NORTH HYKEHAM COMMUNITY HUB 2.2 CONTRACT SUM ANALYSIS 2.2.2 Elemental Detailed Costs Description Qty Unit Rate Total 0- (0-) FACILITATING WORKS 0A- (0.2) Site Clearance A Item 0.00 B Item 0.00 0A-T Total To Elemental Summary 0.00 1- (1-) SUBSTRUCTURE 1A- (1.1) Standard Foundations C m 0.00 D m 0.00 E m 0.00 F Pad foundations generally Nr 0.00 G Item 0.00 Any other item in connection with foundations the Contractor wishes to price - please insert 1A-T Total To Elemental Summary 0.00 Strip foundations; 600 wide Strip foundations; 450 wide Extra; removal of obstructions and contaminated material off site Excavate, remove surplus excavation; earthwork support; concrete, formwork and reinforcement; all as Engineer's Drawing 15409/300 Strip foundations; 750 wide General site clearance; removing debris, shrubs bushes and vegetation generally Removing topsoil; storing on adjacent site in spoil heaps; location & placing to be agreed with the Employer Contract Sum Analysis Page 1

Upload: others

Post on 14-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NORTH HYKEHAM COMMUNITY HUB 2.2 CONTRACT SUM ANALYSIS 2.2.2 Elemental …parishes.lincolnshire.gov.uk/Files/Parish/35/22_Contract... · 2016-02-03 · NORTH HYKEHAM COMMUNITY HUB

NORTH HYKEHAM COMMUNITY HUB

2.2 CONTRACT SUM ANALYSIS

2.2.2 Elemental Detailed Costs

Description Qty Unit Rate Total

0- (0-) FACILITATING WORKS

0A- (0.2) Site Clearance

AItem 0.00

B

Item 0.00

0A-T Total To Elemental Summary 0.00

1- (1-) SUBSTRUCTURE

1A- (1.1) Standard Foundations

C m 0.00

D m 0.00

E m 0.00

F Pad foundations generally Nr 0.00

GItem 0.00

Any other item in connection with

foundations the Contractor wishes

to price - please insert

1A-T Total To Elemental Summary 0.00

Strip foundations; 600 wide

Strip foundations; 450 wide

Extra; removal of obstructions and

contaminated material off site

Excavate, remove surplus excavation;

earthwork support; concrete, formwork and

reinforcement; all as Engineer's Drawing

15409/300

Strip foundations; 750 wide

General site clearance; removing debris,

shrubs bushes and vegetation generally

Removing topsoil; storing on adjacent site in

spoil heaps; location & placing to be agreed

with the Employer

Contract Sum Analysis Page 1

Page 2: NORTH HYKEHAM COMMUNITY HUB 2.2 CONTRACT SUM ANALYSIS 2.2.2 Elemental …parishes.lincolnshire.gov.uk/Files/Parish/35/22_Contract... · 2016-02-03 · NORTH HYKEHAM COMMUNITY HUB

NORTH HYKEHAM COMMUNITY HUB

2.2 CONTRACT SUM ANALYSIS

2.2.2 Elemental Detailed Costs

Description Qty Unit Rate Total

1C- (1.2) Lowest Floor Construction

A

m3 0.00

B

m2 0.00

CItem 0.00

D Item 0.00

Any other item in connection with

slab works the Contractor wishes to

price - please insert

1C-T Total To Elemental Summary 0.00

Reinforced concrete floor slab complete;

granular base; damp proof course;

reinforcement; formwork; surface finish;

joints

Excavate, remove surplus excavation;

earthwork support; concrete, formwork and

reinforcement; all as Engineer's Drawing

15409/301 (screed & insulation included

within finishes)

Extra; removal of obstructions and

contaminated material off site

Excavate to reduce levels; storing on

adjacent site in spoil heaps; location &

method to be agreed with the Employer

Extra; forming floor gulley to showers

Contract Sum Analysis Page 2

Page 3: NORTH HYKEHAM COMMUNITY HUB 2.2 CONTRACT SUM ANALYSIS 2.2.2 Elemental …parishes.lincolnshire.gov.uk/Files/Parish/35/22_Contract... · 2016-02-03 · NORTH HYKEHAM COMMUNITY HUB

NORTH HYKEHAM COMMUNITY HUB

2.2 CONTRACT SUM ANALYSIS

2.2.2 Elemental Detailed Costs

Description Qty Unit Rate Total

2- (2-) SUPERSTRUCTURE

2A- (2.1) Frame

A columns t 0.00

B beams t 0.00

C

t 0.00

D fittings/fixings and the like t 0.00

E m2 0.00

Fm2 0.00

GItem 0.00

H JJI 300C engineered timber joists m 0.00

J JJI 300D engineered timber joists m 0.00

KFixing noggins at 1000 centres as

roof bearers m2 0.00

L 12 plywood decking m2 0.00

M Item 0.00

Any other item in connection with

structural works the Contractor

wishes to price - please insert

2A-T Total To Elemental Summary 0.00

Sundry fixings straps infill pieces etc

protection to steel frame; exposed

protection to steel frame; hidden; 2 costs

asphaltic compound

Structural steelwork generally; as Engineer's

Drawing 15409/302, 303 & 304

hollow section, angle and channel section;

