north west group/fugro - farm service agency · • 44 lifts (multiple aircraft) ... indiana 2007...

26
North West Group/Fugro

Upload: vodan

Post on 01-Apr-2018

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: North West Group/Fugro - Farm Service Agency · • 44 lifts (multiple aircraft) ... Indiana 2007 reprocessed with pan sharpening to a 1m FCIR and color product

North West Group/Fugro

Page 2: North West Group/Fugro - Farm Service Agency · • 44 lifts (multiple aircraft) ... Indiana 2007 reprocessed with pan sharpening to a 1m FCIR and color product

North West: Project management

Arizona acquisition (49%)

Indiana acquisition (100%)

Ingest QC

Data archival

Processing

Delivery

Warranty fulfillment

Fugro EarthData: Arizona acquisition (19%)

Ingest QC

Fugro Horizons: Arizona acquisition (32%)

Ingest QC

Due to limited awards ED/HZN did not perform any processing

5th consecutive season of the same team

2007 NAIP - NWG27 November 2007 2

Page 3: North West Group/Fugro - Farm Service Agency · • 44 lifts (multiple aircraft) ... Indiana 2007 reprocessed with pan sharpening to a 1m FCIR and color product

7 Cessna Conquest’s

4 Lear jet’s (and doors)

9 ADS40-II SH52 sensors

3 processing centers

During NAIP work is shuffled to have processing centers “100%” NAIP – much better throughput doing so

Used 2007 season:

3 Conquests

1 Lear Jet

4 ADS40’s

1 processing center

128 CPU cluster, 480TB online storage capacity

6 staff dedicated to NAIP processing:

1 Data management, 1 AT/Ortho, 1 Mosaic/DOQQ/CCM creation, 2 QA/QC, 1 deliverables and shipping

27 November 2007 2007 NAIP - NWG 3

Page 4: North West Group/Fugro - Farm Service Agency · • 44 lifts (multiple aircraft) ... Indiana 2007 reprocessed with pan sharpening to a 1m FCIR and color product

Indiana:

•Acquisition:• Flown with Lear Jet @ 47,000 ft

• Flight lines collect 3 rows of DOQQ’s

• 3 flight blocks, 2 seasons

• On site from season start to acquisition completion: 43 days

• 13 good weather days

• 30% days on site suitable for flight

• 18 lifts

• 35.9 hours online time

• No mechanical downtime (aircraft or sensor)

• 1.8TB raw data collected

•Processing:• AT – 6 hours

• Ortho – 21 hours (cluster, 128 CPU’S)

• Mosaic – 11 hours (3 systems)

• CCM creation – 30 hours (Cluster, 8 CPU’s)

• Total: 68 hours, ~92 seconds per DOQQ

•Poor weather slowed acquisition

•Very quick inspection and acceptance by USDA!

2007 NAIP - NWG27 November 2007 4

Page 5: North West Group/Fugro - Farm Service Agency · • 44 lifts (multiple aircraft) ... Indiana 2007 reprocessed with pan sharpening to a 1m FCIR and color product

Indiana delivery

time

•100% delivered prior to product due date

•Delivery from last flight:

•Maximum delivery time: 38 days

•Minimum delivery time: 2 days

•Average delivery time: 13 days

30%

40%

10%

16%

4%

1 to 7 days

8 to 15 days

16 to 30 days

31 to 35 days

36 to 40 days

2007 NAIP - NWG27 November 2007 5

Page 6: North West Group/Fugro - Farm Service Agency · • 44 lifts (multiple aircraft) ... Indiana 2007 reprocessed with pan sharpening to a 1m FCIR and color product

