notice of activity and use limitation (naul) - town …

46
Bk 39600 Pg406 #88608 07-07-2021@ 11:24a Note: Pursuant to 310 CMR 40. l 074(5), upon transfer of any interest in or a right to use the property or a portion thereof that is subject to this Notice of Activity and Use Limitation, the Notice of Activity and Use Limitation shall be incorporated either in full or by reference into all future deeds, easements, mortgages, leases, licenses, occupancy agreements or any other instrument of transfer. Within 30 days of so incorporating the Notice of Activity and Use Limitation in a deed that is recorded or registered, a copy of such deed shall be submitted to the Department of Environmental Protection. NOTICE OF ACTIVITY AND USE LIMITATION 42 U.S.C. § 9601, et seq.; 40 CFR Part 300; M.G.L. c. 21E, § 6: and 310 CMR 40.0000 [Note: This Notice ofActivity and Use Limitation has been recorded pursuant to 310 CMR 40.0111 as part of an institutional con/ rol for a site that is both a federal Supe1:f11nd sire, listed on the National Priorities List pursuant to Section 105 of CERCLA. 42 USC.§ 9605. and a disposal site under M.G.L. c. 21E.] Superfund Site Name: Blackbum & Union Privileges Superfund Site Site Location: Walpole, MA EPA Site Identification Number: MAD982 I 91363 MassDEP Release Tracking No.(s): 4-3000603 ii\ . This Notice of Activity and Use Lim. itation ("Notice") is made as of this Jl__ ¾y of n-gv' 1 \ , 201.\, by Town of Walpole. 135 School Street, Walpole, Massachusetts, togethe~with his/her/its/their successors and assigns (collectively "Owner"). All capitalized tenns used herein without definition shall have the meaning given to them in the Massachusetts Oil and Hazardous Materials Release, Prevention and Response Act, M.G.L. c. 21 E, as amended (''Chapter 21 E") and the Massachusetts Contingency Plan, 310 CMR 40.0000, as amended (the "MCP"). WITNESS ETH: WHEREAS, Town of Walpole is the owner(s) in fee simple of those certain parcels of land located in Walpole, Massachusetts, Norfolk County, Massachusetts with the buildings and improvements thereon, pursuant to a Judgment in Tax Lien Case No. 97 TL 114322, recorded with the Norfolk Registry of Deeds in Book 33107, Page 408, Judgment in Tax Lien Case No. 13 TL 147512 recorded with said Deeds in Book 33107, Page 415, and Judgment in Tax Lien Case No. 13 TL 14 7510 recorded with said Deeds in Book 33107, Page 413, and Pagel of 12 WILLIAM P. O'DONNELL, REGISTER NORFOLK COUNTY REGISTRY OF DEEDS RECEIVED & RECORDED ELECTRONICALLY

Upload: others

Post on 28-Nov-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

Bk 39600 Pg406 88608 07-07-2021 1124a

Note Pursuant to 310 CMR 40 l 074(5) upon transfer of any interest in or a right to use the property or a portion thereof that is subject to this Notice of Activity and Use Limitation the Notice of Activity and Use Limitation shall be incorporated either in full or by reference into all future deeds easements mortgages leases licenses occupancy agreements or any other instrument of transfer Within 30 days of so incorporating the Notice of Activity and Use Limitation in a deed that is recorded or registered a

copy of such deed shall be submitted to the Department of Environmental Protection

NOTICE OF ACTIVITY AND USE LIMITATION 42 USC sect 9601 et seq 40 CFR Part 300 MGL c 21E sect 6 and 310 CMR 400000

[Note This Notice ofActivity and Use Limitation has been recorded pursuant to 310 CMR 400111 as part ofan institutional con rol for a site that is both a federal Supe1f11nd sire listed on the National Priorities List pursuant to Section 105 of CERCLA 42 USCsect 9605 and a disposal site under MGL c 21E]

Superfund Site Name Blackbum amp Union Privileges Superfund Site Site Location Walpole MA EPA Site Identification Number MAD982 I91363 MassDEP Release Tracking No(s) 4-3000603

ii This Notice of Activity and Use Limitation (Notice) is made as of this Jl__frac34y of n-gv1 201 by Town of Walpole 135 School Street Walpole Massachusetts togethe~with hisheritstheir successors and assigns (collectively Owner) All capitalized tenns used herein without definition shall have the meaning given to them in the Massachusetts Oil and Hazardous Materials Release Prevention and Response Act MGL c 21 E as amended (Chapter 21 E) and the Massachusetts Contingency Plan 310 CMR 400000 as amended (the MCP)

WITNESS ETH

WHEREAS Town of Walpole is the owner(s) in fee simple of those certain parcels of land located in Walpole Massachusetts Norfolk County Massachusetts with the buildings and improvements thereon pursuant to a Judgment in Tax Lien Case No 97 TL 114322 recorded with the Norfolk Registry of Deeds in Book 33107 Page 408 Judgment in Tax Lien Case No 13 TL 147512 recorded with said Deeds in Book 33107 Page 415 and Judgment in Tax Lien Case No 13 TL 14 7510 recorded with said Deeds in Book 33107 Page 413 and

Pagel of 12

WILLIAM P ODONNELL REGISTER

NORFOLK COUNTY REGISTRY OF DEEDS

RECEIVED amp RECORDED ELECTRONICALLY

Bk 39600 Pg407 88608

Judgment in Tax Lien Case No 13 TL 147513 recorded with said Deeds in Book 33107 Page 416 said parcels of land are more particularly bounded and described in Exhibit A attached hereto and made a part hereof (the Property)

WHEREAS the portion of the Property which is subject to this Notice of Activity and Use Limitation is shown on a plan titled Activity and Use Limitations Plan of Land Blackburn amp Union Privileges Superfund Site recorded in the Norfolk County Registry of Deeds in Plan Book~ Plan~ a photo-reduced version of which is attached hereto as Exhibit C such area is more particularly described on Exhibit B attached hereto and made part hereof (the Restricted Area)

WHEREAS the Restricted Area of the Property is comprised of four categories of cover types (Cover Types) which are designated as the Building Footprint Areas Paved Areas Landscaped Areas and Unimproved Areas said Cover Types are shown on a plan titled Activity and Use Limitations Plan of Restricted Areas and Cover Types Blackburn amp Union Privileges Superfund Site recorded with the Norfolk County Registry of Deeds in Plan Book__]_ Plan~ (Plan of Restricted Areas) with a coordinate table a photo-reduced version of which is attached hereto as Exhibit D

WHEREAS the portions of the Restricted Area improved by buildings or other structures are designated as Building Foot Print Areas as shown on the Plan of Restricted Areas the portions of the Restricted Area which are covered with pavement are designated as Paved Areas as shown on the Plan of Restricted Areas the portions of the Restricted Area which are landscaped are designated as Landscaped Areas all other portions of the Property are designated as Unimproved Areas as shown on the Plan of Restricted Areas

WHEREAS the coordinate table which can be used to determine the boundaries of each of the Cover Types as shown on the Plan of Restricted Areas is also attached as part of Exhibit B

WHEREAS pursuant to Section 105 of the Comprehensive Environmental Response Compensation and Liability Act as amended 42 USC sect 9605 (CERCLA) and the National Contingency Plan 40 CFR sectsect 3001 et seq (the NCP) the United States Environmental Protection Agency an agency established under the laws of the United States (EPA) having its New England regional office at Five Post Office Square Boston Massachusetts 02109 (Region 1 ) placed land within the Property on the National Priorities List set forth at 40CFR Part 300 Appendix B by publication in the Federal Register on May 31 1994 Fed Reg 27989 due to a release of hazardous substances as that term is defined by the Section 104 of CERCLA 42 USC sect 9604 (Hazardous Substances) such land being a federal Superfund Site known as the Blackbum amp Union Privileges Superfund Site (Superfund Site)

WHEREAS the Plan of Restricted Areas shows the relationship of the Property and the Restricted Area to the boundaries of the Superfund Site to the extent those boundaries have been established

Page 2 of 12

Bk 39600 Pg408 88608

WHEREAS pursuant to Chapter 21E and the MCP the Massachusetts Department of Environmental Protection an agency established under the laws of the Commonwealth of Massachusetts having its principal office at One Winter Street Boston Massachusetts 02108 (MassDEP) assigned to releases of oil andor hazardous materials occurring at from or onto the Property MassDEP Release Tracking Number(s) 4-3000603 and all places where such oil andor hazardous materials have come to be located are a disposal site under Chapter 21 E and the MCP (the Disposal Site)

WHEREAS in a document titled Record of Decision Blackburn amp Union Privileges Superfund Site dated September 30 2008 (the ROD) said ROD being on file at the EPA Region I Record Center located at Five Post Office Square Boston Massachusetts (EPA Region 1 Record Center) EPA with the concmTence of MassDEP as evidenced by a letter of concurrence from Janine Commerford Assistant Commissioner to Mr James T Owens III Director dated September 29 2008 has selected one or more response actions (collectively the Selected Remedy) for the Superfund Site in accordance with CERCLA and the NCP

WHEREAS the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) (the OampM Plan)

WHEREAS the Selected Remedy is based in part upon the restriction of human access to and contact with Hazardous Substances in soil sediment andor groundwater and the restriction of certain uses and activities occurring in on through over or under the Restricted Areas

WHEREAS in a document titled Institutional Control Design Statement for the

- lackbum and Union Privileges Superfund Site -East of South Street Area dated

(the IC Design Statement) said IC Design Statement being attached he eto as Exhibit E EPA approved a remedial design for land use restrictions and other institutional controls at the Superfund Site

WHEREAS the JC Design Statement contains a description of the basis for land use restrictions and the release event(s) or site history that resulted in the contaminated media subject to this Notice including (a) a statement that specifies why the Notice is necessary to the Selected Remedy (b) a description of the release event(s) or site history that resulted in the contaminated media subject to the Notice (ie date of the release(s) to the extent known release volumes(s) and response actions taken to address the release(s)) (c) a description of the contaminated media (ie media type(s) and approximate vertical and horizontal extent) subject to the Notice ( d) a statement of which activities and uses are consistent and which are inconsistent with maintaining the Selected Remedy (e) a description of all other components of the institutional and land use controls at the Property

WHEREAS the tenn Ground Surface as used herein shall mean in Paved Areas and in Building Footprint Areas the uppem10st surface of the ground located immediately below any pavement in Paved Areas or under any buildings or stmctures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppermost surface of the ground based upon the surface elevations depicted in Exhibit C attached hereto

Page 3 of 12

Bk 39600 Pg409 88608

WHEREAS pursuant to 3IO CMR 4001 1 I(1 ) MassDEP shal1 deem response actions at a disposal site subject to CERCLA adequately regulated for purposes of compliance with the MCP provided certain enumerated conditions are satisfied including disposal sites subject to CERCLA with respect to which MassDEP has issued a letter of concurrence

WHEREAS pursuant to 3IO CMR 400111 land use controls may be implemented at disposal sites deemed adequately regulated under CERCLA by means of a Notice of Activity and Use Limitation and

WHEREAS pursuant to 310 CMR 400111(10) disposal sites adequately regulated under CERCLA at which (a) remedial actions have been completed in accordance with the ROD for the site (b) subsequent design construction and other pertinent plans have been approved by EPA and ( c) EPA has certified completion of the remedial action will be considered to have achieved a Pennanent Solution under MGL c 21E and the MCP for those hazardous substances subject to such remedial actions

NOW THEREFORE notice is hereby given that the activity and use limitations required by the ROD and more particularly set forth in the IC Design Statement are as follows

I Activities and Uses Consistent with Maintaining the Selected Remedy The following Activities and Uses are consistent with maintaining the Selected Remedy and as such may occur on the Restricted Area without compromising the Permanent Solution that has been achieved for the Site

i Any response actions necessary to maintain the Selected Remedy (including without limitation sampling of existing wel1s and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

11 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

iii Non-residential school and day care uses

1v Paving repaving andor maintenance by adult workers of the Paved Areas provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

v Maintenance work by adult workers in the Landscaped Areas that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or barrier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in

Page 4 of 12

Bk 39600 Pg410 88608

Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

v1 Without limiting Subparagraph I (v) above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan CSMP) The SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation ofwork Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement ofpipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage storm water gas fuel oil electricity and communications

The SMP shall provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

a Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored on the prope1ty

b Appropriate measures shall be taken to secure stored soil and to control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

c Groundwater monitoring we1ls shall be repaired or replaced if damaged

d Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

e A date on which the SMP expires if required by EPA and MassDEP

f A report to be submitted to MassDEP and EPA at the completion of the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health

Page 5 of 12

Bk 39600 Pg411 88608

and safety provisions of 29 Code of Federal Regulation Section 1910 120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Notwithstanding subparagraph 1(vi)(f) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

Vil Such other activities and uses not identified in Paragraph 2 below as being activities and uses inconsistent with maintaining the Selected Remedy

2 Activities and Uses Inconsistent with Maintaining the Selected Remedy The following Activities and Uses are inconsistent with maintaining the Selected Remedy and as such may not occur on the Restricted Area without compromising the Permanent Solution that has been achieved for the Site

i Residential use or activity

11 Except as permitted in Paragraph 1i above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

111 Except as permitted by Section I above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

1v Agricultural use or activity except for raised garden beds approved in accordance with Section l(vi)

v Construction or installation of a bu iiding or structure for human occupancy without prior written approval of EPA

vi Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

Page 6 of 12

Bk 39600 Pg412 88608

3 Obligations and Conditions The following obligations andor conditions are necessary and shall be undertaken at the Property to maintain the Selected Remedy and to avoid compromising the Permanent Solution that has been achieved for the Site

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

11 If EPA has provided written notice that EPA has determined that the parties responsible under the OampM Plan are no longer able to submit an annual compliance letter regarding this NAUL the owner of the Property shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the Restricted Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such cel1ifications are based

4 Emergency Excavation If it becomes necessary to excavate within the Restricted Area as pal1 of a response to an emergency (for example repairing utility lines or responding to a fire or flood) the provisions of Paragraph 1 of this Notice shall be suspended with respect to such excavation to the extent necessary to permit such response provided that the Owner

(i) orally notifies the following persons of such emergency as soon as possible but no later than two (2) hours after having learned of such emergency

A EPA National Response Center at (800) 424-8802 and EPA Region 1 Office of Site Remediation and Restoration Emergency Planning and Response Branch at 888-3 72-7341 and

B MassDEP Emergency Response at (888) 304-1133 and MassDEP Southeast Regional Office of Emergency Response Section at 508-946-2850

or such other persons as MassDEP and EPA respectively may identify in writing from time to time to Owner for such oral emergency response notifications

(ii) notifies MassDEP and EPA in writing of such emergency no later than five (5) days after having learned of such emergency such notifications to be sent to the following addresses

A MassDEP Southeast Regional Office 20 Riverside Drive Lakeville MA 02347 and

Page 7 of 12

Bk 39600 Pg413 88608

B EPA New England Region I 5 Post Office Square - Suite 100 Boston MA 02109-3912

or to such addresses as MassDEP and EPA respectively may identify in writing from time to time to Owner for such written emergency response notifications

(iii) limits the actual disturbance involved in such excavation to the minimum reasonably necessary to adequately respond to the emergency

(iv) implements all measures necessary to limit actual or potential risk to the public health and environment

(v) engages a qualified hazardous waste site cleanup professional such as a Licensed Site Professional (LSP) as defined in the MCP at 310 CMR 400006(12) to oversee the implementation of this Paragraph and to prepare and oversee the implementation of a written plan (Emergency Restoration Plan) that will restore the Property to a condition that meets or exceeds the performance standards established under the ROD for the Selected Remedy and that is consistent with this Notice and to review and evaluate response actions contained in the Emergency Restoration Plan to ensure minimal disturbance of any contaminated soils and sediments and

(vi) performs all actions laid out in the Emergency Restoration Plan within thirty (30) days of the occutTence of the emergency or within such other time period as may be approved by MassDEP and EPA in writing and submit a copy of the Emergency Restoration Plan to MassDEP and EPA within ten (10) days of its performance with a statement from the cleanup professional confirming that the Property has been restored to the standard described above

5 Proposed Changes in Activities and Uses Amendments Pursuant to 310 CMR 4001 l l(amp)(c) the Owner must notify and obtain approval from EPA and MassDEP of any proposed change in activities and uses at the Property that is not provided for in this Notice Pursuant to 3 IO CMR 400111 (8)( d) the Owner must obtain EPA and MassDEP approval of any Amendment or Termination of this Notice All EPA and MassDEP approvals of any Amendment or Termination of this Notice must be in writing and be recorded andor registered with the appropriate Registry(ies) of Deeds andor Land Registration Office(s) to be effective

6 Violations The activities uses andor exposures upon which this Notice is based must not change at any time to (a) cause risks that are not protective of human health or the environment pursuant to the criteria set forth in the NCP at 40 CFR

Page 8 of12

Bk 39600 Pg414 88608

300430(e)(2)(i) (b) interfere with the Selected Remedy or (c) cause a significant risk of harm to health safety public welfare or the environment pursuant to Chapter 21E and the MCP

Compliance with the terms and conditions of this Notice is subject to enforcement pursuant to Chapter 21 E the MCP MGL c 21 A sect 16 and 310 CMR 5 00 and CERCLA and the NCP Such enforcement may include without limitation enforcement with respect to (a) any activities or uses that may occur that are described in Paragraph 2 of this Notice as being inconsistent with the Selected Remedy (b) any failure to undertake any obligations and conditions described in Paragraph 3 of this Notice as being necessary to maintain the Selected Remedy and (c) any other failure to maintain the Selected Remedy or Pem1anent Solution resulting from a failure to act consistently with this Notice

7 Incorporation Into Deeds Mortgages Leases and Instruments of Transfer This Notice shall be incorporated either in full or by reference into all future deeds easements mortgages leases licenses occupancy agreements or any other instrument of transfer whereby an interest in andor a right to use the Property or a portion thereof is conveyed in accordance with 310 CMR 401074(5)

8 Reservation of Rights

This instrument shall not limit or otherwise affect the right of EPA andor MassDEP to obtain access to or restrict the use of the Property pursuant to CERCLA Chapter 21 E or any other applicable statute or regulation

This instrument shall not release the Owner or any other party from liability for releases of oil or hazardous substances or materials nor shall this instrument excuse the Owner or any other party from complying with CERCLA Chapter 21 E or any other applicable federal state or local laws regulations or ordinances or by-laws

Owner hereby authorizes and consents to the filing and recordation andor registration of this Notice said Notice to become effective when recorded andor registered with the appropriate Registry(ies) of Deeds andor Land Registration Office(s)

Page 9 of 12

Town of Walpole acting by and through the Board of Selectmen

n Town Administrator authorized by ard of Selectmen recorded herewith

Bk 39600 Pg415 88608

Witness the execution of this instrument under seal this 21_ day of df 11 ( 2021

COMMONWE

COUNTY OF NORFOLK ss

~ On this 21 day of 4f1 2021 before me the undersigned notary public

personally appeared James Johnson as Town Administrator for the Town of Walpole and proved to me to through satisfactory evidence of identification which was ~6laquo~ ~ -fr VJ1e [indicate ifdrivers license or passport or other document] to be the person whose name is signed on the preceding or attached document and acknowledged to me that signed it voluntarily for its stated purpose

Name CA~ U ~

My Commission Expires July S 2t)z

Page 10 of 12

--------

Bk 39600 Pg416 88608

In accordance with CERCLA 42 USC sect 9601 et seq and the National Contingency Plan the United States Environmental Protection Agency Region I hereby approves this Notice of Activity and Use Limitation

Name 8r~Cltvi Olso Director Superfund and Emerncy Management Division (SEMO)

US Environmental Protection Agency Region I

In accordance with MGL c 21E sect 6 and the Massachusetts Contingency Plan (310 CMR 400000) the Department of Environmental Protection hereby approves this Notice of Activity and Use Limitation (as to form only)

Date Paul W Locke Assistant Commissioner Bureau of Waste Site Cleanup Department of Environmental Protection

Page 11 of 12

---------------

Bk 39600 Pg417 88608

In accordance with CERCLA 42 USC sect 9601 et seq and the National Contingency Plan the United States EobulliionmenlaJ Protectioo Agency Region I hereby appro1es this Notice of Activity and Use Limitation

Date ~------

Name Director Superfund and Emergency Management Division (SEMO)

US Environmental Prokction i0 ency Region I

Jn accordance with MGL c 21 E sect 6 and the Massachusetts Contingency Plan (310 CMR 400000) the Depamnent ofEmironmental Prolectioo hereby approves this Norice ofActivity

and Use Limilarioo (as ro funn ooly)_ ~~

Dale 4r S microlJ ~ Paul W Locke Assisrant Commissioner Bureau ofWaste Site Cleanup Department of Environmental Protection

Page 11 of 12

Bk 39600 Pg418 88608

List of Exhibits

Exhibit A Legal Description of the Property Exhibit B Legal Description of the Restricted Area and Coordinates of Cover Types Exhibit C Photo-Reduced Copy of Activity and Use Limitations Plan of Land Exhibit D Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table Exhibit E Institutional Control Design Statement (EOS) Exhibit F Copy of Vote of Town of Walpole

Return to

Attn Kristine Sheehy Senior Real Estate Attorney FOLEY HOAG LLP Seaport West 155 Seaport Boulevard Boston Massachusetts 02210-2600

Page 12 of 12

Bk 39600 Pg419 88608

EXHIBIT A

Legal Description of Property The land with the improvements thereon located in Walpole Norfolk County Massachusetts bounded and described as follows

PARCEL I

The land on the Southeasterly side of South Street bounded

NORTHWESTERLY NORTHERLY AND AGAIN NORTHWESTERLY by South Street by seven lines measuring respectively

17027 feet 120 feet 22011 feet 1653 feet 325 89 feet 4515 feet and 1497 feet

NORTHEASTERLY by Gleason Court 2627 feet

SOUTHEASTERLY AGAIN NORTHEASTERLY AND AGAIN SOUTHEASTERLY by land now or fom1erly of Santomarco by five lines

measuring respectively 6750 feet 2050 feet 1190 feet 2952 feet and 2001 feet

NORTHEASTERLY AGAIN by said land of Santomarco and land now or formerly of Cashorali 10056 feet

NORTHWESTERLY AGAIN by said land of Cashorali 2845 feet

NORTHEASTERLY by land now or formerly of Muighitti 9007 feet

SOUTHEASTERLY by the location of Old Colony Railroad by three lines measuring respectively 6809 feet 32808 feet and 38250 feet

and

SOUTHWESTERLY by land now or formerly of Meyer by three lines AND SOUTHERLY measuring respectively 9143 feet 1998 feet and

15202 feet

Parcel I is described in the deed recorded with the Norfolk County Registry of Deeds in Book 4459 Page 287

A portion of said premises is shown on plan entitled Plan of Land in Walpole Mass Belonging to General Fibre Co Inc by Edward C Peterson CE dated January 16 1960 filed with the Norfolk Registry of Deeds as Plan No 849 of 1967 in Plan Book 223 and the remainder is shown on plan entitled Plan of Land in Walpole Massdeg by E Worthington Engineer dated February 6 193 7 recorded with said Deeds Book D2135 Page 8 I

FHBOSTON52454092

Bk 39600 Pg420 88608

PARCEL II Property known as Parcel 33-120 of the Town of Walpole Tax Assessors Map which is

part of the property situate in the Town of Walpole County ofNorfolk and Commonwealth of Massachusetts and being all of the right title and interest of The Penn Central Corporation in and to all those certain pieces or parcels of land and premises easements rights of way and any other rights of any kind whatsoever appurtenant thereto or used in conjunction therewith on and along a portion of Branch of Railroad known as the Wrentham Branch said portion of railroad being described as follows

Beginning at a line extended across the right of way of said Branch of rai road said line being the Northerly line of South Street and extending thence in a Northeasterly direction the distance of 2852 feet more or less along said Branch of rai Iroad to a line which is parallel with the Southwesterly line of Common Street said parallel line extending across said right of way through a point in the centerline thereof at railroad valuation survey station 733 + 67 more or less and being the place of ending

Parcel II is described in the deed recorded with the Norfolk Registry of Deeds in Book 7986 Page 372 and is a portion of the land shown on the plan recorded with said Deeds as Plan No 52 of 1983

FHBOSTON52454092

Bk 39600 Pg421 88608

Exhibit B Legal Description of the Restricted Area and Coordinates of Cover Types

Le2al Description for Restricted Area The area shown on the plan entitled Activity and Use Limitations Plan of Land Blackburn amp Union Privileges Superfund Site 50 amp 60 South Street Walpole Mass Scale l = 30 dated April 6 2021 by Norwood Engineering Company Inc recorded with the Norfolk Registry of Deeds in Plan Book 704 Page 41 being bounded and described as follows

Beginning at a point on the easterly sideline of South Street at the southerly point of curvature of Gleason Court on said plan thence

Northeasterly and curving to the right along an arc of a curve having a radius of twentyshyfive and 00100 (2500) feet a length of forty-five and 15100 (4515) feet thence

S 48deg1352 E a distance of twenty-two and 24100 (2224) feet the previous course by the southerly sideline of Gleason Court thence

s 32deg0208 w a distance of fifty-four and 78100 (54 78) feet thence

S 59deg27 32 E a distance of twenty and 50100 (2050) feet thence

S 47deg5252 E a distance of eleven and 90100 (1190) feet thence

S 49deg01 10 E a distance of twenty-nine and 58100 (2958) feet thence

s 38deg3108 w a distance oftwenty and 01100 (2001) feet thence

S 49deg00 57 E a distance of one hundred and 56100 (10056) feet thence

N 39deg5348 E a distance of twenty-eight and 45100 (2845) feet the previous seven (7) courses by land ofNF Thelma A Casborali thence

S 49deg0808 E a distance of ninety and 29100 (9029) feet the previous course by land ofNF Ming L Yau thence

s 25deg2312 w a distance of siliy-eight and 22100 (6822) feet to a point on the westerly sideline of a fonner railroad right of way the previous course by land of the Town of Walpole assessor parcel 33-121 thence

S 55deg2937 E a distance of ninety-nine and 78 100 (99 78) feet to a point of tangency on the easterly sideline of a forn1er railroad right of way thence

Page 1 of 13

Bk 39600 Pg422 88608

s 30deg11 32 w

S 23deg49 I6 W

N 66deg1044 W

N 23deg4908 E

N l 6deg00 52 E

S 37deg0240 E

N 10deg1437 W

N 34deg093 I W

N 11 deg5558E

Northeasterly

N 27deg41 48 E

a distance of three hundred and three and 74100 (30374) feet the previous course by land ofNF Nicholas H Dowd and NF Emilio P Baldassari thence

a distance of four hundred ninety and 86100 (49086) feet to a SBdh the previous two (2) courses by the easterly sideline of a former railroad right of way thence

a distance of eighty-two and 76100 (8276) feet to an Iron Pipe on the westerly sideline of the former railroad right of way thence

a distance of twelve and 09100 (1209) feet to a SBdh thence

a distance of ninety-six and 50100 (9650) feet to a S Bdh thence

a distance of fifteen and 00100 (1500) feet the previous three (3) courses by the westerly sideline of the former railroad right ofway and land of NF Joseph R Carpentieri and NF Joseph R and Faith N Carpentiero thence

a distance of ninety-two and 82100 (9282) feet the previous course by land ofNF Richard A and Josette M Burke thence

a distance of tvvo hundred thirty-seven and 86100 (23786) feet to a point on the easterly sideline of South Street thence

a distance of one hundred twenty and 00100 (12000) feet along the easterly sideline of South Street to a point of curvature of the easterly sideline of South Street thence

and curving to the right along an arc of a curve having a radius of eight hundred and 00100 (80000) feet a length of two hundred hventy and 11100 (22011) feet along the easterly sideline of South Street thence

a distance of three hundred forty-hvo and 42100 (34242) feet to the point of beginning

Containing 621 Acres of land more or less

Page 2 of 13

3000

3005

3010

3015

3020

3025

3030

Bk 39600 Pg423 88608

EXHIBIT B (cont)

Points and Coordinates associated with Restriction Areas and Cover Types for the Activity and Use Limitations (AUL) at 50 amp 60 South Street Walpole Mass

Point Northing Easting Type

Curve Curve Number Len2th Radius

28754430528 7236432250 COR

3001 28755604597 7236680368 PC L=7535 R=80000

3002 2875597 1222 7236766913 POC

3003 28756333366 7236870620 PT

3004 28756280754 723697 3031 COR

28756025570 7237001250 COR

3006 28755918670 7237001140 COR

3007 28755864440 7237 I 05890 COR

3008 28755903200 72371963 IO COR

3009 28756030893 7237217396 COR

28756042534 7237250325 COR

3011 28756021733 7237317808 COR

3012 28755800732 7237640949 COR

3013 2875552 1424 7237667395 COR

3014 28755321388 7237708416 COR

28755197081 7237834881 COR

3016 28755102230 7238045173 COR

3017 28754941531 7238291869 COR

3018 28754851375 7238512944 COR

3019 28754753441 7238824 760 COR

28754681541 723916 1881 COR

3021 28754608227 7239406506 COR

3022 28754515846 7239459928 COR

3023 2875426 7589 723943 8163 COR

3024 28754198016 7239590840 COR

28753886764 7239449006 COR

3026 2875329 7944 7239187206 COR

3027 28752506745 7238837890 COR

3028 28751859560 7238552142 COR

3029 28751221833 723827342 l COR

28750848788 7238107869 COR

3031 2875045 3654 7237927814 COR

3032 28750630420 7237527432 COR

3033 28750741023 723757 6257 COR

3034 28751668594 7237842488 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 3 of 13 April 14 2021

3035

3040

3045

3050

3055

3060

3065

3070

Bk 39600 Pg424 88608

Point Number

Northing Easting Type Curve Leneth

Curve Radius

28751548848 7237932869 COR

3036 28752462269 7237767802 COR

3037 28756438461 7236904209 POC L=2207 R=80000

3038 28756543084 7236939245 PT

3039 2875653 7987 7236954123 PC

28756597578 7237007344 POC L=1651 R=937

3041 28756594465 7237087181 PT

3042 28756459044 7237347021 PC L=347 R=220

3043 28756432531 7237363546 PT

3044 28756280644 7237286201 COR

28755924210 7237966952 COR

3046 28756081959 7238048554 PC L=472 R=236

3047 28756064922 7238084404 PT

3048 28755523491 7237845047 COR

3049 28755419845 7238081981 COR

28755460757 7238099621 PC L=240 R=l57

3051 28755467701 7238120241 PT 3052 28755398690 7238275280 COR

3053 28755365410 7238264910 COR

3054 28755087149 7238900449 COR

28755158001 7238931521 COR

3056 28755040360 7239199770 COR

3057 28755311720 7239318930 COR

3058 28755263010 7239429300 COR

3059 28755388260 7239484290 COR

28755348660 7239576000 COR

3061 28755625470 7239696500 COR

3062 28755664605 7239606601 COR

3063 28755736202 7239637768 COR

3064 28755621870 7239897370 COR

287 5567 6160 7239920410 COR

3066 28755718270 7239830260 COR

3067 2875587 9750 7239900310 COR

3068 28755718790 724026 7600 COR

3069 28755763390 7240285350 COR

28756035900 7239926600 COR

3071 28756086280 7239812770 COR

3072 28756089984 7239813649 COR

3073 28756229128 7239501910 PC L=482 R=l54

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 4 of 13 Apnl 14 2021

3075

3080

3085

3090

3095

3100

3105

3110

Bk 39600 Pg425 88608

Point Number

Northing Easting Type Curve Length

Curve Radius

3074 28756257366 7239513984 PT

28756185799 7239674928 COR

3076 28756739833 7239921136 COR

3077 28756876060 7239682275 COR

3078 28756948336 7239735898 PC L=335 R=298

3079 28756958235 7239766064 PT

28756866081 7239978133 COR

3081 28757166275 7240127374 COR

3082 28757068320 7240314640 COR

3083 28757602980 7240594310 COR

3084 28757700050 7240408736 COR

28758247941 7240688376 COR

3086 28758250190 7240683910 COR

3087 28758344979 7240738168 COR

3088 2875843 6103 7240581527 COR

3089 28758602943 7240664224 COR

28758740024 7240397393 COR

3091 28758605706 724032 7776 PC L=477 R=309

3092 28758594882 7240286013 PT

3093 28758666635 7240197585 PC L=2573 R=3127

3094 28758767113 7240118710 POC

28758890752 7240086604 PRC L=I653 R=3993

3096 28758972305 7240074125 POC

3097 28759049552 7240045 I 52 PT

3098 28759330312 7239734408 COR

3099 28759459414 7239588584 PC L=2269 R=5217

28759524821 7239496174 POC

3101 28759568752 7239391829 PRC L=1814 R=486

3102 28759603259 7239308095 POC

3103 28759653883 7239232999 PCC L=l31 R=088

3104 28759665694 7239231411 PT

28759800587 7239299586 COR

3106 28759986288 7238981214 COR

3107 2875983 5797 7238891829 COR

3108 28759879750 7238798689 COR

3109 28759905380 7238754769 PC L=1600 R=2552

28759963590 7238700398 POC

3111 28760035727 7238666620 PT

3112 28760700665 723901 5672 PC L=4515 R=2500

3113 28760830230 7239191198 POC

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 5 of 13 April 14 2021

3115

3120

3125

3130

3135

3140

3145

3150

Bk 39600 Pg426 88608

Point Number

Northing Easting Type Curve Len2th

Curve Radius

3114 2876077 263 6 723 940 1624 PT 28760624518 7239567466 COR

3116 28760160100 7239276864 COR

3117 28760055928 7239453423 COR

3137 28759976118 7239541692 COR

3118 28759782139 7239764992 COR

3119 28759625581 7239640375 COR

28758966057 7240399493 COR

3121 28759184326 7240581973 COR

3122 28758593598 724126478] COR

3123 28757977293 724097 2314 COR

3124 28757716516 7241351659 COR

28757288251 7241140719 COR

3126 28756725827 7240851862 COR

3127 28756162468 7240586126 COR

3128 28755614498 7240338506 COR

3129 28754346745 7239768507 COR

28753845716 7239540194 COR

3131 28753257436 723927 8634 COR

3132 28752466355 7238929370 COR

3133 28751819340 7238643698 COR

3134 28751181527 7238364939 COR

28750807772 7238199071 COR

3136 28750413263 7238019301 COR

3138 28756920317 7237298739 PC L=l941 R=2104

3139 28756827128 7237274848 POC

28756733047 7237294944 PRC L=401 R=l66

3141 2875671 1336 723 727 2844 PCC L=1492 R=13345

3142 28756744594 7237206091 POC

3143 28756781529 7237141301 PCC L=1419 R=l018

3144 28756833084 7237094642 POC

28756902566 7237091952 PCC L=2413 R=157959

3146 28757017337 7237129167 POC

3147 28757131820 7237167258 PCC L=330I R=S0000

3148 28757282552 7237234442 POC

3149 28757431866 7237304721 PT 28757338390 7237495930 COR

3151 28757541620 7237605380 COR

3152 28756897590 723883 4280 COR

Exhibit B to NA UL-Part 11-EOS Coordinate Tables Page 6 of 3 April 14 202

3155

3160

3165

3170

3175

3180

3185

Bk 39600 Pg427 88608

Point Northing Easting Type Curve Cunbulle

Number Lenszth Radius 3153 28756870623 7238820218 COR

3154 28756838273 7238882258 COR

28756865240 7238896320 COR

3156 28756777004 7239062996 COR

3157 28756770439 7239063663 PC L=l 146 R=2269

3158 2875665836 I 7239046180 PCC L=l423 R=957

3159 2875661 7520 7238989913 POC

28756625544 7238920850 PT

3161 28756728525 7238726583 PC L=232 R=l58

3162 28756748720 7238720236 PT

3163 28756899634 7238797341 COR

3164 28757254653 7238121363 COR

28757520153 723761266 7 COR

3166 28757306899 723 750 IO 10 COR

3167 28756690336 7237500169 PC L=243 R=I68

3168 28756682599 7237479273 PT

3169 28756686990 7237469583 PC L=0250 R=l68

28756708806 7237463018 PT 3171 28757000109 7237616354 PC L=233 R=l73

3172 28757005368 7237637270 PT

3173 28757000998 7237645513 PC L=233 R=l69

3174 28756980219 7237651023 PT

28756429209 7238339422 COR

3176 28756342982 7238506849 COR

3177 28756500076 7238596485 PC L=l19 R=l48

3178 28756499701 7238608072 PT 3179 2875644 7813 7238705611 PC L=l 182 R=483

28756358177 723 869 0707 PT

3181 2875623 6099 7238376388 PC L=443 R=467

3182 28756235611 7238333779 PCC L=343 R=9IO

3183 28756249049 7238302418 PCC L=412 R=9IO

3184 28756278952 7238274519 PCC L=368 R=300

28756313362 7238277619 PT

3186 28756282498 7238911796 PC L748 R=216

3187 28756240650 7238919721 PT

3188 28756126081 7238620406 PC L=323 R162

3189 28756138645 7238591575 PCC L=333 R=283

Exhibit B to NAUL-Part II-EOS Coordmate Tables Page 7 of 13 April 14 2021

3190

3195

3200

3205

3210

3215

3220

Bk 39600 Pg428 88608

Point Number Northing Easting Type Curve

Leneth Curve Radius

28756163375 7238602867 PT

3191 2875523 0908 7238765275 COR

3192 28755205040 7238752740 COR

3193 28755391740 7238328470 COR

3194 28755466840 7238361040 COR

28755452760 7238392590 COR

3196 28755516920 7238421040 COR

3197 28755530690 7238388730 COR

3198 28755603230 7238421460 COR

3199 2875555 7568 723852 7053 COR

28755371220 7238445330 COR

3201 28755629198 7238558466 COR

3202 28755676040 7238453290 COR

3203 28755925410 7238563840 PC L=1902 R=3548

3204 28755927383 7238658634 POC

28755954390 7238749520 PT 3206 28755974770 7238807230 COR

3207 28755779200 7238881701 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

28755746700 7238609997 COR

3211 2875593774 7239036608 COR

3212 28756048460 7238996850 PC l=1445 R=2903

3213 28756070631 7239065422 POC

3214 28756109010 7239126420 PT

28756153820 7239182190 PC L=S98 R=848

3216 28756171980 723923 7880 PT

3217 287S6026148 7239566166 COR

3218 28756003865 7239556465 COR

3219 287S6134380 7239256650 COR

28755998460 7239195370 COR

3221 2875600 71S0 7239174530 COR

3222 28756001791 7239172152 COR

3223 28756040451 7239079437 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 8 of 13 April 14 2021

Bk 39600 Pg429 88608

Point Number

3210

3200

3056

3057

3058

3059

3060

3061

3062

3218

3219

3220

3221

3224

3225

3226

3227

3228

3070

3071

3234

3233

3235

3236

3237

3238

3239

3240

3241

3242

3243

3244

3245

3246

3247

3248

Northing

28755746700

28755371220

28755040360

28755311720

28755263010

28755388260

28755348660

2875562 54 70

28755664605

28756003865

28756134380

28755998460

28756007150

28755941340

28755962080

28755867937

28755819702

28755766128

28756035900

28756086280

28755991990

28755942100

28756477248

28756677238

28756650130

28756473307

28756480112

28756675030

28756724454

28756742099

28756742133

28756703924

28756640759

28757607280

28757401530

28757467350

Easting

7238609997

7238445330

7239199770

7239318930

7239429300

7239484290

7239576000

7239696500

7239606601

7239556465

7239256650

7239195370

7239174530

7239145324

7239100930

7239061674

7238935003

7238911508

7239926600

7239812770

7239769910

7239884050

7239261913

7239253008

7239321810

7239319038

7239298824

7239364440

7239271845

7239292625

723935 0187

7239393239

7239393096

7237584960

7237475300

7237345620

Type

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

PC PCC

POC

PCC

PT

COR

COR

COR

Curve Len2th

L=273

L=ll77

L=657

Cunmiddote Radius

R=1421

R=810

R=679

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 9 of 13 April 14 2021

Bk 39600 Pg430 88608

Point Number Northing Easting Type Curve

Len2th Curve Radius

3249 287 57514570 7237372360 PC l=ll05 R=1993

3250 287 57 588060 7237452980 PT

3251 28757631382 7237429676 PC L=2244 R=2352

3252 287 5765 6810 7237537876 POC

3253 2875 762 9720 7237645671 PT

3254 28756940655 7238952710 PC l=1493 R=1509

3255 28756901845 7239015577 POC

3256 2875683 7836 7239052474 PT

3257 28758104824 7237653014 COR

3258 28758028960 7237800160 COR

3259 28757949530 7237760790 COR

3260 28757901005 7237855021 COR

3261 28757839230 7237820908 PC L=273 R=l33

3262 28757830688 7237799810 PCC L=539 R=2144

3263 28757852974 7237750897 PT

3264 28757891705 7237688178 PC L=lS26 R=2432

3265 28757948636 7237637880 POC

3266 287 58018307 7237607597 PT

3248 28757467350 7237345620 COR

3267 28757550832 7237363444 POC L=2653 R=80000

3268 28757668809 7237424132 PT

3269 28757504 719 7238817989 COR

3270 28757493010 7238842230 COR

3271 28757561074 7238880970 COR

3272 28757483953 7239024127 PC L=323 R=l70

3273 28757459939 7239037846 PT

3274 28757311605 7238957122 PC L=1388 R=906

3275 2875727 2732 7238901647 POC

3276 28757283181 7238834718 PT

3277 287 5733 4061 7238752337 PC L=255 R=l60

3278 287 5735 5527 7238744411 PT

3279 2875 7102815 7239517199 PC l=261 R=l70

3280 28757080654 7239525307 PCC l=909 R=1275

3281 2875 700 5390 7239477911 PCC L=l007 R=990

3282 28756999624 7239381704 PT

3283 2875707 7705 7239230604 PC L=ll14 R=907

Exhibit B lo NAUL-Part IlbullEOS Coordinate Tables Page 10 of13 April 14 2021

3285

3290

3295

3300

3305

3310

3315

Bk 39600 Pg431 88608

Point Number Northing Easting Type

Curve Leneth

Curve Radius

3284 28757168066 7239178102 PT

28757205717 7239186398 PC L=518 R=930

3286 28757249003 7239213534 PCC L=l41 R=086

3287 2875724 7909 7239226048 PT

3288 28758415755 7239842757 PC L=251 R=l59

3289 28758437695 7239837379 PT

28758456377 7239846949 PC L=812 R=876

3291 28758494897 7239915165 PCC L=456 R=757

3292 28758483790 7239958646 PT

3293 28758405147 7240111348 PC L=l057 R=955

3294 28758318136 7240161452 PCC L=477 R=l063

28758272407 7240149529 PCC L=250 R=l60

3296 28758265647 7240128003 PT

3297 28758157937 7237680895 COR

3298 28758902927 723807 1969 COR

3299 28758852531 7238168280 COR

28758779660 7238129750 COR

3301 28758746973 7238192072 COR

3302 2875807 6630 7237840490 COR

3303 28758049940 7237894220 COR

3304 2875871 7997 7238243620 COR

28758680103 7238315946 COR

3306 28758533699 7238239240 COR

3307 2875852 6899 7238252220 COR

3308 28758098180 7238027600 COR

3309 28757974484 7238264223 COR

28757957598 7238255513 COR

3311 28757757732 7238637845 COR

3312 28757774584 7238646620 COR

3313 28757653710 723887 7846 COR

3314 28757560920 7238829340 COR

28759004930 7238125514 COR

3316 28759689797 7238485028 PC L=1992 R=2609

3317 28759697204 7238583760 POC

3318 28759667288 723867 8142 PT

3319 28758996126 7238323718 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 11 of 13 April 14202 I

Bk 39600 Pg432 88608

Point Number

Northing Easting Type Curve Lenfth

Curve Radius

3320 28759028950 7238261560 COR 3321 28758954486 7238222188 COR

3322 28758972523 7238378387 COR 3323 28759421550 7238613630 COR 3324 28759377933 7238698105 COR 3325 2875907 4811 7238539289 COR 3326 28759081611 7238526309 COR 3327 28758935210 7238449604 COR

3328 28759464470 7238637330 COR 3329 28759632674 7238722481 PC L=ll83 R=l578

3330 28759583973 7238755474 POC 3331 28759526573 7238768343 PRC L=2163 R=2455

3332 28759422964 7238796123 POC 3333 28759341091 7238865430 PT

3334 28759193370 7239050710 COR 3335 28759416340 7239163940 COR 3336 28759263600 7239455620 COR 3337 28759043690 7239336510 COR 3338 28758935490 7239552130 COR 3339 28757650890 7238883240 COR 3312 28757774584 7238646620 COR 3311 28757757732 7238637845 COR 3310 28757957598 7238255513 COR 3309 28757974484 7238264223 COR 3308 28758098180 723802 7600 COR 3307 28758526899 7238252220 COR 3306 28758533699 7238239240 COR 3340 28758700033 7238326388 COR 3341 28758675436 7238373334 COR 3342 28758733013 7238403500 COR 3343 28758760858 7238350353 COR 3344 28758860952 7238402796 COR 3345 28758833106 7238455943 COR 3346 28758890683 7238486109 COR 3347 28758915280 7238439162 COR 3326 28759081611 7238526309 COR 3325 28759074811 7238539289 COR

Exhibit B to NAUL-Part H-EOS Coordinate Tables Page 12 of l3 April 14 2021

Bk 39600 Pg433 88608

Point Number

Northing Easting Type Curve Len2th

Cunbulle Radius

3324 2875937 7933 7238698105 COR

3082 28757068320 7240314640 COR 3083 28757602980 7240594310 COR 3349 28757790234 7240236327 COR

3348 28757255574 7239956657 COR

3124 28757716516 7241351659 COR 3125 28757288251 7241140719 COR 3126 28756725827 7240851862 COR 3127 28756162468 7240586126 COR 3128 287 55614498 7240338506 COR 3129 28754346745 7239768507 COR 3130 28753845716 7239540194 COR 3131 28753257436 723927 8634 COR 3132 28752466355 7238929370 COR 3133 28751819340 7238643698 COR 3134 2875118152 7 7238364939 COR 3135 2875080 7772 7238199071 COR 3136 28750413263 7238019301 COR 3350 28750296168 7238284525 COR 3351 28754 78 6636 7240267040 COR 3352 28757412029 7241794586 COR

POINT DESCRIPTION ABBREVIATIONS

COR=CORNER PC= POINT OF CURVE WHERE CURVE STARTS POC -= POINT ON CUR VE PT=POINT OF TANGENCY WHERE THE CURVE ENDS PCC = POINT OF COMPOUND CURVE (WHERE RADIUS CHANGES) PRC = POINT OF REVERSE CURVE

NOTES

THE COORDINATES ARE BASED ON AN EXISTING CONDITIONS AS-BUILT FIELD SURVEY BY NORWOOD ENGINEERING CO INC BETWEEN NOVEMBER 15 TO DECEMBER 18 2019 TI-IE COORDINATES ARE BASED ON l1ASSACHUSETIS ST A TE PLANE COORDINATE SYSTEM NAD 1983 (FEET) THE ACCURACY OF THE COORDINATE LOCATIONS ARE +-0J FEET

Exhibit B to N1UL-Part II-EOS Coordmate Tables Page 13 ofl3 April 14 2021

---

1f~ flJr ~i

f ~~ J~i](M~I ~ 1 jf~ ~~f W-- )e 1

It lj fY pl ~-~j

I --- ~ ~

1 (J-c~ er ~

C JI fl JYf

1 ~ ~Yu-~ 1i

~r

( LOClJS P

SCAUllbulliQO

I ar lMIT flG PINI tMS _ lIIPMIDMICXNllRlnT~tlCfllUS 1111D cmuftraquodl s - NIKl1III tfIJIIIIIOfM~1HCll allE1

DAre Jllrl

NUKIJU LU6 DMitM

mmtG6DKbdlt

~4~-middot

~~I

-- ampnbullllf~ ~ fa

LEGEND 0

-i~wr0o-m lICUUoaampbullco--11111 _ _l_J

0

bull ~-ail_I

~-

mo(I ---fwj

amp~~~~ ~ ~~ltgtmiddot ~A~

~6

_L-r

bull -~ IBP__l-11Uil n-rlfl-lffll rMCllI 1a 1rr ai

-~ lll-lliI u-W--11a 1 Ml[ 411 amt l0IIC 3JICJ7 ~ 33-1--I- DIID llXII D111 JlMZ 411 lraquo- ~lUN~t --- - etMpound 11JII

~ MffD mmaat ZL I01t 111

1Jlll~-IICfIQfJICIISJ DfEI IC71- I~ 1~ 9 Cl 1VY IICIIWCLl~fCSC~lNCl

~11HltOXW1A~JtCI~llfB MXIC 1HI lME INCi 111M bull11 (S 1f41~middot~-~-)

~ io

0 0 0 0 -0 0 0 D O 1 middot tbull O

_- _pound ~ - Tf middot- ---r ~~ ~~- ~=middoti

r jil7bull --------4~-middot~

(

SCAtpound 1bull bull YI

I ~ tfAIE lIMa toafllltl1E ~NAD1w1(rJ

1 ~ PlIla II MMt QI 11D TD D111oPl

~c1MlntID9~~-l 1NIIJIIKlNI LnlJTU ~ deg qllAJSTE uM011111 iu1II 1111ZT IIIILJaZ

Exhibit C - Photo-Reduced Copy of Activity and Use Limitations Plan of Land

--~middot---

I ~111-11111

iiiii

-ill111liilt

ACJIYIJY ANJ) lJSE lJJll7ATJONS PLAN OF LANI)

81ACJ(81R1 I IINION Flr11lfES SllffllF7AVO SIle

o tfO SOIJIH s1ar HlltlPOtL IIAS

SCAlElrJAt IPfffl152021

1IJrwod Eng1neerlng

- EnQlbullHrlflg Compaffy middot~~=~ m Cm1JQ u fnfJa-eal

~ -

-~

9l1EET 1 OF I 8324-02

td ~

w ~ m 0 0

Id Q ii w ii

co co m

co 0

-l

~-77--raquo- -~I~ )middot~ ~ bull _I lT ~ v~

AI ~ If ~)middot~ 7- ~1 c t11 yil ~ ~ ~middot~41 bull1 l ~~l(i~r~1 f7 )ll y-

~~ f -~ -v fgtV ~ ~ ~ l er-- u -

tl x-P~C ()

JP yen f(( 11 1degpoundS -~ (

ftunrTfflllllTnallJrNNQWDf ~ ti IZNtRlTT lnH M IULS IIJIUIUlA-DlltlllllDlJlllIICIF tJbllt~llC~lJNp

DTl NlllltaJatl-Witiill (raquo11 iiiK(+til

I aJnlTlKATJlfl PlAH~ THE PUIIJll1T UC TIUlf Mlaquo THE l5 11 oawG ~ NII 1Hpound1as Of1111E111 AMllfrlTll9laquolllt Mpound ntem OPlaJ CJ1 IWM1pound BREn 011 bulln

~ ~illi~fli~ _lt ---c~-Clmiddot~~c0-nmiddotmiddot~bullJmiddot04~- ~--~--yen~~bull - L -bull -n ~ -r - ~ -

it

~ fr ~ ~- -~bull~bullv OG- ~n0

bull--ltmiddot middot~ -~- ~~-=~7~st~-~~~~i~~Hil~-) 2~C 0 ~~~~~ --------Y-Tgt-bullbullmiddot-

U-IU ~middotshy =i==-

bullbull bull _ -middot-

~----- ( ~11middot

__IC1ZMJ - bull IOC)0l lftEf ___ i gt mEKJllJfNG rotJ1FRIIIT AIIEAS B~ p~ AIIEAS ~ea-vmiddot LIUIID

~ e--- -+ ~ rzprz1za 1 ~ IJTATC PRC ~TC

nJml lltPtasCltJ

DUD BCD lJlll7 PMC 4H 1 1 YERT1CAL M1llI II NCCI ~ _ ro conurr DOD 80CIC 3JII07 llME 4H I ntaM NUIU 1121 IJ4TAI m IMlC 111111 nATIIW ~fsi

tJMAlfflOlI) AIIEAS1 bull 11AMJSCAlfl) AlpoundAS Lill] 1Dll IOlII POT PlCit 6115 J)-t20 ~atfnujK~tlLWlQI

~PUNMl-17 POflTIVNf1Ell llaD BaalC Tl_ Paa bullbull - 99 a 11

_-ijf1iltDP~IZ~ 5CME - JOSUva1fTLJ ~ ~-rr 111 C tMI=

bull111 I~

i=iiii7

~ e---

t c z rl

L-n11 ~

ACJIVJTY AND USE LIAlffAJIONS

PIAN OF RESTRIC1EJJ AREAS ANJJ COVER TYPES

fltACK1(fN _ llNlltgtI PfMIECCS SllPVFVNlJ51Tlt

JO _ lxJ srJllH STREET IIALPrJU JASS

SCAU I - 30 APRIL 2021

lcnwod Engineering

llarwood Cngnrilgtf cpmy -t~~~~

fIL Pllpa-ru - (1u]1a-lftll

~L=wl f 01~JII IO_

a SIEET I (F 2 B324-02

bj ~

w 0

0 0 deg It

iQ ~ w l11

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 1 of 2

CX) CX)

deg CX) 0

ntllT -1~1~ rurnlaquo1 r1n l1XTM 11Nf -r~ lie UUffCI 11Pt lDll1Hf iniin --IC unr1G Tlr 1n1rn Iota allll Ito tyen1tlll ~~11CRnrzJ11-11--~ci-- n31 nr111w11J1t ~bull c ~- diams JDrnn llloffl rcnlml IDII

-~ ]al rll _ _ PnlM-1-PI lbull-- ll7HrirrIPlllD1lf~-a bullbullll 111bull IClln9XnolDlllIIIIIIOm

214 ff7371JOOT ~bull JllC Ibullbull 171 JICllEY)l)vlUTlo~lUl~ ~li_~ -~~ MDlol ll4L~TllJraquofllllf190abullbullt ~~nQuu~~1aJI _~~OtottWU~1t11txm~arcPbrmllmCDt ~~ ~~ ~ =~ gj ~l11~ llltlM Mrattllll TDPmllIDCDI JJ4bull e~ _ ~ e PClC lbullI- 1- ~1sect~ ~ ~ ~ ~ ~~~-nr~44bull~mn11-a11 ~~ =mt =m~ ~ ~~ ~ =~~-~~ =~~rt~l~llibullltbull=

~~~~~~~~r-~r-~~sectsect55~55 ~~ ~=g~~ mi --1~ ~-==~~m~ L-~r UVPllrlllUillDITDr4L 1JI lbullKlllll~==~~~=~

~~~~~~~~ raquoff-llll 111rritl_aianbull ~11lCla rr- n ttll XDP11r1r 11111c-1C111~ RTl~rJlllllbullbull~llllJlllipo~~=r~tm=~~

~=~3r~t==~ ~=~i==~~ llt1ttl70 m~~n~ =n~ L diams 11- bull - iaEi~mi 1lE~HHffi ~1-~ E LbulllT bullU-7YA 8911U TMn4 OJII C- lllkHrnl1nlntll11106~

MJ9~gt111ftlrfffll11 ~ SbullC61hLJT raquoWl lll~IJlll11amp1 utVllllt a lbulllfGl bulllC lT

lliilH~1 ~~rm-=rn~ lbullIIIICU-1bull0

itt ishwI JUo ma m1 bull 1-c iiliii ~==~m~=~ Ullln U7IIY M1NLl411 fflf f-~ llr IL ~ lbullt Ill uaP11rllDn1rin1bull139nf- na_ 1111lnl ___ lWTDf-ID 111Jbullnllr-cishy

J1JT1 lflTI-noLbull COi lJ1 tsr18GOTDrl1~ 1--Cn ~~~==-=~ LbullS1rbull-p

LbulllI ~middot x1 fl11bull diams an l~J P-~ WI 1~1Slrmsraquo11nirorn 11bull1n-

llrgt 58 - TDrl ZJlJ l~ Zl llf4 Pll1raquo91I lnP~IIEI 11 ==~=-~~ lbullt-11bullh1~

nun_-~bullfllrlll_ lbulll-lrbull N- - nr6-11MII rinaus a 1bull1E-t1 im1 nrxi mr~ 7nn1 4i i 1c m llrS~iJ-ltJlillII Tt-Ul ris ~=~~middotiill~~ tf llDln~n1rJrgt11nbull1ric ~IPgt9nq~ It-MU rbull RflrrlllVllbulltPllbullOIIUAfC lbullnJtrNbull_~lD+4ftJSHJ7711JrllIIIIT144lDI lbulll ~I llfs-mllThn~-f 1bull11

1a5blH=i5gS El~ iE =iilli ~ID aH~~ ~~ leJINNllllfflnlt10ff1nll~1g=TI==~- lbullN~Jmiddot pw nrwuhtl tba11 l- lllllsectimiii~ ~ lllaquot ll116UW41 llllII NII Cl Ld bullt ll 11r 111~-~lHtl-IINOClll 1Dgtn~rMOtnllfbull3all)Mnr~bullwrmm11uoo~ ~r~ m~ = ~~ t~-i m NNtotl n11nn cm

~~~~~Ttr~ in Httl01llxl nlfM114ta cm

JJN n=-PIW - I- C lbullT rnr nnubullNoXI ffllPI n1 11-amp 11middot 77)111fflffPl~JlaUII

i1JJ n91lbull ti Jnlftbulllll QII

~g=~~~~ir~f~5 =i~=~~ ~=~ ~ ~j====goi H1111t-llll ffo~ ~rn tm111 ta1Vl~ tnar- IVI rm u1i ~ nw ~illl cm 1111 Hltt1H T7U 72w111ll tm UI ftffiH~bull1 naMUlI nlll

lltfll~IOUl rnes~ttlClll

~I~~=~=~~= l3111ratlQOJ121lllll CS u1n-n-a mn-c~11111llllilr ~====m~~ lbulllllr~~Oll~r1111-t~rtRiHa)toI

-~rt~_Utr111tt~USI ~m~i==r~~llfflpound1gtgtMllkllit1U10C011 annrxnbull-TCRL11ai~=~=~g)llllll~--rWltMJtt-8 DR Pl rraquof ntl rim Gllf CCI~~1r~~ liiilllii u- ntlt bull llJ~naJCDI

raquo11NMl10~Ullllcm ntrlnK)fL~nlln-1c lllf ~--TlJaft_Lmc i lbull1 bull l3il0 Nl-197) Ttlll1344 a LbullI 3 l diams 1-111 lflS 1111lOllt ffl- MP PII bullHI lgtl llJI l97Mlt Ian -ti DG llC

111111===-~~~=mg ====~~ tD rlrffllZllIITO-lfllCIIII=~tr~L~~~= - Pl~I llII TD_ ff~ tDII31119NIJMlDffU~~ H CZIII liii~mlt~ D1111nrn11GQ~-CaKftQNJWNczr41140ffnQCUII Jnffnt1JIIIIJunbull~1Qc20lll ~Pllli ll mrnnn lbulltlP 17Jrffdeg-degluoElJIIIQII

~-I-ti _nrna~rlll

a n- 4411 llbullQI 1=40 rt La n- lllf ffrgtn _Jr_~ Ullk ---rr~~ ~=~=tl~~ =1 nttltt nraquo 1nlU as

=-mn--~111DJIDII Ullgt~fflflnanaaJIIJalt55~~EIS~=~~ ~~)1 -11CIJII nn~bullbullbullnaKatt1ta1

JOIT ru~- rf- deg hJIIII r- 111111 ~1111) -1 aJ1 ld t11D1etlll_TalCIS -~-UCV~bullraquootur=~=~I~~=~--~ ~rsrgo_mlaquoshym rs~11flI ~- rnilr==~=~~ ~~r _ ~ atfl ~ rtw Dgtlnn-f-lEllln17n-UIIP

D11 fflXTJ111111 I~~ ar D1Jn4 ~leJJS-OnC111

=====5 middoti SHU=~ 5 ampn iliiiiiIiI11

ngtgtn~1~1tbullubull1rm DH tu~- lt11 rirmU1111 CDIII

~i~i555mi~ ~~ ~m=~==m~g===~~~~ tn1r JtW ~ma- PiOll a CU

~ XNr~t~fDllll1-all~~ m===~~ bullbull~W 111111 ==~~ ampT g~ ru~ =

~lU $Et=ni ~ llll0111ra1Ln~otqC011

H~ g==i =~1 ~

~111111 ~~g~n~a~J))pound11 1=~)6tia

~~ mEfHfH~Si

amp12Ct _ an ~

U N711f21th mM1LU aa o1bull~--117CII in4r ~llllll1Vffl-111Dlr lit~ Hmtlpound1 71 12L I CCIII ---~CUnMIIUOCVf JIHtlnn nl 7r ll4011CIIII

llllDNXCWZflDtlltllCIDCDr

~~=~==~=gnn n1raquoL bullw noanDNt CIJIIi=~ C~middot ~ ~ ~ HnffTI-QIJroQ__111PtlJIIInfflll bullbull1~ aaeIT t-- nrJD nJUntu~CllWI

m ~1 ~ ~~~ ~ ilria~gliiiji~=ir ~lt-OTT gl1raquo ~Iraquou fflllIL nllll 1111111 flC~middotIY_4allCCIIIi l1i5~ ~~11~middot~ ~~ ffll H71W786lll 7P-JOalllllll 2N ~ 1-flllt 7HIJl4- DI ~ ~==~ ~t-tr bullM-

114 Hit71aTra7ririatNOCIIII

llHl1Hf ll~7Dl4fIZIIICIIII 1141ftillf+1DllnTgtlMa~=~bull==~r Lbulll-lllbullbulllJJ

=~~~HR-~a ~ =iEri ~ ~=6

= 1MESE COCIIIOlfAlEi ARC 9~ at AH DISTlfG CONJmOfS AS-alLT FED 5UKiEY Y NORWDal EJICltJIJll(G CD~ IIElMEN ~ 1S 111 DECDaR a 2DII 1)pound OCICIIIDNAlES 5HCflI UIpound IIAID Cit MltSSAOfllffT5 STATE FlJriNII CDCffllNAT smult ~AO leJ (IMIJ 1HE ACQlltACY ltF 1HE COCftDINT[ LDCAnatS Mpound diams- 01 FtU

POINT DESCRIPTION ABBREVIATIONS~-~middotPC Pmlr Of CLIRIJC bullIEllL ClMNpound STilRlS PDC bull PtJtilTIIJOM1poundr ~ [raquo TAHCINiT W(R[ lll[ CURpound uroo Fo F[1NT(1t~tfflvt[ltft1llllIIUlt OMNtilE)PRC ~T oT ~pound ~Vlllrlt

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 2 of 2

I ~ IHAT nfl PlM MS 81D1 PIIDMQl ~WllTM(llUI MOIIEOIAAlPlllR~Df IIUPS C- lttE ~111 Cl__ HftNMIIIZlt

WWWWJU Cii6 liftitit

ACTIVITY ANI) USE LINTATIONS

PLAN OF RES7RIC1EJJ AREAS ANJJ COlER TYPES

8V CKlJ()RN IJNl()N PflllfpoundCpoundS SlllERFIIMJ SITC

50 HJ S(J11( SmEpoundT llAIPOIL JASS

=r-o ~ ll 2021

~ Engmeer1ng

Hltd ~~ middot~~-=~ra (f~AJ lIQ c- f

a llfEET 2 ltF 6324-02

td ~

w ~ m 0 0

Id Q ii w m

co co m 0 co

Bk 39600 Pg437 88608

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY New England Region

Five Post Office Square - Suite 100 Boston Massachusetts 02109-3912

INSTITUTIONAL CONTROL DESIGN STATEMENT FOR THE BLACKBURN AND UNION PRIVILEGES SUPERFUND SITE - EAST OF SOUTH STREET AREA

1 Introduction

Pursuant to the Comprehensive Environmental Response Compensation and Liability Act 42 USC sect 9601 et seq (CERCLA) and the National Contingency Plan 40 CFR Part 300 (the NCP) this document contains a description of the release events and site history that resulted in the contaminated media that require institutional controls in the fom1 of Activity and Use Limitations the basis for land use restrictions and uses that are consistent and inconsistent with the Selected Remedy ( as described below) This Institutional Control (IC) Design Statement pertains to a portion of the Blackburn and Union Privileges Superfund Site located in the Town of Walpole Massachusetts (the Site) which has been listed on EPAs National Priorities List (NPL) which portion is generally referred to as the East of South Street Area (the EOS Area) The EOS Area is located to the east of South Street in Walpole and is shown on Figure 1 attached hereto

A Notice of Activity and Use Limitation (NAUL) is necessary and appropriate for the EOS Area of the Site based on the fact that pursuant to EPAs risk evaluations asbestos arsenic trichloroethene (TCE) and certain polycyclic aromatic hydrocarbon (PAH) contan1inants remain in place in soils at levels higher than those appropriate for unlimited use or unrestricted exposure groundwater underlying the EOS Area contains hazardous substances at levels that present an unacceptable risk of exposure and remedial measures at the Site must be protected and maintained to ensure that the Selected Remedy remains protective

EPAs Record of Decision (ROD) dated September 30 2008 specified the need for institutional controls such as a NAUL to ensure long-tenn perfonnance and protectiveness of the Selected Remedy The institutional controls described herein are necessary and appropriate to ensure that the Selected Remedy for the Site remains protective of human health and the environment The remedy for the Site as described in the ROD is referred to herein and in the NAUL as the Selected Remedy

Page 1 of7

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 2: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

Bk 39600 Pg407 88608

Judgment in Tax Lien Case No 13 TL 147513 recorded with said Deeds in Book 33107 Page 416 said parcels of land are more particularly bounded and described in Exhibit A attached hereto and made a part hereof (the Property)

WHEREAS the portion of the Property which is subject to this Notice of Activity and Use Limitation is shown on a plan titled Activity and Use Limitations Plan of Land Blackburn amp Union Privileges Superfund Site recorded in the Norfolk County Registry of Deeds in Plan Book~ Plan~ a photo-reduced version of which is attached hereto as Exhibit C such area is more particularly described on Exhibit B attached hereto and made part hereof (the Restricted Area)

WHEREAS the Restricted Area of the Property is comprised of four categories of cover types (Cover Types) which are designated as the Building Footprint Areas Paved Areas Landscaped Areas and Unimproved Areas said Cover Types are shown on a plan titled Activity and Use Limitations Plan of Restricted Areas and Cover Types Blackburn amp Union Privileges Superfund Site recorded with the Norfolk County Registry of Deeds in Plan Book__]_ Plan~ (Plan of Restricted Areas) with a coordinate table a photo-reduced version of which is attached hereto as Exhibit D

WHEREAS the portions of the Restricted Area improved by buildings or other structures are designated as Building Foot Print Areas as shown on the Plan of Restricted Areas the portions of the Restricted Area which are covered with pavement are designated as Paved Areas as shown on the Plan of Restricted Areas the portions of the Restricted Area which are landscaped are designated as Landscaped Areas all other portions of the Property are designated as Unimproved Areas as shown on the Plan of Restricted Areas

WHEREAS the coordinate table which can be used to determine the boundaries of each of the Cover Types as shown on the Plan of Restricted Areas is also attached as part of Exhibit B

WHEREAS pursuant to Section 105 of the Comprehensive Environmental Response Compensation and Liability Act as amended 42 USC sect 9605 (CERCLA) and the National Contingency Plan 40 CFR sectsect 3001 et seq (the NCP) the United States Environmental Protection Agency an agency established under the laws of the United States (EPA) having its New England regional office at Five Post Office Square Boston Massachusetts 02109 (Region 1 ) placed land within the Property on the National Priorities List set forth at 40CFR Part 300 Appendix B by publication in the Federal Register on May 31 1994 Fed Reg 27989 due to a release of hazardous substances as that term is defined by the Section 104 of CERCLA 42 USC sect 9604 (Hazardous Substances) such land being a federal Superfund Site known as the Blackbum amp Union Privileges Superfund Site (Superfund Site)

WHEREAS the Plan of Restricted Areas shows the relationship of the Property and the Restricted Area to the boundaries of the Superfund Site to the extent those boundaries have been established

Page 2 of 12

Bk 39600 Pg408 88608

WHEREAS pursuant to Chapter 21E and the MCP the Massachusetts Department of Environmental Protection an agency established under the laws of the Commonwealth of Massachusetts having its principal office at One Winter Street Boston Massachusetts 02108 (MassDEP) assigned to releases of oil andor hazardous materials occurring at from or onto the Property MassDEP Release Tracking Number(s) 4-3000603 and all places where such oil andor hazardous materials have come to be located are a disposal site under Chapter 21 E and the MCP (the Disposal Site)

WHEREAS in a document titled Record of Decision Blackburn amp Union Privileges Superfund Site dated September 30 2008 (the ROD) said ROD being on file at the EPA Region I Record Center located at Five Post Office Square Boston Massachusetts (EPA Region 1 Record Center) EPA with the concmTence of MassDEP as evidenced by a letter of concurrence from Janine Commerford Assistant Commissioner to Mr James T Owens III Director dated September 29 2008 has selected one or more response actions (collectively the Selected Remedy) for the Superfund Site in accordance with CERCLA and the NCP

WHEREAS the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) (the OampM Plan)

WHEREAS the Selected Remedy is based in part upon the restriction of human access to and contact with Hazardous Substances in soil sediment andor groundwater and the restriction of certain uses and activities occurring in on through over or under the Restricted Areas

WHEREAS in a document titled Institutional Control Design Statement for the

- lackbum and Union Privileges Superfund Site -East of South Street Area dated

(the IC Design Statement) said IC Design Statement being attached he eto as Exhibit E EPA approved a remedial design for land use restrictions and other institutional controls at the Superfund Site

WHEREAS the JC Design Statement contains a description of the basis for land use restrictions and the release event(s) or site history that resulted in the contaminated media subject to this Notice including (a) a statement that specifies why the Notice is necessary to the Selected Remedy (b) a description of the release event(s) or site history that resulted in the contaminated media subject to the Notice (ie date of the release(s) to the extent known release volumes(s) and response actions taken to address the release(s)) (c) a description of the contaminated media (ie media type(s) and approximate vertical and horizontal extent) subject to the Notice ( d) a statement of which activities and uses are consistent and which are inconsistent with maintaining the Selected Remedy (e) a description of all other components of the institutional and land use controls at the Property

WHEREAS the tenn Ground Surface as used herein shall mean in Paved Areas and in Building Footprint Areas the uppem10st surface of the ground located immediately below any pavement in Paved Areas or under any buildings or stmctures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppermost surface of the ground based upon the surface elevations depicted in Exhibit C attached hereto

Page 3 of 12

Bk 39600 Pg409 88608

WHEREAS pursuant to 3IO CMR 4001 1 I(1 ) MassDEP shal1 deem response actions at a disposal site subject to CERCLA adequately regulated for purposes of compliance with the MCP provided certain enumerated conditions are satisfied including disposal sites subject to CERCLA with respect to which MassDEP has issued a letter of concurrence

WHEREAS pursuant to 3IO CMR 400111 land use controls may be implemented at disposal sites deemed adequately regulated under CERCLA by means of a Notice of Activity and Use Limitation and

WHEREAS pursuant to 310 CMR 400111(10) disposal sites adequately regulated under CERCLA at which (a) remedial actions have been completed in accordance with the ROD for the site (b) subsequent design construction and other pertinent plans have been approved by EPA and ( c) EPA has certified completion of the remedial action will be considered to have achieved a Pennanent Solution under MGL c 21E and the MCP for those hazardous substances subject to such remedial actions

NOW THEREFORE notice is hereby given that the activity and use limitations required by the ROD and more particularly set forth in the IC Design Statement are as follows

I Activities and Uses Consistent with Maintaining the Selected Remedy The following Activities and Uses are consistent with maintaining the Selected Remedy and as such may occur on the Restricted Area without compromising the Permanent Solution that has been achieved for the Site

i Any response actions necessary to maintain the Selected Remedy (including without limitation sampling of existing wel1s and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

11 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

iii Non-residential school and day care uses

1v Paving repaving andor maintenance by adult workers of the Paved Areas provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

v Maintenance work by adult workers in the Landscaped Areas that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or barrier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in

Page 4 of 12

Bk 39600 Pg410 88608

Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

v1 Without limiting Subparagraph I (v) above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan CSMP) The SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation ofwork Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement ofpipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage storm water gas fuel oil electricity and communications

The SMP shall provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

a Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored on the prope1ty

b Appropriate measures shall be taken to secure stored soil and to control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

c Groundwater monitoring we1ls shall be repaired or replaced if damaged

d Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

e A date on which the SMP expires if required by EPA and MassDEP

f A report to be submitted to MassDEP and EPA at the completion of the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health

Page 5 of 12

Bk 39600 Pg411 88608

and safety provisions of 29 Code of Federal Regulation Section 1910 120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Notwithstanding subparagraph 1(vi)(f) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

Vil Such other activities and uses not identified in Paragraph 2 below as being activities and uses inconsistent with maintaining the Selected Remedy

2 Activities and Uses Inconsistent with Maintaining the Selected Remedy The following Activities and Uses are inconsistent with maintaining the Selected Remedy and as such may not occur on the Restricted Area without compromising the Permanent Solution that has been achieved for the Site

i Residential use or activity

11 Except as permitted in Paragraph 1i above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

111 Except as permitted by Section I above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

1v Agricultural use or activity except for raised garden beds approved in accordance with Section l(vi)

v Construction or installation of a bu iiding or structure for human occupancy without prior written approval of EPA

vi Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

Page 6 of 12

Bk 39600 Pg412 88608

3 Obligations and Conditions The following obligations andor conditions are necessary and shall be undertaken at the Property to maintain the Selected Remedy and to avoid compromising the Permanent Solution that has been achieved for the Site

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

11 If EPA has provided written notice that EPA has determined that the parties responsible under the OampM Plan are no longer able to submit an annual compliance letter regarding this NAUL the owner of the Property shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the Restricted Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such cel1ifications are based

4 Emergency Excavation If it becomes necessary to excavate within the Restricted Area as pal1 of a response to an emergency (for example repairing utility lines or responding to a fire or flood) the provisions of Paragraph 1 of this Notice shall be suspended with respect to such excavation to the extent necessary to permit such response provided that the Owner

(i) orally notifies the following persons of such emergency as soon as possible but no later than two (2) hours after having learned of such emergency

A EPA National Response Center at (800) 424-8802 and EPA Region 1 Office of Site Remediation and Restoration Emergency Planning and Response Branch at 888-3 72-7341 and

B MassDEP Emergency Response at (888) 304-1133 and MassDEP Southeast Regional Office of Emergency Response Section at 508-946-2850

or such other persons as MassDEP and EPA respectively may identify in writing from time to time to Owner for such oral emergency response notifications

(ii) notifies MassDEP and EPA in writing of such emergency no later than five (5) days after having learned of such emergency such notifications to be sent to the following addresses

A MassDEP Southeast Regional Office 20 Riverside Drive Lakeville MA 02347 and

Page 7 of 12

Bk 39600 Pg413 88608

B EPA New England Region I 5 Post Office Square - Suite 100 Boston MA 02109-3912

or to such addresses as MassDEP and EPA respectively may identify in writing from time to time to Owner for such written emergency response notifications

(iii) limits the actual disturbance involved in such excavation to the minimum reasonably necessary to adequately respond to the emergency

(iv) implements all measures necessary to limit actual or potential risk to the public health and environment

(v) engages a qualified hazardous waste site cleanup professional such as a Licensed Site Professional (LSP) as defined in the MCP at 310 CMR 400006(12) to oversee the implementation of this Paragraph and to prepare and oversee the implementation of a written plan (Emergency Restoration Plan) that will restore the Property to a condition that meets or exceeds the performance standards established under the ROD for the Selected Remedy and that is consistent with this Notice and to review and evaluate response actions contained in the Emergency Restoration Plan to ensure minimal disturbance of any contaminated soils and sediments and

(vi) performs all actions laid out in the Emergency Restoration Plan within thirty (30) days of the occutTence of the emergency or within such other time period as may be approved by MassDEP and EPA in writing and submit a copy of the Emergency Restoration Plan to MassDEP and EPA within ten (10) days of its performance with a statement from the cleanup professional confirming that the Property has been restored to the standard described above

5 Proposed Changes in Activities and Uses Amendments Pursuant to 310 CMR 4001 l l(amp)(c) the Owner must notify and obtain approval from EPA and MassDEP of any proposed change in activities and uses at the Property that is not provided for in this Notice Pursuant to 3 IO CMR 400111 (8)( d) the Owner must obtain EPA and MassDEP approval of any Amendment or Termination of this Notice All EPA and MassDEP approvals of any Amendment or Termination of this Notice must be in writing and be recorded andor registered with the appropriate Registry(ies) of Deeds andor Land Registration Office(s) to be effective

6 Violations The activities uses andor exposures upon which this Notice is based must not change at any time to (a) cause risks that are not protective of human health or the environment pursuant to the criteria set forth in the NCP at 40 CFR

Page 8 of12

Bk 39600 Pg414 88608

300430(e)(2)(i) (b) interfere with the Selected Remedy or (c) cause a significant risk of harm to health safety public welfare or the environment pursuant to Chapter 21E and the MCP

Compliance with the terms and conditions of this Notice is subject to enforcement pursuant to Chapter 21 E the MCP MGL c 21 A sect 16 and 310 CMR 5 00 and CERCLA and the NCP Such enforcement may include without limitation enforcement with respect to (a) any activities or uses that may occur that are described in Paragraph 2 of this Notice as being inconsistent with the Selected Remedy (b) any failure to undertake any obligations and conditions described in Paragraph 3 of this Notice as being necessary to maintain the Selected Remedy and (c) any other failure to maintain the Selected Remedy or Pem1anent Solution resulting from a failure to act consistently with this Notice

7 Incorporation Into Deeds Mortgages Leases and Instruments of Transfer This Notice shall be incorporated either in full or by reference into all future deeds easements mortgages leases licenses occupancy agreements or any other instrument of transfer whereby an interest in andor a right to use the Property or a portion thereof is conveyed in accordance with 310 CMR 401074(5)

8 Reservation of Rights

This instrument shall not limit or otherwise affect the right of EPA andor MassDEP to obtain access to or restrict the use of the Property pursuant to CERCLA Chapter 21 E or any other applicable statute or regulation

This instrument shall not release the Owner or any other party from liability for releases of oil or hazardous substances or materials nor shall this instrument excuse the Owner or any other party from complying with CERCLA Chapter 21 E or any other applicable federal state or local laws regulations or ordinances or by-laws

Owner hereby authorizes and consents to the filing and recordation andor registration of this Notice said Notice to become effective when recorded andor registered with the appropriate Registry(ies) of Deeds andor Land Registration Office(s)

Page 9 of 12

Town of Walpole acting by and through the Board of Selectmen

n Town Administrator authorized by ard of Selectmen recorded herewith

Bk 39600 Pg415 88608

Witness the execution of this instrument under seal this 21_ day of df 11 ( 2021

COMMONWE

COUNTY OF NORFOLK ss

~ On this 21 day of 4f1 2021 before me the undersigned notary public

personally appeared James Johnson as Town Administrator for the Town of Walpole and proved to me to through satisfactory evidence of identification which was ~6laquo~ ~ -fr VJ1e [indicate ifdrivers license or passport or other document] to be the person whose name is signed on the preceding or attached document and acknowledged to me that signed it voluntarily for its stated purpose

Name CA~ U ~

My Commission Expires July S 2t)z

Page 10 of 12

--------

Bk 39600 Pg416 88608

In accordance with CERCLA 42 USC sect 9601 et seq and the National Contingency Plan the United States Environmental Protection Agency Region I hereby approves this Notice of Activity and Use Limitation

Name 8r~Cltvi Olso Director Superfund and Emerncy Management Division (SEMO)

US Environmental Protection Agency Region I

In accordance with MGL c 21E sect 6 and the Massachusetts Contingency Plan (310 CMR 400000) the Department of Environmental Protection hereby approves this Notice of Activity and Use Limitation (as to form only)

Date Paul W Locke Assistant Commissioner Bureau of Waste Site Cleanup Department of Environmental Protection

Page 11 of 12

---------------

Bk 39600 Pg417 88608

In accordance with CERCLA 42 USC sect 9601 et seq and the National Contingency Plan the United States EobulliionmenlaJ Protectioo Agency Region I hereby appro1es this Notice of Activity and Use Limitation

Date ~------

Name Director Superfund and Emergency Management Division (SEMO)

US Environmental Prokction i0 ency Region I

Jn accordance with MGL c 21 E sect 6 and the Massachusetts Contingency Plan (310 CMR 400000) the Depamnent ofEmironmental Prolectioo hereby approves this Norice ofActivity

and Use Limilarioo (as ro funn ooly)_ ~~

Dale 4r S microlJ ~ Paul W Locke Assisrant Commissioner Bureau ofWaste Site Cleanup Department of Environmental Protection

Page 11 of 12

Bk 39600 Pg418 88608

List of Exhibits

Exhibit A Legal Description of the Property Exhibit B Legal Description of the Restricted Area and Coordinates of Cover Types Exhibit C Photo-Reduced Copy of Activity and Use Limitations Plan of Land Exhibit D Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table Exhibit E Institutional Control Design Statement (EOS) Exhibit F Copy of Vote of Town of Walpole

Return to

Attn Kristine Sheehy Senior Real Estate Attorney FOLEY HOAG LLP Seaport West 155 Seaport Boulevard Boston Massachusetts 02210-2600

Page 12 of 12

Bk 39600 Pg419 88608

EXHIBIT A

Legal Description of Property The land with the improvements thereon located in Walpole Norfolk County Massachusetts bounded and described as follows

PARCEL I

The land on the Southeasterly side of South Street bounded

NORTHWESTERLY NORTHERLY AND AGAIN NORTHWESTERLY by South Street by seven lines measuring respectively

17027 feet 120 feet 22011 feet 1653 feet 325 89 feet 4515 feet and 1497 feet

NORTHEASTERLY by Gleason Court 2627 feet

SOUTHEASTERLY AGAIN NORTHEASTERLY AND AGAIN SOUTHEASTERLY by land now or fom1erly of Santomarco by five lines

measuring respectively 6750 feet 2050 feet 1190 feet 2952 feet and 2001 feet

NORTHEASTERLY AGAIN by said land of Santomarco and land now or formerly of Cashorali 10056 feet

NORTHWESTERLY AGAIN by said land of Cashorali 2845 feet

NORTHEASTERLY by land now or formerly of Muighitti 9007 feet

SOUTHEASTERLY by the location of Old Colony Railroad by three lines measuring respectively 6809 feet 32808 feet and 38250 feet

and

SOUTHWESTERLY by land now or formerly of Meyer by three lines AND SOUTHERLY measuring respectively 9143 feet 1998 feet and

15202 feet

Parcel I is described in the deed recorded with the Norfolk County Registry of Deeds in Book 4459 Page 287

A portion of said premises is shown on plan entitled Plan of Land in Walpole Mass Belonging to General Fibre Co Inc by Edward C Peterson CE dated January 16 1960 filed with the Norfolk Registry of Deeds as Plan No 849 of 1967 in Plan Book 223 and the remainder is shown on plan entitled Plan of Land in Walpole Massdeg by E Worthington Engineer dated February 6 193 7 recorded with said Deeds Book D2135 Page 8 I

FHBOSTON52454092

Bk 39600 Pg420 88608

PARCEL II Property known as Parcel 33-120 of the Town of Walpole Tax Assessors Map which is

part of the property situate in the Town of Walpole County ofNorfolk and Commonwealth of Massachusetts and being all of the right title and interest of The Penn Central Corporation in and to all those certain pieces or parcels of land and premises easements rights of way and any other rights of any kind whatsoever appurtenant thereto or used in conjunction therewith on and along a portion of Branch of Railroad known as the Wrentham Branch said portion of railroad being described as follows

Beginning at a line extended across the right of way of said Branch of rai road said line being the Northerly line of South Street and extending thence in a Northeasterly direction the distance of 2852 feet more or less along said Branch of rai Iroad to a line which is parallel with the Southwesterly line of Common Street said parallel line extending across said right of way through a point in the centerline thereof at railroad valuation survey station 733 + 67 more or less and being the place of ending

Parcel II is described in the deed recorded with the Norfolk Registry of Deeds in Book 7986 Page 372 and is a portion of the land shown on the plan recorded with said Deeds as Plan No 52 of 1983

FHBOSTON52454092

Bk 39600 Pg421 88608

Exhibit B Legal Description of the Restricted Area and Coordinates of Cover Types

Le2al Description for Restricted Area The area shown on the plan entitled Activity and Use Limitations Plan of Land Blackburn amp Union Privileges Superfund Site 50 amp 60 South Street Walpole Mass Scale l = 30 dated April 6 2021 by Norwood Engineering Company Inc recorded with the Norfolk Registry of Deeds in Plan Book 704 Page 41 being bounded and described as follows

Beginning at a point on the easterly sideline of South Street at the southerly point of curvature of Gleason Court on said plan thence

Northeasterly and curving to the right along an arc of a curve having a radius of twentyshyfive and 00100 (2500) feet a length of forty-five and 15100 (4515) feet thence

S 48deg1352 E a distance of twenty-two and 24100 (2224) feet the previous course by the southerly sideline of Gleason Court thence

s 32deg0208 w a distance of fifty-four and 78100 (54 78) feet thence

S 59deg27 32 E a distance of twenty and 50100 (2050) feet thence

S 47deg5252 E a distance of eleven and 90100 (1190) feet thence

S 49deg01 10 E a distance of twenty-nine and 58100 (2958) feet thence

s 38deg3108 w a distance oftwenty and 01100 (2001) feet thence

S 49deg00 57 E a distance of one hundred and 56100 (10056) feet thence

N 39deg5348 E a distance of twenty-eight and 45100 (2845) feet the previous seven (7) courses by land ofNF Thelma A Casborali thence

S 49deg0808 E a distance of ninety and 29100 (9029) feet the previous course by land ofNF Ming L Yau thence

s 25deg2312 w a distance of siliy-eight and 22100 (6822) feet to a point on the westerly sideline of a fonner railroad right of way the previous course by land of the Town of Walpole assessor parcel 33-121 thence

S 55deg2937 E a distance of ninety-nine and 78 100 (99 78) feet to a point of tangency on the easterly sideline of a forn1er railroad right of way thence

Page 1 of 13

Bk 39600 Pg422 88608

s 30deg11 32 w

S 23deg49 I6 W

N 66deg1044 W

N 23deg4908 E

N l 6deg00 52 E

S 37deg0240 E

N 10deg1437 W

N 34deg093 I W

N 11 deg5558E

Northeasterly

N 27deg41 48 E

a distance of three hundred and three and 74100 (30374) feet the previous course by land ofNF Nicholas H Dowd and NF Emilio P Baldassari thence

a distance of four hundred ninety and 86100 (49086) feet to a SBdh the previous two (2) courses by the easterly sideline of a former railroad right of way thence

a distance of eighty-two and 76100 (8276) feet to an Iron Pipe on the westerly sideline of the former railroad right of way thence

a distance of twelve and 09100 (1209) feet to a SBdh thence

a distance of ninety-six and 50100 (9650) feet to a S Bdh thence

a distance of fifteen and 00100 (1500) feet the previous three (3) courses by the westerly sideline of the former railroad right ofway and land of NF Joseph R Carpentieri and NF Joseph R and Faith N Carpentiero thence

a distance of ninety-two and 82100 (9282) feet the previous course by land ofNF Richard A and Josette M Burke thence

a distance of tvvo hundred thirty-seven and 86100 (23786) feet to a point on the easterly sideline of South Street thence

a distance of one hundred twenty and 00100 (12000) feet along the easterly sideline of South Street to a point of curvature of the easterly sideline of South Street thence

and curving to the right along an arc of a curve having a radius of eight hundred and 00100 (80000) feet a length of two hundred hventy and 11100 (22011) feet along the easterly sideline of South Street thence

a distance of three hundred forty-hvo and 42100 (34242) feet to the point of beginning

Containing 621 Acres of land more or less

Page 2 of 13

3000

3005

3010

3015

3020

3025

3030

Bk 39600 Pg423 88608

EXHIBIT B (cont)

Points and Coordinates associated with Restriction Areas and Cover Types for the Activity and Use Limitations (AUL) at 50 amp 60 South Street Walpole Mass

Point Northing Easting Type

Curve Curve Number Len2th Radius

28754430528 7236432250 COR

3001 28755604597 7236680368 PC L=7535 R=80000

3002 2875597 1222 7236766913 POC

3003 28756333366 7236870620 PT

3004 28756280754 723697 3031 COR

28756025570 7237001250 COR

3006 28755918670 7237001140 COR

3007 28755864440 7237 I 05890 COR

3008 28755903200 72371963 IO COR

3009 28756030893 7237217396 COR

28756042534 7237250325 COR

3011 28756021733 7237317808 COR

3012 28755800732 7237640949 COR

3013 2875552 1424 7237667395 COR

3014 28755321388 7237708416 COR

28755197081 7237834881 COR

3016 28755102230 7238045173 COR

3017 28754941531 7238291869 COR

3018 28754851375 7238512944 COR

3019 28754753441 7238824 760 COR

28754681541 723916 1881 COR

3021 28754608227 7239406506 COR

3022 28754515846 7239459928 COR

3023 2875426 7589 723943 8163 COR

3024 28754198016 7239590840 COR

28753886764 7239449006 COR

3026 2875329 7944 7239187206 COR

3027 28752506745 7238837890 COR

3028 28751859560 7238552142 COR

3029 28751221833 723827342 l COR

28750848788 7238107869 COR

3031 2875045 3654 7237927814 COR

3032 28750630420 7237527432 COR

3033 28750741023 723757 6257 COR

3034 28751668594 7237842488 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 3 of 13 April 14 2021

3035

3040

3045

3050

3055

3060

3065

3070

Bk 39600 Pg424 88608

Point Number

Northing Easting Type Curve Leneth

Curve Radius

28751548848 7237932869 COR

3036 28752462269 7237767802 COR

3037 28756438461 7236904209 POC L=2207 R=80000

3038 28756543084 7236939245 PT

3039 2875653 7987 7236954123 PC

28756597578 7237007344 POC L=1651 R=937

3041 28756594465 7237087181 PT

3042 28756459044 7237347021 PC L=347 R=220

3043 28756432531 7237363546 PT

3044 28756280644 7237286201 COR

28755924210 7237966952 COR

3046 28756081959 7238048554 PC L=472 R=236

3047 28756064922 7238084404 PT

3048 28755523491 7237845047 COR

3049 28755419845 7238081981 COR

28755460757 7238099621 PC L=240 R=l57

3051 28755467701 7238120241 PT 3052 28755398690 7238275280 COR

3053 28755365410 7238264910 COR

3054 28755087149 7238900449 COR

28755158001 7238931521 COR

3056 28755040360 7239199770 COR

3057 28755311720 7239318930 COR

3058 28755263010 7239429300 COR

3059 28755388260 7239484290 COR

28755348660 7239576000 COR

3061 28755625470 7239696500 COR

3062 28755664605 7239606601 COR

3063 28755736202 7239637768 COR

3064 28755621870 7239897370 COR

287 5567 6160 7239920410 COR

3066 28755718270 7239830260 COR

3067 2875587 9750 7239900310 COR

3068 28755718790 724026 7600 COR

3069 28755763390 7240285350 COR

28756035900 7239926600 COR

3071 28756086280 7239812770 COR

3072 28756089984 7239813649 COR

3073 28756229128 7239501910 PC L=482 R=l54

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 4 of 13 Apnl 14 2021

3075

3080

3085

3090

3095

3100

3105

3110

Bk 39600 Pg425 88608

Point Number

Northing Easting Type Curve Length

Curve Radius

3074 28756257366 7239513984 PT

28756185799 7239674928 COR

3076 28756739833 7239921136 COR

3077 28756876060 7239682275 COR

3078 28756948336 7239735898 PC L=335 R=298

3079 28756958235 7239766064 PT

28756866081 7239978133 COR

3081 28757166275 7240127374 COR

3082 28757068320 7240314640 COR

3083 28757602980 7240594310 COR

3084 28757700050 7240408736 COR

28758247941 7240688376 COR

3086 28758250190 7240683910 COR

3087 28758344979 7240738168 COR

3088 2875843 6103 7240581527 COR

3089 28758602943 7240664224 COR

28758740024 7240397393 COR

3091 28758605706 724032 7776 PC L=477 R=309

3092 28758594882 7240286013 PT

3093 28758666635 7240197585 PC L=2573 R=3127

3094 28758767113 7240118710 POC

28758890752 7240086604 PRC L=I653 R=3993

3096 28758972305 7240074125 POC

3097 28759049552 7240045 I 52 PT

3098 28759330312 7239734408 COR

3099 28759459414 7239588584 PC L=2269 R=5217

28759524821 7239496174 POC

3101 28759568752 7239391829 PRC L=1814 R=486

3102 28759603259 7239308095 POC

3103 28759653883 7239232999 PCC L=l31 R=088

3104 28759665694 7239231411 PT

28759800587 7239299586 COR

3106 28759986288 7238981214 COR

3107 2875983 5797 7238891829 COR

3108 28759879750 7238798689 COR

3109 28759905380 7238754769 PC L=1600 R=2552

28759963590 7238700398 POC

3111 28760035727 7238666620 PT

3112 28760700665 723901 5672 PC L=4515 R=2500

3113 28760830230 7239191198 POC

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 5 of 13 April 14 2021

3115

3120

3125

3130

3135

3140

3145

3150

Bk 39600 Pg426 88608

Point Number

Northing Easting Type Curve Len2th

Curve Radius

3114 2876077 263 6 723 940 1624 PT 28760624518 7239567466 COR

3116 28760160100 7239276864 COR

3117 28760055928 7239453423 COR

3137 28759976118 7239541692 COR

3118 28759782139 7239764992 COR

3119 28759625581 7239640375 COR

28758966057 7240399493 COR

3121 28759184326 7240581973 COR

3122 28758593598 724126478] COR

3123 28757977293 724097 2314 COR

3124 28757716516 7241351659 COR

28757288251 7241140719 COR

3126 28756725827 7240851862 COR

3127 28756162468 7240586126 COR

3128 28755614498 7240338506 COR

3129 28754346745 7239768507 COR

28753845716 7239540194 COR

3131 28753257436 723927 8634 COR

3132 28752466355 7238929370 COR

3133 28751819340 7238643698 COR

3134 28751181527 7238364939 COR

28750807772 7238199071 COR

3136 28750413263 7238019301 COR

3138 28756920317 7237298739 PC L=l941 R=2104

3139 28756827128 7237274848 POC

28756733047 7237294944 PRC L=401 R=l66

3141 2875671 1336 723 727 2844 PCC L=1492 R=13345

3142 28756744594 7237206091 POC

3143 28756781529 7237141301 PCC L=1419 R=l018

3144 28756833084 7237094642 POC

28756902566 7237091952 PCC L=2413 R=157959

3146 28757017337 7237129167 POC

3147 28757131820 7237167258 PCC L=330I R=S0000

3148 28757282552 7237234442 POC

3149 28757431866 7237304721 PT 28757338390 7237495930 COR

3151 28757541620 7237605380 COR

3152 28756897590 723883 4280 COR

Exhibit B to NA UL-Part 11-EOS Coordinate Tables Page 6 of 3 April 14 202

3155

3160

3165

3170

3175

3180

3185

Bk 39600 Pg427 88608

Point Northing Easting Type Curve Cunbulle

Number Lenszth Radius 3153 28756870623 7238820218 COR

3154 28756838273 7238882258 COR

28756865240 7238896320 COR

3156 28756777004 7239062996 COR

3157 28756770439 7239063663 PC L=l 146 R=2269

3158 2875665836 I 7239046180 PCC L=l423 R=957

3159 2875661 7520 7238989913 POC

28756625544 7238920850 PT

3161 28756728525 7238726583 PC L=232 R=l58

3162 28756748720 7238720236 PT

3163 28756899634 7238797341 COR

3164 28757254653 7238121363 COR

28757520153 723761266 7 COR

3166 28757306899 723 750 IO 10 COR

3167 28756690336 7237500169 PC L=243 R=I68

3168 28756682599 7237479273 PT

3169 28756686990 7237469583 PC L=0250 R=l68

28756708806 7237463018 PT 3171 28757000109 7237616354 PC L=233 R=l73

3172 28757005368 7237637270 PT

3173 28757000998 7237645513 PC L=233 R=l69

3174 28756980219 7237651023 PT

28756429209 7238339422 COR

3176 28756342982 7238506849 COR

3177 28756500076 7238596485 PC L=l19 R=l48

3178 28756499701 7238608072 PT 3179 2875644 7813 7238705611 PC L=l 182 R=483

28756358177 723 869 0707 PT

3181 2875623 6099 7238376388 PC L=443 R=467

3182 28756235611 7238333779 PCC L=343 R=9IO

3183 28756249049 7238302418 PCC L=412 R=9IO

3184 28756278952 7238274519 PCC L=368 R=300

28756313362 7238277619 PT

3186 28756282498 7238911796 PC L748 R=216

3187 28756240650 7238919721 PT

3188 28756126081 7238620406 PC L=323 R162

3189 28756138645 7238591575 PCC L=333 R=283

Exhibit B to NAUL-Part II-EOS Coordmate Tables Page 7 of 13 April 14 2021

3190

3195

3200

3205

3210

3215

3220

Bk 39600 Pg428 88608

Point Number Northing Easting Type Curve

Leneth Curve Radius

28756163375 7238602867 PT

3191 2875523 0908 7238765275 COR

3192 28755205040 7238752740 COR

3193 28755391740 7238328470 COR

3194 28755466840 7238361040 COR

28755452760 7238392590 COR

3196 28755516920 7238421040 COR

3197 28755530690 7238388730 COR

3198 28755603230 7238421460 COR

3199 2875555 7568 723852 7053 COR

28755371220 7238445330 COR

3201 28755629198 7238558466 COR

3202 28755676040 7238453290 COR

3203 28755925410 7238563840 PC L=1902 R=3548

3204 28755927383 7238658634 POC

28755954390 7238749520 PT 3206 28755974770 7238807230 COR

3207 28755779200 7238881701 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

28755746700 7238609997 COR

3211 2875593774 7239036608 COR

3212 28756048460 7238996850 PC l=1445 R=2903

3213 28756070631 7239065422 POC

3214 28756109010 7239126420 PT

28756153820 7239182190 PC L=S98 R=848

3216 28756171980 723923 7880 PT

3217 287S6026148 7239566166 COR

3218 28756003865 7239556465 COR

3219 287S6134380 7239256650 COR

28755998460 7239195370 COR

3221 2875600 71S0 7239174530 COR

3222 28756001791 7239172152 COR

3223 28756040451 7239079437 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 8 of 13 April 14 2021

Bk 39600 Pg429 88608

Point Number

3210

3200

3056

3057

3058

3059

3060

3061

3062

3218

3219

3220

3221

3224

3225

3226

3227

3228

3070

3071

3234

3233

3235

3236

3237

3238

3239

3240

3241

3242

3243

3244

3245

3246

3247

3248

Northing

28755746700

28755371220

28755040360

28755311720

28755263010

28755388260

28755348660

2875562 54 70

28755664605

28756003865

28756134380

28755998460

28756007150

28755941340

28755962080

28755867937

28755819702

28755766128

28756035900

28756086280

28755991990

28755942100

28756477248

28756677238

28756650130

28756473307

28756480112

28756675030

28756724454

28756742099

28756742133

28756703924

28756640759

28757607280

28757401530

28757467350

Easting

7238609997

7238445330

7239199770

7239318930

7239429300

7239484290

7239576000

7239696500

7239606601

7239556465

7239256650

7239195370

7239174530

7239145324

7239100930

7239061674

7238935003

7238911508

7239926600

7239812770

7239769910

7239884050

7239261913

7239253008

7239321810

7239319038

7239298824

7239364440

7239271845

7239292625

723935 0187

7239393239

7239393096

7237584960

7237475300

7237345620

Type

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

PC PCC

POC

PCC

PT

COR

COR

COR

Curve Len2th

L=273

L=ll77

L=657

Cunmiddote Radius

R=1421

R=810

R=679

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 9 of 13 April 14 2021

Bk 39600 Pg430 88608

Point Number Northing Easting Type Curve

Len2th Curve Radius

3249 287 57514570 7237372360 PC l=ll05 R=1993

3250 287 57 588060 7237452980 PT

3251 28757631382 7237429676 PC L=2244 R=2352

3252 287 5765 6810 7237537876 POC

3253 2875 762 9720 7237645671 PT

3254 28756940655 7238952710 PC l=1493 R=1509

3255 28756901845 7239015577 POC

3256 2875683 7836 7239052474 PT

3257 28758104824 7237653014 COR

3258 28758028960 7237800160 COR

3259 28757949530 7237760790 COR

3260 28757901005 7237855021 COR

3261 28757839230 7237820908 PC L=273 R=l33

3262 28757830688 7237799810 PCC L=539 R=2144

3263 28757852974 7237750897 PT

3264 28757891705 7237688178 PC L=lS26 R=2432

3265 28757948636 7237637880 POC

3266 287 58018307 7237607597 PT

3248 28757467350 7237345620 COR

3267 28757550832 7237363444 POC L=2653 R=80000

3268 28757668809 7237424132 PT

3269 28757504 719 7238817989 COR

3270 28757493010 7238842230 COR

3271 28757561074 7238880970 COR

3272 28757483953 7239024127 PC L=323 R=l70

3273 28757459939 7239037846 PT

3274 28757311605 7238957122 PC L=1388 R=906

3275 2875727 2732 7238901647 POC

3276 28757283181 7238834718 PT

3277 287 5733 4061 7238752337 PC L=255 R=l60

3278 287 5735 5527 7238744411 PT

3279 2875 7102815 7239517199 PC l=261 R=l70

3280 28757080654 7239525307 PCC l=909 R=1275

3281 2875 700 5390 7239477911 PCC L=l007 R=990

3282 28756999624 7239381704 PT

3283 2875707 7705 7239230604 PC L=ll14 R=907

Exhibit B lo NAUL-Part IlbullEOS Coordinate Tables Page 10 of13 April 14 2021

3285

3290

3295

3300

3305

3310

3315

Bk 39600 Pg431 88608

Point Number Northing Easting Type

Curve Leneth

Curve Radius

3284 28757168066 7239178102 PT

28757205717 7239186398 PC L=518 R=930

3286 28757249003 7239213534 PCC L=l41 R=086

3287 2875724 7909 7239226048 PT

3288 28758415755 7239842757 PC L=251 R=l59

3289 28758437695 7239837379 PT

28758456377 7239846949 PC L=812 R=876

3291 28758494897 7239915165 PCC L=456 R=757

3292 28758483790 7239958646 PT

3293 28758405147 7240111348 PC L=l057 R=955

3294 28758318136 7240161452 PCC L=477 R=l063

28758272407 7240149529 PCC L=250 R=l60

3296 28758265647 7240128003 PT

3297 28758157937 7237680895 COR

3298 28758902927 723807 1969 COR

3299 28758852531 7238168280 COR

28758779660 7238129750 COR

3301 28758746973 7238192072 COR

3302 2875807 6630 7237840490 COR

3303 28758049940 7237894220 COR

3304 2875871 7997 7238243620 COR

28758680103 7238315946 COR

3306 28758533699 7238239240 COR

3307 2875852 6899 7238252220 COR

3308 28758098180 7238027600 COR

3309 28757974484 7238264223 COR

28757957598 7238255513 COR

3311 28757757732 7238637845 COR

3312 28757774584 7238646620 COR

3313 28757653710 723887 7846 COR

3314 28757560920 7238829340 COR

28759004930 7238125514 COR

3316 28759689797 7238485028 PC L=1992 R=2609

3317 28759697204 7238583760 POC

3318 28759667288 723867 8142 PT

3319 28758996126 7238323718 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 11 of 13 April 14202 I

Bk 39600 Pg432 88608

Point Number

Northing Easting Type Curve Lenfth

Curve Radius

3320 28759028950 7238261560 COR 3321 28758954486 7238222188 COR

3322 28758972523 7238378387 COR 3323 28759421550 7238613630 COR 3324 28759377933 7238698105 COR 3325 2875907 4811 7238539289 COR 3326 28759081611 7238526309 COR 3327 28758935210 7238449604 COR

3328 28759464470 7238637330 COR 3329 28759632674 7238722481 PC L=ll83 R=l578

3330 28759583973 7238755474 POC 3331 28759526573 7238768343 PRC L=2163 R=2455

3332 28759422964 7238796123 POC 3333 28759341091 7238865430 PT

3334 28759193370 7239050710 COR 3335 28759416340 7239163940 COR 3336 28759263600 7239455620 COR 3337 28759043690 7239336510 COR 3338 28758935490 7239552130 COR 3339 28757650890 7238883240 COR 3312 28757774584 7238646620 COR 3311 28757757732 7238637845 COR 3310 28757957598 7238255513 COR 3309 28757974484 7238264223 COR 3308 28758098180 723802 7600 COR 3307 28758526899 7238252220 COR 3306 28758533699 7238239240 COR 3340 28758700033 7238326388 COR 3341 28758675436 7238373334 COR 3342 28758733013 7238403500 COR 3343 28758760858 7238350353 COR 3344 28758860952 7238402796 COR 3345 28758833106 7238455943 COR 3346 28758890683 7238486109 COR 3347 28758915280 7238439162 COR 3326 28759081611 7238526309 COR 3325 28759074811 7238539289 COR

Exhibit B to NAUL-Part H-EOS Coordinate Tables Page 12 of l3 April 14 2021

Bk 39600 Pg433 88608

Point Number

Northing Easting Type Curve Len2th

Cunbulle Radius

3324 2875937 7933 7238698105 COR

3082 28757068320 7240314640 COR 3083 28757602980 7240594310 COR 3349 28757790234 7240236327 COR

3348 28757255574 7239956657 COR

3124 28757716516 7241351659 COR 3125 28757288251 7241140719 COR 3126 28756725827 7240851862 COR 3127 28756162468 7240586126 COR 3128 287 55614498 7240338506 COR 3129 28754346745 7239768507 COR 3130 28753845716 7239540194 COR 3131 28753257436 723927 8634 COR 3132 28752466355 7238929370 COR 3133 28751819340 7238643698 COR 3134 2875118152 7 7238364939 COR 3135 2875080 7772 7238199071 COR 3136 28750413263 7238019301 COR 3350 28750296168 7238284525 COR 3351 28754 78 6636 7240267040 COR 3352 28757412029 7241794586 COR

POINT DESCRIPTION ABBREVIATIONS

COR=CORNER PC= POINT OF CURVE WHERE CURVE STARTS POC -= POINT ON CUR VE PT=POINT OF TANGENCY WHERE THE CURVE ENDS PCC = POINT OF COMPOUND CURVE (WHERE RADIUS CHANGES) PRC = POINT OF REVERSE CURVE

NOTES

THE COORDINATES ARE BASED ON AN EXISTING CONDITIONS AS-BUILT FIELD SURVEY BY NORWOOD ENGINEERING CO INC BETWEEN NOVEMBER 15 TO DECEMBER 18 2019 TI-IE COORDINATES ARE BASED ON l1ASSACHUSETIS ST A TE PLANE COORDINATE SYSTEM NAD 1983 (FEET) THE ACCURACY OF THE COORDINATE LOCATIONS ARE +-0J FEET

Exhibit B to N1UL-Part II-EOS Coordmate Tables Page 13 ofl3 April 14 2021

---

1f~ flJr ~i

f ~~ J~i](M~I ~ 1 jf~ ~~f W-- )e 1

It lj fY pl ~-~j

I --- ~ ~

1 (J-c~ er ~

C JI fl JYf

1 ~ ~Yu-~ 1i

~r

( LOClJS P

SCAUllbulliQO

I ar lMIT flG PINI tMS _ lIIPMIDMICXNllRlnT~tlCfllUS 1111D cmuftraquodl s - NIKl1III tfIJIIIIIOfM~1HCll allE1

DAre Jllrl

NUKIJU LU6 DMitM

mmtG6DKbdlt

~4~-middot

~~I

-- ampnbullllf~ ~ fa

LEGEND 0

-i~wr0o-m lICUUoaampbullco--11111 _ _l_J

0

bull ~-ail_I

~-

mo(I ---fwj

amp~~~~ ~ ~~ltgtmiddot ~A~

~6

_L-r

bull -~ IBP__l-11Uil n-rlfl-lffll rMCllI 1a 1rr ai

-~ lll-lliI u-W--11a 1 Ml[ 411 amt l0IIC 3JICJ7 ~ 33-1--I- DIID llXII D111 JlMZ 411 lraquo- ~lUN~t --- - etMpound 11JII

~ MffD mmaat ZL I01t 111

1Jlll~-IICfIQfJICIISJ DfEI IC71- I~ 1~ 9 Cl 1VY IICIIWCLl~fCSC~lNCl

~11HltOXW1A~JtCI~llfB MXIC 1HI lME INCi 111M bull11 (S 1f41~middot~-~-)

~ io

0 0 0 0 -0 0 0 D O 1 middot tbull O

_- _pound ~ - Tf middot- ---r ~~ ~~- ~=middoti

r jil7bull --------4~-middot~

(

SCAtpound 1bull bull YI

I ~ tfAIE lIMa toafllltl1E ~NAD1w1(rJ

1 ~ PlIla II MMt QI 11D TD D111oPl

~c1MlntID9~~-l 1NIIJIIKlNI LnlJTU ~ deg qllAJSTE uM011111 iu1II 1111ZT IIIILJaZ

Exhibit C - Photo-Reduced Copy of Activity and Use Limitations Plan of Land

--~middot---

I ~111-11111

iiiii

-ill111liilt

ACJIYIJY ANJ) lJSE lJJll7ATJONS PLAN OF LANI)

81ACJ(81R1 I IINION Flr11lfES SllffllF7AVO SIle

o tfO SOIJIH s1ar HlltlPOtL IIAS

SCAlElrJAt IPfffl152021

1IJrwod Eng1neerlng

- EnQlbullHrlflg Compaffy middot~~=~ m Cm1JQ u fnfJa-eal

~ -

-~

9l1EET 1 OF I 8324-02

td ~

w ~ m 0 0

Id Q ii w ii

co co m

co 0

-l

~-77--raquo- -~I~ )middot~ ~ bull _I lT ~ v~

AI ~ If ~)middot~ 7- ~1 c t11 yil ~ ~ ~middot~41 bull1 l ~~l(i~r~1 f7 )ll y-

~~ f -~ -v fgtV ~ ~ ~ l er-- u -

tl x-P~C ()

JP yen f(( 11 1degpoundS -~ (

ftunrTfflllllTnallJrNNQWDf ~ ti IZNtRlTT lnH M IULS IIJIUIUlA-DlltlllllDlJlllIICIF tJbllt~llC~lJNp

DTl NlllltaJatl-Witiill (raquo11 iiiK(+til

I aJnlTlKATJlfl PlAH~ THE PUIIJll1T UC TIUlf Mlaquo THE l5 11 oawG ~ NII 1Hpound1as Of1111E111 AMllfrlTll9laquolllt Mpound ntem OPlaJ CJ1 IWM1pound BREn 011 bulln

~ ~illi~fli~ _lt ---c~-Clmiddot~~c0-nmiddotmiddot~bullJmiddot04~- ~--~--yen~~bull - L -bull -n ~ -r - ~ -

it

~ fr ~ ~- -~bull~bullv OG- ~n0

bull--ltmiddot middot~ -~- ~~-=~7~st~-~~~~i~~Hil~-) 2~C 0 ~~~~~ --------Y-Tgt-bullbullmiddot-

U-IU ~middotshy =i==-

bullbull bull _ -middot-

~----- ( ~11middot

__IC1ZMJ - bull IOC)0l lftEf ___ i gt mEKJllJfNG rotJ1FRIIIT AIIEAS B~ p~ AIIEAS ~ea-vmiddot LIUIID

~ e--- -+ ~ rzprz1za 1 ~ IJTATC PRC ~TC

nJml lltPtasCltJ

DUD BCD lJlll7 PMC 4H 1 1 YERT1CAL M1llI II NCCI ~ _ ro conurr DOD 80CIC 3JII07 llME 4H I ntaM NUIU 1121 IJ4TAI m IMlC 111111 nATIIW ~fsi

tJMAlfflOlI) AIIEAS1 bull 11AMJSCAlfl) AlpoundAS Lill] 1Dll IOlII POT PlCit 6115 J)-t20 ~atfnujK~tlLWlQI

~PUNMl-17 POflTIVNf1Ell llaD BaalC Tl_ Paa bullbull - 99 a 11

_-ijf1iltDP~IZ~ 5CME - JOSUva1fTLJ ~ ~-rr 111 C tMI=

bull111 I~

i=iiii7

~ e---

t c z rl

L-n11 ~

ACJIVJTY AND USE LIAlffAJIONS

PIAN OF RESTRIC1EJJ AREAS ANJJ COVER TYPES

fltACK1(fN _ llNlltgtI PfMIECCS SllPVFVNlJ51Tlt

JO _ lxJ srJllH STREET IIALPrJU JASS

SCAU I - 30 APRIL 2021

lcnwod Engineering

llarwood Cngnrilgtf cpmy -t~~~~

fIL Pllpa-ru - (1u]1a-lftll

~L=wl f 01~JII IO_

a SIEET I (F 2 B324-02

bj ~

w 0

0 0 deg It

iQ ~ w l11

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 1 of 2

CX) CX)

deg CX) 0

ntllT -1~1~ rurnlaquo1 r1n l1XTM 11Nf -r~ lie UUffCI 11Pt lDll1Hf iniin --IC unr1G Tlr 1n1rn Iota allll Ito tyen1tlll ~~11CRnrzJ11-11--~ci-- n31 nr111w11J1t ~bull c ~- diams JDrnn llloffl rcnlml IDII

-~ ]al rll _ _ PnlM-1-PI lbull-- ll7HrirrIPlllD1lf~-a bullbullll 111bull IClln9XnolDlllIIIIIIOm

214 ff7371JOOT ~bull JllC Ibullbull 171 JICllEY)l)vlUTlo~lUl~ ~li_~ -~~ MDlol ll4L~TllJraquofllllf190abullbullt ~~nQuu~~1aJI _~~OtottWU~1t11txm~arcPbrmllmCDt ~~ ~~ ~ =~ gj ~l11~ llltlM Mrattllll TDPmllIDCDI JJ4bull e~ _ ~ e PClC lbullI- 1- ~1sect~ ~ ~ ~ ~ ~~~-nr~44bull~mn11-a11 ~~ =mt =m~ ~ ~~ ~ =~~-~~ =~~rt~l~llibullltbull=

~~~~~~~~r-~r-~~sectsect55~55 ~~ ~=g~~ mi --1~ ~-==~~m~ L-~r UVPllrlllUillDITDr4L 1JI lbullKlllll~==~~~=~

~~~~~~~~ raquoff-llll 111rritl_aianbull ~11lCla rr- n ttll XDP11r1r 11111c-1C111~ RTl~rJlllllbullbull~llllJlllipo~~=r~tm=~~

~=~3r~t==~ ~=~i==~~ llt1ttl70 m~~n~ =n~ L diams 11- bull - iaEi~mi 1lE~HHffi ~1-~ E LbulllT bullU-7YA 8911U TMn4 OJII C- lllkHrnl1nlntll11106~

MJ9~gt111ftlrfffll11 ~ SbullC61hLJT raquoWl lll~IJlll11amp1 utVllllt a lbulllfGl bulllC lT

lliilH~1 ~~rm-=rn~ lbullIIIICU-1bull0

itt ishwI JUo ma m1 bull 1-c iiliii ~==~m~=~ Ullln U7IIY M1NLl411 fflf f-~ llr IL ~ lbullt Ill uaP11rllDn1rin1bull139nf- na_ 1111lnl ___ lWTDf-ID 111Jbullnllr-cishy

J1JT1 lflTI-noLbull COi lJ1 tsr18GOTDrl1~ 1--Cn ~~~==-=~ LbullS1rbull-p

LbulllI ~middot x1 fl11bull diams an l~J P-~ WI 1~1Slrmsraquo11nirorn 11bull1n-

llrgt 58 - TDrl ZJlJ l~ Zl llf4 Pll1raquo91I lnP~IIEI 11 ==~=-~~ lbullt-11bullh1~

nun_-~bullfllrlll_ lbulll-lrbull N- - nr6-11MII rinaus a 1bull1E-t1 im1 nrxi mr~ 7nn1 4i i 1c m llrS~iJ-ltJlillII Tt-Ul ris ~=~~middotiill~~ tf llDln~n1rJrgt11nbull1ric ~IPgt9nq~ It-MU rbull RflrrlllVllbulltPllbullOIIUAfC lbullnJtrNbull_~lD+4ftJSHJ7711JrllIIIIT144lDI lbulll ~I llfs-mllThn~-f 1bull11

1a5blH=i5gS El~ iE =iilli ~ID aH~~ ~~ leJINNllllfflnlt10ff1nll~1g=TI==~- lbullN~Jmiddot pw nrwuhtl tba11 l- lllllsectimiii~ ~ lllaquot ll116UW41 llllII NII Cl Ld bullt ll 11r 111~-~lHtl-IINOClll 1Dgtn~rMOtnllfbull3all)Mnr~bullwrmm11uoo~ ~r~ m~ = ~~ t~-i m NNtotl n11nn cm

~~~~~Ttr~ in Httl01llxl nlfM114ta cm

JJN n=-PIW - I- C lbullT rnr nnubullNoXI ffllPI n1 11-amp 11middot 77)111fflffPl~JlaUII

i1JJ n91lbull ti Jnlftbulllll QII

~g=~~~~ir~f~5 =i~=~~ ~=~ ~ ~j====goi H1111t-llll ffo~ ~rn tm111 ta1Vl~ tnar- IVI rm u1i ~ nw ~illl cm 1111 Hltt1H T7U 72w111ll tm UI ftffiH~bull1 naMUlI nlll

lltfll~IOUl rnes~ttlClll

~I~~=~=~~= l3111ratlQOJ121lllll CS u1n-n-a mn-c~11111llllilr ~====m~~ lbulllllr~~Oll~r1111-t~rtRiHa)toI

-~rt~_Utr111tt~USI ~m~i==r~~llfflpound1gtgtMllkllit1U10C011 annrxnbull-TCRL11ai~=~=~g)llllll~--rWltMJtt-8 DR Pl rraquof ntl rim Gllf CCI~~1r~~ liiilllii u- ntlt bull llJ~naJCDI

raquo11NMl10~Ullllcm ntrlnK)fL~nlln-1c lllf ~--TlJaft_Lmc i lbull1 bull l3il0 Nl-197) Ttlll1344 a LbullI 3 l diams 1-111 lflS 1111lOllt ffl- MP PII bullHI lgtl llJI l97Mlt Ian -ti DG llC

111111===-~~~=mg ====~~ tD rlrffllZllIITO-lfllCIIII=~tr~L~~~= - Pl~I llII TD_ ff~ tDII31119NIJMlDffU~~ H CZIII liii~mlt~ D1111nrn11GQ~-CaKftQNJWNczr41140ffnQCUII Jnffnt1JIIIIJunbull~1Qc20lll ~Pllli ll mrnnn lbulltlP 17Jrffdeg-degluoElJIIIQII

~-I-ti _nrna~rlll

a n- 4411 llbullQI 1=40 rt La n- lllf ffrgtn _Jr_~ Ullk ---rr~~ ~=~=tl~~ =1 nttltt nraquo 1nlU as

=-mn--~111DJIDII Ullgt~fflflnanaaJIIJalt55~~EIS~=~~ ~~)1 -11CIJII nn~bullbullbullnaKatt1ta1

JOIT ru~- rf- deg hJIIII r- 111111 ~1111) -1 aJ1 ld t11D1etlll_TalCIS -~-UCV~bullraquootur=~=~I~~=~--~ ~rsrgo_mlaquoshym rs~11flI ~- rnilr==~=~~ ~~r _ ~ atfl ~ rtw Dgtlnn-f-lEllln17n-UIIP

D11 fflXTJ111111 I~~ ar D1Jn4 ~leJJS-OnC111

=====5 middoti SHU=~ 5 ampn iliiiiiIiI11

ngtgtn~1~1tbullubull1rm DH tu~- lt11 rirmU1111 CDIII

~i~i555mi~ ~~ ~m=~==m~g===~~~~ tn1r JtW ~ma- PiOll a CU

~ XNr~t~fDllll1-all~~ m===~~ bullbull~W 111111 ==~~ ampT g~ ru~ =

~lU $Et=ni ~ llll0111ra1Ln~otqC011

H~ g==i =~1 ~

~111111 ~~g~n~a~J))pound11 1=~)6tia

~~ mEfHfH~Si

amp12Ct _ an ~

U N711f21th mM1LU aa o1bull~--117CII in4r ~llllll1Vffl-111Dlr lit~ Hmtlpound1 71 12L I CCIII ---~CUnMIIUOCVf JIHtlnn nl 7r ll4011CIIII

llllDNXCWZflDtlltllCIDCDr

~~=~==~=gnn n1raquoL bullw noanDNt CIJIIi=~ C~middot ~ ~ ~ HnffTI-QIJroQ__111PtlJIIInfflll bullbull1~ aaeIT t-- nrJD nJUntu~CllWI

m ~1 ~ ~~~ ~ ilria~gliiiji~=ir ~lt-OTT gl1raquo ~Iraquou fflllIL nllll 1111111 flC~middotIY_4allCCIIIi l1i5~ ~~11~middot~ ~~ ffll H71W786lll 7P-JOalllllll 2N ~ 1-flllt 7HIJl4- DI ~ ~==~ ~t-tr bullM-

114 Hit71aTra7ririatNOCIIII

llHl1Hf ll~7Dl4fIZIIICIIII 1141ftillf+1DllnTgtlMa~=~bull==~r Lbulll-lllbullbulllJJ

=~~~HR-~a ~ =iEri ~ ~=6

= 1MESE COCIIIOlfAlEi ARC 9~ at AH DISTlfG CONJmOfS AS-alLT FED 5UKiEY Y NORWDal EJICltJIJll(G CD~ IIElMEN ~ 1S 111 DECDaR a 2DII 1)pound OCICIIIDNAlES 5HCflI UIpound IIAID Cit MltSSAOfllffT5 STATE FlJriNII CDCffllNAT smult ~AO leJ (IMIJ 1HE ACQlltACY ltF 1HE COCftDINT[ LDCAnatS Mpound diams- 01 FtU

POINT DESCRIPTION ABBREVIATIONS~-~middotPC Pmlr Of CLIRIJC bullIEllL ClMNpound STilRlS PDC bull PtJtilTIIJOM1poundr ~ [raquo TAHCINiT W(R[ lll[ CURpound uroo Fo F[1NT(1t~tfflvt[ltft1llllIIUlt OMNtilE)PRC ~T oT ~pound ~Vlllrlt

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 2 of 2

I ~ IHAT nfl PlM MS 81D1 PIIDMQl ~WllTM(llUI MOIIEOIAAlPlllR~Df IIUPS C- lttE ~111 Cl__ HftNMIIIZlt

WWWWJU Cii6 liftitit

ACTIVITY ANI) USE LINTATIONS

PLAN OF RES7RIC1EJJ AREAS ANJJ COlER TYPES

8V CKlJ()RN IJNl()N PflllfpoundCpoundS SlllERFIIMJ SITC

50 HJ S(J11( SmEpoundT llAIPOIL JASS

=r-o ~ ll 2021

~ Engmeer1ng

Hltd ~~ middot~~-=~ra (f~AJ lIQ c- f

a llfEET 2 ltF 6324-02

td ~

w ~ m 0 0

Id Q ii w m

co co m 0 co

Bk 39600 Pg437 88608

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY New England Region

Five Post Office Square - Suite 100 Boston Massachusetts 02109-3912

INSTITUTIONAL CONTROL DESIGN STATEMENT FOR THE BLACKBURN AND UNION PRIVILEGES SUPERFUND SITE - EAST OF SOUTH STREET AREA

1 Introduction

Pursuant to the Comprehensive Environmental Response Compensation and Liability Act 42 USC sect 9601 et seq (CERCLA) and the National Contingency Plan 40 CFR Part 300 (the NCP) this document contains a description of the release events and site history that resulted in the contaminated media that require institutional controls in the fom1 of Activity and Use Limitations the basis for land use restrictions and uses that are consistent and inconsistent with the Selected Remedy ( as described below) This Institutional Control (IC) Design Statement pertains to a portion of the Blackburn and Union Privileges Superfund Site located in the Town of Walpole Massachusetts (the Site) which has been listed on EPAs National Priorities List (NPL) which portion is generally referred to as the East of South Street Area (the EOS Area) The EOS Area is located to the east of South Street in Walpole and is shown on Figure 1 attached hereto

A Notice of Activity and Use Limitation (NAUL) is necessary and appropriate for the EOS Area of the Site based on the fact that pursuant to EPAs risk evaluations asbestos arsenic trichloroethene (TCE) and certain polycyclic aromatic hydrocarbon (PAH) contan1inants remain in place in soils at levels higher than those appropriate for unlimited use or unrestricted exposure groundwater underlying the EOS Area contains hazardous substances at levels that present an unacceptable risk of exposure and remedial measures at the Site must be protected and maintained to ensure that the Selected Remedy remains protective

EPAs Record of Decision (ROD) dated September 30 2008 specified the need for institutional controls such as a NAUL to ensure long-tenn perfonnance and protectiveness of the Selected Remedy The institutional controls described herein are necessary and appropriate to ensure that the Selected Remedy for the Site remains protective of human health and the environment The remedy for the Site as described in the ROD is referred to herein and in the NAUL as the Selected Remedy

Page 1 of7

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 3: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

Bk 39600 Pg408 88608

WHEREAS pursuant to Chapter 21E and the MCP the Massachusetts Department of Environmental Protection an agency established under the laws of the Commonwealth of Massachusetts having its principal office at One Winter Street Boston Massachusetts 02108 (MassDEP) assigned to releases of oil andor hazardous materials occurring at from or onto the Property MassDEP Release Tracking Number(s) 4-3000603 and all places where such oil andor hazardous materials have come to be located are a disposal site under Chapter 21 E and the MCP (the Disposal Site)

WHEREAS in a document titled Record of Decision Blackburn amp Union Privileges Superfund Site dated September 30 2008 (the ROD) said ROD being on file at the EPA Region I Record Center located at Five Post Office Square Boston Massachusetts (EPA Region 1 Record Center) EPA with the concmTence of MassDEP as evidenced by a letter of concurrence from Janine Commerford Assistant Commissioner to Mr James T Owens III Director dated September 29 2008 has selected one or more response actions (collectively the Selected Remedy) for the Superfund Site in accordance with CERCLA and the NCP

WHEREAS the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) (the OampM Plan)

WHEREAS the Selected Remedy is based in part upon the restriction of human access to and contact with Hazardous Substances in soil sediment andor groundwater and the restriction of certain uses and activities occurring in on through over or under the Restricted Areas

WHEREAS in a document titled Institutional Control Design Statement for the

- lackbum and Union Privileges Superfund Site -East of South Street Area dated

(the IC Design Statement) said IC Design Statement being attached he eto as Exhibit E EPA approved a remedial design for land use restrictions and other institutional controls at the Superfund Site

WHEREAS the JC Design Statement contains a description of the basis for land use restrictions and the release event(s) or site history that resulted in the contaminated media subject to this Notice including (a) a statement that specifies why the Notice is necessary to the Selected Remedy (b) a description of the release event(s) or site history that resulted in the contaminated media subject to the Notice (ie date of the release(s) to the extent known release volumes(s) and response actions taken to address the release(s)) (c) a description of the contaminated media (ie media type(s) and approximate vertical and horizontal extent) subject to the Notice ( d) a statement of which activities and uses are consistent and which are inconsistent with maintaining the Selected Remedy (e) a description of all other components of the institutional and land use controls at the Property

WHEREAS the tenn Ground Surface as used herein shall mean in Paved Areas and in Building Footprint Areas the uppem10st surface of the ground located immediately below any pavement in Paved Areas or under any buildings or stmctures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppermost surface of the ground based upon the surface elevations depicted in Exhibit C attached hereto

Page 3 of 12

Bk 39600 Pg409 88608

WHEREAS pursuant to 3IO CMR 4001 1 I(1 ) MassDEP shal1 deem response actions at a disposal site subject to CERCLA adequately regulated for purposes of compliance with the MCP provided certain enumerated conditions are satisfied including disposal sites subject to CERCLA with respect to which MassDEP has issued a letter of concurrence

WHEREAS pursuant to 3IO CMR 400111 land use controls may be implemented at disposal sites deemed adequately regulated under CERCLA by means of a Notice of Activity and Use Limitation and

WHEREAS pursuant to 310 CMR 400111(10) disposal sites adequately regulated under CERCLA at which (a) remedial actions have been completed in accordance with the ROD for the site (b) subsequent design construction and other pertinent plans have been approved by EPA and ( c) EPA has certified completion of the remedial action will be considered to have achieved a Pennanent Solution under MGL c 21E and the MCP for those hazardous substances subject to such remedial actions

NOW THEREFORE notice is hereby given that the activity and use limitations required by the ROD and more particularly set forth in the IC Design Statement are as follows

I Activities and Uses Consistent with Maintaining the Selected Remedy The following Activities and Uses are consistent with maintaining the Selected Remedy and as such may occur on the Restricted Area without compromising the Permanent Solution that has been achieved for the Site

i Any response actions necessary to maintain the Selected Remedy (including without limitation sampling of existing wel1s and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

11 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

iii Non-residential school and day care uses

1v Paving repaving andor maintenance by adult workers of the Paved Areas provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

v Maintenance work by adult workers in the Landscaped Areas that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or barrier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in

Page 4 of 12

Bk 39600 Pg410 88608

Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

v1 Without limiting Subparagraph I (v) above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan CSMP) The SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation ofwork Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement ofpipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage storm water gas fuel oil electricity and communications

The SMP shall provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

a Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored on the prope1ty

b Appropriate measures shall be taken to secure stored soil and to control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

c Groundwater monitoring we1ls shall be repaired or replaced if damaged

d Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

e A date on which the SMP expires if required by EPA and MassDEP

f A report to be submitted to MassDEP and EPA at the completion of the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health

Page 5 of 12

Bk 39600 Pg411 88608

and safety provisions of 29 Code of Federal Regulation Section 1910 120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Notwithstanding subparagraph 1(vi)(f) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

Vil Such other activities and uses not identified in Paragraph 2 below as being activities and uses inconsistent with maintaining the Selected Remedy

2 Activities and Uses Inconsistent with Maintaining the Selected Remedy The following Activities and Uses are inconsistent with maintaining the Selected Remedy and as such may not occur on the Restricted Area without compromising the Permanent Solution that has been achieved for the Site

i Residential use or activity

11 Except as permitted in Paragraph 1i above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

111 Except as permitted by Section I above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

1v Agricultural use or activity except for raised garden beds approved in accordance with Section l(vi)

v Construction or installation of a bu iiding or structure for human occupancy without prior written approval of EPA

vi Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

Page 6 of 12

Bk 39600 Pg412 88608

3 Obligations and Conditions The following obligations andor conditions are necessary and shall be undertaken at the Property to maintain the Selected Remedy and to avoid compromising the Permanent Solution that has been achieved for the Site

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

11 If EPA has provided written notice that EPA has determined that the parties responsible under the OampM Plan are no longer able to submit an annual compliance letter regarding this NAUL the owner of the Property shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the Restricted Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such cel1ifications are based

4 Emergency Excavation If it becomes necessary to excavate within the Restricted Area as pal1 of a response to an emergency (for example repairing utility lines or responding to a fire or flood) the provisions of Paragraph 1 of this Notice shall be suspended with respect to such excavation to the extent necessary to permit such response provided that the Owner

(i) orally notifies the following persons of such emergency as soon as possible but no later than two (2) hours after having learned of such emergency

A EPA National Response Center at (800) 424-8802 and EPA Region 1 Office of Site Remediation and Restoration Emergency Planning and Response Branch at 888-3 72-7341 and

B MassDEP Emergency Response at (888) 304-1133 and MassDEP Southeast Regional Office of Emergency Response Section at 508-946-2850

or such other persons as MassDEP and EPA respectively may identify in writing from time to time to Owner for such oral emergency response notifications

(ii) notifies MassDEP and EPA in writing of such emergency no later than five (5) days after having learned of such emergency such notifications to be sent to the following addresses

A MassDEP Southeast Regional Office 20 Riverside Drive Lakeville MA 02347 and

Page 7 of 12

Bk 39600 Pg413 88608

B EPA New England Region I 5 Post Office Square - Suite 100 Boston MA 02109-3912

or to such addresses as MassDEP and EPA respectively may identify in writing from time to time to Owner for such written emergency response notifications

(iii) limits the actual disturbance involved in such excavation to the minimum reasonably necessary to adequately respond to the emergency

(iv) implements all measures necessary to limit actual or potential risk to the public health and environment

(v) engages a qualified hazardous waste site cleanup professional such as a Licensed Site Professional (LSP) as defined in the MCP at 310 CMR 400006(12) to oversee the implementation of this Paragraph and to prepare and oversee the implementation of a written plan (Emergency Restoration Plan) that will restore the Property to a condition that meets or exceeds the performance standards established under the ROD for the Selected Remedy and that is consistent with this Notice and to review and evaluate response actions contained in the Emergency Restoration Plan to ensure minimal disturbance of any contaminated soils and sediments and

(vi) performs all actions laid out in the Emergency Restoration Plan within thirty (30) days of the occutTence of the emergency or within such other time period as may be approved by MassDEP and EPA in writing and submit a copy of the Emergency Restoration Plan to MassDEP and EPA within ten (10) days of its performance with a statement from the cleanup professional confirming that the Property has been restored to the standard described above

5 Proposed Changes in Activities and Uses Amendments Pursuant to 310 CMR 4001 l l(amp)(c) the Owner must notify and obtain approval from EPA and MassDEP of any proposed change in activities and uses at the Property that is not provided for in this Notice Pursuant to 3 IO CMR 400111 (8)( d) the Owner must obtain EPA and MassDEP approval of any Amendment or Termination of this Notice All EPA and MassDEP approvals of any Amendment or Termination of this Notice must be in writing and be recorded andor registered with the appropriate Registry(ies) of Deeds andor Land Registration Office(s) to be effective

6 Violations The activities uses andor exposures upon which this Notice is based must not change at any time to (a) cause risks that are not protective of human health or the environment pursuant to the criteria set forth in the NCP at 40 CFR

Page 8 of12

Bk 39600 Pg414 88608

300430(e)(2)(i) (b) interfere with the Selected Remedy or (c) cause a significant risk of harm to health safety public welfare or the environment pursuant to Chapter 21E and the MCP

Compliance with the terms and conditions of this Notice is subject to enforcement pursuant to Chapter 21 E the MCP MGL c 21 A sect 16 and 310 CMR 5 00 and CERCLA and the NCP Such enforcement may include without limitation enforcement with respect to (a) any activities or uses that may occur that are described in Paragraph 2 of this Notice as being inconsistent with the Selected Remedy (b) any failure to undertake any obligations and conditions described in Paragraph 3 of this Notice as being necessary to maintain the Selected Remedy and (c) any other failure to maintain the Selected Remedy or Pem1anent Solution resulting from a failure to act consistently with this Notice

7 Incorporation Into Deeds Mortgages Leases and Instruments of Transfer This Notice shall be incorporated either in full or by reference into all future deeds easements mortgages leases licenses occupancy agreements or any other instrument of transfer whereby an interest in andor a right to use the Property or a portion thereof is conveyed in accordance with 310 CMR 401074(5)

8 Reservation of Rights

This instrument shall not limit or otherwise affect the right of EPA andor MassDEP to obtain access to or restrict the use of the Property pursuant to CERCLA Chapter 21 E or any other applicable statute or regulation

This instrument shall not release the Owner or any other party from liability for releases of oil or hazardous substances or materials nor shall this instrument excuse the Owner or any other party from complying with CERCLA Chapter 21 E or any other applicable federal state or local laws regulations or ordinances or by-laws

Owner hereby authorizes and consents to the filing and recordation andor registration of this Notice said Notice to become effective when recorded andor registered with the appropriate Registry(ies) of Deeds andor Land Registration Office(s)

Page 9 of 12

Town of Walpole acting by and through the Board of Selectmen

n Town Administrator authorized by ard of Selectmen recorded herewith

Bk 39600 Pg415 88608

Witness the execution of this instrument under seal this 21_ day of df 11 ( 2021

COMMONWE

COUNTY OF NORFOLK ss

~ On this 21 day of 4f1 2021 before me the undersigned notary public

personally appeared James Johnson as Town Administrator for the Town of Walpole and proved to me to through satisfactory evidence of identification which was ~6laquo~ ~ -fr VJ1e [indicate ifdrivers license or passport or other document] to be the person whose name is signed on the preceding or attached document and acknowledged to me that signed it voluntarily for its stated purpose

Name CA~ U ~

My Commission Expires July S 2t)z

Page 10 of 12

--------

Bk 39600 Pg416 88608

In accordance with CERCLA 42 USC sect 9601 et seq and the National Contingency Plan the United States Environmental Protection Agency Region I hereby approves this Notice of Activity and Use Limitation

Name 8r~Cltvi Olso Director Superfund and Emerncy Management Division (SEMO)

US Environmental Protection Agency Region I

In accordance with MGL c 21E sect 6 and the Massachusetts Contingency Plan (310 CMR 400000) the Department of Environmental Protection hereby approves this Notice of Activity and Use Limitation (as to form only)

Date Paul W Locke Assistant Commissioner Bureau of Waste Site Cleanup Department of Environmental Protection

Page 11 of 12

---------------

Bk 39600 Pg417 88608

In accordance with CERCLA 42 USC sect 9601 et seq and the National Contingency Plan the United States EobulliionmenlaJ Protectioo Agency Region I hereby appro1es this Notice of Activity and Use Limitation

Date ~------

Name Director Superfund and Emergency Management Division (SEMO)

US Environmental Prokction i0 ency Region I

Jn accordance with MGL c 21 E sect 6 and the Massachusetts Contingency Plan (310 CMR 400000) the Depamnent ofEmironmental Prolectioo hereby approves this Norice ofActivity

and Use Limilarioo (as ro funn ooly)_ ~~

Dale 4r S microlJ ~ Paul W Locke Assisrant Commissioner Bureau ofWaste Site Cleanup Department of Environmental Protection

Page 11 of 12

Bk 39600 Pg418 88608

List of Exhibits

Exhibit A Legal Description of the Property Exhibit B Legal Description of the Restricted Area and Coordinates of Cover Types Exhibit C Photo-Reduced Copy of Activity and Use Limitations Plan of Land Exhibit D Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table Exhibit E Institutional Control Design Statement (EOS) Exhibit F Copy of Vote of Town of Walpole

Return to

Attn Kristine Sheehy Senior Real Estate Attorney FOLEY HOAG LLP Seaport West 155 Seaport Boulevard Boston Massachusetts 02210-2600

Page 12 of 12

Bk 39600 Pg419 88608

EXHIBIT A

Legal Description of Property The land with the improvements thereon located in Walpole Norfolk County Massachusetts bounded and described as follows

PARCEL I

The land on the Southeasterly side of South Street bounded

NORTHWESTERLY NORTHERLY AND AGAIN NORTHWESTERLY by South Street by seven lines measuring respectively

17027 feet 120 feet 22011 feet 1653 feet 325 89 feet 4515 feet and 1497 feet

NORTHEASTERLY by Gleason Court 2627 feet

SOUTHEASTERLY AGAIN NORTHEASTERLY AND AGAIN SOUTHEASTERLY by land now or fom1erly of Santomarco by five lines

measuring respectively 6750 feet 2050 feet 1190 feet 2952 feet and 2001 feet

NORTHEASTERLY AGAIN by said land of Santomarco and land now or formerly of Cashorali 10056 feet

NORTHWESTERLY AGAIN by said land of Cashorali 2845 feet

NORTHEASTERLY by land now or formerly of Muighitti 9007 feet

SOUTHEASTERLY by the location of Old Colony Railroad by three lines measuring respectively 6809 feet 32808 feet and 38250 feet

and

SOUTHWESTERLY by land now or formerly of Meyer by three lines AND SOUTHERLY measuring respectively 9143 feet 1998 feet and

15202 feet

Parcel I is described in the deed recorded with the Norfolk County Registry of Deeds in Book 4459 Page 287

A portion of said premises is shown on plan entitled Plan of Land in Walpole Mass Belonging to General Fibre Co Inc by Edward C Peterson CE dated January 16 1960 filed with the Norfolk Registry of Deeds as Plan No 849 of 1967 in Plan Book 223 and the remainder is shown on plan entitled Plan of Land in Walpole Massdeg by E Worthington Engineer dated February 6 193 7 recorded with said Deeds Book D2135 Page 8 I

FHBOSTON52454092

Bk 39600 Pg420 88608

PARCEL II Property known as Parcel 33-120 of the Town of Walpole Tax Assessors Map which is

part of the property situate in the Town of Walpole County ofNorfolk and Commonwealth of Massachusetts and being all of the right title and interest of The Penn Central Corporation in and to all those certain pieces or parcels of land and premises easements rights of way and any other rights of any kind whatsoever appurtenant thereto or used in conjunction therewith on and along a portion of Branch of Railroad known as the Wrentham Branch said portion of railroad being described as follows

Beginning at a line extended across the right of way of said Branch of rai road said line being the Northerly line of South Street and extending thence in a Northeasterly direction the distance of 2852 feet more or less along said Branch of rai Iroad to a line which is parallel with the Southwesterly line of Common Street said parallel line extending across said right of way through a point in the centerline thereof at railroad valuation survey station 733 + 67 more or less and being the place of ending

Parcel II is described in the deed recorded with the Norfolk Registry of Deeds in Book 7986 Page 372 and is a portion of the land shown on the plan recorded with said Deeds as Plan No 52 of 1983

FHBOSTON52454092

Bk 39600 Pg421 88608

Exhibit B Legal Description of the Restricted Area and Coordinates of Cover Types

Le2al Description for Restricted Area The area shown on the plan entitled Activity and Use Limitations Plan of Land Blackburn amp Union Privileges Superfund Site 50 amp 60 South Street Walpole Mass Scale l = 30 dated April 6 2021 by Norwood Engineering Company Inc recorded with the Norfolk Registry of Deeds in Plan Book 704 Page 41 being bounded and described as follows

Beginning at a point on the easterly sideline of South Street at the southerly point of curvature of Gleason Court on said plan thence

Northeasterly and curving to the right along an arc of a curve having a radius of twentyshyfive and 00100 (2500) feet a length of forty-five and 15100 (4515) feet thence

S 48deg1352 E a distance of twenty-two and 24100 (2224) feet the previous course by the southerly sideline of Gleason Court thence

s 32deg0208 w a distance of fifty-four and 78100 (54 78) feet thence

S 59deg27 32 E a distance of twenty and 50100 (2050) feet thence

S 47deg5252 E a distance of eleven and 90100 (1190) feet thence

S 49deg01 10 E a distance of twenty-nine and 58100 (2958) feet thence

s 38deg3108 w a distance oftwenty and 01100 (2001) feet thence

S 49deg00 57 E a distance of one hundred and 56100 (10056) feet thence

N 39deg5348 E a distance of twenty-eight and 45100 (2845) feet the previous seven (7) courses by land ofNF Thelma A Casborali thence

S 49deg0808 E a distance of ninety and 29100 (9029) feet the previous course by land ofNF Ming L Yau thence

s 25deg2312 w a distance of siliy-eight and 22100 (6822) feet to a point on the westerly sideline of a fonner railroad right of way the previous course by land of the Town of Walpole assessor parcel 33-121 thence

S 55deg2937 E a distance of ninety-nine and 78 100 (99 78) feet to a point of tangency on the easterly sideline of a forn1er railroad right of way thence

Page 1 of 13

Bk 39600 Pg422 88608

s 30deg11 32 w

S 23deg49 I6 W

N 66deg1044 W

N 23deg4908 E

N l 6deg00 52 E

S 37deg0240 E

N 10deg1437 W

N 34deg093 I W

N 11 deg5558E

Northeasterly

N 27deg41 48 E

a distance of three hundred and three and 74100 (30374) feet the previous course by land ofNF Nicholas H Dowd and NF Emilio P Baldassari thence

a distance of four hundred ninety and 86100 (49086) feet to a SBdh the previous two (2) courses by the easterly sideline of a former railroad right of way thence

a distance of eighty-two and 76100 (8276) feet to an Iron Pipe on the westerly sideline of the former railroad right of way thence

a distance of twelve and 09100 (1209) feet to a SBdh thence

a distance of ninety-six and 50100 (9650) feet to a S Bdh thence

a distance of fifteen and 00100 (1500) feet the previous three (3) courses by the westerly sideline of the former railroad right ofway and land of NF Joseph R Carpentieri and NF Joseph R and Faith N Carpentiero thence

a distance of ninety-two and 82100 (9282) feet the previous course by land ofNF Richard A and Josette M Burke thence

a distance of tvvo hundred thirty-seven and 86100 (23786) feet to a point on the easterly sideline of South Street thence

a distance of one hundred twenty and 00100 (12000) feet along the easterly sideline of South Street to a point of curvature of the easterly sideline of South Street thence

and curving to the right along an arc of a curve having a radius of eight hundred and 00100 (80000) feet a length of two hundred hventy and 11100 (22011) feet along the easterly sideline of South Street thence

a distance of three hundred forty-hvo and 42100 (34242) feet to the point of beginning

Containing 621 Acres of land more or less

Page 2 of 13

3000

3005

3010

3015

3020

3025

3030

Bk 39600 Pg423 88608

EXHIBIT B (cont)

Points and Coordinates associated with Restriction Areas and Cover Types for the Activity and Use Limitations (AUL) at 50 amp 60 South Street Walpole Mass

Point Northing Easting Type

Curve Curve Number Len2th Radius

28754430528 7236432250 COR

3001 28755604597 7236680368 PC L=7535 R=80000

3002 2875597 1222 7236766913 POC

3003 28756333366 7236870620 PT

3004 28756280754 723697 3031 COR

28756025570 7237001250 COR

3006 28755918670 7237001140 COR

3007 28755864440 7237 I 05890 COR

3008 28755903200 72371963 IO COR

3009 28756030893 7237217396 COR

28756042534 7237250325 COR

3011 28756021733 7237317808 COR

3012 28755800732 7237640949 COR

3013 2875552 1424 7237667395 COR

3014 28755321388 7237708416 COR

28755197081 7237834881 COR

3016 28755102230 7238045173 COR

3017 28754941531 7238291869 COR

3018 28754851375 7238512944 COR

3019 28754753441 7238824 760 COR

28754681541 723916 1881 COR

3021 28754608227 7239406506 COR

3022 28754515846 7239459928 COR

3023 2875426 7589 723943 8163 COR

3024 28754198016 7239590840 COR

28753886764 7239449006 COR

3026 2875329 7944 7239187206 COR

3027 28752506745 7238837890 COR

3028 28751859560 7238552142 COR

3029 28751221833 723827342 l COR

28750848788 7238107869 COR

3031 2875045 3654 7237927814 COR

3032 28750630420 7237527432 COR

3033 28750741023 723757 6257 COR

3034 28751668594 7237842488 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 3 of 13 April 14 2021