secondary steelwork, wind posts etc

Structural timbers generally; as Engineer's

Drawing 15409/302, 303 & 304

structural timbers generally; wall plates,

fixing noggins, cantilever frames etc

Contract Sum Analysis Page 3

Page 4: NORTH HYKEHAM COMMUNITY HUB 2.2 CONTRACT SUM ANALYSIS 2.2.2 Elemental …parishes.lincolnshire.gov.uk/Files/Parish/35/22_Contract... · 2016-02-03 · NORTH HYKEHAM COMMUNITY HUB

NORTH HYKEHAM COMMUNITY HUB

2.2 CONTRACT SUM ANALYSIS

2.2.2 Elemental Detailed Costs

Description Qty Unit Rate Total

2B- (2.2) Upper Floors

A Not applicable 0 m2 0.00 0.00

2B-T Total To Elemental Summary 0.00

2C- (2.3) Roof

B

m2 0.00

C Edge/junction detail; eaves m 0.00

D Edge/junction detail; abutment m 0.00

E Edge/junction detail; gable m 0.00

Fm 0.00

G

m 0.00

Any other item in connection with

roof finishes the Contractor wishes

to price - please insert

2C-T Total To Elemental Summary 0.00

2D- (2.4) Stairs and Ramps

L Not applicable 0 m2 0.00 0.00

2D-T Total To Elemental Summary 0.00

Rainwater installations; gutters; fittings and

fixings; as specification R10.311

Roof finish, stucco embossed aluminium

standing seam roofing system complete; as

specification H31.110; insulation

Rainwater installations; pipes, flush joint

aluminium; fittings and fixings; as

specification R10.370

Contract Sum Analysis Page 4

Page 5: NORTH HYKEHAM COMMUNITY HUB 2.2 CONTRACT SUM ANALYSIS 2.2.2 Elemental …parishes.lincolnshire.gov.uk/Files/Parish/35/22_Contract... · 2016-02-03 · NORTH HYKEHAM COMMUNITY HUB

NORTH HYKEHAM COMMUNITY HUB

2.2 CONTRACT SUM ANALYSIS

2.2.2 Elemental Detailed Costs

Description Qty Unit Rate Total

2E- (2.5) External Walls

A

m 0.00

B

m2 0.00

C

m2 0.00

D

m2 0.00

E Blockwork inner lining to cladding m2 0.00

FItem 0.00

G

m2 0.00

Masonry walls; external leaf; plain insitu

concrete cavity fill; insulation; inner leaf; to

damp proof course level

Masonry walls; facings as specification

F10.110; insulation as specification

P10.240; 200 blockwork inner leaf complete

as specification F10.260; above damp proof

course; inclusive of works to openings;

lintels as Engineer's Drawing 15409/302;

cills, jambs; damp proof courses, cavity

closer & insulation

Cedar cladding; insulation and structural

support; flashings, trims and the like; as

specification K13.110

Masonry walls; facings as specification

F10.110; in attached piers to front elevation

Masonry support generally; Ancon MDCR as

Engineer's Drawing 15409/302

Masonry walls; facings as specification

F10.110; insulation as specification

P10.240; 140 blockwork inner leaf complete

as specification F10.260; above damp proof

course; inclusive of works to openings;

lintels as Engineer's Drawing 15409/302;

cills, jambs; damp proof courses, cavity

closer & insulation

Contract Sum Analysis Page 5

Page 6: NORTH HYKEHAM COMMUNITY HUB 2.2 CONTRACT SUM ANALYSIS 2.2.2 Elemental …parishes.lincolnshire.gov.uk/Files/Parish/35/22_Contract... · 2016-02-03 · NORTH HYKEHAM COMMUNITY HUB

NORTH HYKEHAM COMMUNITY HUB

2.2 CONTRACT SUM ANALYSIS

2.2.2 Elemental Detailed Costs

Description Qty Unit Rate Total

(2.5) External Walls (Continued)

A generally; varying widths m2 0.00

B

Item 0.00

Any other item in connection with

external walls the Contractor wishes

to price - please insert

2E-T Total To Elemental Summary 0.00

PPC aluminium portico as door

surround; 3 thick; supports; flashings;

secret fixings; as specification H31.120

Soffit Cladding as Drawing 8201; soffits

complete; suspension system; board; trims

and flashings; battens; as specification

M20.100

Contract Sum Analysis Page 6

Page 7: NORTH HYKEHAM COMMUNITY HUB 2.2 CONTRACT SUM ANALYSIS 2.2.2 Elemental …parishes.lincolnshire.gov.uk/Files/Parish/35/22_Contract... · 2016-02-03 · NORTH HYKEHAM COMMUNITY HUB

