BEE2922
INDUSTRIAL INDUSTRIAL INSTALLATIONINSTALLATION
![Page 2: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/2.jpg)
Syllabus1. Electrical Power Supply (T)• Institution of Electrical Engineers (IEE)regulation • Power Distribution
2. Main Switch Board-MSB (T)– Power factor correction – Switchgear and protective devices-RCCB,ACB,VCB– Over current protective devices-CT ratio, TMS(time
multiply setting) , relays– Standby generator
![Page 3: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/3.jpg)
3. Sub-Switch Board-SSB (T)• Feeder pillar• Choose of cable size• Switchgear and protective devices-
MCCB,ACB,fuses• Meters
4. Distribution Board-DB (T)• Current carrying capacity• Cable sizing• Circuit breaker rating • Three phase and single phase supply• Assessment
![Page 4: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/4.jpg)
5. Loads (T)– Total Connected Load(TCL)– Current carrying capacity– Voltage drop– Sensitivity – Balanced three phase circuit – Maximum demand– Tariffs
6. Project (P)• Configuration of tools and equipment• Schematic drawing-assignment• Conduit and trunks • Installation and wiring• Cables - Armoured cable • Inspection and Testing- Condition of equipment and materials,
continuity, insulation, termination, earth electrode
![Page 5: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/5.jpg)
LEARNING OUTCOMESThis subject introduces student to three phase wiring.
The students will learn how to do electrical wiring involving three phase supply and also the safety
measures required.
The students should be able to:i. Differential between domestic and Industrial wiringii. Demonstrate the component and function of
distribution boardiii. Explain the flow of distribution power system.iv. Practice right installation and wiring technique.
![Page 6: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/6.jpg)
CHAPTER 1
• ELECTRICAL POWER SUPPLY IEE
POWER DISTRIBUTION
![Page 7: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/7.jpg)
IEE REGULATION
• The 16th IEE regulation (Institution of Electrical Engineers) currently is used in commenwealth countries
• It must be follow as practically in order to achieve/fulfill the safety and rule requirement
![Page 8: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/8.jpg)
ELECTRICAL REGULATION 1994
• The rule to describe how the activities in generation, transmission, distribution, consuming, supervising, handling, license, competent person, importing, manufacturing, upgrading, etc is applied
![Page 9: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/9.jpg)
COMPETENT PERSON
• Pendawai Elektrik (Wireman), PW1 to PW6• Penjaga Jentera Elektrik (Chargeman), A0 to A4• Penyelia Elektrik (Electrical Supervisor)• Pencantum Kabel (Cable Jointer)• Jurutera Elektrik Kompeten (Competent Engineer)• Jurutera Elektrik Perkhidmatan (Servising Engineer)• Jurutera Elektrik Kompeten Residen (Competent
Resident Electrical Engineer)
![Page 10: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/10.jpg)
![Page 11: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/11.jpg)
POWER STATION
![Page 12: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/12.jpg)
ALTERNATOR
![Page 13: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/13.jpg)
Main intake substation
![Page 14: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/14.jpg)
POWER GENERATIONTNB 33kV/11kV
![Page 15: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/15.jpg)
11kV/433kV substation
![Page 16: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/16.jpg)
TRANSMISSION and DISTRIBUTION
![Page 17: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/17.jpg)
CHAPTER 2• MSB (LV 415V)
![Page 18: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/18.jpg)
• CHAPTER 2 :POWER DISTRIBUTION
TNB SUBSTATION
MAIN SWITCH BOARD
SUB SWITCH BOARD
DISTRIBUTION BOARD
LOAD
11 kV
415V
415/240V
415/240V
![Page 19: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/19.jpg)
POWER DISTRIBUTION
MSB(415V)
SSB415V
SSB415V
SSB)415V
STANDBY GENSET
![Page 20: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/20.jpg)
