north west group/fugro - farm service agency · • 44 lifts (multiple aircraft) ... indiana 2007...
TRANSCRIPT
North West Group/Fugro
North West: Project management
Arizona acquisition (49%)
Indiana acquisition (100%)
Ingest QC
Data archival
Processing
Delivery
Warranty fulfillment
Fugro EarthData: Arizona acquisition (19%)
Ingest QC
Fugro Horizons: Arizona acquisition (32%)
Ingest QC
Due to limited awards ED/HZN did not perform any processing
5th consecutive season of the same team
2007 NAIP - NWG27 November 2007 2
7 Cessna Conquest’s
4 Lear jet’s (and doors)
9 ADS40-II SH52 sensors
3 processing centers
During NAIP work is shuffled to have processing centers “100%” NAIP – much better throughput doing so
Used 2007 season:
3 Conquests
1 Lear Jet
4 ADS40’s
1 processing center
128 CPU cluster, 480TB online storage capacity
6 staff dedicated to NAIP processing:
1 Data management, 1 AT/Ortho, 1 Mosaic/DOQQ/CCM creation, 2 QA/QC, 1 deliverables and shipping
27 November 2007 2007 NAIP - NWG 3
Indiana:
•Acquisition:• Flown with Lear Jet @ 47,000 ft
• Flight lines collect 3 rows of DOQQ’s
• 3 flight blocks, 2 seasons
• On site from season start to acquisition completion: 43 days
• 13 good weather days
• 30% days on site suitable for flight
• 18 lifts
• 35.9 hours online time
• No mechanical downtime (aircraft or sensor)
• 1.8TB raw data collected
•Processing:• AT – 6 hours
• Ortho – 21 hours (cluster, 128 CPU’S)
• Mosaic – 11 hours (3 systems)
• CCM creation – 30 hours (Cluster, 8 CPU’s)
• Total: 68 hours, ~92 seconds per DOQQ
•Poor weather slowed acquisition
•Very quick inspection and acceptance by USDA!
2007 NAIP - NWG27 November 2007 4
Indiana delivery
time
•100% delivered prior to product due date
•Delivery from last flight:
•Maximum delivery time: 38 days
•Minimum delivery time: 2 days
•Average delivery time: 13 days
30%
40%
10%
16%
4%
1 to 7 days
8 to 15 days
16 to 30 days
31 to 35 days
36 to 40 days
2007 NAIP - NWG27 November 2007 5
0
5
10
15
20
25
30
35
40A
dam
sA
llen
Bar
tho
lom
ewB
ento
nB
lack
ford
Bo
on
eB
row
nC
arro
llC
ass
Cla
rkC
lay
Cli
nto
nC
raw
ford
Dav
iess
Dea
rbo
rnD
ecat
ur
DeK
alb
Del
awar
eD
ub
ois
Elk
har
tF
ayet
teF
loy
dF
ou
nta
inF
ran
kli
nF
ult
on
Gib
son
Gra
nt
Gre
ene
Ham
ilto
nH
anco
ckH
arri
son
Hen
dri
cks
Hen
ryH
ow
ard
Hu
nti
ng
ton
Jack
son
Jasp
erJa
yJe
ffer
son
Jen
nin
gs
Joh
nso
nK
no
xK
osc
iusk
oL
agra
ng
eL
ake
LaP
ort
eL
awre
nce
Mad
iso
nM
ario
nM
arsh
all
Mar
tin
Mia
mi
Mo
nro
eM
on
tgo
mer
yM
org
anN
ewto
nN
ob
leO
hio
Ora
ng
eO
wen
Par
ke
Per
ryP
ike
Po
rter
Po
sey
Pu
lask
iP
utn
amR
an
do
lph
Rip
ley
Ru
shS
cott
Sh
elb
yS
pen
cer
St.
