Chairman Vice Chairman

6. Regional Committee for Scientific assessment of flood Prone area held on 10th March, 2016 at office Chamber of Secretary (WRD), Government of Arunachal Pradesh

Vice Chairman

7. Meeting with Hon’ble Minister, WR, RD&GR in the presentation on NEBRRA on 11.03.2016

Chairman

8. Visited the erosion affected area of Kaziranga national park & meeting with officials of WRD, Assam & DFO, KNP, Kohora range on 12th & 13th March, 2016

Chairman Accompanied by Vice

Chairman

���

CWC, New Delhi

NP

123

13.

14.

15.

16.

17.

18.

19.

20.

Page 55: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

Chapter- VII

Annual Accounts and Audit by C & AG Office

7.1 Statement of AccountsThe statements of annual accounts of Brahmaputra Board for the year 2015-16 are given in atabular form at page no. 124 to 151 in this chapter.

7.1.1 Audit: The position of audit objections raised by internal as well as external audit is furnishedas under-

Position of Outstanding Audit Paras of Inspection Report of Internal Audit as on 31.03.2016

Sl.

No Name of the Office Outstanding

as on 01.04.2015

Para raised during the

year 2015-16

Para settled during the

year 2015-16

Balance as on

31.03.2016

1. Guwahati Circle 4 11 8 7

2. Guwahati Division 10 15 16 9

3. Barak Valley Division 47 15 10 52

4. Agartala Division 10 0 4 6

5. Nagaon Division 2 5 4 3

6. Liaison Office 0 0 0 0

7. North Guwahati Circle 7 9 2 14

8. North Guwahati Division 26 12 20 18

9. Nalbari Circle 3 6 6 3

10. Nalbari Division 14 8 10 12

11. Rangia Division 8 0 5 3

12. Jalpaiguri Division 2 13 8 7

13. Jorhat Circle 19 0 8 11

14. Lakhimpur Division 39 0 27 12

15. Majuli Division 40 0 28 12

16. Roing Division 35 13 23 25

Total 266 107 179 194

124

Page 56: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

���

Position of Outstanding Paras of PAG (Audit) & Principal Director of Audit as on 31.03.2016

Investment Pattern of Brahmaputra Board Contributory Provident Fund Trust (CPF) Accounts as on31.03.2016Brahmaputra Board has invested the CPF amount conforming to Govt. Guidelines i.e. 6.40% inCentral Govt. Securities and 93.60% in Govt. Financial Institutions / Nationalized Banks.The Investment pattern of Brahmaputra Board CPF Trust for the year ended on 31st March, 2016 isgiven below-

INVESTMENT PATTERNSl. No Name of Institutions / Bank Amount Invested up to

31.03.2016 (in Rs.) % of Investment

1 IDBI bank 6,94,00,000.00 10.24 2 Union Bank of India 25,73,07,518.00 37.97 3 Indian Bank 7,19,00,000.00 10.61 4 Syndicate Bank 4,37,00,000.00 6.45 5 Bank of India 4,34,35,154.00 6.41 6 Vijaya Bank 90,00,000.00 1.33 7 Central Bank of India 6,76,00,000.00 9.98 8 Allahabad Bank 7,19,00,000.00 10.61 9 NABARD 2,98,81,000.00 4.41

10 Govt. Loan / Bond 1,34,66,750.00 1.99 Total Rs. 67,75,90,422.00

Sl. No.

Name of the Office Outstanding para as on 01.04.2015

Para raised during the

year 2015-16

Para settled during the

year 2015-16

Balanceas on 31.3.2016

1 Head Quarter Office 27 18 9 36

2 Guwahati Circle 8 0 1 7

3 Guwahati Division 24 0 12 12 4 Barak Valley Division 42 0 1 41 5 Agartala Division 11 0 1 10 6 North Guwahati Circle 12 0 7 5 7 North Guwahati Division 26 6 9 23

8 Nagaon Division 3 0 1 2 9 Roing Division 24 0 1 23

10 Nalbari Division 7 0 1 6

11 Rangia Division 12 0 0 12

12 Jalpaiguri Division 15 0 3 12

13 Jorhat Circle 6 0 2 4

14 Lakhimpur Division 14 0 2 12

15 Majuli Division 27 0 4 23 16 Liaison Office 6 0 0 6

Total 264 24 54 234

125

Page 57: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

Page 58: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

ANNUAL ACCOUNTSFOR THE YEAR

2015-16

BRAHMAPUTRA BOARD BASISTHA, GUWAHATI-29

Government of IndiaMinistry of Water Resources

River Development & Ganga Rejuvenation

Page 59: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

Page 60: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

(

N. N

. Dek

a) D

y. F

inan

cial

Adv

iser

(Dr.

Raja

t Bha

rgav

a) I.

A.S

Fina

ncia

l Adv

iser

(Am

ount

in R

s.)C

API

TA

L F

UN

D A

ND

LIA

BIL

ITIE

SSc

hedu

leC

urre

nt Y

ear

Prev

ious

Yea

r

CA

PIT

AL

FU

ND

: N

et B

alan

ce o

f Gra

nts i

n A

id re

ceiv

ed fr

om G

over

nmen

t of I

ndia

14,

045,

976,

871.

41

3,

915,

547,

601.

90

R

ESE

RV

ES

AN

D S

UR

PLU

S-

EA

RM

AR

KE

D/ E

ND

OW

ME

NT

FU

ND

S-

SEC

UR

ED

LO

AN

S A

ND

BO

RR

OW

ING

S-

UN

SEC

UR

ED

LO

AN

S A

ND

BO

RR

OW

ING

S-

DE

FER

RE

D C

RE

DIT

LIA

BIL

ITIE

S-

CU

RR

EN

T L

IAB

ILIT

IES

AN

D P

RO

VIS

ION

S 2

66,7

42,1

68.4

9

69

,747

,962

.99

TO

TA

L4,

112,

719,

039.

903,

985,

295,

564.

89

ASS

ET

S

FIX

ED A

SSE

TS

33,

515,

229,

200.

93

3,

343,

796,

542.

61

INV

EST

ME

NT

S FR

OM

EA

RM

AR

KE

D F

UN

D4

-

-

INV

EST

ME

NT

S- O

TH

ER

S-

CU

RR

EN

T A

SSE

TS,

LO

AN

S &

AD

VA

NC

ES

ET

C.

559

7,48

9,83

8.97

64

1,49

9,02

2.28

M

ISC

EL

LA

NE

OU

S E

XPE

ND

ITU

RE

--

-

TO

TA

L4,

112,

719,

039.

903,

985,

295,

564.

89SI

GN

IFIC

ANT

ACC

OU

NTI

NG

PO

LIC

IES

& N

OTE

S O

N A

CC

OU

NTS

13

BR

AH

MA

PUT

RA

BO

AR

D ::

GU

WA

HA

TI

(GO

VT

.OF

IND

IA)

B

ALA

NC

E S

HE

ET

AS

AT

31ST

MA

RC

H 2

016.

126

Page 61: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

(

N. N

. Dek

a) D

y. F

inan

cial

Adv

iser

(Dr.

Raja

t Bha

rgav

a) I.

A.S

Fina

ncia

l Adv

iser

( Am

ount

in R

s.)

INC

OM

ESc

hedu

leC

urre

nt Y

ear

Prev

ious

Yea

r

Inco

me

from

Sal

es /S

ervi

ce-

-

-

Gra

nts

6-

-

Fe

es /

Subs

crip

tions

--

-

In

com

e fr

om In

vest

men

ts o

n Ea

rmar

ked

Fund

s7

-

-

Inco

me

from

Roy

alty

, Pub

licat

ion

etc.

-In

tere

st E

arne

d 8

13,7

55,3

73.6

9

25,7

58,1

91.8

6

Inte

rest

Ear

ned

but n

ot re

ceiv

ed (A

ccru

ed)

8(A)

41,9

72.0

0

109,

794.

00

O

ther

Inco

me

95,

128,

338.

00

5,

454,

279.

00

Incr

ease

/ D

ecre

ase

in S

tock

of F

inis

hed

good

s and

wor

ks in

pro

gres

s-

-

-

Prio

r Per

iod

Adj

ustm

ent

TO

TA

L (A

)18

,925

,683

.69

31,3

22,2

64.8

6E

XPE

ND

ITU

RE

Esta

blis

hmen

t Exp

ense

s10

470,

282,

052.

00

36

9,88

0,34

7.00

Oth

er A

dmin

istra

tive

Expe

nses

etc

.11

53,7

65,3

68.1

9

56,7

99,5

28.0

0

Expe

nditu

re o

n G

rant

s, Su

bsid

ies e

tc.

-In

tere

st-

Expe

nditu

re o

n W

orks

1213

5,67

8,04

4.00

78,5

65,0

10.0

0

Dep

reci

atio

n 3

10,2

70,9

49.9

9

6,92

8,86

1.71

Pr

ior P

erio

d A

djus

tmen

tT

OT

AL

( B

)66

9,99

6,41

4.18

512,

173,

746.

71B

alan

ce b

eing

Exc

ess o

f Exp

endi

ture

ove

r In

com

e ( B

-A )

651,

070,

730.

4948

0,85

1,48

1.85

Tran

sfer

to S

peci

al R

eser

ve-

-

Tr

ansf

er to

/ fro

m G

ener

al R

eser

ve-

-

B

ALA

NC

E B

EIN

G D

EFI

CIT

CA

RR

IED

OV

ER T

O B

AL

AN

CE

SH

EET

651,

070,

730.

4948

0,85

1,48

1.85

SIG

NIF

ICAN

T AC

CO

UN

TIN

G P

OLI

CIE

S &

NO

TES

ON

AC

CO

UN

TS

13

BR

AH

MA

PUT

RA

BO

AR

D ::

GU

WA

HA

TI

(GO

VT

.OF

IND

IA)

INC

OM

E A

ND

EX

PEN

DIT

UR

E A

CC

OU

NT

FO

R T

HE

YE

AR

EN

DE

D 3

1ST

MA

RC

H 2

016.

127

Page 62: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

(A

moun

t in R

s)

RE

CE

IPTS

Cu

rrent

Year

Prev

ious Y

ear

PA

YM

EN

TSCu

rrent

Year

Prev

ious Y

ear

1. O

peni

ng B

alan

ces

1. E

stab

lishm

ent E

xpen

ses

47

0,282

,052.0

0

36

9,880

,347.0

0

a)

Cash

in ha

nd45

,126.6

2

30

,500.6

2

(Sch

edule

-10 )

b) Ba

nk B

alanc

e in c

urren

t A/c

47,14

1,215

.11

50,46

0,859

.25

2. A

dmin

istr

ativ

e E

xpen

ses

53,74

0,639

.50

56,38

6,656

.00

c) Sh

ort Te

rm D

epos

it29

0,000

,000.0

0

18

0,000

,000.0

0

( Sch

edule

-11 )

d) Im

prest

with

Emplo

yees

884,3

43.00

-

3. P

aym

ents

mad

e ag

ains

t va

riou

s w

orks

:

e) Re

mitta

nce i

n Tran

sit2,0

67,00

0.00

-

a)

Surve

y & In

vesti

gatio

n of M

ulti P

urpos

e Proj

ect

35,45

9,539

.00

39,23

5,870

.00

b)Su

rvey &

Inve

stiga

tion o

f Mas

ter Pl

an4,4

82,76

5.00

4,0

89,77

2.00

2.