MSB
SSB SSB SSB SSB
DB DB DB DB
![Page 21: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/21.jpg)
![Page 22: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/22.jpg)
INSIDE SUBSTATION
Ring Main Unit (RMU) / Ring Main Unit (RMU) / Switchgear 11kVSwitchgear 11kV
Transformer (11/0.415kV)Transformer (11/0.415kV) MSBMSBFeeder pillarFeeder pillarHigh voltage & low voltage cableHigh voltage & low voltage cable
![Page 23: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/23.jpg)
![Page 24: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/24.jpg)
2.0:MAIN SWITCH BOARD(MSB)
![Page 25: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/25.jpg)
2.1 CAPACITOR BANK• power factor correction
<= 0.85• Lowest PF – penalty
![Page 26: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/26.jpg)
![Page 27: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/27.jpg)
RESIDUAL CURRENT CIRCUIT BREAKER (RCCB)
• Automatic Circuit Breaker for current leakage to earth
• Current rating:40A and 60/63A
• Sensitivity of current leaking :10mA, 30mA, 100mA, 300mA
• Three phase and single phase type
![Page 28: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/28.jpg)
2.3 AIR CIRCUIT BREAKER
• Current rating – 600A and above
• Add - Current Transformer, relay and shunt trip coil for operation
• Current trip be adjusted
![Page 29: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/29.jpg)
2.3 CT, TMS, RELAY
![Page 30: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/30.jpg)
CURRENT TRANSFORMER (CT)
![Page 31: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/31.jpg)
2.4 STANDBY GENSET
![Page 32: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/32.jpg)
3.0 SSB
3.1 SWITCH GEAR PROTECTION3.2 RCCB, ACB, VCB
![Page 33: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/33.jpg)
Type of protection
• Over current (short circuit)• overload• earth fault• earth leakage• lightning• Overheating• unbalance phase• reverse phase sequence
![Page 34: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/34.jpg)
3.0 SUB SWITCH BOARD (SSB)
![Page 35: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/35.jpg)
EARTH FAULT RELAY
![Page 36: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/36.jpg)
MOULDED CASE CIRCUIT BREAKER (MCCB)
• Function=MCB• For 60A and above usage• For three phase power supply• Replace switch fuse and fuse switch• ON- after Short circuit and over loading• Easy to operate
![Page 37: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/37.jpg)
3 PHASE ELCB CONSTRUCTION
R Y B N
Perintang uji
Punatekan uji
Teras besi ( Gelung secondary )
PLBB Tiga Fasa
Elemen sensitif
Suis 4 kutub jenis link
BEBAN
![Page 38: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/38.jpg)
BALANCE CONDITION
R Y B N
BEBAN
20A 20A 20A
20A
![Page 39: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/39.jpg)
UNBALANCE CONDITION
R Y B N
bocor ke bumi
BEBAN
20A 20A 20A
10A
![Page 40: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/40.jpg)
3.2 FEEDER PILLAR
![Page 41: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/41.jpg)
CABLE CONSTRUCTION
• conductor – Aluminium/Copper• insulator – Paper, PVC, XLPE• Lembar (strand) – helaian paling
kecil• core – himpunan helaian• Perisai (armour) – perlindungan
mekanikal• Salut (sheath) – kemasan luaran• Pengisi (filler) – mengisi ruang
kosong• Screen (thin copper foil) – stress
uniformity• Pengalas (bedding) – alas antara
bahagian keras dgn bahagian lembut
PILCDSTAS CABLE (PAPER CABLE)
![Page 42: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/42.jpg)
![Page 43: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/43.jpg)
VARIOUS TYPE OF CABLES
![Page 44: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/44.jpg)
KABEL PVC/SWA/PVC
![Page 45: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/45.jpg)
04/08/23 [email protected] 45
![Page 46: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/46.jpg)
![Page 47: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/47.jpg)
3.3 CABLE SIZE vs CURRENT RATINGmm SQUAREmm SQUARE CURRENT (A)CURRENT (A)
