Project components include: Building a new Clutch Switch Substation Constructing just over 2 miles of 69-kilovolt transmission line Constructing a new Schafrath Switch The need for improvements to the transmission system is essential to ensure an adequate supply of electricity is available for the area’s industrial, commercial, and residential custom- ers. Improvements reconfigure the design of the electric system by creating a loop. This loop adds redundancy, reducing power outages in the area and speeding recovery of service when outages occur. The project involves constructing a new transmission line along W. Smithville Western Road. The line extends from the Schafrath Switch, located near County Road 112, to the Madisonburg Substation, located west of Canaan Center Road. A majority of the line will be co-located with existing distribution lines and utilizes easements previously acquired in 2009 and 2010. WHAT WHY WHERE NORTH WOOSTER AREA REINFORCEMENTS PROJECT AEP Ohio, along with AEP Ohio Transmission Company, Inc., is improving the electric transmission system north of Wooster. The approximately $14 million project is essential to support economic development in the area and improve reliability by constructing a loop that creates redundancy. PROJECT SCHEDULE *Timeline subject to change. *Timeline subject to change. PROJECT ANNOUNCEMENT Late October 2017 FIELD AND ENVIRONMENTAL SURVEYS Early November 2017 RESTORATION COMPLETE Late Summer 2018 2017 2018 PRE-CONSTRUCTION ACTIVITIES BEGIN January 2018 RIGHT-OF-WAY ACQUISITION BEGINS Early November 2017 TRANSMISSION LINE CONSTRUCTION Early February 2018 FACILITIES PLACED IN-SERVICE June 2018

Upload: others

Post on 24-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NorthWooster FactSheet V7 · NORTH WOOSTER AREA REINFORCEMENTS PROJECT AEP Ohio, along with AEP Ohio Transmission Company, Inc., is improving the electric transmission system north

Project components include:

• Building a new Clutch Switch Substation

• Constructing just over 2 miles of

69-kilovolt transmission line

• Constructing a new Schafrath Switch

The need for improvements to the transmission

system is essential to ensure an adequate

supply of electricity is available for the area’s

industrial, commercial, and residential custom-

ers. Improvements reconfigure the design of the

electric system by creating a loop. This loop

adds redundancy, reducing power outages in

the area and speeding recovery of service when

outages occur.

The project involves constructing a new

transmission line along W. Smithville Western

Road. The line extends from the Schafrath

Switch, located near County Road 112, to the

Madisonburg Substation, located west of

Canaan Center Road. A majority of the line will

be co-located with existing distribution lines

and utilizes easements previously acquired in

2009 and 2010.

WHAT WHY WHERE

NORTH WOOSTERAREA REINFORCEMENTS PROJECT

AEP Ohio, along with AEP Ohio Transmission Company, Inc.,

is improving the electric transmission system north of

Wooster. The approximately $14 million project is essential

to support economic development in the area and improve

reliability by constructing a loop that creates redundancy.

PROJECT SCHEDULE

*Timeline subject to change.*Timeline subject to change.

PROJECT ANNOUNCEMENTLate October 2017

FIELD AND ENVIRONMENTAL SURVEYSEarly November 2017

RESTORATION COMPLETELate Summer 2018

2017 2018

PRE-CONSTRUCTION ACTIVITIES BEGINJanuary 2018

RIGHT-OF-WAY ACQUISITION BEGINSEarly November 2017

TRANSMISSION LINE CONSTRUCTIONEarly February 2018

FACILITIES PLACED IN-SERVICEJune 2018

Page 2: NorthWooster FactSheet V7 · NORTH WOOSTER AREA REINFORCEMENTS PROJECT AEP Ohio, along with AEP Ohio Transmission Company, Inc., is improving the electric transmission system north

AEP OHIO VALUES YOUR INPUT ABOUT THIS PROJECT. PLEASE SEND COMMENTS AND QUESTIONS TO:

*Exact structure, height and right-of-way requirements may vary

09/26/201909/26/2019

AEP Ohio plans to use wood poles approximately 65 to 75-feet tall. Structures will be placed in a 50-foot right-of-way.

AEP Ohio is committed to meeting the energy needs of customers while protecting the environment and natural beauty of the region.

TYPICAL STRUCTURES

@

WOOSTERWOOSTER

NORTH WOOSTER AREA REINFORCEMENTS PROJECT

EXISTING TRANSMISSION LINE

PROPOSED TRANSMISSION LINE ROUTE

EXISTING SUBSTATION

NEW SUBSTATION N

83

3CL

EVEL

AND

RD

23

PORTAGE RD

86SMITHVILLE WESTERN RD

22

585BU

RBANK

RD

SCHAFRATHSWITCH

CLUTCH SWITCHSUBSTATION

HIGHLAND AVENUESUBSTATION

MADISONBURGSUBSTATION

GEYERSWITCH

AEP Ohioc/o Joe Demaree8600 Smiths Mill RoadNew Albany, OH 43054

[email protected]

(308) 205-5046

AEPOhio.com/NorthWooster1