3035

3040

3045

3050

3055

3060

3065

3070

Bk 39600 Pg424 88608

Point Number

Northing Easting Type Curve Leneth

Curve Radius

28751548848 7237932869 COR

3036 28752462269 7237767802 COR

3037 28756438461 7236904209 POC L=2207 R=80000

3038 28756543084 7236939245 PT

3039 2875653 7987 7236954123 PC

28756597578 7237007344 POC L=1651 R=937

3041 28756594465 7237087181 PT

3042 28756459044 7237347021 PC L=347 R=220

3043 28756432531 7237363546 PT

3044 28756280644 7237286201 COR

28755924210 7237966952 COR

3046 28756081959 7238048554 PC L=472 R=236

3047 28756064922 7238084404 PT

3048 28755523491 7237845047 COR

3049 28755419845 7238081981 COR

28755460757 7238099621 PC L=240 R=l57

3051 28755467701 7238120241 PT 3052 28755398690 7238275280 COR

3053 28755365410 7238264910 COR

3054 28755087149 7238900449 COR

28755158001 7238931521 COR

3056 28755040360 7239199770 COR

3057 28755311720 7239318930 COR

3058 28755263010 7239429300 COR

3059 28755388260 7239484290 COR

28755348660 7239576000 COR

3061 28755625470 7239696500 COR

3062 28755664605 7239606601 COR

3063 28755736202 7239637768 COR

3064 28755621870 7239897370 COR

287 5567 6160 7239920410 COR

3066 28755718270 7239830260 COR

3067 2875587 9750 7239900310 COR

3068 28755718790 724026 7600 COR

3069 28755763390 7240285350 COR

28756035900 7239926600 COR

3071 28756086280 7239812770 COR

3072 28756089984 7239813649 COR

3073 28756229128 7239501910 PC L=482 R=l54

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 4 of 13 Apnl 14 2021

3075

3080

3085

3090

3095

3100

3105

3110

Bk 39600 Pg425 88608

Point Number

Northing Easting Type Curve Length

Curve Radius

3074 28756257366 7239513984 PT

28756185799 7239674928 COR

3076 28756739833 7239921136 COR

3077 28756876060 7239682275 COR

3078 28756948336 7239735898 PC L=335 R=298

3079 28756958235 7239766064 PT

28756866081 7239978133 COR

3081 28757166275 7240127374 COR

3082 28757068320 7240314640 COR

3083 28757602980 7240594310 COR

3084 28757700050 7240408736 COR

28758247941 7240688376 COR

3086 28758250190 7240683910 COR

3087 28758344979 7240738168 COR

3088 2875843 6103 7240581527 COR

3089 28758602943 7240664224 COR

28758740024 7240397393 COR

3091 28758605706 724032 7776 PC L=477 R=309

3092 28758594882 7240286013 PT

3093 28758666635 7240197585 PC L=2573 R=3127

3094 28758767113 7240118710 POC

28758890752 7240086604 PRC L=I653 R=3993

3096 28758972305 7240074125 POC

3097 28759049552 7240045 I 52 PT

3098 28759330312 7239734408 COR

3099 28759459414 7239588584 PC L=2269 R=5217

28759524821 7239496174 POC

3101 28759568752 7239391829 PRC L=1814 R=486

3102 28759603259 7239308095 POC

3103 28759653883 7239232999 PCC L=l31 R=088

3104 28759665694 7239231411 PT

28759800587 7239299586 COR

3106 28759986288 7238981214 COR

3107 2875983 5797 7238891829 COR

3108 28759879750 7238798689 COR

3109 28759905380 7238754769 PC L=1600 R=2552

28759963590 7238700398 POC

3111 28760035727 7238666620 PT

3112 28760700665 723901 5672 PC L=4515 R=2500

3113 28760830230 7239191198 POC

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 5 of 13 April 14 2021

3115

3120

3125

3130

3135

3140

3145

3150

Bk 39600 Pg426 88608

Point Number

Northing Easting Type Curve Len2th

Curve Radius

3114 2876077 263 6 723 940 1624 PT 28760624518 7239567466 COR

3116 28760160100 7239276864 COR

3117 28760055928 7239453423 COR

3137 28759976118 7239541692 COR

3118 28759782139 7239764992 COR

3119 28759625581 7239640375 COR

28758966057 7240399493 COR

3121 28759184326 7240581973 COR

3122 28758593598 724126478] COR

3123 28757977293 724097 2314 COR

3124 28757716516 7241351659 COR

28757288251 7241140719 COR

3126 28756725827 7240851862 COR

3127 28756162468 7240586126 COR

3128 28755614498 7240338506 COR

3129 28754346745 7239768507 COR

28753845716 7239540194 COR

3131 28753257436 723927 8634 COR

3132 28752466355 7238929370 COR

3133 28751819340 7238643698 COR

3134 28751181527 7238364939 COR

28750807772 7238199071 COR

3136 28750413263 7238019301 COR

3138 28756920317 7237298739 PC L=l941 R=2104

3139 28756827128 7237274848 POC

28756733047 7237294944 PRC L=401 R=l66

3141 2875671 1336 723 727 2844 PCC L=1492 R=13345

3142 28756744594 7237206091 POC

3143 28756781529 7237141301 PCC L=1419 R=l018

3144 28756833084 7237094642 POC

28756902566 7237091952 PCC L=2413 R=157959

3146 28757017337 7237129167 POC

3147 28757131820 7237167258 PCC L=330I R=S0000

3148 28757282552 7237234442 POC

3149 28757431866 7237304721 PT 28757338390 7237495930 COR

3151 28757541620 7237605380 COR

3152 28756897590 723883 4280 COR

Exhibit B to NA UL-Part 11-EOS Coordinate Tables Page 6 of 3 April 14 202

3155

3160

3165

3170

3175

3180

3185

Bk 39600 Pg427 88608

Point Northing Easting Type Curve Cunbulle

Number Lenszth Radius 3153 28756870623 7238820218 COR

3154 28756838273 7238882258 COR

28756865240 7238896320 COR

3156 28756777004 7239062996 COR

3157 28756770439 7239063663 PC L=l 146 R=2269

3158 2875665836 I 7239046180 PCC L=l423 R=957

3159 2875661 7520 7238989913 POC

28756625544 7238920850 PT

3161 28756728525 7238726583 PC L=232 R=l58

3162 28756748720 7238720236 PT

3163 28756899634 7238797341 COR

3164 28757254653 7238121363 COR

28757520153 723761266 7 COR

3166 28757306899 723 750 IO 10 COR

3167 28756690336 7237500169 PC L=243 R=I68

3168 28756682599 7237479273 PT

3169 28756686990 7237469583 PC L=0250 R=l68

28756708806 7237463018 PT 3171 28757000109 7237616354 PC L=233 R=l73

3172 28757005368 7237637270 PT

3173 28757000998 7237645513 PC L=233 R=l69

3174 28756980219 7237651023 PT

28756429209 7238339422 COR

3176 28756342982 7238506849 COR

3177 28756500076 7238596485 PC L=l19 R=l48

3178 28756499701 7238608072 PT 3179 2875644 7813 7238705611 PC L=l 182 R=483

28756358177 723 869 0707 PT

3181 2875623 6099 7238376388 PC L=443 R=467

3182 28756235611 7238333779 PCC L=343 R=9IO

3183 28756249049 7238302418 PCC L=412 R=9IO

3184 28756278952 7238274519 PCC L=368 R=300

28756313362 7238277619 PT

3186 28756282498 7238911796 PC L748 R=216

3187 28756240650 7238919721 PT

3188 28756126081 7238620406 PC L=323 R162

3189 28756138645 7238591575 PCC L=333 R=283

Exhibit B to NAUL-Part II-EOS Coordmate Tables Page 7 of 13 April 14 2021

3190

3195

3200

3205

3210

3215

3220

Bk 39600 Pg428 88608

Point Number Northing Easting Type Curve

Leneth Curve Radius

28756163375 7238602867 PT

3191 2875523 0908 7238765275 COR

3192 28755205040 7238752740 COR

3193 28755391740 7238328470 COR

3194 28755466840 7238361040 COR

28755452760 7238392590 COR

3196 28755516920 7238421040 COR

3197 28755530690 7238388730 COR

3198 28755603230 7238421460 COR

3199 2875555 7568 723852 7053 COR

28755371220 7238445330 COR

3201 28755629198 7238558466 COR

3202 28755676040 7238453290 COR

3203 28755925410 7238563840 PC L=1902 R=3548

3204 28755927383 7238658634 POC

28755954390 7238749520 PT 3206 28755974770 7238807230 COR

3207 28755779200 7238881701 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

28755746700 7238609997 COR

3211 2875593774 7239036608 COR

3212 28756048460 7238996850 PC l=1445 R=2903

3213 28756070631 7239065422 POC

3214 28756109010 7239126420 PT

28756153820 7239182190 PC L=S98 R=848

3216 28756171980 723923 7880 PT

3217 287S6026148 7239566166 COR

3218 28756003865 7239556465 COR

3219 287S6134380 7239256650 COR

28755998460 7239195370 COR

3221 2875600 71S0 7239174530 COR

3222 28756001791 7239172152 COR

3223 28756040451 7239079437 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 8 of 13 April 14 2021

Bk 39600 Pg429 88608

Point Number

3210

3200

3056

3057

3058

3059

3060

3061

3062

3218

3219

3220

3221

3224

3225

3226

3227

3228

3070

3071

3234

3233

3235

3236

3237

3238

3239

3240

3241

3242

3243

3244

3245

3246

3247

3248

Northing

28755746700

28755371220

28755040360

28755311720

28755263010

28755388260

28755348660

2875562 54 70

28755664605

28756003865

28756134380

28755998460

28756007150

28755941340

28755962080

28755867937

28755819702

28755766128

28756035900

28756086280

28755991990

28755942100

28756477248

28756677238

28756650130

28756473307

28756480112

28756675030

28756724454

28756742099

28756742133

28756703924

28756640759

28757607280

28757401530

28757467350

Easting

7238609997

7238445330

7239199770

7239318930

7239429300

7239484290

7239576000

7239696500

7239606601

7239556465

7239256650

7239195370

7239174530

7239145324

7239100930

7239061674

7238935003

7238911508

7239926600

7239812770

7239769910

7239884050

7239261913

7239253008

7239321810

7239319038

7239298824

7239364440

7239271845

7239292625

723935 0187

7239393239

7239393096

7237584960

7237475300

7237345620

Type

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

PC PCC

POC

PCC

PT

COR

COR

COR

Curve Len2th

L=273

L=ll77

L=657

Cunmiddote Radius

R=1421

R=810

R=679

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 9 of 13 April 14 2021

Bk 39600 Pg430 88608

Point Number Northing Easting Type Curve

Len2th Curve Radius

3249 287 57514570 7237372360 PC l=ll05 R=1993

3250 287 57 588060 7237452980 PT

3251 28757631382 7237429676 PC L=2244 R=2352

3252 287 5765 6810 7237537876 POC

3253 2875 762 9720 7237645671 PT

3254 28756940655 7238952710 PC l=1493 R=1509

3255 28756901845 7239015577 POC

3256 2875683 7836 7239052474 PT

3257 28758104824 7237653014 COR

3258 28758028960 7237800160 COR

3259 28757949530 7237760790 COR

3260 28757901005 7237855021 COR

3261 28757839230 7237820908 PC L=273 R=l33

3262 28757830688 7237799810 PCC L=539 R=2144

3263 28757852974 7237750897 PT

3264 28757891705 7237688178 PC L=lS26 R=2432

3265 28757948636 7237637880 POC

3266 287 58018307 7237607597 PT

3248 28757467350 7237345620 COR

3267 28757550832 7237363444 POC L=2653 R=80000

3268 28757668809 7237424132 PT

3269 28757504 719 7238817989 COR

3270 28757493010 7238842230 COR

3271 28757561074 7238880970 COR

3272 28757483953 7239024127 PC L=323 R=l70

3273 28757459939 7239037846 PT

3274 28757311605 7238957122 PC L=1388 R=906

3275 2875727 2732 7238901647 POC

3276 28757283181 7238834718 PT

3277 287 5733 4061 7238752337 PC L=255 R=l60

3278 287 5735 5527 7238744411 PT

3279 2875 7102815 7239517199 PC l=261 R=l70

3280 28757080654 7239525307 PCC l=909 R=1275

3281 2875 700 5390 7239477911 PCC L=l007 R=990

3282 28756999624 7239381704 PT

3283 2875707 7705 7239230604 PC L=ll14 R=907

Exhibit B lo NAUL-Part IlbullEOS Coordinate Tables Page 10 of13 April 14 2021

3285

3290

3295

3300

3305

3310

3315

Bk 39600 Pg431 88608

Point Number Northing Easting Type

Curve Leneth

Curve Radius

3284 28757168066 7239178102 PT

28757205717 7239186398 PC L=518 R=930

3286 28757249003 7239213534 PCC L=l41 R=086

3287 2875724 7909 7239226048 PT

3288 28758415755 7239842757 PC L=251 R=l59

3289 28758437695 7239837379 PT

28758456377 7239846949 PC L=812 R=876

3291 28758494897 7239915165 PCC L=456 R=757

3292 28758483790 7239958646 PT

3293 28758405147 7240111348 PC L=l057 R=955

3294 28758318136 7240161452 PCC L=477 R=l063

28758272407 7240149529 PCC L=250 R=l60

3296 28758265647 7240128003 PT

3297 28758157937 7237680895 COR

3298 28758902927 723807 1969 COR

3299 28758852531 7238168280 COR

28758779660 7238129750 COR

3301 28758746973 7238192072 COR

3302 2875807 6630 7237840490 COR

3303 28758049940 7237894220 COR

3304 2875871 7997 7238243620 COR

28758680103 7238315946 COR

3306 28758533699 7238239240 COR

3307 2875852 6899 7238252220 COR

3308 28758098180 7238027600 COR

3309 28757974484 7238264223 COR

28757957598 7238255513 COR

3311 28757757732 7238637845 COR

3312 28757774584 7238646620 COR

3313 28757653710 723887 7846 COR

3314 28757560920 7238829340 COR

28759004930 7238125514 COR

3316 28759689797 7238485028 PC L=1992 R=2609

3317 28759697204 7238583760 POC

3318 28759667288 723867 8142 PT

3319 28758996126 7238323718 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 11 of 13 April 14202 I

Bk 39600 Pg432 88608

Point Number

Northing Easting Type Curve Lenfth

Curve Radius

3320 28759028950 7238261560 COR 3321 28758954486 7238222188 COR

3322 28758972523 7238378387 COR 3323 28759421550 7238613630 COR 3324 28759377933 7238698105 COR 3325 2875907 4811 7238539289 COR 3326 28759081611 7238526309 COR 3327 28758935210 7238449604 COR

3328 28759464470 7238637330 COR 3329 28759632674 7238722481 PC L=ll83 R=l578

3330 28759583973 7238755474 POC 3331 28759526573 7238768343 PRC L=2163 R=2455

3332 28759422964 7238796123 POC 3333 28759341091 7238865430 PT

3334 28759193370 7239050710 COR 3335 28759416340 7239163940 COR 3336 28759263600 7239455620 COR 3337 28759043690 7239336510 COR 3338 28758935490 7239552130 COR 3339 28757650890 7238883240 COR 3312 28757774584 7238646620 COR 3311 28757757732 7238637845 COR 3310 28757957598 7238255513 COR 3309 28757974484 7238264223 COR 3308 28758098180 723802 7600 COR 3307 28758526899 7238252220 COR 3306 28758533699 7238239240 COR 3340 28758700033 7238326388 COR 3341 28758675436 7238373334 COR 3342 28758733013 7238403500 COR 3343 28758760858 7238350353 COR 3344 28758860952 7238402796 COR 3345 28758833106 7238455943 COR 3346 28758890683 7238486109 COR 3347 28758915280 7238439162 COR 3326 28759081611 7238526309 COR 3325 28759074811 7238539289 COR

Exhibit B to NAUL-Part H-EOS Coordinate Tables Page 12 of l3 April 14 2021

Bk 39600 Pg433 88608

Point Number

Northing Easting Type Curve Len2th

Cunbulle Radius

3324 2875937 7933 7238698105 COR

3082 28757068320 7240314640 COR 3083 28757602980 7240594310 COR 3349 28757790234 7240236327 COR

3348 28757255574 7239956657 COR

3124 28757716516 7241351659 COR 3125 28757288251 7241140719 COR 3126 28756725827 7240851862 COR 3127 28756162468 7240586126 COR 3128 287 55614498 7240338506 COR 3129 28754346745 7239768507 COR 3130 28753845716 7239540194 COR 3131 28753257436 723927 8634 COR 3132 28752466355 7238929370 COR 3133 28751819340 7238643698 COR 3134 2875118152 7 7238364939 COR 3135 2875080 7772 7238199071 COR 3136 28750413263 7238019301 COR 3350 28750296168 7238284525 COR 3351 28754 78 6636 7240267040 COR 3352 28757412029 7241794586 COR

POINT DESCRIPTION ABBREVIATIONS

COR=CORNER PC= POINT OF CURVE WHERE CURVE STARTS POC -= POINT ON CUR VE PT=POINT OF TANGENCY WHERE THE CURVE ENDS PCC = POINT OF COMPOUND CURVE (WHERE RADIUS CHANGES) PRC = POINT OF REVERSE CURVE

NOTES

THE COORDINATES ARE BASED ON AN EXISTING CONDITIONS AS-BUILT FIELD SURVEY BY NORWOOD ENGINEERING CO INC BETWEEN NOVEMBER 15 TO DECEMBER 18 2019 TI-IE COORDINATES ARE BASED ON l1ASSACHUSETIS ST A TE PLANE COORDINATE SYSTEM NAD 1983 (FEET) THE ACCURACY OF THE COORDINATE LOCATIONS ARE +-0J FEET

Exhibit B to N1UL-Part II-EOS Coordmate Tables Page 13 ofl3 April 14 2021

---

1f~ flJr ~i

f ~~ J~i](M~I ~ 1 jf~ ~~f W-- )e 1

It lj fY pl ~-~j

I --- ~ ~

1 (J-c~ er ~

C JI fl JYf

1 ~ ~Yu-~ 1i

~r

( LOClJS P

SCAUllbulliQO

I ar lMIT flG PINI tMS _ lIIPMIDMICXNllRlnT~tlCfllUS 1111D cmuftraquodl s - NIKl1III tfIJIIIIIOfM~1HCll allE1

DAre Jllrl

NUKIJU LU6 DMitM

mmtG6DKbdlt

~4~-middot

~~I

-- ampnbullllf~ ~ fa

LEGEND 0

-i~wr0o-m lICUUoaampbullco--11111 _ _l_J

0

bull ~-ail_I

~-

mo(I ---fwj

amp~~~~ ~ ~~ltgtmiddot ~A~

~6

_L-r

bull -~ IBP__l-11Uil n-rlfl-lffll rMCllI 1a 1rr ai

-~ lll-lliI u-W--11a 1 Ml[ 411 amt l0IIC 3JICJ7 ~ 33-1--I- DIID llXII D111 JlMZ 411 lraquo- ~lUN~t --- - etMpound 11JII

~ MffD mmaat ZL I01t 111

1Jlll~-IICfIQfJICIISJ DfEI IC71- I~ 1~ 9 Cl 1VY IICIIWCLl~fCSC~lNCl

~11HltOXW1A~JtCI~llfB MXIC 1HI lME INCi 111M bull11 (S 1f41~middot~-~-)

~ io

0 0 0 0 -0 0 0 D O 1 middot tbull O

_- _pound ~ - Tf middot- ---r ~~ ~~- ~=middoti

r jil7bull --------4~-middot~

(

SCAtpound 1bull bull YI

I ~ tfAIE lIMa toafllltl1E ~NAD1w1(rJ

1 ~ PlIla II MMt QI 11D TD D111oPl

~c1MlntID9~~-l 1NIIJIIKlNI LnlJTU ~ deg qllAJSTE uM011111 iu1II 1111ZT IIIILJaZ

Exhibit C - Photo-Reduced Copy of Activity and Use Limitations Plan of Land

--~middot---

I ~111-11111

iiiii

-ill111liilt

ACJIYIJY ANJ) lJSE lJJll7ATJONS PLAN OF LANI)

81ACJ(81R1 I IINION Flr11lfES SllffllF7AVO SIle

o tfO SOIJIH s1ar HlltlPOtL IIAS

SCAlElrJAt IPfffl152021

1IJrwod Eng1neerlng

- EnQlbullHrlflg Compaffy middot~~=~ m Cm1JQ u fnfJa-eal

~ -

-~

9l1EET 1 OF I 8324-02

td ~

w ~ m 0 0

Id Q ii w ii

co co m

co 0

-l

~-77--raquo- -~I~ )middot~ ~ bull _I lT ~ v~

AI ~ If ~)middot~ 7- ~1 c t11 yil ~ ~ ~middot~41 bull1 l ~~l(i~r~1 f7 )ll y-

~~ f -~ -v fgtV ~ ~ ~ l er-- u -

tl x-P~C ()

JP yen f(( 11 1degpoundS -~ (

ftunrTfflllllTnallJrNNQWDf ~ ti IZNtRlTT lnH M IULS IIJIUIUlA-DlltlllllDlJlllIICIF tJbllt~llC~lJNp

DTl NlllltaJatl-Witiill (raquo11 iiiK(+til

I aJnlTlKATJlfl PlAH~ THE PUIIJll1T UC TIUlf Mlaquo THE l5 11 oawG ~ NII 1Hpound1as Of1111E111 AMllfrlTll9laquolllt Mpound ntem OPlaJ CJ1 IWM1pound BREn 011 bulln

~ ~illi~fli~ _lt ---c~-Clmiddot~~c0-nmiddotmiddot~bullJmiddot04~- ~--~--yen~~bull - L -bull -n ~ -r - ~ -

it

~ fr ~ ~- -~bull~bullv OG- ~n0

bull--ltmiddot middot~ -~- ~~-=~7~st~-~~~~i~~Hil~-) 2~C 0 ~~~~~ --------Y-Tgt-bullbullmiddot-

U-IU ~middotshy =i==-

bullbull bull _ -middot-

~----- ( ~11middot

__IC1ZMJ - bull IOC)0l lftEf ___ i gt mEKJllJfNG rotJ1FRIIIT AIIEAS B~ p~ AIIEAS ~ea-vmiddot LIUIID

~ e--- -+ ~ rzprz1za 1 ~ IJTATC PRC ~TC

nJml lltPtasCltJ

DUD BCD lJlll7 PMC 4H 1 1 YERT1CAL M1llI II NCCI ~ _ ro conurr DOD 80CIC 3JII07 llME 4H I ntaM NUIU 1121 IJ4TAI m IMlC 111111 nATIIW ~fsi

tJMAlfflOlI) AIIEAS1 bull 11AMJSCAlfl) AlpoundAS Lill] 1Dll IOlII POT PlCit 6115 J)-t20 ~atfnujK~tlLWlQI

~PUNMl-17 POflTIVNf1Ell llaD BaalC Tl_ Paa bullbull - 99 a 11

_-ijf1iltDP~IZ~ 5CME - JOSUva1fTLJ ~ ~-rr 111 C tMI=

bull111 I~

i=iiii7

~ e---

t c z rl

L-n11 ~

ACJIVJTY AND USE LIAlffAJIONS

PIAN OF RESTRIC1EJJ AREAS ANJJ COVER TYPES

fltACK1(fN _ llNlltgtI PfMIECCS SllPVFVNlJ51Tlt

JO _ lxJ srJllH STREET IIALPrJU JASS

SCAU I - 30 APRIL 2021

lcnwod Engineering

llarwood Cngnrilgtf cpmy -t~~~~

fIL Pllpa-ru - (1u]1a-lftll

~L=wl f 01~JII IO_

a SIEET I (F 2 B324-02

bj ~

w 0

0 0 deg It

iQ ~ w l11

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 1 of 2

CX) CX)

deg CX) 0

ntllT -1~1~ rurnlaquo1 r1n l1XTM 11Nf -r~ lie UUffCI 11Pt lDll1Hf iniin --IC unr1G Tlr 1n1rn Iota allll Ito tyen1tlll ~~11CRnrzJ11-11--~ci-- n31 nr111w11J1t ~bull c ~- diams JDrnn llloffl rcnlml IDII

-~ ]al rll _ _ PnlM-1-PI lbull-- ll7HrirrIPlllD1lf~-a bullbullll 111bull IClln9XnolDlllIIIIIIOm

214 ff7371JOOT ~bull JllC Ibullbull 171 JICllEY)l)vlUTlo~lUl~ ~li_~ -~~ MDlol ll4L~TllJraquofllllf190abullbullt ~~nQuu~~1aJI _~~OtottWU~1t11txm~arcPbrmllmCDt ~~ ~~ ~ =~ gj ~l11~ llltlM Mrattllll TDPmllIDCDI JJ4bull e~ _ ~ e PClC lbullI- 1- ~1sect~ ~ ~ ~ ~ ~~~-nr~44bull~mn11-a11 ~~ =mt =m~ ~ ~~ ~ =~~-~~ =~~rt~l~llibullltbull=

~~~~~~~~r-~r-~~sectsect55~55 ~~ ~=g~~ mi --1~ ~-==~~m~ L-~r UVPllrlllUillDITDr4L 1JI lbullKlllll~==~~~=~

~~~~~~~~ raquoff-llll 111rritl_aianbull ~11lCla rr- n ttll XDP11r1r 11111c-1C111~ RTl~rJlllllbullbull~llllJlllipo~~=r~tm=~~

~=~3r~t==~ ~=~i==~~ llt1ttl70 m~~n~ =n~ L diams 11- bull - iaEi~mi 1lE~HHffi ~1-~ E LbulllT bullU-7YA 8911U TMn4 OJII C- lllkHrnl1nlntll11106~

MJ9~gt111ftlrfffll11 ~ SbullC61hLJT raquoWl lll~IJlll11amp1 utVllllt a lbulllfGl bulllC lT

lliilH~1 ~~rm-=rn~ lbullIIIICU-1bull0

itt ishwI JUo ma m1 bull 1-c iiliii ~==~m~=~ Ullln U7IIY M1NLl411 fflf f-~ llr IL ~ lbullt Ill uaP11rllDn1rin1bull139nf- na_ 1111lnl ___ lWTDf-ID 111Jbullnllr-cishy

J1JT1 lflTI-noLbull COi lJ1 tsr18GOTDrl1~ 1--Cn ~~~==-=~ LbullS1rbull-p

LbulllI ~middot x1 fl11bull diams an l~J P-~ WI 1~1Slrmsraquo11nirorn 11bull1n-

llrgt 58 - TDrl ZJlJ l~ Zl llf4 Pll1raquo91I lnP~IIEI 11 ==~=-~~ lbullt-11bullh1~

nun_-~bullfllrlll_ lbulll-lrbull N- - nr6-11MII rinaus a 1bull1E-t1 im1 nrxi mr~ 7nn1 4i i 1c m llrS~iJ-ltJlillII Tt-Ul ris ~=~~middotiill~~ tf llDln~n1rJrgt11nbull1ric ~IPgt9nq~ It-MU rbull RflrrlllVllbulltPllbullOIIUAfC lbullnJtrNbull_~lD+4ftJSHJ7711JrllIIIIT144lDI lbulll ~I llfs-mllThn~-f 1bull11

1a5blH=i5gS El~ iE =iilli ~ID aH~~ ~~ leJINNllllfflnlt10ff1nll~1g=TI==~- lbullN~Jmiddot pw nrwuhtl tba11 l- lllllsectimiii~ ~ lllaquot ll116UW41 llllII NII Cl Ld bullt ll 11r 111~-~lHtl-IINOClll 1Dgtn~rMOtnllfbull3all)Mnr~bullwrmm11uoo~ ~r~ m~ = ~~ t~-i m NNtotl n11nn cm

~~~~~Ttr~ in Httl01llxl nlfM114ta cm

JJN n=-PIW - I- C lbullT rnr nnubullNoXI ffllPI n1 11-amp 11middot 77)111fflffPl~JlaUII

i1JJ n91lbull ti Jnlftbulllll QII

~g=~~~~ir~f~5 =i~=~~ ~=~ ~ ~j====goi H1111t-llll ffo~ ~rn tm111 ta1Vl~ tnar- IVI rm u1i ~ nw ~illl cm 1111 Hltt1H T7U 72w111ll tm UI ftffiH~bull1 naMUlI nlll

lltfll~IOUl rnes~ttlClll

~I~~=~=~~= l3111ratlQOJ121lllll CS u1n-n-a mn-c~11111llllilr ~====m~~ lbulllllr~~Oll~r1111-t~rtRiHa)toI

-~rt~_Utr111tt~USI ~m~i==r~~llfflpound1gtgtMllkllit1U10C011 annrxnbull-TCRL11ai~=~=~g)llllll~--rWltMJtt-8 DR Pl rraquof ntl rim Gllf CCI~~1r~~ liiilllii u- ntlt bull llJ~naJCDI

raquo11NMl10~Ullllcm ntrlnK)fL~nlln-1c lllf ~--TlJaft_Lmc i lbull1 bull l3il0 Nl-197) Ttlll1344 a LbullI 3 l diams 1-111 lflS 1111lOllt ffl- MP PII bullHI lgtl llJI l97Mlt Ian -ti DG llC

111111===-~~~=mg ====~~ tD rlrffllZllIITO-lfllCIIII=~tr~L~~~= - Pl~I llII TD_ ff~ tDII31119NIJMlDffU~~ H CZIII liii~mlt~ D1111nrn11GQ~-CaKftQNJWNczr41140ffnQCUII Jnffnt1JIIIIJunbull~1Qc20lll ~Pllli ll mrnnn lbulltlP 17Jrffdeg-degluoElJIIIQII

~-I-ti _nrna~rlll

a n- 4411 llbullQI 1=40 rt La n- lllf ffrgtn _Jr_~ Ullk ---rr~~ ~=~=tl~~ =1 nttltt nraquo 1nlU as

=-mn--~111DJIDII Ullgt~fflflnanaaJIIJalt55~~EIS~=~~ ~~)1 -11CIJII nn~bullbullbullnaKatt1ta1

JOIT ru~- rf- deg hJIIII r- 111111 ~1111) -1 aJ1 ld t11D1etlll_TalCIS -~-UCV~bullraquootur=~=~I~~=~--~ ~rsrgo_mlaquoshym rs~11flI ~- rnilr==~=~~ ~~r _ ~ atfl ~ rtw Dgtlnn-f-lEllln17n-UIIP

D11 fflXTJ111111 I~~ ar D1Jn4 ~leJJS-OnC111

=====5 middoti SHU=~ 5 ampn iliiiiiIiI11

ngtgtn~1~1tbullubull1rm DH tu~- lt11 rirmU1111 CDIII

~i~i555mi~ ~~ ~m=~==m~g===~~~~ tn1r JtW ~ma- PiOll a CU

~ XNr~t~fDllll1-all~~ m===~~ bullbull~W 111111 ==~~ ampT g~ ru~ =

~lU $Et=ni ~ llll0111ra1Ln~otqC011

H~ g==i =~1 ~

~111111 ~~g~n~a~J))pound11 1=~)6tia

~~ mEfHfH~Si

amp12Ct _ an ~

U N711f21th mM1LU aa o1bull~--117CII in4r ~llllll1Vffl-111Dlr lit~ Hmtlpound1 71 12L I CCIII ---~CUnMIIUOCVf JIHtlnn nl 7r ll4011CIIII

llllDNXCWZflDtlltllCIDCDr

~~=~==~=gnn n1raquoL bullw noanDNt CIJIIi=~ C~middot ~ ~ ~ HnffTI-QIJroQ__111PtlJIIInfflll bullbull1~ aaeIT t-- nrJD nJUntu~CllWI

m ~1 ~ ~~~ ~ ilria~gliiiji~=ir ~lt-OTT gl1raquo ~Iraquou fflllIL nllll 1111111 flC~middotIY_4allCCIIIi l1i5~ ~~11~middot~ ~~ ffll H71W786lll 7P-JOalllllll 2N ~ 1-flllt 7HIJl4- DI ~ ~==~ ~t-tr bullM-

114 Hit71aTra7ririatNOCIIII

llHl1Hf ll~7Dl4fIZIIICIIII 1141ftillf+1DllnTgtlMa~=~bull==~r Lbulll-lllbullbulllJJ

=~~~HR-~a ~ =iEri ~ ~=6

= 1MESE COCIIIOlfAlEi ARC 9~ at AH DISTlfG CONJmOfS AS-alLT FED 5UKiEY Y NORWDal EJICltJIJll(G CD~ IIElMEN ~ 1S 111 DECDaR a 2DII 1)pound OCICIIIDNAlES 5HCflI UIpound IIAID Cit MltSSAOfllffT5 STATE FlJriNII CDCffllNAT smult ~AO leJ (IMIJ 1HE ACQlltACY ltF 1HE COCftDINT[ LDCAnatS Mpound diams- 01 FtU

POINT DESCRIPTION ABBREVIATIONS~-~middotPC Pmlr Of CLIRIJC bullIEllL ClMNpound STilRlS PDC bull PtJtilTIIJOM1poundr ~ [raquo TAHCINiT W(R[ lll[ CURpound uroo Fo F[1NT(1t~tfflvt[ltft1llllIIUlt OMNtilE)PRC ~T oT ~pound ~Vlllrlt

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 2 of 2

I ~ IHAT nfl PlM MS 81D1 PIIDMQl ~WllTM(llUI MOIIEOIAAlPlllR~Df IIUPS C- lttE ~111 Cl__ HftNMIIIZlt

WWWWJU Cii6 liftitit

ACTIVITY ANI) USE LINTATIONS

PLAN OF RES7RIC1EJJ AREAS ANJJ COlER TYPES

8V CKlJ()RN IJNl()N PflllfpoundCpoundS SlllERFIIMJ SITC

50 HJ S(J11( SmEpoundT llAIPOIL JASS

=r-o ~ ll 2021

~ Engmeer1ng

Hltd ~~ middot~~-=~ra (f~AJ lIQ c- f

a llfEET 2 ltF 6324-02

td ~

w ~ m 0 0

Id Q ii w m

co co m 0 co

Bk 39600 Pg437 88608

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY New England Region

Five Post Office Square - Suite 100 Boston Massachusetts 02109-3912

INSTITUTIONAL CONTROL DESIGN STATEMENT FOR THE BLACKBURN AND UNION PRIVILEGES SUPERFUND SITE - EAST OF SOUTH STREET AREA

1 Introduction

Pursuant to the Comprehensive Environmental Response Compensation and Liability Act 42 USC sect 9601 et seq (CERCLA) and the National Contingency Plan 40 CFR Part 300 (the NCP) this document contains a description of the release events and site history that resulted in the contaminated media that require institutional controls in the fom1 of Activity and Use Limitations the basis for land use restrictions and uses that are consistent and inconsistent with the Selected Remedy ( as described below) This Institutional Control (IC) Design Statement pertains to a portion of the Blackburn and Union Privileges Superfund Site located in the Town of Walpole Massachusetts (the Site) which has been listed on EPAs National Priorities List (NPL) which portion is generally referred to as the East of South Street Area (the EOS Area) The EOS Area is located to the east of South Street in Walpole and is shown on Figure 1 attached hereto

A Notice of Activity and Use Limitation (NAUL) is necessary and appropriate for the EOS Area of the Site based on the fact that pursuant to EPAs risk evaluations asbestos arsenic trichloroethene (TCE) and certain polycyclic aromatic hydrocarbon (PAH) contan1inants remain in place in soils at levels higher than those appropriate for unlimited use or unrestricted exposure groundwater underlying the EOS Area contains hazardous substances at levels that present an unacceptable risk of exposure and remedial measures at the Site must be protected and maintained to ensure that the Selected Remedy remains protective

EPAs Record of Decision (ROD) dated September 30 2008 specified the need for institutional controls such as a NAUL to ensure long-tenn perfonnance and protectiveness of the Selected Remedy The institutional controls described herein are necessary and appropriate to ensure that the Selected Remedy for the Site remains protective of human health and the environment The remedy for the Site as described in the ROD is referred to herein and in the NAUL as the Selected Remedy

Page 1 of7

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 4: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

Bk 39600 Pg409 88608

WHEREAS pursuant to 3IO CMR 4001 1 I(1 ) MassDEP shal1 deem response actions at a disposal site subject to CERCLA adequately regulated for purposes of compliance with the MCP provided certain enumerated conditions are satisfied including disposal sites subject to CERCLA with respect to which MassDEP has issued a letter of concurrence

WHEREAS pursuant to 3IO CMR 400111 land use controls may be implemented at disposal sites deemed adequately regulated under CERCLA by means of a Notice of Activity and Use Limitation and

WHEREAS pursuant to 310 CMR 400111(10) disposal sites adequately regulated under CERCLA at which (a) remedial actions have been completed in accordance with the ROD for the site (b) subsequent design construction and other pertinent plans have been approved by EPA and ( c) EPA has certified completion of the remedial action will be considered to have achieved a Pennanent Solution under MGL c 21E and the MCP for those hazardous substances subject to such remedial actions

NOW THEREFORE notice is hereby given that the activity and use limitations required by the ROD and more particularly set forth in the IC Design Statement are as follows

I Activities and Uses Consistent with Maintaining the Selected Remedy The following Activities and Uses are consistent with maintaining the Selected Remedy and as such may occur on the Restricted Area without compromising the Permanent Solution that has been achieved for the Site

i Any response actions necessary to maintain the Selected Remedy (including without limitation sampling of existing wel1s and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

11 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

iii Non-residential school and day care uses

1v Paving repaving andor maintenance by adult workers of the Paved Areas provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

v Maintenance work by adult workers in the Landscaped Areas that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or barrier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in

Page 4 of 12

Bk 39600 Pg410 88608

Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

v1 Without limiting Subparagraph I (v) above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan CSMP) The SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation ofwork Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement ofpipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage storm water gas fuel oil electricity and communications

The SMP shall provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

a Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored on the prope1ty

b Appropriate measures shall be taken to secure stored soil and to control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

c Groundwater monitoring we1ls shall be repaired or replaced if damaged

d Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

e A date on which the SMP expires if required by EPA and MassDEP

f A report to be submitted to MassDEP and EPA at the completion of the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health

Page 5 of 12

Bk 39600 Pg411 88608

and safety provisions of 29 Code of Federal Regulation Section 1910 120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Notwithstanding subparagraph 1(vi)(f) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

Vil Such other activities and uses not identified in Paragraph 2 below as being activities and uses inconsistent with maintaining the Selected Remedy

2 Activities and Uses Inconsistent with Maintaining the Selected Remedy The following Activities and Uses are inconsistent with maintaining the Selected Remedy and as such may not occur on the Restricted Area without compromising the Permanent Solution that has been achieved for the Site

i Residential use or activity

11 Except as permitted in Paragraph 1i above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

111 Except as permitted by Section I above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

1v Agricultural use or activity except for raised garden beds approved in accordance with Section l(vi)

v Construction or installation of a bu iiding or structure for human occupancy without prior written approval of EPA

vi Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

Page 6 of 12

Bk 39600 Pg412 88608

3 Obligations and Conditions The following obligations andor conditions are necessary and shall be undertaken at the Property to maintain the Selected Remedy and to avoid compromising the Permanent Solution that has been achieved for the Site

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

11 If EPA has provided written notice that EPA has determined that the parties responsible under the OampM Plan are no longer able to submit an annual compliance letter regarding this NAUL the owner of the Property shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the Restricted Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such cel1ifications are based

4 Emergency Excavation If it becomes necessary to excavate within the Restricted Area as pal1 of a response to an emergency (for example repairing utility lines or responding to a fire or flood) the provisions of Paragraph 1 of this Notice shall be suspended with respect to such excavation to the extent necessary to permit such response provided that the Owner

(i) orally notifies the following persons of such emergency as soon as possible but no later than two (2) hours after having learned of such emergency

A EPA National Response Center at (800) 424-8802 and EPA Region 1 Office of Site Remediation and Restoration Emergency Planning and Response Branch at 888-3 72-7341 and

B MassDEP Emergency Response at (888) 304-1133 and MassDEP Southeast Regional Office of Emergency Response Section at 508-946-2850

or such other persons as MassDEP and EPA respectively may identify in writing from time to time to Owner for such oral emergency response notifications

(ii) notifies MassDEP and EPA in writing of such emergency no later than five (5) days after having learned of such emergency such notifications to be sent to the following addresses

A MassDEP Southeast Regional Office 20 Riverside Drive Lakeville MA 02347 and

Page 7 of 12

Bk 39600 Pg413 88608

B EPA New England Region I 5 Post Office Square - Suite 100 Boston MA 02109-3912

or to such addresses as MassDEP and EPA respectively may identify in writing from time to time to Owner for such written emergency response notifications

(iii) limits the actual disturbance involved in such excavation to the minimum reasonably necessary to adequately respond to the emergency

(iv) implements all measures necessary to limit actual or potential risk to the public health and environment

(v) engages a qualified hazardous waste site cleanup professional such as a Licensed Site Professional (LSP) as defined in the MCP at 310 CMR 400006(12) to oversee the implementation of this Paragraph and to prepare and oversee the implementation of a written plan (Emergency Restoration Plan) that will restore the Property to a condition that meets or exceeds the performance standards established under the ROD for the Selected Remedy and that is consistent with this Notice and to review and evaluate response actions contained in the Emergency Restoration Plan to ensure minimal disturbance of any contaminated soils and sediments and

(vi) performs all actions laid out in the Emergency Restoration Plan within thirty (30) days of the occutTence of the emergency or within such other time period as may be approved by MassDEP and EPA in writing and submit a copy of the Emergency Restoration Plan to MassDEP and EPA within ten (10) days of its performance with a statement from the cleanup professional confirming that the Property has been restored to the standard described above

5 Proposed Changes in Activities and Uses Amendments Pursuant to 310 CMR 4001 l l(amp)(c) the Owner must notify and obtain approval from EPA and MassDEP of any proposed change in activities and uses at the Property that is not provided for in this Notice Pursuant to 3 IO CMR 400111 (8)( d) the Owner must obtain EPA and MassDEP approval of any Amendment or Termination of this Notice All EPA and MassDEP approvals of any Amendment or Termination of this Notice must be in writing and be recorded andor registered with the appropriate Registry(ies) of Deeds andor Land Registration Office(s) to be effective

6 Violations The activities uses andor exposures upon which this Notice is based must not change at any time to (a) cause risks that are not protective of human health or the environment pursuant to the criteria set forth in the NCP at 40 CFR

Page 8 of12

Bk 39600 Pg414 88608

300430(e)(2)(i) (b) interfere with the Selected Remedy or (c) cause a significant risk of harm to health safety public welfare or the environment pursuant to Chapter 21E and the MCP

Compliance with the terms and conditions of this Notice is subject to enforcement pursuant to Chapter 21 E the MCP MGL c 21 A sect 16 and 310 CMR 5 00 and CERCLA and the NCP Such enforcement may include without limitation enforcement with respect to (a) any activities or uses that may occur that are described in Paragraph 2 of this Notice as being inconsistent with the Selected Remedy (b) any failure to undertake any obligations and conditions described in Paragraph 3 of this Notice as being necessary to maintain the Selected Remedy and (c) any other failure to maintain the Selected Remedy or Pem1anent Solution resulting from a failure to act consistently with this Notice

7 Incorporation Into Deeds Mortgages Leases and Instruments of Transfer This Notice shall be incorporated either in full or by reference into all future deeds easements mortgages leases licenses occupancy agreements or any other instrument of transfer whereby an interest in andor a right to use the Property or a portion thereof is conveyed in accordance with 310 CMR 401074(5)

8 Reservation of Rights

This instrument shall not limit or otherwise affect the right of EPA andor MassDEP to obtain access to or restrict the use of the Property pursuant to CERCLA Chapter 21 E or any other applicable statute or regulation

This instrument shall not release the Owner or any other party from liability for releases of oil or hazardous substances or materials nor shall this instrument excuse the Owner or any other party from complying with CERCLA Chapter 21 E or any other applicable federal state or local laws regulations or ordinances or by-laws

Owner hereby authorizes and consents to the filing and recordation andor registration of this Notice said Notice to become effective when recorded andor registered with the appropriate Registry(ies) of Deeds andor Land Registration Office(s)

Page 9 of 12

Town of Walpole acting by and through the Board of Selectmen

n Town Administrator authorized by ard of Selectmen recorded herewith

Bk 39600 Pg415 88608

Witness the execution of this instrument under seal this 21_ day of df 11 ( 2021

COMMONWE

COUNTY OF NORFOLK ss

~ On this 21 day of 4f1 2021 before me the undersigned notary public

personally appeared James Johnson as Town Administrator for the Town of Walpole and proved to me to through satisfactory evidence of identification which was ~6laquo~ ~ -fr VJ1e [indicate ifdrivers license or passport or other document] to be the person whose name is signed on the preceding or attached document and acknowledged to me that signed it voluntarily for its stated purpose

Name CA~ U ~

My Commission Expires July S 2t)z

Page 10 of 12

--------

Bk 39600 Pg416 88608

In accordance with CERCLA 42 USC sect 9601 et seq and the National Contingency Plan the United States Environmental Protection Agency Region I hereby approves this Notice of Activity and Use Limitation

Name 8r~Cltvi Olso Director Superfund and Emerncy Management Division (SEMO)

US Environmental Protection Agency Region I

In accordance with MGL c 21E sect 6 and the Massachusetts Contingency Plan (310 CMR 400000) the Department of Environmental Protection hereby approves this Notice of Activity and Use Limitation (as to form only)

Date Paul W Locke Assistant Commissioner Bureau of Waste Site Cleanup Department of Environmental Protection

Page 11 of 12

---------------

Bk 39600 Pg417 88608

In accordance with CERCLA 42 USC sect 9601 et seq and the National Contingency Plan the United States EobulliionmenlaJ Protectioo Agency Region I hereby appro1es this Notice of Activity and Use Limitation

Date ~------

Name Director Superfund and Emergency Management Division (SEMO)

US Environmental Prokction i0 ency Region I

Jn accordance with MGL c 21 E sect 6 and the Massachusetts Contingency Plan (310 CMR 400000) the Depamnent ofEmironmental Prolectioo hereby approves this Norice ofActivity

and Use Limilarioo (as ro funn ooly)_ ~~

Dale 4r S microlJ ~ Paul W Locke Assisrant Commissioner Bureau ofWaste Site Cleanup Department of Environmental Protection

Page 11 of 12

Bk 39600 Pg418 88608

List of Exhibits

Exhibit A Legal Description of the Property Exhibit B Legal Description of the Restricted Area and Coordinates of Cover Types Exhibit C Photo-Reduced Copy of Activity and Use Limitations Plan of Land Exhibit D Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table Exhibit E Institutional Control Design Statement (EOS) Exhibit F Copy of Vote of Town of Walpole

Return to

Attn Kristine Sheehy Senior Real Estate Attorney FOLEY HOAG LLP Seaport West 155 Seaport Boulevard Boston Massachusetts 02210-2600

Page 12 of 12

Bk 39600 Pg419 88608

EXHIBIT A

Legal Description of Property The land with the improvements thereon located in Walpole Norfolk County Massachusetts bounded and described as follows

PARCEL I

The land on the Southeasterly side of South Street bounded

NORTHWESTERLY NORTHERLY AND AGAIN NORTHWESTERLY by South Street by seven lines measuring respectively

17027 feet 120 feet 22011 feet 1653 feet 325 89 feet 4515 feet and 1497 feet

NORTHEASTERLY by Gleason Court 2627 feet

SOUTHEASTERLY AGAIN NORTHEASTERLY AND AGAIN SOUTHEASTERLY by land now or fom1erly of Santomarco by five lines

measuring respectively 6750 feet 2050 feet 1190 feet 2952 feet and 2001 feet

NORTHEASTERLY AGAIN by said land of Santomarco and land now or formerly of Cashorali 10056 feet

NORTHWESTERLY AGAIN by said land of Cashorali 2845 feet

NORTHEASTERLY by land now or formerly of Muighitti 9007 feet

SOUTHEASTERLY by the location of Old Colony Railroad by three lines measuring respectively 6809 feet 32808 feet and 38250 feet

and

SOUTHWESTERLY by land now or formerly of Meyer by three lines AND SOUTHERLY measuring respectively 9143 feet 1998 feet and

15202 feet

Parcel I is described in the deed recorded with the Norfolk County Registry of Deeds in Book 4459 Page 287

A portion of said premises is shown on plan entitled Plan of Land in Walpole Mass Belonging to General Fibre Co Inc by Edward C Peterson CE dated January 16 1960 filed with the Norfolk Registry of Deeds as Plan No 849 of 1967 in Plan Book 223 and the remainder is shown on plan entitled Plan of Land in Walpole Massdeg by E Worthington Engineer dated February 6 193 7 recorded with said Deeds Book D2135 Page 8 I

FHBOSTON52454092

Bk 39600 Pg420 88608

PARCEL II Property known as Parcel 33-120 of the Town of Walpole Tax Assessors Map which is

part of the property situate in the Town of Walpole County ofNorfolk and Commonwealth of Massachusetts and being all of the right title and interest of The Penn Central Corporation in and to all those certain pieces or parcels of land and premises easements rights of way and any other rights of any kind whatsoever appurtenant thereto or used in conjunction therewith on and along a portion of Branch of Railroad known as the Wrentham Branch said portion of railroad being described as follows

Beginning at a line extended across the right of way of said Branch of rai road said line being the Northerly line of South Street and extending thence in a Northeasterly direction the distance of 2852 feet more or less along said Branch of rai Iroad to a line which is parallel with the Southwesterly line of Common Street said parallel line extending across said right of way through a point in the centerline thereof at railroad valuation survey station 733 + 67 more or less and being the place of ending

Parcel II is described in the deed recorded with the Norfolk Registry of Deeds in Book 7986 Page 372 and is a portion of the land shown on the plan recorded with said Deeds as Plan No 52 of 1983

FHBOSTON52454092

Bk 39600 Pg421 88608

Exhibit B Legal Description of the Restricted Area and Coordinates of Cover Types

Le2al Description for Restricted Area The area shown on the plan entitled Activity and Use Limitations Plan of Land Blackburn amp Union Privileges Superfund Site 50 amp 60 South Street Walpole Mass Scale l = 30 dated April 6 2021 by Norwood Engineering Company Inc recorded with the Norfolk Registry of Deeds in Plan Book 704 Page 41 being bounded and described as follows

Beginning at a point on the easterly sideline of South Street at the southerly point of curvature of Gleason Court on said plan thence

Northeasterly and curving to the right along an arc of a curve having a radius of twentyshyfive and 00100 (2500) feet a length of forty-five and 15100 (4515) feet thence

S 48deg1352 E a distance of twenty-two and 24100 (2224) feet the previous course by the southerly sideline of Gleason Court thence

s 32deg0208 w a distance of fifty-four and 78100 (54 78) feet thence

S 59deg27 32 E a distance of twenty and 50100 (2050) feet thence

S 47deg5252 E a distance of eleven and 90100 (1190) feet thence

S 49deg01 10 E a distance of twenty-nine and 58100 (2958) feet thence

s 38deg3108 w a distance oftwenty and 01100 (2001) feet thence

S 49deg00 57 E a distance of one hundred and 56100 (10056) feet thence

N 39deg5348 E a distance of twenty-eight and 45100 (2845) feet the previous seven (7) courses by land ofNF Thelma A Casborali thence

S 49deg0808 E a distance of ninety and 29100 (9029) feet the previous course by land ofNF Ming L Yau thence

s 25deg2312 w a distance of siliy-eight and 22100 (6822) feet to a point on the westerly sideline of a fonner railroad right of way the previous course by land of the Town of Walpole assessor parcel 33-121 thence

S 55deg2937 E a distance of ninety-nine and 78 100 (99 78) feet to a point of tangency on the easterly sideline of a forn1er railroad right of way thence

Page 1 of 13

Bk 39600 Pg422 88608

s 30deg11 32 w

S 23deg49 I6 W

N 66deg1044 W

N 23deg4908 E

N l 6deg00 52 E

S 37deg0240 E

N 10deg1437 W

N 34deg093 I W

N 11 deg5558E

Northeasterly

N 27deg41 48 E

a distance of three hundred and three and 74100 (30374) feet the previous course by land ofNF Nicholas H Dowd and NF Emilio P Baldassari thence

a distance of four hundred ninety and 86100 (49086) feet to a SBdh the previous two (2) courses by the easterly sideline of a former railroad right of way thence

a distance of eighty-two and 76100 (8276) feet to an Iron Pipe on the westerly sideline of the former railroad right of way thence

a distance of twelve and 09100 (1209) feet to a SBdh thence

a distance of ninety-six and 50100 (9650) feet to a S Bdh thence

a distance of fifteen and 00100 (1500) feet the previous three (3) courses by the westerly sideline of the former railroad right ofway and land of NF Joseph R Carpentieri and NF Joseph R and Faith N Carpentiero thence

a distance of ninety-two and 82100 (9282) feet the previous course by land ofNF Richard A and Josette M Burke thence

a distance of tvvo hundred thirty-seven and 86100 (23786) feet to a point on the easterly sideline of South Street thence

a distance of one hundred twenty and 00100 (12000) feet along the easterly sideline of South Street to a point of curvature of the easterly sideline of South Street thence

and curving to the right along an arc of a curve having a radius of eight hundred and 00100 (80000) feet a length of two hundred hventy and 11100 (22011) feet along the easterly sideline of South Street thence

a distance of three hundred forty-hvo and 42100 (34242) feet to the point of beginning

Containing 621 Acres of land more or less

Page 2 of 13

3000

3005

3010

3015

3020

3025

3030

Bk 39600 Pg423 88608

EXHIBIT B (cont)

Points and Coordinates associated with Restriction Areas and Cover Types for the Activity and Use Limitations (AUL) at 50 amp 60 South Street Walpole Mass

Point Northing Easting Type

Curve Curve Number Len2th Radius

28754430528 7236432250 COR

3001 28755604597 7236680368 PC L=7535 R=80000

3002 2875597 1222 7236766913 POC

3003 28756333366 7236870620 PT

3004 28756280754 723697 3031 COR

28756025570 7237001250 COR

3006 28755918670 7237001140 COR

3007 28755864440 7237 I 05890 COR

3008 28755903200 72371963 IO COR

3009 28756030893 7237217396 COR

28756042534 7237250325 COR

3011 28756021733 7237317808 COR

3012 28755800732 7237640949 COR

3013 2875552 1424 7237667395 COR

3014 28755321388 7237708416 COR

28755197081 7237834881 COR

3016 28755102230 7238045173 COR

3017 28754941531 7238291869 COR

3018 28754851375 7238512944 COR

3019 28754753441 7238824 760 COR

28754681541 723916 1881 COR

3021 28754608227 7239406506 COR

3022 28754515846 7239459928 COR

3023 2875426 7589 723943 8163 COR

3024 28754198016 7239590840 COR

28753886764 7239449006 COR

3026 2875329 7944 7239187206 COR

3027 28752506745 7238837890 COR

3028 28751859560 7238552142 COR

3029 28751221833 723827342 l COR

28750848788 7238107869 COR

3031 2875045 3654 7237927814 COR

3032 28750630420 7237527432 COR

3033 28750741023 723757 6257 COR

3034 28751668594 7237842488 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 3 of 13 April 14 2021

3035

3040

3045

3050

3055

3060

3065

3070

Bk 39600 Pg424 88608

Point Number

Northing Easting Type Curve Leneth

Curve Radius

28751548848 7237932869 COR

3036 28752462269 7237767802 COR

3037 28756438461 7236904209 POC L=2207 R=80000

3038 28756543084 7236939245 PT

3039 2875653 7987 7236954123 PC

28756597578 7237007344 POC L=1651 R=937

3041 28756594465 7237087181 PT

3042 28756459044 7237347021 PC L=347 R=220

3043 28756432531 7237363546 PT

3044 28756280644 7237286201 COR

28755924210 7237966952 COR

3046 28756081959 7238048554 PC L=472 R=236

3047 28756064922 7238084404 PT

3048 28755523491 7237845047 COR

3049 28755419845 7238081981 COR

28755460757 7238099621 PC L=240 R=l57

3051 28755467701 7238120241 PT 3052 28755398690 7238275280 COR

3053 28755365410 7238264910 COR

3054 28755087149 7238900449 COR

28755158001 7238931521 COR

3056 28755040360 7239199770 COR

3057 28755311720 7239318930 COR

3058 28755263010 7239429300 COR

3059 28755388260 7239484290 COR

28755348660 7239576000 COR

3061 28755625470 7239696500 COR

3062 28755664605 7239606601 COR

3063 28755736202 7239637768 COR

3064 28755621870 7239897370 COR

287 5567 6160 7239920410 COR

3066 28755718270 7239830260 COR

3067 2875587 9750 7239900310 COR

3068 28755718790 724026 7600 COR

3069 28755763390 7240285350 COR

28756035900 7239926600 COR

3071 28756086280 7239812770 COR

3072 28756089984 7239813649 COR

3073 28756229128 7239501910 PC L=482 R=l54

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 4 of 13 Apnl 14 2021

3075

3080

3085

3090

3095

3100

3105

3110

Bk 39600 Pg425 88608

Point Number

Northing Easting Type Curve Length

Curve Radius

3074 28756257366 7239513984 PT

28756185799 7239674928 COR

3076 28756739833 7239921136 COR

3077 28756876060 7239682275 COR

3078 28756948336 7239735898 PC L=335 R=298

3079 28756958235 7239766064 PT

28756866081 7239978133 COR

3081 28757166275 7240127374 COR

3082 28757068320 7240314640 COR

3083 28757602980 7240594310 COR

3084 28757700050 7240408736 COR

28758247941 7240688376 COR

3086 28758250190 7240683910 COR

3087 28758344979 7240738168 COR

3088 2875843 6103 7240581527 COR

3089 28758602943 7240664224 COR

28758740024 7240397393 COR

3091 28758605706 724032 7776 PC L=477 R=309

3092 28758594882 7240286013 PT

3093 28758666635 7240197585 PC L=2573 R=3127

3094 28758767113 7240118710 POC

28758890752 7240086604 PRC L=I653 R=3993

3096 28758972305 7240074125 POC

3097 28759049552 7240045 I 52 PT

3098 28759330312 7239734408 COR

3099 28759459414 7239588584 PC L=2269 R=5217

28759524821 7239496174 POC

3101 28759568752 7239391829 PRC L=1814 R=486

3102 28759603259 7239308095 POC

3103 28759653883 7239232999 PCC L=l31 R=088

3104 28759665694 7239231411 PT

28759800587 7239299586 COR

3106 28759986288 7238981214 COR

3107 2875983 5797 7238891829 COR

3108 28759879750 7238798689 COR

3109 28759905380 7238754769 PC L=1600 R=2552

28759963590 7238700398 POC

3111 28760035727 7238666620 PT

3112 28760700665 723901 5672 PC L=4515 R=2500

3113 28760830230 7239191198 POC

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 5 of 13 April 14 2021

3115

3120

3125

3130

3135

3140

3145

3150

Bk 39600 Pg426 88608

Point Number

Northing Easting Type Curve Len2th

Curve Radius

3114 2876077 263 6 723 940 1624 PT 28760624518 7239567466 COR

3116 28760160100 7239276864 COR

3117 28760055928 7239453423 COR

3137 28759976118 7239541692 COR

3118 28759782139 7239764992 COR

3119 28759625581 7239640375 COR

28758966057 7240399493 COR

3121 28759184326 7240581973 COR

3122 28758593598 724126478] COR

3123 28757977293 724097 2314 COR

3124 28757716516 7241351659 COR

28757288251 7241140719 COR

3126 28756725827 7240851862 COR

3127 28756162468 7240586126 COR

3128 28755614498 7240338506 COR

3129 28754346745 7239768507 COR

28753845716 7239540194 COR

3131 28753257436 723927 8634 COR

3132 28752466355 7238929370 COR

3133 28751819340 7238643698 COR

3134 28751181527 7238364939 COR

28750807772 7238199071 COR

3136 28750413263 7238019301 COR

3138 28756920317 7237298739 PC L=l941 R=2104

3139 28756827128 7237274848 POC

28756733047 7237294944 PRC L=401 R=l66

3141 2875671 1336 723 727 2844 PCC L=1492 R=13345

3142 28756744594 7237206091 POC

3143 28756781529 7237141301 PCC L=1419 R=l018

3144 28756833084 7237094642 POC

28756902566 7237091952 PCC L=2413 R=157959

3146 28757017337 7237129167 POC

3147 28757131820 7237167258 PCC L=330I R=S0000

3148 28757282552 7237234442 POC

3149 28757431866 7237304721 PT 28757338390 7237495930 COR

3151 28757541620 7237605380 COR

3152 28756897590 723883 4280 COR

Exhibit B to NA UL-Part 11-EOS Coordinate Tables Page 6 of 3 April 14 202

3155

3160

3165

3170

3175

3180

3185

Bk 39600 Pg427 88608

Point Northing Easting Type Curve Cunbulle

Number Lenszth Radius 3153 28756870623 7238820218 COR

3154 28756838273 7238882258 COR

28756865240 7238896320 COR

3156 28756777004 7239062996 COR

3157 28756770439 7239063663 PC L=l 146 R=2269

3158 2875665836 I 7239046180 PCC L=l423 R=957

3159 2875661 7520 7238989913 POC

28756625544 7238920850 PT

3161 28756728525 7238726583 PC L=232 R=l58

3162 28756748720 7238720236 PT

3163 28756899634 7238797341 COR

3164 28757254653 7238121363 COR

28757520153 723761266 7 COR

3166 28757306899 723 750 IO 10 COR

3167 28756690336 7237500169 PC L=243 R=I68

3168 28756682599 7237479273 PT

3169 28756686990 7237469583 PC L=0250 R=l68

28756708806 7237463018 PT 3171 28757000109 7237616354 PC L=233 R=l73

3172 28757005368 7237637270 PT

3173 28757000998 7237645513 PC L=233 R=l69

3174 28756980219 7237651023 PT

28756429209 7238339422 COR

3176 28756342982 7238506849 COR

3177 28756500076 7238596485 PC L=l19 R=l48

3178 28756499701 7238608072 PT 3179 2875644 7813 7238705611 PC L=l 182 R=483

28756358177 723 869 0707 PT

3181 2875623 6099 7238376388 PC L=443 R=467

3182 28756235611 7238333779 PCC L=343 R=9IO

3183 28756249049 7238302418 PCC L=412 R=9IO

3184 28756278952 7238274519 PCC L=368 R=300

28756313362 7238277619 PT

3186 28756282498 7238911796 PC L748 R=216

3187 28756240650 7238919721 PT

3188 28756126081 7238620406 PC L=323 R162

3189 28756138645 7238591575 PCC L=333 R=283

Exhibit B to NAUL-Part II-EOS Coordmate Tables Page 7 of 13 April 14 2021

3190

3195

3200

3205

3210

3215

3220

Bk 39600 Pg428 88608

Point Number Northing Easting Type Curve

Leneth Curve Radius

28756163375 7238602867 PT

3191 2875523 0908 7238765275 COR

3192 28755205040 7238752740 COR

3193 28755391740 7238328470 COR

3194 28755466840 7238361040 COR

28755452760 7238392590 COR

3196 28755516920 7238421040 COR

3197 28755530690 7238388730 COR

3198 28755603230 7238421460 COR

3199 2875555 7568 723852 7053 COR

28755371220 7238445330 COR

3201 28755629198 7238558466 COR

3202 28755676040 7238453290 COR

3203 28755925410 7238563840 PC L=1902 R=3548

3204 28755927383 7238658634 POC

28755954390 7238749520 PT 3206 28755974770 7238807230 COR

3207 28755779200 7238881701 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

28755746700 7238609997 COR

3211 2875593774 7239036608 COR

3212 28756048460 7238996850 PC l=1445 R=2903

3213 28756070631 7239065422 POC

3214 28756109010 7239126420 PT

28756153820 7239182190 PC L=S98 R=848

3216 28756171980 723923 7880 PT

3217 287S6026148 7239566166 COR

3218 28756003865 7239556465 COR

3219 287S6134380 7239256650 COR

28755998460 7239195370 COR

3221 2875600 71S0 7239174530 COR

3222 28756001791 7239172152 COR

3223 28756040451 7239079437 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 8 of 13 April 14 2021

Bk 39600 Pg429 88608

Point Number

3210

3200

3056

3057

3058

3059

3060

3061

3062

3218

3219

3220

3221

3224

3225

3226

3227

3228

3070

3071

3234

3233

3235

3236

3237

3238

3239

3240

3241

3242

3243

3244

3245

3246

3247

3248

Northing

28755746700

28755371220

28755040360

28755311720

28755263010

28755388260

28755348660

2875562 54 70

28755664605

28756003865

28756134380

28755998460

28756007150

28755941340

28755962080

28755867937

28755819702

28755766128

28756035900

28756086280

28755991990

28755942100

28756477248

28756677238

28756650130

28756473307

28756480112

28756675030

28756724454

28756742099

28756742133

28756703924

28756640759

28757607280

28757401530

28757467350

Easting

7238609997

7238445330

7239199770

7239318930

7239429300

7239484290

7239576000

7239696500

7239606601

7239556465

7239256650

7239195370

7239174530

7239145324

7239100930

7239061674

7238935003

7238911508

7239926600

7239812770

7239769910

7239884050

7239261913

7239253008

7239321810

7239319038

7239298824

7239364440

7239271845

7239292625

723935 0187

7239393239

7239393096

7237584960

7237475300

7237345620

Type

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

PC PCC

POC

PCC

PT

COR

COR

COR

Curve Len2th

L=273

L=ll77

L=657

Cunmiddote Radius

R=1421

R=810

R=679

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 9 of 13 April 14 2021

Bk 39600 Pg430 88608

Point Number Northing Easting Type Curve

Len2th Curve Radius

3249 287 57514570 7237372360 PC l=ll05 R=1993

3250 287 57 588060 7237452980 PT

3251 28757631382 7237429676 PC L=2244 R=2352

3252 287 5765 6810 7237537876 POC

3253 2875 762 9720 7237645671 PT

3254 28756940655 7238952710 PC l=1493 R=1509

3255 28756901845 7239015577 POC

3256 2875683 7836 7239052474 PT

3257 28758104824 7237653014 COR

3258 28758028960 7237800160 COR

3259 28757949530 7237760790 COR

3260 28757901005 7237855021 COR

3261 28757839230 7237820908 PC L=273 R=l33

3262 28757830688 7237799810 PCC L=539 R=2144

3263 28757852974 7237750897 PT

3264 28757891705 7237688178 PC L=lS26 R=2432

3265 28757948636 7237637880 POC

3266 287 58018307 7237607597 PT

3248 28757467350 7237345620 COR

3267 28757550832 7237363444 POC L=2653 R=80000

3268 28757668809 7237424132 PT

3269 28757504 719 7238817989 COR

3270 28757493010 7238842230 COR

3271 28757561074 7238880970 COR

3272 28757483953 7239024127 PC L=323 R=l70

3273 28757459939 7239037846 PT

3274 28757311605 7238957122 PC L=1388 R=906

3275 2875727 2732 7238901647 POC

3276 28757283181 7238834718 PT

3277 287 5733 4061 7238752337 PC L=255 R=l60

3278 287 5735 5527 7238744411 PT

3279 2875 7102815 7239517199 PC l=261 R=l70

3280 28757080654 7239525307 PCC l=909 R=1275

3281 2875 700 5390 7239477911 PCC L=l007 R=990

3282 28756999624 7239381704 PT

3283 2875707 7705 7239230604 PC L=ll14 R=907

Exhibit B lo NAUL-Part IlbullEOS Coordinate Tables Page 10 of13 April 14 2021

3285

3290

3295

3300

3305

3310

3315

Bk 39600 Pg431 88608

Point Number Northing Easting Type

Curve Leneth

Curve Radius

3284 28757168066 7239178102 PT

28757205717 7239186398 PC L=518 R=930

3286 28757249003 7239213534 PCC L=l41 R=086

3287 2875724 7909 7239226048 PT

3288 28758415755 7239842757 PC L=251 R=l59

3289 28758437695 7239837379 PT

28758456377 7239846949 PC L=812 R=876

3291 28758494897 7239915165 PCC L=456 R=757

3292 28758483790 7239958646 PT

3293 28758405147 7240111348 PC L=l057 R=955

3294 28758318136 7240161452 PCC L=477 R=l063

28758272407 7240149529 PCC L=250 R=l60

3296 28758265647 7240128003 PT

3297 28758157937 7237680895 COR

3298 28758902927 723807 1969 COR

3299 28758852531 7238168280 COR

28758779660 7238129750 COR

3301 28758746973 7238192072 COR

3302 2875807 6630 7237840490 COR

3303 28758049940 7237894220 COR

3304 2875871 7997 7238243620 COR

28758680103 7238315946 COR

3306 28758533699 7238239240 COR

3307 2875852 6899 7238252220 COR

3308 28758098180 7238027600 COR

3309 28757974484 7238264223 COR

28757957598 7238255513 COR

3311 28757757732 7238637845 COR

3312 28757774584 7238646620 COR

3313 28757653710 723887 7846 COR

3314 28757560920 7238829340 COR

28759004930 7238125514 COR

3316 28759689797 7238485028 PC L=1992 R=2609

3317 28759697204 7238583760 POC

3318 28759667288 723867 8142 PT

3319 28758996126 7238323718 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 11 of 13 April 14202 I

Bk 39600 Pg432 88608

Point Number

Northing Easting Type Curve Lenfth

Curve Radius

3320 28759028950 7238261560 COR 3321 28758954486 7238222188 COR

3322 28758972523 7238378387 COR 3323 28759421550 7238613630 COR 3324 28759377933 7238698105 COR 3325 2875907 4811 7238539289 COR 3326 28759081611 7238526309 COR 3327 28758935210 7238449604 COR

3328 28759464470 7238637330 COR 3329 28759632674 7238722481 PC L=ll83 R=l578

3330 28759583973 7238755474 POC 3331 28759526573 7238768343 PRC L=2163 R=2455

3332 28759422964 7238796123 POC 3333 28759341091 7238865430 PT

3334 28759193370 7239050710 COR 3335 28759416340 7239163940 COR 3336 28759263600 7239455620 COR 3337 28759043690 7239336510 COR 3338 28758935490 7239552130 COR 3339 28757650890 7238883240 COR 3312 28757774584 7238646620 COR 3311 28757757732 7238637845 COR 3310 28757957598 7238255513 COR 3309 28757974484 7238264223 COR 3308 28758098180 723802 7600 COR 3307 28758526899 7238252220 COR 3306 28758533699 7238239240 COR 3340 28758700033 7238326388 COR 3341 28758675436 7238373334 COR 3342 28758733013 7238403500 COR 3343 28758760858 7238350353 COR 3344 28758860952 7238402796 COR 3345 28758833106 7238455943 COR 3346 28758890683 7238486109 COR 3347 28758915280 7238439162 COR 3326 28759081611 7238526309 COR 3325 28759074811 7238539289 COR

Exhibit B to NAUL-Part H-EOS Coordinate Tables Page 12 of l3 April 14 2021

Bk 39600 Pg433 88608

Point Number

Northing Easting Type Curve Len2th

Cunbulle Radius

3324 2875937 7933 7238698105 COR

3082 28757068320 7240314640 COR 3083 28757602980 7240594310 COR 3349 28757790234 7240236327 COR

3348 28757255574 7239956657 COR

3124 28757716516 7241351659 COR 3125 28757288251 7241140719 COR 3126 28756725827 7240851862 COR 3127 28756162468 7240586126 COR 3128 287 55614498 7240338506 COR 3129 28754346745 7239768507 COR 3130 28753845716 7239540194 COR 3131 28753257436 723927 8634 COR 3132 28752466355 7238929370 COR 3133 28751819340 7238643698 COR 3134 2875118152 7 7238364939 COR 3135 2875080 7772 7238199071 COR 3136 28750413263 7238019301 COR 3350 28750296168 7238284525 COR 3351 28754 78 6636 7240267040 COR 3352 28757412029 7241794586 COR

POINT DESCRIPTION ABBREVIATIONS

COR=CORNER PC= POINT OF CURVE WHERE CURVE STARTS POC -= POINT ON CUR VE PT=POINT OF TANGENCY WHERE THE CURVE ENDS PCC = POINT OF COMPOUND CURVE (WHERE RADIUS CHANGES) PRC = POINT OF REVERSE CURVE

NOTES

THE COORDINATES ARE BASED ON AN EXISTING CONDITIONS AS-BUILT FIELD SURVEY BY NORWOOD ENGINEERING CO INC BETWEEN NOVEMBER 15 TO DECEMBER 18 2019 TI-IE COORDINATES ARE BASED ON l1ASSACHUSETIS ST A TE PLANE COORDINATE SYSTEM NAD 1983 (FEET) THE ACCURACY OF THE COORDINATE LOCATIONS ARE +-0J FEET

Exhibit B to N1UL-Part II-EOS Coordmate Tables Page 13 ofl3 April 14 2021

---

1f~ flJr ~i

f ~~ J~i](M~I ~ 1 jf~ ~~f W-- )e 1

It lj fY pl ~-~j

I --- ~ ~

1 (J-c~ er ~

C JI fl JYf

1 ~ ~Yu-~ 1i

~r

( LOClJS P

SCAUllbulliQO

I ar lMIT flG PINI tMS _ lIIPMIDMICXNllRlnT~tlCfllUS 1111D cmuftraquodl s - NIKl1III tfIJIIIIIOfM~1HCll allE1

DAre Jllrl

NUKIJU LU6 DMitM

mmtG6DKbdlt

~4~-middot

~~I

-- ampnbullllf~ ~ fa

LEGEND 0

-i~wr0o-m lICUUoaampbullco--11111 _ _l_J

0

bull ~-ail_I

~-

mo(I ---fwj

amp~~~~ ~ ~~ltgtmiddot ~A~

~6

_L-r

bull -~ IBP__l-11Uil n-rlfl-lffll rMCllI 1a 1rr ai

-~ lll-lliI u-W--11a 1 Ml[ 411 amt l0IIC 3JICJ7 ~ 33-1--I- DIID llXII D111 JlMZ 411 lraquo- ~lUN~t --- - etMpound 11JII

~ MffD mmaat ZL I01t 111

1Jlll~-IICfIQfJICIISJ DfEI IC71- I~ 1~ 9 Cl 1VY IICIIWCLl~fCSC~lNCl

~11HltOXW1A~JtCI~llfB MXIC 1HI lME INCi 111M bull11 (S 1f41~middot~-~-)

~ io

0 0 0 0 -0 0 0 D O 1 middot tbull O

_- _pound ~ - Tf middot- ---r ~~ ~~- ~=middoti

r jil7bull --------4~-middot~

(

SCAtpound 1bull bull YI

I ~ tfAIE lIMa toafllltl1E ~NAD1w1(rJ

1 ~ PlIla II MMt QI 11D TD D111oPl

~c1MlntID9~~-l 1NIIJIIKlNI LnlJTU ~ deg qllAJSTE uM011111 iu1II 1111ZT IIIILJaZ

Exhibit C - Photo-Reduced Copy of Activity and Use Limitations Plan of Land

--~middot---

I ~111-11111

iiiii

-ill111liilt

ACJIYIJY ANJ) lJSE lJJll7ATJONS PLAN OF LANI)

81ACJ(81R1 I IINION Flr11lfES SllffllF7AVO SIle

o tfO SOIJIH s1ar HlltlPOtL IIAS

SCAlElrJAt IPfffl152021

1IJrwod Eng1neerlng

- EnQlbullHrlflg Compaffy middot~~=~ m Cm1JQ u fnfJa-eal

~ -

-~

9l1EET 1 OF I 8324-02

td ~

w ~ m 0 0

Id Q ii w ii

co co m

co 0

-l

~-77--raquo- -~I~ )middot~ ~ bull _I lT ~ v~

AI ~ If ~)middot~ 7- ~1 c t11 yil ~ ~ ~middot~41 bull1 l ~~l(i~r~1 f7 )ll y-

~~ f -~ -v fgtV ~ ~ ~ l er-- u -

tl x-P~C ()

JP yen f(( 11 1degpoundS -~ (

ftunrTfflllllTnallJrNNQWDf ~ ti IZNtRlTT lnH M IULS IIJIUIUlA-DlltlllllDlJlllIICIF tJbllt~llC~lJNp

DTl NlllltaJatl-Witiill (raquo11 iiiK(+til

I aJnlTlKATJlfl PlAH~ THE PUIIJll1T UC TIUlf Mlaquo THE l5 11 oawG ~ NII 1Hpound1as Of1111E111 AMllfrlTll9laquolllt Mpound ntem OPlaJ CJ1 IWM1pound BREn 011 bulln

~ ~illi~fli~ _lt ---c~-Clmiddot~~c0-nmiddotmiddot~bullJmiddot04~- ~--~--yen~~bull - L -bull -n ~ -r - ~ -

it

~ fr ~ ~- -~bull~bullv OG- ~n0

bull--ltmiddot middot~ -~- ~~-=~7~st~-~~~~i~~Hil~-) 2~C 0 ~~~~~ --------Y-Tgt-bullbullmiddot-

U-IU ~middotshy =i==-

bullbull bull _ -middot-

~----- ( ~11middot

__IC1ZMJ - bull IOC)0l lftEf ___ i gt mEKJllJfNG rotJ1FRIIIT AIIEAS B~ p~ AIIEAS ~ea-vmiddot LIUIID

~ e--- -+ ~ rzprz1za 1 ~ IJTATC PRC ~TC

nJml lltPtasCltJ

DUD BCD lJlll7 PMC 4H 1 1 YERT1CAL M1llI II NCCI ~ _ ro conurr DOD 80CIC 3JII07 llME 4H I ntaM NUIU 1121 IJ4TAI m IMlC 111111 nATIIW ~fsi

tJMAlfflOlI) AIIEAS1 bull 11AMJSCAlfl) AlpoundAS Lill] 1Dll IOlII POT PlCit 6115 J)-t20 ~atfnujK~tlLWlQI

~PUNMl-17 POflTIVNf1Ell llaD BaalC Tl_ Paa bullbull - 99 a 11

_-ijf1iltDP~IZ~ 5CME - JOSUva1fTLJ ~ ~-rr 111 C tMI=

bull111 I~

i=iiii7

~ e---

t c z rl

L-n11 ~

ACJIVJTY AND USE LIAlffAJIONS

PIAN OF RESTRIC1EJJ AREAS ANJJ COVER TYPES

fltACK1(fN _ llNlltgtI PfMIECCS SllPVFVNlJ51Tlt

JO _ lxJ srJllH STREET IIALPrJU JASS

SCAU I - 30 APRIL 2021

lcnwod Engineering

llarwood Cngnrilgtf cpmy -t~~~~

fIL Pllpa-ru - (1u]1a-lftll

~L=wl f 01~JII IO_

a SIEET I (F 2 B324-02

bj ~

w 0

0 0 deg It

iQ ~ w l11

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 1 of 2

CX) CX)

deg CX) 0

ntllT -1~1~ rurnlaquo1 r1n l1XTM 11Nf -r~ lie UUffCI 11Pt lDll1Hf iniin --IC unr1G Tlr 1n1rn Iota allll Ito tyen1tlll ~~11CRnrzJ11-11--~ci-- n31 nr111w11J1t ~bull c ~- diams JDrnn llloffl rcnlml IDII

-~ ]al rll _ _ PnlM-1-PI lbull-- ll7HrirrIPlllD1lf~-a bullbullll 111bull IClln9XnolDlllIIIIIIOm

214 ff7371JOOT ~bull JllC Ibullbull 171 JICllEY)l)vlUTlo~lUl~ ~li_~ -~~ MDlol ll4L~TllJraquofllllf190abullbullt ~~nQuu~~1aJI _~~OtottWU~1t11txm~arcPbrmllmCDt ~~ ~~ ~ =~ gj ~l11~ llltlM Mrattllll TDPmllIDCDI JJ4bull e~ _ ~ e PClC lbullI- 1- ~1sect~ ~ ~ ~ ~ ~~~-nr~44bull~mn11-a11 ~~ =mt =m~ ~ ~~ ~ =~~-~~ =~~rt~l~llibullltbull=

~~~~~~~~r-~r-~~sectsect55~55 ~~ ~=g~~ mi --1~ ~-==~~m~ L-~r UVPllrlllUillDITDr4L 1JI lbullKlllll~==~~~=~

~~~~~~~~ raquoff-llll 111rritl_aianbull ~11lCla rr- n ttll XDP11r1r 11111c-1C111~ RTl~rJlllllbullbull~llllJlllipo~~=r~tm=~~

~=~3r~t==~ ~=~i==~~ llt1ttl70 m~~n~ =n~ L diams 11- bull - iaEi~mi 1lE~HHffi ~1-~ E LbulllT bullU-7YA 8911U TMn4 OJII C- lllkHrnl1nlntll11106~

MJ9~gt111ftlrfffll11 ~ SbullC61hLJT raquoWl lll~IJlll11amp1 utVllllt a lbulllfGl bulllC lT

lliilH~1 ~~rm-=rn~ lbullIIIICU-1bull0

itt ishwI JUo ma m1 bull 1-c iiliii ~==~m~=~ Ullln U7IIY M1NLl411 fflf f-~ llr IL ~ lbullt Ill uaP11rllDn1rin1bull139nf- na_ 1111lnl ___ lWTDf-ID 111Jbullnllr-cishy

J1JT1 lflTI-noLbull COi lJ1 tsr18GOTDrl1~ 1--Cn ~~~==-=~ LbullS1rbull-p

LbulllI ~middot x1 fl11bull diams an l~J P-~ WI 1~1Slrmsraquo11nirorn 11bull1n-

llrgt 58 - TDrl ZJlJ l~ Zl llf4 Pll1raquo91I lnP~IIEI 11 ==~=-~~ lbullt-11bullh1~

nun_-~bullfllrlll_ lbulll-lrbull N- - nr6-11MII rinaus a 1bull1E-t1 im1 nrxi mr~ 7nn1 4i i 1c m llrS~iJ-ltJlillII Tt-Ul ris ~=~~middotiill~~ tf llDln~n1rJrgt11nbull1ric ~IPgt9nq~ It-MU rbull RflrrlllVllbulltPllbullOIIUAfC lbullnJtrNbull_~lD+4ftJSHJ7711JrllIIIIT144lDI lbulll ~I llfs-mllThn~-f 1bull11

1a5blH=i5gS El~ iE =iilli ~ID aH~~ ~~ leJINNllllfflnlt10ff1nll~1g=TI==~- lbullN~Jmiddot pw nrwuhtl tba11 l- lllllsectimiii~ ~ lllaquot ll116UW41 llllII NII Cl Ld bullt ll 11r 111~-~lHtl-IINOClll 1Dgtn~rMOtnllfbull3all)Mnr~bullwrmm11uoo~ ~r~ m~ = ~~ t~-i m NNtotl n11nn cm

~~~~~Ttr~ in Httl01llxl nlfM114ta cm

JJN n=-PIW - I- C lbullT rnr nnubullNoXI ffllPI n1 11-amp 11middot 77)111fflffPl~JlaUII

i1JJ n91lbull ti Jnlftbulllll QII

~g=~~~~ir~f~5 =i~=~~ ~=~ ~ ~j====goi H1111t-llll ffo~ ~rn tm111 ta1Vl~ tnar- IVI rm u1i ~ nw ~illl cm 1111 Hltt1H T7U 72w111ll tm UI ftffiH~bull1 naMUlI nlll

lltfll~IOUl rnes~ttlClll

~I~~=~=~~= l3111ratlQOJ121lllll CS u1n-n-a mn-c~11111llllilr ~====m~~ lbulllllr~~Oll~r1111-t~rtRiHa)toI

-~rt~_Utr111tt~USI ~m~i==r~~llfflpound1gtgtMllkllit1U10C011 annrxnbull-TCRL11ai~=~=~g)llllll~--rWltMJtt-8 DR Pl rraquof ntl rim Gllf CCI~~1r~~ liiilllii u- ntlt bull llJ~naJCDI

raquo11NMl10~Ullllcm ntrlnK)fL~nlln-1c lllf ~--TlJaft_Lmc i lbull1 bull l3il0 Nl-197) Ttlll1344 a LbullI 3 l diams 1-111 lflS 1111lOllt ffl- MP PII bullHI lgtl llJI l97Mlt Ian -ti DG llC

111111===-~~~=mg ====~~ tD rlrffllZllIITO-lfllCIIII=~tr~L~~~= - Pl~I llII TD_ ff~ tDII31119NIJMlDffU~~ H CZIII liii~mlt~ D1111nrn11GQ~-CaKftQNJWNczr41140ffnQCUII Jnffnt1JIIIIJunbull~1Qc20lll ~Pllli ll mrnnn lbulltlP 17Jrffdeg-degluoElJIIIQII

~-I-ti _nrna~rlll

a n- 4411 llbullQI 1=40 rt La n- lllf ffrgtn _Jr_~ Ullk ---rr~~ ~=~=tl~~ =1 nttltt nraquo 1nlU as

=-mn--~111DJIDII Ullgt~fflflnanaaJIIJalt55~~EIS~=~~ ~~)1 -11CIJII nn~bullbullbullnaKatt1ta1

JOIT ru~- rf- deg hJIIII r- 111111 ~1111) -1 aJ1 ld t11D1etlll_TalCIS -~-UCV~bullraquootur=~=~I~~=~--~ ~rsrgo_mlaquoshym rs~11flI ~- rnilr==~=~~ ~~r _ ~ atfl ~ rtw Dgtlnn-f-lEllln17n-UIIP

D11 fflXTJ111111 I~~ ar D1Jn4 ~leJJS-OnC111

=====5 middoti SHU=~ 5 ampn iliiiiiIiI11

ngtgtn~1~1tbullubull1rm DH tu~- lt11 rirmU1111 CDIII

~i~i555mi~ ~~ ~m=~==m~g===~~~~ tn1r JtW ~ma- PiOll a CU

~ XNr~t~fDllll1-all~~ m===~~ bullbull~W 111111 ==~~ ampT g~ ru~ =

~lU $Et=ni ~ llll0111ra1Ln~otqC011

H~ g==i =~1 ~

~111111 ~~g~n~a~J))pound11 1=~)6tia

~~ mEfHfH~Si

amp12Ct _ an ~

U N711f21th mM1LU aa o1bull~--117CII in4r ~llllll1Vffl-111Dlr lit~ Hmtlpound1 71 12L I CCIII ---~CUnMIIUOCVf JIHtlnn nl 7r ll4011CIIII

llllDNXCWZflDtlltllCIDCDr

~~=~==~=gnn n1raquoL bullw noanDNt CIJIIi=~ C~middot ~ ~ ~ HnffTI-QIJroQ__111PtlJIIInfflll bullbull1~ aaeIT t-- nrJD nJUntu~CllWI

m ~1 ~ ~~~ ~ ilria~gliiiji~=ir ~lt-OTT gl1raquo ~Iraquou fflllIL nllll 1111111 flC~middotIY_4allCCIIIi l1i5~ ~~11~middot~ ~~ ffll H71W786lll 7P-JOalllllll 2N ~ 1-flllt 7HIJl4- DI ~ ~==~ ~t-tr bullM-

114 Hit71aTra7ririatNOCIIII

llHl1Hf ll~7Dl4fIZIIICIIII 1141ftillf+1DllnTgtlMa~=~bull==~r Lbulll-lllbullbulllJJ

=~~~HR-~a ~ =iEri ~ ~=6

= 1MESE COCIIIOlfAlEi ARC 9~ at AH DISTlfG CONJmOfS AS-alLT FED 5UKiEY Y NORWDal EJICltJIJll(G CD~ IIElMEN ~ 1S 111 DECDaR a 2DII 1)pound OCICIIIDNAlES 5HCflI UIpound IIAID Cit MltSSAOfllffT5 STATE FlJriNII CDCffllNAT smult ~AO leJ (IMIJ 1HE ACQlltACY ltF 1HE COCftDINT[ LDCAnatS Mpound diams- 01 FtU

POINT DESCRIPTION ABBREVIATIONS~-~middotPC Pmlr Of CLIRIJC bullIEllL ClMNpound STilRlS PDC bull PtJtilTIIJOM1poundr ~ [raquo TAHCINiT W(R[ lll[ CURpound uroo Fo F[1NT(1t~tfflvt[ltft1llllIIUlt OMNtilE)PRC ~T oT ~pound ~Vlllrlt

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 2 of 2

I ~ IHAT nfl PlM MS 81D1 PIIDMQl ~WllTM(llUI MOIIEOIAAlPlllR~Df IIUPS C- lttE ~111 Cl__ HftNMIIIZlt

WWWWJU Cii6 liftitit

ACTIVITY ANI) USE LINTATIONS

PLAN OF RES7RIC1EJJ AREAS ANJJ COlER TYPES

8V CKlJ()RN IJNl()N PflllfpoundCpoundS SlllERFIIMJ SITC

50 HJ S(J11( SmEpoundT llAIPOIL JASS

=r-o ~ ll 2021

~ Engmeer1ng

Hltd ~~ middot~~-=~ra (f~AJ lIQ c- f

a llfEET 2 ltF 6324-02

td ~

w ~ m 0 0

Id Q ii w m

co co m 0 co

Bk 39600 Pg437 88608

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY New England Region

Five Post Office Square - Suite 100 Boston Massachusetts 02109-3912

INSTITUTIONAL CONTROL DESIGN STATEMENT FOR THE BLACKBURN AND UNION PRIVILEGES SUPERFUND SITE - EAST OF SOUTH STREET AREA

1 Introduction

Pursuant to the Comprehensive Environmental Response Compensation and Liability Act 42 USC sect 9601 et seq (CERCLA) and the National Contingency Plan 40 CFR Part 300 (the NCP) this document contains a description of the release events and site history that resulted in the contaminated media that require institutional controls in the fom1 of Activity and Use Limitations the basis for land use restrictions and uses that are consistent and inconsistent with the Selected Remedy ( as described below) This Institutional Control (IC) Design Statement pertains to a portion of the Blackburn and Union Privileges Superfund Site located in the Town of Walpole Massachusetts (the Site) which has been listed on EPAs National Priorities List (NPL) which portion is generally referred to as the East of South Street Area (the EOS Area) The EOS Area is located to the east of South Street in Walpole and is shown on Figure 1 attached hereto

A Notice of Activity and Use Limitation (NAUL) is necessary and appropriate for the EOS Area of the Site based on the fact that pursuant to EPAs risk evaluations asbestos arsenic trichloroethene (TCE) and certain polycyclic aromatic hydrocarbon (PAH) contan1inants remain in place in soils at levels higher than those appropriate for unlimited use or unrestricted exposure groundwater underlying the EOS Area contains hazardous substances at levels that present an unacceptable risk of exposure and remedial measures at the Site must be protected and maintained to ensure that the Selected Remedy remains protective

EPAs Record of Decision (ROD) dated September 30 2008 specified the need for institutional controls such as a NAUL to ensure long-tenn perfonnance and protectiveness of the Selected Remedy The institutional controls described herein are necessary and appropriate to ensure that the Selected Remedy for the Site remains protective of human health and the environment The remedy for the Site as described in the ROD is referred to herein and in the NAUL as the Selected Remedy

Page 1 of7

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 5: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

Bk 39600 Pg410 88608

Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

v1 Without limiting Subparagraph I (v) above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan CSMP) The SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation ofwork Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement ofpipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage storm water gas fuel oil electricity and communications

The SMP shall provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

a Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored on the prope1ty

b Appropriate measures shall be taken to secure stored soil and to control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

c Groundwater monitoring we1ls shall be repaired or replaced if damaged

d Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

e A date on which the SMP expires if required by EPA and MassDEP

f A report to be submitted to MassDEP and EPA at the completion of the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health

Page 5 of 12

Bk 39600 Pg411 88608

and safety provisions of 29 Code of Federal Regulation Section 1910 120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Notwithstanding subparagraph 1(vi)(f) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

Vil Such other activities and uses not identified in Paragraph 2 below as being activities and uses inconsistent with maintaining the Selected Remedy

2 Activities and Uses Inconsistent with Maintaining the Selected Remedy The following Activities and Uses are inconsistent with maintaining the Selected Remedy and as such may not occur on the Restricted Area without compromising the Permanent Solution that has been achieved for the Site

i Residential use or activity

11 Except as permitted in Paragraph 1i above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

111 Except as permitted by Section I above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

1v Agricultural use or activity except for raised garden beds approved in accordance with Section l(vi)

v Construction or installation of a bu iiding or structure for human occupancy without prior written approval of EPA

vi Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

Page 6 of 12

Bk 39600 Pg412 88608

3 Obligations and Conditions The following obligations andor conditions are necessary and shall be undertaken at the Property to maintain the Selected Remedy and to avoid compromising the Permanent Solution that has been achieved for the Site

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

11 If EPA has provided written notice that EPA has determined that the parties responsible under the OampM Plan are no longer able to submit an annual compliance letter regarding this NAUL the owner of the Property shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the Restricted Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such cel1ifications are based

4 Emergency Excavation If it becomes necessary to excavate within the Restricted Area as pal1 of a response to an emergency (for example repairing utility lines or responding to a fire or flood) the provisions of Paragraph 1 of this Notice shall be suspended with respect to such excavation to the extent necessary to permit such response provided that the Owner

(i) orally notifies the following persons of such emergency as soon as possible but no later than two (2) hours after having learned of such emergency

A EPA National Response Center at (800) 424-8802 and EPA Region 1 Office of Site Remediation and Restoration Emergency Planning and Response Branch at 888-3 72-7341 and

B MassDEP Emergency Response at (888) 304-1133 and MassDEP Southeast Regional Office of Emergency Response Section at 508-946-2850

or such other persons as MassDEP and EPA respectively may identify in writing from time to time to Owner for such oral emergency response notifications

(ii) notifies MassDEP and EPA in writing of such emergency no later than five (5) days after having learned of such emergency such notifications to be sent to the following addresses

A MassDEP Southeast Regional Office 20 Riverside Drive Lakeville MA 02347 and

Page 7 of 12

Bk 39600 Pg413 88608

B EPA New England Region I 5 Post Office Square - Suite 100 Boston MA 02109-3912

or to such addresses as MassDEP and EPA respectively may identify in writing from time to time to Owner for such written emergency response notifications

(iii) limits the actual disturbance involved in such excavation to the minimum reasonably necessary to adequately respond to the emergency

(iv) implements all measures necessary to limit actual or potential risk to the public health and environment

(v) engages a qualified hazardous waste site cleanup professional such as a Licensed Site Professional (LSP) as defined in the MCP at 310 CMR 400006(12) to oversee the implementation of this Paragraph and to prepare and oversee the implementation of a written plan (Emergency Restoration Plan) that will restore the Property to a condition that meets or exceeds the performance standards established under the ROD for the Selected Remedy and that is consistent with this Notice and to review and evaluate response actions contained in the Emergency Restoration Plan to ensure minimal disturbance of any contaminated soils and sediments and

(vi) performs all actions laid out in the Emergency Restoration Plan within thirty (30) days of the occutTence of the emergency or within such other time period as may be approved by MassDEP and EPA in writing and submit a copy of the Emergency Restoration Plan to MassDEP and EPA within ten (10) days of its performance with a statement from the cleanup professional confirming that the Property has been restored to the standard described above

5 Proposed Changes in Activities and Uses Amendments Pursuant to 310 CMR 4001 l l(amp)(c) the Owner must notify and obtain approval from EPA and MassDEP of any proposed change in activities and uses at the Property that is not provided for in this Notice Pursuant to 3 IO CMR 400111 (8)( d) the Owner must obtain EPA and MassDEP approval of any Amendment or Termination of this Notice All EPA and MassDEP approvals of any Amendment or Termination of this Notice must be in writing and be recorded andor registered with the appropriate Registry(ies) of Deeds andor Land Registration Office(s) to be effective

6 Violations The activities uses andor exposures upon which this Notice is based must not change at any time to (a) cause risks that are not protective of human health or the environment pursuant to the criteria set forth in the NCP at 40 CFR

Page 8 of12

Bk 39600 Pg414 88608

300430(e)(2)(i) (b) interfere with the Selected Remedy or (c) cause a significant risk of harm to health safety public welfare or the environment pursuant to Chapter 21E and the MCP

Compliance with the terms and conditions of this Notice is subject to enforcement pursuant to Chapter 21 E the MCP MGL c 21 A sect 16 and 310 CMR 5 00 and CERCLA and the NCP Such enforcement may include without limitation enforcement with respect to (a) any activities or uses that may occur that are described in Paragraph 2 of this Notice as being inconsistent with the Selected Remedy (b) any failure to undertake any obligations and conditions described in Paragraph 3 of this Notice as being necessary to maintain the Selected Remedy and (c) any other failure to maintain the Selected Remedy or Pem1anent Solution resulting from a failure to act consistently with this Notice

7 Incorporation Into Deeds Mortgages Leases and Instruments of Transfer This Notice shall be incorporated either in full or by reference into all future deeds easements mortgages leases licenses occupancy agreements or any other instrument of transfer whereby an interest in andor a right to use the Property or a portion thereof is conveyed in accordance with 310 CMR 401074(5)

8 Reservation of Rights

This instrument shall not limit or otherwise affect the right of EPA andor MassDEP to obtain access to or restrict the use of the Property pursuant to CERCLA Chapter 21 E or any other applicable statute or regulation

This instrument shall not release the Owner or any other party from liability for releases of oil or hazardous substances or materials nor shall this instrument excuse the Owner or any other party from complying with CERCLA Chapter 21 E or any other applicable federal state or local laws regulations or ordinances or by-laws

Owner hereby authorizes and consents to the filing and recordation andor registration of this Notice said Notice to become effective when recorded andor registered with the appropriate Registry(ies) of Deeds andor Land Registration Office(s)

Page 9 of 12

Town of Walpole acting by and through the Board of Selectmen

n Town Administrator authorized by ard of Selectmen recorded herewith

Bk 39600 Pg415 88608

Witness the execution of this instrument under seal this 21_ day of df 11 ( 2021

COMMONWE

COUNTY OF NORFOLK ss

~ On this 21 day of 4f1 2021 before me the undersigned notary public

personally appeared James Johnson as Town Administrator for the Town of Walpole and proved to me to through satisfactory evidence of identification which was ~6laquo~ ~ -fr VJ1e [indicate ifdrivers license or passport or other document] to be the person whose name is signed on the preceding or attached document and acknowledged to me that signed it voluntarily for its stated purpose

Name CA~ U ~

My Commission Expires July S 2t)z

Page 10 of 12

--------

Bk 39600 Pg416 88608

In accordance with CERCLA 42 USC sect 9601 et seq and the National Contingency Plan the United States Environmental Protection Agency Region I hereby approves this Notice of Activity and Use Limitation

Name 8r~Cltvi Olso Director Superfund and Emerncy Management Division (SEMO)

US Environmental Protection Agency Region I

In accordance with MGL c 21E sect 6 and the Massachusetts Contingency Plan (310 CMR 400000) the Department of Environmental Protection hereby approves this Notice of Activity and Use Limitation (as to form only)

Date Paul W Locke Assistant Commissioner Bureau of Waste Site Cleanup Department of Environmental Protection

Page 11 of 12

---------------

Bk 39600 Pg417 88608

In accordance with CERCLA 42 USC sect 9601 et seq and the National Contingency Plan the United States EobulliionmenlaJ Protectioo Agency Region I hereby appro1es this Notice of Activity and Use Limitation

Date ~------

Name Director Superfund and Emergency Management Division (SEMO)

US Environmental Prokction i0 ency Region I

Jn accordance with MGL c 21 E sect 6 and the Massachusetts Contingency Plan (310 CMR 400000) the Depamnent ofEmironmental Prolectioo hereby approves this Norice ofActivity

and Use Limilarioo (as ro funn ooly)_ ~~

Dale 4r S microlJ ~ Paul W Locke Assisrant Commissioner Bureau ofWaste Site Cleanup Department of Environmental Protection

Page 11 of 12

Bk 39600 Pg418 88608

List of Exhibits

Exhibit A Legal Description of the Property Exhibit B Legal Description of the Restricted Area and Coordinates of Cover Types Exhibit C Photo-Reduced Copy of Activity and Use Limitations Plan of Land Exhibit D Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table Exhibit E Institutional Control Design Statement (EOS) Exhibit F Copy of Vote of Town of Walpole

Return to

Attn Kristine Sheehy Senior Real Estate Attorney FOLEY HOAG LLP Seaport West 155 Seaport Boulevard Boston Massachusetts 02210-2600

Page 12 of 12

Bk 39600 Pg419 88608

EXHIBIT A

Legal Description of Property The land with the improvements thereon located in Walpole Norfolk County Massachusetts bounded and described as follows

PARCEL I

The land on the Southeasterly side of South Street bounded

NORTHWESTERLY NORTHERLY AND AGAIN NORTHWESTERLY by South Street by seven lines measuring respectively

17027 feet 120 feet 22011 feet 1653 feet 325 89 feet 4515 feet and 1497 feet

NORTHEASTERLY by Gleason Court 2627 feet

SOUTHEASTERLY AGAIN NORTHEASTERLY AND AGAIN SOUTHEASTERLY by land now or fom1erly of Santomarco by five lines

measuring respectively 6750 feet 2050 feet 1190 feet 2952 feet and 2001 feet

NORTHEASTERLY AGAIN by said land of Santomarco and land now or formerly of Cashorali 10056 feet

NORTHWESTERLY AGAIN by said land of Cashorali 2845 feet

NORTHEASTERLY by land now or formerly of Muighitti 9007 feet

SOUTHEASTERLY by the location of Old Colony Railroad by three lines measuring respectively 6809 feet 32808 feet and 38250 feet

and

SOUTHWESTERLY by land now or formerly of Meyer by three lines AND SOUTHERLY measuring respectively 9143 feet 1998 feet and

15202 feet

Parcel I is described in the deed recorded with the Norfolk County Registry of Deeds in Book 4459 Page 287

A portion of said premises is shown on plan entitled Plan of Land in Walpole Mass Belonging to General Fibre Co Inc by Edward C Peterson CE dated January 16 1960 filed with the Norfolk Registry of Deeds as Plan No 849 of 1967 in Plan Book 223 and the remainder is shown on plan entitled Plan of Land in Walpole Massdeg by E Worthington Engineer dated February 6 193 7 recorded with said Deeds Book D2135 Page 8 I

FHBOSTON52454092

Bk 39600 Pg420 88608

PARCEL II Property known as Parcel 33-120 of the Town of Walpole Tax Assessors Map which is

part of the property situate in the Town of Walpole County ofNorfolk and Commonwealth of Massachusetts and being all of the right title and interest of The Penn Central Corporation in and to all those certain pieces or parcels of land and premises easements rights of way and any other rights of any kind whatsoever appurtenant thereto or used in conjunction therewith on and along a portion of Branch of Railroad known as the Wrentham Branch said portion of railroad being described as follows

Beginning at a line extended across the right of way of said Branch of rai road said line being the Northerly line of South Street and extending thence in a Northeasterly direction the distance of 2852 feet more or less along said Branch of rai Iroad to a line which is parallel with the Southwesterly line of Common Street said parallel line extending across said right of way through a point in the centerline thereof at railroad valuation survey station 733 + 67 more or less and being the place of ending

Parcel II is described in the deed recorded with the Norfolk Registry of Deeds in Book 7986 Page 372 and is a portion of the land shown on the plan recorded with said Deeds as Plan No 52 of 1983

FHBOSTON52454092

Bk 39600 Pg421 88608

Exhibit B Legal Description of the Restricted Area and Coordinates of Cover Types

Le2al Description for Restricted Area The area shown on the plan entitled Activity and Use Limitations Plan of Land Blackburn amp Union Privileges Superfund Site 50 amp 60 South Street Walpole Mass Scale l = 30 dated April 6 2021 by Norwood Engineering Company Inc recorded with the Norfolk Registry of Deeds in Plan Book 704 Page 41 being bounded and described as follows

Beginning at a point on the easterly sideline of South Street at the southerly point of curvature of Gleason Court on said plan thence

Northeasterly and curving to the right along an arc of a curve having a radius of twentyshyfive and 00100 (2500) feet a length of forty-five and 15100 (4515) feet thence

S 48deg1352 E a distance of twenty-two and 24100 (2224) feet the previous course by the southerly sideline of Gleason Court thence

s 32deg0208 w a distance of fifty-four and 78100 (54 78) feet thence

S 59deg27 32 E a distance of twenty and 50100 (2050) feet thence

S 47deg5252 E a distance of eleven and 90100 (1190) feet thence

S 49deg01 10 E a distance of twenty-nine and 58100 (2958) feet thence

s 38deg3108 w a distance oftwenty and 01100 (2001) feet thence

S 49deg00 57 E a distance of one hundred and 56100 (10056) feet thence

N 39deg5348 E a distance of twenty-eight and 45100 (2845) feet the previous seven (7) courses by land ofNF Thelma A Casborali thence

S 49deg0808 E a distance of ninety and 29100 (9029) feet the previous course by land ofNF Ming L Yau thence

s 25deg2312 w a distance of siliy-eight and 22100 (6822) feet to a point on the westerly sideline of a fonner railroad right of way the previous course by land of the Town of Walpole assessor parcel 33-121 thence

S 55deg2937 E a distance of ninety-nine and 78 100 (99 78) feet to a point of tangency on the easterly sideline of a forn1er railroad right of way thence

Page 1 of 13

Bk 39600 Pg422 88608

s 30deg11 32 w

S 23deg49 I6 W

N 66deg1044 W

N 23deg4908 E

N l 6deg00 52 E

S 37deg0240 E

N 10deg1437 W

N 34deg093 I W

N 11 deg5558E

Northeasterly

N 27deg41 48 E

a distance of three hundred and three and 74100 (30374) feet the previous course by land ofNF Nicholas H Dowd and NF Emilio P Baldassari thence

a distance of four hundred ninety and 86100 (49086) feet to a SBdh the previous two (2) courses by the easterly sideline of a former railroad right of way thence

a distance of eighty-two and 76100 (8276) feet to an Iron Pipe on the westerly sideline of the former railroad right of way thence

a distance of twelve and 09100 (1209) feet to a SBdh thence

a distance of ninety-six and 50100 (9650) feet to a S Bdh thence

a distance of fifteen and 00100 (1500) feet the previous three (3) courses by the westerly sideline of the former railroad right ofway and land of NF Joseph R Carpentieri and NF Joseph R and Faith N Carpentiero thence

a distance of ninety-two and 82100 (9282) feet the previous course by land ofNF Richard A and Josette M Burke thence

a distance of tvvo hundred thirty-seven and 86100 (23786) feet to a point on the easterly sideline of South Street thence

a distance of one hundred twenty and 00100 (12000) feet along the easterly sideline of South Street to a point of curvature of the easterly sideline of South Street thence

and curving to the right along an arc of a curve having a radius of eight hundred and 00100 (80000) feet a length of two hundred hventy and 11100 (22011) feet along the easterly sideline of South Street thence

a distance of three hundred forty-hvo and 42100 (34242) feet to the point of beginning

Containing 621 Acres of land more or less

Page 2 of 13

3000

3005

3010

3015

3020

3025

3030

Bk 39600 Pg423 88608

EXHIBIT B (cont)

Points and Coordinates associated with Restriction Areas and Cover Types for the Activity and Use Limitations (AUL) at 50 amp 60 South Street Walpole Mass

Point Northing Easting Type

Curve Curve Number Len2th Radius

28754430528 7236432250 COR

3001 28755604597 7236680368 PC L=7535 R=80000

3002 2875597 1222 7236766913 POC

3003 28756333366 7236870620 PT

3004 28756280754 723697 3031 COR

28756025570 7237001250 COR

3006 28755918670 7237001140 COR

3007 28755864440 7237 I 05890 COR

3008 28755903200 72371963 IO COR

3009 28756030893 7237217396 COR

28756042534 7237250325 COR

3011 28756021733 7237317808 COR

3012 28755800732 7237640949 COR

3013 2875552 1424 7237667395 COR

3014 28755321388 7237708416 COR

28755197081 7237834881 COR

3016 28755102230 7238045173 COR

3017 28754941531 7238291869 COR

3018 28754851375 7238512944 COR

3019 28754753441 7238824 760 COR

28754681541 723916 1881 COR

3021 28754608227 7239406506 COR

3022 28754515846 7239459928 COR

3023 2875426 7589 723943 8163 COR

3024 28754198016 7239590840 COR

28753886764 7239449006 COR

3026 2875329 7944 7239187206 COR

3027 28752506745 7238837890 COR

3028 28751859560 7238552142 COR

3029 28751221833 723827342 l COR

28750848788 7238107869 COR

3031 2875045 3654 7237927814 COR

3032 28750630420 7237527432 COR

3033 28750741023 723757 6257 COR

3034 28751668594 7237842488 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 3 of 13 April 14 2021

3035

3040

3045

3050

3055

3060

3065

3070

Bk 39600 Pg424 88608

Point Number

Northing Easting Type Curve Leneth

Curve Radius

28751548848 7237932869 COR

3036 28752462269 7237767802 COR

3037 28756438461 7236904209 POC L=2207 R=80000

3038 28756543084 7236939245 PT

3039 2875653 7987 7236954123 PC

28756597578 7237007344 POC L=1651 R=937

3041 28756594465 7237087181 PT

3042 28756459044 7237347021 PC L=347 R=220

3043 28756432531 7237363546 PT

3044 28756280644 7237286201 COR

28755924210 7237966952 COR

3046 28756081959 7238048554 PC L=472 R=236

3047 28756064922 7238084404 PT

3048 28755523491 7237845047 COR

3049 28755419845 7238081981 COR

28755460757 7238099621 PC L=240 R=l57

3051 28755467701 7238120241 PT 3052 28755398690 7238275280 COR

3053 28755365410 7238264910 COR

3054 28755087149 7238900449 COR

28755158001 7238931521 COR

3056 28755040360 7239199770 COR

3057 28755311720 7239318930 COR

3058 28755263010 7239429300 COR

3059 28755388260 7239484290 COR

28755348660 7239576000 COR

3061 28755625470 7239696500 COR

3062 28755664605 7239606601 COR

3063 28755736202 7239637768 COR

3064 28755621870 7239897370 COR

287 5567 6160 7239920410 COR

3066 28755718270 7239830260 COR

3067 2875587 9750 7239900310 COR

3068 28755718790 724026 7600 COR

3069 28755763390 7240285350 COR

28756035900 7239926600 COR

3071 28756086280 7239812770 COR

3072 28756089984 7239813649 COR

3073 28756229128 7239501910 PC L=482 R=l54

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 4 of 13 Apnl 14 2021

3075

3080

3085

3090

3095

3100

3105

3110

Bk 39600 Pg425 88608

Point Number

Northing Easting Type Curve Length

Curve Radius

3074 28756257366 7239513984 PT

28756185799 7239674928 COR

3076 28756739833 7239921136 COR

3077 28756876060 7239682275 COR

3078 28756948336 7239735898 PC L=335 R=298

3079 28756958235 7239766064 PT

28756866081 7239978133 COR

3081 28757166275 7240127374 COR

3082 28757068320 7240314640 COR

3083 28757602980 7240594310 COR

3084 28757700050 7240408736 COR

28758247941 7240688376 COR

3086 28758250190 7240683910 COR

3087 28758344979 7240738168 COR

3088 2875843 6103 7240581527 COR

3089 28758602943 7240664224 COR

28758740024 7240397393 COR

3091 28758605706 724032 7776 PC L=477 R=309

3092 28758594882 7240286013 PT

3093 28758666635 7240197585 PC L=2573 R=3127

3094 28758767113 7240118710 POC

28758890752 7240086604 PRC L=I653 R=3993

3096 28758972305 7240074125 POC

3097 28759049552 7240045 I 52 PT

3098 28759330312 7239734408 COR

3099 28759459414 7239588584 PC L=2269 R=5217

28759524821 7239496174 POC

3101 28759568752 7239391829 PRC L=1814 R=486

3102 28759603259 7239308095 POC

3103 28759653883 7239232999 PCC L=l31 R=088

3104 28759665694 7239231411 PT

28759800587 7239299586 COR

3106 28759986288 7238981214 COR

3107 2875983 5797 7238891829 COR

3108 28759879750 7238798689 COR

3109 28759905380 7238754769 PC L=1600 R=2552

28759963590 7238700398 POC

3111 28760035727 7238666620 PT

3112 28760700665 723901 5672 PC L=4515 R=2500

3113 28760830230 7239191198 POC

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 5 of 13 April 14 2021

3115

3120

3125

3130

3135

3140

3145

3150

Bk 39600 Pg426 88608

Point Number

Northing Easting Type Curve Len2th

Curve Radius

3114 2876077 263 6 723 940 1624 PT 28760624518 7239567466 COR

3116 28760160100 7239276864 COR

3117 28760055928 7239453423 COR

3137 28759976118 7239541692 COR

3118 28759782139 7239764992 COR

3119 28759625581 7239640375 COR

28758966057 7240399493 COR

3121 28759184326 7240581973 COR

3122 28758593598 724126478] COR

3123 28757977293 724097 2314 COR

3124 28757716516 7241351659 COR

28757288251 7241140719 COR

3126 28756725827 7240851862 COR

3127 28756162468 7240586126 COR

3128 28755614498 7240338506 COR

3129 28754346745 7239768507 COR

28753845716 7239540194 COR

3131 28753257436 723927 8634 COR

3132 28752466355 7238929370 COR

3133 28751819340 7238643698 COR

3134 28751181527 7238364939 COR

28750807772 7238199071 COR

3136 28750413263 7238019301 COR

3138 28756920317 7237298739 PC L=l941 R=2104

3139 28756827128 7237274848 POC

28756733047 7237294944 PRC L=401 R=l66

3141 2875671 1336 723 727 2844 PCC L=1492 R=13345

3142 28756744594 7237206091 POC

3143 28756781529 7237141301 PCC L=1419 R=l018

3144 28756833084 7237094642 POC

28756902566 7237091952 PCC L=2413 R=157959

3146 28757017337 7237129167 POC

3147 28757131820 7237167258 PCC L=330I R=S0000

3148 28757282552 7237234442 POC

3149 28757431866 7237304721 PT 28757338390 7237495930 COR

3151 28757541620 7237605380 COR

3152 28756897590 723883 4280 COR

Exhibit B to NA UL-Part 11-EOS Coordinate Tables Page 6 of 3 April 14 202

3155

3160

3165

3170

3175

3180

3185

Bk 39600 Pg427 88608

Point Northing Easting Type Curve Cunbulle

Number Lenszth Radius 3153 28756870623 7238820218 COR

3154 28756838273 7238882258 COR

28756865240 7238896320 COR

3156 28756777004 7239062996 COR

3157 28756770439 7239063663 PC L=l 146 R=2269

3158 2875665836 I 7239046180 PCC L=l423 R=957

3159 2875661 7520 7238989913 POC

28756625544 7238920850 PT

3161 28756728525 7238726583 PC L=232 R=l58

3162 28756748720 7238720236 PT

3163 28756899634 7238797341 COR

3164 28757254653 7238121363 COR

28757520153 723761266 7 COR

3166 28757306899 723 750 IO 10 COR

3167 28756690336 7237500169 PC L=243 R=I68

3168 28756682599 7237479273 PT

3169 28756686990 7237469583 PC L=0250 R=l68

28756708806 7237463018 PT 3171 28757000109 7237616354 PC L=233 R=l73

3172 28757005368 7237637270 PT

3173 28757000998 7237645513 PC L=233 R=l69

3174 28756980219 7237651023 PT

28756429209 7238339422 COR

3176 28756342982 7238506849 COR

3177 28756500076 7238596485 PC L=l19 R=l48

3178 28756499701 7238608072 PT 3179 2875644 7813 7238705611 PC L=l 182 R=483

28756358177 723 869 0707 PT

3181 2875623 6099 7238376388 PC L=443 R=467

3182 28756235611 7238333779 PCC L=343 R=9IO

3183 28756249049 7238302418 PCC L=412 R=9IO

3184 28756278952 7238274519 PCC L=368 R=300

28756313362 7238277619 PT

3186 28756282498 7238911796 PC L748 R=216

3187 28756240650 7238919721 PT

3188 28756126081 7238620406 PC L=323 R162

3189 28756138645 7238591575 PCC L=333 R=283

Exhibit B to NAUL-Part II-EOS Coordmate Tables Page 7 of 13 April 14 2021

3190

3195

3200

3205

3210

3215

3220

Bk 39600 Pg428 88608

Point Number Northing Easting Type Curve

Leneth Curve Radius

28756163375 7238602867 PT

3191 2875523 0908 7238765275 COR

3192 28755205040 7238752740 COR

3193 28755391740 7238328470 COR

3194 28755466840 7238361040 COR

28755452760 7238392590 COR

3196 28755516920 7238421040 COR

3197 28755530690 7238388730 COR

3198 28755603230 7238421460 COR

3199 2875555 7568 723852 7053 COR

28755371220 7238445330 COR

3201 28755629198 7238558466 COR

3202 28755676040 7238453290 COR

3203 28755925410 7238563840 PC L=1902 R=3548

3204 28755927383 7238658634 POC

28755954390 7238749520 PT 3206 28755974770 7238807230 COR

3207 28755779200 7238881701 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

28755746700 7238609997 COR

3211 2875593774 7239036608 COR

3212 28756048460 7238996850 PC l=1445 R=2903

3213 28756070631 7239065422 POC

3214 28756109010 7239126420 PT

28756153820 7239182190 PC L=S98 R=848

3216 28756171980 723923 7880 PT

3217 287S6026148 7239566166 COR

3218 28756003865 7239556465 COR

3219 287S6134380 7239256650 COR

28755998460 7239195370 COR

3221 2875600 71S0 7239174530 COR

3222 28756001791 7239172152 COR

3223 28756040451 7239079437 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 8 of 13 April 14 2021

Bk 39600 Pg429 88608

Point Number

3210

3200

3056

3057

3058

3059

3060

3061

3062

3218

3219

3220

3221

3224

3225

3226

3227

3228

3070

3071

3234

3233

3235

3236

3237

3238

3239

3240

3241

3242

3243

3244

3245

3246

3247

3248

Northing

28755746700

28755371220

28755040360

28755311720

28755263010

28755388260

28755348660

2875562 54 70

28755664605

28756003865

28756134380

28755998460

28756007150

28755941340

28755962080

28755867937

28755819702

28755766128

28756035900

28756086280

28755991990

28755942100

28756477248

28756677238

28756650130

28756473307

28756480112

28756675030

28756724454

28756742099

28756742133

28756703924

28756640759

28757607280

28757401530

28757467350

Easting

7238609997

7238445330

7239199770

7239318930

7239429300

7239484290

7239576000

7239696500

7239606601

7239556465

7239256650

7239195370

7239174530

7239145324

7239100930

7239061674

7238935003

7238911508

7239926600

7239812770

7239769910

7239884050

7239261913

7239253008

7239321810

7239319038

7239298824

7239364440

7239271845

7239292625

723935 0187

7239393239

7239393096

7237584960

7237475300

7237345620

Type

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

PC PCC

POC

PCC

PT

COR

COR

COR

Curve Len2th

L=273

L=ll77

L=657

Cunmiddote Radius

R=1421

R=810

R=679

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 9 of 13 April 14 2021

Bk 39600 Pg430 88608

Point Number Northing Easting Type Curve

Len2th Curve Radius

3249 287 57514570 7237372360 PC l=ll05 R=1993

3250 287 57 588060 7237452980 PT

3251 28757631382 7237429676 PC L=2244 R=2352

3252 287 5765 6810 7237537876 POC

3253 2875 762 9720 7237645671 PT

3254 28756940655 7238952710 PC l=1493 R=1509

3255 28756901845 7239015577 POC

3256 2875683 7836 7239052474 PT

3257 28758104824 7237653014 COR

3258 28758028960 7237800160 COR

3259 28757949530 7237760790 COR

3260 28757901005 7237855021 COR

3261 28757839230 7237820908 PC L=273 R=l33

3262 28757830688 7237799810 PCC L=539 R=2144

3263 28757852974 7237750897 PT

3264 28757891705 7237688178 PC L=lS26 R=2432

3265 28757948636 7237637880 POC

3266 287 58018307 7237607597 PT

3248 28757467350 7237345620 COR

3267 28757550832 7237363444 POC L=2653 R=80000

3268 28757668809 7237424132 PT

3269 28757504 719 7238817989 COR

3270 28757493010 7238842230 COR

3271 28757561074 7238880970 COR

3272 28757483953 7239024127 PC L=323 R=l70

3273 28757459939 7239037846 PT

3274 28757311605 7238957122 PC L=1388 R=906

3275 2875727 2732 7238901647 POC

3276 28757283181 7238834718 PT

3277 287 5733 4061 7238752337 PC L=255 R=l60

3278 287 5735 5527 7238744411 PT

3279 2875 7102815 7239517199 PC l=261 R=l70

3280 28757080654 7239525307 PCC l=909 R=1275

3281 2875 700 5390 7239477911 PCC L=l007 R=990

3282 28756999624 7239381704 PT

3283 2875707 7705 7239230604 PC L=ll14 R=907

Exhibit B lo NAUL-Part IlbullEOS Coordinate Tables Page 10 of13 April 14 2021

3285

3290

3295

3300

3305

3310

3315

Bk 39600 Pg431 88608

Point Number Northing Easting Type

Curve Leneth

Curve Radius

3284 28757168066 7239178102 PT

28757205717 7239186398 PC L=518 R=930

3286 28757249003 7239213534 PCC L=l41 R=086

3287 2875724 7909 7239226048 PT

3288 28758415755 7239842757 PC L=251 R=l59

3289 28758437695 7239837379 PT

28758456377 7239846949 PC L=812 R=876

3291 28758494897 7239915165 PCC L=456 R=757

3292 28758483790 7239958646 PT

3293 28758405147 7240111348 PC L=l057 R=955

3294 28758318136 7240161452 PCC L=477 R=l063

28758272407 7240149529 PCC L=250 R=l60

3296 28758265647 7240128003 PT

3297 28758157937 7237680895 COR

3298 28758902927 723807 1969 COR

3299 28758852531 7238168280 COR

28758779660 7238129750 COR

3301 28758746973 7238192072 COR

3302 2875807 6630 7237840490 COR

3303 28758049940 7237894220 COR

3304 2875871 7997 7238243620 COR

28758680103 7238315946 COR

3306 28758533699 7238239240 COR

3307 2875852 6899 7238252220 COR

3308 28758098180 7238027600 COR

3309 28757974484 7238264223 COR

28757957598 7238255513 COR

3311 28757757732 7238637845 COR

3312 28757774584 7238646620 COR

3313 28757653710 723887 7846 COR

3314 28757560920 7238829340 COR

28759004930 7238125514 COR

3316 28759689797 7238485028 PC L=1992 R=2609

3317 28759697204 7238583760 POC

3318 28759667288 723867 8142 PT

3319 28758996126 7238323718 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 11 of 13 April 14202 I

Bk 39600 Pg432 88608

Point Number

Northing Easting Type Curve Lenfth

Curve Radius

3320 28759028950 7238261560 COR 3321 28758954486 7238222188 COR

3322 28758972523 7238378387 COR 3323 28759421550 7238613630 COR 3324 28759377933 7238698105 COR 3325 2875907 4811 7238539289 COR 3326 28759081611 7238526309 COR 3327 28758935210 7238449604 COR

3328 28759464470 7238637330 COR 3329 28759632674 7238722481 PC L=ll83 R=l578

3330 28759583973 7238755474 POC 3331 28759526573 7238768343 PRC L=2163 R=2455

3332 28759422964 7238796123 POC 3333 28759341091 7238865430 PT

3334 28759193370 7239050710 COR 3335 28759416340 7239163940 COR 3336 28759263600 7239455620 COR 3337 28759043690 7239336510 COR 3338 28758935490 7239552130 COR 3339 28757650890 7238883240 COR 3312 28757774584 7238646620 COR 3311 28757757732 7238637845 COR 3310 28757957598 7238255513 COR 3309 28757974484 7238264223 COR 3308 28758098180 723802 7600 COR 3307 28758526899 7238252220 COR 3306 28758533699 7238239240 COR 3340 28758700033 7238326388 COR 3341 28758675436 7238373334 COR 3342 28758733013 7238403500 COR 3343 28758760858 7238350353 COR 3344 28758860952 7238402796 COR 3345 28758833106 7238455943 COR 3346 28758890683 7238486109 COR 3347 28758915280 7238439162 COR 3326 28759081611 7238526309 COR 3325 28759074811 7238539289 COR

Exhibit B to NAUL-Part H-EOS Coordinate Tables Page 12 of l3 April 14 2021

Bk 39600 Pg433 88608

Point Number

Northing Easting Type Curve Len2th

Cunbulle Radius

3324 2875937 7933 7238698105 COR

3082 28757068320 7240314640 COR 3083 28757602980 7240594310 COR 3349 28757790234 7240236327 COR

3348 28757255574 7239956657 COR

3124 28757716516 7241351659 COR 3125 28757288251 7241140719 COR 3126 28756725827 7240851862 COR 3127 28756162468 7240586126 COR 3128 287 55614498 7240338506 COR 3129 28754346745 7239768507 COR 3130 28753845716 7239540194 COR 3131 28753257436 723927 8634 COR 3132 28752466355 7238929370 COR 3133 28751819340 7238643698 COR 3134 2875118152 7 7238364939 COR 3135 2875080 7772 7238199071 COR 3136 28750413263 7238019301 COR 3350 28750296168 7238284525 COR 3351 28754 78 6636 7240267040 COR 3352 28757412029 7241794586 COR

POINT DESCRIPTION ABBREVIATIONS

COR=CORNER PC= POINT OF CURVE WHERE CURVE STARTS POC -= POINT ON CUR VE PT=POINT OF TANGENCY WHERE THE CURVE ENDS PCC = POINT OF COMPOUND CURVE (WHERE RADIUS CHANGES) PRC = POINT OF REVERSE CURVE

NOTES

THE COORDINATES ARE BASED ON AN EXISTING CONDITIONS AS-BUILT FIELD SURVEY BY NORWOOD ENGINEERING CO INC BETWEEN NOVEMBER 15 TO DECEMBER 18 2019 TI-IE COORDINATES ARE BASED ON l1ASSACHUSETIS ST A TE PLANE COORDINATE SYSTEM NAD 1983 (FEET) THE ACCURACY OF THE COORDINATE LOCATIONS ARE +-0J FEET

Exhibit B to N1UL-Part II-EOS Coordmate Tables Page 13 ofl3 April 14 2021

---

1f~ flJr ~i

f ~~ J~i](M~I ~ 1 jf~ ~~f W-- )e 1

It lj fY pl ~-~j

I --- ~ ~

1 (J-c~ er ~

C JI fl JYf

1 ~ ~Yu-~ 1i

~r

( LOClJS P

SCAUllbulliQO

I ar lMIT flG PINI tMS _ lIIPMIDMICXNllRlnT~tlCfllUS 1111D cmuftraquodl s - NIKl1III tfIJIIIIIOfM~1HCll allE1

DAre Jllrl

NUKIJU LU6 DMitM

mmtG6DKbdlt

~4~-middot

~~I

-- ampnbullllf~ ~ fa

LEGEND 0

-i~wr0o-m lICUUoaampbullco--11111 _ _l_J

0

bull ~-ail_I

~-

mo(I ---fwj

amp~~~~ ~ ~~ltgtmiddot ~A~

~6

_L-r

bull -~ IBP__l-11Uil n-rlfl-lffll rMCllI 1a 1rr ai

-~ lll-lliI u-W--11a 1 Ml[ 411 amt l0IIC 3JICJ7 ~ 33-1--I- DIID llXII D111 JlMZ 411 lraquo- ~lUN~t --- - etMpound 11JII

~ MffD mmaat ZL I01t 111

1Jlll~-IICfIQfJICIISJ DfEI IC71- I~ 1~ 9 Cl 1VY IICIIWCLl~fCSC~lNCl

~11HltOXW1A~JtCI~llfB MXIC 1HI lME INCi 111M bull11 (S 1f41~middot~-~-)

~ io

0 0 0 0 -0 0 0 D O 1 middot tbull O

_- _pound ~ - Tf middot- ---r ~~ ~~- ~=middoti

r jil7bull --------4~-middot~

(

SCAtpound 1bull bull YI

I ~ tfAIE lIMa toafllltl1E ~NAD1w1(rJ

1 ~ PlIla II MMt QI 11D TD D111oPl

~c1MlntID9~~-l 1NIIJIIKlNI LnlJTU ~ deg qllAJSTE uM011111 iu1II 1111ZT IIIILJaZ

Exhibit C - Photo-Reduced Copy of Activity and Use Limitations Plan of Land

--~middot---

I ~111-11111

iiiii

-ill111liilt

ACJIYIJY ANJ) lJSE lJJll7ATJONS PLAN OF LANI)

81ACJ(81R1 I IINION Flr11lfES SllffllF7AVO SIle

o tfO SOIJIH s1ar HlltlPOtL IIAS

SCAlElrJAt IPfffl152021

1IJrwod Eng1neerlng

- EnQlbullHrlflg Compaffy middot~~=~ m Cm1JQ u fnfJa-eal

~ -

-~

9l1EET 1 OF I 8324-02

td ~

w ~ m 0 0

Id Q ii w ii

co co m

co 0

-l

~-77--raquo- -~I~ )middot~ ~ bull _I lT ~ v~

AI ~ If ~)middot~ 7- ~1 c t11 yil ~ ~ ~middot~41 bull1 l ~~l(i~r~1 f7 )ll y-

~~ f -~ -v fgtV ~ ~ ~ l er-- u -

tl x-P~C ()

JP yen f(( 11 1degpoundS -~ (

ftunrTfflllllTnallJrNNQWDf ~ ti IZNtRlTT lnH M IULS IIJIUIUlA-DlltlllllDlJlllIICIF tJbllt~llC~lJNp

DTl NlllltaJatl-Witiill (raquo11 iiiK(+til

I aJnlTlKATJlfl PlAH~ THE PUIIJll1T UC TIUlf Mlaquo THE l5 11 oawG ~ NII 1Hpound1as Of1111E111 AMllfrlTll9laquolllt Mpound ntem OPlaJ CJ1 IWM1pound BREn 011 bulln

~ ~illi~fli~ _lt ---c~-Clmiddot~~c0-nmiddotmiddot~bullJmiddot04~- ~--~--yen~~bull - L -bull -n ~ -r - ~ -

it

~ fr ~ ~- -~bull~bullv OG- ~n0

bull--ltmiddot middot~ -~- ~~-=~7~st~-~~~~i~~Hil~-) 2~C 0 ~~~~~ --------Y-Tgt-bullbullmiddot-

U-IU ~middotshy =i==-

bullbull bull _ -middot-

~----- ( ~11middot

__IC1ZMJ - bull IOC)0l lftEf ___ i gt mEKJllJfNG rotJ1FRIIIT AIIEAS B~ p~ AIIEAS ~ea-vmiddot LIUIID

~ e--- -+ ~ rzprz1za 1 ~ IJTATC PRC ~TC

nJml lltPtasCltJ

DUD BCD lJlll7 PMC 4H 1 1 YERT1CAL M1llI II NCCI ~ _ ro conurr DOD 80CIC 3JII07 llME 4H I ntaM NUIU 1121 IJ4TAI m IMlC 111111 nATIIW ~fsi

tJMAlfflOlI) AIIEAS1 bull 11AMJSCAlfl) AlpoundAS Lill] 1Dll IOlII POT PlCit 6115 J)-t20 ~atfnujK~tlLWlQI

~PUNMl-17 POflTIVNf1Ell llaD BaalC Tl_ Paa bullbull - 99 a 11

_-ijf1iltDP~IZ~ 5CME - JOSUva1fTLJ ~ ~-rr 111 C tMI=

bull111 I~

i=iiii7

~ e---

t c z rl

L-n11 ~

ACJIVJTY AND USE LIAlffAJIONS

PIAN OF RESTRIC1EJJ AREAS ANJJ COVER TYPES

fltACK1(fN _ llNlltgtI PfMIECCS SllPVFVNlJ51Tlt

JO _ lxJ srJllH STREET IIALPrJU JASS

SCAU I - 30 APRIL 2021

lcnwod Engineering

llarwood Cngnrilgtf cpmy -t~~~~

fIL Pllpa-ru - (1u]1a-lftll

~L=wl f 01~JII IO_

a SIEET I (F 2 B324-02

bj ~

w 0

0 0 deg It

iQ ~ w l11

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 1 of 2

CX) CX)

deg CX) 0

ntllT -1~1~ rurnlaquo1 r1n l1XTM 11Nf -r~ lie UUffCI 11Pt lDll1Hf iniin --IC unr1G Tlr 1n1rn Iota allll Ito tyen1tlll ~~11CRnrzJ11-11--~ci-- n31 nr111w11J1t ~bull c ~- diams JDrnn llloffl rcnlml IDII

-~ ]al rll _ _ PnlM-1-PI lbull-- ll7HrirrIPlllD1lf~-a bullbullll 111bull IClln9XnolDlllIIIIIIOm

214 ff7371JOOT ~bull JllC Ibullbull 171 JICllEY)l)vlUTlo~lUl~ ~li_~ -~~ MDlol ll4L~TllJraquofllllf190abullbullt ~~nQuu~~1aJI _~~OtottWU~1t11txm~arcPbrmllmCDt ~~ ~~ ~ =~ gj ~l11~ llltlM Mrattllll TDPmllIDCDI JJ4bull e~ _ ~ e PClC lbullI- 1- ~1sect~ ~ ~ ~ ~ ~~~-nr~44bull~mn11-a11 ~~ =mt =m~ ~ ~~ ~ =~~-~~ =~~rt~l~llibullltbull=

~~~~~~~~r-~r-~~sectsect55~55 ~~ ~=g~~ mi --1~ ~-==~~m~ L-~r UVPllrlllUillDITDr4L 1JI lbullKlllll~==~~~=~

~~~~~~~~ raquoff-llll 111rritl_aianbull ~11lCla rr- n ttll XDP11r1r 11111c-1C111~ RTl~rJlllllbullbull~llllJlllipo~~=r~tm=~~

~=~3r~t==~ ~=~i==~~ llt1ttl70 m~~n~ =n~ L diams 11- bull - iaEi~mi 1lE~HHffi ~1-~ E LbulllT bullU-7YA 8911U TMn4 OJII C- lllkHrnl1nlntll11106~

MJ9~gt111ftlrfffll11 ~ SbullC61hLJT raquoWl lll~IJlll11amp1 utVllllt a lbulllfGl bulllC lT

lliilH~1 ~~rm-=rn~ lbullIIIICU-1bull0

itt ishwI JUo ma m1 bull 1-c iiliii ~==~m~=~ Ullln U7IIY M1NLl411 fflf f-~ llr IL ~ lbullt Ill uaP11rllDn1rin1bull139nf- na_ 1111lnl ___ lWTDf-ID 111Jbullnllr-cishy

J1JT1 lflTI-noLbull COi lJ1 tsr18GOTDrl1~ 1--Cn ~~~==-=~ LbullS1rbull-p

LbulllI ~middot x1 fl11bull diams an l~J P-~ WI 1~1Slrmsraquo11nirorn 11bull1n-

llrgt 58 - TDrl ZJlJ l~ Zl llf4 Pll1raquo91I lnP~IIEI 11 ==~=-~~ lbullt-11bullh1~

nun_-~bullfllrlll_ lbulll-lrbull N- - nr6-11MII rinaus a 1bull1E-t1 im1 nrxi mr~ 7nn1 4i i 1c m llrS~iJ-ltJlillII Tt-Ul ris ~=~~middotiill~~ tf llDln~n1rJrgt11nbull1ric ~IPgt9nq~ It-MU rbull RflrrlllVllbulltPllbullOIIUAfC lbullnJtrNbull_~lD+4ftJSHJ7711JrllIIIIT144lDI lbulll ~I llfs-mllThn~-f 1bull11