0

5

10

15

20

25

30

35

40A

dam

sA

llen

Bar

tho

lom

ewB

ento

nB

lack

ford

Bo

on

eB

row

nC

arro

llC

ass

Cla

rkC

lay

Cli

nto

nC

raw

ford

Dav

iess

Dea

rbo

rnD

ecat

ur

DeK

alb

Del

awar

eD

ub

ois

Elk

har

tF

ayet

teF

loy

dF

ou

nta

inF

ran

kli

nF

ult

on

Gib

son

Gra

nt

Gre

ene

Ham

ilto

nH

anco

ckH

arri

son

Hen

dri

cks

Hen

ryH

ow

ard

Hu

nti

ng

ton

Jack

son

Jasp

erJa

yJe

ffer

son

Jen

nin

gs

Joh

nso

nK

no

xK

osc

iusk

oL

agra

ng

eL

ake

LaP

ort

eL

awre

nce

Mad

iso

nM

ario

nM

arsh

all

Mar

tin

Mia

mi

Mo

nro

eM

on

tgo

mer

yM

org

anN

ewto

nN

ob

leO

hio

Ora

ng

eO

wen

Par

ke

Per

ryP

ike

Po

rter

Po

sey

Pu

lask

iP

utn

amR

an

do

lph

Rip

ley

Ru

shS

cott

Sh

elb

yS

pen

cer

St.

Jo

sep

hS

tark

eS

teu

ben

Su

lliv

anS

wit

zerl

an

dT

ipp

ecan

oe

Tip

ton

Un

ion

Van

der

bu

rgh

Ver

mil

lio

nV

igo

Wab

ash

War

ren

War

rick

Was

hin

gto

nW

ayn

eW

ells

Wh

ite

Wh

itle

y

Delivery Time (last flight in county to CCM shipped)

2007 NAIP - NWG27 November 2007 6

Page 7: North West Group/Fugro - Farm Service Agency · • 44 lifts (multiple aircraft) ... Indiana 2007 reprocessed with pan sharpening to a 1m FCIR and color product

0

5

10

15

20

25

30

35

40

45A

dam

sA

llen

Bar

tho

lom

ewB

ento

nB

lack

ford

Bo

on

eB

row

nC

arro

llC

ass

Cla

rkC

lay

Cli

nto

nC

raw

ford

Dav

iess

Dea

rbo

rnD

ecat

ur

DeK

alb

Del

awar

eD

ub

ois

Elk

har

tF

ayet

teF

loy

dF

ou

nta

inF

ran

kli

nF

ult

on

Gib

son

Gra

nt

Gre

ene

Ham

ilto

nH

anco

ckH

arri

son

Hen

dri

cks

Hen

ryH

ow

ard

Hu

nti

ng

ton

Jack

son

Jasp

erJa

yJe

ffer

son

Jen

nin

gs

Joh

nso

nK

no

xK

osc

iusk

oL

agra

ng

eL

ake

LaP

ort

eL

awre

nce

Mad

iso

nM

ario

nM

arsh

all

Mar

tin

Mia

mi

Mo

nro

eM

on

tgo

mer

yM

org

anN

ewto

nN

ob

leO

hio

Ora

ng

eO

wen

Par

ke

Per

ryP

ike

Po

rter

Po

sey

Pu

lask

iP

utn

amR

an

do

lph

Rip

ley

Ru

shS

cott

Sh

elb

yS

pen

cer

St.

Jo

sep

hS

tark

eS

teu

ben

Su

lliv

anS

wit

zerl

and

Tip

pec

ano

eT

ipto

nU

nio

nV

and

erb

urg

hV

erm

illi

on

Vig

oW

abas

hW

arre

nW

arri

ckW

ash

ing

ton

Way

ne

Wel

lsW

hit

eW

hit

ley

Delivery Time (Days BEFORE due date)

2007 NAIP - NWG27 November 2007 7

Page 8: North West Group/Fugro - Farm Service Agency · • 44 lifts (multiple aircraft) ... Indiana 2007 reprocessed with pan sharpening to a 1m FCIR and color product

Arizona:

•Acquisition:

• Up to 3 Cessna Conquests

• First flight on first day of season

• 33 days from start of season to completion of acquisition

• 89 aircraft days on site

• 22 good weather days (67%)

• 44 lifts (multiple aircraft)

• 180.4 flight hours

• 6.3TB raw data collected

•Processing:

• AT – 26 hours

• Ortho – 86 hours (cluster, 128 CPU’s)

• Mosaic – 22 hours (3 systems)

• CCM creation – 174 hours (cluster, 8 CPU’s)

• Total: 308 hours, ~145 seconds per DOQQ

• Significant DOQQ’s completed prior to complete counties due to county size

2007 NAIP - NWG27 November 2007 8

Page 9: North West Group/Fugro - Farm Service Agency · • 44 lifts (multiple aircraft) ... Indiana 2007 reprocessed with pan sharpening to a 1m FCIR and color product