Gra

nts

in A

id r

ecei

ved

from

c)

Surve

y & In

vesti

gatio

n of S

pecif

ic Dr

ainag

e Sch

eme

13,03

3.00

31,92

1.00

Gov

t. o

f Ind

ia

781,5

00,00

0.00

799,9

67,00

0.00

d) Inv

estig

ation

of M

ini M

icro H

ydel

Proje

ct6,0

43,13

1.00

7,7

75,73

7.00

e)

Opera

tiona

lisati

on &

Main

tenan

ce of

NEH

ARI

22,52

4,925

.00

20,05

5,240

.00

3. In

tere

st r

ecei

ved

:-

f ) Em

ergen

t floo

d man

agem

ent W

ork (C

onst.

of R

aised

Plat

form)

768,1

67.00

5,382

,131.0

0

a)

On B

ank D

epos

its

13,86

5,167

.69

25,92

6,684

.86

g) An

ti eros

ion S

chem

e of B

alat v

illage

.46

,578,2

58.00

1,9

58,22

6.00

b) Lo

ans &

Adva

nces

paid

to Em

ploye

es3,7

36,79

8.00

4,0

01,14

8.00

h)

Anti e

rosion

Sch

eme o

f Kala

iralga

& M

asala

bari

19,78

6,469

.00

-

i) Qua

lity co

ntrol

& evu

lation

stud

y-

4.

Oth

er R

ecei

pts

Pay

able

4.

Pur

chas

e of

Fix

ed A

sset

s :

a) Ea

rnest

Mone

y, Se

curity

Dep

osit e

tc.36

,254,7

30.50

26

,029,1

34.00

a)

Offic

e, Dr

illing &

Surv

ey E

quipm

ent

300,7

96.00

852,4

37.00

b) Mi

scell

aneo

us m

onthl

y rec

overi

es

113,3

73,95

7.00

100,4

17,58

5.00

b) Fu

rnitur

e & Fi

xture

8,703

.00

1,397

,679.0

0

c) Re

cove

ry fro

m Co

ntrac

tors :

-c)

Comp

uter /

Perip

heral

s25

9,958

.00

90

5,016

.00

i) La

nd co

mpen

satio

n

-

d ) O

ther M

iscell

aneo

us A

ssets

6,4

99.00

32

,140.0

0

ii)

Labo

ur Ce

ss1,8

60,91

4.00

37

8,127

.00

e)

Land

-

-

5. P

aym

ent a

gai

nst C

apita

l Wor

k in

Pro

gre

ss :

5. O

ther

Mis

c. R

ecei

pts

1,102

,790.0

0

1,237

,270.0

0

a) Co

nstru

ction

of H

arang

Drai

nage

Dev

elopm

ent S

chem

e-

-

b)

Exec

ution

of D

raina

ge D

evelo

pmen

t Sch

eme

1,656

,488.0

0

5,541

,290.0

0

6. R

eco

very

/adj

ustm

ent o

f A

dv. t

o em

loye

es:-

9,857

,139.0

0

8,029

,906.0

0

c) Am

jur D

raina

ge D

evelo

pmen

t Sch

eme

11,81

4,619

.00

11,09

0,649

.00

d) Av

ulsion

of riv

er Br

ahma

putra

at D

hola,

Hati

ghuli

38,47

9,818

.00

34,15

1,285

.00

7. R

eco

very

/ ad

just

men

t of

Ad

v./ D

epos

it :-

e) Ba

rbhag

Drai

nage

Dev

elopm

ent S

chem

e14

,496,7

35.00

9,4

81,25

5.00

a)

Adva

nce t

o Sup

pliers

-

40

1,647

.00

f )

Adv./

Depo

sit w

ith ot

her G

ovt. B

odies

(Borb

hag D

DS)

-

-

b) Ad

vanc

e to C

ontra

ctor

229,3

10.00

-

g) Pr

otecti

on of

Maju

li Isla

nd11

4,711

,071.0

0

12

6,650

,306.0

0

c)

Depo

sit w

ith ot

her G

ovt. B

odies

281,0

00.00

-

h) Ad

v./De

posit

with

othe

r Gov

t. Bod

ies (M

ajuli)

14,00

0.00

7,000

.00

d) Ad

vanc

e for

Spec

ial S

tudies

-

-

i ) Co

nstru

ction

of N

EHAR

I Ph-I

I-

-

BR

AH

MA

PU

TR

A B

OA

RD

:: G

UW

AH

AT

I (G

OV

T. O

F I

ND

IA)

REC

EIPT

S AN

D P

AYM

ENTS

AC

CO

UN

T FO

R T

HE

YEAR

EN

DED

31S

T M

ARC

H 2

016

128

Page 63: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

(

N. N

. Dek

a) D

y. F

inan

cial

Adv

iser

(Dr.

Raja

t Bha

rgav

a) I.

A.S

Fina

ncia

l Adv

iser

-2-

REC

EIPT

S Cu

rrent

Year

Prev

ious Y

ear

PAYM

ENTS

Curre

nt Ye

arPr

eviou

s Yea

r

8. O

ther

Rec

eipt

s/ In

com

e no

t cov

ered

6. S

tock

s &

Sto

res

-

f

rom

Sl.

2 to

Sl.

7 :-

7.A

dvan

ce p

aid

to S

uppl

iers

-

14

1,060

.00

a)

Prior

perio

d adju

stmen

t-

-

8.

Adv

ance

pai

d to

Con

trac

tor

229,3

10.00

-

b) Sto

cks &

Store

s Rec

overy

-

-

9.D

epos

it m

ade

with

oth

er G

ovt.

Bod

ies

96,98

0.00

6,150

,000.0

0

c) Se

rvice

Tax

42,24

5.00

25,61

6.00

10. A

dvan

ce p

aid

to E

mpl

oyee

s 8,0

61,41

9.00

6,4

48,28

9.00

d)

Fund

rece

ived a

gains

t Dep

osit W

ork:-

11. R

elea

se/ R

emitt

ance

s of

:-

i) L

abora

tory T

estin

g Cha

rge

308,7

50.00

227,8

70.00

a) Ea

rnest

Mone

y, Se

curity

Dep

osit e

tc.31

,427,8

45.00

42

,357,4

48.00

e)

Leav

e sala

ry & p

ensio

n Con

tributi

on-

-

b)

Misc

ellan

eous

mon

thly r

ecov

eries

11

3,588

,395.0

0

10

0,224

,346.0

0

c)

Servi

ce Ta

x 42

,245.0

0

16

,351.0

0

d) Re

cove

ry for

Labo

ur Ce

ss1,8

60,91

4.00

80

7,379

.00

9.

INV

ES

TME

NTS

FR

OM

EA

RM

AR

KE

D F

UN

D

(Dep

osit f

or Le

ave S

alary

& Pen

sion C

ontrib

ution

)12

. Pay

men

t aga

inst

Dep

osit

Wor

k :-

i) En

cash

ment

of Inv

estm

ent-

-

-

( As

per S

ched

ule 12

-B)

21,75

7.00

36,11

3.00

ii)

Intere

st rec

eived

on en

cash

ment-

-

-

13

.Pay

men

t of S

unda

ry C

redi

tors

-

-

10

. A

dv./D

epos

it w

ith o

ther

Bod

ies

a)Prot

ectio

n of M

ajuli

350.0

0

-

14

. Ref

und

to M

oWR

:-

b) Av

ulsion

of D

holla

Hati

ghuli

-

-

a) G

rants

again

st Im

pact

Evalu

ation

Stud

y on W

atersh

ed M

anag

mnt.

-

-

c) Bo

rbhag

DDS

947,7

64.00

11.

Pay

able

to C

ontr

acto

rs14

,794,9

67.00

10

,015,8

40.00

14

. Rel

ease

of a

mou

nt P

ayab

le to

con

trac

tors

22,41

3,209

.00

17,75

7,667

.00

15. C

losi

ng B

alan

ces

a) Ca

sh in

hand

30

,246.6

2

45

,126.6

2

b) Ba

nk Ba

lance

in cu

rrent

A/c

87,76

1,623

.80

47,14

1,215

.11

c) Sh

ort Te

rm D

epos

it 20

9,500

,000.0

0

29

0,000

,000.0

0

d)

Impre

st wit

h Emp

loyee

s

884,1

93.00

-

e) Re

mitta

nce i

n Tran

sit

-

2,067

,000.0

0

TOTA

L1,

317,

345,

802.

92

1,20

8,09

6,95

1.73

TOTA

L1,

317,

345,

802.

92

1,20

8,09

6,95

1.73

129

Page 64: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16(A

mou

nt in

Rs.)

CA

PIT

AL

FU

ND

C

urre

nt Y

ear

Prev

ious

Yea

r( G

rant

s-in

-Aid

rece

ived

from

Gov

t. of

Indi

a)

Bal

ance

at t

he b

egin

ning

of t

he y

ear

3,91

5,54

7,60

1.90

3,59

6,43

2,08

3.75

3,91

5,54

7,60

1.90

3,59

6,43

2,08

3.75

Add

:G

rant

s-in

-Aid

rec

eive

d du

ring

the

year

201

5-16

S.N

oSa

nctio

n O

rder

No.

& D

ate

Dra

ft N

o. &

Dat

eA

mou

nt

i)F.

No.

B-4

/201

5/B

&B

/862

-63

dt. 0

7.07

.201

5 By

R.T

.G.S

.85

,100

,000

.00

ii)F.

No.

B-4

/201

5/B

&B

/318

0-31

81 d

t. 11

.09.

2015

By

R.T

.G.S

.36

0,00

0,00

0.00

iii)

F. N

o. 4

/1/2

015-

Bud

./383

-22

dt. 0

4.02

.201

6By

R.T

.G.S

.24

3,50

0,00

0.00

iv)

F. N

o. B

-4/2

015/

B&

B/5

54-5

55 d

t. 17

.03.

2016

By

R.T

.G.S

.92

,900

,000

.00

781,

500,

000.

0079

9,96

7,00

0.00

4,69

7,04

7,60

1.90

4,39

6,39

9,08

3.75

Les

s:i)

Exce

ss o

f Exp

endi

ture

ove

r Inc

ome

trans

ferr

ed fr

om th

e In

com

e &

Exp

endi

ture

Acc

ount

651,

070,

730.

49

480,

851,

481.

85

Bal

ance

at t

he y

ear

end

4,04

5,97

6,87

1.41

3,91

5,54

7,60

1.90

BR

AH

MA

PUTR

A B

OA

RD

: G

UW

AH

AT

I(G

OV

T. O

F IN

DIA

)SC

HE

DU

LE 1

SC

HE

DU

LE

FO

RM

ING

PA

RT

OF

BA

LAN

CE

SH

EET

AS

AT

31s

t MA

RC

H' 2

016

Net

Bal

ance

at t

he b

egin

ning

of t

he y

ear

Tot

al

(A. B

aroo

ah)

Acco

unts

Offi

cer

(

N. N

. Dek

a) S

r. Ac

coun

ts O

ffice

r

130

Page 65: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

SCH

ED

UL

E 2

(Am

ount

in R

s.)C

UR

RE

NT

LIA

BIL

ITIE

S A

ND

PR

OV

ISIO

NS

Cur

rent

Yea

rPr

evio

us Y

ear

A. C

UR

RE

NT

LIA

BIL

ITIE

S1

Sund

ry C

redi

tors

33,7

88.3

1

33,7

88.3

1

2O

ther

Cur

rent

Lia

bilit

ies :

i) Ea

rnes

t Mon

ey, S

ecur

ity D

epos

it et

c. p

ayab

le62

,859

,364

.44

58

,032

,478

.94

ii) M

isce

llane

ous M

onth

ly R

ecov

erie

s pay

able

735,

843.

74

95

0,28

1.74

iii) R

ecov

ery

for L

and

Com

pens

atio

n fr

om C

ontra

ctor

s3,

113,

159.

00

3,56

7,62

6.00

iv) R

ecov

ery

for L

abou

r Ces

s fro

m C

ontra

ctor

s 3.

00

3.