11 13.513.5
1.51.5 17.517.5
2.52.5 2424
44 3232
66 4141
1010 5757
1616 7676
2525 101101
3535 125125
5050 151151
7070 192192
9595 232232
120120 269269
150150 300300
![Page 48: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/48.jpg)
3.4 METERS
kWhour meter
CT meter
![Page 49: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/49.jpg)
4.0 DB
![Page 50: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/50.jpg)
CURRENT CARRYING CAPACITYFUSE/MCB (Amp)FUSE/MCB (Amp) CABLE SIZE (mmCABLE SIZE (mm²)²) MAX POWER(watt)MAX POWER(watt)
5/65/6 1.51.5 1000/12001000/1200
1515 2.52.5 1 x 13A s/s/o1 x 13A s/s/o
2020 2.52.5 2 x 13A s/s/o2 x 13A s/s/o
30 (gelang)30 (gelang) 2.52.5 10 x 13A s/s/o10 x 13A s/s/o
30 (jejari)30 (jejari) 4.04.0 6 X 13A s/s/o6 X 13A s/s/o
1515 2.52.5 1 x cooker 3 kW1 x cooker 3 kW
3030 4.04.0 1 x cooker 8 kW1 x cooker 8 kW
1515 4.04.0 1 x heater 1.5kW1 x heater 1.5kW
1515 4.04.0 1 x 1.5 HP air cond1 x 1.5 HP air cond
3030 6.06.0 1 x 2.5 HP air cond1 x 2.5 HP air cond
6363 16/2516/25 Kabel masuk utamaKabel masuk utama
![Page 51: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/51.jpg)
4.0:DB-SINGLE PHASE
• CONTENT:ISOLATOR (63A)ELCB -4 poleLIVE TERMINALNEUTRAL TERMINALEARTH TERMINALMCB
![Page 52: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/52.jpg)
![Page 53: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/53.jpg)
![Page 54: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/54.jpg)
CABLE SIZING• 1.25 / 1.5 mm square (lamp/fan circuit)• 2.5 mm square (socket 13A, radial)• 4.0 mm square (socket 13A, ring)• 6.0 mm square (socket 13A, ring)• 10.0 mm square (main cable)• 16.0 mm square (main cable)• 25 mm square (main cable)• 35 mm square (main cable)• 50 mm square (main cable)• 70 mm square( main cable)
![Page 55: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/55.jpg)
MCB
![Page 56: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/56.jpg)
Cable sizing sizesize No of core/No of core/
Core Core size(diametsize(diamet
er)er)
LOadLOad voltage voltage ratingrating
Size of Size of cable cable
(diameter)(diameter)
1.25 1.25 mmmm22
(7/0.53 (7/0.53 mm)mm)
lamp circuitlamp circuit 300/500 300/500 voltvolt
2.5 mm2.5 mm
1.5 mm1.5 mm22 (3/0.737 (3/0.737 mm)mm)
lamp circuit/ lamp circuit/ heaterheater
300/500 300/500 voltvolt
3.0 mm3.0 mm
2.5 mm2.5 mm22 (7/0.67 (7/0.67 mm)mm)
Power Power circuit/water circuit/water heater 5kW- heater 5kW- 20A20A
400/750 400/750 voltvolt
3.7 mm3.7 mm
4 mm4 mm22 (7/0.85 (7/0.85 mm)mm)
water heater water heater 7kW- 30A7kW- 30A
400/750 400/750 voltvolt
4.2 mm4.2 mm
![Page 57: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/57.jpg)
INTERNAL MCB COMPONENT
![Page 58: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/58.jpg)
MCB-internal design
![Page 59: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/59.jpg)
Earth chamber & earth electrode
![Page 60: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/60.jpg)
• Earth chamber & earth electrode
![Page 61: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/61.jpg)
EARTH RESISTANCE MEASUREMENT
• The grounding system is an essential element for the electrical system security and it is required to:
• Allow for protective devices activation when there is an insulation fault.
• Equalize the potential of conductive parts that can be accessed simultaneously, with the potential in the surrounding soil in order to prevent people from being exposed to hazardous voltages.
• Allow the lightning strike energy to be safely dissipated.
• Reduce electromagnetic interferences.
04/08/23 [email protected] 61
![Page 62: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/62.jpg)
Earth electrode• Standard Earth Electrode 6
inches length• Galvanised Iron (G.I) hollow
pipe with diameter 2 in• Wire mesh • Max resistance-for
domestic wiring=1 ohm• Max resistance-for
lightning=10 ohm
Down conductors
Air terminal
![Page 63: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/63.jpg)
5.1: total connected load• TCL is a total load in
each electrical equipment it is need supply for project or installation