NORTH HYKEHAM COMMUNITY HUB

2.2 CONTRACT SUM ANALYSIS

2.2.2 Elemental Detailed Costs

Description Qty Unit Rate Total

2F- (2.6) Windows & External Doors

A GFEX - W01, - 08 Nr 0.00

B GFEX - W09 -14 Nr 0.00

C Nr 0.00

D Extra; double doors; GFEX D03 Nr 0.00

E Nr0.00

F Nr 0.00

G Nr 0.00

H

Nr 0.00

Jm 0.00

K Blinds; as specification N10.230 Item 0.00

Any other item in connection with

windows and external doors the

Contractor wishes to price - please

insert

2F-T Total To Elemental Summary 0.00

Windows, louvres and doors; frames,

glazing; ironmongery; sealing at perimeter;

As Architect's Drawing SH-A-0001 and

specification L10.160

Window board; as specification P20.202;

decorations

External door; single doors to rear entrance;

GFEX 04; as specification L20.500

Glazing at high level; 4510 wide; CW-03

Glazing to rear elevation; 4510 wide; CW-01

& 02

Extra; double doors; GFEX D01 & D02

Glazing to front elevation; 3217 wide

Contract Sum Analysis Page 7

Page 8: NORTH HYKEHAM COMMUNITY HUB 2.2 CONTRACT SUM ANALYSIS 2.2.2 Elemental …parishes.lincolnshire.gov.uk/Files/Parish/35/22_Contract... · 2016-02-03 · NORTH HYKEHAM COMMUNITY HUB

NORTH HYKEHAM COMMUNITY HUB

2.2 CONTRACT SUM ANALYSIS

2.2.2 Elemental Detailed Costs

Description Qty Unit Rate Total

2G- (2.7) Internal Walls & Partitions

Blockwork; as specifications F10.250 & 260

A Blockwork; 100 thick m2 0.00

B m2 0.00

C m2 0.00

D Blockwork; 140 thickm2 0.00

E m2 0.00

F m2 0.00

GExtra; lintels as Engineer's

drawings 15409/302Item 0.00

H Movement joints Item 0.00

J

m2 0.00

K

m2 0.00

L

m2 0.00

Mm2 0.00

2G-T Total To Elemental Summary 0.00

Blockwork; 140 thick; fair faced one side

Blockwork; 140 thick; fair faced both sides

Blockwork; 100 thick; fair faced both sides

Blockwork; 100 thick; fair faced one side

Any other item in connection with internal

walls the Contractor wishes to price - please

insert

Partitions; wall type 2; as specification

K10.127B; plaster skim as specification

K10.681A

Internal walls; as Architect's Drawing 6301; all trims

fixings and the like

Partitions; IPS panelling; as specification

K32.150

Partitions; wall type 1; as specification

K10.127A; skim coat plaster as specification

K10.681A

Partitions; wall type 3; as specification

K10.156A; plaster skim as specification

K10.681A

Contract Sum Analysis Page 8

Page 9: NORTH HYKEHAM COMMUNITY HUB 2.2 CONTRACT SUM ANALYSIS 2.2.2 Elemental …parishes.lincolnshire.gov.uk/Files/Parish/35/22_Contract... · 2016-02-03 · NORTH HYKEHAM COMMUNITY HUB

NORTH HYKEHAM COMMUNITY HUB

2.2 CONTRACT SUM ANALYSIS

2.2.2 Elemental Detailed Costs

Description Qty Unit Rate Total

2H- (2.8) Internal Doors

A GFINT-D001 Nr 0.00

B GFINT-D002 Nr 0.00

C GFINT-D003 Nr 0.00

D GFINT-D004 Nr 0.00

E GFINT-D005 Nr 0.00

F GFINT-D006 Nr 0.00

G GFINT-D007 Nr 0.00

H GFINT-D008 Nr 0.00

J GFINT-D009Nr 0.00

K GFINT-D010Nr 0.00

L GFINT-D011Nr 0.00

M GFINT-D012Nr 0.00

N GFINT-D013Nr 0.00

P GFINT-D014Nr 0.00

Q GFINT-D015Nr 0.00

R GFINT-D016Nr 0.00

S GFINT-D017Nr 0.00

T GFINT-D018Nr 0.00

U GFINT-D019Nr 0.00

V GFINT-D020Nr 0.00

W GFINT-D021Nr 0.00

X GFINT-D022Nr 0.00

Y

Nr 0.00

ZRoller shutter doors to kitchen; as

specification L20.310 Nr 0.00

Doors; frames and architraves, glazing;

ironmongery; as Drawing SH-A-00002; as

specifications L20.430 & L10.150

Sliding folding partitions; to club room;

incorporating single pass door; GFINT-

D023; as specification L20.540

Contract Sum Analysis Page 9

Page 10: NORTH HYKEHAM COMMUNITY HUB 2.2 CONTRACT SUM ANALYSIS 2.2.2 Elemental …parishes.lincolnshire.gov.uk/Files/Parish/35/22_Contract... · 2016-02-03 · NORTH HYKEHAM COMMUNITY HUB