00v)

Ser

vice

Tax

Pay

able

10.0

0

10.0

0vi

) Ded

uctio

n fr

om C

ontra

ctor

s Pay

able

-

7,16

3,77

5.00

B. P

RO

VIS

ION

S

BR

AH

MA

PUT

RA

BO

AR

D :

GU

WA

HA

TI

( GO

VT

. OF

IND

IA)

SCH

ED

UL

E F

OR

MIN

G P

AR

T O

F B

AL

AN

CE

SH

EE

T A

S A

T 3

1st M

AR

CH

' 201

6

Tot

al (

A)

66,7

42,1

68.4

969

,747

,962

.99

-

-

Tot

al (

B)

-

-

Tot

al (

A+B

)66

,742

,168

.49

69,7

47,9

62.9

9

(A. B

aroo

ah)

Acco

unts

Offi

cer

(

N. N

. Dek

a) S

r. Ac

coun

ts O

ffice

r

131

Page 66: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

FIX

ED A

SSET

S

(Am

ount

in R

upee

s)

SlD

escr

iptio

n V

alu

e

Ad

dit

ion

s

Tra

nsf

er/

Val

ue

as a

t D

uri

ng

Ded

uct

ion

as a

t A

s a

t D

uri

ng

th

e

Tra

nfe

r/T

otal

as a

t A

s at

As a

tN

o.1.

4.2

015

the

year

Du

rin

g t

he

year

31.3

.201

61.

4.2

015

Ye

arA

dju

stm

ent

31.3

.201

6 3

1.3.

2016

31.3

.201

5A

.F

IXE

D A

SS

ET

S

1La

nd16

,968,0

92.32

-

-

16,96

8,092

.32

-

-

-

-

16,96

8,09

2.32

16,96

8,092

.32

2Pl

ant, M

achin

ery

34,29

7,018

.09

-

-

34

,297,0

18.09

32,8

30,3

96.93

58

6,827

.36

-

33

,417

,224.2

9

879,7

93.80

1,4

66,62

1.16

& Eq

uipme

nt3

Offic

e, Dr

illing

39

,731

,744

.38

30

0,796

.00

(44,

728.6

9)

39

,987,8

11.69

38,3

99,6

74.80

50

5,911

.36

-

38,90

5,586

.16

1,082

,225.5

3

1,3

32,06

9.58

& Su

rvey

Equip

ments

4Fu

rnitu

re &

18

,942,5

32.75

8,703

.00

18

,951,2

35.75

7,23

0,42

8.58

1,1

48,00

5.39

1,008

,793.7

99,3

87,22

7.76

9,564

,007.9

9

11

,712,1

04.1

7

Fixtur

es5

Build

ing82

,683,9

74.64

-

82

,683,9

74.64

26,2

45,4

87.47

1,288

,892.6

7-

27

,534

,380.1

4

55,14

9,594

.50

56

,438,4

87.1

7

6Ro

ad, B

ridge

10

,692,1

53.36

-

10

,692,1

53.36

5,00

9,64

4.04

13

3,019

.65

-

5,

142,6

63.69

5,549

,489.6

7

5,6

82,50

9.32

& Cu

lverts

7Ve

hicle

18,58

6,901

.35

-

18,58

6,901

.35

18

,586

,901

.35

-

18

,586

,901.3

5

-

-

8Ot

her M

iscell

.28

,733,8

23.34

6,499

.00

28

,740,3

22.34

28,3

82,7

04.54

290,2

52.59

-

28

,672,9

57.13

67

,365.2

1

35

1,118

.80

As

sets

9Co

mpute

r/13

,686,7

54.00

259,9

58.00

13

,946,7

12.00

4,43

6,46

9.69

2,2

20,73

2.73

2,353

,954.1

29,0

11,15

6.54

4,935

,555.4

6

9,2

50,28

4.31

Perip

hera

ls10

Tube

wells

&

65,72

1.00

-

65

,721.0

0

9,

679.5

4

1071

.26

-

10

,750.8

0

54,97

0.20

56,04

1.46

W

ater S

uppli

esT

ota

l Cu

rren

t Y

ear

264,

388

,715

.23

57

5,9

56.0

0

(4

4,7

28.6

9)

2

64,9

19,

942

.54

16

1,1

31,3

86.9

4

6,1

74,7

13.

013,

362,

747.

9117

0,66

8,8

47.8

6

94

,251

,094

.68

103,

257

,32

8.29

To

tal P

revi

ou

sYea

r 26

1,34

2,1

27.5

4

3,18

7,27

2.0

0

(90,

195

.00)

264

,43

9,20

4.5

4

155

,069

,184

.87

6,

456

,01

4.91

(343

,323

.53)

161,

181

,876

.25

103,

257

,328

.29

BC

AP

ITA

L W

OR

K

IN P

RO

GR

ES

S

1Co

nstru

ction

of30

2,208

,678.3

4

-

-

30

2,208

,678.3

4

1,

018,

367.1

5

8,451

.56

7,98

4.26

1,0

34,80

2.97

301,1

73,87

5.37

30

1,190

,311.1

9

Hara

ng D

raina

geDe

velop

ment

Sc

heme

{Sch

-3(A

)}Co

ntd. P

/2

G

R

O

S

S

B

L

O

C

KD

E

P

R

E

C

I

A

T

I

O

N

NET

BL

OC

K

BR

AH

MA

PUT

RA

BO

AR

D :

GU

WA

HA

TI

( GO

VT

. OF

IND

IA)

SCH

ED

UL

E O

F FI

XE

D A

SSE

TS

FOR

MIN

G P

AR

T O

F B

AL

AN

CE

SH

EE

T A

S A

T 3

1st M

AR

CH

' 201

6

SCH

ED

UL

E -3

132

Page 67: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

(A. B

aroo

ah)

Acco

unts

Offi

cer

(

N. N

. Dek

a) S

r. Ac

coun

ts O

ffice

r

-2-

Note

:-1)

The

amou

nt s

how

n in

Tra

nsfe

r/Ad

just

men

t col

umn

unde

r Dep

reci

atio

n fo

r `10

,08,

793.

79 &

`23

,53,

954.

12 a

gain

st S

l. N

o. 4

& 9

is d

ue to

cha

nge

ofDe

prec

iatio

n ra

te w

.e.f.

201

3-14

from

3.3

4 %

to 6

.33%

for F

urni

ture

& F

ixtu

re a

nd fr

om 7

.07%

to 1

6.21

% fo

r Com

pute

r Per

ipha

rals

has b

een

prov

ided

in a

ccou

nts a

s per

D.O

. let

ter N

o.Pr

.DA(

SA)/

EA/S

AR/B

B-Gu

wah

ati/2

014-

15/7

85 d

t. 15

.10.

15 re

ceiv

ed fr

om P

rinci

pal D

irect

or o

f Aud

it, S

cien

tific

Dep

tt.,

New

Del

hi.

2)Th

e di

ffere

nce

agai

nst S

l. N

o.3

in th

e O

peni

ng G

ross

Blo

ck o

f Ass

ets(

`39

7822

33.6

9-`

3973

1744

.38)

and

in th

e O

peni

ng G

ross

val

ue o

f Dep

reci

atio

n( `

3845

0164

.11-

`50

489.

31)b

y`

50,4

89.3

1 is

due

to

writ

e of

f of t

he a

ccum

ulat

ed d

epre

ciat

ion

on t

he a

sset

s (C

anon

IR-2

018

N) w

hich

was

sol

dun

der b

uy b

ack

syst

em o

n 20

.10.

15.

SlD

escr

iptio

n V

alu

e

Ad

dit

ion

s

Tra

nsf

er/

Val

ue

as a

t D

uri

ng

Ded

uct

ion

as a

t A

s a

t D

uri

ng

th

e

Tra

nfe

r/T

otal

as a

t A

s at

As a

tN

o.1.

4.2

015

the

year

Du

rin

g t

he

year

31.3

.201

61.

4.2

015

Ye

arA

dju

stm

ent

31.3

.201

6 3

1.3.

2016

31.3

.201

52

Cons

tructi

on of

256,3

77,88

4.91

-

-

256,3

77,88

4.91

10,2

39,4

74.06

56

8,835

.11

129,7

94.64

10,93

8,103

.81

245,4

39,78

1.10

24

6,138

,410.8

5

Pagla

diya D

amPr

oject

{Sch

-3(B

)}3

Amjur

Dra

inage

141,9

56,82

5.00

11,8

14,61

9.00

15

3,771

,444.0

0

-

-

-

-

15

3,771

,444.

00

141,9

56,82

5.00

Devp

. Sch

eme

3.1

Adv/

Depo

sit w

ith

1,014

,000.0

0

-

1,014

,000.0

0

-

-

-

-

1,014

,000.

00

1,0

14,00

0.00

oth

er G

ovt.B

odies

4Av

ulsion

of riv

er73

8,672

,414.0

0

38

,472

,818.0

0

777,1

45,23

2.00

-

-

-

-

77

7,145

,232.

00

738,6

72,41

4.00

Brah

mapu

tra a

tDh

olla,

Hagh

uli4

.1Ad

v/ De

posit

with

22

0,600

.00

7,000

.00

22

7,600

.00

-

-

-

-

227,6

00.0

0

220,6

00.0

0

other

Gov

t.Bod

ies5

Prote

ction

o f1,6

69,63

8,779

.2011

4,711

,071.0

01,7

84,34

9,850

.20

15,35

2.92

18,42

3.50

-

33,77

6.42

1,7

84,31

6,07

3.78

1,6

69,62

3,426

.28

Ma

juli Is

land

5.1

Adv/

Depo

sit w

ith

3,579

,350.0

0

14

,000.0

0

(350

.00)

3,593

,000.0

0

-

-

-

-

3,5

93,00

0.00

3,579

,350.

00

other

Gov

t.Bod

ies6

Barb

hag

Drain

age

65,88

1,542

.00

14

,496

,735.0

0

80,37

8,277

.00

-

-

-

-

80,37

8,27

7.00

65,88

1,542

.00

De

vp. S

chem

e 6

.1Ad

v/ De

posit

with

-

-

-

-

-

-

-

-

-

other

Gov

t.Bod

ies7

Exec

ution

of35

,803,4

69.00

1,65

6,488

.00

37

,459,9

57.00

-

-

-

-

37

,459,

957.

00

35

,803,4

69.0

0

Drain

g.Dev

p.Sch

. 8

Cons

tructi

on of

9,7

87,66

8.00

-

9,7

87,66

8.00

-

-

-

-

9,787

,668.

00

9,7

87,66

8.00

NE

HARI

Ph-

II-

-

-

-

-

T

ota

l Cu

rren

t Y

ear

3,22

5,14

1,2

10.4

5

18

1,17

2,73

1.0

0

(3

50.0

0)

3,

406

,31

3,59

1.4

5

11,2

73,1

94.1

3

5

95,7

10.

1713

7,77

8.90

12,

006

,683

.20

3,3

94,3

06,9

08.2

5

3,

213,

868

,01

6.32

To

tal P

revi

ou

sYea

r 3,

039,

167

,189

.45

186,

921,

785

.00

(947

,764

.00)

3,2

25,1

41,

210

.45

10

,457

,023

.80

816

,17

0.33

-

11,

273

,194

.13

3

,213

,868

,016

.32

CM

isc.

Cap

ital

Pro

ject

1E

ast

of

Bar

pet

a 2

6,67

1,1

98.0

0

-

-

26

,67

1,19

8.0

0

-

-

-

-

26,6

71,1

98.0

0

26,6

71,1

98.

00

Gra

nd

To

tal (

A+

B+

C)

Cu

rren

t Y

ear

3,51

6,20

1,1

23.6

8

18

1,74

8,68

7.0

0

(4

5,0

78.6

9)

3,

697

,90

4,73

1.9

9

172

,404

,581

.07

6,

770

,42

3.18

3,50

0,52

6.81

182,

675

,531

.06

3,5

15,2

29,2

00.9

3

3,

343,

796

,54

2.61

Pre

vio

usY

ear

3,32

7,18

0,5

14.9

9

19

0,10

9,05

7.0

0

(1

,037

,959

.00)

3,

516

,25

1,61

2.9

9

165

,526

,208

.67

7,

272

,18

5.24

(343

,323

.53)

172,

455

,070

.38

3,3

43,7

96,5

42.6

1

-

G

R

O

S

S

B

L

O

C

KD

E

P

R

E

C

I

A

T

I

O

N

NET

BL

OC

K

133

Page 68: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

(A. B

aroo

ah)

Acco

unts

Offi

cer

(

N. N

. Dek

a) S

r. Ac

coun

ts O

ffice

r

(CAP

ITAL

WOR

K IN

PRO

GRES

S)

(Figu

res in

Rupe

es)

SlIte

mA

s on

A

dditi

on

Tran

sfer

/G

ross

Blo

ck

No.