1a5blH=i5gS El~ iE =iilli ~ID aH~~ ~~ leJINNllllfflnlt10ff1nll~1g=TI==~- lbullN~Jmiddot pw nrwuhtl tba11 l- lllllsectimiii~ ~ lllaquot ll116UW41 llllII NII Cl Ld bullt ll 11r 111~-~lHtl-IINOClll 1Dgtn~rMOtnllfbull3all)Mnr~bullwrmm11uoo~ ~r~ m~ = ~~ t~-i m NNtotl n11nn cm

~~~~~Ttr~ in Httl01llxl nlfM114ta cm

JJN n=-PIW - I- C lbullT rnr nnubullNoXI ffllPI n1 11-amp 11middot 77)111fflffPl~JlaUII

i1JJ n91lbull ti Jnlftbulllll QII

~g=~~~~ir~f~5 =i~=~~ ~=~ ~ ~j====goi H1111t-llll ffo~ ~rn tm111 ta1Vl~ tnar- IVI rm u1i ~ nw ~illl cm 1111 Hltt1H T7U 72w111ll tm UI ftffiH~bull1 naMUlI nlll

lltfll~IOUl rnes~ttlClll

~I~~=~=~~= l3111ratlQOJ121lllll CS u1n-n-a mn-c~11111llllilr ~====m~~ lbulllllr~~Oll~r1111-t~rtRiHa)toI

-~rt~_Utr111tt~USI ~m~i==r~~llfflpound1gtgtMllkllit1U10C011 annrxnbull-TCRL11ai~=~=~g)llllll~--rWltMJtt-8 DR Pl rraquof ntl rim Gllf CCI~~1r~~ liiilllii u- ntlt bull llJ~naJCDI

raquo11NMl10~Ullllcm ntrlnK)fL~nlln-1c lllf ~--TlJaft_Lmc i lbull1 bull l3il0 Nl-197) Ttlll1344 a LbullI 3 l diams 1-111 lflS 1111lOllt ffl- MP PII bullHI lgtl llJI l97Mlt Ian -ti DG llC

111111===-~~~=mg ====~~ tD rlrffllZllIITO-lfllCIIII=~tr~L~~~= - Pl~I llII TD_ ff~ tDII31119NIJMlDffU~~ H CZIII liii~mlt~ D1111nrn11GQ~-CaKftQNJWNczr41140ffnQCUII Jnffnt1JIIIIJunbull~1Qc20lll ~Pllli ll mrnnn lbulltlP 17Jrffdeg-degluoElJIIIQII

~-I-ti _nrna~rlll

a n- 4411 llbullQI 1=40 rt La n- lllf ffrgtn _Jr_~ Ullk ---rr~~ ~=~=tl~~ =1 nttltt nraquo 1nlU as

=-mn--~111DJIDII Ullgt~fflflnanaaJIIJalt55~~EIS~=~~ ~~)1 -11CIJII nn~bullbullbullnaKatt1ta1

JOIT ru~- rf- deg hJIIII r- 111111 ~1111) -1 aJ1 ld t11D1etlll_TalCIS -~-UCV~bullraquootur=~=~I~~=~--~ ~rsrgo_mlaquoshym rs~11flI ~- rnilr==~=~~ ~~r _ ~ atfl ~ rtw Dgtlnn-f-lEllln17n-UIIP

D11 fflXTJ111111 I~~ ar D1Jn4 ~leJJS-OnC111

=====5 middoti SHU=~ 5 ampn iliiiiiIiI11

ngtgtn~1~1tbullubull1rm DH tu~- lt11 rirmU1111 CDIII

~i~i555mi~ ~~ ~m=~==m~g===~~~~ tn1r JtW ~ma- PiOll a CU

~ XNr~t~fDllll1-all~~ m===~~ bullbull~W 111111 ==~~ ampT g~ ru~ =

~lU $Et=ni ~ llll0111ra1Ln~otqC011

H~ g==i =~1 ~

~111111 ~~g~n~a~J))pound11 1=~)6tia

~~ mEfHfH~Si

amp12Ct _ an ~

U N711f21th mM1LU aa o1bull~--117CII in4r ~llllll1Vffl-111Dlr lit~ Hmtlpound1 71 12L I CCIII ---~CUnMIIUOCVf JIHtlnn nl 7r ll4011CIIII

llllDNXCWZflDtlltllCIDCDr

~~=~==~=gnn n1raquoL bullw noanDNt CIJIIi=~ C~middot ~ ~ ~ HnffTI-QIJroQ__111PtlJIIInfflll bullbull1~ aaeIT t-- nrJD nJUntu~CllWI

m ~1 ~ ~~~ ~ ilria~gliiiji~=ir ~lt-OTT gl1raquo ~Iraquou fflllIL nllll 1111111 flC~middotIY_4allCCIIIi l1i5~ ~~11~middot~ ~~ ffll H71W786lll 7P-JOalllllll 2N ~ 1-flllt 7HIJl4- DI ~ ~==~ ~t-tr bullM-

114 Hit71aTra7ririatNOCIIII

llHl1Hf ll~7Dl4fIZIIICIIII 1141ftillf+1DllnTgtlMa~=~bull==~r Lbulll-lllbullbulllJJ

=~~~HR-~a ~ =iEri ~ ~=6

= 1MESE COCIIIOlfAlEi ARC 9~ at AH DISTlfG CONJmOfS AS-alLT FED 5UKiEY Y NORWDal EJICltJIJll(G CD~ IIElMEN ~ 1S 111 DECDaR a 2DII 1)pound OCICIIIDNAlES 5HCflI UIpound IIAID Cit MltSSAOfllffT5 STATE FlJriNII CDCffllNAT smult ~AO leJ (IMIJ 1HE ACQlltACY ltF 1HE COCftDINT[ LDCAnatS Mpound diams- 01 FtU

POINT DESCRIPTION ABBREVIATIONS~-~middotPC Pmlr Of CLIRIJC bullIEllL ClMNpound STilRlS PDC bull PtJtilTIIJOM1poundr ~ [raquo TAHCINiT W(R[ lll[ CURpound uroo Fo F[1NT(1t~tfflvt[ltft1llllIIUlt OMNtilE)PRC ~T oT ~pound ~Vlllrlt

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 2 of 2

I ~ IHAT nfl PlM MS 81D1 PIIDMQl ~WllTM(llUI MOIIEOIAAlPlllR~Df IIUPS C- lttE ~111 Cl__ HftNMIIIZlt

WWWWJU Cii6 liftitit

ACTIVITY ANI) USE LINTATIONS

PLAN OF RES7RIC1EJJ AREAS ANJJ COlER TYPES

8V CKlJ()RN IJNl()N PflllfpoundCpoundS SlllERFIIMJ SITC

50 HJ S(J11( SmEpoundT llAIPOIL JASS

=r-o ~ ll 2021

~ Engmeer1ng

Hltd ~~ middot~~-=~ra (f~AJ lIQ c- f

a llfEET 2 ltF 6324-02

td ~

w ~ m 0 0

Id Q ii w m

co co m 0 co

Bk 39600 Pg437 88608

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY New England Region

Five Post Office Square - Suite 100 Boston Massachusetts 02109-3912

INSTITUTIONAL CONTROL DESIGN STATEMENT FOR THE BLACKBURN AND UNION PRIVILEGES SUPERFUND SITE - EAST OF SOUTH STREET AREA

1 Introduction

Pursuant to the Comprehensive Environmental Response Compensation and Liability Act 42 USC sect 9601 et seq (CERCLA) and the National Contingency Plan 40 CFR Part 300 (the NCP) this document contains a description of the release events and site history that resulted in the contaminated media that require institutional controls in the fom1 of Activity and Use Limitations the basis for land use restrictions and uses that are consistent and inconsistent with the Selected Remedy ( as described below) This Institutional Control (IC) Design Statement pertains to a portion of the Blackburn and Union Privileges Superfund Site located in the Town of Walpole Massachusetts (the Site) which has been listed on EPAs National Priorities List (NPL) which portion is generally referred to as the East of South Street Area (the EOS Area) The EOS Area is located to the east of South Street in Walpole and is shown on Figure 1 attached hereto

A Notice of Activity and Use Limitation (NAUL) is necessary and appropriate for the EOS Area of the Site based on the fact that pursuant to EPAs risk evaluations asbestos arsenic trichloroethene (TCE) and certain polycyclic aromatic hydrocarbon (PAH) contan1inants remain in place in soils at levels higher than those appropriate for unlimited use or unrestricted exposure groundwater underlying the EOS Area contains hazardous substances at levels that present an unacceptable risk of exposure and remedial measures at the Site must be protected and maintained to ensure that the Selected Remedy remains protective

EPAs Record of Decision (ROD) dated September 30 2008 specified the need for institutional controls such as a NAUL to ensure long-tenn perfonnance and protectiveness of the Selected Remedy The institutional controls described herein are necessary and appropriate to ensure that the Selected Remedy for the Site remains protective of human health and the environment The remedy for the Site as described in the ROD is referred to herein and in the NAUL as the Selected Remedy

Page 1 of7

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 6: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

Bk 39600 Pg411 88608

and safety provisions of 29 Code of Federal Regulation Section 1910 120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Notwithstanding subparagraph 1(vi)(f) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

Vil Such other activities and uses not identified in Paragraph 2 below as being activities and uses inconsistent with maintaining the Selected Remedy

2 Activities and Uses Inconsistent with Maintaining the Selected Remedy The following Activities and Uses are inconsistent with maintaining the Selected Remedy and as such may not occur on the Restricted Area without compromising the Permanent Solution that has been achieved for the Site

i Residential use or activity

11 Except as permitted in Paragraph 1i above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

111 Except as permitted by Section I above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

1v Agricultural use or activity except for raised garden beds approved in accordance with Section l(vi)

v Construction or installation of a bu iiding or structure for human occupancy without prior written approval of EPA

vi Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

Page 6 of 12

Bk 39600 Pg412 88608

3 Obligations and Conditions The following obligations andor conditions are necessary and shall be undertaken at the Property to maintain the Selected Remedy and to avoid compromising the Permanent Solution that has been achieved for the Site

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

11 If EPA has provided written notice that EPA has determined that the parties responsible under the OampM Plan are no longer able to submit an annual compliance letter regarding this NAUL the owner of the Property shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the Restricted Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such cel1ifications are based

4 Emergency Excavation If it becomes necessary to excavate within the Restricted Area as pal1 of a response to an emergency (for example repairing utility lines or responding to a fire or flood) the provisions of Paragraph 1 of this Notice shall be suspended with respect to such excavation to the extent necessary to permit such response provided that the Owner

(i) orally notifies the following persons of such emergency as soon as possible but no later than two (2) hours after having learned of such emergency

A EPA National Response Center at (800) 424-8802 and EPA Region 1 Office of Site Remediation and Restoration Emergency Planning and Response Branch at 888-3 72-7341 and

B MassDEP Emergency Response at (888) 304-1133 and MassDEP Southeast Regional Office of Emergency Response Section at 508-946-2850

or such other persons as MassDEP and EPA respectively may identify in writing from time to time to Owner for such oral emergency response notifications

(ii) notifies MassDEP and EPA in writing of such emergency no later than five (5) days after having learned of such emergency such notifications to be sent to the following addresses

A MassDEP Southeast Regional Office 20 Riverside Drive Lakeville MA 02347 and

Page 7 of 12

Bk 39600 Pg413 88608

B EPA New England Region I 5 Post Office Square - Suite 100 Boston MA 02109-3912

or to such addresses as MassDEP and EPA respectively may identify in writing from time to time to Owner for such written emergency response notifications

(iii) limits the actual disturbance involved in such excavation to the minimum reasonably necessary to adequately respond to the emergency

(iv) implements all measures necessary to limit actual or potential risk to the public health and environment

(v) engages a qualified hazardous waste site cleanup professional such as a Licensed Site Professional (LSP) as defined in the MCP at 310 CMR 400006(12) to oversee the implementation of this Paragraph and to prepare and oversee the implementation of a written plan (Emergency Restoration Plan) that will restore the Property to a condition that meets or exceeds the performance standards established under the ROD for the Selected Remedy and that is consistent with this Notice and to review and evaluate response actions contained in the Emergency Restoration Plan to ensure minimal disturbance of any contaminated soils and sediments and

(vi) performs all actions laid out in the Emergency Restoration Plan within thirty (30) days of the occutTence of the emergency or within such other time period as may be approved by MassDEP and EPA in writing and submit a copy of the Emergency Restoration Plan to MassDEP and EPA within ten (10) days of its performance with a statement from the cleanup professional confirming that the Property has been restored to the standard described above

5 Proposed Changes in Activities and Uses Amendments Pursuant to 310 CMR 4001 l l(amp)(c) the Owner must notify and obtain approval from EPA and MassDEP of any proposed change in activities and uses at the Property that is not provided for in this Notice Pursuant to 3 IO CMR 400111 (8)( d) the Owner must obtain EPA and MassDEP approval of any Amendment or Termination of this Notice All EPA and MassDEP approvals of any Amendment or Termination of this Notice must be in writing and be recorded andor registered with the appropriate Registry(ies) of Deeds andor Land Registration Office(s) to be effective

6 Violations The activities uses andor exposures upon which this Notice is based must not change at any time to (a) cause risks that are not protective of human health or the environment pursuant to the criteria set forth in the NCP at 40 CFR

Page 8 of12

Bk 39600 Pg414 88608

300430(e)(2)(i) (b) interfere with the Selected Remedy or (c) cause a significant risk of harm to health safety public welfare or the environment pursuant to Chapter 21E and the MCP

Compliance with the terms and conditions of this Notice is subject to enforcement pursuant to Chapter 21 E the MCP MGL c 21 A sect 16 and 310 CMR 5 00 and CERCLA and the NCP Such enforcement may include without limitation enforcement with respect to (a) any activities or uses that may occur that are described in Paragraph 2 of this Notice as being inconsistent with the Selected Remedy (b) any failure to undertake any obligations and conditions described in Paragraph 3 of this Notice as being necessary to maintain the Selected Remedy and (c) any other failure to maintain the Selected Remedy or Pem1anent Solution resulting from a failure to act consistently with this Notice

7 Incorporation Into Deeds Mortgages Leases and Instruments of Transfer This Notice shall be incorporated either in full or by reference into all future deeds easements mortgages leases licenses occupancy agreements or any other instrument of transfer whereby an interest in andor a right to use the Property or a portion thereof is conveyed in accordance with 310 CMR 401074(5)

8 Reservation of Rights

This instrument shall not limit or otherwise affect the right of EPA andor MassDEP to obtain access to or restrict the use of the Property pursuant to CERCLA Chapter 21 E or any other applicable statute or regulation

This instrument shall not release the Owner or any other party from liability for releases of oil or hazardous substances or materials nor shall this instrument excuse the Owner or any other party from complying with CERCLA Chapter 21 E or any other applicable federal state or local laws regulations or ordinances or by-laws

Owner hereby authorizes and consents to the filing and recordation andor registration of this Notice said Notice to become effective when recorded andor registered with the appropriate Registry(ies) of Deeds andor Land Registration Office(s)

Page 9 of 12

Town of Walpole acting by and through the Board of Selectmen

n Town Administrator authorized by ard of Selectmen recorded herewith

Bk 39600 Pg415 88608

Witness the execution of this instrument under seal this 21_ day of df 11 ( 2021

COMMONWE

COUNTY OF NORFOLK ss

~ On this 21 day of 4f1 2021 before me the undersigned notary public

personally appeared James Johnson as Town Administrator for the Town of Walpole and proved to me to through satisfactory evidence of identification which was ~6laquo~ ~ -fr VJ1e [indicate ifdrivers license or passport or other document] to be the person whose name is signed on the preceding or attached document and acknowledged to me that signed it voluntarily for its stated purpose

Name CA~ U ~

My Commission Expires July S 2t)z

Page 10 of 12

--------

Bk 39600 Pg416 88608

In accordance with CERCLA 42 USC sect 9601 et seq and the National Contingency Plan the United States Environmental Protection Agency Region I hereby approves this Notice of Activity and Use Limitation

Name 8r~Cltvi Olso Director Superfund and Emerncy Management Division (SEMO)

US Environmental Protection Agency Region I

In accordance with MGL c 21E sect 6 and the Massachusetts Contingency Plan (310 CMR 400000) the Department of Environmental Protection hereby approves this Notice of Activity and Use Limitation (as to form only)

Date Paul W Locke Assistant Commissioner Bureau of Waste Site Cleanup Department of Environmental Protection

Page 11 of 12

---------------

Bk 39600 Pg417 88608

In accordance with CERCLA 42 USC sect 9601 et seq and the National Contingency Plan the United States EobulliionmenlaJ Protectioo Agency Region I hereby appro1es this Notice of Activity and Use Limitation

Date ~------

Name Director Superfund and Emergency Management Division (SEMO)

US Environmental Prokction i0 ency Region I

Jn accordance with MGL c 21 E sect 6 and the Massachusetts Contingency Plan (310 CMR 400000) the Depamnent ofEmironmental Prolectioo hereby approves this Norice ofActivity

and Use Limilarioo (as ro funn ooly)_ ~~

Dale 4r S microlJ ~ Paul W Locke Assisrant Commissioner Bureau ofWaste Site Cleanup Department of Environmental Protection

Page 11 of 12

Bk 39600 Pg418 88608

List of Exhibits

Exhibit A Legal Description of the Property Exhibit B Legal Description of the Restricted Area and Coordinates of Cover Types Exhibit C Photo-Reduced Copy of Activity and Use Limitations Plan of Land Exhibit D Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table Exhibit E Institutional Control Design Statement (EOS) Exhibit F Copy of Vote of Town of Walpole

Return to

Attn Kristine Sheehy Senior Real Estate Attorney FOLEY HOAG LLP Seaport West 155 Seaport Boulevard Boston Massachusetts 02210-2600

Page 12 of 12

Bk 39600 Pg419 88608

EXHIBIT A

Legal Description of Property The land with the improvements thereon located in Walpole Norfolk County Massachusetts bounded and described as follows

PARCEL I

The land on the Southeasterly side of South Street bounded

NORTHWESTERLY NORTHERLY AND AGAIN NORTHWESTERLY by South Street by seven lines measuring respectively

17027 feet 120 feet 22011 feet 1653 feet 325 89 feet 4515 feet and 1497 feet

NORTHEASTERLY by Gleason Court 2627 feet

SOUTHEASTERLY AGAIN NORTHEASTERLY AND AGAIN SOUTHEASTERLY by land now or fom1erly of Santomarco by five lines

measuring respectively 6750 feet 2050 feet 1190 feet 2952 feet and 2001 feet

NORTHEASTERLY AGAIN by said land of Santomarco and land now or formerly of Cashorali 10056 feet

NORTHWESTERLY AGAIN by said land of Cashorali 2845 feet

NORTHEASTERLY by land now or formerly of Muighitti 9007 feet

SOUTHEASTERLY by the location of Old Colony Railroad by three lines measuring respectively 6809 feet 32808 feet and 38250 feet

and

SOUTHWESTERLY by land now or formerly of Meyer by three lines AND SOUTHERLY measuring respectively 9143 feet 1998 feet and

15202 feet

Parcel I is described in the deed recorded with the Norfolk County Registry of Deeds in Book 4459 Page 287

A portion of said premises is shown on plan entitled Plan of Land in Walpole Mass Belonging to General Fibre Co Inc by Edward C Peterson CE dated January 16 1960 filed with the Norfolk Registry of Deeds as Plan No 849 of 1967 in Plan Book 223 and the remainder is shown on plan entitled Plan of Land in Walpole Massdeg by E Worthington Engineer dated February 6 193 7 recorded with said Deeds Book D2135 Page 8 I

FHBOSTON52454092

Bk 39600 Pg420 88608

PARCEL II Property known as Parcel 33-120 of the Town of Walpole Tax Assessors Map which is

part of the property situate in the Town of Walpole County ofNorfolk and Commonwealth of Massachusetts and being all of the right title and interest of The Penn Central Corporation in and to all those certain pieces or parcels of land and premises easements rights of way and any other rights of any kind whatsoever appurtenant thereto or used in conjunction therewith on and along a portion of Branch of Railroad known as the Wrentham Branch said portion of railroad being described as follows

Beginning at a line extended across the right of way of said Branch of rai road said line being the Northerly line of South Street and extending thence in a Northeasterly direction the distance of 2852 feet more or less along said Branch of rai Iroad to a line which is parallel with the Southwesterly line of Common Street said parallel line extending across said right of way through a point in the centerline thereof at railroad valuation survey station 733 + 67 more or less and being the place of ending

Parcel II is described in the deed recorded with the Norfolk Registry of Deeds in Book 7986 Page 372 and is a portion of the land shown on the plan recorded with said Deeds as Plan No 52 of 1983

FHBOSTON52454092

Bk 39600 Pg421 88608

Exhibit B Legal Description of the Restricted Area and Coordinates of Cover Types

Le2al Description for Restricted Area The area shown on the plan entitled Activity and Use Limitations Plan of Land Blackburn amp Union Privileges Superfund Site 50 amp 60 South Street Walpole Mass Scale l = 30 dated April 6 2021 by Norwood Engineering Company Inc recorded with the Norfolk Registry of Deeds in Plan Book 704 Page 41 being bounded and described as follows

Beginning at a point on the easterly sideline of South Street at the southerly point of curvature of Gleason Court on said plan thence

Northeasterly and curving to the right along an arc of a curve having a radius of twentyshyfive and 00100 (2500) feet a length of forty-five and 15100 (4515) feet thence

S 48deg1352 E a distance of twenty-two and 24100 (2224) feet the previous course by the southerly sideline of Gleason Court thence

s 32deg0208 w a distance of fifty-four and 78100 (54 78) feet thence

S 59deg27 32 E a distance of twenty and 50100 (2050) feet thence

S 47deg5252 E a distance of eleven and 90100 (1190) feet thence

S 49deg01 10 E a distance of twenty-nine and 58100 (2958) feet thence

s 38deg3108 w a distance oftwenty and 01100 (2001) feet thence

S 49deg00 57 E a distance of one hundred and 56100 (10056) feet thence

N 39deg5348 E a distance of twenty-eight and 45100 (2845) feet the previous seven (7) courses by land ofNF Thelma A Casborali thence

S 49deg0808 E a distance of ninety and 29100 (9029) feet the previous course by land ofNF Ming L Yau thence

s 25deg2312 w a distance of siliy-eight and 22100 (6822) feet to a point on the westerly sideline of a fonner railroad right of way the previous course by land of the Town of Walpole assessor parcel 33-121 thence

S 55deg2937 E a distance of ninety-nine and 78 100 (99 78) feet to a point of tangency on the easterly sideline of a forn1er railroad right of way thence

Page 1 of 13

Bk 39600 Pg422 88608

s 30deg11 32 w

S 23deg49 I6 W

N 66deg1044 W

N 23deg4908 E

N l 6deg00 52 E

S 37deg0240 E

N 10deg1437 W

N 34deg093 I W

N 11 deg5558E

Northeasterly

N 27deg41 48 E

a distance of three hundred and three and 74100 (30374) feet the previous course by land ofNF Nicholas H Dowd and NF Emilio P Baldassari thence

a distance of four hundred ninety and 86100 (49086) feet to a SBdh the previous two (2) courses by the easterly sideline of a former railroad right of way thence

a distance of eighty-two and 76100 (8276) feet to an Iron Pipe on the westerly sideline of the former railroad right of way thence

a distance of twelve and 09100 (1209) feet to a SBdh thence

a distance of ninety-six and 50100 (9650) feet to a S Bdh thence

a distance of fifteen and 00100 (1500) feet the previous three (3) courses by the westerly sideline of the former railroad right ofway and land of NF Joseph R Carpentieri and NF Joseph R and Faith N Carpentiero thence

a distance of ninety-two and 82100 (9282) feet the previous course by land ofNF Richard A and Josette M Burke thence

a distance of tvvo hundred thirty-seven and 86100 (23786) feet to a point on the easterly sideline of South Street thence

a distance of one hundred twenty and 00100 (12000) feet along the easterly sideline of South Street to a point of curvature of the easterly sideline of South Street thence

and curving to the right along an arc of a curve having a radius of eight hundred and 00100 (80000) feet a length of two hundred hventy and 11100 (22011) feet along the easterly sideline of South Street thence

a distance of three hundred forty-hvo and 42100 (34242) feet to the point of beginning

Containing 621 Acres of land more or less

Page 2 of 13

3000

3005

3010

3015

3020

3025

3030

Bk 39600 Pg423 88608

EXHIBIT B (cont)

Points and Coordinates associated with Restriction Areas and Cover Types for the Activity and Use Limitations (AUL) at 50 amp 60 South Street Walpole Mass

Point Northing Easting Type

Curve Curve Number Len2th Radius

28754430528 7236432250 COR

3001 28755604597 7236680368 PC L=7535 R=80000

3002 2875597 1222 7236766913 POC

3003 28756333366 7236870620 PT

3004 28756280754 723697 3031 COR

28756025570 7237001250 COR

3006 28755918670 7237001140 COR

3007 28755864440 7237 I 05890 COR

3008 28755903200 72371963 IO COR

3009 28756030893 7237217396 COR

28756042534 7237250325 COR

3011 28756021733 7237317808 COR

3012 28755800732 7237640949 COR

3013 2875552 1424 7237667395 COR

3014 28755321388 7237708416 COR

28755197081 7237834881 COR

3016 28755102230 7238045173 COR

3017 28754941531 7238291869 COR

3018 28754851375 7238512944 COR

3019 28754753441 7238824 760 COR

28754681541 723916 1881 COR

3021 28754608227 7239406506 COR

3022 28754515846 7239459928 COR

3023 2875426 7589 723943 8163 COR

3024 28754198016 7239590840 COR

28753886764 7239449006 COR

3026 2875329 7944 7239187206 COR

3027 28752506745 7238837890 COR

3028 28751859560 7238552142 COR

3029 28751221833 723827342 l COR

28750848788 7238107869 COR

3031 2875045 3654 7237927814 COR

3032 28750630420 7237527432 COR

3033 28750741023 723757 6257 COR

3034 28751668594 7237842488 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 3 of 13 April 14 2021

3035

3040

3045

3050

3055

3060

3065

3070

Bk 39600 Pg424 88608

Point Number

Northing Easting Type Curve Leneth

Curve Radius

28751548848 7237932869 COR

3036 28752462269 7237767802 COR

3037 28756438461 7236904209 POC L=2207 R=80000

3038 28756543084 7236939245 PT

3039 2875653 7987 7236954123 PC

28756597578 7237007344 POC L=1651 R=937

3041 28756594465 7237087181 PT

3042 28756459044 7237347021 PC L=347 R=220

3043 28756432531 7237363546 PT

3044 28756280644 7237286201 COR

28755924210 7237966952 COR

3046 28756081959 7238048554 PC L=472 R=236

3047 28756064922 7238084404 PT

3048 28755523491 7237845047 COR

3049 28755419845 7238081981 COR

28755460757 7238099621 PC L=240 R=l57

3051 28755467701 7238120241 PT 3052 28755398690 7238275280 COR

3053 28755365410 7238264910 COR

3054 28755087149 7238900449 COR

28755158001 7238931521 COR

3056 28755040360 7239199770 COR

3057 28755311720 7239318930 COR

3058 28755263010 7239429300 COR

3059 28755388260 7239484290 COR

28755348660 7239576000 COR

3061 28755625470 7239696500 COR

3062 28755664605 7239606601 COR

3063 28755736202 7239637768 COR

3064 28755621870 7239897370 COR

287 5567 6160 7239920410 COR

3066 28755718270 7239830260 COR

3067 2875587 9750 7239900310 COR

3068 28755718790 724026 7600 COR

3069 28755763390 7240285350 COR

28756035900 7239926600 COR

3071 28756086280 7239812770 COR

3072 28756089984 7239813649 COR

3073 28756229128 7239501910 PC L=482 R=l54

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 4 of 13 Apnl 14 2021

3075

3080

3085

3090

3095

3100

3105

3110

Bk 39600 Pg425 88608

Point Number

Northing Easting Type Curve Length

Curve Radius

3074 28756257366 7239513984 PT

28756185799 7239674928 COR

3076 28756739833 7239921136 COR

3077 28756876060 7239682275 COR

3078 28756948336 7239735898 PC L=335 R=298

3079 28756958235 7239766064 PT

28756866081 7239978133 COR

3081 28757166275 7240127374 COR

3082 28757068320 7240314640 COR

3083 28757602980 7240594310 COR

3084 28757700050 7240408736 COR

28758247941 7240688376 COR

3086 28758250190 7240683910 COR

3087 28758344979 7240738168 COR

3088 2875843 6103 7240581527 COR

3089 28758602943 7240664224 COR

28758740024 7240397393 COR

3091 28758605706 724032 7776 PC L=477 R=309

3092 28758594882 7240286013 PT

3093 28758666635 7240197585 PC L=2573 R=3127

3094 28758767113 7240118710 POC

28758890752 7240086604 PRC L=I653 R=3993

3096 28758972305 7240074125 POC

3097 28759049552 7240045 I 52 PT

3098 28759330312 7239734408 COR

3099 28759459414 7239588584 PC L=2269 R=5217

28759524821 7239496174 POC

3101 28759568752 7239391829 PRC L=1814 R=486

3102 28759603259 7239308095 POC

3103 28759653883 7239232999 PCC L=l31 R=088

3104 28759665694 7239231411 PT

28759800587 7239299586 COR

3106 28759986288 7238981214 COR

3107 2875983 5797 7238891829 COR

3108 28759879750 7238798689 COR

3109 28759905380 7238754769 PC L=1600 R=2552

28759963590 7238700398 POC

3111 28760035727 7238666620 PT

3112 28760700665 723901 5672 PC L=4515 R=2500

3113 28760830230 7239191198 POC

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 5 of 13 April 14 2021

3115

3120

3125

3130

3135

3140

3145

3150

Bk 39600 Pg426 88608

Point Number

Northing Easting Type Curve Len2th

Curve Radius

3114 2876077 263 6 723 940 1624 PT 28760624518 7239567466 COR

3116 28760160100 7239276864 COR

3117 28760055928 7239453423 COR

3137 28759976118 7239541692 COR

3118 28759782139 7239764992 COR

3119 28759625581 7239640375 COR

28758966057 7240399493 COR

3121 28759184326 7240581973 COR

3122 28758593598 724126478] COR

3123 28757977293 724097 2314 COR

3124 28757716516 7241351659 COR

28757288251 7241140719 COR

3126 28756725827 7240851862 COR

3127 28756162468 7240586126 COR

3128 28755614498 7240338506 COR

3129 28754346745 7239768507 COR

28753845716 7239540194 COR

3131 28753257436 723927 8634 COR

3132 28752466355 7238929370 COR

3133 28751819340 7238643698 COR

3134 28751181527 7238364939 COR

28750807772 7238199071 COR

3136 28750413263 7238019301 COR

3138 28756920317 7237298739 PC L=l941 R=2104

3139 28756827128 7237274848 POC

28756733047 7237294944 PRC L=401 R=l66

3141 2875671 1336 723 727 2844 PCC L=1492 R=13345

3142 28756744594 7237206091 POC

3143 28756781529 7237141301 PCC L=1419 R=l018

3144 28756833084 7237094642 POC

28756902566 7237091952 PCC L=2413 R=157959

3146 28757017337 7237129167 POC

3147 28757131820 7237167258 PCC L=330I R=S0000

3148 28757282552 7237234442 POC

3149 28757431866 7237304721 PT 28757338390 7237495930 COR

3151 28757541620 7237605380 COR

3152 28756897590 723883 4280 COR

Exhibit B to NA UL-Part 11-EOS Coordinate Tables Page 6 of 3 April 14 202

3155

3160

3165

3170

3175

3180

3185

Bk 39600 Pg427 88608

Point Northing Easting Type Curve Cunbulle

Number Lenszth Radius 3153 28756870623 7238820218 COR

3154 28756838273 7238882258 COR

28756865240 7238896320 COR

3156 28756777004 7239062996 COR

3157 28756770439 7239063663 PC L=l 146 R=2269

3158 2875665836 I 7239046180 PCC L=l423 R=957

3159 2875661 7520 7238989913 POC

28756625544 7238920850 PT

3161 28756728525 7238726583 PC L=232 R=l58

3162 28756748720 7238720236 PT

3163 28756899634 7238797341 COR

3164 28757254653 7238121363 COR

28757520153 723761266 7 COR

3166 28757306899 723 750 IO 10 COR

3167 28756690336 7237500169 PC L=243 R=I68

3168 28756682599 7237479273 PT

3169 28756686990 7237469583 PC L=0250 R=l68

28756708806 7237463018 PT 3171 28757000109 7237616354 PC L=233 R=l73

3172 28757005368 7237637270 PT

3173 28757000998 7237645513 PC L=233 R=l69

3174 28756980219 7237651023 PT

28756429209 7238339422 COR

3176 28756342982 7238506849 COR

3177 28756500076 7238596485 PC L=l19 R=l48

3178 28756499701 7238608072 PT 3179 2875644 7813 7238705611 PC L=l 182 R=483

28756358177 723 869 0707 PT

3181 2875623 6099 7238376388 PC L=443 R=467

3182 28756235611 7238333779 PCC L=343 R=9IO

3183 28756249049 7238302418 PCC L=412 R=9IO

3184 28756278952 7238274519 PCC L=368 R=300

28756313362 7238277619 PT

3186 28756282498 7238911796 PC L748 R=216

3187 28756240650 7238919721 PT

3188 28756126081 7238620406 PC L=323 R162

3189 28756138645 7238591575 PCC L=333 R=283

Exhibit B to NAUL-Part II-EOS Coordmate Tables Page 7 of 13 April 14 2021

3190

3195

3200

3205

3210

3215

3220

Bk 39600 Pg428 88608

Point Number Northing Easting Type Curve

Leneth Curve Radius

28756163375 7238602867 PT

3191 2875523 0908 7238765275 COR

3192 28755205040 7238752740 COR

3193 28755391740 7238328470 COR

3194 28755466840 7238361040 COR

28755452760 7238392590 COR

3196 28755516920 7238421040 COR

3197 28755530690 7238388730 COR

3198 28755603230 7238421460 COR

3199 2875555 7568 723852 7053 COR

28755371220 7238445330 COR

3201 28755629198 7238558466 COR

3202 28755676040 7238453290 COR

3203 28755925410 7238563840 PC L=1902 R=3548

3204 28755927383 7238658634 POC

28755954390 7238749520 PT 3206 28755974770 7238807230 COR

3207 28755779200 7238881701 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

28755746700 7238609997 COR

3211 2875593774 7239036608 COR

3212 28756048460 7238996850 PC l=1445 R=2903

3213 28756070631 7239065422 POC

3214 28756109010 7239126420 PT

28756153820 7239182190 PC L=S98 R=848

3216 28756171980 723923 7880 PT

3217 287S6026148 7239566166 COR

3218 28756003865 7239556465 COR

3219 287S6134380 7239256650 COR

28755998460 7239195370 COR

3221 2875600 71S0 7239174530 COR

3222 28756001791 7239172152 COR

3223 28756040451 7239079437 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 8 of 13 April 14 2021

Bk 39600 Pg429 88608

Point Number

3210

3200

3056

3057

3058

3059

3060

3061

3062

3218

3219

3220

3221

3224

3225

3226

3227

3228

3070

3071

3234

3233

3235

3236

3237

3238

3239

3240

3241

3242

3243

3244

3245

3246

3247

3248

Northing

28755746700

28755371220

28755040360

28755311720

28755263010

28755388260

28755348660

2875562 54 70

28755664605

28756003865

28756134380

28755998460

28756007150

28755941340

28755962080

28755867937

28755819702

28755766128

28756035900

28756086280

28755991990

28755942100

28756477248

28756677238

28756650130

28756473307

28756480112

28756675030

28756724454

28756742099

28756742133

28756703924

28756640759

28757607280

28757401530

28757467350

Easting

7238609997

7238445330

7239199770

7239318930

7239429300

7239484290

7239576000

7239696500

7239606601

7239556465

7239256650

7239195370

7239174530

7239145324

7239100930

7239061674

7238935003

7238911508

7239926600

7239812770

7239769910

7239884050

7239261913

7239253008

7239321810

7239319038

7239298824

7239364440

7239271845

7239292625

723935 0187

7239393239

7239393096

7237584960

7237475300

7237345620

Type

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

PC PCC

POC

PCC

PT

COR

COR

COR

Curve Len2th

L=273

L=ll77

L=657

Cunmiddote Radius

R=1421

R=810

R=679

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 9 of 13 April 14 2021

Bk 39600 Pg430 88608

Point Number Northing Easting Type Curve

Len2th Curve Radius

3249 287 57514570 7237372360 PC l=ll05 R=1993

3250 287 57 588060 7237452980 PT

3251 28757631382 7237429676 PC L=2244 R=2352

3252 287 5765 6810 7237537876 POC

3253 2875 762 9720 7237645671 PT

3254 28756940655 7238952710 PC l=1493 R=1509

3255 28756901845 7239015577 POC

3256 2875683 7836 7239052474 PT

3257 28758104824 7237653014 COR

3258 28758028960 7237800160 COR

3259 28757949530 7237760790 COR

3260 28757901005 7237855021 COR

3261 28757839230 7237820908 PC L=273 R=l33

3262 28757830688 7237799810 PCC L=539 R=2144

3263 28757852974 7237750897 PT

3264 28757891705 7237688178 PC L=lS26 R=2432

3265 28757948636 7237637880 POC

3266 287 58018307 7237607597 PT

3248 28757467350 7237345620 COR

3267 28757550832 7237363444 POC L=2653 R=80000

3268 28757668809 7237424132 PT

3269 28757504 719 7238817989 COR

3270 28757493010 7238842230 COR

3271 28757561074 7238880970 COR

3272 28757483953 7239024127 PC L=323 R=l70

3273 28757459939 7239037846 PT

3274 28757311605 7238957122 PC L=1388 R=906

3275 2875727 2732 7238901647 POC

3276 28757283181 7238834718 PT

3277 287 5733 4061 7238752337 PC L=255 R=l60

3278 287 5735 5527 7238744411 PT

3279 2875 7102815 7239517199 PC l=261 R=l70

3280 28757080654 7239525307 PCC l=909 R=1275

3281 2875 700 5390 7239477911 PCC L=l007 R=990

3282 28756999624 7239381704 PT

3283 2875707 7705 7239230604 PC L=ll14 R=907

Exhibit B lo NAUL-Part IlbullEOS Coordinate Tables Page 10 of13 April 14 2021

3285

3290

3295

3300

3305

3310

3315

Bk 39600 Pg431 88608

Point Number Northing Easting Type

Curve Leneth

Curve Radius

3284 28757168066 7239178102 PT

28757205717 7239186398 PC L=518 R=930

3286 28757249003 7239213534 PCC L=l41 R=086

3287 2875724 7909 7239226048 PT

3288 28758415755 7239842757 PC L=251 R=l59

3289 28758437695 7239837379 PT

28758456377 7239846949 PC L=812 R=876

3291 28758494897 7239915165 PCC L=456 R=757

3292 28758483790 7239958646 PT

3293 28758405147 7240111348 PC L=l057 R=955

3294 28758318136 7240161452 PCC L=477 R=l063

28758272407 7240149529 PCC L=250 R=l60

3296 28758265647 7240128003 PT

3297 28758157937 7237680895 COR

3298 28758902927 723807 1969 COR

3299 28758852531 7238168280 COR

28758779660 7238129750 COR

3301 28758746973 7238192072 COR

3302 2875807 6630 7237840490 COR

3303 28758049940 7237894220 COR

3304 2875871 7997 7238243620 COR

28758680103 7238315946 COR

3306 28758533699 7238239240 COR

3307 2875852 6899 7238252220 COR

3308 28758098180 7238027600 COR

3309 28757974484 7238264223 COR

28757957598 7238255513 COR

3311 28757757732 7238637845 COR

3312 28757774584 7238646620 COR

3313 28757653710 723887 7846 COR

3314 28757560920 7238829340 COR

28759004930 7238125514 COR

3316 28759689797 7238485028 PC L=1992 R=2609

3317 28759697204 7238583760 POC

3318 28759667288 723867 8142 PT

3319 28758996126 7238323718 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 11 of 13 April 14202 I

Bk 39600 Pg432 88608

Point Number

Northing Easting Type Curve Lenfth

Curve Radius

3320 28759028950 7238261560 COR 3321 28758954486 7238222188 COR

3322 28758972523 7238378387 COR 3323 28759421550 7238613630 COR 3324 28759377933 7238698105 COR 3325 2875907 4811 7238539289 COR 3326 28759081611 7238526309 COR 3327 28758935210 7238449604 COR

3328 28759464470 7238637330 COR 3329 28759632674 7238722481 PC L=ll83 R=l578

3330 28759583973 7238755474 POC 3331 28759526573 7238768343 PRC L=2163 R=2455

3332 28759422964 7238796123 POC 3333 28759341091 7238865430 PT

3334 28759193370 7239050710 COR 3335 28759416340 7239163940 COR 3336 28759263600 7239455620 COR 3337 28759043690 7239336510 COR 3338 28758935490 7239552130 COR 3339 28757650890 7238883240 COR 3312 28757774584 7238646620 COR 3311 28757757732 7238637845 COR 3310 28757957598 7238255513 COR 3309 28757974484 7238264223 COR 3308 28758098180 723802 7600 COR 3307 28758526899 7238252220 COR 3306 28758533699 7238239240 COR 3340 28758700033 7238326388 COR 3341 28758675436 7238373334 COR 3342 28758733013 7238403500 COR 3343 28758760858 7238350353 COR 3344 28758860952 7238402796 COR 3345 28758833106 7238455943 COR 3346 28758890683 7238486109 COR 3347 28758915280 7238439162 COR 3326 28759081611 7238526309 COR 3325 28759074811 7238539289 COR

Exhibit B to NAUL-Part H-EOS Coordinate Tables Page 12 of l3 April 14 2021

Bk 39600 Pg433 88608

Point Number

Northing Easting Type Curve Len2th

Cunbulle Radius

3324 2875937 7933 7238698105 COR

3082 28757068320 7240314640 COR 3083 28757602980 7240594310 COR 3349 28757790234 7240236327 COR

3348 28757255574 7239956657 COR

3124 28757716516 7241351659 COR 3125 28757288251 7241140719 COR 3126 28756725827 7240851862 COR 3127 28756162468 7240586126 COR 3128 287 55614498 7240338506 COR 3129 28754346745 7239768507 COR 3130 28753845716 7239540194 COR 3131 28753257436 723927 8634 COR 3132 28752466355 7238929370 COR 3133 28751819340 7238643698 COR 3134 2875118152 7 7238364939 COR 3135 2875080 7772 7238199071 COR 3136 28750413263 7238019301 COR 3350 28750296168 7238284525 COR 3351 28754 78 6636 7240267040 COR 3352 28757412029 7241794586 COR

POINT DESCRIPTION ABBREVIATIONS

COR=CORNER PC= POINT OF CURVE WHERE CURVE STARTS POC -= POINT ON CUR VE PT=POINT OF TANGENCY WHERE THE CURVE ENDS PCC = POINT OF COMPOUND CURVE (WHERE RADIUS CHANGES) PRC = POINT OF REVERSE CURVE

NOTES

THE COORDINATES ARE BASED ON AN EXISTING CONDITIONS AS-BUILT FIELD SURVEY BY NORWOOD ENGINEERING CO INC BETWEEN NOVEMBER 15 TO DECEMBER 18 2019 TI-IE COORDINATES ARE BASED ON l1ASSACHUSETIS ST A TE PLANE COORDINATE SYSTEM NAD 1983 (FEET) THE ACCURACY OF THE COORDINATE LOCATIONS ARE +-0J FEET

Exhibit B to N1UL-Part II-EOS Coordmate Tables Page 13 ofl3 April 14 2021

---

1f~ flJr ~i

f ~~ J~i](M~I ~ 1 jf~ ~~f W-- )e 1

It lj fY pl ~-~j

I --- ~ ~

1 (J-c~ er ~

C JI fl JYf

1 ~ ~Yu-~ 1i

~r

( LOClJS P

SCAUllbulliQO

I ar lMIT flG PINI tMS _ lIIPMIDMICXNllRlnT~tlCfllUS 1111D cmuftraquodl s - NIKl1III tfIJIIIIIOfM~1HCll allE1

DAre Jllrl

NUKIJU LU6 DMitM

mmtG6DKbdlt

~4~-middot

~~I

-- ampnbullllf~ ~ fa

LEGEND 0

-i~wr0o-m lICUUoaampbullco--11111 _ _l_J

0

bull ~-ail_I

~-

mo(I ---fwj

amp~~~~ ~ ~~ltgtmiddot ~A~

~6

_L-r

bull -~ IBP__l-11Uil n-rlfl-lffll rMCllI 1a 1rr ai

-~ lll-lliI u-W--11a 1 Ml[ 411 amt l0IIC 3JICJ7 ~ 33-1--I- DIID llXII D111 JlMZ 411 lraquo- ~lUN~t --- - etMpound 11JII

~ MffD mmaat ZL I01t 111

1Jlll~-IICfIQfJICIISJ DfEI IC71- I~ 1~ 9 Cl 1VY IICIIWCLl~fCSC~lNCl

~11HltOXW1A~JtCI~llfB MXIC 1HI lME INCi 111M bull11 (S 1f41~middot~-~-)

~ io

0 0 0 0 -0 0 0 D O 1 middot tbull O

_- _pound ~ - Tf middot- ---r ~~ ~~- ~=middoti

r jil7bull --------4~-middot~

(

SCAtpound 1bull bull YI

I ~ tfAIE lIMa toafllltl1E ~NAD1w1(rJ

1 ~ PlIla II MMt QI 11D TD D111oPl

~c1MlntID9~~-l 1NIIJIIKlNI LnlJTU ~ deg qllAJSTE uM011111 iu1II 1111ZT IIIILJaZ

Exhibit C - Photo-Reduced Copy of Activity and Use Limitations Plan of Land

--~middot---

I ~111-11111

iiiii

-ill111liilt

ACJIYIJY ANJ) lJSE lJJll7ATJONS PLAN OF LANI)

81ACJ(81R1 I IINION Flr11lfES SllffllF7AVO SIle

o tfO SOIJIH s1ar HlltlPOtL IIAS

SCAlElrJAt IPfffl152021

1IJrwod Eng1neerlng

- EnQlbullHrlflg Compaffy middot~~=~ m Cm1JQ u fnfJa-eal

~ -

-~

9l1EET 1 OF I 8324-02

td ~

w ~ m 0 0

Id Q ii w ii

co co m

co 0

-l

~-77--raquo- -~I~ )middot~ ~ bull _I lT ~ v~

AI ~ If ~)middot~ 7- ~1 c t11 yil ~ ~ ~middot~41 bull1 l ~~l(i~r~1 f7 )ll y-

~~ f -~ -v fgtV ~ ~ ~ l er-- u -

tl x-P~C ()

JP yen f(( 11 1degpoundS -~ (

ftunrTfflllllTnallJrNNQWDf ~ ti IZNtRlTT lnH M IULS IIJIUIUlA-DlltlllllDlJlllIICIF tJbllt~llC~lJNp

DTl NlllltaJatl-Witiill (raquo11 iiiK(+til

I aJnlTlKATJlfl PlAH~ THE PUIIJll1T UC TIUlf Mlaquo THE l5 11 oawG ~ NII 1Hpound1as Of1111E111 AMllfrlTll9laquolllt Mpound ntem OPlaJ CJ1 IWM1pound BREn 011 bulln

~ ~illi~fli~ _lt ---c~-Clmiddot~~c0-nmiddotmiddot~bullJmiddot04~- ~--~--yen~~bull - L -bull -n ~ -r - ~ -

it

~ fr ~ ~- -~bull~bullv OG- ~n0

bull--ltmiddot middot~ -~- ~~-=~7~st~-~~~~i~~Hil~-) 2~C 0 ~~~~~ --------Y-Tgt-bullbullmiddot-

U-IU ~middotshy =i==-

bullbull bull _ -middot-

~----- ( ~11middot

__IC1ZMJ - bull IOC)0l lftEf ___ i gt mEKJllJfNG rotJ1FRIIIT AIIEAS B~ p~ AIIEAS ~ea-vmiddot LIUIID

~ e--- -+ ~ rzprz1za 1 ~ IJTATC PRC ~TC

nJml lltPtasCltJ

DUD BCD lJlll7 PMC 4H 1 1 YERT1CAL M1llI II NCCI ~ _ ro conurr DOD 80CIC 3JII07 llME 4H I ntaM NUIU 1121 IJ4TAI m IMlC 111111 nATIIW ~fsi

tJMAlfflOlI) AIIEAS1 bull 11AMJSCAlfl) AlpoundAS Lill] 1Dll IOlII POT PlCit 6115 J)-t20 ~atfnujK~tlLWlQI

~PUNMl-17 POflTIVNf1Ell llaD BaalC Tl_ Paa bullbull - 99 a 11

_-ijf1iltDP~IZ~ 5CME - JOSUva1fTLJ ~ ~-rr 111 C tMI=

bull111 I~

i=iiii7

~ e---

t c z rl

L-n11 ~

ACJIVJTY AND USE LIAlffAJIONS

PIAN OF RESTRIC1EJJ AREAS ANJJ COVER TYPES

fltACK1(fN _ llNlltgtI PfMIECCS SllPVFVNlJ51Tlt

JO _ lxJ srJllH STREET IIALPrJU JASS

SCAU I - 30 APRIL 2021

lcnwod Engineering

llarwood Cngnrilgtf cpmy -t~~~~

fIL Pllpa-ru - (1u]1a-lftll

~L=wl f 01~JII IO_

a SIEET I (F 2 B324-02

bj ~

w 0

0 0 deg It

iQ ~ w l11

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 1 of 2

CX) CX)

deg CX) 0

ntllT -1~1~ rurnlaquo1 r1n l1XTM 11Nf -r~ lie UUffCI 11Pt lDll1Hf iniin --IC unr1G Tlr 1n1rn Iota allll Ito tyen1tlll ~~11CRnrzJ11-11--~ci-- n31 nr111w11J1t ~bull c ~- diams JDrnn llloffl rcnlml IDII

-~ ]al rll _ _ PnlM-1-PI lbull-- ll7HrirrIPlllD1lf~-a bullbullll 111bull IClln9XnolDlllIIIIIIOm

214 ff7371JOOT ~bull JllC Ibullbull 171 JICllEY)l)vlUTlo~lUl~ ~li_~ -~~ MDlol ll4L~TllJraquofllllf190abullbullt ~~nQuu~~1aJI _~~OtottWU~1t11txm~arcPbrmllmCDt ~~ ~~ ~ =~ gj ~l11~ llltlM Mrattllll TDPmllIDCDI JJ4bull e~ _ ~ e PClC lbullI- 1- ~1sect~ ~ ~ ~ ~ ~~~-nr~44bull~mn11-a11 ~~ =mt =m~ ~ ~~ ~ =~~-~~ =~~rt~l~llibullltbull=

~~~~~~~~r-~r-~~sectsect55~55 ~~ ~=g~~ mi --1~ ~-==~~m~ L-~r UVPllrlllUillDITDr4L 1JI lbullKlllll~==~~~=~

~~~~~~~~ raquoff-llll 111rritl_aianbull ~11lCla rr- n ttll XDP11r1r 11111c-1C111~ RTl~rJlllllbullbull~llllJlllipo~~=r~tm=~~

~=~3r~t==~ ~=~i==~~ llt1ttl70 m~~n~ =n~ L diams 11- bull - iaEi~mi 1lE~HHffi ~1-~ E LbulllT bullU-7YA 8911U TMn4 OJII C- lllkHrnl1nlntll11106~

MJ9~gt111ftlrfffll11 ~ SbullC61hLJT raquoWl lll~IJlll11amp1 utVllllt a lbulllfGl bulllC lT

lliilH~1 ~~rm-=rn~ lbullIIIICU-1bull0

itt ishwI JUo ma m1 bull 1-c iiliii ~==~m~=~ Ullln U7IIY M1NLl411 fflf f-~ llr IL ~ lbullt Ill uaP11rllDn1rin1bull139nf- na_ 1111lnl ___ lWTDf-ID 111Jbullnllr-cishy

J1JT1 lflTI-noLbull COi lJ1 tsr18GOTDrl1~ 1--Cn ~~~==-=~ LbullS1rbull-p

LbulllI ~middot x1 fl11bull diams an l~J P-~ WI 1~1Slrmsraquo11nirorn 11bull1n-

llrgt 58 - TDrl ZJlJ l~ Zl llf4 Pll1raquo91I lnP~IIEI 11 ==~=-~~ lbullt-11bullh1~

nun_-~bullfllrlll_ lbulll-lrbull N- - nr6-11MII rinaus a 1bull1E-t1 im1 nrxi mr~ 7nn1 4i i 1c m llrS~iJ-ltJlillII Tt-Ul ris ~=~~middotiill~~ tf llDln~n1rJrgt11nbull1ric ~IPgt9nq~ It-MU rbull RflrrlllVllbulltPllbullOIIUAfC lbullnJtrNbull_~lD+4ftJSHJ7711JrllIIIIT144lDI lbulll ~I llfs-mllThn~-f 1bull11

1a5blH=i5gS El~ iE =iilli ~ID aH~~ ~~ leJINNllllfflnlt10ff1nll~1g=TI==~- lbullN~Jmiddot pw nrwuhtl tba11 l- lllllsectimiii~ ~ lllaquot ll116UW41 llllII NII Cl Ld bullt ll 11r 111~-~lHtl-IINOClll 1Dgtn~rMOtnllfbull3all)Mnr~bullwrmm11uoo~ ~r~ m~ = ~~ t~-i m NNtotl n11nn cm

~~~~~Ttr~ in Httl01llxl nlfM114ta cm

JJN n=-PIW - I- C lbullT rnr nnubullNoXI ffllPI n1 11-amp 11middot 77)111fflffPl~JlaUII

i1JJ n91lbull ti Jnlftbulllll QII

~g=~~~~ir~f~5 =i~=~~ ~=~ ~ ~j====goi H1111t-llll ffo~ ~rn tm111 ta1Vl~ tnar- IVI rm u1i ~ nw ~illl cm 1111 Hltt1H T7U 72w111ll tm UI ftffiH~bull1 naMUlI nlll

lltfll~IOUl rnes~ttlClll

~I~~=~=~~= l3111ratlQOJ121lllll CS u1n-n-a mn-c~11111llllilr ~====m~~ lbulllllr~~Oll~r1111-t~rtRiHa)toI

-~rt~_Utr111tt~USI ~m~i==r~~llfflpound1gtgtMllkllit1U10C011 annrxnbull-TCRL11ai~=~=~g)llllll~--rWltMJtt-8 DR Pl rraquof ntl rim Gllf CCI~~1r~~ liiilllii u- ntlt bull llJ~naJCDI

raquo11NMl10~Ullllcm ntrlnK)fL~nlln-1c lllf ~--TlJaft_Lmc i lbull1 bull l3il0 Nl-197) Ttlll1344 a LbullI 3 l diams 1-111 lflS 1111lOllt ffl- MP PII bullHI lgtl llJI l97Mlt Ian -ti DG llC

111111===-~~~=mg ====~~ tD rlrffllZllIITO-lfllCIIII=~tr~L~~~= - Pl~I llII TD_ ff~ tDII31119NIJMlDffU~~ H CZIII liii~mlt~ D1111nrn11GQ~-CaKftQNJWNczr41140ffnQCUII Jnffnt1JIIIIJunbull~1Qc20lll ~Pllli ll mrnnn lbulltlP 17Jrffdeg-degluoElJIIIQII

~-I-ti _nrna~rlll

a n- 4411 llbullQI 1=40 rt La n- lllf ffrgtn _Jr_~ Ullk ---rr~~ ~=~=tl~~ =1 nttltt nraquo 1nlU as

=-mn--~111DJIDII Ullgt~fflflnanaaJIIJalt55~~EIS~=~~ ~~)1 -11CIJII nn~bullbullbullnaKatt1ta1

JOIT ru~- rf- deg hJIIII r- 111111 ~1111) -1 aJ1 ld t11D1etlll_TalCIS -~-UCV~bullraquootur=~=~I~~=~--~ ~rsrgo_mlaquoshym rs~11flI ~- rnilr==~=~~ ~~r _ ~ atfl ~ rtw Dgtlnn-f-lEllln17n-UIIP

D11 fflXTJ111111 I~~ ar D1Jn4 ~leJJS-OnC111

=====5 middoti SHU=~ 5 ampn iliiiiiIiI11

ngtgtn~1~1tbullubull1rm DH tu~- lt11 rirmU1111 CDIII

~i~i555mi~ ~~ ~m=~==m~g===~~~~ tn1r JtW ~ma- PiOll a CU

~ XNr~t~fDllll1-all~~ m===~~ bullbull~W 111111 ==~~ ampT g~ ru~ =

~lU $Et=ni ~ llll0111ra1Ln~otqC011

H~ g==i =~1 ~

~111111 ~~g~n~a~J))pound11 1=~)6tia

~~ mEfHfH~Si

amp12Ct _ an ~

U N711f21th mM1LU aa o1bull~--117CII in4r ~llllll1Vffl-111Dlr lit~ Hmtlpound1 71 12L I CCIII ---~CUnMIIUOCVf JIHtlnn nl 7r ll4011CIIII

llllDNXCWZflDtlltllCIDCDr

~~=~==~=gnn n1raquoL bullw noanDNt CIJIIi=~ C~middot ~ ~ ~ HnffTI-QIJroQ__111PtlJIIInfflll bullbull1~ aaeIT t-- nrJD nJUntu~CllWI

m ~1 ~ ~~~ ~ ilria~gliiiji~=ir ~lt-OTT gl1raquo ~Iraquou fflllIL nllll 1111111 flC~middotIY_4allCCIIIi l1i5~ ~~11~middot~ ~~ ffll H71W786lll 7P-JOalllllll 2N ~ 1-flllt 7HIJl4- DI ~ ~==~ ~t-tr bullM-

114 Hit71aTra7ririatNOCIIII

llHl1Hf ll~7Dl4fIZIIICIIII 1141ftillf+1DllnTgtlMa~=~bull==~r Lbulll-lllbullbulllJJ

=~~~HR-~a ~ =iEri ~ ~=6

= 1MESE COCIIIOlfAlEi ARC 9~ at AH DISTlfG CONJmOfS AS-alLT FED 5UKiEY Y NORWDal EJICltJIJll(G CD~ IIElMEN ~ 1S 111 DECDaR a 2DII 1)pound OCICIIIDNAlES 5HCflI UIpound IIAID Cit MltSSAOfllffT5 STATE FlJriNII CDCffllNAT smult ~AO leJ (IMIJ 1HE ACQlltACY ltF 1HE COCftDINT[ LDCAnatS Mpound diams- 01 FtU

POINT DESCRIPTION ABBREVIATIONS~-~middotPC Pmlr Of CLIRIJC bullIEllL ClMNpound STilRlS PDC bull PtJtilTIIJOM1poundr ~ [raquo TAHCINiT W(R[ lll[ CURpound uroo Fo F[1NT(1t~tfflvt[ltft1llllIIUlt OMNtilE)PRC ~T oT ~pound ~Vlllrlt

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 2 of 2

I ~ IHAT nfl PlM MS 81D1 PIIDMQl ~WllTM(llUI MOIIEOIAAlPlllR~Df IIUPS C- lttE ~111 Cl__ HftNMIIIZlt

WWWWJU Cii6 liftitit

ACTIVITY ANI) USE LINTATIONS

PLAN OF RES7RIC1EJJ AREAS ANJJ COlER TYPES

8V CKlJ()RN IJNl()N PflllfpoundCpoundS SlllERFIIMJ SITC

50 HJ S(J11( SmEpoundT llAIPOIL JASS

=r-o ~ ll 2021

~ Engmeer1ng

Hltd ~~ middot~~-=~ra (f~AJ lIQ c- f

a llfEET 2 ltF 6324-02

td ~

w ~ m 0 0

Id Q ii w m

co co m 0 co

Bk 39600 Pg437 88608

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY New England Region

Five Post Office Square - Suite 100 Boston Massachusetts 02109-3912

INSTITUTIONAL CONTROL DESIGN STATEMENT FOR THE BLACKBURN AND UNION PRIVILEGES SUPERFUND SITE - EAST OF SOUTH STREET AREA

1 Introduction

Pursuant to the Comprehensive Environmental Response Compensation and Liability Act 42 USC sect 9601 et seq (CERCLA) and the National Contingency Plan 40 CFR Part 300 (the NCP) this document contains a description of the release events and site history that resulted in the contaminated media that require institutional controls in the fom1 of Activity and Use Limitations the basis for land use restrictions and uses that are consistent and inconsistent with the Selected Remedy ( as described below) This Institutional Control (IC) Design Statement pertains to a portion of the Blackburn and Union Privileges Superfund Site located in the Town of Walpole Massachusetts (the Site) which has been listed on EPAs National Priorities List (NPL) which portion is generally referred to as the East of South Street Area (the EOS Area) The EOS Area is located to the east of South Street in Walpole and is shown on Figure 1 attached hereto

A Notice of Activity and Use Limitation (NAUL) is necessary and appropriate for the EOS Area of the Site based on the fact that pursuant to EPAs risk evaluations asbestos arsenic trichloroethene (TCE) and certain polycyclic aromatic hydrocarbon (PAH) contan1inants remain in place in soils at levels higher than those appropriate for unlimited use or unrestricted exposure groundwater underlying the EOS Area contains hazardous substances at levels that present an unacceptable risk of exposure and remedial measures at the Site must be protected and maintained to ensure that the Selected Remedy remains protective

EPAs Record of Decision (ROD) dated September 30 2008 specified the need for institutional controls such as a NAUL to ensure long-tenn perfonnance and protectiveness of the Selected Remedy The institutional controls described herein are necessary and appropriate to ensure that the Selected Remedy for the Site remains protective of human health and the environment The remedy for the Site as described in the ROD is referred to herein and in the NAUL as the Selected Remedy

Page 1 of7

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 7: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

Bk 39600 Pg412 88608

3 Obligations and Conditions The following obligations andor conditions are necessary and shall be undertaken at the Property to maintain the Selected Remedy and to avoid compromising the Permanent Solution that has been achieved for the Site

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

11 If EPA has provided written notice that EPA has determined that the parties responsible under the OampM Plan are no longer able to submit an annual compliance letter regarding this NAUL the owner of the Property shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the Restricted Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such cel1ifications are based

4 Emergency Excavation If it becomes necessary to excavate within the Restricted Area as pal1 of a response to an emergency (for example repairing utility lines or responding to a fire or flood) the provisions of Paragraph 1 of this Notice shall be suspended with respect to such excavation to the extent necessary to permit such response provided that the Owner

(i) orally notifies the following persons of such emergency as soon as possible but no later than two (2) hours after having learned of such emergency

A EPA National Response Center at (800) 424-8802 and EPA Region 1 Office of Site Remediation and Restoration Emergency Planning and Response Branch at 888-3 72-7341 and

B MassDEP Emergency Response at (888) 304-1133 and MassDEP Southeast Regional Office of Emergency Response Section at 508-946-2850

or such other persons as MassDEP and EPA respectively may identify in writing from time to time to Owner for such oral emergency response notifications

(ii) notifies MassDEP and EPA in writing of such emergency no later than five (5) days after having learned of such emergency such notifications to be sent to the following addresses

A MassDEP Southeast Regional Office 20 Riverside Drive Lakeville MA 02347 and

Page 7 of 12

Bk 39600 Pg413 88608

B EPA New England Region I 5 Post Office Square - Suite 100 Boston MA 02109-3912

or to such addresses as MassDEP and EPA respectively may identify in writing from time to time to Owner for such written emergency response notifications

(iii) limits the actual disturbance involved in such excavation to the minimum reasonably necessary to adequately respond to the emergency

(iv) implements all measures necessary to limit actual or potential risk to the public health and environment

(v) engages a qualified hazardous waste site cleanup professional such as a Licensed Site Professional (LSP) as defined in the MCP at 310 CMR 400006(12) to oversee the implementation of this Paragraph and to prepare and oversee the implementation of a written plan (Emergency Restoration Plan) that will restore the Property to a condition that meets or exceeds the performance standards established under the ROD for the Selected Remedy and that is consistent with this Notice and to review and evaluate response actions contained in the Emergency Restoration Plan to ensure minimal disturbance of any contaminated soils and sediments and

(vi) performs all actions laid out in the Emergency Restoration Plan within thirty (30) days of the occutTence of the emergency or within such other time period as may be approved by MassDEP and EPA in writing and submit a copy of the Emergency Restoration Plan to MassDEP and EPA within ten (10) days of its performance with a statement from the cleanup professional confirming that the Property has been restored to the standard described above

5 Proposed Changes in Activities and Uses Amendments Pursuant to 310 CMR 4001 l l(amp)(c) the Owner must notify and obtain approval from EPA and MassDEP of any proposed change in activities and uses at the Property that is not provided for in this Notice Pursuant to 3 IO CMR 400111 (8)( d) the Owner must obtain EPA and MassDEP approval of any Amendment or Termination of this Notice All EPA and MassDEP approvals of any Amendment or Termination of this Notice must be in writing and be recorded andor registered with the appropriate Registry(ies) of Deeds andor Land Registration Office(s) to be effective

6 Violations The activities uses andor exposures upon which this Notice is based must not change at any time to (a) cause risks that are not protective of human health or the environment pursuant to the criteria set forth in the NCP at 40 CFR

Page 8 of12

Bk 39600 Pg414 88608

300430(e)(2)(i) (b) interfere with the Selected Remedy or (c) cause a significant risk of harm to health safety public welfare or the environment pursuant to Chapter 21E and the MCP

Compliance with the terms and conditions of this Notice is subject to enforcement pursuant to Chapter 21 E the MCP MGL c 21 A sect 16 and 310 CMR 5 00 and CERCLA and the NCP Such enforcement may include without limitation enforcement with respect to (a) any activities or uses that may occur that are described in Paragraph 2 of this Notice as being inconsistent with the Selected Remedy (b) any failure to undertake any obligations and conditions described in Paragraph 3 of this Notice as being necessary to maintain the Selected Remedy and (c) any other failure to maintain the Selected Remedy or Pem1anent Solution resulting from a failure to act consistently with this Notice

7 Incorporation Into Deeds Mortgages Leases and Instruments of Transfer This Notice shall be incorporated either in full or by reference into all future deeds easements mortgages leases licenses occupancy agreements or any other instrument of transfer whereby an interest in andor a right to use the Property or a portion thereof is conveyed in accordance with 310 CMR 401074(5)

8 Reservation of Rights

This instrument shall not limit or otherwise affect the right of EPA andor MassDEP to obtain access to or restrict the use of the Property pursuant to CERCLA Chapter 21 E or any other applicable statute or regulation

This instrument shall not release the Owner or any other party from liability for releases of oil or hazardous substances or materials nor shall this instrument excuse the Owner or any other party from complying with CERCLA Chapter 21 E or any other applicable federal state or local laws regulations or ordinances or by-laws

Owner hereby authorizes and consents to the filing and recordation andor registration of this Notice said Notice to become effective when recorded andor registered with the appropriate Registry(ies) of Deeds andor Land Registration Office(s)

Page 9 of 12

Town of Walpole acting by and through the Board of Selectmen

n Town Administrator authorized by ard of Selectmen recorded herewith

Bk 39600 Pg415 88608

Witness the execution of this instrument under seal this 21_ day of df 11 ( 2021

COMMONWE

COUNTY OF NORFOLK ss

~ On this 21 day of 4f1 2021 before me the undersigned notary public

personally appeared James Johnson as Town Administrator for the Town of Walpole and proved to me to through satisfactory evidence of identification which was ~6laquo~ ~ -fr VJ1e [indicate ifdrivers license or passport or other document] to be the person whose name is signed on the preceding or attached document and acknowledged to me that signed it voluntarily for its stated purpose

Name CA~ U ~

My Commission Expires July S 2t)z

Page 10 of 12

--------

Bk 39600 Pg416 88608

In accordance with CERCLA 42 USC sect 9601 et seq and the National Contingency Plan the United States Environmental Protection Agency Region I hereby approves this Notice of Activity and Use Limitation

Name 8r~Cltvi Olso Director Superfund and Emerncy Management Division (SEMO)

US Environmental Protection Agency Region I

In accordance with MGL c 21E sect 6 and the Massachusetts Contingency Plan (310 CMR 400000) the Department of Environmental Protection hereby approves this Notice of Activity and Use Limitation (as to form only)

Date Paul W Locke Assistant Commissioner Bureau of Waste Site Cleanup Department of Environmental Protection

Page 11 of 12

---------------

Bk 39600 Pg417 88608

In accordance with CERCLA 42 USC sect 9601 et seq and the National Contingency Plan the United States EobulliionmenlaJ Protectioo Agency Region I hereby appro1es this Notice of Activity and Use Limitation

Date ~------

Name Director Superfund and Emergency Management Division (SEMO)

US Environmental Prokction i0 ency Region I

Jn accordance with MGL c 21 E sect 6 and the Massachusetts Contingency Plan (310 CMR 400000) the Depamnent ofEmironmental Prolectioo hereby approves this Norice ofActivity

and Use Limilarioo (as ro funn ooly)_ ~~

Dale 4r S microlJ ~ Paul W Locke Assisrant Commissioner Bureau ofWaste Site Cleanup Department of Environmental Protection

Page 11 of 12

Bk 39600 Pg418 88608

List of Exhibits

Exhibit A Legal Description of the Property Exhibit B Legal Description of the Restricted Area and Coordinates of Cover Types Exhibit C Photo-Reduced Copy of Activity and Use Limitations Plan of Land Exhibit D Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table Exhibit E Institutional Control Design Statement (EOS) Exhibit F Copy of Vote of Town of Walpole

Return to

Attn Kristine Sheehy Senior Real Estate Attorney FOLEY HOAG LLP Seaport West 155 Seaport Boulevard Boston Massachusetts 02210-2600

Page 12 of 12

Bk 39600 Pg419 88608

EXHIBIT A

Legal Description of Property The land with the improvements thereon located in Walpole Norfolk County Massachusetts bounded and described as follows

PARCEL I

The land on the Southeasterly side of South Street bounded

NORTHWESTERLY NORTHERLY AND AGAIN NORTHWESTERLY by South Street by seven lines measuring respectively

17027 feet 120 feet 22011 feet 1653 feet 325 89 feet 4515 feet and 1497 feet

NORTHEASTERLY by Gleason Court 2627 feet

SOUTHEASTERLY AGAIN NORTHEASTERLY AND AGAIN SOUTHEASTERLY by land now or fom1erly of Santomarco by five lines

measuring respectively 6750 feet 2050 feet 1190 feet 2952 feet and 2001 feet

NORTHEASTERLY AGAIN by said land of Santomarco and land now or formerly of Cashorali 10056 feet

NORTHWESTERLY AGAIN by said land of Cashorali 2845 feet

NORTHEASTERLY by land now or formerly of Muighitti 9007 feet

SOUTHEASTERLY by the location of Old Colony Railroad by three lines measuring respectively 6809 feet 32808 feet and 38250 feet

and

SOUTHWESTERLY by land now or formerly of Meyer by three lines AND SOUTHERLY measuring respectively 9143 feet 1998 feet and

15202 feet

Parcel I is described in the deed recorded with the Norfolk County Registry of Deeds in Book 4459 Page 287

A portion of said premises is shown on plan entitled Plan of Land in Walpole Mass Belonging to General Fibre Co Inc by Edward C Peterson CE dated January 16 1960 filed with the Norfolk Registry of Deeds as Plan No 849 of 1967 in Plan Book 223 and the remainder is shown on plan entitled Plan of Land in Walpole Massdeg by E Worthington Engineer dated February 6 193 7 recorded with said Deeds Book D2135 Page 8 I

FHBOSTON52454092

Bk 39600 Pg420 88608

PARCEL II Property known as Parcel 33-120 of the Town of Walpole Tax Assessors Map which is

part of the property situate in the Town of Walpole County ofNorfolk and Commonwealth of Massachusetts and being all of the right title and interest of The Penn Central Corporation in and to all those certain pieces or parcels of land and premises easements rights of way and any other rights of any kind whatsoever appurtenant thereto or used in conjunction therewith on and along a portion of Branch of Railroad known as the Wrentham Branch said portion of railroad being described as follows

Beginning at a line extended across the right of way of said Branch of rai road said line being the Northerly line of South Street and extending thence in a Northeasterly direction the distance of 2852 feet more or less along said Branch of rai Iroad to a line which is parallel with the Southwesterly line of Common Street said parallel line extending across said right of way through a point in the centerline thereof at railroad valuation survey station 733 + 67 more or less and being the place of ending

Parcel II is described in the deed recorded with the Norfolk Registry of Deeds in Book 7986 Page 372 and is a portion of the land shown on the plan recorded with said Deeds as Plan No 52 of 1983

FHBOSTON52454092

Bk 39600 Pg421 88608

Exhibit B Legal Description of the Restricted Area and Coordinates of Cover Types

Le2al Description for Restricted Area The area shown on the plan entitled Activity and Use Limitations Plan of Land Blackburn amp Union Privileges Superfund Site 50 amp 60 South Street Walpole Mass Scale l = 30 dated April 6 2021 by Norwood Engineering Company Inc recorded with the Norfolk Registry of Deeds in Plan Book 704 Page 41 being bounded and described as follows

Beginning at a point on the easterly sideline of South Street at the southerly point of curvature of Gleason Court on said plan thence

Northeasterly and curving to the right along an arc of a curve having a radius of twentyshyfive and 00100 (2500) feet a length of forty-five and 15100 (4515) feet thence

S 48deg1352 E a distance of twenty-two and 24100 (2224) feet the previous course by the southerly sideline of Gleason Court thence

s 32deg0208 w a distance of fifty-four and 78100 (54 78) feet thence

S 59deg27 32 E a distance of twenty and 50100 (2050) feet thence

S 47deg5252 E a distance of eleven and 90100 (1190) feet thence

S 49deg01 10 E a distance of twenty-nine and 58100 (2958) feet thence

s 38deg3108 w a distance oftwenty and 01100 (2001) feet thence

S 49deg00 57 E a distance of one hundred and 56100 (10056) feet thence

N 39deg5348 E a distance of twenty-eight and 45100 (2845) feet the previous seven (7) courses by land ofNF Thelma A Casborali thence

S 49deg0808 E a distance of ninety and 29100 (9029) feet the previous course by land ofNF Ming L Yau thence

s 25deg2312 w a distance of siliy-eight and 22100 (6822) feet to a point on the westerly sideline of a fonner railroad right of way the previous course by land of the Town of Walpole assessor parcel 33-121 thence

S 55deg2937 E a distance of ninety-nine and 78 100 (99 78) feet to a point of tangency on the easterly sideline of a forn1er railroad right of way thence

Page 1 of 13

Bk 39600 Pg422 88608

s 30deg11 32 w

S 23deg49 I6 W

N 66deg1044 W

N 23deg4908 E

N l 6deg00 52 E

S 37deg0240 E

N 10deg1437 W

N 34deg093 I W

N 11 deg5558E

Northeasterly

N 27deg41 48 E

a distance of three hundred and three and 74100 (30374) feet the previous course by land ofNF Nicholas H Dowd and NF Emilio P Baldassari thence

a distance of four hundred ninety and 86100 (49086) feet to a SBdh the previous two (2) courses by the easterly sideline of a former railroad right of way thence

a distance of eighty-two and 76100 (8276) feet to an Iron Pipe on the westerly sideline of the former railroad right of way thence

a distance of twelve and 09100 (1209) feet to a SBdh thence

a distance of ninety-six and 50100 (9650) feet to a S Bdh thence

a distance of fifteen and 00100 (1500) feet the previous three (3) courses by the westerly sideline of the former railroad right ofway and land of NF Joseph R Carpentieri and NF Joseph R and Faith N Carpentiero thence

a distance of ninety-two and 82100 (9282) feet the previous course by land ofNF Richard A and Josette M Burke thence

a distance of tvvo hundred thirty-seven and 86100 (23786) feet to a point on the easterly sideline of South Street thence

a distance of one hundred twenty and 00100 (12000) feet along the easterly sideline of South Street to a point of curvature of the easterly sideline of South Street thence

and curving to the right along an arc of a curve having a radius of eight hundred and 00100 (80000) feet a length of two hundred hventy and 11100 (22011) feet along the easterly sideline of South Street thence

a distance of three hundred forty-hvo and 42100 (34242) feet to the point of beginning

Containing 621 Acres of land more or less

Page 2 of 13

3000

3005

3010

3015

3020

3025

3030

Bk 39600 Pg423 88608

EXHIBIT B (cont)

Points and Coordinates associated with Restriction Areas and Cover Types for the Activity and Use Limitations (AUL) at 50 amp 60 South Street Walpole Mass

Point Northing Easting Type

Curve Curve Number Len2th Radius

28754430528 7236432250 COR

3001 28755604597 7236680368 PC L=7535 R=80000

3002 2875597 1222 7236766913 POC

3003 28756333366 7236870620 PT

3004 28756280754 723697 3031 COR

28756025570 7237001250 COR

3006 28755918670 7237001140 COR

3007 28755864440 7237 I 05890 COR

3008 28755903200 72371963 IO COR

3009 28756030893 7237217396 COR

28756042534 7237250325 COR

3011 28756021733 7237317808 COR

3012 28755800732 7237640949 COR

3013 2875552 1424 7237667395 COR

3014 28755321388 7237708416 COR

28755197081 7237834881 COR

3016 28755102230 7238045173 COR

3017 28754941531 7238291869 COR

3018 28754851375 7238512944 COR

3019 28754753441 7238824 760 COR

28754681541 723916 1881 COR

3021 28754608227 7239406506 COR

3022 28754515846 7239459928 COR

3023 2875426 7589 723943 8163 COR

3024 28754198016 7239590840 COR

28753886764 7239449006 COR

3026 2875329 7944 7239187206 COR

3027 28752506745 7238837890 COR

3028 28751859560 7238552142 COR

3029 28751221833 723827342 l COR

28750848788 7238107869 COR

3031 2875045 3654 7237927814 COR

3032 28750630420 7237527432 COR

3033 28750741023 723757 6257 COR

3034 28751668594 7237842488 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 3 of 13 April 14 2021

3035

3040

3045

3050

3055

3060

3065

3070

Bk 39600 Pg424 88608

Point Number

Northing Easting Type Curve Leneth

Curve Radius

28751548848 7237932869 COR

3036 28752462269 7237767802 COR

3037 28756438461 7236904209 POC L=2207 R=80000

3038 28756543084 7236939245 PT

3039 2875653 7987 7236954123 PC

28756597578 7237007344 POC L=1651 R=937

3041 28756594465 7237087181 PT

3042 28756459044 7237347021 PC L=347 R=220

3043 28756432531 7237363546 PT

3044 28756280644 7237286201 COR

28755924210 7237966952 COR

3046 28756081959 7238048554 PC L=472 R=236

3047 28756064922 7238084404 PT

3048 28755523491 7237845047 COR

3049 28755419845 7238081981 COR

28755460757 7238099621 PC L=240 R=l57

3051 28755467701 7238120241 PT 3052 28755398690 7238275280 COR

3053 28755365410 7238264910 COR

3054 28755087149 7238900449 COR

28755158001 7238931521 COR

3056 28755040360 7239199770 COR

3057 28755311720 7239318930 COR

3058 28755263010 7239429300 COR

3059 28755388260 7239484290 COR

28755348660 7239576000 COR

3061 28755625470 7239696500 COR

3062 28755664605 7239606601 COR

3063 28755736202 7239637768 COR

3064 28755621870 7239897370 COR

287 5567 6160 7239920410 COR

3066 28755718270 7239830260 COR

3067 2875587 9750 7239900310 COR

3068 28755718790 724026 7600 COR

3069 28755763390 7240285350 COR

28756035900 7239926600 COR

3071 28756086280 7239812770 COR

3072 28756089984 7239813649 COR

3073 28756229128 7239501910 PC L=482 R=l54

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 4 of 13 Apnl 14 2021

3075

3080

3085

3090

3095

3100

3105

3110

Bk 39600 Pg425 88608

Point Number

Northing Easting Type Curve Length

Curve Radius

3074 28756257366 7239513984 PT

28756185799 7239674928 COR

3076 28756739833 7239921136 COR

3077 28756876060 7239682275 COR

3078 28756948336 7239735898 PC L=335 R=298

3079 28756958235 7239766064 PT

28756866081 7239978133 COR

3081 28757166275 7240127374 COR

3082 28757068320 7240314640 COR

3083 28757602980 7240594310 COR

3084 28757700050 7240408736 COR

28758247941 7240688376 COR

3086 28758250190 7240683910 COR

3087 28758344979 7240738168 COR

3088 2875843 6103 7240581527 COR

3089 28758602943 7240664224 COR

28758740024 7240397393 COR

3091 28758605706 724032 7776 PC L=477 R=309

3092 28758594882 7240286013 PT

3093 28758666635 7240197585 PC L=2573 R=3127

3094 28758767113 7240118710 POC

28758890752 7240086604 PRC L=I653 R=3993

3096 28758972305 7240074125 POC

3097 28759049552 7240045 I 52 PT

3098 28759330312 7239734408 COR

3099 28759459414 7239588584 PC L=2269 R=5217

28759524821 7239496174 POC

3101 28759568752 7239391829 PRC L=1814 R=486

3102 28759603259 7239308095 POC

3103 28759653883 7239232999 PCC L=l31 R=088

3104 28759665694 7239231411 PT

28759800587 7239299586 COR

3106 28759986288 7238981214 COR

3107 2875983 5797 7238891829 COR

3108 28759879750 7238798689 COR

3109 28759905380 7238754769 PC L=1600 R=2552

28759963590 7238700398 POC

3111 28760035727 7238666620 PT

3112 28760700665 723901 5672 PC L=4515 R=2500

3113 28760830230 7239191198 POC

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 5 of 13 April 14 2021

3115

3120

3125

3130

3135

3140

3145

3150

Bk 39600 Pg426 88608

Point Number

Northing Easting Type Curve Len2th

Curve Radius

3114 2876077 263 6 723 940 1624 PT 28760624518 7239567466 COR

3116 28760160100 7239276864 COR

3117 28760055928 7239453423 COR

3137 28759976118 7239541692 COR

3118 28759782139 7239764992 COR

3119 28759625581 7239640375 COR

28758966057 7240399493 COR

3121 28759184326 7240581973 COR

3122 28758593598 724126478] COR

3123 28757977293 724097 2314 COR

3124 28757716516 7241351659 COR

28757288251 7241140719 COR

3126 28756725827 7240851862 COR

3127 28756162468 7240586126 COR

3128 28755614498 7240338506 COR

3129 28754346745 7239768507 COR

28753845716 7239540194 COR

3131 28753257436 723927 8634 COR

3132 28752466355 7238929370 COR

3133 28751819340 7238643698 COR

3134 28751181527 7238364939 COR

28750807772 7238199071 COR

3136 28750413263 7238019301 COR

3138 28756920317 7237298739 PC L=l941 R=2104

3139 28756827128 7237274848 POC

28756733047 7237294944 PRC L=401 R=l66

3141 2875671 1336 723 727 2844 PCC L=1492 R=13345

3142 28756744594 7237206091 POC

3143 28756781529 7237141301 PCC L=1419 R=l018

3144 28756833084 7237094642 POC

28756902566 7237091952 PCC L=2413 R=157959

3146 28757017337 7237129167 POC

3147 28757131820 7237167258 PCC L=330I R=S0000

3148 28757282552 7237234442 POC

3149 28757431866 7237304721 PT 28757338390 7237495930 COR

3151 28757541620 7237605380 COR

3152 28756897590 723883 4280 COR

Exhibit B to NA UL-Part 11-EOS Coordinate Tables Page 6 of 3 April 14 202

3155

3160

3165

3170

3175

3180

3185

Bk 39600 Pg427 88608

Point Northing Easting Type Curve Cunbulle

Number Lenszth Radius 3153 28756870623 7238820218 COR

3154 28756838273 7238882258 COR

28756865240 7238896320 COR

3156 28756777004 7239062996 COR

3157 28756770439 7239063663 PC L=l 146 R=2269

3158 2875665836 I 7239046180 PCC L=l423 R=957

3159 2875661 7520 7238989913 POC

28756625544 7238920850 PT

3161 28756728525 7238726583 PC L=232 R=l58

3162 28756748720 7238720236 PT

3163 28756899634 7238797341 COR

3164 28757254653 7238121363 COR

28757520153 723761266 7 COR

3166 28757306899 723 750 IO 10 COR

3167 28756690336 7237500169 PC L=243 R=I68

3168 28756682599 7237479273 PT

3169 28756686990 7237469583 PC L=0250 R=l68

28756708806 7237463018 PT 3171 28757000109 7237616354 PC L=233 R=l73

3172 28757005368 7237637270 PT

3173 28757000998 7237645513 PC L=233 R=l69

3174 28756980219 7237651023 PT

28756429209 7238339422 COR

3176 28756342982 7238506849 COR

3177 28756500076 7238596485 PC L=l19 R=l48

3178 28756499701 7238608072 PT 3179 2875644 7813 7238705611 PC L=l 182 R=483

28756358177 723 869 0707 PT

3181 2875623 6099 7238376388 PC L=443 R=467

3182 28756235611 7238333779 PCC L=343 R=9IO

3183 28756249049 7238302418 PCC L=412 R=9IO

3184 28756278952 7238274519 PCC L=368 R=300

28756313362 7238277619 PT

3186 28756282498 7238911796 PC L748 R=216

3187 28756240650 7238919721 PT

3188 28756126081 7238620406 PC L=323 R162

3189 28756138645 7238591575 PCC L=333 R=283

Exhibit B to NAUL-Part II-EOS Coordmate Tables Page 7 of 13 April 14 2021

3190

3195

3200

3205

3210

3215

3220

Bk 39600 Pg428 88608

Point Number Northing Easting Type Curve

Leneth Curve Radius

28756163375 7238602867 PT

3191 2875523 0908 7238765275 COR

3192 28755205040 7238752740 COR

3193 28755391740 7238328470 COR

3194 28755466840 7238361040 COR

28755452760 7238392590 COR

3196 28755516920 7238421040 COR

3197 28755530690 7238388730 COR

3198 28755603230 7238421460 COR

3199 2875555 7568 723852 7053 COR

28755371220 7238445330 COR

3201 28755629198 7238558466 COR

3202 28755676040 7238453290 COR

3203 28755925410 7238563840 PC L=1902 R=3548

3204 28755927383 7238658634 POC

28755954390 7238749520 PT 3206 28755974770 7238807230 COR

3207 28755779200 7238881701 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

28755746700 7238609997 COR

3211 2875593774 7239036608 COR

3212 28756048460 7238996850 PC l=1445 R=2903

3213 28756070631 7239065422 POC

3214 28756109010 7239126420 PT

28756153820 7239182190 PC L=S98 R=848

3216 28756171980 723923 7880 PT

3217 287S6026148 7239566166 COR

3218 28756003865 7239556465 COR

3219 287S6134380 7239256650 COR

28755998460 7239195370 COR

3221 2875600 71S0 7239174530 COR

3222 28756001791 7239172152 COR

3223 28756040451 7239079437 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 8 of 13 April 14 2021

Bk 39600 Pg429 88608

Point Number

3210

3200

3056

3057

3058

3059

3060

3061

3062

3218

3219

3220

3221

3224

3225

3226

3227

3228

3070

3071

3234

3233

3235

3236

3237

3238

3239

3240

3241

3242

3243

3244

3245

3246

3247

3248

Northing

28755746700

28755371220

28755040360

28755311720

28755263010

28755388260

28755348660

2875562 54 70

28755664605

28756003865

28756134380

28755998460

28756007150

28755941340

28755962080

28755867937

28755819702

28755766128

28756035900

28756086280

28755991990

28755942100

28756477248

28756677238

28756650130

28756473307

28756480112

28756675030

28756724454

28756742099

28756742133

28756703924

28756640759

28757607280

28757401530

28757467350

Easting

7238609997

7238445330

7239199770

7239318930

7239429300

7239484290

7239576000

7239696500

7239606601

7239556465

7239256650

7239195370

7239174530

7239145324

7239100930

7239061674

7238935003

7238911508

7239926600

7239812770

7239769910

7239884050

7239261913

7239253008

7239321810

7239319038

7239298824

7239364440

7239271845

7239292625

723935 0187

7239393239

7239393096

7237584960

7237475300

7237345620

Type

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

PC PCC

POC

PCC

PT

COR

COR

COR

Curve Len2th

L=273

L=ll77

L=657

Cunmiddote Radius

R=1421

R=810

R=679

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 9 of 13 April 14 2021

Bk 39600 Pg430 88608

Point Number Northing Easting Type Curve

Len2th Curve Radius

3249 287 57514570 7237372360 PC l=ll05 R=1993

3250 287 57 588060 7237452980 PT

3251 28757631382 7237429676 PC L=2244 R=2352

3252 287 5765 6810 7237537876 POC

3253 2875 762 9720 7237645671 PT

3254 28756940655 7238952710 PC l=1493 R=1509

3255 28756901845 7239015577 POC

3256 2875683 7836 7239052474 PT

3257 28758104824 7237653014 COR

3258 28758028960 7237800160 COR

3259 28757949530 7237760790 COR

3260 28757901005 7237855021 COR

3261 28757839230 7237820908 PC L=273 R=l33

3262 28757830688 7237799810 PCC L=539 R=2144

3263 28757852974 7237750897 PT

3264 28757891705 7237688178 PC L=lS26 R=2432

3265 28757948636 7237637880 POC

3266 287 58018307 7237607597 PT

3248 28757467350 7237345620 COR

3267 28757550832 7237363444 POC L=2653 R=80000

3268 28757668809 7237424132 PT

3269 28757504 719 7238817989 COR

3270 28757493010 7238842230 COR

3271 28757561074 7238880970 COR

3272 28757483953 7239024127 PC L=323 R=l70

3273 28757459939 7239037846 PT

3274 28757311605 7238957122 PC L=1388 R=906

3275 2875727 2732 7238901647 POC

3276 28757283181 7238834718 PT

3277 287 5733 4061 7238752337 PC L=255 R=l60

3278 287 5735 5527 7238744411 PT

3279 2875 7102815 7239517199 PC l=261 R=l70

3280 28757080654 7239525307 PCC l=909 R=1275

3281 2875 700 5390 7239477911 PCC L=l007 R=990

3282 28756999624 7239381704 PT

3283 2875707 7705 7239230604 PC L=ll14 R=907

Exhibit B lo NAUL-Part IlbullEOS Coordinate Tables Page 10 of13 April 14 2021

3285

3290

3295

3300

3305

3310

3315

Bk 39600 Pg431 88608

Point Number Northing Easting Type

Curve Leneth

Curve Radius

3284 28757168066 7239178102 PT

28757205717 7239186398 PC L=518 R=930

3286 28757249003 7239213534 PCC L=l41 R=086

3287 2875724 7909 7239226048 PT

3288 28758415755 7239842757 PC L=251 R=l59

3289 28758437695 7239837379 PT

28758456377 7239846949 PC L=812 R=876

3291 28758494897 7239915165 PCC L=456 R=757

3292 28758483790 7239958646 PT

3293 28758405147 7240111348 PC L=l057 R=955

3294 28758318136 7240161452 PCC L=477 R=l063

28758272407 7240149529 PCC L=250 R=l60

3296 28758265647 7240128003 PT

3297 28758157937 7237680895 COR

3298 28758902927 723807 1969 COR

3299 28758852531 7238168280 COR

28758779660 7238129750 COR

3301 28758746973 7238192072 COR

3302 2875807 6630 7237840490 COR

3303 28758049940 7237894220 COR

3304 2875871 7997 7238243620 COR

28758680103 7238315946 COR

3306 28758533699 7238239240 COR

3307 2875852 6899 7238252220 COR

3308 28758098180 7238027600 COR

3309 28757974484 7238264223 COR

28757957598 7238255513 COR

3311 28757757732 7238637845 COR

3312 28757774584 7238646620 COR

3313 28757653710 723887 7846 COR

3314 28757560920 7238829340 COR

28759004930 7238125514 COR

3316 28759689797 7238485028 PC L=1992 R=2609

3317 28759697204 7238583760 POC

3318 28759667288 723867 8142 PT

3319 28758996126 7238323718 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 11 of 13 April 14202 I

Bk 39600 Pg432 88608

Point Number

Northing Easting Type Curve Lenfth

Curve Radius

3320 28759028950 7238261560 COR 3321 28758954486 7238222188 COR

3322 28758972523 7238378387 COR 3323 28759421550 7238613630 COR 3324 28759377933 7238698105 COR 3325 2875907 4811 7238539289 COR 3326 28759081611 7238526309 COR 3327 28758935210 7238449604 COR

3328 28759464470 7238637330 COR 3329 28759632674 7238722481 PC L=ll83 R=l578

3330 28759583973 7238755474 POC 3331 28759526573 7238768343 PRC L=2163 R=2455

3332 28759422964 7238796123 POC 3333 28759341091 7238865430 PT

3334 28759193370 7239050710 COR 3335 28759416340 7239163940 COR 3336 28759263600 7239455620 COR 3337 28759043690 7239336510 COR 3338 28758935490 7239552130 COR 3339 28757650890 7238883240 COR 3312 28757774584 7238646620 COR 3311 28757757732 7238637845 COR 3310 28757957598 7238255513 COR 3309 28757974484 7238264223 COR 3308 28758098180 723802 7600 COR 3307 28758526899 7238252220 COR 3306 28758533699 7238239240 COR 3340 28758700033 7238326388 COR 3341 28758675436 7238373334 COR 3342 28758733013 7238403500 COR 3343 28758760858 7238350353 COR 3344 28758860952 7238402796 COR 3345 28758833106 7238455943 COR 3346 28758890683 7238486109 COR 3347 28758915280 7238439162 COR 3326 28759081611 7238526309 COR 3325 28759074811 7238539289 COR

Exhibit B to NAUL-Part H-EOS Coordinate Tables Page 12 of l3 April 14 2021

Bk 39600 Pg433 88608

Point Number

Northing Easting Type Curve Len2th

Cunbulle Radius

3324 2875937 7933 7238698105 COR

3082 28757068320 7240314640 COR 3083 28757602980 7240594310 COR 3349 28757790234 7240236327 COR

3348 28757255574 7239956657 COR

3124 28757716516 7241351659 COR 3125 28757288251 7241140719 COR 3126 28756725827 7240851862 COR 3127 28756162468 7240586126 COR 3128 287 55614498 7240338506 COR 3129 28754346745 7239768507 COR 3130 28753845716 7239540194 COR 3131 28753257436 723927 8634 COR 3132 28752466355 7238929370 COR 3133 28751819340 7238643698 COR 3134 2875118152 7 7238364939 COR 3135 2875080 7772 7238199071 COR 3136 28750413263 7238019301 COR 3350 28750296168 7238284525 COR 3351 28754 78 6636 7240267040 COR 3352 28757412029 7241794586 COR

POINT DESCRIPTION ABBREVIATIONS

COR=CORNER PC= POINT OF CURVE WHERE CURVE STARTS POC -= POINT ON CUR VE PT=POINT OF TANGENCY WHERE THE CURVE ENDS PCC = POINT OF COMPOUND CURVE (WHERE RADIUS CHANGES) PRC = POINT OF REVERSE CURVE

NOTES

THE COORDINATES ARE BASED ON AN EXISTING CONDITIONS AS-BUILT FIELD SURVEY BY NORWOOD ENGINEERING CO INC BETWEEN NOVEMBER 15 TO DECEMBER 18 2019 TI-IE COORDINATES ARE BASED ON l1ASSACHUSETIS ST A TE PLANE COORDINATE SYSTEM NAD 1983 (FEET) THE ACCURACY OF THE COORDINATE LOCATIONS ARE +-0J FEET

Exhibit B to N1UL-Part II-EOS Coordmate Tables Page 13 ofl3 April 14 2021

---

1f~ flJr ~i

f ~~ J~i](M~I ~ 1 jf~ ~~f W-- )e 1

It lj fY pl ~-~j

I --- ~ ~

1 (J-c~ er ~

C JI fl JYf

1 ~ ~Yu-~ 1i

~r

( LOClJS P

SCAUllbulliQO

I ar lMIT flG PINI tMS _ lIIPMIDMICXNllRlnT~tlCfllUS 1111D cmuftraquodl s - NIKl1III tfIJIIIIIOfM~1HCll allE1

DAre Jllrl

NUKIJU LU6 DMitM

mmtG6DKbdlt

~4~-middot

~~I

-- ampnbullllf~ ~ fa

LEGEND 0

-i~wr0o-m lICUUoaampbullco--11111 _ _l_J

0

bull ~-ail_I

~-

mo(I ---fwj

amp~~~~ ~ ~~ltgtmiddot ~A~

~6

_L-r

bull -~ IBP__l-11Uil n-rlfl-lffll rMCllI 1a 1rr ai

-~ lll-lliI u-W--11a 1 Ml[ 411 amt l0IIC 3JICJ7 ~ 33-1--I- DIID llXII D111 JlMZ 411 lraquo- ~lUN~t --- - etMpound 11JII

~ MffD mmaat ZL I01t 111

1Jlll~-IICfIQfJICIISJ DfEI IC71- I~ 1~ 9 Cl 1VY IICIIWCLl~fCSC~lNCl

~11HltOXW1A~JtCI~llfB MXIC 1HI lME INCi 111M bull11 (S 1f41~middot~-~-)

~ io

0 0 0 0 -0 0 0 D O 1 middot tbull O

_- _pound ~ - Tf middot- ---r ~~ ~~- ~=middoti

r jil7bull --------4~-middot~

(

SCAtpound 1bull bull YI

I ~ tfAIE lIMa toafllltl1E ~NAD1w1(rJ

1 ~ PlIla II MMt QI 11D TD D111oPl

~c1MlntID9~~-l 1NIIJIIKlNI LnlJTU ~ deg qllAJSTE uM011111 iu1II 1111ZT IIIILJaZ

Exhibit C - Photo-Reduced Copy of Activity and Use Limitations Plan of Land

--~middot---

I ~111-11111

iiiii

-ill111liilt

ACJIYIJY ANJ) lJSE lJJll7ATJONS PLAN OF LANI)

81ACJ(81R1 I IINION Flr11lfES SllffllF7AVO SIle

o tfO SOIJIH s1ar HlltlPOtL IIAS

SCAlElrJAt IPfffl152021

1IJrwod Eng1neerlng

- EnQlbullHrlflg Compaffy middot~~=~ m Cm1JQ u fnfJa-eal

~ -

-~

9l1EET 1 OF I 8324-02

td ~

w ~ m 0 0

Id Q ii w ii

co co m

co 0

-l

~-77--raquo- -~I~ )middot~ ~ bull _I lT ~ v~

AI ~ If ~)middot~ 7- ~1 c t11 yil ~ ~ ~middot~41 bull1 l ~~l(i~r~1 f7 )ll y-

~~ f -~ -v fgtV ~ ~ ~ l er-- u -

tl x-P~C ()

JP yen f(( 11 1degpoundS -~ (

ftunrTfflllllTnallJrNNQWDf ~ ti IZNtRlTT lnH M IULS IIJIUIUlA-DlltlllllDlJlllIICIF tJbllt~llC~lJNp

DTl NlllltaJatl-Witiill (raquo11 iiiK(+til

I aJnlTlKATJlfl PlAH~ THE PUIIJll1T UC TIUlf Mlaquo THE l5 11 oawG ~ NII 1Hpound1as Of1111E111 AMllfrlTll9laquolllt Mpound ntem OPlaJ CJ1 IWM1pound BREn 011 bulln

~ ~illi~fli~ _lt ---c~-Clmiddot~~c0-nmiddotmiddot~bullJmiddot04~- ~--~--yen~~bull - L -bull -n ~ -r - ~ -

it

~ fr ~ ~- -~bull~bullv OG- ~n0

bull--ltmiddot middot~ -~- ~~-=~7~st~-~~~~i~~Hil~-) 2~C 0 ~~~~~ --------Y-Tgt-bullbullmiddot-

U-IU ~middotshy =i==-

bullbull bull _ -middot-

~----- ( ~11middot

__IC1ZMJ - bull IOC)0l lftEf ___ i gt mEKJllJfNG rotJ1FRIIIT AIIEAS B~ p~ AIIEAS ~ea-vmiddot LIUIID

~ e--- -+ ~ rzprz1za 1 ~ IJTATC PRC ~TC

nJml lltPtasCltJ

DUD BCD lJlll7 PMC 4H 1 1 YERT1CAL M1llI II NCCI ~ _ ro conurr DOD 80CIC 3JII07 llME 4H I ntaM NUIU 1121 IJ4TAI m IMlC 111111 nATIIW ~fsi

tJMAlfflOlI) AIIEAS1 bull 11AMJSCAlfl) AlpoundAS Lill] 1Dll IOlII POT PlCit 6115 J)-t20 ~atfnujK~tlLWlQI

~PUNMl-17 POflTIVNf1Ell llaD BaalC Tl_ Paa bullbull - 99 a 11

_-ijf1iltDP~IZ~ 5CME - JOSUva1fTLJ ~ ~-rr 111 C tMI=

bull111 I~

i=iiii7

~ e---

t c z rl

L-n11 ~

ACJIVJTY AND USE LIAlffAJIONS

PIAN OF RESTRIC1EJJ AREAS ANJJ COVER TYPES

fltACK1(fN _ llNlltgtI PfMIECCS SllPVFVNlJ51Tlt

JO _ lxJ srJllH STREET IIALPrJU JASS

SCAU I - 30 APRIL 2021

lcnwod Engineering

llarwood Cngnrilgtf cpmy -t~~~~

fIL Pllpa-ru - (1u]1a-lftll

~L=wl f 01~JII IO_

a SIEET I (F 2 B324-02

bj ~

w 0

0 0 deg It

iQ ~ w l11

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 1 of 2

CX) CX)

deg CX) 0

ntllT -1~1~ rurnlaquo1 r1n l1XTM 11Nf -r~ lie UUffCI 11Pt lDll1Hf iniin --IC unr1G Tlr 1n1rn Iota allll Ito tyen1tlll ~~11CRnrzJ11-11--~ci-- n31 nr111w11J1t ~bull c ~- diams JDrnn llloffl rcnlml IDII

-~ ]al rll _ _ PnlM-1-PI lbull-- ll7HrirrIPlllD1lf~-a bullbullll 111bull IClln9XnolDlllIIIIIIOm

214 ff7371JOOT ~bull JllC Ibullbull 171 JICllEY)l)vlUTlo~lUl~ ~li_~ -~~ MDlol ll4L~TllJraquofllllf190abullbullt ~~nQuu~~1aJI _~~OtottWU~1t11txm~arcPbrmllmCDt ~~ ~~ ~ =~ gj ~l11~ llltlM Mrattllll TDPmllIDCDI JJ4bull e~ _ ~ e PClC lbullI- 1- ~1sect~ ~ ~ ~ ~ ~~~-nr~44bull~mn11-a11 ~~ =mt =m~ ~ ~~ ~ =~~-~~ =~~rt~l~llibullltbull=

~~~~~~~~r-~r-~~sectsect55~55 ~~ ~=g~~ mi --1~ ~-==~~m~ L-~r UVPllrlllUillDITDr4L 1JI lbullKlllll~==~~~=~

~~~~~~~~ raquoff-llll 111rritl_aianbull ~11lCla rr- n ttll XDP11r1r 11111c-1C111~ RTl~rJlllllbullbull~llllJlllipo~~=r~tm=~~

~=~3r~t==~ ~=~i==~~ llt1ttl70 m~~n~ =n~ L diams 11- bull - iaEi~mi 1lE~HHffi ~1-~ E LbulllT bullU-7YA 8911U TMn4 OJII C- lllkHrnl1nlntll11106~

MJ9~gt111ftlrfffll11 ~ SbullC61hLJT raquoWl lll~IJlll11amp1 utVllllt a lbulllfGl bulllC lT

lliilH~1 ~~rm-=rn~ lbullIIIICU-1bull0

itt ishwI JUo ma m1 bull 1-c iiliii ~==~m~=~ Ullln U7IIY M1NLl411 fflf f-~ llr IL ~ lbullt Ill uaP11rllDn1rin1bull139nf- na_ 1111lnl ___ lWTDf-ID 111Jbullnllr-cishy

J1JT1 lflTI-noLbull COi lJ1 tsr18GOTDrl1~ 1--Cn ~~~==-=~ LbullS1rbull-p

LbulllI ~middot x1 fl11bull diams an l~J P-~ WI 1~1Slrmsraquo11nirorn 11bull1n-

llrgt 58 - TDrl ZJlJ l~ Zl llf4 Pll1raquo91I lnP~IIEI 11 ==~=-~~ lbullt-11bullh1~

nun_-~bullfllrlll_ lbulll-lrbull N- - nr6-11MII rinaus a 1bull1E-t1 im1 nrxi mr~ 7nn1 4i i 1c m llrS~iJ-ltJlillII Tt-Ul ris ~=~~middotiill~~ tf llDln~n1rJrgt11nbull1ric ~IPgt9nq~ It-MU rbull RflrrlllVllbulltPllbullOIIUAfC lbullnJtrNbull_~lD+4ftJSHJ7711JrllIIIIT144lDI lbulll ~I llfs-mllThn~-f 1bull11

1a5blH=i5gS El~ iE =iilli ~ID aH~~ ~~ leJINNllllfflnlt10ff1nll~1g=TI==~- lbullN~Jmiddot pw nrwuhtl tba11 l- lllllsectimiii~ ~ lllaquot ll116UW41 llllII NII Cl Ld bullt ll 11r 111~-~lHtl-IINOClll 1Dgtn~rMOtnllfbull3all)Mnr~bullwrmm11uoo~ ~r~ m~ = ~~ t~-i m NNtotl n11nn cm

~~~~~Ttr~ in Httl01llxl nlfM114ta cm

JJN n=-PIW - I- C lbullT rnr nnubullNoXI ffllPI n1 11-amp 11middot 77)111fflffPl~JlaUII

i1JJ n91lbull ti Jnlftbulllll QII

~g=~~~~ir~f~5 =i~=~~ ~=~ ~ ~j====goi H1111t-llll ffo~ ~rn tm111 ta1Vl~ tnar- IVI rm u1i ~ nw ~illl cm 1111 Hltt1H T7U 72w111ll tm UI ftffiH~bull1 naMUlI nlll

lltfll~IOUl rnes~ttlClll

~I~~=~=~~= l3111ratlQOJ121lllll CS u1n-n-a mn-c~11111llllilr ~====m~~ lbulllllr~~Oll~r1111-t~rtRiHa)toI

-~rt~_Utr111tt~USI ~m~i==r~~llfflpound1gtgtMllkllit1U10C011 annrxnbull-TCRL11ai~=~=~g)llllll~--rWltMJtt-8 DR Pl rraquof ntl rim Gllf CCI~~1r~~ liiilllii u- ntlt bull llJ~naJCDI

raquo11NMl10~Ullllcm ntrlnK)fL~nlln-1c lllf ~--TlJaft_Lmc i lbull1 bull l3il0 Nl-197) Ttlll1344 a LbullI 3 l diams 1-111 lflS 1111lOllt ffl- MP PII bullHI lgtl llJI l97Mlt Ian -ti DG llC

111111===-~~~=mg ====~~ tD rlrffllZllIITO-lfllCIIII=~tr~L~~~= - Pl~I llII TD_ ff~ tDII31119NIJMlDffU~~ H CZIII liii~mlt~ D1111nrn11GQ~-CaKftQNJWNczr41140ffnQCUII Jnffnt1JIIIIJunbull~1Qc20lll ~Pllli ll mrnnn lbulltlP 17Jrffdeg-degluoElJIIIQII

~-I-ti _nrna~rlll

a n- 4411 llbullQI 1=40 rt La n- lllf ffrgtn _Jr_~ Ullk ---rr~~ ~=~=tl~~ =1 nttltt nraquo 1nlU as

=-mn--~111DJIDII Ullgt~fflflnanaaJIIJalt55~~EIS~=~~ ~~)1 -11CIJII nn~bullbullbullnaKatt1ta1

JOIT ru~- rf- deg hJIIII r- 111111 ~1111) -1 aJ1 ld t11D1etlll_TalCIS -~-UCV~bullraquootur=~=~I~~=~--~ ~rsrgo_mlaquoshym rs~11flI ~- rnilr==~=~~ ~~r _ ~ atfl ~ rtw Dgtlnn-f-lEllln17n-UIIP

D11 fflXTJ111111 I~~ ar D1Jn4 ~leJJS-OnC111

=====5 middoti SHU=~ 5 ampn iliiiiiIiI11

ngtgtn~1~1tbullubull1rm DH tu~- lt11 rirmU1111 CDIII

~i~i555mi~ ~~ ~m=~==m~g===~~~~ tn1r JtW ~ma- PiOll a CU

~ XNr~t~fDllll1-all~~ m===~~ bullbull~W 111111 ==~~ ampT g~ ru~ =

~lU $Et=ni ~ llll0111ra1Ln~otqC011

H~ g==i =~1 ~

~111111 ~~g~n~a~J))pound11 1=~)6tia

~~ mEfHfH~Si

amp12Ct _ an ~

U N711f21th mM1LU aa o1bull~--117CII in4r ~llllll1Vffl-111Dlr lit~ Hmtlpound1 71 12L I CCIII ---~CUnMIIUOCVf JIHtlnn nl 7r ll4011CIIII

llllDNXCWZflDtlltllCIDCDr

~~=~==~=gnn n1raquoL bullw noanDNt CIJIIi=~ C~middot ~ ~ ~ HnffTI-QIJroQ__111PtlJIIInfflll bullbull1~ aaeIT t-- nrJD nJUntu~CllWI

m ~1 ~ ~~~ ~ ilria~gliiiji~=ir ~lt-OTT gl1raquo ~Iraquou fflllIL nllll 1111111 flC~middotIY_4allCCIIIi l1i5~ ~~11~middot~ ~~ ffll H71W786lll 7P-JOalllllll 2N ~ 1-flllt 7HIJl4- DI ~ ~==~ ~t-tr bullM-

114 Hit71aTra7ririatNOCIIII

llHl1Hf ll~7Dl4fIZIIICIIII 1141ftillf+1DllnTgtlMa~=~bull==~r Lbulll-lllbullbulllJJ

=~~~HR-~a ~ =iEri ~ ~=6

= 1MESE COCIIIOlfAlEi ARC 9~ at AH DISTlfG CONJmOfS AS-alLT FED 5UKiEY Y NORWDal EJICltJIJll(G CD~ IIElMEN ~ 1S 111 DECDaR a 2DII 1)pound OCICIIIDNAlES 5HCflI UIpound IIAID Cit MltSSAOfllffT5 STATE FlJriNII CDCffllNAT smult ~AO leJ (IMIJ 1HE ACQlltACY ltF 1HE COCftDINT[ LDCAnatS Mpound diams- 01 FtU

POINT DESCRIPTION ABBREVIATIONS~-~middotPC Pmlr Of CLIRIJC bullIEllL ClMNpound STilRlS PDC bull PtJtilTIIJOM1poundr ~ [raquo TAHCINiT W(R[ lll[ CURpound uroo Fo F[1NT(1t~tfflvt[ltft1llllIIUlt OMNtilE)PRC ~T oT ~pound ~Vlllrlt

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 2 of 2

I ~ IHAT nfl PlM MS 81D1 PIIDMQl ~WllTM(llUI MOIIEOIAAlPlllR~Df IIUPS C- lttE ~111 Cl__ HftNMIIIZlt

WWWWJU Cii6 liftitit

ACTIVITY ANI) USE LINTATIONS

PLAN OF RES7RIC1EJJ AREAS ANJJ COlER TYPES

8V CKlJ()RN IJNl()N PflllfpoundCpoundS SlllERFIIMJ SITC

50 HJ S(J11( SmEpoundT llAIPOIL JASS

=r-o ~ ll 2021

~ Engmeer1ng

Hltd ~~ middot~~-=~ra (f~AJ lIQ c- f

a llfEET 2 ltF 6324-02

td ~

w ~ m 0 0

Id Q ii w m

co co m 0 co

Bk 39600 Pg437 88608

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY New England Region

Five Post Office Square - Suite 100 Boston Massachusetts 02109-3912

INSTITUTIONAL CONTROL DESIGN STATEMENT FOR THE BLACKBURN AND UNION PRIVILEGES SUPERFUND SITE - EAST OF SOUTH STREET AREA

1 Introduction

Pursuant to the Comprehensive Environmental Response Compensation and Liability Act 42 USC sect 9601 et seq (CERCLA) and the National Contingency Plan 40 CFR Part 300 (the NCP) this document contains a description of the release events and site history that resulted in the contaminated media that require institutional controls in the fom1 of Activity and Use Limitations the basis for land use restrictions and uses that are consistent and inconsistent with the Selected Remedy ( as described below) This Institutional Control (IC) Design Statement pertains to a portion of the Blackburn and Union Privileges Superfund Site located in the Town of Walpole Massachusetts (the Site) which has been listed on EPAs National Priorities List (NPL) which portion is generally referred to as the East of South Street Area (the EOS Area) The EOS Area is located to the east of South Street in Walpole and is shown on Figure 1 attached hereto

A Notice of Activity and Use Limitation (NAUL) is necessary and appropriate for the EOS Area of the Site based on the fact that pursuant to EPAs risk evaluations asbestos arsenic trichloroethene (TCE) and certain polycyclic aromatic hydrocarbon (PAH) contan1inants remain in place in soils at levels higher than those appropriate for unlimited use or unrestricted exposure groundwater underlying the EOS Area contains hazardous substances at levels that present an unacceptable risk of exposure and remedial measures at the Site must be protected and maintained to ensure that the Selected Remedy remains protective

EPAs Record of Decision (ROD) dated September 30 2008 specified the need for institutional controls such as a NAUL to ensure long-tenn perfonnance and protectiveness of the Selected Remedy The institutional controls described herein are necessary and appropriate to ensure that the Selected Remedy for the Site remains protective of human health and the environment The remedy for the Site as described in the ROD is referred to herein and in the NAUL as the Selected Remedy

Page 1 of7

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 8: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

Bk 39600 Pg413 88608

B EPA New England Region I 5 Post Office Square - Suite 100 Boston MA 02109-3912

or to such addresses as MassDEP and EPA respectively may identify in writing from time to time to Owner for such written emergency response notifications

(iii) limits the actual disturbance involved in such excavation to the minimum reasonably necessary to adequately respond to the emergency

(iv) implements all measures necessary to limit actual or potential risk to the public health and environment

(v) engages a qualified hazardous waste site cleanup professional such as a Licensed Site Professional (LSP) as defined in the MCP at 310 CMR 400006(12) to oversee the implementation of this Paragraph and to prepare and oversee the implementation of a written plan (Emergency Restoration Plan) that will restore the Property to a condition that meets or exceeds the performance standards established under the ROD for the Selected Remedy and that is consistent with this Notice and to review and evaluate response actions contained in the Emergency Restoration Plan to ensure minimal disturbance of any contaminated soils and sediments and

(vi) performs all actions laid out in the Emergency Restoration Plan within thirty (30) days of the occutTence of the emergency or within such other time period as may be approved by MassDEP and EPA in writing and submit a copy of the Emergency Restoration Plan to MassDEP and EPA within ten (10) days of its performance with a statement from the cleanup professional confirming that the Property has been restored to the standard described above

5 Proposed Changes in Activities and Uses Amendments Pursuant to 310 CMR 4001 l l(amp)(c) the Owner must notify and obtain approval from EPA and MassDEP of any proposed change in activities and uses at the Property that is not provided for in this Notice Pursuant to 3 IO CMR 400111 (8)( d) the Owner must obtain EPA and MassDEP approval of any Amendment or Termination of this Notice All EPA and MassDEP approvals of any Amendment or Termination of this Notice must be in writing and be recorded andor registered with the appropriate Registry(ies) of Deeds andor Land Registration Office(s) to be effective

6 Violations The activities uses andor exposures upon which this Notice is based must not change at any time to (a) cause risks that are not protective of human health or the environment pursuant to the criteria set forth in the NCP at 40 CFR

Page 8 of12

Bk 39600 Pg414 88608

300430(e)(2)(i) (b) interfere with the Selected Remedy or (c) cause a significant risk of harm to health safety public welfare or the environment pursuant to Chapter 21E and the MCP

Compliance with the terms and conditions of this Notice is subject to enforcement pursuant to Chapter 21 E the MCP MGL c 21 A sect 16 and 310 CMR 5 00 and CERCLA and the NCP Such enforcement may include without limitation enforcement with respect to (a) any activities or uses that may occur that are described in Paragraph 2 of this Notice as being inconsistent with the Selected Remedy (b) any failure to undertake any obligations and conditions described in Paragraph 3 of this Notice as being necessary to maintain the Selected Remedy and (c) any other failure to maintain the Selected Remedy or Pem1anent Solution resulting from a failure to act consistently with this Notice

7 Incorporation Into Deeds Mortgages Leases and Instruments of Transfer This Notice shall be incorporated either in full or by reference into all future deeds easements mortgages leases licenses occupancy agreements or any other instrument of transfer whereby an interest in andor a right to use the Property or a portion thereof is conveyed in accordance with 310 CMR 401074(5)

8 Reservation of Rights

This instrument shall not limit or otherwise affect the right of EPA andor MassDEP to obtain access to or restrict the use of the Property pursuant to CERCLA Chapter 21 E or any other applicable statute or regulation

This instrument shall not release the Owner or any other party from liability for releases of oil or hazardous substances or materials nor shall this instrument excuse the Owner or any other party from complying with CERCLA Chapter 21 E or any other applicable federal state or local laws regulations or ordinances or by-laws

Owner hereby authorizes and consents to the filing and recordation andor registration of this Notice said Notice to become effective when recorded andor registered with the appropriate Registry(ies) of Deeds andor Land Registration Office(s)

Page 9 of 12

Town of Walpole acting by and through the Board of Selectmen

n Town Administrator authorized by ard of Selectmen recorded herewith

Bk 39600 Pg415 88608

Witness the execution of this instrument under seal this 21_ day of df 11 ( 2021

COMMONWE

COUNTY OF NORFOLK ss

~ On this 21 day of 4f1 2021 before me the undersigned notary public

personally appeared James Johnson as Town Administrator for the Town of Walpole and proved to me to through satisfactory evidence of identification which was ~6laquo~ ~ -fr VJ1e [indicate ifdrivers license or passport or other document] to be the person whose name is signed on the preceding or attached document and acknowledged to me that signed it voluntarily for its stated purpose

Name CA~ U ~

My Commission Expires July S 2t)z

Page 10 of 12

--------

Bk 39600 Pg416 88608

In accordance with CERCLA 42 USC sect 9601 et seq and the National Contingency Plan the United States Environmental Protection Agency Region I hereby approves this Notice of Activity and Use Limitation

Name 8r~Cltvi Olso Director Superfund and Emerncy Management Division (SEMO)

US Environmental Protection Agency Region I

In accordance with MGL c 21E sect 6 and the Massachusetts Contingency Plan (310 CMR 400000) the Department of Environmental Protection hereby approves this Notice of Activity and Use Limitation (as to form only)

Date Paul W Locke Assistant Commissioner Bureau of Waste Site Cleanup Department of Environmental Protection

Page 11 of 12

---------------

Bk 39600 Pg417 88608

In accordance with CERCLA 42 USC sect 9601 et seq and the National Contingency Plan the United States EobulliionmenlaJ Protectioo Agency Region I hereby appro1es this Notice of Activity and Use Limitation

Date ~------

Name Director Superfund and Emergency Management Division (SEMO)

US Environmental Prokction i0 ency Region I

Jn accordance with MGL c 21 E sect 6 and the Massachusetts Contingency Plan (310 CMR 400000) the Depamnent ofEmironmental Prolectioo hereby approves this Norice ofActivity

and Use Limilarioo (as ro funn ooly)_ ~~

Dale 4r S microlJ ~ Paul W Locke Assisrant Commissioner Bureau ofWaste Site Cleanup Department of Environmental Protection

Page 11 of 12

Bk 39600 Pg418 88608

List of Exhibits

Exhibit A Legal Description of the Property Exhibit B Legal Description of the Restricted Area and Coordinates of Cover Types Exhibit C Photo-Reduced Copy of Activity and Use Limitations Plan of Land Exhibit D Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table Exhibit E Institutional Control Design Statement (EOS) Exhibit F Copy of Vote of Town of Walpole

Return to

Attn Kristine Sheehy Senior Real Estate Attorney FOLEY HOAG LLP Seaport West 155 Seaport Boulevard Boston Massachusetts 02210-2600

Page 12 of 12

Bk 39600 Pg419 88608

EXHIBIT A

Legal Description of Property The land with the improvements thereon located in Walpole Norfolk County Massachusetts bounded and described as follows

PARCEL I

The land on the Southeasterly side of South Street bounded

NORTHWESTERLY NORTHERLY AND AGAIN NORTHWESTERLY by South Street by seven lines measuring respectively

17027 feet 120 feet 22011 feet 1653 feet 325 89 feet 4515 feet and 1497 feet

NORTHEASTERLY by Gleason Court 2627 feet

SOUTHEASTERLY AGAIN NORTHEASTERLY AND AGAIN SOUTHEASTERLY by land now or fom1erly of Santomarco by five lines

measuring respectively 6750 feet 2050 feet 1190 feet 2952 feet and 2001 feet

NORTHEASTERLY AGAIN by said land of Santomarco and land now or formerly of Cashorali 10056 feet

NORTHWESTERLY AGAIN by said land of Cashorali 2845 feet

NORTHEASTERLY by land now or formerly of Muighitti 9007 feet

SOUTHEASTERLY by the location of Old Colony Railroad by three lines measuring respectively 6809 feet 32808 feet and 38250 feet

and

SOUTHWESTERLY by land now or formerly of Meyer by three lines AND SOUTHERLY measuring respectively 9143 feet 1998 feet and

15202 feet

Parcel I is described in the deed recorded with the Norfolk County Registry of Deeds in Book 4459 Page 287

A portion of said premises is shown on plan entitled Plan of Land in Walpole Mass Belonging to General Fibre Co Inc by Edward C Peterson CE dated January 16 1960 filed with the Norfolk Registry of Deeds as Plan No 849 of 1967 in Plan Book 223 and the remainder is shown on plan entitled Plan of Land in Walpole Massdeg by E Worthington Engineer dated February 6 193 7 recorded with said Deeds Book D2135 Page 8 I

FHBOSTON52454092

Bk 39600 Pg420 88608

PARCEL II Property known as Parcel 33-120 of the Town of Walpole Tax Assessors Map which is

part of the property situate in the Town of Walpole County ofNorfolk and Commonwealth of Massachusetts and being all of the right title and interest of The Penn Central Corporation in and to all those certain pieces or parcels of land and premises easements rights of way and any other rights of any kind whatsoever appurtenant thereto or used in conjunction therewith on and along a portion of Branch of Railroad known as the Wrentham Branch said portion of railroad being described as follows

Beginning at a line extended across the right of way of said Branch of rai road said line being the Northerly line of South Street and extending thence in a Northeasterly direction the distance of 2852 feet more or less along said Branch of rai Iroad to a line which is parallel with the Southwesterly line of Common Street said parallel line extending across said right of way through a point in the centerline thereof at railroad valuation survey station 733 + 67 more or less and being the place of ending

Parcel II is described in the deed recorded with the Norfolk Registry of Deeds in Book 7986 Page 372 and is a portion of the land shown on the plan recorded with said Deeds as Plan No 52 of 1983

FHBOSTON52454092

Bk 39600 Pg421 88608

Exhibit B Legal Description of the Restricted Area and Coordinates of Cover Types

Le2al Description for Restricted Area The area shown on the plan entitled Activity and Use Limitations Plan of Land Blackburn amp Union Privileges Superfund Site 50 amp 60 South Street Walpole Mass Scale l = 30 dated April 6 2021 by Norwood Engineering Company Inc recorded with the Norfolk Registry of Deeds in Plan Book 704 Page 41 being bounded and described as follows

Beginning at a point on the easterly sideline of South Street at the southerly point of curvature of Gleason Court on said plan thence

Northeasterly and curving to the right along an arc of a curve having a radius of twentyshyfive and 00100 (2500) feet a length of forty-five and 15100 (4515) feet thence

S 48deg1352 E a distance of twenty-two and 24100 (2224) feet the previous course by the southerly sideline of Gleason Court thence

s 32deg0208 w a distance of fifty-four and 78100 (54 78) feet thence

S 59deg27 32 E a distance of twenty and 50100 (2050) feet thence

S 47deg5252 E a distance of eleven and 90100 (1190) feet thence

S 49deg01 10 E a distance of twenty-nine and 58100 (2958) feet thence

s 38deg3108 w a distance oftwenty and 01100 (2001) feet thence

S 49deg00 57 E a distance of one hundred and 56100 (10056) feet thence

N 39deg5348 E a distance of twenty-eight and 45100 (2845) feet the previous seven (7) courses by land ofNF Thelma A Casborali thence

S 49deg0808 E a distance of ninety and 29100 (9029) feet the previous course by land ofNF Ming L Yau thence

s 25deg2312 w a distance of siliy-eight and 22100 (6822) feet to a point on the westerly sideline of a fonner railroad right of way the previous course by land of the Town of Walpole assessor parcel 33-121 thence

S 55deg2937 E a distance of ninety-nine and 78 100 (99 78) feet to a point of tangency on the easterly sideline of a forn1er railroad right of way thence

Page 1 of 13

Bk 39600 Pg422 88608

s 30deg11 32 w

S 23deg49 I6 W

N 66deg1044 W

N 23deg4908 E

N l 6deg00 52 E

S 37deg0240 E

N 10deg1437 W

N 34deg093 I W

N 11 deg5558E

Northeasterly

N 27deg41 48 E

a distance of three hundred and three and 74100 (30374) feet the previous course by land ofNF Nicholas H Dowd and NF Emilio P Baldassari thence

a distance of four hundred ninety and 86100 (49086) feet to a SBdh the previous two (2) courses by the easterly sideline of a former railroad right of way thence

a distance of eighty-two and 76100 (8276) feet to an Iron Pipe on the westerly sideline of the former railroad right of way thence

a distance of twelve and 09100 (1209) feet to a SBdh thence

a distance of ninety-six and 50100 (9650) feet to a S Bdh thence

a distance of fifteen and 00100 (1500) feet the previous three (3) courses by the westerly sideline of the former railroad right ofway and land of NF Joseph R Carpentieri and NF Joseph R and Faith N Carpentiero thence

a distance of ninety-two and 82100 (9282) feet the previous course by land ofNF Richard A and Josette M Burke thence

a distance of tvvo hundred thirty-seven and 86100 (23786) feet to a point on the easterly sideline of South Street thence

a distance of one hundred twenty and 00100 (12000) feet along the easterly sideline of South Street to a point of curvature of the easterly sideline of South Street thence

and curving to the right along an arc of a curve having a radius of eight hundred and 00100 (80000) feet a length of two hundred hventy and 11100 (22011) feet along the easterly sideline of South Street thence

a distance of three hundred forty-hvo and 42100 (34242) feet to the point of beginning

Containing 621 Acres of land more or less

Page 2 of 13

3000

3005

3010

3015

3020

3025

3030

Bk 39600 Pg423 88608

EXHIBIT B (cont)

Points and Coordinates associated with Restriction Areas and Cover Types for the Activity and Use Limitations (AUL) at 50 amp 60 South Street Walpole Mass

Point Northing Easting Type

Curve Curve Number Len2th Radius

28754430528 7236432250 COR

3001 28755604597 7236680368 PC L=7535 R=80000

3002 2875597 1222 7236766913 POC

3003 28756333366 7236870620 PT

3004 28756280754 723697 3031 COR

28756025570 7237001250 COR

3006 28755918670 7237001140 COR

3007 28755864440 7237 I 05890 COR

3008 28755903200 72371963 IO COR

3009 28756030893 7237217396 COR

28756042534 7237250325 COR

3011 28756021733 7237317808 COR

3012 28755800732 7237640949 COR

3013 2875552 1424 7237667395 COR

3014 28755321388 7237708416 COR

28755197081 7237834881 COR

3016 28755102230 7238045173 COR

3017 28754941531 7238291869 COR

3018 28754851375 7238512944 COR

3019 28754753441 7238824 760 COR

28754681541 723916 1881 COR

3021 28754608227 7239406506 COR

3022 28754515846 7239459928 COR

3023 2875426 7589 723943 8163 COR

3024 28754198016 7239590840 COR

28753886764 7239449006 COR

3026 2875329 7944 7239187206 COR

3027 28752506745 7238837890 COR

3028 28751859560 7238552142 COR

3029 28751221833 723827342 l COR

28750848788 7238107869 COR

3031 2875045 3654 7237927814 COR

3032 28750630420 7237527432 COR

3033 28750741023 723757 6257 COR

3034 28751668594 7237842488 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 3 of 13 April 14 2021

3035

3040

3045

3050

3055

3060

3065

3070

Bk 39600 Pg424 88608

Point Number

Northing Easting Type Curve Leneth

Curve Radius

28751548848 7237932869 COR

3036 28752462269 7237767802 COR

3037 28756438461 7236904209 POC L=2207 R=80000

3038 28756543084 7236939245 PT

3039 2875653 7987 7236954123 PC

28756597578 7237007344 POC L=1651 R=937

3041 28756594465 7237087181 PT

3042 28756459044 7237347021 PC L=347 R=220

3043 28756432531 7237363546 PT

3044 28756280644 7237286201 COR

28755924210 7237966952 COR

3046 28756081959 7238048554 PC L=472 R=236

3047 28756064922 7238084404 PT

3048 28755523491 7237845047 COR

3049 28755419845 7238081981 COR

28755460757 7238099621 PC L=240 R=l57

3051 28755467701 7238120241 PT 3052 28755398690 7238275280 COR

3053 28755365410 7238264910 COR

3054 28755087149 7238900449 COR

28755158001 7238931521 COR

3056 28755040360 7239199770 COR

3057 28755311720 7239318930 COR

3058 28755263010 7239429300 COR

3059 28755388260 7239484290 COR

28755348660 7239576000 COR

3061 28755625470 7239696500 COR

3062 28755664605 7239606601 COR

3063 28755736202 7239637768 COR

3064 28755621870 7239897370 COR

287 5567 6160 7239920410 COR

3066 28755718270 7239830260 COR

3067 2875587 9750 7239900310 COR

3068 28755718790 724026 7600 COR

3069 28755763390 7240285350 COR

28756035900 7239926600 COR

3071 28756086280 7239812770 COR

3072 28756089984 7239813649 COR

3073 28756229128 7239501910 PC L=482 R=l54

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 4 of 13 Apnl 14 2021

3075

3080

3085

3090

3095

3100

3105

3110

Bk 39600 Pg425 88608

Point Number

Northing Easting Type Curve Length

Curve Radius

3074 28756257366 7239513984 PT

28756185799 7239674928 COR

3076 28756739833 7239921136 COR

3077 28756876060 7239682275 COR

3078 28756948336 7239735898 PC L=335 R=298

3079 28756958235 7239766064 PT

28756866081 7239978133 COR

3081 28757166275 7240127374 COR

3082 28757068320 7240314640 COR

3083 28757602980 7240594310 COR

3084 28757700050 7240408736 COR

28758247941 7240688376 COR

3086 28758250190 7240683910 COR

3087 28758344979 7240738168 COR

3088 2875843 6103 7240581527 COR

3089 28758602943 7240664224 COR

28758740024 7240397393 COR

3091 28758605706 724032 7776 PC L=477 R=309

3092 28758594882 7240286013 PT

3093 28758666635 7240197585 PC L=2573 R=3127

3094 28758767113 7240118710 POC

28758890752 7240086604 PRC L=I653 R=3993

3096 28758972305 7240074125 POC

3097 28759049552 7240045 I 52 PT

3098 28759330312 7239734408 COR

3099 28759459414 7239588584 PC L=2269 R=5217

28759524821 7239496174 POC

3101 28759568752 7239391829 PRC L=1814 R=486

3102 28759603259 7239308095 POC

3103 28759653883 7239232999 PCC L=l31 R=088

3104 28759665694 7239231411 PT

28759800587 7239299586 COR

3106 28759986288 7238981214 COR

3107 2875983 5797 7238891829 COR

3108 28759879750 7238798689 COR

3109 28759905380 7238754769 PC L=1600 R=2552

28759963590 7238700398 POC

3111 28760035727 7238666620 PT

3112 28760700665 723901 5672 PC L=4515 R=2500

3113 28760830230 7239191198 POC

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 5 of 13 April 14 2021

3115

3120

3125

3130

3135

3140

3145

3150

Bk 39600 Pg426 88608

Point Number

Northing Easting Type Curve Len2th

Curve Radius

3114 2876077 263 6 723 940 1624 PT 28760624518 7239567466 COR

3116 28760160100 7239276864 COR

3117 28760055928 7239453423 COR

3137 28759976118 7239541692 COR

3118 28759782139 7239764992 COR

3119 28759625581 7239640375 COR

28758966057 7240399493 COR

3121 28759184326 7240581973 COR

3122 28758593598 724126478] COR

3123 28757977293 724097 2314 COR

3124 28757716516 7241351659 COR

28757288251 7241140719 COR

3126 28756725827 7240851862 COR

3127 28756162468 7240586126 COR

3128 28755614498 7240338506 COR

3129 28754346745 7239768507 COR

28753845716 7239540194 COR

3131 28753257436 723927 8634 COR

3132 28752466355 7238929370 COR

3133 28751819340 7238643698 COR

3134 28751181527 7238364939 COR

28750807772 7238199071 COR

3136 28750413263 7238019301 COR

3138 28756920317 7237298739 PC L=l941 R=2104

3139 28756827128 7237274848 POC

28756733047 7237294944 PRC L=401 R=l66

3141 2875671 1336 723 727 2844 PCC L=1492 R=13345

3142 28756744594 7237206091 POC

3143 28756781529 7237141301 PCC L=1419 R=l018

3144 28756833084 7237094642 POC

28756902566 7237091952 PCC L=2413 R=157959

3146 28757017337 7237129167 POC

3147 28757131820 7237167258 PCC L=330I R=S0000

3148 28757282552 7237234442 POC

3149 28757431866 7237304721 PT 28757338390 7237495930 COR

3151 28757541620 7237605380 COR

3152 28756897590 723883 4280 COR

Exhibit B to NA UL-Part 11-EOS Coordinate Tables Page 6 of 3 April 14 202

3155

3160

3165

3170

3175

3180

3185

Bk 39600 Pg427 88608

Point Northing Easting Type Curve Cunbulle

Number Lenszth Radius 3153 28756870623 7238820218 COR

3154 28756838273 7238882258 COR

28756865240 7238896320 COR

3156 28756777004 7239062996 COR

3157 28756770439 7239063663 PC L=l 146 R=2269

3158 2875665836 I 7239046180 PCC L=l423 R=957

3159 2875661 7520 7238989913 POC

28756625544 7238920850 PT

3161 28756728525 7238726583 PC L=232 R=l58

3162 28756748720 7238720236 PT

3163 28756899634 7238797341 COR

3164 28757254653 7238121363 COR

28757520153 723761266 7 COR

3166 28757306899 723 750 IO 10 COR

3167 28756690336 7237500169 PC L=243 R=I68

3168 28756682599 7237479273 PT

3169 28756686990 7237469583 PC L=0250 R=l68

28756708806 7237463018 PT 3171 28757000109 7237616354 PC L=233 R=l73

3172 28757005368 7237637270 PT

3173 28757000998 7237645513 PC L=233 R=l69

3174 28756980219 7237651023 PT

28756429209 7238339422 COR

3176 28756342982 7238506849 COR

3177 28756500076 7238596485 PC L=l19 R=l48

3178 28756499701 7238608072 PT 3179 2875644 7813 7238705611 PC L=l 182 R=483

28756358177 723 869 0707 PT

3181 2875623 6099 7238376388 PC L=443 R=467

3182 28756235611 7238333779 PCC L=343 R=9IO

3183 28756249049 7238302418 PCC L=412 R=9IO

3184 28756278952 7238274519 PCC L=368 R=300

28756313362 7238277619 PT

3186 28756282498 7238911796 PC L748 R=216

3187 28756240650 7238919721 PT

3188 28756126081 7238620406 PC L=323 R162

3189 28756138645 7238591575 PCC L=333 R=283

Exhibit B to NAUL-Part II-EOS Coordmate Tables Page 7 of 13 April 14 2021

3190

3195

3200

3205

3210

3215

3220

Bk 39600 Pg428 88608

Point Number Northing Easting Type Curve

Leneth Curve Radius

28756163375 7238602867 PT

3191 2875523 0908 7238765275 COR

3192 28755205040 7238752740 COR

3193 28755391740 7238328470 COR

3194 28755466840 7238361040 COR

28755452760 7238392590 COR

3196 28755516920 7238421040 COR

3197 28755530690 7238388730 COR

3198 28755603230 7238421460 COR

3199 2875555 7568 723852 7053 COR

28755371220 7238445330 COR

3201 28755629198 7238558466 COR

3202 28755676040 7238453290 COR

3203 28755925410 7238563840 PC L=1902 R=3548

3204 28755927383 7238658634 POC

28755954390 7238749520 PT 3206 28755974770 7238807230 COR

3207 28755779200 7238881701 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

28755746700 7238609997 COR

3211 2875593774 7239036608 COR

3212 28756048460 7238996850 PC l=1445 R=2903

3213 28756070631 7239065422 POC

3214 28756109010 7239126420 PT

28756153820 7239182190 PC L=S98 R=848

3216 28756171980 723923 7880 PT

3217 287S6026148 7239566166 COR

3218 28756003865 7239556465 COR

3219 287S6134380 7239256650 COR

28755998460 7239195370 COR

3221 2875600 71S0 7239174530 COR

3222 28756001791 7239172152 COR

3223 28756040451 7239079437 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 8 of 13 April 14 2021

Bk 39600 Pg429 88608

Point Number

3210

3200

3056

3057

3058

3059

3060

3061

3062

3218

3219

3220

3221

3224

3225

3226

3227

3228

3070

3071

3234

3233

3235

3236

3237

3238

3239

3240

3241

3242

3243

3244

3245

3246

3247

3248

Northing

28755746700

28755371220

28755040360

28755311720

28755263010

28755388260

28755348660

2875562 54 70

28755664605

28756003865

28756134380

28755998460

28756007150

28755941340

28755962080

28755867937

28755819702

28755766128

28756035900

28756086280

28755991990

28755942100

28756477248

28756677238

28756650130

28756473307

28756480112

28756675030

28756724454

28756742099

28756742133

28756703924

28756640759

28757607280

28757401530

28757467350

Easting

7238609997

7238445330

7239199770

7239318930

7239429300

7239484290

7239576000

7239696500

7239606601

7239556465

7239256650

7239195370

7239174530

7239145324

7239100930

7239061674

7238935003

7238911508

7239926600

7239812770

7239769910

7239884050

7239261913

7239253008

7239321810

7239319038

7239298824

7239364440

7239271845

7239292625

723935 0187

7239393239

7239393096

7237584960

7237475300

7237345620

Type

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

PC PCC

POC

PCC

PT

COR

COR

COR

Curve Len2th

L=273

L=ll77

L=657

Cunmiddote Radius

R=1421

R=810

R=679

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 9 of 13 April 14 2021

Bk 39600 Pg430 88608

Point Number Northing Easting Type Curve

Len2th Curve Radius

3249 287 57514570 7237372360 PC l=ll05 R=1993

3250 287 57 588060 7237452980 PT

3251 28757631382 7237429676 PC L=2244 R=2352

3252 287 5765 6810 7237537876 POC

3253 2875 762 9720 7237645671 PT

3254 28756940655 7238952710 PC l=1493 R=1509

3255 28756901845 7239015577 POC

3256 2875683 7836 7239052474 PT

3257 28758104824 7237653014 COR

3258 28758028960 7237800160 COR

3259 28757949530 7237760790 COR

3260 28757901005 7237855021 COR

3261 28757839230 7237820908 PC L=273 R=l33

3262 28757830688 7237799810 PCC L=539 R=2144

3263 28757852974 7237750897 PT

3264 28757891705 7237688178 PC L=lS26 R=2432

3265 28757948636 7237637880 POC

3266 287 58018307 7237607597 PT

3248 28757467350 7237345620 COR

3267 28757550832 7237363444 POC L=2653 R=80000

3268 28757668809 7237424132 PT

3269 28757504 719 7238817989 COR

3270 28757493010 7238842230 COR

3271 28757561074 7238880970 COR

3272 28757483953 7239024127 PC L=323 R=l70

3273 28757459939 7239037846 PT

3274 28757311605 7238957122 PC L=1388 R=906

3275 2875727 2732 7238901647 POC

3276 28757283181 7238834718 PT

3277 287 5733 4061 7238752337 PC L=255 R=l60

3278 287 5735 5527 7238744411 PT

3279 2875 7102815 7239517199 PC l=261 R=l70

3280 28757080654 7239525307 PCC l=909 R=1275

3281 2875 700 5390 7239477911 PCC L=l007 R=990

3282 28756999624 7239381704 PT

3283 2875707 7705 7239230604 PC L=ll14 R=907

Exhibit B lo NAUL-Part IlbullEOS Coordinate Tables Page 10 of13 April 14 2021

3285

3290

3295

3300

3305

3310

3315

Bk 39600 Pg431 88608

Point Number Northing Easting Type

Curve Leneth

Curve Radius

3284 28757168066 7239178102 PT

28757205717 7239186398 PC L=518 R=930

3286 28757249003 7239213534 PCC L=l41 R=086

3287 2875724 7909 7239226048 PT

3288 28758415755 7239842757 PC L=251 R=l59

3289 28758437695 7239837379 PT

28758456377 7239846949 PC L=812 R=876

3291 28758494897 7239915165 PCC L=456 R=757

3292 28758483790 7239958646 PT

3293 28758405147 7240111348 PC L=l057 R=955

3294 28758318136 7240161452 PCC L=477 R=l063

28758272407 7240149529 PCC L=250 R=l60

3296 28758265647 7240128003 PT

3297 28758157937 7237680895 COR

3298 28758902927 723807 1969 COR

3299 28758852531 7238168280 COR

28758779660 7238129750 COR

3301 28758746973 7238192072 COR

3302 2875807 6630 7237840490 COR

3303 28758049940 7237894220 COR

3304 2875871 7997 7238243620 COR

28758680103 7238315946 COR

3306 28758533699 7238239240 COR

3307 2875852 6899 7238252220 COR

3308 28758098180 7238027600 COR

3309 28757974484 7238264223 COR

28757957598 7238255513 COR

3311 28757757732 7238637845 COR

3312 28757774584 7238646620 COR

3313 28757653710 723887 7846 COR

3314 28757560920 7238829340 COR

28759004930 7238125514 COR

3316 28759689797 7238485028 PC L=1992 R=2609

3317 28759697204 7238583760 POC

3318 28759667288 723867 8142 PT

3319 28758996126 7238323718 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 11 of 13 April 14202 I

Bk 39600 Pg432 88608

Point Number

Northing Easting Type Curve Lenfth

Curve Radius

3320 28759028950 7238261560 COR 3321 28758954486 7238222188 COR

3322 28758972523 7238378387 COR 3323 28759421550 7238613630 COR 3324 28759377933 7238698105 COR 3325 2875907 4811 7238539289 COR 3326 28759081611 7238526309 COR 3327 28758935210 7238449604 COR

3328 28759464470 7238637330 COR 3329 28759632674 7238722481 PC L=ll83 R=l578

3330 28759583973 7238755474 POC 3331 28759526573 7238768343 PRC L=2163 R=2455

3332 28759422964 7238796123 POC 3333 28759341091 7238865430 PT

3334 28759193370 7239050710 COR 3335 28759416340 7239163940 COR 3336 28759263600 7239455620 COR 3337 28759043690 7239336510 COR 3338 28758935490 7239552130 COR 3339 28757650890 7238883240 COR 3312 28757774584 7238646620 COR 3311 28757757732 7238637845 COR 3310 28757957598 7238255513 COR 3309 28757974484 7238264223 COR 3308 28758098180 723802 7600 COR 3307 28758526899 7238252220 COR 3306 28758533699 7238239240 COR 3340 28758700033 7238326388 COR 3341 28758675436 7238373334 COR 3342 28758733013 7238403500 COR 3343 28758760858 7238350353 COR 3344 28758860952 7238402796 COR 3345 28758833106 7238455943 COR 3346 28758890683 7238486109 COR 3347 28758915280 7238439162 COR 3326 28759081611 7238526309 COR 3325 28759074811 7238539289 COR

Exhibit B to NAUL-Part H-EOS Coordinate Tables Page 12 of l3 April 14 2021

Bk 39600 Pg433 88608

Point Number

Northing Easting Type Curve Len2th

Cunbulle Radius

3324 2875937 7933 7238698105 COR

3082 28757068320 7240314640 COR 3083 28757602980 7240594310 COR 3349 28757790234 7240236327 COR

3348 28757255574 7239956657 COR

3124 28757716516 7241351659 COR 3125 28757288251 7241140719 COR 3126 28756725827 7240851862 COR 3127 28756162468 7240586126 COR 3128 287 55614498 7240338506 COR 3129 28754346745 7239768507 COR 3130 28753845716 7239540194 COR 3131 28753257436 723927 8634 COR 3132 28752466355 7238929370 COR 3133 28751819340 7238643698 COR 3134 2875118152 7 7238364939 COR 3135 2875080 7772 7238199071 COR 3136 28750413263 7238019301 COR 3350 28750296168 7238284525 COR 3351 28754 78 6636 7240267040 COR 3352 28757412029 7241794586 COR

POINT DESCRIPTION ABBREVIATIONS

COR=CORNER PC= POINT OF CURVE WHERE CURVE STARTS POC -= POINT ON CUR VE PT=POINT OF TANGENCY WHERE THE CURVE ENDS PCC = POINT OF COMPOUND CURVE (WHERE RADIUS CHANGES) PRC = POINT OF REVERSE CURVE

NOTES

THE COORDINATES ARE BASED ON AN EXISTING CONDITIONS AS-BUILT FIELD SURVEY BY NORWOOD ENGINEERING CO INC BETWEEN NOVEMBER 15 TO DECEMBER 18 2019 TI-IE COORDINATES ARE BASED ON l1ASSACHUSETIS ST A TE PLANE COORDINATE SYSTEM NAD 1983 (FEET) THE ACCURACY OF THE COORDINATE LOCATIONS ARE +-0J FEET

Exhibit B to N1UL-Part II-EOS Coordmate Tables Page 13 ofl3 April 14 2021

---

1f~ flJr ~i

f ~~ J~i](M~I ~ 1 jf~ ~~f W-- )e 1

It lj fY pl ~-~j

I --- ~ ~

1 (J-c~ er ~

C JI fl JYf

1 ~ ~Yu-~ 1i

~r

( LOClJS P

SCAUllbulliQO

I ar lMIT flG PINI tMS _ lIIPMIDMICXNllRlnT~tlCfllUS 1111D cmuftraquodl s - NIKl1III tfIJIIIIIOfM~1HCll allE1

DAre Jllrl

NUKIJU LU6 DMitM

mmtG6DKbdlt

~4~-middot

~~I

-- ampnbullllf~ ~ fa

LEGEND 0

-i~wr0o-m lICUUoaampbullco--11111 _ _l_J

0

bull ~-ail_I

~-

mo(I ---fwj

amp~~~~ ~ ~~ltgtmiddot ~A~

~6

_L-r

bull -~ IBP__l-11Uil n-rlfl-lffll rMCllI 1a 1rr ai

-~ lll-lliI u-W--11a 1 Ml[ 411 amt l0IIC 3JICJ7 ~ 33-1--I- DIID llXII D111 JlMZ 411 lraquo- ~lUN~t --- - etMpound 11JII

~ MffD mmaat ZL I01t 111

1Jlll~-IICfIQfJICIISJ DfEI IC71- I~ 1~ 9 Cl 1VY IICIIWCLl~fCSC~lNCl

~11HltOXW1A~JtCI~llfB MXIC 1HI lME INCi 111M bull11 (S 1f41~middot~-~-)

~ io

0 0 0 0 -0 0 0 D O 1 middot tbull O

_- _pound ~ - Tf middot- ---r ~~ ~~- ~=middoti

r jil7bull --------4~-middot~

(

SCAtpound 1bull bull YI

I ~ tfAIE lIMa toafllltl1E ~NAD1w1(rJ

1 ~ PlIla II MMt QI 11D TD D111oPl

~c1MlntID9~~-l 1NIIJIIKlNI LnlJTU ~ deg qllAJSTE uM011111 iu1II 1111ZT IIIILJaZ

Exhibit C - Photo-Reduced Copy of Activity and Use Limitations Plan of Land

--~middot---

I ~111-11111

iiiii

-ill111liilt

ACJIYIJY ANJ) lJSE lJJll7ATJONS PLAN OF LANI)

81ACJ(81R1 I IINION Flr11lfES SllffllF7AVO SIle

o tfO SOIJIH s1ar HlltlPOtL IIAS

SCAlElrJAt IPfffl152021

1IJrwod Eng1neerlng

- EnQlbullHrlflg Compaffy middot~~=~ m Cm1JQ u fnfJa-eal

~ -

-~

9l1EET 1 OF I 8324-02

td ~

w ~ m 0 0

Id Q ii w ii

co co m

co 0

-l

~-77--raquo- -~I~ )middot~ ~ bull _I lT ~ v~

AI ~ If ~)middot~ 7- ~1 c t11 yil ~ ~ ~middot~41 bull1 l ~~l(i~r~1 f7 )ll y-

~~ f -~ -v fgtV ~ ~ ~ l er-- u -

tl x-P~C ()

JP yen f(( 11 1degpoundS -~ (

ftunrTfflllllTnallJrNNQWDf ~ ti IZNtRlTT lnH M IULS IIJIUIUlA-DlltlllllDlJlllIICIF tJbllt~llC~lJNp

DTl NlllltaJatl-Witiill (raquo11 iiiK(+til

I aJnlTlKATJlfl PlAH~ THE PUIIJll1T UC TIUlf Mlaquo THE l5 11 oawG ~ NII 1Hpound1as Of1111E111 AMllfrlTll9laquolllt Mpound ntem OPlaJ CJ1 IWM1pound BREn 011 bulln

~ ~illi~fli~ _lt ---c~-Clmiddot~~c0-nmiddotmiddot~bullJmiddot04~- ~--~--yen~~bull - L -bull -n ~ -r - ~ -

it

~ fr ~ ~- -~bull~bullv OG- ~n0

bull--ltmiddot middot~ -~- ~~-=~7~st~-~~~~i~~Hil~-) 2~C 0 ~~~~~ --------Y-Tgt-bullbullmiddot-

U-IU ~middotshy =i==-

bullbull bull _ -middot-

~----- ( ~11middot

__IC1ZMJ - bull IOC)0l lftEf ___ i gt mEKJllJfNG rotJ1FRIIIT AIIEAS B~ p~ AIIEAS ~ea-vmiddot LIUIID

~ e--- -+ ~ rzprz1za 1 ~ IJTATC PRC ~TC

nJml lltPtasCltJ

DUD BCD lJlll7 PMC 4H 1 1 YERT1CAL M1llI II NCCI ~ _ ro conurr DOD 80CIC 3JII07 llME 4H I ntaM NUIU 1121 IJ4TAI m IMlC 111111 nATIIW ~fsi

tJMAlfflOlI) AIIEAS1 bull 11AMJSCAlfl) AlpoundAS Lill] 1Dll IOlII POT PlCit 6115 J)-t20 ~atfnujK~tlLWlQI

~PUNMl-17 POflTIVNf1Ell llaD BaalC Tl_ Paa bullbull - 99 a 11

_-ijf1iltDP~IZ~ 5CME - JOSUva1fTLJ ~ ~-rr 111 C tMI=

bull111 I~

i=iiii7

~ e---

t c z rl

L-n11 ~

ACJIVJTY AND USE LIAlffAJIONS

PIAN OF RESTRIC1EJJ AREAS ANJJ COVER TYPES

fltACK1(fN _ llNlltgtI PfMIECCS SllPVFVNlJ51Tlt

JO _ lxJ srJllH STREET IIALPrJU JASS

SCAU I - 30 APRIL 2021

lcnwod Engineering

llarwood Cngnrilgtf cpmy -t~~~~

fIL Pllpa-ru - (1u]1a-lftll

~L=wl f 01~JII IO_

a SIEET I (F 2 B324-02

bj ~

w 0

0 0 deg It

iQ ~ w l11

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 1 of 2

CX) CX)

deg CX) 0

ntllT -1~1~ rurnlaquo1 r1n l1XTM 11Nf -r~ lie UUffCI 11Pt lDll1Hf iniin --IC unr1G Tlr 1n1rn Iota allll Ito tyen1tlll ~~11CRnrzJ11-11--~ci-- n31 nr111w11J1t ~bull c ~- diams JDrnn llloffl rcnlml IDII

-~ ]al rll _ _ PnlM-1-PI lbull-- ll7HrirrIPlllD1lf~-a bullbullll 111bull IClln9XnolDlllIIIIIIOm

214 ff7371JOOT ~bull JllC Ibullbull 171 JICllEY)l)vlUTlo~lUl~ ~li_~ -~~ MDlol ll4L~TllJraquofllllf190abullbullt ~~nQuu~~1aJI _~~OtottWU~1t11txm~arcPbrmllmCDt ~~ ~~ ~ =~ gj ~l11~ llltlM Mrattllll TDPmllIDCDI JJ4bull e~ _ ~ e PClC lbullI- 1- ~1sect~ ~ ~ ~ ~ ~~~-nr~44bull~mn11-a11 ~~ =mt =m~ ~ ~~ ~ =~~-~~ =~~rt~l~llibullltbull=

~~~~~~~~r-~r-~~sectsect55~55 ~~ ~=g~~ mi --1~ ~-==~~m~ L-~r UVPllrlllUillDITDr4L 1JI lbullKlllll~==~~~=~

~~~~~~~~ raquoff-llll 111rritl_aianbull ~11lCla rr- n ttll XDP11r1r 11111c-1C111~ RTl~rJlllllbullbull~llllJlllipo~~=r~tm=~~

~=~3r~t==~ ~=~i==~~ llt1ttl70 m~~n~ =n~ L diams 11- bull - iaEi~mi 1lE~HHffi ~1-~ E LbulllT bullU-7YA 8911U TMn4 OJII C- lllkHrnl1nlntll11106~

MJ9~gt111ftlrfffll11 ~ SbullC61hLJT raquoWl lll~IJlll11amp1 utVllllt a lbulllfGl bulllC lT

lliilH~1 ~~rm-=rn~ lbullIIIICU-1bull0

itt ishwI JUo ma m1 bull 1-c iiliii ~==~m~=~ Ullln U7IIY M1NLl411 fflf f-~ llr IL ~ lbullt Ill uaP11rllDn1rin1bull139nf- na_ 1111lnl ___ lWTDf-ID 111Jbullnllr-cishy

J1JT1 lflTI-noLbull COi lJ1 tsr18GOTDrl1~ 1--Cn ~~~==-=~ LbullS1rbull-p

LbulllI ~middot x1 fl11bull diams an l~J P-~ WI 1~1Slrmsraquo11nirorn 11bull1n-

llrgt 58 - TDrl ZJlJ l~ Zl llf4 Pll1raquo91I lnP~IIEI 11 ==~=-~~ lbullt-11bullh1~

nun_-~bullfllrlll_ lbulll-lrbull N- - nr6-11MII rinaus a 1bull1E-t1 im1 nrxi mr~ 7nn1 4i i 1c m llrS~iJ-ltJlillII Tt-Ul ris ~=~~middotiill~~ tf llDln~n1rJrgt11nbull1ric ~IPgt9nq~ It-MU rbull RflrrlllVllbulltPllbullOIIUAfC lbullnJtrNbull_~lD+4ftJSHJ7711JrllIIIIT144lDI lbulll ~I llfs-mllThn~-f 1bull11

1a5blH=i5gS El~ iE =iilli ~ID aH~~ ~~ leJINNllllfflnlt10ff1nll~1g=TI==~- lbullN~Jmiddot pw nrwuhtl tba11 l- lllllsectimiii~ ~ lllaquot ll116UW41 llllII NII Cl Ld bullt ll 11r 111~-~lHtl-IINOClll 1Dgtn~rMOtnllfbull3all)Mnr~bullwrmm11uoo~ ~r~ m~ = ~~ t~-i m NNtotl n11nn cm

~~~~~Ttr~ in Httl01llxl nlfM114ta cm

JJN n=-PIW - I- C lbullT rnr nnubullNoXI ffllPI n1 11-amp 11middot 77)111fflffPl~JlaUII

i1JJ n91lbull ti Jnlftbulllll QII

~g=~~~~ir~f~5 =i~=~~ ~=~ ~ ~j====goi H1111t-llll ffo~ ~rn tm111 ta1Vl~ tnar- IVI rm u1i ~ nw ~illl cm 1111 Hltt1H T7U 72w111ll tm UI ftffiH~bull1 naMUlI nlll

lltfll~IOUl rnes~ttlClll

~I~~=~=~~= l3111ratlQOJ121lllll CS u1n-n-a mn-c~11111llllilr ~====m~~ lbulllllr~~Oll~r1111-t~rtRiHa)toI

-~rt~_Utr111tt~USI ~m~i==r~~llfflpound1gtgtMllkllit1U10C011 annrxnbull-TCRL11ai~=~=~g)llllll~--rWltMJtt-8 DR Pl rraquof ntl rim Gllf CCI~~1r~~ liiilllii u- ntlt bull llJ~naJCDI

raquo11NMl10~Ullllcm ntrlnK)fL~nlln-1c lllf ~--TlJaft_Lmc i lbull1 bull l3il0 Nl-197) Ttlll1344 a LbullI 3 l diams 1-111 lflS 1111lOllt ffl- MP PII bullHI lgtl llJI l97Mlt Ian -ti DG llC

111111===-~~~=mg ====~~ tD rlrffllZllIITO-lfllCIIII=~tr~L~~~= - Pl~I llII TD_ ff~ tDII31119NIJMlDffU~~ H CZIII liii~mlt~ D1111nrn11GQ~-CaKftQNJWNczr41140ffnQCUII Jnffnt1JIIIIJunbull~1Qc20lll ~Pllli ll mrnnn lbulltlP 17Jrffdeg-degluoElJIIIQII

~-I-ti _nrna~rlll

a n- 4411 llbullQI 1=40 rt La n- lllf ffrgtn _Jr_~ Ullk ---rr~~ ~=~=tl~~ =1 nttltt nraquo 1nlU as

=-mn--~111DJIDII Ullgt~fflflnanaaJIIJalt55~~EIS~=~~ ~~)1 -11CIJII nn~bullbullbullnaKatt1ta1

JOIT ru~- rf- deg hJIIII r- 111111 ~1111) -1 aJ1 ld t11D1etlll_TalCIS -~-UCV~bullraquootur=~=~I~~=~--~ ~rsrgo_mlaquoshym rs~11flI ~- rnilr==~=~~ ~~r _ ~ atfl ~ rtw Dgtlnn-f-lEllln17n-UIIP

D11 fflXTJ111111 I~~ ar D1Jn4 ~leJJS-OnC111

=====5 middoti SHU=~ 5 ampn iliiiiiIiI11

ngtgtn~1~1tbullubull1rm DH tu~- lt11 rirmU1111 CDIII

~i~i555mi~ ~~ ~m=~==m~g===~~~~ tn1r JtW ~ma- PiOll a CU

~ XNr~t~fDllll1-all~~ m===~~ bullbull~W 111111 ==~~ ampT g~ ru~ =

~lU $Et=ni ~ llll0111ra1Ln~otqC011

H~ g==i =~1 ~

~111111 ~~g~n~a~J))pound11 1=~)6tia

~~ mEfHfH~Si

amp12Ct _ an ~

U N711f21th mM1LU aa o1bull~--117CII in4r ~llllll1Vffl-111Dlr lit~ Hmtlpound1 71 12L I CCIII ---~CUnMIIUOCVf JIHtlnn nl 7r ll4011CIIII

llllDNXCWZflDtlltllCIDCDr

~~=~==~=gnn n1raquoL bullw noanDNt CIJIIi=~ C~middot ~ ~ ~ HnffTI-QIJroQ__111PtlJIIInfflll bullbull1~ aaeIT t-- nrJD nJUntu~CllWI

m ~1 ~ ~~~ ~ ilria~gliiiji~=ir ~lt-OTT gl1raquo ~Iraquou fflllIL nllll 1111111 flC~middotIY_4allCCIIIi l1i5~ ~~11~middot~ ~~ ffll H71W786lll 7P-JOalllllll 2N ~ 1-flllt 7HIJl4- DI ~ ~==~ ~t-tr bullM-

114 Hit71aTra7ririatNOCIIII

llHl1Hf ll~7Dl4fIZIIICIIII 1141ftillf+1DllnTgtlMa~=~bull==~r Lbulll-lllbullbulllJJ

=~~~HR-~a ~ =iEri ~ ~=6

= 1MESE COCIIIOlfAlEi ARC 9~ at AH DISTlfG CONJmOfS AS-alLT FED 5UKiEY Y NORWDal EJICltJIJll(G CD~ IIElMEN ~ 1S 111 DECDaR a 2DII 1)pound OCICIIIDNAlES 5HCflI UIpound IIAID Cit MltSSAOfllffT5 STATE FlJriNII CDCffllNAT smult ~AO leJ (IMIJ 1HE ACQlltACY ltF 1HE COCftDINT[ LDCAnatS Mpound diams- 01 FtU

POINT DESCRIPTION ABBREVIATIONS~-~middotPC Pmlr Of CLIRIJC bullIEllL ClMNpound STilRlS PDC bull PtJtilTIIJOM1poundr ~ [raquo TAHCINiT W(R[ lll[ CURpound uroo Fo F[1NT(1t~tfflvt[ltft1llllIIUlt OMNtilE)PRC ~T oT ~pound ~Vlllrlt

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 2 of 2

I ~ IHAT nfl PlM MS 81D1 PIIDMQl ~WllTM(llUI MOIIEOIAAlPlllR~Df IIUPS C- lttE ~111 Cl__ HftNMIIIZlt

WWWWJU Cii6 liftitit

ACTIVITY ANI) USE LINTATIONS

PLAN OF RES7RIC1EJJ AREAS ANJJ COlER TYPES

8V CKlJ()RN IJNl()N PflllfpoundCpoundS SlllERFIIMJ SITC

50 HJ S(J11( SmEpoundT llAIPOIL JASS

=r-o ~ ll 2021

~ Engmeer1ng

Hltd ~~ middot~~-=~ra (f~AJ lIQ c- f

a llfEET 2 ltF 6324-02

td ~

w ~ m 0 0

Id Q ii w m

co co m 0 co

Bk 39600 Pg437 88608

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY New England Region

Five Post Office Square - Suite 100 Boston Massachusetts 02109-3912

INSTITUTIONAL CONTROL DESIGN STATEMENT FOR THE BLACKBURN AND UNION PRIVILEGES SUPERFUND SITE - EAST OF SOUTH STREET AREA

1 Introduction

Pursuant to the Comprehensive Environmental Response Compensation and Liability Act 42 USC sect 9601 et seq (CERCLA) and the National Contingency Plan 40 CFR Part 300 (the NCP) this document contains a description of the release events and site history that resulted in the contaminated media that require institutional controls in the fom1 of Activity and Use Limitations the basis for land use restrictions and uses that are consistent and inconsistent with the Selected Remedy ( as described below) This Institutional Control (IC) Design Statement pertains to a portion of the Blackburn and Union Privileges Superfund Site located in the Town of Walpole Massachusetts (the Site) which has been listed on EPAs National Priorities List (NPL) which portion is generally referred to as the East of South Street Area (the EOS Area) The EOS Area is located to the east of South Street in Walpole and is shown on Figure 1 attached hereto

A Notice of Activity and Use Limitation (NAUL) is necessary and appropriate for the EOS Area of the Site based on the fact that pursuant to EPAs risk evaluations asbestos arsenic trichloroethene (TCE) and certain polycyclic aromatic hydrocarbon (PAH) contan1inants remain in place in soils at levels higher than those appropriate for unlimited use or unrestricted exposure groundwater underlying the EOS Area contains hazardous substances at levels that present an unacceptable risk of exposure and remedial measures at the Site must be protected and maintained to ensure that the Selected Remedy remains protective

EPAs Record of Decision (ROD) dated September 30 2008 specified the need for institutional controls such as a NAUL to ensure long-tenn perfonnance and protectiveness of the Selected Remedy The institutional controls described herein are necessary and appropriate to ensure that the Selected Remedy for the Site remains protective of human health and the environment The remedy for the Site as described in the ROD is referred to herein and in the NAUL as the Selected Remedy

Page 1 of7

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 9: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

Bk 39600 Pg414 88608

300430(e)(2)(i) (b) interfere with the Selected Remedy or (c) cause a significant risk of harm to health safety public welfare or the environment pursuant to Chapter 21E and the MCP

Compliance with the terms and conditions of this Notice is subject to enforcement pursuant to Chapter 21 E the MCP MGL c 21 A sect 16 and 310 CMR 5 00 and CERCLA and the NCP Such enforcement may include without limitation enforcement with respect to (a) any activities or uses that may occur that are described in Paragraph 2 of this Notice as being inconsistent with the Selected Remedy (b) any failure to undertake any obligations and conditions described in Paragraph 3 of this Notice as being necessary to maintain the Selected Remedy and (c) any other failure to maintain the Selected Remedy or Pem1anent Solution resulting from a failure to act consistently with this Notice

7 Incorporation Into Deeds Mortgages Leases and Instruments of Transfer This Notice shall be incorporated either in full or by reference into all future deeds easements mortgages leases licenses occupancy agreements or any other instrument of transfer whereby an interest in andor a right to use the Property or a portion thereof is conveyed in accordance with 310 CMR 401074(5)

8 Reservation of Rights

This instrument shall not limit or otherwise affect the right of EPA andor MassDEP to obtain access to or restrict the use of the Property pursuant to CERCLA Chapter 21 E or any other applicable statute or regulation

This instrument shall not release the Owner or any other party from liability for releases of oil or hazardous substances or materials nor shall this instrument excuse the Owner or any other party from complying with CERCLA Chapter 21 E or any other applicable federal state or local laws regulations or ordinances or by-laws

Owner hereby authorizes and consents to the filing and recordation andor registration of this Notice said Notice to become effective when recorded andor registered with the appropriate Registry(ies) of Deeds andor Land Registration Office(s)

Page 9 of 12

Town of Walpole acting by and through the Board of Selectmen

n Town Administrator authorized by ard of Selectmen recorded herewith

Bk 39600 Pg415 88608

Witness the execution of this instrument under seal this 21_ day of df 11 ( 2021

COMMONWE

COUNTY OF NORFOLK ss

~ On this 21 day of 4f1 2021 before me the undersigned notary public

personally appeared James Johnson as Town Administrator for the Town of Walpole and proved to me to through satisfactory evidence of identification which was ~6laquo~ ~ -fr VJ1e [indicate ifdrivers license or passport or other document] to be the person whose name is signed on the preceding or attached document and acknowledged to me that signed it voluntarily for its stated purpose

Name CA~ U ~

My Commission Expires July S 2t)z

Page 10 of 12

--------

Bk 39600 Pg416 88608

In accordance with CERCLA 42 USC sect 9601 et seq and the National Contingency Plan the United States Environmental Protection Agency Region I hereby approves this Notice of Activity and Use Limitation

Name 8r~Cltvi Olso Director Superfund and Emerncy Management Division (SEMO)

US Environmental Protection Agency Region I

In accordance with MGL c 21E sect 6 and the Massachusetts Contingency Plan (310 CMR 400000) the Department of Environmental Protection hereby approves this Notice of Activity and Use Limitation (as to form only)

Date Paul W Locke Assistant Commissioner Bureau of Waste Site Cleanup Department of Environmental Protection