NORTH HYKEHAM COMMUNITY HUB

2.2 CONTRACT SUM ANALYSIS

2.2.2 Elemental Detailed Costs

Description Qty Unit Rate Total

(2.8) Internal Doors (Continued)

A GFINT - W25; 910 x 2260 Nr 0.00

B Decorations to doors generally Item 0.00

Any other item in connection with

internal doors the Contractor wishes

to price - please insert

2H-T Total To Elemental Summary 0.00

Windows, louvres and doors; frames,

glazing; ironmongery; sealing at perimeter;

As Architect's Drawing SH-A-0001

Contract Sum Analysis Page 10

Page 11: NORTH HYKEHAM COMMUNITY HUB 2.2 CONTRACT SUM ANALYSIS 2.2.2 Elemental …parishes.lincolnshire.gov.uk/Files/Parish/35/22_Contract... · 2016-02-03 · NORTH HYKEHAM COMMUNITY HUB

NORTH HYKEHAM COMMUNITY HUB

2.2 CONTRACT SUM ANALYSIS

2.2.2 Elemental Detailed Costs

Description Qty Unit Rate Total

3- (3-) FINISHINGS

3A- (3.1) Wall Finishes

Am2 0.00

BDecorations to walls; emulsion paint

as specification M60.110 m2 0.00

CDecorations to walls; mopuld

resistant paint as specification

M60.115m2 0.00

D

m2 0.00

Em2 0.00

Any other item in connection with

wall finishes the Contractor wishes

to price - please insert

3A-T Total To Elemental Summary 0.00

Whiterock; as specification N11.420; in

splash backs to kitchen

Two coat plaster work to walls; to blockwork

base; as specification K10.220

Ceramic wall tiles; fixing with adhesive;

grouting and trims as required; showers; as

specification M40.113

Wall finishes as Drawing 8601; complete;

trims, beading

Contract Sum Analysis Page 11

Page 12: NORTH HYKEHAM COMMUNITY HUB 2.2 CONTRACT SUM ANALYSIS 2.2.2 Elemental …parishes.lincolnshire.gov.uk/Files/Parish/35/22_Contract... · 2016-02-03 · NORTH HYKEHAM COMMUNITY HUB

NORTH HYKEHAM COMMUNITY HUB

2.2 CONTRACT SUM ANALYSIS

2.2.2 Elemental Detailed Costs

Description Qty Unit Rate Total

3B- (3.2) Floor Finishes

Am2 0.00

Bm2 0.00

Cm2 0.00

Dm2 0.00

E Carpet; as specification M50.130 m2 0.00

F Carpet; as specification M50.140 m2 0.00

G m2 0.00

H m2 0.00

J m2 0.00

K Tile skirtings generally m 0.00

Lm2 0.00

M m2 0.00

N m2 0.00

P m2 0.00

Qm 0.00

3B-T Total To Elemental Summary 0.00

Any other item in connection with floor

finishes the Contractor wishes to price -

please insert

Timber skirtings generally; 75 x 15, as

specification P20.200; decoration

Screed 115 thick; to insulation base;

generally; as specification M10.130

Insulation, 115 thick to ground floor slab;

generally; as specification P10.230

Entrance barrier; external; as specification

M50.170

Floor finishes as Drawing 8401; levelling

screed, trims and accessories as required

Insulation, 115 thick to ground floor slab; in

connection with under floor heating

Screed 115 thick; to insulation base; in

connection with under floor heating

Entrance barrier; internal; as specification

M50.160

Timber flooring; as specification K21.111

Ceramic Tile; as specification M40.110

Ceramic Tile; as specification M40.111

Ceramic Tile; as specification M40.112

Linoleum; as specification M50.150

Contract Sum Analysis Page 12

Page 13: NORTH HYKEHAM COMMUNITY HUB 2.2 CONTRACT SUM ANALYSIS 2.2.2 Elemental …parishes.lincolnshire.gov.uk/Files/Parish/35/22_Contract... · 2016-02-03 · NORTH HYKEHAM COMMUNITY HUB

NORTH HYKEHAM COMMUNITY HUB

2.2 CONTRACT SUM ANALYSIS

2.2.2 Elemental Detailed Costs

Description Qty Unit Rate Total

3C- (3.3) Ceiling Finishes

Am2 0.00

Bm2 0.00

Cm2 0.00

Dm2 0.00

Em2 0.00

F Item 0.00

Gm2 0.00

Hm2 0.00

Any other item in connection with

ceiling finishes the Contractor

wishes to price - please insert

3C-T Total To Elemental Summary 0.00

Extra; access, bulkheads, fire barriers

Ceiling finishes as Drawing 8201; ceilings

complete; suspension system; board; trims

battens

Moisture resistant plasterboard Type 2;

flat; as specification 226B

Moisture resistant plasterboard Type 5;

sloping; as specification K13.226E

Standard plasterboard; Type 3; sloping; as

specification K13.226C

Standard plasterboard; Type 4; sloping; as

specification K13.226D

Standard plasterboard; Type 1; flat; as

spoecification K13.226A

Moisture resistant paint to ceilings as

specification M60,115

Emulsion paint to ceilings as specification

M60,110

Contract Sum Analysis Page 13

Page 14: NORTH HYKEHAM COMMUNITY HUB 2.2 CONTRACT SUM ANALYSIS 2.2.2 Elemental …parishes.lincolnshire.gov.uk/Files/Parish/35/22_Contract... · 2016-02-03 · NORTH HYKEHAM COMMUNITY HUB