1.4.

2015

Dur

ing

Ded

uctio

nA

s on

As

at

Dur

ing

the

Tran

fer /

As

at

As at

As at

the

year

Dur

ing

the

yea

r 3

1.3.

2016

1.4.

2015

Year

Adj

ustm

ent

31.3

.201

6 31

.3.20

16 31

.3.20

15

Con

stru

ctio

n of

Har

ang

Dra

inag

e D

evel

opm

ent S

chem

e:-

(I )

A- Pre

limina

ry5,3

30,04

4.00

-

-

5,330

,044.0

0

-

-

-

-

5,330

,044.0

0

5,3

30,04

4.00

O- M

iscell

aneo

us7,6

13,70

0.50

-

-

7,613

,700.5

0

-

-

-

-

7,613

,700.5

0

7,6

13,70

0.50

O

rdina

ry T &

P20

6,650

.00

-

-

20

6,650

.00

-

-

-

-

206,6

50.00

206,6

50.00

P-

Maint

enan

ce1,0

07,63

9.50

-

-

1,007

,639.5

0

-

-

-

-

1,007

,639.5

0

1,0

07,63

9.50

B- La

nd41

,660,9

24.55

-

-

41

,660,9

24.55

-

-

-

-

41,66

0,924

.55

41,66

0,924

.55

R- Co

mmun

icatio

n7,9

29,45

2.00

-

-

7,929

,452.0

0

-

-

-

-

7,929

,452.0

0

7,9

29,45

2.00

C- W

orks

216,6

30,46

7.40

-

-

21

6,630

,467.4

0

-

-

-

-

21

6,630

,467.4

0

216,6

30,46

7.40

Furni

ture

133,5

16.00

-

-

133,5

16.00

70,04

9.15

8,451

.56

7,9

84.26

86

,484.9

7

47

,031.0

3

63,46

6.85

Ve

hicle

896,7

29.00

-

-

896,7

29.00

896,7

29.00

-

-

896,7

29.00

-

-

Ot

her E

sstt.

Expe

nses

19,13

7,789

.25

-

-

19,13

7,789

.25

-

-

-

-

19

,137,7

89.25

19

,137,7

89.25

Wo

rk ch

arge P

ay65

2,725

.00

-

-

65

2,725

.00

-

-

-

-

652,7

25.00

652,7

25.00

Sto

res &

Stock

Susp

ense

26,19

9.50

-

-

26

,199.5

0

-

-

-

-

26

,199.5

0

26,19

9.50

Of

fice E

quipm

ent

51,58

9.00

-

-

51

,589.0

0

51,58

9.00

-

-

51

,589.0

0

-

-

(II

)Ad

v/ De

posit

with o

ther

Govt.

Bodie

s93

1,252

.64

-

-

93

1,252

.64

-

-

-

-

931,2

52.64

931,2

52.64

TO

TAL

302,

208,

678.

34

-

-

302,

208,

678.

34

1,01

8,36

7.15

8,45

1.56

7,98

4.26

1,03

4,80

2.97

30

1,17

3,87

5.37

301,

190,

311.

19

D E

P R

E C

I A

T I

O N

N E

T B

L O

C K

BR

AH

MA

PUT

RA

BO

AR

D :

GU

WA

HA

TI

(GO

VT

. OF

IND

IA)

SCH

ED

UL

E- 3

(A)

SCH

ED

ULE

OF

FIX

ED

ASS

ETS

FO

RM

ING

PA

RT

OF

BA

LAN

CE

SH

EE

T A

S A

T 31

st M

AR

CH

201

6

134

Page 69: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

(A. B

aroo

ah)

Acco

unts

Offi

cer

(

N. N

. Dek

a) S

r. Ac

coun

ts O

ffice

r

(CA

PITA

L W

ORK

IN P

ROG

RESS

) (F

igures

in R

upee

s)

SlIt

emA

s o

n

Ad

diti

on

Tra

nsfe

r /

Gro

ss B

lock

No.

1.4.

2015

Dur

ing

D

educ

tion

As

on

As

at

Du

rin

g th

e T

ran

fer

/A

s at

A

s at

As a

t

the

year

Dur

ing

the

yea

r 3

1.3.

2016

1.4.

2015

Yea

rA

dju

stm

ent

31.3

.201

6 3

1.3.

2016

31.

3.20

15

Con

stru

ctio

n o

f Pag

lad

iya

Dam

Pro

ject

:-

(I)

A- P

relim

inary

10,53

4,416

.95

-

10,53

4,416

.95

-

-

-

-

10

,534,4

16.95

10

,534,4

16.95

B-

Land

14,68

4,684

.43

14,68

4,684

.43

-

-

-

-

14

,684,6

84.43

14

,684,6

84.43

K-

Buil

ding

27,01

5,977

.78

27,01

5,977

.78

2,292

,054.7

8

208,0

04.41

2,5

00,05

9.19

24

,515,9

18.59

24

,723,9

23.00

O-

Misc

ellan

eous

28,99

2,205

.81

28,99

2,205

.81

-

-

-

-

28

,992,2

05.81

28

,992,2

05.81

P-

Main

tenan

ce1,2

70,22

7.30

1,270

,227.3

0

-

-

-

-

1,270

,227.3

0

1,2

70,22

7.30

Q- S

pecia

l T&P

/-

-

-

-

-

-

-

-

O

rdina

ry T&

P1,7

05,63

6.00

1,705

,636.0

0

-

-

-

-

1,705

,636.0

0

1,7

05,63

6.00

R- C

ommu

nicati

on50

,668,1

13.31

50

,668,1

13.31

-

-

-

-

50,66

8,113

.31

50,66

8,113

.31

Work

charg

e Pay

16,59

1,469

.12

16,59

1,469

.12

-

-

-

-

16

,591,4

69.12

16

,591,4

69.12

Of

fice E

quipm

ent

1,979

,214.0

0

1,9

79,21

4.00

1,726

,114.9

0

139,9

30.43

-

1,8

66,04

5.33

11

3,168

.67

25

3,099

.10

Furni

ture &

Fixtu

re2,1

70,47

9.00

2,170

,479.0

0

94

4,218

.77

137,3

91.32

12

9,794

.64

1,211

,404.7

3

959,0

74.27

1,226

,260.2

3

Ot

her E

sstt.

Expe

nses

76,35

4,978

.35

76,35

4,978

.35

-

-

-

76,35

4,978

.35

76,35

4,978

.35

Mach

inery

& Eq

uipme

nt1,6

21,53

3.00

1,621

,533.0

0

1,1

34,34

1.61

83

,508.9

5

-

1,217

,850.5

6

403,6

82.44

487,1

91.39

C-

Work

s11

,774,1

50.86

11

,774,1

50.86

-

-

-

11

,774,1

50.86

11

,774,1

50.86

Ve

hicle

4,142

,744.0

0

4,1

42,74

4.00

4,142

,744.0

0

-

-

4,1

42,74

4.00

-

-

St

ores &

Stoc

k Sus

pens

e5,4

05,71

4.06

5,405

,714.0

6

-

-

-

-

5,405

,714.0

6

5,4

05,71

4.06

M- P

lantat

ion36

,280.0

0

36,28

0.00

-

-

-

-

36,28

0.00

36

,280.0

0

(II)

Adv/

Depo

sit w

ith ot

her

Govt.

Bod

ies1,4

30,06

0.94

-

1,430

,060.9

4

-

-

-

-

1,430

,060.9

4

1,4

30,06

0.94

TOTA

L

256,

377,

884.

91

-

-

256,

377,

884.

9110

,239

,474

.06

568,

835.

11

129,

794.

64

10

,938

,103

.81

245,

439,

781.

10

246,

138,

410.

85

D E

P R

E C

I A

T I

O N

N E

T

B L

O C

K

BR

AH

MA

PUT

RA

BO

AR

D :

GU

WA

HA

TI

(GO

VT.

OF

IND

IA)

SCH

ED

UL

E- 3

(B)

SCH

ED

ULE

OF

FIX

ED

ASS

ETS

FO

RM

ING

PA

RT

OF

BA

LAN

CE

SH

EE

T A

S A

T 31

st M

AR

CH

201

6

135

Page 70: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

(A. B

aroo

ah)

Acco

unts

Offi

cer

(

N. N

. Dek

a) S

r. Ac

coun

ts O

ffice

r

SCH

ED

UL

E- 4

(Am

ount

in R

s.)

INV

EST

ME

NT

S FR

OM

EA

RM

AR

KE

D F

UN

DS

Cur

rent

Yea

rPr

evio

us Y

ear

( Dep

osit

for L

eave

Sal

ary

and

Pens

ion

Con

tribu

tion

etc.

)

1In

Sho

rt Te

rm D

epos

it w

ith S

ched

uled

Ban

k-

-

BR

AH

MA

PUT

RA

BO

AR

D :

GU

WA

HA

TI

( GO

VT

. OF

IND

IA)

SCH

ED

UL

E F

OR

MIN

G P

AR

T O

F B

AL

AN

CE

SHE

ET

AS

AT

31s

t MA

RC

H' 2

016

Tot

al

-

-

136

Page 71: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

(A. B

aroo

ah)

Acco

unts

Offi

cer

(

N. N

. Dek

a) S

r. Ac

coun

ts O

ffice

r

(Am

ount

in R

s.)

CU

RR

EN

T A

SSE

TS,

LO

AN

S A

ND

AD

VA

NC

ES

ET

C.

Cur

rent

Yea

rPr

evio

us Y

ear

AC

UR

RE

NT

ASS

ET

S :

1St

ock

and

Stor

es2,

552,

980.

232,

552,

980.

232

Sund

ry D

ebto

rsi)

Rec

eiva

ble

from

NH

PC L

td.

(aga

inst

tran

sfer

of S

uban

siri

Proj

ect)

230,

934,

824.

0023

0,93

4,82

4.00

ii) R

ecei

vabl

e fro

m N

EEPC

O L

td.

(aga

inst

tran

sfer

of T

ipai

muk

h Pr

ojec

t) 45

,888

,545

.12

45,8

88,5

45.1

2iii

) Rec

eiva

ble

agai

nst L

abou

r Ces

s-

-

iv

) Rec

eiva

ble

agai

nst S

ervi

ce T

ax3

Cas

h B

alan

ces i

n ha

nd30

,246

.62

45,1

26.6

24

Ban

k Ba

lanc

es w

ith S

ched

uled

Ban

ks o

n C

urre

nt A

ccou

nts

87,7

61,6

23.8

047

,141

,215

.11

5B

ank

Bala

nces

with

Sch

edul

ed B

anks

on

Shor

t ter

m D

epos

its20

9,50

0,00

0.00

290,

000,

000.

006

Impr

est w

ith E

mpl

oyee

s27

,988

.83

28,1

38.8

37

Rem

ittan

ce in

Tra

nsit

0.00

2,06

7,00

0.00

BL

OA

NS,

AD

VA

NC

ES

AN

D O

TH

ER

ASS

ET

S :

1Lo

ans &

Adv

ance

s to

Empl

oyee

s ( H

BA

, Con

veya

nce

Adv

ance

, etc

.)3,

679,

810.

925,

475,

530.

922

Adv

ance

s and

oth

er a

mou

nts r

ecov

erab

le in

cas

h or

in k

ind

or fo

r val

ue to

be

rece

ived

i) A

dvan

ce to

Con

tract

ors

1,47

0,03

1.20

1,47

0,03

1.20

ii) A

dvan

ce to

Sup

plie

rs18

7,13

8.25

187,

138.

25iii

) Dep

osit

with

oth

er G

ovt.