Page 11 of 12

---------------

Bk 39600 Pg417 88608

In accordance with CERCLA 42 USC sect 9601 et seq and the National Contingency Plan the United States EobulliionmenlaJ Protectioo Agency Region I hereby appro1es this Notice of Activity and Use Limitation

Date ~------

Name Director Superfund and Emergency Management Division (SEMO)

US Environmental Prokction i0 ency Region I

Jn accordance with MGL c 21 E sect 6 and the Massachusetts Contingency Plan (310 CMR 400000) the Depamnent ofEmironmental Prolectioo hereby approves this Norice ofActivity

and Use Limilarioo (as ro funn ooly)_ ~~

Dale 4r S microlJ ~ Paul W Locke Assisrant Commissioner Bureau ofWaste Site Cleanup Department of Environmental Protection

Page 11 of 12

Bk 39600 Pg418 88608

List of Exhibits

Exhibit A Legal Description of the Property Exhibit B Legal Description of the Restricted Area and Coordinates of Cover Types Exhibit C Photo-Reduced Copy of Activity and Use Limitations Plan of Land Exhibit D Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table Exhibit E Institutional Control Design Statement (EOS) Exhibit F Copy of Vote of Town of Walpole

Return to

Attn Kristine Sheehy Senior Real Estate Attorney FOLEY HOAG LLP Seaport West 155 Seaport Boulevard Boston Massachusetts 02210-2600

Page 12 of 12

Bk 39600 Pg419 88608

EXHIBIT A

Legal Description of Property The land with the improvements thereon located in Walpole Norfolk County Massachusetts bounded and described as follows

PARCEL I

The land on the Southeasterly side of South Street bounded

NORTHWESTERLY NORTHERLY AND AGAIN NORTHWESTERLY by South Street by seven lines measuring respectively

17027 feet 120 feet 22011 feet 1653 feet 325 89 feet 4515 feet and 1497 feet

NORTHEASTERLY by Gleason Court 2627 feet

SOUTHEASTERLY AGAIN NORTHEASTERLY AND AGAIN SOUTHEASTERLY by land now or fom1erly of Santomarco by five lines

measuring respectively 6750 feet 2050 feet 1190 feet 2952 feet and 2001 feet

NORTHEASTERLY AGAIN by said land of Santomarco and land now or formerly of Cashorali 10056 feet

NORTHWESTERLY AGAIN by said land of Cashorali 2845 feet

NORTHEASTERLY by land now or formerly of Muighitti 9007 feet

SOUTHEASTERLY by the location of Old Colony Railroad by three lines measuring respectively 6809 feet 32808 feet and 38250 feet

and

SOUTHWESTERLY by land now or formerly of Meyer by three lines AND SOUTHERLY measuring respectively 9143 feet 1998 feet and

15202 feet

Parcel I is described in the deed recorded with the Norfolk County Registry of Deeds in Book 4459 Page 287

A portion of said premises is shown on plan entitled Plan of Land in Walpole Mass Belonging to General Fibre Co Inc by Edward C Peterson CE dated January 16 1960 filed with the Norfolk Registry of Deeds as Plan No 849 of 1967 in Plan Book 223 and the remainder is shown on plan entitled Plan of Land in Walpole Massdeg by E Worthington Engineer dated February 6 193 7 recorded with said Deeds Book D2135 Page 8 I

FHBOSTON52454092

Bk 39600 Pg420 88608

PARCEL II Property known as Parcel 33-120 of the Town of Walpole Tax Assessors Map which is

part of the property situate in the Town of Walpole County ofNorfolk and Commonwealth of Massachusetts and being all of the right title and interest of The Penn Central Corporation in and to all those certain pieces or parcels of land and premises easements rights of way and any other rights of any kind whatsoever appurtenant thereto or used in conjunction therewith on and along a portion of Branch of Railroad known as the Wrentham Branch said portion of railroad being described as follows

Beginning at a line extended across the right of way of said Branch of rai road said line being the Northerly line of South Street and extending thence in a Northeasterly direction the distance of 2852 feet more or less along said Branch of rai Iroad to a line which is parallel with the Southwesterly line of Common Street said parallel line extending across said right of way through a point in the centerline thereof at railroad valuation survey station 733 + 67 more or less and being the place of ending

Parcel II is described in the deed recorded with the Norfolk Registry of Deeds in Book 7986 Page 372 and is a portion of the land shown on the plan recorded with said Deeds as Plan No 52 of 1983

FHBOSTON52454092

Bk 39600 Pg421 88608

Exhibit B Legal Description of the Restricted Area and Coordinates of Cover Types

Le2al Description for Restricted Area The area shown on the plan entitled Activity and Use Limitations Plan of Land Blackburn amp Union Privileges Superfund Site 50 amp 60 South Street Walpole Mass Scale l = 30 dated April 6 2021 by Norwood Engineering Company Inc recorded with the Norfolk Registry of Deeds in Plan Book 704 Page 41 being bounded and described as follows

Beginning at a point on the easterly sideline of South Street at the southerly point of curvature of Gleason Court on said plan thence

Northeasterly and curving to the right along an arc of a curve having a radius of twentyshyfive and 00100 (2500) feet a length of forty-five and 15100 (4515) feet thence

S 48deg1352 E a distance of twenty-two and 24100 (2224) feet the previous course by the southerly sideline of Gleason Court thence

s 32deg0208 w a distance of fifty-four and 78100 (54 78) feet thence

S 59deg27 32 E a distance of twenty and 50100 (2050) feet thence

S 47deg5252 E a distance of eleven and 90100 (1190) feet thence

S 49deg01 10 E a distance of twenty-nine and 58100 (2958) feet thence

s 38deg3108 w a distance oftwenty and 01100 (2001) feet thence

S 49deg00 57 E a distance of one hundred and 56100 (10056) feet thence

N 39deg5348 E a distance of twenty-eight and 45100 (2845) feet the previous seven (7) courses by land ofNF Thelma A Casborali thence

S 49deg0808 E a distance of ninety and 29100 (9029) feet the previous course by land ofNF Ming L Yau thence

s 25deg2312 w a distance of siliy-eight and 22100 (6822) feet to a point on the westerly sideline of a fonner railroad right of way the previous course by land of the Town of Walpole assessor parcel 33-121 thence

S 55deg2937 E a distance of ninety-nine and 78 100 (99 78) feet to a point of tangency on the easterly sideline of a forn1er railroad right of way thence

Page 1 of 13

Bk 39600 Pg422 88608

s 30deg11 32 w

S 23deg49 I6 W

N 66deg1044 W

N 23deg4908 E

N l 6deg00 52 E

S 37deg0240 E

N 10deg1437 W

N 34deg093 I W

N 11 deg5558E

Northeasterly

N 27deg41 48 E

a distance of three hundred and three and 74100 (30374) feet the previous course by land ofNF Nicholas H Dowd and NF Emilio P Baldassari thence

a distance of four hundred ninety and 86100 (49086) feet to a SBdh the previous two (2) courses by the easterly sideline of a former railroad right of way thence

a distance of eighty-two and 76100 (8276) feet to an Iron Pipe on the westerly sideline of the former railroad right of way thence

a distance of twelve and 09100 (1209) feet to a SBdh thence

a distance of ninety-six and 50100 (9650) feet to a S Bdh thence

a distance of fifteen and 00100 (1500) feet the previous three (3) courses by the westerly sideline of the former railroad right ofway and land of NF Joseph R Carpentieri and NF Joseph R and Faith N Carpentiero thence

a distance of ninety-two and 82100 (9282) feet the previous course by land ofNF Richard A and Josette M Burke thence

a distance of tvvo hundred thirty-seven and 86100 (23786) feet to a point on the easterly sideline of South Street thence

a distance of one hundred twenty and 00100 (12000) feet along the easterly sideline of South Street to a point of curvature of the easterly sideline of South Street thence

and curving to the right along an arc of a curve having a radius of eight hundred and 00100 (80000) feet a length of two hundred hventy and 11100 (22011) feet along the easterly sideline of South Street thence

a distance of three hundred forty-hvo and 42100 (34242) feet to the point of beginning

Containing 621 Acres of land more or less

Page 2 of 13

3000

3005

3010

3015

3020

3025

3030

Bk 39600 Pg423 88608

EXHIBIT B (cont)

Points and Coordinates associated with Restriction Areas and Cover Types for the Activity and Use Limitations (AUL) at 50 amp 60 South Street Walpole Mass

Point Northing Easting Type

Curve Curve Number Len2th Radius

28754430528 7236432250 COR

3001 28755604597 7236680368 PC L=7535 R=80000

3002 2875597 1222 7236766913 POC

3003 28756333366 7236870620 PT

3004 28756280754 723697 3031 COR

28756025570 7237001250 COR

3006 28755918670 7237001140 COR

3007 28755864440 7237 I 05890 COR

3008 28755903200 72371963 IO COR

3009 28756030893 7237217396 COR

28756042534 7237250325 COR

3011 28756021733 7237317808 COR

3012 28755800732 7237640949 COR

3013 2875552 1424 7237667395 COR

3014 28755321388 7237708416 COR

28755197081 7237834881 COR

3016 28755102230 7238045173 COR

3017 28754941531 7238291869 COR

3018 28754851375 7238512944 COR

3019 28754753441 7238824 760 COR

28754681541 723916 1881 COR

3021 28754608227 7239406506 COR

3022 28754515846 7239459928 COR

3023 2875426 7589 723943 8163 COR

3024 28754198016 7239590840 COR

28753886764 7239449006 COR

3026 2875329 7944 7239187206 COR

3027 28752506745 7238837890 COR

3028 28751859560 7238552142 COR

3029 28751221833 723827342 l COR

28750848788 7238107869 COR

3031 2875045 3654 7237927814 COR

3032 28750630420 7237527432 COR

3033 28750741023 723757 6257 COR

3034 28751668594 7237842488 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 3 of 13 April 14 2021

3035

3040

3045

3050

3055

3060

3065

3070

Bk 39600 Pg424 88608

Point Number

Northing Easting Type Curve Leneth

Curve Radius

28751548848 7237932869 COR

3036 28752462269 7237767802 COR

3037 28756438461 7236904209 POC L=2207 R=80000

3038 28756543084 7236939245 PT

3039 2875653 7987 7236954123 PC

28756597578 7237007344 POC L=1651 R=937

3041 28756594465 7237087181 PT

3042 28756459044 7237347021 PC L=347 R=220

3043 28756432531 7237363546 PT

3044 28756280644 7237286201 COR

28755924210 7237966952 COR

3046 28756081959 7238048554 PC L=472 R=236

3047 28756064922 7238084404 PT

3048 28755523491 7237845047 COR

3049 28755419845 7238081981 COR

28755460757 7238099621 PC L=240 R=l57

3051 28755467701 7238120241 PT 3052 28755398690 7238275280 COR

3053 28755365410 7238264910 COR

3054 28755087149 7238900449 COR

28755158001 7238931521 COR

3056 28755040360 7239199770 COR

3057 28755311720 7239318930 COR

3058 28755263010 7239429300 COR

3059 28755388260 7239484290 COR

28755348660 7239576000 COR

3061 28755625470 7239696500 COR

3062 28755664605 7239606601 COR

3063 28755736202 7239637768 COR

3064 28755621870 7239897370 COR

287 5567 6160 7239920410 COR

3066 28755718270 7239830260 COR

3067 2875587 9750 7239900310 COR

3068 28755718790 724026 7600 COR

3069 28755763390 7240285350 COR

28756035900 7239926600 COR

3071 28756086280 7239812770 COR

3072 28756089984 7239813649 COR

3073 28756229128 7239501910 PC L=482 R=l54

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 4 of 13 Apnl 14 2021

3075

3080

3085

3090

3095

3100

3105

3110

Bk 39600 Pg425 88608

Point Number

Northing Easting Type Curve Length

Curve Radius

3074 28756257366 7239513984 PT

28756185799 7239674928 COR

3076 28756739833 7239921136 COR

3077 28756876060 7239682275 COR

3078 28756948336 7239735898 PC L=335 R=298

3079 28756958235 7239766064 PT

28756866081 7239978133 COR

3081 28757166275 7240127374 COR

3082 28757068320 7240314640 COR

3083 28757602980 7240594310 COR

3084 28757700050 7240408736 COR

28758247941 7240688376 COR

3086 28758250190 7240683910 COR

3087 28758344979 7240738168 COR

3088 2875843 6103 7240581527 COR

3089 28758602943 7240664224 COR

28758740024 7240397393 COR

3091 28758605706 724032 7776 PC L=477 R=309

3092 28758594882 7240286013 PT

3093 28758666635 7240197585 PC L=2573 R=3127

3094 28758767113 7240118710 POC

28758890752 7240086604 PRC L=I653 R=3993

3096 28758972305 7240074125 POC

3097 28759049552 7240045 I 52 PT

3098 28759330312 7239734408 COR

3099 28759459414 7239588584 PC L=2269 R=5217

28759524821 7239496174 POC

3101 28759568752 7239391829 PRC L=1814 R=486

3102 28759603259 7239308095 POC

3103 28759653883 7239232999 PCC L=l31 R=088

3104 28759665694 7239231411 PT

28759800587 7239299586 COR

3106 28759986288 7238981214 COR

3107 2875983 5797 7238891829 COR

3108 28759879750 7238798689 COR

3109 28759905380 7238754769 PC L=1600 R=2552

28759963590 7238700398 POC

3111 28760035727 7238666620 PT

3112 28760700665 723901 5672 PC L=4515 R=2500

3113 28760830230 7239191198 POC

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 5 of 13 April 14 2021

3115

3120

3125

3130

3135

3140

3145

3150

Bk 39600 Pg426 88608

Point Number

Northing Easting Type Curve Len2th

Curve Radius

3114 2876077 263 6 723 940 1624 PT 28760624518 7239567466 COR

3116 28760160100 7239276864 COR

3117 28760055928 7239453423 COR

3137 28759976118 7239541692 COR

3118 28759782139 7239764992 COR

3119 28759625581 7239640375 COR

28758966057 7240399493 COR

3121 28759184326 7240581973 COR

3122 28758593598 724126478] COR

3123 28757977293 724097 2314 COR

3124 28757716516 7241351659 COR

28757288251 7241140719 COR

3126 28756725827 7240851862 COR

3127 28756162468 7240586126 COR

3128 28755614498 7240338506 COR

3129 28754346745 7239768507 COR

28753845716 7239540194 COR

3131 28753257436 723927 8634 COR

3132 28752466355 7238929370 COR

3133 28751819340 7238643698 COR

3134 28751181527 7238364939 COR

28750807772 7238199071 COR

3136 28750413263 7238019301 COR

3138 28756920317 7237298739 PC L=l941 R=2104

3139 28756827128 7237274848 POC

28756733047 7237294944 PRC L=401 R=l66

3141 2875671 1336 723 727 2844 PCC L=1492 R=13345

3142 28756744594 7237206091 POC

3143 28756781529 7237141301 PCC L=1419 R=l018

3144 28756833084 7237094642 POC

28756902566 7237091952 PCC L=2413 R=157959

3146 28757017337 7237129167 POC

3147 28757131820 7237167258 PCC L=330I R=S0000

3148 28757282552 7237234442 POC

3149 28757431866 7237304721 PT 28757338390 7237495930 COR

3151 28757541620 7237605380 COR

3152 28756897590 723883 4280 COR

Exhibit B to NA UL-Part 11-EOS Coordinate Tables Page 6 of 3 April 14 202

3155

3160

3165

3170

3175

3180

3185

Bk 39600 Pg427 88608

Point Northing Easting Type Curve Cunbulle

Number Lenszth Radius 3153 28756870623 7238820218 COR

3154 28756838273 7238882258 COR

28756865240 7238896320 COR

3156 28756777004 7239062996 COR

3157 28756770439 7239063663 PC L=l 146 R=2269

3158 2875665836 I 7239046180 PCC L=l423 R=957

3159 2875661 7520 7238989913 POC

28756625544 7238920850 PT

3161 28756728525 7238726583 PC L=232 R=l58

3162 28756748720 7238720236 PT

3163 28756899634 7238797341 COR

3164 28757254653 7238121363 COR

28757520153 723761266 7 COR

3166 28757306899 723 750 IO 10 COR

3167 28756690336 7237500169 PC L=243 R=I68

3168 28756682599 7237479273 PT

3169 28756686990 7237469583 PC L=0250 R=l68

28756708806 7237463018 PT 3171 28757000109 7237616354 PC L=233 R=l73

3172 28757005368 7237637270 PT

3173 28757000998 7237645513 PC L=233 R=l69

3174 28756980219 7237651023 PT

28756429209 7238339422 COR

3176 28756342982 7238506849 COR

3177 28756500076 7238596485 PC L=l19 R=l48

3178 28756499701 7238608072 PT 3179 2875644 7813 7238705611 PC L=l 182 R=483

28756358177 723 869 0707 PT

3181 2875623 6099 7238376388 PC L=443 R=467

3182 28756235611 7238333779 PCC L=343 R=9IO

3183 28756249049 7238302418 PCC L=412 R=9IO

3184 28756278952 7238274519 PCC L=368 R=300

28756313362 7238277619 PT

3186 28756282498 7238911796 PC L748 R=216

3187 28756240650 7238919721 PT

3188 28756126081 7238620406 PC L=323 R162

3189 28756138645 7238591575 PCC L=333 R=283

Exhibit B to NAUL-Part II-EOS Coordmate Tables Page 7 of 13 April 14 2021

3190

3195

3200

3205

3210

3215

3220

Bk 39600 Pg428 88608

Point Number Northing Easting Type Curve

Leneth Curve Radius

28756163375 7238602867 PT

3191 2875523 0908 7238765275 COR

3192 28755205040 7238752740 COR

3193 28755391740 7238328470 COR

3194 28755466840 7238361040 COR

28755452760 7238392590 COR

3196 28755516920 7238421040 COR

3197 28755530690 7238388730 COR

3198 28755603230 7238421460 COR

3199 2875555 7568 723852 7053 COR

28755371220 7238445330 COR

3201 28755629198 7238558466 COR

3202 28755676040 7238453290 COR

3203 28755925410 7238563840 PC L=1902 R=3548

3204 28755927383 7238658634 POC

28755954390 7238749520 PT 3206 28755974770 7238807230 COR

3207 28755779200 7238881701 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

28755746700 7238609997 COR

3211 2875593774 7239036608 COR

3212 28756048460 7238996850 PC l=1445 R=2903

3213 28756070631 7239065422 POC

3214 28756109010 7239126420 PT

28756153820 7239182190 PC L=S98 R=848

3216 28756171980 723923 7880 PT

3217 287S6026148 7239566166 COR

3218 28756003865 7239556465 COR

3219 287S6134380 7239256650 COR

28755998460 7239195370 COR

3221 2875600 71S0 7239174530 COR

3222 28756001791 7239172152 COR

3223 28756040451 7239079437 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 8 of 13 April 14 2021

Bk 39600 Pg429 88608

Point Number

3210

3200

3056

3057

3058

3059

3060

3061

3062

3218

3219

3220

3221

3224

3225

3226

3227

3228

3070

3071

3234

3233

3235

3236

3237

3238

3239

3240

3241

3242

3243

3244

3245

3246

3247

3248

Northing

28755746700

28755371220

28755040360

28755311720

28755263010

28755388260

28755348660

2875562 54 70

28755664605

28756003865

28756134380

28755998460

28756007150

28755941340

28755962080

28755867937

28755819702

28755766128

28756035900

28756086280

28755991990

28755942100

28756477248

28756677238

28756650130

28756473307

28756480112

28756675030

28756724454

28756742099

28756742133

28756703924

28756640759

28757607280

28757401530

28757467350

Easting

7238609997

7238445330

7239199770

7239318930

7239429300

7239484290

7239576000

7239696500

7239606601

7239556465

7239256650

7239195370

7239174530

7239145324

7239100930

7239061674

7238935003

7238911508

7239926600

7239812770

7239769910

7239884050

7239261913

7239253008

7239321810

7239319038

7239298824

7239364440

7239271845

7239292625

723935 0187

7239393239

7239393096

7237584960

7237475300

7237345620

Type

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

PC PCC

POC

PCC

PT

COR

COR

COR

Curve Len2th

L=273

L=ll77

L=657

Cunmiddote Radius

R=1421

R=810

R=679

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 9 of 13 April 14 2021

Bk 39600 Pg430 88608

Point Number Northing Easting Type Curve

Len2th Curve Radius

3249 287 57514570 7237372360 PC l=ll05 R=1993

3250 287 57 588060 7237452980 PT

3251 28757631382 7237429676 PC L=2244 R=2352

3252 287 5765 6810 7237537876 POC

3253 2875 762 9720 7237645671 PT

3254 28756940655 7238952710 PC l=1493 R=1509

3255 28756901845 7239015577 POC

3256 2875683 7836 7239052474 PT

3257 28758104824 7237653014 COR

3258 28758028960 7237800160 COR

3259 28757949530 7237760790 COR

3260 28757901005 7237855021 COR

3261 28757839230 7237820908 PC L=273 R=l33

3262 28757830688 7237799810 PCC L=539 R=2144

3263 28757852974 7237750897 PT

3264 28757891705 7237688178 PC L=lS26 R=2432

3265 28757948636 7237637880 POC

3266 287 58018307 7237607597 PT

3248 28757467350 7237345620 COR

3267 28757550832 7237363444 POC L=2653 R=80000

3268 28757668809 7237424132 PT

3269 28757504 719 7238817989 COR

3270 28757493010 7238842230 COR

3271 28757561074 7238880970 COR

3272 28757483953 7239024127 PC L=323 R=l70

3273 28757459939 7239037846 PT

3274 28757311605 7238957122 PC L=1388 R=906

3275 2875727 2732 7238901647 POC

3276 28757283181 7238834718 PT

3277 287 5733 4061 7238752337 PC L=255 R=l60

3278 287 5735 5527 7238744411 PT

3279 2875 7102815 7239517199 PC l=261 R=l70

3280 28757080654 7239525307 PCC l=909 R=1275

3281 2875 700 5390 7239477911 PCC L=l007 R=990

3282 28756999624 7239381704 PT

3283 2875707 7705 7239230604 PC L=ll14 R=907

Exhibit B lo NAUL-Part IlbullEOS Coordinate Tables Page 10 of13 April 14 2021

3285

3290

3295

3300

3305

3310

3315

Bk 39600 Pg431 88608

Point Number Northing Easting Type

Curve Leneth

Curve Radius

3284 28757168066 7239178102 PT

28757205717 7239186398 PC L=518 R=930

3286 28757249003 7239213534 PCC L=l41 R=086

3287 2875724 7909 7239226048 PT

3288 28758415755 7239842757 PC L=251 R=l59

3289 28758437695 7239837379 PT

28758456377 7239846949 PC L=812 R=876

3291 28758494897 7239915165 PCC L=456 R=757

3292 28758483790 7239958646 PT

3293 28758405147 7240111348 PC L=l057 R=955

3294 28758318136 7240161452 PCC L=477 R=l063

28758272407 7240149529 PCC L=250 R=l60

3296 28758265647 7240128003 PT

3297 28758157937 7237680895 COR

3298 28758902927 723807 1969 COR

3299 28758852531 7238168280 COR

28758779660 7238129750 COR

3301 28758746973 7238192072 COR

3302 2875807 6630 7237840490 COR

3303 28758049940 7237894220 COR

3304 2875871 7997 7238243620 COR

28758680103 7238315946 COR

3306 28758533699 7238239240 COR

3307 2875852 6899 7238252220 COR

3308 28758098180 7238027600 COR

3309 28757974484 7238264223 COR

28757957598 7238255513 COR

3311 28757757732 7238637845 COR

3312 28757774584 7238646620 COR

3313 28757653710 723887 7846 COR

3314 28757560920 7238829340 COR

28759004930 7238125514 COR

3316 28759689797 7238485028 PC L=1992 R=2609

3317 28759697204 7238583760 POC

3318 28759667288 723867 8142 PT

3319 28758996126 7238323718 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 11 of 13 April 14202 I

Bk 39600 Pg432 88608

Point Number

Northing Easting Type Curve Lenfth

Curve Radius

3320 28759028950 7238261560 COR 3321 28758954486 7238222188 COR

3322 28758972523 7238378387 COR 3323 28759421550 7238613630 COR 3324 28759377933 7238698105 COR 3325 2875907 4811 7238539289 COR 3326 28759081611 7238526309 COR 3327 28758935210 7238449604 COR

3328 28759464470 7238637330 COR 3329 28759632674 7238722481 PC L=ll83 R=l578

3330 28759583973 7238755474 POC 3331 28759526573 7238768343 PRC L=2163 R=2455

3332 28759422964 7238796123 POC 3333 28759341091 7238865430 PT

3334 28759193370 7239050710 COR 3335 28759416340 7239163940 COR 3336 28759263600 7239455620 COR 3337 28759043690 7239336510 COR 3338 28758935490 7239552130 COR 3339 28757650890 7238883240 COR 3312 28757774584 7238646620 COR 3311 28757757732 7238637845 COR 3310 28757957598 7238255513 COR 3309 28757974484 7238264223 COR 3308 28758098180 723802 7600 COR 3307 28758526899 7238252220 COR 3306 28758533699 7238239240 COR 3340 28758700033 7238326388 COR 3341 28758675436 7238373334 COR 3342 28758733013 7238403500 COR 3343 28758760858 7238350353 COR 3344 28758860952 7238402796 COR 3345 28758833106 7238455943 COR 3346 28758890683 7238486109 COR 3347 28758915280 7238439162 COR 3326 28759081611 7238526309 COR 3325 28759074811 7238539289 COR

Exhibit B to NAUL-Part H-EOS Coordinate Tables Page 12 of l3 April 14 2021

Bk 39600 Pg433 88608

Point Number

Northing Easting Type Curve Len2th

Cunbulle Radius

3324 2875937 7933 7238698105 COR

3082 28757068320 7240314640 COR 3083 28757602980 7240594310 COR 3349 28757790234 7240236327 COR

3348 28757255574 7239956657 COR

3124 28757716516 7241351659 COR 3125 28757288251 7241140719 COR 3126 28756725827 7240851862 COR 3127 28756162468 7240586126 COR 3128 287 55614498 7240338506 COR 3129 28754346745 7239768507 COR 3130 28753845716 7239540194 COR 3131 28753257436 723927 8634 COR 3132 28752466355 7238929370 COR 3133 28751819340 7238643698 COR 3134 2875118152 7 7238364939 COR 3135 2875080 7772 7238199071 COR 3136 28750413263 7238019301 COR 3350 28750296168 7238284525 COR 3351 28754 78 6636 7240267040 COR 3352 28757412029 7241794586 COR

POINT DESCRIPTION ABBREVIATIONS

COR=CORNER PC= POINT OF CURVE WHERE CURVE STARTS POC -= POINT ON CUR VE PT=POINT OF TANGENCY WHERE THE CURVE ENDS PCC = POINT OF COMPOUND CURVE (WHERE RADIUS CHANGES) PRC = POINT OF REVERSE CURVE

NOTES

THE COORDINATES ARE BASED ON AN EXISTING CONDITIONS AS-BUILT FIELD SURVEY BY NORWOOD ENGINEERING CO INC BETWEEN NOVEMBER 15 TO DECEMBER 18 2019 TI-IE COORDINATES ARE BASED ON l1ASSACHUSETIS ST A TE PLANE COORDINATE SYSTEM NAD 1983 (FEET) THE ACCURACY OF THE COORDINATE LOCATIONS ARE +-0J FEET

Exhibit B to N1UL-Part II-EOS Coordmate Tables Page 13 ofl3 April 14 2021

---

1f~ flJr ~i

f ~~ J~i](M~I ~ 1 jf~ ~~f W-- )e 1

It lj fY pl ~-~j

I --- ~ ~

1 (J-c~ er ~

C JI fl JYf

1 ~ ~Yu-~ 1i

~r

( LOClJS P

SCAUllbulliQO

I ar lMIT flG PINI tMS _ lIIPMIDMICXNllRlnT~tlCfllUS 1111D cmuftraquodl s - NIKl1III tfIJIIIIIOfM~1HCll allE1

DAre Jllrl

NUKIJU LU6 DMitM

mmtG6DKbdlt

~4~-middot

~~I

-- ampnbullllf~ ~ fa

LEGEND 0

-i~wr0o-m lICUUoaampbullco--11111 _ _l_J

0

bull ~-ail_I

~-

mo(I ---fwj

amp~~~~ ~ ~~ltgtmiddot ~A~

~6

_L-r

bull -~ IBP__l-11Uil n-rlfl-lffll rMCllI 1a 1rr ai

-~ lll-lliI u-W--11a 1 Ml[ 411 amt l0IIC 3JICJ7 ~ 33-1--I- DIID llXII D111 JlMZ 411 lraquo- ~lUN~t --- - etMpound 11JII

~ MffD mmaat ZL I01t 111

1Jlll~-IICfIQfJICIISJ DfEI IC71- I~ 1~ 9 Cl 1VY IICIIWCLl~fCSC~lNCl

~11HltOXW1A~JtCI~llfB MXIC 1HI lME INCi 111M bull11 (S 1f41~middot~-~-)

~ io

0 0 0 0 -0 0 0 D O 1 middot tbull O

_- _pound ~ - Tf middot- ---r ~~ ~~- ~=middoti

r jil7bull --------4~-middot~

(

SCAtpound 1bull bull YI

I ~ tfAIE lIMa toafllltl1E ~NAD1w1(rJ

1 ~ PlIla II MMt QI 11D TD D111oPl

~c1MlntID9~~-l 1NIIJIIKlNI LnlJTU ~ deg qllAJSTE uM011111 iu1II 1111ZT IIIILJaZ

Exhibit C - Photo-Reduced Copy of Activity and Use Limitations Plan of Land

--~middot---

I ~111-11111

iiiii

-ill111liilt

ACJIYIJY ANJ) lJSE lJJll7ATJONS PLAN OF LANI)

81ACJ(81R1 I IINION Flr11lfES SllffllF7AVO SIle

o tfO SOIJIH s1ar HlltlPOtL IIAS

SCAlElrJAt IPfffl152021

1IJrwod Eng1neerlng

- EnQlbullHrlflg Compaffy middot~~=~ m Cm1JQ u fnfJa-eal

~ -

-~

9l1EET 1 OF I 8324-02

td ~

w ~ m 0 0

Id Q ii w ii

co co m

co 0

-l

~-77--raquo- -~I~ )middot~ ~ bull _I lT ~ v~

AI ~ If ~)middot~ 7- ~1 c t11 yil ~ ~ ~middot~41 bull1 l ~~l(i~r~1 f7 )ll y-

~~ f -~ -v fgtV ~ ~ ~ l er-- u -

tl x-P~C ()

JP yen f(( 11 1degpoundS -~ (

ftunrTfflllllTnallJrNNQWDf ~ ti IZNtRlTT lnH M IULS IIJIUIUlA-DlltlllllDlJlllIICIF tJbllt~llC~lJNp

DTl NlllltaJatl-Witiill (raquo11 iiiK(+til

I aJnlTlKATJlfl PlAH~ THE PUIIJll1T UC TIUlf Mlaquo THE l5 11 oawG ~ NII 1Hpound1as Of1111E111 AMllfrlTll9laquolllt Mpound ntem OPlaJ CJ1 IWM1pound BREn 011 bulln

~ ~illi~fli~ _lt ---c~-Clmiddot~~c0-nmiddotmiddot~bullJmiddot04~- ~--~--yen~~bull - L -bull -n ~ -r - ~ -

it

~ fr ~ ~- -~bull~bullv OG- ~n0

bull--ltmiddot middot~ -~- ~~-=~7~st~-~~~~i~~Hil~-) 2~C 0 ~~~~~ --------Y-Tgt-bullbullmiddot-

U-IU ~middotshy =i==-

bullbull bull _ -middot-

~----- ( ~11middot

__IC1ZMJ - bull IOC)0l lftEf ___ i gt mEKJllJfNG rotJ1FRIIIT AIIEAS B~ p~ AIIEAS ~ea-vmiddot LIUIID

~ e--- -+ ~ rzprz1za 1 ~ IJTATC PRC ~TC

nJml lltPtasCltJ

DUD BCD lJlll7 PMC 4H 1 1 YERT1CAL M1llI II NCCI ~ _ ro conurr DOD 80CIC 3JII07 llME 4H I ntaM NUIU 1121 IJ4TAI m IMlC 111111 nATIIW ~fsi

tJMAlfflOlI) AIIEAS1 bull 11AMJSCAlfl) AlpoundAS Lill] 1Dll IOlII POT PlCit 6115 J)-t20 ~atfnujK~tlLWlQI

~PUNMl-17 POflTIVNf1Ell llaD BaalC Tl_ Paa bullbull - 99 a 11

_-ijf1iltDP~IZ~ 5CME - JOSUva1fTLJ ~ ~-rr 111 C tMI=

bull111 I~

i=iiii7

~ e---

t c z rl

L-n11 ~

ACJIVJTY AND USE LIAlffAJIONS

PIAN OF RESTRIC1EJJ AREAS ANJJ COVER TYPES

fltACK1(fN _ llNlltgtI PfMIECCS SllPVFVNlJ51Tlt

JO _ lxJ srJllH STREET IIALPrJU JASS

SCAU I - 30 APRIL 2021

lcnwod Engineering

llarwood Cngnrilgtf cpmy -t~~~~

fIL Pllpa-ru - (1u]1a-lftll

~L=wl f 01~JII IO_

a SIEET I (F 2 B324-02

bj ~

w 0

0 0 deg It

iQ ~ w l11

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 1 of 2

CX) CX)

deg CX) 0

ntllT -1~1~ rurnlaquo1 r1n l1XTM 11Nf -r~ lie UUffCI 11Pt lDll1Hf iniin --IC unr1G Tlr 1n1rn Iota allll Ito tyen1tlll ~~11CRnrzJ11-11--~ci-- n31 nr111w11J1t ~bull c ~- diams JDrnn llloffl rcnlml IDII

-~ ]al rll _ _ PnlM-1-PI lbull-- ll7HrirrIPlllD1lf~-a bullbullll 111bull IClln9XnolDlllIIIIIIOm

214 ff7371JOOT ~bull JllC Ibullbull 171 JICllEY)l)vlUTlo~lUl~ ~li_~ -~~ MDlol ll4L~TllJraquofllllf190abullbullt ~~nQuu~~1aJI _~~OtottWU~1t11txm~arcPbrmllmCDt ~~ ~~ ~ =~ gj ~l11~ llltlM Mrattllll TDPmllIDCDI JJ4bull e~ _ ~ e PClC lbullI- 1- ~1sect~ ~ ~ ~ ~ ~~~-nr~44bull~mn11-a11 ~~ =mt =m~ ~ ~~ ~ =~~-~~ =~~rt~l~llibullltbull=

~~~~~~~~r-~r-~~sectsect55~55 ~~ ~=g~~ mi --1~ ~-==~~m~ L-~r UVPllrlllUillDITDr4L 1JI lbullKlllll~==~~~=~

~~~~~~~~ raquoff-llll 111rritl_aianbull ~11lCla rr- n ttll XDP11r1r 11111c-1C111~ RTl~rJlllllbullbull~llllJlllipo~~=r~tm=~~

~=~3r~t==~ ~=~i==~~ llt1ttl70 m~~n~ =n~ L diams 11- bull - iaEi~mi 1lE~HHffi ~1-~ E LbulllT bullU-7YA 8911U TMn4 OJII C- lllkHrnl1nlntll11106~

MJ9~gt111ftlrfffll11 ~ SbullC61hLJT raquoWl lll~IJlll11amp1 utVllllt a lbulllfGl bulllC lT

lliilH~1 ~~rm-=rn~ lbullIIIICU-1bull0

itt ishwI JUo ma m1 bull 1-c iiliii ~==~m~=~ Ullln U7IIY M1NLl411 fflf f-~ llr IL ~ lbullt Ill uaP11rllDn1rin1bull139nf- na_ 1111lnl ___ lWTDf-ID 111Jbullnllr-cishy

J1JT1 lflTI-noLbull COi lJ1 tsr18GOTDrl1~ 1--Cn ~~~==-=~ LbullS1rbull-p

LbulllI ~middot x1 fl11bull diams an l~J P-~ WI 1~1Slrmsraquo11nirorn 11bull1n-

llrgt 58 - TDrl ZJlJ l~ Zl llf4 Pll1raquo91I lnP~IIEI 11 ==~=-~~ lbullt-11bullh1~

nun_-~bullfllrlll_ lbulll-lrbull N- - nr6-11MII rinaus a 1bull1E-t1 im1 nrxi mr~ 7nn1 4i i 1c m llrS~iJ-ltJlillII Tt-Ul ris ~=~~middotiill~~ tf llDln~n1rJrgt11nbull1ric ~IPgt9nq~ It-MU rbull RflrrlllVllbulltPllbullOIIUAfC lbullnJtrNbull_~lD+4ftJSHJ7711JrllIIIIT144lDI lbulll ~I llfs-mllThn~-f 1bull11

1a5blH=i5gS El~ iE =iilli ~ID aH~~ ~~ leJINNllllfflnlt10ff1nll~1g=TI==~- lbullN~Jmiddot pw nrwuhtl tba11 l- lllllsectimiii~ ~ lllaquot ll116UW41 llllII NII Cl Ld bullt ll 11r 111~-~lHtl-IINOClll 1Dgtn~rMOtnllfbull3all)Mnr~bullwrmm11uoo~ ~r~ m~ = ~~ t~-i m NNtotl n11nn cm

~~~~~Ttr~ in Httl01llxl nlfM114ta cm

JJN n=-PIW - I- C lbullT rnr nnubullNoXI ffllPI n1 11-amp 11middot 77)111fflffPl~JlaUII

i1JJ n91lbull ti Jnlftbulllll QII

~g=~~~~ir~f~5 =i~=~~ ~=~ ~ ~j====goi H1111t-llll ffo~ ~rn tm111 ta1Vl~ tnar- IVI rm u1i ~ nw ~illl cm 1111 Hltt1H T7U 72w111ll tm UI ftffiH~bull1 naMUlI nlll

lltfll~IOUl rnes~ttlClll

~I~~=~=~~= l3111ratlQOJ121lllll CS u1n-n-a mn-c~11111llllilr ~====m~~ lbulllllr~~Oll~r1111-t~rtRiHa)toI

-~rt~_Utr111tt~USI ~m~i==r~~llfflpound1gtgtMllkllit1U10C011 annrxnbull-TCRL11ai~=~=~g)llllll~--rWltMJtt-8 DR Pl rraquof ntl rim Gllf CCI~~1r~~ liiilllii u- ntlt bull llJ~naJCDI

raquo11NMl10~Ullllcm ntrlnK)fL~nlln-1c lllf ~--TlJaft_Lmc i lbull1 bull l3il0 Nl-197) Ttlll1344 a LbullI 3 l diams 1-111 lflS 1111lOllt ffl- MP PII bullHI lgtl llJI l97Mlt Ian -ti DG llC

111111===-~~~=mg ====~~ tD rlrffllZllIITO-lfllCIIII=~tr~L~~~= - Pl~I llII TD_ ff~ tDII31119NIJMlDffU~~ H CZIII liii~mlt~ D1111nrn11GQ~-CaKftQNJWNczr41140ffnQCUII Jnffnt1JIIIIJunbull~1Qc20lll ~Pllli ll mrnnn lbulltlP 17Jrffdeg-degluoElJIIIQII

~-I-ti _nrna~rlll

a n- 4411 llbullQI 1=40 rt La n- lllf ffrgtn _Jr_~ Ullk ---rr~~ ~=~=tl~~ =1 nttltt nraquo 1nlU as

=-mn--~111DJIDII Ullgt~fflflnanaaJIIJalt55~~EIS~=~~ ~~)1 -11CIJII nn~bullbullbullnaKatt1ta1

JOIT ru~- rf- deg hJIIII r- 111111 ~1111) -1 aJ1 ld t11D1etlll_TalCIS -~-UCV~bullraquootur=~=~I~~=~--~ ~rsrgo_mlaquoshym rs~11flI ~- rnilr==~=~~ ~~r _ ~ atfl ~ rtw Dgtlnn-f-lEllln17n-UIIP

D11 fflXTJ111111 I~~ ar D1Jn4 ~leJJS-OnC111

=====5 middoti SHU=~ 5 ampn iliiiiiIiI11

ngtgtn~1~1tbullubull1rm DH tu~- lt11 rirmU1111 CDIII

~i~i555mi~ ~~ ~m=~==m~g===~~~~ tn1r JtW ~ma- PiOll a CU

~ XNr~t~fDllll1-all~~ m===~~ bullbull~W 111111 ==~~ ampT g~ ru~ =

~lU $Et=ni ~ llll0111ra1Ln~otqC011

H~ g==i =~1 ~

~111111 ~~g~n~a~J))pound11 1=~)6tia

~~ mEfHfH~Si

amp12Ct _ an ~

U N711f21th mM1LU aa o1bull~--117CII in4r ~llllll1Vffl-111Dlr lit~ Hmtlpound1 71 12L I CCIII ---~CUnMIIUOCVf JIHtlnn nl 7r ll4011CIIII

llllDNXCWZflDtlltllCIDCDr

~~=~==~=gnn n1raquoL bullw noanDNt CIJIIi=~ C~middot ~ ~ ~ HnffTI-QIJroQ__111PtlJIIInfflll bullbull1~ aaeIT t-- nrJD nJUntu~CllWI

m ~1 ~ ~~~ ~ ilria~gliiiji~=ir ~lt-OTT gl1raquo ~Iraquou fflllIL nllll 1111111 flC~middotIY_4allCCIIIi l1i5~ ~~11~middot~ ~~ ffll H71W786lll 7P-JOalllllll 2N ~ 1-flllt 7HIJl4- DI ~ ~==~ ~t-tr bullM-

114 Hit71aTra7ririatNOCIIII

llHl1Hf ll~7Dl4fIZIIICIIII 1141ftillf+1DllnTgtlMa~=~bull==~r Lbulll-lllbullbulllJJ

=~~~HR-~a ~ =iEri ~ ~=6

= 1MESE COCIIIOlfAlEi ARC 9~ at AH DISTlfG CONJmOfS AS-alLT FED 5UKiEY Y NORWDal EJICltJIJll(G CD~ IIElMEN ~ 1S 111 DECDaR a 2DII 1)pound OCICIIIDNAlES 5HCflI UIpound IIAID Cit MltSSAOfllffT5 STATE FlJriNII CDCffllNAT smult ~AO leJ (IMIJ 1HE ACQlltACY ltF 1HE COCftDINT[ LDCAnatS Mpound diams- 01 FtU

POINT DESCRIPTION ABBREVIATIONS~-~middotPC Pmlr Of CLIRIJC bullIEllL ClMNpound STilRlS PDC bull PtJtilTIIJOM1poundr ~ [raquo TAHCINiT W(R[ lll[ CURpound uroo Fo F[1NT(1t~tfflvt[ltft1llllIIUlt OMNtilE)PRC ~T oT ~pound ~Vlllrlt

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 2 of 2

I ~ IHAT nfl PlM MS 81D1 PIIDMQl ~WllTM(llUI MOIIEOIAAlPlllR~Df IIUPS C- lttE ~111 Cl__ HftNMIIIZlt

WWWWJU Cii6 liftitit

ACTIVITY ANI) USE LINTATIONS

PLAN OF RES7RIC1EJJ AREAS ANJJ COlER TYPES

8V CKlJ()RN IJNl()N PflllfpoundCpoundS SlllERFIIMJ SITC

50 HJ S(J11( SmEpoundT llAIPOIL JASS

=r-o ~ ll 2021

~ Engmeer1ng

Hltd ~~ middot~~-=~ra (f~AJ lIQ c- f

a llfEET 2 ltF 6324-02

td ~

w ~ m 0 0

Id Q ii w m

co co m 0 co

Bk 39600 Pg437 88608

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY New England Region

Five Post Office Square - Suite 100 Boston Massachusetts 02109-3912

INSTITUTIONAL CONTROL DESIGN STATEMENT FOR THE BLACKBURN AND UNION PRIVILEGES SUPERFUND SITE - EAST OF SOUTH STREET AREA

1 Introduction

Pursuant to the Comprehensive Environmental Response Compensation and Liability Act 42 USC sect 9601 et seq (CERCLA) and the National Contingency Plan 40 CFR Part 300 (the NCP) this document contains a description of the release events and site history that resulted in the contaminated media that require institutional controls in the fom1 of Activity and Use Limitations the basis for land use restrictions and uses that are consistent and inconsistent with the Selected Remedy ( as described below) This Institutional Control (IC) Design Statement pertains to a portion of the Blackburn and Union Privileges Superfund Site located in the Town of Walpole Massachusetts (the Site) which has been listed on EPAs National Priorities List (NPL) which portion is generally referred to as the East of South Street Area (the EOS Area) The EOS Area is located to the east of South Street in Walpole and is shown on Figure 1 attached hereto

A Notice of Activity and Use Limitation (NAUL) is necessary and appropriate for the EOS Area of the Site based on the fact that pursuant to EPAs risk evaluations asbestos arsenic trichloroethene (TCE) and certain polycyclic aromatic hydrocarbon (PAH) contan1inants remain in place in soils at levels higher than those appropriate for unlimited use or unrestricted exposure groundwater underlying the EOS Area contains hazardous substances at levels that present an unacceptable risk of exposure and remedial measures at the Site must be protected and maintained to ensure that the Selected Remedy remains protective

EPAs Record of Decision (ROD) dated September 30 2008 specified the need for institutional controls such as a NAUL to ensure long-tenn perfonnance and protectiveness of the Selected Remedy The institutional controls described herein are necessary and appropriate to ensure that the Selected Remedy for the Site remains protective of human health and the environment The remedy for the Site as described in the ROD is referred to herein and in the NAUL as the Selected Remedy

Page 1 of7

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 10: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

Town of Walpole acting by and through the Board of Selectmen

n Town Administrator authorized by ard of Selectmen recorded herewith

Bk 39600 Pg415 88608

Witness the execution of this instrument under seal this 21_ day of df 11 ( 2021

COMMONWE

COUNTY OF NORFOLK ss

~ On this 21 day of 4f1 2021 before me the undersigned notary public

personally appeared James Johnson as Town Administrator for the Town of Walpole and proved to me to through satisfactory evidence of identification which was ~6laquo~ ~ -fr VJ1e [indicate ifdrivers license or passport or other document] to be the person whose name is signed on the preceding or attached document and acknowledged to me that signed it voluntarily for its stated purpose

Name CA~ U ~

My Commission Expires July S 2t)z

Page 10 of 12

--------

Bk 39600 Pg416 88608

In accordance with CERCLA 42 USC sect 9601 et seq and the National Contingency Plan the United States Environmental Protection Agency Region I hereby approves this Notice of Activity and Use Limitation

Name 8r~Cltvi Olso Director Superfund and Emerncy Management Division (SEMO)

US Environmental Protection Agency Region I

In accordance with MGL c 21E sect 6 and the Massachusetts Contingency Plan (310 CMR 400000) the Department of Environmental Protection hereby approves this Notice of Activity and Use Limitation (as to form only)

Date Paul W Locke Assistant Commissioner Bureau of Waste Site Cleanup Department of Environmental Protection

Page 11 of 12

---------------

Bk 39600 Pg417 88608

In accordance with CERCLA 42 USC sect 9601 et seq and the National Contingency Plan the United States EobulliionmenlaJ Protectioo Agency Region I hereby appro1es this Notice of Activity and Use Limitation

Date ~------

Name Director Superfund and Emergency Management Division (SEMO)

US Environmental Prokction i0 ency Region I

Jn accordance with MGL c 21 E sect 6 and the Massachusetts Contingency Plan (310 CMR 400000) the Depamnent ofEmironmental Prolectioo hereby approves this Norice ofActivity

and Use Limilarioo (as ro funn ooly)_ ~~

Dale 4r S microlJ ~ Paul W Locke Assisrant Commissioner Bureau ofWaste Site Cleanup Department of Environmental Protection

Page 11 of 12

Bk 39600 Pg418 88608

List of Exhibits

Exhibit A Legal Description of the Property Exhibit B Legal Description of the Restricted Area and Coordinates of Cover Types Exhibit C Photo-Reduced Copy of Activity and Use Limitations Plan of Land Exhibit D Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table Exhibit E Institutional Control Design Statement (EOS) Exhibit F Copy of Vote of Town of Walpole

Return to

Attn Kristine Sheehy Senior Real Estate Attorney FOLEY HOAG LLP Seaport West 155 Seaport Boulevard Boston Massachusetts 02210-2600

Page 12 of 12

Bk 39600 Pg419 88608

EXHIBIT A

Legal Description of Property The land with the improvements thereon located in Walpole Norfolk County Massachusetts bounded and described as follows

PARCEL I

The land on the Southeasterly side of South Street bounded

NORTHWESTERLY NORTHERLY AND AGAIN NORTHWESTERLY by South Street by seven lines measuring respectively

17027 feet 120 feet 22011 feet 1653 feet 325 89 feet 4515 feet and 1497 feet

NORTHEASTERLY by Gleason Court 2627 feet

SOUTHEASTERLY AGAIN NORTHEASTERLY AND AGAIN SOUTHEASTERLY by land now or fom1erly of Santomarco by five lines

measuring respectively 6750 feet 2050 feet 1190 feet 2952 feet and 2001 feet

NORTHEASTERLY AGAIN by said land of Santomarco and land now or formerly of Cashorali 10056 feet

NORTHWESTERLY AGAIN by said land of Cashorali 2845 feet

NORTHEASTERLY by land now or formerly of Muighitti 9007 feet

SOUTHEASTERLY by the location of Old Colony Railroad by three lines measuring respectively 6809 feet 32808 feet and 38250 feet

and

SOUTHWESTERLY by land now or formerly of Meyer by three lines AND SOUTHERLY measuring respectively 9143 feet 1998 feet and

15202 feet

Parcel I is described in the deed recorded with the Norfolk County Registry of Deeds in Book 4459 Page 287

A portion of said premises is shown on plan entitled Plan of Land in Walpole Mass Belonging to General Fibre Co Inc by Edward C Peterson CE dated January 16 1960 filed with the Norfolk Registry of Deeds as Plan No 849 of 1967 in Plan Book 223 and the remainder is shown on plan entitled Plan of Land in Walpole Massdeg by E Worthington Engineer dated February 6 193 7 recorded with said Deeds Book D2135 Page 8 I

FHBOSTON52454092

Bk 39600 Pg420 88608

PARCEL II Property known as Parcel 33-120 of the Town of Walpole Tax Assessors Map which is

part of the property situate in the Town of Walpole County ofNorfolk and Commonwealth of Massachusetts and being all of the right title and interest of The Penn Central Corporation in and to all those certain pieces or parcels of land and premises easements rights of way and any other rights of any kind whatsoever appurtenant thereto or used in conjunction therewith on and along a portion of Branch of Railroad known as the Wrentham Branch said portion of railroad being described as follows

Beginning at a line extended across the right of way of said Branch of rai road said line being the Northerly line of South Street and extending thence in a Northeasterly direction the distance of 2852 feet more or less along said Branch of rai Iroad to a line which is parallel with the Southwesterly line of Common Street said parallel line extending across said right of way through a point in the centerline thereof at railroad valuation survey station 733 + 67 more or less and being the place of ending

Parcel II is described in the deed recorded with the Norfolk Registry of Deeds in Book 7986 Page 372 and is a portion of the land shown on the plan recorded with said Deeds as Plan No 52 of 1983

FHBOSTON52454092

Bk 39600 Pg421 88608

Exhibit B Legal Description of the Restricted Area and Coordinates of Cover Types

Le2al Description for Restricted Area The area shown on the plan entitled Activity and Use Limitations Plan of Land Blackburn amp Union Privileges Superfund Site 50 amp 60 South Street Walpole Mass Scale l = 30 dated April 6 2021 by Norwood Engineering Company Inc recorded with the Norfolk Registry of Deeds in Plan Book 704 Page 41 being bounded and described as follows

Beginning at a point on the easterly sideline of South Street at the southerly point of curvature of Gleason Court on said plan thence

Northeasterly and curving to the right along an arc of a curve having a radius of twentyshyfive and 00100 (2500) feet a length of forty-five and 15100 (4515) feet thence

S 48deg1352 E a distance of twenty-two and 24100 (2224) feet the previous course by the southerly sideline of Gleason Court thence

s 32deg0208 w a distance of fifty-four and 78100 (54 78) feet thence

S 59deg27 32 E a distance of twenty and 50100 (2050) feet thence

S 47deg5252 E a distance of eleven and 90100 (1190) feet thence

S 49deg01 10 E a distance of twenty-nine and 58100 (2958) feet thence

s 38deg3108 w a distance oftwenty and 01100 (2001) feet thence

S 49deg00 57 E a distance of one hundred and 56100 (10056) feet thence

N 39deg5348 E a distance of twenty-eight and 45100 (2845) feet the previous seven (7) courses by land ofNF Thelma A Casborali thence

S 49deg0808 E a distance of ninety and 29100 (9029) feet the previous course by land ofNF Ming L Yau thence

s 25deg2312 w a distance of siliy-eight and 22100 (6822) feet to a point on the westerly sideline of a fonner railroad right of way the previous course by land of the Town of Walpole assessor parcel 33-121 thence

S 55deg2937 E a distance of ninety-nine and 78 100 (99 78) feet to a point of tangency on the easterly sideline of a forn1er railroad right of way thence

Page 1 of 13

Bk 39600 Pg422 88608

s 30deg11 32 w

S 23deg49 I6 W

N 66deg1044 W

N 23deg4908 E

N l 6deg00 52 E

S 37deg0240 E

N 10deg1437 W

N 34deg093 I W

N 11 deg5558E

Northeasterly

N 27deg41 48 E

a distance of three hundred and three and 74100 (30374) feet the previous course by land ofNF Nicholas H Dowd and NF Emilio P Baldassari thence

a distance of four hundred ninety and 86100 (49086) feet to a SBdh the previous two (2) courses by the easterly sideline of a former railroad right of way thence

a distance of eighty-two and 76100 (8276) feet to an Iron Pipe on the westerly sideline of the former railroad right of way thence

a distance of twelve and 09100 (1209) feet to a SBdh thence

a distance of ninety-six and 50100 (9650) feet to a S Bdh thence

a distance of fifteen and 00100 (1500) feet the previous three (3) courses by the westerly sideline of the former railroad right ofway and land of NF Joseph R Carpentieri and NF Joseph R and Faith N Carpentiero thence

a distance of ninety-two and 82100 (9282) feet the previous course by land ofNF Richard A and Josette M Burke thence

a distance of tvvo hundred thirty-seven and 86100 (23786) feet to a point on the easterly sideline of South Street thence

a distance of one hundred twenty and 00100 (12000) feet along the easterly sideline of South Street to a point of curvature of the easterly sideline of South Street thence

and curving to the right along an arc of a curve having a radius of eight hundred and 00100 (80000) feet a length of two hundred hventy and 11100 (22011) feet along the easterly sideline of South Street thence

a distance of three hundred forty-hvo and 42100 (34242) feet to the point of beginning

Containing 621 Acres of land more or less

Page 2 of 13

3000

3005

3010

3015

3020

3025

3030

Bk 39600 Pg423 88608

EXHIBIT B (cont)

Points and Coordinates associated with Restriction Areas and Cover Types for the Activity and Use Limitations (AUL) at 50 amp 60 South Street Walpole Mass

Point Northing Easting Type

Curve Curve Number Len2th Radius

28754430528 7236432250 COR

3001 28755604597 7236680368 PC L=7535 R=80000

3002 2875597 1222 7236766913 POC

3003 28756333366 7236870620 PT

3004 28756280754 723697 3031 COR

28756025570 7237001250 COR

3006 28755918670 7237001140 COR

3007 28755864440 7237 I 05890 COR

3008 28755903200 72371963 IO COR

3009 28756030893 7237217396 COR

28756042534 7237250325 COR

3011 28756021733 7237317808 COR

3012 28755800732 7237640949 COR

3013 2875552 1424 7237667395 COR

3014 28755321388 7237708416 COR

28755197081 7237834881 COR

3016 28755102230 7238045173 COR

3017 28754941531 7238291869 COR

3018 28754851375 7238512944 COR

3019 28754753441 7238824 760 COR

28754681541 723916 1881 COR

3021 28754608227 7239406506 COR

3022 28754515846 7239459928 COR

3023 2875426 7589 723943 8163 COR

3024 28754198016 7239590840 COR

28753886764 7239449006 COR

3026 2875329 7944 7239187206 COR

3027 28752506745 7238837890 COR

3028 28751859560 7238552142 COR

3029 28751221833 723827342 l COR

28750848788 7238107869 COR

3031 2875045 3654 7237927814 COR

3032 28750630420 7237527432 COR

3033 28750741023 723757 6257 COR

3034 28751668594 7237842488 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 3 of 13 April 14 2021

3035

3040

3045

3050

3055

3060

3065

3070

Bk 39600 Pg424 88608

Point Number

Northing Easting Type Curve Leneth

Curve Radius

28751548848 7237932869 COR

3036 28752462269 7237767802 COR

3037 28756438461 7236904209 POC L=2207 R=80000

3038 28756543084 7236939245 PT

3039 2875653 7987 7236954123 PC

28756597578 7237007344 POC L=1651 R=937

3041 28756594465 7237087181 PT

3042 28756459044 7237347021 PC L=347 R=220

3043 28756432531 7237363546 PT

3044 28756280644 7237286201 COR

28755924210 7237966952 COR

3046 28756081959 7238048554 PC L=472 R=236

3047 28756064922 7238084404 PT

3048 28755523491 7237845047 COR

3049 28755419845 7238081981 COR

28755460757 7238099621 PC L=240 R=l57

3051 28755467701 7238120241 PT 3052 28755398690 7238275280 COR

3053 28755365410 7238264910 COR

3054 28755087149 7238900449 COR

28755158001 7238931521 COR

3056 28755040360 7239199770 COR

3057 28755311720 7239318930 COR

3058 28755263010 7239429300 COR

3059 28755388260 7239484290 COR

28755348660 7239576000 COR

3061 28755625470 7239696500 COR

3062 28755664605 7239606601 COR

3063 28755736202 7239637768 COR

3064 28755621870 7239897370 COR

287 5567 6160 7239920410 COR

3066 28755718270 7239830260 COR

3067 2875587 9750 7239900310 COR

3068 28755718790 724026 7600 COR

3069 28755763390 7240285350 COR

28756035900 7239926600 COR

3071 28756086280 7239812770 COR

3072 28756089984 7239813649 COR

3073 28756229128 7239501910 PC L=482 R=l54

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 4 of 13 Apnl 14 2021

3075

3080

3085

3090

3095

3100

3105

3110

Bk 39600 Pg425 88608

Point Number

Northing Easting Type Curve Length

Curve Radius

3074 28756257366 7239513984 PT

28756185799 7239674928 COR

3076 28756739833 7239921136 COR

3077 28756876060 7239682275 COR

3078 28756948336 7239735898 PC L=335 R=298

3079 28756958235 7239766064 PT

28756866081 7239978133 COR

3081 28757166275 7240127374 COR

3082 28757068320 7240314640 COR

3083 28757602980 7240594310 COR

3084 28757700050 7240408736 COR

28758247941 7240688376 COR

3086 28758250190 7240683910 COR

3087 28758344979 7240738168 COR

3088 2875843 6103 7240581527 COR

3089 28758602943 7240664224 COR

28758740024 7240397393 COR

3091 28758605706 724032 7776 PC L=477 R=309

3092 28758594882 7240286013 PT

3093 28758666635 7240197585 PC L=2573 R=3127

3094 28758767113 7240118710 POC

28758890752 7240086604 PRC L=I653 R=3993

3096 28758972305 7240074125 POC

3097 28759049552 7240045 I 52 PT

3098 28759330312 7239734408 COR

3099 28759459414 7239588584 PC L=2269 R=5217

28759524821 7239496174 POC

3101 28759568752 7239391829 PRC L=1814 R=486

3102 28759603259 7239308095 POC

3103 28759653883 7239232999 PCC L=l31 R=088

3104 28759665694 7239231411 PT

28759800587 7239299586 COR

3106 28759986288 7238981214 COR

3107 2875983 5797 7238891829 COR

3108 28759879750 7238798689 COR

3109 28759905380 7238754769 PC L=1600 R=2552

28759963590 7238700398 POC

3111 28760035727 7238666620 PT

3112 28760700665 723901 5672 PC L=4515 R=2500

3113 28760830230 7239191198 POC

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 5 of 13 April 14 2021

3115

3120

3125

3130

3135

3140

3145

3150

Bk 39600 Pg426 88608

Point Number

Northing Easting Type Curve Len2th

Curve Radius

3114 2876077 263 6 723 940 1624 PT 28760624518 7239567466 COR

3116 28760160100 7239276864 COR

3117 28760055928 7239453423 COR

3137 28759976118 7239541692 COR

3118 28759782139 7239764992 COR

3119 28759625581 7239640375 COR

28758966057 7240399493 COR

3121 28759184326 7240581973 COR

3122 28758593598 724126478] COR

3123 28757977293 724097 2314 COR

3124 28757716516 7241351659 COR

28757288251 7241140719 COR

3126 28756725827 7240851862 COR

3127 28756162468 7240586126 COR

3128 28755614498 7240338506 COR

3129 28754346745 7239768507 COR

28753845716 7239540194 COR

3131 28753257436 723927 8634 COR

3132 28752466355 7238929370 COR

3133 28751819340 7238643698 COR

3134 28751181527 7238364939 COR

28750807772 7238199071 COR

3136 28750413263 7238019301 COR

3138 28756920317 7237298739 PC L=l941 R=2104

3139 28756827128 7237274848 POC

28756733047 7237294944 PRC L=401 R=l66

3141 2875671 1336 723 727 2844 PCC L=1492 R=13345

3142 28756744594 7237206091 POC

3143 28756781529 7237141301 PCC L=1419 R=l018

3144 28756833084 7237094642 POC

28756902566 7237091952 PCC L=2413 R=157959

3146 28757017337 7237129167 POC

3147 28757131820 7237167258 PCC L=330I R=S0000

3148 28757282552 7237234442 POC

3149 28757431866 7237304721 PT 28757338390 7237495930 COR

3151 28757541620 7237605380 COR

3152 28756897590 723883 4280 COR

Exhibit B to NA UL-Part 11-EOS Coordinate Tables Page 6 of 3 April 14 202

3155

3160

3165

3170

3175

3180

3185

Bk 39600 Pg427 88608

Point Northing Easting Type Curve Cunbulle

Number Lenszth Radius 3153 28756870623 7238820218 COR

3154 28756838273 7238882258 COR

28756865240 7238896320 COR

3156 28756777004 7239062996 COR

3157 28756770439 7239063663 PC L=l 146 R=2269

3158 2875665836 I 7239046180 PCC L=l423 R=957

3159 2875661 7520 7238989913 POC

28756625544 7238920850 PT

3161 28756728525 7238726583 PC L=232 R=l58

3162 28756748720 7238720236 PT

3163 28756899634 7238797341 COR

3164 28757254653 7238121363 COR

28757520153 723761266 7 COR

3166 28757306899 723 750 IO 10 COR

3167 28756690336 7237500169 PC L=243 R=I68

3168 28756682599 7237479273 PT

3169 28756686990 7237469583 PC L=0250 R=l68

28756708806 7237463018 PT 3171 28757000109 7237616354 PC L=233 R=l73

3172 28757005368 7237637270 PT

3173 28757000998 7237645513 PC L=233 R=l69

3174 28756980219 7237651023 PT

28756429209 7238339422 COR

3176 28756342982 7238506849 COR

3177 28756500076 7238596485 PC L=l19 R=l48

3178 28756499701 7238608072 PT 3179 2875644 7813 7238705611 PC L=l 182 R=483

28756358177 723 869 0707 PT

3181 2875623 6099 7238376388 PC L=443 R=467

3182 28756235611 7238333779 PCC L=343 R=9IO

3183 28756249049 7238302418 PCC L=412 R=9IO

3184 28756278952 7238274519 PCC L=368 R=300

28756313362 7238277619 PT

3186 28756282498 7238911796 PC L748 R=216

3187 28756240650 7238919721 PT

3188 28756126081 7238620406 PC L=323 R162

3189 28756138645 7238591575 PCC L=333 R=283

Exhibit B to NAUL-Part II-EOS Coordmate Tables Page 7 of 13 April 14 2021

3190

3195

3200

3205

3210

3215

3220

Bk 39600 Pg428 88608

Point Number Northing Easting Type Curve

Leneth Curve Radius

28756163375 7238602867 PT

3191 2875523 0908 7238765275 COR

3192 28755205040 7238752740 COR

3193 28755391740 7238328470 COR

3194 28755466840 7238361040 COR

28755452760 7238392590 COR

3196 28755516920 7238421040 COR

3197 28755530690 7238388730 COR

3198 28755603230 7238421460 COR

3199 2875555 7568 723852 7053 COR

28755371220 7238445330 COR

3201 28755629198 7238558466 COR

3202 28755676040 7238453290 COR

3203 28755925410 7238563840 PC L=1902 R=3548

3204 28755927383 7238658634 POC

28755954390 7238749520 PT 3206 28755974770 7238807230 COR

3207 28755779200 7238881701 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

28755746700 7238609997 COR

3211 2875593774 7239036608 COR

3212 28756048460 7238996850 PC l=1445 R=2903

3213 28756070631 7239065422 POC

3214 28756109010 7239126420 PT

28756153820 7239182190 PC L=S98 R=848

3216 28756171980 723923 7880 PT

3217 287S6026148 7239566166 COR

3218 28756003865 7239556465 COR

3219 287S6134380 7239256650 COR

28755998460 7239195370 COR

3221 2875600 71S0 7239174530 COR

3222 28756001791 7239172152 COR

3223 28756040451 7239079437 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 8 of 13 April 14 2021

Bk 39600 Pg429 88608

Point Number

3210

3200

3056

3057

3058

3059

3060

3061

3062

3218

3219

3220

3221

3224

3225

3226

3227

3228

3070

3071

3234

3233

3235

3236

3237

3238

3239

3240

3241

3242

3243

3244

3245

3246

3247

3248

Northing

28755746700

28755371220

28755040360

28755311720

28755263010

28755388260

28755348660

2875562 54 70

28755664605

28756003865

28756134380

28755998460

28756007150

28755941340

28755962080

28755867937

28755819702

28755766128

28756035900

28756086280

28755991990

28755942100

28756477248

28756677238

28756650130

28756473307

28756480112

28756675030

28756724454

28756742099

28756742133

28756703924

28756640759

28757607280

28757401530

28757467350

Easting

7238609997

7238445330

7239199770

7239318930

7239429300

7239484290

7239576000

7239696500

7239606601

7239556465

7239256650

7239195370

7239174530

7239145324

7239100930

7239061674

7238935003

7238911508

7239926600

7239812770

7239769910

7239884050

7239261913

7239253008

7239321810

7239319038

7239298824

7239364440

7239271845

7239292625

723935 0187

7239393239

7239393096

7237584960

7237475300

7237345620

Type

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

PC PCC

POC

PCC

PT

COR

COR

COR

Curve Len2th

L=273

L=ll77

L=657

Cunmiddote Radius

R=1421

R=810

R=679

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 9 of 13 April 14 2021

Bk 39600 Pg430 88608

Point Number Northing Easting Type Curve

Len2th Curve Radius

3249 287 57514570 7237372360 PC l=ll05 R=1993

3250 287 57 588060 7237452980 PT

3251 28757631382 7237429676 PC L=2244 R=2352

3252 287 5765 6810 7237537876 POC

3253 2875 762 9720 7237645671 PT

3254 28756940655 7238952710 PC l=1493 R=1509

3255 28756901845 7239015577 POC

3256 2875683 7836 7239052474 PT

3257 28758104824 7237653014 COR

3258 28758028960 7237800160 COR

3259 28757949530 7237760790 COR

3260 28757901005 7237855021 COR

3261 28757839230 7237820908 PC L=273 R=l33

3262 28757830688 7237799810 PCC L=539 R=2144

3263 28757852974 7237750897 PT

3264 28757891705 7237688178 PC L=lS26 R=2432

3265 28757948636 7237637880 POC

3266 287 58018307 7237607597 PT

3248 28757467350 7237345620 COR

3267 28757550832 7237363444 POC L=2653 R=80000

3268 28757668809 7237424132 PT

3269 28757504 719 7238817989 COR

3270 28757493010 7238842230 COR

3271 28757561074 7238880970 COR

3272 28757483953 7239024127 PC L=323 R=l70

3273 28757459939 7239037846 PT

3274 28757311605 7238957122 PC L=1388 R=906

3275 2875727 2732 7238901647 POC

3276 28757283181 7238834718 PT

3277 287 5733 4061 7238752337 PC L=255 R=l60

3278 287 5735 5527 7238744411 PT

3279 2875 7102815 7239517199 PC l=261 R=l70

3280 28757080654 7239525307 PCC l=909 R=1275

3281 2875 700 5390 7239477911 PCC L=l007 R=990

3282 28756999624 7239381704 PT

3283 2875707 7705 7239230604 PC L=ll14 R=907

Exhibit B lo NAUL-Part IlbullEOS Coordinate Tables Page 10 of13 April 14 2021

3285

3290

3295

3300

3305

3310

3315

Bk 39600 Pg431 88608

Point Number Northing Easting Type

Curve Leneth

Curve Radius

3284 28757168066 7239178102 PT

28757205717 7239186398 PC L=518 R=930

3286 28757249003 7239213534 PCC L=l41 R=086

3287 2875724 7909 7239226048 PT

3288 28758415755 7239842757 PC L=251 R=l59

3289 28758437695 7239837379 PT

28758456377 7239846949 PC L=812 R=876

3291 28758494897 7239915165 PCC L=456 R=757

3292 28758483790 7239958646 PT

3293 28758405147 7240111348 PC L=l057 R=955

3294 28758318136 7240161452 PCC L=477 R=l063

28758272407 7240149529 PCC L=250 R=l60

3296 28758265647 7240128003 PT

3297 28758157937 7237680895 COR

3298 28758902927 723807 1969 COR

3299 28758852531 7238168280 COR

28758779660 7238129750 COR

3301 28758746973 7238192072 COR

3302 2875807 6630 7237840490 COR

3303 28758049940 7237894220 COR

3304 2875871 7997 7238243620 COR

28758680103 7238315946 COR

3306 28758533699 7238239240 COR

3307 2875852 6899 7238252220 COR

3308 28758098180 7238027600 COR

3309 28757974484 7238264223 COR

28757957598 7238255513 COR

3311 28757757732 7238637845 COR

3312 28757774584 7238646620 COR

3313 28757653710 723887 7846 COR

3314 28757560920 7238829340 COR

28759004930 7238125514 COR

3316 28759689797 7238485028 PC L=1992 R=2609

3317 28759697204 7238583760 POC

3318 28759667288 723867 8142 PT

3319 28758996126 7238323718 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 11 of 13 April 14202 I

Bk 39600 Pg432 88608

Point Number

Northing Easting Type Curve Lenfth

Curve Radius

3320 28759028950 7238261560 COR 3321 28758954486 7238222188 COR

3322 28758972523 7238378387 COR 3323 28759421550 7238613630 COR 3324 28759377933 7238698105 COR 3325 2875907 4811 7238539289 COR 3326 28759081611 7238526309 COR 3327 28758935210 7238449604 COR

3328 28759464470 7238637330 COR 3329 28759632674 7238722481 PC L=ll83 R=l578

3330 28759583973 7238755474 POC 3331 28759526573 7238768343 PRC L=2163 R=2455

3332 28759422964 7238796123 POC 3333 28759341091 7238865430 PT

3334 28759193370 7239050710 COR 3335 28759416340 7239163940 COR 3336 28759263600 7239455620 COR 3337 28759043690 7239336510 COR 3338 28758935490 7239552130 COR 3339 28757650890 7238883240 COR 3312 28757774584 7238646620 COR 3311 28757757732 7238637845 COR 3310 28757957598 7238255513 COR 3309 28757974484 7238264223 COR 3308 28758098180 723802 7600 COR 3307 28758526899 7238252220 COR 3306 28758533699 7238239240 COR 3340 28758700033 7238326388 COR 3341 28758675436 7238373334 COR 3342 28758733013 7238403500 COR 3343 28758760858 7238350353 COR 3344 28758860952 7238402796 COR 3345 28758833106 7238455943 COR 3346 28758890683 7238486109 COR 3347 28758915280 7238439162 COR 3326 28759081611 7238526309 COR 3325 28759074811 7238539289 COR

Exhibit B to NAUL-Part H-EOS Coordinate Tables Page 12 of l3 April 14 2021

Bk 39600 Pg433 88608

Point Number

Northing Easting Type Curve Len2th

Cunbulle Radius

3324 2875937 7933 7238698105 COR

3082 28757068320 7240314640 COR 3083 28757602980 7240594310 COR 3349 28757790234 7240236327 COR

3348 28757255574 7239956657 COR

3124 28757716516 7241351659 COR 3125 28757288251 7241140719 COR 3126 28756725827 7240851862 COR 3127 28756162468 7240586126 COR 3128 287 55614498 7240338506 COR 3129 28754346745 7239768507 COR 3130 28753845716 7239540194 COR 3131 28753257436 723927 8634 COR 3132 28752466355 7238929370 COR 3133 28751819340 7238643698 COR 3134 2875118152 7 7238364939 COR 3135 2875080 7772 7238199071 COR 3136 28750413263 7238019301 COR 3350 28750296168 7238284525 COR 3351 28754 78 6636 7240267040 COR 3352 28757412029 7241794586 COR

POINT DESCRIPTION ABBREVIATIONS

COR=CORNER PC= POINT OF CURVE WHERE CURVE STARTS POC -= POINT ON CUR VE PT=POINT OF TANGENCY WHERE THE CURVE ENDS PCC = POINT OF COMPOUND CURVE (WHERE RADIUS CHANGES) PRC = POINT OF REVERSE CURVE

NOTES

THE COORDINATES ARE BASED ON AN EXISTING CONDITIONS AS-BUILT FIELD SURVEY BY NORWOOD ENGINEERING CO INC BETWEEN NOVEMBER 15 TO DECEMBER 18 2019 TI-IE COORDINATES ARE BASED ON l1ASSACHUSETIS ST A TE PLANE COORDINATE SYSTEM NAD 1983 (FEET) THE ACCURACY OF THE COORDINATE LOCATIONS ARE +-0J FEET

Exhibit B to N1UL-Part II-EOS Coordmate Tables Page 13 ofl3 April 14 2021

---

1f~ flJr ~i

f ~~ J~i](M~I ~ 1 jf~ ~~f W-- )e 1

It lj fY pl ~-~j

I --- ~ ~

1 (J-c~ er ~

C JI fl JYf

1 ~ ~Yu-~ 1i

~r

( LOClJS P

SCAUllbulliQO

I ar lMIT flG PINI tMS _ lIIPMIDMICXNllRlnT~tlCfllUS 1111D cmuftraquodl s - NIKl1III tfIJIIIIIOfM~1HCll allE1

DAre Jllrl

NUKIJU LU6 DMitM

mmtG6DKbdlt

~4~-middot

~~I

-- ampnbullllf~ ~ fa

LEGEND 0

-i~wr0o-m lICUUoaampbullco--11111 _ _l_J

0

bull ~-ail_I

~-

mo(I ---fwj

amp~~~~ ~ ~~ltgtmiddot ~A~

~6

_L-r

bull -~ IBP__l-11Uil n-rlfl-lffll rMCllI 1a 1rr ai

-~ lll-lliI u-W--11a 1 Ml[ 411 amt l0IIC 3JICJ7 ~ 33-1--I- DIID llXII D111 JlMZ 411 lraquo- ~lUN~t --- - etMpound 11JII

~ MffD mmaat ZL I01t 111

1Jlll~-IICfIQfJICIISJ DfEI IC71- I~ 1~ 9 Cl 1VY IICIIWCLl~fCSC~lNCl

~11HltOXW1A~JtCI~llfB MXIC 1HI lME INCi 111M bull11 (S 1f41~middot~-~-)

~ io

0 0 0 0 -0 0 0 D O 1 middot tbull O

_- _pound ~ - Tf middot- ---r ~~ ~~- ~=middoti

r jil7bull --------4~-middot~

(

SCAtpound 1bull bull YI

I ~ tfAIE lIMa toafllltl1E ~NAD1w1(rJ

1 ~ PlIla II MMt QI 11D TD D111oPl

~c1MlntID9~~-l 1NIIJIIKlNI LnlJTU ~ deg qllAJSTE uM011111 iu1II 1111ZT IIIILJaZ

Exhibit C - Photo-Reduced Copy of Activity and Use Limitations Plan of Land

--~middot---

I ~111-11111

iiiii

-ill111liilt

ACJIYIJY ANJ) lJSE lJJll7ATJONS PLAN OF LANI)

81ACJ(81R1 I IINION Flr11lfES SllffllF7AVO SIle

o tfO SOIJIH s1ar HlltlPOtL IIAS

SCAlElrJAt IPfffl152021

1IJrwod Eng1neerlng

- EnQlbullHrlflg Compaffy middot~~=~ m Cm1JQ u fnfJa-eal

~ -

-~

9l1EET 1 OF I 8324-02

td ~

w ~ m 0 0

Id Q ii w ii

co co m

co 0

-l

~-77--raquo- -~I~ )middot~ ~ bull _I lT ~ v~

AI ~ If ~)middot~ 7- ~1 c t11 yil ~ ~ ~middot~41 bull1 l ~~l(i~r~1 f7 )ll y-

~~ f -~ -v fgtV ~ ~ ~ l er-- u -

tl x-P~C ()

JP yen f(( 11 1degpoundS -~ (

ftunrTfflllllTnallJrNNQWDf ~ ti IZNtRlTT lnH M IULS IIJIUIUlA-DlltlllllDlJlllIICIF tJbllt~llC~lJNp

DTl NlllltaJatl-Witiill (raquo11 iiiK(+til

I aJnlTlKATJlfl PlAH~ THE PUIIJll1T UC TIUlf Mlaquo THE l5 11 oawG ~ NII 1Hpound1as Of1111E111 AMllfrlTll9laquolllt Mpound ntem OPlaJ CJ1 IWM1pound BREn 011 bulln

~ ~illi~fli~ _lt ---c~-Clmiddot~~c0-nmiddotmiddot~bullJmiddot04~- ~--~--yen~~bull - L -bull -n ~ -r - ~ -

it

~ fr ~ ~- -~bull~bullv OG- ~n0

bull--ltmiddot middot~ -~- ~~-=~7~st~-~~~~i~~Hil~-) 2~C 0 ~~~~~ --------Y-Tgt-bullbullmiddot-

U-IU ~middotshy =i==-

bullbull bull _ -middot-

~----- ( ~11middot

__IC1ZMJ - bull IOC)0l lftEf ___ i gt mEKJllJfNG rotJ1FRIIIT AIIEAS B~ p~ AIIEAS ~ea-vmiddot LIUIID

~ e--- -+ ~ rzprz1za 1 ~ IJTATC PRC ~TC

nJml lltPtasCltJ

DUD BCD lJlll7 PMC 4H 1 1 YERT1CAL M1llI II NCCI ~ _ ro conurr DOD 80CIC 3JII07 llME 4H I ntaM NUIU 1121 IJ4TAI m IMlC 111111 nATIIW ~fsi

tJMAlfflOlI) AIIEAS1 bull 11AMJSCAlfl) AlpoundAS Lill] 1Dll IOlII POT PlCit 6115 J)-t20 ~atfnujK~tlLWlQI

~PUNMl-17 POflTIVNf1Ell llaD BaalC Tl_ Paa bullbull - 99 a 11

_-ijf1iltDP~IZ~ 5CME - JOSUva1fTLJ ~ ~-rr 111 C tMI=

bull111 I~

i=iiii7

~ e---

t c z rl

L-n11 ~

ACJIVJTY AND USE LIAlffAJIONS

PIAN OF RESTRIC1EJJ AREAS ANJJ COVER TYPES

fltACK1(fN _ llNlltgtI PfMIECCS SllPVFVNlJ51Tlt

JO _ lxJ srJllH STREET IIALPrJU JASS

SCAU I - 30 APRIL 2021

lcnwod Engineering

llarwood Cngnrilgtf cpmy -t~~~~

fIL Pllpa-ru - (1u]1a-lftll

~L=wl f 01~JII IO_

a SIEET I (F 2 B324-02

bj ~

w 0

0 0 deg It

iQ ~ w l11

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 1 of 2

CX) CX)

deg CX) 0

ntllT -1~1~ rurnlaquo1 r1n l1XTM 11Nf -r~ lie UUffCI 11Pt lDll1Hf iniin --IC unr1G Tlr 1n1rn Iota allll Ito tyen1tlll ~~11CRnrzJ11-11--~ci-- n31 nr111w11J1t ~bull c ~- diams JDrnn llloffl rcnlml IDII

-~ ]al rll _ _ PnlM-1-PI lbull-- ll7HrirrIPlllD1lf~-a bullbullll 111bull IClln9XnolDlllIIIIIIOm

214 ff7371JOOT ~bull JllC Ibullbull 171 JICllEY)l)vlUTlo~lUl~ ~li_~ -~~ MDlol ll4L~TllJraquofllllf190abullbullt ~~nQuu~~1aJI _~~OtottWU~1t11txm~arcPbrmllmCDt ~~ ~~ ~ =~ gj ~l11~ llltlM Mrattllll TDPmllIDCDI JJ4bull e~ _ ~ e PClC lbullI- 1- ~1sect~ ~ ~ ~ ~ ~~~-nr~44bull~mn11-a11 ~~ =mt =m~ ~ ~~ ~ =~~-~~ =~~rt~l~llibullltbull=

~~~~~~~~r-~r-~~sectsect55~55 ~~ ~=g~~ mi --1~ ~-==~~m~ L-~r UVPllrlllUillDITDr4L 1JI lbullKlllll~==~~~=~

~~~~~~~~ raquoff-llll 111rritl_aianbull ~11lCla rr- n ttll XDP11r1r 11111c-1C111~ RTl~rJlllllbullbull~llllJlllipo~~=r~tm=~~

~=~3r~t==~ ~=~i==~~ llt1ttl70 m~~n~ =n~ L diams 11- bull - iaEi~mi 1lE~HHffi ~1-~ E LbulllT bullU-7YA 8911U TMn4 OJII C- lllkHrnl1nlntll11106~

MJ9~gt111ftlrfffll11 ~ SbullC61hLJT raquoWl lll~IJlll11amp1 utVllllt a lbulllfGl bulllC lT

lliilH~1 ~~rm-=rn~ lbullIIIICU-1bull0

itt ishwI JUo ma m1 bull 1-c iiliii ~==~m~=~ Ullln U7IIY M1NLl411 fflf f-~ llr IL ~ lbullt Ill uaP11rllDn1rin1bull139nf- na_ 1111lnl ___ lWTDf-ID 111Jbullnllr-cishy

J1JT1 lflTI-noLbull COi lJ1 tsr18GOTDrl1~ 1--Cn ~~~==-=~ LbullS1rbull-p

LbulllI ~middot x1 fl11bull diams an l~J P-~ WI 1~1Slrmsraquo11nirorn 11bull1n-

llrgt 58 - TDrl ZJlJ l~ Zl llf4 Pll1raquo91I lnP~IIEI 11 ==~=-~~ lbullt-11bullh1~

nun_-~bullfllrlll_ lbulll-lrbull N- - nr6-11MII rinaus a 1bull1E-t1 im1 nrxi mr~ 7nn1 4i i 1c m llrS~iJ-ltJlillII Tt-Ul ris ~=~~middotiill~~ tf llDln~n1rJrgt11nbull1ric ~IPgt9nq~ It-MU rbull RflrrlllVllbulltPllbullOIIUAfC lbullnJtrNbull_~lD+4ftJSHJ7711JrllIIIIT144lDI lbulll ~I llfs-mllThn~-f 1bull11

1a5blH=i5gS El~ iE =iilli ~ID aH~~ ~~ leJINNllllfflnlt10ff1nll~1g=TI==~- lbullN~Jmiddot pw nrwuhtl tba11 l- lllllsectimiii~ ~ lllaquot ll116UW41 llllII NII Cl Ld bullt ll 11r 111~-~lHtl-IINOClll 1Dgtn~rMOtnllfbull3all)Mnr~bullwrmm11uoo~ ~r~ m~ = ~~ t~-i m NNtotl n11nn cm

~~~~~Ttr~ in Httl01llxl nlfM114ta cm

JJN n=-PIW - I- C lbullT rnr nnubullNoXI ffllPI n1 11-amp 11middot 77)111fflffPl~JlaUII

i1JJ n91lbull ti Jnlftbulllll QII

~g=~~~~ir~f~5 =i~=~~ ~=~ ~ ~j====goi H1111t-llll ffo~ ~rn tm111 ta1Vl~ tnar- IVI rm u1i ~ nw ~illl cm 1111 Hltt1H T7U 72w111ll tm UI ftffiH~bull1 naMUlI nlll

lltfll~IOUl rnes~ttlClll

~I~~=~=~~= l3111ratlQOJ121lllll CS u1n-n-a mn-c~11111llllilr ~====m~~ lbulllllr~~Oll~r1111-t~rtRiHa)toI

-~rt~_Utr111tt~USI ~m~i==r~~llfflpound1gtgtMllkllit1U10C011 annrxnbull-TCRL11ai~=~=~g)llllll~--rWltMJtt-8 DR Pl rraquof ntl rim Gllf CCI~~1r~~ liiilllii u- ntlt bull llJ~naJCDI

raquo11NMl10~Ullllcm ntrlnK)fL~nlln-1c lllf ~--TlJaft_Lmc i lbull1 bull l3il0 Nl-197) Ttlll1344 a LbullI 3 l diams 1-111 lflS 1111lOllt ffl- MP PII bullHI lgtl llJI l97Mlt Ian -ti DG llC

111111===-~~~=mg ====~~ tD rlrffllZllIITO-lfllCIIII=~tr~L~~~= - Pl~I llII TD_ ff~ tDII31119NIJMlDffU~~ H CZIII liii~mlt~ D1111nrn11GQ~-CaKftQNJWNczr41140ffnQCUII Jnffnt1JIIIIJunbull~1Qc20lll ~Pllli ll mrnnn lbulltlP 17Jrffdeg-degluoElJIIIQII

~-I-ti _nrna~rlll

a n- 4411 llbullQI 1=40 rt La n- lllf ffrgtn _Jr_~ Ullk ---rr~~ ~=~=tl~~ =1 nttltt nraquo 1nlU as

=-mn--~111DJIDII Ullgt~fflflnanaaJIIJalt55~~EIS~=~~ ~~)1 -11CIJII nn~bullbullbullnaKatt1ta1

JOIT ru~- rf- deg hJIIII r- 111111 ~1111) -1 aJ1 ld t11D1etlll_TalCIS -~-UCV~bullraquootur=~=~I~~=~--~ ~rsrgo_mlaquoshym rs~11flI ~- rnilr==~=~~ ~~r _ ~ atfl ~ rtw Dgtlnn-f-lEllln17n-UIIP

D11 fflXTJ111111 I~~ ar D1Jn4 ~leJJS-OnC111

=====5 middoti SHU=~ 5 ampn iliiiiiIiI11

ngtgtn~1~1tbullubull1rm DH tu~- lt11 rirmU1111 CDIII

~i~i555mi~ ~~ ~m=~==m~g===~~~~ tn1r JtW ~ma- PiOll a CU

~ XNr~t~fDllll1-all~~ m===~~ bullbull~W 111111 ==~~ ampT g~ ru~ =

~lU $Et=ni ~ llll0111ra1Ln~otqC011

H~ g==i =~1 ~

~111111 ~~g~n~a~J))pound11 1=~)6tia

~~ mEfHfH~Si

amp12Ct _ an ~

U N711f21th mM1LU aa o1bull~--117CII in4r ~llllll1Vffl-111Dlr lit~ Hmtlpound1 71 12L I CCIII ---~CUnMIIUOCVf JIHtlnn nl 7r ll4011CIIII

llllDNXCWZflDtlltllCIDCDr

~~=~==~=gnn n1raquoL bullw noanDNt CIJIIi=~ C~middot ~ ~ ~ HnffTI-QIJroQ__111PtlJIIInfflll bullbull1~ aaeIT t-- nrJD nJUntu~CllWI

m ~1 ~ ~~~ ~ ilria~gliiiji~=ir ~lt-OTT gl1raquo ~Iraquou fflllIL nllll 1111111 flC~middotIY_4allCCIIIi l1i5~ ~~11~middot~ ~~ ffll H71W786lll 7P-JOalllllll 2N ~ 1-flllt 7HIJl4- DI ~ ~==~ ~t-tr bullM-

114 Hit71aTra7ririatNOCIIII

llHl1Hf ll~7Dl4fIZIIICIIII 1141ftillf+1DllnTgtlMa~=~bull==~r Lbulll-lllbullbulllJJ

=~~~HR-~a ~ =iEri ~ ~=6

= 1MESE COCIIIOlfAlEi ARC 9~ at AH DISTlfG CONJmOfS AS-alLT FED 5UKiEY Y NORWDal EJICltJIJll(G CD~ IIElMEN ~ 1S 111 DECDaR a 2DII 1)pound OCICIIIDNAlES 5HCflI UIpound IIAID Cit MltSSAOfllffT5 STATE FlJriNII CDCffllNAT smult ~AO leJ (IMIJ 1HE ACQlltACY ltF 1HE COCftDINT[ LDCAnatS Mpound diams- 01 FtU

POINT DESCRIPTION ABBREVIATIONS~-~middotPC Pmlr Of CLIRIJC bullIEllL ClMNpound STilRlS PDC bull PtJtilTIIJOM1poundr ~ [raquo TAHCINiT W(R[ lll[ CURpound uroo Fo F[1NT(1t~tfflvt[ltft1llllIIUlt OMNtilE)PRC ~T oT ~pound ~Vlllrlt

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 2 of 2

I ~ IHAT nfl PlM MS 81D1 PIIDMQl ~WllTM(llUI MOIIEOIAAlPlllR~Df IIUPS C- lttE ~111 Cl__ HftNMIIIZlt

WWWWJU Cii6 liftitit

ACTIVITY ANI) USE LINTATIONS

PLAN OF RES7RIC1EJJ AREAS ANJJ COlER TYPES

8V CKlJ()RN IJNl()N PflllfpoundCpoundS SlllERFIIMJ SITC

50 HJ S(J11( SmEpoundT llAIPOIL JASS

=r-o ~ ll 2021

~ Engmeer1ng

Hltd ~~ middot~~-=~ra (f~AJ lIQ c- f

a llfEET 2 ltF 6324-02

td ~

w ~ m 0 0

Id Q ii w m

co co m 0 co

Bk 39600 Pg437 88608

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY New England Region

Five Post Office Square - Suite 100 Boston Massachusetts 02109-3912

INSTITUTIONAL CONTROL DESIGN STATEMENT FOR THE BLACKBURN AND UNION PRIVILEGES SUPERFUND SITE - EAST OF SOUTH STREET AREA

1 Introduction

Pursuant to the Comprehensive Environmental Response Compensation and Liability Act 42 USC sect 9601 et seq (CERCLA) and the National Contingency Plan 40 CFR Part 300 (the NCP) this document contains a description of the release events and site history that resulted in the contaminated media that require institutional controls in the fom1 of Activity and Use Limitations the basis for land use restrictions and uses that are consistent and inconsistent with the Selected Remedy ( as described below) This Institutional Control (IC) Design Statement pertains to a portion of the Blackburn and Union Privileges Superfund Site located in the Town of Walpole Massachusetts (the Site) which has been listed on EPAs National Priorities List (NPL) which portion is generally referred to as the East of South Street Area (the EOS Area) The EOS Area is located to the east of South Street in Walpole and is shown on Figure 1 attached hereto

A Notice of Activity and Use Limitation (NAUL) is necessary and appropriate for the EOS Area of the Site based on the fact that pursuant to EPAs risk evaluations asbestos arsenic trichloroethene (TCE) and certain polycyclic aromatic hydrocarbon (PAH) contan1inants remain in place in soils at levels higher than those appropriate for unlimited use or unrestricted exposure groundwater underlying the EOS Area contains hazardous substances at levels that present an unacceptable risk of exposure and remedial measures at the Site must be protected and maintained to ensure that the Selected Remedy remains protective

EPAs Record of Decision (ROD) dated September 30 2008 specified the need for institutional controls such as a NAUL to ensure long-tenn perfonnance and protectiveness of the Selected Remedy The institutional controls described herein are necessary and appropriate to ensure that the Selected Remedy for the Site remains protective of human health and the environment The remedy for the Site as described in the ROD is referred to herein and in the NAUL as the Selected Remedy

Page 1 of7

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 11: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

--------

Bk 39600 Pg416 88608

In accordance with CERCLA 42 USC sect 9601 et seq and the National Contingency Plan the United States Environmental Protection Agency Region I hereby approves this Notice of Activity and Use Limitation

Name 8r~Cltvi Olso Director Superfund and Emerncy Management Division (SEMO)

US Environmental Protection Agency Region I

In accordance with MGL c 21E sect 6 and the Massachusetts Contingency Plan (310 CMR 400000) the Department of Environmental Protection hereby approves this Notice of Activity and Use Limitation (as to form only)

Date Paul W Locke Assistant Commissioner Bureau of Waste Site Cleanup Department of Environmental Protection

Page 11 of 12

---------------

Bk 39600 Pg417 88608

In accordance with CERCLA 42 USC sect 9601 et seq and the National Contingency Plan the United States EobulliionmenlaJ Protectioo Agency Region I hereby appro1es this Notice of Activity and Use Limitation

Date ~------

Name Director Superfund and Emergency Management Division (SEMO)

US Environmental Prokction i0 ency Region I

Jn accordance with MGL c 21 E sect 6 and the Massachusetts Contingency Plan (310 CMR 400000) the Depamnent ofEmironmental Prolectioo hereby approves this Norice ofActivity

and Use Limilarioo (as ro funn ooly)_ ~~

Dale 4r S microlJ ~ Paul W Locke Assisrant Commissioner Bureau ofWaste Site Cleanup Department of Environmental Protection

Page 11 of 12

Bk 39600 Pg418 88608

List of Exhibits

Exhibit A Legal Description of the Property Exhibit B Legal Description of the Restricted Area and Coordinates of Cover Types Exhibit C Photo-Reduced Copy of Activity and Use Limitations Plan of Land Exhibit D Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table Exhibit E Institutional Control Design Statement (EOS) Exhibit F Copy of Vote of Town of Walpole

Return to

Attn Kristine Sheehy Senior Real Estate Attorney FOLEY HOAG LLP Seaport West 155 Seaport Boulevard Boston Massachusetts 02210-2600

Page 12 of 12

Bk 39600 Pg419 88608

EXHIBIT A

Legal Description of Property The land with the improvements thereon located in Walpole Norfolk County Massachusetts bounded and described as follows

PARCEL I

The land on the Southeasterly side of South Street bounded

NORTHWESTERLY NORTHERLY AND AGAIN NORTHWESTERLY by South Street by seven lines measuring respectively

17027 feet 120 feet 22011 feet 1653 feet 325 89 feet 4515 feet and 1497 feet

NORTHEASTERLY by Gleason Court 2627 feet

SOUTHEASTERLY AGAIN NORTHEASTERLY AND AGAIN SOUTHEASTERLY by land now or fom1erly of Santomarco by five lines

measuring respectively 6750 feet 2050 feet 1190 feet 2952 feet and 2001 feet

NORTHEASTERLY AGAIN by said land of Santomarco and land now or formerly of Cashorali 10056 feet

NORTHWESTERLY AGAIN by said land of Cashorali 2845 feet

NORTHEASTERLY by land now or formerly of Muighitti 9007 feet

SOUTHEASTERLY by the location of Old Colony Railroad by three lines measuring respectively 6809 feet 32808 feet and 38250 feet

and

SOUTHWESTERLY by land now or formerly of Meyer by three lines AND SOUTHERLY measuring respectively 9143 feet 1998 feet and

15202 feet

Parcel I is described in the deed recorded with the Norfolk County Registry of Deeds in Book 4459 Page 287

A portion of said premises is shown on plan entitled Plan of Land in Walpole Mass Belonging to General Fibre Co Inc by Edward C Peterson CE dated January 16 1960 filed with the Norfolk Registry of Deeds as Plan No 849 of 1967 in Plan Book 223 and the remainder is shown on plan entitled Plan of Land in Walpole Massdeg by E Worthington Engineer dated February 6 193 7 recorded with said Deeds Book D2135 Page 8 I

FHBOSTON52454092

Bk 39600 Pg420 88608

PARCEL II Property known as Parcel 33-120 of the Town of Walpole Tax Assessors Map which is

part of the property situate in the Town of Walpole County ofNorfolk and Commonwealth of Massachusetts and being all of the right title and interest of The Penn Central Corporation in and to all those certain pieces or parcels of land and premises easements rights of way and any other rights of any kind whatsoever appurtenant thereto or used in conjunction therewith on and along a portion of Branch of Railroad known as the Wrentham Branch said portion of railroad being described as follows

Beginning at a line extended across the right of way of said Branch of rai road said line being the Northerly line of South Street and extending thence in a Northeasterly direction the distance of 2852 feet more or less along said Branch of rai Iroad to a line which is parallel with the Southwesterly line of Common Street said parallel line extending across said right of way through a point in the centerline thereof at railroad valuation survey station 733 + 67 more or less and being the place of ending

Parcel II is described in the deed recorded with the Norfolk Registry of Deeds in Book 7986 Page 372 and is a portion of the land shown on the plan recorded with said Deeds as Plan No 52 of 1983

FHBOSTON52454092

Bk 39600 Pg421 88608

Exhibit B Legal Description of the Restricted Area and Coordinates of Cover Types

Le2al Description for Restricted Area The area shown on the plan entitled Activity and Use Limitations Plan of Land Blackburn amp Union Privileges Superfund Site 50 amp 60 South Street Walpole Mass Scale l = 30 dated April 6 2021 by Norwood Engineering Company Inc recorded with the Norfolk Registry of Deeds in Plan Book 704 Page 41 being bounded and described as follows

Beginning at a point on the easterly sideline of South Street at the southerly point of curvature of Gleason Court on said plan thence

Northeasterly and curving to the right along an arc of a curve having a radius of twentyshyfive and 00100 (2500) feet a length of forty-five and 15100 (4515) feet thence

S 48deg1352 E a distance of twenty-two and 24100 (2224) feet the previous course by the southerly sideline of Gleason Court thence

s 32deg0208 w a distance of fifty-four and 78100 (54 78) feet thence

S 59deg27 32 E a distance of twenty and 50100 (2050) feet thence

S 47deg5252 E a distance of eleven and 90100 (1190) feet thence

S 49deg01 10 E a distance of twenty-nine and 58100 (2958) feet thence

s 38deg3108 w a distance oftwenty and 01100 (2001) feet thence

S 49deg00 57 E a distance of one hundred and 56100 (10056) feet thence

N 39deg5348 E a distance of twenty-eight and 45100 (2845) feet the previous seven (7) courses by land ofNF Thelma A Casborali thence

S 49deg0808 E a distance of ninety and 29100 (9029) feet the previous course by land ofNF Ming L Yau thence

s 25deg2312 w a distance of siliy-eight and 22100 (6822) feet to a point on the westerly sideline of a fonner railroad right of way the previous course by land of the Town of Walpole assessor parcel 33-121 thence

S 55deg2937 E a distance of ninety-nine and 78 100 (99 78) feet to a point of tangency on the easterly sideline of a forn1er railroad right of way thence

Page 1 of 13

Bk 39600 Pg422 88608

s 30deg11 32 w

S 23deg49 I6 W

N 66deg1044 W

N 23deg4908 E

N l 6deg00 52 E

S 37deg0240 E

N 10deg1437 W

N 34deg093 I W

N 11 deg5558E

Northeasterly

N 27deg41 48 E

a distance of three hundred and three and 74100 (30374) feet the previous course by land ofNF Nicholas H Dowd and NF Emilio P Baldassari thence

a distance of four hundred ninety and 86100 (49086) feet to a SBdh the previous two (2) courses by the easterly sideline of a former railroad right of way thence

a distance of eighty-two and 76100 (8276) feet to an Iron Pipe on the westerly sideline of the former railroad right of way thence

a distance of twelve and 09100 (1209) feet to a SBdh thence

a distance of ninety-six and 50100 (9650) feet to a S Bdh thence

a distance of fifteen and 00100 (1500) feet the previous three (3) courses by the westerly sideline of the former railroad right ofway and land of NF Joseph R Carpentieri and NF Joseph R and Faith N Carpentiero thence

a distance of ninety-two and 82100 (9282) feet the previous course by land ofNF Richard A and Josette M Burke thence

a distance of tvvo hundred thirty-seven and 86100 (23786) feet to a point on the easterly sideline of South Street thence

a distance of one hundred twenty and 00100 (12000) feet along the easterly sideline of South Street to a point of curvature of the easterly sideline of South Street thence

and curving to the right along an arc of a curve having a radius of eight hundred and 00100 (80000) feet a length of two hundred hventy and 11100 (22011) feet along the easterly sideline of South Street thence

a distance of three hundred forty-hvo and 42100 (34242) feet to the point of beginning

Containing 621 Acres of land more or less

Page 2 of 13

3000

3005

3010

3015

3020

3025

3030

Bk 39600 Pg423 88608

EXHIBIT B (cont)

Points and Coordinates associated with Restriction Areas and Cover Types for the Activity and Use Limitations (AUL) at 50 amp 60 South Street Walpole Mass

Point Northing Easting Type

Curve Curve Number Len2th Radius

28754430528 7236432250 COR

3001 28755604597 7236680368 PC L=7535 R=80000

3002 2875597 1222 7236766913 POC

3003 28756333366 7236870620 PT

3004 28756280754 723697 3031 COR

28756025570 7237001250 COR

3006 28755918670 7237001140 COR

3007 28755864440 7237 I 05890 COR

3008 28755903200 72371963 IO COR

3009 28756030893 7237217396 COR

28756042534 7237250325 COR

3011 28756021733 7237317808 COR

3012 28755800732 7237640949 COR

3013 2875552 1424 7237667395 COR

3014 28755321388 7237708416 COR

28755197081 7237834881 COR

3016 28755102230 7238045173 COR

3017 28754941531 7238291869 COR

3018 28754851375 7238512944 COR

3019 28754753441 7238824 760 COR

28754681541 723916 1881 COR

3021 28754608227 7239406506 COR

3022 28754515846 7239459928 COR

3023 2875426 7589 723943 8163 COR

3024 28754198016 7239590840 COR

28753886764 7239449006 COR

3026 2875329 7944 7239187206 COR

3027 28752506745 7238837890 COR

3028 28751859560 7238552142 COR

3029 28751221833 723827342 l COR

28750848788 7238107869 COR

3031 2875045 3654 7237927814 COR

3032 28750630420 7237527432 COR

3033 28750741023 723757 6257 COR

3034 28751668594 7237842488 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 3 of 13 April 14 2021

3035

3040

3045

3050

3055

3060

3065

3070

Bk 39600 Pg424 88608

Point Number

Northing Easting Type Curve Leneth

Curve Radius

28751548848 7237932869 COR

3036 28752462269 7237767802 COR

3037 28756438461 7236904209 POC L=2207 R=80000

3038 28756543084 7236939245 PT

3039 2875653 7987 7236954123 PC

28756597578 7237007344 POC L=1651 R=937

3041 28756594465 7237087181 PT

3042 28756459044 7237347021 PC L=347 R=220

3043 28756432531 7237363546 PT

3044 28756280644 7237286201 COR

28755924210 7237966952 COR

3046 28756081959 7238048554 PC L=472 R=236

3047 28756064922 7238084404 PT

3048 28755523491 7237845047 COR

3049 28755419845 7238081981 COR

28755460757 7238099621 PC L=240 R=l57

3051 28755467701 7238120241 PT 3052 28755398690 7238275280 COR

3053 28755365410 7238264910 COR

3054 28755087149 7238900449 COR

28755158001 7238931521 COR

3056 28755040360 7239199770 COR

3057 28755311720 7239318930 COR

3058 28755263010 7239429300 COR

3059 28755388260 7239484290 COR

28755348660 7239576000 COR

3061 28755625470 7239696500 COR

3062 28755664605 7239606601 COR

3063 28755736202 7239637768 COR

3064 28755621870 7239897370 COR

287 5567 6160 7239920410 COR

3066 28755718270 7239830260 COR

3067 2875587 9750 7239900310 COR

3068 28755718790 724026 7600 COR

3069 28755763390 7240285350 COR

28756035900 7239926600 COR

3071 28756086280 7239812770 COR

3072 28756089984 7239813649 COR

3073 28756229128 7239501910 PC L=482 R=l54

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 4 of 13 Apnl 14 2021

3075

3080

3085

3090

3095

3100

3105

3110

Bk 39600 Pg425 88608

Point Number

Northing Easting Type Curve Length

Curve Radius

3074 28756257366 7239513984 PT

28756185799 7239674928 COR

3076 28756739833 7239921136 COR

3077 28756876060 7239682275 COR

3078 28756948336 7239735898 PC L=335 R=298

3079 28756958235 7239766064 PT

28756866081 7239978133 COR

3081 28757166275 7240127374 COR

3082 28757068320 7240314640 COR

3083 28757602980 7240594310 COR

3084 28757700050 7240408736 COR

28758247941 7240688376 COR

3086 28758250190 7240683910 COR

3087 28758344979 7240738168 COR

3088 2875843 6103 7240581527 COR

3089 28758602943 7240664224 COR

28758740024 7240397393 COR

3091 28758605706 724032 7776 PC L=477 R=309

3092 28758594882 7240286013 PT

3093 28758666635 7240197585 PC L=2573 R=3127

3094 28758767113 7240118710 POC

28758890752 7240086604 PRC L=I653 R=3993

3096 28758972305 7240074125 POC

3097 28759049552 7240045 I 52 PT

3098 28759330312 7239734408 COR

3099 28759459414 7239588584 PC L=2269 R=5217

28759524821 7239496174 POC

3101 28759568752 7239391829 PRC L=1814 R=486

3102 28759603259 7239308095 POC

3103 28759653883 7239232999 PCC L=l31 R=088

3104 28759665694 7239231411 PT

28759800587 7239299586 COR

3106 28759986288 7238981214 COR

3107 2875983 5797 7238891829 COR

3108 28759879750 7238798689 COR

3109 28759905380 7238754769 PC L=1600 R=2552

28759963590 7238700398 POC

3111 28760035727 7238666620 PT

3112 28760700665 723901 5672 PC L=4515 R=2500

3113 28760830230 7239191198 POC

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 5 of 13 April 14 2021

3115

3120

3125

3130

3135

3140

3145

3150

Bk 39600 Pg426 88608

Point Number

Northing Easting Type Curve Len2th

Curve Radius

3114 2876077 263 6 723 940 1624 PT 28760624518 7239567466 COR

3116 28760160100 7239276864 COR

3117 28760055928 7239453423 COR

3137 28759976118 7239541692 COR

3118 28759782139 7239764992 COR

3119 28759625581 7239640375 COR

28758966057 7240399493 COR

3121 28759184326 7240581973 COR

3122 28758593598 724126478] COR

3123 28757977293 724097 2314 COR

3124 28757716516 7241351659 COR

28757288251 7241140719 COR

3126 28756725827 7240851862 COR

3127 28756162468 7240586126 COR

3128 28755614498 7240338506 COR

3129 28754346745 7239768507 COR

28753845716 7239540194 COR

3131 28753257436 723927 8634 COR

3132 28752466355 7238929370 COR

3133 28751819340 7238643698 COR

3134 28751181527 7238364939 COR

28750807772 7238199071 COR

3136 28750413263 7238019301 COR

3138 28756920317 7237298739 PC L=l941 R=2104

3139 28756827128 7237274848 POC

28756733047 7237294944 PRC L=401 R=l66

3141 2875671 1336 723 727 2844 PCC L=1492 R=13345

3142 28756744594 7237206091 POC

3143 28756781529 7237141301 PCC L=1419 R=l018

3144 28756833084 7237094642 POC

28756902566 7237091952 PCC L=2413 R=157959

3146 28757017337 7237129167 POC

3147 28757131820 7237167258 PCC L=330I R=S0000

3148 28757282552 7237234442 POC

3149 28757431866 7237304721 PT 28757338390 7237495930 COR

3151 28757541620 7237605380 COR

3152 28756897590 723883 4280 COR

Exhibit B to NA UL-Part 11-EOS Coordinate Tables Page 6 of 3 April 14 202

3155

3160

3165

3170

3175

3180

3185

Bk 39600 Pg427 88608

Point Northing Easting Type Curve Cunbulle

Number Lenszth Radius 3153 28756870623 7238820218 COR

3154 28756838273 7238882258 COR

28756865240 7238896320 COR

3156 28756777004 7239062996 COR

3157 28756770439 7239063663 PC L=l 146 R=2269

3158 2875665836 I 7239046180 PCC L=l423 R=957

3159 2875661 7520 7238989913 POC

28756625544 7238920850 PT

3161 28756728525 7238726583 PC L=232 R=l58

3162 28756748720 7238720236 PT

3163 28756899634 7238797341 COR

3164 28757254653 7238121363 COR

28757520153 723761266 7 COR

3166 28757306899 723 750 IO 10 COR

3167 28756690336 7237500169 PC L=243 R=I68

3168 28756682599 7237479273 PT

3169 28756686990 7237469583 PC L=0250 R=l68

28756708806 7237463018 PT 3171 28757000109 7237616354 PC L=233 R=l73

3172 28757005368 7237637270 PT

3173 28757000998 7237645513 PC L=233 R=l69

3174 28756980219 7237651023 PT

28756429209 7238339422 COR

3176 28756342982 7238506849 COR

3177 28756500076 7238596485 PC L=l19 R=l48

3178 28756499701 7238608072 PT 3179 2875644 7813 7238705611 PC L=l 182 R=483

28756358177 723 869 0707 PT

3181 2875623 6099 7238376388 PC L=443 R=467

3182 28756235611 7238333779 PCC L=343 R=9IO

3183 28756249049 7238302418 PCC L=412 R=9IO

3184 28756278952 7238274519 PCC L=368 R=300

28756313362 7238277619 PT

3186 28756282498 7238911796 PC L748 R=216

3187 28756240650 7238919721 PT

3188 28756126081 7238620406 PC L=323 R162

3189 28756138645 7238591575 PCC L=333 R=283

Exhibit B to NAUL-Part II-EOS Coordmate Tables Page 7 of 13 April 14 2021

3190

3195

3200

3205

3210

3215

3220

Bk 39600 Pg428 88608

Point Number Northing Easting Type Curve

Leneth Curve Radius

28756163375 7238602867 PT

3191 2875523 0908 7238765275 COR

3192 28755205040 7238752740 COR

3193 28755391740 7238328470 COR

3194 28755466840 7238361040 COR

28755452760 7238392590 COR

3196 28755516920 7238421040 COR

3197 28755530690 7238388730 COR

3198 28755603230 7238421460 COR

3199 2875555 7568 723852 7053 COR

28755371220 7238445330 COR

3201 28755629198 7238558466 COR

3202 28755676040 7238453290 COR

3203 28755925410 7238563840 PC L=1902 R=3548

3204 28755927383 7238658634 POC

28755954390 7238749520 PT 3206 28755974770 7238807230 COR

3207 28755779200 7238881701 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

28755746700 7238609997 COR

3211 2875593774 7239036608 COR

3212 28756048460 7238996850 PC l=1445 R=2903

3213 28756070631 7239065422 POC

3214 28756109010 7239126420 PT

28756153820 7239182190 PC L=S98 R=848

3216 28756171980 723923 7880 PT

3217 287S6026148 7239566166 COR

3218 28756003865 7239556465 COR

3219 287S6134380 7239256650 COR

28755998460 7239195370 COR

3221 2875600 71S0 7239174530 COR

3222 28756001791 7239172152 COR

3223 28756040451 7239079437 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 8 of 13 April 14 2021

Bk 39600 Pg429 88608

Point Number

3210

3200

3056

3057

3058

3059

3060

3061

3062

3218

3219

3220

3221

3224

3225

3226

3227

3228

3070

3071

3234

3233

3235

3236

3237

3238

3239

3240

3241

3242

3243

3244

3245

3246

3247

3248

Northing

28755746700

28755371220

28755040360

28755311720

28755263010

28755388260

28755348660

2875562 54 70

28755664605

28756003865

28756134380

28755998460

28756007150

28755941340

28755962080

28755867937

28755819702

28755766128

28756035900

28756086280

28755991990

28755942100

28756477248

28756677238

28756650130

28756473307

28756480112

28756675030

28756724454

28756742099

28756742133

28756703924

28756640759

28757607280

28757401530

28757467350

Easting

7238609997

7238445330

7239199770

7239318930

7239429300

7239484290

7239576000

7239696500

7239606601

7239556465

7239256650

7239195370

7239174530

7239145324

7239100930

7239061674

7238935003

7238911508

7239926600

7239812770

7239769910

7239884050

7239261913

7239253008

7239321810

7239319038

7239298824

7239364440

7239271845

7239292625

723935 0187

7239393239

7239393096

7237584960

7237475300

7237345620

Type

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

PC PCC

POC

PCC

PT

COR

COR

COR

Curve Len2th

L=273

L=ll77

L=657

Cunmiddote Radius

R=1421

R=810

R=679

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 9 of 13 April 14 2021

Bk 39600 Pg430 88608

Point Number Northing Easting Type Curve

Len2th Curve Radius

3249 287 57514570 7237372360 PC l=ll05 R=1993

3250 287 57 588060 7237452980 PT

3251 28757631382 7237429676 PC L=2244 R=2352

3252 287 5765 6810 7237537876 POC

3253 2875 762 9720 7237645671 PT

3254 28756940655 7238952710 PC l=1493 R=1509

3255 28756901845 7239015577 POC

3256 2875683 7836 7239052474 PT

3257 28758104824 7237653014 COR

3258 28758028960 7237800160 COR

3259 28757949530 7237760790 COR

3260 28757901005 7237855021 COR

3261 28757839230 7237820908 PC L=273 R=l33

3262 28757830688 7237799810 PCC L=539 R=2144

3263 28757852974 7237750897 PT

3264 28757891705 7237688178 PC L=lS26 R=2432

3265 28757948636 7237637880 POC

3266 287 58018307 7237607597 PT

3248 28757467350 7237345620 COR

3267 28757550832 7237363444 POC L=2653 R=80000

3268 28757668809 7237424132 PT

3269 28757504 719 7238817989 COR

3270 28757493010 7238842230 COR

3271 28757561074 7238880970 COR

3272 28757483953 7239024127 PC L=323 R=l70

3273 28757459939 7239037846 PT

3274 28757311605 7238957122 PC L=1388 R=906

3275 2875727 2732 7238901647 POC

3276 28757283181 7238834718 PT

3277 287 5733 4061 7238752337 PC L=255 R=l60

3278 287 5735 5527 7238744411 PT

3279 2875 7102815 7239517199 PC l=261 R=l70

3280 28757080654 7239525307 PCC l=909 R=1275

3281 2875 700 5390 7239477911 PCC L=l007 R=990

3282 28756999624 7239381704 PT

3283 2875707 7705 7239230604 PC L=ll14 R=907

Exhibit B lo NAUL-Part IlbullEOS Coordinate Tables Page 10 of13 April 14 2021

3285

3290

3295

3300

3305

3310

3315

Bk 39600 Pg431 88608

Point Number Northing Easting Type

Curve Leneth

Curve Radius

3284 28757168066 7239178102 PT

28757205717 7239186398 PC L=518 R=930

3286 28757249003 7239213534 PCC L=l41 R=086

3287 2875724 7909 7239226048 PT

3288 28758415755 7239842757 PC L=251 R=l59

3289 28758437695 7239837379 PT

28758456377 7239846949 PC L=812 R=876

3291 28758494897 7239915165 PCC L=456 R=757

3292 28758483790 7239958646 PT

3293 28758405147 7240111348 PC L=l057 R=955

3294 28758318136 7240161452 PCC L=477 R=l063

28758272407 7240149529 PCC L=250 R=l60

3296 28758265647 7240128003 PT

3297 28758157937 7237680895 COR

3298 28758902927 723807 1969 COR

3299 28758852531 7238168280 COR

28758779660 7238129750 COR

3301 28758746973 7238192072 COR

3302 2875807 6630 7237840490 COR

3303 28758049940 7237894220 COR

3304 2875871 7997 7238243620 COR

28758680103 7238315946 COR

3306 28758533699 7238239240 COR

3307 2875852 6899 7238252220 COR

3308 28758098180 7238027600 COR

3309 28757974484 7238264223 COR

28757957598 7238255513 COR

3311 28757757732 7238637845 COR

3312 28757774584 7238646620 COR

3313 28757653710 723887 7846 COR

3314 28757560920 7238829340 COR

28759004930 7238125514 COR

3316 28759689797 7238485028 PC L=1992 R=2609

3317 28759697204 7238583760 POC

3318 28759667288 723867 8142 PT

3319 28758996126 7238323718 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 11 of 13 April 14202 I

Bk 39600 Pg432 88608

Point Number

Northing Easting Type Curve Lenfth

Curve Radius

3320 28759028950 7238261560 COR 3321 28758954486 7238222188 COR

3322 28758972523 7238378387 COR 3323 28759421550 7238613630 COR 3324 28759377933 7238698105 COR 3325 2875907 4811 7238539289 COR 3326 28759081611 7238526309 COR 3327 28758935210 7238449604 COR

3328 28759464470 7238637330 COR 3329 28759632674 7238722481 PC L=ll83 R=l578

3330 28759583973 7238755474 POC 3331 28759526573 7238768343 PRC L=2163 R=2455

3332 28759422964 7238796123 POC 3333 28759341091 7238865430 PT

3334 28759193370 7239050710 COR 3335 28759416340 7239163940 COR 3336 28759263600 7239455620 COR 3337 28759043690 7239336510 COR 3338 28758935490 7239552130 COR 3339 28757650890 7238883240 COR 3312 28757774584 7238646620 COR 3311 28757757732 7238637845 COR 3310 28757957598 7238255513 COR 3309 28757974484 7238264223 COR 3308 28758098180 723802 7600 COR 3307 28758526899 7238252220 COR 3306 28758533699 7238239240 COR 3340 28758700033 7238326388 COR 3341 28758675436 7238373334 COR 3342 28758733013 7238403500 COR 3343 28758760858 7238350353 COR 3344 28758860952 7238402796 COR 3345 28758833106 7238455943 COR 3346 28758890683 7238486109 COR 3347 28758915280 7238439162 COR 3326 28759081611 7238526309 COR 3325 28759074811 7238539289 COR

Exhibit B to NAUL-Part H-EOS Coordinate Tables Page 12 of l3 April 14 2021

Bk 39600 Pg433 88608

Point Number

Northing Easting Type Curve Len2th

Cunbulle Radius

3324 2875937 7933 7238698105 COR

3082 28757068320 7240314640 COR 3083 28757602980 7240594310 COR 3349 28757790234 7240236327 COR

3348 28757255574 7239956657 COR

3124 28757716516 7241351659 COR 3125 28757288251 7241140719 COR 3126 28756725827 7240851862 COR 3127 28756162468 7240586126 COR 3128 287 55614498 7240338506 COR 3129 28754346745 7239768507 COR 3130 28753845716 7239540194 COR 3131 28753257436 723927 8634 COR 3132 28752466355 7238929370 COR 3133 28751819340 7238643698 COR 3134 2875118152 7 7238364939 COR 3135 2875080 7772 7238199071 COR 3136 28750413263 7238019301 COR 3350 28750296168 7238284525 COR 3351 28754 78 6636 7240267040 COR 3352 28757412029 7241794586 COR

POINT DESCRIPTION ABBREVIATIONS

COR=CORNER PC= POINT OF CURVE WHERE CURVE STARTS POC -= POINT ON CUR VE PT=POINT OF TANGENCY WHERE THE CURVE ENDS PCC = POINT OF COMPOUND CURVE (WHERE RADIUS CHANGES) PRC = POINT OF REVERSE CURVE

NOTES

THE COORDINATES ARE BASED ON AN EXISTING CONDITIONS AS-BUILT FIELD SURVEY BY NORWOOD ENGINEERING CO INC BETWEEN NOVEMBER 15 TO DECEMBER 18 2019 TI-IE COORDINATES ARE BASED ON l1ASSACHUSETIS ST A TE PLANE COORDINATE SYSTEM NAD 1983 (FEET) THE ACCURACY OF THE COORDINATE LOCATIONS ARE +-0J FEET

Exhibit B to N1UL-Part II-EOS Coordmate Tables Page 13 ofl3 April 14 2021

---

1f~ flJr ~i

f ~~ J~i](M~I ~ 1 jf~ ~~f W-- )e 1

It lj fY pl ~-~j

I --- ~ ~

1 (J-c~ er ~

C JI fl JYf

1 ~ ~Yu-~ 1i

~r

( LOClJS P

SCAUllbulliQO

I ar lMIT flG PINI tMS _ lIIPMIDMICXNllRlnT~tlCfllUS 1111D cmuftraquodl s - NIKl1III tfIJIIIIIOfM~1HCll allE1

DAre Jllrl

NUKIJU LU6 DMitM

mmtG6DKbdlt

~4~-middot

~~I

-- ampnbullllf~ ~ fa

LEGEND 0

-i~wr0o-m lICUUoaampbullco--11111 _ _l_J

0

bull ~-ail_I

~-

mo(I ---fwj

amp~~~~ ~ ~~ltgtmiddot ~A~

~6

_L-r

bull -~ IBP__l-11Uil n-rlfl-lffll rMCllI 1a 1rr ai

-~ lll-lliI u-W--11a 1 Ml[ 411 amt l0IIC 3JICJ7 ~ 33-1--I- DIID llXII D111 JlMZ 411 lraquo- ~lUN~t --- - etMpound 11JII

~ MffD mmaat ZL I01t 111

1Jlll~-IICfIQfJICIISJ DfEI IC71- I~ 1~ 9 Cl 1VY IICIIWCLl~fCSC~lNCl

~11HltOXW1A~JtCI~llfB MXIC 1HI lME INCi 111M bull11 (S 1f41~middot~-~-)

~ io

0 0 0 0 -0 0 0 D O 1 middot tbull O

_- _pound ~ - Tf middot- ---r ~~ ~~- ~=middoti

r jil7bull --------4~-middot~

(

SCAtpound 1bull bull YI

I ~ tfAIE lIMa toafllltl1E ~NAD1w1(rJ

1 ~ PlIla II MMt QI 11D TD D111oPl

~c1MlntID9~~-l 1NIIJIIKlNI LnlJTU ~ deg qllAJSTE uM011111 iu1II 1111ZT IIIILJaZ

Exhibit C - Photo-Reduced Copy of Activity and Use Limitations Plan of Land

--~middot---

I ~111-11111

iiiii

-ill111liilt

ACJIYIJY ANJ) lJSE lJJll7ATJONS PLAN OF LANI)

81ACJ(81R1 I IINION Flr11lfES SllffllF7AVO SIle

o tfO SOIJIH s1ar HlltlPOtL IIAS

SCAlElrJAt IPfffl152021

1IJrwod Eng1neerlng

- EnQlbullHrlflg Compaffy middot~~=~ m Cm1JQ u fnfJa-eal

~ -

-~

9l1EET 1 OF I 8324-02

td ~

w ~ m 0 0

Id Q ii w ii

co co m

co 0

-l

~-77--raquo- -~I~ )middot~ ~ bull _I lT ~ v~

AI ~ If ~)middot~ 7- ~1 c t11 yil ~ ~ ~middot~41 bull1 l ~~l(i~r~1 f7 )ll y-

~~ f -~ -v fgtV ~ ~ ~ l er-- u -

tl x-P~C ()

JP yen f(( 11 1degpoundS -~ (

ftunrTfflllllTnallJrNNQWDf ~ ti IZNtRlTT lnH M IULS IIJIUIUlA-DlltlllllDlJlllIICIF tJbllt~llC~lJNp

DTl NlllltaJatl-Witiill (raquo11 iiiK(+til

I aJnlTlKATJlfl PlAH~ THE PUIIJll1T UC TIUlf Mlaquo THE l5 11 oawG ~ NII 1Hpound1as Of1111E111 AMllfrlTll9laquolllt Mpound ntem OPlaJ CJ1 IWM1pound BREn 011 bulln

~ ~illi~fli~ _lt ---c~-Clmiddot~~c0-nmiddotmiddot~bullJmiddot04~- ~--~--yen~~bull - L -bull -n ~ -r - ~ -

it

~ fr ~ ~- -~bull~bullv OG- ~n0

bull--ltmiddot middot~ -~- ~~-=~7~st~-~~~~i~~Hil~-) 2~C 0 ~~~~~ --------Y-Tgt-bullbullmiddot-

U-IU ~middotshy =i==-

bullbull bull _ -middot-

~----- ( ~11middot

__IC1ZMJ - bull IOC)0l lftEf ___ i gt mEKJllJfNG rotJ1FRIIIT AIIEAS B~ p~ AIIEAS ~ea-vmiddot LIUIID

~ e--- -+ ~ rzprz1za 1 ~ IJTATC PRC ~TC

nJml lltPtasCltJ

DUD BCD lJlll7 PMC 4H 1 1 YERT1CAL M1llI II NCCI ~ _ ro conurr DOD 80CIC 3JII07 llME 4H I ntaM NUIU 1121 IJ4TAI m IMlC 111111 nATIIW ~fsi

tJMAlfflOlI) AIIEAS1 bull 11AMJSCAlfl) AlpoundAS Lill] 1Dll IOlII POT PlCit 6115 J)-t20 ~atfnujK~tlLWlQI

~PUNMl-17 POflTIVNf1Ell llaD BaalC Tl_ Paa bullbull - 99 a 11

_-ijf1iltDP~IZ~ 5CME - JOSUva1fTLJ ~ ~-rr 111 C tMI=

bull111 I~

i=iiii7

~ e---

t c z rl

L-n11 ~

ACJIVJTY AND USE LIAlffAJIONS

PIAN OF RESTRIC1EJJ AREAS ANJJ COVER TYPES

fltACK1(fN _ llNlltgtI PfMIECCS SllPVFVNlJ51Tlt

JO _ lxJ srJllH STREET IIALPrJU JASS

SCAU I - 30 APRIL 2021

lcnwod Engineering

llarwood Cngnrilgtf cpmy -t~~~~

fIL Pllpa-ru - (1u]1a-lftll

~L=wl f 01~JII IO_

a SIEET I (F 2 B324-02

bj ~

w 0

0 0 deg It

iQ ~ w l11

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 1 of 2

CX) CX)

deg CX) 0

ntllT -1~1~ rurnlaquo1 r1n l1XTM 11Nf -r~ lie UUffCI 11Pt lDll1Hf iniin --IC unr1G Tlr 1n1rn Iota allll Ito tyen1tlll ~~11CRnrzJ11-11--~ci-- n31 nr111w11J1t ~bull c ~- diams JDrnn llloffl rcnlml IDII

-~ ]al rll _ _ PnlM-1-PI lbull-- ll7HrirrIPlllD1lf~-a bullbullll 111bull IClln9XnolDlllIIIIIIOm

214 ff7371JOOT ~bull JllC Ibullbull 171 JICllEY)l)vlUTlo~lUl~ ~li_~ -~~ MDlol ll4L~TllJraquofllllf190abullbullt ~~nQuu~~1aJI _~~OtottWU~1t11txm~arcPbrmllmCDt ~~ ~~ ~ =~ gj ~l11~ llltlM Mrattllll TDPmllIDCDI JJ4bull e~ _ ~ e PClC lbullI- 1- ~1sect~ ~ ~ ~ ~ ~~~-nr~44bull~mn11-a11 ~~ =mt =m~ ~ ~~ ~ =~~-~~ =~~rt~l~llibullltbull=

~~~~~~~~r-~r-~~sectsect55~55 ~~ ~=g~~ mi --1~ ~-==~~m~ L-~r UVPllrlllUillDITDr4L 1JI lbullKlllll~==~~~=~

~~~~~~~~ raquoff-llll 111rritl_aianbull ~11lCla rr- n ttll XDP11r1r 11111c-1C111~ RTl~rJlllllbullbull~llllJlllipo~~=r~tm=~~

~=~3r~t==~ ~=~i==~~ llt1ttl70 m~~n~ =n~ L diams 11- bull - iaEi~mi 1lE~HHffi ~1-~ E LbulllT bullU-7YA 8911U TMn4 OJII C- lllkHrnl1nlntll11106~

MJ9~gt111ftlrfffll11 ~ SbullC61hLJT raquoWl lll~IJlll11amp1 utVllllt a lbulllfGl bulllC lT

lliilH~1 ~~rm-=rn~ lbullIIIICU-1bull0

itt ishwI JUo ma m1 bull 1-c iiliii ~==~m~=~ Ullln U7IIY M1NLl411 fflf f-~ llr IL ~ lbullt Ill uaP11rllDn1rin1bull139nf- na_ 1111lnl ___ lWTDf-ID 111Jbullnllr-cishy

J1JT1 lflTI-noLbull COi lJ1 tsr18GOTDrl1~ 1--Cn ~~~==-=~ LbullS1rbull-p

LbulllI ~middot x1 fl11bull diams an l~J P-~ WI 1~1Slrmsraquo11nirorn 11bull1n-

llrgt 58 - TDrl ZJlJ l~ Zl llf4 Pll1raquo91I lnP~IIEI 11 ==~=-~~ lbullt-11bullh1~

nun_-~bullfllrlll_ lbulll-lrbull N- - nr6-11MII rinaus a 1bull1E-t1 im1 nrxi mr~ 7nn1 4i i 1c m llrS~iJ-ltJlillII Tt-Ul ris ~=~~middotiill~~ tf llDln~n1rJrgt11nbull1ric ~IPgt9nq~ It-MU rbull RflrrlllVllbulltPllbullOIIUAfC lbullnJtrNbull_~lD+4ftJSHJ7711JrllIIIIT144lDI lbulll ~I llfs-mllThn~-f 1bull11