NORTH HYKEHAM COMMUNITY HUB

2.2 CONTRACT SUM ANALYSIS

2.2.2 Elemental Detailed Costs

Description Qty Unit Rate Total

4-

4A- (4.1) Fittings

A Item 0.00

B Item 0.00

CItem 0.00

DNr 0.00

ENr 0.00

FNr 0.00

GNr 0.00

H Mirrors; as specification N10.240 Nr 0.00

J Mirrors; as specification N10.250 Nr 0.00

K base units Nr 0.00

L wall units Nr 0.00

M worktops Nr 0.00

N custom made units Nr 0.00

P oven Nr 0.00

Q Signage - internal Item 0.00

R Signage -external Item 0.00

Signage generally; as specification N14

Kitchen units; as specification N11; battens,

bearers, fixings generally; sealant

Storage units: as specification N10.120

Notice boards; as specification N10.195

Spur shelving to cleaners; as specification

N10.160

Benches to changing rooms; as specification

N10.170

(4-) FITTINGS, FURNISHINGS &

EQUIPMENT

Coat hooks to changing rooms; as

specification N10.210

Baby change unit; as specification N10.220

Lockers to changing rooms; as specification

N10.200

Contract Sum Analysis Page 14

Page 15: NORTH HYKEHAM COMMUNITY HUB 2.2 CONTRACT SUM ANALYSIS 2.2.2 Elemental …parishes.lincolnshire.gov.uk/Files/Parish/35/22_Contract... · 2016-02-03 · NORTH HYKEHAM COMMUNITY HUB

NORTH HYKEHAM COMMUNITY HUB

2.2 CONTRACT SUM ANALYSIS

2.2.2 Elemental Detailed Costs

Description Qty Unit Rate Total

(4.1) Fittings (Continued)

A generally Item 0.00

B signage; as Drawing Nr 06302 Item 0.00

Any other item in connection with

fittings the Contractor wishes to

price - please insert

4A-T Total To Elemental Summary 0.00

Fire fighting equipment; as specification

N17; pattresess, fixings and the like

Contract Sum Analysis Page 15

Page 16: NORTH HYKEHAM COMMUNITY HUB 2.2 CONTRACT SUM ANALYSIS 2.2.2 Elemental …parishes.lincolnshire.gov.uk/Files/Parish/35/22_Contract... · 2016-02-03 · NORTH HYKEHAM COMMUNITY HUB

NORTH HYKEHAM COMMUNITY HUB

2.2 CONTRACT SUM ANALYSIS

2.2.2 Elemental Detailed Costs

Description Qty Unit Rate Total

5- (5-) SERVICES

5A- (5.1) Sanitary Installations

ANr 0.00

B Wc's; as specification N13.300 Nr 0.00

CNr 0.00

DNr 0.00

ENr 0.00

FNr 0.00

GNr 0.00

HNr 0.00

JNr 0.00

KNr 0.00

LNr 0.00

M Nr 0.00

PNr 0.00

5A-T Total To Elemental Summary 0.00

Cleaner's sink; taps; as specification

N13.330

Any other item in connection with sanitary

fittings the Contractor wishes to price -

please insert

Wash hand basin; taps; as specification

N13.310

Disabled wc area; as specification N13.320

Sanitary towel dispensers; as specification

N13.370

Soap dispensers; as specification N13.380

Disabled shower area; as specification

N13.340

Sink & single drainer as specification

N11.340

Toilet brush holders; as specification

N13.385

Waste bins; as specification N13.390

Showers to officials; as specification

N13.350

Showers to changing rooms; as specification

N13.350

Paper towel dispensers; as specification

N13.360

Contract Sum Analysis Page 16

Page 17: NORTH HYKEHAM COMMUNITY HUB 2.2 CONTRACT SUM ANALYSIS 2.2.2 Elemental …parishes.lincolnshire.gov.uk/Files/Parish/35/22_Contract... · 2016-02-03 · NORTH HYKEHAM COMMUNITY HUB