Bodi

es15

,414

,678

.00

15,5

98,6

98.0

03

Inco

me

Acc

rued

i) O

n In

vest

men

t fro

m e

arm

arke

d fu

ndii)

On

Inve

stm

ents

- O

ther

s (Sh

ort T

erm

Dep

osit

with

Sch

edul

ed B

ank)

41,9

72.0

010

9,79

4.00

Tot

al o

f (A

) 57

6,69

6,20

8.60

618,

657,

829.

91

22,8

41,1

92.3

7T

otal

of

(A+B

) 59

7,48

9,83

8.97

641,

499,

022.

28T

otal

of

(B)

20,7

93,6

30.3

7

SCH

ED

UL

E -5

B

RA

HM

APU

TR

A B

OA

RD

: G

UW

AH

AT

I( G

OV

T. O

F IN

DIA

)SC

HE

DU

LE

FO

RM

ING

PA

RT

OF

BA

LA

NC

E S

HE

ET

AS

AT

31s

t MA

RC

H' 2

016

137

Page 72: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

(A. B

aroo

ah)

Acco

unts

Offi

cer

(

N. N

. Dek

a) S

r. Ac

coun

ts O

ffice

r

SCH

ED

UL

E -

6

(Am

ount

in R

s.)

OT

HE

R R

EC

EIP

TC

urre

nt Y

ear

Prev

ious

Yea

r

1C

entra

l Gov

ernm

ent :

a)

-

-

b)

-

-

BR

AH

MA

PUT

RA

BO

AR

D :

GU

WA

HA

TI

( GO

VT

. OF

IND

IA)

SCH

ED

UL

E F

OR

MIN

G P

AR

T O

F IN

CO

ME

AN

D E

XPE

ND

ITU

RE

FO

R T

HE

YE

AR

EN

DE

D 3

1st M

AR

CH

' 201

6

Tot

al

-

-

138

Page 73: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

SCH

ED

UL

E- 7

(Am

ount

in R

s.)IN

CO

ME

FR

OM

INV

EST

ME

NT

S O

N E

AR

MA

RK

ED

FU

ND

SC

urre

nt Y

ear

Prev

ious

Yea

r( D

epos

it fo

r Lea

ve S

alar

y an

d Pe

nsio

n C

ontri

butio

n et

c.)

1In

tere

st o

n Sh

ort T

erm

Dep

osit

with

Sch

edul

ed B

ank

-

-

BR

AH

MA

PUT

RA

BO

AR

D :

GU

WA

HA

TI

( GO

VT.

OF

IND

IA)

SCH

ED

UL

E F

OR

MIN

G P

AR

T O

F IN

CO

ME

AN

D E

XPE

ND

ITU

RE

FOR

TH

E Y

EA

R E

ND

ED

31s

t MA

RC

H 2

016

Tot

al

-

-

(A. B

aroo

ah)

Acco

unts

Offi

cer

(

N. N

. Dek

a) S

r. Ac

coun

ts O

ffice

r

139

Page 74: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

SCH

ED

UL

E- 8

(Am

ount

in R

s.)IN

TE

RE

ST E

AR

NE

DC

urre

nt Y

ear

Prev

ious

Yea

r

1O

n Sh

ort T

erm

Dep

osit

with

Sch

edul

ed B

anks

:-

a) In

tere

st e

arne

d an

d re

ceiv

ed fr

om B

ank

13,7

55,3

73.6

9

25

,758

,191

.86

BR

AH

MA

PUT

RA

BO

AR

D :

GU

WA

HA

TI

( GO

VT.

OF

IND

IA)

SCH

ED

UL

E F

OR

MIN

G P

AR

T O

F IN

CO

ME

AN

D E

XPE

ND

ITU

RE

FOR

TH

E Y

EA

R E

ND

ED

31s

t MA

RC

H 2

016

Tot

al

13,7

55,3

73.6

925

,758

,191

.86

(A. B

aroo

ah)

Acco

unts

Offi

cer

(

N. N

. Dek

a) S

r. Ac

coun

ts O

ffice

r

140

Page 75: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

SCH

ED

UL

E- 8

(A)

(Am

ount

in R

s.)IN

TE

RE

ST E

AR

NE

DC

urre

nt Y

ear

Prev

ious

Yea

r

1O

n Sh

ort T

erm

Dep

osit

with

Sch

edul

ed B

anks

:-

a) In

tere

st e

arne

d bu

t not

rece

ived

(Acc

rued

) 41

,972

.00

109,

794.

00

BR

AH

MA

PUT

RA

BO

AR

D :

GU

WA

HA

TI

( GO

VT.

OF

IND

IA)

SCH

ED

UL

E F

OR

MIN

G P

AR

T O

F IN

CO

ME

AN

D E

XPE

ND

ITU

RE

FOR

TH

E Y

EA

R E

ND

ED

31s

t MA

RC

H 2

016

Tot

al

41,9

72.0

010

9,79

4.00

(A. B

aroo

ah)

Acco

unts

Offi

cer

(

N. N

. Dek

a) S

r. Ac

coun

ts O

ffice

r

141

Page 76: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16SC

HE

DU

LE

- 9

(Am

ount

in R

s.)O

TH

ER

INC

OM

E

Cur

rent

Yea

rPr

evio

us Y

ear

1M

isce

llane

ous I

ncom

e :

a) R

ebat

e fr

om C

ontra

ctor

-

-

b)

Pen

alty

from

Con

tract

or

181,

559.

00

337,

722.

00c)

Sal

e of

old

new

s pap

ers/

Bitu

men

etc

6,74

4.00

3,

790.

00d)

Auc

tion

of T

& P

mat

eria

ls3,

940.

00e)

Gue

st H

ouse

Rec

eipt

s29

0,69

3.00

27

4,30

5.00

f ) L

icen

ce F

ee12

3,78

7.00

10

8,91

2.00

g) E

lect

ricity

cha

rge

reco

very

325,

238.

00

252,

707.

00h)

Wat

er c

harg

e re

cove

ry3,

568.

00

3,30

6.00

i ) S

taff

Bus

Far

e re

cove

ry51

,110

.00

55,8

60.0

0j)

Tend

er F

ee84

,210

.00

169,

095.

00k)

Pan

alty

from

em

ploy

ees

529.

00

15

,153

.00

l ) A

mou

nt re

ceiv

ed a

gain

st R

TI15

2.00

471.

00

m) I

nter

est f

rom

Ban

k-

n

) Ren

t fro

m B

SNL

o) F

orfe

it of

Ear

nest

Mon

ey15

,200

.00

2La

bora

tory

Tes

ting

Cha

rges

at N

EHA

RI

308,

750.

00

227,

870.

003

Inte

rest

on

Loan

s and

Adv

ance

s pai

d to

em

ploy

ees

3,73

6,79

8.00

4,00

1,14

8.00

-

-

BR

AH

MA

PUT

RA

BO

AR

D :

GU

WA

HA

TI

( GO

VT

. OF

IND

IA)

SCH

ED

UL

E F

OR

MIN

G P

AR

T O

F IN

CO

ME

AN

D E

XPE

ND

ITU

RE

FO

R T

HE

YE

AR

EN

DE

D 3

1st M

AR

CH

201

6

Tot

al

5,12

8,33

8.00

5,45

4,27

9.00

(A. B

aroo

ah)

Acco

unts

Offi

cer

(

N. N

. Dek

a) S

r. Ac

coun

ts O

ffice

r

142

Page 77: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16SC

HE

DU

LE

-10

(Am

ount

in R

s.)

a)

Sala

ries &

Wag

es33

6,42

4,17

5.00

32

1,95

3,08

1.00

b)

Leav

e En

cash

men

t37

,982

,662

.00

6,57

3,95

9.00

c)

Live

ries &

Uni

form

s-

226,

218.

00 d

) H

onor

ariu

m23

,510

.00

5,92

0.00

e)

Bon

us1,

510,

136.

00

1,55

5,59

8.00

f )

L.T.

C.

3,06

7,45

6.00

3,

680,

778.

00 g

) Sc

hola

rshi

p &

Stip

end

-

-

h)

Gra

tuity

67,9

06,2

86.0

0

12

,172

,703

.00

i )

Con

tribu

tion

to C

.P.F

.17

,657

,561

.00

17,0

96,5

62.0

0 j

) M

edic

al E

xpen

ses

5,51

4,30

1.00

6,

530,

353.

00 k

) Tr

aini

ng20

,000

.00

- l

) Le

ave

Sala

ry a

nd P

ensi

on C

ontri

butio

n17

5,96

5.00

85,1

75.0

0

BR

AH

MA

PUT

RA

BO

AR

D :

GU

WA

HA

TI

( GO

VT.

OF

IND

IA)

SCH

ED

UL

E F

OR

MIN

G P

AR

T O

F IN

CO

ME

AN

D E

XPE

ND

ITU

RE

FO

R T

HE

YE

AR

EN

DE

D 3

1ST

MA

RC

H' 2

016

EST

AB

LIS

HM

EN

T E

XPE

NSE

SC

urre

nt Y

ear

Prev

ious

Yea

r

Tot

al

470,

282,

052.

0036

9,88

0,34

7.00

Not

e: 1

. Exp

entit

ure

on B

oard

Con

trib

utio

n to

CPF

for ̀

1,7

6,57

,561

/- in

clud

es ̀

9,82

0 /-

, pai

d di

rect

ly a

s CPF

arr

ear t

o re

tired

em

ploy

ees o

f the

Boa

rd a

ndex

clud

es`

3,57

1/- o

f Sri

Moi

nudd

in A

hmed

, Ret

d JE

, Ght

y Ci

rcle

(A. B

aroo

ah)

Acco

unts

Offi

cer

(

N. N

. Dek

a) S

r. Ac

coun

ts O

ffice

r

143

Page 78: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

SCH

ED

UL

E -1

1

(Am

ount

in R

s.)

a)

Post

age

Tele

gram

& T

elep

hone

998,

832.

00

1,

002,

688.

00

b)

Prin

ting

& S

tatio

nary

3,18

3,87

3.00

4,

887,

823.

00

c)

Boo

ks &

Per

iodi

cals

291,

749.

00

33

2,43

0.00

d)

Expe

nses

on

Mee

ting/

Sem

inar

s/ W

orks

hop

2,95

0,39

0.00

1,

253,

929.

00

e)

Insu

ranc

e-

f )

Hos

pita

lity

Expe

nses

121,

041.

00

12

6,51

3.00

g)

Expe

nses

on

Lega

l Fee

s41

0,43

6.00

655,

200.

00

h

) El

ectri

city

& W

ater

Cha

rges

742,

072.

00

51

6,94

1.00

i )

Ban

k C

harg

es12

,777

.50

14,4

97.0

0

j )

Oth

er E

xpen

ses (

Inde

pend

ence

/Rep

ublic

/Boa

rd d

ay c

eleb

ratio

n et

c.)

482,

220.

00

77

3,29

9.00

k)

Trav

el &

Con

veya

nce

Expe

nses

6,41

6,12

6.00

5,

103,

021.

00

l )

Ren

t Rat

es &

Tax

es2,

400,

978.

00

2,59

9,76

4.00

m

) Pu

blic

atio

n-

-

n

) A

dver

tisem

ent &

Pub

licity

223,

320.

00

18

7,94

0.00

o)

Subs

crip

tion

and

Con

tribu

tion

4,00

0.00

-

p)

R&

M o

f Off

ice

Equi

pmen

t20

4,72

0.00

288,

597.

00

q

) R

&M

of F

urni

ture

12,2

99.0

0

25

,883

.00

r

) R

&M

of B

uild

ing

33,6

52,8

22.0

0

36

,939

,114

.00

s )

R&

M o

f Veh

icle

1,63

2,98

4.00

1,

679,

017.

00

t )

Loss

on

Sale

of A

sset

s/ S

tock

etc

.

i)

Cur

rent

Yea

r24

,728

.69

ii) P

rior P

erio

d-

24,7

28.6

9

41

2,87

2.00

BR

AH

MA

PUT

RA

BO

AR

D :

GU

WA

HA

TI

( G

OV

T. O

F IN

DIA

)

SCH

ED

UL

E F

OR

MIN

G P

AR

T O

F IN

CO

ME

AN

D E

XPE

ND

ITU

RE

FO

R T

HE

YE

AR

EN

DE

D 3

1ST

MA

RC

H' 2

016

OT

HER

AD

MIN

IST

RA

TIV

E E

XPE

NSE

S E

TC.