1a5blH=i5gS El~ iE =iilli ~ID aH~~ ~~ leJINNllllfflnlt10ff1nll~1g=TI==~- lbullN~Jmiddot pw nrwuhtl tba11 l- lllllsectimiii~ ~ lllaquot ll116UW41 llllII NII Cl Ld bullt ll 11r 111~-~lHtl-IINOClll 1Dgtn~rMOtnllfbull3all)Mnr~bullwrmm11uoo~ ~r~ m~ = ~~ t~-i m NNtotl n11nn cm

~~~~~Ttr~ in Httl01llxl nlfM114ta cm

JJN n=-PIW - I- C lbullT rnr nnubullNoXI ffllPI n1 11-amp 11middot 77)111fflffPl~JlaUII

i1JJ n91lbull ti Jnlftbulllll QII

~g=~~~~ir~f~5 =i~=~~ ~=~ ~ ~j====goi H1111t-llll ffo~ ~rn tm111 ta1Vl~ tnar- IVI rm u1i ~ nw ~illl cm 1111 Hltt1H T7U 72w111ll tm UI ftffiH~bull1 naMUlI nlll

lltfll~IOUl rnes~ttlClll

~I~~=~=~~= l3111ratlQOJ121lllll CS u1n-n-a mn-c~11111llllilr ~====m~~ lbulllllr~~Oll~r1111-t~rtRiHa)toI

-~rt~_Utr111tt~USI ~m~i==r~~llfflpound1gtgtMllkllit1U10C011 annrxnbull-TCRL11ai~=~=~g)llllll~--rWltMJtt-8 DR Pl rraquof ntl rim Gllf CCI~~1r~~ liiilllii u- ntlt bull llJ~naJCDI

raquo11NMl10~Ullllcm ntrlnK)fL~nlln-1c lllf ~--TlJaft_Lmc i lbull1 bull l3il0 Nl-197) Ttlll1344 a LbullI 3 l diams 1-111 lflS 1111lOllt ffl- MP PII bullHI lgtl llJI l97Mlt Ian -ti DG llC

111111===-~~~=mg ====~~ tD rlrffllZllIITO-lfllCIIII=~tr~L~~~= - Pl~I llII TD_ ff~ tDII31119NIJMlDffU~~ H CZIII liii~mlt~ D1111nrn11GQ~-CaKftQNJWNczr41140ffnQCUII Jnffnt1JIIIIJunbull~1Qc20lll ~Pllli ll mrnnn lbulltlP 17Jrffdeg-degluoElJIIIQII

~-I-ti _nrna~rlll

a n- 4411 llbullQI 1=40 rt La n- lllf ffrgtn _Jr_~ Ullk ---rr~~ ~=~=tl~~ =1 nttltt nraquo 1nlU as

=-mn--~111DJIDII Ullgt~fflflnanaaJIIJalt55~~EIS~=~~ ~~)1 -11CIJII nn~bullbullbullnaKatt1ta1

JOIT ru~- rf- deg hJIIII r- 111111 ~1111) -1 aJ1 ld t11D1etlll_TalCIS -~-UCV~bullraquootur=~=~I~~=~--~ ~rsrgo_mlaquoshym rs~11flI ~- rnilr==~=~~ ~~r _ ~ atfl ~ rtw Dgtlnn-f-lEllln17n-UIIP

D11 fflXTJ111111 I~~ ar D1Jn4 ~leJJS-OnC111

=====5 middoti SHU=~ 5 ampn iliiiiiIiI11

ngtgtn~1~1tbullubull1rm DH tu~- lt11 rirmU1111 CDIII

~i~i555mi~ ~~ ~m=~==m~g===~~~~ tn1r JtW ~ma- PiOll a CU

~ XNr~t~fDllll1-all~~ m===~~ bullbull~W 111111 ==~~ ampT g~ ru~ =

~lU $Et=ni ~ llll0111ra1Ln~otqC011

H~ g==i =~1 ~

~111111 ~~g~n~a~J))pound11 1=~)6tia

~~ mEfHfH~Si

amp12Ct _ an ~

U N711f21th mM1LU aa o1bull~--117CII in4r ~llllll1Vffl-111Dlr lit~ Hmtlpound1 71 12L I CCIII ---~CUnMIIUOCVf JIHtlnn nl 7r ll4011CIIII

llllDNXCWZflDtlltllCIDCDr

~~=~==~=gnn n1raquoL bullw noanDNt CIJIIi=~ C~middot ~ ~ ~ HnffTI-QIJroQ__111PtlJIIInfflll bullbull1~ aaeIT t-- nrJD nJUntu~CllWI

m ~1 ~ ~~~ ~ ilria~gliiiji~=ir ~lt-OTT gl1raquo ~Iraquou fflllIL nllll 1111111 flC~middotIY_4allCCIIIi l1i5~ ~~11~middot~ ~~ ffll H71W786lll 7P-JOalllllll 2N ~ 1-flllt 7HIJl4- DI ~ ~==~ ~t-tr bullM-

114 Hit71aTra7ririatNOCIIII

llHl1Hf ll~7Dl4fIZIIICIIII 1141ftillf+1DllnTgtlMa~=~bull==~r Lbulll-lllbullbulllJJ

=~~~HR-~a ~ =iEri ~ ~=6

= 1MESE COCIIIOlfAlEi ARC 9~ at AH DISTlfG CONJmOfS AS-alLT FED 5UKiEY Y NORWDal EJICltJIJll(G CD~ IIElMEN ~ 1S 111 DECDaR a 2DII 1)pound OCICIIIDNAlES 5HCflI UIpound IIAID Cit MltSSAOfllffT5 STATE FlJriNII CDCffllNAT smult ~AO leJ (IMIJ 1HE ACQlltACY ltF 1HE COCftDINT[ LDCAnatS Mpound diams- 01 FtU

POINT DESCRIPTION ABBREVIATIONS~-~middotPC Pmlr Of CLIRIJC bullIEllL ClMNpound STilRlS PDC bull PtJtilTIIJOM1poundr ~ [raquo TAHCINiT W(R[ lll[ CURpound uroo Fo F[1NT(1t~tfflvt[ltft1llllIIUlt OMNtilE)PRC ~T oT ~pound ~Vlllrlt

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 2 of 2

I ~ IHAT nfl PlM MS 81D1 PIIDMQl ~WllTM(llUI MOIIEOIAAlPlllR~Df IIUPS C- lttE ~111 Cl__ HftNMIIIZlt

WWWWJU Cii6 liftitit

ACTIVITY ANI) USE LINTATIONS

PLAN OF RES7RIC1EJJ AREAS ANJJ COlER TYPES

8V CKlJ()RN IJNl()N PflllfpoundCpoundS SlllERFIIMJ SITC

50 HJ S(J11( SmEpoundT llAIPOIL JASS

=r-o ~ ll 2021

~ Engmeer1ng

Hltd ~~ middot~~-=~ra (f~AJ lIQ c- f

a llfEET 2 ltF 6324-02

td ~

w ~ m 0 0

Id Q ii w m

co co m 0 co

Bk 39600 Pg437 88608

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY New England Region

Five Post Office Square - Suite 100 Boston Massachusetts 02109-3912

INSTITUTIONAL CONTROL DESIGN STATEMENT FOR THE BLACKBURN AND UNION PRIVILEGES SUPERFUND SITE - EAST OF SOUTH STREET AREA

1 Introduction

Pursuant to the Comprehensive Environmental Response Compensation and Liability Act 42 USC sect 9601 et seq (CERCLA) and the National Contingency Plan 40 CFR Part 300 (the NCP) this document contains a description of the release events and site history that resulted in the contaminated media that require institutional controls in the fom1 of Activity and Use Limitations the basis for land use restrictions and uses that are consistent and inconsistent with the Selected Remedy ( as described below) This Institutional Control (IC) Design Statement pertains to a portion of the Blackburn and Union Privileges Superfund Site located in the Town of Walpole Massachusetts (the Site) which has been listed on EPAs National Priorities List (NPL) which portion is generally referred to as the East of South Street Area (the EOS Area) The EOS Area is located to the east of South Street in Walpole and is shown on Figure 1 attached hereto

A Notice of Activity and Use Limitation (NAUL) is necessary and appropriate for the EOS Area of the Site based on the fact that pursuant to EPAs risk evaluations asbestos arsenic trichloroethene (TCE) and certain polycyclic aromatic hydrocarbon (PAH) contan1inants remain in place in soils at levels higher than those appropriate for unlimited use or unrestricted exposure groundwater underlying the EOS Area contains hazardous substances at levels that present an unacceptable risk of exposure and remedial measures at the Site must be protected and maintained to ensure that the Selected Remedy remains protective

EPAs Record of Decision (ROD) dated September 30 2008 specified the need for institutional controls such as a NAUL to ensure long-tenn perfonnance and protectiveness of the Selected Remedy The institutional controls described herein are necessary and appropriate to ensure that the Selected Remedy for the Site remains protective of human health and the environment The remedy for the Site as described in the ROD is referred to herein and in the NAUL as the Selected Remedy

Page 1 of7

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 12: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

---------------

Bk 39600 Pg417 88608

In accordance with CERCLA 42 USC sect 9601 et seq and the National Contingency Plan the United States EobulliionmenlaJ Protectioo Agency Region I hereby appro1es this Notice of Activity and Use Limitation

Date ~------

Name Director Superfund and Emergency Management Division (SEMO)

US Environmental Prokction i0 ency Region I

Jn accordance with MGL c 21 E sect 6 and the Massachusetts Contingency Plan (310 CMR 400000) the Depamnent ofEmironmental Prolectioo hereby approves this Norice ofActivity

and Use Limilarioo (as ro funn ooly)_ ~~

Dale 4r S microlJ ~ Paul W Locke Assisrant Commissioner Bureau ofWaste Site Cleanup Department of Environmental Protection

Page 11 of 12

Bk 39600 Pg418 88608

List of Exhibits

Exhibit A Legal Description of the Property Exhibit B Legal Description of the Restricted Area and Coordinates of Cover Types Exhibit C Photo-Reduced Copy of Activity and Use Limitations Plan of Land Exhibit D Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table Exhibit E Institutional Control Design Statement (EOS) Exhibit F Copy of Vote of Town of Walpole

Return to

Attn Kristine Sheehy Senior Real Estate Attorney FOLEY HOAG LLP Seaport West 155 Seaport Boulevard Boston Massachusetts 02210-2600

Page 12 of 12

Bk 39600 Pg419 88608

EXHIBIT A

Legal Description of Property The land with the improvements thereon located in Walpole Norfolk County Massachusetts bounded and described as follows

PARCEL I

The land on the Southeasterly side of South Street bounded

NORTHWESTERLY NORTHERLY AND AGAIN NORTHWESTERLY by South Street by seven lines measuring respectively

17027 feet 120 feet 22011 feet 1653 feet 325 89 feet 4515 feet and 1497 feet

NORTHEASTERLY by Gleason Court 2627 feet

SOUTHEASTERLY AGAIN NORTHEASTERLY AND AGAIN SOUTHEASTERLY by land now or fom1erly of Santomarco by five lines

measuring respectively 6750 feet 2050 feet 1190 feet 2952 feet and 2001 feet

NORTHEASTERLY AGAIN by said land of Santomarco and land now or formerly of Cashorali 10056 feet

NORTHWESTERLY AGAIN by said land of Cashorali 2845 feet

NORTHEASTERLY by land now or formerly of Muighitti 9007 feet

SOUTHEASTERLY by the location of Old Colony Railroad by three lines measuring respectively 6809 feet 32808 feet and 38250 feet

and

SOUTHWESTERLY by land now or formerly of Meyer by three lines AND SOUTHERLY measuring respectively 9143 feet 1998 feet and

15202 feet

Parcel I is described in the deed recorded with the Norfolk County Registry of Deeds in Book 4459 Page 287

A portion of said premises is shown on plan entitled Plan of Land in Walpole Mass Belonging to General Fibre Co Inc by Edward C Peterson CE dated January 16 1960 filed with the Norfolk Registry of Deeds as Plan No 849 of 1967 in Plan Book 223 and the remainder is shown on plan entitled Plan of Land in Walpole Massdeg by E Worthington Engineer dated February 6 193 7 recorded with said Deeds Book D2135 Page 8 I

FHBOSTON52454092

Bk 39600 Pg420 88608

PARCEL II Property known as Parcel 33-120 of the Town of Walpole Tax Assessors Map which is

part of the property situate in the Town of Walpole County ofNorfolk and Commonwealth of Massachusetts and being all of the right title and interest of The Penn Central Corporation in and to all those certain pieces or parcels of land and premises easements rights of way and any other rights of any kind whatsoever appurtenant thereto or used in conjunction therewith on and along a portion of Branch of Railroad known as the Wrentham Branch said portion of railroad being described as follows

Beginning at a line extended across the right of way of said Branch of rai road said line being the Northerly line of South Street and extending thence in a Northeasterly direction the distance of 2852 feet more or less along said Branch of rai Iroad to a line which is parallel with the Southwesterly line of Common Street said parallel line extending across said right of way through a point in the centerline thereof at railroad valuation survey station 733 + 67 more or less and being the place of ending

Parcel II is described in the deed recorded with the Norfolk Registry of Deeds in Book 7986 Page 372 and is a portion of the land shown on the plan recorded with said Deeds as Plan No 52 of 1983

FHBOSTON52454092

Bk 39600 Pg421 88608

Exhibit B Legal Description of the Restricted Area and Coordinates of Cover Types

Le2al Description for Restricted Area The area shown on the plan entitled Activity and Use Limitations Plan of Land Blackburn amp Union Privileges Superfund Site 50 amp 60 South Street Walpole Mass Scale l = 30 dated April 6 2021 by Norwood Engineering Company Inc recorded with the Norfolk Registry of Deeds in Plan Book 704 Page 41 being bounded and described as follows

Beginning at a point on the easterly sideline of South Street at the southerly point of curvature of Gleason Court on said plan thence

Northeasterly and curving to the right along an arc of a curve having a radius of twentyshyfive and 00100 (2500) feet a length of forty-five and 15100 (4515) feet thence

S 48deg1352 E a distance of twenty-two and 24100 (2224) feet the previous course by the southerly sideline of Gleason Court thence

s 32deg0208 w a distance of fifty-four and 78100 (54 78) feet thence

S 59deg27 32 E a distance of twenty and 50100 (2050) feet thence

S 47deg5252 E a distance of eleven and 90100 (1190) feet thence

S 49deg01 10 E a distance of twenty-nine and 58100 (2958) feet thence

s 38deg3108 w a distance oftwenty and 01100 (2001) feet thence

S 49deg00 57 E a distance of one hundred and 56100 (10056) feet thence

N 39deg5348 E a distance of twenty-eight and 45100 (2845) feet the previous seven (7) courses by land ofNF Thelma A Casborali thence

S 49deg0808 E a distance of ninety and 29100 (9029) feet the previous course by land ofNF Ming L Yau thence

s 25deg2312 w a distance of siliy-eight and 22100 (6822) feet to a point on the westerly sideline of a fonner railroad right of way the previous course by land of the Town of Walpole assessor parcel 33-121 thence

S 55deg2937 E a distance of ninety-nine and 78 100 (99 78) feet to a point of tangency on the easterly sideline of a forn1er railroad right of way thence

Page 1 of 13

Bk 39600 Pg422 88608

s 30deg11 32 w

S 23deg49 I6 W

N 66deg1044 W

N 23deg4908 E

N l 6deg00 52 E

S 37deg0240 E

N 10deg1437 W

N 34deg093 I W

N 11 deg5558E

Northeasterly

N 27deg41 48 E

a distance of three hundred and three and 74100 (30374) feet the previous course by land ofNF Nicholas H Dowd and NF Emilio P Baldassari thence

a distance of four hundred ninety and 86100 (49086) feet to a SBdh the previous two (2) courses by the easterly sideline of a former railroad right of way thence

a distance of eighty-two and 76100 (8276) feet to an Iron Pipe on the westerly sideline of the former railroad right of way thence

a distance of twelve and 09100 (1209) feet to a SBdh thence

a distance of ninety-six and 50100 (9650) feet to a S Bdh thence

a distance of fifteen and 00100 (1500) feet the previous three (3) courses by the westerly sideline of the former railroad right ofway and land of NF Joseph R Carpentieri and NF Joseph R and Faith N Carpentiero thence

a distance of ninety-two and 82100 (9282) feet the previous course by land ofNF Richard A and Josette M Burke thence

a distance of tvvo hundred thirty-seven and 86100 (23786) feet to a point on the easterly sideline of South Street thence

a distance of one hundred twenty and 00100 (12000) feet along the easterly sideline of South Street to a point of curvature of the easterly sideline of South Street thence

and curving to the right along an arc of a curve having a radius of eight hundred and 00100 (80000) feet a length of two hundred hventy and 11100 (22011) feet along the easterly sideline of South Street thence

a distance of three hundred forty-hvo and 42100 (34242) feet to the point of beginning

Containing 621 Acres of land more or less

Page 2 of 13

3000

3005

3010

3015

3020

3025

3030

Bk 39600 Pg423 88608

EXHIBIT B (cont)

Points and Coordinates associated with Restriction Areas and Cover Types for the Activity and Use Limitations (AUL) at 50 amp 60 South Street Walpole Mass

Point Northing Easting Type

Curve Curve Number Len2th Radius

28754430528 7236432250 COR

3001 28755604597 7236680368 PC L=7535 R=80000

3002 2875597 1222 7236766913 POC

3003 28756333366 7236870620 PT

3004 28756280754 723697 3031 COR

28756025570 7237001250 COR

3006 28755918670 7237001140 COR

3007 28755864440 7237 I 05890 COR

3008 28755903200 72371963 IO COR

3009 28756030893 7237217396 COR

28756042534 7237250325 COR

3011 28756021733 7237317808 COR

3012 28755800732 7237640949 COR

3013 2875552 1424 7237667395 COR

3014 28755321388 7237708416 COR

28755197081 7237834881 COR

3016 28755102230 7238045173 COR

3017 28754941531 7238291869 COR

3018 28754851375 7238512944 COR

3019 28754753441 7238824 760 COR

28754681541 723916 1881 COR

3021 28754608227 7239406506 COR

3022 28754515846 7239459928 COR

3023 2875426 7589 723943 8163 COR

3024 28754198016 7239590840 COR

28753886764 7239449006 COR

3026 2875329 7944 7239187206 COR

3027 28752506745 7238837890 COR

3028 28751859560 7238552142 COR

3029 28751221833 723827342 l COR

28750848788 7238107869 COR

3031 2875045 3654 7237927814 COR

3032 28750630420 7237527432 COR

3033 28750741023 723757 6257 COR

3034 28751668594 7237842488 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 3 of 13 April 14 2021

3035

3040

3045

3050

3055

3060

3065

3070

Bk 39600 Pg424 88608

Point Number

Northing Easting Type Curve Leneth

Curve Radius

28751548848 7237932869 COR

3036 28752462269 7237767802 COR

3037 28756438461 7236904209 POC L=2207 R=80000

3038 28756543084 7236939245 PT

3039 2875653 7987 7236954123 PC

28756597578 7237007344 POC L=1651 R=937

3041 28756594465 7237087181 PT

3042 28756459044 7237347021 PC L=347 R=220

3043 28756432531 7237363546 PT

3044 28756280644 7237286201 COR

28755924210 7237966952 COR

3046 28756081959 7238048554 PC L=472 R=236

3047 28756064922 7238084404 PT

3048 28755523491 7237845047 COR

3049 28755419845 7238081981 COR

28755460757 7238099621 PC L=240 R=l57

3051 28755467701 7238120241 PT 3052 28755398690 7238275280 COR

3053 28755365410 7238264910 COR

3054 28755087149 7238900449 COR

28755158001 7238931521 COR

3056 28755040360 7239199770 COR

3057 28755311720 7239318930 COR

3058 28755263010 7239429300 COR

3059 28755388260 7239484290 COR

28755348660 7239576000 COR

3061 28755625470 7239696500 COR

3062 28755664605 7239606601 COR

3063 28755736202 7239637768 COR

3064 28755621870 7239897370 COR

287 5567 6160 7239920410 COR

3066 28755718270 7239830260 COR

3067 2875587 9750 7239900310 COR

3068 28755718790 724026 7600 COR

3069 28755763390 7240285350 COR

28756035900 7239926600 COR

3071 28756086280 7239812770 COR

3072 28756089984 7239813649 COR

3073 28756229128 7239501910 PC L=482 R=l54

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 4 of 13 Apnl 14 2021

3075

3080

3085

3090

3095

3100

3105

3110

Bk 39600 Pg425 88608

Point Number

Northing Easting Type Curve Length

Curve Radius

3074 28756257366 7239513984 PT

28756185799 7239674928 COR

3076 28756739833 7239921136 COR

3077 28756876060 7239682275 COR

3078 28756948336 7239735898 PC L=335 R=298

3079 28756958235 7239766064 PT

28756866081 7239978133 COR

3081 28757166275 7240127374 COR

3082 28757068320 7240314640 COR

3083 28757602980 7240594310 COR

3084 28757700050 7240408736 COR

28758247941 7240688376 COR

3086 28758250190 7240683910 COR

3087 28758344979 7240738168 COR

3088 2875843 6103 7240581527 COR

3089 28758602943 7240664224 COR

28758740024 7240397393 COR

3091 28758605706 724032 7776 PC L=477 R=309

3092 28758594882 7240286013 PT

3093 28758666635 7240197585 PC L=2573 R=3127

3094 28758767113 7240118710 POC

28758890752 7240086604 PRC L=I653 R=3993

3096 28758972305 7240074125 POC

3097 28759049552 7240045 I 52 PT

3098 28759330312 7239734408 COR

3099 28759459414 7239588584 PC L=2269 R=5217

28759524821 7239496174 POC

3101 28759568752 7239391829 PRC L=1814 R=486

3102 28759603259 7239308095 POC

3103 28759653883 7239232999 PCC L=l31 R=088

3104 28759665694 7239231411 PT

28759800587 7239299586 COR

3106 28759986288 7238981214 COR

3107 2875983 5797 7238891829 COR

3108 28759879750 7238798689 COR

3109 28759905380 7238754769 PC L=1600 R=2552

28759963590 7238700398 POC

3111 28760035727 7238666620 PT

3112 28760700665 723901 5672 PC L=4515 R=2500

3113 28760830230 7239191198 POC

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 5 of 13 April 14 2021

3115

3120

3125

3130

3135

3140

3145

3150

Bk 39600 Pg426 88608

Point Number

Northing Easting Type Curve Len2th

Curve Radius

3114 2876077 263 6 723 940 1624 PT 28760624518 7239567466 COR

3116 28760160100 7239276864 COR

3117 28760055928 7239453423 COR

3137 28759976118 7239541692 COR

3118 28759782139 7239764992 COR

3119 28759625581 7239640375 COR

28758966057 7240399493 COR

3121 28759184326 7240581973 COR

3122 28758593598 724126478] COR

3123 28757977293 724097 2314 COR

3124 28757716516 7241351659 COR

28757288251 7241140719 COR

3126 28756725827 7240851862 COR

3127 28756162468 7240586126 COR

3128 28755614498 7240338506 COR

3129 28754346745 7239768507 COR

28753845716 7239540194 COR

3131 28753257436 723927 8634 COR

3132 28752466355 7238929370 COR

3133 28751819340 7238643698 COR

3134 28751181527 7238364939 COR

28750807772 7238199071 COR

3136 28750413263 7238019301 COR

3138 28756920317 7237298739 PC L=l941 R=2104

3139 28756827128 7237274848 POC

28756733047 7237294944 PRC L=401 R=l66

3141 2875671 1336 723 727 2844 PCC L=1492 R=13345

3142 28756744594 7237206091 POC

3143 28756781529 7237141301 PCC L=1419 R=l018

3144 28756833084 7237094642 POC

28756902566 7237091952 PCC L=2413 R=157959

3146 28757017337 7237129167 POC

3147 28757131820 7237167258 PCC L=330I R=S0000

3148 28757282552 7237234442 POC

3149 28757431866 7237304721 PT 28757338390 7237495930 COR

3151 28757541620 7237605380 COR

3152 28756897590 723883 4280 COR

Exhibit B to NA UL-Part 11-EOS Coordinate Tables Page 6 of 3 April 14 202

3155

3160

3165

3170

3175

3180

3185

Bk 39600 Pg427 88608

Point Northing Easting Type Curve Cunbulle

Number Lenszth Radius 3153 28756870623 7238820218 COR

3154 28756838273 7238882258 COR

28756865240 7238896320 COR

3156 28756777004 7239062996 COR

3157 28756770439 7239063663 PC L=l 146 R=2269

3158 2875665836 I 7239046180 PCC L=l423 R=957

3159 2875661 7520 7238989913 POC

28756625544 7238920850 PT

3161 28756728525 7238726583 PC L=232 R=l58

3162 28756748720 7238720236 PT

3163 28756899634 7238797341 COR

3164 28757254653 7238121363 COR

28757520153 723761266 7 COR

3166 28757306899 723 750 IO 10 COR

3167 28756690336 7237500169 PC L=243 R=I68

3168 28756682599 7237479273 PT

3169 28756686990 7237469583 PC L=0250 R=l68

28756708806 7237463018 PT 3171 28757000109 7237616354 PC L=233 R=l73

3172 28757005368 7237637270 PT

3173 28757000998 7237645513 PC L=233 R=l69

3174 28756980219 7237651023 PT

28756429209 7238339422 COR

3176 28756342982 7238506849 COR

3177 28756500076 7238596485 PC L=l19 R=l48

3178 28756499701 7238608072 PT 3179 2875644 7813 7238705611 PC L=l 182 R=483

28756358177 723 869 0707 PT

3181 2875623 6099 7238376388 PC L=443 R=467

3182 28756235611 7238333779 PCC L=343 R=9IO

3183 28756249049 7238302418 PCC L=412 R=9IO

3184 28756278952 7238274519 PCC L=368 R=300

28756313362 7238277619 PT

3186 28756282498 7238911796 PC L748 R=216

3187 28756240650 7238919721 PT

3188 28756126081 7238620406 PC L=323 R162

3189 28756138645 7238591575 PCC L=333 R=283

Exhibit B to NAUL-Part II-EOS Coordmate Tables Page 7 of 13 April 14 2021

3190

3195

3200

3205

3210

3215

3220

Bk 39600 Pg428 88608

Point Number Northing Easting Type Curve

Leneth Curve Radius

28756163375 7238602867 PT

3191 2875523 0908 7238765275 COR

3192 28755205040 7238752740 COR

3193 28755391740 7238328470 COR

3194 28755466840 7238361040 COR

28755452760 7238392590 COR

3196 28755516920 7238421040 COR

3197 28755530690 7238388730 COR

3198 28755603230 7238421460 COR

3199 2875555 7568 723852 7053 COR

28755371220 7238445330 COR

3201 28755629198 7238558466 COR

3202 28755676040 7238453290 COR

3203 28755925410 7238563840 PC L=1902 R=3548

3204 28755927383 7238658634 POC

28755954390 7238749520 PT 3206 28755974770 7238807230 COR

3207 28755779200 7238881701 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

28755746700 7238609997 COR

3211 2875593774 7239036608 COR

3212 28756048460 7238996850 PC l=1445 R=2903

3213 28756070631 7239065422 POC

3214 28756109010 7239126420 PT

28756153820 7239182190 PC L=S98 R=848

3216 28756171980 723923 7880 PT

3217 287S6026148 7239566166 COR

3218 28756003865 7239556465 COR

3219 287S6134380 7239256650 COR

28755998460 7239195370 COR

3221 2875600 71S0 7239174530 COR

3222 28756001791 7239172152 COR

3223 28756040451 7239079437 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 8 of 13 April 14 2021

Bk 39600 Pg429 88608

Point Number

3210

3200

3056

3057

3058

3059

3060

3061

3062

3218

3219

3220

3221

3224

3225

3226

3227

3228

3070

3071

3234

3233

3235

3236

3237

3238

3239

3240

3241

3242

3243

3244

3245

3246

3247

3248

Northing

28755746700

28755371220

28755040360

28755311720

28755263010

28755388260

28755348660

2875562 54 70

28755664605

28756003865

28756134380

28755998460

28756007150

28755941340

28755962080

28755867937

28755819702

28755766128

28756035900

28756086280

28755991990

28755942100

28756477248

28756677238

28756650130

28756473307

28756480112

28756675030

28756724454

28756742099

28756742133

28756703924

28756640759

28757607280

28757401530

28757467350

Easting

7238609997

7238445330

7239199770

7239318930

7239429300

7239484290

7239576000

7239696500

7239606601

7239556465

7239256650

7239195370

7239174530

7239145324

7239100930

7239061674

7238935003

7238911508

7239926600

7239812770

7239769910

7239884050

7239261913

7239253008

7239321810

7239319038

7239298824

7239364440

7239271845

7239292625

723935 0187

7239393239

7239393096

7237584960

7237475300

7237345620

Type

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

PC PCC

POC

PCC

PT

COR

COR

COR

Curve Len2th

L=273

L=ll77

L=657

Cunmiddote Radius

R=1421

R=810

R=679

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 9 of 13 April 14 2021

Bk 39600 Pg430 88608

Point Number Northing Easting Type Curve

Len2th Curve Radius

3249 287 57514570 7237372360 PC l=ll05 R=1993

3250 287 57 588060 7237452980 PT

3251 28757631382 7237429676 PC L=2244 R=2352

3252 287 5765 6810 7237537876 POC

3253 2875 762 9720 7237645671 PT

3254 28756940655 7238952710 PC l=1493 R=1509

3255 28756901845 7239015577 POC

3256 2875683 7836 7239052474 PT

3257 28758104824 7237653014 COR

3258 28758028960 7237800160 COR

3259 28757949530 7237760790 COR

3260 28757901005 7237855021 COR

3261 28757839230 7237820908 PC L=273 R=l33

3262 28757830688 7237799810 PCC L=539 R=2144

3263 28757852974 7237750897 PT

3264 28757891705 7237688178 PC L=lS26 R=2432

3265 28757948636 7237637880 POC

3266 287 58018307 7237607597 PT

3248 28757467350 7237345620 COR

3267 28757550832 7237363444 POC L=2653 R=80000

3268 28757668809 7237424132 PT

3269 28757504 719 7238817989 COR

3270 28757493010 7238842230 COR

3271 28757561074 7238880970 COR

3272 28757483953 7239024127 PC L=323 R=l70

3273 28757459939 7239037846 PT

3274 28757311605 7238957122 PC L=1388 R=906

3275 2875727 2732 7238901647 POC

3276 28757283181 7238834718 PT

3277 287 5733 4061 7238752337 PC L=255 R=l60

3278 287 5735 5527 7238744411 PT

3279 2875 7102815 7239517199 PC l=261 R=l70

3280 28757080654 7239525307 PCC l=909 R=1275

3281 2875 700 5390 7239477911 PCC L=l007 R=990

3282 28756999624 7239381704 PT

3283 2875707 7705 7239230604 PC L=ll14 R=907

Exhibit B lo NAUL-Part IlbullEOS Coordinate Tables Page 10 of13 April 14 2021

3285

3290

3295

3300

3305

3310

3315

Bk 39600 Pg431 88608

Point Number Northing Easting Type

Curve Leneth

Curve Radius

3284 28757168066 7239178102 PT

28757205717 7239186398 PC L=518 R=930

3286 28757249003 7239213534 PCC L=l41 R=086

3287 2875724 7909 7239226048 PT

3288 28758415755 7239842757 PC L=251 R=l59

3289 28758437695 7239837379 PT

28758456377 7239846949 PC L=812 R=876

3291 28758494897 7239915165 PCC L=456 R=757

3292 28758483790 7239958646 PT

3293 28758405147 7240111348 PC L=l057 R=955

3294 28758318136 7240161452 PCC L=477 R=l063

28758272407 7240149529 PCC L=250 R=l60

3296 28758265647 7240128003 PT

3297 28758157937 7237680895 COR

3298 28758902927 723807 1969 COR

3299 28758852531 7238168280 COR

28758779660 7238129750 COR

3301 28758746973 7238192072 COR

3302 2875807 6630 7237840490 COR

3303 28758049940 7237894220 COR

3304 2875871 7997 7238243620 COR

28758680103 7238315946 COR

3306 28758533699 7238239240 COR

3307 2875852 6899 7238252220 COR

3308 28758098180 7238027600 COR

3309 28757974484 7238264223 COR

28757957598 7238255513 COR

3311 28757757732 7238637845 COR

3312 28757774584 7238646620 COR

3313 28757653710 723887 7846 COR

3314 28757560920 7238829340 COR

28759004930 7238125514 COR

3316 28759689797 7238485028 PC L=1992 R=2609

3317 28759697204 7238583760 POC

3318 28759667288 723867 8142 PT

3319 28758996126 7238323718 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 11 of 13 April 14202 I

Bk 39600 Pg432 88608

Point Number

Northing Easting Type Curve Lenfth

Curve Radius

3320 28759028950 7238261560 COR 3321 28758954486 7238222188 COR

3322 28758972523 7238378387 COR 3323 28759421550 7238613630 COR 3324 28759377933 7238698105 COR 3325 2875907 4811 7238539289 COR 3326 28759081611 7238526309 COR 3327 28758935210 7238449604 COR

3328 28759464470 7238637330 COR 3329 28759632674 7238722481 PC L=ll83 R=l578

3330 28759583973 7238755474 POC 3331 28759526573 7238768343 PRC L=2163 R=2455

3332 28759422964 7238796123 POC 3333 28759341091 7238865430 PT

3334 28759193370 7239050710 COR 3335 28759416340 7239163940 COR 3336 28759263600 7239455620 COR 3337 28759043690 7239336510 COR 3338 28758935490 7239552130 COR 3339 28757650890 7238883240 COR 3312 28757774584 7238646620 COR 3311 28757757732 7238637845 COR 3310 28757957598 7238255513 COR 3309 28757974484 7238264223 COR 3308 28758098180 723802 7600 COR 3307 28758526899 7238252220 COR 3306 28758533699 7238239240 COR 3340 28758700033 7238326388 COR 3341 28758675436 7238373334 COR 3342 28758733013 7238403500 COR 3343 28758760858 7238350353 COR 3344 28758860952 7238402796 COR 3345 28758833106 7238455943 COR 3346 28758890683 7238486109 COR 3347 28758915280 7238439162 COR 3326 28759081611 7238526309 COR 3325 28759074811 7238539289 COR

Exhibit B to NAUL-Part H-EOS Coordinate Tables Page 12 of l3 April 14 2021

Bk 39600 Pg433 88608

Point Number

Northing Easting Type Curve Len2th

Cunbulle Radius

3324 2875937 7933 7238698105 COR

3082 28757068320 7240314640 COR 3083 28757602980 7240594310 COR 3349 28757790234 7240236327 COR

3348 28757255574 7239956657 COR

3124 28757716516 7241351659 COR 3125 28757288251 7241140719 COR 3126 28756725827 7240851862 COR 3127 28756162468 7240586126 COR 3128 287 55614498 7240338506 COR 3129 28754346745 7239768507 COR 3130 28753845716 7239540194 COR 3131 28753257436 723927 8634 COR 3132 28752466355 7238929370 COR 3133 28751819340 7238643698 COR 3134 2875118152 7 7238364939 COR 3135 2875080 7772 7238199071 COR 3136 28750413263 7238019301 COR 3350 28750296168 7238284525 COR 3351 28754 78 6636 7240267040 COR 3352 28757412029 7241794586 COR

POINT DESCRIPTION ABBREVIATIONS

COR=CORNER PC= POINT OF CURVE WHERE CURVE STARTS POC -= POINT ON CUR VE PT=POINT OF TANGENCY WHERE THE CURVE ENDS PCC = POINT OF COMPOUND CURVE (WHERE RADIUS CHANGES) PRC = POINT OF REVERSE CURVE

NOTES

THE COORDINATES ARE BASED ON AN EXISTING CONDITIONS AS-BUILT FIELD SURVEY BY NORWOOD ENGINEERING CO INC BETWEEN NOVEMBER 15 TO DECEMBER 18 2019 TI-IE COORDINATES ARE BASED ON l1ASSACHUSETIS ST A TE PLANE COORDINATE SYSTEM NAD 1983 (FEET) THE ACCURACY OF THE COORDINATE LOCATIONS ARE +-0J FEET

Exhibit B to N1UL-Part II-EOS Coordmate Tables Page 13 ofl3 April 14 2021

---

1f~ flJr ~i

f ~~ J~i](M~I ~ 1 jf~ ~~f W-- )e 1

It lj fY pl ~-~j

I --- ~ ~

1 (J-c~ er ~

C JI fl JYf

1 ~ ~Yu-~ 1i

~r

( LOClJS P

SCAUllbulliQO

I ar lMIT flG PINI tMS _ lIIPMIDMICXNllRlnT~tlCfllUS 1111D cmuftraquodl s - NIKl1III tfIJIIIIIOfM~1HCll allE1

DAre Jllrl

NUKIJU LU6 DMitM

mmtG6DKbdlt

~4~-middot

~~I

-- ampnbullllf~ ~ fa

LEGEND 0

-i~wr0o-m lICUUoaampbullco--11111 _ _l_J

0

bull ~-ail_I

~-

mo(I ---fwj

amp~~~~ ~ ~~ltgtmiddot ~A~

~6

_L-r

bull -~ IBP__l-11Uil n-rlfl-lffll rMCllI 1a 1rr ai

-~ lll-lliI u-W--11a 1 Ml[ 411 amt l0IIC 3JICJ7 ~ 33-1--I- DIID llXII D111 JlMZ 411 lraquo- ~lUN~t --- - etMpound 11JII

~ MffD mmaat ZL I01t 111

1Jlll~-IICfIQfJICIISJ DfEI IC71- I~ 1~ 9 Cl 1VY IICIIWCLl~fCSC~lNCl

~11HltOXW1A~JtCI~llfB MXIC 1HI lME INCi 111M bull11 (S 1f41~middot~-~-)

~ io

0 0 0 0 -0 0 0 D O 1 middot tbull O

_- _pound ~ - Tf middot- ---r ~~ ~~- ~=middoti

r jil7bull --------4~-middot~

(

SCAtpound 1bull bull YI

I ~ tfAIE lIMa toafllltl1E ~NAD1w1(rJ

1 ~ PlIla II MMt QI 11D TD D111oPl

~c1MlntID9~~-l 1NIIJIIKlNI LnlJTU ~ deg qllAJSTE uM011111 iu1II 1111ZT IIIILJaZ

Exhibit C - Photo-Reduced Copy of Activity and Use Limitations Plan of Land

--~middot---

I ~111-11111

iiiii

-ill111liilt

ACJIYIJY ANJ) lJSE lJJll7ATJONS PLAN OF LANI)

81ACJ(81R1 I IINION Flr11lfES SllffllF7AVO SIle

o tfO SOIJIH s1ar HlltlPOtL IIAS

SCAlElrJAt IPfffl152021

1IJrwod Eng1neerlng

- EnQlbullHrlflg Compaffy middot~~=~ m Cm1JQ u fnfJa-eal

~ -

-~

9l1EET 1 OF I 8324-02

td ~

w ~ m 0 0

Id Q ii w ii

co co m

co 0

-l

~-77--raquo- -~I~ )middot~ ~ bull _I lT ~ v~

AI ~ If ~)middot~ 7- ~1 c t11 yil ~ ~ ~middot~41 bull1 l ~~l(i~r~1 f7 )ll y-

~~ f -~ -v fgtV ~ ~ ~ l er-- u -

tl x-P~C ()

JP yen f(( 11 1degpoundS -~ (

ftunrTfflllllTnallJrNNQWDf ~ ti IZNtRlTT lnH M IULS IIJIUIUlA-DlltlllllDlJlllIICIF tJbllt~llC~lJNp

DTl NlllltaJatl-Witiill (raquo11 iiiK(+til

I aJnlTlKATJlfl PlAH~ THE PUIIJll1T UC TIUlf Mlaquo THE l5 11 oawG ~ NII 1Hpound1as Of1111E111 AMllfrlTll9laquolllt Mpound ntem OPlaJ CJ1 IWM1pound BREn 011 bulln

~ ~illi~fli~ _lt ---c~-Clmiddot~~c0-nmiddotmiddot~bullJmiddot04~- ~--~--yen~~bull - L -bull -n ~ -r - ~ -

it

~ fr ~ ~- -~bull~bullv OG- ~n0

bull--ltmiddot middot~ -~- ~~-=~7~st~-~~~~i~~Hil~-) 2~C 0 ~~~~~ --------Y-Tgt-bullbullmiddot-

U-IU ~middotshy =i==-

bullbull bull _ -middot-

~----- ( ~11middot

__IC1ZMJ - bull IOC)0l lftEf ___ i gt mEKJllJfNG rotJ1FRIIIT AIIEAS B~ p~ AIIEAS ~ea-vmiddot LIUIID

~ e--- -+ ~ rzprz1za 1 ~ IJTATC PRC ~TC

nJml lltPtasCltJ

DUD BCD lJlll7 PMC 4H 1 1 YERT1CAL M1llI II NCCI ~ _ ro conurr DOD 80CIC 3JII07 llME 4H I ntaM NUIU 1121 IJ4TAI m IMlC 111111 nATIIW ~fsi

tJMAlfflOlI) AIIEAS1 bull 11AMJSCAlfl) AlpoundAS Lill] 1Dll IOlII POT PlCit 6115 J)-t20 ~atfnujK~tlLWlQI

~PUNMl-17 POflTIVNf1Ell llaD BaalC Tl_ Paa bullbull - 99 a 11

_-ijf1iltDP~IZ~ 5CME - JOSUva1fTLJ ~ ~-rr 111 C tMI=

bull111 I~

i=iiii7

~ e---

t c z rl

L-n11 ~

ACJIVJTY AND USE LIAlffAJIONS

PIAN OF RESTRIC1EJJ AREAS ANJJ COVER TYPES

fltACK1(fN _ llNlltgtI PfMIECCS SllPVFVNlJ51Tlt

JO _ lxJ srJllH STREET IIALPrJU JASS

SCAU I - 30 APRIL 2021

lcnwod Engineering

llarwood Cngnrilgtf cpmy -t~~~~

fIL Pllpa-ru - (1u]1a-lftll

~L=wl f 01~JII IO_

a SIEET I (F 2 B324-02

bj ~

w 0

0 0 deg It

iQ ~ w l11

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 1 of 2

CX) CX)

deg CX) 0

ntllT -1~1~ rurnlaquo1 r1n l1XTM 11Nf -r~ lie UUffCI 11Pt lDll1Hf iniin --IC unr1G Tlr 1n1rn Iota allll Ito tyen1tlll ~~11CRnrzJ11-11--~ci-- n31 nr111w11J1t ~bull c ~- diams JDrnn llloffl rcnlml IDII

-~ ]al rll _ _ PnlM-1-PI lbull-- ll7HrirrIPlllD1lf~-a bullbullll 111bull IClln9XnolDlllIIIIIIOm

214 ff7371JOOT ~bull JllC Ibullbull 171 JICllEY)l)vlUTlo~lUl~ ~li_~ -~~ MDlol ll4L~TllJraquofllllf190abullbullt ~~nQuu~~1aJI _~~OtottWU~1t11txm~arcPbrmllmCDt ~~ ~~ ~ =~ gj ~l11~ llltlM Mrattllll TDPmllIDCDI JJ4bull e~ _ ~ e PClC lbullI- 1- ~1sect~ ~ ~ ~ ~ ~~~-nr~44bull~mn11-a11 ~~ =mt =m~ ~ ~~ ~ =~~-~~ =~~rt~l~llibullltbull=

~~~~~~~~r-~r-~~sectsect55~55 ~~ ~=g~~ mi --1~ ~-==~~m~ L-~r UVPllrlllUillDITDr4L 1JI lbullKlllll~==~~~=~

~~~~~~~~ raquoff-llll 111rritl_aianbull ~11lCla rr- n ttll XDP11r1r 11111c-1C111~ RTl~rJlllllbullbull~llllJlllipo~~=r~tm=~~

~=~3r~t==~ ~=~i==~~ llt1ttl70 m~~n~ =n~ L diams 11- bull - iaEi~mi 1lE~HHffi ~1-~ E LbulllT bullU-7YA 8911U TMn4 OJII C- lllkHrnl1nlntll11106~

MJ9~gt111ftlrfffll11 ~ SbullC61hLJT raquoWl lll~IJlll11amp1 utVllllt a lbulllfGl bulllC lT

lliilH~1 ~~rm-=rn~ lbullIIIICU-1bull0

itt ishwI JUo ma m1 bull 1-c iiliii ~==~m~=~ Ullln U7IIY M1NLl411 fflf f-~ llr IL ~ lbullt Ill uaP11rllDn1rin1bull139nf- na_ 1111lnl ___ lWTDf-ID 111Jbullnllr-cishy

J1JT1 lflTI-noLbull COi lJ1 tsr18GOTDrl1~ 1--Cn ~~~==-=~ LbullS1rbull-p

LbulllI ~middot x1 fl11bull diams an l~J P-~ WI 1~1Slrmsraquo11nirorn 11bull1n-

llrgt 58 - TDrl ZJlJ l~ Zl llf4 Pll1raquo91I lnP~IIEI 11 ==~=-~~ lbullt-11bullh1~

nun_-~bullfllrlll_ lbulll-lrbull N- - nr6-11MII rinaus a 1bull1E-t1 im1 nrxi mr~ 7nn1 4i i 1c m llrS~iJ-ltJlillII Tt-Ul ris ~=~~middotiill~~ tf llDln~n1rJrgt11nbull1ric ~IPgt9nq~ It-MU rbull RflrrlllVllbulltPllbullOIIUAfC lbullnJtrNbull_~lD+4ftJSHJ7711JrllIIIIT144lDI lbulll ~I llfs-mllThn~-f 1bull11

1a5blH=i5gS El~ iE =iilli ~ID aH~~ ~~ leJINNllllfflnlt10ff1nll~1g=TI==~- lbullN~Jmiddot pw nrwuhtl tba11 l- lllllsectimiii~ ~ lllaquot ll116UW41 llllII NII Cl Ld bullt ll 11r 111~-~lHtl-IINOClll 1Dgtn~rMOtnllfbull3all)Mnr~bullwrmm11uoo~ ~r~ m~ = ~~ t~-i m NNtotl n11nn cm

~~~~~Ttr~ in Httl01llxl nlfM114ta cm

JJN n=-PIW - I- C lbullT rnr nnubullNoXI ffllPI n1 11-amp 11middot 77)111fflffPl~JlaUII

i1JJ n91lbull ti Jnlftbulllll QII

~g=~~~~ir~f~5 =i~=~~ ~=~ ~ ~j====goi H1111t-llll ffo~ ~rn tm111 ta1Vl~ tnar- IVI rm u1i ~ nw ~illl cm 1111 Hltt1H T7U 72w111ll tm UI ftffiH~bull1 naMUlI nlll

lltfll~IOUl rnes~ttlClll

~I~~=~=~~= l3111ratlQOJ121lllll CS u1n-n-a mn-c~11111llllilr ~====m~~ lbulllllr~~Oll~r1111-t~rtRiHa)toI

-~rt~_Utr111tt~USI ~m~i==r~~llfflpound1gtgtMllkllit1U10C011 annrxnbull-TCRL11ai~=~=~g)llllll~--rWltMJtt-8 DR Pl rraquof ntl rim Gllf CCI~~1r~~ liiilllii u- ntlt bull llJ~naJCDI

raquo11NMl10~Ullllcm ntrlnK)fL~nlln-1c lllf ~--TlJaft_Lmc i lbull1 bull l3il0 Nl-197) Ttlll1344 a LbullI 3 l diams 1-111 lflS 1111lOllt ffl- MP PII bullHI lgtl llJI l97Mlt Ian -ti DG llC

111111===-~~~=mg ====~~ tD rlrffllZllIITO-lfllCIIII=~tr~L~~~= - Pl~I llII TD_ ff~ tDII31119NIJMlDffU~~ H CZIII liii~mlt~ D1111nrn11GQ~-CaKftQNJWNczr41140ffnQCUII Jnffnt1JIIIIJunbull~1Qc20lll ~Pllli ll mrnnn lbulltlP 17Jrffdeg-degluoElJIIIQII

~-I-ti _nrna~rlll

a n- 4411 llbullQI 1=40 rt La n- lllf ffrgtn _Jr_~ Ullk ---rr~~ ~=~=tl~~ =1 nttltt nraquo 1nlU as

=-mn--~111DJIDII Ullgt~fflflnanaaJIIJalt55~~EIS~=~~ ~~)1 -11CIJII nn~bullbullbullnaKatt1ta1

JOIT ru~- rf- deg hJIIII r- 111111 ~1111) -1 aJ1 ld t11D1etlll_TalCIS -~-UCV~bullraquootur=~=~I~~=~--~ ~rsrgo_mlaquoshym rs~11flI ~- rnilr==~=~~ ~~r _ ~ atfl ~ rtw Dgtlnn-f-lEllln17n-UIIP

D11 fflXTJ111111 I~~ ar D1Jn4 ~leJJS-OnC111

=====5 middoti SHU=~ 5 ampn iliiiiiIiI11

ngtgtn~1~1tbullubull1rm DH tu~- lt11 rirmU1111 CDIII

~i~i555mi~ ~~ ~m=~==m~g===~~~~ tn1r JtW ~ma- PiOll a CU

~ XNr~t~fDllll1-all~~ m===~~ bullbull~W 111111 ==~~ ampT g~ ru~ =

~lU $Et=ni ~ llll0111ra1Ln~otqC011

H~ g==i =~1 ~

~111111 ~~g~n~a~J))pound11 1=~)6tia

~~ mEfHfH~Si

amp12Ct _ an ~

U N711f21th mM1LU aa o1bull~--117CII in4r ~llllll1Vffl-111Dlr lit~ Hmtlpound1 71 12L I CCIII ---~CUnMIIUOCVf JIHtlnn nl 7r ll4011CIIII

llllDNXCWZflDtlltllCIDCDr

~~=~==~=gnn n1raquoL bullw noanDNt CIJIIi=~ C~middot ~ ~ ~ HnffTI-QIJroQ__111PtlJIIInfflll bullbull1~ aaeIT t-- nrJD nJUntu~CllWI

m ~1 ~ ~~~ ~ ilria~gliiiji~=ir ~lt-OTT gl1raquo ~Iraquou fflllIL nllll 1111111 flC~middotIY_4allCCIIIi l1i5~ ~~11~middot~ ~~ ffll H71W786lll 7P-JOalllllll 2N ~ 1-flllt 7HIJl4- DI ~ ~==~ ~t-tr bullM-

114 Hit71aTra7ririatNOCIIII

llHl1Hf ll~7Dl4fIZIIICIIII 1141ftillf+1DllnTgtlMa~=~bull==~r Lbulll-lllbullbulllJJ

=~~~HR-~a ~ =iEri ~ ~=6

= 1MESE COCIIIOlfAlEi ARC 9~ at AH DISTlfG CONJmOfS AS-alLT FED 5UKiEY Y NORWDal EJICltJIJll(G CD~ IIElMEN ~ 1S 111 DECDaR a 2DII 1)pound OCICIIIDNAlES 5HCflI UIpound IIAID Cit MltSSAOfllffT5 STATE FlJriNII CDCffllNAT smult ~AO leJ (IMIJ 1HE ACQlltACY ltF 1HE COCftDINT[ LDCAnatS Mpound diams- 01 FtU

POINT DESCRIPTION ABBREVIATIONS~-~middotPC Pmlr Of CLIRIJC bullIEllL ClMNpound STilRlS PDC bull PtJtilTIIJOM1poundr ~ [raquo TAHCINiT W(R[ lll[ CURpound uroo Fo F[1NT(1t~tfflvt[ltft1llllIIUlt OMNtilE)PRC ~T oT ~pound ~Vlllrlt

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 2 of 2

I ~ IHAT nfl PlM MS 81D1 PIIDMQl ~WllTM(llUI MOIIEOIAAlPlllR~Df IIUPS C- lttE ~111 Cl__ HftNMIIIZlt

WWWWJU Cii6 liftitit

ACTIVITY ANI) USE LINTATIONS

PLAN OF RES7RIC1EJJ AREAS ANJJ COlER TYPES

8V CKlJ()RN IJNl()N PflllfpoundCpoundS SlllERFIIMJ SITC

50 HJ S(J11( SmEpoundT llAIPOIL JASS

=r-o ~ ll 2021

~ Engmeer1ng

Hltd ~~ middot~~-=~ra (f~AJ lIQ c- f

a llfEET 2 ltF 6324-02

td ~

w ~ m 0 0

Id Q ii w m

co co m 0 co

Bk 39600 Pg437 88608

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY New England Region

Five Post Office Square - Suite 100 Boston Massachusetts 02109-3912

INSTITUTIONAL CONTROL DESIGN STATEMENT FOR THE BLACKBURN AND UNION PRIVILEGES SUPERFUND SITE - EAST OF SOUTH STREET AREA

1 Introduction

Pursuant to the Comprehensive Environmental Response Compensation and Liability Act 42 USC sect 9601 et seq (CERCLA) and the National Contingency Plan 40 CFR Part 300 (the NCP) this document contains a description of the release events and site history that resulted in the contaminated media that require institutional controls in the fom1 of Activity and Use Limitations the basis for land use restrictions and uses that are consistent and inconsistent with the Selected Remedy ( as described below) This Institutional Control (IC) Design Statement pertains to a portion of the Blackburn and Union Privileges Superfund Site located in the Town of Walpole Massachusetts (the Site) which has been listed on EPAs National Priorities List (NPL) which portion is generally referred to as the East of South Street Area (the EOS Area) The EOS Area is located to the east of South Street in Walpole and is shown on Figure 1 attached hereto

A Notice of Activity and Use Limitation (NAUL) is necessary and appropriate for the EOS Area of the Site based on the fact that pursuant to EPAs risk evaluations asbestos arsenic trichloroethene (TCE) and certain polycyclic aromatic hydrocarbon (PAH) contan1inants remain in place in soils at levels higher than those appropriate for unlimited use or unrestricted exposure groundwater underlying the EOS Area contains hazardous substances at levels that present an unacceptable risk of exposure and remedial measures at the Site must be protected and maintained to ensure that the Selected Remedy remains protective

EPAs Record of Decision (ROD) dated September 30 2008 specified the need for institutional controls such as a NAUL to ensure long-tenn perfonnance and protectiveness of the Selected Remedy The institutional controls described herein are necessary and appropriate to ensure that the Selected Remedy for the Site remains protective of human health and the environment The remedy for the Site as described in the ROD is referred to herein and in the NAUL as the Selected Remedy

Page 1 of7

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 13: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

Bk 39600 Pg418 88608

List of Exhibits

Exhibit A Legal Description of the Property Exhibit B Legal Description of the Restricted Area and Coordinates of Cover Types Exhibit C Photo-Reduced Copy of Activity and Use Limitations Plan of Land Exhibit D Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table Exhibit E Institutional Control Design Statement (EOS) Exhibit F Copy of Vote of Town of Walpole

Return to

Attn Kristine Sheehy Senior Real Estate Attorney FOLEY HOAG LLP Seaport West 155 Seaport Boulevard Boston Massachusetts 02210-2600

Page 12 of 12

Bk 39600 Pg419 88608

EXHIBIT A

Legal Description of Property The land with the improvements thereon located in Walpole Norfolk County Massachusetts bounded and described as follows

PARCEL I

The land on the Southeasterly side of South Street bounded

NORTHWESTERLY NORTHERLY AND AGAIN NORTHWESTERLY by South Street by seven lines measuring respectively

17027 feet 120 feet 22011 feet 1653 feet 325 89 feet 4515 feet and 1497 feet

NORTHEASTERLY by Gleason Court 2627 feet

SOUTHEASTERLY AGAIN NORTHEASTERLY AND AGAIN SOUTHEASTERLY by land now or fom1erly of Santomarco by five lines

measuring respectively 6750 feet 2050 feet 1190 feet 2952 feet and 2001 feet

NORTHEASTERLY AGAIN by said land of Santomarco and land now or formerly of Cashorali 10056 feet

NORTHWESTERLY AGAIN by said land of Cashorali 2845 feet

NORTHEASTERLY by land now or formerly of Muighitti 9007 feet

SOUTHEASTERLY by the location of Old Colony Railroad by three lines measuring respectively 6809 feet 32808 feet and 38250 feet

and

SOUTHWESTERLY by land now or formerly of Meyer by three lines AND SOUTHERLY measuring respectively 9143 feet 1998 feet and

15202 feet

Parcel I is described in the deed recorded with the Norfolk County Registry of Deeds in Book 4459 Page 287

A portion of said premises is shown on plan entitled Plan of Land in Walpole Mass Belonging to General Fibre Co Inc by Edward C Peterson CE dated January 16 1960 filed with the Norfolk Registry of Deeds as Plan No 849 of 1967 in Plan Book 223 and the remainder is shown on plan entitled Plan of Land in Walpole Massdeg by E Worthington Engineer dated February 6 193 7 recorded with said Deeds Book D2135 Page 8 I

FHBOSTON52454092

Bk 39600 Pg420 88608

PARCEL II Property known as Parcel 33-120 of the Town of Walpole Tax Assessors Map which is

part of the property situate in the Town of Walpole County ofNorfolk and Commonwealth of Massachusetts and being all of the right title and interest of The Penn Central Corporation in and to all those certain pieces or parcels of land and premises easements rights of way and any other rights of any kind whatsoever appurtenant thereto or used in conjunction therewith on and along a portion of Branch of Railroad known as the Wrentham Branch said portion of railroad being described as follows

Beginning at a line extended across the right of way of said Branch of rai road said line being the Northerly line of South Street and extending thence in a Northeasterly direction the distance of 2852 feet more or less along said Branch of rai Iroad to a line which is parallel with the Southwesterly line of Common Street said parallel line extending across said right of way through a point in the centerline thereof at railroad valuation survey station 733 + 67 more or less and being the place of ending

Parcel II is described in the deed recorded with the Norfolk Registry of Deeds in Book 7986 Page 372 and is a portion of the land shown on the plan recorded with said Deeds as Plan No 52 of 1983

FHBOSTON52454092

Bk 39600 Pg421 88608

Exhibit B Legal Description of the Restricted Area and Coordinates of Cover Types

Le2al Description for Restricted Area The area shown on the plan entitled Activity and Use Limitations Plan of Land Blackburn amp Union Privileges Superfund Site 50 amp 60 South Street Walpole Mass Scale l = 30 dated April 6 2021 by Norwood Engineering Company Inc recorded with the Norfolk Registry of Deeds in Plan Book 704 Page 41 being bounded and described as follows

Beginning at a point on the easterly sideline of South Street at the southerly point of curvature of Gleason Court on said plan thence

Northeasterly and curving to the right along an arc of a curve having a radius of twentyshyfive and 00100 (2500) feet a length of forty-five and 15100 (4515) feet thence

S 48deg1352 E a distance of twenty-two and 24100 (2224) feet the previous course by the southerly sideline of Gleason Court thence

s 32deg0208 w a distance of fifty-four and 78100 (54 78) feet thence

S 59deg27 32 E a distance of twenty and 50100 (2050) feet thence

S 47deg5252 E a distance of eleven and 90100 (1190) feet thence

S 49deg01 10 E a distance of twenty-nine and 58100 (2958) feet thence

s 38deg3108 w a distance oftwenty and 01100 (2001) feet thence

S 49deg00 57 E a distance of one hundred and 56100 (10056) feet thence

N 39deg5348 E a distance of twenty-eight and 45100 (2845) feet the previous seven (7) courses by land ofNF Thelma A Casborali thence

S 49deg0808 E a distance of ninety and 29100 (9029) feet the previous course by land ofNF Ming L Yau thence

s 25deg2312 w a distance of siliy-eight and 22100 (6822) feet to a point on the westerly sideline of a fonner railroad right of way the previous course by land of the Town of Walpole assessor parcel 33-121 thence

S 55deg2937 E a distance of ninety-nine and 78 100 (99 78) feet to a point of tangency on the easterly sideline of a forn1er railroad right of way thence

Page 1 of 13

Bk 39600 Pg422 88608

s 30deg11 32 w

S 23deg49 I6 W

N 66deg1044 W

N 23deg4908 E

N l 6deg00 52 E

S 37deg0240 E

N 10deg1437 W

N 34deg093 I W

N 11 deg5558E

Northeasterly

N 27deg41 48 E

a distance of three hundred and three and 74100 (30374) feet the previous course by land ofNF Nicholas H Dowd and NF Emilio P Baldassari thence

a distance of four hundred ninety and 86100 (49086) feet to a SBdh the previous two (2) courses by the easterly sideline of a former railroad right of way thence

a distance of eighty-two and 76100 (8276) feet to an Iron Pipe on the westerly sideline of the former railroad right of way thence

a distance of twelve and 09100 (1209) feet to a SBdh thence

a distance of ninety-six and 50100 (9650) feet to a S Bdh thence

a distance of fifteen and 00100 (1500) feet the previous three (3) courses by the westerly sideline of the former railroad right ofway and land of NF Joseph R Carpentieri and NF Joseph R and Faith N Carpentiero thence

a distance of ninety-two and 82100 (9282) feet the previous course by land ofNF Richard A and Josette M Burke thence

a distance of tvvo hundred thirty-seven and 86100 (23786) feet to a point on the easterly sideline of South Street thence

a distance of one hundred twenty and 00100 (12000) feet along the easterly sideline of South Street to a point of curvature of the easterly sideline of South Street thence

and curving to the right along an arc of a curve having a radius of eight hundred and 00100 (80000) feet a length of two hundred hventy and 11100 (22011) feet along the easterly sideline of South Street thence

a distance of three hundred forty-hvo and 42100 (34242) feet to the point of beginning

Containing 621 Acres of land more or less

Page 2 of 13

3000

3005

3010

3015

3020

3025

3030

Bk 39600 Pg423 88608

EXHIBIT B (cont)

Points and Coordinates associated with Restriction Areas and Cover Types for the Activity and Use Limitations (AUL) at 50 amp 60 South Street Walpole Mass

Point Northing Easting Type

Curve Curve Number Len2th Radius

28754430528 7236432250 COR

3001 28755604597 7236680368 PC L=7535 R=80000

3002 2875597 1222 7236766913 POC

3003 28756333366 7236870620 PT

3004 28756280754 723697 3031 COR

28756025570 7237001250 COR

3006 28755918670 7237001140 COR

3007 28755864440 7237 I 05890 COR

3008 28755903200 72371963 IO COR

3009 28756030893 7237217396 COR

28756042534 7237250325 COR

3011 28756021733 7237317808 COR

3012 28755800732 7237640949 COR

3013 2875552 1424 7237667395 COR

3014 28755321388 7237708416 COR

28755197081 7237834881 COR

3016 28755102230 7238045173 COR

3017 28754941531 7238291869 COR

3018 28754851375 7238512944 COR

3019 28754753441 7238824 760 COR

28754681541 723916 1881 COR

3021 28754608227 7239406506 COR

3022 28754515846 7239459928 COR

3023 2875426 7589 723943 8163 COR

3024 28754198016 7239590840 COR

28753886764 7239449006 COR

3026 2875329 7944 7239187206 COR

3027 28752506745 7238837890 COR

3028 28751859560 7238552142 COR

3029 28751221833 723827342 l COR

28750848788 7238107869 COR

3031 2875045 3654 7237927814 COR

3032 28750630420 7237527432 COR

3033 28750741023 723757 6257 COR

3034 28751668594 7237842488 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 3 of 13 April 14 2021

3035

3040

3045

3050

3055

3060

3065

3070

Bk 39600 Pg424 88608

Point Number

Northing Easting Type Curve Leneth

Curve Radius

28751548848 7237932869 COR

3036 28752462269 7237767802 COR

3037 28756438461 7236904209 POC L=2207 R=80000

3038 28756543084 7236939245 PT

3039 2875653 7987 7236954123 PC

28756597578 7237007344 POC L=1651 R=937

3041 28756594465 7237087181 PT

3042 28756459044 7237347021 PC L=347 R=220

3043 28756432531 7237363546 PT

3044 28756280644 7237286201 COR

28755924210 7237966952 COR

3046 28756081959 7238048554 PC L=472 R=236

3047 28756064922 7238084404 PT

3048 28755523491 7237845047 COR

3049 28755419845 7238081981 COR

28755460757 7238099621 PC L=240 R=l57

3051 28755467701 7238120241 PT 3052 28755398690 7238275280 COR

3053 28755365410 7238264910 COR

3054 28755087149 7238900449 COR

28755158001 7238931521 COR

3056 28755040360 7239199770 COR

3057 28755311720 7239318930 COR

3058 28755263010 7239429300 COR

3059 28755388260 7239484290 COR

28755348660 7239576000 COR

3061 28755625470 7239696500 COR

3062 28755664605 7239606601 COR

3063 28755736202 7239637768 COR

3064 28755621870 7239897370 COR

287 5567 6160 7239920410 COR

3066 28755718270 7239830260 COR

3067 2875587 9750 7239900310 COR

3068 28755718790 724026 7600 COR

3069 28755763390 7240285350 COR

28756035900 7239926600 COR

3071 28756086280 7239812770 COR

3072 28756089984 7239813649 COR

3073 28756229128 7239501910 PC L=482 R=l54

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 4 of 13 Apnl 14 2021

3075

3080

3085

3090

3095

3100

3105

3110

Bk 39600 Pg425 88608

Point Number

Northing Easting Type Curve Length

Curve Radius

3074 28756257366 7239513984 PT

28756185799 7239674928 COR

3076 28756739833 7239921136 COR

3077 28756876060 7239682275 COR

3078 28756948336 7239735898 PC L=335 R=298

3079 28756958235 7239766064 PT

28756866081 7239978133 COR

3081 28757166275 7240127374 COR

3082 28757068320 7240314640 COR

3083 28757602980 7240594310 COR

3084 28757700050 7240408736 COR

28758247941 7240688376 COR

3086 28758250190 7240683910 COR

3087 28758344979 7240738168 COR

3088 2875843 6103 7240581527 COR

3089 28758602943 7240664224 COR

28758740024 7240397393 COR

3091 28758605706 724032 7776 PC L=477 R=309

3092 28758594882 7240286013 PT

3093 28758666635 7240197585 PC L=2573 R=3127

3094 28758767113 7240118710 POC

28758890752 7240086604 PRC L=I653 R=3993

3096 28758972305 7240074125 POC

3097 28759049552 7240045 I 52 PT

3098 28759330312 7239734408 COR

3099 28759459414 7239588584 PC L=2269 R=5217

28759524821 7239496174 POC

3101 28759568752 7239391829 PRC L=1814 R=486

3102 28759603259 7239308095 POC

3103 28759653883 7239232999 PCC L=l31 R=088

3104 28759665694 7239231411 PT

28759800587 7239299586 COR

3106 28759986288 7238981214 COR

3107 2875983 5797 7238891829 COR

3108 28759879750 7238798689 COR

3109 28759905380 7238754769 PC L=1600 R=2552

28759963590 7238700398 POC

3111 28760035727 7238666620 PT

3112 28760700665 723901 5672 PC L=4515 R=2500

3113 28760830230 7239191198 POC

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 5 of 13 April 14 2021

3115

3120

3125

3130

3135

3140

3145

3150

Bk 39600 Pg426 88608

Point Number

Northing Easting Type Curve Len2th

Curve Radius

3114 2876077 263 6 723 940 1624 PT 28760624518 7239567466 COR

3116 28760160100 7239276864 COR

3117 28760055928 7239453423 COR

3137 28759976118 7239541692 COR

3118 28759782139 7239764992 COR

3119 28759625581 7239640375 COR

28758966057 7240399493 COR

3121 28759184326 7240581973 COR

3122 28758593598 724126478] COR

3123 28757977293 724097 2314 COR

3124 28757716516 7241351659 COR

28757288251 7241140719 COR

3126 28756725827 7240851862 COR

3127 28756162468 7240586126 COR

3128 28755614498 7240338506 COR

3129 28754346745 7239768507 COR

28753845716 7239540194 COR

3131 28753257436 723927 8634 COR

3132 28752466355 7238929370 COR

3133 28751819340 7238643698 COR

3134 28751181527 7238364939 COR

28750807772 7238199071 COR

3136 28750413263 7238019301 COR

3138 28756920317 7237298739 PC L=l941 R=2104

3139 28756827128 7237274848 POC

28756733047 7237294944 PRC L=401 R=l66

3141 2875671 1336 723 727 2844 PCC L=1492 R=13345

3142 28756744594 7237206091 POC

3143 28756781529 7237141301 PCC L=1419 R=l018

3144 28756833084 7237094642 POC

28756902566 7237091952 PCC L=2413 R=157959

3146 28757017337 7237129167 POC

3147 28757131820 7237167258 PCC L=330I R=S0000

3148 28757282552 7237234442 POC

3149 28757431866 7237304721 PT 28757338390 7237495930 COR

3151 28757541620 7237605380 COR

3152 28756897590 723883 4280 COR

Exhibit B to NA UL-Part 11-EOS Coordinate Tables Page 6 of 3 April 14 202

3155

3160

3165

3170

3175

3180

3185

Bk 39600 Pg427 88608

Point Northing Easting Type Curve Cunbulle

Number Lenszth Radius 3153 28756870623 7238820218 COR

3154 28756838273 7238882258 COR

28756865240 7238896320 COR

3156 28756777004 7239062996 COR

3157 28756770439 7239063663 PC L=l 146 R=2269

3158 2875665836 I 7239046180 PCC L=l423 R=957

3159 2875661 7520 7238989913 POC

28756625544 7238920850 PT

3161 28756728525 7238726583 PC L=232 R=l58

3162 28756748720 7238720236 PT

3163 28756899634 7238797341 COR

3164 28757254653 7238121363 COR

28757520153 723761266 7 COR

3166 28757306899 723 750 IO 10 COR

3167 28756690336 7237500169 PC L=243 R=I68

3168 28756682599 7237479273 PT

3169 28756686990 7237469583 PC L=0250 R=l68

28756708806 7237463018 PT 3171 28757000109 7237616354 PC L=233 R=l73

3172 28757005368 7237637270 PT

3173 28757000998 7237645513 PC L=233 R=l69

3174 28756980219 7237651023 PT

28756429209 7238339422 COR

3176 28756342982 7238506849 COR

3177 28756500076 7238596485 PC L=l19 R=l48

3178 28756499701 7238608072 PT 3179 2875644 7813 7238705611 PC L=l 182 R=483

28756358177 723 869 0707 PT

3181 2875623 6099 7238376388 PC L=443 R=467

3182 28756235611 7238333779 PCC L=343 R=9IO

3183 28756249049 7238302418 PCC L=412 R=9IO

3184 28756278952 7238274519 PCC L=368 R=300

28756313362 7238277619 PT

3186 28756282498 7238911796 PC L748 R=216

3187 28756240650 7238919721 PT

3188 28756126081 7238620406 PC L=323 R162

3189 28756138645 7238591575 PCC L=333 R=283

Exhibit B to NAUL-Part II-EOS Coordmate Tables Page 7 of 13 April 14 2021

3190

3195

3200

3205

3210

3215

3220

Bk 39600 Pg428 88608

Point Number Northing Easting Type Curve

Leneth Curve Radius

28756163375 7238602867 PT

3191 2875523 0908 7238765275 COR

3192 28755205040 7238752740 COR

3193 28755391740 7238328470 COR

3194 28755466840 7238361040 COR

28755452760 7238392590 COR

3196 28755516920 7238421040 COR

3197 28755530690 7238388730 COR

3198 28755603230 7238421460 COR

3199 2875555 7568 723852 7053 COR

28755371220 7238445330 COR

3201 28755629198 7238558466 COR

3202 28755676040 7238453290 COR

3203 28755925410 7238563840 PC L=1902 R=3548

3204 28755927383 7238658634 POC

28755954390 7238749520 PT 3206 28755974770 7238807230 COR

3207 28755779200 7238881701 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

28755746700 7238609997 COR

3211 2875593774 7239036608 COR

3212 28756048460 7238996850 PC l=1445 R=2903

3213 28756070631 7239065422 POC

3214 28756109010 7239126420 PT

28756153820 7239182190 PC L=S98 R=848

3216 28756171980 723923 7880 PT

3217 287S6026148 7239566166 COR

3218 28756003865 7239556465 COR

3219 287S6134380 7239256650 COR

28755998460 7239195370 COR

3221 2875600 71S0 7239174530 COR

3222 28756001791 7239172152 COR

3223 28756040451 7239079437 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 8 of 13 April 14 2021

Bk 39600 Pg429 88608

Point Number

3210

3200

3056

3057

3058

3059

3060

3061

3062

3218

3219

3220

3221

3224

3225

3226

3227

3228

3070

3071

3234

3233

3235

3236

3237

3238

3239

3240

3241

3242

3243

3244

3245

3246

3247

3248

Northing

28755746700

28755371220

28755040360

28755311720

28755263010

28755388260

28755348660

2875562 54 70

28755664605

28756003865

28756134380

28755998460

28756007150

28755941340

28755962080

28755867937

28755819702

28755766128

28756035900

28756086280

28755991990

28755942100

28756477248

28756677238

28756650130

28756473307

28756480112

28756675030

28756724454

28756742099

28756742133

28756703924

28756640759

28757607280

28757401530

28757467350

Easting

7238609997

7238445330

7239199770

7239318930

7239429300

7239484290

7239576000

7239696500

7239606601

7239556465

7239256650

7239195370

7239174530

7239145324

7239100930

7239061674

7238935003

7238911508

7239926600

7239812770

7239769910

7239884050

7239261913

7239253008

7239321810

7239319038

7239298824

7239364440

7239271845

7239292625

723935 0187

7239393239

7239393096

7237584960

7237475300

7237345620

Type

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

PC PCC

POC

PCC

PT

COR

COR

COR

Curve Len2th

L=273

L=ll77

L=657

Cunmiddote Radius

R=1421

R=810

R=679

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 9 of 13 April 14 2021

Bk 39600 Pg430 88608

Point Number Northing Easting Type Curve

Len2th Curve Radius

3249 287 57514570 7237372360 PC l=ll05 R=1993

3250 287 57 588060 7237452980 PT

3251 28757631382 7237429676 PC L=2244 R=2352

3252 287 5765 6810 7237537876 POC

3253 2875 762 9720 7237645671 PT

3254 28756940655 7238952710 PC l=1493 R=1509

3255 28756901845 7239015577 POC

3256 2875683 7836 7239052474 PT

3257 28758104824 7237653014 COR

3258 28758028960 7237800160 COR

3259 28757949530 7237760790 COR

3260 28757901005 7237855021 COR

3261 28757839230 7237820908 PC L=273 R=l33

3262 28757830688 7237799810 PCC L=539 R=2144

3263 28757852974 7237750897 PT

3264 28757891705 7237688178 PC L=lS26 R=2432

3265 28757948636 7237637880 POC

3266 287 58018307 7237607597 PT

3248 28757467350 7237345620 COR

3267 28757550832 7237363444 POC L=2653 R=80000

3268 28757668809 7237424132 PT

3269 28757504 719 7238817989 COR

3270 28757493010 7238842230 COR

3271 28757561074 7238880970 COR

3272 28757483953 7239024127 PC L=323 R=l70

3273 28757459939 7239037846 PT

3274 28757311605 7238957122 PC L=1388 R=906

3275 2875727 2732 7238901647 POC

3276 28757283181 7238834718 PT

3277 287 5733 4061 7238752337 PC L=255 R=l60

3278 287 5735 5527 7238744411 PT

3279 2875 7102815 7239517199 PC l=261 R=l70

3280 28757080654 7239525307 PCC l=909 R=1275

3281 2875 700 5390 7239477911 PCC L=l007 R=990

3282 28756999624 7239381704 PT

3283 2875707 7705 7239230604 PC L=ll14 R=907

Exhibit B lo NAUL-Part IlbullEOS Coordinate Tables Page 10 of13 April 14 2021

3285

3290

3295

3300

3305

3310

3315

Bk 39600 Pg431 88608

Point Number Northing Easting Type

Curve Leneth

Curve Radius

3284 28757168066 7239178102 PT

28757205717 7239186398 PC L=518 R=930

3286 28757249003 7239213534 PCC L=l41 R=086

3287 2875724 7909 7239226048 PT

3288 28758415755 7239842757 PC L=251 R=l59

3289 28758437695 7239837379 PT

28758456377 7239846949 PC L=812 R=876

3291 28758494897 7239915165 PCC L=456 R=757

3292 28758483790 7239958646 PT

3293 28758405147 7240111348 PC L=l057 R=955

3294 28758318136 7240161452 PCC L=477 R=l063

28758272407 7240149529 PCC L=250 R=l60

3296 28758265647 7240128003 PT

3297 28758157937 7237680895 COR

3298 28758902927 723807 1969 COR

3299 28758852531 7238168280 COR

28758779660 7238129750 COR

3301 28758746973 7238192072 COR

3302 2875807 6630 7237840490 COR

3303 28758049940 7237894220 COR

3304 2875871 7997 7238243620 COR

28758680103 7238315946 COR

3306 28758533699 7238239240 COR

3307 2875852 6899 7238252220 COR

3308 28758098180 7238027600 COR

3309 28757974484 7238264223 COR

28757957598 7238255513 COR

3311 28757757732 7238637845 COR

3312 28757774584 7238646620 COR

3313 28757653710 723887 7846 COR

3314 28757560920 7238829340 COR

28759004930 7238125514 COR

3316 28759689797 7238485028 PC L=1992 R=2609

3317 28759697204 7238583760 POC

3318 28759667288 723867 8142 PT

3319 28758996126 7238323718 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 11 of 13 April 14202 I

Bk 39600 Pg432 88608

Point Number

Northing Easting Type Curve Lenfth

Curve Radius

3320 28759028950 7238261560 COR 3321 28758954486 7238222188 COR

3322 28758972523 7238378387 COR 3323 28759421550 7238613630 COR 3324 28759377933 7238698105 COR 3325 2875907 4811 7238539289 COR 3326 28759081611 7238526309 COR 3327 28758935210 7238449604 COR

3328 28759464470 7238637330 COR 3329 28759632674 7238722481 PC L=ll83 R=l578

3330 28759583973 7238755474 POC 3331 28759526573 7238768343 PRC L=2163 R=2455

3332 28759422964 7238796123 POC 3333 28759341091 7238865430 PT

3334 28759193370 7239050710 COR 3335 28759416340 7239163940 COR 3336 28759263600 7239455620 COR 3337 28759043690 7239336510 COR 3338 28758935490 7239552130 COR 3339 28757650890 7238883240 COR 3312 28757774584 7238646620 COR 3311 28757757732 7238637845 COR 3310 28757957598 7238255513 COR 3309 28757974484 7238264223 COR 3308 28758098180 723802 7600 COR 3307 28758526899 7238252220 COR 3306 28758533699 7238239240 COR 3340 28758700033 7238326388 COR 3341 28758675436 7238373334 COR 3342 28758733013 7238403500 COR 3343 28758760858 7238350353 COR 3344 28758860952 7238402796 COR 3345 28758833106 7238455943 COR 3346 28758890683 7238486109 COR 3347 28758915280 7238439162 COR 3326 28759081611 7238526309 COR 3325 28759074811 7238539289 COR

Exhibit B to NAUL-Part H-EOS Coordinate Tables Page 12 of l3 April 14 2021

Bk 39600 Pg433 88608

Point Number

Northing Easting Type Curve Len2th

Cunbulle Radius

3324 2875937 7933 7238698105 COR

3082 28757068320 7240314640 COR 3083 28757602980 7240594310 COR 3349 28757790234 7240236327 COR

3348 28757255574 7239956657 COR

3124 28757716516 7241351659 COR 3125 28757288251 7241140719 COR 3126 28756725827 7240851862 COR 3127 28756162468 7240586126 COR 3128 287 55614498 7240338506 COR 3129 28754346745 7239768507 COR 3130 28753845716 7239540194 COR 3131 28753257436 723927 8634 COR 3132 28752466355 7238929370 COR 3133 28751819340 7238643698 COR 3134 2875118152 7 7238364939 COR 3135 2875080 7772 7238199071 COR 3136 28750413263 7238019301 COR 3350 28750296168 7238284525 COR 3351 28754 78 6636 7240267040 COR 3352 28757412029 7241794586 COR

POINT DESCRIPTION ABBREVIATIONS

COR=CORNER PC= POINT OF CURVE WHERE CURVE STARTS POC -= POINT ON CUR VE PT=POINT OF TANGENCY WHERE THE CURVE ENDS PCC = POINT OF COMPOUND CURVE (WHERE RADIUS CHANGES) PRC = POINT OF REVERSE CURVE

NOTES

THE COORDINATES ARE BASED ON AN EXISTING CONDITIONS AS-BUILT FIELD SURVEY BY NORWOOD ENGINEERING CO INC BETWEEN NOVEMBER 15 TO DECEMBER 18 2019 TI-IE COORDINATES ARE BASED ON l1ASSACHUSETIS ST A TE PLANE COORDINATE SYSTEM NAD 1983 (FEET) THE ACCURACY OF THE COORDINATE LOCATIONS ARE +-0J FEET

Exhibit B to N1UL-Part II-EOS Coordmate Tables Page 13 ofl3 April 14 2021

---

1f~ flJr ~i

f ~~ J~i](M~I ~ 1 jf~ ~~f W-- )e 1

It lj fY pl ~-~j

I --- ~ ~

1 (J-c~ er ~

C JI fl JYf

1 ~ ~Yu-~ 1i

~r

( LOClJS P

SCAUllbulliQO

I ar lMIT flG PINI tMS _ lIIPMIDMICXNllRlnT~tlCfllUS 1111D cmuftraquodl s - NIKl1III tfIJIIIIIOfM~1HCll allE1

DAre Jllrl

NUKIJU LU6 DMitM

mmtG6DKbdlt

~4~-middot

~~I

-- ampnbullllf~ ~ fa

LEGEND 0

-i~wr0o-m lICUUoaampbullco--11111 _ _l_J

0

bull ~-ail_I

~-

mo(I ---fwj

amp~~~~ ~ ~~ltgtmiddot ~A~

~6

_L-r

bull -~ IBP__l-11Uil n-rlfl-lffll rMCllI 1a 1rr ai

-~ lll-lliI u-W--11a 1 Ml[ 411 amt l0IIC 3JICJ7 ~ 33-1--I- DIID llXII D111 JlMZ 411 lraquo- ~lUN~t --- - etMpound 11JII

~ MffD mmaat ZL I01t 111

1Jlll~-IICfIQfJICIISJ DfEI IC71- I~ 1~ 9 Cl 1VY IICIIWCLl~fCSC~lNCl

~11HltOXW1A~JtCI~llfB MXIC 1HI lME INCi 111M bull11 (S 1f41~middot~-~-)

~ io

0 0 0 0 -0 0 0 D O 1 middot tbull O

_- _pound ~ - Tf middot- ---r ~~ ~~- ~=middoti

r jil7bull --------4~-middot~

(

SCAtpound 1bull bull YI

I ~ tfAIE lIMa toafllltl1E ~NAD1w1(rJ

1 ~ PlIla II MMt QI 11D TD D111oPl

~c1MlntID9~~-l 1NIIJIIKlNI LnlJTU ~ deg qllAJSTE uM011111 iu1II 1111ZT IIIILJaZ

Exhibit C - Photo-Reduced Copy of Activity and Use Limitations Plan of Land

--~middot---

I ~111-11111

iiiii

-ill111liilt

ACJIYIJY ANJ) lJSE lJJll7ATJONS PLAN OF LANI)

81ACJ(81R1 I IINION Flr11lfES SllffllF7AVO SIle

o tfO SOIJIH s1ar HlltlPOtL IIAS

SCAlElrJAt IPfffl152021

1IJrwod Eng1neerlng

- EnQlbullHrlflg Compaffy middot~~=~ m Cm1JQ u fnfJa-eal

~ -

-~

9l1EET 1 OF I 8324-02

td ~

w ~ m 0 0

Id Q ii w ii

co co m

co 0

-l

~-77--raquo- -~I~ )middot~ ~ bull _I lT ~ v~

AI ~ If ~)middot~ 7- ~1 c t11 yil ~ ~ ~middot~41 bull1 l ~~l(i~r~1 f7 )ll y-

~~ f -~ -v fgtV ~ ~ ~ l er-- u -

tl x-P~C ()

JP yen f(( 11 1degpoundS -~ (

ftunrTfflllllTnallJrNNQWDf ~ ti IZNtRlTT lnH M IULS IIJIUIUlA-DlltlllllDlJlllIICIF tJbllt~llC~lJNp

DTl NlllltaJatl-Witiill (raquo11 iiiK(+til

I aJnlTlKATJlfl PlAH~ THE PUIIJll1T UC TIUlf Mlaquo THE l5 11 oawG ~ NII 1Hpound1as Of1111E111 AMllfrlTll9laquolllt Mpound ntem OPlaJ CJ1 IWM1pound BREn 011 bulln

~ ~illi~fli~ _lt ---c~-Clmiddot~~c0-nmiddotmiddot~bullJmiddot04~- ~--~--yen~~bull - L -bull -n ~ -r - ~ -

it

~ fr ~ ~- -~bull~bullv OG- ~n0

bull--ltmiddot middot~ -~- ~~-=~7~st~-~~~~i~~Hil~-) 2~C 0 ~~~~~ --------Y-Tgt-bullbullmiddot-

U-IU ~middotshy =i==-

bullbull bull _ -middot-

~----- ( ~11middot

__IC1ZMJ - bull IOC)0l lftEf ___ i gt mEKJllJfNG rotJ1FRIIIT AIIEAS B~ p~ AIIEAS ~ea-vmiddot LIUIID

~ e--- -+ ~ rzprz1za 1 ~ IJTATC PRC ~TC

nJml lltPtasCltJ

DUD BCD lJlll7 PMC 4H 1 1 YERT1CAL M1llI II NCCI ~ _ ro conurr DOD 80CIC 3JII07 llME 4H I ntaM NUIU 1121 IJ4TAI m IMlC 111111 nATIIW ~fsi

tJMAlfflOlI) AIIEAS1 bull 11AMJSCAlfl) AlpoundAS Lill] 1Dll IOlII POT PlCit 6115 J)-t20 ~atfnujK~tlLWlQI

~PUNMl-17 POflTIVNf1Ell llaD BaalC Tl_ Paa bullbull - 99 a 11

_-ijf1iltDP~IZ~ 5CME - JOSUva1fTLJ ~ ~-rr 111 C tMI=

bull111 I~

i=iiii7

~ e---

t c z rl

L-n11 ~

ACJIVJTY AND USE LIAlffAJIONS

PIAN OF RESTRIC1EJJ AREAS ANJJ COVER TYPES

fltACK1(fN _ llNlltgtI PfMIECCS SllPVFVNlJ51Tlt

JO _ lxJ srJllH STREET IIALPrJU JASS

SCAU I - 30 APRIL 2021

lcnwod Engineering

llarwood Cngnrilgtf cpmy -t~~~~

fIL Pllpa-ru - (1u]1a-lftll

~L=wl f 01~JII IO_

a SIEET I (F 2 B324-02

bj ~

w 0

0 0 deg It

iQ ~ w l11

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 1 of 2

CX) CX)

deg CX) 0

ntllT -1~1~ rurnlaquo1 r1n l1XTM 11Nf -r~ lie UUffCI 11Pt lDll1Hf iniin --IC unr1G Tlr 1n1rn Iota allll Ito tyen1tlll ~~11CRnrzJ11-11--~ci-- n31 nr111w11J1t ~bull c ~- diams JDrnn llloffl rcnlml IDII

-~ ]al rll _ _ PnlM-1-PI lbull-- ll7HrirrIPlllD1lf~-a bullbullll 111bull IClln9XnolDlllIIIIIIOm

214 ff7371JOOT ~bull JllC Ibullbull 171 JICllEY)l)vlUTlo~lUl~ ~li_~ -~~ MDlol ll4L~TllJraquofllllf190abullbullt ~~nQuu~~1aJI _~~OtottWU~1t11txm~arcPbrmllmCDt ~~ ~~ ~ =~ gj ~l11~ llltlM Mrattllll TDPmllIDCDI JJ4bull e~ _ ~ e PClC lbullI- 1- ~1sect~ ~ ~ ~ ~ ~~~-nr~44bull~mn11-a11 ~~ =mt =m~ ~ ~~ ~ =~~-~~ =~~rt~l~llibullltbull=

~~~~~~~~r-~r-~~sectsect55~55 ~~ ~=g~~ mi --1~ ~-==~~m~ L-~r UVPllrlllUillDITDr4L 1JI lbullKlllll~==~~~=~

~~~~~~~~ raquoff-llll 111rritl_aianbull ~11lCla rr- n ttll XDP11r1r 11111c-1C111~ RTl~rJlllllbullbull~llllJlllipo~~=r~tm=~~

~=~3r~t==~ ~=~i==~~ llt1ttl70 m~~n~ =n~ L diams 11- bull - iaEi~mi 1lE~HHffi ~1-~ E LbulllT bullU-7YA 8911U TMn4 OJII C- lllkHrnl1nlntll11106~

MJ9~gt111ftlrfffll11 ~ SbullC61hLJT raquoWl lll~IJlll11amp1 utVllllt a lbulllfGl bulllC lT

lliilH~1 ~~rm-=rn~ lbullIIIICU-1bull0

itt ishwI JUo ma m1 bull 1-c iiliii ~==~m~=~ Ullln U7IIY M1NLl411 fflf f-~ llr IL ~ lbullt Ill uaP11rllDn1rin1bull139nf- na_ 1111lnl ___ lWTDf-ID 111Jbullnllr-cishy

J1JT1 lflTI-noLbull COi lJ1 tsr18GOTDrl1~ 1--Cn ~~~==-=~ LbullS1rbull-p

LbulllI ~middot x1 fl11bull diams an l~J P-~ WI 1~1Slrmsraquo11nirorn 11bull1n-

llrgt 58 - TDrl ZJlJ l~ Zl llf4 Pll1raquo91I lnP~IIEI 11 ==~=-~~ lbullt-11bullh1~

nun_-~bullfllrlll_ lbulll-lrbull N- - nr6-11MII rinaus a 1bull1E-t1 im1 nrxi mr~ 7nn1 4i i 1c m llrS~iJ-ltJlillII Tt-Ul ris ~=~~middotiill~~ tf llDln~n1rJrgt11nbull1ric ~IPgt9nq~ It-MU rbull RflrrlllVllbulltPllbullOIIUAfC lbullnJtrNbull_~lD+4ftJSHJ7711JrllIIIIT144lDI lbulll ~I llfs-mllThn~-f 1bull11

1a5blH=i5gS El~ iE =iilli ~ID aH~~ ~~ leJINNllllfflnlt10ff1nll~1g=TI==~- lbullN~Jmiddot pw nrwuhtl tba11 l- lllllsectimiii~ ~ lllaquot ll116UW41 llllII NII Cl Ld bullt ll 11r 111~-~lHtl-IINOClll 1Dgtn~rMOtnllfbull3all)Mnr~bullwrmm11uoo~ ~r~ m~ = ~~ t~-i m NNtotl n11nn cm

~~~~~Ttr~ in Httl01llxl nlfM114ta cm

JJN n=-PIW - I- C lbullT rnr nnubullNoXI ffllPI n1 11-amp 11middot 77)111fflffPl~JlaUII

i1JJ n91lbull ti Jnlftbulllll QII

~g=~~~~ir~f~5 =i~=~~ ~=~ ~ ~j====goi H1111t-llll ffo~ ~rn tm111 ta1Vl~ tnar- IVI rm u1i ~ nw ~illl cm 1111 Hltt1H T7U 72w111ll tm UI ftffiH~bull1 naMUlI nlll

lltfll~IOUl rnes~ttlClll

~I~~=~=~~= l3111ratlQOJ121lllll CS u1n-n-a mn-c~11111llllilr ~====m~~ lbulllllr~~Oll~r1111-t~rtRiHa)toI

-~rt~_Utr111tt~USI ~m~i==r~~llfflpound1gtgtMllkllit1U10C011 annrxnbull-TCRL11ai~=~=~g)llllll~--rWltMJtt-8 DR Pl rraquof ntl rim Gllf CCI~~1r~~ liiilllii u- ntlt bull llJ~naJCDI

raquo11NMl10~Ullllcm ntrlnK)fL~nlln-1c lllf ~--TlJaft_Lmc i lbull1 bull l3il0 Nl-197) Ttlll1344 a LbullI 3 l diams 1-111 lflS 1111lOllt ffl- MP PII bullHI lgtl llJI l97Mlt Ian -ti DG llC

111111===-~~~=mg ====~~ tD rlrffllZllIITO-lfllCIIII=~tr~L~~~= - Pl~I llII TD_ ff~ tDII31119NIJMlDffU~~ H CZIII liii~mlt~ D1111nrn11GQ~-CaKftQNJWNczr41140ffnQCUII Jnffnt1JIIIIJunbull~1Qc20lll ~Pllli ll mrnnn lbulltlP 17Jrffdeg-degluoElJIIIQII

~-I-ti _nrna~rlll

a n- 4411 llbullQI 1=40 rt La n- lllf ffrgtn _Jr_~ Ullk ---rr~~ ~=~=tl~~ =1 nttltt nraquo 1nlU as

=-mn--~111DJIDII Ullgt~fflflnanaaJIIJalt55~~EIS~=~~ ~~)1 -11CIJII nn~bullbullbullnaKatt1ta1

JOIT ru~- rf- deg hJIIII r- 111111 ~1111) -1 aJ1 ld t11D1etlll_TalCIS -~-UCV~bullraquootur=~=~I~~=~--~ ~rsrgo_mlaquoshym rs~11flI ~- rnilr==~=~~ ~~r _ ~ atfl ~ rtw Dgtlnn-f-lEllln17n-UIIP

D11 fflXTJ111111 I~~ ar D1Jn4 ~leJJS-OnC111

=====5 middoti SHU=~ 5 ampn iliiiiiIiI11

ngtgtn~1~1tbullubull1rm DH tu~- lt11 rirmU1111 CDIII

~i~i555mi~ ~~ ~m=~==m~g===~~~~ tn1r JtW ~ma- PiOll a CU

~ XNr~t~fDllll1-all~~ m===~~ bullbull~W 111111 ==~~ ampT g~ ru~ =

~lU $Et=ni ~ llll0111ra1Ln~otqC011

H~ g==i =~1 ~

~111111 ~~g~n~a~J))pound11 1=~)6tia

~~ mEfHfH~Si

amp12Ct _ an ~

U N711f21th mM1LU aa o1bull~--117CII in4r ~llllll1Vffl-111Dlr lit~ Hmtlpound1 71 12L I CCIII ---~CUnMIIUOCVf JIHtlnn nl 7r ll4011CIIII

llllDNXCWZflDtlltllCIDCDr

~~=~==~=gnn n1raquoL bullw noanDNt CIJIIi=~ C~middot ~ ~ ~ HnffTI-QIJroQ__111PtlJIIInfflll bullbull1~ aaeIT t-- nrJD nJUntu~CllWI

m ~1 ~ ~~~ ~ ilria~gliiiji~=ir ~lt-OTT gl1raquo ~Iraquou fflllIL nllll 1111111 flC~middotIY_4allCCIIIi l1i5~ ~~11~middot~ ~~ ffll H71W786lll 7P-JOalllllll 2N ~ 1-flllt 7HIJl4- DI ~ ~==~ ~t-tr bullM-

114 Hit71aTra7ririatNOCIIII

llHl1Hf ll~7Dl4fIZIIICIIII 1141ftillf+1DllnTgtlMa~=~bull==~r Lbulll-lllbullbulllJJ

=~~~HR-~a ~ =iEri ~ ~=6

= 1MESE COCIIIOlfAlEi ARC 9~ at AH DISTlfG CONJmOfS AS-alLT FED 5UKiEY Y NORWDal EJICltJIJll(G CD~ IIElMEN ~ 1S 111 DECDaR a 2DII 1)pound OCICIIIDNAlES 5HCflI UIpound IIAID Cit MltSSAOfllffT5 STATE FlJriNII CDCffllNAT smult ~AO leJ (IMIJ 1HE ACQlltACY ltF 1HE COCftDINT[ LDCAnatS Mpound diams- 01 FtU

POINT DESCRIPTION ABBREVIATIONS~-~middotPC Pmlr Of CLIRIJC bullIEllL ClMNpound STilRlS PDC bull PtJtilTIIJOM1poundr ~ [raquo TAHCINiT W(R[ lll[ CURpound uroo Fo F[1NT(1t~tfflvt[ltft1llllIIUlt OMNtilE)PRC ~T oT ~pound ~Vlllrlt

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 2 of 2

I ~ IHAT nfl PlM MS 81D1 PIIDMQl ~WllTM(llUI MOIIEOIAAlPlllR~Df IIUPS C- lttE ~111 Cl__ HftNMIIIZlt

WWWWJU Cii6 liftitit

ACTIVITY ANI) USE LINTATIONS

PLAN OF RES7RIC1EJJ AREAS ANJJ COlER TYPES

8V CKlJ()RN IJNl()N PflllfpoundCpoundS SlllERFIIMJ SITC

50 HJ S(J11( SmEpoundT llAIPOIL JASS

=r-o ~ ll 2021

~ Engmeer1ng

Hltd ~~ middot~~-=~ra (f~AJ lIQ c- f

a llfEET 2 ltF 6324-02

td ~

w ~ m 0 0

Id Q ii w m

co co m 0 co

Bk 39600 Pg437 88608

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY New England Region

Five Post Office Square - Suite 100 Boston Massachusetts 02109-3912

INSTITUTIONAL CONTROL DESIGN STATEMENT FOR THE BLACKBURN AND UNION PRIVILEGES SUPERFUND SITE - EAST OF SOUTH STREET AREA

1 Introduction

Pursuant to the Comprehensive Environmental Response Compensation and Liability Act 42 USC sect 9601 et seq (CERCLA) and the National Contingency Plan 40 CFR Part 300 (the NCP) this document contains a description of the release events and site history that resulted in the contaminated media that require institutional controls in the fom1 of Activity and Use Limitations the basis for land use restrictions and uses that are consistent and inconsistent with the Selected Remedy ( as described below) This Institutional Control (IC) Design Statement pertains to a portion of the Blackburn and Union Privileges Superfund Site located in the Town of Walpole Massachusetts (the Site) which has been listed on EPAs National Priorities List (NPL) which portion is generally referred to as the East of South Street Area (the EOS Area) The EOS Area is located to the east of South Street in Walpole and is shown on Figure 1 attached hereto

A Notice of Activity and Use Limitation (NAUL) is necessary and appropriate for the EOS Area of the Site based on the fact that pursuant to EPAs risk evaluations asbestos arsenic trichloroethene (TCE) and certain polycyclic aromatic hydrocarbon (PAH) contan1inants remain in place in soils at levels higher than those appropriate for unlimited use or unrestricted exposure groundwater underlying the EOS Area contains hazardous substances at levels that present an unacceptable risk of exposure and remedial measures at the Site must be protected and maintained to ensure that the Selected Remedy remains protective

EPAs Record of Decision (ROD) dated September 30 2008 specified the need for institutional controls such as a NAUL to ensure long-tenn perfonnance and protectiveness of the Selected Remedy The institutional controls described herein are necessary and appropriate to ensure that the Selected Remedy for the Site remains protective of human health and the environment The remedy for the Site as described in the ROD is referred to herein and in the NAUL as the Selected Remedy

Page 1 of7

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 14: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

Bk 39600 Pg419 88608

EXHIBIT A

Legal Description of Property The land with the improvements thereon located in Walpole Norfolk County Massachusetts bounded and described as follows

PARCEL I

The land on the Southeasterly side of South Street bounded

NORTHWESTERLY NORTHERLY AND AGAIN NORTHWESTERLY by South Street by seven lines measuring respectively

17027 feet 120 feet 22011 feet 1653 feet 325 89 feet 4515 feet and 1497 feet

NORTHEASTERLY by Gleason Court 2627 feet

SOUTHEASTERLY AGAIN NORTHEASTERLY AND AGAIN SOUTHEASTERLY by land now or fom1erly of Santomarco by five lines

measuring respectively 6750 feet 2050 feet 1190 feet 2952 feet and 2001 feet

NORTHEASTERLY AGAIN by said land of Santomarco and land now or formerly of Cashorali 10056 feet

NORTHWESTERLY AGAIN by said land of Cashorali 2845 feet

NORTHEASTERLY by land now or formerly of Muighitti 9007 feet

SOUTHEASTERLY by the location of Old Colony Railroad by three lines measuring respectively 6809 feet 32808 feet and 38250 feet

and

SOUTHWESTERLY by land now or formerly of Meyer by three lines AND SOUTHERLY measuring respectively 9143 feet 1998 feet and

15202 feet

Parcel I is described in the deed recorded with the Norfolk County Registry of Deeds in Book 4459 Page 287

A portion of said premises is shown on plan entitled Plan of Land in Walpole Mass Belonging to General Fibre Co Inc by Edward C Peterson CE dated January 16 1960 filed with the Norfolk Registry of Deeds as Plan No 849 of 1967 in Plan Book 223 and the remainder is shown on plan entitled Plan of Land in Walpole Massdeg by E Worthington Engineer dated February 6 193 7 recorded with said Deeds Book D2135 Page 8 I

FHBOSTON52454092

Bk 39600 Pg420 88608

PARCEL II Property known as Parcel 33-120 of the Town of Walpole Tax Assessors Map which is

part of the property situate in the Town of Walpole County ofNorfolk and Commonwealth of Massachusetts and being all of the right title and interest of The Penn Central Corporation in and to all those certain pieces or parcels of land and premises easements rights of way and any other rights of any kind whatsoever appurtenant thereto or used in conjunction therewith on and along a portion of Branch of Railroad known as the Wrentham Branch said portion of railroad being described as follows

Beginning at a line extended across the right of way of said Branch of rai road said line being the Northerly line of South Street and extending thence in a Northeasterly direction the distance of 2852 feet more or less along said Branch of rai Iroad to a line which is parallel with the Southwesterly line of Common Street said parallel line extending across said right of way through a point in the centerline thereof at railroad valuation survey station 733 + 67 more or less and being the place of ending

Parcel II is described in the deed recorded with the Norfolk Registry of Deeds in Book 7986 Page 372 and is a portion of the land shown on the plan recorded with said Deeds as Plan No 52 of 1983

FHBOSTON52454092

Bk 39600 Pg421 88608

Exhibit B Legal Description of the Restricted Area and Coordinates of Cover Types

Le2al Description for Restricted Area The area shown on the plan entitled Activity and Use Limitations Plan of Land Blackburn amp Union Privileges Superfund Site 50 amp 60 South Street Walpole Mass Scale l = 30 dated April 6 2021 by Norwood Engineering Company Inc recorded with the Norfolk Registry of Deeds in Plan Book 704 Page 41 being bounded and described as follows

Beginning at a point on the easterly sideline of South Street at the southerly point of curvature of Gleason Court on said plan thence

Northeasterly and curving to the right along an arc of a curve having a radius of twentyshyfive and 00100 (2500) feet a length of forty-five and 15100 (4515) feet thence

S 48deg1352 E a distance of twenty-two and 24100 (2224) feet the previous course by the southerly sideline of Gleason Court thence

s 32deg0208 w a distance of fifty-four and 78100 (54 78) feet thence

S 59deg27 32 E a distance of twenty and 50100 (2050) feet thence

S 47deg5252 E a distance of eleven and 90100 (1190) feet thence

S 49deg01 10 E a distance of twenty-nine and 58100 (2958) feet thence

s 38deg3108 w a distance oftwenty and 01100 (2001) feet thence

S 49deg00 57 E a distance of one hundred and 56100 (10056) feet thence

N 39deg5348 E a distance of twenty-eight and 45100 (2845) feet the previous seven (7) courses by land ofNF Thelma A Casborali thence

S 49deg0808 E a distance of ninety and 29100 (9029) feet the previous course by land ofNF Ming L Yau thence

s 25deg2312 w a distance of siliy-eight and 22100 (6822) feet to a point on the westerly sideline of a fonner railroad right of way the previous course by land of the Town of Walpole assessor parcel 33-121 thence

S 55deg2937 E a distance of ninety-nine and 78 100 (99 78) feet to a point of tangency on the easterly sideline of a forn1er railroad right of way thence

Page 1 of 13

Bk 39600 Pg422 88608

s 30deg11 32 w

S 23deg49 I6 W

N 66deg1044 W

N 23deg4908 E

N l 6deg00 52 E

S 37deg0240 E

N 10deg1437 W

N 34deg093 I W

N 11 deg5558E

Northeasterly

N 27deg41 48 E

a distance of three hundred and three and 74100 (30374) feet the previous course by land ofNF Nicholas H Dowd and NF Emilio P Baldassari thence

a distance of four hundred ninety and 86100 (49086) feet to a SBdh the previous two (2) courses by the easterly sideline of a former railroad right of way thence

a distance of eighty-two and 76100 (8276) feet to an Iron Pipe on the westerly sideline of the former railroad right of way thence

a distance of twelve and 09100 (1209) feet to a SBdh thence

a distance of ninety-six and 50100 (9650) feet to a S Bdh thence

a distance of fifteen and 00100 (1500) feet the previous three (3) courses by the westerly sideline of the former railroad right ofway and land of NF Joseph R Carpentieri and NF Joseph R and Faith N Carpentiero thence

a distance of ninety-two and 82100 (9282) feet the previous course by land ofNF Richard A and Josette M Burke thence

a distance of tvvo hundred thirty-seven and 86100 (23786) feet to a point on the easterly sideline of South Street thence

a distance of one hundred twenty and 00100 (12000) feet along the easterly sideline of South Street to a point of curvature of the easterly sideline of South Street thence

and curving to the right along an arc of a curve having a radius of eight hundred and 00100 (80000) feet a length of two hundred hventy and 11100 (22011) feet along the easterly sideline of South Street thence

a distance of three hundred forty-hvo and 42100 (34242) feet to the point of beginning

Containing 621 Acres of land more or less

Page 2 of 13

3000

3005

3010

3015

3020

3025

3030

Bk 39600 Pg423 88608

EXHIBIT B (cont)

Points and Coordinates associated with Restriction Areas and Cover Types for the Activity and Use Limitations (AUL) at 50 amp 60 South Street Walpole Mass

Point Northing Easting Type

Curve Curve Number Len2th Radius

28754430528 7236432250 COR

3001 28755604597 7236680368 PC L=7535 R=80000

3002 2875597 1222 7236766913 POC

3003 28756333366 7236870620 PT

3004 28756280754 723697 3031 COR

28756025570 7237001250 COR

3006 28755918670 7237001140 COR

3007 28755864440 7237 I 05890 COR

3008 28755903200 72371963 IO COR

3009 28756030893 7237217396 COR

28756042534 7237250325 COR

3011 28756021733 7237317808 COR

3012 28755800732 7237640949 COR

3013 2875552 1424 7237667395 COR

3014 28755321388 7237708416 COR

28755197081 7237834881 COR

3016 28755102230 7238045173 COR

3017 28754941531 7238291869 COR

3018 28754851375 7238512944 COR

3019 28754753441 7238824 760 COR

28754681541 723916 1881 COR

3021 28754608227 7239406506 COR

3022 28754515846 7239459928 COR

3023 2875426 7589 723943 8163 COR

3024 28754198016 7239590840 COR

28753886764 7239449006 COR

3026 2875329 7944 7239187206 COR

3027 28752506745 7238837890 COR

3028 28751859560 7238552142 COR

3029 28751221833 723827342 l COR

28750848788 7238107869 COR

3031 2875045 3654 7237927814 COR

3032 28750630420 7237527432 COR

3033 28750741023 723757 6257 COR

3034 28751668594 7237842488 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 3 of 13 April 14 2021

3035

3040

3045

3050

3055

3060

3065

3070

Bk 39600 Pg424 88608

Point Number

Northing Easting Type Curve Leneth

Curve Radius

28751548848 7237932869 COR

3036 28752462269 7237767802 COR

3037 28756438461 7236904209 POC L=2207 R=80000

3038 28756543084 7236939245 PT

3039 2875653 7987 7236954123 PC

28756597578 7237007344 POC L=1651 R=937

3041 28756594465 7237087181 PT

3042 28756459044 7237347021 PC L=347 R=220

3043 28756432531 7237363546 PT

3044 28756280644 7237286201 COR

28755924210 7237966952 COR

3046 28756081959 7238048554 PC L=472 R=236

3047 28756064922 7238084404 PT

3048 28755523491 7237845047 COR

3049 28755419845 7238081981 COR

28755460757 7238099621 PC L=240 R=l57

3051 28755467701 7238120241 PT 3052 28755398690 7238275280 COR

3053 28755365410 7238264910 COR

3054 28755087149 7238900449 COR

28755158001 7238931521 COR

3056 28755040360 7239199770 COR

3057 28755311720 7239318930 COR

3058 28755263010 7239429300 COR

3059 28755388260 7239484290 COR

28755348660 7239576000 COR

3061 28755625470 7239696500 COR

3062 28755664605 7239606601 COR

3063 28755736202 7239637768 COR

3064 28755621870 7239897370 COR

287 5567 6160 7239920410 COR

3066 28755718270 7239830260 COR

3067 2875587 9750 7239900310 COR

3068 28755718790 724026 7600 COR

3069 28755763390 7240285350 COR

28756035900 7239926600 COR

3071 28756086280 7239812770 COR

3072 28756089984 7239813649 COR

3073 28756229128 7239501910 PC L=482 R=l54

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 4 of 13 Apnl 14 2021

3075

3080

3085

3090

3095

3100

3105

3110

Bk 39600 Pg425 88608

Point Number

Northing Easting Type Curve Length

Curve Radius

3074 28756257366 7239513984 PT

28756185799 7239674928 COR

3076 28756739833 7239921136 COR

3077 28756876060 7239682275 COR

3078 28756948336 7239735898 PC L=335 R=298

3079 28756958235 7239766064 PT

28756866081 7239978133 COR

3081 28757166275 7240127374 COR

3082 28757068320 7240314640 COR

3083 28757602980 7240594310 COR

3084 28757700050 7240408736 COR

28758247941 7240688376 COR

3086 28758250190 7240683910 COR

3087 28758344979 7240738168 COR

3088 2875843 6103 7240581527 COR

3089 28758602943 7240664224 COR

28758740024 7240397393 COR

3091 28758605706 724032 7776 PC L=477 R=309

3092 28758594882 7240286013 PT

3093 28758666635 7240197585 PC L=2573 R=3127

3094 28758767113 7240118710 POC

28758890752 7240086604 PRC L=I653 R=3993

3096 28758972305 7240074125 POC

3097 28759049552 7240045 I 52 PT

3098 28759330312 7239734408 COR

3099 28759459414 7239588584 PC L=2269 R=5217

28759524821 7239496174 POC

3101 28759568752 7239391829 PRC L=1814 R=486

3102 28759603259 7239308095 POC

3103 28759653883 7239232999 PCC L=l31 R=088

3104 28759665694 7239231411 PT

28759800587 7239299586 COR

3106 28759986288 7238981214 COR

3107 2875983 5797 7238891829 COR

3108 28759879750 7238798689 COR

3109 28759905380 7238754769 PC L=1600 R=2552

28759963590 7238700398 POC

3111 28760035727 7238666620 PT

3112 28760700665 723901 5672 PC L=4515 R=2500

3113 28760830230 7239191198 POC

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 5 of 13 April 14 2021

3115

3120

3125

3130

3135

3140

3145

3150

Bk 39600 Pg426 88608

Point Number

Northing Easting Type Curve Len2th

Curve Radius

3114 2876077 263 6 723 940 1624 PT 28760624518 7239567466 COR

3116 28760160100 7239276864 COR

3117 28760055928 7239453423 COR

3137 28759976118 7239541692 COR

3118 28759782139 7239764992 COR

3119 28759625581 7239640375 COR

28758966057 7240399493 COR

3121 28759184326 7240581973 COR

3122 28758593598 724126478] COR

3123 28757977293 724097 2314 COR

3124 28757716516 7241351659 COR

28757288251 7241140719 COR

3126 28756725827 7240851862 COR

3127 28756162468 7240586126 COR

3128 28755614498 7240338506 COR

3129 28754346745 7239768507 COR

28753845716 7239540194 COR

3131 28753257436 723927 8634 COR

3132 28752466355 7238929370 COR

3133 28751819340 7238643698 COR

3134 28751181527 7238364939 COR

28750807772 7238199071 COR

3136 28750413263 7238019301 COR

3138 28756920317 7237298739 PC L=l941 R=2104

3139 28756827128 7237274848 POC

28756733047 7237294944 PRC L=401 R=l66

3141 2875671 1336 723 727 2844 PCC L=1492 R=13345

3142 28756744594 7237206091 POC

3143 28756781529 7237141301 PCC L=1419 R=l018

3144 28756833084 7237094642 POC

28756902566 7237091952 PCC L=2413 R=157959

3146 28757017337 7237129167 POC

3147 28757131820 7237167258 PCC L=330I R=S0000

3148 28757282552 7237234442 POC

3149 28757431866 7237304721 PT 28757338390 7237495930 COR

3151 28757541620 7237605380 COR

3152 28756897590 723883 4280 COR

Exhibit B to NA UL-Part 11-EOS Coordinate Tables Page 6 of 3 April 14 202

3155

3160

3165

3170

3175

3180

3185

Bk 39600 Pg427 88608

Point Northing Easting Type Curve Cunbulle

Number Lenszth Radius 3153 28756870623 7238820218 COR

3154 28756838273 7238882258 COR

28756865240 7238896320 COR

3156 28756777004 7239062996 COR

3157 28756770439 7239063663 PC L=l 146 R=2269

3158 2875665836 I 7239046180 PCC L=l423 R=957

3159 2875661 7520 7238989913 POC

28756625544 7238920850 PT

3161 28756728525 7238726583 PC L=232 R=l58

3162 28756748720 7238720236 PT

3163 28756899634 7238797341 COR

3164 28757254653 7238121363 COR

28757520153 723761266 7 COR

3166 28757306899 723 750 IO 10 COR

3167 28756690336 7237500169 PC L=243 R=I68

3168 28756682599 7237479273 PT

3169 28756686990 7237469583 PC L=0250 R=l68

28756708806 7237463018 PT 3171 28757000109 7237616354 PC L=233 R=l73

3172 28757005368 7237637270 PT

3173 28757000998 7237645513 PC L=233 R=l69

3174 28756980219 7237651023 PT

28756429209 7238339422 COR

3176 28756342982 7238506849 COR

3177 28756500076 7238596485 PC L=l19 R=l48

3178 28756499701 7238608072 PT 3179 2875644 7813 7238705611 PC L=l 182 R=483

28756358177 723 869 0707 PT

3181 2875623 6099 7238376388 PC L=443 R=467

3182 28756235611 7238333779 PCC L=343 R=9IO

3183 28756249049 7238302418 PCC L=412 R=9IO

3184 28756278952 7238274519 PCC L=368 R=300

28756313362 7238277619 PT

3186 28756282498 7238911796 PC L748 R=216

3187 28756240650 7238919721 PT

3188 28756126081 7238620406 PC L=323 R162

3189 28756138645 7238591575 PCC L=333 R=283

Exhibit B to NAUL-Part II-EOS Coordmate Tables Page 7 of 13 April 14 2021

3190

3195

3200

3205

3210

3215

3220

Bk 39600 Pg428 88608

Point Number Northing Easting Type Curve

Leneth Curve Radius

28756163375 7238602867 PT

3191 2875523 0908 7238765275 COR

3192 28755205040 7238752740 COR

3193 28755391740 7238328470 COR

3194 28755466840 7238361040 COR

28755452760 7238392590 COR

3196 28755516920 7238421040 COR

3197 28755530690 7238388730 COR

3198 28755603230 7238421460 COR

3199 2875555 7568 723852 7053 COR

28755371220 7238445330 COR

3201 28755629198 7238558466 COR

3202 28755676040 7238453290 COR

3203 28755925410 7238563840 PC L=1902 R=3548

3204 28755927383 7238658634 POC

28755954390 7238749520 PT 3206 28755974770 7238807230 COR

3207 28755779200 7238881701 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

28755746700 7238609997 COR

3211 2875593774 7239036608 COR

3212 28756048460 7238996850 PC l=1445 R=2903

3213 28756070631 7239065422 POC

3214 28756109010 7239126420 PT

28756153820 7239182190 PC L=S98 R=848

3216 28756171980 723923 7880 PT

3217 287S6026148 7239566166 COR

3218 28756003865 7239556465 COR

3219 287S6134380 7239256650 COR

28755998460 7239195370 COR

3221 2875600 71S0 7239174530 COR

3222 28756001791 7239172152 COR

3223 28756040451 7239079437 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 8 of 13 April 14 2021

Bk 39600 Pg429 88608

Point Number

3210

3200

3056

3057

3058

3059

3060

3061

3062

3218

3219

3220

3221

3224

3225

3226

3227

3228

3070

3071

3234

3233

3235

3236

3237

3238

3239

3240

3241

3242

3243

3244

3245

3246

3247

3248

Northing

28755746700

28755371220

28755040360

28755311720

28755263010

28755388260

28755348660

2875562 54 70

28755664605

28756003865

28756134380

28755998460

28756007150

28755941340

28755962080

28755867937

28755819702

28755766128

28756035900

28756086280

28755991990

28755942100

28756477248

28756677238

28756650130

28756473307

28756480112

28756675030

28756724454

28756742099

28756742133

28756703924

28756640759

28757607280

28757401530

28757467350

Easting

7238609997

7238445330

7239199770

7239318930

7239429300

7239484290

7239576000

7239696500

7239606601

7239556465

7239256650

7239195370

7239174530

7239145324

7239100930

7239061674

7238935003

7238911508

7239926600

7239812770

7239769910

7239884050

7239261913

7239253008

7239321810

7239319038

7239298824

7239364440

7239271845

7239292625

723935 0187

7239393239

7239393096

7237584960

7237475300

7237345620

Type

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

PC PCC

POC

PCC

PT

COR

COR

COR

Curve Len2th

L=273

L=ll77

L=657

Cunmiddote Radius

R=1421

R=810

R=679

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 9 of 13 April 14 2021

Bk 39600 Pg430 88608

Point Number Northing Easting Type Curve

Len2th Curve Radius

3249 287 57514570 7237372360 PC l=ll05 R=1993

3250 287 57 588060 7237452980 PT

3251 28757631382 7237429676 PC L=2244 R=2352

3252 287 5765 6810 7237537876 POC

3253 2875 762 9720 7237645671 PT

3254 28756940655 7238952710 PC l=1493 R=1509

3255 28756901845 7239015577 POC

3256 2875683 7836 7239052474 PT

3257 28758104824 7237653014 COR

3258 28758028960 7237800160 COR

3259 28757949530 7237760790 COR

3260 28757901005 7237855021 COR

3261 28757839230 7237820908 PC L=273 R=l33

3262 28757830688 7237799810 PCC L=539 R=2144

3263 28757852974 7237750897 PT

3264 28757891705 7237688178 PC L=lS26 R=2432

3265 28757948636 7237637880 POC

3266 287 58018307 7237607597 PT

3248 28757467350 7237345620 COR

3267 28757550832 7237363444 POC L=2653 R=80000

3268 28757668809 7237424132 PT

3269 28757504 719 7238817989 COR

3270 28757493010 7238842230 COR

3271 28757561074 7238880970 COR

3272 28757483953 7239024127 PC L=323 R=l70

3273 28757459939 7239037846 PT

3274 28757311605 7238957122 PC L=1388 R=906

3275 2875727 2732 7238901647 POC

3276 28757283181 7238834718 PT

3277 287 5733 4061 7238752337 PC L=255 R=l60

3278 287 5735 5527 7238744411 PT

3279 2875 7102815 7239517199 PC l=261 R=l70

3280 28757080654 7239525307 PCC l=909 R=1275

3281 2875 700 5390 7239477911 PCC L=l007 R=990

3282 28756999624 7239381704 PT

3283 2875707 7705 7239230604 PC L=ll14 R=907

Exhibit B lo NAUL-Part IlbullEOS Coordinate Tables Page 10 of13 April 14 2021

3285

3290

3295

3300

3305

3310

3315

Bk 39600 Pg431 88608

Point Number Northing Easting Type

Curve Leneth

Curve Radius

3284 28757168066 7239178102 PT

28757205717 7239186398 PC L=518 R=930

3286 28757249003 7239213534 PCC L=l41 R=086

3287 2875724 7909 7239226048 PT

3288 28758415755 7239842757 PC L=251 R=l59

3289 28758437695 7239837379 PT

28758456377 7239846949 PC L=812 R=876

3291 28758494897 7239915165 PCC L=456 R=757

3292 28758483790 7239958646 PT

3293 28758405147 7240111348 PC L=l057 R=955

3294 28758318136 7240161452 PCC L=477 R=l063

28758272407 7240149529 PCC L=250 R=l60

3296 28758265647 7240128003 PT

3297 28758157937 7237680895 COR

3298 28758902927 723807 1969 COR

3299 28758852531 7238168280 COR

28758779660 7238129750 COR

3301 28758746973 7238192072 COR

3302 2875807 6630 7237840490 COR

3303 28758049940 7237894220 COR

3304 2875871 7997 7238243620 COR

28758680103 7238315946 COR

3306 28758533699 7238239240 COR

3307 2875852 6899 7238252220 COR

3308 28758098180 7238027600 COR

3309 28757974484 7238264223 COR

28757957598 7238255513 COR

3311 28757757732 7238637845 COR

3312 28757774584 7238646620 COR

3313 28757653710 723887 7846 COR

3314 28757560920 7238829340 COR

28759004930 7238125514 COR

3316 28759689797 7238485028 PC L=1992 R=2609

3317 28759697204 7238583760 POC

3318 28759667288 723867 8142 PT

3319 28758996126 7238323718 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 11 of 13 April 14202 I

Bk 39600 Pg432 88608

Point Number

Northing Easting Type Curve Lenfth

Curve Radius

3320 28759028950 7238261560 COR 3321 28758954486 7238222188 COR

3322 28758972523 7238378387 COR 3323 28759421550 7238613630 COR 3324 28759377933 7238698105 COR 3325 2875907 4811 7238539289 COR 3326 28759081611 7238526309 COR 3327 28758935210 7238449604 COR

3328 28759464470 7238637330 COR 3329 28759632674 7238722481 PC L=ll83 R=l578

3330 28759583973 7238755474 POC 3331 28759526573 7238768343 PRC L=2163 R=2455

3332 28759422964 7238796123 POC 3333 28759341091 7238865430 PT

3334 28759193370 7239050710 COR 3335 28759416340 7239163940 COR 3336 28759263600 7239455620 COR 3337 28759043690 7239336510 COR 3338 28758935490 7239552130 COR 3339 28757650890 7238883240 COR 3312 28757774584 7238646620 COR 3311 28757757732 7238637845 COR 3310 28757957598 7238255513 COR 3309 28757974484 7238264223 COR 3308 28758098180 723802 7600 COR 3307 28758526899 7238252220 COR 3306 28758533699 7238239240 COR 3340 28758700033 7238326388 COR 3341 28758675436 7238373334 COR 3342 28758733013 7238403500 COR 3343 28758760858 7238350353 COR 3344 28758860952 7238402796 COR 3345 28758833106 7238455943 COR 3346 28758890683 7238486109 COR 3347 28758915280 7238439162 COR 3326 28759081611 7238526309 COR 3325 28759074811 7238539289 COR

Exhibit B to NAUL-Part H-EOS Coordinate Tables Page 12 of l3 April 14 2021

Bk 39600 Pg433 88608

Point Number

Northing Easting Type Curve Len2th

Cunbulle Radius

3324 2875937 7933 7238698105 COR

3082 28757068320 7240314640 COR 3083 28757602980 7240594310 COR 3349 28757790234 7240236327 COR

3348 28757255574 7239956657 COR

3124 28757716516 7241351659 COR 3125 28757288251 7241140719 COR 3126 28756725827 7240851862 COR 3127 28756162468 7240586126 COR 3128 287 55614498 7240338506 COR 3129 28754346745 7239768507 COR 3130 28753845716 7239540194 COR 3131 28753257436 723927 8634 COR 3132 28752466355 7238929370 COR 3133 28751819340 7238643698 COR 3134 2875118152 7 7238364939 COR 3135 2875080 7772 7238199071 COR 3136 28750413263 7238019301 COR 3350 28750296168 7238284525 COR 3351 28754 78 6636 7240267040 COR 3352 28757412029 7241794586 COR

POINT DESCRIPTION ABBREVIATIONS

COR=CORNER PC= POINT OF CURVE WHERE CURVE STARTS POC -= POINT ON CUR VE PT=POINT OF TANGENCY WHERE THE CURVE ENDS PCC = POINT OF COMPOUND CURVE (WHERE RADIUS CHANGES) PRC = POINT OF REVERSE CURVE

NOTES

THE COORDINATES ARE BASED ON AN EXISTING CONDITIONS AS-BUILT FIELD SURVEY BY NORWOOD ENGINEERING CO INC BETWEEN NOVEMBER 15 TO DECEMBER 18 2019 TI-IE COORDINATES ARE BASED ON l1ASSACHUSETIS ST A TE PLANE COORDINATE SYSTEM NAD 1983 (FEET) THE ACCURACY OF THE COORDINATE LOCATIONS ARE +-0J FEET

Exhibit B to N1UL-Part II-EOS Coordmate Tables Page 13 ofl3 April 14 2021

---

1f~ flJr ~i

f ~~ J~i](M~I ~ 1 jf~ ~~f W-- )e 1

It lj fY pl ~-~j

I --- ~ ~

1 (J-c~ er ~

C JI fl JYf

1 ~ ~Yu-~ 1i

~r

( LOClJS P

SCAUllbulliQO

I ar lMIT flG PINI tMS _ lIIPMIDMICXNllRlnT~tlCfllUS 1111D cmuftraquodl s - NIKl1III tfIJIIIIIOfM~1HCll allE1

DAre Jllrl

NUKIJU LU6 DMitM

mmtG6DKbdlt

~4~-middot

~~I

-- ampnbullllf~ ~ fa

LEGEND 0

-i~wr0o-m lICUUoaampbullco--11111 _ _l_J

0

bull ~-ail_I

~-

mo(I ---fwj

amp~~~~ ~ ~~ltgtmiddot ~A~

~6

_L-r

bull -~ IBP__l-11Uil n-rlfl-lffll rMCllI 1a 1rr ai

-~ lll-lliI u-W--11a 1 Ml[ 411 amt l0IIC 3JICJ7 ~ 33-1--I- DIID llXII D111 JlMZ 411 lraquo- ~lUN~t --- - etMpound 11JII

~ MffD mmaat ZL I01t 111

1Jlll~-IICfIQfJICIISJ DfEI IC71- I~ 1~ 9 Cl 1VY IICIIWCLl~fCSC~lNCl

~11HltOXW1A~JtCI~llfB MXIC 1HI lME INCi 111M bull11 (S 1f41~middot~-~-)

~ io

0 0 0 0 -0 0 0 D O 1 middot tbull O

_- _pound ~ - Tf middot- ---r ~~ ~~- ~=middoti

r jil7bull --------4~-middot~

(

SCAtpound 1bull bull YI

I ~ tfAIE lIMa toafllltl1E ~NAD1w1(rJ

1 ~ PlIla II MMt QI 11D TD D111oPl

~c1MlntID9~~-l 1NIIJIIKlNI LnlJTU ~ deg qllAJSTE uM011111 iu1II 1111ZT IIIILJaZ

Exhibit C - Photo-Reduced Copy of Activity and Use Limitations Plan of Land

--~middot---

I ~111-11111

iiiii

-ill111liilt

ACJIYIJY ANJ) lJSE lJJll7ATJONS PLAN OF LANI)

81ACJ(81R1 I IINION Flr11lfES SllffllF7AVO SIle

o tfO SOIJIH s1ar HlltlPOtL IIAS

SCAlElrJAt IPfffl152021

1IJrwod Eng1neerlng

- EnQlbullHrlflg Compaffy middot~~=~ m Cm1JQ u fnfJa-eal

~ -

-~

9l1EET 1 OF I 8324-02

td ~

w ~ m 0 0

Id Q ii w ii

co co m

co 0

-l

~-77--raquo- -~I~ )middot~ ~ bull _I lT ~ v~

AI ~ If ~)middot~ 7- ~1 c t11 yil ~ ~ ~middot~41 bull1 l ~~l(i~r~1 f7 )ll y-

~~ f -~ -v fgtV ~ ~ ~ l er-- u -

tl x-P~C ()

JP yen f(( 11 1degpoundS -~ (

ftunrTfflllllTnallJrNNQWDf ~ ti IZNtRlTT lnH M IULS IIJIUIUlA-DlltlllllDlJlllIICIF tJbllt~llC~lJNp

DTl NlllltaJatl-Witiill (raquo11 iiiK(+til

I aJnlTlKATJlfl PlAH~ THE PUIIJll1T UC TIUlf Mlaquo THE l5 11 oawG ~ NII 1Hpound1as Of1111E111 AMllfrlTll9laquolllt Mpound ntem OPlaJ CJ1 IWM1pound BREn 011 bulln

~ ~illi~fli~ _lt ---c~-Clmiddot~~c0-nmiddotmiddot~bullJmiddot04~- ~--~--yen~~bull - L -bull -n ~ -r - ~ -

it

~ fr ~ ~- -~bull~bullv OG- ~n0

bull--ltmiddot middot~ -~- ~~-=~7~st~-~~~~i~~Hil~-) 2~C 0 ~~~~~ --------Y-Tgt-bullbullmiddot-

U-IU ~middotshy =i==-

bullbull bull _ -middot-

~----- ( ~11middot

__IC1ZMJ - bull IOC)0l lftEf ___ i gt mEKJllJfNG rotJ1FRIIIT AIIEAS B~ p~ AIIEAS ~ea-vmiddot LIUIID

~ e--- -+ ~ rzprz1za 1 ~ IJTATC PRC ~TC

nJml lltPtasCltJ

DUD BCD lJlll7 PMC 4H 1 1 YERT1CAL M1llI II NCCI ~ _ ro conurr DOD 80CIC 3JII07 llME 4H I ntaM NUIU 1121 IJ4TAI m IMlC 111111 nATIIW ~fsi

tJMAlfflOlI) AIIEAS1 bull 11AMJSCAlfl) AlpoundAS Lill] 1Dll IOlII POT PlCit 6115 J)-t20 ~atfnujK~tlLWlQI

~PUNMl-17 POflTIVNf1Ell llaD BaalC Tl_ Paa bullbull - 99 a 11

_-ijf1iltDP~IZ~ 5CME - JOSUva1fTLJ ~ ~-rr 111 C tMI=

bull111 I~

i=iiii7

~ e---

t c z rl

L-n11 ~

ACJIVJTY AND USE LIAlffAJIONS

PIAN OF RESTRIC1EJJ AREAS ANJJ COVER TYPES

fltACK1(fN _ llNlltgtI PfMIECCS SllPVFVNlJ51Tlt

JO _ lxJ srJllH STREET IIALPrJU JASS

SCAU I - 30 APRIL 2021

lcnwod Engineering

llarwood Cngnrilgtf cpmy -t~~~~

fIL Pllpa-ru - (1u]1a-lftll

~L=wl f 01~JII IO_

a SIEET I (F 2 B324-02

bj ~

w 0

0 0 deg It

iQ ~ w l11

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 1 of 2

CX) CX)

deg CX) 0

ntllT -1~1~ rurnlaquo1 r1n l1XTM 11Nf -r~ lie UUffCI 11Pt lDll1Hf iniin --IC unr1G Tlr 1n1rn Iota allll Ito tyen1tlll ~~11CRnrzJ11-11--~ci-- n31 nr111w11J1t ~bull c ~- diams JDrnn llloffl rcnlml IDII

-~ ]al rll _ _ PnlM-1-PI lbull-- ll7HrirrIPlllD1lf~-a bullbullll 111bull IClln9XnolDlllIIIIIIOm

214 ff7371JOOT ~bull JllC Ibullbull 171 JICllEY)l)vlUTlo~lUl~ ~li_~ -~~ MDlol ll4L~TllJraquofllllf190abullbullt ~~nQuu~~1aJI _~~OtottWU~1t11txm~arcPbrmllmCDt ~~ ~~ ~ =~ gj ~l11~ llltlM Mrattllll TDPmllIDCDI JJ4bull e~ _ ~ e PClC lbullI- 1- ~1sect~ ~ ~ ~ ~ ~~~-nr~44bull~mn11-a11 ~~ =mt =m~ ~ ~~ ~ =~~-~~ =~~rt~l~llibullltbull=

~~~~~~~~r-~r-~~sectsect55~55 ~~ ~=g~~ mi --1~ ~-==~~m~ L-~r UVPllrlllUillDITDr4L 1JI lbullKlllll~==~~~=~

~~~~~~~~ raquoff-llll 111rritl_aianbull ~11lCla rr- n ttll XDP11r1r 11111c-1C111~ RTl~rJlllllbullbull~llllJlllipo~~=r~tm=~~

~=~3r~t==~ ~=~i==~~ llt1ttl70 m~~n~ =n~ L diams 11- bull - iaEi~mi 1lE~HHffi ~1-~ E LbulllT bullU-7YA 8911U TMn4 OJII C- lllkHrnl1nlntll11106~

MJ9~gt111ftlrfffll11 ~ SbullC61hLJT raquoWl lll~IJlll11amp1 utVllllt a lbulllfGl bulllC lT

lliilH~1 ~~rm-=rn~ lbullIIIICU-1bull0

itt ishwI JUo ma m1 bull 1-c iiliii ~==~m~=~ Ullln U7IIY M1NLl411 fflf f-~ llr IL ~ lbullt Ill uaP11rllDn1rin1bull139nf- na_ 1111lnl ___ lWTDf-ID 111Jbullnllr-cishy

J1JT1 lflTI-noLbull COi lJ1 tsr18GOTDrl1~ 1--Cn ~~~==-=~ LbullS1rbull-p

LbulllI ~middot x1 fl11bull diams an l~J P-~ WI 1~1Slrmsraquo11nirorn 11bull1n-

llrgt 58 - TDrl ZJlJ l~ Zl llf4 Pll1raquo91I lnP~IIEI 11 ==~=-~~ lbullt-11bullh1~

nun_-~bullfllrlll_ lbulll-lrbull N- - nr6-11MII rinaus a 1bull1E-t1 im1 nrxi mr~ 7nn1 4i i 1c m llrS~iJ-ltJlillII Tt-Ul ris ~=~~middotiill~~ tf llDln~n1rJrgt11nbull1ric ~IPgt9nq~ It-MU rbull RflrrlllVllbulltPllbullOIIUAfC lbullnJtrNbull_~lD+4ftJSHJ7711JrllIIIIT144lDI lbulll ~I llfs-mllThn~-f 1bull11

1a5blH=i5gS El~ iE =iilli ~ID aH~~ ~~ leJINNllllfflnlt10ff1nll~1g=TI==~- lbullN~Jmiddot pw nrwuhtl tba11 l- lllllsectimiii~ ~ lllaquot ll116UW41 llllII NII Cl Ld bullt ll 11r 111~-~lHtl-IINOClll 1Dgtn~rMOtnllfbull3all)Mnr~bullwrmm11uoo~ ~r~ m~ = ~~ t~-i m NNtotl n11nn cm

~~~~~Ttr~ in Httl01llxl nlfM114ta cm

JJN n=-PIW - I- C lbullT rnr nnubullNoXI ffllPI n1 11-amp 11middot 77)111fflffPl~JlaUII

i1JJ n91lbull ti Jnlftbulllll QII

~g=~~~~ir~f~5 =i~=~~ ~=~ ~ ~j====goi H1111t-llll ffo~ ~rn tm111 ta1Vl~ tnar- IVI rm u1i ~ nw ~illl cm 1111 Hltt1H T7U 72w111ll tm UI ftffiH~bull1 naMUlI nlll

lltfll~IOUl rnes~ttlClll

~I~~=~=~~= l3111ratlQOJ121lllll CS u1n-n-a mn-c~11111llllilr ~====m~~ lbulllllr~~Oll~r1111-t~rtRiHa)toI

-~rt~_Utr111tt~USI ~m~i==r~~llfflpound1gtgtMllkllit1U10C011 annrxnbull-TCRL11ai~=~=~g)llllll~--rWltMJtt-8 DR Pl rraquof ntl rim Gllf CCI~~1r~~ liiilllii u- ntlt bull llJ~naJCDI

raquo11NMl10~Ullllcm ntrlnK)fL~nlln-1c lllf ~--TlJaft_Lmc i lbull1 bull l3il0 Nl-197) Ttlll1344 a LbullI 3 l diams 1-111 lflS 1111lOllt ffl- MP PII bullHI lgtl llJI l97Mlt Ian -ti DG llC

111111===-~~~=mg ====~~ tD rlrffllZllIITO-lfllCIIII=~tr~L~~~= - Pl~I llII TD_ ff~ tDII31119NIJMlDffU~~ H CZIII liii~mlt~ D1111nrn11GQ~-CaKftQNJWNczr41140ffnQCUII Jnffnt1JIIIIJunbull~1Qc20lll ~Pllli ll mrnnn lbulltlP 17Jrffdeg-degluoElJIIIQII

~-I-ti _nrna~rlll

a n- 4411 llbullQI 1=40 rt La n- lllf ffrgtn _Jr_~ Ullk ---rr~~ ~=~=tl~~ =1 nttltt nraquo 1nlU as

=-mn--~111DJIDII Ullgt~fflflnanaaJIIJalt55~~EIS~=~~ ~~)1 -11CIJII nn~bullbullbullnaKatt1ta1

JOIT ru~- rf- deg hJIIII r- 111111 ~1111) -1 aJ1 ld t11D1etlll_TalCIS -~-UCV~bullraquootur=~=~I~~=~--~ ~rsrgo_mlaquoshym rs~11flI ~- rnilr==~=~~ ~~r _ ~ atfl ~ rtw Dgtlnn-f-lEllln17n-UIIP

D11 fflXTJ111111 I~~ ar D1Jn4 ~leJJS-OnC111

=====5 middoti SHU=~ 5 ampn iliiiiiIiI11

ngtgtn~1~1tbullubull1rm DH tu~- lt11 rirmU1111 CDIII

~i~i555mi~ ~~ ~m=~==m~g===~~~~ tn1r JtW ~ma- PiOll a CU

~ XNr~t~fDllll1-all~~ m===~~ bullbull~W 111111 ==~~ ampT g~ ru~ =

~lU $Et=ni ~ llll0111ra1Ln~otqC011

H~ g==i =~1 ~

~111111 ~~g~n~a~J))pound11 1=~)6tia

~~ mEfHfH~Si

amp12Ct _ an ~

U N711f21th mM1LU aa o1bull~--117CII in4r ~llllll1Vffl-111Dlr lit~ Hmtlpound1 71 12L I CCIII ---~CUnMIIUOCVf JIHtlnn nl 7r ll4011CIIII

llllDNXCWZflDtlltllCIDCDr

~~=~==~=gnn n1raquoL bullw noanDNt CIJIIi=~ C~middot ~ ~ ~ HnffTI-QIJroQ__111PtlJIIInfflll bullbull1~ aaeIT t-- nrJD nJUntu~CllWI

m ~1 ~ ~~~ ~ ilria~gliiiji~=ir ~lt-OTT gl1raquo ~Iraquou fflllIL nllll 1111111 flC~middotIY_4allCCIIIi l1i5~ ~~11~middot~ ~~ ffll H71W786lll 7P-JOalllllll 2N ~ 1-flllt 7HIJl4- DI ~ ~==~ ~t-tr bullM-

114 Hit71aTra7ririatNOCIIII

llHl1Hf ll~7Dl4fIZIIICIIII 1141ftillf+1DllnTgtlMa~=~bull==~r Lbulll-lllbullbulllJJ

=~~~HR-~a ~ =iEri ~ ~=6

= 1MESE COCIIIOlfAlEi ARC 9~ at AH DISTlfG CONJmOfS AS-alLT FED 5UKiEY Y NORWDal EJICltJIJll(G CD~ IIElMEN ~ 1S 111 DECDaR a 2DII 1)pound OCICIIIDNAlES 5HCflI UIpound IIAID Cit MltSSAOfllffT5 STATE FlJriNII CDCffllNAT smult ~AO leJ (IMIJ 1HE ACQlltACY ltF 1HE COCftDINT[ LDCAnatS Mpound diams- 01 FtU

POINT DESCRIPTION ABBREVIATIONS~-~middotPC Pmlr Of CLIRIJC bullIEllL ClMNpound STilRlS PDC bull PtJtilTIIJOM1poundr ~ [raquo TAHCINiT W(R[ lll[ CURpound uroo Fo F[1NT(1t~tfflvt[ltft1llllIIUlt OMNtilE)PRC ~T oT ~pound ~Vlllrlt

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 2 of 2

I ~ IHAT nfl PlM MS 81D1 PIIDMQl ~WllTM(llUI MOIIEOIAAlPlllR~Df IIUPS C- lttE ~111 Cl__ HftNMIIIZlt

WWWWJU Cii6 liftitit

ACTIVITY ANI) USE LINTATIONS

PLAN OF RES7RIC1EJJ AREAS ANJJ COlER TYPES

8V CKlJ()RN IJNl()N PflllfpoundCpoundS SlllERFIIMJ SITC

50 HJ S(J11( SmEpoundT llAIPOIL JASS

=r-o ~ ll 2021

~ Engmeer1ng

Hltd ~~ middot~~-=~ra (f~AJ lIQ c- f

a llfEET 2 ltF 6324-02

td ~

w ~ m 0 0

Id Q ii w m

co co m 0 co

Bk 39600 Pg437 88608

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY New England Region

Five Post Office Square - Suite 100 Boston Massachusetts 02109-3912

INSTITUTIONAL CONTROL DESIGN STATEMENT FOR THE BLACKBURN AND UNION PRIVILEGES SUPERFUND SITE - EAST OF SOUTH STREET AREA

1 Introduction

Pursuant to the Comprehensive Environmental Response Compensation and Liability Act 42 USC sect 9601 et seq (CERCLA) and the National Contingency Plan 40 CFR Part 300 (the NCP) this document contains a description of the release events and site history that resulted in the contaminated media that require institutional controls in the fom1 of Activity and Use Limitations the basis for land use restrictions and uses that are consistent and inconsistent with the Selected Remedy ( as described below) This Institutional Control (IC) Design Statement pertains to a portion of the Blackburn and Union Privileges Superfund Site located in the Town of Walpole Massachusetts (the Site) which has been listed on EPAs National Priorities List (NPL) which portion is generally referred to as the East of South Street Area (the EOS Area) The EOS Area is located to the east of South Street in Walpole and is shown on Figure 1 attached hereto

A Notice of Activity and Use Limitation (NAUL) is necessary and appropriate for the EOS Area of the Site based on the fact that pursuant to EPAs risk evaluations asbestos arsenic trichloroethene (TCE) and certain polycyclic aromatic hydrocarbon (PAH) contan1inants remain in place in soils at levels higher than those appropriate for unlimited use or unrestricted exposure groundwater underlying the EOS Area contains hazardous substances at levels that present an unacceptable risk of exposure and remedial measures at the Site must be protected and maintained to ensure that the Selected Remedy remains protective

EPAs Record of Decision (ROD) dated September 30 2008 specified the need for institutional controls such as a NAUL to ensure long-tenn perfonnance and protectiveness of the Selected Remedy The institutional controls described herein are necessary and appropriate to ensure that the Selected Remedy for the Site remains protective of human health and the environment The remedy for the Site as described in the ROD is referred to herein and in the NAUL as the Selected Remedy

Page 1 of7

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 15: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

Bk 39600 Pg420 88608

PARCEL II Property known as Parcel 33-120 of the Town of Walpole Tax Assessors Map which is

part of the property situate in the Town of Walpole County ofNorfolk and Commonwealth of Massachusetts and being all of the right title and interest of The Penn Central Corporation in and to all those certain pieces or parcels of land and premises easements rights of way and any other rights of any kind whatsoever appurtenant thereto or used in conjunction therewith on and along a portion of Branch of Railroad known as the Wrentham Branch said portion of railroad being described as follows

Beginning at a line extended across the right of way of said Branch of rai road said line being the Northerly line of South Street and extending thence in a Northeasterly direction the distance of 2852 feet more or less along said Branch of rai Iroad to a line which is parallel with the Southwesterly line of Common Street said parallel line extending across said right of way through a point in the centerline thereof at railroad valuation survey station 733 + 67 more or less and being the place of ending

Parcel II is described in the deed recorded with the Norfolk Registry of Deeds in Book 7986 Page 372 and is a portion of the land shown on the plan recorded with said Deeds as Plan No 52 of 1983

FHBOSTON52454092

Bk 39600 Pg421 88608

Exhibit B Legal Description of the Restricted Area and Coordinates of Cover Types

Le2al Description for Restricted Area The area shown on the plan entitled Activity and Use Limitations Plan of Land Blackburn amp Union Privileges Superfund Site 50 amp 60 South Street Walpole Mass Scale l = 30 dated April 6 2021 by Norwood Engineering Company Inc recorded with the Norfolk Registry of Deeds in Plan Book 704 Page 41 being bounded and described as follows

Beginning at a point on the easterly sideline of South Street at the southerly point of curvature of Gleason Court on said plan thence

Northeasterly and curving to the right along an arc of a curve having a radius of twentyshyfive and 00100 (2500) feet a length of forty-five and 15100 (4515) feet thence

S 48deg1352 E a distance of twenty-two and 24100 (2224) feet the previous course by the southerly sideline of Gleason Court thence

s 32deg0208 w a distance of fifty-four and 78100 (54 78) feet thence

S 59deg27 32 E a distance of twenty and 50100 (2050) feet thence

S 47deg5252 E a distance of eleven and 90100 (1190) feet thence

S 49deg01 10 E a distance of twenty-nine and 58100 (2958) feet thence

s 38deg3108 w a distance oftwenty and 01100 (2001) feet thence

S 49deg00 57 E a distance of one hundred and 56100 (10056) feet thence

N 39deg5348 E a distance of twenty-eight and 45100 (2845) feet the previous seven (7) courses by land ofNF Thelma A Casborali thence

S 49deg0808 E a distance of ninety and 29100 (9029) feet the previous course by land ofNF Ming L Yau thence

s 25deg2312 w a distance of siliy-eight and 22100 (6822) feet to a point on the westerly sideline of a fonner railroad right of way the previous course by land of the Town of Walpole assessor parcel 33-121 thence

S 55deg2937 E a distance of ninety-nine and 78 100 (99 78) feet to a point of tangency on the easterly sideline of a forn1er railroad right of way thence

Page 1 of 13

Bk 39600 Pg422 88608

s 30deg11 32 w

S 23deg49 I6 W

N 66deg1044 W

N 23deg4908 E

N l 6deg00 52 E

S 37deg0240 E

N 10deg1437 W

N 34deg093 I W

N 11 deg5558E

Northeasterly

N 27deg41 48 E

a distance of three hundred and three and 74100 (30374) feet the previous course by land ofNF Nicholas H Dowd and NF Emilio P Baldassari thence

a distance of four hundred ninety and 86100 (49086) feet to a SBdh the previous two (2) courses by the easterly sideline of a former railroad right of way thence

a distance of eighty-two and 76100 (8276) feet to an Iron Pipe on the westerly sideline of the former railroad right of way thence

a distance of twelve and 09100 (1209) feet to a SBdh thence

a distance of ninety-six and 50100 (9650) feet to a S Bdh thence

a distance of fifteen and 00100 (1500) feet the previous three (3) courses by the westerly sideline of the former railroad right ofway and land of NF Joseph R Carpentieri and NF Joseph R and Faith N Carpentiero thence

a distance of ninety-two and 82100 (9282) feet the previous course by land ofNF Richard A and Josette M Burke thence

a distance of tvvo hundred thirty-seven and 86100 (23786) feet to a point on the easterly sideline of South Street thence

a distance of one hundred twenty and 00100 (12000) feet along the easterly sideline of South Street to a point of curvature of the easterly sideline of South Street thence

and curving to the right along an arc of a curve having a radius of eight hundred and 00100 (80000) feet a length of two hundred hventy and 11100 (22011) feet along the easterly sideline of South Street thence

a distance of three hundred forty-hvo and 42100 (34242) feet to the point of beginning

Containing 621 Acres of land more or less

Page 2 of 13

3000

3005

3010

3015

3020

3025

3030

Bk 39600 Pg423 88608

EXHIBIT B (cont)

Points and Coordinates associated with Restriction Areas and Cover Types for the Activity and Use Limitations (AUL) at 50 amp 60 South Street Walpole Mass

Point Northing Easting Type

Curve Curve Number Len2th Radius

28754430528 7236432250 COR

3001 28755604597 7236680368 PC L=7535 R=80000

3002 2875597 1222 7236766913 POC

3003 28756333366 7236870620 PT

3004 28756280754 723697 3031 COR

28756025570 7237001250 COR

3006 28755918670 7237001140 COR

3007 28755864440 7237 I 05890 COR

3008 28755903200 72371963 IO COR

3009 28756030893 7237217396 COR

28756042534 7237250325 COR

3011 28756021733 7237317808 COR

3012 28755800732 7237640949 COR

3013 2875552 1424 7237667395 COR

3014 28755321388 7237708416 COR

28755197081 7237834881 COR

3016 28755102230 7238045173 COR

3017 28754941531 7238291869 COR

3018 28754851375 7238512944 COR

3019 28754753441 7238824 760 COR

28754681541 723916 1881 COR

3021 28754608227 7239406506 COR

3022 28754515846 7239459928 COR

3023 2875426 7589 723943 8163 COR

3024 28754198016 7239590840 COR

28753886764 7239449006 COR

3026 2875329 7944 7239187206 COR

3027 28752506745 7238837890 COR

3028 28751859560 7238552142 COR

3029 28751221833 723827342 l COR

28750848788 7238107869 COR

3031 2875045 3654 7237927814 COR

3032 28750630420 7237527432 COR

3033 28750741023 723757 6257 COR

3034 28751668594 7237842488 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 3 of 13 April 14 2021

3035

3040

3045

3050

3055

3060

3065

3070

Bk 39600 Pg424 88608

Point Number

Northing Easting Type Curve Leneth

Curve Radius

28751548848 7237932869 COR

3036 28752462269 7237767802 COR

3037 28756438461 7236904209 POC L=2207 R=80000

3038 28756543084 7236939245 PT

3039 2875653 7987 7236954123 PC

28756597578 7237007344 POC L=1651 R=937

3041 28756594465 7237087181 PT

3042 28756459044 7237347021 PC L=347 R=220

3043 28756432531 7237363546 PT

3044 28756280644 7237286201 COR

28755924210 7237966952 COR

3046 28756081959 7238048554 PC L=472 R=236

3047 28756064922 7238084404 PT

3048 28755523491 7237845047 COR

3049 28755419845 7238081981 COR

28755460757 7238099621 PC L=240 R=l57

3051 28755467701 7238120241 PT 3052 28755398690 7238275280 COR

3053 28755365410 7238264910 COR

3054 28755087149 7238900449 COR

28755158001 7238931521 COR

3056 28755040360 7239199770 COR

3057 28755311720 7239318930 COR

3058 28755263010 7239429300 COR

3059 28755388260 7239484290 COR

28755348660 7239576000 COR

3061 28755625470 7239696500 COR

3062 28755664605 7239606601 COR

3063 28755736202 7239637768 COR

3064 28755621870 7239897370 COR

287 5567 6160 7239920410 COR

3066 28755718270 7239830260 COR

3067 2875587 9750 7239900310 COR

3068 28755718790 724026 7600 COR

3069 28755763390 7240285350 COR

28756035900 7239926600 COR

3071 28756086280 7239812770 COR

3072 28756089984 7239813649 COR

3073 28756229128 7239501910 PC L=482 R=l54

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 4 of 13 Apnl 14 2021

3075

3080

3085

3090

3095

3100

3105

3110

Bk 39600 Pg425 88608

Point Number

Northing Easting Type Curve Length

Curve Radius

3074 28756257366 7239513984 PT

28756185799 7239674928 COR

3076 28756739833 7239921136 COR

3077 28756876060 7239682275 COR

3078 28756948336 7239735898 PC L=335 R=298

3079 28756958235 7239766064 PT

28756866081 7239978133 COR

3081 28757166275 7240127374 COR

3082 28757068320 7240314640 COR

3083 28757602980 7240594310 COR

3084 28757700050 7240408736 COR

28758247941 7240688376 COR

3086 28758250190 7240683910 COR

3087 28758344979 7240738168 COR

3088 2875843 6103 7240581527 COR

3089 28758602943 7240664224 COR

28758740024 7240397393 COR

3091 28758605706 724032 7776 PC L=477 R=309

3092 28758594882 7240286013 PT

3093 28758666635 7240197585 PC L=2573 R=3127

3094 28758767113 7240118710 POC

28758890752 7240086604 PRC L=I653 R=3993

3096 28758972305 7240074125 POC

3097 28759049552 7240045 I 52 PT

3098 28759330312 7239734408 COR

3099 28759459414 7239588584 PC L=2269 R=5217

28759524821 7239496174 POC

3101 28759568752 7239391829 PRC L=1814 R=486

3102 28759603259 7239308095 POC

3103 28759653883 7239232999 PCC L=l31 R=088

3104 28759665694 7239231411 PT

28759800587 7239299586 COR

3106 28759986288 7238981214 COR

3107 2875983 5797 7238891829 COR

3108 28759879750 7238798689 COR

3109 28759905380 7238754769 PC L=1600 R=2552

28759963590 7238700398 POC

3111 28760035727 7238666620 PT

3112 28760700665 723901 5672 PC L=4515 R=2500

3113 28760830230 7239191198 POC

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 5 of 13 April 14 2021

3115

3120

3125

3130

3135

3140

3145

3150

Bk 39600 Pg426 88608

Point Number

Northing Easting Type Curve Len2th

Curve Radius

3114 2876077 263 6 723 940 1624 PT 28760624518 7239567466 COR

3116 28760160100 7239276864 COR

3117 28760055928 7239453423 COR

3137 28759976118 7239541692 COR

3118 28759782139 7239764992 COR

3119 28759625581 7239640375 COR

28758966057 7240399493 COR

3121 28759184326 7240581973 COR

3122 28758593598 724126478] COR

3123 28757977293 724097 2314 COR

3124 28757716516 7241351659 COR

28757288251 7241140719 COR

3126 28756725827 7240851862 COR

3127 28756162468 7240586126 COR

3128 28755614498 7240338506 COR

3129 28754346745 7239768507 COR

28753845716 7239540194 COR

3131 28753257436 723927 8634 COR

3132 28752466355 7238929370 COR

3133 28751819340 7238643698 COR

3134 28751181527 7238364939 COR

28750807772 7238199071 COR

3136 28750413263 7238019301 COR

3138 28756920317 7237298739 PC L=l941 R=2104

3139 28756827128 7237274848 POC

28756733047 7237294944 PRC L=401 R=l66

3141 2875671 1336 723 727 2844 PCC L=1492 R=13345

3142 28756744594 7237206091 POC

3143 28756781529 7237141301 PCC L=1419 R=l018

3144 28756833084 7237094642 POC

28756902566 7237091952 PCC L=2413 R=157959

3146 28757017337 7237129167 POC

3147 28757131820 7237167258 PCC L=330I R=S0000

3148 28757282552 7237234442 POC

3149 28757431866 7237304721 PT 28757338390 7237495930 COR

3151 28757541620 7237605380 COR

3152 28756897590 723883 4280 COR

Exhibit B to NA UL-Part 11-EOS Coordinate Tables Page 6 of 3 April 14 202

3155

3160

3165

3170

3175

3180

3185

Bk 39600 Pg427 88608

Point Northing Easting Type Curve Cunbulle

Number Lenszth Radius 3153 28756870623 7238820218 COR

3154 28756838273 7238882258 COR

28756865240 7238896320 COR

3156 28756777004 7239062996 COR

3157 28756770439 7239063663 PC L=l 146 R=2269

3158 2875665836 I 7239046180 PCC L=l423 R=957

3159 2875661 7520 7238989913 POC

28756625544 7238920850 PT

3161 28756728525 7238726583 PC L=232 R=l58

3162 28756748720 7238720236 PT

3163 28756899634 7238797341 COR

3164 28757254653 7238121363 COR

28757520153 723761266 7 COR

3166 28757306899 723 750 IO 10 COR

3167 28756690336 7237500169 PC L=243 R=I68

3168 28756682599 7237479273 PT

3169 28756686990 7237469583 PC L=0250 R=l68

28756708806 7237463018 PT 3171 28757000109 7237616354 PC L=233 R=l73

3172 28757005368 7237637270 PT

3173 28757000998 7237645513 PC L=233 R=l69

3174 28756980219 7237651023 PT

28756429209 7238339422 COR

3176 28756342982 7238506849 COR

3177 28756500076 7238596485 PC L=l19 R=l48

3178 28756499701 7238608072 PT 3179 2875644 7813 7238705611 PC L=l 182 R=483

28756358177 723 869 0707 PT

3181 2875623 6099 7238376388 PC L=443 R=467

3182 28756235611 7238333779 PCC L=343 R=9IO

3183 28756249049 7238302418 PCC L=412 R=9IO

3184 28756278952 7238274519 PCC L=368 R=300

28756313362 7238277619 PT

3186 28756282498 7238911796 PC L748 R=216

3187 28756240650 7238919721 PT

3188 28756126081 7238620406 PC L=323 R162

3189 28756138645 7238591575 PCC L=333 R=283

Exhibit B to NAUL-Part II-EOS Coordmate Tables Page 7 of 13 April 14 2021

3190

3195

3200

3205

3210

3215

3220

Bk 39600 Pg428 88608

Point Number Northing Easting Type Curve

Leneth Curve Radius

28756163375 7238602867 PT

3191 2875523 0908 7238765275 COR

3192 28755205040 7238752740 COR

3193 28755391740 7238328470 COR

3194 28755466840 7238361040 COR

28755452760 7238392590 COR

3196 28755516920 7238421040 COR

3197 28755530690 7238388730 COR

3198 28755603230 7238421460 COR

3199 2875555 7568 723852 7053 COR

28755371220 7238445330 COR

3201 28755629198 7238558466 COR

3202 28755676040 7238453290 COR

3203 28755925410 7238563840 PC L=1902 R=3548

3204 28755927383 7238658634 POC

28755954390 7238749520 PT 3206 28755974770 7238807230 COR

3207 28755779200 7238881701 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

28755746700 7238609997 COR

3211 2875593774 7239036608 COR

3212 28756048460 7238996850 PC l=1445 R=2903

3213 28756070631 7239065422 POC

3214 28756109010 7239126420 PT

28756153820 7239182190 PC L=S98 R=848

3216 28756171980 723923 7880 PT

3217 287S6026148 7239566166 COR

3218 28756003865 7239556465 COR

3219 287S6134380 7239256650 COR

28755998460 7239195370 COR

3221 2875600 71S0 7239174530 COR

3222 28756001791 7239172152 COR

3223 28756040451 7239079437 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 8 of 13 April 14 2021

Bk 39600 Pg429 88608

Point Number

3210

3200

3056

3057

3058

3059

3060

3061

3062

3218

3219

3220

3221

3224

3225

3226

3227

3228

3070

3071

3234

3233

3235

3236

3237

3238

3239

3240

3241

3242

3243

3244

3245

3246

3247

3248

Northing

28755746700

28755371220

28755040360

28755311720

28755263010

28755388260

28755348660

2875562 54 70

28755664605

28756003865

28756134380

28755998460

28756007150

28755941340

28755962080

28755867937

28755819702

28755766128

28756035900

28756086280

28755991990

28755942100

28756477248

28756677238

28756650130

28756473307

28756480112

28756675030

28756724454

28756742099

28756742133

28756703924

28756640759

28757607280

28757401530

28757467350

Easting

7238609997

7238445330

7239199770

7239318930

7239429300

7239484290

7239576000

7239696500

7239606601

7239556465

7239256650

7239195370

7239174530

7239145324

7239100930

7239061674

7238935003

7238911508

7239926600

7239812770

7239769910

7239884050

7239261913

7239253008

7239321810

7239319038

7239298824

7239364440

7239271845

7239292625

723935 0187

7239393239

7239393096

7237584960

7237475300

7237345620

Type

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

PC PCC

POC

PCC

PT

COR

COR

COR

Curve Len2th

L=273

L=ll77

L=657

Cunmiddote Radius

R=1421

R=810

R=679

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 9 of 13 April 14 2021

Bk 39600 Pg430 88608

Point Number Northing Easting Type Curve

Len2th Curve Radius

3249 287 57514570 7237372360 PC l=ll05 R=1993

3250 287 57 588060 7237452980 PT

3251 28757631382 7237429676 PC L=2244 R=2352

3252 287 5765 6810 7237537876 POC

3253 2875 762 9720 7237645671 PT

3254 28756940655 7238952710 PC l=1493 R=1509

3255 28756901845 7239015577 POC

3256 2875683 7836 7239052474 PT

3257 28758104824 7237653014 COR

3258 28758028960 7237800160 COR

3259 28757949530 7237760790 COR

3260 28757901005 7237855021 COR

3261 28757839230 7237820908 PC L=273 R=l33

3262 28757830688 7237799810 PCC L=539 R=2144

3263 28757852974 7237750897 PT

3264 28757891705 7237688178 PC L=lS26 R=2432

3265 28757948636 7237637880 POC

3266 287 58018307 7237607597 PT

3248 28757467350 7237345620 COR

3267 28757550832 7237363444 POC L=2653 R=80000

3268 28757668809 7237424132 PT

3269 28757504 719 7238817989 COR

3270 28757493010 7238842230 COR

3271 28757561074 7238880970 COR

3272 28757483953 7239024127 PC L=323 R=l70

3273 28757459939 7239037846 PT

3274 28757311605 7238957122 PC L=1388 R=906

3275 2875727 2732 7238901647 POC

3276 28757283181 7238834718 PT

3277 287 5733 4061 7238752337 PC L=255 R=l60

3278 287 5735 5527 7238744411 PT

3279 2875 7102815 7239517199 PC l=261 R=l70

3280 28757080654 7239525307 PCC l=909 R=1275

3281 2875 700 5390 7239477911 PCC L=l007 R=990

3282 28756999624 7239381704 PT

3283 2875707 7705 7239230604 PC L=ll14 R=907

Exhibit B lo NAUL-Part IlbullEOS Coordinate Tables Page 10 of13 April 14 2021

3285

3290

3295

3300

3305

3310

3315

Bk 39600 Pg431 88608

Point Number Northing Easting Type

Curve Leneth

Curve Radius

3284 28757168066 7239178102 PT

28757205717 7239186398 PC L=518 R=930

3286 28757249003 7239213534 PCC L=l41 R=086

3287 2875724 7909 7239226048 PT

3288 28758415755 7239842757 PC L=251 R=l59

3289 28758437695 7239837379 PT

28758456377 7239846949 PC L=812 R=876

3291 28758494897 7239915165 PCC L=456 R=757

3292 28758483790 7239958646 PT

3293 28758405147 7240111348 PC L=l057 R=955

3294 28758318136 7240161452 PCC L=477 R=l063

28758272407 7240149529 PCC L=250 R=l60

3296 28758265647 7240128003 PT

3297 28758157937 7237680895 COR

3298 28758902927 723807 1969 COR

3299 28758852531 7238168280 COR

28758779660 7238129750 COR

3301 28758746973 7238192072 COR

3302 2875807 6630 7237840490 COR

3303 28758049940 7237894220 COR

3304 2875871 7997 7238243620 COR

28758680103 7238315946 COR

3306 28758533699 7238239240 COR

3307 2875852 6899 7238252220 COR

3308 28758098180 7238027600 COR

3309 28757974484 7238264223 COR

28757957598 7238255513 COR

3311 28757757732 7238637845 COR

3312 28757774584 7238646620 COR

3313 28757653710 723887 7846 COR

3314 28757560920 7238829340 COR

28759004930 7238125514 COR

3316 28759689797 7238485028 PC L=1992 R=2609

3317 28759697204 7238583760 POC

3318 28759667288 723867 8142 PT

3319 28758996126 7238323718 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 11 of 13 April 14202 I

Bk 39600 Pg432 88608

Point Number

Northing Easting Type Curve Lenfth

Curve Radius

3320 28759028950 7238261560 COR 3321 28758954486 7238222188 COR

3322 28758972523 7238378387 COR 3323 28759421550 7238613630 COR 3324 28759377933 7238698105 COR 3325 2875907 4811 7238539289 COR 3326 28759081611 7238526309 COR 3327 28758935210 7238449604 COR

3328 28759464470 7238637330 COR 3329 28759632674 7238722481 PC L=ll83 R=l578

3330 28759583973 7238755474 POC 3331 28759526573 7238768343 PRC L=2163 R=2455

3332 28759422964 7238796123 POC 3333 28759341091 7238865430 PT

3334 28759193370 7239050710 COR 3335 28759416340 7239163940 COR 3336 28759263600 7239455620 COR 3337 28759043690 7239336510 COR 3338 28758935490 7239552130 COR 3339 28757650890 7238883240 COR 3312 28757774584 7238646620 COR 3311 28757757732 7238637845 COR 3310 28757957598 7238255513 COR 3309 28757974484 7238264223 COR 3308 28758098180 723802 7600 COR 3307 28758526899 7238252220 COR 3306 28758533699 7238239240 COR 3340 28758700033 7238326388 COR 3341 28758675436 7238373334 COR 3342 28758733013 7238403500 COR 3343 28758760858 7238350353 COR 3344 28758860952 7238402796 COR 3345 28758833106 7238455943 COR 3346 28758890683 7238486109 COR 3347 28758915280 7238439162 COR 3326 28759081611 7238526309 COR 3325 28759074811 7238539289 COR

Exhibit B to NAUL-Part H-EOS Coordinate Tables Page 12 of l3 April 14 2021

Bk 39600 Pg433 88608

Point Number

Northing Easting Type Curve Len2th

Cunbulle Radius

3324 2875937 7933 7238698105 COR

3082 28757068320 7240314640 COR 3083 28757602980 7240594310 COR 3349 28757790234 7240236327 COR

3348 28757255574 7239956657 COR

3124 28757716516 7241351659 COR 3125 28757288251 7241140719 COR 3126 28756725827 7240851862 COR 3127 28756162468 7240586126 COR 3128 287 55614498 7240338506 COR 3129 28754346745 7239768507 COR 3130 28753845716 7239540194 COR 3131 28753257436 723927 8634 COR 3132 28752466355 7238929370 COR 3133 28751819340 7238643698 COR 3134 2875118152 7 7238364939 COR 3135 2875080 7772 7238199071 COR 3136 28750413263 7238019301 COR 3350 28750296168 7238284525 COR 3351 28754 78 6636 7240267040 COR 3352 28757412029 7241794586 COR

POINT DESCRIPTION ABBREVIATIONS

COR=CORNER PC= POINT OF CURVE WHERE CURVE STARTS POC -= POINT ON CUR VE PT=POINT OF TANGENCY WHERE THE CURVE ENDS PCC = POINT OF COMPOUND CURVE (WHERE RADIUS CHANGES) PRC = POINT OF REVERSE CURVE

NOTES

THE COORDINATES ARE BASED ON AN EXISTING CONDITIONS AS-BUILT FIELD SURVEY BY NORWOOD ENGINEERING CO INC BETWEEN NOVEMBER 15 TO DECEMBER 18 2019 TI-IE COORDINATES ARE BASED ON l1ASSACHUSETIS ST A TE PLANE COORDINATE SYSTEM NAD 1983 (FEET) THE ACCURACY OF THE COORDINATE LOCATIONS ARE +-0J FEET

Exhibit B to N1UL-Part II-EOS Coordmate Tables Page 13 ofl3 April 14 2021

---

1f~ flJr ~i

f ~~ J~i](M~I ~ 1 jf~ ~~f W-- )e 1

It lj fY pl ~-~j

I --- ~ ~

1 (J-c~ er ~

C JI fl JYf

1 ~ ~Yu-~ 1i

~r

( LOClJS P

SCAUllbulliQO

I ar lMIT flG PINI tMS _ lIIPMIDMICXNllRlnT~tlCfllUS 1111D cmuftraquodl s - NIKl1III tfIJIIIIIOfM~1HCll allE1

DAre Jllrl

NUKIJU LU6 DMitM

mmtG6DKbdlt

~4~-middot

~~I

-- ampnbullllf~ ~ fa

LEGEND 0

-i~wr0o-m lICUUoaampbullco--11111 _ _l_J

0

bull ~-ail_I

~-

mo(I ---fwj

amp~~~~ ~ ~~ltgtmiddot ~A~

~6

_L-r

bull -~ IBP__l-11Uil n-rlfl-lffll rMCllI 1a 1rr ai

-~ lll-lliI u-W--11a 1 Ml[ 411 amt l0IIC 3JICJ7 ~ 33-1--I- DIID llXII D111 JlMZ 411 lraquo- ~lUN~t --- - etMpound 11JII

~ MffD mmaat ZL I01t 111

1Jlll~-IICfIQfJICIISJ DfEI IC71- I~ 1~ 9 Cl 1VY IICIIWCLl~fCSC~lNCl

~11HltOXW1A~JtCI~llfB MXIC 1HI lME INCi 111M bull11 (S 1f41~middot~-~-)

~ io

0 0 0 0 -0 0 0 D O 1 middot tbull O

_- _pound ~ - Tf middot- ---r ~~ ~~- ~=middoti

r jil7bull --------4~-middot~

(

SCAtpound 1bull bull YI

I ~ tfAIE lIMa toafllltl1E ~NAD1w1(rJ

1 ~ PlIla II MMt QI 11D TD D111oPl

~c1MlntID9~~-l 1NIIJIIKlNI LnlJTU ~ deg qllAJSTE uM011111 iu1II 1111ZT IIIILJaZ

Exhibit C - Photo-Reduced Copy of Activity and Use Limitations Plan of Land

--~middot---

I ~111-11111

iiiii

-ill111liilt

ACJIYIJY ANJ) lJSE lJJll7ATJONS PLAN OF LANI)

81ACJ(81R1 I IINION Flr11lfES SllffllF7AVO SIle

o tfO SOIJIH s1ar HlltlPOtL IIAS

SCAlElrJAt IPfffl152021

1IJrwod Eng1neerlng

- EnQlbullHrlflg Compaffy middot~~=~ m Cm1JQ u fnfJa-eal

~ -

-~

9l1EET 1 OF I 8324-02

td ~

w ~ m 0 0

Id Q ii w ii

co co m

co 0

-l

~-77--raquo- -~I~ )middot~ ~ bull _I lT ~ v~

AI ~ If ~)middot~ 7- ~1 c t11 yil ~ ~ ~middot~41 bull1 l ~~l(i~r~1 f7 )ll y-

~~ f -~ -v fgtV ~ ~ ~ l er-- u -

tl x-P~C ()