NORTH HYKEHAM COMMUNITY HUB

2.2 CONTRACT SUM ANALYSIS

2.2.2 Elemental Detailed Costs

Description Qty Unit Rate Total

5B- (5.2) Services Equipment

A Item 0.00

5B-T Total To Elemental Summary 0.00

5C- (5.3) Disposal Installations

BItem 0.00

5C-T Total To Elemental Summary 0.00

5D- (5.4) Water Installations

C Cold water installationsItem 0.00

D Hot water installationsItem 0.00

5D-T Total To Elemental Summary 0.00

5E- (5.5) Heat Source

E Boiler Item 0.00

5E-T Total To Elemental Summary 0.00

5F- (5.6) Space Heating & Air Conditioning

FItem 0.00

5F-T Total To Elemental Summary 0.00

5G- (5.7) Ventilation Systems

G Ventilation installations Item 0.00

5G-T Total To Elemental Summary 0.00

Plant room - mechanical installations

Disposal installations; soil waste and

overflow installations complete

Electrical heating complete (screed and

insulation included within floor finishes)

Contract Sum Analysis Page 17

Page 18: NORTH HYKEHAM COMMUNITY HUB 2.2 CONTRACT SUM ANALYSIS 2.2.2 Elemental …parishes.lincolnshire.gov.uk/Files/Parish/35/22_Contract... · 2016-02-03 · NORTH HYKEHAM COMMUNITY HUB

NORTH HYKEHAM COMMUNITY HUB

2.2 CONTRACT SUM ANALYSIS

2.2.2 Elemental Detailed Costs

Description Qty Unit Rate Total

5H- (5.8) Electrical Installations

A Item 0.00

BItem 0.00

C Power installations Item 0.00

DItem 0.00

E Lighting installations generally Item 0.00

F Emergency lighting installationsItem 0.00

G External lighting Item 0.00

H Earthing & bonding Item 0.00

5H-T Total To Elemental Summary 0.00

5I- (5.9) Fuel Installations

J Gas installations generally 0 Item 0.00

5I-T Total To Elemental Summary 0.00

5J- (5.10) Lift & Conveyor Installations

K Not applicable Item 0.00

5J-T Total To Elemental Summary 0.00

5K- (5.11) Fire & Lightning Protection

LFire and smoke alarm installations

Item 0.00

M Lightning protection Item 0.00

5K-T Total To Elemental Summary 0.00

Plant room - electrical installations

Mains installations, sub mains and

containment

Supplies in connection with mechanical

equipment

Contract Sum Analysis Page 18

Page 19: NORTH HYKEHAM COMMUNITY HUB 2.2 CONTRACT SUM ANALYSIS 2.2.2 Elemental …parishes.lincolnshire.gov.uk/Files/Parish/35/22_Contract... · 2016-02-03 · NORTH HYKEHAM COMMUNITY HUB

NORTH HYKEHAM COMMUNITY HUB

2.2 CONTRACT SUM ANALYSIS

2.2.2 Elemental Detailed Costs

Description Qty Unit Rate Total

5L-

A Data & telecoms installations Item 0.00

B Access control Item 0.00

C Security installations Item 0.00

D CCTV installations Item 0.00

E Control systems Item 0.00

5L-T Total To Elemental Summary 0.00

5M- (5.13) Others generally

FAny other items the contractor

wishes to insert; please list

5M-T Total To Elemental Summary 0.00

5N- (5.14) Builders Work In Connection

Gplumbing and mechanical

installations Item 0.00

H electrical installations Item 0.00

5N-T Total To Elemental Summary 0.00

(5.12) Communications, Security &

Control

Builders work in connection generally

Contract Sum Analysis Page 19

Page 20: NORTH HYKEHAM COMMUNITY HUB 2.2 CONTRACT SUM ANALYSIS 2.2.2 Elemental …parishes.lincolnshire.gov.uk/Files/Parish/35/22_Contract... · 2016-02-03 · NORTH HYKEHAM COMMUNITY HUB

NORTH HYKEHAM COMMUNITY HUB

2.2 CONTRACT SUM ANALYSIS

2.2.2 Elemental Detailed Costs

Description Qty Unit Rate Total

5O- (5.15) Sundry Associated Works

Design

Aplumbing and mechanical

installations Item 0.00

B electrical installations Item 0.00

Specific services preliminaries

Cplumbing and mechanical

installations Item 0.00

D electrical installations Item 0.00

Testing and commissioning

Eplumbing and mechanical

installations Item 0.00

F electrical installations Item 0.00

As built information; operating &

maintenance manuals, information

for SBEM & the like

Gplumbing and mechanical

installationsItem 0.00

H electrical installations Item 0.00

5O-T Total To Elemental Summary 0.00

Contract Sum Analysis Page 20

Page 21: NORTH HYKEHAM COMMUNITY HUB 2.2 CONTRACT SUM ANALYSIS 2.2.2 Elemental …parishes.lincolnshire.gov.uk/Files/Parish/35/22_Contract... · 2016-02-03 · NORTH HYKEHAM COMMUNITY HUB