Cur

rent

Yea

rPr

evio

us Y

ear

Tot

al

53,7

65,3

68.1

956

,799

,528

.00

Not

e: O

ther

Adm

inist

rativ

e ex

pens

es a

s per

Rec

eipt

s & P

aym

ent A

ccou

nt i

s `5,

37,4

0,63

9.50

(`5,

37,6

5,36

8.19

- `

24,7

28.6

9) e

xclu

des "

Loss

on

Sale

of

Asse

ts/S

tock

etc

." f

or `

24,7

28.6

9/-

(A. B

aroo

ah)

Acco

unts

Offi

cer

(

N. N

. Dek

a) S

r. Ac

coun

ts O

ffice

r

144

Page 79: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

SCH

ED

ULE

-12

SCH

ED

UL

E F

OR

MIN

G P

AR

T O

F IN

CO

ME

AN

D E

XPE

ND

ITU

RE

FO

R T

HE

YE

AR

EN

DE

D 3

1st M

AR

CH

201

6(A

mou

nt in

Rs.)

AR

iver

Man

agem

ent A

ctiv

ities

& W

orks

rel

ated

to B

orde

r A

reas

a) S

urve

y &

Inve

stig

atio

n of

Mul

tipur

pose

Pro

ject

35,4

59,5

39.0

0

39

,235

,870

.00

b)

Sur

vey

& In

vest

igat

ion

of M

aste

r Pla

n4,

482,

765.

00

4,08

9,77

2.00

c) S

urve

y &

Inve

stig

atio

n of

Spe

cific

Dra

inag

e Sc

hem

e13

,033

.00

31

,921

.00

d)

Ope

ratio

nalis

atio

n &

mai

nten

ance

of N

EHA

RI

22,5

24,9

25.0

0

20

,055

,240

.00

e)

Inve

stig

atio

n of

Min

i Mic

ro H

ydel

Pro

ject

6,04

3,13

1.00

7,

775,

737.

00

f)

Em

erge

nt fl

ood

man

agem

ent w

ork

of c

onst

ruct

ion

of ra

ised

pla

tefo

rm76

8,16

7.00

5,38

2,13

1.00

g) A

nti e

rosi

on S

chem

e (K

alai

ralg

a &

Mas

alab

ari,

Bala

t Nal

abar

i)66

,364

,727

.00

1,95

8,22

6.00

h) C

hann

elis

atio

n St

udy

of ri

ver B

rahm

aput

ra-

-

i ) Q

ualit

y C

ontro

l & E

valu

atio

n St

udy

-

-

Tot

al (

A )

135,

656,

287.

0078

,528

,897

.00

BD

EPO

SIT

WO

RK

S :

a) S

oil T

est o

f Kill

ing

, M.P

. Pro

ject

, Nag

aon

Div

isio

n-

36,1

13.0

0

b) R

ock

Test

of M

iddl

e B

arap

ani H

.E. P

roje

ct, M

SEB

, Meg

hala

ya9,

892.

00

-

c) M

at-s

akui

H.E

. Pro

ject

,CW

C, M

izor

am11

,865

.00

-

Tot

al (

B )

21,7

57.0

0

36,1

13.0

0

BR

AH

MA

PUT

RA

BO

AR

D :

GU

WA

HA

TI

( GO

VT

. OF

IND

IA)

EX

PEN

DIT

UR

E O

N W

OR

KS

Cur

rent

Yea

rPr

evio

us Y

ear

Gra

nd T

otal

( A

+B )

135,

678,

044.

0078

,565

,010

.00

(A. B

aroo

ah)

Acco

unts

Offi

cer

(

N. N

. Dek

a) S

r. Ac

coun

ts O

ffice

r

145

Page 80: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

SIGNIFICANT ACCOUNTING POLICIES AND NOTES ON ACCOUNTS:-

1. FORM OF ACCOUNTS :

The statements of Annual Accounts of the Brahmaputra Board for the year 2015-16 comprising of theBalance Sheet, Income and Expenditure Account and Receipts and Payments Account have beenprepared as per revised form of Financial Statements approved by the Govt. of India as applicable toCentral Autonomous Bodies (Non-profit Organisations) on the basis of statement of accounts certifiedby the field offices of the Board.

2. ACCOUNTING PRINCIPLE :

The Receipts and Payments Account has been prepared on cash basis, whereas the Income andExpenditure Account and the Balance Sheet have been prepared on the accrual method of accounting.

3. INVENTORY VALUATION :

Stock and Stores are valued at cost.

4. FIXED ASSETS :

The fixed assets are stated at cost of acquisition inclusive of inward freight, duties and taxes and incidentaland direct expenses related to acquisition.

5. DEPRECIATION :

i) Depreciation on fixed assets has been computed on Straight Line method as per rates specified inthe Companies Amendment Act, 1956.

ii) In respect of additions to fixed assets during the year, depreciation is considered on pro-rata basisi.e. completed monthly uses basis. The period from1st to 15th of the month is taken as full monthand the period from 15th afterwards is omitted.

iii) The Book value & depreciation already charged on Fixed Assets (Office, Drilling & Survey Equipments)sold under buy back system have been written off from both the opening Gross Block of Assetsand depreciation as depicted in Schedule-3. Further, necessary notes regarding understatementof Depreciation due to change of Depreciation rate i.e. on Computer from 7.07 % to 16.21 % andon Furniture from 3.34 % to 6.33 % has been appended in Schedule-3 as per D.O. letter No.Pr.DA(SA)/EA/SAR/BB-Guwahati/2014-15/785 dt. 15.10.15 received from Principal Director of Audit, ScientificDeptt., New Delhi.

6. GRANTS IN AID FROM GOVERNMENT:

i) All grants received from MoWR, Govt. of India against various Schemes/ Projects being undertakenby the Board are treated as Capital Grants as no classification is made in the sanction of grantsby the MoWR.

BRAHMAPUTRA BOARD :: GUWAHATI(GOVT. OF INDIA)

SCHEDULE FORMING PART OF THE ACCOUNTS FOR THE PERIOD ENDING 31ST MARCH 2016SCHEDULE -13

146

Page 81: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

7. DEPOSIT WORK / LABORATORY TESTING CHARGES :

i) All amounts received from other organizations viz. NEC, NHPC Ltd., BRTF, CWC, etc. towardsdeposit work/ laboratory testing charges at NEHARI and expenditure incurred thereon during theyear have been considered as revenue items and accordingly exhibited in the Income andExpenditure Account.

8. OTHERS :

i) The Bank balances on current account as on 31st March 2016 with various offices of the Boardhave been duly reconciled with respective certified balances of the Bank Statement.

ii) All prior period adjustments comprising items of income or expenses in respect of errors/ omissionsin the preparation of Financial Statements of previous years have been shown under "Prior PeriodAdjustment" in Income and Expenditure Account.

iii) The unprecedented flood during 2004 ( May & July) has caused devastation of Board's propertiesunder construction of Pagladiya Dam Project near dam site at Madaltana, Barsarkuchi officecomplex and security complex at dam sites. The extent of damage of Board's properties due tothe flood comes to Rs. 45.33 lakh (approx) as per preliminary flood report submitted by the Boardas communicated to the Commissioner(ER), MoWR vide letter No. BB(PC)RTW/03-04/62/28 dt. 01-10-2004. In order to determine the actual flood damage of the properties of Board, a sub-committeewas constituted and the committee worked out the actual damage to the tune of Rs.33.83 lakhand accordingly communicated to the Commissioner(B&B) for approval vide No. BB(PC)RTW/03-04/63 dt. 11-08-2011, but the approval of the same is still awaited. Thus, the expenditure exhibitedin the Schedule-3(B) amounting to Rs. 24,54,39,781.10 against the construction of Pagladiya Projectis subject to be written off to the extent of actual value of the damaged assets in the AnnualAccounts of the Board.

iv) The Dehang and Subansiri Project had been handed over to NHPC Ltd in pursuance of MoWR OMNo F. No. 24/2/97-ER Dt.22-3-2000 and in terms of the said order, a claim towards reimbursement ofexpenditure incurred by the Board on the project for Rs. 26.51 crore was raised on NHPC. Anamount of Rs. 1.35 crore was reimbursed initially by NHPC Ltd. The depreciation was charged forRs.2.07 crore upto 31.03.2000 and the net claim receivable is Rs.23.09 crore from NHPC Ltd..TheBrahmaputra Board in its Board Meeting have reviewed the case from time to time and directedthe Board to make expeditious efforts for reimbursement of the balance amount. Accordingly, theChairman, Brahmaputra Board has taken up the matter with J. S. & F.A. of MoWR, Govt. of India,vide Board's letter No. BB/ACS/37/2000/53 dt. 12.10.2007 for early settlement of the outstandingclaims of the Board and direction from the MoWR is still awaited.

However, as per decision of the recent meeting taken by Joint Secretary (H), Ministry of Power,Govt. of India with the representatives of NHPC Ltd., Ministry of Water Resources, Govt. of Indiaand Brahmaputra Board on 19.03.2012, the claim of the above two projects along with interestwill be claimed by NHPC Ltd. from the private developers to whom the respective projects were

147

Page 82: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

transferred and fund so collected by NHPC Ltd. will be transferred as per the decision of Ministry ofPower in consultation with Ministry of Water Resources, Govt. of India. However, the final actionin this respect is still awaited.

v) The Tipaimukh Dam Project has been handed over to NEEPCO Ltd. in terms of MoWR DO No. 24/2/97-ER/821 (A) Dt. 18-03-1999 and as per Minutes of Meeting held in-between Chairman,Brahmaputra Board and CMD, NEEPCO Ltd. held on 14-7-99, a claim towards reimbursement ofexpenditure incurred by the Board on the project for Rs. 4.88 crore was raised. The Net claimreceivable from NEEPCO Ltd. after charging depreciation of Rs. 0.30 crores is Rs. 4.58 crore, but sofar no reimbursement has been received from NEEPCO Ltd.

vi) No figure in the Balance Sheet or Income and Expenditure Account has been rounded off.

vii) Schedule-1 to Schedule-13 annexed to are form an integral part of the Balance Sheet as at 31stMarch 2016 and the Income and Expenditure Account for the year ended on that date.

viii) The Harrang Drainage Development Scheme has been physically completed as certified by ChiefEngineer (I&W) vide letter No.BB/CE(I&W)/109/204/Pt.-I/1060-67 dt. 08.06.2011. Due to non-finalisationof some liabilities, the entire work of Harrang Scheme could not be capitalized as fixed assets andaccordingly shown under Capital Work in Progress. However, on finalisation of the liabilities, thesame would be capitalized.

ix) East of Barpeta Drainage Development Scheme which was depicted as Capital Work in Progressin Schedule-3 under the nomenclature 'Execution of Drainage Development Scheme' has beentransferred from Capital Work in Progress to "Misc. Capital Project: East of Barpeta" as the schemewas handed over to Govt. of Assam on its completion for maintenance purpose as intimated bySuperintending Engineer, Guwahati Circle vide letter No. BB/GC/T-242/11/4730 Dt. 16.08.12 andshown in Schedule -3( C ).

x) Adjustment regarding loss on sale of assets under Buy Back system, was shown in Schedule 11 forRs. 24,728.69 under the Head "Loss on Sale of Assets".