Lots of new things:

First large scale project with ADS40-II SH52

First large scale project using Leica IPAS GPS/INS system with Honeywell uIRS INS

4 Band pilot

Seam line shape file pilot

Absolute accuracy specifications

2007 NAIP - NWG27 November 2007 9

Page 10: North West Group/Fugro - Farm Service Agency · • 44 lifts (multiple aircraft) ... Indiana 2007 reprocessed with pan sharpening to a 1m FCIR and color product

Communications is key to do this quickly and cost effectively

AZ state and USDA worked very well on this pilot

Different approach over Utah 2006:

Provide rough location of required control based on flight blocks

If weather didn’t cooperate we had the ability to capture additional control

Best balance between minimizing control cost versus processing delays

Use of FAA centerlines was a good approach

For a 6m accuracy requirement we’d prefer more points in the ~1m range opposed to fewer in the 10cm range: lower cost per point

Photo ID points provided (29 points)

Supplemented control to lower costs (36 points)

Waiting on control delayed CCM production about 15 days

27 November 2007 2007 NAIP - NWG 10

Page 11: North West Group/Fugro - Farm Service Agency · • 44 lifts (multiple aircraft) ... Indiana 2007 reprocessed with pan sharpening to a 1m FCIR and color product

A few hiccups with the 4 band generation that had to be addressed: Mr. SID could not compress 4 band imagery as

input. Workaround: Strip RGB bands to create a 3 band dataset for Mr. SID compression.

Photoshop has issues with 4 band imagery, tough to apply the USDA color specification checks Developed our own utility

Mosaic process tweaked to find the best seam line placement for all 4 bands Forests are a problem: RGB is quite dark, IR is quite

saturated due to vegetation

Reworking several CCM’s for a better product and to work out a better process

2007 NAIP - NWG27 November 2007 11

Page 12: North West Group/Fugro - Farm Service Agency · • 44 lifts (multiple aircraft) ... Indiana 2007 reprocessed with pan sharpening to a 1m FCIR and color product

0

5

10

15

20

25

30

35

Ap

ach

e

Co

nch

ise

Co

con

ino

Gil

a

Gra

ham

Gre

enle

e

La

Paz

Mar

ico

pa

Mo

ha

ve

Nav

ajo

Pim

a

Pin

al

San

ta C

ruz

Yav

apai

Yu

ma

Delivery time (Days BEFORE due date)

2007 NAIP - NWG27 November 2007 12

Page 13: North West Group/Fugro - Farm Service Agency · • 44 lifts (multiple aircraft) ... Indiana 2007 reprocessed with pan sharpening to a 1m FCIR and color product

ARIZONA 1M, RGB ARIZONA 1M, FCIR

2007 NAIP - NWG27 November 2007 13

Page 14: North West Group/Fugro - Farm Service Agency · • 44 lifts (multiple aircraft) ... Indiana 2007 reprocessed with pan sharpening to a 1m FCIR and color product

ARIZONA, 1M, RGB ARIZONA 1M, FCIR

2007 NAIP - NWG27 November 2007 14

Page 15: North West Group/Fugro - Farm Service Agency · • 44 lifts (multiple aircraft) ... Indiana 2007 reprocessed with pan sharpening to a 1m FCIR and color product

2007 NAIP - NWG27 November 2007 15

Page 16: North West Group/Fugro - Farm Service Agency · • 44 lifts (multiple aircraft) ... Indiana 2007 reprocessed with pan sharpening to a 1m FCIR and color product

2007 NAIP - NWG27 November 2007 16

Page 17: North West Group/Fugro - Farm Service Agency · • 44 lifts (multiple aircraft) ... Indiana 2007 reprocessed with pan sharpening to a 1m FCIR and color product

4 Band Pilot – Arizona 2007

2007 NAIP - NWG27 November 2007 17

Page 18: North West Group/Fugro - Farm Service Agency · • 44 lifts (multiple aircraft) ... Indiana 2007 reprocessed with pan sharpening to a 1m FCIR and color product