Jo
sep
hS
tark
eS
teu
ben
Su
lliv
anS
wit
zerl
an
dT
ipp
ecan
oe
Tip
ton
Un
ion
Van
der
bu
rgh
Ver
mil
lio
nV
igo
Wab
ash
War
ren
War
rick
Was
hin
gto
nW
ayn
eW
ells
Wh
ite
Wh
itle
y
Delivery Time (last flight in county to CCM shipped)
2007 NAIP - NWG27 November 2007 6
0
5
10
15
20
25
30
35
40
45A
dam
sA
llen
Bar
tho
lom
ewB
ento
nB
lack
ford
Bo
on
eB
row
nC
arro
llC
ass
Cla
rkC
lay
Cli
nto
nC
raw
ford
Dav
iess
Dea
rbo
rnD
ecat
ur
DeK
alb
Del
awar
eD
ub
ois
Elk
har
tF
ayet
teF
loy
dF
ou
nta
inF
ran
kli
nF
ult
on
Gib
son
Gra
nt
Gre
ene
Ham
ilto
nH
anco
ckH
arri
son
Hen
dri
cks
Hen
ryH
ow
ard
Hu
nti
ng
ton
Jack
son
Jasp
erJa
yJe
ffer
son
Jen
nin
gs
Joh
nso
nK
no
xK
osc
iusk
oL
agra
ng
eL
ake
LaP
ort
eL
awre
nce
Mad
iso
nM
ario
nM
arsh
all
Mar
tin
Mia
mi
Mo
nro
eM
on
tgo
mer
yM
org
anN
ewto
nN
ob
leO
hio
Ora
ng
eO
wen
Par
ke
Per
ryP
ike
Po
rter
Po
sey
Pu
lask
iP
utn
amR
an
do
lph
Rip
ley
Ru
shS
cott
Sh
elb
yS
pen
cer
St.
Jo
sep
hS
tark
eS
teu
ben
Su
lliv
anS
wit
zerl
and
Tip
pec
ano
eT
ipto
nU
nio
nV
and
erb
urg
hV
erm
illi
on
Vig
oW
abas
hW
arre
nW
arri
ckW
ash
ing
ton
Way
ne
Wel
lsW
hit
eW
hit
ley
Delivery Time (Days BEFORE due date)
2007 NAIP - NWG27 November 2007 7
Arizona:
•Acquisition:
• Up to 3 Cessna Conquests
• First flight on first day of season
• 33 days from start of season to completion of acquisition
• 89 aircraft days on site
• 22 good weather days (67%)
• 44 lifts (multiple aircraft)
• 180.4 flight hours
• 6.3TB raw data collected
•Processing:
• AT – 26 hours
• Ortho – 86 hours (cluster, 128 CPU’s)
• Mosaic – 22 hours (3 systems)
• CCM creation – 174 hours (cluster, 8 CPU’s)
• Total: 308 hours, ~145 seconds per DOQQ
• Significant DOQQ’s completed prior to complete counties due to county size
2007 NAIP - NWG27 November 2007 8
Lots of new things:
First large scale project with ADS40-II SH52
First large scale project using Leica IPAS GPS/INS system with Honeywell uIRS INS
4 Band pilot
Seam line shape file pilot
Absolute accuracy specifications
2007 NAIP - NWG27 November 2007 9
Communications is key to do this quickly and cost effectively
AZ state and USDA worked very well on this pilot
Different approach over Utah 2006:
Provide rough location of required control based on flight blocks
If weather didn’t cooperate we had the ability to capture additional control
Best balance between minimizing control cost versus processing delays
Use of FAA centerlines was a good approach
For a 6m accuracy requirement we’d prefer more points in the ~1m range opposed to fewer in the 10cm range: lower cost per point
Photo ID points provided (29 points)
Supplemented control to lower costs (36 points)
Waiting on control delayed CCM production about 15 days
27 November 2007 2007 NAIP - NWG 10
A few hiccups with the 4 band generation that had to be addressed: Mr. SID could not compress 4 band imagery as
input. Workaround: Strip RGB bands to create a 3 band dataset for Mr. SID compression.