(A. Barooah)Accounts Officer

(N. N. Deka) Sr. Accounts Officer

148

Page 83: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

BR

AHM

APU

TRA

BO

ARD

CO

NTR

IBU

TOR

Y PR

OVI

DEN

T FU

ND

TR

UST

BA

LAN

CE

SHEE

T A

S A

T 31

ST M

AR

CH

'201

6

(Fi

gure

s in

Rup

ees)

Prev

ious

Yea

r

C

urre

nt Y

ear

Prev

ious

Yea

r

C

urre

nt Y

ear

as a

t 31s

tC

APIT

AL &

LIA

BIL

ITIE

S

a

s at

31s

t Mar

ch'2

016

as a

t 31s

tAS

SETS

as

at 3

1st M

arch

'201

6M

arch

'201

5M

arch

'201

5

21,8

81,9

43.1

2

EMPL

OYE

ES C

ON

TRIB

UTI

ON

6,65

9,15

6.12

INVE

STM

ENT :

179,

993,

060.

52EM

PLO

YER

'S C

ON

TRIB

UTI

ON

177,

097,

855.

52

627,

427,

772.

00

i) F

ixed

Dep

osit

with

Ban

k67

7,59

0,42

2.00

119,

855,

192.

66VO

LUN

TAR

Y C

ON

TRIB

UTI

ON

145,

234,

076.

66

67,9

40,5

93.2

8

ii) In

tere

st A

ccru

ed o

n Fi

xed

Dep

osit

42,5

16,9

23.5

1

CU

RR

ENT

LIAB

ILIT

IES

AND

4,66

0,09

3.84

LOAN

S AN

D A

DVA

NC

ES T

O

PRO

VISI

ON

:SU

BSC

RIB

ERS

4,52

0,65

8.84

335,

946,

160.

00

Inte

rest

Pay

able

to S

ubsc

riber

s35

0,36

9,47

6.00

CAS

H A

T B

ANK

:

49,4

47,8

00.8

8

EXC

ESS

OF

INC

OM

E O

VER

4,14

7,94

8.57

i) U

nion

Ban

k of

Indi

a7,

936,

106.

20

EXPE

ND

ITU

RE

54,6

88,9

23.7

4

2,94

7,74

9.49

ii) ID

BI B

ank

1,48

5,37

7.49

707,

124,

157.

18

TOTA

L:73

4,04

9,48

8.04

707,

124,

157.

18

TOTA

L:73

4,04

9,48

8.04

B

RAH

MAP

UTR

A B

OAR

D ::

GU

WAH

ATI-2

9

Juni

or A

ccou

ntan

tEx

ecut

ive

Offi

cer

Brah

map

utra

Boa

rd C

PF Tr

ust

Cha

irman

Bra

hmap

utra

Boa

rd C

PF Tr

ust

149

Page 84: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

BR

AHM

APU

TRA

BO

ARD

:: G

UW

AHAT

I-29

B

RAH

MAP

UTR

A B

OAR

D C

ON

TRIB

UTO

RY

PRO

VID

ENT

FUN

D T

RU

STIN

CO

ME

AN

D E

XPEN

DIT

UR

E A

CC

OU

NT

FOR

TH

E YE

AR

EN

DED

ON

31S

T M

AR

CH

'201

6

(

Figu

res

in R

upee

s)AS

ON

A

S O

NAS

ON

AS O

N31

ST M

ARC

H'1

5EX

PEN

DIT

UR

E

31S

T M

ARC

H'1

631

ST M

ARC

H'1

5IN

CO

ME

3

1ST

MAR

CH

'16

50,8

17,7

07.0

0

TO IN

TER

EST

PAYA

BLE

TO

BY

INTE

RES

T FR

OM

BAN

K:

S

UB

SCR

IBER

S55

,864

,136

.00

56

3,13

7.00

i)

Sav

ing

Ban

k A/

C86

2,68

1.00

955.

00

TO B

ANK

CH

ARG

ES1,

075.

00

57

,540

,125

.00

ii)

Fix

ed D

epos

it R

ecei

pt60

,243

,652

.86

7,

284,

600.

00

TO

EXC

ESS

OF

INC

OM

E O

VER

E

XPEN

DIT

UR

E C

ARR

IED

O

VER

TO

BAL

ANC

E SH

EET

5,24

1,12

2.86

58,1

03,2

62.0

0

TOTA

L:61

,106

,333

.86

58

,103

,262

.00

TO

TAL:

61,1

06,3

33.8

6

Juni

or A

ccou

ntan

tEx

ecut

ive

Offi

cer

Brah

map

utra

Boa

rd C

PF Tr

ust

Cha

irman

Bra

hmap

utra

Boa

rd C

PF Tr

ust

150

Page 85: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

B

RAH

MAP

UTR

A B

OAR

D ::

GU

WAH

ATI

-29

B

RAH

MAP

UTR

A B

OAR

D C

ON

TRIB

UTO

RY

PRO

VID

ENT

FUN

D T

RU

ST

REC

EIPT

S A

ND

PA

YMEN

TS A

CC

OU

NT

FOR

TH

E YE

AR

EN

DED

ON

31S

T M

AR

CH

'201

6

(F

igur

es in

Rup

ees)

AS

ON

AS

ON

AS O

N

AS

ON

31ST

MAR

CH

'15

REC

EIPT

S

31S

T M

ARC

H'1

631

ST M

ARC

H'1

5PA

YMEN

TS

31S

T M

ARC

H'1

6

TO O

PEN

ING

BAL

ANC

E :27

,417

,506

.00

B

Y EM

PLO

YEES

CO

NTR

IBU

TIO

N:

2,63

2,65

6.34

i) C

ash

at B

ank

(UBI

) 4,

147,

948.

57

i)

Em

ploy

ees

Par

t-With

draw

al12

,360

,770

.00

1,09

4,63

7.49

ii) C

ash

at B

ank

(IDB

I Ban

k)2,

947,

749.

49

ii)

Fin

al S

ettle

men

t of C

PF

20,5

83,2

43.0

0

32,9

44,0

13.0

0

17,1

63,7

81.0

0

TO E

MPL

OYE

ES C

ON

TRIB

UTI

ON

:9,

112,

606.

00

B

Y EM

PLO

YER

'S C

ON

TRIB

UTI

ON

20,5

73,0

80.0

0

i) F

rom

Bra

hmap

utra

Boa

rd17

,661

,475

.00

6,

276,

249.

00

B

Y VO

LUN

TAR

Y C

ON

TRIB

UTI

ON

20,5

53,3

86.0

0

ii) F

rom

oth

er o

rgan

isat

ion

59,7

51.0

0

17

,721

,226

.00

5,

333,

000.

00

B

Y LO

ANS

AN

D A

DVA

NC

ES T

O

17,1

10,1

59.0

0

TO E

MPL

OYE

R'S

CO

NTR

IBU

TIO

N:

S

UB

SCR

IBER

S5,

643,

400.

00

i) F

rom

Bra

hmap

utra

Boa

rd17

,651

,312

.00

38

3,62

1,50

4.00

BY

FIXE

D D

EPO

SIT

WIT

H B

AN

K60

7,69

9,00

0.00

ii) F

rom

oth

er o

rgan

isat

ion

26,5

63.0

0

17

,677

,875

.00

15

,812

,956

.00

B

Y IN

TER

EST

PAID

TO

SU

BSC

RI-

36,9

90,4

00.0

0

TO V

OLU

NTA

RY

CO

NTR

IBU

TIO

N45

,932

,270

.00

BER

S O

N F

INAL

SET

TLEM

ENT

41,4

40,8

20.0

0

6,48

0,58

0.00

TO A

DVA

NC

E R

ECO

VER

Y FR

OM

955.

00

BY

BA

NK

CH

ARG

ES1,

075.

00

S

UB

SCR

IBER

S5,

782,

835.

00

B

Y C

LOSI

NG

BAL

AN

CE:

318,

880,

956.

00TO

EN

CAS

HM

ENT

OF

FIXE

D4,

147,

948.

57

i)

Cas

h at

Ban

k (U

BI)

7,93

6,10

6.20

D

EPO

SIT

557,

536,

350.

00

2,94

7,74

9.49

ii) C

ash

at B

ank

(IDBI

Ban

k)1,

485,

377.

49

54,3

17,3

04.2

3

TO IN

TER

EST

FRO

M B

ANK

:

i) S

avin

g B

ank

A/C

862,

681.

00

ii) F

ixed

Dep

osit

Rec

eipt

85,6

67,3

22.6

3

86,5

30,0

03.6

3

454,

670,

474.

06

TOTA

L:73

8,27

6,25

7.69

454,

670,

474.

06TO

TAL:

738,

276,

257.

69

Juni

or A

ccou

ntan

tEx

ecut

ive

Offi

cer

Brah

map

utra

Boa

rd C

PF Tr

ust

Cha

irman

Bra

hmap

utra

Boa

rd C

PF Tr

ust

151

Page 86: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

Separate Audit Report on the Accounts of theBrahmaputra Board, Guwahati, Assam

for the year 2015-16

‚àÿ◊fl ¡ÿÃ

Page 87: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

Page 88: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

152

Separate Audit Report of the Comptroller and Auditor General of India on theAccounts of Brahmaputra Board. Guwahati for the ended 31st March 2016.

1. We have audited the attached Balance Sheet of Brahmaputra Board Guwahati as at 31st March2016 and the ‘Income and Expenditure Account/Receipts and Payment Account’ for the year endedon that date under Section 19(2) of the Comptroller and Auditor General’s (Duties, Powers andConditions of Service) Act 1971 read with Brahmaputra Board Act. 1980 (No 46 of 1980). Thesefinancial statements include the accounts of the Board and its 16 Division Circle Liaison Officeincluding Board. These financial statements are the responsibility of the Brahmaputra Board’smanagement. Our responsibility is to express an opinion on these financial statements based on ouraudit.

2. This Separate Audit Report contains the comments of the Comptroller and Auditor General of India(CAG) on the accounting treatment only with regard to classification, conformity with the bestaccounting practices, accounting standards and disclosure norms. etc. Audit observations onfinancial transactions with regard to compliance with the Law, Rules and Regulations (Proprietyand Regularity) and efficiency cum-performance aspects. etc., if any are reported through InspectionReports/CAG’s Audit separately.

3. We have conducted our audit in accordance with the auditing standards generally accepted inIndia. These standards require that we plan and perform the audit to obtain reasonable assuranceabout whether the financial statements are free from material misstatements. An audit includesexamining, on a test basis, evidences supporting the amounts and disclosure in the financialstatements. An audit also includes assessing the accounting principles used and significant estimatesmade by management, as well as evaluating the overall presentation of financial statements. Webelieve that our audit provides a reasonable basis for our opinion.

4. Based on our audit, we report that :i. We have obtained all the information and explanations, which to the best of our knowledge

and belief were necessary for the purpose of our audit.ii. The Balance Sheet and Income and Expenditure Account/Receipt and Payment Account dealt

with by this report have been drawn up in the format approved by the Ministry of Finance,New Delhi.

iii. In our opinion, proper books of accounts and other relevant records have been maintainedby the Brahmaputra Board, Guwahati as required under Section 19 (2) of the BrahmaputraBoard Act in so far as it appears from our examination of such books.

iv. We further report that :A. Balance SheetFixed Assets (Schedule-3)

During consolation of depreciation of different divisions Brahmaputra Board had taken depreciationof Guwahati Division as `2,56,190.12 instead of `2,42,539.36. Thus resulted overstatement ofdepreciation of Guwahati Division `13650.76 (`2,56,190.12 minus `2,42,539.36

B. Income and Expenditure AccountB.1 Expenditure

An amount of `3.96 lakh towards electricity/telephone/Establishment bill though pertaining to theyear 2015-16. was incurred during the year 2016-17. The non-provisions for electricity/telephone/

Page 89: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

153

Establishment bill for the year 2015-16. This resulted the understatement of Expenditure and currentliabilities by `3.96 lakh.

B2. Misclassification of AccountsScrutiny of Schedule -11 of Annual Accounts for the year 2015-16 revealed that sub-head ‘insurance’under head ‘Other Administrative Expenses etc. was shown as “nil” however scrutiny of annualaccounts of Nagaon Division, Nagaon there was an expenditure of insurance of `13744.00 whichwas shown under Repair and Maintenance (R&M) of Assets instead of showing it in ‘insurance’ sub-head.