4 Band Pilot – Arizona 2007

2007 NAIP - NWG27 November 2007 18

Page 19: North West Group/Fugro - Farm Service Agency · • 44 lifts (multiple aircraft) ... Indiana 2007 reprocessed with pan sharpening to a 1m FCIR and color product

Seam Line Shape File

2007 NAIP - NWG27 November 2007 19

Page 20: North West Group/Fugro - Farm Service Agency · • 44 lifts (multiple aircraft) ... Indiana 2007 reprocessed with pan sharpening to a 1m FCIR and color product

Pixel Pockets

2007 NAIP - NWG27 November 2007 20

Page 21: North West Group/Fugro - Farm Service Agency · • 44 lifts (multiple aircraft) ... Indiana 2007 reprocessed with pan sharpening to a 1m FCIR and color product

“Pixel Pockets”

2007 NAIP - NWG27 November 2007 21

Page 22: North West Group/Fugro - Farm Service Agency · • 44 lifts (multiple aircraft) ... Indiana 2007 reprocessed with pan sharpening to a 1m FCIR and color product

Modify process to be CCM based opposed to block based

Improvements to 4 band product generation:

Better seam-line generation method to give best color and false-color products

Better seam line shape file generation

ADS40-SH51/52 pan sharpening mode now in place

Reduces 1m acquisition DOQQ cost about 20%

For 2m we are already altitude limited

Allows 0.5m products for cost of current 1m products

Better tools to ensure USDA color specs are met:

No more using photo shop for the QC steps

All 9 ADS40’s are now upgraded to ADS40-II with SH52

Team is capable of ~80,000 DOQQ throughput in NAIP window

2007 NAIP - NWG27 November 2007 22

Page 23: North West Group/Fugro - Farm Service Agency · • 44 lifts (multiple aircraft) ... Indiana 2007 reprocessed with pan sharpening to a 1m FCIR and color product

Consider same states to a vendor for the 5 year contract: Some efficiencies gained as control, DEM doesn’t need to be

“re-prepped”

Better able to negotiate fuel and hotel rates for multi-year

Better able to negotiate resale opportunities early enough to impact NAIP pricing

Lots of discussion over moving to JPEG2000: Great idea!!

Slight cost reduction (~1.5%)

Warning: need a solid baseline spec to be set as lots of “knobs to tweak”

Anything to enlarge the season is a win for everyone!

2007 NAIP - NWG27 November 2007 23

Page 24: North West Group/Fugro - Farm Service Agency · • 44 lifts (multiple aircraft) ... Indiana 2007 reprocessed with pan sharpening to a 1m FCIR and color product

Conquest “mid life” inspection:

$140K per plane if they don’t find anything wrong

$250K typical for a well maintained plane

Lots of damage history - $500K+

All 7 Conquest underway, complete by end of Dec

Will expand to cover most aircraft used in our industry

Fuel increase: ~8%

Hotel: ~10% - 40%

Insurance: ~5%

4 band: ~3%

Seam line shape files: ~1%

Looking at ~15% increase before optimizations to offset

27 November 2007 2007 NAIP – NWG 24

Page 25: North West Group/Fugro - Farm Service Agency · • 44 lifts (multiple aircraft) ... Indiana 2007 reprocessed with pan sharpening to a 1m FCIR and color product

A few interesting data resale’s: California 2005 data reprocessed to 1m FCIR ortho and

panchromatic and color stereo products

Nevada 2006 reprocessed to 1m FCIR and also color stereo products

Arizona 2007 reprocessed with pan sharpening to a 0.5m color product

Indiana 2007 reprocessed with pan sharpening to a 1m FCIR and color product

Large oil and gas company using NY, Ohio, Wyoming, Utah, Nevada, Montana data via our Valtus subsidiary: ~1,500 image views/month

Slow to develop the market but it is building….

Stereo 4 band ortho and stereo products generating a lot of interest

2007 NAIP - NWG27 November 2007 25

Page 26: North West Group/Fugro - Farm Service Agency · • 44 lifts (multiple aircraft) ... Indiana 2007 reprocessed with pan sharpening to a 1m FCIR and color product

For more info please contact:

John Welter ([email protected])

Tim Crago ([email protected])

Marc Simard ([email protected])

Thanks for your time!

2007 NAIP - NWG27 November 2007 26