Photoshop has issues with 4 band imagery, tough to apply the USDA color specification checks Developed our own utility
Mosaic process tweaked to find the best seam line placement for all 4 bands Forests are a problem: RGB is quite dark, IR is quite
saturated due to vegetation
Reworking several CCM’s for a better product and to work out a better process
2007 NAIP - NWG27 November 2007 11
0
5
10
15
20
25
30
35
Ap
ach
e
Co
nch
ise
Co
con
ino
Gil
a
Gra
ham
Gre
enle
e
La
Paz
Mar
ico
pa
Mo
ha
ve
Nav
ajo
Pim
a
Pin
al
San
ta C
ruz
Yav
apai
Yu
ma
Delivery time (Days BEFORE due date)
2007 NAIP - NWG27 November 2007 12
ARIZONA 1M, RGB ARIZONA 1M, FCIR
2007 NAIP - NWG27 November 2007 13
ARIZONA, 1M, RGB ARIZONA 1M, FCIR
2007 NAIP - NWG27 November 2007 14
2007 NAIP - NWG27 November 2007 15
2007 NAIP - NWG27 November 2007 16
4 Band Pilot – Arizona 2007
2007 NAIP - NWG27 November 2007 17
4 Band Pilot – Arizona 2007
2007 NAIP - NWG27 November 2007 18
Seam Line Shape File
2007 NAIP - NWG27 November 2007 19
Pixel Pockets
2007 NAIP - NWG27 November 2007 20
“Pixel Pockets”
2007 NAIP - NWG27 November 2007 21
Modify process to be CCM based opposed to block based
Improvements to 4 band product generation:
Better seam-line generation method to give best color and false-color products
Better seam line shape file generation
ADS40-SH51/52 pan sharpening mode now in place
Reduces 1m acquisition DOQQ cost about 20%
For 2m we are already altitude limited
Allows 0.5m products for cost of current 1m products
Better tools to ensure USDA color specs are met:
No more using photo shop for the QC steps
All 9 ADS40’s are now upgraded to ADS40-II with SH52
Team is capable of ~80,000 DOQQ throughput in NAIP window
2007 NAIP - NWG27 November 2007 22
Consider same states to a vendor for the 5 year contract: Some efficiencies gained as control, DEM doesn’t need to be
“re-prepped”
Better able to negotiate fuel and hotel rates for multi-year
Better able to negotiate resale opportunities early enough to impact NAIP pricing
Lots of discussion over moving to JPEG2000: Great idea!!
Slight cost reduction (~1.5%)
Warning: need a solid baseline spec to be set as lots of “knobs to tweak”
Anything to enlarge the season is a win for everyone!
2007 NAIP - NWG27 November 2007 23
Conquest “mid life” inspection:
$140K per plane if they don’t find anything wrong
$250K typical for a well maintained plane
Lots of damage history - $500K+
All 7 Conquest underway, complete by end of Dec
Will expand to cover most aircraft used in our industry
Fuel increase: ~8%
Hotel: ~10% - 40%
Insurance: ~5%
4 band: ~3%
Seam line shape files: ~1%
Looking at ~15% increase before optimizations to offset
27 November 2007 2007 NAIP – NWG 24
A few interesting data resale’s: California 2005 data reprocessed to 1m FCIR ortho and
panchromatic and color stereo products
Nevada 2006 reprocessed to 1m FCIR and also color stereo products
Arizona 2007 reprocessed with pan sharpening to a 0.5m color product
Indiana 2007 reprocessed with pan sharpening to a 1m FCIR and color product
Large oil and gas company using NY, Ohio, Wyoming, Utah, Nevada, Montana data via our Valtus subsidiary: ~1,500 image views/month
Slow to develop the market but it is building….
Stereo 4 band ortho and stereo products generating a lot of interest
2007 NAIP - NWG27 November 2007 25
For more info please contact:
John Welter ([email protected])
Tim Crago ([email protected])
Marc Simard ([email protected])
Thanks for your time!
2007 NAIP - NWG27 November 2007 26