B.3 General commentsNo provision for retirement benefits were made on the basis of actuarial valuation as prescribes inAS-15.

C. Grants-in-aidThe Board received plan funds aggregating ̀ 88.09 crore (including ̀ 9.94 crore unspent balance ofprevious year) during the year 2015-16. Out of ̀ 88.09 crore, the Board had incurred an expenditureof `84.31 during the period 2015-16 and balance of `3.78 crore was available at the Board during2015-16.

D. Management letterDeficiencies which have not been included in the Audit Report have been brought to the notice ofthe Chairman, Brahmaputra Board, Guwahati through a management letter issued separately forremedial/ corrective action.i. Subject to our observations in the preceding paragraphs, we report that the Balance Sheet

and Income and Expenditure Account/Receipt and Payment Account dealt with by this reportare in agreement with the books of accounts.

ii. In our opinion and to the best of our information and according to the explanations given tous, the said financial statements read together with the Accounting Policies and Notes onAccounts, and subject to the significant matters stated above and other matters mentionedin Annexure to this Audit report give a true and fair view in conformity with accounting principlesgenerally accepted in India.

a. In so far as it relates to the Balance Sheet, of the state of affairs of the Brahmaputra Board asat 31 March 2016.

b. In so far as it relates to Income and Expenditure Account of the deficit for the year ended onthat date.

Place : New Delhi

For and on behalf of the C&AG of India

Director General of Audit (SD)

Page 90: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

Annexure-I to Audit Report

154

���

1. Inadequacy of Internal Audit System The internal audit system was inadequate. The internal audit of Brahmaputra Board was conductedupto March 2016 in respect of 6 field units out of the 16 units and there were total 192 paras were lyingunsettled in respect of 10 units as on 31.03.2016.

2. Internal control systemIt was observed that no surprise check of the cash is being carried out by the Board as per Receiptand Payments rules. There is no Management Information System available in the Board. Also there isno I.T. controls in place in the entity. Further physical verification of consumable item was not conductedregularly.

3. System of Physical Verification of Fixed assetsPhysical verification of fixed assets has been conducted upto 2015-16.

4. System of Physical Verification of inventoryPhysical Verification of consumable items was not conducted for the year 2015-16.

5. Regularity in payment of Statutory duesNo observation found in respect of regularity in payment of Statutory dues.

Director General of Audit (SD)

Page 91: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

Page 92: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

ANNEXURES

Page 93: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

Page 94: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

ANNEXURE - I

Composition of the Board Appointed Under Clause - A, B, C, D and E of Sub-Section (3) of Section(4) of Brahmaputra Board Act (46 of 1980)

A Full Time MemberSl. No. Designation of members Name of members Tenure (As on 31.03.2016)

1 Chairman, Brahmaputra Board

Shri Narendra Kumar Shri Nikhilesh Jha, IAS

From 23.01.2015 to 06.10.2015 From 07.10.2015 to Till date

2 Vice Chairman, Brahmaputra Board

Shri Chaman Lal From 09.10.2015 to Till date

3 General Manager, Brahmaputra Board

Vacant Vacant from 01.07.2014

4 Financial Adviser, Brahmaputra Board

Shri Rajat Bhagarva, IAS From 09.10.2015 to Till date

B Part Time Member

Sl. No. Designation of member Representing State/Organization 1 Secretary to the Government of

Assam, Water Resources Department To represent the Government of Assam

2 Chief Engineer, PWD(R), Government of Meghalaya

To represent the Government of Meghalaya

3 Chief Engineer, Irrigation & Flood Control Department, Government of Nagaland.

To represent the Government of Nagaland

4 Chief Engineer, PWD (WR), Government of Tripura

To represent the Government of Tripura

5 Chief Engineer, Irrigation & Flood Control Department, Government of Manipur

To represent the Government of Manipur

6 Chief Engineer, Water Resources Department, Government of Arunachal Pradesh

To represent the Government of Arunachal Pradesh

7 Chief Engineer (Civil), Power and Electricity Department, Government of Mizoram

To represent the Government of Mizoram.

8 Financial Adviser, North Eastern Council, Shillong

To represent the North Eastern Council, Shillong

9 Joint Secretary, Soil Conservation and Land Resources, Ministry of Agriculture.

To represent the Ministry of Agriculture, Government of India

10 Commissioner (B&B), Ministry of Water Resources, Government of India

To represent the Ministry of Water Resources, Government of India

11 Financial Adviser, Ministry of Water Resources, Government of India

To represent the Ministry of Finance, Government of India

155

Page 95: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

Sl. No. Designation of member Representing State/Organization 12 Joint Secretary (H), Ministry of Power,

Government of India To represent the Ministry of Power, Government of India

13 Chief Engineer, Inland Waterways Authority of India, Government of India

To represent the Ministry of Surface Transport, Government of India,

14 Member (RM), Central Water Commission

To represent the Central water Commission

15 Member (HE), Central Electricity Authority

To represent the Central Electricity Authority

16 Deputy Director General, GeologicalSurvey of India , North Eastern Region

To represent the Geological Survey of India

17 Director General of Meteorology, India Meteorological Department, Government of India

To represent the India Meteorological Department, Government of India

C Special Invitee

1 The Adviser (NE), NITI AYOG, Yojana Bhawan, Sansad Marg, New Delhi

2 The Chief Engineer (B & BBO), Central Water Commission, Shillong

3 The Secretary, Irrigation and Waterways Department, Government of West Bengal, Jalasampad Bhawan, Salt Lake, Kolkata

4 The Secretary, Water Resources & River Development Department, Government of Sikkim, Gangtok

5 The Secretary, Department of Development of North Eastern Region (DoNER), Vigyan Bhawan Annex, Maulana Azad Road, New Delhi

156

Page 96: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

ANNEXURE-II

Composition of the High Powered Review Board Appointed by the Government of India Vide ResolutionNo. 2(17)/80-FC/460 Dated 19th March, 1982 and as Amended Vide Resolution No. 23/8/92-ER/1798 Dated 1st

October, 1992

1 Union Minister for Water Resources Chairman

2 Chief Minister of Assam or a Cabinet Minister duly authorized by him Member

3 Chief Minister of Manipur or a Cabinet Minister duly authorized by him Member

4 Chief Minister of Meghalaya or a Cabinet Minister duly authorized by him Member

5 Chief Minister of Nagaland or a Cabinet Minister duly authorized by him Member

6 Chief Minister of Tripura or a Cabinet Minister duly authorized by him Member

7 Chief Minister of Mizoram or a Cabinet Minister duly authorized by him Member

8 Chief Minister of Arunachal Pradesh or a Cabinet Minister duly authorized by him Member

9 Union Minister / Minister of State for Finance Member

10 Minister of State for Water Resources Member

11 Union Minister / Minister of State for Energy Member

12 Union Minister / Minister of State for Agriculture. Member

13 Union Minister / Minister of State for Surface Transport Member

14 Secretary, Ministry of Water Resources, Government of India Member

15 Chairman, Central Water Commission Member

16 Chairman, Brahmaputra Board

Member-Secretary

17 Member (RM), Central Water Commission

Permanent Invitee

157

Page 97: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

AN

NEX

URE

-III

158

Page 98: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

Sl.

NoNa

me

of O

ffice

Grou

p A

Grou

p - B

Gr

oup

C

Tota

l (A+

B+C)

Al

l pos

ts in

PB-3

and

abo

ve

All p

osts

in PB

-2

All p

osts

in PB

-1

Sanc

tio-

ned

stren

gth

No.

in posi-

tion

SC

ST

OBC

PH

Sa

nctio

-ne

d str

engt

h

No. in

po

si-tio

n

SC

ST

OBC

PH

Sa

nctio

-ne

d str

engt

h

No. in

po

si-tio

n

SC

ST

OBC

PH

1 2

3 4

5 6

7 8

9 10

11

12

13

14

15

16

17

18

19

20

21

22

1

Boar

d's H

ead

quar

ters

offic

e inc

luding

Liai

son

offic

e

8 0

0 2

0

17

5 0

3 0

57

6

3 5

3

82

2F.A

's O

ffice

3

0 0

0 0

3

1 0

0 0

16

4

0 3

0

22

3CE

-I O

ffice

9

0 0

1 0

20

4

3 3

0

17

0 0

3 0

46

4CE

-II O

ffice

4

0 0

0 0

5

1 0

1 0

5

1 0

1 0

14

5 SE

(Fie

ld) o

ffice

s

5 1

0 2

0

7 0

0 4

0

22

3 1

5 0

34

6 EE

(Fie

ld) O

ffice

s

28

1 0

3 0

97

16

5

27

0

135

21

7 25

4

26

0

TOTA

L 82

57

2

0 8

0 18

1 14

9 27

8

38

0 36

5 25

2 35

11

42

7

628

458

AN

NEX

URE

-IV

Stat

emen

t of R

egul

ar S

anct

ione

d St

reng

th a

nd N

umbe

r in

Posit

ion

of O

ffice

rs /

Staf

f and

Fie

ld S

taff

alon

g w

ith th

e Po

sitio

n of

SC

/ ST

/ O

BC a

nd P

H as

on

01.0

4.20

16

159

Page 99: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

AN

NEX

URE

-IV (A

)

160

Page 100: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

ANNEXURE-V

List of Officers who attended training / Seminar / Workshop during the year 2015-2016

Sl.No

Name of Trainee Details of Seminer/Training/ Workshop/Course attended

Period and place of training

Whether SC/ST

1 2 3 4 5 1 Shri Shyamal Deka

Asstt. Executive Engineer Application of Remote Sensing of Geographical Information System in Water Resources Sector

22nd to 26th

February, 2016 at Pune

General

2 Shri Alemwati Longkumer Jr. Engineer

Application of Remote Sensing of Geographical Information System in Water Resources Sector

22nd to 26th

February, 2016 at Pune

ST

3 Shri Ranjit Deka Asstt. Executive Engineer

Course on Web Based Hydrological Softwares of NIH

16th to 20th

February, 2016 at Roorkee

General

4 Shri Bhaskar Chaudhury Asstt. Executive Engineer

Course on Web Based Hydrological Softwares of NIH

16th to 20th

February, 2016 at Roorkee

General

161

Page 101: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

ANNEXURE- VI

List of Officers on deputation to other organization(As on 31.03.2016)

Sl. No.

Name & designation Name of the Organization Period of deputation

1 Shri Dharanidhar Bharali

Jr. Engineer

N.F. Railway 19.12.2014

to

Till date

162

Page 102: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

ANNEXURE-VII

RTI Annual Return information system for the year 2015-2016

Ministry / Department / Organization: Brahmaputra Board, Basistha, Guwahati-29Year: 2015-2016 (Up to 31st March, 2016)

Progress Report in 2015-16 Opening

Balance As on01.04.2015

No. of application received during the year as transfer from other PAs

Received during the year (includingcases transferred to other Public Authority)

No. of cases transferred to other Public Authorities -U/S 6(3)

Decisions where requests/ appealsrejected

Decisions where requests/ appeals accepted

Requests Nil 29 16 1 Nil 40

First appeals

Nil Nil Nil Nil Nil Nil

No. of cases where disciplinary action taken against any Officer Nil

No. of CAPIOs designated No. of CPIOs designated No. of AAs designated 16 1 1

No. of items of various provisions invoked while rejecting requests Relevancy sections of RTI Act, 2005

Section 8 (1) Sections a b c d e f g h i j 9 11 24 Other

Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil

Amount of charges collected (in Rs.)

Registration fees Additional fees and any other charges

Penalties amount

150.00 210.00 Nil

163

Page 103: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)
Page 104: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)
Page 105: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)
Page 106: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Annual Report : 2015-16

Page 107: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)

Swachh Bharat Abhiyan campaign at HQ complex, Br. Board, Guwahati by officers & staff of Brahmaputra Board on 25.09.2015

Page 108: North Eastern Hydraulic and Allied Research Institute ...mowr.gov.in/sites/default/files/AR_BB_2015-16_English.pdf · North Eastern Hydraulic and Allied Research Institute (NEHARI)