JP yen f(( 11 1degpoundS -~ (

ftunrTfflllllTnallJrNNQWDf ~ ti IZNtRlTT lnH M IULS IIJIUIUlA-DlltlllllDlJlllIICIF tJbllt~llC~lJNp

DTl NlllltaJatl-Witiill (raquo11 iiiK(+til

I aJnlTlKATJlfl PlAH~ THE PUIIJll1T UC TIUlf Mlaquo THE l5 11 oawG ~ NII 1Hpound1as Of1111E111 AMllfrlTll9laquolllt Mpound ntem OPlaJ CJ1 IWM1pound BREn 011 bulln

~ ~illi~fli~ _lt ---c~-Clmiddot~~c0-nmiddotmiddot~bullJmiddot04~- ~--~--yen~~bull - L -bull -n ~ -r - ~ -

it

~ fr ~ ~- -~bull~bullv OG- ~n0

bull--ltmiddot middot~ -~- ~~-=~7~st~-~~~~i~~Hil~-) 2~C 0 ~~~~~ --------Y-Tgt-bullbullmiddot-

U-IU ~middotshy =i==-

bullbull bull _ -middot-

~----- ( ~11middot

__IC1ZMJ - bull IOC)0l lftEf ___ i gt mEKJllJfNG rotJ1FRIIIT AIIEAS B~ p~ AIIEAS ~ea-vmiddot LIUIID

~ e--- -+ ~ rzprz1za 1 ~ IJTATC PRC ~TC

nJml lltPtasCltJ

DUD BCD lJlll7 PMC 4H 1 1 YERT1CAL M1llI II NCCI ~ _ ro conurr DOD 80CIC 3JII07 llME 4H I ntaM NUIU 1121 IJ4TAI m IMlC 111111 nATIIW ~fsi

tJMAlfflOlI) AIIEAS1 bull 11AMJSCAlfl) AlpoundAS Lill] 1Dll IOlII POT PlCit 6115 J)-t20 ~atfnujK~tlLWlQI

~PUNMl-17 POflTIVNf1Ell llaD BaalC Tl_ Paa bullbull - 99 a 11

_-ijf1iltDP~IZ~ 5CME - JOSUva1fTLJ ~ ~-rr 111 C tMI=

bull111 I~

i=iiii7

~ e---

t c z rl

L-n11 ~

ACJIVJTY AND USE LIAlffAJIONS

PIAN OF RESTRIC1EJJ AREAS ANJJ COVER TYPES

fltACK1(fN _ llNlltgtI PfMIECCS SllPVFVNlJ51Tlt

JO _ lxJ srJllH STREET IIALPrJU JASS

SCAU I - 30 APRIL 2021

lcnwod Engineering

llarwood Cngnrilgtf cpmy -t~~~~

fIL Pllpa-ru - (1u]1a-lftll

~L=wl f 01~JII IO_

a SIEET I (F 2 B324-02

bj ~

w 0

0 0 deg It

iQ ~ w l11

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 1 of 2

CX) CX)

deg CX) 0

ntllT -1~1~ rurnlaquo1 r1n l1XTM 11Nf -r~ lie UUffCI 11Pt lDll1Hf iniin --IC unr1G Tlr 1n1rn Iota allll Ito tyen1tlll ~~11CRnrzJ11-11--~ci-- n31 nr111w11J1t ~bull c ~- diams JDrnn llloffl rcnlml IDII

-~ ]al rll _ _ PnlM-1-PI lbull-- ll7HrirrIPlllD1lf~-a bullbullll 111bull IClln9XnolDlllIIIIIIOm

214 ff7371JOOT ~bull JllC Ibullbull 171 JICllEY)l)vlUTlo~lUl~ ~li_~ -~~ MDlol ll4L~TllJraquofllllf190abullbullt ~~nQuu~~1aJI _~~OtottWU~1t11txm~arcPbrmllmCDt ~~ ~~ ~ =~ gj ~l11~ llltlM Mrattllll TDPmllIDCDI JJ4bull e~ _ ~ e PClC lbullI- 1- ~1sect~ ~ ~ ~ ~ ~~~-nr~44bull~mn11-a11 ~~ =mt =m~ ~ ~~ ~ =~~-~~ =~~rt~l~llibullltbull=

~~~~~~~~r-~r-~~sectsect55~55 ~~ ~=g~~ mi --1~ ~-==~~m~ L-~r UVPllrlllUillDITDr4L 1JI lbullKlllll~==~~~=~

~~~~~~~~ raquoff-llll 111rritl_aianbull ~11lCla rr- n ttll XDP11r1r 11111c-1C111~ RTl~rJlllllbullbull~llllJlllipo~~=r~tm=~~

~=~3r~t==~ ~=~i==~~ llt1ttl70 m~~n~ =n~ L diams 11- bull - iaEi~mi 1lE~HHffi ~1-~ E LbulllT bullU-7YA 8911U TMn4 OJII C- lllkHrnl1nlntll11106~

MJ9~gt111ftlrfffll11 ~ SbullC61hLJT raquoWl lll~IJlll11amp1 utVllllt a lbulllfGl bulllC lT

lliilH~1 ~~rm-=rn~ lbullIIIICU-1bull0

itt ishwI JUo ma m1 bull 1-c iiliii ~==~m~=~ Ullln U7IIY M1NLl411 fflf f-~ llr IL ~ lbullt Ill uaP11rllDn1rin1bull139nf- na_ 1111lnl ___ lWTDf-ID 111Jbullnllr-cishy

J1JT1 lflTI-noLbull COi lJ1 tsr18GOTDrl1~ 1--Cn ~~~==-=~ LbullS1rbull-p

LbulllI ~middot x1 fl11bull diams an l~J P-~ WI 1~1Slrmsraquo11nirorn 11bull1n-

llrgt 58 - TDrl ZJlJ l~ Zl llf4 Pll1raquo91I lnP~IIEI 11 ==~=-~~ lbullt-11bullh1~

nun_-~bullfllrlll_ lbulll-lrbull N- - nr6-11MII rinaus a 1bull1E-t1 im1 nrxi mr~ 7nn1 4i i 1c m llrS~iJ-ltJlillII Tt-Ul ris ~=~~middotiill~~ tf llDln~n1rJrgt11nbull1ric ~IPgt9nq~ It-MU rbull RflrrlllVllbulltPllbullOIIUAfC lbullnJtrNbull_~lD+4ftJSHJ7711JrllIIIIT144lDI lbulll ~I llfs-mllThn~-f 1bull11

1a5blH=i5gS El~ iE =iilli ~ID aH~~ ~~ leJINNllllfflnlt10ff1nll~1g=TI==~- lbullN~Jmiddot pw nrwuhtl tba11 l- lllllsectimiii~ ~ lllaquot ll116UW41 llllII NII Cl Ld bullt ll 11r 111~-~lHtl-IINOClll 1Dgtn~rMOtnllfbull3all)Mnr~bullwrmm11uoo~ ~r~ m~ = ~~ t~-i m NNtotl n11nn cm

~~~~~Ttr~ in Httl01llxl nlfM114ta cm

JJN n=-PIW - I- C lbullT rnr nnubullNoXI ffllPI n1 11-amp 11middot 77)111fflffPl~JlaUII

i1JJ n91lbull ti Jnlftbulllll QII

~g=~~~~ir~f~5 =i~=~~ ~=~ ~ ~j====goi H1111t-llll ffo~ ~rn tm111 ta1Vl~ tnar- IVI rm u1i ~ nw ~illl cm 1111 Hltt1H T7U 72w111ll tm UI ftffiH~bull1 naMUlI nlll

lltfll~IOUl rnes~ttlClll

~I~~=~=~~= l3111ratlQOJ121lllll CS u1n-n-a mn-c~11111llllilr ~====m~~ lbulllllr~~Oll~r1111-t~rtRiHa)toI

-~rt~_Utr111tt~USI ~m~i==r~~llfflpound1gtgtMllkllit1U10C011 annrxnbull-TCRL11ai~=~=~g)llllll~--rWltMJtt-8 DR Pl rraquof ntl rim Gllf CCI~~1r~~ liiilllii u- ntlt bull llJ~naJCDI

raquo11NMl10~Ullllcm ntrlnK)fL~nlln-1c lllf ~--TlJaft_Lmc i lbull1 bull l3il0 Nl-197) Ttlll1344 a LbullI 3 l diams 1-111 lflS 1111lOllt ffl- MP PII bullHI lgtl llJI l97Mlt Ian -ti DG llC

111111===-~~~=mg ====~~ tD rlrffllZllIITO-lfllCIIII=~tr~L~~~= - Pl~I llII TD_ ff~ tDII31119NIJMlDffU~~ H CZIII liii~mlt~ D1111nrn11GQ~-CaKftQNJWNczr41140ffnQCUII Jnffnt1JIIIIJunbull~1Qc20lll ~Pllli ll mrnnn lbulltlP 17Jrffdeg-degluoElJIIIQII

~-I-ti _nrna~rlll

a n- 4411 llbullQI 1=40 rt La n- lllf ffrgtn _Jr_~ Ullk ---rr~~ ~=~=tl~~ =1 nttltt nraquo 1nlU as

=-mn--~111DJIDII Ullgt~fflflnanaaJIIJalt55~~EIS~=~~ ~~)1 -11CIJII nn~bullbullbullnaKatt1ta1

JOIT ru~- rf- deg hJIIII r- 111111 ~1111) -1 aJ1 ld t11D1etlll_TalCIS -~-UCV~bullraquootur=~=~I~~=~--~ ~rsrgo_mlaquoshym rs~11flI ~- rnilr==~=~~ ~~r _ ~ atfl ~ rtw Dgtlnn-f-lEllln17n-UIIP

D11 fflXTJ111111 I~~ ar D1Jn4 ~leJJS-OnC111

=====5 middoti SHU=~ 5 ampn iliiiiiIiI11

ngtgtn~1~1tbullubull1rm DH tu~- lt11 rirmU1111 CDIII

~i~i555mi~ ~~ ~m=~==m~g===~~~~ tn1r JtW ~ma- PiOll a CU

~ XNr~t~fDllll1-all~~ m===~~ bullbull~W 111111 ==~~ ampT g~ ru~ =

~lU $Et=ni ~ llll0111ra1Ln~otqC011

H~ g==i =~1 ~

~111111 ~~g~n~a~J))pound11 1=~)6tia

~~ mEfHfH~Si

amp12Ct _ an ~

U N711f21th mM1LU aa o1bull~--117CII in4r ~llllll1Vffl-111Dlr lit~ Hmtlpound1 71 12L I CCIII ---~CUnMIIUOCVf JIHtlnn nl 7r ll4011CIIII

llllDNXCWZflDtlltllCIDCDr

~~=~==~=gnn n1raquoL bullw noanDNt CIJIIi=~ C~middot ~ ~ ~ HnffTI-QIJroQ__111PtlJIIInfflll bullbull1~ aaeIT t-- nrJD nJUntu~CllWI

m ~1 ~ ~~~ ~ ilria~gliiiji~=ir ~lt-OTT gl1raquo ~Iraquou fflllIL nllll 1111111 flC~middotIY_4allCCIIIi l1i5~ ~~11~middot~ ~~ ffll H71W786lll 7P-JOalllllll 2N ~ 1-flllt 7HIJl4- DI ~ ~==~ ~t-tr bullM-

114 Hit71aTra7ririatNOCIIII

llHl1Hf ll~7Dl4fIZIIICIIII 1141ftillf+1DllnTgtlMa~=~bull==~r Lbulll-lllbullbulllJJ

=~~~HR-~a ~ =iEri ~ ~=6

= 1MESE COCIIIOlfAlEi ARC 9~ at AH DISTlfG CONJmOfS AS-alLT FED 5UKiEY Y NORWDal EJICltJIJll(G CD~ IIElMEN ~ 1S 111 DECDaR a 2DII 1)pound OCICIIIDNAlES 5HCflI UIpound IIAID Cit MltSSAOfllffT5 STATE FlJriNII CDCffllNAT smult ~AO leJ (IMIJ 1HE ACQlltACY ltF 1HE COCftDINT[ LDCAnatS Mpound diams- 01 FtU

POINT DESCRIPTION ABBREVIATIONS~-~middotPC Pmlr Of CLIRIJC bullIEllL ClMNpound STilRlS PDC bull PtJtilTIIJOM1poundr ~ [raquo TAHCINiT W(R[ lll[ CURpound uroo Fo F[1NT(1t~tfflvt[ltft1llllIIUlt OMNtilE)PRC ~T oT ~pound ~Vlllrlt

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 2 of 2

I ~ IHAT nfl PlM MS 81D1 PIIDMQl ~WllTM(llUI MOIIEOIAAlPlllR~Df IIUPS C- lttE ~111 Cl__ HftNMIIIZlt

WWWWJU Cii6 liftitit

ACTIVITY ANI) USE LINTATIONS

PLAN OF RES7RIC1EJJ AREAS ANJJ COlER TYPES

8V CKlJ()RN IJNl()N PflllfpoundCpoundS SlllERFIIMJ SITC

50 HJ S(J11( SmEpoundT llAIPOIL JASS

=r-o ~ ll 2021

~ Engmeer1ng

Hltd ~~ middot~~-=~ra (f~AJ lIQ c- f

a llfEET 2 ltF 6324-02

td ~

w ~ m 0 0

Id Q ii w m

co co m 0 co

Bk 39600 Pg437 88608

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY New England Region

Five Post Office Square - Suite 100 Boston Massachusetts 02109-3912

INSTITUTIONAL CONTROL DESIGN STATEMENT FOR THE BLACKBURN AND UNION PRIVILEGES SUPERFUND SITE - EAST OF SOUTH STREET AREA

1 Introduction

Pursuant to the Comprehensive Environmental Response Compensation and Liability Act 42 USC sect 9601 et seq (CERCLA) and the National Contingency Plan 40 CFR Part 300 (the NCP) this document contains a description of the release events and site history that resulted in the contaminated media that require institutional controls in the fom1 of Activity and Use Limitations the basis for land use restrictions and uses that are consistent and inconsistent with the Selected Remedy ( as described below) This Institutional Control (IC) Design Statement pertains to a portion of the Blackburn and Union Privileges Superfund Site located in the Town of Walpole Massachusetts (the Site) which has been listed on EPAs National Priorities List (NPL) which portion is generally referred to as the East of South Street Area (the EOS Area) The EOS Area is located to the east of South Street in Walpole and is shown on Figure 1 attached hereto

A Notice of Activity and Use Limitation (NAUL) is necessary and appropriate for the EOS Area of the Site based on the fact that pursuant to EPAs risk evaluations asbestos arsenic trichloroethene (TCE) and certain polycyclic aromatic hydrocarbon (PAH) contan1inants remain in place in soils at levels higher than those appropriate for unlimited use or unrestricted exposure groundwater underlying the EOS Area contains hazardous substances at levels that present an unacceptable risk of exposure and remedial measures at the Site must be protected and maintained to ensure that the Selected Remedy remains protective

EPAs Record of Decision (ROD) dated September 30 2008 specified the need for institutional controls such as a NAUL to ensure long-tenn perfonnance and protectiveness of the Selected Remedy The institutional controls described herein are necessary and appropriate to ensure that the Selected Remedy for the Site remains protective of human health and the environment The remedy for the Site as described in the ROD is referred to herein and in the NAUL as the Selected Remedy

Page 1 of7

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 16: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

Bk 39600 Pg421 88608

Exhibit B Legal Description of the Restricted Area and Coordinates of Cover Types

Le2al Description for Restricted Area The area shown on the plan entitled Activity and Use Limitations Plan of Land Blackburn amp Union Privileges Superfund Site 50 amp 60 South Street Walpole Mass Scale l = 30 dated April 6 2021 by Norwood Engineering Company Inc recorded with the Norfolk Registry of Deeds in Plan Book 704 Page 41 being bounded and described as follows

Beginning at a point on the easterly sideline of South Street at the southerly point of curvature of Gleason Court on said plan thence

Northeasterly and curving to the right along an arc of a curve having a radius of twentyshyfive and 00100 (2500) feet a length of forty-five and 15100 (4515) feet thence

S 48deg1352 E a distance of twenty-two and 24100 (2224) feet the previous course by the southerly sideline of Gleason Court thence

s 32deg0208 w a distance of fifty-four and 78100 (54 78) feet thence

S 59deg27 32 E a distance of twenty and 50100 (2050) feet thence

S 47deg5252 E a distance of eleven and 90100 (1190) feet thence

S 49deg01 10 E a distance of twenty-nine and 58100 (2958) feet thence

s 38deg3108 w a distance oftwenty and 01100 (2001) feet thence

S 49deg00 57 E a distance of one hundred and 56100 (10056) feet thence

N 39deg5348 E a distance of twenty-eight and 45100 (2845) feet the previous seven (7) courses by land ofNF Thelma A Casborali thence

S 49deg0808 E a distance of ninety and 29100 (9029) feet the previous course by land ofNF Ming L Yau thence

s 25deg2312 w a distance of siliy-eight and 22100 (6822) feet to a point on the westerly sideline of a fonner railroad right of way the previous course by land of the Town of Walpole assessor parcel 33-121 thence

S 55deg2937 E a distance of ninety-nine and 78 100 (99 78) feet to a point of tangency on the easterly sideline of a forn1er railroad right of way thence

Page 1 of 13

Bk 39600 Pg422 88608

s 30deg11 32 w

S 23deg49 I6 W

N 66deg1044 W

N 23deg4908 E

N l 6deg00 52 E

S 37deg0240 E

N 10deg1437 W

N 34deg093 I W

N 11 deg5558E

Northeasterly

N 27deg41 48 E

a distance of three hundred and three and 74100 (30374) feet the previous course by land ofNF Nicholas H Dowd and NF Emilio P Baldassari thence

a distance of four hundred ninety and 86100 (49086) feet to a SBdh the previous two (2) courses by the easterly sideline of a former railroad right of way thence

a distance of eighty-two and 76100 (8276) feet to an Iron Pipe on the westerly sideline of the former railroad right of way thence

a distance of twelve and 09100 (1209) feet to a SBdh thence

a distance of ninety-six and 50100 (9650) feet to a S Bdh thence

a distance of fifteen and 00100 (1500) feet the previous three (3) courses by the westerly sideline of the former railroad right ofway and land of NF Joseph R Carpentieri and NF Joseph R and Faith N Carpentiero thence

a distance of ninety-two and 82100 (9282) feet the previous course by land ofNF Richard A and Josette M Burke thence

a distance of tvvo hundred thirty-seven and 86100 (23786) feet to a point on the easterly sideline of South Street thence

a distance of one hundred twenty and 00100 (12000) feet along the easterly sideline of South Street to a point of curvature of the easterly sideline of South Street thence

and curving to the right along an arc of a curve having a radius of eight hundred and 00100 (80000) feet a length of two hundred hventy and 11100 (22011) feet along the easterly sideline of South Street thence

a distance of three hundred forty-hvo and 42100 (34242) feet to the point of beginning

Containing 621 Acres of land more or less

Page 2 of 13

3000

3005

3010

3015

3020

3025

3030

Bk 39600 Pg423 88608

EXHIBIT B (cont)

Points and Coordinates associated with Restriction Areas and Cover Types for the Activity and Use Limitations (AUL) at 50 amp 60 South Street Walpole Mass

Point Northing Easting Type

Curve Curve Number Len2th Radius

28754430528 7236432250 COR

3001 28755604597 7236680368 PC L=7535 R=80000

3002 2875597 1222 7236766913 POC

3003 28756333366 7236870620 PT

3004 28756280754 723697 3031 COR

28756025570 7237001250 COR

3006 28755918670 7237001140 COR

3007 28755864440 7237 I 05890 COR

3008 28755903200 72371963 IO COR

3009 28756030893 7237217396 COR

28756042534 7237250325 COR

3011 28756021733 7237317808 COR

3012 28755800732 7237640949 COR

3013 2875552 1424 7237667395 COR

3014 28755321388 7237708416 COR

28755197081 7237834881 COR

3016 28755102230 7238045173 COR

3017 28754941531 7238291869 COR

3018 28754851375 7238512944 COR

3019 28754753441 7238824 760 COR

28754681541 723916 1881 COR

3021 28754608227 7239406506 COR

3022 28754515846 7239459928 COR

3023 2875426 7589 723943 8163 COR

3024 28754198016 7239590840 COR

28753886764 7239449006 COR

3026 2875329 7944 7239187206 COR

3027 28752506745 7238837890 COR

3028 28751859560 7238552142 COR

3029 28751221833 723827342 l COR

28750848788 7238107869 COR

3031 2875045 3654 7237927814 COR

3032 28750630420 7237527432 COR

3033 28750741023 723757 6257 COR

3034 28751668594 7237842488 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 3 of 13 April 14 2021

3035

3040

3045

3050

3055

3060

3065

3070

Bk 39600 Pg424 88608

Point Number

Northing Easting Type Curve Leneth

Curve Radius

28751548848 7237932869 COR

3036 28752462269 7237767802 COR

3037 28756438461 7236904209 POC L=2207 R=80000

3038 28756543084 7236939245 PT

3039 2875653 7987 7236954123 PC

28756597578 7237007344 POC L=1651 R=937

3041 28756594465 7237087181 PT

3042 28756459044 7237347021 PC L=347 R=220

3043 28756432531 7237363546 PT

3044 28756280644 7237286201 COR

28755924210 7237966952 COR

3046 28756081959 7238048554 PC L=472 R=236

3047 28756064922 7238084404 PT

3048 28755523491 7237845047 COR

3049 28755419845 7238081981 COR

28755460757 7238099621 PC L=240 R=l57

3051 28755467701 7238120241 PT 3052 28755398690 7238275280 COR

3053 28755365410 7238264910 COR

3054 28755087149 7238900449 COR

28755158001 7238931521 COR

3056 28755040360 7239199770 COR

3057 28755311720 7239318930 COR

3058 28755263010 7239429300 COR

3059 28755388260 7239484290 COR

28755348660 7239576000 COR

3061 28755625470 7239696500 COR

3062 28755664605 7239606601 COR

3063 28755736202 7239637768 COR

3064 28755621870 7239897370 COR

287 5567 6160 7239920410 COR

3066 28755718270 7239830260 COR

3067 2875587 9750 7239900310 COR

3068 28755718790 724026 7600 COR

3069 28755763390 7240285350 COR

28756035900 7239926600 COR

3071 28756086280 7239812770 COR

3072 28756089984 7239813649 COR

3073 28756229128 7239501910 PC L=482 R=l54

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 4 of 13 Apnl 14 2021

3075

3080

3085

3090

3095

3100

3105

3110

Bk 39600 Pg425 88608

Point Number

Northing Easting Type Curve Length

Curve Radius

3074 28756257366 7239513984 PT

28756185799 7239674928 COR

3076 28756739833 7239921136 COR

3077 28756876060 7239682275 COR

3078 28756948336 7239735898 PC L=335 R=298

3079 28756958235 7239766064 PT

28756866081 7239978133 COR

3081 28757166275 7240127374 COR

3082 28757068320 7240314640 COR

3083 28757602980 7240594310 COR

3084 28757700050 7240408736 COR

28758247941 7240688376 COR

3086 28758250190 7240683910 COR

3087 28758344979 7240738168 COR

3088 2875843 6103 7240581527 COR

3089 28758602943 7240664224 COR

28758740024 7240397393 COR

3091 28758605706 724032 7776 PC L=477 R=309

3092 28758594882 7240286013 PT

3093 28758666635 7240197585 PC L=2573 R=3127

3094 28758767113 7240118710 POC

28758890752 7240086604 PRC L=I653 R=3993

3096 28758972305 7240074125 POC

3097 28759049552 7240045 I 52 PT

3098 28759330312 7239734408 COR

3099 28759459414 7239588584 PC L=2269 R=5217

28759524821 7239496174 POC

3101 28759568752 7239391829 PRC L=1814 R=486

3102 28759603259 7239308095 POC

3103 28759653883 7239232999 PCC L=l31 R=088

3104 28759665694 7239231411 PT

28759800587 7239299586 COR

3106 28759986288 7238981214 COR

3107 2875983 5797 7238891829 COR

3108 28759879750 7238798689 COR

3109 28759905380 7238754769 PC L=1600 R=2552

28759963590 7238700398 POC

3111 28760035727 7238666620 PT

3112 28760700665 723901 5672 PC L=4515 R=2500

3113 28760830230 7239191198 POC

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 5 of 13 April 14 2021

3115

3120

3125

3130

3135

3140

3145

3150

Bk 39600 Pg426 88608

Point Number

Northing Easting Type Curve Len2th

Curve Radius

3114 2876077 263 6 723 940 1624 PT 28760624518 7239567466 COR

3116 28760160100 7239276864 COR

3117 28760055928 7239453423 COR

3137 28759976118 7239541692 COR

3118 28759782139 7239764992 COR

3119 28759625581 7239640375 COR

28758966057 7240399493 COR

3121 28759184326 7240581973 COR

3122 28758593598 724126478] COR

3123 28757977293 724097 2314 COR

3124 28757716516 7241351659 COR

28757288251 7241140719 COR

3126 28756725827 7240851862 COR

3127 28756162468 7240586126 COR

3128 28755614498 7240338506 COR

3129 28754346745 7239768507 COR

28753845716 7239540194 COR

3131 28753257436 723927 8634 COR

3132 28752466355 7238929370 COR

3133 28751819340 7238643698 COR

3134 28751181527 7238364939 COR

28750807772 7238199071 COR

3136 28750413263 7238019301 COR

3138 28756920317 7237298739 PC L=l941 R=2104

3139 28756827128 7237274848 POC

28756733047 7237294944 PRC L=401 R=l66

3141 2875671 1336 723 727 2844 PCC L=1492 R=13345

3142 28756744594 7237206091 POC

3143 28756781529 7237141301 PCC L=1419 R=l018

3144 28756833084 7237094642 POC

28756902566 7237091952 PCC L=2413 R=157959

3146 28757017337 7237129167 POC

3147 28757131820 7237167258 PCC L=330I R=S0000

3148 28757282552 7237234442 POC

3149 28757431866 7237304721 PT 28757338390 7237495930 COR

3151 28757541620 7237605380 COR

3152 28756897590 723883 4280 COR

Exhibit B to NA UL-Part 11-EOS Coordinate Tables Page 6 of 3 April 14 202

3155

3160

3165

3170

3175

3180

3185

Bk 39600 Pg427 88608

Point Northing Easting Type Curve Cunbulle

Number Lenszth Radius 3153 28756870623 7238820218 COR

3154 28756838273 7238882258 COR

28756865240 7238896320 COR

3156 28756777004 7239062996 COR

3157 28756770439 7239063663 PC L=l 146 R=2269

3158 2875665836 I 7239046180 PCC L=l423 R=957

3159 2875661 7520 7238989913 POC

28756625544 7238920850 PT

3161 28756728525 7238726583 PC L=232 R=l58

3162 28756748720 7238720236 PT

3163 28756899634 7238797341 COR

3164 28757254653 7238121363 COR

28757520153 723761266 7 COR

3166 28757306899 723 750 IO 10 COR

3167 28756690336 7237500169 PC L=243 R=I68

3168 28756682599 7237479273 PT

3169 28756686990 7237469583 PC L=0250 R=l68

28756708806 7237463018 PT 3171 28757000109 7237616354 PC L=233 R=l73

3172 28757005368 7237637270 PT

3173 28757000998 7237645513 PC L=233 R=l69

3174 28756980219 7237651023 PT

28756429209 7238339422 COR

3176 28756342982 7238506849 COR

3177 28756500076 7238596485 PC L=l19 R=l48

3178 28756499701 7238608072 PT 3179 2875644 7813 7238705611 PC L=l 182 R=483

28756358177 723 869 0707 PT

3181 2875623 6099 7238376388 PC L=443 R=467

3182 28756235611 7238333779 PCC L=343 R=9IO

3183 28756249049 7238302418 PCC L=412 R=9IO

3184 28756278952 7238274519 PCC L=368 R=300

28756313362 7238277619 PT

3186 28756282498 7238911796 PC L748 R=216

3187 28756240650 7238919721 PT

3188 28756126081 7238620406 PC L=323 R162

3189 28756138645 7238591575 PCC L=333 R=283

Exhibit B to NAUL-Part II-EOS Coordmate Tables Page 7 of 13 April 14 2021

3190

3195

3200

3205

3210

3215

3220

Bk 39600 Pg428 88608

Point Number Northing Easting Type Curve

Leneth Curve Radius

28756163375 7238602867 PT

3191 2875523 0908 7238765275 COR

3192 28755205040 7238752740 COR

3193 28755391740 7238328470 COR

3194 28755466840 7238361040 COR

28755452760 7238392590 COR

3196 28755516920 7238421040 COR

3197 28755530690 7238388730 COR

3198 28755603230 7238421460 COR

3199 2875555 7568 723852 7053 COR

28755371220 7238445330 COR

3201 28755629198 7238558466 COR

3202 28755676040 7238453290 COR

3203 28755925410 7238563840 PC L=1902 R=3548

3204 28755927383 7238658634 POC

28755954390 7238749520 PT 3206 28755974770 7238807230 COR

3207 28755779200 7238881701 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

28755746700 7238609997 COR

3211 2875593774 7239036608 COR

3212 28756048460 7238996850 PC l=1445 R=2903

3213 28756070631 7239065422 POC

3214 28756109010 7239126420 PT

28756153820 7239182190 PC L=S98 R=848

3216 28756171980 723923 7880 PT

3217 287S6026148 7239566166 COR

3218 28756003865 7239556465 COR

3219 287S6134380 7239256650 COR

28755998460 7239195370 COR

3221 2875600 71S0 7239174530 COR

3222 28756001791 7239172152 COR

3223 28756040451 7239079437 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 8 of 13 April 14 2021

Bk 39600 Pg429 88608

Point Number

3210

3200

3056

3057

3058

3059

3060

3061

3062

3218

3219

3220

3221

3224

3225

3226

3227

3228

3070

3071

3234

3233

3235

3236

3237

3238

3239

3240

3241

3242

3243

3244

3245

3246

3247

3248

Northing

28755746700

28755371220

28755040360

28755311720

28755263010

28755388260

28755348660

2875562 54 70

28755664605

28756003865

28756134380

28755998460

28756007150

28755941340

28755962080

28755867937

28755819702

28755766128

28756035900

28756086280

28755991990

28755942100

28756477248

28756677238

28756650130

28756473307

28756480112

28756675030

28756724454

28756742099

28756742133

28756703924

28756640759

28757607280

28757401530

28757467350

Easting

7238609997

7238445330

7239199770

7239318930

7239429300

7239484290

7239576000

7239696500

7239606601

7239556465

7239256650

7239195370

7239174530

7239145324

7239100930

7239061674

7238935003

7238911508

7239926600

7239812770

7239769910

7239884050

7239261913

7239253008

7239321810

7239319038

7239298824

7239364440

7239271845

7239292625

723935 0187

7239393239

7239393096

7237584960

7237475300

7237345620

Type

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

PC PCC

POC

PCC

PT

COR

COR

COR

Curve Len2th

L=273

L=ll77

L=657

Cunmiddote Radius

R=1421

R=810

R=679

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 9 of 13 April 14 2021

Bk 39600 Pg430 88608

Point Number Northing Easting Type Curve

Len2th Curve Radius

3249 287 57514570 7237372360 PC l=ll05 R=1993

3250 287 57 588060 7237452980 PT

3251 28757631382 7237429676 PC L=2244 R=2352

3252 287 5765 6810 7237537876 POC

3253 2875 762 9720 7237645671 PT

3254 28756940655 7238952710 PC l=1493 R=1509

3255 28756901845 7239015577 POC

3256 2875683 7836 7239052474 PT

3257 28758104824 7237653014 COR

3258 28758028960 7237800160 COR

3259 28757949530 7237760790 COR

3260 28757901005 7237855021 COR

3261 28757839230 7237820908 PC L=273 R=l33

3262 28757830688 7237799810 PCC L=539 R=2144

3263 28757852974 7237750897 PT

3264 28757891705 7237688178 PC L=lS26 R=2432

3265 28757948636 7237637880 POC

3266 287 58018307 7237607597 PT

3248 28757467350 7237345620 COR

3267 28757550832 7237363444 POC L=2653 R=80000

3268 28757668809 7237424132 PT

3269 28757504 719 7238817989 COR

3270 28757493010 7238842230 COR

3271 28757561074 7238880970 COR

3272 28757483953 7239024127 PC L=323 R=l70

3273 28757459939 7239037846 PT

3274 28757311605 7238957122 PC L=1388 R=906

3275 2875727 2732 7238901647 POC

3276 28757283181 7238834718 PT

3277 287 5733 4061 7238752337 PC L=255 R=l60

3278 287 5735 5527 7238744411 PT

3279 2875 7102815 7239517199 PC l=261 R=l70

3280 28757080654 7239525307 PCC l=909 R=1275

3281 2875 700 5390 7239477911 PCC L=l007 R=990

3282 28756999624 7239381704 PT

3283 2875707 7705 7239230604 PC L=ll14 R=907

Exhibit B lo NAUL-Part IlbullEOS Coordinate Tables Page 10 of13 April 14 2021

3285

3290

3295

3300

3305

3310

3315

Bk 39600 Pg431 88608

Point Number Northing Easting Type

Curve Leneth

Curve Radius

3284 28757168066 7239178102 PT

28757205717 7239186398 PC L=518 R=930

3286 28757249003 7239213534 PCC L=l41 R=086

3287 2875724 7909 7239226048 PT

3288 28758415755 7239842757 PC L=251 R=l59

3289 28758437695 7239837379 PT

28758456377 7239846949 PC L=812 R=876

3291 28758494897 7239915165 PCC L=456 R=757

3292 28758483790 7239958646 PT

3293 28758405147 7240111348 PC L=l057 R=955

3294 28758318136 7240161452 PCC L=477 R=l063

28758272407 7240149529 PCC L=250 R=l60

3296 28758265647 7240128003 PT

3297 28758157937 7237680895 COR

3298 28758902927 723807 1969 COR

3299 28758852531 7238168280 COR

28758779660 7238129750 COR

3301 28758746973 7238192072 COR

3302 2875807 6630 7237840490 COR

3303 28758049940 7237894220 COR

3304 2875871 7997 7238243620 COR

28758680103 7238315946 COR

3306 28758533699 7238239240 COR

3307 2875852 6899 7238252220 COR

3308 28758098180 7238027600 COR

3309 28757974484 7238264223 COR

28757957598 7238255513 COR

3311 28757757732 7238637845 COR

3312 28757774584 7238646620 COR

3313 28757653710 723887 7846 COR

3314 28757560920 7238829340 COR

28759004930 7238125514 COR

3316 28759689797 7238485028 PC L=1992 R=2609

3317 28759697204 7238583760 POC

3318 28759667288 723867 8142 PT

3319 28758996126 7238323718 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 11 of 13 April 14202 I

Bk 39600 Pg432 88608

Point Number

Northing Easting Type Curve Lenfth

Curve Radius

3320 28759028950 7238261560 COR 3321 28758954486 7238222188 COR

3322 28758972523 7238378387 COR 3323 28759421550 7238613630 COR 3324 28759377933 7238698105 COR 3325 2875907 4811 7238539289 COR 3326 28759081611 7238526309 COR 3327 28758935210 7238449604 COR

3328 28759464470 7238637330 COR 3329 28759632674 7238722481 PC L=ll83 R=l578

3330 28759583973 7238755474 POC 3331 28759526573 7238768343 PRC L=2163 R=2455

3332 28759422964 7238796123 POC 3333 28759341091 7238865430 PT

3334 28759193370 7239050710 COR 3335 28759416340 7239163940 COR 3336 28759263600 7239455620 COR 3337 28759043690 7239336510 COR 3338 28758935490 7239552130 COR 3339 28757650890 7238883240 COR 3312 28757774584 7238646620 COR 3311 28757757732 7238637845 COR 3310 28757957598 7238255513 COR 3309 28757974484 7238264223 COR 3308 28758098180 723802 7600 COR 3307 28758526899 7238252220 COR 3306 28758533699 7238239240 COR 3340 28758700033 7238326388 COR 3341 28758675436 7238373334 COR 3342 28758733013 7238403500 COR 3343 28758760858 7238350353 COR 3344 28758860952 7238402796 COR 3345 28758833106 7238455943 COR 3346 28758890683 7238486109 COR 3347 28758915280 7238439162 COR 3326 28759081611 7238526309 COR 3325 28759074811 7238539289 COR

Exhibit B to NAUL-Part H-EOS Coordinate Tables Page 12 of l3 April 14 2021

Bk 39600 Pg433 88608

Point Number

Northing Easting Type Curve Len2th

Cunbulle Radius

3324 2875937 7933 7238698105 COR

3082 28757068320 7240314640 COR 3083 28757602980 7240594310 COR 3349 28757790234 7240236327 COR

3348 28757255574 7239956657 COR

3124 28757716516 7241351659 COR 3125 28757288251 7241140719 COR 3126 28756725827 7240851862 COR 3127 28756162468 7240586126 COR 3128 287 55614498 7240338506 COR 3129 28754346745 7239768507 COR 3130 28753845716 7239540194 COR 3131 28753257436 723927 8634 COR 3132 28752466355 7238929370 COR 3133 28751819340 7238643698 COR 3134 2875118152 7 7238364939 COR 3135 2875080 7772 7238199071 COR 3136 28750413263 7238019301 COR 3350 28750296168 7238284525 COR 3351 28754 78 6636 7240267040 COR 3352 28757412029 7241794586 COR

POINT DESCRIPTION ABBREVIATIONS

COR=CORNER PC= POINT OF CURVE WHERE CURVE STARTS POC -= POINT ON CUR VE PT=POINT OF TANGENCY WHERE THE CURVE ENDS PCC = POINT OF COMPOUND CURVE (WHERE RADIUS CHANGES) PRC = POINT OF REVERSE CURVE

NOTES

THE COORDINATES ARE BASED ON AN EXISTING CONDITIONS AS-BUILT FIELD SURVEY BY NORWOOD ENGINEERING CO INC BETWEEN NOVEMBER 15 TO DECEMBER 18 2019 TI-IE COORDINATES ARE BASED ON l1ASSACHUSETIS ST A TE PLANE COORDINATE SYSTEM NAD 1983 (FEET) THE ACCURACY OF THE COORDINATE LOCATIONS ARE +-0J FEET

Exhibit B to N1UL-Part II-EOS Coordmate Tables Page 13 ofl3 April 14 2021

---

1f~ flJr ~i

f ~~ J~i](M~I ~ 1 jf~ ~~f W-- )e 1

It lj fY pl ~-~j

I --- ~ ~

1 (J-c~ er ~

C JI fl JYf

1 ~ ~Yu-~ 1i

~r

( LOClJS P

SCAUllbulliQO

I ar lMIT flG PINI tMS _ lIIPMIDMICXNllRlnT~tlCfllUS 1111D cmuftraquodl s - NIKl1III tfIJIIIIIOfM~1HCll allE1

DAre Jllrl

NUKIJU LU6 DMitM

mmtG6DKbdlt

~4~-middot

~~I

-- ampnbullllf~ ~ fa

LEGEND 0

-i~wr0o-m lICUUoaampbullco--11111 _ _l_J

0

bull ~-ail_I

~-

mo(I ---fwj

amp~~~~ ~ ~~ltgtmiddot ~A~

~6

_L-r

bull -~ IBP__l-11Uil n-rlfl-lffll rMCllI 1a 1rr ai

-~ lll-lliI u-W--11a 1 Ml[ 411 amt l0IIC 3JICJ7 ~ 33-1--I- DIID llXII D111 JlMZ 411 lraquo- ~lUN~t --- - etMpound 11JII

~ MffD mmaat ZL I01t 111

1Jlll~-IICfIQfJICIISJ DfEI IC71- I~ 1~ 9 Cl 1VY IICIIWCLl~fCSC~lNCl

~11HltOXW1A~JtCI~llfB MXIC 1HI lME INCi 111M bull11 (S 1f41~middot~-~-)

~ io

0 0 0 0 -0 0 0 D O 1 middot tbull O

_- _pound ~ - Tf middot- ---r ~~ ~~- ~=middoti

r jil7bull --------4~-middot~

(

SCAtpound 1bull bull YI

I ~ tfAIE lIMa toafllltl1E ~NAD1w1(rJ

1 ~ PlIla II MMt QI 11D TD D111oPl

~c1MlntID9~~-l 1NIIJIIKlNI LnlJTU ~ deg qllAJSTE uM011111 iu1II 1111ZT IIIILJaZ

Exhibit C - Photo-Reduced Copy of Activity and Use Limitations Plan of Land

--~middot---

I ~111-11111

iiiii

-ill111liilt

ACJIYIJY ANJ) lJSE lJJll7ATJONS PLAN OF LANI)

81ACJ(81R1 I IINION Flr11lfES SllffllF7AVO SIle

o tfO SOIJIH s1ar HlltlPOtL IIAS

SCAlElrJAt IPfffl152021

1IJrwod Eng1neerlng

- EnQlbullHrlflg Compaffy middot~~=~ m Cm1JQ u fnfJa-eal

~ -

-~

9l1EET 1 OF I 8324-02

td ~

w ~ m 0 0

Id Q ii w ii

co co m

co 0

-l

~-77--raquo- -~I~ )middot~ ~ bull _I lT ~ v~

AI ~ If ~)middot~ 7- ~1 c t11 yil ~ ~ ~middot~41 bull1 l ~~l(i~r~1 f7 )ll y-

~~ f -~ -v fgtV ~ ~ ~ l er-- u -

tl x-P~C ()

JP yen f(( 11 1degpoundS -~ (

ftunrTfflllllTnallJrNNQWDf ~ ti IZNtRlTT lnH M IULS IIJIUIUlA-DlltlllllDlJlllIICIF tJbllt~llC~lJNp

DTl NlllltaJatl-Witiill (raquo11 iiiK(+til

I aJnlTlKATJlfl PlAH~ THE PUIIJll1T UC TIUlf Mlaquo THE l5 11 oawG ~ NII 1Hpound1as Of1111E111 AMllfrlTll9laquolllt Mpound ntem OPlaJ CJ1 IWM1pound BREn 011 bulln

~ ~illi~fli~ _lt ---c~-Clmiddot~~c0-nmiddotmiddot~bullJmiddot04~- ~--~--yen~~bull - L -bull -n ~ -r - ~ -

it

~ fr ~ ~- -~bull~bullv OG- ~n0

bull--ltmiddot middot~ -~- ~~-=~7~st~-~~~~i~~Hil~-) 2~C 0 ~~~~~ --------Y-Tgt-bullbullmiddot-

U-IU ~middotshy =i==-

bullbull bull _ -middot-

~----- ( ~11middot

__IC1ZMJ - bull IOC)0l lftEf ___ i gt mEKJllJfNG rotJ1FRIIIT AIIEAS B~ p~ AIIEAS ~ea-vmiddot LIUIID

~ e--- -+ ~ rzprz1za 1 ~ IJTATC PRC ~TC

nJml lltPtasCltJ

DUD BCD lJlll7 PMC 4H 1 1 YERT1CAL M1llI II NCCI ~ _ ro conurr DOD 80CIC 3JII07 llME 4H I ntaM NUIU 1121 IJ4TAI m IMlC 111111 nATIIW ~fsi

tJMAlfflOlI) AIIEAS1 bull 11AMJSCAlfl) AlpoundAS Lill] 1Dll IOlII POT PlCit 6115 J)-t20 ~atfnujK~tlLWlQI

~PUNMl-17 POflTIVNf1Ell llaD BaalC Tl_ Paa bullbull - 99 a 11

_-ijf1iltDP~IZ~ 5CME - JOSUva1fTLJ ~ ~-rr 111 C tMI=

bull111 I~

i=iiii7

~ e---

t c z rl

L-n11 ~

ACJIVJTY AND USE LIAlffAJIONS

PIAN OF RESTRIC1EJJ AREAS ANJJ COVER TYPES

fltACK1(fN _ llNlltgtI PfMIECCS SllPVFVNlJ51Tlt

JO _ lxJ srJllH STREET IIALPrJU JASS

SCAU I - 30 APRIL 2021

lcnwod Engineering

llarwood Cngnrilgtf cpmy -t~~~~

fIL Pllpa-ru - (1u]1a-lftll

~L=wl f 01~JII IO_

a SIEET I (F 2 B324-02

bj ~

w 0

0 0 deg It

iQ ~ w l11

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 1 of 2

CX) CX)

deg CX) 0

ntllT -1~1~ rurnlaquo1 r1n l1XTM 11Nf -r~ lie UUffCI 11Pt lDll1Hf iniin --IC unr1G Tlr 1n1rn Iota allll Ito tyen1tlll ~~11CRnrzJ11-11--~ci-- n31 nr111w11J1t ~bull c ~- diams JDrnn llloffl rcnlml IDII

-~ ]al rll _ _ PnlM-1-PI lbull-- ll7HrirrIPlllD1lf~-a bullbullll 111bull IClln9XnolDlllIIIIIIOm

214 ff7371JOOT ~bull JllC Ibullbull 171 JICllEY)l)vlUTlo~lUl~ ~li_~ -~~ MDlol ll4L~TllJraquofllllf190abullbullt ~~nQuu~~1aJI _~~OtottWU~1t11txm~arcPbrmllmCDt ~~ ~~ ~ =~ gj ~l11~ llltlM Mrattllll TDPmllIDCDI JJ4bull e~ _ ~ e PClC lbullI- 1- ~1sect~ ~ ~ ~ ~ ~~~-nr~44bull~mn11-a11 ~~ =mt =m~ ~ ~~ ~ =~~-~~ =~~rt~l~llibullltbull=

~~~~~~~~r-~r-~~sectsect55~55 ~~ ~=g~~ mi --1~ ~-==~~m~ L-~r UVPllrlllUillDITDr4L 1JI lbullKlllll~==~~~=~

~~~~~~~~ raquoff-llll 111rritl_aianbull ~11lCla rr- n ttll XDP11r1r 11111c-1C111~ RTl~rJlllllbullbull~llllJlllipo~~=r~tm=~~

~=~3r~t==~ ~=~i==~~ llt1ttl70 m~~n~ =n~ L diams 11- bull - iaEi~mi 1lE~HHffi ~1-~ E LbulllT bullU-7YA 8911U TMn4 OJII C- lllkHrnl1nlntll11106~

MJ9~gt111ftlrfffll11 ~ SbullC61hLJT raquoWl lll~IJlll11amp1 utVllllt a lbulllfGl bulllC lT

lliilH~1 ~~rm-=rn~ lbullIIIICU-1bull0

itt ishwI JUo ma m1 bull 1-c iiliii ~==~m~=~ Ullln U7IIY M1NLl411 fflf f-~ llr IL ~ lbullt Ill uaP11rllDn1rin1bull139nf- na_ 1111lnl ___ lWTDf-ID 111Jbullnllr-cishy

J1JT1 lflTI-noLbull COi lJ1 tsr18GOTDrl1~ 1--Cn ~~~==-=~ LbullS1rbull-p

LbulllI ~middot x1 fl11bull diams an l~J P-~ WI 1~1Slrmsraquo11nirorn 11bull1n-

llrgt 58 - TDrl ZJlJ l~ Zl llf4 Pll1raquo91I lnP~IIEI 11 ==~=-~~ lbullt-11bullh1~

nun_-~bullfllrlll_ lbulll-lrbull N- - nr6-11MII rinaus a 1bull1E-t1 im1 nrxi mr~ 7nn1 4i i 1c m llrS~iJ-ltJlillII Tt-Ul ris ~=~~middotiill~~ tf llDln~n1rJrgt11nbull1ric ~IPgt9nq~ It-MU rbull RflrrlllVllbulltPllbullOIIUAfC lbullnJtrNbull_~lD+4ftJSHJ7711JrllIIIIT144lDI lbulll ~I llfs-mllThn~-f 1bull11

1a5blH=i5gS El~ iE =iilli ~ID aH~~ ~~ leJINNllllfflnlt10ff1nll~1g=TI==~- lbullN~Jmiddot pw nrwuhtl tba11 l- lllllsectimiii~ ~ lllaquot ll116UW41 llllII NII Cl Ld bullt ll 11r 111~-~lHtl-IINOClll 1Dgtn~rMOtnllfbull3all)Mnr~bullwrmm11uoo~ ~r~ m~ = ~~ t~-i m NNtotl n11nn cm

~~~~~Ttr~ in Httl01llxl nlfM114ta cm

JJN n=-PIW - I- C lbullT rnr nnubullNoXI ffllPI n1 11-amp 11middot 77)111fflffPl~JlaUII

i1JJ n91lbull ti Jnlftbulllll QII

~g=~~~~ir~f~5 =i~=~~ ~=~ ~ ~j====goi H1111t-llll ffo~ ~rn tm111 ta1Vl~ tnar- IVI rm u1i ~ nw ~illl cm 1111 Hltt1H T7U 72w111ll tm UI ftffiH~bull1 naMUlI nlll

lltfll~IOUl rnes~ttlClll

~I~~=~=~~= l3111ratlQOJ121lllll CS u1n-n-a mn-c~11111llllilr ~====m~~ lbulllllr~~Oll~r1111-t~rtRiHa)toI

-~rt~_Utr111tt~USI ~m~i==r~~llfflpound1gtgtMllkllit1U10C011 annrxnbull-TCRL11ai~=~=~g)llllll~--rWltMJtt-8 DR Pl rraquof ntl rim Gllf CCI~~1r~~ liiilllii u- ntlt bull llJ~naJCDI

raquo11NMl10~Ullllcm ntrlnK)fL~nlln-1c lllf ~--TlJaft_Lmc i lbull1 bull l3il0 Nl-197) Ttlll1344 a LbullI 3 l diams 1-111 lflS 1111lOllt ffl- MP PII bullHI lgtl llJI l97Mlt Ian -ti DG llC

111111===-~~~=mg ====~~ tD rlrffllZllIITO-lfllCIIII=~tr~L~~~= - Pl~I llII TD_ ff~ tDII31119NIJMlDffU~~ H CZIII liii~mlt~ D1111nrn11GQ~-CaKftQNJWNczr41140ffnQCUII Jnffnt1JIIIIJunbull~1Qc20lll ~Pllli ll mrnnn lbulltlP 17Jrffdeg-degluoElJIIIQII

~-I-ti _nrna~rlll

a n- 4411 llbullQI 1=40 rt La n- lllf ffrgtn _Jr_~ Ullk ---rr~~ ~=~=tl~~ =1 nttltt nraquo 1nlU as

=-mn--~111DJIDII Ullgt~fflflnanaaJIIJalt55~~EIS~=~~ ~~)1 -11CIJII nn~bullbullbullnaKatt1ta1

JOIT ru~- rf- deg hJIIII r- 111111 ~1111) -1 aJ1 ld t11D1etlll_TalCIS -~-UCV~bullraquootur=~=~I~~=~--~ ~rsrgo_mlaquoshym rs~11flI ~- rnilr==~=~~ ~~r _ ~ atfl ~ rtw Dgtlnn-f-lEllln17n-UIIP

D11 fflXTJ111111 I~~ ar D1Jn4 ~leJJS-OnC111

=====5 middoti SHU=~ 5 ampn iliiiiiIiI11

ngtgtn~1~1tbullubull1rm DH tu~- lt11 rirmU1111 CDIII

~i~i555mi~ ~~ ~m=~==m~g===~~~~ tn1r JtW ~ma- PiOll a CU

~ XNr~t~fDllll1-all~~ m===~~ bullbull~W 111111 ==~~ ampT g~ ru~ =

~lU $Et=ni ~ llll0111ra1Ln~otqC011

H~ g==i =~1 ~

~111111 ~~g~n~a~J))pound11 1=~)6tia

~~ mEfHfH~Si

amp12Ct _ an ~

U N711f21th mM1LU aa o1bull~--117CII in4r ~llllll1Vffl-111Dlr lit~ Hmtlpound1 71 12L I CCIII ---~CUnMIIUOCVf JIHtlnn nl 7r ll4011CIIII

llllDNXCWZflDtlltllCIDCDr

~~=~==~=gnn n1raquoL bullw noanDNt CIJIIi=~ C~middot ~ ~ ~ HnffTI-QIJroQ__111PtlJIIInfflll bullbull1~ aaeIT t-- nrJD nJUntu~CllWI

m ~1 ~ ~~~ ~ ilria~gliiiji~=ir ~lt-OTT gl1raquo ~Iraquou fflllIL nllll 1111111 flC~middotIY_4allCCIIIi l1i5~ ~~11~middot~ ~~ ffll H71W786lll 7P-JOalllllll 2N ~ 1-flllt 7HIJl4- DI ~ ~==~ ~t-tr bullM-

114 Hit71aTra7ririatNOCIIII

llHl1Hf ll~7Dl4fIZIIICIIII 1141ftillf+1DllnTgtlMa~=~bull==~r Lbulll-lllbullbulllJJ

=~~~HR-~a ~ =iEri ~ ~=6

= 1MESE COCIIIOlfAlEi ARC 9~ at AH DISTlfG CONJmOfS AS-alLT FED 5UKiEY Y NORWDal EJICltJIJll(G CD~ IIElMEN ~ 1S 111 DECDaR a 2DII 1)pound OCICIIIDNAlES 5HCflI UIpound IIAID Cit MltSSAOfllffT5 STATE FlJriNII CDCffllNAT smult ~AO leJ (IMIJ 1HE ACQlltACY ltF 1HE COCftDINT[ LDCAnatS Mpound diams- 01 FtU

POINT DESCRIPTION ABBREVIATIONS~-~middotPC Pmlr Of CLIRIJC bullIEllL ClMNpound STilRlS PDC bull PtJtilTIIJOM1poundr ~ [raquo TAHCINiT W(R[ lll[ CURpound uroo Fo F[1NT(1t~tfflvt[ltft1llllIIUlt OMNtilE)PRC ~T oT ~pound ~Vlllrlt

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 2 of 2

I ~ IHAT nfl PlM MS 81D1 PIIDMQl ~WllTM(llUI MOIIEOIAAlPlllR~Df IIUPS C- lttE ~111 Cl__ HftNMIIIZlt

WWWWJU Cii6 liftitit

ACTIVITY ANI) USE LINTATIONS

PLAN OF RES7RIC1EJJ AREAS ANJJ COlER TYPES

8V CKlJ()RN IJNl()N PflllfpoundCpoundS SlllERFIIMJ SITC

50 HJ S(J11( SmEpoundT llAIPOIL JASS

=r-o ~ ll 2021

~ Engmeer1ng

Hltd ~~ middot~~-=~ra (f~AJ lIQ c- f

a llfEET 2 ltF 6324-02

td ~

w ~ m 0 0

Id Q ii w m

co co m 0 co

Bk 39600 Pg437 88608

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY New England Region

Five Post Office Square - Suite 100 Boston Massachusetts 02109-3912

INSTITUTIONAL CONTROL DESIGN STATEMENT FOR THE BLACKBURN AND UNION PRIVILEGES SUPERFUND SITE - EAST OF SOUTH STREET AREA

1 Introduction

Pursuant to the Comprehensive Environmental Response Compensation and Liability Act 42 USC sect 9601 et seq (CERCLA) and the National Contingency Plan 40 CFR Part 300 (the NCP) this document contains a description of the release events and site history that resulted in the contaminated media that require institutional controls in the fom1 of Activity and Use Limitations the basis for land use restrictions and uses that are consistent and inconsistent with the Selected Remedy ( as described below) This Institutional Control (IC) Design Statement pertains to a portion of the Blackburn and Union Privileges Superfund Site located in the Town of Walpole Massachusetts (the Site) which has been listed on EPAs National Priorities List (NPL) which portion is generally referred to as the East of South Street Area (the EOS Area) The EOS Area is located to the east of South Street in Walpole and is shown on Figure 1 attached hereto

A Notice of Activity and Use Limitation (NAUL) is necessary and appropriate for the EOS Area of the Site based on the fact that pursuant to EPAs risk evaluations asbestos arsenic trichloroethene (TCE) and certain polycyclic aromatic hydrocarbon (PAH) contan1inants remain in place in soils at levels higher than those appropriate for unlimited use or unrestricted exposure groundwater underlying the EOS Area contains hazardous substances at levels that present an unacceptable risk of exposure and remedial measures at the Site must be protected and maintained to ensure that the Selected Remedy remains protective

EPAs Record of Decision (ROD) dated September 30 2008 specified the need for institutional controls such as a NAUL to ensure long-tenn perfonnance and protectiveness of the Selected Remedy The institutional controls described herein are necessary and appropriate to ensure that the Selected Remedy for the Site remains protective of human health and the environment The remedy for the Site as described in the ROD is referred to herein and in the NAUL as the Selected Remedy

Page 1 of7

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 17: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

Bk 39600 Pg422 88608

s 30deg11 32 w

S 23deg49 I6 W

N 66deg1044 W

N 23deg4908 E

N l 6deg00 52 E

S 37deg0240 E

N 10deg1437 W

N 34deg093 I W

N 11 deg5558E

Northeasterly

N 27deg41 48 E

a distance of three hundred and three and 74100 (30374) feet the previous course by land ofNF Nicholas H Dowd and NF Emilio P Baldassari thence

a distance of four hundred ninety and 86100 (49086) feet to a SBdh the previous two (2) courses by the easterly sideline of a former railroad right of way thence

a distance of eighty-two and 76100 (8276) feet to an Iron Pipe on the westerly sideline of the former railroad right of way thence

a distance of twelve and 09100 (1209) feet to a SBdh thence

a distance of ninety-six and 50100 (9650) feet to a S Bdh thence

a distance of fifteen and 00100 (1500) feet the previous three (3) courses by the westerly sideline of the former railroad right ofway and land of NF Joseph R Carpentieri and NF Joseph R and Faith N Carpentiero thence

a distance of ninety-two and 82100 (9282) feet the previous course by land ofNF Richard A and Josette M Burke thence

a distance of tvvo hundred thirty-seven and 86100 (23786) feet to a point on the easterly sideline of South Street thence

a distance of one hundred twenty and 00100 (12000) feet along the easterly sideline of South Street to a point of curvature of the easterly sideline of South Street thence

and curving to the right along an arc of a curve having a radius of eight hundred and 00100 (80000) feet a length of two hundred hventy and 11100 (22011) feet along the easterly sideline of South Street thence

a distance of three hundred forty-hvo and 42100 (34242) feet to the point of beginning

Containing 621 Acres of land more or less

Page 2 of 13

3000

3005

3010

3015

3020

3025

3030

Bk 39600 Pg423 88608

EXHIBIT B (cont)

Points and Coordinates associated with Restriction Areas and Cover Types for the Activity and Use Limitations (AUL) at 50 amp 60 South Street Walpole Mass

Point Northing Easting Type

Curve Curve Number Len2th Radius

28754430528 7236432250 COR

3001 28755604597 7236680368 PC L=7535 R=80000

3002 2875597 1222 7236766913 POC

3003 28756333366 7236870620 PT

3004 28756280754 723697 3031 COR

28756025570 7237001250 COR

3006 28755918670 7237001140 COR

3007 28755864440 7237 I 05890 COR

3008 28755903200 72371963 IO COR

3009 28756030893 7237217396 COR

28756042534 7237250325 COR

3011 28756021733 7237317808 COR

3012 28755800732 7237640949 COR

3013 2875552 1424 7237667395 COR

3014 28755321388 7237708416 COR

28755197081 7237834881 COR

3016 28755102230 7238045173 COR

3017 28754941531 7238291869 COR

3018 28754851375 7238512944 COR

3019 28754753441 7238824 760 COR

28754681541 723916 1881 COR

3021 28754608227 7239406506 COR

3022 28754515846 7239459928 COR

3023 2875426 7589 723943 8163 COR

3024 28754198016 7239590840 COR

28753886764 7239449006 COR

3026 2875329 7944 7239187206 COR

3027 28752506745 7238837890 COR

3028 28751859560 7238552142 COR

3029 28751221833 723827342 l COR

28750848788 7238107869 COR

3031 2875045 3654 7237927814 COR

3032 28750630420 7237527432 COR

3033 28750741023 723757 6257 COR

3034 28751668594 7237842488 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 3 of 13 April 14 2021

3035

3040

3045

3050

3055

3060

3065

3070

Bk 39600 Pg424 88608

Point Number

Northing Easting Type Curve Leneth

Curve Radius

28751548848 7237932869 COR

3036 28752462269 7237767802 COR

3037 28756438461 7236904209 POC L=2207 R=80000

3038 28756543084 7236939245 PT

3039 2875653 7987 7236954123 PC

28756597578 7237007344 POC L=1651 R=937

3041 28756594465 7237087181 PT

3042 28756459044 7237347021 PC L=347 R=220

3043 28756432531 7237363546 PT

3044 28756280644 7237286201 COR

28755924210 7237966952 COR

3046 28756081959 7238048554 PC L=472 R=236

3047 28756064922 7238084404 PT

3048 28755523491 7237845047 COR

3049 28755419845 7238081981 COR

28755460757 7238099621 PC L=240 R=l57

3051 28755467701 7238120241 PT 3052 28755398690 7238275280 COR

3053 28755365410 7238264910 COR

3054 28755087149 7238900449 COR

28755158001 7238931521 COR

3056 28755040360 7239199770 COR

3057 28755311720 7239318930 COR

3058 28755263010 7239429300 COR

3059 28755388260 7239484290 COR

28755348660 7239576000 COR

3061 28755625470 7239696500 COR

3062 28755664605 7239606601 COR

3063 28755736202 7239637768 COR

3064 28755621870 7239897370 COR

287 5567 6160 7239920410 COR

3066 28755718270 7239830260 COR

3067 2875587 9750 7239900310 COR

3068 28755718790 724026 7600 COR

3069 28755763390 7240285350 COR

28756035900 7239926600 COR

3071 28756086280 7239812770 COR

3072 28756089984 7239813649 COR

3073 28756229128 7239501910 PC L=482 R=l54

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 4 of 13 Apnl 14 2021

3075

3080

3085

3090

3095

3100

3105

3110

Bk 39600 Pg425 88608

Point Number

Northing Easting Type Curve Length

Curve Radius

3074 28756257366 7239513984 PT

28756185799 7239674928 COR

3076 28756739833 7239921136 COR

3077 28756876060 7239682275 COR

3078 28756948336 7239735898 PC L=335 R=298

3079 28756958235 7239766064 PT

28756866081 7239978133 COR

3081 28757166275 7240127374 COR

3082 28757068320 7240314640 COR

3083 28757602980 7240594310 COR

3084 28757700050 7240408736 COR

28758247941 7240688376 COR

3086 28758250190 7240683910 COR

3087 28758344979 7240738168 COR

3088 2875843 6103 7240581527 COR

3089 28758602943 7240664224 COR

28758740024 7240397393 COR

3091 28758605706 724032 7776 PC L=477 R=309

3092 28758594882 7240286013 PT

3093 28758666635 7240197585 PC L=2573 R=3127

3094 28758767113 7240118710 POC

28758890752 7240086604 PRC L=I653 R=3993

3096 28758972305 7240074125 POC

3097 28759049552 7240045 I 52 PT

3098 28759330312 7239734408 COR

3099 28759459414 7239588584 PC L=2269 R=5217

28759524821 7239496174 POC

3101 28759568752 7239391829 PRC L=1814 R=486

3102 28759603259 7239308095 POC

3103 28759653883 7239232999 PCC L=l31 R=088

3104 28759665694 7239231411 PT

28759800587 7239299586 COR

3106 28759986288 7238981214 COR

3107 2875983 5797 7238891829 COR

3108 28759879750 7238798689 COR

3109 28759905380 7238754769 PC L=1600 R=2552

28759963590 7238700398 POC

3111 28760035727 7238666620 PT

3112 28760700665 723901 5672 PC L=4515 R=2500

3113 28760830230 7239191198 POC

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 5 of 13 April 14 2021

3115

3120

3125

3130

3135

3140

3145

3150

Bk 39600 Pg426 88608

Point Number

Northing Easting Type Curve Len2th

Curve Radius

3114 2876077 263 6 723 940 1624 PT 28760624518 7239567466 COR

3116 28760160100 7239276864 COR

3117 28760055928 7239453423 COR

3137 28759976118 7239541692 COR

3118 28759782139 7239764992 COR

3119 28759625581 7239640375 COR

28758966057 7240399493 COR

3121 28759184326 7240581973 COR

3122 28758593598 724126478] COR

3123 28757977293 724097 2314 COR

3124 28757716516 7241351659 COR

28757288251 7241140719 COR

3126 28756725827 7240851862 COR

3127 28756162468 7240586126 COR

3128 28755614498 7240338506 COR

3129 28754346745 7239768507 COR

28753845716 7239540194 COR

3131 28753257436 723927 8634 COR

3132 28752466355 7238929370 COR

3133 28751819340 7238643698 COR

3134 28751181527 7238364939 COR

28750807772 7238199071 COR

3136 28750413263 7238019301 COR

3138 28756920317 7237298739 PC L=l941 R=2104

3139 28756827128 7237274848 POC

28756733047 7237294944 PRC L=401 R=l66

3141 2875671 1336 723 727 2844 PCC L=1492 R=13345

3142 28756744594 7237206091 POC

3143 28756781529 7237141301 PCC L=1419 R=l018

3144 28756833084 7237094642 POC

28756902566 7237091952 PCC L=2413 R=157959

3146 28757017337 7237129167 POC

3147 28757131820 7237167258 PCC L=330I R=S0000

3148 28757282552 7237234442 POC

3149 28757431866 7237304721 PT 28757338390 7237495930 COR

3151 28757541620 7237605380 COR

3152 28756897590 723883 4280 COR

Exhibit B to NA UL-Part 11-EOS Coordinate Tables Page 6 of 3 April 14 202

3155

3160

3165

3170

3175

3180

3185

Bk 39600 Pg427 88608

Point Northing Easting Type Curve Cunbulle

Number Lenszth Radius 3153 28756870623 7238820218 COR

3154 28756838273 7238882258 COR

28756865240 7238896320 COR

3156 28756777004 7239062996 COR

3157 28756770439 7239063663 PC L=l 146 R=2269

3158 2875665836 I 7239046180 PCC L=l423 R=957

3159 2875661 7520 7238989913 POC

28756625544 7238920850 PT

3161 28756728525 7238726583 PC L=232 R=l58

3162 28756748720 7238720236 PT

3163 28756899634 7238797341 COR

3164 28757254653 7238121363 COR

28757520153 723761266 7 COR

3166 28757306899 723 750 IO 10 COR

3167 28756690336 7237500169 PC L=243 R=I68

3168 28756682599 7237479273 PT

3169 28756686990 7237469583 PC L=0250 R=l68

28756708806 7237463018 PT 3171 28757000109 7237616354 PC L=233 R=l73

3172 28757005368 7237637270 PT

3173 28757000998 7237645513 PC L=233 R=l69

3174 28756980219 7237651023 PT

28756429209 7238339422 COR

3176 28756342982 7238506849 COR

3177 28756500076 7238596485 PC L=l19 R=l48

3178 28756499701 7238608072 PT 3179 2875644 7813 7238705611 PC L=l 182 R=483

28756358177 723 869 0707 PT

3181 2875623 6099 7238376388 PC L=443 R=467

3182 28756235611 7238333779 PCC L=343 R=9IO

3183 28756249049 7238302418 PCC L=412 R=9IO

3184 28756278952 7238274519 PCC L=368 R=300

28756313362 7238277619 PT

3186 28756282498 7238911796 PC L748 R=216

3187 28756240650 7238919721 PT

3188 28756126081 7238620406 PC L=323 R162

3189 28756138645 7238591575 PCC L=333 R=283

Exhibit B to NAUL-Part II-EOS Coordmate Tables Page 7 of 13 April 14 2021

3190

3195

3200

3205

3210

3215

3220

Bk 39600 Pg428 88608

Point Number Northing Easting Type Curve

Leneth Curve Radius

28756163375 7238602867 PT

3191 2875523 0908 7238765275 COR

3192 28755205040 7238752740 COR

3193 28755391740 7238328470 COR

3194 28755466840 7238361040 COR

28755452760 7238392590 COR

3196 28755516920 7238421040 COR

3197 28755530690 7238388730 COR

3198 28755603230 7238421460 COR

3199 2875555 7568 723852 7053 COR

28755371220 7238445330 COR

3201 28755629198 7238558466 COR

3202 28755676040 7238453290 COR

3203 28755925410 7238563840 PC L=1902 R=3548

3204 28755927383 7238658634 POC

28755954390 7238749520 PT 3206 28755974770 7238807230 COR

3207 28755779200 7238881701 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

28755746700 7238609997 COR

3211 2875593774 7239036608 COR

3212 28756048460 7238996850 PC l=1445 R=2903

3213 28756070631 7239065422 POC

3214 28756109010 7239126420 PT

28756153820 7239182190 PC L=S98 R=848

3216 28756171980 723923 7880 PT

3217 287S6026148 7239566166 COR

3218 28756003865 7239556465 COR

3219 287S6134380 7239256650 COR

28755998460 7239195370 COR

3221 2875600 71S0 7239174530 COR

3222 28756001791 7239172152 COR

3223 28756040451 7239079437 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 8 of 13 April 14 2021

Bk 39600 Pg429 88608

Point Number

3210

3200

3056

3057

3058

3059

3060

3061

3062

3218

3219

3220

3221

3224

3225

3226

3227

3228

3070

3071

3234

3233

3235

3236

3237

3238

3239

3240

3241

3242

3243

3244

3245

3246

3247

3248

Northing

28755746700

28755371220

28755040360

28755311720

28755263010

28755388260

28755348660

2875562 54 70

28755664605

28756003865

28756134380

28755998460

28756007150

28755941340

28755962080

28755867937

28755819702

28755766128

28756035900

28756086280

28755991990

28755942100

28756477248

28756677238

28756650130

28756473307

28756480112

28756675030

28756724454

28756742099

28756742133

28756703924

28756640759

28757607280

28757401530

28757467350

Easting

7238609997

7238445330

7239199770

7239318930

7239429300

7239484290

7239576000

7239696500

7239606601

7239556465

7239256650

7239195370

7239174530

7239145324

7239100930

7239061674

7238935003

7238911508

7239926600

7239812770

7239769910

7239884050

7239261913

7239253008

7239321810

7239319038

7239298824

7239364440

7239271845

7239292625

723935 0187

7239393239

7239393096

7237584960

7237475300

7237345620

Type

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

PC PCC

POC

PCC

PT

COR

COR

COR

Curve Len2th

L=273

L=ll77

L=657

Cunmiddote Radius

R=1421

R=810

R=679

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 9 of 13 April 14 2021

Bk 39600 Pg430 88608

Point Number Northing Easting Type Curve

Len2th Curve Radius

3249 287 57514570 7237372360 PC l=ll05 R=1993

3250 287 57 588060 7237452980 PT

3251 28757631382 7237429676 PC L=2244 R=2352

3252 287 5765 6810 7237537876 POC

3253 2875 762 9720 7237645671 PT

3254 28756940655 7238952710 PC l=1493 R=1509

3255 28756901845 7239015577 POC

3256 2875683 7836 7239052474 PT

3257 28758104824 7237653014 COR

3258 28758028960 7237800160 COR

3259 28757949530 7237760790 COR

3260 28757901005 7237855021 COR

3261 28757839230 7237820908 PC L=273 R=l33

3262 28757830688 7237799810 PCC L=539 R=2144

3263 28757852974 7237750897 PT

3264 28757891705 7237688178 PC L=lS26 R=2432

3265 28757948636 7237637880 POC

3266 287 58018307 7237607597 PT

3248 28757467350 7237345620 COR

3267 28757550832 7237363444 POC L=2653 R=80000

3268 28757668809 7237424132 PT

3269 28757504 719 7238817989 COR

3270 28757493010 7238842230 COR

3271 28757561074 7238880970 COR

3272 28757483953 7239024127 PC L=323 R=l70

3273 28757459939 7239037846 PT

3274 28757311605 7238957122 PC L=1388 R=906

3275 2875727 2732 7238901647 POC

3276 28757283181 7238834718 PT

3277 287 5733 4061 7238752337 PC L=255 R=l60

3278 287 5735 5527 7238744411 PT

3279 2875 7102815 7239517199 PC l=261 R=l70

3280 28757080654 7239525307 PCC l=909 R=1275

3281 2875 700 5390 7239477911 PCC L=l007 R=990

3282 28756999624 7239381704 PT

3283 2875707 7705 7239230604 PC L=ll14 R=907

Exhibit B lo NAUL-Part IlbullEOS Coordinate Tables Page 10 of13 April 14 2021

3285

3290

3295

3300

3305

3310

3315

Bk 39600 Pg431 88608

Point Number Northing Easting Type

Curve Leneth

Curve Radius

3284 28757168066 7239178102 PT

28757205717 7239186398 PC L=518 R=930

3286 28757249003 7239213534 PCC L=l41 R=086

3287 2875724 7909 7239226048 PT

3288 28758415755 7239842757 PC L=251 R=l59

3289 28758437695 7239837379 PT

28758456377 7239846949 PC L=812 R=876

3291 28758494897 7239915165 PCC L=456 R=757

3292 28758483790 7239958646 PT

3293 28758405147 7240111348 PC L=l057 R=955

3294 28758318136 7240161452 PCC L=477 R=l063

28758272407 7240149529 PCC L=250 R=l60

3296 28758265647 7240128003 PT

3297 28758157937 7237680895 COR

3298 28758902927 723807 1969 COR

3299 28758852531 7238168280 COR

28758779660 7238129750 COR

3301 28758746973 7238192072 COR

3302 2875807 6630 7237840490 COR

3303 28758049940 7237894220 COR

3304 2875871 7997 7238243620 COR

28758680103 7238315946 COR

3306 28758533699 7238239240 COR

3307 2875852 6899 7238252220 COR

3308 28758098180 7238027600 COR

3309 28757974484 7238264223 COR

28757957598 7238255513 COR

3311 28757757732 7238637845 COR

3312 28757774584 7238646620 COR

3313 28757653710 723887 7846 COR

3314 28757560920 7238829340 COR

28759004930 7238125514 COR

3316 28759689797 7238485028 PC L=1992 R=2609

3317 28759697204 7238583760 POC

3318 28759667288 723867 8142 PT

3319 28758996126 7238323718 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 11 of 13 April 14202 I

Bk 39600 Pg432 88608

Point Number

Northing Easting Type Curve Lenfth

Curve Radius

3320 28759028950 7238261560 COR 3321 28758954486 7238222188 COR

3322 28758972523 7238378387 COR 3323 28759421550 7238613630 COR 3324 28759377933 7238698105 COR 3325 2875907 4811 7238539289 COR 3326 28759081611 7238526309 COR 3327 28758935210 7238449604 COR

3328 28759464470 7238637330 COR 3329 28759632674 7238722481 PC L=ll83 R=l578

3330 28759583973 7238755474 POC 3331 28759526573 7238768343 PRC L=2163 R=2455

3332 28759422964 7238796123 POC 3333 28759341091 7238865430 PT

3334 28759193370 7239050710 COR 3335 28759416340 7239163940 COR 3336 28759263600 7239455620 COR 3337 28759043690 7239336510 COR 3338 28758935490 7239552130 COR 3339 28757650890 7238883240 COR 3312 28757774584 7238646620 COR 3311 28757757732 7238637845 COR 3310 28757957598 7238255513 COR 3309 28757974484 7238264223 COR 3308 28758098180 723802 7600 COR 3307 28758526899 7238252220 COR 3306 28758533699 7238239240 COR 3340 28758700033 7238326388 COR 3341 28758675436 7238373334 COR 3342 28758733013 7238403500 COR 3343 28758760858 7238350353 COR 3344 28758860952 7238402796 COR 3345 28758833106 7238455943 COR 3346 28758890683 7238486109 COR 3347 28758915280 7238439162 COR 3326 28759081611 7238526309 COR 3325 28759074811 7238539289 COR

Exhibit B to NAUL-Part H-EOS Coordinate Tables Page 12 of l3 April 14 2021

Bk 39600 Pg433 88608

Point Number

Northing Easting Type Curve Len2th

Cunbulle Radius

3324 2875937 7933 7238698105 COR

3082 28757068320 7240314640 COR 3083 28757602980 7240594310 COR 3349 28757790234 7240236327 COR

3348 28757255574 7239956657 COR

3124 28757716516 7241351659 COR 3125 28757288251 7241140719 COR 3126 28756725827 7240851862 COR 3127 28756162468 7240586126 COR 3128 287 55614498 7240338506 COR 3129 28754346745 7239768507 COR 3130 28753845716 7239540194 COR 3131 28753257436 723927 8634 COR 3132 28752466355 7238929370 COR 3133 28751819340 7238643698 COR 3134 2875118152 7 7238364939 COR 3135 2875080 7772 7238199071 COR 3136 28750413263 7238019301 COR 3350 28750296168 7238284525 COR 3351 28754 78 6636 7240267040 COR 3352 28757412029 7241794586 COR

POINT DESCRIPTION ABBREVIATIONS

COR=CORNER PC= POINT OF CURVE WHERE CURVE STARTS POC -= POINT ON CUR VE PT=POINT OF TANGENCY WHERE THE CURVE ENDS PCC = POINT OF COMPOUND CURVE (WHERE RADIUS CHANGES) PRC = POINT OF REVERSE CURVE

NOTES

THE COORDINATES ARE BASED ON AN EXISTING CONDITIONS AS-BUILT FIELD SURVEY BY NORWOOD ENGINEERING CO INC BETWEEN NOVEMBER 15 TO DECEMBER 18 2019 TI-IE COORDINATES ARE BASED ON l1ASSACHUSETIS ST A TE PLANE COORDINATE SYSTEM NAD 1983 (FEET) THE ACCURACY OF THE COORDINATE LOCATIONS ARE +-0J FEET

Exhibit B to N1UL-Part II-EOS Coordmate Tables Page 13 ofl3 April 14 2021

---

1f~ flJr ~i

f ~~ J~i](M~I ~ 1 jf~ ~~f W-- )e 1

It lj fY pl ~-~j

I --- ~ ~

1 (J-c~ er ~

C JI fl JYf

1 ~ ~Yu-~ 1i

~r

( LOClJS P

SCAUllbulliQO

I ar lMIT flG PINI tMS _ lIIPMIDMICXNllRlnT~tlCfllUS 1111D cmuftraquodl s - NIKl1III tfIJIIIIIOfM~1HCll allE1

DAre Jllrl

NUKIJU LU6 DMitM

mmtG6DKbdlt

~4~-middot

~~I

-- ampnbullllf~ ~ fa

LEGEND 0

-i~wr0o-m lICUUoaampbullco--11111 _ _l_J

0

bull ~-ail_I

~-

mo(I ---fwj

amp~~~~ ~ ~~ltgtmiddot ~A~

~6

_L-r

bull -~ IBP__l-11Uil n-rlfl-lffll rMCllI 1a 1rr ai

-~ lll-lliI u-W--11a 1 Ml[ 411 amt l0IIC 3JICJ7 ~ 33-1--I- DIID llXII D111 JlMZ 411 lraquo- ~lUN~t --- - etMpound 11JII

~ MffD mmaat ZL I01t 111

1Jlll~-IICfIQfJICIISJ DfEI IC71- I~ 1~ 9 Cl 1VY IICIIWCLl~fCSC~lNCl

~11HltOXW1A~JtCI~llfB MXIC 1HI lME INCi 111M bull11 (S 1f41~middot~-~-)

~ io

0 0 0 0 -0 0 0 D O 1 middot tbull O

_- _pound ~ - Tf middot- ---r ~~ ~~- ~=middoti

r jil7bull --------4~-middot~

(

SCAtpound 1bull bull YI

I ~ tfAIE lIMa toafllltl1E ~NAD1w1(rJ

1 ~ PlIla II MMt QI 11D TD D111oPl

~c1MlntID9~~-l 1NIIJIIKlNI LnlJTU ~ deg qllAJSTE uM011111 iu1II 1111ZT IIIILJaZ

Exhibit C - Photo-Reduced Copy of Activity and Use Limitations Plan of Land

--~middot---

I ~111-11111

iiiii

-ill111liilt

ACJIYIJY ANJ) lJSE lJJll7ATJONS PLAN OF LANI)

81ACJ(81R1 I IINION Flr11lfES SllffllF7AVO SIle

o tfO SOIJIH s1ar HlltlPOtL IIAS

SCAlElrJAt IPfffl152021

1IJrwod Eng1neerlng

- EnQlbullHrlflg Compaffy middot~~=~ m Cm1JQ u fnfJa-eal

~ -

-~

9l1EET 1 OF I 8324-02

td ~

w ~ m 0 0

Id Q ii w ii

co co m

co 0

-l

~-77--raquo- -~I~ )middot~ ~ bull _I lT ~ v~

AI ~ If ~)middot~ 7- ~1 c t11 yil ~ ~ ~middot~41 bull1 l ~~l(i~r~1 f7 )ll y-

~~ f -~ -v fgtV ~ ~ ~ l er-- u -

tl x-P~C ()

JP yen f(( 11 1degpoundS -~ (

ftunrTfflllllTnallJrNNQWDf ~ ti IZNtRlTT lnH M IULS IIJIUIUlA-DlltlllllDlJlllIICIF tJbllt~llC~lJNp

DTl NlllltaJatl-Witiill (raquo11 iiiK(+til

I aJnlTlKATJlfl PlAH~ THE PUIIJll1T UC TIUlf Mlaquo THE l5 11 oawG ~ NII 1Hpound1as Of1111E111 AMllfrlTll9laquolllt Mpound ntem OPlaJ CJ1 IWM1pound BREn 011 bulln

~ ~illi~fli~ _lt ---c~-Clmiddot~~c0-nmiddotmiddot~bullJmiddot04~- ~--~--yen~~bull - L -bull -n ~ -r - ~ -

it

~ fr ~ ~- -~bull~bullv OG- ~n0

bull--ltmiddot middot~ -~- ~~-=~7~st~-~~~~i~~Hil~-) 2~C 0 ~~~~~ --------Y-Tgt-bullbullmiddot-

U-IU ~middotshy =i==-

bullbull bull _ -middot-

~----- ( ~11middot

__IC1ZMJ - bull IOC)0l lftEf ___ i gt mEKJllJfNG rotJ1FRIIIT AIIEAS B~ p~ AIIEAS ~ea-vmiddot LIUIID

~ e--- -+ ~ rzprz1za 1 ~ IJTATC PRC ~TC

nJml lltPtasCltJ

DUD BCD lJlll7 PMC 4H 1 1 YERT1CAL M1llI II NCCI ~ _ ro conurr DOD 80CIC 3JII07 llME 4H I ntaM NUIU 1121 IJ4TAI m IMlC 111111 nATIIW ~fsi

tJMAlfflOlI) AIIEAS1 bull 11AMJSCAlfl) AlpoundAS Lill] 1Dll IOlII POT PlCit 6115 J)-t20 ~atfnujK~tlLWlQI

~PUNMl-17 POflTIVNf1Ell llaD BaalC Tl_ Paa bullbull - 99 a 11

_-ijf1iltDP~IZ~ 5CME - JOSUva1fTLJ ~ ~-rr 111 C tMI=

bull111 I~

i=iiii7

~ e---

t c z rl

L-n11 ~

ACJIVJTY AND USE LIAlffAJIONS

PIAN OF RESTRIC1EJJ AREAS ANJJ COVER TYPES

fltACK1(fN _ llNlltgtI PfMIECCS SllPVFVNlJ51Tlt

JO _ lxJ srJllH STREET IIALPrJU JASS

SCAU I - 30 APRIL 2021

lcnwod Engineering

llarwood Cngnrilgtf cpmy -t~~~~

fIL Pllpa-ru - (1u]1a-lftll

~L=wl f 01~JII IO_

a SIEET I (F 2 B324-02

bj ~

w 0

0 0 deg It

iQ ~ w l11

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 1 of 2

CX) CX)

deg CX) 0

ntllT -1~1~ rurnlaquo1 r1n l1XTM 11Nf -r~ lie UUffCI 11Pt lDll1Hf iniin --IC unr1G Tlr 1n1rn Iota allll Ito tyen1tlll ~~11CRnrzJ11-11--~ci-- n31 nr111w11J1t ~bull c ~- diams JDrnn llloffl rcnlml IDII

-~ ]al rll _ _ PnlM-1-PI lbull-- ll7HrirrIPlllD1lf~-a bullbullll 111bull IClln9XnolDlllIIIIIIOm

214 ff7371JOOT ~bull JllC Ibullbull 171 JICllEY)l)vlUTlo~lUl~ ~li_~ -~~ MDlol ll4L~TllJraquofllllf190abullbullt ~~nQuu~~1aJI _~~OtottWU~1t11txm~arcPbrmllmCDt ~~ ~~ ~ =~ gj ~l11~ llltlM Mrattllll TDPmllIDCDI JJ4bull e~ _ ~ e PClC lbullI- 1- ~1sect~ ~ ~ ~ ~ ~~~-nr~44bull~mn11-a11 ~~ =mt =m~ ~ ~~ ~ =~~-~~ =~~rt~l~llibullltbull=

~~~~~~~~r-~r-~~sectsect55~55 ~~ ~=g~~ mi --1~ ~-==~~m~ L-~r UVPllrlllUillDITDr4L 1JI lbullKlllll~==~~~=~

~~~~~~~~ raquoff-llll 111rritl_aianbull ~11lCla rr- n ttll XDP11r1r 11111c-1C111~ RTl~rJlllllbullbull~llllJlllipo~~=r~tm=~~

~=~3r~t==~ ~=~i==~~ llt1ttl70 m~~n~ =n~ L diams 11- bull - iaEi~mi 1lE~HHffi ~1-~ E LbulllT bullU-7YA 8911U TMn4 OJII C- lllkHrnl1nlntll11106~

MJ9~gt111ftlrfffll11 ~ SbullC61hLJT raquoWl lll~IJlll11amp1 utVllllt a lbulllfGl bulllC lT

lliilH~1 ~~rm-=rn~ lbullIIIICU-1bull0

itt ishwI JUo ma m1 bull 1-c iiliii ~==~m~=~ Ullln U7IIY M1NLl411 fflf f-~ llr IL ~ lbullt Ill uaP11rllDn1rin1bull139nf- na_ 1111lnl ___ lWTDf-ID 111Jbullnllr-cishy

J1JT1 lflTI-noLbull COi lJ1 tsr18GOTDrl1~ 1--Cn ~~~==-=~ LbullS1rbull-p

LbulllI ~middot x1 fl11bull diams an l~J P-~ WI 1~1Slrmsraquo11nirorn 11bull1n-

llrgt 58 - TDrl ZJlJ l~ Zl llf4 Pll1raquo91I lnP~IIEI 11 ==~=-~~ lbullt-11bullh1~

nun_-~bullfllrlll_ lbulll-lrbull N- - nr6-11MII rinaus a 1bull1E-t1 im1 nrxi mr~ 7nn1 4i i 1c m llrS~iJ-ltJlillII Tt-Ul ris ~=~~middotiill~~ tf llDln~n1rJrgt11nbull1ric ~IPgt9nq~ It-MU rbull RflrrlllVllbulltPllbullOIIUAfC lbullnJtrNbull_~lD+4ftJSHJ7711JrllIIIIT144lDI lbulll ~I llfs-mllThn~-f 1bull11

1a5blH=i5gS El~ iE =iilli ~ID aH~~ ~~ leJINNllllfflnlt10ff1nll~1g=TI==~- lbullN~Jmiddot pw nrwuhtl tba11 l- lllllsectimiii~ ~ lllaquot ll116UW41 llllII NII Cl Ld bullt ll 11r 111~-~lHtl-IINOClll 1Dgtn~rMOtnllfbull3all)Mnr~bullwrmm11uoo~ ~r~ m~ = ~~ t~-i m NNtotl n11nn cm

~~~~~Ttr~ in Httl01llxl nlfM114ta cm

JJN n=-PIW - I- C lbullT rnr nnubullNoXI ffllPI n1 11-amp 11middot 77)111fflffPl~JlaUII

i1JJ n91lbull ti Jnlftbulllll QII

~g=~~~~ir~f~5 =i~=~~ ~=~ ~ ~j====goi H1111t-llll ffo~ ~rn tm111 ta1Vl~ tnar- IVI rm u1i ~ nw ~illl cm 1111 Hltt1H T7U 72w111ll tm UI ftffiH~bull1 naMUlI nlll

lltfll~IOUl rnes~ttlClll

~I~~=~=~~= l3111ratlQOJ121lllll CS u1n-n-a mn-c~11111llllilr ~====m~~ lbulllllr~~Oll~r1111-t~rtRiHa)toI

-~rt~_Utr111tt~USI ~m~i==r~~llfflpound1gtgtMllkllit1U10C011 annrxnbull-TCRL11ai~=~=~g)llllll~--rWltMJtt-8 DR Pl rraquof ntl rim Gllf CCI~~1r~~ liiilllii u- ntlt bull llJ~naJCDI

raquo11NMl10~Ullllcm ntrlnK)fL~nlln-1c lllf ~--TlJaft_Lmc i lbull1 bull l3il0 Nl-197) Ttlll1344 a LbullI 3 l diams 1-111 lflS 1111lOllt ffl- MP PII bullHI lgtl llJI l97Mlt Ian -ti DG llC

111111===-~~~=mg ====~~ tD rlrffllZllIITO-lfllCIIII=~tr~L~~~= - Pl~I llII TD_ ff~ tDII31119NIJMlDffU~~ H CZIII liii~mlt~ D1111nrn11GQ~-CaKftQNJWNczr41140ffnQCUII Jnffnt1JIIIIJunbull~1Qc20lll ~Pllli ll mrnnn lbulltlP 17Jrffdeg-degluoElJIIIQII

~-I-ti _nrna~rlll

a n- 4411 llbullQI 1=40 rt La n- lllf ffrgtn _Jr_~ Ullk ---rr~~ ~=~=tl~~ =1 nttltt nraquo 1nlU as

=-mn--~111DJIDII Ullgt~fflflnanaaJIIJalt55~~EIS~=~~ ~~)1 -11CIJII nn~bullbullbullnaKatt1ta1

JOIT ru~- rf- deg hJIIII r- 111111 ~1111) -1 aJ1 ld t11D1etlll_TalCIS -~-UCV~bullraquootur=~=~I~~=~--~ ~rsrgo_mlaquoshym rs~11flI ~- rnilr==~=~~ ~~r _ ~ atfl ~ rtw Dgtlnn-f-lEllln17n-UIIP

D11 fflXTJ111111 I~~ ar D1Jn4 ~leJJS-OnC111

=====5 middoti SHU=~ 5 ampn iliiiiiIiI11

ngtgtn~1~1tbullubull1rm DH tu~- lt11 rirmU1111 CDIII

~i~i555mi~ ~~ ~m=~==m~g===~~~~ tn1r JtW ~ma- PiOll a CU

~ XNr~t~fDllll1-all~~ m===~~ bullbull~W 111111 ==~~ ampT g~ ru~ =

~lU $Et=ni ~ llll0111ra1Ln~otqC011

H~ g==i =~1 ~

~111111 ~~g~n~a~J))pound11 1=~)6tia

~~ mEfHfH~Si

amp12Ct _ an ~

U N711f21th mM1LU aa o1bull~--117CII in4r ~llllll1Vffl-111Dlr lit~ Hmtlpound1 71 12L I CCIII ---~CUnMIIUOCVf JIHtlnn nl 7r ll4011CIIII

llllDNXCWZflDtlltllCIDCDr

~~=~==~=gnn n1raquoL bullw noanDNt CIJIIi=~ C~middot ~ ~ ~ HnffTI-QIJroQ__111PtlJIIInfflll bullbull1~ aaeIT t-- nrJD nJUntu~CllWI

m ~1 ~ ~~~ ~ ilria~gliiiji~=ir ~lt-OTT gl1raquo ~Iraquou fflllIL nllll 1111111 flC~middotIY_4allCCIIIi l1i5~ ~~11~middot~ ~~ ffll H71W786lll 7P-JOalllllll 2N ~ 1-flllt 7HIJl4- DI ~ ~==~ ~t-tr bullM-

114 Hit71aTra7ririatNOCIIII

llHl1Hf ll~7Dl4fIZIIICIIII 1141ftillf+1DllnTgtlMa~=~bull==~r Lbulll-lllbullbulllJJ

=~~~HR-~a ~ =iEri ~ ~=6

= 1MESE COCIIIOlfAlEi ARC 9~ at AH DISTlfG CONJmOfS AS-alLT FED 5UKiEY Y NORWDal EJICltJIJll(G CD~ IIElMEN ~ 1S 111 DECDaR a 2DII 1)pound OCICIIIDNAlES 5HCflI UIpound IIAID Cit MltSSAOfllffT5 STATE FlJriNII CDCffllNAT smult ~AO leJ (IMIJ 1HE ACQlltACY ltF 1HE COCftDINT[ LDCAnatS Mpound diams- 01 FtU

POINT DESCRIPTION ABBREVIATIONS~-~middotPC Pmlr Of CLIRIJC bullIEllL ClMNpound STilRlS PDC bull PtJtilTIIJOM1poundr ~ [raquo TAHCINiT W(R[ lll[ CURpound uroo Fo F[1NT(1t~tfflvt[ltft1llllIIUlt OMNtilE)PRC ~T oT ~pound ~Vlllrlt

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 2 of 2

I ~ IHAT nfl PlM MS 81D1 PIIDMQl ~WllTM(llUI MOIIEOIAAlPlllR~Df IIUPS C- lttE ~111 Cl__ HftNMIIIZlt

WWWWJU Cii6 liftitit

ACTIVITY ANI) USE LINTATIONS

PLAN OF RES7RIC1EJJ AREAS ANJJ COlER TYPES

8V CKlJ()RN IJNl()N PflllfpoundCpoundS SlllERFIIMJ SITC

50 HJ S(J11( SmEpoundT llAIPOIL JASS

=r-o ~ ll 2021

~ Engmeer1ng

Hltd ~~ middot~~-=~ra (f~AJ lIQ c- f

a llfEET 2 ltF 6324-02

td ~

w ~ m 0 0

Id Q ii w m

co co m 0 co

Bk 39600 Pg437 88608

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY New England Region

Five Post Office Square - Suite 100 Boston Massachusetts 02109-3912

INSTITUTIONAL CONTROL DESIGN STATEMENT FOR THE BLACKBURN AND UNION PRIVILEGES SUPERFUND SITE - EAST OF SOUTH STREET AREA

1 Introduction

Pursuant to the Comprehensive Environmental Response Compensation and Liability Act 42 USC sect 9601 et seq (CERCLA) and the National Contingency Plan 40 CFR Part 300 (the NCP) this document contains a description of the release events and site history that resulted in the contaminated media that require institutional controls in the fom1 of Activity and Use Limitations the basis for land use restrictions and uses that are consistent and inconsistent with the Selected Remedy ( as described below) This Institutional Control (IC) Design Statement pertains to a portion of the Blackburn and Union Privileges Superfund Site located in the Town of Walpole Massachusetts (the Site) which has been listed on EPAs National Priorities List (NPL) which portion is generally referred to as the East of South Street Area (the EOS Area) The EOS Area is located to the east of South Street in Walpole and is shown on Figure 1 attached hereto

A Notice of Activity and Use Limitation (NAUL) is necessary and appropriate for the EOS Area of the Site based on the fact that pursuant to EPAs risk evaluations asbestos arsenic trichloroethene (TCE) and certain polycyclic aromatic hydrocarbon (PAH) contan1inants remain in place in soils at levels higher than those appropriate for unlimited use or unrestricted exposure groundwater underlying the EOS Area contains hazardous substances at levels that present an unacceptable risk of exposure and remedial measures at the Site must be protected and maintained to ensure that the Selected Remedy remains protective

EPAs Record of Decision (ROD) dated September 30 2008 specified the need for institutional controls such as a NAUL to ensure long-tenn perfonnance and protectiveness of the Selected Remedy The institutional controls described herein are necessary and appropriate to ensure that the Selected Remedy for the Site remains protective of human health and the environment The remedy for the Site as described in the ROD is referred to herein and in the NAUL as the Selected Remedy

Page 1 of7

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 18: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

3000

3005

3010

3015

3020

3025

3030

Bk 39600 Pg423 88608

EXHIBIT B (cont)

Points and Coordinates associated with Restriction Areas and Cover Types for the Activity and Use Limitations (AUL) at 50 amp 60 South Street Walpole Mass

Point Northing Easting Type

Curve Curve Number Len2th Radius

28754430528 7236432250 COR

3001 28755604597 7236680368 PC L=7535 R=80000

3002 2875597 1222 7236766913 POC

3003 28756333366 7236870620 PT

3004 28756280754 723697 3031 COR

28756025570 7237001250 COR

3006 28755918670 7237001140 COR

3007 28755864440 7237 I 05890 COR

3008 28755903200 72371963 IO COR

3009 28756030893 7237217396 COR

28756042534 7237250325 COR

3011 28756021733 7237317808 COR

3012 28755800732 7237640949 COR

3013 2875552 1424 7237667395 COR

3014 28755321388 7237708416 COR

28755197081 7237834881 COR

3016 28755102230 7238045173 COR

3017 28754941531 7238291869 COR

3018 28754851375 7238512944 COR

3019 28754753441 7238824 760 COR

28754681541 723916 1881 COR

3021 28754608227 7239406506 COR

3022 28754515846 7239459928 COR

3023 2875426 7589 723943 8163 COR

3024 28754198016 7239590840 COR

28753886764 7239449006 COR

3026 2875329 7944 7239187206 COR

3027 28752506745 7238837890 COR

3028 28751859560 7238552142 COR

3029 28751221833 723827342 l COR

28750848788 7238107869 COR

3031 2875045 3654 7237927814 COR

3032 28750630420 7237527432 COR

3033 28750741023 723757 6257 COR

3034 28751668594 7237842488 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 3 of 13 April 14 2021

3035

3040

3045

3050

3055

3060

3065

3070

Bk 39600 Pg424 88608

Point Number

Northing Easting Type Curve Leneth

Curve Radius

28751548848 7237932869 COR

3036 28752462269 7237767802 COR

3037 28756438461 7236904209 POC L=2207 R=80000

3038 28756543084 7236939245 PT

3039 2875653 7987 7236954123 PC

28756597578 7237007344 POC L=1651 R=937

3041 28756594465 7237087181 PT

3042 28756459044 7237347021 PC L=347 R=220

3043 28756432531 7237363546 PT

3044 28756280644 7237286201 COR

28755924210 7237966952 COR

3046 28756081959 7238048554 PC L=472 R=236

3047 28756064922 7238084404 PT

3048 28755523491 7237845047 COR

3049 28755419845 7238081981 COR

28755460757 7238099621 PC L=240 R=l57

3051 28755467701 7238120241 PT 3052 28755398690 7238275280 COR

3053 28755365410 7238264910 COR

3054 28755087149 7238900449 COR

28755158001 7238931521 COR

3056 28755040360 7239199770 COR

3057 28755311720 7239318930 COR

3058 28755263010 7239429300 COR

3059 28755388260 7239484290 COR

28755348660 7239576000 COR

3061 28755625470 7239696500 COR

3062 28755664605 7239606601 COR

3063 28755736202 7239637768 COR

3064 28755621870 7239897370 COR

287 5567 6160 7239920410 COR

3066 28755718270 7239830260 COR

3067 2875587 9750 7239900310 COR

3068 28755718790 724026 7600 COR

3069 28755763390 7240285350 COR

28756035900 7239926600 COR

3071 28756086280 7239812770 COR

3072 28756089984 7239813649 COR

3073 28756229128 7239501910 PC L=482 R=l54

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 4 of 13 Apnl 14 2021

3075

3080

3085

3090

3095

3100

3105

3110

Bk 39600 Pg425 88608

Point Number

Northing Easting Type Curve Length

Curve Radius

3074 28756257366 7239513984 PT

28756185799 7239674928 COR

3076 28756739833 7239921136 COR

3077 28756876060 7239682275 COR

3078 28756948336 7239735898 PC L=335 R=298

3079 28756958235 7239766064 PT

28756866081 7239978133 COR

3081 28757166275 7240127374 COR

3082 28757068320 7240314640 COR

3083 28757602980 7240594310 COR

3084 28757700050 7240408736 COR

28758247941 7240688376 COR

3086 28758250190 7240683910 COR

3087 28758344979 7240738168 COR

3088 2875843 6103 7240581527 COR

3089 28758602943 7240664224 COR

28758740024 7240397393 COR

3091 28758605706 724032 7776 PC L=477 R=309

3092 28758594882 7240286013 PT

3093 28758666635 7240197585 PC L=2573 R=3127

3094 28758767113 7240118710 POC

28758890752 7240086604 PRC L=I653 R=3993

3096 28758972305 7240074125 POC

3097 28759049552 7240045 I 52 PT

3098 28759330312 7239734408 COR

3099 28759459414 7239588584 PC L=2269 R=5217

28759524821 7239496174 POC

3101 28759568752 7239391829 PRC L=1814 R=486

3102 28759603259 7239308095 POC

3103 28759653883 7239232999 PCC L=l31 R=088

3104 28759665694 7239231411 PT

28759800587 7239299586 COR

3106 28759986288 7238981214 COR

3107 2875983 5797 7238891829 COR

3108 28759879750 7238798689 COR

3109 28759905380 7238754769 PC L=1600 R=2552

28759963590 7238700398 POC

3111 28760035727 7238666620 PT

3112 28760700665 723901 5672 PC L=4515 R=2500

3113 28760830230 7239191198 POC

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 5 of 13 April 14 2021

3115

3120

3125

3130

3135

3140

3145

3150

Bk 39600 Pg426 88608

Point Number

Northing Easting Type Curve Len2th

Curve Radius

3114 2876077 263 6 723 940 1624 PT 28760624518 7239567466 COR

3116 28760160100 7239276864 COR

3117 28760055928 7239453423 COR

3137 28759976118 7239541692 COR

3118 28759782139 7239764992 COR

3119 28759625581 7239640375 COR

28758966057 7240399493 COR

3121 28759184326 7240581973 COR

3122 28758593598 724126478] COR

3123 28757977293 724097 2314 COR

3124 28757716516 7241351659 COR

28757288251 7241140719 COR

3126 28756725827 7240851862 COR

3127 28756162468 7240586126 COR

3128 28755614498 7240338506 COR

3129 28754346745 7239768507 COR

28753845716 7239540194 COR

3131 28753257436 723927 8634 COR

3132 28752466355 7238929370 COR

3133 28751819340 7238643698 COR

3134 28751181527 7238364939 COR

28750807772 7238199071 COR

3136 28750413263 7238019301 COR

3138 28756920317 7237298739 PC L=l941 R=2104

3139 28756827128 7237274848 POC

28756733047 7237294944 PRC L=401 R=l66

3141 2875671 1336 723 727 2844 PCC L=1492 R=13345

3142 28756744594 7237206091 POC

3143 28756781529 7237141301 PCC L=1419 R=l018

3144 28756833084 7237094642 POC

28756902566 7237091952 PCC L=2413 R=157959

3146 28757017337 7237129167 POC

3147 28757131820 7237167258 PCC L=330I R=S0000

3148 28757282552 7237234442 POC

3149 28757431866 7237304721 PT 28757338390 7237495930 COR

3151 28757541620 7237605380 COR

3152 28756897590 723883 4280 COR

Exhibit B to NA UL-Part 11-EOS Coordinate Tables Page 6 of 3 April 14 202

3155

3160

3165

3170

3175

3180

3185

Bk 39600 Pg427 88608

Point Northing Easting Type Curve Cunbulle

Number Lenszth Radius 3153 28756870623 7238820218 COR

3154 28756838273 7238882258 COR

28756865240 7238896320 COR

3156 28756777004 7239062996 COR

3157 28756770439 7239063663 PC L=l 146 R=2269

3158 2875665836 I 7239046180 PCC L=l423 R=957

3159 2875661 7520 7238989913 POC

28756625544 7238920850 PT

3161 28756728525 7238726583 PC L=232 R=l58

3162 28756748720 7238720236 PT

3163 28756899634 7238797341 COR

3164 28757254653 7238121363 COR

28757520153 723761266 7 COR

3166 28757306899 723 750 IO 10 COR

3167 28756690336 7237500169 PC L=243 R=I68

3168 28756682599 7237479273 PT

3169 28756686990 7237469583 PC L=0250 R=l68

28756708806 7237463018 PT 3171 28757000109 7237616354 PC L=233 R=l73

3172 28757005368 7237637270 PT

3173 28757000998 7237645513 PC L=233 R=l69

3174 28756980219 7237651023 PT

28756429209 7238339422 COR

3176 28756342982 7238506849 COR

3177 28756500076 7238596485 PC L=l19 R=l48

3178 28756499701 7238608072 PT 3179 2875644 7813 7238705611 PC L=l 182 R=483

28756358177 723 869 0707 PT

3181 2875623 6099 7238376388 PC L=443 R=467

3182 28756235611 7238333779 PCC L=343 R=9IO

3183 28756249049 7238302418 PCC L=412 R=9IO

3184 28756278952 7238274519 PCC L=368 R=300

28756313362 7238277619 PT

3186 28756282498 7238911796 PC L748 R=216

3187 28756240650 7238919721 PT

3188 28756126081 7238620406 PC L=323 R162

3189 28756138645 7238591575 PCC L=333 R=283

Exhibit B to NAUL-Part II-EOS Coordmate Tables Page 7 of 13 April 14 2021

3190

3195

3200

3205

3210

3215

3220

Bk 39600 Pg428 88608

Point Number Northing Easting Type Curve

Leneth Curve Radius

28756163375 7238602867 PT

3191 2875523 0908 7238765275 COR

3192 28755205040 7238752740 COR

3193 28755391740 7238328470 COR

3194 28755466840 7238361040 COR

28755452760 7238392590 COR

3196 28755516920 7238421040 COR

3197 28755530690 7238388730 COR

3198 28755603230 7238421460 COR

3199 2875555 7568 723852 7053 COR

28755371220 7238445330 COR

3201 28755629198 7238558466 COR

3202 28755676040 7238453290 COR

3203 28755925410 7238563840 PC L=1902 R=3548

3204 28755927383 7238658634 POC

28755954390 7238749520 PT 3206 28755974770 7238807230 COR

3207 28755779200 7238881701 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

28755746700 7238609997 COR

3211 2875593774 7239036608 COR

3212 28756048460 7238996850 PC l=1445 R=2903

3213 28756070631 7239065422 POC

3214 28756109010 7239126420 PT

28756153820 7239182190 PC L=S98 R=848

3216 28756171980 723923 7880 PT

3217 287S6026148 7239566166 COR

3218 28756003865 7239556465 COR

3219 287S6134380 7239256650 COR

28755998460 7239195370 COR

3221 2875600 71S0 7239174530 COR

3222 28756001791 7239172152 COR

3223 28756040451 7239079437 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 8 of 13 April 14 2021

Bk 39600 Pg429 88608

Point Number

3210

3200

3056

3057

3058

3059

3060

3061

3062

3218

3219

3220

3221

3224

3225

3226

3227

3228

3070

3071

3234

3233

3235

3236

3237

3238

3239

3240

3241

3242

3243

3244

3245

3246

3247

3248

Northing

28755746700

28755371220

28755040360

28755311720

28755263010

28755388260

28755348660

2875562 54 70

28755664605

28756003865

28756134380

28755998460

28756007150

28755941340

28755962080

28755867937

28755819702

28755766128

28756035900

28756086280

28755991990

28755942100

28756477248

28756677238

28756650130

28756473307

28756480112

28756675030

28756724454

28756742099

28756742133

28756703924

28756640759

28757607280

28757401530

28757467350

Easting

7238609997

7238445330

7239199770

7239318930

7239429300

7239484290

7239576000

7239696500

7239606601

7239556465

7239256650

7239195370

7239174530

7239145324

7239100930

7239061674

7238935003

7238911508

7239926600

7239812770

7239769910

7239884050

7239261913

7239253008

7239321810

7239319038

7239298824

7239364440

7239271845

7239292625

723935 0187

7239393239

7239393096

7237584960

7237475300

7237345620

Type

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

PC PCC

POC

PCC

PT

COR

COR

COR

Curve Len2th

L=273

L=ll77

L=657

Cunmiddote Radius

R=1421

R=810

R=679

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 9 of 13 April 14 2021

Bk 39600 Pg430 88608

Point Number Northing Easting Type Curve

Len2th Curve Radius

3249 287 57514570 7237372360 PC l=ll05 R=1993

3250 287 57 588060 7237452980 PT

3251 28757631382 7237429676 PC L=2244 R=2352

3252 287 5765 6810 7237537876 POC

3253 2875 762 9720 7237645671 PT

3254 28756940655 7238952710 PC l=1493 R=1509

3255 28756901845 7239015577 POC

3256 2875683 7836 7239052474 PT

3257 28758104824 7237653014 COR

3258 28758028960 7237800160 COR

3259 28757949530 7237760790 COR

3260 28757901005 7237855021 COR

3261 28757839230 7237820908 PC L=273 R=l33

3262 28757830688 7237799810 PCC L=539 R=2144

3263 28757852974 7237750897 PT

3264 28757891705 7237688178 PC L=lS26 R=2432

3265 28757948636 7237637880 POC

3266 287 58018307 7237607597 PT

3248 28757467350 7237345620 COR

3267 28757550832 7237363444 POC L=2653 R=80000

3268 28757668809 7237424132 PT

3269 28757504 719 7238817989 COR

3270 28757493010 7238842230 COR

3271 28757561074 7238880970 COR

3272 28757483953 7239024127 PC L=323 R=l70

3273 28757459939 7239037846 PT

3274 28757311605 7238957122 PC L=1388 R=906

3275 2875727 2732 7238901647 POC

3276 28757283181 7238834718 PT

3277 287 5733 4061 7238752337 PC L=255 R=l60

3278 287 5735 5527 7238744411 PT

3279 2875 7102815 7239517199 PC l=261 R=l70

3280 28757080654 7239525307 PCC l=909 R=1275

3281 2875 700 5390 7239477911 PCC L=l007 R=990

3282 28756999624 7239381704 PT

3283 2875707 7705 7239230604 PC L=ll14 R=907

Exhibit B lo NAUL-Part IlbullEOS Coordinate Tables Page 10 of13 April 14 2021

3285

3290

3295

3300

3305

3310

3315

Bk 39600 Pg431 88608

Point Number Northing Easting Type

Curve Leneth

Curve Radius

3284 28757168066 7239178102 PT

28757205717 7239186398 PC L=518 R=930

3286 28757249003 7239213534 PCC L=l41 R=086

3287 2875724 7909 7239226048 PT

3288 28758415755 7239842757 PC L=251 R=l59

3289 28758437695 7239837379 PT

28758456377 7239846949 PC L=812 R=876

3291 28758494897 7239915165 PCC L=456 R=757

3292 28758483790 7239958646 PT

3293 28758405147 7240111348 PC L=l057 R=955

3294 28758318136 7240161452 PCC L=477 R=l063

28758272407 7240149529 PCC L=250 R=l60

3296 28758265647 7240128003 PT

3297 28758157937 7237680895 COR

3298 28758902927 723807 1969 COR

3299 28758852531 7238168280 COR

28758779660 7238129750 COR

3301 28758746973 7238192072 COR

3302 2875807 6630 7237840490 COR

3303 28758049940 7237894220 COR

3304 2875871 7997 7238243620 COR

28758680103 7238315946 COR

3306 28758533699 7238239240 COR

3307 2875852 6899 7238252220 COR

3308 28758098180 7238027600 COR

3309 28757974484 7238264223 COR

28757957598 7238255513 COR

3311 28757757732 7238637845 COR

3312 28757774584 7238646620 COR

3313 28757653710 723887 7846 COR

3314 28757560920 7238829340 COR

28759004930 7238125514 COR

3316 28759689797 7238485028 PC L=1992 R=2609

3317 28759697204 7238583760 POC

3318 28759667288 723867 8142 PT

3319 28758996126 7238323718 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 11 of 13 April 14202 I

Bk 39600 Pg432 88608

Point Number

Northing Easting Type Curve Lenfth

Curve Radius

3320 28759028950 7238261560 COR 3321 28758954486 7238222188 COR

3322 28758972523 7238378387 COR 3323 28759421550 7238613630 COR 3324 28759377933 7238698105 COR 3325 2875907 4811 7238539289 COR 3326 28759081611 7238526309 COR 3327 28758935210 7238449604 COR

3328 28759464470 7238637330 COR 3329 28759632674 7238722481 PC L=ll83 R=l578

3330 28759583973 7238755474 POC 3331 28759526573 7238768343 PRC L=2163 R=2455

3332 28759422964 7238796123 POC 3333 28759341091 7238865430 PT

3334 28759193370 7239050710 COR 3335 28759416340 7239163940 COR 3336 28759263600 7239455620 COR 3337 28759043690 7239336510 COR 3338 28758935490 7239552130 COR 3339 28757650890 7238883240 COR 3312 28757774584 7238646620 COR 3311 28757757732 7238637845 COR 3310 28757957598 7238255513 COR 3309 28757974484 7238264223 COR 3308 28758098180 723802 7600 COR 3307 28758526899 7238252220 COR 3306 28758533699 7238239240 COR 3340 28758700033 7238326388 COR 3341 28758675436 7238373334 COR 3342 28758733013 7238403500 COR 3343 28758760858 7238350353 COR 3344 28758860952 7238402796 COR 3345 28758833106 7238455943 COR 3346 28758890683 7238486109 COR 3347 28758915280 7238439162 COR 3326 28759081611 7238526309 COR 3325 28759074811 7238539289 COR

Exhibit B to NAUL-Part H-EOS Coordinate Tables Page 12 of l3 April 14 2021

Bk 39600 Pg433 88608

Point Number

Northing Easting Type Curve Len2th

Cunbulle Radius

3324 2875937 7933 7238698105 COR

3082 28757068320 7240314640 COR 3083 28757602980 7240594310 COR 3349 28757790234 7240236327 COR

3348 28757255574 7239956657 COR

3124 28757716516 7241351659 COR 3125 28757288251 7241140719 COR 3126 28756725827 7240851862 COR 3127 28756162468 7240586126 COR 3128 287 55614498 7240338506 COR 3129 28754346745 7239768507 COR 3130 28753845716 7239540194 COR 3131 28753257436 723927 8634 COR 3132 28752466355 7238929370 COR 3133 28751819340 7238643698 COR 3134 2875118152 7 7238364939 COR 3135 2875080 7772 7238199071 COR 3136 28750413263 7238019301 COR 3350 28750296168 7238284525 COR 3351 28754 78 6636 7240267040 COR 3352 28757412029 7241794586 COR

POINT DESCRIPTION ABBREVIATIONS

COR=CORNER PC= POINT OF CURVE WHERE CURVE STARTS POC -= POINT ON CUR VE PT=POINT OF TANGENCY WHERE THE CURVE ENDS PCC = POINT OF COMPOUND CURVE (WHERE RADIUS CHANGES) PRC = POINT OF REVERSE CURVE

NOTES

THE COORDINATES ARE BASED ON AN EXISTING CONDITIONS AS-BUILT FIELD SURVEY BY NORWOOD ENGINEERING CO INC BETWEEN NOVEMBER 15 TO DECEMBER 18 2019 TI-IE COORDINATES ARE BASED ON l1ASSACHUSETIS ST A TE PLANE COORDINATE SYSTEM NAD 1983 (FEET) THE ACCURACY OF THE COORDINATE LOCATIONS ARE +-0J FEET

Exhibit B to N1UL-Part II-EOS Coordmate Tables Page 13 ofl3 April 14 2021

---

1f~ flJr ~i

f ~~ J~i](M~I ~ 1 jf~ ~~f W-- )e 1

It lj fY pl ~-~j

I --- ~ ~

1 (J-c~ er ~

C JI fl JYf

1 ~ ~Yu-~ 1i

~r

( LOClJS P

SCAUllbulliQO

I ar lMIT flG PINI tMS _ lIIPMIDMICXNllRlnT~tlCfllUS 1111D cmuftraquodl s - NIKl1III tfIJIIIIIOfM~1HCll allE1

DAre Jllrl

NUKIJU LU6 DMitM

mmtG6DKbdlt

~4~-middot

~~I

-- ampnbullllf~ ~ fa

LEGEND 0

-i~wr0o-m lICUUoaampbullco--11111 _ _l_J

0

bull ~-ail_I

~-

mo(I ---fwj

amp~~~~ ~ ~~ltgtmiddot ~A~

~6

_L-r

bull -~ IBP__l-11Uil n-rlfl-lffll rMCllI 1a 1rr ai

-~ lll-lliI u-W--11a 1 Ml[ 411 amt l0IIC 3JICJ7 ~ 33-1--I- DIID llXII D111 JlMZ 411 lraquo- ~lUN~t --- - etMpound 11JII

~ MffD mmaat ZL I01t 111

1Jlll~-IICfIQfJICIISJ DfEI IC71- I~ 1~ 9 Cl 1VY IICIIWCLl~fCSC~lNCl

~11HltOXW1A~JtCI~llfB MXIC 1HI lME INCi 111M bull11 (S 1f41~middot~-~-)

~ io

0 0 0 0 -0 0 0 D O 1 middot tbull O

_- _pound ~ - Tf middot- ---r ~~ ~~- ~=middoti

r jil7bull --------4~-middot~

(

SCAtpound 1bull bull YI

I ~ tfAIE lIMa toafllltl1E ~NAD1w1(rJ

1 ~ PlIla II MMt QI 11D TD D111oPl

~c1MlntID9~~-l 1NIIJIIKlNI LnlJTU ~ deg qllAJSTE uM011111 iu1II 1111ZT IIIILJaZ

Exhibit C - Photo-Reduced Copy of Activity and Use Limitations Plan of Land

--~middot---

I ~111-11111

iiiii

-ill111liilt

ACJIYIJY ANJ) lJSE lJJll7ATJONS PLAN OF LANI)

81ACJ(81R1 I IINION Flr11lfES SllffllF7AVO SIle

o tfO SOIJIH s1ar HlltlPOtL IIAS

SCAlElrJAt IPfffl152021

1IJrwod Eng1neerlng

- EnQlbullHrlflg Compaffy middot~~=~ m Cm1JQ u fnfJa-eal

~ -

-~

9l1EET 1 OF I 8324-02

td ~

w ~ m 0 0

Id Q ii w ii

co co m

co 0

-l

~-77--raquo- -~I~ )middot~ ~ bull _I lT ~ v~

AI ~ If ~)middot~ 7- ~1 c t11 yil ~ ~ ~middot~41 bull1 l ~~l(i~r~1 f7 )ll y-

~~ f -~ -v fgtV ~ ~ ~ l er-- u -

tl x-P~C ()

JP yen f(( 11 1degpoundS -~ (

ftunrTfflllllTnallJrNNQWDf ~ ti IZNtRlTT lnH M IULS IIJIUIUlA-DlltlllllDlJlllIICIF tJbllt~llC~lJNp

DTl NlllltaJatl-Witiill (raquo11 iiiK(+til

I aJnlTlKATJlfl PlAH~ THE PUIIJll1T UC TIUlf Mlaquo THE l5 11 oawG ~ NII 1Hpound1as Of1111E111 AMllfrlTll9laquolllt Mpound ntem OPlaJ CJ1 IWM1pound BREn 011 bulln

~ ~illi~fli~ _lt ---c~-Clmiddot~~c0-nmiddotmiddot~bullJmiddot04~- ~--~--yen~~bull - L -bull -n ~ -r - ~ -

it

~ fr ~ ~- -~bull~bullv OG- ~n0

bull--ltmiddot middot~ -~- ~~-=~7~st~-~~~~i~~Hil~-) 2~C 0 ~~~~~ --------Y-Tgt-bullbullmiddot-

U-IU ~middotshy =i==-

bullbull bull _ -middot-

~----- ( ~11middot

__IC1ZMJ - bull IOC)0l lftEf ___ i gt mEKJllJfNG rotJ1FRIIIT AIIEAS B~ p~ AIIEAS ~ea-vmiddot LIUIID

~ e--- -+ ~ rzprz1za 1 ~ IJTATC PRC ~TC

nJml lltPtasCltJ

DUD BCD lJlll7 PMC 4H 1 1 YERT1CAL M1llI II NCCI ~ _ ro conurr DOD 80CIC 3JII07 llME 4H I ntaM NUIU 1121 IJ4TAI m IMlC 111111 nATIIW ~fsi

tJMAlfflOlI) AIIEAS1 bull 11AMJSCAlfl) AlpoundAS Lill] 1Dll IOlII POT PlCit 6115 J)-t20 ~atfnujK~tlLWlQI

~PUNMl-17 POflTIVNf1Ell llaD BaalC Tl_ Paa bullbull - 99 a 11

_-ijf1iltDP~IZ~ 5CME - JOSUva1fTLJ ~ ~-rr 111 C tMI=

bull111 I~

i=iiii7

~ e---

t c z rl

L-n11 ~

ACJIVJTY AND USE LIAlffAJIONS

PIAN OF RESTRIC1EJJ AREAS ANJJ COVER TYPES

fltACK1(fN _ llNlltgtI PfMIECCS SllPVFVNlJ51Tlt

JO _ lxJ srJllH STREET IIALPrJU JASS

SCAU I - 30 APRIL 2021

lcnwod Engineering

llarwood Cngnrilgtf cpmy -t~~~~

fIL Pllpa-ru - (1u]1a-lftll

~L=wl f 01~JII IO_

a SIEET I (F 2 B324-02

bj ~

w 0

0 0 deg It

iQ ~ w l11

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 1 of 2

CX) CX)

deg CX) 0

ntllT -1~1~ rurnlaquo1 r1n l1XTM 11Nf -r~ lie UUffCI 11Pt lDll1Hf iniin --IC unr1G Tlr 1n1rn Iota allll Ito tyen1tlll ~~11CRnrzJ11-11--~ci-- n31 nr111w11J1t ~bull c ~- diams JDrnn llloffl rcnlml IDII

-~ ]al rll _ _ PnlM-1-PI lbull-- ll7HrirrIPlllD1lf~-a bullbullll 111bull IClln9XnolDlllIIIIIIOm

214 ff7371JOOT ~bull JllC Ibullbull 171 JICllEY)l)vlUTlo~lUl~ ~li_~ -~~ MDlol ll4L~TllJraquofllllf190abullbullt ~~nQuu~~1aJI _~~OtottWU~1t11txm~arcPbrmllmCDt ~~ ~~ ~ =~ gj ~l11~ llltlM Mrattllll TDPmllIDCDI JJ4bull e~ _ ~ e PClC lbullI- 1- ~1sect~ ~ ~ ~ ~ ~~~-nr~44bull~mn11-a11 ~~ =mt =m~ ~ ~~ ~ =~~-~~ =~~rt~l~llibullltbull=

~~~~~~~~r-~r-~~sectsect55~55 ~~ ~=g~~ mi --1~ ~-==~~m~ L-~r UVPllrlllUillDITDr4L 1JI lbullKlllll~==~~~=~

~~~~~~~~ raquoff-llll 111rritl_aianbull ~11lCla rr- n ttll XDP11r1r 11111c-1C111~ RTl~rJlllllbullbull~llllJlllipo~~=r~tm=~~

~=~3r~t==~ ~=~i==~~ llt1ttl70 m~~n~ =n~ L diams 11- bull - iaEi~mi 1lE~HHffi ~1-~ E LbulllT bullU-7YA 8911U TMn4 OJII C- lllkHrnl1nlntll11106~

MJ9~gt111ftlrfffll11 ~ SbullC61hLJT raquoWl lll~IJlll11amp1 utVllllt a lbulllfGl bulllC lT

lliilH~1 ~~rm-=rn~ lbullIIIICU-1bull0

itt ishwI JUo ma m1 bull 1-c iiliii ~==~m~=~ Ullln U7IIY M1NLl411 fflf f-~ llr IL ~ lbullt Ill uaP11rllDn1rin1bull139nf- na_ 1111lnl ___ lWTDf-ID 111Jbullnllr-cishy

J1JT1 lflTI-noLbull COi lJ1 tsr18GOTDrl1~ 1--Cn ~~~==-=~ LbullS1rbull-p

LbulllI ~middot x1 fl11bull diams an l~J P-~ WI 1~1Slrmsraquo11nirorn 11bull1n-

llrgt 58 - TDrl ZJlJ l~ Zl llf4 Pll1raquo91I lnP~IIEI 11 ==~=-~~ lbullt-11bullh1~

nun_-~bullfllrlll_ lbulll-lrbull N- - nr6-11MII rinaus a 1bull1E-t1 im1 nrxi mr~ 7nn1 4i i 1c m llrS~iJ-ltJlillII Tt-Ul ris ~=~~middotiill~~ tf llDln~n1rJrgt11nbull1ric ~IPgt9nq~ It-MU rbull RflrrlllVllbulltPllbullOIIUAfC lbullnJtrNbull_~lD+4ftJSHJ7711JrllIIIIT144lDI lbulll ~I llfs-mllThn~-f 1bull11

1a5blH=i5gS El~ iE =iilli ~ID aH~~ ~~ leJINNllllfflnlt10ff1nll~1g=TI==~- lbullN~Jmiddot pw nrwuhtl tba11 l- lllllsectimiii~ ~ lllaquot ll116UW41 llllII NII Cl Ld bullt ll 11r 111~-~lHtl-IINOClll 1Dgtn~rMOtnllfbull3all)Mnr~bullwrmm11uoo~ ~r~ m~ = ~~ t~-i m NNtotl n11nn cm

~~~~~Ttr~ in Httl01llxl nlfM114ta cm

JJN n=-PIW - I- C lbullT rnr nnubullNoXI ffllPI n1 11-amp 11middot 77)111fflffPl~JlaUII

i1JJ n91lbull ti Jnlftbulllll QII

~g=~~~~ir~f~5 =i~=~~ ~=~ ~ ~j====goi H1111t-llll ffo~ ~rn tm111 ta1Vl~ tnar- IVI rm u1i ~ nw ~illl cm 1111 Hltt1H T7U 72w111ll tm UI ftffiH~bull1 naMUlI nlll

lltfll~IOUl rnes~ttlClll

~I~~=~=~~= l3111ratlQOJ121lllll CS u1n-n-a mn-c~11111llllilr ~====m~~ lbulllllr~~Oll~r1111-t~rtRiHa)toI

-~rt~_Utr111tt~USI ~m~i==r~~llfflpound1gtgtMllkllit1U10C011 annrxnbull-TCRL11ai~=~=~g)llllll~--rWltMJtt-8 DR Pl rraquof ntl rim Gllf CCI~~1r~~ liiilllii u- ntlt bull llJ~naJCDI

raquo11NMl10~Ullllcm ntrlnK)fL~nlln-1c lllf ~--TlJaft_Lmc i lbull1 bull l3il0 Nl-197) Ttlll1344 a LbullI 3 l diams 1-111 lflS 1111lOllt ffl- MP PII bullHI lgtl llJI l97Mlt Ian -ti DG llC

111111===-~~~=mg ====~~ tD rlrffllZllIITO-lfllCIIII=~tr~L~~~= - Pl~I llII TD_ ff~ tDII31119NIJMlDffU~~ H CZIII liii~mlt~ D1111nrn11GQ~-CaKftQNJWNczr41140ffnQCUII Jnffnt1JIIIIJunbull~1Qc20lll ~Pllli ll mrnnn lbulltlP 17Jrffdeg-degluoElJIIIQII

~-I-ti _nrna~rlll

a n- 4411 llbullQI 1=40 rt La n- lllf ffrgtn _Jr_~ Ullk ---rr~~ ~=~=tl~~ =1 nttltt nraquo 1nlU as

=-mn--~111DJIDII Ullgt~fflflnanaaJIIJalt55~~EIS~=~~ ~~)1 -11CIJII nn~bullbullbullnaKatt1ta1

JOIT ru~- rf- deg hJIIII r- 111111 ~1111) -1 aJ1 ld t11D1etlll_TalCIS -~-UCV~bullraquootur=~=~I~~=~--~ ~rsrgo_mlaquoshym rs~11flI ~- rnilr==~=~~ ~~r _ ~ atfl ~ rtw Dgtlnn-f-lEllln17n-UIIP

D11 fflXTJ111111 I~~ ar D1Jn4 ~leJJS-OnC111

=====5 middoti SHU=~ 5 ampn iliiiiiIiI11

ngtgtn~1~1tbullubull1rm DH tu~- lt11 rirmU1111 CDIII

~i~i555mi~ ~~ ~m=~==m~g===~~~~ tn1r JtW ~ma- PiOll a CU

~ XNr~t~fDllll1-all~~ m===~~ bullbull~W 111111 ==~~ ampT g~ ru~ =

~lU $Et=ni ~ llll0111ra1Ln~otqC011

H~ g==i =~1 ~

~111111 ~~g~n~a~J))pound11 1=~)6tia

~~ mEfHfH~Si

amp12Ct _ an ~

U N711f21th mM1LU aa o1bull~--117CII in4r ~llllll1Vffl-111Dlr lit~ Hmtlpound1 71 12L I CCIII ---~CUnMIIUOCVf JIHtlnn nl 7r ll4011CIIII

llllDNXCWZflDtlltllCIDCDr

~~=~==~=gnn n1raquoL bullw noanDNt CIJIIi=~ C~middot ~ ~ ~ HnffTI-QIJroQ__111PtlJIIInfflll bullbull1~ aaeIT t-- nrJD nJUntu~CllWI

m ~1 ~ ~~~ ~ ilria~gliiiji~=ir ~lt-OTT gl1raquo ~Iraquou fflllIL nllll 1111111 flC~middotIY_4allCCIIIi l1i5~ ~~11~middot~ ~~ ffll H71W786lll 7P-JOalllllll 2N ~ 1-flllt 7HIJl4- DI ~ ~==~ ~t-tr bullM-

114 Hit71aTra7ririatNOCIIII

llHl1Hf ll~7Dl4fIZIIICIIII 1141ftillf+1DllnTgtlMa~=~bull==~r Lbulll-lllbullbulllJJ

=~~~HR-~a ~ =iEri ~ ~=6

= 1MESE COCIIIOlfAlEi ARC 9~ at AH DISTlfG CONJmOfS AS-alLT FED 5UKiEY Y NORWDal EJICltJIJll(G CD~ IIElMEN ~ 1S 111 DECDaR a 2DII 1)pound OCICIIIDNAlES 5HCflI UIpound IIAID Cit MltSSAOfllffT5 STATE FlJriNII CDCffllNAT smult ~AO leJ (IMIJ 1HE ACQlltACY ltF 1HE COCftDINT[ LDCAnatS Mpound diams- 01 FtU

POINT DESCRIPTION ABBREVIATIONS~-~middotPC Pmlr Of CLIRIJC bullIEllL ClMNpound STilRlS PDC bull PtJtilTIIJOM1poundr ~ [raquo TAHCINiT W(R[ lll[ CURpound uroo Fo F[1NT(1t~tfflvt[ltft1llllIIUlt OMNtilE)PRC ~T oT ~pound ~Vlllrlt

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 2 of 2

I ~ IHAT nfl PlM MS 81D1 PIIDMQl ~WllTM(llUI MOIIEOIAAlPlllR~Df IIUPS C- lttE ~111 Cl__ HftNMIIIZlt

WWWWJU Cii6 liftitit

ACTIVITY ANI) USE LINTATIONS

PLAN OF RES7RIC1EJJ AREAS ANJJ COlER TYPES

8V CKlJ()RN IJNl()N PflllfpoundCpoundS SlllERFIIMJ SITC

50 HJ S(J11( SmEpoundT llAIPOIL JASS

=r-o ~ ll 2021

~ Engmeer1ng

Hltd ~~ middot~~-=~ra (f~AJ lIQ c- f

a llfEET 2 ltF 6324-02

td ~

w ~ m 0 0

Id Q ii w m

co co m 0 co

Bk 39600 Pg437 88608

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY New England Region

Five Post Office Square - Suite 100 Boston Massachusetts 02109-3912

INSTITUTIONAL CONTROL DESIGN STATEMENT FOR THE BLACKBURN AND UNION PRIVILEGES SUPERFUND SITE - EAST OF SOUTH STREET AREA

1 Introduction

Pursuant to the Comprehensive Environmental Response Compensation and Liability Act 42 USC sect 9601 et seq (CERCLA) and the National Contingency Plan 40 CFR Part 300 (the NCP) this document contains a description of the release events and site history that resulted in the contaminated media that require institutional controls in the fom1 of Activity and Use Limitations the basis for land use restrictions and uses that are consistent and inconsistent with the Selected Remedy ( as described below) This Institutional Control (IC) Design Statement pertains to a portion of the Blackburn and Union Privileges Superfund Site located in the Town of Walpole Massachusetts (the Site) which has been listed on EPAs National Priorities List (NPL) which portion is generally referred to as the East of South Street Area (the EOS Area) The EOS Area is located to the east of South Street in Walpole and is shown on Figure 1 attached hereto

A Notice of Activity and Use Limitation (NAUL) is necessary and appropriate for the EOS Area of the Site based on the fact that pursuant to EPAs risk evaluations asbestos arsenic trichloroethene (TCE) and certain polycyclic aromatic hydrocarbon (PAH) contan1inants remain in place in soils at levels higher than those appropriate for unlimited use or unrestricted exposure groundwater underlying the EOS Area contains hazardous substances at levels that present an unacceptable risk of exposure and remedial measures at the Site must be protected and maintained to ensure that the Selected Remedy remains protective

EPAs Record of Decision (ROD) dated September 30 2008 specified the need for institutional controls such as a NAUL to ensure long-tenn perfonnance and protectiveness of the Selected Remedy The institutional controls described herein are necessary and appropriate to ensure that the Selected Remedy for the Site remains protective of human health and the environment The remedy for the Site as described in the ROD is referred to herein and in the NAUL as the Selected Remedy

Page 1 of7

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 19: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

3035

3040

3045

3050

3055

3060

3065

3070

Bk 39600 Pg424 88608

Point Number

Northing Easting Type Curve Leneth

Curve Radius

28751548848 7237932869 COR

3036 28752462269 7237767802 COR

3037 28756438461 7236904209 POC L=2207 R=80000

3038 28756543084 7236939245 PT

3039 2875653 7987 7236954123 PC

28756597578 7237007344 POC L=1651 R=937

3041 28756594465 7237087181 PT

3042 28756459044 7237347021 PC L=347 R=220

3043 28756432531 7237363546 PT

3044 28756280644 7237286201 COR

28755924210 7237966952 COR

3046 28756081959 7238048554 PC L=472 R=236

3047 28756064922 7238084404 PT

3048 28755523491 7237845047 COR

3049 28755419845 7238081981 COR

28755460757 7238099621 PC L=240 R=l57

3051 28755467701 7238120241 PT 3052 28755398690 7238275280 COR

3053 28755365410 7238264910 COR

3054 28755087149 7238900449 COR

28755158001 7238931521 COR

3056 28755040360 7239199770 COR

3057 28755311720 7239318930 COR

3058 28755263010 7239429300 COR

3059 28755388260 7239484290 COR

28755348660 7239576000 COR

3061 28755625470 7239696500 COR

3062 28755664605 7239606601 COR

3063 28755736202 7239637768 COR

3064 28755621870 7239897370 COR

287 5567 6160 7239920410 COR

3066 28755718270 7239830260 COR

3067 2875587 9750 7239900310 COR

3068 28755718790 724026 7600 COR

3069 28755763390 7240285350 COR

28756035900 7239926600 COR

3071 28756086280 7239812770 COR

3072 28756089984 7239813649 COR

3073 28756229128 7239501910 PC L=482 R=l54

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 4 of 13 Apnl 14 2021

3075

3080

3085

3090

3095

3100

3105

3110

Bk 39600 Pg425 88608

Point Number

Northing Easting Type Curve Length

Curve Radius

3074 28756257366 7239513984 PT

28756185799 7239674928 COR

3076 28756739833 7239921136 COR

3077 28756876060 7239682275 COR

3078 28756948336 7239735898 PC L=335 R=298

3079 28756958235 7239766064 PT

28756866081 7239978133 COR

3081 28757166275 7240127374 COR

3082 28757068320 7240314640 COR

3083 28757602980 7240594310 COR

3084 28757700050 7240408736 COR

28758247941 7240688376 COR

3086 28758250190 7240683910 COR

3087 28758344979 7240738168 COR

3088 2875843 6103 7240581527 COR

3089 28758602943 7240664224 COR

28758740024 7240397393 COR

3091 28758605706 724032 7776 PC L=477 R=309

3092 28758594882 7240286013 PT

3093 28758666635 7240197585 PC L=2573 R=3127

3094 28758767113 7240118710 POC

28758890752 7240086604 PRC L=I653 R=3993

3096 28758972305 7240074125 POC

3097 28759049552 7240045 I 52 PT

3098 28759330312 7239734408 COR

3099 28759459414 7239588584 PC L=2269 R=5217

28759524821 7239496174 POC

3101 28759568752 7239391829 PRC L=1814 R=486

3102 28759603259 7239308095 POC

3103 28759653883 7239232999 PCC L=l31 R=088

3104 28759665694 7239231411 PT

28759800587 7239299586 COR

3106 28759986288 7238981214 COR

3107 2875983 5797 7238891829 COR

3108 28759879750 7238798689 COR

3109 28759905380 7238754769 PC L=1600 R=2552

28759963590 7238700398 POC

3111 28760035727 7238666620 PT

3112 28760700665 723901 5672 PC L=4515 R=2500

3113 28760830230 7239191198 POC

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 5 of 13 April 14 2021

3115

3120

3125

3130

3135

3140

3145

3150

Bk 39600 Pg426 88608

Point Number

Northing Easting Type Curve Len2th

Curve Radius

3114 2876077 263 6 723 940 1624 PT 28760624518 7239567466 COR

3116 28760160100 7239276864 COR

3117 28760055928 7239453423 COR

3137 28759976118 7239541692 COR

3118 28759782139 7239764992 COR

3119 28759625581 7239640375 COR

28758966057 7240399493 COR

3121 28759184326 7240581973 COR

3122 28758593598 724126478] COR

3123 28757977293 724097 2314 COR

3124 28757716516 7241351659 COR

28757288251 7241140719 COR

3126 28756725827 7240851862 COR

3127 28756162468 7240586126 COR

3128 28755614498 7240338506 COR

3129 28754346745 7239768507 COR

28753845716 7239540194 COR

3131 28753257436 723927 8634 COR

3132 28752466355 7238929370 COR

3133 28751819340 7238643698 COR

3134 28751181527 7238364939 COR

28750807772 7238199071 COR

3136 28750413263 7238019301 COR

3138 28756920317 7237298739 PC L=l941 R=2104

3139 28756827128 7237274848 POC

28756733047 7237294944 PRC L=401 R=l66

3141 2875671 1336 723 727 2844 PCC L=1492 R=13345

3142 28756744594 7237206091 POC

3143 28756781529 7237141301 PCC L=1419 R=l018

3144 28756833084 7237094642 POC

28756902566 7237091952 PCC L=2413 R=157959

3146 28757017337 7237129167 POC

3147 28757131820 7237167258 PCC L=330I R=S0000

3148 28757282552 7237234442 POC

3149 28757431866 7237304721 PT 28757338390 7237495930 COR

3151 28757541620 7237605380 COR

3152 28756897590 723883 4280 COR

Exhibit B to NA UL-Part 11-EOS Coordinate Tables Page 6 of 3 April 14 202

3155

3160

3165

3170

3175

3180

3185

Bk 39600 Pg427 88608

Point Northing Easting Type Curve Cunbulle

Number Lenszth Radius 3153 28756870623 7238820218 COR

3154 28756838273 7238882258 COR

28756865240 7238896320 COR

3156 28756777004 7239062996 COR

3157 28756770439 7239063663 PC L=l 146 R=2269

3158 2875665836 I 7239046180 PCC L=l423 R=957

3159 2875661 7520 7238989913 POC

28756625544 7238920850 PT

3161 28756728525 7238726583 PC L=232 R=l58

3162 28756748720 7238720236 PT

3163 28756899634 7238797341 COR

3164 28757254653 7238121363 COR

28757520153 723761266 7 COR

3166 28757306899 723 750 IO 10 COR

3167 28756690336 7237500169 PC L=243 R=I68

3168 28756682599 7237479273 PT

3169 28756686990 7237469583 PC L=0250 R=l68

28756708806 7237463018 PT 3171 28757000109 7237616354 PC L=233 R=l73

3172 28757005368 7237637270 PT

3173 28757000998 7237645513 PC L=233 R=l69

3174 28756980219 7237651023 PT

28756429209 7238339422 COR

3176 28756342982 7238506849 COR

3177 28756500076 7238596485 PC L=l19 R=l48

3178 28756499701 7238608072 PT 3179 2875644 7813 7238705611 PC L=l 182 R=483

28756358177 723 869 0707 PT

3181 2875623 6099 7238376388 PC L=443 R=467

3182 28756235611 7238333779 PCC L=343 R=9IO

3183 28756249049 7238302418 PCC L=412 R=9IO

3184 28756278952 7238274519 PCC L=368 R=300

28756313362 7238277619 PT

3186 28756282498 7238911796 PC L748 R=216

3187 28756240650 7238919721 PT

3188 28756126081 7238620406 PC L=323 R162

3189 28756138645 7238591575 PCC L=333 R=283

Exhibit B to NAUL-Part II-EOS Coordmate Tables Page 7 of 13 April 14 2021

3190

3195

3200

3205

3210

3215

3220

Bk 39600 Pg428 88608

Point Number Northing Easting Type Curve

Leneth Curve Radius

28756163375 7238602867 PT

3191 2875523 0908 7238765275 COR

3192 28755205040 7238752740 COR

3193 28755391740 7238328470 COR

3194 28755466840 7238361040 COR

28755452760 7238392590 COR

3196 28755516920 7238421040 COR

3197 28755530690 7238388730 COR

3198 28755603230 7238421460 COR

3199 2875555 7568 723852 7053 COR

28755371220 7238445330 COR

3201 28755629198 7238558466 COR

3202 28755676040 7238453290 COR

3203 28755925410 7238563840 PC L=1902 R=3548

3204 28755927383 7238658634 POC

28755954390 7238749520 PT 3206 28755974770 7238807230 COR

3207 28755779200 7238881701 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

28755746700 7238609997 COR

3211 2875593774 7239036608 COR

3212 28756048460 7238996850 PC l=1445 R=2903

3213 28756070631 7239065422 POC

3214 28756109010 7239126420 PT

28756153820 7239182190 PC L=S98 R=848

3216 28756171980 723923 7880 PT

3217 287S6026148 7239566166 COR

3218 28756003865 7239556465 COR

3219 287S6134380 7239256650 COR

28755998460 7239195370 COR

3221 2875600 71S0 7239174530 COR

3222 28756001791 7239172152 COR

3223 28756040451 7239079437 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 8 of 13 April 14 2021

Bk 39600 Pg429 88608

Point Number

3210

3200

3056

3057

3058

3059

3060

3061

3062

3218

3219

3220

3221

3224

3225

3226

3227

3228

3070

3071

3234

3233

3235

3236

3237

3238

3239

3240

3241

3242

3243

3244

3245

3246

3247

3248

Northing

28755746700

28755371220

28755040360

28755311720

28755263010

28755388260

28755348660

2875562 54 70

28755664605

28756003865

28756134380

28755998460

28756007150

28755941340

28755962080

28755867937

28755819702

28755766128

28756035900

28756086280

28755991990

28755942100

28756477248

28756677238

28756650130

28756473307

28756480112

28756675030

28756724454

28756742099

28756742133

28756703924

28756640759

28757607280

28757401530

28757467350

Easting

7238609997

7238445330

7239199770

7239318930

7239429300

7239484290

7239576000

7239696500

7239606601

7239556465

7239256650

7239195370

7239174530

7239145324

7239100930

7239061674

7238935003

7238911508

7239926600

7239812770

7239769910

7239884050

7239261913

7239253008

7239321810

7239319038

7239298824

7239364440

7239271845

7239292625

723935 0187

7239393239

7239393096

7237584960

7237475300

7237345620

Type

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

PC PCC

POC

PCC

PT

COR

COR

COR

Curve Len2th

L=273

L=ll77

L=657

Cunmiddote Radius

R=1421

R=810

R=679

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 9 of 13 April 14 2021

Bk 39600 Pg430 88608

Point Number Northing Easting Type Curve

Len2th Curve Radius

3249 287 57514570 7237372360 PC l=ll05 R=1993

3250 287 57 588060 7237452980 PT

3251 28757631382 7237429676 PC L=2244 R=2352

3252 287 5765 6810 7237537876 POC

3253 2875 762 9720 7237645671 PT

3254 28756940655 7238952710 PC l=1493 R=1509

3255 28756901845 7239015577 POC

3256 2875683 7836 7239052474 PT

3257 28758104824 7237653014 COR

3258 28758028960 7237800160 COR

3259 28757949530 7237760790 COR

3260 28757901005 7237855021 COR

3261 28757839230 7237820908 PC L=273 R=l33

3262 28757830688 7237799810 PCC L=539 R=2144

3263 28757852974 7237750897 PT

3264 28757891705 7237688178 PC L=lS26 R=2432

3265 28757948636 7237637880 POC

3266 287 58018307 7237607597 PT

3248 28757467350 7237345620 COR

3267 28757550832 7237363444 POC L=2653 R=80000

3268 28757668809 7237424132 PT

3269 28757504 719 7238817989 COR

3270 28757493010 7238842230 COR

3271 28757561074 7238880970 COR

3272 28757483953 7239024127 PC L=323 R=l70

3273 28757459939 7239037846 PT

3274 28757311605 7238957122 PC L=1388 R=906

3275 2875727 2732 7238901647 POC

3276 28757283181 7238834718 PT

3277 287 5733 4061 7238752337 PC L=255 R=l60

3278 287 5735 5527 7238744411 PT

3279 2875 7102815 7239517199 PC l=261 R=l70

3280 28757080654 7239525307 PCC l=909 R=1275

3281 2875 700 5390 7239477911 PCC L=l007 R=990

3282 28756999624 7239381704 PT

3283 2875707 7705 7239230604 PC L=ll14 R=907

Exhibit B lo NAUL-Part IlbullEOS Coordinate Tables Page 10 of13 April 14 2021

3285

3290

3295

3300

3305

3310

3315

Bk 39600 Pg431 88608

Point Number Northing Easting Type

Curve Leneth

Curve Radius

3284 28757168066 7239178102 PT

28757205717 7239186398 PC L=518 R=930

3286 28757249003 7239213534 PCC L=l41 R=086

3287 2875724 7909 7239226048 PT

3288 28758415755 7239842757 PC L=251 R=l59

3289 28758437695 7239837379 PT

28758456377 7239846949 PC L=812 R=876

3291 28758494897 7239915165 PCC L=456 R=757

3292 28758483790 7239958646 PT

3293 28758405147 7240111348 PC L=l057 R=955

3294 28758318136 7240161452 PCC L=477 R=l063

28758272407 7240149529 PCC L=250 R=l60

3296 28758265647 7240128003 PT

3297 28758157937 7237680895 COR

3298 28758902927 723807 1969 COR

3299 28758852531 7238168280 COR

28758779660 7238129750 COR

3301 28758746973 7238192072 COR

3302 2875807 6630 7237840490 COR

3303 28758049940 7237894220 COR

3304 2875871 7997 7238243620 COR

28758680103 7238315946 COR

3306 28758533699 7238239240 COR

3307 2875852 6899 7238252220 COR

3308 28758098180 7238027600 COR

3309 28757974484 7238264223 COR

28757957598 7238255513 COR

3311 28757757732 7238637845 COR

3312 28757774584 7238646620 COR

3313 28757653710 723887 7846 COR

3314 28757560920 7238829340 COR

28759004930 7238125514 COR

3316 28759689797 7238485028 PC L=1992 R=2609

3317 28759697204 7238583760 POC

3318 28759667288 723867 8142 PT

3319 28758996126 7238323718 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 11 of 13 April 14202 I

Bk 39600 Pg432 88608

Point Number

Northing Easting Type Curve Lenfth

Curve Radius

3320 28759028950 7238261560 COR 3321 28758954486 7238222188 COR

3322 28758972523 7238378387 COR 3323 28759421550 7238613630 COR 3324 28759377933 7238698105 COR 3325 2875907 4811 7238539289 COR 3326 28759081611 7238526309 COR 3327 28758935210 7238449604 COR

3328 28759464470 7238637330 COR 3329 28759632674 7238722481 PC L=ll83 R=l578

3330 28759583973 7238755474 POC 3331 28759526573 7238768343 PRC L=2163 R=2455

3332 28759422964 7238796123 POC 3333 28759341091 7238865430 PT

3334 28759193370 7239050710 COR 3335 28759416340 7239163940 COR 3336 28759263600 7239455620 COR 3337 28759043690 7239336510 COR 3338 28758935490 7239552130 COR 3339 28757650890 7238883240 COR 3312 28757774584 7238646620 COR 3311 28757757732 7238637845 COR 3310 28757957598 7238255513 COR 3309 28757974484 7238264223 COR 3308 28758098180 723802 7600 COR 3307 28758526899 7238252220 COR 3306 28758533699 7238239240 COR 3340 28758700033 7238326388 COR 3341 28758675436 7238373334 COR 3342 28758733013 7238403500 COR 3343 28758760858 7238350353 COR 3344 28758860952 7238402796 COR 3345 28758833106 7238455943 COR 3346 28758890683 7238486109 COR 3347 28758915280 7238439162 COR 3326 28759081611 7238526309 COR 3325 28759074811 7238539289 COR

Exhibit B to NAUL-Part H-EOS Coordinate Tables Page 12 of l3 April 14 2021

Bk 39600 Pg433 88608

Point Number

Northing Easting Type Curve Len2th

Cunbulle Radius

3324 2875937 7933 7238698105 COR

3082 28757068320 7240314640 COR 3083 28757602980 7240594310 COR 3349 28757790234 7240236327 COR

3348 28757255574 7239956657 COR

3124 28757716516 7241351659 COR 3125 28757288251 7241140719 COR 3126 28756725827 7240851862 COR 3127 28756162468 7240586126 COR 3128 287 55614498 7240338506 COR 3129 28754346745 7239768507 COR 3130 28753845716 7239540194 COR 3131 28753257436 723927 8634 COR 3132 28752466355 7238929370 COR 3133 28751819340 7238643698 COR 3134 2875118152 7 7238364939 COR 3135 2875080 7772 7238199071 COR 3136 28750413263 7238019301 COR 3350 28750296168 7238284525 COR 3351 28754 78 6636 7240267040 COR 3352 28757412029 7241794586 COR