• These equipment – lamp, fan, power point, lift, water pump, and electrical equipment
• Exp:
loadload raterate
1 x 18 W1 x 18 W 30W30W
1 x 36 W1 x 36 W 50W50W
Ceiling Ceiling fanfan
65W65W
EmergencEmergency lampy lamp
20W20W
Socket Socket outlet outlet 13A13A
250 W250 W
Socket Socket outlet outlet 15A15A
500 W500 W
![Page 64: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/64.jpg)
VOLTAGE DROP
• IEE regulation-• Voltage drop≤4% from voltage source• EXAMPLE :VOLTAGE SOURCE= 240VMAXIMUM VOLTAGE DROP =240 X 4% = 9.6V
• VOLTAGE SOURCE =415VMAXIMUM VOLTAGE DROP=415 X 4% = 16.6V
![Page 65: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/65.jpg)
CHAPTER 6: size of trunks
cable sizecable size Cable factorCable factor
1.5 mm1.5 mm 8.18.1
2.5 mm2.5 mm 11.411.4
4 mm4 mm 15.415.4
6 mm6 mm 22.922.9
10 mm10 mm 36.336.3
• CABLE FACTOR
• Trunks factor
Trunks size (mm)Trunks size (mm) factorfactor50 x 3850 x 38 767767
50 x 5050 x 50 10371037
75 x 2575 x 25 738738
75 x 3875 x 38 11461146
75 x 5075 x 50 15551555
75 x 7575 x 75 23712371
100 x 25100 x 25 99.399.3
100 x 38100 x 38 15421542
100 x 50100 x 50 20912091
100 x 75100 x 75 31893189
100 x 100100 x 100 42524252
![Page 66: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/66.jpg)
example• Calculate the size of trunks to carried the cable size as below:a. 12 x 1.5mm²b. 16x2.5mm²c. 8 x 4mm²d. 4x6mm²
![Page 67: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/67.jpg)
solution
• define the cable factor:a. 12 x 1.5mm² =12 x 8.1=97.2b. 16x2.5mm²=16 x 11.4=182.4c. 8 x 4mm²=8 x 15.4= 123.2d. 4x6mm²= 4 x 22.9= 91.6
• 494.4
• Trunks size=75 x 25 mm
![Page 68: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/68.jpg)
FLAXIBLE CONDUIT
![Page 69: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/69.jpg)
TYPE OF TRUNKING
![Page 70: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/70.jpg)
STARTING
4 cm
X
X
![Page 71: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/71.jpg)
TRUNKING -90 °
XX
X
20cm 5cm5cm
X
XX
X
X
![Page 72: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/72.jpg)
TRUNKING 45 °-1
XX
X
X
45
2cm 2cm
20 cm
20cm
X X
X
X
![Page 73: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/73.jpg)
TRUNKING 45 °-2
X
X
X
45
2cm 2cm
X
=28.5cm
X
X
![Page 74: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/74.jpg)
ENDING
5 cm
X
X
![Page 75: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/75.jpg)
CAP
5 cm 5 cm20 cm
X
X
X
X
X
90˚
2 cm2 cm
2 cm 2 cm
X
45˚-2
45˚-1
20 cm
![Page 76: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/76.jpg)
DOL
TO MOTOR
MCB 32 A
O/L
CONTACTOR
![Page 77: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/77.jpg)
Inside DB (Three Phase)
MCCB(40A)
ELCB(40A)
CON(32A)
10A
20A
20A
32A
32A
TO DOL
TO SOCKET OUTLET
SPARE
SPARE
EN
INCOMING FROM ISOLATOR
E/S
CABLE SIZE: 4mm
A1
A2
SPARE
![Page 78: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/78.jpg)
RING CIRCUIT
S/O 2S/O 1
S/O 3
MCB (20A)E N
Cable size:2.5mm
![Page 79: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/79.jpg)
R BY N E
Moulded-Case Circuit Breaker
(MCCB)
Earth Leakage Circuit Breaker (ELCB)
Magnetic Contactor
(MC) Emergency Stop Button
Coils
A1
A2
Neutral Link
Neutral bar
Earth bar
Miniature Circuit
Breaker (MCB)
32A
32A
20A
20A
10A
to D.O.L starter
SPARE
SPARE
SPARE
to Outlet Socket
4mm Cable
From MCCB until MCB
2.5mm Cable
DOL Starter
Socket Outlet
One Way Switch
Socket Outlet
![Page 80: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/80.jpg)
OVERALL LAYOUT
TRUNKING (2”X2”)
CONDUIT(3/4”)
DB
DOL
S/O 1
S/O 3
S/O 2
E/S
45°
45°
90°
90°
12”
7”7”
9”
9”
10”
10”16”
12”
10”
10”
45°
45°
![Page 81: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/81.jpg)
Practical FLOW WORK
START
CONDUIT-measurement, cutting, bending and threading
TRUNKING (body & cap)–measurement, cutting, hole
Conduit fitting-clip
TRUNKING FITTING-screwing
WIRING
TESTING
TEORI
![Page 82: Notes 1](https://reader033.vdocument.in/reader033/viewer/2022050815/546a43b3b4af9feb6b8b484e/html5/thumbnails/82.jpg)
ASSESSMENT
• Quizzes (5%)• Test (10%)• Practical (35%)