NORTH HYKEHAM COMMUNITY HUB

2.2 CONTRACT SUM ANALYSIS

2.2.2 Elemental Detailed Costs

Description Qty Unit Rate Total

A Not applicable Item 0.00

Total To Elemental Summary 0.00

(7-) WORKS TO EXISTING BUILDINGS

(7.1 - 7.6) Works to Existing Buildings

B Not applicable Item 0.00

Total To Elemental Summary 0.00

6- (8-) EXTERNAL BUILDING WORKS

6A- (8.1) Site Preparation Works

CGeneral reduced level excavation

and store on site m3 -

6A-T Total To Elemental Summary 0.00

(6.1) Prefabricated Buildings & Building

Units

(6-) PREFABRICATED BUILDINGS &

BUILDING UNITS

Contract Sum Analysis Page 21

Page 22: NORTH HYKEHAM COMMUNITY HUB 2.2 CONTRACT SUM ANALYSIS 2.2.2 Elemental …parishes.lincolnshire.gov.uk/Files/Parish/35/22_Contract... · 2016-02-03 · NORTH HYKEHAM COMMUNITY HUB

NORTH HYKEHAM COMMUNITY HUB

2.2 CONTRACT SUM ANALYSIS

2.2.2 Elemental Detailed Costs

Description Qty Unit Rate Total

6B- (8.2) Roads, Paths, Pavings & Surfacing

Am2 0.00

Bm2 0.00

Cm2 0.00

Dm2 0.00

Em2 0.00

FExtra; removing unsuitable

excavated material from site m3 0.00

GPrecast concrete kerbs and

foundation; ref HB 2 m 0.00

HPrecast concrete kerbs and

foundation; flush kerb m 0.00

JPrecast concrete edgings and

foundation m 0.00

Any other item in connection with

external finishes the Contractor

wishes to price - please insert

6B-T Total To Elemental Summary 0.00

Excavate, remove surplus excavation and

place on adjacent site; earthwork support;

concrete, formwork and reinforcement; sub

base and pavings; all as Engineer's

Drawings 15409/230 & 235

Sett pavings as pedestrian crossover; as

specification Q25.100

Macadam car parking and roads, as

specification Q22.110

Macadam car parking and roads, as

specification Q22.100

Concrete pedestrian pavings; as

specification Q50.130

Natural stone pebble border; as

specification Q25.120

Contract Sum Analysis Page 22

Page 23: NORTH HYKEHAM COMMUNITY HUB 2.2 CONTRACT SUM ANALYSIS 2.2.2 Elemental …parishes.lincolnshire.gov.uk/Files/Parish/35/22_Contract... · 2016-02-03 · NORTH HYKEHAM COMMUNITY HUB

NORTH HYKEHAM COMMUNITY HUB

2.2 CONTRACT SUM ANALYSIS

2.2.2 Elemental Detailed Costs

Description Qty Unit Rate Total

6C- (8.3) Soft Landscaping, Planting

ATopsoil; stored on site; preparing for

seeding m2 0.00

B Grass seeding m2 0.00

C Soft planting Item 0.00

6C-T Total To Elemental Summary 0.00

6D- (8.4) Fencing Rails & Walls

D m 0.00

6D-T Total To Elemental Summary 0.00

(8.5) External Features

E Nr 0.00

F Nr 0.00

G Nr 0.00

H Nr 0.00

J Nr 0.00

K Nr 0.00

Total To Elemental Summary 0.00

Cycle stands; as specification Q50.210

Refuse/Mower store; as specification

Q50.215; base, surround

Entrance barrier; as specification Q50.110

Lamp post protector; as specification

Q50.130

Bollards; as specification Q50.120

External benching; as specification Q50.220

Boot cleaning station; as specification

Q50.220

Contract Sum Analysis Page 23

Page 24: NORTH HYKEHAM COMMUNITY HUB 2.2 CONTRACT SUM ANALYSIS 2.2.2 Elemental …parishes.lincolnshire.gov.uk/Files/Parish/35/22_Contract... · 2016-02-03 · NORTH HYKEHAM COMMUNITY HUB

NORTH HYKEHAM COMMUNITY HUB

2.2 CONTRACT SUM ANALYSIS

2.2.2 Elemental Detailed Costs

Description Qty Unit Rate Total

(8.6) External Drainage Within the Confines of the Site

Surface water; as Engineer's

Drawing 15409 240 & 260

A 100 pipe m 0.00

B 150 pipe m 0.00

C rainwater pipe connection Nr 0.00

D road gullies Nr 0.00

E rodding point Nr 0.00

F Nr 0.00

G Nr 0.00

H Nr 0.00

J Nr 0.00

Excavate trenches, earthwork support,

filling on completion removing surplus

excavated material, bed and surround,

pipe and fittings

Excavate , earthwork support, filling on

completion removing surplus excavated

material, concrete bed or foundation,

cover and frame

Mini PPIC chambers complete; maximum

depth not exceeding 600

PPIC chambers complete; depth 750 -

1000

PPIC chambers complete; depth 1000 -

1500

Manhole complete; 1200 diameter

chamber maximum depth 1300

Contract Sum Analysis Page 24

Page 25: NORTH HYKEHAM COMMUNITY HUB 2.2 CONTRACT SUM ANALYSIS 2.2.2 Elemental …parishes.lincolnshire.gov.uk/Files/Parish/35/22_Contract... · 2016-02-03 · NORTH HYKEHAM COMMUNITY HUB