POINT DESCRIPTION ABBREVIATIONS

COR=CORNER PC= POINT OF CURVE WHERE CURVE STARTS POC -= POINT ON CUR VE PT=POINT OF TANGENCY WHERE THE CURVE ENDS PCC = POINT OF COMPOUND CURVE (WHERE RADIUS CHANGES) PRC = POINT OF REVERSE CURVE

NOTES

THE COORDINATES ARE BASED ON AN EXISTING CONDITIONS AS-BUILT FIELD SURVEY BY NORWOOD ENGINEERING CO INC BETWEEN NOVEMBER 15 TO DECEMBER 18 2019 TI-IE COORDINATES ARE BASED ON l1ASSACHUSETIS ST A TE PLANE COORDINATE SYSTEM NAD 1983 (FEET) THE ACCURACY OF THE COORDINATE LOCATIONS ARE +-0J FEET

Exhibit B to N1UL-Part II-EOS Coordmate Tables Page 13 ofl3 April 14 2021

---

1f~ flJr ~i

f ~~ J~i](M~I ~ 1 jf~ ~~f W-- )e 1

It lj fY pl ~-~j

I --- ~ ~

1 (J-c~ er ~

C JI fl JYf

1 ~ ~Yu-~ 1i

~r

( LOClJS P

SCAUllbulliQO

I ar lMIT flG PINI tMS _ lIIPMIDMICXNllRlnT~tlCfllUS 1111D cmuftraquodl s - NIKl1III tfIJIIIIIOfM~1HCll allE1

DAre Jllrl

NUKIJU LU6 DMitM

mmtG6DKbdlt

~4~-middot

~~I

-- ampnbullllf~ ~ fa

LEGEND 0

-i~wr0o-m lICUUoaampbullco--11111 _ _l_J

0

bull ~-ail_I

~-

mo(I ---fwj

amp~~~~ ~ ~~ltgtmiddot ~A~

~6

_L-r

bull -~ IBP__l-11Uil n-rlfl-lffll rMCllI 1a 1rr ai

-~ lll-lliI u-W--11a 1 Ml[ 411 amt l0IIC 3JICJ7 ~ 33-1--I- DIID llXII D111 JlMZ 411 lraquo- ~lUN~t --- - etMpound 11JII

~ MffD mmaat ZL I01t 111

1Jlll~-IICfIQfJICIISJ DfEI IC71- I~ 1~ 9 Cl 1VY IICIIWCLl~fCSC~lNCl

~11HltOXW1A~JtCI~llfB MXIC 1HI lME INCi 111M bull11 (S 1f41~middot~-~-)

~ io

0 0 0 0 -0 0 0 D O 1 middot tbull O

_- _pound ~ - Tf middot- ---r ~~ ~~- ~=middoti

r jil7bull --------4~-middot~

(

SCAtpound 1bull bull YI

I ~ tfAIE lIMa toafllltl1E ~NAD1w1(rJ

1 ~ PlIla II MMt QI 11D TD D111oPl

~c1MlntID9~~-l 1NIIJIIKlNI LnlJTU ~ deg qllAJSTE uM011111 iu1II 1111ZT IIIILJaZ

Exhibit C - Photo-Reduced Copy of Activity and Use Limitations Plan of Land

--~middot---

I ~111-11111

iiiii

-ill111liilt

ACJIYIJY ANJ) lJSE lJJll7ATJONS PLAN OF LANI)

81ACJ(81R1 I IINION Flr11lfES SllffllF7AVO SIle

o tfO SOIJIH s1ar HlltlPOtL IIAS

SCAlElrJAt IPfffl152021

1IJrwod Eng1neerlng

- EnQlbullHrlflg Compaffy middot~~=~ m Cm1JQ u fnfJa-eal

~ -

-~

9l1EET 1 OF I 8324-02

td ~

w ~ m 0 0

Id Q ii w ii

co co m

co 0

-l

~-77--raquo- -~I~ )middot~ ~ bull _I lT ~ v~

AI ~ If ~)middot~ 7- ~1 c t11 yil ~ ~ ~middot~41 bull1 l ~~l(i~r~1 f7 )ll y-

~~ f -~ -v fgtV ~ ~ ~ l er-- u -

tl x-P~C ()

JP yen f(( 11 1degpoundS -~ (

ftunrTfflllllTnallJrNNQWDf ~ ti IZNtRlTT lnH M IULS IIJIUIUlA-DlltlllllDlJlllIICIF tJbllt~llC~lJNp

DTl NlllltaJatl-Witiill (raquo11 iiiK(+til

I aJnlTlKATJlfl PlAH~ THE PUIIJll1T UC TIUlf Mlaquo THE l5 11 oawG ~ NII 1Hpound1as Of1111E111 AMllfrlTll9laquolllt Mpound ntem OPlaJ CJ1 IWM1pound BREn 011 bulln

~ ~illi~fli~ _lt ---c~-Clmiddot~~c0-nmiddotmiddot~bullJmiddot04~- ~--~--yen~~bull - L -bull -n ~ -r - ~ -

it

~ fr ~ ~- -~bull~bullv OG- ~n0

bull--ltmiddot middot~ -~- ~~-=~7~st~-~~~~i~~Hil~-) 2~C 0 ~~~~~ --------Y-Tgt-bullbullmiddot-

U-IU ~middotshy =i==-

bullbull bull _ -middot-

~----- ( ~11middot

__IC1ZMJ - bull IOC)0l lftEf ___ i gt mEKJllJfNG rotJ1FRIIIT AIIEAS B~ p~ AIIEAS ~ea-vmiddot LIUIID

~ e--- -+ ~ rzprz1za 1 ~ IJTATC PRC ~TC

nJml lltPtasCltJ

DUD BCD lJlll7 PMC 4H 1 1 YERT1CAL M1llI II NCCI ~ _ ro conurr DOD 80CIC 3JII07 llME 4H I ntaM NUIU 1121 IJ4TAI m IMlC 111111 nATIIW ~fsi

tJMAlfflOlI) AIIEAS1 bull 11AMJSCAlfl) AlpoundAS Lill] 1Dll IOlII POT PlCit 6115 J)-t20 ~atfnujK~tlLWlQI

~PUNMl-17 POflTIVNf1Ell llaD BaalC Tl_ Paa bullbull - 99 a 11

_-ijf1iltDP~IZ~ 5CME - JOSUva1fTLJ ~ ~-rr 111 C tMI=

bull111 I~

i=iiii7

~ e---

t c z rl

L-n11 ~

ACJIVJTY AND USE LIAlffAJIONS

PIAN OF RESTRIC1EJJ AREAS ANJJ COVER TYPES

fltACK1(fN _ llNlltgtI PfMIECCS SllPVFVNlJ51Tlt

JO _ lxJ srJllH STREET IIALPrJU JASS

SCAU I - 30 APRIL 2021

lcnwod Engineering

llarwood Cngnrilgtf cpmy -t~~~~

fIL Pllpa-ru - (1u]1a-lftll

~L=wl f 01~JII IO_

a SIEET I (F 2 B324-02

bj ~

w 0

0 0 deg It

iQ ~ w l11

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 1 of 2

CX) CX)

deg CX) 0

ntllT -1~1~ rurnlaquo1 r1n l1XTM 11Nf -r~ lie UUffCI 11Pt lDll1Hf iniin --IC unr1G Tlr 1n1rn Iota allll Ito tyen1tlll ~~11CRnrzJ11-11--~ci-- n31 nr111w11J1t ~bull c ~- diams JDrnn llloffl rcnlml IDII

-~ ]al rll _ _ PnlM-1-PI lbull-- ll7HrirrIPlllD1lf~-a bullbullll 111bull IClln9XnolDlllIIIIIIOm

214 ff7371JOOT ~bull JllC Ibullbull 171 JICllEY)l)vlUTlo~lUl~ ~li_~ -~~ MDlol ll4L~TllJraquofllllf190abullbullt ~~nQuu~~1aJI _~~OtottWU~1t11txm~arcPbrmllmCDt ~~ ~~ ~ =~ gj ~l11~ llltlM Mrattllll TDPmllIDCDI JJ4bull e~ _ ~ e PClC lbullI- 1- ~1sect~ ~ ~ ~ ~ ~~~-nr~44bull~mn11-a11 ~~ =mt =m~ ~ ~~ ~ =~~-~~ =~~rt~l~llibullltbull=

~~~~~~~~r-~r-~~sectsect55~55 ~~ ~=g~~ mi --1~ ~-==~~m~ L-~r UVPllrlllUillDITDr4L 1JI lbullKlllll~==~~~=~

~~~~~~~~ raquoff-llll 111rritl_aianbull ~11lCla rr- n ttll XDP11r1r 11111c-1C111~ RTl~rJlllllbullbull~llllJlllipo~~=r~tm=~~

~=~3r~t==~ ~=~i==~~ llt1ttl70 m~~n~ =n~ L diams 11- bull - iaEi~mi 1lE~HHffi ~1-~ E LbulllT bullU-7YA 8911U TMn4 OJII C- lllkHrnl1nlntll11106~

MJ9~gt111ftlrfffll11 ~ SbullC61hLJT raquoWl lll~IJlll11amp1 utVllllt a lbulllfGl bulllC lT

lliilH~1 ~~rm-=rn~ lbullIIIICU-1bull0

itt ishwI JUo ma m1 bull 1-c iiliii ~==~m~=~ Ullln U7IIY M1NLl411 fflf f-~ llr IL ~ lbullt Ill uaP11rllDn1rin1bull139nf- na_ 1111lnl ___ lWTDf-ID 111Jbullnllr-cishy

J1JT1 lflTI-noLbull COi lJ1 tsr18GOTDrl1~ 1--Cn ~~~==-=~ LbullS1rbull-p

LbulllI ~middot x1 fl11bull diams an l~J P-~ WI 1~1Slrmsraquo11nirorn 11bull1n-

llrgt 58 - TDrl ZJlJ l~ Zl llf4 Pll1raquo91I lnP~IIEI 11 ==~=-~~ lbullt-11bullh1~

nun_-~bullfllrlll_ lbulll-lrbull N- - nr6-11MII rinaus a 1bull1E-t1 im1 nrxi mr~ 7nn1 4i i 1c m llrS~iJ-ltJlillII Tt-Ul ris ~=~~middotiill~~ tf llDln~n1rJrgt11nbull1ric ~IPgt9nq~ It-MU rbull RflrrlllVllbulltPllbullOIIUAfC lbullnJtrNbull_~lD+4ftJSHJ7711JrllIIIIT144lDI lbulll ~I llfs-mllThn~-f 1bull11

1a5blH=i5gS El~ iE =iilli ~ID aH~~ ~~ leJINNllllfflnlt10ff1nll~1g=TI==~- lbullN~Jmiddot pw nrwuhtl tba11 l- lllllsectimiii~ ~ lllaquot ll116UW41 llllII NII Cl Ld bullt ll 11r 111~-~lHtl-IINOClll 1Dgtn~rMOtnllfbull3all)Mnr~bullwrmm11uoo~ ~r~ m~ = ~~ t~-i m NNtotl n11nn cm

~~~~~Ttr~ in Httl01llxl nlfM114ta cm

JJN n=-PIW - I- C lbullT rnr nnubullNoXI ffllPI n1 11-amp 11middot 77)111fflffPl~JlaUII

i1JJ n91lbull ti Jnlftbulllll QII

~g=~~~~ir~f~5 =i~=~~ ~=~ ~ ~j====goi H1111t-llll ffo~ ~rn tm111 ta1Vl~ tnar- IVI rm u1i ~ nw ~illl cm 1111 Hltt1H T7U 72w111ll tm UI ftffiH~bull1 naMUlI nlll

lltfll~IOUl rnes~ttlClll

~I~~=~=~~= l3111ratlQOJ121lllll CS u1n-n-a mn-c~11111llllilr ~====m~~ lbulllllr~~Oll~r1111-t~rtRiHa)toI

-~rt~_Utr111tt~USI ~m~i==r~~llfflpound1gtgtMllkllit1U10C011 annrxnbull-TCRL11ai~=~=~g)llllll~--rWltMJtt-8 DR Pl rraquof ntl rim Gllf CCI~~1r~~ liiilllii u- ntlt bull llJ~naJCDI

raquo11NMl10~Ullllcm ntrlnK)fL~nlln-1c lllf ~--TlJaft_Lmc i lbull1 bull l3il0 Nl-197) Ttlll1344 a LbullI 3 l diams 1-111 lflS 1111lOllt ffl- MP PII bullHI lgtl llJI l97Mlt Ian -ti DG llC

111111===-~~~=mg ====~~ tD rlrffllZllIITO-lfllCIIII=~tr~L~~~= - Pl~I llII TD_ ff~ tDII31119NIJMlDffU~~ H CZIII liii~mlt~ D1111nrn11GQ~-CaKftQNJWNczr41140ffnQCUII Jnffnt1JIIIIJunbull~1Qc20lll ~Pllli ll mrnnn lbulltlP 17Jrffdeg-degluoElJIIIQII

~-I-ti _nrna~rlll

a n- 4411 llbullQI 1=40 rt La n- lllf ffrgtn _Jr_~ Ullk ---rr~~ ~=~=tl~~ =1 nttltt nraquo 1nlU as

=-mn--~111DJIDII Ullgt~fflflnanaaJIIJalt55~~EIS~=~~ ~~)1 -11CIJII nn~bullbullbullnaKatt1ta1

JOIT ru~- rf- deg hJIIII r- 111111 ~1111) -1 aJ1 ld t11D1etlll_TalCIS -~-UCV~bullraquootur=~=~I~~=~--~ ~rsrgo_mlaquoshym rs~11flI ~- rnilr==~=~~ ~~r _ ~ atfl ~ rtw Dgtlnn-f-lEllln17n-UIIP

D11 fflXTJ111111 I~~ ar D1Jn4 ~leJJS-OnC111

=====5 middoti SHU=~ 5 ampn iliiiiiIiI11

ngtgtn~1~1tbullubull1rm DH tu~- lt11 rirmU1111 CDIII

~i~i555mi~ ~~ ~m=~==m~g===~~~~ tn1r JtW ~ma- PiOll a CU

~ XNr~t~fDllll1-all~~ m===~~ bullbull~W 111111 ==~~ ampT g~ ru~ =

~lU $Et=ni ~ llll0111ra1Ln~otqC011

H~ g==i =~1 ~

~111111 ~~g~n~a~J))pound11 1=~)6tia

~~ mEfHfH~Si

amp12Ct _ an ~

U N711f21th mM1LU aa o1bull~--117CII in4r ~llllll1Vffl-111Dlr lit~ Hmtlpound1 71 12L I CCIII ---~CUnMIIUOCVf JIHtlnn nl 7r ll4011CIIII

llllDNXCWZflDtlltllCIDCDr

~~=~==~=gnn n1raquoL bullw noanDNt CIJIIi=~ C~middot ~ ~ ~ HnffTI-QIJroQ__111PtlJIIInfflll bullbull1~ aaeIT t-- nrJD nJUntu~CllWI

m ~1 ~ ~~~ ~ ilria~gliiiji~=ir ~lt-OTT gl1raquo ~Iraquou fflllIL nllll 1111111 flC~middotIY_4allCCIIIi l1i5~ ~~11~middot~ ~~ ffll H71W786lll 7P-JOalllllll 2N ~ 1-flllt 7HIJl4- DI ~ ~==~ ~t-tr bullM-

114 Hit71aTra7ririatNOCIIII

llHl1Hf ll~7Dl4fIZIIICIIII 1141ftillf+1DllnTgtlMa~=~bull==~r Lbulll-lllbullbulllJJ

=~~~HR-~a ~ =iEri ~ ~=6

= 1MESE COCIIIOlfAlEi ARC 9~ at AH DISTlfG CONJmOfS AS-alLT FED 5UKiEY Y NORWDal EJICltJIJll(G CD~ IIElMEN ~ 1S 111 DECDaR a 2DII 1)pound OCICIIIDNAlES 5HCflI UIpound IIAID Cit MltSSAOfllffT5 STATE FlJriNII CDCffllNAT smult ~AO leJ (IMIJ 1HE ACQlltACY ltF 1HE COCftDINT[ LDCAnatS Mpound diams- 01 FtU

POINT DESCRIPTION ABBREVIATIONS~-~middotPC Pmlr Of CLIRIJC bullIEllL ClMNpound STilRlS PDC bull PtJtilTIIJOM1poundr ~ [raquo TAHCINiT W(R[ lll[ CURpound uroo Fo F[1NT(1t~tfflvt[ltft1llllIIUlt OMNtilE)PRC ~T oT ~pound ~Vlllrlt

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 2 of 2

I ~ IHAT nfl PlM MS 81D1 PIIDMQl ~WllTM(llUI MOIIEOIAAlPlllR~Df IIUPS C- lttE ~111 Cl__ HftNMIIIZlt

WWWWJU Cii6 liftitit

ACTIVITY ANI) USE LINTATIONS

PLAN OF RES7RIC1EJJ AREAS ANJJ COlER TYPES

8V CKlJ()RN IJNl()N PflllfpoundCpoundS SlllERFIIMJ SITC

50 HJ S(J11( SmEpoundT llAIPOIL JASS

=r-o ~ ll 2021

~ Engmeer1ng

Hltd ~~ middot~~-=~ra (f~AJ lIQ c- f

a llfEET 2 ltF 6324-02

td ~

w ~ m 0 0

Id Q ii w m

co co m 0 co

Bk 39600 Pg437 88608

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY New England Region

Five Post Office Square - Suite 100 Boston Massachusetts 02109-3912

INSTITUTIONAL CONTROL DESIGN STATEMENT FOR THE BLACKBURN AND UNION PRIVILEGES SUPERFUND SITE - EAST OF SOUTH STREET AREA

1 Introduction

Pursuant to the Comprehensive Environmental Response Compensation and Liability Act 42 USC sect 9601 et seq (CERCLA) and the National Contingency Plan 40 CFR Part 300 (the NCP) this document contains a description of the release events and site history that resulted in the contaminated media that require institutional controls in the fom1 of Activity and Use Limitations the basis for land use restrictions and uses that are consistent and inconsistent with the Selected Remedy ( as described below) This Institutional Control (IC) Design Statement pertains to a portion of the Blackburn and Union Privileges Superfund Site located in the Town of Walpole Massachusetts (the Site) which has been listed on EPAs National Priorities List (NPL) which portion is generally referred to as the East of South Street Area (the EOS Area) The EOS Area is located to the east of South Street in Walpole and is shown on Figure 1 attached hereto

A Notice of Activity and Use Limitation (NAUL) is necessary and appropriate for the EOS Area of the Site based on the fact that pursuant to EPAs risk evaluations asbestos arsenic trichloroethene (TCE) and certain polycyclic aromatic hydrocarbon (PAH) contan1inants remain in place in soils at levels higher than those appropriate for unlimited use or unrestricted exposure groundwater underlying the EOS Area contains hazardous substances at levels that present an unacceptable risk of exposure and remedial measures at the Site must be protected and maintained to ensure that the Selected Remedy remains protective

EPAs Record of Decision (ROD) dated September 30 2008 specified the need for institutional controls such as a NAUL to ensure long-tenn perfonnance and protectiveness of the Selected Remedy The institutional controls described herein are necessary and appropriate to ensure that the Selected Remedy for the Site remains protective of human health and the environment The remedy for the Site as described in the ROD is referred to herein and in the NAUL as the Selected Remedy

Page 1 of7

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 20: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

3075

3080

3085

3090

3095

3100

3105

3110

Bk 39600 Pg425 88608

Point Number

Northing Easting Type Curve Length

Curve Radius

3074 28756257366 7239513984 PT

28756185799 7239674928 COR

3076 28756739833 7239921136 COR

3077 28756876060 7239682275 COR

3078 28756948336 7239735898 PC L=335 R=298

3079 28756958235 7239766064 PT

28756866081 7239978133 COR

3081 28757166275 7240127374 COR

3082 28757068320 7240314640 COR

3083 28757602980 7240594310 COR

3084 28757700050 7240408736 COR

28758247941 7240688376 COR

3086 28758250190 7240683910 COR

3087 28758344979 7240738168 COR

3088 2875843 6103 7240581527 COR

3089 28758602943 7240664224 COR

28758740024 7240397393 COR

3091 28758605706 724032 7776 PC L=477 R=309

3092 28758594882 7240286013 PT

3093 28758666635 7240197585 PC L=2573 R=3127

3094 28758767113 7240118710 POC

28758890752 7240086604 PRC L=I653 R=3993

3096 28758972305 7240074125 POC

3097 28759049552 7240045 I 52 PT

3098 28759330312 7239734408 COR

3099 28759459414 7239588584 PC L=2269 R=5217

28759524821 7239496174 POC

3101 28759568752 7239391829 PRC L=1814 R=486

3102 28759603259 7239308095 POC

3103 28759653883 7239232999 PCC L=l31 R=088

3104 28759665694 7239231411 PT

28759800587 7239299586 COR

3106 28759986288 7238981214 COR

3107 2875983 5797 7238891829 COR

3108 28759879750 7238798689 COR

3109 28759905380 7238754769 PC L=1600 R=2552

28759963590 7238700398 POC

3111 28760035727 7238666620 PT

3112 28760700665 723901 5672 PC L=4515 R=2500

3113 28760830230 7239191198 POC

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 5 of 13 April 14 2021

3115

3120

3125

3130

3135

3140

3145

3150

Bk 39600 Pg426 88608

Point Number

Northing Easting Type Curve Len2th

Curve Radius

3114 2876077 263 6 723 940 1624 PT 28760624518 7239567466 COR

3116 28760160100 7239276864 COR

3117 28760055928 7239453423 COR

3137 28759976118 7239541692 COR

3118 28759782139 7239764992 COR

3119 28759625581 7239640375 COR

28758966057 7240399493 COR

3121 28759184326 7240581973 COR

3122 28758593598 724126478] COR

3123 28757977293 724097 2314 COR

3124 28757716516 7241351659 COR

28757288251 7241140719 COR

3126 28756725827 7240851862 COR

3127 28756162468 7240586126 COR

3128 28755614498 7240338506 COR

3129 28754346745 7239768507 COR

28753845716 7239540194 COR

3131 28753257436 723927 8634 COR

3132 28752466355 7238929370 COR

3133 28751819340 7238643698 COR

3134 28751181527 7238364939 COR

28750807772 7238199071 COR

3136 28750413263 7238019301 COR

3138 28756920317 7237298739 PC L=l941 R=2104

3139 28756827128 7237274848 POC

28756733047 7237294944 PRC L=401 R=l66

3141 2875671 1336 723 727 2844 PCC L=1492 R=13345

3142 28756744594 7237206091 POC

3143 28756781529 7237141301 PCC L=1419 R=l018

3144 28756833084 7237094642 POC

28756902566 7237091952 PCC L=2413 R=157959

3146 28757017337 7237129167 POC

3147 28757131820 7237167258 PCC L=330I R=S0000

3148 28757282552 7237234442 POC

3149 28757431866 7237304721 PT 28757338390 7237495930 COR

3151 28757541620 7237605380 COR

3152 28756897590 723883 4280 COR

Exhibit B to NA UL-Part 11-EOS Coordinate Tables Page 6 of 3 April 14 202

3155

3160

3165

3170

3175

3180

3185

Bk 39600 Pg427 88608

Point Northing Easting Type Curve Cunbulle

Number Lenszth Radius 3153 28756870623 7238820218 COR

3154 28756838273 7238882258 COR

28756865240 7238896320 COR

3156 28756777004 7239062996 COR

3157 28756770439 7239063663 PC L=l 146 R=2269

3158 2875665836 I 7239046180 PCC L=l423 R=957

3159 2875661 7520 7238989913 POC

28756625544 7238920850 PT

3161 28756728525 7238726583 PC L=232 R=l58

3162 28756748720 7238720236 PT

3163 28756899634 7238797341 COR

3164 28757254653 7238121363 COR

28757520153 723761266 7 COR

3166 28757306899 723 750 IO 10 COR

3167 28756690336 7237500169 PC L=243 R=I68

3168 28756682599 7237479273 PT

3169 28756686990 7237469583 PC L=0250 R=l68

28756708806 7237463018 PT 3171 28757000109 7237616354 PC L=233 R=l73

3172 28757005368 7237637270 PT

3173 28757000998 7237645513 PC L=233 R=l69

3174 28756980219 7237651023 PT

28756429209 7238339422 COR

3176 28756342982 7238506849 COR

3177 28756500076 7238596485 PC L=l19 R=l48

3178 28756499701 7238608072 PT 3179 2875644 7813 7238705611 PC L=l 182 R=483

28756358177 723 869 0707 PT

3181 2875623 6099 7238376388 PC L=443 R=467

3182 28756235611 7238333779 PCC L=343 R=9IO

3183 28756249049 7238302418 PCC L=412 R=9IO

3184 28756278952 7238274519 PCC L=368 R=300

28756313362 7238277619 PT

3186 28756282498 7238911796 PC L748 R=216

3187 28756240650 7238919721 PT

3188 28756126081 7238620406 PC L=323 R162

3189 28756138645 7238591575 PCC L=333 R=283

Exhibit B to NAUL-Part II-EOS Coordmate Tables Page 7 of 13 April 14 2021

3190

3195

3200

3205

3210

3215

3220

Bk 39600 Pg428 88608

Point Number Northing Easting Type Curve

Leneth Curve Radius

28756163375 7238602867 PT

3191 2875523 0908 7238765275 COR

3192 28755205040 7238752740 COR

3193 28755391740 7238328470 COR

3194 28755466840 7238361040 COR

28755452760 7238392590 COR

3196 28755516920 7238421040 COR

3197 28755530690 7238388730 COR

3198 28755603230 7238421460 COR

3199 2875555 7568 723852 7053 COR

28755371220 7238445330 COR

3201 28755629198 7238558466 COR

3202 28755676040 7238453290 COR

3203 28755925410 7238563840 PC L=1902 R=3548

3204 28755927383 7238658634 POC

28755954390 7238749520 PT 3206 28755974770 7238807230 COR

3207 28755779200 7238881701 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

28755746700 7238609997 COR

3211 2875593774 7239036608 COR

3212 28756048460 7238996850 PC l=1445 R=2903

3213 28756070631 7239065422 POC

3214 28756109010 7239126420 PT

28756153820 7239182190 PC L=S98 R=848

3216 28756171980 723923 7880 PT

3217 287S6026148 7239566166 COR

3218 28756003865 7239556465 COR

3219 287S6134380 7239256650 COR

28755998460 7239195370 COR

3221 2875600 71S0 7239174530 COR

3222 28756001791 7239172152 COR

3223 28756040451 7239079437 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 8 of 13 April 14 2021

Bk 39600 Pg429 88608

Point Number

3210

3200

3056

3057

3058

3059

3060

3061

3062

3218

3219

3220

3221

3224

3225

3226

3227

3228

3070

3071

3234

3233

3235

3236

3237

3238

3239

3240

3241

3242

3243

3244

3245

3246

3247

3248

Northing

28755746700

28755371220

28755040360

28755311720

28755263010

28755388260

28755348660

2875562 54 70

28755664605

28756003865

28756134380

28755998460

28756007150

28755941340

28755962080

28755867937

28755819702

28755766128

28756035900

28756086280

28755991990

28755942100

28756477248

28756677238

28756650130

28756473307

28756480112

28756675030

28756724454

28756742099

28756742133

28756703924

28756640759

28757607280

28757401530

28757467350

Easting

7238609997

7238445330

7239199770

7239318930

7239429300

7239484290

7239576000

7239696500

7239606601

7239556465

7239256650

7239195370

7239174530

7239145324

7239100930

7239061674

7238935003

7238911508

7239926600

7239812770

7239769910

7239884050

7239261913

7239253008

7239321810

7239319038

7239298824

7239364440

7239271845

7239292625

723935 0187

7239393239

7239393096

7237584960

7237475300

7237345620

Type

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

PC PCC

POC

PCC

PT

COR

COR

COR

Curve Len2th

L=273

L=ll77

L=657

Cunmiddote Radius

R=1421

R=810

R=679

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 9 of 13 April 14 2021

Bk 39600 Pg430 88608

Point Number Northing Easting Type Curve

Len2th Curve Radius

3249 287 57514570 7237372360 PC l=ll05 R=1993

3250 287 57 588060 7237452980 PT

3251 28757631382 7237429676 PC L=2244 R=2352

3252 287 5765 6810 7237537876 POC

3253 2875 762 9720 7237645671 PT

3254 28756940655 7238952710 PC l=1493 R=1509

3255 28756901845 7239015577 POC

3256 2875683 7836 7239052474 PT

3257 28758104824 7237653014 COR

3258 28758028960 7237800160 COR

3259 28757949530 7237760790 COR

3260 28757901005 7237855021 COR

3261 28757839230 7237820908 PC L=273 R=l33

3262 28757830688 7237799810 PCC L=539 R=2144

3263 28757852974 7237750897 PT

3264 28757891705 7237688178 PC L=lS26 R=2432

3265 28757948636 7237637880 POC

3266 287 58018307 7237607597 PT

3248 28757467350 7237345620 COR

3267 28757550832 7237363444 POC L=2653 R=80000

3268 28757668809 7237424132 PT

3269 28757504 719 7238817989 COR

3270 28757493010 7238842230 COR

3271 28757561074 7238880970 COR

3272 28757483953 7239024127 PC L=323 R=l70

3273 28757459939 7239037846 PT

3274 28757311605 7238957122 PC L=1388 R=906

3275 2875727 2732 7238901647 POC

3276 28757283181 7238834718 PT

3277 287 5733 4061 7238752337 PC L=255 R=l60

3278 287 5735 5527 7238744411 PT

3279 2875 7102815 7239517199 PC l=261 R=l70

3280 28757080654 7239525307 PCC l=909 R=1275

3281 2875 700 5390 7239477911 PCC L=l007 R=990

3282 28756999624 7239381704 PT

3283 2875707 7705 7239230604 PC L=ll14 R=907

Exhibit B lo NAUL-Part IlbullEOS Coordinate Tables Page 10 of13 April 14 2021

3285

3290

3295

3300

3305

3310

3315

Bk 39600 Pg431 88608

Point Number Northing Easting Type

Curve Leneth

Curve Radius

3284 28757168066 7239178102 PT

28757205717 7239186398 PC L=518 R=930

3286 28757249003 7239213534 PCC L=l41 R=086

3287 2875724 7909 7239226048 PT

3288 28758415755 7239842757 PC L=251 R=l59

3289 28758437695 7239837379 PT

28758456377 7239846949 PC L=812 R=876

3291 28758494897 7239915165 PCC L=456 R=757

3292 28758483790 7239958646 PT

3293 28758405147 7240111348 PC L=l057 R=955

3294 28758318136 7240161452 PCC L=477 R=l063

28758272407 7240149529 PCC L=250 R=l60

3296 28758265647 7240128003 PT

3297 28758157937 7237680895 COR

3298 28758902927 723807 1969 COR

3299 28758852531 7238168280 COR

28758779660 7238129750 COR

3301 28758746973 7238192072 COR

3302 2875807 6630 7237840490 COR

3303 28758049940 7237894220 COR

3304 2875871 7997 7238243620 COR

28758680103 7238315946 COR

3306 28758533699 7238239240 COR

3307 2875852 6899 7238252220 COR

3308 28758098180 7238027600 COR

3309 28757974484 7238264223 COR

28757957598 7238255513 COR

3311 28757757732 7238637845 COR

3312 28757774584 7238646620 COR

3313 28757653710 723887 7846 COR

3314 28757560920 7238829340 COR

28759004930 7238125514 COR

3316 28759689797 7238485028 PC L=1992 R=2609

3317 28759697204 7238583760 POC

3318 28759667288 723867 8142 PT

3319 28758996126 7238323718 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 11 of 13 April 14202 I

Bk 39600 Pg432 88608

Point Number

Northing Easting Type Curve Lenfth

Curve Radius

3320 28759028950 7238261560 COR 3321 28758954486 7238222188 COR

3322 28758972523 7238378387 COR 3323 28759421550 7238613630 COR 3324 28759377933 7238698105 COR 3325 2875907 4811 7238539289 COR 3326 28759081611 7238526309 COR 3327 28758935210 7238449604 COR

3328 28759464470 7238637330 COR 3329 28759632674 7238722481 PC L=ll83 R=l578

3330 28759583973 7238755474 POC 3331 28759526573 7238768343 PRC L=2163 R=2455

3332 28759422964 7238796123 POC 3333 28759341091 7238865430 PT

3334 28759193370 7239050710 COR 3335 28759416340 7239163940 COR 3336 28759263600 7239455620 COR 3337 28759043690 7239336510 COR 3338 28758935490 7239552130 COR 3339 28757650890 7238883240 COR 3312 28757774584 7238646620 COR 3311 28757757732 7238637845 COR 3310 28757957598 7238255513 COR 3309 28757974484 7238264223 COR 3308 28758098180 723802 7600 COR 3307 28758526899 7238252220 COR 3306 28758533699 7238239240 COR 3340 28758700033 7238326388 COR 3341 28758675436 7238373334 COR 3342 28758733013 7238403500 COR 3343 28758760858 7238350353 COR 3344 28758860952 7238402796 COR 3345 28758833106 7238455943 COR 3346 28758890683 7238486109 COR 3347 28758915280 7238439162 COR 3326 28759081611 7238526309 COR 3325 28759074811 7238539289 COR

Exhibit B to NAUL-Part H-EOS Coordinate Tables Page 12 of l3 April 14 2021

Bk 39600 Pg433 88608

Point Number

Northing Easting Type Curve Len2th

Cunbulle Radius

3324 2875937 7933 7238698105 COR

3082 28757068320 7240314640 COR 3083 28757602980 7240594310 COR 3349 28757790234 7240236327 COR

3348 28757255574 7239956657 COR

3124 28757716516 7241351659 COR 3125 28757288251 7241140719 COR 3126 28756725827 7240851862 COR 3127 28756162468 7240586126 COR 3128 287 55614498 7240338506 COR 3129 28754346745 7239768507 COR 3130 28753845716 7239540194 COR 3131 28753257436 723927 8634 COR 3132 28752466355 7238929370 COR 3133 28751819340 7238643698 COR 3134 2875118152 7 7238364939 COR 3135 2875080 7772 7238199071 COR 3136 28750413263 7238019301 COR 3350 28750296168 7238284525 COR 3351 28754 78 6636 7240267040 COR 3352 28757412029 7241794586 COR

POINT DESCRIPTION ABBREVIATIONS

COR=CORNER PC= POINT OF CURVE WHERE CURVE STARTS POC -= POINT ON CUR VE PT=POINT OF TANGENCY WHERE THE CURVE ENDS PCC = POINT OF COMPOUND CURVE (WHERE RADIUS CHANGES) PRC = POINT OF REVERSE CURVE

NOTES

THE COORDINATES ARE BASED ON AN EXISTING CONDITIONS AS-BUILT FIELD SURVEY BY NORWOOD ENGINEERING CO INC BETWEEN NOVEMBER 15 TO DECEMBER 18 2019 TI-IE COORDINATES ARE BASED ON l1ASSACHUSETIS ST A TE PLANE COORDINATE SYSTEM NAD 1983 (FEET) THE ACCURACY OF THE COORDINATE LOCATIONS ARE +-0J FEET

Exhibit B to N1UL-Part II-EOS Coordmate Tables Page 13 ofl3 April 14 2021

---

1f~ flJr ~i

f ~~ J~i](M~I ~ 1 jf~ ~~f W-- )e 1

It lj fY pl ~-~j

I --- ~ ~

1 (J-c~ er ~

C JI fl JYf

1 ~ ~Yu-~ 1i

~r

( LOClJS P

SCAUllbulliQO

I ar lMIT flG PINI tMS _ lIIPMIDMICXNllRlnT~tlCfllUS 1111D cmuftraquodl s - NIKl1III tfIJIIIIIOfM~1HCll allE1

DAre Jllrl

NUKIJU LU6 DMitM

mmtG6DKbdlt

~4~-middot

~~I

-- ampnbullllf~ ~ fa

LEGEND 0

-i~wr0o-m lICUUoaampbullco--11111 _ _l_J

0

bull ~-ail_I

~-

mo(I ---fwj

amp~~~~ ~ ~~ltgtmiddot ~A~

~6

_L-r

bull -~ IBP__l-11Uil n-rlfl-lffll rMCllI 1a 1rr ai

-~ lll-lliI u-W--11a 1 Ml[ 411 amt l0IIC 3JICJ7 ~ 33-1--I- DIID llXII D111 JlMZ 411 lraquo- ~lUN~t --- - etMpound 11JII

~ MffD mmaat ZL I01t 111

1Jlll~-IICfIQfJICIISJ DfEI IC71- I~ 1~ 9 Cl 1VY IICIIWCLl~fCSC~lNCl

~11HltOXW1A~JtCI~llfB MXIC 1HI lME INCi 111M bull11 (S 1f41~middot~-~-)

~ io

0 0 0 0 -0 0 0 D O 1 middot tbull O

_- _pound ~ - Tf middot- ---r ~~ ~~- ~=middoti

r jil7bull --------4~-middot~

(

SCAtpound 1bull bull YI

I ~ tfAIE lIMa toafllltl1E ~NAD1w1(rJ

1 ~ PlIla II MMt QI 11D TD D111oPl

~c1MlntID9~~-l 1NIIJIIKlNI LnlJTU ~ deg qllAJSTE uM011111 iu1II 1111ZT IIIILJaZ

Exhibit C - Photo-Reduced Copy of Activity and Use Limitations Plan of Land

--~middot---

I ~111-11111

iiiii

-ill111liilt

ACJIYIJY ANJ) lJSE lJJll7ATJONS PLAN OF LANI)

81ACJ(81R1 I IINION Flr11lfES SllffllF7AVO SIle

o tfO SOIJIH s1ar HlltlPOtL IIAS

SCAlElrJAt IPfffl152021

1IJrwod Eng1neerlng

- EnQlbullHrlflg Compaffy middot~~=~ m Cm1JQ u fnfJa-eal

~ -

-~

9l1EET 1 OF I 8324-02

td ~

w ~ m 0 0

Id Q ii w ii

co co m

co 0

-l

~-77--raquo- -~I~ )middot~ ~ bull _I lT ~ v~

AI ~ If ~)middot~ 7- ~1 c t11 yil ~ ~ ~middot~41 bull1 l ~~l(i~r~1 f7 )ll y-

~~ f -~ -v fgtV ~ ~ ~ l er-- u -

tl x-P~C ()

JP yen f(( 11 1degpoundS -~ (

ftunrTfflllllTnallJrNNQWDf ~ ti IZNtRlTT lnH M IULS IIJIUIUlA-DlltlllllDlJlllIICIF tJbllt~llC~lJNp

DTl NlllltaJatl-Witiill (raquo11 iiiK(+til

I aJnlTlKATJlfl PlAH~ THE PUIIJll1T UC TIUlf Mlaquo THE l5 11 oawG ~ NII 1Hpound1as Of1111E111 AMllfrlTll9laquolllt Mpound ntem OPlaJ CJ1 IWM1pound BREn 011 bulln

~ ~illi~fli~ _lt ---c~-Clmiddot~~c0-nmiddotmiddot~bullJmiddot04~- ~--~--yen~~bull - L -bull -n ~ -r - ~ -

it

~ fr ~ ~- -~bull~bullv OG- ~n0

bull--ltmiddot middot~ -~- ~~-=~7~st~-~~~~i~~Hil~-) 2~C 0 ~~~~~ --------Y-Tgt-bullbullmiddot-

U-IU ~middotshy =i==-

bullbull bull _ -middot-

~----- ( ~11middot

__IC1ZMJ - bull IOC)0l lftEf ___ i gt mEKJllJfNG rotJ1FRIIIT AIIEAS B~ p~ AIIEAS ~ea-vmiddot LIUIID

~ e--- -+ ~ rzprz1za 1 ~ IJTATC PRC ~TC

nJml lltPtasCltJ

DUD BCD lJlll7 PMC 4H 1 1 YERT1CAL M1llI II NCCI ~ _ ro conurr DOD 80CIC 3JII07 llME 4H I ntaM NUIU 1121 IJ4TAI m IMlC 111111 nATIIW ~fsi

tJMAlfflOlI) AIIEAS1 bull 11AMJSCAlfl) AlpoundAS Lill] 1Dll IOlII POT PlCit 6115 J)-t20 ~atfnujK~tlLWlQI

~PUNMl-17 POflTIVNf1Ell llaD BaalC Tl_ Paa bullbull - 99 a 11

_-ijf1iltDP~IZ~ 5CME - JOSUva1fTLJ ~ ~-rr 111 C tMI=

bull111 I~

i=iiii7

~ e---

t c z rl

L-n11 ~

ACJIVJTY AND USE LIAlffAJIONS

PIAN OF RESTRIC1EJJ AREAS ANJJ COVER TYPES

fltACK1(fN _ llNlltgtI PfMIECCS SllPVFVNlJ51Tlt

JO _ lxJ srJllH STREET IIALPrJU JASS

SCAU I - 30 APRIL 2021

lcnwod Engineering

llarwood Cngnrilgtf cpmy -t~~~~

fIL Pllpa-ru - (1u]1a-lftll

~L=wl f 01~JII IO_

a SIEET I (F 2 B324-02

bj ~

w 0

0 0 deg It

iQ ~ w l11

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 1 of 2

CX) CX)

deg CX) 0

ntllT -1~1~ rurnlaquo1 r1n l1XTM 11Nf -r~ lie UUffCI 11Pt lDll1Hf iniin --IC unr1G Tlr 1n1rn Iota allll Ito tyen1tlll ~~11CRnrzJ11-11--~ci-- n31 nr111w11J1t ~bull c ~- diams JDrnn llloffl rcnlml IDII

-~ ]al rll _ _ PnlM-1-PI lbull-- ll7HrirrIPlllD1lf~-a bullbullll 111bull IClln9XnolDlllIIIIIIOm

214 ff7371JOOT ~bull JllC Ibullbull 171 JICllEY)l)vlUTlo~lUl~ ~li_~ -~~ MDlol ll4L~TllJraquofllllf190abullbullt ~~nQuu~~1aJI _~~OtottWU~1t11txm~arcPbrmllmCDt ~~ ~~ ~ =~ gj ~l11~ llltlM Mrattllll TDPmllIDCDI JJ4bull e~ _ ~ e PClC lbullI- 1- ~1sect~ ~ ~ ~ ~ ~~~-nr~44bull~mn11-a11 ~~ =mt =m~ ~ ~~ ~ =~~-~~ =~~rt~l~llibullltbull=

~~~~~~~~r-~r-~~sectsect55~55 ~~ ~=g~~ mi --1~ ~-==~~m~ L-~r UVPllrlllUillDITDr4L 1JI lbullKlllll~==~~~=~

~~~~~~~~ raquoff-llll 111rritl_aianbull ~11lCla rr- n ttll XDP11r1r 11111c-1C111~ RTl~rJlllllbullbull~llllJlllipo~~=r~tm=~~

~=~3r~t==~ ~=~i==~~ llt1ttl70 m~~n~ =n~ L diams 11- bull - iaEi~mi 1lE~HHffi ~1-~ E LbulllT bullU-7YA 8911U TMn4 OJII C- lllkHrnl1nlntll11106~

MJ9~gt111ftlrfffll11 ~ SbullC61hLJT raquoWl lll~IJlll11amp1 utVllllt a lbulllfGl bulllC lT

lliilH~1 ~~rm-=rn~ lbullIIIICU-1bull0

itt ishwI JUo ma m1 bull 1-c iiliii ~==~m~=~ Ullln U7IIY M1NLl411 fflf f-~ llr IL ~ lbullt Ill uaP11rllDn1rin1bull139nf- na_ 1111lnl ___ lWTDf-ID 111Jbullnllr-cishy

J1JT1 lflTI-noLbull COi lJ1 tsr18GOTDrl1~ 1--Cn ~~~==-=~ LbullS1rbull-p

LbulllI ~middot x1 fl11bull diams an l~J P-~ WI 1~1Slrmsraquo11nirorn 11bull1n-

llrgt 58 - TDrl ZJlJ l~ Zl llf4 Pll1raquo91I lnP~IIEI 11 ==~=-~~ lbullt-11bullh1~

nun_-~bullfllrlll_ lbulll-lrbull N- - nr6-11MII rinaus a 1bull1E-t1 im1 nrxi mr~ 7nn1 4i i 1c m llrS~iJ-ltJlillII Tt-Ul ris ~=~~middotiill~~ tf llDln~n1rJrgt11nbull1ric ~IPgt9nq~ It-MU rbull RflrrlllVllbulltPllbullOIIUAfC lbullnJtrNbull_~lD+4ftJSHJ7711JrllIIIIT144lDI lbulll ~I llfs-mllThn~-f 1bull11

1a5blH=i5gS El~ iE =iilli ~ID aH~~ ~~ leJINNllllfflnlt10ff1nll~1g=TI==~- lbullN~Jmiddot pw nrwuhtl tba11 l- lllllsectimiii~ ~ lllaquot ll116UW41 llllII NII Cl Ld bullt ll 11r 111~-~lHtl-IINOClll 1Dgtn~rMOtnllfbull3all)Mnr~bullwrmm11uoo~ ~r~ m~ = ~~ t~-i m NNtotl n11nn cm

~~~~~Ttr~ in Httl01llxl nlfM114ta cm

JJN n=-PIW - I- C lbullT rnr nnubullNoXI ffllPI n1 11-amp 11middot 77)111fflffPl~JlaUII

i1JJ n91lbull ti Jnlftbulllll QII

~g=~~~~ir~f~5 =i~=~~ ~=~ ~ ~j====goi H1111t-llll ffo~ ~rn tm111 ta1Vl~ tnar- IVI rm u1i ~ nw ~illl cm 1111 Hltt1H T7U 72w111ll tm UI ftffiH~bull1 naMUlI nlll

lltfll~IOUl rnes~ttlClll

~I~~=~=~~= l3111ratlQOJ121lllll CS u1n-n-a mn-c~11111llllilr ~====m~~ lbulllllr~~Oll~r1111-t~rtRiHa)toI

-~rt~_Utr111tt~USI ~m~i==r~~llfflpound1gtgtMllkllit1U10C011 annrxnbull-TCRL11ai~=~=~g)llllll~--rWltMJtt-8 DR Pl rraquof ntl rim Gllf CCI~~1r~~ liiilllii u- ntlt bull llJ~naJCDI

raquo11NMl10~Ullllcm ntrlnK)fL~nlln-1c lllf ~--TlJaft_Lmc i lbull1 bull l3il0 Nl-197) Ttlll1344 a LbullI 3 l diams 1-111 lflS 1111lOllt ffl- MP PII bullHI lgtl llJI l97Mlt Ian -ti DG llC

111111===-~~~=mg ====~~ tD rlrffllZllIITO-lfllCIIII=~tr~L~~~= - Pl~I llII TD_ ff~ tDII31119NIJMlDffU~~ H CZIII liii~mlt~ D1111nrn11GQ~-CaKftQNJWNczr41140ffnQCUII Jnffnt1JIIIIJunbull~1Qc20lll ~Pllli ll mrnnn lbulltlP 17Jrffdeg-degluoElJIIIQII

~-I-ti _nrna~rlll

a n- 4411 llbullQI 1=40 rt La n- lllf ffrgtn _Jr_~ Ullk ---rr~~ ~=~=tl~~ =1 nttltt nraquo 1nlU as

=-mn--~111DJIDII Ullgt~fflflnanaaJIIJalt55~~EIS~=~~ ~~)1 -11CIJII nn~bullbullbullnaKatt1ta1

JOIT ru~- rf- deg hJIIII r- 111111 ~1111) -1 aJ1 ld t11D1etlll_TalCIS -~-UCV~bullraquootur=~=~I~~=~--~ ~rsrgo_mlaquoshym rs~11flI ~- rnilr==~=~~ ~~r _ ~ atfl ~ rtw Dgtlnn-f-lEllln17n-UIIP

D11 fflXTJ111111 I~~ ar D1Jn4 ~leJJS-OnC111

=====5 middoti SHU=~ 5 ampn iliiiiiIiI11

ngtgtn~1~1tbullubull1rm DH tu~- lt11 rirmU1111 CDIII

~i~i555mi~ ~~ ~m=~==m~g===~~~~ tn1r JtW ~ma- PiOll a CU

~ XNr~t~fDllll1-all~~ m===~~ bullbull~W 111111 ==~~ ampT g~ ru~ =

~lU $Et=ni ~ llll0111ra1Ln~otqC011

H~ g==i =~1 ~

~111111 ~~g~n~a~J))pound11 1=~)6tia

~~ mEfHfH~Si

amp12Ct _ an ~

U N711f21th mM1LU aa o1bull~--117CII in4r ~llllll1Vffl-111Dlr lit~ Hmtlpound1 71 12L I CCIII ---~CUnMIIUOCVf JIHtlnn nl 7r ll4011CIIII

llllDNXCWZflDtlltllCIDCDr

~~=~==~=gnn n1raquoL bullw noanDNt CIJIIi=~ C~middot ~ ~ ~ HnffTI-QIJroQ__111PtlJIIInfflll bullbull1~ aaeIT t-- nrJD nJUntu~CllWI

m ~1 ~ ~~~ ~ ilria~gliiiji~=ir ~lt-OTT gl1raquo ~Iraquou fflllIL nllll 1111111 flC~middotIY_4allCCIIIi l1i5~ ~~11~middot~ ~~ ffll H71W786lll 7P-JOalllllll 2N ~ 1-flllt 7HIJl4- DI ~ ~==~ ~t-tr bullM-

114 Hit71aTra7ririatNOCIIII

llHl1Hf ll~7Dl4fIZIIICIIII 1141ftillf+1DllnTgtlMa~=~bull==~r Lbulll-lllbullbulllJJ

=~~~HR-~a ~ =iEri ~ ~=6

= 1MESE COCIIIOlfAlEi ARC 9~ at AH DISTlfG CONJmOfS AS-alLT FED 5UKiEY Y NORWDal EJICltJIJll(G CD~ IIElMEN ~ 1S 111 DECDaR a 2DII 1)pound OCICIIIDNAlES 5HCflI UIpound IIAID Cit MltSSAOfllffT5 STATE FlJriNII CDCffllNAT smult ~AO leJ (IMIJ 1HE ACQlltACY ltF 1HE COCftDINT[ LDCAnatS Mpound diams- 01 FtU

POINT DESCRIPTION ABBREVIATIONS~-~middotPC Pmlr Of CLIRIJC bullIEllL ClMNpound STilRlS PDC bull PtJtilTIIJOM1poundr ~ [raquo TAHCINiT W(R[ lll[ CURpound uroo Fo F[1NT(1t~tfflvt[ltft1llllIIUlt OMNtilE)PRC ~T oT ~pound ~Vlllrlt

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 2 of 2

I ~ IHAT nfl PlM MS 81D1 PIIDMQl ~WllTM(llUI MOIIEOIAAlPlllR~Df IIUPS C- lttE ~111 Cl__ HftNMIIIZlt

WWWWJU Cii6 liftitit

ACTIVITY ANI) USE LINTATIONS

PLAN OF RES7RIC1EJJ AREAS ANJJ COlER TYPES

8V CKlJ()RN IJNl()N PflllfpoundCpoundS SlllERFIIMJ SITC

50 HJ S(J11( SmEpoundT llAIPOIL JASS

=r-o ~ ll 2021

~ Engmeer1ng

Hltd ~~ middot~~-=~ra (f~AJ lIQ c- f

a llfEET 2 ltF 6324-02

td ~

w ~ m 0 0

Id Q ii w m

co co m 0 co

Bk 39600 Pg437 88608

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY New England Region

Five Post Office Square - Suite 100 Boston Massachusetts 02109-3912

INSTITUTIONAL CONTROL DESIGN STATEMENT FOR THE BLACKBURN AND UNION PRIVILEGES SUPERFUND SITE - EAST OF SOUTH STREET AREA

1 Introduction

Pursuant to the Comprehensive Environmental Response Compensation and Liability Act 42 USC sect 9601 et seq (CERCLA) and the National Contingency Plan 40 CFR Part 300 (the NCP) this document contains a description of the release events and site history that resulted in the contaminated media that require institutional controls in the fom1 of Activity and Use Limitations the basis for land use restrictions and uses that are consistent and inconsistent with the Selected Remedy ( as described below) This Institutional Control (IC) Design Statement pertains to a portion of the Blackburn and Union Privileges Superfund Site located in the Town of Walpole Massachusetts (the Site) which has been listed on EPAs National Priorities List (NPL) which portion is generally referred to as the East of South Street Area (the EOS Area) The EOS Area is located to the east of South Street in Walpole and is shown on Figure 1 attached hereto

A Notice of Activity and Use Limitation (NAUL) is necessary and appropriate for the EOS Area of the Site based on the fact that pursuant to EPAs risk evaluations asbestos arsenic trichloroethene (TCE) and certain polycyclic aromatic hydrocarbon (PAH) contan1inants remain in place in soils at levels higher than those appropriate for unlimited use or unrestricted exposure groundwater underlying the EOS Area contains hazardous substances at levels that present an unacceptable risk of exposure and remedial measures at the Site must be protected and maintained to ensure that the Selected Remedy remains protective

EPAs Record of Decision (ROD) dated September 30 2008 specified the need for institutional controls such as a NAUL to ensure long-tenn perfonnance and protectiveness of the Selected Remedy The institutional controls described herein are necessary and appropriate to ensure that the Selected Remedy for the Site remains protective of human health and the environment The remedy for the Site as described in the ROD is referred to herein and in the NAUL as the Selected Remedy

Page 1 of7

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 21: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

3115

3120

3125

3130

3135

3140

3145

3150

Bk 39600 Pg426 88608

Point Number

Northing Easting Type Curve Len2th

Curve Radius

3114 2876077 263 6 723 940 1624 PT 28760624518 7239567466 COR

3116 28760160100 7239276864 COR

3117 28760055928 7239453423 COR

3137 28759976118 7239541692 COR

3118 28759782139 7239764992 COR

3119 28759625581 7239640375 COR

28758966057 7240399493 COR

3121 28759184326 7240581973 COR

3122 28758593598 724126478] COR

3123 28757977293 724097 2314 COR

3124 28757716516 7241351659 COR

28757288251 7241140719 COR

3126 28756725827 7240851862 COR

3127 28756162468 7240586126 COR

3128 28755614498 7240338506 COR

3129 28754346745 7239768507 COR

28753845716 7239540194 COR

3131 28753257436 723927 8634 COR

3132 28752466355 7238929370 COR

3133 28751819340 7238643698 COR

3134 28751181527 7238364939 COR

28750807772 7238199071 COR

3136 28750413263 7238019301 COR

3138 28756920317 7237298739 PC L=l941 R=2104

3139 28756827128 7237274848 POC

28756733047 7237294944 PRC L=401 R=l66

3141 2875671 1336 723 727 2844 PCC L=1492 R=13345

3142 28756744594 7237206091 POC

3143 28756781529 7237141301 PCC L=1419 R=l018

3144 28756833084 7237094642 POC

28756902566 7237091952 PCC L=2413 R=157959

3146 28757017337 7237129167 POC

3147 28757131820 7237167258 PCC L=330I R=S0000

3148 28757282552 7237234442 POC

3149 28757431866 7237304721 PT 28757338390 7237495930 COR

3151 28757541620 7237605380 COR

3152 28756897590 723883 4280 COR

Exhibit B to NA UL-Part 11-EOS Coordinate Tables Page 6 of 3 April 14 202

3155

3160

3165

3170

3175

3180

3185

Bk 39600 Pg427 88608

Point Northing Easting Type Curve Cunbulle

Number Lenszth Radius 3153 28756870623 7238820218 COR

3154 28756838273 7238882258 COR

28756865240 7238896320 COR

3156 28756777004 7239062996 COR

3157 28756770439 7239063663 PC L=l 146 R=2269

3158 2875665836 I 7239046180 PCC L=l423 R=957

3159 2875661 7520 7238989913 POC

28756625544 7238920850 PT

3161 28756728525 7238726583 PC L=232 R=l58

3162 28756748720 7238720236 PT

3163 28756899634 7238797341 COR

3164 28757254653 7238121363 COR

28757520153 723761266 7 COR

3166 28757306899 723 750 IO 10 COR

3167 28756690336 7237500169 PC L=243 R=I68

3168 28756682599 7237479273 PT

3169 28756686990 7237469583 PC L=0250 R=l68

28756708806 7237463018 PT 3171 28757000109 7237616354 PC L=233 R=l73

3172 28757005368 7237637270 PT

3173 28757000998 7237645513 PC L=233 R=l69

3174 28756980219 7237651023 PT

28756429209 7238339422 COR

3176 28756342982 7238506849 COR

3177 28756500076 7238596485 PC L=l19 R=l48

3178 28756499701 7238608072 PT 3179 2875644 7813 7238705611 PC L=l 182 R=483

28756358177 723 869 0707 PT

3181 2875623 6099 7238376388 PC L=443 R=467

3182 28756235611 7238333779 PCC L=343 R=9IO

3183 28756249049 7238302418 PCC L=412 R=9IO

3184 28756278952 7238274519 PCC L=368 R=300

28756313362 7238277619 PT

3186 28756282498 7238911796 PC L748 R=216

3187 28756240650 7238919721 PT

3188 28756126081 7238620406 PC L=323 R162

3189 28756138645 7238591575 PCC L=333 R=283

Exhibit B to NAUL-Part II-EOS Coordmate Tables Page 7 of 13 April 14 2021

3190

3195

3200

3205

3210

3215

3220

Bk 39600 Pg428 88608

Point Number Northing Easting Type Curve

Leneth Curve Radius

28756163375 7238602867 PT

3191 2875523 0908 7238765275 COR

3192 28755205040 7238752740 COR

3193 28755391740 7238328470 COR

3194 28755466840 7238361040 COR

28755452760 7238392590 COR

3196 28755516920 7238421040 COR

3197 28755530690 7238388730 COR

3198 28755603230 7238421460 COR

3199 2875555 7568 723852 7053 COR

28755371220 7238445330 COR

3201 28755629198 7238558466 COR

3202 28755676040 7238453290 COR

3203 28755925410 7238563840 PC L=1902 R=3548

3204 28755927383 7238658634 POC

28755954390 7238749520 PT 3206 28755974770 7238807230 COR

3207 28755779200 7238881701 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

28755746700 7238609997 COR

3211 2875593774 7239036608 COR

3212 28756048460 7238996850 PC l=1445 R=2903

3213 28756070631 7239065422 POC

3214 28756109010 7239126420 PT

28756153820 7239182190 PC L=S98 R=848

3216 28756171980 723923 7880 PT

3217 287S6026148 7239566166 COR

3218 28756003865 7239556465 COR

3219 287S6134380 7239256650 COR

28755998460 7239195370 COR

3221 2875600 71S0 7239174530 COR

3222 28756001791 7239172152 COR

3223 28756040451 7239079437 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 8 of 13 April 14 2021

Bk 39600 Pg429 88608

Point Number

3210

3200

3056

3057

3058

3059

3060

3061

3062

3218

3219

3220

3221

3224

3225

3226

3227

3228

3070

3071

3234

3233

3235

3236

3237

3238

3239

3240

3241

3242

3243

3244

3245

3246

3247

3248

Northing

28755746700

28755371220

28755040360

28755311720

28755263010

28755388260

28755348660

2875562 54 70

28755664605

28756003865

28756134380

28755998460

28756007150

28755941340

28755962080

28755867937

28755819702

28755766128

28756035900

28756086280

28755991990

28755942100

28756477248

28756677238

28756650130

28756473307

28756480112

28756675030

28756724454

28756742099

28756742133

28756703924

28756640759

28757607280

28757401530

28757467350

Easting

7238609997

7238445330

7239199770

7239318930

7239429300

7239484290

7239576000

7239696500

7239606601

7239556465

7239256650

7239195370

7239174530

7239145324

7239100930

7239061674

7238935003

7238911508

7239926600

7239812770

7239769910

7239884050

7239261913

7239253008

7239321810

7239319038

7239298824

7239364440

7239271845

7239292625

723935 0187

7239393239

7239393096

7237584960

7237475300

7237345620

Type

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

PC PCC

POC

PCC

PT

COR

COR

COR

Curve Len2th

L=273

L=ll77

L=657

Cunmiddote Radius

R=1421

R=810

R=679

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 9 of 13 April 14 2021

Bk 39600 Pg430 88608

Point Number Northing Easting Type Curve

Len2th Curve Radius

3249 287 57514570 7237372360 PC l=ll05 R=1993

3250 287 57 588060 7237452980 PT

3251 28757631382 7237429676 PC L=2244 R=2352

3252 287 5765 6810 7237537876 POC

3253 2875 762 9720 7237645671 PT

3254 28756940655 7238952710 PC l=1493 R=1509

3255 28756901845 7239015577 POC

3256 2875683 7836 7239052474 PT

3257 28758104824 7237653014 COR

3258 28758028960 7237800160 COR

3259 28757949530 7237760790 COR

3260 28757901005 7237855021 COR

3261 28757839230 7237820908 PC L=273 R=l33

3262 28757830688 7237799810 PCC L=539 R=2144

3263 28757852974 7237750897 PT

3264 28757891705 7237688178 PC L=lS26 R=2432

3265 28757948636 7237637880 POC

3266 287 58018307 7237607597 PT

3248 28757467350 7237345620 COR

3267 28757550832 7237363444 POC L=2653 R=80000

3268 28757668809 7237424132 PT

3269 28757504 719 7238817989 COR

3270 28757493010 7238842230 COR

3271 28757561074 7238880970 COR

3272 28757483953 7239024127 PC L=323 R=l70

3273 28757459939 7239037846 PT

3274 28757311605 7238957122 PC L=1388 R=906

3275 2875727 2732 7238901647 POC

3276 28757283181 7238834718 PT

3277 287 5733 4061 7238752337 PC L=255 R=l60

3278 287 5735 5527 7238744411 PT

3279 2875 7102815 7239517199 PC l=261 R=l70

3280 28757080654 7239525307 PCC l=909 R=1275

3281 2875 700 5390 7239477911 PCC L=l007 R=990

3282 28756999624 7239381704 PT

3283 2875707 7705 7239230604 PC L=ll14 R=907

Exhibit B lo NAUL-Part IlbullEOS Coordinate Tables Page 10 of13 April 14 2021

3285

3290

3295

3300

3305

3310

3315

Bk 39600 Pg431 88608

Point Number Northing Easting Type

Curve Leneth

Curve Radius

3284 28757168066 7239178102 PT

28757205717 7239186398 PC L=518 R=930

3286 28757249003 7239213534 PCC L=l41 R=086

3287 2875724 7909 7239226048 PT

3288 28758415755 7239842757 PC L=251 R=l59

3289 28758437695 7239837379 PT

28758456377 7239846949 PC L=812 R=876

3291 28758494897 7239915165 PCC L=456 R=757

3292 28758483790 7239958646 PT

3293 28758405147 7240111348 PC L=l057 R=955

3294 28758318136 7240161452 PCC L=477 R=l063

28758272407 7240149529 PCC L=250 R=l60

3296 28758265647 7240128003 PT

3297 28758157937 7237680895 COR

3298 28758902927 723807 1969 COR

3299 28758852531 7238168280 COR

28758779660 7238129750 COR

3301 28758746973 7238192072 COR

3302 2875807 6630 7237840490 COR

3303 28758049940 7237894220 COR

3304 2875871 7997 7238243620 COR

28758680103 7238315946 COR

3306 28758533699 7238239240 COR

3307 2875852 6899 7238252220 COR

3308 28758098180 7238027600 COR

3309 28757974484 7238264223 COR

28757957598 7238255513 COR

3311 28757757732 7238637845 COR

3312 28757774584 7238646620 COR

3313 28757653710 723887 7846 COR

3314 28757560920 7238829340 COR

28759004930 7238125514 COR

3316 28759689797 7238485028 PC L=1992 R=2609

3317 28759697204 7238583760 POC

3318 28759667288 723867 8142 PT

3319 28758996126 7238323718 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 11 of 13 April 14202 I

Bk 39600 Pg432 88608

Point Number

Northing Easting Type Curve Lenfth

Curve Radius

3320 28759028950 7238261560 COR 3321 28758954486 7238222188 COR

3322 28758972523 7238378387 COR 3323 28759421550 7238613630 COR 3324 28759377933 7238698105 COR 3325 2875907 4811 7238539289 COR 3326 28759081611 7238526309 COR 3327 28758935210 7238449604 COR

3328 28759464470 7238637330 COR 3329 28759632674 7238722481 PC L=ll83 R=l578

3330 28759583973 7238755474 POC 3331 28759526573 7238768343 PRC L=2163 R=2455

3332 28759422964 7238796123 POC 3333 28759341091 7238865430 PT

3334 28759193370 7239050710 COR 3335 28759416340 7239163940 COR 3336 28759263600 7239455620 COR 3337 28759043690 7239336510 COR 3338 28758935490 7239552130 COR 3339 28757650890 7238883240 COR 3312 28757774584 7238646620 COR 3311 28757757732 7238637845 COR 3310 28757957598 7238255513 COR 3309 28757974484 7238264223 COR 3308 28758098180 723802 7600 COR 3307 28758526899 7238252220 COR 3306 28758533699 7238239240 COR 3340 28758700033 7238326388 COR 3341 28758675436 7238373334 COR 3342 28758733013 7238403500 COR 3343 28758760858 7238350353 COR 3344 28758860952 7238402796 COR 3345 28758833106 7238455943 COR 3346 28758890683 7238486109 COR 3347 28758915280 7238439162 COR 3326 28759081611 7238526309 COR 3325 28759074811 7238539289 COR

Exhibit B to NAUL-Part H-EOS Coordinate Tables Page 12 of l3 April 14 2021

Bk 39600 Pg433 88608

Point Number

Northing Easting Type Curve Len2th

Cunbulle Radius

3324 2875937 7933 7238698105 COR

3082 28757068320 7240314640 COR 3083 28757602980 7240594310 COR 3349 28757790234 7240236327 COR

3348 28757255574 7239956657 COR

3124 28757716516 7241351659 COR 3125 28757288251 7241140719 COR 3126 28756725827 7240851862 COR 3127 28756162468 7240586126 COR 3128 287 55614498 7240338506 COR 3129 28754346745 7239768507 COR 3130 28753845716 7239540194 COR 3131 28753257436 723927 8634 COR 3132 28752466355 7238929370 COR 3133 28751819340 7238643698 COR 3134 2875118152 7 7238364939 COR 3135 2875080 7772 7238199071 COR 3136 28750413263 7238019301 COR 3350 28750296168 7238284525 COR 3351 28754 78 6636 7240267040 COR 3352 28757412029 7241794586 COR

POINT DESCRIPTION ABBREVIATIONS

COR=CORNER PC= POINT OF CURVE WHERE CURVE STARTS POC -= POINT ON CUR VE PT=POINT OF TANGENCY WHERE THE CURVE ENDS PCC = POINT OF COMPOUND CURVE (WHERE RADIUS CHANGES) PRC = POINT OF REVERSE CURVE

NOTES

THE COORDINATES ARE BASED ON AN EXISTING CONDITIONS AS-BUILT FIELD SURVEY BY NORWOOD ENGINEERING CO INC BETWEEN NOVEMBER 15 TO DECEMBER 18 2019 TI-IE COORDINATES ARE BASED ON l1ASSACHUSETIS ST A TE PLANE COORDINATE SYSTEM NAD 1983 (FEET) THE ACCURACY OF THE COORDINATE LOCATIONS ARE +-0J FEET

Exhibit B to N1UL-Part II-EOS Coordmate Tables Page 13 ofl3 April 14 2021

---

1f~ flJr ~i

f ~~ J~i](M~I ~ 1 jf~ ~~f W-- )e 1

It lj fY pl ~-~j

I --- ~ ~

1 (J-c~ er ~

C JI fl JYf

1 ~ ~Yu-~ 1i

~r

( LOClJS P

SCAUllbulliQO

I ar lMIT flG PINI tMS _ lIIPMIDMICXNllRlnT~tlCfllUS 1111D cmuftraquodl s - NIKl1III tfIJIIIIIOfM~1HCll allE1

DAre Jllrl

NUKIJU LU6 DMitM

mmtG6DKbdlt

~4~-middot

~~I

-- ampnbullllf~ ~ fa

LEGEND 0

-i~wr0o-m lICUUoaampbullco--11111 _ _l_J

0

bull ~-ail_I

~-

mo(I ---fwj

amp~~~~ ~ ~~ltgtmiddot ~A~

~6

_L-r

bull -~ IBP__l-11Uil n-rlfl-lffll rMCllI 1a 1rr ai

-~ lll-lliI u-W--11a 1 Ml[ 411 amt l0IIC 3JICJ7 ~ 33-1--I- DIID llXII D111 JlMZ 411 lraquo- ~lUN~t --- - etMpound 11JII

~ MffD mmaat ZL I01t 111

1Jlll~-IICfIQfJICIISJ DfEI IC71- I~ 1~ 9 Cl 1VY IICIIWCLl~fCSC~lNCl

~11HltOXW1A~JtCI~llfB MXIC 1HI lME INCi 111M bull11 (S 1f41~middot~-~-)

~ io

0 0 0 0 -0 0 0 D O 1 middot tbull O

_- _pound ~ - Tf middot- ---r ~~ ~~- ~=middoti

r jil7bull --------4~-middot~

(

SCAtpound 1bull bull YI

I ~ tfAIE lIMa toafllltl1E ~NAD1w1(rJ

1 ~ PlIla II MMt QI 11D TD D111oPl

~c1MlntID9~~-l 1NIIJIIKlNI LnlJTU ~ deg qllAJSTE uM011111 iu1II 1111ZT IIIILJaZ

Exhibit C - Photo-Reduced Copy of Activity and Use Limitations Plan of Land

--~middot---

I ~111-11111

iiiii

-ill111liilt

ACJIYIJY ANJ) lJSE lJJll7ATJONS PLAN OF LANI)

81ACJ(81R1 I IINION Flr11lfES SllffllF7AVO SIle

o tfO SOIJIH s1ar HlltlPOtL IIAS

SCAlElrJAt IPfffl152021

1IJrwod Eng1neerlng

- EnQlbullHrlflg Compaffy middot~~=~ m Cm1JQ u fnfJa-eal

~ -

-~

9l1EET 1 OF I 8324-02

td ~

w ~ m 0 0

Id Q ii w ii

co co m

co 0

-l

~-77--raquo- -~I~ )middot~ ~ bull _I lT ~ v~

AI ~ If ~)middot~ 7- ~1 c t11 yil ~ ~ ~middot~41 bull1 l ~~l(i~r~1 f7 )ll y-

~~ f -~ -v fgtV ~ ~ ~ l er-- u -

tl x-P~C ()

JP yen f(( 11 1degpoundS -~ (

ftunrTfflllllTnallJrNNQWDf ~ ti IZNtRlTT lnH M IULS IIJIUIUlA-DlltlllllDlJlllIICIF tJbllt~llC~lJNp

DTl NlllltaJatl-Witiill (raquo11 iiiK(+til

I aJnlTlKATJlfl PlAH~ THE PUIIJll1T UC TIUlf Mlaquo THE l5 11 oawG ~ NII 1Hpound1as Of1111E111 AMllfrlTll9laquolllt Mpound ntem OPlaJ CJ1 IWM1pound BREn 011 bulln

~ ~illi~fli~ _lt ---c~-Clmiddot~~c0-nmiddotmiddot~bullJmiddot04~- ~--~--yen~~bull - L -bull -n ~ -r - ~ -

it

~ fr ~ ~- -~bull~bullv OG- ~n0

bull--ltmiddot middot~ -~- ~~-=~7~st~-~~~~i~~Hil~-) 2~C 0 ~~~~~ --------Y-Tgt-bullbullmiddot-

U-IU ~middotshy =i==-

bullbull bull _ -middot-

~----- ( ~11middot

__IC1ZMJ - bull IOC)0l lftEf ___ i gt mEKJllJfNG rotJ1FRIIIT AIIEAS B~ p~ AIIEAS ~ea-vmiddot LIUIID

~ e--- -+ ~ rzprz1za 1 ~ IJTATC PRC ~TC

nJml lltPtasCltJ

DUD BCD lJlll7 PMC 4H 1 1 YERT1CAL M1llI II NCCI ~ _ ro conurr DOD 80CIC 3JII07 llME 4H I ntaM NUIU 1121 IJ4TAI m IMlC 111111 nATIIW ~fsi

tJMAlfflOlI) AIIEAS1 bull 11AMJSCAlfl) AlpoundAS Lill] 1Dll IOlII POT PlCit 6115 J)-t20 ~atfnujK~tlLWlQI

~PUNMl-17 POflTIVNf1Ell llaD BaalC Tl_ Paa bullbull - 99 a 11

_-ijf1iltDP~IZ~ 5CME - JOSUva1fTLJ ~ ~-rr 111 C tMI=

bull111 I~

i=iiii7

~ e---

t c z rl

L-n11 ~

ACJIVJTY AND USE LIAlffAJIONS

PIAN OF RESTRIC1EJJ AREAS ANJJ COVER TYPES

fltACK1(fN _ llNlltgtI PfMIECCS SllPVFVNlJ51Tlt

JO _ lxJ srJllH STREET IIALPrJU JASS

SCAU I - 30 APRIL 2021

lcnwod Engineering

llarwood Cngnrilgtf cpmy -t~~~~

fIL Pllpa-ru - (1u]1a-lftll

~L=wl f 01~JII IO_

a SIEET I (F 2 B324-02

bj ~

w 0

0 0 deg It

iQ ~ w l11

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 1 of 2

CX) CX)

deg CX) 0

ntllT -1~1~ rurnlaquo1 r1n l1XTM 11Nf -r~ lie UUffCI 11Pt lDll1Hf iniin --IC unr1G Tlr 1n1rn Iota allll Ito tyen1tlll ~~11CRnrzJ11-11--~ci-- n31 nr111w11J1t ~bull c ~- diams JDrnn llloffl rcnlml IDII

-~ ]al rll _ _ PnlM-1-PI lbull-- ll7HrirrIPlllD1lf~-a bullbullll 111bull IClln9XnolDlllIIIIIIOm

214 ff7371JOOT ~bull JllC Ibullbull 171 JICllEY)l)vlUTlo~lUl~ ~li_~ -~~ MDlol ll4L~TllJraquofllllf190abullbullt ~~nQuu~~1aJI _~~OtottWU~1t11txm~arcPbrmllmCDt ~~ ~~ ~ =~ gj ~l11~ llltlM Mrattllll TDPmllIDCDI JJ4bull e~ _ ~ e PClC lbullI- 1- ~1sect~ ~ ~ ~ ~ ~~~-nr~44bull~mn11-a11 ~~ =mt =m~ ~ ~~ ~ =~~-~~ =~~rt~l~llibullltbull=

~~~~~~~~r-~r-~~sectsect55~55 ~~ ~=g~~ mi --1~ ~-==~~m~ L-~r UVPllrlllUillDITDr4L 1JI lbullKlllll~==~~~=~

~~~~~~~~ raquoff-llll 111rritl_aianbull ~11lCla rr- n ttll XDP11r1r 11111c-1C111~ RTl~rJlllllbullbull~llllJlllipo~~=r~tm=~~

~=~3r~t==~ ~=~i==~~ llt1ttl70 m~~n~ =n~ L diams 11- bull - iaEi~mi 1lE~HHffi ~1-~ E LbulllT bullU-7YA 8911U TMn4 OJII C- lllkHrnl1nlntll11106~

MJ9~gt111ftlrfffll11 ~ SbullC61hLJT raquoWl lll~IJlll11amp1 utVllllt a lbulllfGl bulllC lT

lliilH~1 ~~rm-=rn~ lbullIIIICU-1bull0

itt ishwI JUo ma m1 bull 1-c iiliii ~==~m~=~ Ullln U7IIY M1NLl411 fflf f-~ llr IL ~ lbullt Ill uaP11rllDn1rin1bull139nf- na_ 1111lnl ___ lWTDf-ID 111Jbullnllr-cishy

J1JT1 lflTI-noLbull COi lJ1 tsr18GOTDrl1~ 1--Cn ~~~==-=~ LbullS1rbull-p

LbulllI ~middot x1 fl11bull diams an l~J P-~ WI 1~1Slrmsraquo11nirorn 11bull1n-

llrgt 58 - TDrl ZJlJ l~ Zl llf4 Pll1raquo91I lnP~IIEI 11 ==~=-~~ lbullt-11bullh1~

nun_-~bullfllrlll_ lbulll-lrbull N- - nr6-11MII rinaus a 1bull1E-t1 im1 nrxi mr~ 7nn1 4i i 1c m llrS~iJ-ltJlillII Tt-Ul ris ~=~~middotiill~~ tf llDln~n1rJrgt11nbull1ric ~IPgt9nq~ It-MU rbull RflrrlllVllbulltPllbullOIIUAfC lbullnJtrNbull_~lD+4ftJSHJ7711JrllIIIIT144lDI lbulll ~I llfs-mllThn~-f 1bull11

1a5blH=i5gS El~ iE =iilli ~ID aH~~ ~~ leJINNllllfflnlt10ff1nll~1g=TI==~- lbullN~Jmiddot pw nrwuhtl tba11 l- lllllsectimiii~ ~ lllaquot ll116UW41 llllII NII Cl Ld bullt ll 11r 111~-~lHtl-IINOClll 1Dgtn~rMOtnllfbull3all)Mnr~bullwrmm11uoo~ ~r~ m~ = ~~ t~-i m NNtotl n11nn cm

~~~~~Ttr~ in Httl01llxl nlfM114ta cm

JJN n=-PIW - I- C lbullT rnr nnubullNoXI ffllPI n1 11-amp 11middot 77)111fflffPl~JlaUII

i1JJ n91lbull ti Jnlftbulllll QII

~g=~~~~ir~f~5 =i~=~~ ~=~ ~ ~j====goi H1111t-llll ffo~ ~rn tm111 ta1Vl~ tnar- IVI rm u1i ~ nw ~illl cm 1111 Hltt1H T7U 72w111ll tm UI ftffiH~bull1 naMUlI nlll

lltfll~IOUl rnes~ttlClll

~I~~=~=~~= l3111ratlQOJ121lllll CS u1n-n-a mn-c~11111llllilr ~====m~~ lbulllllr~~Oll~r1111-t~rtRiHa)toI

-~rt~_Utr111tt~USI ~m~i==r~~llfflpound1gtgtMllkllit1U10C011 annrxnbull-TCRL11ai~=~=~g)llllll~--rWltMJtt-8 DR Pl rraquof ntl rim Gllf CCI~~1r~~ liiilllii u- ntlt bull llJ~naJCDI

raquo11NMl10~Ullllcm ntrlnK)fL~nlln-1c lllf ~--TlJaft_Lmc i lbull1 bull l3il0 Nl-197) Ttlll1344 a LbullI 3 l diams 1-111 lflS 1111lOllt ffl- MP PII bullHI lgtl llJI l97Mlt Ian -ti DG llC

111111===-~~~=mg ====~~ tD rlrffllZllIITO-lfllCIIII=~tr~L~~~= - Pl~I llII TD_ ff~ tDII31119NIJMlDffU~~ H CZIII liii~mlt~ D1111nrn11GQ~-CaKftQNJWNczr41140ffnQCUII Jnffnt1JIIIIJunbull~1Qc20lll ~Pllli ll mrnnn lbulltlP 17Jrffdeg-degluoElJIIIQII

~-I-ti _nrna~rlll

a n- 4411 llbullQI 1=40 rt La n- lllf ffrgtn _Jr_~ Ullk ---rr~~ ~=~=tl~~ =1 nttltt nraquo 1nlU as

=-mn--~111DJIDII Ullgt~fflflnanaaJIIJalt55~~EIS~=~~ ~~)1 -11CIJII nn~bullbullbullnaKatt1ta1

JOIT ru~- rf- deg hJIIII r- 111111 ~1111) -1 aJ1 ld t11D1etlll_TalCIS -~-UCV~bullraquootur=~=~I~~=~--~ ~rsrgo_mlaquoshym rs~11flI ~- rnilr==~=~~ ~~r _ ~ atfl ~ rtw Dgtlnn-f-lEllln17n-UIIP

D11 fflXTJ111111 I~~ ar D1Jn4 ~leJJS-OnC111

=====5 middoti SHU=~ 5 ampn iliiiiiIiI11

ngtgtn~1~1tbullubull1rm DH tu~- lt11 rirmU1111 CDIII

~i~i555mi~ ~~ ~m=~==m~g===~~~~ tn1r JtW ~ma- PiOll a CU

~ XNr~t~fDllll1-all~~ m===~~ bullbull~W 111111 ==~~ ampT g~ ru~ =

~lU $Et=ni ~ llll0111ra1Ln~otqC011

H~ g==i =~1 ~

~111111 ~~g~n~a~J))pound11 1=~)6tia

~~ mEfHfH~Si

amp12Ct _ an ~

U N711f21th mM1LU aa o1bull~--117CII in4r ~llllll1Vffl-111Dlr lit~ Hmtlpound1 71 12L I CCIII ---~CUnMIIUOCVf JIHtlnn nl 7r ll4011CIIII

llllDNXCWZflDtlltllCIDCDr

~~=~==~=gnn n1raquoL bullw noanDNt CIJIIi=~ C~middot ~ ~ ~ HnffTI-QIJroQ__111PtlJIIInfflll bullbull1~ aaeIT t-- nrJD nJUntu~CllWI

m ~1 ~ ~~~ ~ ilria~gliiiji~=ir ~lt-OTT gl1raquo ~Iraquou fflllIL nllll 1111111 flC~middotIY_4allCCIIIi l1i5~ ~~11~middot~ ~~ ffll H71W786lll 7P-JOalllllll 2N ~ 1-flllt 7HIJl4- DI ~ ~==~ ~t-tr bullM-

114 Hit71aTra7ririatNOCIIII

llHl1Hf ll~7Dl4fIZIIICIIII 1141ftillf+1DllnTgtlMa~=~bull==~r Lbulll-lllbullbulllJJ

=~~~HR-~a ~ =iEri ~ ~=6

= 1MESE COCIIIOlfAlEi ARC 9~ at AH DISTlfG CONJmOfS AS-alLT FED 5UKiEY Y NORWDal EJICltJIJll(G CD~ IIElMEN ~ 1S 111 DECDaR a 2DII 1)pound OCICIIIDNAlES 5HCflI UIpound IIAID Cit MltSSAOfllffT5 STATE FlJriNII CDCffllNAT smult ~AO leJ (IMIJ 1HE ACQlltACY ltF 1HE COCftDINT[ LDCAnatS Mpound diams- 01 FtU

POINT DESCRIPTION ABBREVIATIONS~-~middotPC Pmlr Of CLIRIJC bullIEllL ClMNpound STilRlS PDC bull PtJtilTIIJOM1poundr ~ [raquo TAHCINiT W(R[ lll[ CURpound uroo Fo F[1NT(1t~tfflvt[ltft1llllIIUlt OMNtilE)PRC ~T oT ~pound ~Vlllrlt

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 2 of 2

I ~ IHAT nfl PlM MS 81D1 PIIDMQl ~WllTM(llUI MOIIEOIAAlPlllR~Df IIUPS C- lttE ~111 Cl__ HftNMIIIZlt

WWWWJU Cii6 liftitit

ACTIVITY ANI) USE LINTATIONS

PLAN OF RES7RIC1EJJ AREAS ANJJ COlER TYPES

8V CKlJ()RN IJNl()N PflllfpoundCpoundS SlllERFIIMJ SITC

50 HJ S(J11( SmEpoundT llAIPOIL JASS

=r-o ~ ll 2021

~ Engmeer1ng

Hltd ~~ middot~~-=~ra (f~AJ lIQ c- f

a llfEET 2 ltF 6324-02

td ~

w ~ m 0 0

Id Q ii w m

co co m 0 co

Bk 39600 Pg437 88608

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY New England Region

Five Post Office Square - Suite 100 Boston Massachusetts 02109-3912

INSTITUTIONAL CONTROL DESIGN STATEMENT FOR THE BLACKBURN AND UNION PRIVILEGES SUPERFUND SITE - EAST OF SOUTH STREET AREA

1 Introduction

Pursuant to the Comprehensive Environmental Response Compensation and Liability Act 42 USC sect 9601 et seq (CERCLA) and the National Contingency Plan 40 CFR Part 300 (the NCP) this document contains a description of the release events and site history that resulted in the contaminated media that require institutional controls in the fom1 of Activity and Use Limitations the basis for land use restrictions and uses that are consistent and inconsistent with the Selected Remedy ( as described below) This Institutional Control (IC) Design Statement pertains to a portion of the Blackburn and Union Privileges Superfund Site located in the Town of Walpole Massachusetts (the Site) which has been listed on EPAs National Priorities List (NPL) which portion is generally referred to as the East of South Street Area (the EOS Area) The EOS Area is located to the east of South Street in Walpole and is shown on Figure 1 attached hereto

A Notice of Activity and Use Limitation (NAUL) is necessary and appropriate for the EOS Area of the Site based on the fact that pursuant to EPAs risk evaluations asbestos arsenic trichloroethene (TCE) and certain polycyclic aromatic hydrocarbon (PAH) contan1inants remain in place in soils at levels higher than those appropriate for unlimited use or unrestricted exposure groundwater underlying the EOS Area contains hazardous substances at levels that present an unacceptable risk of exposure and remedial measures at the Site must be protected and maintained to ensure that the Selected Remedy remains protective

EPAs Record of Decision (ROD) dated September 30 2008 specified the need for institutional controls such as a NAUL to ensure long-tenn perfonnance and protectiveness of the Selected Remedy The institutional controls described herein are necessary and appropriate to ensure that the Selected Remedy for the Site remains protective of human health and the environment The remedy for the Site as described in the ROD is referred to herein and in the NAUL as the Selected Remedy

Page 1 of7

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 22: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

3155

3160

3165

3170

3175

3180

3185

Bk 39600 Pg427 88608

Point Northing Easting Type Curve Cunbulle

Number Lenszth Radius 3153 28756870623 7238820218 COR

3154 28756838273 7238882258 COR

28756865240 7238896320 COR

3156 28756777004 7239062996 COR

3157 28756770439 7239063663 PC L=l 146 R=2269

3158 2875665836 I 7239046180 PCC L=l423 R=957

3159 2875661 7520 7238989913 POC

28756625544 7238920850 PT

3161 28756728525 7238726583 PC L=232 R=l58

3162 28756748720 7238720236 PT

3163 28756899634 7238797341 COR

3164 28757254653 7238121363 COR

28757520153 723761266 7 COR

3166 28757306899 723 750 IO 10 COR

3167 28756690336 7237500169 PC L=243 R=I68

3168 28756682599 7237479273 PT

3169 28756686990 7237469583 PC L=0250 R=l68

28756708806 7237463018 PT 3171 28757000109 7237616354 PC L=233 R=l73

3172 28757005368 7237637270 PT

3173 28757000998 7237645513 PC L=233 R=l69

3174 28756980219 7237651023 PT

28756429209 7238339422 COR

3176 28756342982 7238506849 COR

3177 28756500076 7238596485 PC L=l19 R=l48

3178 28756499701 7238608072 PT 3179 2875644 7813 7238705611 PC L=l 182 R=483

28756358177 723 869 0707 PT

3181 2875623 6099 7238376388 PC L=443 R=467

3182 28756235611 7238333779 PCC L=343 R=9IO

3183 28756249049 7238302418 PCC L=412 R=9IO

3184 28756278952 7238274519 PCC L=368 R=300

28756313362 7238277619 PT

3186 28756282498 7238911796 PC L748 R=216

3187 28756240650 7238919721 PT

3188 28756126081 7238620406 PC L=323 R162

3189 28756138645 7238591575 PCC L=333 R=283

Exhibit B to NAUL-Part II-EOS Coordmate Tables Page 7 of 13 April 14 2021

3190

3195

3200

3205

3210

3215

3220

Bk 39600 Pg428 88608

Point Number Northing Easting Type Curve

Leneth Curve Radius

28756163375 7238602867 PT

3191 2875523 0908 7238765275 COR

3192 28755205040 7238752740 COR

3193 28755391740 7238328470 COR

3194 28755466840 7238361040 COR

28755452760 7238392590 COR

3196 28755516920 7238421040 COR

3197 28755530690 7238388730 COR

3198 28755603230 7238421460 COR

3199 2875555 7568 723852 7053 COR

28755371220 7238445330 COR

3201 28755629198 7238558466 COR

3202 28755676040 7238453290 COR

3203 28755925410 7238563840 PC L=1902 R=3548

3204 28755927383 7238658634 POC

28755954390 7238749520 PT 3206 28755974770 7238807230 COR

3207 28755779200 7238881701 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

28755746700 7238609997 COR

3211 2875593774 7239036608 COR

3212 28756048460 7238996850 PC l=1445 R=2903

3213 28756070631 7239065422 POC

3214 28756109010 7239126420 PT

28756153820 7239182190 PC L=S98 R=848

3216 28756171980 723923 7880 PT

3217 287S6026148 7239566166 COR

3218 28756003865 7239556465 COR

3219 287S6134380 7239256650 COR

28755998460 7239195370 COR

3221 2875600 71S0 7239174530 COR

3222 28756001791 7239172152 COR

3223 28756040451 7239079437 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 8 of 13 April 14 2021

Bk 39600 Pg429 88608

Point Number

3210

3200

3056

3057

3058

3059

3060

3061

3062

3218

3219

3220

3221

3224

3225

3226

3227

3228

3070

3071

3234

3233

3235

3236

3237

3238

3239

3240

3241

3242

3243

3244

3245

3246

3247

3248

Northing

28755746700

28755371220

28755040360

28755311720

28755263010

28755388260

28755348660

2875562 54 70

28755664605

28756003865

28756134380

28755998460

28756007150

28755941340

28755962080

28755867937

28755819702

28755766128

28756035900

28756086280

28755991990

28755942100

28756477248

28756677238

28756650130

28756473307

28756480112

28756675030

28756724454

28756742099

28756742133

28756703924

28756640759

28757607280

28757401530

28757467350

Easting

7238609997

7238445330

7239199770

7239318930

7239429300

7239484290

7239576000

7239696500

7239606601

7239556465

7239256650

7239195370

7239174530

7239145324

7239100930

7239061674

7238935003

7238911508

7239926600

7239812770

7239769910

7239884050

7239261913

7239253008

7239321810

7239319038

7239298824

7239364440

7239271845

7239292625

723935 0187

7239393239

7239393096

7237584960

7237475300

7237345620

Type

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

PC PCC

POC

PCC

PT

COR

COR

COR

Curve Len2th

L=273

L=ll77

L=657

Cunmiddote Radius

R=1421

R=810

R=679

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 9 of 13 April 14 2021

Bk 39600 Pg430 88608

Point Number Northing Easting Type Curve

Len2th Curve Radius

3249 287 57514570 7237372360 PC l=ll05 R=1993

3250 287 57 588060 7237452980 PT

3251 28757631382 7237429676 PC L=2244 R=2352

3252 287 5765 6810 7237537876 POC

3253 2875 762 9720 7237645671 PT

3254 28756940655 7238952710 PC l=1493 R=1509

3255 28756901845 7239015577 POC

3256 2875683 7836 7239052474 PT

3257 28758104824 7237653014 COR

3258 28758028960 7237800160 COR

3259 28757949530 7237760790 COR

3260 28757901005 7237855021 COR

3261 28757839230 7237820908 PC L=273 R=l33

3262 28757830688 7237799810 PCC L=539 R=2144

3263 28757852974 7237750897 PT

3264 28757891705 7237688178 PC L=lS26 R=2432

3265 28757948636 7237637880 POC

3266 287 58018307 7237607597 PT

3248 28757467350 7237345620 COR

3267 28757550832 7237363444 POC L=2653 R=80000

3268 28757668809 7237424132 PT

3269 28757504 719 7238817989 COR

3270 28757493010 7238842230 COR

3271 28757561074 7238880970 COR

3272 28757483953 7239024127 PC L=323 R=l70

3273 28757459939 7239037846 PT

3274 28757311605 7238957122 PC L=1388 R=906

3275 2875727 2732 7238901647 POC

3276 28757283181 7238834718 PT

3277 287 5733 4061 7238752337 PC L=255 R=l60

3278 287 5735 5527 7238744411 PT

3279 2875 7102815 7239517199 PC l=261 R=l70

3280 28757080654 7239525307 PCC l=909 R=1275

3281 2875 700 5390 7239477911 PCC L=l007 R=990

3282 28756999624 7239381704 PT

3283 2875707 7705 7239230604 PC L=ll14 R=907

Exhibit B lo NAUL-Part IlbullEOS Coordinate Tables Page 10 of13 April 14 2021

3285

3290

3295

3300

3305

3310

3315

Bk 39600 Pg431 88608

Point Number Northing Easting Type

Curve Leneth

Curve Radius

3284 28757168066 7239178102 PT

28757205717 7239186398 PC L=518 R=930

3286 28757249003 7239213534 PCC L=l41 R=086

3287 2875724 7909 7239226048 PT

3288 28758415755 7239842757 PC L=251 R=l59

3289 28758437695 7239837379 PT

28758456377 7239846949 PC L=812 R=876

3291 28758494897 7239915165 PCC L=456 R=757

3292 28758483790 7239958646 PT

3293 28758405147 7240111348 PC L=l057 R=955

3294 28758318136 7240161452 PCC L=477 R=l063

28758272407 7240149529 PCC L=250 R=l60

3296 28758265647 7240128003 PT

3297 28758157937 7237680895 COR

3298 28758902927 723807 1969 COR

3299 28758852531 7238168280 COR

28758779660 7238129750 COR

3301 28758746973 7238192072 COR

3302 2875807 6630 7237840490 COR

3303 28758049940 7237894220 COR

3304 2875871 7997 7238243620 COR

28758680103 7238315946 COR

3306 28758533699 7238239240 COR

3307 2875852 6899 7238252220 COR

3308 28758098180 7238027600 COR

3309 28757974484 7238264223 COR

28757957598 7238255513 COR

3311 28757757732 7238637845 COR

3312 28757774584 7238646620 COR

3313 28757653710 723887 7846 COR

3314 28757560920 7238829340 COR

28759004930 7238125514 COR

3316 28759689797 7238485028 PC L=1992 R=2609

3317 28759697204 7238583760 POC

3318 28759667288 723867 8142 PT

3319 28758996126 7238323718 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 11 of 13 April 14202 I

Bk 39600 Pg432 88608

Point Number

Northing Easting Type Curve Lenfth

Curve Radius

3320 28759028950 7238261560 COR 3321 28758954486 7238222188 COR

3322 28758972523 7238378387 COR 3323 28759421550 7238613630 COR 3324 28759377933 7238698105 COR 3325 2875907 4811 7238539289 COR 3326 28759081611 7238526309 COR 3327 28758935210 7238449604 COR

3328 28759464470 7238637330 COR 3329 28759632674 7238722481 PC L=ll83 R=l578

3330 28759583973 7238755474 POC 3331 28759526573 7238768343 PRC L=2163 R=2455

3332 28759422964 7238796123 POC 3333 28759341091 7238865430 PT

3334 28759193370 7239050710 COR 3335 28759416340 7239163940 COR 3336 28759263600 7239455620 COR 3337 28759043690 7239336510 COR 3338 28758935490 7239552130 COR 3339 28757650890 7238883240 COR 3312 28757774584 7238646620 COR 3311 28757757732 7238637845 COR 3310 28757957598 7238255513 COR 3309 28757974484 7238264223 COR 3308 28758098180 723802 7600 COR 3307 28758526899 7238252220 COR 3306 28758533699 7238239240 COR 3340 28758700033 7238326388 COR 3341 28758675436 7238373334 COR 3342 28758733013 7238403500 COR 3343 28758760858 7238350353 COR 3344 28758860952 7238402796 COR 3345 28758833106 7238455943 COR 3346 28758890683 7238486109 COR 3347 28758915280 7238439162 COR 3326 28759081611 7238526309 COR 3325 28759074811 7238539289 COR

Exhibit B to NAUL-Part H-EOS Coordinate Tables Page 12 of l3 April 14 2021

Bk 39600 Pg433 88608

Point Number

Northing Easting Type Curve Len2th

Cunbulle Radius

3324 2875937 7933 7238698105 COR

3082 28757068320 7240314640 COR 3083 28757602980 7240594310 COR 3349 28757790234 7240236327 COR

3348 28757255574 7239956657 COR

3124 28757716516 7241351659 COR 3125 28757288251 7241140719 COR 3126 28756725827 7240851862 COR 3127 28756162468 7240586126 COR 3128 287 55614498 7240338506 COR 3129 28754346745 7239768507 COR 3130 28753845716 7239540194 COR 3131 28753257436 723927 8634 COR 3132 28752466355 7238929370 COR 3133 28751819340 7238643698 COR 3134 2875118152 7 7238364939 COR 3135 2875080 7772 7238199071 COR 3136 28750413263 7238019301 COR 3350 28750296168 7238284525 COR 3351 28754 78 6636 7240267040 COR 3352 28757412029 7241794586 COR

POINT DESCRIPTION ABBREVIATIONS

COR=CORNER PC= POINT OF CURVE WHERE CURVE STARTS POC -= POINT ON CUR VE PT=POINT OF TANGENCY WHERE THE CURVE ENDS PCC = POINT OF COMPOUND CURVE (WHERE RADIUS CHANGES) PRC = POINT OF REVERSE CURVE

NOTES

THE COORDINATES ARE BASED ON AN EXISTING CONDITIONS AS-BUILT FIELD SURVEY BY NORWOOD ENGINEERING CO INC BETWEEN NOVEMBER 15 TO DECEMBER 18 2019 TI-IE COORDINATES ARE BASED ON l1ASSACHUSETIS ST A TE PLANE COORDINATE SYSTEM NAD 1983 (FEET) THE ACCURACY OF THE COORDINATE LOCATIONS ARE +-0J FEET

Exhibit B to N1UL-Part II-EOS Coordmate Tables Page 13 ofl3 April 14 2021

---

1f~ flJr ~i

f ~~ J~i](M~I ~ 1 jf~ ~~f W-- )e 1

It lj fY pl ~-~j

I --- ~ ~

1 (J-c~ er ~

C JI fl JYf

1 ~ ~Yu-~ 1i

~r

( LOClJS P

SCAUllbulliQO

I ar lMIT flG PINI tMS _ lIIPMIDMICXNllRlnT~tlCfllUS 1111D cmuftraquodl s - NIKl1III tfIJIIIIIOfM~1HCll allE1

DAre Jllrl

NUKIJU LU6 DMitM

mmtG6DKbdlt

~4~-middot

~~I

-- ampnbullllf~ ~ fa

LEGEND 0

-i~wr0o-m lICUUoaampbullco--11111 _ _l_J

0

bull ~-ail_I

~-

mo(I ---fwj

amp~~~~ ~ ~~ltgtmiddot ~A~

~6

_L-r

bull -~ IBP__l-11Uil n-rlfl-lffll rMCllI 1a 1rr ai

-~ lll-lliI u-W--11a 1 Ml[ 411 amt l0IIC 3JICJ7 ~ 33-1--I- DIID llXII D111 JlMZ 411 lraquo- ~lUN~t --- - etMpound 11JII

~ MffD mmaat ZL I01t 111

1Jlll~-IICfIQfJICIISJ DfEI IC71- I~ 1~ 9 Cl 1VY IICIIWCLl~fCSC~lNCl

~11HltOXW1A~JtCI~llfB MXIC 1HI lME INCi 111M bull11 (S 1f41~middot~-~-)

~ io

0 0 0 0 -0 0 0 D O 1 middot tbull O

_- _pound ~ - Tf middot- ---r ~~ ~~- ~=middoti

r jil7bull --------4~-middot~

(

SCAtpound 1bull bull YI

I ~ tfAIE lIMa toafllltl1E ~NAD1w1(rJ

1 ~ PlIla II MMt QI 11D TD D111oPl

~c1MlntID9~~-l 1NIIJIIKlNI LnlJTU ~ deg qllAJSTE uM011111 iu1II 1111ZT IIIILJaZ

Exhibit C - Photo-Reduced Copy of Activity and Use Limitations Plan of Land

--~middot---

I ~111-11111

iiiii

-ill111liilt

ACJIYIJY ANJ) lJSE lJJll7ATJONS PLAN OF LANI)

81ACJ(81R1 I IINION Flr11lfES SllffllF7AVO SIle

o tfO SOIJIH s1ar HlltlPOtL IIAS

SCAlElrJAt IPfffl152021

1IJrwod Eng1neerlng

- EnQlbullHrlflg Compaffy middot~~=~ m Cm1JQ u fnfJa-eal

~ -

-~

9l1EET 1 OF I 8324-02

td ~

w ~ m 0 0

Id Q ii w ii

co co m

co 0

-l

~-77--raquo- -~I~ )middot~ ~ bull _I lT ~ v~

AI ~ If ~)middot~ 7- ~1 c t11 yil ~ ~ ~middot~41 bull1 l ~~l(i~r~1 f7 )ll y-

~~ f -~ -v fgtV ~ ~ ~ l er-- u -

tl x-P~C ()

JP yen f(( 11 1degpoundS -~ (

ftunrTfflllllTnallJrNNQWDf ~ ti IZNtRlTT lnH M IULS IIJIUIUlA-DlltlllllDlJlllIICIF tJbllt~llC~lJNp

DTl NlllltaJatl-Witiill (raquo11 iiiK(+til

I aJnlTlKATJlfl PlAH~ THE PUIIJll1T UC TIUlf Mlaquo THE l5 11 oawG ~ NII 1Hpound1as Of1111E111 AMllfrlTll9laquolllt Mpound ntem OPlaJ CJ1 IWM1pound BREn 011 bulln

~ ~illi~fli~ _lt ---c~-Clmiddot~~c0-nmiddotmiddot~bullJmiddot04~- ~--~--yen~~bull - L -bull -n ~ -r - ~ -

it

~ fr ~ ~- -~bull~bullv OG- ~n0

bull--ltmiddot middot~ -~- ~~-=~7~st~-~~~~i~~Hil~-) 2~C 0 ~~~~~ --------Y-Tgt-bullbullmiddot-

U-IU ~middotshy =i==-

bullbull bull _ -middot-

~----- ( ~11middot

__IC1ZMJ - bull IOC)0l lftEf ___ i gt mEKJllJfNG rotJ1FRIIIT AIIEAS B~ p~ AIIEAS ~ea-vmiddot LIUIID

~ e--- -+ ~ rzprz1za 1 ~ IJTATC PRC ~TC

nJml lltPtasCltJ

DUD BCD lJlll7 PMC 4H 1 1 YERT1CAL M1llI II NCCI ~ _ ro conurr DOD 80CIC 3JII07 llME 4H I ntaM NUIU 1121 IJ4TAI m IMlC 111111 nATIIW ~fsi

tJMAlfflOlI) AIIEAS1 bull 11AMJSCAlfl) AlpoundAS Lill] 1Dll IOlII POT PlCit 6115 J)-t20 ~atfnujK~tlLWlQI

~PUNMl-17 POflTIVNf1Ell llaD BaalC Tl_ Paa bullbull - 99 a 11

_-ijf1iltDP~IZ~ 5CME - JOSUva1fTLJ ~ ~-rr 111 C tMI=

bull111 I~

i=iiii7

~ e---

t c z rl

L-n11 ~

ACJIVJTY AND USE LIAlffAJIONS

PIAN OF RESTRIC1EJJ AREAS ANJJ COVER TYPES

fltACK1(fN _ llNlltgtI PfMIECCS SllPVFVNlJ51Tlt

JO _ lxJ srJllH STREET IIALPrJU JASS

SCAU I - 30 APRIL 2021

lcnwod Engineering

llarwood Cngnrilgtf cpmy -t~~~~

fIL Pllpa-ru - (1u]1a-lftll

~L=wl f 01~JII IO_

a SIEET I (F 2 B324-02

bj ~

w 0

0 0 deg It

iQ ~ w l11

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 1 of 2

CX) CX)

deg CX) 0

ntllT -1~1~ rurnlaquo1 r1n l1XTM 11Nf -r~ lie UUffCI 11Pt lDll1Hf iniin --IC unr1G Tlr 1n1rn Iota allll Ito tyen1tlll ~~11CRnrzJ11-11--~ci-- n31 nr111w11J1t ~bull c ~- diams JDrnn llloffl rcnlml IDII

-~ ]al rll _ _ PnlM-1-PI lbull-- ll7HrirrIPlllD1lf~-a bullbullll 111bull IClln9XnolDlllIIIIIIOm

214 ff7371JOOT ~bull JllC Ibullbull 171 JICllEY)l)vlUTlo~lUl~ ~li_~ -~~ MDlol ll4L~TllJraquofllllf190abullbullt ~~nQuu~~1aJI _~~OtottWU~1t11txm~arcPbrmllmCDt ~~ ~~ ~ =~ gj ~l11~ llltlM Mrattllll TDPmllIDCDI JJ4bull e~ _ ~ e PClC lbullI- 1- ~1sect~ ~ ~ ~ ~ ~~~-nr~44bull~mn11-a11 ~~ =mt =m~ ~ ~~ ~ =~~-~~ =~~rt~l~llibullltbull=

~~~~~~~~r-~r-~~sectsect55~55 ~~ ~=g~~ mi --1~ ~-==~~m~ L-~r UVPllrlllUillDITDr4L 1JI lbullKlllll~==~~~=~

~~~~~~~~ raquoff-llll 111rritl_aianbull ~11lCla rr- n ttll XDP11r1r 11111c-1C111~ RTl~rJlllllbullbull~llllJlllipo~~=r~tm=~~

~=~3r~t==~ ~=~i==~~ llt1ttl70 m~~n~ =n~ L diams 11- bull - iaEi~mi 1lE~HHffi ~1-~ E LbulllT bullU-7YA 8911U TMn4 OJII C- lllkHrnl1nlntll11106~

MJ9~gt111ftlrfffll11 ~ SbullC61hLJT raquoWl lll~IJlll11amp1 utVllllt a lbulllfGl bulllC lT

lliilH~1 ~~rm-=rn~ lbullIIIICU-1bull0

itt ishwI JUo ma m1 bull 1-c iiliii ~==~m~=~ Ullln U7IIY M1NLl411 fflf f-~ llr IL ~ lbullt Ill uaP11rllDn1rin1bull139nf- na_ 1111lnl ___ lWTDf-ID 111Jbullnllr-cishy

J1JT1 lflTI-noLbull COi lJ1 tsr18GOTDrl1~ 1--Cn ~~~==-=~ LbullS1rbull-p

LbulllI ~middot x1 fl11bull diams an l~J P-~ WI 1~1Slrmsraquo11nirorn 11bull1n-

llrgt 58 - TDrl ZJlJ l~ Zl llf4 Pll1raquo91I lnP~IIEI 11 ==~=-~~ lbullt-11bullh1~

nun_-~bullfllrlll_ lbulll-lrbull N- - nr6-11MII rinaus a 1bull1E-t1 im1 nrxi mr~ 7nn1 4i i 1c m llrS~iJ-ltJlillII Tt-Ul ris ~=~~middotiill~~ tf llDln~n1rJrgt11nbull1ric ~IPgt9nq~ It-MU rbull RflrrlllVllbulltPllbullOIIUAfC lbullnJtrNbull_~lD+4ftJSHJ7711JrllIIIIT144lDI lbulll ~I llfs-mllThn~-f 1bull11

1a5blH=i5gS El~ iE =iilli ~ID aH~~ ~~ leJINNllllfflnlt10ff1nll~1g=TI==~- lbullN~Jmiddot pw nrwuhtl tba11 l- lllllsectimiii~ ~ lllaquot ll116UW41 llllII NII Cl Ld bullt ll 11r 111~-~lHtl-IINOClll 1Dgtn~rMOtnllfbull3all)Mnr~bullwrmm11uoo~ ~r~ m~ = ~~ t~-i m NNtotl n11nn cm

~~~~~Ttr~ in Httl01llxl nlfM114ta cm

JJN n=-PIW - I- C lbullT rnr nnubullNoXI ffllPI n1 11-amp 11middot 77)111fflffPl~JlaUII

i1JJ n91lbull ti Jnlftbulllll QII

~g=~~~~ir~f~5 =i~=~~ ~=~ ~ ~j====goi H1111t-llll ffo~ ~rn tm111 ta1Vl~ tnar- IVI rm u1i ~ nw ~illl cm 1111 Hltt1H T7U 72w111ll tm UI ftffiH~bull1 naMUlI nlll

lltfll~IOUl rnes~ttlClll

~I~~=~=~~= l3111ratlQOJ121lllll CS u1n-n-a mn-c~11111llllilr ~====m~~ lbulllllr~~Oll~r1111-t~rtRiHa)toI

-~rt~_Utr111tt~USI ~m~i==r~~llfflpound1gtgtMllkllit1U10C011 annrxnbull-TCRL11ai~=~=~g)llllll~--rWltMJtt-8 DR Pl rraquof ntl rim Gllf CCI~~1r~~ liiilllii u- ntlt bull llJ~naJCDI

raquo11NMl10~Ullllcm ntrlnK)fL~nlln-1c lllf ~--TlJaft_Lmc i lbull1 bull l3il0 Nl-197) Ttlll1344 a LbullI 3 l diams 1-111 lflS 1111lOllt ffl- MP PII bullHI lgtl llJI l97Mlt Ian -ti DG llC

111111===-~~~=mg ====~~ tD rlrffllZllIITO-lfllCIIII=~tr~L~~~= - Pl~I llII TD_ ff~ tDII31119NIJMlDffU~~ H CZIII liii~mlt~ D1111nrn11GQ~-CaKftQNJWNczr41140ffnQCUII Jnffnt1JIIIIJunbull~1Qc20lll ~Pllli ll mrnnn lbulltlP 17Jrffdeg-degluoElJIIIQII

~-I-ti _nrna~rlll

a n- 4411 llbullQI 1=40 rt La n- lllf ffrgtn _Jr_~ Ullk ---rr~~ ~=~=tl~~ =1 nttltt nraquo 1nlU as

=-mn--~111DJIDII Ullgt~fflflnanaaJIIJalt55~~EIS~=~~ ~~)1 -11CIJII nn~bullbullbullnaKatt1ta1

JOIT ru~- rf- deg hJIIII r- 111111 ~1111) -1 aJ1 ld t11D1etlll_TalCIS -~-UCV~bullraquootur=~=~I~~=~--~ ~rsrgo_mlaquoshym rs~11flI ~- rnilr==~=~~ ~~r _ ~ atfl ~ rtw Dgtlnn-f-lEllln17n-UIIP

D11 fflXTJ111111 I~~ ar D1Jn4 ~leJJS-OnC111

=====5 middoti SHU=~ 5 ampn iliiiiiIiI11

ngtgtn~1~1tbullubull1rm DH tu~- lt11 rirmU1111 CDIII

~i~i555mi~ ~~ ~m=~==m~g===~~~~ tn1r JtW ~ma- PiOll a CU

~ XNr~t~fDllll1-all~~ m===~~ bullbull~W 111111 ==~~ ampT g~ ru~ =

~lU $Et=ni ~ llll0111ra1Ln~otqC011

H~ g==i =~1 ~

~111111 ~~g~n~a~J))pound11 1=~)6tia

~~ mEfHfH~Si

amp12Ct _ an ~

U N711f21th mM1LU aa o1bull~--117CII in4r ~llllll1Vffl-111Dlr lit~ Hmtlpound1 71 12L I CCIII ---~CUnMIIUOCVf JIHtlnn nl 7r ll4011CIIII

llllDNXCWZflDtlltllCIDCDr

~~=~==~=gnn n1raquoL bullw noanDNt CIJIIi=~ C~middot ~ ~ ~ HnffTI-QIJroQ__111PtlJIIInfflll bullbull1~ aaeIT t-- nrJD nJUntu~CllWI

m ~1 ~ ~~~ ~ ilria~gliiiji~=ir ~lt-OTT gl1raquo ~Iraquou fflllIL nllll 1111111 flC~middotIY_4allCCIIIi l1i5~ ~~11~middot~ ~~ ffll H71W786lll 7P-JOalllllll 2N ~ 1-flllt 7HIJl4- DI ~ ~==~ ~t-tr bullM-

114 Hit71aTra7ririatNOCIIII

llHl1Hf ll~7Dl4fIZIIICIIII 1141ftillf+1DllnTgtlMa~=~bull==~r Lbulll-lllbullbulllJJ

=~~~HR-~a ~ =iEri ~ ~=6

= 1MESE COCIIIOlfAlEi ARC 9~ at AH DISTlfG CONJmOfS AS-alLT FED 5UKiEY Y NORWDal EJICltJIJll(G CD~ IIElMEN ~ 1S 111 DECDaR a 2DII 1)pound OCICIIIDNAlES 5HCflI UIpound IIAID Cit MltSSAOfllffT5 STATE FlJriNII CDCffllNAT smult ~AO leJ (IMIJ 1HE ACQlltACY ltF 1HE COCftDINT[ LDCAnatS Mpound diams- 01 FtU

POINT DESCRIPTION ABBREVIATIONS~-~middotPC Pmlr Of CLIRIJC bullIEllL ClMNpound STilRlS PDC bull PtJtilTIIJOM1poundr ~ [raquo TAHCINiT W(R[ lll[ CURpound uroo Fo F[1NT(1t~tfflvt[ltft1llllIIUlt OMNtilE)PRC ~T oT ~pound ~Vlllrlt

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 2 of 2

I ~ IHAT nfl PlM MS 81D1 PIIDMQl ~WllTM(llUI MOIIEOIAAlPlllR~Df IIUPS C- lttE ~111 Cl__ HftNMIIIZlt

WWWWJU Cii6 liftitit

ACTIVITY ANI) USE LINTATIONS

PLAN OF RES7RIC1EJJ AREAS ANJJ COlER TYPES

8V CKlJ()RN IJNl()N PflllfpoundCpoundS SlllERFIIMJ SITC

50 HJ S(J11( SmEpoundT llAIPOIL JASS

=r-o ~ ll 2021

~ Engmeer1ng

Hltd ~~ middot~~-=~ra (f~AJ lIQ c- f

a llfEET 2 ltF 6324-02

td ~

w ~ m 0 0

Id Q ii w m

co co m 0 co

Bk 39600 Pg437 88608

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY New England Region

Five Post Office Square - Suite 100 Boston Massachusetts 02109-3912

INSTITUTIONAL CONTROL DESIGN STATEMENT FOR THE BLACKBURN AND UNION PRIVILEGES SUPERFUND SITE - EAST OF SOUTH STREET AREA

1 Introduction

Pursuant to the Comprehensive Environmental Response Compensation and Liability Act 42 USC sect 9601 et seq (CERCLA) and the National Contingency Plan 40 CFR Part 300 (the NCP) this document contains a description of the release events and site history that resulted in the contaminated media that require institutional controls in the fom1 of Activity and Use Limitations the basis for land use restrictions and uses that are consistent and inconsistent with the Selected Remedy ( as described below) This Institutional Control (IC) Design Statement pertains to a portion of the Blackburn and Union Privileges Superfund Site located in the Town of Walpole Massachusetts (the Site) which has been listed on EPAs National Priorities List (NPL) which portion is generally referred to as the East of South Street Area (the EOS Area) The EOS Area is located to the east of South Street in Walpole and is shown on Figure 1 attached hereto

A Notice of Activity and Use Limitation (NAUL) is necessary and appropriate for the EOS Area of the Site based on the fact that pursuant to EPAs risk evaluations asbestos arsenic trichloroethene (TCE) and certain polycyclic aromatic hydrocarbon (PAH) contan1inants remain in place in soils at levels higher than those appropriate for unlimited use or unrestricted exposure groundwater underlying the EOS Area contains hazardous substances at levels that present an unacceptable risk of exposure and remedial measures at the Site must be protected and maintained to ensure that the Selected Remedy remains protective

EPAs Record of Decision (ROD) dated September 30 2008 specified the need for institutional controls such as a NAUL to ensure long-tenn perfonnance and protectiveness of the Selected Remedy The institutional controls described herein are necessary and appropriate to ensure that the Selected Remedy for the Site remains protective of human health and the environment The remedy for the Site as described in the ROD is referred to herein and in the NAUL as the Selected Remedy

Page 1 of7

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 23: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

3190

3195

3200

3205

3210

3215

3220

Bk 39600 Pg428 88608

Point Number Northing Easting Type Curve

Leneth Curve Radius

28756163375 7238602867 PT

3191 2875523 0908 7238765275 COR

3192 28755205040 7238752740 COR

3193 28755391740 7238328470 COR

3194 28755466840 7238361040 COR

28755452760 7238392590 COR

3196 28755516920 7238421040 COR

3197 28755530690 7238388730 COR

3198 28755603230 7238421460 COR

3199 2875555 7568 723852 7053 COR

28755371220 7238445330 COR

3201 28755629198 7238558466 COR

3202 28755676040 7238453290 COR

3203 28755925410 7238563840 PC L=1902 R=3548

3204 28755927383 7238658634 POC

28755954390 7238749520 PT 3206 28755974770 7238807230 COR

3207 28755779200 7238881701 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

28755746700 7238609997 COR

3211 2875593774 7239036608 COR

3212 28756048460 7238996850 PC l=1445 R=2903

3213 28756070631 7239065422 POC

3214 28756109010 7239126420 PT

28756153820 7239182190 PC L=S98 R=848

3216 28756171980 723923 7880 PT

3217 287S6026148 7239566166 COR

3218 28756003865 7239556465 COR

3219 287S6134380 7239256650 COR

28755998460 7239195370 COR

3221 2875600 71S0 7239174530 COR

3222 28756001791 7239172152 COR

3223 28756040451 7239079437 COR

3208 28755892640 7238623030 COR

3209 28755765446 7238567249 COR

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 8 of 13 April 14 2021

Bk 39600 Pg429 88608

Point Number

3210

3200

3056

3057

3058

3059

3060

3061

3062

3218

3219

3220

3221

3224

3225

3226

3227

3228

3070

3071

3234

3233

3235

3236

3237

3238

3239

3240

3241

3242

3243

3244

3245

3246

3247

3248

Northing

28755746700

28755371220

28755040360

28755311720

28755263010

28755388260

28755348660

2875562 54 70

28755664605

28756003865

28756134380

28755998460

28756007150

28755941340

28755962080

28755867937

28755819702

28755766128

28756035900

28756086280

28755991990

28755942100

28756477248

28756677238

28756650130

28756473307

28756480112

28756675030

28756724454

28756742099

28756742133

28756703924

28756640759

28757607280

28757401530

28757467350

Easting

7238609997

7238445330

7239199770

7239318930

7239429300

7239484290

7239576000

7239696500

7239606601

7239556465

7239256650

7239195370

7239174530

7239145324

7239100930

7239061674

7238935003

7238911508

7239926600

7239812770

7239769910

7239884050

7239261913

7239253008

7239321810

7239319038

7239298824

7239364440

7239271845

7239292625

723935 0187

7239393239

7239393096

7237584960

7237475300

7237345620

Type

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

PC PCC

POC

PCC

PT

COR

COR

COR

Curve Len2th

L=273

L=ll77

L=657

Cunmiddote Radius

R=1421

R=810

R=679

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 9 of 13 April 14 2021

Bk 39600 Pg430 88608

Point Number Northing Easting Type Curve

Len2th Curve Radius

3249 287 57514570 7237372360 PC l=ll05 R=1993

3250 287 57 588060 7237452980 PT

3251 28757631382 7237429676 PC L=2244 R=2352

3252 287 5765 6810 7237537876 POC

3253 2875 762 9720 7237645671 PT

3254 28756940655 7238952710 PC l=1493 R=1509

3255 28756901845 7239015577 POC

3256 2875683 7836 7239052474 PT

3257 28758104824 7237653014 COR

3258 28758028960 7237800160 COR

3259 28757949530 7237760790 COR

3260 28757901005 7237855021 COR

3261 28757839230 7237820908 PC L=273 R=l33

3262 28757830688 7237799810 PCC L=539 R=2144

3263 28757852974 7237750897 PT

3264 28757891705 7237688178 PC L=lS26 R=2432

3265 28757948636 7237637880 POC

3266 287 58018307 7237607597 PT

3248 28757467350 7237345620 COR

3267 28757550832 7237363444 POC L=2653 R=80000

3268 28757668809 7237424132 PT

3269 28757504 719 7238817989 COR

3270 28757493010 7238842230 COR

3271 28757561074 7238880970 COR

3272 28757483953 7239024127 PC L=323 R=l70

3273 28757459939 7239037846 PT

3274 28757311605 7238957122 PC L=1388 R=906

3275 2875727 2732 7238901647 POC

3276 28757283181 7238834718 PT

3277 287 5733 4061 7238752337 PC L=255 R=l60

3278 287 5735 5527 7238744411 PT

3279 2875 7102815 7239517199 PC l=261 R=l70

3280 28757080654 7239525307 PCC l=909 R=1275

3281 2875 700 5390 7239477911 PCC L=l007 R=990

3282 28756999624 7239381704 PT

3283 2875707 7705 7239230604 PC L=ll14 R=907

Exhibit B lo NAUL-Part IlbullEOS Coordinate Tables Page 10 of13 April 14 2021

3285

3290

3295

3300

3305

3310

3315

Bk 39600 Pg431 88608

Point Number Northing Easting Type

Curve Leneth

Curve Radius

3284 28757168066 7239178102 PT

28757205717 7239186398 PC L=518 R=930

3286 28757249003 7239213534 PCC L=l41 R=086

3287 2875724 7909 7239226048 PT

3288 28758415755 7239842757 PC L=251 R=l59

3289 28758437695 7239837379 PT

28758456377 7239846949 PC L=812 R=876

3291 28758494897 7239915165 PCC L=456 R=757

3292 28758483790 7239958646 PT

3293 28758405147 7240111348 PC L=l057 R=955

3294 28758318136 7240161452 PCC L=477 R=l063

28758272407 7240149529 PCC L=250 R=l60

3296 28758265647 7240128003 PT

3297 28758157937 7237680895 COR

3298 28758902927 723807 1969 COR

3299 28758852531 7238168280 COR

28758779660 7238129750 COR

3301 28758746973 7238192072 COR

3302 2875807 6630 7237840490 COR

3303 28758049940 7237894220 COR

3304 2875871 7997 7238243620 COR

28758680103 7238315946 COR

3306 28758533699 7238239240 COR

3307 2875852 6899 7238252220 COR

3308 28758098180 7238027600 COR

3309 28757974484 7238264223 COR

28757957598 7238255513 COR

3311 28757757732 7238637845 COR

3312 28757774584 7238646620 COR

3313 28757653710 723887 7846 COR

3314 28757560920 7238829340 COR

28759004930 7238125514 COR

3316 28759689797 7238485028 PC L=1992 R=2609

3317 28759697204 7238583760 POC

3318 28759667288 723867 8142 PT

3319 28758996126 7238323718 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 11 of 13 April 14202 I

Bk 39600 Pg432 88608

Point Number

Northing Easting Type Curve Lenfth

Curve Radius

3320 28759028950 7238261560 COR 3321 28758954486 7238222188 COR

3322 28758972523 7238378387 COR 3323 28759421550 7238613630 COR 3324 28759377933 7238698105 COR 3325 2875907 4811 7238539289 COR 3326 28759081611 7238526309 COR 3327 28758935210 7238449604 COR

3328 28759464470 7238637330 COR 3329 28759632674 7238722481 PC L=ll83 R=l578

3330 28759583973 7238755474 POC 3331 28759526573 7238768343 PRC L=2163 R=2455

3332 28759422964 7238796123 POC 3333 28759341091 7238865430 PT

3334 28759193370 7239050710 COR 3335 28759416340 7239163940 COR 3336 28759263600 7239455620 COR 3337 28759043690 7239336510 COR 3338 28758935490 7239552130 COR 3339 28757650890 7238883240 COR 3312 28757774584 7238646620 COR 3311 28757757732 7238637845 COR 3310 28757957598 7238255513 COR 3309 28757974484 7238264223 COR 3308 28758098180 723802 7600 COR 3307 28758526899 7238252220 COR 3306 28758533699 7238239240 COR 3340 28758700033 7238326388 COR 3341 28758675436 7238373334 COR 3342 28758733013 7238403500 COR 3343 28758760858 7238350353 COR 3344 28758860952 7238402796 COR 3345 28758833106 7238455943 COR 3346 28758890683 7238486109 COR 3347 28758915280 7238439162 COR 3326 28759081611 7238526309 COR 3325 28759074811 7238539289 COR

Exhibit B to NAUL-Part H-EOS Coordinate Tables Page 12 of l3 April 14 2021

Bk 39600 Pg433 88608

Point Number

Northing Easting Type Curve Len2th

Cunbulle Radius

3324 2875937 7933 7238698105 COR

3082 28757068320 7240314640 COR 3083 28757602980 7240594310 COR 3349 28757790234 7240236327 COR

3348 28757255574 7239956657 COR

3124 28757716516 7241351659 COR 3125 28757288251 7241140719 COR 3126 28756725827 7240851862 COR 3127 28756162468 7240586126 COR 3128 287 55614498 7240338506 COR 3129 28754346745 7239768507 COR 3130 28753845716 7239540194 COR 3131 28753257436 723927 8634 COR 3132 28752466355 7238929370 COR 3133 28751819340 7238643698 COR 3134 2875118152 7 7238364939 COR 3135 2875080 7772 7238199071 COR 3136 28750413263 7238019301 COR 3350 28750296168 7238284525 COR 3351 28754 78 6636 7240267040 COR 3352 28757412029 7241794586 COR

POINT DESCRIPTION ABBREVIATIONS

COR=CORNER PC= POINT OF CURVE WHERE CURVE STARTS POC -= POINT ON CUR VE PT=POINT OF TANGENCY WHERE THE CURVE ENDS PCC = POINT OF COMPOUND CURVE (WHERE RADIUS CHANGES) PRC = POINT OF REVERSE CURVE

NOTES

THE COORDINATES ARE BASED ON AN EXISTING CONDITIONS AS-BUILT FIELD SURVEY BY NORWOOD ENGINEERING CO INC BETWEEN NOVEMBER 15 TO DECEMBER 18 2019 TI-IE COORDINATES ARE BASED ON l1ASSACHUSETIS ST A TE PLANE COORDINATE SYSTEM NAD 1983 (FEET) THE ACCURACY OF THE COORDINATE LOCATIONS ARE +-0J FEET

Exhibit B to N1UL-Part II-EOS Coordmate Tables Page 13 ofl3 April 14 2021

---

1f~ flJr ~i

f ~~ J~i](M~I ~ 1 jf~ ~~f W-- )e 1

It lj fY pl ~-~j

I --- ~ ~

1 (J-c~ er ~

C JI fl JYf

1 ~ ~Yu-~ 1i

~r

( LOClJS P

SCAUllbulliQO

I ar lMIT flG PINI tMS _ lIIPMIDMICXNllRlnT~tlCfllUS 1111D cmuftraquodl s - NIKl1III tfIJIIIIIOfM~1HCll allE1

DAre Jllrl

NUKIJU LU6 DMitM

mmtG6DKbdlt

~4~-middot

~~I

-- ampnbullllf~ ~ fa

LEGEND 0

-i~wr0o-m lICUUoaampbullco--11111 _ _l_J

0

bull ~-ail_I

~-

mo(I ---fwj

amp~~~~ ~ ~~ltgtmiddot ~A~

~6

_L-r

bull -~ IBP__l-11Uil n-rlfl-lffll rMCllI 1a 1rr ai

-~ lll-lliI u-W--11a 1 Ml[ 411 amt l0IIC 3JICJ7 ~ 33-1--I- DIID llXII D111 JlMZ 411 lraquo- ~lUN~t --- - etMpound 11JII

~ MffD mmaat ZL I01t 111

1Jlll~-IICfIQfJICIISJ DfEI IC71- I~ 1~ 9 Cl 1VY IICIIWCLl~fCSC~lNCl

~11HltOXW1A~JtCI~llfB MXIC 1HI lME INCi 111M bull11 (S 1f41~middot~-~-)

~ io

0 0 0 0 -0 0 0 D O 1 middot tbull O

_- _pound ~ - Tf middot- ---r ~~ ~~- ~=middoti

r jil7bull --------4~-middot~

(

SCAtpound 1bull bull YI

I ~ tfAIE lIMa toafllltl1E ~NAD1w1(rJ

1 ~ PlIla II MMt QI 11D TD D111oPl

~c1MlntID9~~-l 1NIIJIIKlNI LnlJTU ~ deg qllAJSTE uM011111 iu1II 1111ZT IIIILJaZ

Exhibit C - Photo-Reduced Copy of Activity and Use Limitations Plan of Land

--~middot---

I ~111-11111

iiiii

-ill111liilt

ACJIYIJY ANJ) lJSE lJJll7ATJONS PLAN OF LANI)

81ACJ(81R1 I IINION Flr11lfES SllffllF7AVO SIle

o tfO SOIJIH s1ar HlltlPOtL IIAS

SCAlElrJAt IPfffl152021

1IJrwod Eng1neerlng

- EnQlbullHrlflg Compaffy middot~~=~ m Cm1JQ u fnfJa-eal

~ -

-~

9l1EET 1 OF I 8324-02

td ~

w ~ m 0 0

Id Q ii w ii

co co m

co 0

-l

~-77--raquo- -~I~ )middot~ ~ bull _I lT ~ v~

AI ~ If ~)middot~ 7- ~1 c t11 yil ~ ~ ~middot~41 bull1 l ~~l(i~r~1 f7 )ll y-

~~ f -~ -v fgtV ~ ~ ~ l er-- u -

tl x-P~C ()

JP yen f(( 11 1degpoundS -~ (

ftunrTfflllllTnallJrNNQWDf ~ ti IZNtRlTT lnH M IULS IIJIUIUlA-DlltlllllDlJlllIICIF tJbllt~llC~lJNp

DTl NlllltaJatl-Witiill (raquo11 iiiK(+til

I aJnlTlKATJlfl PlAH~ THE PUIIJll1T UC TIUlf Mlaquo THE l5 11 oawG ~ NII 1Hpound1as Of1111E111 AMllfrlTll9laquolllt Mpound ntem OPlaJ CJ1 IWM1pound BREn 011 bulln

~ ~illi~fli~ _lt ---c~-Clmiddot~~c0-nmiddotmiddot~bullJmiddot04~- ~--~--yen~~bull - L -bull -n ~ -r - ~ -

it

~ fr ~ ~- -~bull~bullv OG- ~n0

bull--ltmiddot middot~ -~- ~~-=~7~st~-~~~~i~~Hil~-) 2~C 0 ~~~~~ --------Y-Tgt-bullbullmiddot-

U-IU ~middotshy =i==-

bullbull bull _ -middot-

~----- ( ~11middot

__IC1ZMJ - bull IOC)0l lftEf ___ i gt mEKJllJfNG rotJ1FRIIIT AIIEAS B~ p~ AIIEAS ~ea-vmiddot LIUIID

~ e--- -+ ~ rzprz1za 1 ~ IJTATC PRC ~TC

nJml lltPtasCltJ

DUD BCD lJlll7 PMC 4H 1 1 YERT1CAL M1llI II NCCI ~ _ ro conurr DOD 80CIC 3JII07 llME 4H I ntaM NUIU 1121 IJ4TAI m IMlC 111111 nATIIW ~fsi

tJMAlfflOlI) AIIEAS1 bull 11AMJSCAlfl) AlpoundAS Lill] 1Dll IOlII POT PlCit 6115 J)-t20 ~atfnujK~tlLWlQI

~PUNMl-17 POflTIVNf1Ell llaD BaalC Tl_ Paa bullbull - 99 a 11

_-ijf1iltDP~IZ~ 5CME - JOSUva1fTLJ ~ ~-rr 111 C tMI=

bull111 I~

i=iiii7

~ e---

t c z rl

L-n11 ~

ACJIVJTY AND USE LIAlffAJIONS

PIAN OF RESTRIC1EJJ AREAS ANJJ COVER TYPES

fltACK1(fN _ llNlltgtI PfMIECCS SllPVFVNlJ51Tlt

JO _ lxJ srJllH STREET IIALPrJU JASS

SCAU I - 30 APRIL 2021

lcnwod Engineering

llarwood Cngnrilgtf cpmy -t~~~~

fIL Pllpa-ru - (1u]1a-lftll

~L=wl f 01~JII IO_

a SIEET I (F 2 B324-02

bj ~

w 0

0 0 deg It

iQ ~ w l11

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 1 of 2

CX) CX)

deg CX) 0

ntllT -1~1~ rurnlaquo1 r1n l1XTM 11Nf -r~ lie UUffCI 11Pt lDll1Hf iniin --IC unr1G Tlr 1n1rn Iota allll Ito tyen1tlll ~~11CRnrzJ11-11--~ci-- n31 nr111w11J1t ~bull c ~- diams JDrnn llloffl rcnlml IDII

-~ ]al rll _ _ PnlM-1-PI lbull-- ll7HrirrIPlllD1lf~-a bullbullll 111bull IClln9XnolDlllIIIIIIOm

214 ff7371JOOT ~bull JllC Ibullbull 171 JICllEY)l)vlUTlo~lUl~ ~li_~ -~~ MDlol ll4L~TllJraquofllllf190abullbullt ~~nQuu~~1aJI _~~OtottWU~1t11txm~arcPbrmllmCDt ~~ ~~ ~ =~ gj ~l11~ llltlM Mrattllll TDPmllIDCDI JJ4bull e~ _ ~ e PClC lbullI- 1- ~1sect~ ~ ~ ~ ~ ~~~-nr~44bull~mn11-a11 ~~ =mt =m~ ~ ~~ ~ =~~-~~ =~~rt~l~llibullltbull=

~~~~~~~~r-~r-~~sectsect55~55 ~~ ~=g~~ mi --1~ ~-==~~m~ L-~r UVPllrlllUillDITDr4L 1JI lbullKlllll~==~~~=~

~~~~~~~~ raquoff-llll 111rritl_aianbull ~11lCla rr- n ttll XDP11r1r 11111c-1C111~ RTl~rJlllllbullbull~llllJlllipo~~=r~tm=~~

~=~3r~t==~ ~=~i==~~ llt1ttl70 m~~n~ =n~ L diams 11- bull - iaEi~mi 1lE~HHffi ~1-~ E LbulllT bullU-7YA 8911U TMn4 OJII C- lllkHrnl1nlntll11106~

MJ9~gt111ftlrfffll11 ~ SbullC61hLJT raquoWl lll~IJlll11amp1 utVllllt a lbulllfGl bulllC lT

lliilH~1 ~~rm-=rn~ lbullIIIICU-1bull0

itt ishwI JUo ma m1 bull 1-c iiliii ~==~m~=~ Ullln U7IIY M1NLl411 fflf f-~ llr IL ~ lbullt Ill uaP11rllDn1rin1bull139nf- na_ 1111lnl ___ lWTDf-ID 111Jbullnllr-cishy

J1JT1 lflTI-noLbull COi lJ1 tsr18GOTDrl1~ 1--Cn ~~~==-=~ LbullS1rbull-p

LbulllI ~middot x1 fl11bull diams an l~J P-~ WI 1~1Slrmsraquo11nirorn 11bull1n-

llrgt 58 - TDrl ZJlJ l~ Zl llf4 Pll1raquo91I lnP~IIEI 11 ==~=-~~ lbullt-11bullh1~

nun_-~bullfllrlll_ lbulll-lrbull N- - nr6-11MII rinaus a 1bull1E-t1 im1 nrxi mr~ 7nn1 4i i 1c m llrS~iJ-ltJlillII Tt-Ul ris ~=~~middotiill~~ tf llDln~n1rJrgt11nbull1ric ~IPgt9nq~ It-MU rbull RflrrlllVllbulltPllbullOIIUAfC lbullnJtrNbull_~lD+4ftJSHJ7711JrllIIIIT144lDI lbulll ~I llfs-mllThn~-f 1bull11

1a5blH=i5gS El~ iE =iilli ~ID aH~~ ~~ leJINNllllfflnlt10ff1nll~1g=TI==~- lbullN~Jmiddot pw nrwuhtl tba11 l- lllllsectimiii~ ~ lllaquot ll116UW41 llllII NII Cl Ld bullt ll 11r 111~-~lHtl-IINOClll 1Dgtn~rMOtnllfbull3all)Mnr~bullwrmm11uoo~ ~r~ m~ = ~~ t~-i m NNtotl n11nn cm

~~~~~Ttr~ in Httl01llxl nlfM114ta cm

JJN n=-PIW - I- C lbullT rnr nnubullNoXI ffllPI n1 11-amp 11middot 77)111fflffPl~JlaUII

i1JJ n91lbull ti Jnlftbulllll QII

~g=~~~~ir~f~5 =i~=~~ ~=~ ~ ~j====goi H1111t-llll ffo~ ~rn tm111 ta1Vl~ tnar- IVI rm u1i ~ nw ~illl cm 1111 Hltt1H T7U 72w111ll tm UI ftffiH~bull1 naMUlI nlll

lltfll~IOUl rnes~ttlClll

~I~~=~=~~= l3111ratlQOJ121lllll CS u1n-n-a mn-c~11111llllilr ~====m~~ lbulllllr~~Oll~r1111-t~rtRiHa)toI

-~rt~_Utr111tt~USI ~m~i==r~~llfflpound1gtgtMllkllit1U10C011 annrxnbull-TCRL11ai~=~=~g)llllll~--rWltMJtt-8 DR Pl rraquof ntl rim Gllf CCI~~1r~~ liiilllii u- ntlt bull llJ~naJCDI

raquo11NMl10~Ullllcm ntrlnK)fL~nlln-1c lllf ~--TlJaft_Lmc i lbull1 bull l3il0 Nl-197) Ttlll1344 a LbullI 3 l diams 1-111 lflS 1111lOllt ffl- MP PII bullHI lgtl llJI l97Mlt Ian -ti DG llC

111111===-~~~=mg ====~~ tD rlrffllZllIITO-lfllCIIII=~tr~L~~~= - Pl~I llII TD_ ff~ tDII31119NIJMlDffU~~ H CZIII liii~mlt~ D1111nrn11GQ~-CaKftQNJWNczr41140ffnQCUII Jnffnt1JIIIIJunbull~1Qc20lll ~Pllli ll mrnnn lbulltlP 17Jrffdeg-degluoElJIIIQII

~-I-ti _nrna~rlll

a n- 4411 llbullQI 1=40 rt La n- lllf ffrgtn _Jr_~ Ullk ---rr~~ ~=~=tl~~ =1 nttltt nraquo 1nlU as

=-mn--~111DJIDII Ullgt~fflflnanaaJIIJalt55~~EIS~=~~ ~~)1 -11CIJII nn~bullbullbullnaKatt1ta1

JOIT ru~- rf- deg hJIIII r- 111111 ~1111) -1 aJ1 ld t11D1etlll_TalCIS -~-UCV~bullraquootur=~=~I~~=~--~ ~rsrgo_mlaquoshym rs~11flI ~- rnilr==~=~~ ~~r _ ~ atfl ~ rtw Dgtlnn-f-lEllln17n-UIIP

D11 fflXTJ111111 I~~ ar D1Jn4 ~leJJS-OnC111

=====5 middoti SHU=~ 5 ampn iliiiiiIiI11

ngtgtn~1~1tbullubull1rm DH tu~- lt11 rirmU1111 CDIII

~i~i555mi~ ~~ ~m=~==m~g===~~~~ tn1r JtW ~ma- PiOll a CU

~ XNr~t~fDllll1-all~~ m===~~ bullbull~W 111111 ==~~ ampT g~ ru~ =

~lU $Et=ni ~ llll0111ra1Ln~otqC011

H~ g==i =~1 ~

~111111 ~~g~n~a~J))pound11 1=~)6tia

~~ mEfHfH~Si

amp12Ct _ an ~

U N711f21th mM1LU aa o1bull~--117CII in4r ~llllll1Vffl-111Dlr lit~ Hmtlpound1 71 12L I CCIII ---~CUnMIIUOCVf JIHtlnn nl 7r ll4011CIIII

llllDNXCWZflDtlltllCIDCDr

~~=~==~=gnn n1raquoL bullw noanDNt CIJIIi=~ C~middot ~ ~ ~ HnffTI-QIJroQ__111PtlJIIInfflll bullbull1~ aaeIT t-- nrJD nJUntu~CllWI

m ~1 ~ ~~~ ~ ilria~gliiiji~=ir ~lt-OTT gl1raquo ~Iraquou fflllIL nllll 1111111 flC~middotIY_4allCCIIIi l1i5~ ~~11~middot~ ~~ ffll H71W786lll 7P-JOalllllll 2N ~ 1-flllt 7HIJl4- DI ~ ~==~ ~t-tr bullM-

114 Hit71aTra7ririatNOCIIII

llHl1Hf ll~7Dl4fIZIIICIIII 1141ftillf+1DllnTgtlMa~=~bull==~r Lbulll-lllbullbulllJJ

=~~~HR-~a ~ =iEri ~ ~=6

= 1MESE COCIIIOlfAlEi ARC 9~ at AH DISTlfG CONJmOfS AS-alLT FED 5UKiEY Y NORWDal EJICltJIJll(G CD~ IIElMEN ~ 1S 111 DECDaR a 2DII 1)pound OCICIIIDNAlES 5HCflI UIpound IIAID Cit MltSSAOfllffT5 STATE FlJriNII CDCffllNAT smult ~AO leJ (IMIJ 1HE ACQlltACY ltF 1HE COCftDINT[ LDCAnatS Mpound diams- 01 FtU

POINT DESCRIPTION ABBREVIATIONS~-~middotPC Pmlr Of CLIRIJC bullIEllL ClMNpound STilRlS PDC bull PtJtilTIIJOM1poundr ~ [raquo TAHCINiT W(R[ lll[ CURpound uroo Fo F[1NT(1t~tfflvt[ltft1llllIIUlt OMNtilE)PRC ~T oT ~pound ~Vlllrlt

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 2 of 2

I ~ IHAT nfl PlM MS 81D1 PIIDMQl ~WllTM(llUI MOIIEOIAAlPlllR~Df IIUPS C- lttE ~111 Cl__ HftNMIIIZlt

WWWWJU Cii6 liftitit

ACTIVITY ANI) USE LINTATIONS

PLAN OF RES7RIC1EJJ AREAS ANJJ COlER TYPES

8V CKlJ()RN IJNl()N PflllfpoundCpoundS SlllERFIIMJ SITC

50 HJ S(J11( SmEpoundT llAIPOIL JASS

=r-o ~ ll 2021

~ Engmeer1ng

Hltd ~~ middot~~-=~ra (f~AJ lIQ c- f

a llfEET 2 ltF 6324-02

td ~

w ~ m 0 0

Id Q ii w m

co co m 0 co

Bk 39600 Pg437 88608

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY New England Region

Five Post Office Square - Suite 100 Boston Massachusetts 02109-3912

INSTITUTIONAL CONTROL DESIGN STATEMENT FOR THE BLACKBURN AND UNION PRIVILEGES SUPERFUND SITE - EAST OF SOUTH STREET AREA

1 Introduction

Pursuant to the Comprehensive Environmental Response Compensation and Liability Act 42 USC sect 9601 et seq (CERCLA) and the National Contingency Plan 40 CFR Part 300 (the NCP) this document contains a description of the release events and site history that resulted in the contaminated media that require institutional controls in the fom1 of Activity and Use Limitations the basis for land use restrictions and uses that are consistent and inconsistent with the Selected Remedy ( as described below) This Institutional Control (IC) Design Statement pertains to a portion of the Blackburn and Union Privileges Superfund Site located in the Town of Walpole Massachusetts (the Site) which has been listed on EPAs National Priorities List (NPL) which portion is generally referred to as the East of South Street Area (the EOS Area) The EOS Area is located to the east of South Street in Walpole and is shown on Figure 1 attached hereto

A Notice of Activity and Use Limitation (NAUL) is necessary and appropriate for the EOS Area of the Site based on the fact that pursuant to EPAs risk evaluations asbestos arsenic trichloroethene (TCE) and certain polycyclic aromatic hydrocarbon (PAH) contan1inants remain in place in soils at levels higher than those appropriate for unlimited use or unrestricted exposure groundwater underlying the EOS Area contains hazardous substances at levels that present an unacceptable risk of exposure and remedial measures at the Site must be protected and maintained to ensure that the Selected Remedy remains protective

EPAs Record of Decision (ROD) dated September 30 2008 specified the need for institutional controls such as a NAUL to ensure long-tenn perfonnance and protectiveness of the Selected Remedy The institutional controls described herein are necessary and appropriate to ensure that the Selected Remedy for the Site remains protective of human health and the environment The remedy for the Site as described in the ROD is referred to herein and in the NAUL as the Selected Remedy

Page 1 of7

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 24: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

Bk 39600 Pg429 88608

Point Number

3210

3200

3056

3057

3058

3059

3060

3061

3062

3218

3219

3220

3221

3224

3225

3226

3227

3228

3070

3071

3234

3233

3235

3236

3237

3238

3239

3240

3241

3242

3243

3244

3245

3246

3247

3248

Northing

28755746700

28755371220

28755040360

28755311720

28755263010

28755388260

28755348660

2875562 54 70

28755664605

28756003865

28756134380

28755998460

28756007150

28755941340

28755962080

28755867937

28755819702

28755766128

28756035900

28756086280

28755991990

28755942100

28756477248

28756677238

28756650130

28756473307

28756480112

28756675030

28756724454

28756742099

28756742133

28756703924

28756640759

28757607280

28757401530

28757467350

Easting

7238609997

7238445330

7239199770

7239318930

7239429300

7239484290

7239576000

7239696500

7239606601

7239556465

7239256650

7239195370

7239174530

7239145324

7239100930

7239061674

7238935003

7238911508

7239926600

7239812770

7239769910

7239884050

7239261913

7239253008

7239321810

7239319038

7239298824

7239364440

7239271845

7239292625

723935 0187

7239393239

7239393096

7237584960

7237475300

7237345620

Type

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

COR

PC PCC

POC

PCC

PT

COR

COR

COR

Curve Len2th

L=273

L=ll77

L=657

Cunmiddote Radius

R=1421

R=810

R=679

Exhibit B to NAUL-Part 11-EOS Coordinate Tables Page 9 of 13 April 14 2021

Bk 39600 Pg430 88608

Point Number Northing Easting Type Curve

Len2th Curve Radius

3249 287 57514570 7237372360 PC l=ll05 R=1993

3250 287 57 588060 7237452980 PT

3251 28757631382 7237429676 PC L=2244 R=2352

3252 287 5765 6810 7237537876 POC

3253 2875 762 9720 7237645671 PT

3254 28756940655 7238952710 PC l=1493 R=1509

3255 28756901845 7239015577 POC

3256 2875683 7836 7239052474 PT

3257 28758104824 7237653014 COR

3258 28758028960 7237800160 COR

3259 28757949530 7237760790 COR

3260 28757901005 7237855021 COR

3261 28757839230 7237820908 PC L=273 R=l33

3262 28757830688 7237799810 PCC L=539 R=2144

3263 28757852974 7237750897 PT

3264 28757891705 7237688178 PC L=lS26 R=2432

3265 28757948636 7237637880 POC

3266 287 58018307 7237607597 PT

3248 28757467350 7237345620 COR

3267 28757550832 7237363444 POC L=2653 R=80000

3268 28757668809 7237424132 PT

3269 28757504 719 7238817989 COR

3270 28757493010 7238842230 COR

3271 28757561074 7238880970 COR

3272 28757483953 7239024127 PC L=323 R=l70

3273 28757459939 7239037846 PT

3274 28757311605 7238957122 PC L=1388 R=906

3275 2875727 2732 7238901647 POC

3276 28757283181 7238834718 PT

3277 287 5733 4061 7238752337 PC L=255 R=l60

3278 287 5735 5527 7238744411 PT

3279 2875 7102815 7239517199 PC l=261 R=l70

3280 28757080654 7239525307 PCC l=909 R=1275

3281 2875 700 5390 7239477911 PCC L=l007 R=990

3282 28756999624 7239381704 PT

3283 2875707 7705 7239230604 PC L=ll14 R=907

Exhibit B lo NAUL-Part IlbullEOS Coordinate Tables Page 10 of13 April 14 2021

3285

3290

3295

3300

3305

3310

3315

Bk 39600 Pg431 88608

Point Number Northing Easting Type

Curve Leneth

Curve Radius

3284 28757168066 7239178102 PT

28757205717 7239186398 PC L=518 R=930

3286 28757249003 7239213534 PCC L=l41 R=086

3287 2875724 7909 7239226048 PT

3288 28758415755 7239842757 PC L=251 R=l59

3289 28758437695 7239837379 PT

28758456377 7239846949 PC L=812 R=876

3291 28758494897 7239915165 PCC L=456 R=757

3292 28758483790 7239958646 PT

3293 28758405147 7240111348 PC L=l057 R=955

3294 28758318136 7240161452 PCC L=477 R=l063

28758272407 7240149529 PCC L=250 R=l60

3296 28758265647 7240128003 PT

3297 28758157937 7237680895 COR

3298 28758902927 723807 1969 COR

3299 28758852531 7238168280 COR

28758779660 7238129750 COR

3301 28758746973 7238192072 COR

3302 2875807 6630 7237840490 COR

3303 28758049940 7237894220 COR

3304 2875871 7997 7238243620 COR

28758680103 7238315946 COR

3306 28758533699 7238239240 COR

3307 2875852 6899 7238252220 COR

3308 28758098180 7238027600 COR

3309 28757974484 7238264223 COR

28757957598 7238255513 COR

3311 28757757732 7238637845 COR

3312 28757774584 7238646620 COR

3313 28757653710 723887 7846 COR

3314 28757560920 7238829340 COR

28759004930 7238125514 COR

3316 28759689797 7238485028 PC L=1992 R=2609

3317 28759697204 7238583760 POC

3318 28759667288 723867 8142 PT

3319 28758996126 7238323718 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 11 of 13 April 14202 I

Bk 39600 Pg432 88608

Point Number

Northing Easting Type Curve Lenfth

Curve Radius

3320 28759028950 7238261560 COR 3321 28758954486 7238222188 COR

3322 28758972523 7238378387 COR 3323 28759421550 7238613630 COR 3324 28759377933 7238698105 COR 3325 2875907 4811 7238539289 COR 3326 28759081611 7238526309 COR 3327 28758935210 7238449604 COR

3328 28759464470 7238637330 COR 3329 28759632674 7238722481 PC L=ll83 R=l578

3330 28759583973 7238755474 POC 3331 28759526573 7238768343 PRC L=2163 R=2455

3332 28759422964 7238796123 POC 3333 28759341091 7238865430 PT

3334 28759193370 7239050710 COR 3335 28759416340 7239163940 COR 3336 28759263600 7239455620 COR 3337 28759043690 7239336510 COR 3338 28758935490 7239552130 COR 3339 28757650890 7238883240 COR 3312 28757774584 7238646620 COR 3311 28757757732 7238637845 COR 3310 28757957598 7238255513 COR 3309 28757974484 7238264223 COR 3308 28758098180 723802 7600 COR 3307 28758526899 7238252220 COR 3306 28758533699 7238239240 COR 3340 28758700033 7238326388 COR 3341 28758675436 7238373334 COR 3342 28758733013 7238403500 COR 3343 28758760858 7238350353 COR 3344 28758860952 7238402796 COR 3345 28758833106 7238455943 COR 3346 28758890683 7238486109 COR 3347 28758915280 7238439162 COR 3326 28759081611 7238526309 COR 3325 28759074811 7238539289 COR

Exhibit B to NAUL-Part H-EOS Coordinate Tables Page 12 of l3 April 14 2021

Bk 39600 Pg433 88608

Point Number

Northing Easting Type Curve Len2th

Cunbulle Radius

3324 2875937 7933 7238698105 COR

3082 28757068320 7240314640 COR 3083 28757602980 7240594310 COR 3349 28757790234 7240236327 COR

3348 28757255574 7239956657 COR

3124 28757716516 7241351659 COR 3125 28757288251 7241140719 COR 3126 28756725827 7240851862 COR 3127 28756162468 7240586126 COR 3128 287 55614498 7240338506 COR 3129 28754346745 7239768507 COR 3130 28753845716 7239540194 COR 3131 28753257436 723927 8634 COR 3132 28752466355 7238929370 COR 3133 28751819340 7238643698 COR 3134 2875118152 7 7238364939 COR 3135 2875080 7772 7238199071 COR 3136 28750413263 7238019301 COR 3350 28750296168 7238284525 COR 3351 28754 78 6636 7240267040 COR 3352 28757412029 7241794586 COR

POINT DESCRIPTION ABBREVIATIONS

COR=CORNER PC= POINT OF CURVE WHERE CURVE STARTS POC -= POINT ON CUR VE PT=POINT OF TANGENCY WHERE THE CURVE ENDS PCC = POINT OF COMPOUND CURVE (WHERE RADIUS CHANGES) PRC = POINT OF REVERSE CURVE

NOTES

THE COORDINATES ARE BASED ON AN EXISTING CONDITIONS AS-BUILT FIELD SURVEY BY NORWOOD ENGINEERING CO INC BETWEEN NOVEMBER 15 TO DECEMBER 18 2019 TI-IE COORDINATES ARE BASED ON l1ASSACHUSETIS ST A TE PLANE COORDINATE SYSTEM NAD 1983 (FEET) THE ACCURACY OF THE COORDINATE LOCATIONS ARE +-0J FEET

Exhibit B to N1UL-Part II-EOS Coordmate Tables Page 13 ofl3 April 14 2021

---

1f~ flJr ~i

f ~~ J~i](M~I ~ 1 jf~ ~~f W-- )e 1

It lj fY pl ~-~j

I --- ~ ~

1 (J-c~ er ~

C JI fl JYf

1 ~ ~Yu-~ 1i

~r

( LOClJS P

SCAUllbulliQO

I ar lMIT flG PINI tMS _ lIIPMIDMICXNllRlnT~tlCfllUS 1111D cmuftraquodl s - NIKl1III tfIJIIIIIOfM~1HCll allE1

DAre Jllrl

NUKIJU LU6 DMitM

mmtG6DKbdlt

~4~-middot

~~I

-- ampnbullllf~ ~ fa

LEGEND 0

-i~wr0o-m lICUUoaampbullco--11111 _ _l_J

0

bull ~-ail_I

~-

mo(I ---fwj

amp~~~~ ~ ~~ltgtmiddot ~A~

~6

_L-r

bull -~ IBP__l-11Uil n-rlfl-lffll rMCllI 1a 1rr ai

-~ lll-lliI u-W--11a 1 Ml[ 411 amt l0IIC 3JICJ7 ~ 33-1--I- DIID llXII D111 JlMZ 411 lraquo- ~lUN~t --- - etMpound 11JII

~ MffD mmaat ZL I01t 111

1Jlll~-IICfIQfJICIISJ DfEI IC71- I~ 1~ 9 Cl 1VY IICIIWCLl~fCSC~lNCl

~11HltOXW1A~JtCI~llfB MXIC 1HI lME INCi 111M bull11 (S 1f41~middot~-~-)

~ io

0 0 0 0 -0 0 0 D O 1 middot tbull O

_- _pound ~ - Tf middot- ---r ~~ ~~- ~=middoti

r jil7bull --------4~-middot~

(

SCAtpound 1bull bull YI

I ~ tfAIE lIMa toafllltl1E ~NAD1w1(rJ

1 ~ PlIla II MMt QI 11D TD D111oPl

~c1MlntID9~~-l 1NIIJIIKlNI LnlJTU ~ deg qllAJSTE uM011111 iu1II 1111ZT IIIILJaZ

Exhibit C - Photo-Reduced Copy of Activity and Use Limitations Plan of Land

--~middot---

I ~111-11111

iiiii

-ill111liilt

ACJIYIJY ANJ) lJSE lJJll7ATJONS PLAN OF LANI)

81ACJ(81R1 I IINION Flr11lfES SllffllF7AVO SIle

o tfO SOIJIH s1ar HlltlPOtL IIAS

SCAlElrJAt IPfffl152021

1IJrwod Eng1neerlng

- EnQlbullHrlflg Compaffy middot~~=~ m Cm1JQ u fnfJa-eal

~ -

-~

9l1EET 1 OF I 8324-02

td ~

w ~ m 0 0

Id Q ii w ii

co co m

co 0

-l

~-77--raquo- -~I~ )middot~ ~ bull _I lT ~ v~

AI ~ If ~)middot~ 7- ~1 c t11 yil ~ ~ ~middot~41 bull1 l ~~l(i~r~1 f7 )ll y-

~~ f -~ -v fgtV ~ ~ ~ l er-- u -

tl x-P~C ()

JP yen f(( 11 1degpoundS -~ (

ftunrTfflllllTnallJrNNQWDf ~ ti IZNtRlTT lnH M IULS IIJIUIUlA-DlltlllllDlJlllIICIF tJbllt~llC~lJNp

DTl NlllltaJatl-Witiill (raquo11 iiiK(+til

I aJnlTlKATJlfl PlAH~ THE PUIIJll1T UC TIUlf Mlaquo THE l5 11 oawG ~ NII 1Hpound1as Of1111E111 AMllfrlTll9laquolllt Mpound ntem OPlaJ CJ1 IWM1pound BREn 011 bulln

~ ~illi~fli~ _lt ---c~-Clmiddot~~c0-nmiddotmiddot~bullJmiddot04~- ~--~--yen~~bull - L -bull -n ~ -r - ~ -

it

~ fr ~ ~- -~bull~bullv OG- ~n0

bull--ltmiddot middot~ -~- ~~-=~7~st~-~~~~i~~Hil~-) 2~C 0 ~~~~~ --------Y-Tgt-bullbullmiddot-

U-IU ~middotshy =i==-

bullbull bull _ -middot-

~----- ( ~11middot

__IC1ZMJ - bull IOC)0l lftEf ___ i gt mEKJllJfNG rotJ1FRIIIT AIIEAS B~ p~ AIIEAS ~ea-vmiddot LIUIID

~ e--- -+ ~ rzprz1za 1 ~ IJTATC PRC ~TC

nJml lltPtasCltJ

DUD BCD lJlll7 PMC 4H 1 1 YERT1CAL M1llI II NCCI ~ _ ro conurr DOD 80CIC 3JII07 llME 4H I ntaM NUIU 1121 IJ4TAI m IMlC 111111 nATIIW ~fsi

tJMAlfflOlI) AIIEAS1 bull 11AMJSCAlfl) AlpoundAS Lill] 1Dll IOlII POT PlCit 6115 J)-t20 ~atfnujK~tlLWlQI

~PUNMl-17 POflTIVNf1Ell llaD BaalC Tl_ Paa bullbull - 99 a 11

_-ijf1iltDP~IZ~ 5CME - JOSUva1fTLJ ~ ~-rr 111 C tMI=

bull111 I~

i=iiii7

~ e---

t c z rl

L-n11 ~

ACJIVJTY AND USE LIAlffAJIONS

PIAN OF RESTRIC1EJJ AREAS ANJJ COVER TYPES

fltACK1(fN _ llNlltgtI PfMIECCS SllPVFVNlJ51Tlt

JO _ lxJ srJllH STREET IIALPrJU JASS

SCAU I - 30 APRIL 2021

lcnwod Engineering

llarwood Cngnrilgtf cpmy -t~~~~

fIL Pllpa-ru - (1u]1a-lftll

~L=wl f 01~JII IO_

a SIEET I (F 2 B324-02

bj ~

w 0

0 0 deg It

iQ ~ w l11

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 1 of 2

CX) CX)

deg CX) 0

ntllT -1~1~ rurnlaquo1 r1n l1XTM 11Nf -r~ lie UUffCI 11Pt lDll1Hf iniin --IC unr1G Tlr 1n1rn Iota allll Ito tyen1tlll ~~11CRnrzJ11-11--~ci-- n31 nr111w11J1t ~bull c ~- diams JDrnn llloffl rcnlml IDII

-~ ]al rll _ _ PnlM-1-PI lbull-- ll7HrirrIPlllD1lf~-a bullbullll 111bull IClln9XnolDlllIIIIIIOm

214 ff7371JOOT ~bull JllC Ibullbull 171 JICllEY)l)vlUTlo~lUl~ ~li_~ -~~ MDlol ll4L~TllJraquofllllf190abullbullt ~~nQuu~~1aJI _~~OtottWU~1t11txm~arcPbrmllmCDt ~~ ~~ ~ =~ gj ~l11~ llltlM Mrattllll TDPmllIDCDI JJ4bull e~ _ ~ e PClC lbullI- 1- ~1sect~ ~ ~ ~ ~ ~~~-nr~44bull~mn11-a11 ~~ =mt =m~ ~ ~~ ~ =~~-~~ =~~rt~l~llibullltbull=