NORTH HYKEHAM COMMUNITY HUB

2.2 CONTRACT SUM ANALYSIS

2.2.2 Elemental Detailed Costs

Description Qty Unit Rate Total

Foul water; as Engineer's

Drawing 15409 240 & 260

A 100 pipe m 0.00

B svp connection Nr 0.00

C gully to mower store Nr 0.00

Dinternal gully to plant room; as

specification R11.316Nr 0.00

Elinear floor gully to showers;

as specification R11.310m 0.00

F Nr 0.00

G Nr 0.00

H Nr 0.00

Generally

JTesting foul and surface water

drainageItem 0.00

Any other item in connection with

drainage the Contractor wishes to

price - please insert

Total To Elemental Summary 0.00

PPIC chambers complete; depth 750 -

1000

PPIC chambers complete; depth 1000 -

1250

Manhole complete; 1200 diameter

chamber maximum depth 1200

Excavate trenches, earthwork support,

filling on completion removing surplus

excavated material, bed and surround,

pipe and fittings

Excavate , earthwork support, filling on

completion removing surplus excavated

material, concrete bed or foundation,

cover and frame

Contract Sum Analysis Page 25

Page 26: NORTH HYKEHAM COMMUNITY HUB 2.2 CONTRACT SUM ANALYSIS 2.2.2 Elemental …parishes.lincolnshire.gov.uk/Files/Parish/35/22_Contract... · 2016-02-03 · NORTH HYKEHAM COMMUNITY HUB

NORTH HYKEHAM COMMUNITY HUB

2.2 CONTRACT SUM ANALYSIS

2.2.2 Elemental Detailed Costs

Description Qty Unit Rate Total

(8.7) External Drainage Outside the Confines of the Site

Surface water; as Engineer's

Drawing 15409 240 & 260

A 225 pipe m 0.00

B outfall Item 0.00

Foul water; as Engineer's

Drawing 15409 240 & 260

C m 0.00

D Nr 0.00

E Nr 0.00

F

Connection to existing manhole

within highway; approx depth to

invert 2500; inserting 150 pipe,

making good

Nr 0.00

Manhole complete; 1200 diameter

chamber maximum depth 2000; in existing

highway

Manhole complete; 1200 diameter

chamber maximum depth 1560; in existing

highway

Excavate trenches, earthwork support,

filling on completion removing surplus

excavated material, bed and surround,

pipe and fittings

Excavate , earthwork support, filling on

completion removing surplus excavated

material, concrete bed or foundation,

cover and frame

Excavate trenches, earthwork support,

filling on completion removing surplus

excavated material, bed and surround,

pipe and fittings; within existing

Excavate , earthwork support, filling on

completion removing surplus excavated

material, concrete bed or foundation,

cover and frame; within existing

highway

150 pipe; within existing highway

Contract Sum Analysis Page 26

Page 27: NORTH HYKEHAM COMMUNITY HUB 2.2 CONTRACT SUM ANALYSIS 2.2.2 Elemental …parishes.lincolnshire.gov.uk/Files/Parish/35/22_Contract... · 2016-02-03 · NORTH HYKEHAM COMMUNITY HUB

NORTH HYKEHAM COMMUNITY HUB

2.2 CONTRACT SUM ANALYSIS

2.2.2 Elemental Detailed Costs

Description Qty Unit Rate Total

Generally

ABreaking out existing drainage

pipes, manholes etcItem 0.00

maintaining flow of existing drains

where applicable

BMaking good highway on completion

to satisfaction of local authorityItem 0.00

C Testing and approvals Item 0.00

(8.8) External Services

Incoming services

C water Item 0.00

D electricity Item 0.00

E gas Item 0.00

F telecoms Item 0.00

G Trenches for incoming services Item 0.00

Total To Elemental Summary 0.00

(9-) DESIGN FEES

(9.1 - 9.3 ) Design fees

B

Consultant fees to complete the

design process and carry out all the

post contract works

Please identify each discipline

separately

Total To Elemental Summary 0.00

Contract Sum Analysis Page 27

Page 28: NORTH HYKEHAM COMMUNITY HUB 2.2 CONTRACT SUM ANALYSIS 2.2.2 Elemental …parishes.lincolnshire.gov.uk/Files/Parish/35/22_Contract... · 2016-02-03 · NORTH HYKEHAM COMMUNITY HUB

NORTH HYKEHAM COMMUNITY HUB

2.2 CONTRACT SUM ANALYSIS

2.2.2 Elemental Detailed Costs

Description Qty Unit Rate Total

8- (10-) RISK

8A- (10.1- 10.4) General Risk

DGeneral contingency for all design

risks by the Contractor Item 0.00

Note; A separate contingency will

be held by the Employer for change

controls

8A-T Total To Elemental Summary 0.00

Contract Sum Analysis Page 28