~~~~~~~~r-~r-~~sectsect55~55 ~~ ~=g~~ mi --1~ ~-==~~m~ L-~r UVPllrlllUillDITDr4L 1JI lbullKlllll~==~~~=~

~~~~~~~~ raquoff-llll 111rritl_aianbull ~11lCla rr- n ttll XDP11r1r 11111c-1C111~ RTl~rJlllllbullbull~llllJlllipo~~=r~tm=~~

~=~3r~t==~ ~=~i==~~ llt1ttl70 m~~n~ =n~ L diams 11- bull - iaEi~mi 1lE~HHffi ~1-~ E LbulllT bullU-7YA 8911U TMn4 OJII C- lllkHrnl1nlntll11106~

MJ9~gt111ftlrfffll11 ~ SbullC61hLJT raquoWl lll~IJlll11amp1 utVllllt a lbulllfGl bulllC lT

lliilH~1 ~~rm-=rn~ lbullIIIICU-1bull0

itt ishwI JUo ma m1 bull 1-c iiliii ~==~m~=~ Ullln U7IIY M1NLl411 fflf f-~ llr IL ~ lbullt Ill uaP11rllDn1rin1bull139nf- na_ 1111lnl ___ lWTDf-ID 111Jbullnllr-cishy

J1JT1 lflTI-noLbull COi lJ1 tsr18GOTDrl1~ 1--Cn ~~~==-=~ LbullS1rbull-p

LbulllI ~middot x1 fl11bull diams an l~J P-~ WI 1~1Slrmsraquo11nirorn 11bull1n-

llrgt 58 - TDrl ZJlJ l~ Zl llf4 Pll1raquo91I lnP~IIEI 11 ==~=-~~ lbullt-11bullh1~

nun_-~bullfllrlll_ lbulll-lrbull N- - nr6-11MII rinaus a 1bull1E-t1 im1 nrxi mr~ 7nn1 4i i 1c m llrS~iJ-ltJlillII Tt-Ul ris ~=~~middotiill~~ tf llDln~n1rJrgt11nbull1ric ~IPgt9nq~ It-MU rbull RflrrlllVllbulltPllbullOIIUAfC lbullnJtrNbull_~lD+4ftJSHJ7711JrllIIIIT144lDI lbulll ~I llfs-mllThn~-f 1bull11

1a5blH=i5gS El~ iE =iilli ~ID aH~~ ~~ leJINNllllfflnlt10ff1nll~1g=TI==~- lbullN~Jmiddot pw nrwuhtl tba11 l- lllllsectimiii~ ~ lllaquot ll116UW41 llllII NII Cl Ld bullt ll 11r 111~-~lHtl-IINOClll 1Dgtn~rMOtnllfbull3all)Mnr~bullwrmm11uoo~ ~r~ m~ = ~~ t~-i m NNtotl n11nn cm

~~~~~Ttr~ in Httl01llxl nlfM114ta cm

JJN n=-PIW - I- C lbullT rnr nnubullNoXI ffllPI n1 11-amp 11middot 77)111fflffPl~JlaUII

i1JJ n91lbull ti Jnlftbulllll QII

~g=~~~~ir~f~5 =i~=~~ ~=~ ~ ~j====goi H1111t-llll ffo~ ~rn tm111 ta1Vl~ tnar- IVI rm u1i ~ nw ~illl cm 1111 Hltt1H T7U 72w111ll tm UI ftffiH~bull1 naMUlI nlll

lltfll~IOUl rnes~ttlClll

~I~~=~=~~= l3111ratlQOJ121lllll CS u1n-n-a mn-c~11111llllilr ~====m~~ lbulllllr~~Oll~r1111-t~rtRiHa)toI

-~rt~_Utr111tt~USI ~m~i==r~~llfflpound1gtgtMllkllit1U10C011 annrxnbull-TCRL11ai~=~=~g)llllll~--rWltMJtt-8 DR Pl rraquof ntl rim Gllf CCI~~1r~~ liiilllii u- ntlt bull llJ~naJCDI

raquo11NMl10~Ullllcm ntrlnK)fL~nlln-1c lllf ~--TlJaft_Lmc i lbull1 bull l3il0 Nl-197) Ttlll1344 a LbullI 3 l diams 1-111 lflS 1111lOllt ffl- MP PII bullHI lgtl llJI l97Mlt Ian -ti DG llC

111111===-~~~=mg ====~~ tD rlrffllZllIITO-lfllCIIII=~tr~L~~~= - Pl~I llII TD_ ff~ tDII31119NIJMlDffU~~ H CZIII liii~mlt~ D1111nrn11GQ~-CaKftQNJWNczr41140ffnQCUII Jnffnt1JIIIIJunbull~1Qc20lll ~Pllli ll mrnnn lbulltlP 17Jrffdeg-degluoElJIIIQII

~-I-ti _nrna~rlll

a n- 4411 llbullQI 1=40 rt La n- lllf ffrgtn _Jr_~ Ullk ---rr~~ ~=~=tl~~ =1 nttltt nraquo 1nlU as

=-mn--~111DJIDII Ullgt~fflflnanaaJIIJalt55~~EIS~=~~ ~~)1 -11CIJII nn~bullbullbullnaKatt1ta1

JOIT ru~- rf- deg hJIIII r- 111111 ~1111) -1 aJ1 ld t11D1etlll_TalCIS -~-UCV~bullraquootur=~=~I~~=~--~ ~rsrgo_mlaquoshym rs~11flI ~- rnilr==~=~~ ~~r _ ~ atfl ~ rtw Dgtlnn-f-lEllln17n-UIIP

D11 fflXTJ111111 I~~ ar D1Jn4 ~leJJS-OnC111

=====5 middoti SHU=~ 5 ampn iliiiiiIiI11

ngtgtn~1~1tbullubull1rm DH tu~- lt11 rirmU1111 CDIII

~i~i555mi~ ~~ ~m=~==m~g===~~~~ tn1r JtW ~ma- PiOll a CU

~ XNr~t~fDllll1-all~~ m===~~ bullbull~W 111111 ==~~ ampT g~ ru~ =

~lU $Et=ni ~ llll0111ra1Ln~otqC011

H~ g==i =~1 ~

~111111 ~~g~n~a~J))pound11 1=~)6tia

~~ mEfHfH~Si

amp12Ct _ an ~

U N711f21th mM1LU aa o1bull~--117CII in4r ~llllll1Vffl-111Dlr lit~ Hmtlpound1 71 12L I CCIII ---~CUnMIIUOCVf JIHtlnn nl 7r ll4011CIIII

llllDNXCWZflDtlltllCIDCDr

~~=~==~=gnn n1raquoL bullw noanDNt CIJIIi=~ C~middot ~ ~ ~ HnffTI-QIJroQ__111PtlJIIInfflll bullbull1~ aaeIT t-- nrJD nJUntu~CllWI

m ~1 ~ ~~~ ~ ilria~gliiiji~=ir ~lt-OTT gl1raquo ~Iraquou fflllIL nllll 1111111 flC~middotIY_4allCCIIIi l1i5~ ~~11~middot~ ~~ ffll H71W786lll 7P-JOalllllll 2N ~ 1-flllt 7HIJl4- DI ~ ~==~ ~t-tr bullM-

114 Hit71aTra7ririatNOCIIII

llHl1Hf ll~7Dl4fIZIIICIIII 1141ftillf+1DllnTgtlMa~=~bull==~r Lbulll-lllbullbulllJJ

=~~~HR-~a ~ =iEri ~ ~=6

= 1MESE COCIIIOlfAlEi ARC 9~ at AH DISTlfG CONJmOfS AS-alLT FED 5UKiEY Y NORWDal EJICltJIJll(G CD~ IIElMEN ~ 1S 111 DECDaR a 2DII 1)pound OCICIIIDNAlES 5HCflI UIpound IIAID Cit MltSSAOfllffT5 STATE FlJriNII CDCffllNAT smult ~AO leJ (IMIJ 1HE ACQlltACY ltF 1HE COCftDINT[ LDCAnatS Mpound diams- 01 FtU

POINT DESCRIPTION ABBREVIATIONS~-~middotPC Pmlr Of CLIRIJC bullIEllL ClMNpound STilRlS PDC bull PtJtilTIIJOM1poundr ~ [raquo TAHCINiT W(R[ lll[ CURpound uroo Fo F[1NT(1t~tfflvt[ltft1llllIIUlt OMNtilE)PRC ~T oT ~pound ~Vlllrlt

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 2 of 2

I ~ IHAT nfl PlM MS 81D1 PIIDMQl ~WllTM(llUI MOIIEOIAAlPlllR~Df IIUPS C- lttE ~111 Cl__ HftNMIIIZlt

WWWWJU Cii6 liftitit

ACTIVITY ANI) USE LINTATIONS

PLAN OF RES7RIC1EJJ AREAS ANJJ COlER TYPES

8V CKlJ()RN IJNl()N PflllfpoundCpoundS SlllERFIIMJ SITC

50 HJ S(J11( SmEpoundT llAIPOIL JASS

=r-o ~ ll 2021

~ Engmeer1ng

Hltd ~~ middot~~-=~ra (f~AJ lIQ c- f

a llfEET 2 ltF 6324-02

td ~

w ~ m 0 0

Id Q ii w m

co co m 0 co

Bk 39600 Pg437 88608

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY New England Region

Five Post Office Square - Suite 100 Boston Massachusetts 02109-3912

INSTITUTIONAL CONTROL DESIGN STATEMENT FOR THE BLACKBURN AND UNION PRIVILEGES SUPERFUND SITE - EAST OF SOUTH STREET AREA

1 Introduction

Pursuant to the Comprehensive Environmental Response Compensation and Liability Act 42 USC sect 9601 et seq (CERCLA) and the National Contingency Plan 40 CFR Part 300 (the NCP) this document contains a description of the release events and site history that resulted in the contaminated media that require institutional controls in the fom1 of Activity and Use Limitations the basis for land use restrictions and uses that are consistent and inconsistent with the Selected Remedy ( as described below) This Institutional Control (IC) Design Statement pertains to a portion of the Blackburn and Union Privileges Superfund Site located in the Town of Walpole Massachusetts (the Site) which has been listed on EPAs National Priorities List (NPL) which portion is generally referred to as the East of South Street Area (the EOS Area) The EOS Area is located to the east of South Street in Walpole and is shown on Figure 1 attached hereto

A Notice of Activity and Use Limitation (NAUL) is necessary and appropriate for the EOS Area of the Site based on the fact that pursuant to EPAs risk evaluations asbestos arsenic trichloroethene (TCE) and certain polycyclic aromatic hydrocarbon (PAH) contan1inants remain in place in soils at levels higher than those appropriate for unlimited use or unrestricted exposure groundwater underlying the EOS Area contains hazardous substances at levels that present an unacceptable risk of exposure and remedial measures at the Site must be protected and maintained to ensure that the Selected Remedy remains protective

EPAs Record of Decision (ROD) dated September 30 2008 specified the need for institutional controls such as a NAUL to ensure long-tenn perfonnance and protectiveness of the Selected Remedy The institutional controls described herein are necessary and appropriate to ensure that the Selected Remedy for the Site remains protective of human health and the environment The remedy for the Site as described in the ROD is referred to herein and in the NAUL as the Selected Remedy

Page 1 of7

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 25: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

Bk 39600 Pg430 88608

Point Number Northing Easting Type Curve

Len2th Curve Radius

3249 287 57514570 7237372360 PC l=ll05 R=1993

3250 287 57 588060 7237452980 PT

3251 28757631382 7237429676 PC L=2244 R=2352

3252 287 5765 6810 7237537876 POC

3253 2875 762 9720 7237645671 PT

3254 28756940655 7238952710 PC l=1493 R=1509

3255 28756901845 7239015577 POC

3256 2875683 7836 7239052474 PT

3257 28758104824 7237653014 COR

3258 28758028960 7237800160 COR

3259 28757949530 7237760790 COR

3260 28757901005 7237855021 COR

3261 28757839230 7237820908 PC L=273 R=l33

3262 28757830688 7237799810 PCC L=539 R=2144

3263 28757852974 7237750897 PT

3264 28757891705 7237688178 PC L=lS26 R=2432

3265 28757948636 7237637880 POC

3266 287 58018307 7237607597 PT

3248 28757467350 7237345620 COR

3267 28757550832 7237363444 POC L=2653 R=80000

3268 28757668809 7237424132 PT

3269 28757504 719 7238817989 COR

3270 28757493010 7238842230 COR

3271 28757561074 7238880970 COR

3272 28757483953 7239024127 PC L=323 R=l70

3273 28757459939 7239037846 PT

3274 28757311605 7238957122 PC L=1388 R=906

3275 2875727 2732 7238901647 POC

3276 28757283181 7238834718 PT

3277 287 5733 4061 7238752337 PC L=255 R=l60

3278 287 5735 5527 7238744411 PT

3279 2875 7102815 7239517199 PC l=261 R=l70

3280 28757080654 7239525307 PCC l=909 R=1275

3281 2875 700 5390 7239477911 PCC L=l007 R=990

3282 28756999624 7239381704 PT

3283 2875707 7705 7239230604 PC L=ll14 R=907

Exhibit B lo NAUL-Part IlbullEOS Coordinate Tables Page 10 of13 April 14 2021

3285

3290

3295

3300

3305

3310

3315

Bk 39600 Pg431 88608

Point Number Northing Easting Type

Curve Leneth

Curve Radius

3284 28757168066 7239178102 PT

28757205717 7239186398 PC L=518 R=930

3286 28757249003 7239213534 PCC L=l41 R=086

3287 2875724 7909 7239226048 PT

3288 28758415755 7239842757 PC L=251 R=l59

3289 28758437695 7239837379 PT

28758456377 7239846949 PC L=812 R=876

3291 28758494897 7239915165 PCC L=456 R=757

3292 28758483790 7239958646 PT

3293 28758405147 7240111348 PC L=l057 R=955

3294 28758318136 7240161452 PCC L=477 R=l063

28758272407 7240149529 PCC L=250 R=l60

3296 28758265647 7240128003 PT

3297 28758157937 7237680895 COR

3298 28758902927 723807 1969 COR

3299 28758852531 7238168280 COR

28758779660 7238129750 COR

3301 28758746973 7238192072 COR

3302 2875807 6630 7237840490 COR

3303 28758049940 7237894220 COR

3304 2875871 7997 7238243620 COR

28758680103 7238315946 COR

3306 28758533699 7238239240 COR

3307 2875852 6899 7238252220 COR

3308 28758098180 7238027600 COR

3309 28757974484 7238264223 COR

28757957598 7238255513 COR

3311 28757757732 7238637845 COR

3312 28757774584 7238646620 COR

3313 28757653710 723887 7846 COR

3314 28757560920 7238829340 COR

28759004930 7238125514 COR

3316 28759689797 7238485028 PC L=1992 R=2609

3317 28759697204 7238583760 POC

3318 28759667288 723867 8142 PT

3319 28758996126 7238323718 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 11 of 13 April 14202 I

Bk 39600 Pg432 88608

Point Number

Northing Easting Type Curve Lenfth

Curve Radius

3320 28759028950 7238261560 COR 3321 28758954486 7238222188 COR

3322 28758972523 7238378387 COR 3323 28759421550 7238613630 COR 3324 28759377933 7238698105 COR 3325 2875907 4811 7238539289 COR 3326 28759081611 7238526309 COR 3327 28758935210 7238449604 COR

3328 28759464470 7238637330 COR 3329 28759632674 7238722481 PC L=ll83 R=l578

3330 28759583973 7238755474 POC 3331 28759526573 7238768343 PRC L=2163 R=2455

3332 28759422964 7238796123 POC 3333 28759341091 7238865430 PT

3334 28759193370 7239050710 COR 3335 28759416340 7239163940 COR 3336 28759263600 7239455620 COR 3337 28759043690 7239336510 COR 3338 28758935490 7239552130 COR 3339 28757650890 7238883240 COR 3312 28757774584 7238646620 COR 3311 28757757732 7238637845 COR 3310 28757957598 7238255513 COR 3309 28757974484 7238264223 COR 3308 28758098180 723802 7600 COR 3307 28758526899 7238252220 COR 3306 28758533699 7238239240 COR 3340 28758700033 7238326388 COR 3341 28758675436 7238373334 COR 3342 28758733013 7238403500 COR 3343 28758760858 7238350353 COR 3344 28758860952 7238402796 COR 3345 28758833106 7238455943 COR 3346 28758890683 7238486109 COR 3347 28758915280 7238439162 COR 3326 28759081611 7238526309 COR 3325 28759074811 7238539289 COR

Exhibit B to NAUL-Part H-EOS Coordinate Tables Page 12 of l3 April 14 2021

Bk 39600 Pg433 88608

Point Number

Northing Easting Type Curve Len2th

Cunbulle Radius

3324 2875937 7933 7238698105 COR

3082 28757068320 7240314640 COR 3083 28757602980 7240594310 COR 3349 28757790234 7240236327 COR

3348 28757255574 7239956657 COR

3124 28757716516 7241351659 COR 3125 28757288251 7241140719 COR 3126 28756725827 7240851862 COR 3127 28756162468 7240586126 COR 3128 287 55614498 7240338506 COR 3129 28754346745 7239768507 COR 3130 28753845716 7239540194 COR 3131 28753257436 723927 8634 COR 3132 28752466355 7238929370 COR 3133 28751819340 7238643698 COR 3134 2875118152 7 7238364939 COR 3135 2875080 7772 7238199071 COR 3136 28750413263 7238019301 COR 3350 28750296168 7238284525 COR 3351 28754 78 6636 7240267040 COR 3352 28757412029 7241794586 COR

POINT DESCRIPTION ABBREVIATIONS

COR=CORNER PC= POINT OF CURVE WHERE CURVE STARTS POC -= POINT ON CUR VE PT=POINT OF TANGENCY WHERE THE CURVE ENDS PCC = POINT OF COMPOUND CURVE (WHERE RADIUS CHANGES) PRC = POINT OF REVERSE CURVE

NOTES

THE COORDINATES ARE BASED ON AN EXISTING CONDITIONS AS-BUILT FIELD SURVEY BY NORWOOD ENGINEERING CO INC BETWEEN NOVEMBER 15 TO DECEMBER 18 2019 TI-IE COORDINATES ARE BASED ON l1ASSACHUSETIS ST A TE PLANE COORDINATE SYSTEM NAD 1983 (FEET) THE ACCURACY OF THE COORDINATE LOCATIONS ARE +-0J FEET

Exhibit B to N1UL-Part II-EOS Coordmate Tables Page 13 ofl3 April 14 2021

---

1f~ flJr ~i

f ~~ J~i](M~I ~ 1 jf~ ~~f W-- )e 1

It lj fY pl ~-~j

I --- ~ ~

1 (J-c~ er ~

C JI fl JYf

1 ~ ~Yu-~ 1i

~r

( LOClJS P

SCAUllbulliQO

I ar lMIT flG PINI tMS _ lIIPMIDMICXNllRlnT~tlCfllUS 1111D cmuftraquodl s - NIKl1III tfIJIIIIIOfM~1HCll allE1

DAre Jllrl

NUKIJU LU6 DMitM

mmtG6DKbdlt

~4~-middot

~~I

-- ampnbullllf~ ~ fa

LEGEND 0

-i~wr0o-m lICUUoaampbullco--11111 _ _l_J

0

bull ~-ail_I

~-

mo(I ---fwj

amp~~~~ ~ ~~ltgtmiddot ~A~

~6

_L-r

bull -~ IBP__l-11Uil n-rlfl-lffll rMCllI 1a 1rr ai

-~ lll-lliI u-W--11a 1 Ml[ 411 amt l0IIC 3JICJ7 ~ 33-1--I- DIID llXII D111 JlMZ 411 lraquo- ~lUN~t --- - etMpound 11JII

~ MffD mmaat ZL I01t 111

1Jlll~-IICfIQfJICIISJ DfEI IC71- I~ 1~ 9 Cl 1VY IICIIWCLl~fCSC~lNCl

~11HltOXW1A~JtCI~llfB MXIC 1HI lME INCi 111M bull11 (S 1f41~middot~-~-)

~ io

0 0 0 0 -0 0 0 D O 1 middot tbull O

_- _pound ~ - Tf middot- ---r ~~ ~~- ~=middoti

r jil7bull --------4~-middot~

(

SCAtpound 1bull bull YI

I ~ tfAIE lIMa toafllltl1E ~NAD1w1(rJ

1 ~ PlIla II MMt QI 11D TD D111oPl

~c1MlntID9~~-l 1NIIJIIKlNI LnlJTU ~ deg qllAJSTE uM011111 iu1II 1111ZT IIIILJaZ

Exhibit C - Photo-Reduced Copy of Activity and Use Limitations Plan of Land

--~middot---

I ~111-11111

iiiii

-ill111liilt

ACJIYIJY ANJ) lJSE lJJll7ATJONS PLAN OF LANI)

81ACJ(81R1 I IINION Flr11lfES SllffllF7AVO SIle

o tfO SOIJIH s1ar HlltlPOtL IIAS

SCAlElrJAt IPfffl152021

1IJrwod Eng1neerlng

- EnQlbullHrlflg Compaffy middot~~=~ m Cm1JQ u fnfJa-eal

~ -

-~

9l1EET 1 OF I 8324-02

td ~

w ~ m 0 0

Id Q ii w ii

co co m

co 0

-l

~-77--raquo- -~I~ )middot~ ~ bull _I lT ~ v~

AI ~ If ~)middot~ 7- ~1 c t11 yil ~ ~ ~middot~41 bull1 l ~~l(i~r~1 f7 )ll y-

~~ f -~ -v fgtV ~ ~ ~ l er-- u -

tl x-P~C ()

JP yen f(( 11 1degpoundS -~ (

ftunrTfflllllTnallJrNNQWDf ~ ti IZNtRlTT lnH M IULS IIJIUIUlA-DlltlllllDlJlllIICIF tJbllt~llC~lJNp

DTl NlllltaJatl-Witiill (raquo11 iiiK(+til

I aJnlTlKATJlfl PlAH~ THE PUIIJll1T UC TIUlf Mlaquo THE l5 11 oawG ~ NII 1Hpound1as Of1111E111 AMllfrlTll9laquolllt Mpound ntem OPlaJ CJ1 IWM1pound BREn 011 bulln

~ ~illi~fli~ _lt ---c~-Clmiddot~~c0-nmiddotmiddot~bullJmiddot04~- ~--~--yen~~bull - L -bull -n ~ -r - ~ -

it

~ fr ~ ~- -~bull~bullv OG- ~n0

bull--ltmiddot middot~ -~- ~~-=~7~st~-~~~~i~~Hil~-) 2~C 0 ~~~~~ --------Y-Tgt-bullbullmiddot-

U-IU ~middotshy =i==-

bullbull bull _ -middot-

~----- ( ~11middot

__IC1ZMJ - bull IOC)0l lftEf ___ i gt mEKJllJfNG rotJ1FRIIIT AIIEAS B~ p~ AIIEAS ~ea-vmiddot LIUIID

~ e--- -+ ~ rzprz1za 1 ~ IJTATC PRC ~TC

nJml lltPtasCltJ

DUD BCD lJlll7 PMC 4H 1 1 YERT1CAL M1llI II NCCI ~ _ ro conurr DOD 80CIC 3JII07 llME 4H I ntaM NUIU 1121 IJ4TAI m IMlC 111111 nATIIW ~fsi

tJMAlfflOlI) AIIEAS1 bull 11AMJSCAlfl) AlpoundAS Lill] 1Dll IOlII POT PlCit 6115 J)-t20 ~atfnujK~tlLWlQI

~PUNMl-17 POflTIVNf1Ell llaD BaalC Tl_ Paa bullbull - 99 a 11

_-ijf1iltDP~IZ~ 5CME - JOSUva1fTLJ ~ ~-rr 111 C tMI=

bull111 I~

i=iiii7

~ e---

t c z rl

L-n11 ~

ACJIVJTY AND USE LIAlffAJIONS

PIAN OF RESTRIC1EJJ AREAS ANJJ COVER TYPES

fltACK1(fN _ llNlltgtI PfMIECCS SllPVFVNlJ51Tlt

JO _ lxJ srJllH STREET IIALPrJU JASS

SCAU I - 30 APRIL 2021

lcnwod Engineering

llarwood Cngnrilgtf cpmy -t~~~~

fIL Pllpa-ru - (1u]1a-lftll

~L=wl f 01~JII IO_

a SIEET I (F 2 B324-02

bj ~

w 0

0 0 deg It

iQ ~ w l11

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 1 of 2

CX) CX)

deg CX) 0

ntllT -1~1~ rurnlaquo1 r1n l1XTM 11Nf -r~ lie UUffCI 11Pt lDll1Hf iniin --IC unr1G Tlr 1n1rn Iota allll Ito tyen1tlll ~~11CRnrzJ11-11--~ci-- n31 nr111w11J1t ~bull c ~- diams JDrnn llloffl rcnlml IDII

-~ ]al rll _ _ PnlM-1-PI lbull-- ll7HrirrIPlllD1lf~-a bullbullll 111bull IClln9XnolDlllIIIIIIOm

214 ff7371JOOT ~bull JllC Ibullbull 171 JICllEY)l)vlUTlo~lUl~ ~li_~ -~~ MDlol ll4L~TllJraquofllllf190abullbullt ~~nQuu~~1aJI _~~OtottWU~1t11txm~arcPbrmllmCDt ~~ ~~ ~ =~ gj ~l11~ llltlM Mrattllll TDPmllIDCDI JJ4bull e~ _ ~ e PClC lbullI- 1- ~1sect~ ~ ~ ~ ~ ~~~-nr~44bull~mn11-a11 ~~ =mt =m~ ~ ~~ ~ =~~-~~ =~~rt~l~llibullltbull=

~~~~~~~~r-~r-~~sectsect55~55 ~~ ~=g~~ mi --1~ ~-==~~m~ L-~r UVPllrlllUillDITDr4L 1JI lbullKlllll~==~~~=~

~~~~~~~~ raquoff-llll 111rritl_aianbull ~11lCla rr- n ttll XDP11r1r 11111c-1C111~ RTl~rJlllllbullbull~llllJlllipo~~=r~tm=~~

~=~3r~t==~ ~=~i==~~ llt1ttl70 m~~n~ =n~ L diams 11- bull - iaEi~mi 1lE~HHffi ~1-~ E LbulllT bullU-7YA 8911U TMn4 OJII C- lllkHrnl1nlntll11106~

MJ9~gt111ftlrfffll11 ~ SbullC61hLJT raquoWl lll~IJlll11amp1 utVllllt a lbulllfGl bulllC lT

lliilH~1 ~~rm-=rn~ lbullIIIICU-1bull0

itt ishwI JUo ma m1 bull 1-c iiliii ~==~m~=~ Ullln U7IIY M1NLl411 fflf f-~ llr IL ~ lbullt Ill uaP11rllDn1rin1bull139nf- na_ 1111lnl ___ lWTDf-ID 111Jbullnllr-cishy

J1JT1 lflTI-noLbull COi lJ1 tsr18GOTDrl1~ 1--Cn ~~~==-=~ LbullS1rbull-p

LbulllI ~middot x1 fl11bull diams an l~J P-~ WI 1~1Slrmsraquo11nirorn 11bull1n-

llrgt 58 - TDrl ZJlJ l~ Zl llf4 Pll1raquo91I lnP~IIEI 11 ==~=-~~ lbullt-11bullh1~

nun_-~bullfllrlll_ lbulll-lrbull N- - nr6-11MII rinaus a 1bull1E-t1 im1 nrxi mr~ 7nn1 4i i 1c m llrS~iJ-ltJlillII Tt-Ul ris ~=~~middotiill~~ tf llDln~n1rJrgt11nbull1ric ~IPgt9nq~ It-MU rbull RflrrlllVllbulltPllbullOIIUAfC lbullnJtrNbull_~lD+4ftJSHJ7711JrllIIIIT144lDI lbulll ~I llfs-mllThn~-f 1bull11

1a5blH=i5gS El~ iE =iilli ~ID aH~~ ~~ leJINNllllfflnlt10ff1nll~1g=TI==~- lbullN~Jmiddot pw nrwuhtl tba11 l- lllllsectimiii~ ~ lllaquot ll116UW41 llllII NII Cl Ld bullt ll 11r 111~-~lHtl-IINOClll 1Dgtn~rMOtnllfbull3all)Mnr~bullwrmm11uoo~ ~r~ m~ = ~~ t~-i m NNtotl n11nn cm

~~~~~Ttr~ in Httl01llxl nlfM114ta cm

JJN n=-PIW - I- C lbullT rnr nnubullNoXI ffllPI n1 11-amp 11middot 77)111fflffPl~JlaUII

i1JJ n91lbull ti Jnlftbulllll QII

~g=~~~~ir~f~5 =i~=~~ ~=~ ~ ~j====goi H1111t-llll ffo~ ~rn tm111 ta1Vl~ tnar- IVI rm u1i ~ nw ~illl cm 1111 Hltt1H T7U 72w111ll tm UI ftffiH~bull1 naMUlI nlll

lltfll~IOUl rnes~ttlClll

~I~~=~=~~= l3111ratlQOJ121lllll CS u1n-n-a mn-c~11111llllilr ~====m~~ lbulllllr~~Oll~r1111-t~rtRiHa)toI

-~rt~_Utr111tt~USI ~m~i==r~~llfflpound1gtgtMllkllit1U10C011 annrxnbull-TCRL11ai~=~=~g)llllll~--rWltMJtt-8 DR Pl rraquof ntl rim Gllf CCI~~1r~~ liiilllii u- ntlt bull llJ~naJCDI

raquo11NMl10~Ullllcm ntrlnK)fL~nlln-1c lllf ~--TlJaft_Lmc i lbull1 bull l3il0 Nl-197) Ttlll1344 a LbullI 3 l diams 1-111 lflS 1111lOllt ffl- MP PII bullHI lgtl llJI l97Mlt Ian -ti DG llC

111111===-~~~=mg ====~~ tD rlrffllZllIITO-lfllCIIII=~tr~L~~~= - Pl~I llII TD_ ff~ tDII31119NIJMlDffU~~ H CZIII liii~mlt~ D1111nrn11GQ~-CaKftQNJWNczr41140ffnQCUII Jnffnt1JIIIIJunbull~1Qc20lll ~Pllli ll mrnnn lbulltlP 17Jrffdeg-degluoElJIIIQII

~-I-ti _nrna~rlll

a n- 4411 llbullQI 1=40 rt La n- lllf ffrgtn _Jr_~ Ullk ---rr~~ ~=~=tl~~ =1 nttltt nraquo 1nlU as

=-mn--~111DJIDII Ullgt~fflflnanaaJIIJalt55~~EIS~=~~ ~~)1 -11CIJII nn~bullbullbullnaKatt1ta1

JOIT ru~- rf- deg hJIIII r- 111111 ~1111) -1 aJ1 ld t11D1etlll_TalCIS -~-UCV~bullraquootur=~=~I~~=~--~ ~rsrgo_mlaquoshym rs~11flI ~- rnilr==~=~~ ~~r _ ~ atfl ~ rtw Dgtlnn-f-lEllln17n-UIIP

D11 fflXTJ111111 I~~ ar D1Jn4 ~leJJS-OnC111

=====5 middoti SHU=~ 5 ampn iliiiiiIiI11

ngtgtn~1~1tbullubull1rm DH tu~- lt11 rirmU1111 CDIII

~i~i555mi~ ~~ ~m=~==m~g===~~~~ tn1r JtW ~ma- PiOll a CU

~ XNr~t~fDllll1-all~~ m===~~ bullbull~W 111111 ==~~ ampT g~ ru~ =

~lU $Et=ni ~ llll0111ra1Ln~otqC011

H~ g==i =~1 ~

~111111 ~~g~n~a~J))pound11 1=~)6tia

~~ mEfHfH~Si

amp12Ct _ an ~

U N711f21th mM1LU aa o1bull~--117CII in4r ~llllll1Vffl-111Dlr lit~ Hmtlpound1 71 12L I CCIII ---~CUnMIIUOCVf JIHtlnn nl 7r ll4011CIIII

llllDNXCWZflDtlltllCIDCDr

~~=~==~=gnn n1raquoL bullw noanDNt CIJIIi=~ C~middot ~ ~ ~ HnffTI-QIJroQ__111PtlJIIInfflll bullbull1~ aaeIT t-- nrJD nJUntu~CllWI

m ~1 ~ ~~~ ~ ilria~gliiiji~=ir ~lt-OTT gl1raquo ~Iraquou fflllIL nllll 1111111 flC~middotIY_4allCCIIIi l1i5~ ~~11~middot~ ~~ ffll H71W786lll 7P-JOalllllll 2N ~ 1-flllt 7HIJl4- DI ~ ~==~ ~t-tr bullM-

114 Hit71aTra7ririatNOCIIII

llHl1Hf ll~7Dl4fIZIIICIIII 1141ftillf+1DllnTgtlMa~=~bull==~r Lbulll-lllbullbulllJJ

=~~~HR-~a ~ =iEri ~ ~=6

= 1MESE COCIIIOlfAlEi ARC 9~ at AH DISTlfG CONJmOfS AS-alLT FED 5UKiEY Y NORWDal EJICltJIJll(G CD~ IIElMEN ~ 1S 111 DECDaR a 2DII 1)pound OCICIIIDNAlES 5HCflI UIpound IIAID Cit MltSSAOfllffT5 STATE FlJriNII CDCffllNAT smult ~AO leJ (IMIJ 1HE ACQlltACY ltF 1HE COCftDINT[ LDCAnatS Mpound diams- 01 FtU

POINT DESCRIPTION ABBREVIATIONS~-~middotPC Pmlr Of CLIRIJC bullIEllL ClMNpound STilRlS PDC bull PtJtilTIIJOM1poundr ~ [raquo TAHCINiT W(R[ lll[ CURpound uroo Fo F[1NT(1t~tfflvt[ltft1llllIIUlt OMNtilE)PRC ~T oT ~pound ~Vlllrlt

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 2 of 2

I ~ IHAT nfl PlM MS 81D1 PIIDMQl ~WllTM(llUI MOIIEOIAAlPlllR~Df IIUPS C- lttE ~111 Cl__ HftNMIIIZlt

WWWWJU Cii6 liftitit

ACTIVITY ANI) USE LINTATIONS

PLAN OF RES7RIC1EJJ AREAS ANJJ COlER TYPES

8V CKlJ()RN IJNl()N PflllfpoundCpoundS SlllERFIIMJ SITC

50 HJ S(J11( SmEpoundT llAIPOIL JASS

=r-o ~ ll 2021

~ Engmeer1ng

Hltd ~~ middot~~-=~ra (f~AJ lIQ c- f

a llfEET 2 ltF 6324-02

td ~

w ~ m 0 0

Id Q ii w m

co co m 0 co

Bk 39600 Pg437 88608

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY New England Region

Five Post Office Square - Suite 100 Boston Massachusetts 02109-3912

INSTITUTIONAL CONTROL DESIGN STATEMENT FOR THE BLACKBURN AND UNION PRIVILEGES SUPERFUND SITE - EAST OF SOUTH STREET AREA

1 Introduction

Pursuant to the Comprehensive Environmental Response Compensation and Liability Act 42 USC sect 9601 et seq (CERCLA) and the National Contingency Plan 40 CFR Part 300 (the NCP) this document contains a description of the release events and site history that resulted in the contaminated media that require institutional controls in the fom1 of Activity and Use Limitations the basis for land use restrictions and uses that are consistent and inconsistent with the Selected Remedy ( as described below) This Institutional Control (IC) Design Statement pertains to a portion of the Blackburn and Union Privileges Superfund Site located in the Town of Walpole Massachusetts (the Site) which has been listed on EPAs National Priorities List (NPL) which portion is generally referred to as the East of South Street Area (the EOS Area) The EOS Area is located to the east of South Street in Walpole and is shown on Figure 1 attached hereto

A Notice of Activity and Use Limitation (NAUL) is necessary and appropriate for the EOS Area of the Site based on the fact that pursuant to EPAs risk evaluations asbestos arsenic trichloroethene (TCE) and certain polycyclic aromatic hydrocarbon (PAH) contan1inants remain in place in soils at levels higher than those appropriate for unlimited use or unrestricted exposure groundwater underlying the EOS Area contains hazardous substances at levels that present an unacceptable risk of exposure and remedial measures at the Site must be protected and maintained to ensure that the Selected Remedy remains protective

EPAs Record of Decision (ROD) dated September 30 2008 specified the need for institutional controls such as a NAUL to ensure long-tenn perfonnance and protectiveness of the Selected Remedy The institutional controls described herein are necessary and appropriate to ensure that the Selected Remedy for the Site remains protective of human health and the environment The remedy for the Site as described in the ROD is referred to herein and in the NAUL as the Selected Remedy

Page 1 of7

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 26: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

3285

3290

3295

3300

3305

3310

3315

Bk 39600 Pg431 88608

Point Number Northing Easting Type

Curve Leneth

Curve Radius

3284 28757168066 7239178102 PT

28757205717 7239186398 PC L=518 R=930

3286 28757249003 7239213534 PCC L=l41 R=086

3287 2875724 7909 7239226048 PT

3288 28758415755 7239842757 PC L=251 R=l59

3289 28758437695 7239837379 PT

28758456377 7239846949 PC L=812 R=876

3291 28758494897 7239915165 PCC L=456 R=757

3292 28758483790 7239958646 PT

3293 28758405147 7240111348 PC L=l057 R=955

3294 28758318136 7240161452 PCC L=477 R=l063

28758272407 7240149529 PCC L=250 R=l60

3296 28758265647 7240128003 PT

3297 28758157937 7237680895 COR

3298 28758902927 723807 1969 COR

3299 28758852531 7238168280 COR

28758779660 7238129750 COR

3301 28758746973 7238192072 COR

3302 2875807 6630 7237840490 COR

3303 28758049940 7237894220 COR

3304 2875871 7997 7238243620 COR

28758680103 7238315946 COR

3306 28758533699 7238239240 COR

3307 2875852 6899 7238252220 COR

3308 28758098180 7238027600 COR

3309 28757974484 7238264223 COR

28757957598 7238255513 COR

3311 28757757732 7238637845 COR

3312 28757774584 7238646620 COR

3313 28757653710 723887 7846 COR

3314 28757560920 7238829340 COR

28759004930 7238125514 COR

3316 28759689797 7238485028 PC L=1992 R=2609

3317 28759697204 7238583760 POC

3318 28759667288 723867 8142 PT

3319 28758996126 7238323718 COR

Exhibit B to NAUL-Part II-EOS Coordinate Tables Page 11 of 13 April 14202 I

Bk 39600 Pg432 88608

Point Number

Northing Easting Type Curve Lenfth

Curve Radius

3320 28759028950 7238261560 COR 3321 28758954486 7238222188 COR

3322 28758972523 7238378387 COR 3323 28759421550 7238613630 COR 3324 28759377933 7238698105 COR 3325 2875907 4811 7238539289 COR 3326 28759081611 7238526309 COR 3327 28758935210 7238449604 COR

3328 28759464470 7238637330 COR 3329 28759632674 7238722481 PC L=ll83 R=l578

3330 28759583973 7238755474 POC 3331 28759526573 7238768343 PRC L=2163 R=2455

3332 28759422964 7238796123 POC 3333 28759341091 7238865430 PT

3334 28759193370 7239050710 COR 3335 28759416340 7239163940 COR 3336 28759263600 7239455620 COR 3337 28759043690 7239336510 COR 3338 28758935490 7239552130 COR 3339 28757650890 7238883240 COR 3312 28757774584 7238646620 COR 3311 28757757732 7238637845 COR 3310 28757957598 7238255513 COR 3309 28757974484 7238264223 COR 3308 28758098180 723802 7600 COR 3307 28758526899 7238252220 COR 3306 28758533699 7238239240 COR 3340 28758700033 7238326388 COR 3341 28758675436 7238373334 COR 3342 28758733013 7238403500 COR 3343 28758760858 7238350353 COR 3344 28758860952 7238402796 COR 3345 28758833106 7238455943 COR 3346 28758890683 7238486109 COR 3347 28758915280 7238439162 COR 3326 28759081611 7238526309 COR 3325 28759074811 7238539289 COR

Exhibit B to NAUL-Part H-EOS Coordinate Tables Page 12 of l3 April 14 2021

Bk 39600 Pg433 88608

Point Number

Northing Easting Type Curve Len2th

Cunbulle Radius

3324 2875937 7933 7238698105 COR

3082 28757068320 7240314640 COR 3083 28757602980 7240594310 COR 3349 28757790234 7240236327 COR

3348 28757255574 7239956657 COR

3124 28757716516 7241351659 COR 3125 28757288251 7241140719 COR 3126 28756725827 7240851862 COR 3127 28756162468 7240586126 COR 3128 287 55614498 7240338506 COR 3129 28754346745 7239768507 COR 3130 28753845716 7239540194 COR 3131 28753257436 723927 8634 COR 3132 28752466355 7238929370 COR 3133 28751819340 7238643698 COR 3134 2875118152 7 7238364939 COR 3135 2875080 7772 7238199071 COR 3136 28750413263 7238019301 COR 3350 28750296168 7238284525 COR 3351 28754 78 6636 7240267040 COR 3352 28757412029 7241794586 COR

POINT DESCRIPTION ABBREVIATIONS

COR=CORNER PC= POINT OF CURVE WHERE CURVE STARTS POC -= POINT ON CUR VE PT=POINT OF TANGENCY WHERE THE CURVE ENDS PCC = POINT OF COMPOUND CURVE (WHERE RADIUS CHANGES) PRC = POINT OF REVERSE CURVE

NOTES

THE COORDINATES ARE BASED ON AN EXISTING CONDITIONS AS-BUILT FIELD SURVEY BY NORWOOD ENGINEERING CO INC BETWEEN NOVEMBER 15 TO DECEMBER 18 2019 TI-IE COORDINATES ARE BASED ON l1ASSACHUSETIS ST A TE PLANE COORDINATE SYSTEM NAD 1983 (FEET) THE ACCURACY OF THE COORDINATE LOCATIONS ARE +-0J FEET

Exhibit B to N1UL-Part II-EOS Coordmate Tables Page 13 ofl3 April 14 2021

---

1f~ flJr ~i

f ~~ J~i](M~I ~ 1 jf~ ~~f W-- )e 1

It lj fY pl ~-~j

I --- ~ ~

1 (J-c~ er ~

C JI fl JYf

1 ~ ~Yu-~ 1i

~r

( LOClJS P

SCAUllbulliQO

I ar lMIT flG PINI tMS _ lIIPMIDMICXNllRlnT~tlCfllUS 1111D cmuftraquodl s - NIKl1III tfIJIIIIIOfM~1HCll allE1

DAre Jllrl

NUKIJU LU6 DMitM

mmtG6DKbdlt

~4~-middot

~~I

-- ampnbullllf~ ~ fa

LEGEND 0

-i~wr0o-m lICUUoaampbullco--11111 _ _l_J

0

bull ~-ail_I

~-

mo(I ---fwj

amp~~~~ ~ ~~ltgtmiddot ~A~

~6

_L-r

bull -~ IBP__l-11Uil n-rlfl-lffll rMCllI 1a 1rr ai

-~ lll-lliI u-W--11a 1 Ml[ 411 amt l0IIC 3JICJ7 ~ 33-1--I- DIID llXII D111 JlMZ 411 lraquo- ~lUN~t --- - etMpound 11JII

~ MffD mmaat ZL I01t 111

1Jlll~-IICfIQfJICIISJ DfEI IC71- I~ 1~ 9 Cl 1VY IICIIWCLl~fCSC~lNCl

~11HltOXW1A~JtCI~llfB MXIC 1HI lME INCi 111M bull11 (S 1f41~middot~-~-)

~ io

0 0 0 0 -0 0 0 D O 1 middot tbull O

_- _pound ~ - Tf middot- ---r ~~ ~~- ~=middoti

r jil7bull --------4~-middot~

(

SCAtpound 1bull bull YI

I ~ tfAIE lIMa toafllltl1E ~NAD1w1(rJ

1 ~ PlIla II MMt QI 11D TD D111oPl

~c1MlntID9~~-l 1NIIJIIKlNI LnlJTU ~ deg qllAJSTE uM011111 iu1II 1111ZT IIIILJaZ

Exhibit C - Photo-Reduced Copy of Activity and Use Limitations Plan of Land

--~middot---

I ~111-11111

iiiii

-ill111liilt

ACJIYIJY ANJ) lJSE lJJll7ATJONS PLAN OF LANI)

81ACJ(81R1 I IINION Flr11lfES SllffllF7AVO SIle

o tfO SOIJIH s1ar HlltlPOtL IIAS

SCAlElrJAt IPfffl152021

1IJrwod Eng1neerlng

- EnQlbullHrlflg Compaffy middot~~=~ m Cm1JQ u fnfJa-eal

~ -

-~

9l1EET 1 OF I 8324-02

td ~

w ~ m 0 0

Id Q ii w ii

co co m

co 0

-l

~-77--raquo- -~I~ )middot~ ~ bull _I lT ~ v~

AI ~ If ~)middot~ 7- ~1 c t11 yil ~ ~ ~middot~41 bull1 l ~~l(i~r~1 f7 )ll y-

~~ f -~ -v fgtV ~ ~ ~ l er-- u -

tl x-P~C ()

JP yen f(( 11 1degpoundS -~ (

ftunrTfflllllTnallJrNNQWDf ~ ti IZNtRlTT lnH M IULS IIJIUIUlA-DlltlllllDlJlllIICIF tJbllt~llC~lJNp

DTl NlllltaJatl-Witiill (raquo11 iiiK(+til

I aJnlTlKATJlfl PlAH~ THE PUIIJll1T UC TIUlf Mlaquo THE l5 11 oawG ~ NII 1Hpound1as Of1111E111 AMllfrlTll9laquolllt Mpound ntem OPlaJ CJ1 IWM1pound BREn 011 bulln

~ ~illi~fli~ _lt ---c~-Clmiddot~~c0-nmiddotmiddot~bullJmiddot04~- ~--~--yen~~bull - L -bull -n ~ -r - ~ -

it

~ fr ~ ~- -~bull~bullv OG- ~n0

bull--ltmiddot middot~ -~- ~~-=~7~st~-~~~~i~~Hil~-) 2~C 0 ~~~~~ --------Y-Tgt-bullbullmiddot-

U-IU ~middotshy =i==-

bullbull bull _ -middot-

~----- ( ~11middot

__IC1ZMJ - bull IOC)0l lftEf ___ i gt mEKJllJfNG rotJ1FRIIIT AIIEAS B~ p~ AIIEAS ~ea-vmiddot LIUIID

~ e--- -+ ~ rzprz1za 1 ~ IJTATC PRC ~TC

nJml lltPtasCltJ

DUD BCD lJlll7 PMC 4H 1 1 YERT1CAL M1llI II NCCI ~ _ ro conurr DOD 80CIC 3JII07 llME 4H I ntaM NUIU 1121 IJ4TAI m IMlC 111111 nATIIW ~fsi

tJMAlfflOlI) AIIEAS1 bull 11AMJSCAlfl) AlpoundAS Lill] 1Dll IOlII POT PlCit 6115 J)-t20 ~atfnujK~tlLWlQI

~PUNMl-17 POflTIVNf1Ell llaD BaalC Tl_ Paa bullbull - 99 a 11

_-ijf1iltDP~IZ~ 5CME - JOSUva1fTLJ ~ ~-rr 111 C tMI=

bull111 I~

i=iiii7

~ e---

t c z rl

L-n11 ~

ACJIVJTY AND USE LIAlffAJIONS

PIAN OF RESTRIC1EJJ AREAS ANJJ COVER TYPES

fltACK1(fN _ llNlltgtI PfMIECCS SllPVFVNlJ51Tlt

JO _ lxJ srJllH STREET IIALPrJU JASS

SCAU I - 30 APRIL 2021

lcnwod Engineering

llarwood Cngnrilgtf cpmy -t~~~~

fIL Pllpa-ru - (1u]1a-lftll

~L=wl f 01~JII IO_

a SIEET I (F 2 B324-02

bj ~

w 0

0 0 deg It

iQ ~ w l11

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 1 of 2

CX) CX)

deg CX) 0

ntllT -1~1~ rurnlaquo1 r1n l1XTM 11Nf -r~ lie UUffCI 11Pt lDll1Hf iniin --IC unr1G Tlr 1n1rn Iota allll Ito tyen1tlll ~~11CRnrzJ11-11--~ci-- n31 nr111w11J1t ~bull c ~- diams JDrnn llloffl rcnlml IDII

-~ ]al rll _ _ PnlM-1-PI lbull-- ll7HrirrIPlllD1lf~-a bullbullll 111bull IClln9XnolDlllIIIIIIOm

214 ff7371JOOT ~bull JllC Ibullbull 171 JICllEY)l)vlUTlo~lUl~ ~li_~ -~~ MDlol ll4L~TllJraquofllllf190abullbullt ~~nQuu~~1aJI _~~OtottWU~1t11txm~arcPbrmllmCDt ~~ ~~ ~ =~ gj ~l11~ llltlM Mrattllll TDPmllIDCDI JJ4bull e~ _ ~ e PClC lbullI- 1- ~1sect~ ~ ~ ~ ~ ~~~-nr~44bull~mn11-a11 ~~ =mt =m~ ~ ~~ ~ =~~-~~ =~~rt~l~llibullltbull=

~~~~~~~~r-~r-~~sectsect55~55 ~~ ~=g~~ mi --1~ ~-==~~m~ L-~r UVPllrlllUillDITDr4L 1JI lbullKlllll~==~~~=~

~~~~~~~~ raquoff-llll 111rritl_aianbull ~11lCla rr- n ttll XDP11r1r 11111c-1C111~ RTl~rJlllllbullbull~llllJlllipo~~=r~tm=~~

~=~3r~t==~ ~=~i==~~ llt1ttl70 m~~n~ =n~ L diams 11- bull - iaEi~mi 1lE~HHffi ~1-~ E LbulllT bullU-7YA 8911U TMn4 OJII C- lllkHrnl1nlntll11106~

MJ9~gt111ftlrfffll11 ~ SbullC61hLJT raquoWl lll~IJlll11amp1 utVllllt a lbulllfGl bulllC lT

lliilH~1 ~~rm-=rn~ lbullIIIICU-1bull0

itt ishwI JUo ma m1 bull 1-c iiliii ~==~m~=~ Ullln U7IIY M1NLl411 fflf f-~ llr IL ~ lbullt Ill uaP11rllDn1rin1bull139nf- na_ 1111lnl ___ lWTDf-ID 111Jbullnllr-cishy

J1JT1 lflTI-noLbull COi lJ1 tsr18GOTDrl1~ 1--Cn ~~~==-=~ LbullS1rbull-p

LbulllI ~middot x1 fl11bull diams an l~J P-~ WI 1~1Slrmsraquo11nirorn 11bull1n-

llrgt 58 - TDrl ZJlJ l~ Zl llf4 Pll1raquo91I lnP~IIEI 11 ==~=-~~ lbullt-11bullh1~

nun_-~bullfllrlll_ lbulll-lrbull N- - nr6-11MII rinaus a 1bull1E-t1 im1 nrxi mr~ 7nn1 4i i 1c m llrS~iJ-ltJlillII Tt-Ul ris ~=~~middotiill~~ tf llDln~n1rJrgt11nbull1ric ~IPgt9nq~ It-MU rbull RflrrlllVllbulltPllbullOIIUAfC lbullnJtrNbull_~lD+4ftJSHJ7711JrllIIIIT144lDI lbulll ~I llfs-mllThn~-f 1bull11

1a5blH=i5gS El~ iE =iilli ~ID aH~~ ~~ leJINNllllfflnlt10ff1nll~1g=TI==~- lbullN~Jmiddot pw nrwuhtl tba11 l- lllllsectimiii~ ~ lllaquot ll116UW41 llllII NII Cl Ld bullt ll 11r 111~-~lHtl-IINOClll 1Dgtn~rMOtnllfbull3all)Mnr~bullwrmm11uoo~ ~r~ m~ = ~~ t~-i m NNtotl n11nn cm

~~~~~Ttr~ in Httl01llxl nlfM114ta cm

JJN n=-PIW - I- C lbullT rnr nnubullNoXI ffllPI n1 11-amp 11middot 77)111fflffPl~JlaUII

i1JJ n91lbull ti Jnlftbulllll QII

~g=~~~~ir~f~5 =i~=~~ ~=~ ~ ~j====goi H1111t-llll ffo~ ~rn tm111 ta1Vl~ tnar- IVI rm u1i ~ nw ~illl cm 1111 Hltt1H T7U 72w111ll tm UI ftffiH~bull1 naMUlI nlll

lltfll~IOUl rnes~ttlClll

~I~~=~=~~= l3111ratlQOJ121lllll CS u1n-n-a mn-c~11111llllilr ~====m~~ lbulllllr~~Oll~r1111-t~rtRiHa)toI

-~rt~_Utr111tt~USI ~m~i==r~~llfflpound1gtgtMllkllit1U10C011 annrxnbull-TCRL11ai~=~=~g)llllll~--rWltMJtt-8 DR Pl rraquof ntl rim Gllf CCI~~1r~~ liiilllii u- ntlt bull llJ~naJCDI

raquo11NMl10~Ullllcm ntrlnK)fL~nlln-1c lllf ~--TlJaft_Lmc i lbull1 bull l3il0 Nl-197) Ttlll1344 a LbullI 3 l diams 1-111 lflS 1111lOllt ffl- MP PII bullHI lgtl llJI l97Mlt Ian -ti DG llC

111111===-~~~=mg ====~~ tD rlrffllZllIITO-lfllCIIII=~tr~L~~~= - Pl~I llII TD_ ff~ tDII31119NIJMlDffU~~ H CZIII liii~mlt~ D1111nrn11GQ~-CaKftQNJWNczr41140ffnQCUII Jnffnt1JIIIIJunbull~1Qc20lll ~Pllli ll mrnnn lbulltlP 17Jrffdeg-degluoElJIIIQII

~-I-ti _nrna~rlll

a n- 4411 llbullQI 1=40 rt La n- lllf ffrgtn _Jr_~ Ullk ---rr~~ ~=~=tl~~ =1 nttltt nraquo 1nlU as

=-mn--~111DJIDII Ullgt~fflflnanaaJIIJalt55~~EIS~=~~ ~~)1 -11CIJII nn~bullbullbullnaKatt1ta1

JOIT ru~- rf- deg hJIIII r- 111111 ~1111) -1 aJ1 ld t11D1etlll_TalCIS -~-UCV~bullraquootur=~=~I~~=~--~ ~rsrgo_mlaquoshym rs~11flI ~- rnilr==~=~~ ~~r _ ~ atfl ~ rtw Dgtlnn-f-lEllln17n-UIIP

D11 fflXTJ111111 I~~ ar D1Jn4 ~leJJS-OnC111

=====5 middoti SHU=~ 5 ampn iliiiiiIiI11

ngtgtn~1~1tbullubull1rm DH tu~- lt11 rirmU1111 CDIII

~i~i555mi~ ~~ ~m=~==m~g===~~~~ tn1r JtW ~ma- PiOll a CU

~ XNr~t~fDllll1-all~~ m===~~ bullbull~W 111111 ==~~ ampT g~ ru~ =

~lU $Et=ni ~ llll0111ra1Ln~otqC011

H~ g==i =~1 ~

~111111 ~~g~n~a~J))pound11 1=~)6tia

~~ mEfHfH~Si

amp12Ct _ an ~

U N711f21th mM1LU aa o1bull~--117CII in4r ~llllll1Vffl-111Dlr lit~ Hmtlpound1 71 12L I CCIII ---~CUnMIIUOCVf JIHtlnn nl 7r ll4011CIIII

llllDNXCWZflDtlltllCIDCDr

~~=~==~=gnn n1raquoL bullw noanDNt CIJIIi=~ C~middot ~ ~ ~ HnffTI-QIJroQ__111PtlJIIInfflll bullbull1~ aaeIT t-- nrJD nJUntu~CllWI

m ~1 ~ ~~~ ~ ilria~gliiiji~=ir ~lt-OTT gl1raquo ~Iraquou fflllIL nllll 1111111 flC~middotIY_4allCCIIIi l1i5~ ~~11~middot~ ~~ ffll H71W786lll 7P-JOalllllll 2N ~ 1-flllt 7HIJl4- DI ~ ~==~ ~t-tr bullM-

114 Hit71aTra7ririatNOCIIII

llHl1Hf ll~7Dl4fIZIIICIIII 1141ftillf+1DllnTgtlMa~=~bull==~r Lbulll-lllbullbulllJJ

=~~~HR-~a ~ =iEri ~ ~=6

= 1MESE COCIIIOlfAlEi ARC 9~ at AH DISTlfG CONJmOfS AS-alLT FED 5UKiEY Y NORWDal EJICltJIJll(G CD~ IIElMEN ~ 1S 111 DECDaR a 2DII 1)pound OCICIIIDNAlES 5HCflI UIpound IIAID Cit MltSSAOfllffT5 STATE FlJriNII CDCffllNAT smult ~AO leJ (IMIJ 1HE ACQlltACY ltF 1HE COCftDINT[ LDCAnatS Mpound diams- 01 FtU

POINT DESCRIPTION ABBREVIATIONS~-~middotPC Pmlr Of CLIRIJC bullIEllL ClMNpound STilRlS PDC bull PtJtilTIIJOM1poundr ~ [raquo TAHCINiT W(R[ lll[ CURpound uroo Fo F[1NT(1t~tfflvt[ltft1llllIIUlt OMNtilE)PRC ~T oT ~pound ~Vlllrlt

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 2 of 2

I ~ IHAT nfl PlM MS 81D1 PIIDMQl ~WllTM(llUI MOIIEOIAAlPlllR~Df IIUPS C- lttE ~111 Cl__ HftNMIIIZlt

WWWWJU Cii6 liftitit

ACTIVITY ANI) USE LINTATIONS

PLAN OF RES7RIC1EJJ AREAS ANJJ COlER TYPES

8V CKlJ()RN IJNl()N PflllfpoundCpoundS SlllERFIIMJ SITC

50 HJ S(J11( SmEpoundT llAIPOIL JASS

=r-o ~ ll 2021

~ Engmeer1ng

Hltd ~~ middot~~-=~ra (f~AJ lIQ c- f

a llfEET 2 ltF 6324-02

td ~

w ~ m 0 0

Id Q ii w m

co co m 0 co

Bk 39600 Pg437 88608

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY New England Region

Five Post Office Square - Suite 100 Boston Massachusetts 02109-3912

INSTITUTIONAL CONTROL DESIGN STATEMENT FOR THE BLACKBURN AND UNION PRIVILEGES SUPERFUND SITE - EAST OF SOUTH STREET AREA

1 Introduction

Pursuant to the Comprehensive Environmental Response Compensation and Liability Act 42 USC sect 9601 et seq (CERCLA) and the National Contingency Plan 40 CFR Part 300 (the NCP) this document contains a description of the release events and site history that resulted in the contaminated media that require institutional controls in the fom1 of Activity and Use Limitations the basis for land use restrictions and uses that are consistent and inconsistent with the Selected Remedy ( as described below) This Institutional Control (IC) Design Statement pertains to a portion of the Blackburn and Union Privileges Superfund Site located in the Town of Walpole Massachusetts (the Site) which has been listed on EPAs National Priorities List (NPL) which portion is generally referred to as the East of South Street Area (the EOS Area) The EOS Area is located to the east of South Street in Walpole and is shown on Figure 1 attached hereto

A Notice of Activity and Use Limitation (NAUL) is necessary and appropriate for the EOS Area of the Site based on the fact that pursuant to EPAs risk evaluations asbestos arsenic trichloroethene (TCE) and certain polycyclic aromatic hydrocarbon (PAH) contan1inants remain in place in soils at levels higher than those appropriate for unlimited use or unrestricted exposure groundwater underlying the EOS Area contains hazardous substances at levels that present an unacceptable risk of exposure and remedial measures at the Site must be protected and maintained to ensure that the Selected Remedy remains protective

EPAs Record of Decision (ROD) dated September 30 2008 specified the need for institutional controls such as a NAUL to ensure long-tenn perfonnance and protectiveness of the Selected Remedy The institutional controls described herein are necessary and appropriate to ensure that the Selected Remedy for the Site remains protective of human health and the environment The remedy for the Site as described in the ROD is referred to herein and in the NAUL as the Selected Remedy

Page 1 of7

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 27: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

Bk 39600 Pg432 88608

Point Number

Northing Easting Type Curve Lenfth

Curve Radius

3320 28759028950 7238261560 COR 3321 28758954486 7238222188 COR

3322 28758972523 7238378387 COR 3323 28759421550 7238613630 COR 3324 28759377933 7238698105 COR 3325 2875907 4811 7238539289 COR 3326 28759081611 7238526309 COR 3327 28758935210 7238449604 COR

3328 28759464470 7238637330 COR 3329 28759632674 7238722481 PC L=ll83 R=l578

3330 28759583973 7238755474 POC 3331 28759526573 7238768343 PRC L=2163 R=2455

3332 28759422964 7238796123 POC 3333 28759341091 7238865430 PT

3334 28759193370 7239050710 COR 3335 28759416340 7239163940 COR 3336 28759263600 7239455620 COR 3337 28759043690 7239336510 COR 3338 28758935490 7239552130 COR 3339 28757650890 7238883240 COR 3312 28757774584 7238646620 COR 3311 28757757732 7238637845 COR 3310 28757957598 7238255513 COR 3309 28757974484 7238264223 COR 3308 28758098180 723802 7600 COR 3307 28758526899 7238252220 COR 3306 28758533699 7238239240 COR 3340 28758700033 7238326388 COR 3341 28758675436 7238373334 COR 3342 28758733013 7238403500 COR 3343 28758760858 7238350353 COR 3344 28758860952 7238402796 COR 3345 28758833106 7238455943 COR 3346 28758890683 7238486109 COR 3347 28758915280 7238439162 COR 3326 28759081611 7238526309 COR 3325 28759074811 7238539289 COR

Exhibit B to NAUL-Part H-EOS Coordinate Tables Page 12 of l3 April 14 2021

Bk 39600 Pg433 88608

Point Number

Northing Easting Type Curve Len2th

Cunbulle Radius

3324 2875937 7933 7238698105 COR

3082 28757068320 7240314640 COR 3083 28757602980 7240594310 COR 3349 28757790234 7240236327 COR

3348 28757255574 7239956657 COR

3124 28757716516 7241351659 COR 3125 28757288251 7241140719 COR 3126 28756725827 7240851862 COR 3127 28756162468 7240586126 COR 3128 287 55614498 7240338506 COR 3129 28754346745 7239768507 COR 3130 28753845716 7239540194 COR 3131 28753257436 723927 8634 COR 3132 28752466355 7238929370 COR 3133 28751819340 7238643698 COR 3134 2875118152 7 7238364939 COR 3135 2875080 7772 7238199071 COR 3136 28750413263 7238019301 COR 3350 28750296168 7238284525 COR 3351 28754 78 6636 7240267040 COR 3352 28757412029 7241794586 COR

POINT DESCRIPTION ABBREVIATIONS

COR=CORNER PC= POINT OF CURVE WHERE CURVE STARTS POC -= POINT ON CUR VE PT=POINT OF TANGENCY WHERE THE CURVE ENDS PCC = POINT OF COMPOUND CURVE (WHERE RADIUS CHANGES) PRC = POINT OF REVERSE CURVE

NOTES

THE COORDINATES ARE BASED ON AN EXISTING CONDITIONS AS-BUILT FIELD SURVEY BY NORWOOD ENGINEERING CO INC BETWEEN NOVEMBER 15 TO DECEMBER 18 2019 TI-IE COORDINATES ARE BASED ON l1ASSACHUSETIS ST A TE PLANE COORDINATE SYSTEM NAD 1983 (FEET) THE ACCURACY OF THE COORDINATE LOCATIONS ARE +-0J FEET

Exhibit B to N1UL-Part II-EOS Coordmate Tables Page 13 ofl3 April 14 2021

---

1f~ flJr ~i

f ~~ J~i](M~I ~ 1 jf~ ~~f W-- )e 1

It lj fY pl ~-~j

I --- ~ ~

1 (J-c~ er ~

C JI fl JYf

1 ~ ~Yu-~ 1i

~r

( LOClJS P

SCAUllbulliQO

I ar lMIT flG PINI tMS _ lIIPMIDMICXNllRlnT~tlCfllUS 1111D cmuftraquodl s - NIKl1III tfIJIIIIIOfM~1HCll allE1

DAre Jllrl

NUKIJU LU6 DMitM

mmtG6DKbdlt

~4~-middot

~~I

-- ampnbullllf~ ~ fa

LEGEND 0

-i~wr0o-m lICUUoaampbullco--11111 _ _l_J

0

bull ~-ail_I

~-

mo(I ---fwj

amp~~~~ ~ ~~ltgtmiddot ~A~

~6

_L-r

bull -~ IBP__l-11Uil n-rlfl-lffll rMCllI 1a 1rr ai

-~ lll-lliI u-W--11a 1 Ml[ 411 amt l0IIC 3JICJ7 ~ 33-1--I- DIID llXII D111 JlMZ 411 lraquo- ~lUN~t --- - etMpound 11JII

~ MffD mmaat ZL I01t 111

1Jlll~-IICfIQfJICIISJ DfEI IC71- I~ 1~ 9 Cl 1VY IICIIWCLl~fCSC~lNCl

~11HltOXW1A~JtCI~llfB MXIC 1HI lME INCi 111M bull11 (S 1f41~middot~-~-)

~ io

0 0 0 0 -0 0 0 D O 1 middot tbull O

_- _pound ~ - Tf middot- ---r ~~ ~~- ~=middoti

r jil7bull --------4~-middot~

(

SCAtpound 1bull bull YI

I ~ tfAIE lIMa toafllltl1E ~NAD1w1(rJ

1 ~ PlIla II MMt QI 11D TD D111oPl

~c1MlntID9~~-l 1NIIJIIKlNI LnlJTU ~ deg qllAJSTE uM011111 iu1II 1111ZT IIIILJaZ

Exhibit C - Photo-Reduced Copy of Activity and Use Limitations Plan of Land

--~middot---

I ~111-11111

iiiii

-ill111liilt

ACJIYIJY ANJ) lJSE lJJll7ATJONS PLAN OF LANI)

81ACJ(81R1 I IINION Flr11lfES SllffllF7AVO SIle

o tfO SOIJIH s1ar HlltlPOtL IIAS

SCAlElrJAt IPfffl152021

1IJrwod Eng1neerlng

- EnQlbullHrlflg Compaffy middot~~=~ m Cm1JQ u fnfJa-eal

~ -

-~

9l1EET 1 OF I 8324-02

td ~

w ~ m 0 0

Id Q ii w ii

co co m

co 0

-l

~-77--raquo- -~I~ )middot~ ~ bull _I lT ~ v~

AI ~ If ~)middot~ 7- ~1 c t11 yil ~ ~ ~middot~41 bull1 l ~~l(i~r~1 f7 )ll y-

~~ f -~ -v fgtV ~ ~ ~ l er-- u -

tl x-P~C ()

JP yen f(( 11 1degpoundS -~ (

ftunrTfflllllTnallJrNNQWDf ~ ti IZNtRlTT lnH M IULS IIJIUIUlA-DlltlllllDlJlllIICIF tJbllt~llC~lJNp

DTl NlllltaJatl-Witiill (raquo11 iiiK(+til

I aJnlTlKATJlfl PlAH~ THE PUIIJll1T UC TIUlf Mlaquo THE l5 11 oawG ~ NII 1Hpound1as Of1111E111 AMllfrlTll9laquolllt Mpound ntem OPlaJ CJ1 IWM1pound BREn 011 bulln

~ ~illi~fli~ _lt ---c~-Clmiddot~~c0-nmiddotmiddot~bullJmiddot04~- ~--~--yen~~bull - L -bull -n ~ -r - ~ -

it

~ fr ~ ~- -~bull~bullv OG- ~n0

bull--ltmiddot middot~ -~- ~~-=~7~st~-~~~~i~~Hil~-) 2~C 0 ~~~~~ --------Y-Tgt-bullbullmiddot-

U-IU ~middotshy =i==-

bullbull bull _ -middot-

~----- ( ~11middot

__IC1ZMJ - bull IOC)0l lftEf ___ i gt mEKJllJfNG rotJ1FRIIIT AIIEAS B~ p~ AIIEAS ~ea-vmiddot LIUIID

~ e--- -+ ~ rzprz1za 1 ~ IJTATC PRC ~TC

nJml lltPtasCltJ

DUD BCD lJlll7 PMC 4H 1 1 YERT1CAL M1llI II NCCI ~ _ ro conurr DOD 80CIC 3JII07 llME 4H I ntaM NUIU 1121 IJ4TAI m IMlC 111111 nATIIW ~fsi

tJMAlfflOlI) AIIEAS1 bull 11AMJSCAlfl) AlpoundAS Lill] 1Dll IOlII POT PlCit 6115 J)-t20 ~atfnujK~tlLWlQI

~PUNMl-17 POflTIVNf1Ell llaD BaalC Tl_ Paa bullbull - 99 a 11

_-ijf1iltDP~IZ~ 5CME - JOSUva1fTLJ ~ ~-rr 111 C tMI=

bull111 I~

i=iiii7

~ e---

t c z rl

L-n11 ~

ACJIVJTY AND USE LIAlffAJIONS

PIAN OF RESTRIC1EJJ AREAS ANJJ COVER TYPES

fltACK1(fN _ llNlltgtI PfMIECCS SllPVFVNlJ51Tlt

JO _ lxJ srJllH STREET IIALPrJU JASS

SCAU I - 30 APRIL 2021

lcnwod Engineering

llarwood Cngnrilgtf cpmy -t~~~~

fIL Pllpa-ru - (1u]1a-lftll

~L=wl f 01~JII IO_

a SIEET I (F 2 B324-02

bj ~

w 0

0 0 deg It

iQ ~ w l11

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 1 of 2

CX) CX)

deg CX) 0

ntllT -1~1~ rurnlaquo1 r1n l1XTM 11Nf -r~ lie UUffCI 11Pt lDll1Hf iniin --IC unr1G Tlr 1n1rn Iota allll Ito tyen1tlll ~~11CRnrzJ11-11--~ci-- n31 nr111w11J1t ~bull c ~- diams JDrnn llloffl rcnlml IDII

-~ ]al rll _ _ PnlM-1-PI lbull-- ll7HrirrIPlllD1lf~-a bullbullll 111bull IClln9XnolDlllIIIIIIOm

214 ff7371JOOT ~bull JllC Ibullbull 171 JICllEY)l)vlUTlo~lUl~ ~li_~ -~~ MDlol ll4L~TllJraquofllllf190abullbullt ~~nQuu~~1aJI _~~OtottWU~1t11txm~arcPbrmllmCDt ~~ ~~ ~ =~ gj ~l11~ llltlM Mrattllll TDPmllIDCDI JJ4bull e~ _ ~ e PClC lbullI- 1- ~1sect~ ~ ~ ~ ~ ~~~-nr~44bull~mn11-a11 ~~ =mt =m~ ~ ~~ ~ =~~-~~ =~~rt~l~llibullltbull=

~~~~~~~~r-~r-~~sectsect55~55 ~~ ~=g~~ mi --1~ ~-==~~m~ L-~r UVPllrlllUillDITDr4L 1JI lbullKlllll~==~~~=~

~~~~~~~~ raquoff-llll 111rritl_aianbull ~11lCla rr- n ttll XDP11r1r 11111c-1C111~ RTl~rJlllllbullbull~llllJlllipo~~=r~tm=~~

~=~3r~t==~ ~=~i==~~ llt1ttl70 m~~n~ =n~ L diams 11- bull - iaEi~mi 1lE~HHffi ~1-~ E LbulllT bullU-7YA 8911U TMn4 OJII C- lllkHrnl1nlntll11106~

MJ9~gt111ftlrfffll11 ~ SbullC61hLJT raquoWl lll~IJlll11amp1 utVllllt a lbulllfGl bulllC lT

lliilH~1 ~~rm-=rn~ lbullIIIICU-1bull0

itt ishwI JUo ma m1 bull 1-c iiliii ~==~m~=~ Ullln U7IIY M1NLl411 fflf f-~ llr IL ~ lbullt Ill uaP11rllDn1rin1bull139nf- na_ 1111lnl ___ lWTDf-ID 111Jbullnllr-cishy

J1JT1 lflTI-noLbull COi lJ1 tsr18GOTDrl1~ 1--Cn ~~~==-=~ LbullS1rbull-p

LbulllI ~middot x1 fl11bull diams an l~J P-~ WI 1~1Slrmsraquo11nirorn 11bull1n-

llrgt 58 - TDrl ZJlJ l~ Zl llf4 Pll1raquo91I lnP~IIEI 11 ==~=-~~ lbullt-11bullh1~

nun_-~bullfllrlll_ lbulll-lrbull N- - nr6-11MII rinaus a 1bull1E-t1 im1 nrxi mr~ 7nn1 4i i 1c m llrS~iJ-ltJlillII Tt-Ul ris ~=~~middotiill~~ tf llDln~n1rJrgt11nbull1ric ~IPgt9nq~ It-MU rbull RflrrlllVllbulltPllbullOIIUAfC lbullnJtrNbull_~lD+4ftJSHJ7711JrllIIIIT144lDI lbulll ~I llfs-mllThn~-f 1bull11

1a5blH=i5gS El~ iE =iilli ~ID aH~~ ~~ leJINNllllfflnlt10ff1nll~1g=TI==~- lbullN~Jmiddot pw nrwuhtl tba11 l- lllllsectimiii~ ~ lllaquot ll116UW41 llllII NII Cl Ld bullt ll 11r 111~-~lHtl-IINOClll 1Dgtn~rMOtnllfbull3all)Mnr~bullwrmm11uoo~ ~r~ m~ = ~~ t~-i m NNtotl n11nn cm

~~~~~Ttr~ in Httl01llxl nlfM114ta cm

JJN n=-PIW - I- C lbullT rnr nnubullNoXI ffllPI n1 11-amp 11middot 77)111fflffPl~JlaUII

i1JJ n91lbull ti Jnlftbulllll QII

~g=~~~~ir~f~5 =i~=~~ ~=~ ~ ~j====goi H1111t-llll ffo~ ~rn tm111 ta1Vl~ tnar- IVI rm u1i ~ nw ~illl cm 1111 Hltt1H T7U 72w111ll tm UI ftffiH~bull1 naMUlI nlll

lltfll~IOUl rnes~ttlClll

~I~~=~=~~= l3111ratlQOJ121lllll CS u1n-n-a mn-c~11111llllilr ~====m~~ lbulllllr~~Oll~r1111-t~rtRiHa)toI

-~rt~_Utr111tt~USI ~m~i==r~~llfflpound1gtgtMllkllit1U10C011 annrxnbull-TCRL11ai~=~=~g)llllll~--rWltMJtt-8 DR Pl rraquof ntl rim Gllf CCI~~1r~~ liiilllii u- ntlt bull llJ~naJCDI

raquo11NMl10~Ullllcm ntrlnK)fL~nlln-1c lllf ~--TlJaft_Lmc i lbull1 bull l3il0 Nl-197) Ttlll1344 a LbullI 3 l diams 1-111 lflS 1111lOllt ffl- MP PII bullHI lgtl llJI l97Mlt Ian -ti DG llC

111111===-~~~=mg ====~~ tD rlrffllZllIITO-lfllCIIII=~tr~L~~~= - Pl~I llII TD_ ff~ tDII31119NIJMlDffU~~ H CZIII liii~mlt~ D1111nrn11GQ~-CaKftQNJWNczr41140ffnQCUII Jnffnt1JIIIIJunbull~1Qc20lll ~Pllli ll mrnnn lbulltlP 17Jrffdeg-degluoElJIIIQII

~-I-ti _nrna~rlll

a n- 4411 llbullQI 1=40 rt La n- lllf ffrgtn _Jr_~ Ullk ---rr~~ ~=~=tl~~ =1 nttltt nraquo 1nlU as

=-mn--~111DJIDII Ullgt~fflflnanaaJIIJalt55~~EIS~=~~ ~~)1 -11CIJII nn~bullbullbullnaKatt1ta1

JOIT ru~- rf- deg hJIIII r- 111111 ~1111) -1 aJ1 ld t11D1etlll_TalCIS -~-UCV~bullraquootur=~=~I~~=~--~ ~rsrgo_mlaquoshym rs~11flI ~- rnilr==~=~~ ~~r _ ~ atfl ~ rtw Dgtlnn-f-lEllln17n-UIIP

D11 fflXTJ111111 I~~ ar D1Jn4 ~leJJS-OnC111

=====5 middoti SHU=~ 5 ampn iliiiiiIiI11

ngtgtn~1~1tbullubull1rm DH tu~- lt11 rirmU1111 CDIII

~i~i555mi~ ~~ ~m=~==m~g===~~~~ tn1r JtW ~ma- PiOll a CU

~ XNr~t~fDllll1-all~~ m===~~ bullbull~W 111111 ==~~ ampT g~ ru~ =

~lU $Et=ni ~ llll0111ra1Ln~otqC011

H~ g==i =~1 ~

~111111 ~~g~n~a~J))pound11 1=~)6tia

~~ mEfHfH~Si

amp12Ct _ an ~

U N711f21th mM1LU aa o1bull~--117CII in4r ~llllll1Vffl-111Dlr lit~ Hmtlpound1 71 12L I CCIII ---~CUnMIIUOCVf JIHtlnn nl 7r ll4011CIIII

llllDNXCWZflDtlltllCIDCDr

~~=~==~=gnn n1raquoL bullw noanDNt CIJIIi=~ C~middot ~ ~ ~ HnffTI-QIJroQ__111PtlJIIInfflll bullbull1~ aaeIT t-- nrJD nJUntu~CllWI

m ~1 ~ ~~~ ~ ilria~gliiiji~=ir ~lt-OTT gl1raquo ~Iraquou fflllIL nllll 1111111 flC~middotIY_4allCCIIIi l1i5~ ~~11~middot~ ~~ ffll H71W786lll 7P-JOalllllll 2N ~ 1-flllt 7HIJl4- DI ~ ~==~ ~t-tr bullM-

114 Hit71aTra7ririatNOCIIII

llHl1Hf ll~7Dl4fIZIIICIIII 1141ftillf+1DllnTgtlMa~=~bull==~r Lbulll-lllbullbulllJJ

=~~~HR-~a ~ =iEri ~ ~=6

= 1MESE COCIIIOlfAlEi ARC 9~ at AH DISTlfG CONJmOfS AS-alLT FED 5UKiEY Y NORWDal EJICltJIJll(G CD~ IIElMEN ~ 1S 111 DECDaR a 2DII 1)pound OCICIIIDNAlES 5HCflI UIpound IIAID Cit MltSSAOfllffT5 STATE FlJriNII CDCffllNAT smult ~AO leJ (IMIJ 1HE ACQlltACY ltF 1HE COCftDINT[ LDCAnatS Mpound diams- 01 FtU

POINT DESCRIPTION ABBREVIATIONS~-~middotPC Pmlr Of CLIRIJC bullIEllL ClMNpound STilRlS PDC bull PtJtilTIIJOM1poundr ~ [raquo TAHCINiT W(R[ lll[ CURpound uroo Fo F[1NT(1t~tfflvt[ltft1llllIIUlt OMNtilE)PRC ~T oT ~pound ~Vlllrlt

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 2 of 2

I ~ IHAT nfl PlM MS 81D1 PIIDMQl ~WllTM(llUI MOIIEOIAAlPlllR~Df IIUPS C- lttE ~111 Cl__ HftNMIIIZlt

WWWWJU Cii6 liftitit

ACTIVITY ANI) USE LINTATIONS

PLAN OF RES7RIC1EJJ AREAS ANJJ COlER TYPES

8V CKlJ()RN IJNl()N PflllfpoundCpoundS SlllERFIIMJ SITC

50 HJ S(J11( SmEpoundT llAIPOIL JASS

=r-o ~ ll 2021

~ Engmeer1ng

Hltd ~~ middot~~-=~ra (f~AJ lIQ c- f

a llfEET 2 ltF 6324-02

td ~

w ~ m 0 0

Id Q ii w m

co co m 0 co

Bk 39600 Pg437 88608

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY New England Region

Five Post Office Square - Suite 100 Boston Massachusetts 02109-3912

INSTITUTIONAL CONTROL DESIGN STATEMENT FOR THE BLACKBURN AND UNION PRIVILEGES SUPERFUND SITE - EAST OF SOUTH STREET AREA

1 Introduction

Pursuant to the Comprehensive Environmental Response Compensation and Liability Act 42 USC sect 9601 et seq (CERCLA) and the National Contingency Plan 40 CFR Part 300 (the NCP) this document contains a description of the release events and site history that resulted in the contaminated media that require institutional controls in the fom1 of Activity and Use Limitations the basis for land use restrictions and uses that are consistent and inconsistent with the Selected Remedy ( as described below) This Institutional Control (IC) Design Statement pertains to a portion of the Blackburn and Union Privileges Superfund Site located in the Town of Walpole Massachusetts (the Site) which has been listed on EPAs National Priorities List (NPL) which portion is generally referred to as the East of South Street Area (the EOS Area) The EOS Area is located to the east of South Street in Walpole and is shown on Figure 1 attached hereto

A Notice of Activity and Use Limitation (NAUL) is necessary and appropriate for the EOS Area of the Site based on the fact that pursuant to EPAs risk evaluations asbestos arsenic trichloroethene (TCE) and certain polycyclic aromatic hydrocarbon (PAH) contan1inants remain in place in soils at levels higher than those appropriate for unlimited use or unrestricted exposure groundwater underlying the EOS Area contains hazardous substances at levels that present an unacceptable risk of exposure and remedial measures at the Site must be protected and maintained to ensure that the Selected Remedy remains protective

EPAs Record of Decision (ROD) dated September 30 2008 specified the need for institutional controls such as a NAUL to ensure long-tenn perfonnance and protectiveness of the Selected Remedy The institutional controls described herein are necessary and appropriate to ensure that the Selected Remedy for the Site remains protective of human health and the environment The remedy for the Site as described in the ROD is referred to herein and in the NAUL as the Selected Remedy

Page 1 of7

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 28: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

Bk 39600 Pg433 88608

Point Number

Northing Easting Type Curve Len2th

Cunbulle Radius

3324 2875937 7933 7238698105 COR

3082 28757068320 7240314640 COR 3083 28757602980 7240594310 COR 3349 28757790234 7240236327 COR

3348 28757255574 7239956657 COR

3124 28757716516 7241351659 COR 3125 28757288251 7241140719 COR 3126 28756725827 7240851862 COR 3127 28756162468 7240586126 COR 3128 287 55614498 7240338506 COR 3129 28754346745 7239768507 COR 3130 28753845716 7239540194 COR 3131 28753257436 723927 8634 COR 3132 28752466355 7238929370 COR 3133 28751819340 7238643698 COR 3134 2875118152 7 7238364939 COR 3135 2875080 7772 7238199071 COR 3136 28750413263 7238019301 COR 3350 28750296168 7238284525 COR 3351 28754 78 6636 7240267040 COR 3352 28757412029 7241794586 COR

POINT DESCRIPTION ABBREVIATIONS

COR=CORNER PC= POINT OF CURVE WHERE CURVE STARTS POC -= POINT ON CUR VE PT=POINT OF TANGENCY WHERE THE CURVE ENDS PCC = POINT OF COMPOUND CURVE (WHERE RADIUS CHANGES) PRC = POINT OF REVERSE CURVE

NOTES

THE COORDINATES ARE BASED ON AN EXISTING CONDITIONS AS-BUILT FIELD SURVEY BY NORWOOD ENGINEERING CO INC BETWEEN NOVEMBER 15 TO DECEMBER 18 2019 TI-IE COORDINATES ARE BASED ON l1ASSACHUSETIS ST A TE PLANE COORDINATE SYSTEM NAD 1983 (FEET) THE ACCURACY OF THE COORDINATE LOCATIONS ARE +-0J FEET

Exhibit B to N1UL-Part II-EOS Coordmate Tables Page 13 ofl3 April 14 2021

---

1f~ flJr ~i

f ~~ J~i](M~I ~ 1 jf~ ~~f W-- )e 1

It lj fY pl ~-~j

I --- ~ ~

1 (J-c~ er ~

C JI fl JYf

1 ~ ~Yu-~ 1i

~r

( LOClJS P

SCAUllbulliQO

I ar lMIT flG PINI tMS _ lIIPMIDMICXNllRlnT~tlCfllUS 1111D cmuftraquodl s - NIKl1III tfIJIIIIIOfM~1HCll allE1

DAre Jllrl

NUKIJU LU6 DMitM

mmtG6DKbdlt

~4~-middot

~~I

-- ampnbullllf~ ~ fa

LEGEND 0

-i~wr0o-m lICUUoaampbullco--11111 _ _l_J

0

bull ~-ail_I

~-

mo(I ---fwj

amp~~~~ ~ ~~ltgtmiddot ~A~

~6

_L-r

bull -~ IBP__l-11Uil n-rlfl-lffll rMCllI 1a 1rr ai

-~ lll-lliI u-W--11a 1 Ml[ 411 amt l0IIC 3JICJ7 ~ 33-1--I- DIID llXII D111 JlMZ 411 lraquo- ~lUN~t --- - etMpound 11JII

~ MffD mmaat ZL I01t 111

1Jlll~-IICfIQfJICIISJ DfEI IC71- I~ 1~ 9 Cl 1VY IICIIWCLl~fCSC~lNCl

~11HltOXW1A~JtCI~llfB MXIC 1HI lME INCi 111M bull11 (S 1f41~middot~-~-)

~ io

0 0 0 0 -0 0 0 D O 1 middot tbull O

_- _pound ~ - Tf middot- ---r ~~ ~~- ~=middoti

r jil7bull --------4~-middot~

(

SCAtpound 1bull bull YI

I ~ tfAIE lIMa toafllltl1E ~NAD1w1(rJ

1 ~ PlIla II MMt QI 11D TD D111oPl

~c1MlntID9~~-l 1NIIJIIKlNI LnlJTU ~ deg qllAJSTE uM011111 iu1II 1111ZT IIIILJaZ

Exhibit C - Photo-Reduced Copy of Activity and Use Limitations Plan of Land

--~middot---

I ~111-11111

iiiii

-ill111liilt

ACJIYIJY ANJ) lJSE lJJll7ATJONS PLAN OF LANI)

81ACJ(81R1 I IINION Flr11lfES SllffllF7AVO SIle

o tfO SOIJIH s1ar HlltlPOtL IIAS

SCAlElrJAt IPfffl152021

1IJrwod Eng1neerlng

- EnQlbullHrlflg Compaffy middot~~=~ m Cm1JQ u fnfJa-eal

~ -

-~

9l1EET 1 OF I 8324-02

td ~

w ~ m 0 0

Id Q ii w ii

co co m

co 0

-l

~-77--raquo- -~I~ )middot~ ~ bull _I lT ~ v~

AI ~ If ~)middot~ 7- ~1 c t11 yil ~ ~ ~middot~41 bull1 l ~~l(i~r~1 f7 )ll y-

~~ f -~ -v fgtV ~ ~ ~ l er-- u -

tl x-P~C ()

JP yen f(( 11 1degpoundS -~ (

ftunrTfflllllTnallJrNNQWDf ~ ti IZNtRlTT lnH M IULS IIJIUIUlA-DlltlllllDlJlllIICIF tJbllt~llC~lJNp

DTl NlllltaJatl-Witiill (raquo11 iiiK(+til

I aJnlTlKATJlfl PlAH~ THE PUIIJll1T UC TIUlf Mlaquo THE l5 11 oawG ~ NII 1Hpound1as Of1111E111 AMllfrlTll9laquolllt Mpound ntem OPlaJ CJ1 IWM1pound BREn 011 bulln

~ ~illi~fli~ _lt ---c~-Clmiddot~~c0-nmiddotmiddot~bullJmiddot04~- ~--~--yen~~bull - L -bull -n ~ -r - ~ -

it

~ fr ~ ~- -~bull~bullv OG- ~n0

bull--ltmiddot middot~ -~- ~~-=~7~st~-~~~~i~~Hil~-) 2~C 0 ~~~~~ --------Y-Tgt-bullbullmiddot-

U-IU ~middotshy =i==-

bullbull bull _ -middot-

~----- ( ~11middot

__IC1ZMJ - bull IOC)0l lftEf ___ i gt mEKJllJfNG rotJ1FRIIIT AIIEAS B~ p~ AIIEAS ~ea-vmiddot LIUIID

~ e--- -+ ~ rzprz1za 1 ~ IJTATC PRC ~TC

nJml lltPtasCltJ

DUD BCD lJlll7 PMC 4H 1 1 YERT1CAL M1llI II NCCI ~ _ ro conurr DOD 80CIC 3JII07 llME 4H I ntaM NUIU 1121 IJ4TAI m IMlC 111111 nATIIW ~fsi

tJMAlfflOlI) AIIEAS1 bull 11AMJSCAlfl) AlpoundAS Lill] 1Dll IOlII POT PlCit 6115 J)-t20 ~atfnujK~tlLWlQI

~PUNMl-17 POflTIVNf1Ell llaD BaalC Tl_ Paa bullbull - 99 a 11

_-ijf1iltDP~IZ~ 5CME - JOSUva1fTLJ ~ ~-rr 111 C tMI=

bull111 I~

i=iiii7

~ e---

t c z rl

L-n11 ~

ACJIVJTY AND USE LIAlffAJIONS

PIAN OF RESTRIC1EJJ AREAS ANJJ COVER TYPES

fltACK1(fN _ llNlltgtI PfMIECCS SllPVFVNlJ51Tlt

JO _ lxJ srJllH STREET IIALPrJU JASS

SCAU I - 30 APRIL 2021

lcnwod Engineering

llarwood Cngnrilgtf cpmy -t~~~~

fIL Pllpa-ru - (1u]1a-lftll

~L=wl f 01~JII IO_

a SIEET I (F 2 B324-02

bj ~

w 0

0 0 deg It

iQ ~ w l11

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 1 of 2

CX) CX)

deg CX) 0

ntllT -1~1~ rurnlaquo1 r1n l1XTM 11Nf -r~ lie UUffCI 11Pt lDll1Hf iniin --IC unr1G Tlr 1n1rn Iota allll Ito tyen1tlll ~~11CRnrzJ11-11--~ci-- n31 nr111w11J1t ~bull c ~- diams JDrnn llloffl rcnlml IDII

-~ ]al rll _ _ PnlM-1-PI lbull-- ll7HrirrIPlllD1lf~-a bullbullll 111bull IClln9XnolDlllIIIIIIOm

214 ff7371JOOT ~bull JllC Ibullbull 171 JICllEY)l)vlUTlo~lUl~ ~li_~ -~~ MDlol ll4L~TllJraquofllllf190abullbullt ~~nQuu~~1aJI _~~OtottWU~1t11txm~arcPbrmllmCDt ~~ ~~ ~ =~ gj ~l11~ llltlM Mrattllll TDPmllIDCDI JJ4bull e~ _ ~ e PClC lbullI- 1- ~1sect~ ~ ~ ~ ~ ~~~-nr~44bull~mn11-a11 ~~ =mt =m~ ~ ~~ ~ =~~-~~ =~~rt~l~llibullltbull=

~~~~~~~~r-~r-~~sectsect55~55 ~~ ~=g~~ mi --1~ ~-==~~m~ L-~r UVPllrlllUillDITDr4L 1JI lbullKlllll~==~~~=~

~~~~~~~~ raquoff-llll 111rritl_aianbull ~11lCla rr- n ttll XDP11r1r 11111c-1C111~ RTl~rJlllllbullbull~llllJlllipo~~=r~tm=~~

~=~3r~t==~ ~=~i==~~ llt1ttl70 m~~n~ =n~ L diams 11- bull - iaEi~mi 1lE~HHffi ~1-~ E LbulllT bullU-7YA 8911U TMn4 OJII C- lllkHrnl1nlntll11106~

MJ9~gt111ftlrfffll11 ~ SbullC61hLJT raquoWl lll~IJlll11amp1 utVllllt a lbulllfGl bulllC lT

lliilH~1 ~~rm-=rn~ lbullIIIICU-1bull0

itt ishwI JUo ma m1 bull 1-c iiliii ~==~m~=~ Ullln U7IIY M1NLl411 fflf f-~ llr IL ~ lbullt Ill uaP11rllDn1rin1bull139nf- na_ 1111lnl ___ lWTDf-ID 111Jbullnllr-cishy

J1JT1 lflTI-noLbull COi lJ1 tsr18GOTDrl1~ 1--Cn ~~~==-=~ LbullS1rbull-p

LbulllI ~middot x1 fl11bull diams an l~J P-~ WI 1~1Slrmsraquo11nirorn 11bull1n-

llrgt 58 - TDrl ZJlJ l~ Zl llf4 Pll1raquo91I lnP~IIEI 11 ==~=-~~ lbullt-11bullh1~

nun_-~bullfllrlll_ lbulll-lrbull N- - nr6-11MII rinaus a 1bull1E-t1 im1 nrxi mr~ 7nn1 4i i 1c m llrS~iJ-ltJlillII Tt-Ul ris ~=~~middotiill~~ tf llDln~n1rJrgt11nbull1ric ~IPgt9nq~ It-MU rbull RflrrlllVllbulltPllbullOIIUAfC lbullnJtrNbull_~lD+4ftJSHJ7711JrllIIIIT144lDI lbulll ~I llfs-mllThn~-f 1bull11

1a5blH=i5gS El~ iE =iilli ~ID aH~~ ~~ leJINNllllfflnlt10ff1nll~1g=TI==~- lbullN~Jmiddot pw nrwuhtl tba11 l- lllllsectimiii~ ~ lllaquot ll116UW41 llllII NII Cl Ld bullt ll 11r 111~-~lHtl-IINOClll 1Dgtn~rMOtnllfbull3all)Mnr~bullwrmm11uoo~ ~r~ m~ = ~~ t~-i m NNtotl n11nn cm

~~~~~Ttr~ in Httl01llxl nlfM114ta cm

JJN n=-PIW - I- C lbullT rnr nnubullNoXI ffllPI n1 11-amp 11middot 77)111fflffPl~JlaUII

i1JJ n91lbull ti Jnlftbulllll QII

~g=~~~~ir~f~5 =i~=~~ ~=~ ~ ~j====goi H1111t-llll ffo~ ~rn tm111 ta1Vl~ tnar- IVI rm u1i ~ nw ~illl cm 1111 Hltt1H T7U 72w111ll tm UI ftffiH~bull1 naMUlI nlll

lltfll~IOUl rnes~ttlClll

~I~~=~=~~= l3111ratlQOJ121lllll CS u1n-n-a mn-c~11111llllilr ~====m~~ lbulllllr~~Oll~r1111-t~rtRiHa)toI

-~rt~_Utr111tt~USI ~m~i==r~~llfflpound1gtgtMllkllit1U10C011 annrxnbull-TCRL11ai~=~=~g)llllll~--rWltMJtt-8 DR Pl rraquof ntl rim Gllf CCI~~1r~~ liiilllii u- ntlt bull llJ~naJCDI

raquo11NMl10~Ullllcm ntrlnK)fL~nlln-1c lllf ~--TlJaft_Lmc i lbull1 bull l3il0 Nl-197) Ttlll1344 a LbullI 3 l diams 1-111 lflS 1111lOllt ffl- MP PII bullHI lgtl llJI l97Mlt Ian -ti DG llC

111111===-~~~=mg ====~~ tD rlrffllZllIITO-lfllCIIII=~tr~L~~~= - Pl~I llII TD_ ff~ tDII31119NIJMlDffU~~ H CZIII liii~mlt~ D1111nrn11GQ~-CaKftQNJWNczr41140ffnQCUII Jnffnt1JIIIIJunbull~1Qc20lll ~Pllli ll mrnnn lbulltlP 17Jrffdeg-degluoElJIIIQII

~-I-ti _nrna~rlll

a n- 4411 llbullQI 1=40 rt La n- lllf ffrgtn _Jr_~ Ullk ---rr~~ ~=~=tl~~ =1 nttltt nraquo 1nlU as

=-mn--~111DJIDII Ullgt~fflflnanaaJIIJalt55~~EIS~=~~ ~~)1 -11CIJII nn~bullbullbullnaKatt1ta1

JOIT ru~- rf- deg hJIIII r- 111111 ~1111) -1 aJ1 ld t11D1etlll_TalCIS -~-UCV~bullraquootur=~=~I~~=~--~ ~rsrgo_mlaquoshym rs~11flI ~- rnilr==~=~~ ~~r _ ~ atfl ~ rtw Dgtlnn-f-lEllln17n-UIIP

D11 fflXTJ111111 I~~ ar D1Jn4 ~leJJS-OnC111

=====5 middoti SHU=~ 5 ampn iliiiiiIiI11

ngtgtn~1~1tbullubull1rm DH tu~- lt11 rirmU1111 CDIII

~i~i555mi~ ~~ ~m=~==m~g===~~~~ tn1r JtW ~ma- PiOll a CU

~ XNr~t~fDllll1-all~~ m===~~ bullbull~W 111111 ==~~ ampT g~ ru~ =

~lU $Et=ni ~ llll0111ra1Ln~otqC011

H~ g==i =~1 ~

~111111 ~~g~n~a~J))pound11 1=~)6tia

~~ mEfHfH~Si

amp12Ct _ an ~

U N711f21th mM1LU aa o1bull~--117CII in4r ~llllll1Vffl-111Dlr lit~ Hmtlpound1 71 12L I CCIII ---~CUnMIIUOCVf JIHtlnn nl 7r ll4011CIIII

llllDNXCWZflDtlltllCIDCDr

~~=~==~=gnn n1raquoL bullw noanDNt CIJIIi=~ C~middot ~ ~ ~ HnffTI-QIJroQ__111PtlJIIInfflll bullbull1~ aaeIT t-- nrJD nJUntu~CllWI

m ~1 ~ ~~~ ~ ilria~gliiiji~=ir ~lt-OTT gl1raquo ~Iraquou fflllIL nllll 1111111 flC~middotIY_4allCCIIIi l1i5~ ~~11~middot~ ~~ ffll H71W786lll 7P-JOalllllll 2N ~ 1-flllt 7HIJl4- DI ~ ~==~ ~t-tr bullM-

114 Hit71aTra7ririatNOCIIII

llHl1Hf ll~7Dl4fIZIIICIIII 1141ftillf+1DllnTgtlMa~=~bull==~r Lbulll-lllbullbulllJJ

=~~~HR-~a ~ =iEri ~ ~=6

= 1MESE COCIIIOlfAlEi ARC 9~ at AH DISTlfG CONJmOfS AS-alLT FED 5UKiEY Y NORWDal EJICltJIJll(G CD~ IIElMEN ~ 1S 111 DECDaR a 2DII 1)pound OCICIIIDNAlES 5HCflI UIpound IIAID Cit MltSSAOfllffT5 STATE FlJriNII CDCffllNAT smult ~AO leJ (IMIJ 1HE ACQlltACY ltF 1HE COCftDINT[ LDCAnatS Mpound diams- 01 FtU

POINT DESCRIPTION ABBREVIATIONS~-~middotPC Pmlr Of CLIRIJC bullIEllL ClMNpound STilRlS PDC bull PtJtilTIIJOM1poundr ~ [raquo TAHCINiT W(R[ lll[ CURpound uroo Fo F[1NT(1t~tfflvt[ltft1llllIIUlt OMNtilE)PRC ~T oT ~pound ~Vlllrlt

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 2 of 2

I ~ IHAT nfl PlM MS 81D1 PIIDMQl ~WllTM(llUI MOIIEOIAAlPlllR~Df IIUPS C- lttE ~111 Cl__ HftNMIIIZlt

WWWWJU Cii6 liftitit

ACTIVITY ANI) USE LINTATIONS

PLAN OF RES7RIC1EJJ AREAS ANJJ COlER TYPES

8V CKlJ()RN IJNl()N PflllfpoundCpoundS SlllERFIIMJ SITC

50 HJ S(J11( SmEpoundT llAIPOIL JASS

=r-o ~ ll 2021

~ Engmeer1ng

Hltd ~~ middot~~-=~ra (f~AJ lIQ c- f

a llfEET 2 ltF 6324-02

td ~

w ~ m 0 0

Id Q ii w m

co co m 0 co

Bk 39600 Pg437 88608

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY New England Region

Five Post Office Square - Suite 100 Boston Massachusetts 02109-3912

INSTITUTIONAL CONTROL DESIGN STATEMENT FOR THE BLACKBURN AND UNION PRIVILEGES SUPERFUND SITE - EAST OF SOUTH STREET AREA

1 Introduction

Pursuant to the Comprehensive Environmental Response Compensation and Liability Act 42 USC sect 9601 et seq (CERCLA) and the National Contingency Plan 40 CFR Part 300 (the NCP) this document contains a description of the release events and site history that resulted in the contaminated media that require institutional controls in the fom1 of Activity and Use Limitations the basis for land use restrictions and uses that are consistent and inconsistent with the Selected Remedy ( as described below) This Institutional Control (IC) Design Statement pertains to a portion of the Blackburn and Union Privileges Superfund Site located in the Town of Walpole Massachusetts (the Site) which has been listed on EPAs National Priorities List (NPL) which portion is generally referred to as the East of South Street Area (the EOS Area) The EOS Area is located to the east of South Street in Walpole and is shown on Figure 1 attached hereto

A Notice of Activity and Use Limitation (NAUL) is necessary and appropriate for the EOS Area of the Site based on the fact that pursuant to EPAs risk evaluations asbestos arsenic trichloroethene (TCE) and certain polycyclic aromatic hydrocarbon (PAH) contan1inants remain in place in soils at levels higher than those appropriate for unlimited use or unrestricted exposure groundwater underlying the EOS Area contains hazardous substances at levels that present an unacceptable risk of exposure and remedial measures at the Site must be protected and maintained to ensure that the Selected Remedy remains protective

EPAs Record of Decision (ROD) dated September 30 2008 specified the need for institutional controls such as a NAUL to ensure long-tenn perfonnance and protectiveness of the Selected Remedy The institutional controls described herein are necessary and appropriate to ensure that the Selected Remedy for the Site remains protective of human health and the environment The remedy for the Site as described in the ROD is referred to herein and in the NAUL as the Selected Remedy

Page 1 of7

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 29: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

---

1f~ flJr ~i

f ~~ J~i](M~I ~ 1 jf~ ~~f W-- )e 1

It lj fY pl ~-~j

I --- ~ ~

1 (J-c~ er ~

C JI fl JYf

1 ~ ~Yu-~ 1i

~r

( LOClJS P

SCAUllbulliQO

I ar lMIT flG PINI tMS _ lIIPMIDMICXNllRlnT~tlCfllUS 1111D cmuftraquodl s - NIKl1III tfIJIIIIIOfM~1HCll allE1

DAre Jllrl

NUKIJU LU6 DMitM

mmtG6DKbdlt

~4~-middot

~~I

-- ampnbullllf~ ~ fa

LEGEND 0

-i~wr0o-m lICUUoaampbullco--11111 _ _l_J

0

bull ~-ail_I

~-

mo(I ---fwj

amp~~~~ ~ ~~ltgtmiddot ~A~

~6

_L-r

bull -~ IBP__l-11Uil n-rlfl-lffll rMCllI 1a 1rr ai

-~ lll-lliI u-W--11a 1 Ml[ 411 amt l0IIC 3JICJ7 ~ 33-1--I- DIID llXII D111 JlMZ 411 lraquo- ~lUN~t --- - etMpound 11JII

~ MffD mmaat ZL I01t 111

1Jlll~-IICfIQfJICIISJ DfEI IC71- I~ 1~ 9 Cl 1VY IICIIWCLl~fCSC~lNCl

~11HltOXW1A~JtCI~llfB MXIC 1HI lME INCi 111M bull11 (S 1f41~middot~-~-)

~ io

0 0 0 0 -0 0 0 D O 1 middot tbull O

_- _pound ~ - Tf middot- ---r ~~ ~~- ~=middoti

r jil7bull --------4~-middot~

(

SCAtpound 1bull bull YI

I ~ tfAIE lIMa toafllltl1E ~NAD1w1(rJ

1 ~ PlIla II MMt QI 11D TD D111oPl

~c1MlntID9~~-l 1NIIJIIKlNI LnlJTU ~ deg qllAJSTE uM011111 iu1II 1111ZT IIIILJaZ

Exhibit C - Photo-Reduced Copy of Activity and Use Limitations Plan of Land

--~middot---

I ~111-11111

iiiii

-ill111liilt

ACJIYIJY ANJ) lJSE lJJll7ATJONS PLAN OF LANI)

81ACJ(81R1 I IINION Flr11lfES SllffllF7AVO SIle

o tfO SOIJIH s1ar HlltlPOtL IIAS

SCAlElrJAt IPfffl152021

1IJrwod Eng1neerlng

- EnQlbullHrlflg Compaffy middot~~=~ m Cm1JQ u fnfJa-eal

~ -

-~

9l1EET 1 OF I 8324-02

td ~

w ~ m 0 0

Id Q ii w ii

co co m

co 0

-l

~-77--raquo- -~I~ )middot~ ~ bull _I lT ~ v~

AI ~ If ~)middot~ 7- ~1 c t11 yil ~ ~ ~middot~41 bull1 l ~~l(i~r~1 f7 )ll y-

~~ f -~ -v fgtV ~ ~ ~ l er-- u -

tl x-P~C ()

JP yen f(( 11 1degpoundS -~ (

ftunrTfflllllTnallJrNNQWDf ~ ti IZNtRlTT lnH M IULS IIJIUIUlA-DlltlllllDlJlllIICIF tJbllt~llC~lJNp

DTl NlllltaJatl-Witiill (raquo11 iiiK(+til

I aJnlTlKATJlfl PlAH~ THE PUIIJll1T UC TIUlf Mlaquo THE l5 11 oawG ~ NII 1Hpound1as Of1111E111 AMllfrlTll9laquolllt Mpound ntem OPlaJ CJ1 IWM1pound BREn 011 bulln

~ ~illi~fli~ _lt ---c~-Clmiddot~~c0-nmiddotmiddot~bullJmiddot04~- ~--~--yen~~bull - L -bull -n ~ -r - ~ -

it

~ fr ~ ~- -~bull~bullv OG- ~n0

bull--ltmiddot middot~ -~- ~~-=~7~st~-~~~~i~~Hil~-) 2~C 0 ~~~~~ --------Y-Tgt-bullbullmiddot-

U-IU ~middotshy =i==-

bullbull bull _ -middot-

~----- ( ~11middot

__IC1ZMJ - bull IOC)0l lftEf ___ i gt mEKJllJfNG rotJ1FRIIIT AIIEAS B~ p~ AIIEAS ~ea-vmiddot LIUIID

~ e--- -+ ~ rzprz1za 1 ~ IJTATC PRC ~TC

nJml lltPtasCltJ

DUD BCD lJlll7 PMC 4H 1 1 YERT1CAL M1llI II NCCI ~ _ ro conurr DOD 80CIC 3JII07 llME 4H I ntaM NUIU 1121 IJ4TAI m IMlC 111111 nATIIW ~fsi

tJMAlfflOlI) AIIEAS1 bull 11AMJSCAlfl) AlpoundAS Lill] 1Dll IOlII POT PlCit 6115 J)-t20 ~atfnujK~tlLWlQI

~PUNMl-17 POflTIVNf1Ell llaD BaalC Tl_ Paa bullbull - 99 a 11

_-ijf1iltDP~IZ~ 5CME - JOSUva1fTLJ ~ ~-rr 111 C tMI=

bull111 I~

i=iiii7

~ e---

t c z rl

L-n11 ~

ACJIVJTY AND USE LIAlffAJIONS

PIAN OF RESTRIC1EJJ AREAS ANJJ COVER TYPES

fltACK1(fN _ llNlltgtI PfMIECCS SllPVFVNlJ51Tlt

JO _ lxJ srJllH STREET IIALPrJU JASS

SCAU I - 30 APRIL 2021

lcnwod Engineering

llarwood Cngnrilgtf cpmy -t~~~~

fIL Pllpa-ru - (1u]1a-lftll

~L=wl f 01~JII IO_

a SIEET I (F 2 B324-02

bj ~

w 0

0 0 deg It

iQ ~ w l11

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 1 of 2

CX) CX)

deg CX) 0

ntllT -1~1~ rurnlaquo1 r1n l1XTM 11Nf -r~ lie UUffCI 11Pt lDll1Hf iniin --IC unr1G Tlr 1n1rn Iota allll Ito tyen1tlll ~~11CRnrzJ11-11--~ci-- n31 nr111w11J1t ~bull c ~- diams JDrnn llloffl rcnlml IDII

-~ ]al rll _ _ PnlM-1-PI lbull-- ll7HrirrIPlllD1lf~-a bullbullll 111bull IClln9XnolDlllIIIIIIOm

214 ff7371JOOT ~bull JllC Ibullbull 171 JICllEY)l)vlUTlo~lUl~ ~li_~ -~~ MDlol ll4L~TllJraquofllllf190abullbullt ~~nQuu~~1aJI _~~OtottWU~1t11txm~arcPbrmllmCDt ~~ ~~ ~ =~ gj ~l11~ llltlM Mrattllll TDPmllIDCDI JJ4bull e~ _ ~ e PClC lbullI- 1- ~1sect~ ~ ~ ~ ~ ~~~-nr~44bull~mn11-a11 ~~ =mt =m~ ~ ~~ ~ =~~-~~ =~~rt~l~llibullltbull=

~~~~~~~~r-~r-~~sectsect55~55 ~~ ~=g~~ mi --1~ ~-==~~m~ L-~r UVPllrlllUillDITDr4L 1JI lbullKlllll~==~~~=~

~~~~~~~~ raquoff-llll 111rritl_aianbull ~11lCla rr- n ttll XDP11r1r 11111c-1C111~ RTl~rJlllllbullbull~llllJlllipo~~=r~tm=~~

~=~3r~t==~ ~=~i==~~ llt1ttl70 m~~n~ =n~ L diams 11- bull - iaEi~mi 1lE~HHffi ~1-~ E LbulllT bullU-7YA 8911U TMn4 OJII C- lllkHrnl1nlntll11106~

MJ9~gt111ftlrfffll11 ~ SbullC61hLJT raquoWl lll~IJlll11amp1 utVllllt a lbulllfGl bulllC lT

lliilH~1 ~~rm-=rn~ lbullIIIICU-1bull0

itt ishwI JUo ma m1 bull 1-c iiliii ~==~m~=~ Ullln U7IIY M1NLl411 fflf f-~ llr IL ~ lbullt Ill uaP11rllDn1rin1bull139nf- na_ 1111lnl ___ lWTDf-ID 111Jbullnllr-cishy

J1JT1 lflTI-noLbull COi lJ1 tsr18GOTDrl1~ 1--Cn ~~~==-=~ LbullS1rbull-p

LbulllI ~middot x1 fl11bull diams an l~J P-~ WI 1~1Slrmsraquo11nirorn 11bull1n-

llrgt 58 - TDrl ZJlJ l~ Zl llf4 Pll1raquo91I lnP~IIEI 11 ==~=-~~ lbullt-11bullh1~

nun_-~bullfllrlll_ lbulll-lrbull N- - nr6-11MII rinaus a 1bull1E-t1 im1 nrxi mr~ 7nn1 4i i 1c m llrS~iJ-ltJlillII Tt-Ul ris ~=~~middotiill~~ tf llDln~n1rJrgt11nbull1ric ~IPgt9nq~ It-MU rbull RflrrlllVllbulltPllbullOIIUAfC lbullnJtrNbull_~lD+4ftJSHJ7711JrllIIIIT144lDI lbulll ~I llfs-mllThn~-f 1bull11

1a5blH=i5gS El~ iE =iilli ~ID aH~~ ~~ leJINNllllfflnlt10ff1nll~1g=TI==~- lbullN~Jmiddot pw nrwuhtl tba11 l- lllllsectimiii~ ~ lllaquot ll116UW41 llllII NII Cl Ld bullt ll 11r 111~-~lHtl-IINOClll 1Dgtn~rMOtnllfbull3all)Mnr~bullwrmm11uoo~ ~r~ m~ = ~~ t~-i m NNtotl n11nn cm

~~~~~Ttr~ in Httl01llxl nlfM114ta cm

JJN n=-PIW - I- C lbullT rnr nnubullNoXI ffllPI n1 11-amp 11middot 77)111fflffPl~JlaUII

i1JJ n91lbull ti Jnlftbulllll QII

~g=~~~~ir~f~5 =i~=~~ ~=~ ~ ~j====goi H1111t-llll ffo~ ~rn tm111 ta1Vl~ tnar- IVI rm u1i ~ nw ~illl cm 1111 Hltt1H T7U 72w111ll tm UI ftffiH~bull1 naMUlI nlll

lltfll~IOUl rnes~ttlClll

~I~~=~=~~= l3111ratlQOJ121lllll CS u1n-n-a mn-c~11111llllilr ~====m~~ lbulllllr~~Oll~r1111-t~rtRiHa)toI

-~rt~_Utr111tt~USI ~m~i==r~~llfflpound1gtgtMllkllit1U10C011 annrxnbull-TCRL11ai~=~=~g)llllll~--rWltMJtt-8 DR Pl rraquof ntl rim Gllf CCI~~1r~~ liiilllii u- ntlt bull llJ~naJCDI

raquo11NMl10~Ullllcm ntrlnK)fL~nlln-1c lllf ~--TlJaft_Lmc i lbull1 bull l3il0 Nl-197) Ttlll1344 a LbullI 3 l diams 1-111 lflS 1111lOllt ffl- MP PII bullHI lgtl llJI l97Mlt Ian -ti DG llC

111111===-~~~=mg ====~~ tD rlrffllZllIITO-lfllCIIII=~tr~L~~~= - Pl~I llII TD_ ff~ tDII31119NIJMlDffU~~ H CZIII liii~mlt~ D1111nrn11GQ~-CaKftQNJWNczr41140ffnQCUII Jnffnt1JIIIIJunbull~1Qc20lll ~Pllli ll mrnnn lbulltlP 17Jrffdeg-degluoElJIIIQII

~-I-ti _nrna~rlll

a n- 4411 llbullQI 1=40 rt La n- lllf ffrgtn _Jr_~ Ullk ---rr~~ ~=~=tl~~ =1 nttltt nraquo 1nlU as

=-mn--~111DJIDII Ullgt~fflflnanaaJIIJalt55~~EIS~=~~ ~~)1 -11CIJII nn~bullbullbullnaKatt1ta1

JOIT ru~- rf- deg hJIIII r- 111111 ~1111) -1 aJ1 ld t11D1etlll_TalCIS -~-UCV~bullraquootur=~=~I~~=~--~ ~rsrgo_mlaquoshym rs~11flI ~- rnilr==~=~~ ~~r _ ~ atfl ~ rtw Dgtlnn-f-lEllln17n-UIIP

D11 fflXTJ111111 I~~ ar D1Jn4 ~leJJS-OnC111

=====5 middoti SHU=~ 5 ampn iliiiiiIiI11

ngtgtn~1~1tbullubull1rm DH tu~- lt11 rirmU1111 CDIII

~i~i555mi~ ~~ ~m=~==m~g===~~~~ tn1r JtW ~ma- PiOll a CU

~ XNr~t~fDllll1-all~~ m===~~ bullbull~W 111111 ==~~ ampT g~ ru~ =

~lU $Et=ni ~ llll0111ra1Ln~otqC011

H~ g==i =~1 ~

~111111 ~~g~n~a~J))pound11 1=~)6tia

~~ mEfHfH~Si

amp12Ct _ an ~

U N711f21th mM1LU aa o1bull~--117CII in4r ~llllll1Vffl-111Dlr lit~ Hmtlpound1 71 12L I CCIII ---~CUnMIIUOCVf JIHtlnn nl 7r ll4011CIIII

llllDNXCWZflDtlltllCIDCDr

~~=~==~=gnn n1raquoL bullw noanDNt CIJIIi=~ C~middot ~ ~ ~ HnffTI-QIJroQ__111PtlJIIInfflll bullbull1~ aaeIT t-- nrJD nJUntu~CllWI

m ~1 ~ ~~~ ~ ilria~gliiiji~=ir ~lt-OTT gl1raquo ~Iraquou fflllIL nllll 1111111 flC~middotIY_4allCCIIIi l1i5~ ~~11~middot~ ~~ ffll H71W786lll 7P-JOalllllll 2N ~ 1-flllt 7HIJl4- DI ~ ~==~ ~t-tr bullM-

114 Hit71aTra7ririatNOCIIII

llHl1Hf ll~7Dl4fIZIIICIIII 1141ftillf+1DllnTgtlMa~=~bull==~r Lbulll-lllbullbulllJJ

=~~~HR-~a ~ =iEri ~ ~=6

= 1MESE COCIIIOlfAlEi ARC 9~ at AH DISTlfG CONJmOfS AS-alLT FED 5UKiEY Y NORWDal EJICltJIJll(G CD~ IIElMEN ~ 1S 111 DECDaR a 2DII 1)pound OCICIIIDNAlES 5HCflI UIpound IIAID Cit MltSSAOfllffT5 STATE FlJriNII CDCffllNAT smult ~AO leJ (IMIJ 1HE ACQlltACY ltF 1HE COCftDINT[ LDCAnatS Mpound diams- 01 FtU

POINT DESCRIPTION ABBREVIATIONS~-~middotPC Pmlr Of CLIRIJC bullIEllL ClMNpound STilRlS PDC bull PtJtilTIIJOM1poundr ~ [raquo TAHCINiT W(R[ lll[ CURpound uroo Fo F[1NT(1t~tfflvt[ltft1llllIIUlt OMNtilE)PRC ~T oT ~pound ~Vlllrlt

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 2 of 2

I ~ IHAT nfl PlM MS 81D1 PIIDMQl ~WllTM(llUI MOIIEOIAAlPlllR~Df IIUPS C- lttE ~111 Cl__ HftNMIIIZlt

WWWWJU Cii6 liftitit

ACTIVITY ANI) USE LINTATIONS

PLAN OF RES7RIC1EJJ AREAS ANJJ COlER TYPES

8V CKlJ()RN IJNl()N PflllfpoundCpoundS SlllERFIIMJ SITC

50 HJ S(J11( SmEpoundT llAIPOIL JASS

=r-o ~ ll 2021

~ Engmeer1ng

Hltd ~~ middot~~-=~ra (f~AJ lIQ c- f

a llfEET 2 ltF 6324-02

td ~

w ~ m 0 0

Id Q ii w m

co co m 0 co

Bk 39600 Pg437 88608

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY New England Region

Five Post Office Square - Suite 100 Boston Massachusetts 02109-3912

INSTITUTIONAL CONTROL DESIGN STATEMENT FOR THE BLACKBURN AND UNION PRIVILEGES SUPERFUND SITE - EAST OF SOUTH STREET AREA

1 Introduction

Pursuant to the Comprehensive Environmental Response Compensation and Liability Act 42 USC sect 9601 et seq (CERCLA) and the National Contingency Plan 40 CFR Part 300 (the NCP) this document contains a description of the release events and site history that resulted in the contaminated media that require institutional controls in the fom1 of Activity and Use Limitations the basis for land use restrictions and uses that are consistent and inconsistent with the Selected Remedy ( as described below) This Institutional Control (IC) Design Statement pertains to a portion of the Blackburn and Union Privileges Superfund Site located in the Town of Walpole Massachusetts (the Site) which has been listed on EPAs National Priorities List (NPL) which portion is generally referred to as the East of South Street Area (the EOS Area) The EOS Area is located to the east of South Street in Walpole and is shown on Figure 1 attached hereto

A Notice of Activity and Use Limitation (NAUL) is necessary and appropriate for the EOS Area of the Site based on the fact that pursuant to EPAs risk evaluations asbestos arsenic trichloroethene (TCE) and certain polycyclic aromatic hydrocarbon (PAH) contan1inants remain in place in soils at levels higher than those appropriate for unlimited use or unrestricted exposure groundwater underlying the EOS Area contains hazardous substances at levels that present an unacceptable risk of exposure and remedial measures at the Site must be protected and maintained to ensure that the Selected Remedy remains protective

EPAs Record of Decision (ROD) dated September 30 2008 specified the need for institutional controls such as a NAUL to ensure long-tenn perfonnance and protectiveness of the Selected Remedy The institutional controls described herein are necessary and appropriate to ensure that the Selected Remedy for the Site remains protective of human health and the environment The remedy for the Site as described in the ROD is referred to herein and in the NAUL as the Selected Remedy

Page 1 of7

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 30: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

-l

~-77--raquo- -~I~ )middot~ ~ bull _I lT ~ v~

AI ~ If ~)middot~ 7- ~1 c t11 yil ~ ~ ~middot~41 bull1 l ~~l(i~r~1 f7 )ll y-

~~ f -~ -v fgtV ~ ~ ~ l er-- u -

tl x-P~C ()

JP yen f(( 11 1degpoundS -~ (

ftunrTfflllllTnallJrNNQWDf ~ ti IZNtRlTT lnH M IULS IIJIUIUlA-DlltlllllDlJlllIICIF tJbllt~llC~lJNp

DTl NlllltaJatl-Witiill (raquo11 iiiK(+til

I aJnlTlKATJlfl PlAH~ THE PUIIJll1T UC TIUlf Mlaquo THE l5 11 oawG ~ NII 1Hpound1as Of1111E111 AMllfrlTll9laquolllt Mpound ntem OPlaJ CJ1 IWM1pound BREn 011 bulln

~ ~illi~fli~ _lt ---c~-Clmiddot~~c0-nmiddotmiddot~bullJmiddot04~- ~--~--yen~~bull - L -bull -n ~ -r - ~ -

it

~ fr ~ ~- -~bull~bullv OG- ~n0

bull--ltmiddot middot~ -~- ~~-=~7~st~-~~~~i~~Hil~-) 2~C 0 ~~~~~ --------Y-Tgt-bullbullmiddot-

U-IU ~middotshy =i==-

bullbull bull _ -middot-

~----- ( ~11middot

__IC1ZMJ - bull IOC)0l lftEf ___ i gt mEKJllJfNG rotJ1FRIIIT AIIEAS B~ p~ AIIEAS ~ea-vmiddot LIUIID

~ e--- -+ ~ rzprz1za 1 ~ IJTATC PRC ~TC

nJml lltPtasCltJ

DUD BCD lJlll7 PMC 4H 1 1 YERT1CAL M1llI II NCCI ~ _ ro conurr DOD 80CIC 3JII07 llME 4H I ntaM NUIU 1121 IJ4TAI m IMlC 111111 nATIIW ~fsi

tJMAlfflOlI) AIIEAS1 bull 11AMJSCAlfl) AlpoundAS Lill] 1Dll IOlII POT PlCit 6115 J)-t20 ~atfnujK~tlLWlQI

~PUNMl-17 POflTIVNf1Ell llaD BaalC Tl_ Paa bullbull - 99 a 11

_-ijf1iltDP~IZ~ 5CME - JOSUva1fTLJ ~ ~-rr 111 C tMI=

bull111 I~

i=iiii7

~ e---

t c z rl

L-n11 ~

ACJIVJTY AND USE LIAlffAJIONS

PIAN OF RESTRIC1EJJ AREAS ANJJ COVER TYPES

fltACK1(fN _ llNlltgtI PfMIECCS SllPVFVNlJ51Tlt

JO _ lxJ srJllH STREET IIALPrJU JASS

SCAU I - 30 APRIL 2021

lcnwod Engineering

llarwood Cngnrilgtf cpmy -t~~~~

fIL Pllpa-ru - (1u]1a-lftll

~L=wl f 01~JII IO_

a SIEET I (F 2 B324-02

bj ~

w 0

0 0 deg It

iQ ~ w l11

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 1 of 2

CX) CX)

deg CX) 0

ntllT -1~1~ rurnlaquo1 r1n l1XTM 11Nf -r~ lie UUffCI 11Pt lDll1Hf iniin --IC unr1G Tlr 1n1rn Iota allll Ito tyen1tlll ~~11CRnrzJ11-11--~ci-- n31 nr111w11J1t ~bull c ~- diams JDrnn llloffl rcnlml IDII

-~ ]al rll _ _ PnlM-1-PI lbull-- ll7HrirrIPlllD1lf~-a bullbullll 111bull IClln9XnolDlllIIIIIIOm

214 ff7371JOOT ~bull JllC Ibullbull 171 JICllEY)l)vlUTlo~lUl~ ~li_~ -~~ MDlol ll4L~TllJraquofllllf190abullbullt ~~nQuu~~1aJI _~~OtottWU~1t11txm~arcPbrmllmCDt ~~ ~~ ~ =~ gj ~l11~ llltlM Mrattllll TDPmllIDCDI JJ4bull e~ _ ~ e PClC lbullI- 1- ~1sect~ ~ ~ ~ ~ ~~~-nr~44bull~mn11-a11 ~~ =mt =m~ ~ ~~ ~ =~~-~~ =~~rt~l~llibullltbull=

~~~~~~~~r-~r-~~sectsect55~55 ~~ ~=g~~ mi --1~ ~-==~~m~ L-~r UVPllrlllUillDITDr4L 1JI lbullKlllll~==~~~=~

~~~~~~~~ raquoff-llll 111rritl_aianbull ~11lCla rr- n ttll XDP11r1r 11111c-1C111~ RTl~rJlllllbullbull~llllJlllipo~~=r~tm=~~

~=~3r~t==~ ~=~i==~~ llt1ttl70 m~~n~ =n~ L diams 11- bull - iaEi~mi 1lE~HHffi ~1-~ E LbulllT bullU-7YA 8911U TMn4 OJII C- lllkHrnl1nlntll11106~

MJ9~gt111ftlrfffll11 ~ SbullC61hLJT raquoWl lll~IJlll11amp1 utVllllt a lbulllfGl bulllC lT

lliilH~1 ~~rm-=rn~ lbullIIIICU-1bull0

itt ishwI JUo ma m1 bull 1-c iiliii ~==~m~=~ Ullln U7IIY M1NLl411 fflf f-~ llr IL ~ lbullt Ill uaP11rllDn1rin1bull139nf- na_ 1111lnl ___ lWTDf-ID 111Jbullnllr-cishy

J1JT1 lflTI-noLbull COi lJ1 tsr18GOTDrl1~ 1--Cn ~~~==-=~ LbullS1rbull-p

LbulllI ~middot x1 fl11bull diams an l~J P-~ WI 1~1Slrmsraquo11nirorn 11bull1n-

llrgt 58 - TDrl ZJlJ l~ Zl llf4 Pll1raquo91I lnP~IIEI 11 ==~=-~~ lbullt-11bullh1~

nun_-~bullfllrlll_ lbulll-lrbull N- - nr6-11MII rinaus a 1bull1E-t1 im1 nrxi mr~ 7nn1 4i i 1c m llrS~iJ-ltJlillII Tt-Ul ris ~=~~middotiill~~ tf llDln~n1rJrgt11nbull1ric ~IPgt9nq~ It-MU rbull RflrrlllVllbulltPllbullOIIUAfC lbullnJtrNbull_~lD+4ftJSHJ7711JrllIIIIT144lDI lbulll ~I llfs-mllThn~-f 1bull11

1a5blH=i5gS El~ iE =iilli ~ID aH~~ ~~ leJINNllllfflnlt10ff1nll~1g=TI==~- lbullN~Jmiddot pw nrwuhtl tba11 l- lllllsectimiii~ ~ lllaquot ll116UW41 llllII NII Cl Ld bullt ll 11r 111~-~lHtl-IINOClll 1Dgtn~rMOtnllfbull3all)Mnr~bullwrmm11uoo~ ~r~ m~ = ~~ t~-i m NNtotl n11nn cm

~~~~~Ttr~ in Httl01llxl nlfM114ta cm

JJN n=-PIW - I- C lbullT rnr nnubullNoXI ffllPI n1 11-amp 11middot 77)111fflffPl~JlaUII

i1JJ n91lbull ti Jnlftbulllll QII

~g=~~~~ir~f~5 =i~=~~ ~=~ ~ ~j====goi H1111t-llll ffo~ ~rn tm111 ta1Vl~ tnar- IVI rm u1i ~ nw ~illl cm 1111 Hltt1H T7U 72w111ll tm UI ftffiH~bull1 naMUlI nlll

lltfll~IOUl rnes~ttlClll

~I~~=~=~~= l3111ratlQOJ121lllll CS u1n-n-a mn-c~11111llllilr ~====m~~ lbulllllr~~Oll~r1111-t~rtRiHa)toI

-~rt~_Utr111tt~USI ~m~i==r~~llfflpound1gtgtMllkllit1U10C011 annrxnbull-TCRL11ai~=~=~g)llllll~--rWltMJtt-8 DR Pl rraquof ntl rim Gllf CCI~~1r~~ liiilllii u- ntlt bull llJ~naJCDI

raquo11NMl10~Ullllcm ntrlnK)fL~nlln-1c lllf ~--TlJaft_Lmc i lbull1 bull l3il0 Nl-197) Ttlll1344 a LbullI 3 l diams 1-111 lflS 1111lOllt ffl- MP PII bullHI lgtl llJI l97Mlt Ian -ti DG llC

111111===-~~~=mg ====~~ tD rlrffllZllIITO-lfllCIIII=~tr~L~~~= - Pl~I llII TD_ ff~ tDII31119NIJMlDffU~~ H CZIII liii~mlt~ D1111nrn11GQ~-CaKftQNJWNczr41140ffnQCUII Jnffnt1JIIIIJunbull~1Qc20lll ~Pllli ll mrnnn lbulltlP 17Jrffdeg-degluoElJIIIQII

~-I-ti _nrna~rlll

a n- 4411 llbullQI 1=40 rt La n- lllf ffrgtn _Jr_~ Ullk ---rr~~ ~=~=tl~~ =1 nttltt nraquo 1nlU as

=-mn--~111DJIDII Ullgt~fflflnanaaJIIJalt55~~EIS~=~~ ~~)1 -11CIJII nn~bullbullbullnaKatt1ta1

JOIT ru~- rf- deg hJIIII r- 111111 ~1111) -1 aJ1 ld t11D1etlll_TalCIS -~-UCV~bullraquootur=~=~I~~=~--~ ~rsrgo_mlaquoshym rs~11flI ~- rnilr==~=~~ ~~r _ ~ atfl ~ rtw Dgtlnn-f-lEllln17n-UIIP

D11 fflXTJ111111 I~~ ar D1Jn4 ~leJJS-OnC111

=====5 middoti SHU=~ 5 ampn iliiiiiIiI11

ngtgtn~1~1tbullubull1rm DH tu~- lt11 rirmU1111 CDIII

~i~i555mi~ ~~ ~m=~==m~g===~~~~ tn1r JtW ~ma- PiOll a CU

~ XNr~t~fDllll1-all~~ m===~~ bullbull~W 111111 ==~~ ampT g~ ru~ =

~lU $Et=ni ~ llll0111ra1Ln~otqC011

H~ g==i =~1 ~

~111111 ~~g~n~a~J))pound11 1=~)6tia

~~ mEfHfH~Si

amp12Ct _ an ~

U N711f21th mM1LU aa o1bull~--117CII in4r ~llllll1Vffl-111Dlr lit~ Hmtlpound1 71 12L I CCIII ---~CUnMIIUOCVf JIHtlnn nl 7r ll4011CIIII

llllDNXCWZflDtlltllCIDCDr

~~=~==~=gnn n1raquoL bullw noanDNt CIJIIi=~ C~middot ~ ~ ~ HnffTI-QIJroQ__111PtlJIIInfflll bullbull1~ aaeIT t-- nrJD nJUntu~CllWI

m ~1 ~ ~~~ ~ ilria~gliiiji~=ir ~lt-OTT gl1raquo ~Iraquou fflllIL nllll 1111111 flC~middotIY_4allCCIIIi l1i5~ ~~11~middot~ ~~ ffll H71W786lll 7P-JOalllllll 2N ~ 1-flllt 7HIJl4- DI ~ ~==~ ~t-tr bullM-

114 Hit71aTra7ririatNOCIIII

llHl1Hf ll~7Dl4fIZIIICIIII 1141ftillf+1DllnTgtlMa~=~bull==~r Lbulll-lllbullbulllJJ

=~~~HR-~a ~ =iEri ~ ~=6

= 1MESE COCIIIOlfAlEi ARC 9~ at AH DISTlfG CONJmOfS AS-alLT FED 5UKiEY Y NORWDal EJICltJIJll(G CD~ IIElMEN ~ 1S 111 DECDaR a 2DII 1)pound OCICIIIDNAlES 5HCflI UIpound IIAID Cit MltSSAOfllffT5 STATE FlJriNII CDCffllNAT smult ~AO leJ (IMIJ 1HE ACQlltACY ltF 1HE COCftDINT[ LDCAnatS Mpound diams- 01 FtU

POINT DESCRIPTION ABBREVIATIONS~-~middotPC Pmlr Of CLIRIJC bullIEllL ClMNpound STilRlS PDC bull PtJtilTIIJOM1poundr ~ [raquo TAHCINiT W(R[ lll[ CURpound uroo Fo F[1NT(1t~tfflvt[ltft1llllIIUlt OMNtilE)PRC ~T oT ~pound ~Vlllrlt

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 2 of 2

I ~ IHAT nfl PlM MS 81D1 PIIDMQl ~WllTM(llUI MOIIEOIAAlPlllR~Df IIUPS C- lttE ~111 Cl__ HftNMIIIZlt

WWWWJU Cii6 liftitit

ACTIVITY ANI) USE LINTATIONS

PLAN OF RES7RIC1EJJ AREAS ANJJ COlER TYPES

8V CKlJ()RN IJNl()N PflllfpoundCpoundS SlllERFIIMJ SITC

50 HJ S(J11( SmEpoundT llAIPOIL JASS

=r-o ~ ll 2021

~ Engmeer1ng

Hltd ~~ middot~~-=~ra (f~AJ lIQ c- f

a llfEET 2 ltF 6324-02

td ~

w ~ m 0 0

Id Q ii w m

co co m 0 co

Bk 39600 Pg437 88608

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY New England Region

Five Post Office Square - Suite 100 Boston Massachusetts 02109-3912

INSTITUTIONAL CONTROL DESIGN STATEMENT FOR THE BLACKBURN AND UNION PRIVILEGES SUPERFUND SITE - EAST OF SOUTH STREET AREA

1 Introduction

Pursuant to the Comprehensive Environmental Response Compensation and Liability Act 42 USC sect 9601 et seq (CERCLA) and the National Contingency Plan 40 CFR Part 300 (the NCP) this document contains a description of the release events and site history that resulted in the contaminated media that require institutional controls in the fom1 of Activity and Use Limitations the basis for land use restrictions and uses that are consistent and inconsistent with the Selected Remedy ( as described below) This Institutional Control (IC) Design Statement pertains to a portion of the Blackburn and Union Privileges Superfund Site located in the Town of Walpole Massachusetts (the Site) which has been listed on EPAs National Priorities List (NPL) which portion is generally referred to as the East of South Street Area (the EOS Area) The EOS Area is located to the east of South Street in Walpole and is shown on Figure 1 attached hereto

A Notice of Activity and Use Limitation (NAUL) is necessary and appropriate for the EOS Area of the Site based on the fact that pursuant to EPAs risk evaluations asbestos arsenic trichloroethene (TCE) and certain polycyclic aromatic hydrocarbon (PAH) contan1inants remain in place in soils at levels higher than those appropriate for unlimited use or unrestricted exposure groundwater underlying the EOS Area contains hazardous substances at levels that present an unacceptable risk of exposure and remedial measures at the Site must be protected and maintained to ensure that the Selected Remedy remains protective

EPAs Record of Decision (ROD) dated September 30 2008 specified the need for institutional controls such as a NAUL to ensure long-tenn perfonnance and protectiveness of the Selected Remedy The institutional controls described herein are necessary and appropriate to ensure that the Selected Remedy for the Site remains protective of human health and the environment The remedy for the Site as described in the ROD is referred to herein and in the NAUL as the Selected Remedy

Page 1 of7

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 31: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

ntllT -1~1~ rurnlaquo1 r1n l1XTM 11Nf -r~ lie UUffCI 11Pt lDll1Hf iniin --IC unr1G Tlr 1n1rn Iota allll Ito tyen1tlll ~~11CRnrzJ11-11--~ci-- n31 nr111w11J1t ~bull c ~- diams JDrnn llloffl rcnlml IDII

-~ ]al rll _ _ PnlM-1-PI lbull-- ll7HrirrIPlllD1lf~-a bullbullll 111bull IClln9XnolDlllIIIIIIOm

214 ff7371JOOT ~bull JllC Ibullbull 171 JICllEY)l)vlUTlo~lUl~ ~li_~ -~~ MDlol ll4L~TllJraquofllllf190abullbullt ~~nQuu~~1aJI _~~OtottWU~1t11txm~arcPbrmllmCDt ~~ ~~ ~ =~ gj ~l11~ llltlM Mrattllll TDPmllIDCDI JJ4bull e~ _ ~ e PClC lbullI- 1- ~1sect~ ~ ~ ~ ~ ~~~-nr~44bull~mn11-a11 ~~ =mt =m~ ~ ~~ ~ =~~-~~ =~~rt~l~llibullltbull=

~~~~~~~~r-~r-~~sectsect55~55 ~~ ~=g~~ mi --1~ ~-==~~m~ L-~r UVPllrlllUillDITDr4L 1JI lbullKlllll~==~~~=~

~~~~~~~~ raquoff-llll 111rritl_aianbull ~11lCla rr- n ttll XDP11r1r 11111c-1C111~ RTl~rJlllllbullbull~llllJlllipo~~=r~tm=~~

~=~3r~t==~ ~=~i==~~ llt1ttl70 m~~n~ =n~ L diams 11- bull - iaEi~mi 1lE~HHffi ~1-~ E LbulllT bullU-7YA 8911U TMn4 OJII C- lllkHrnl1nlntll11106~

MJ9~gt111ftlrfffll11 ~ SbullC61hLJT raquoWl lll~IJlll11amp1 utVllllt a lbulllfGl bulllC lT

lliilH~1 ~~rm-=rn~ lbullIIIICU-1bull0

itt ishwI JUo ma m1 bull 1-c iiliii ~==~m~=~ Ullln U7IIY M1NLl411 fflf f-~ llr IL ~ lbullt Ill uaP11rllDn1rin1bull139nf- na_ 1111lnl ___ lWTDf-ID 111Jbullnllr-cishy

J1JT1 lflTI-noLbull COi lJ1 tsr18GOTDrl1~ 1--Cn ~~~==-=~ LbullS1rbull-p

LbulllI ~middot x1 fl11bull diams an l~J P-~ WI 1~1Slrmsraquo11nirorn 11bull1n-

llrgt 58 - TDrl ZJlJ l~ Zl llf4 Pll1raquo91I lnP~IIEI 11 ==~=-~~ lbullt-11bullh1~

nun_-~bullfllrlll_ lbulll-lrbull N- - nr6-11MII rinaus a 1bull1E-t1 im1 nrxi mr~ 7nn1 4i i 1c m llrS~iJ-ltJlillII Tt-Ul ris ~=~~middotiill~~ tf llDln~n1rJrgt11nbull1ric ~IPgt9nq~ It-MU rbull RflrrlllVllbulltPllbullOIIUAfC lbullnJtrNbull_~lD+4ftJSHJ7711JrllIIIIT144lDI lbulll ~I llfs-mllThn~-f 1bull11

1a5blH=i5gS El~ iE =iilli ~ID aH~~ ~~ leJINNllllfflnlt10ff1nll~1g=TI==~- lbullN~Jmiddot pw nrwuhtl tba11 l- lllllsectimiii~ ~ lllaquot ll116UW41 llllII NII Cl Ld bullt ll 11r 111~-~lHtl-IINOClll 1Dgtn~rMOtnllfbull3all)Mnr~bullwrmm11uoo~ ~r~ m~ = ~~ t~-i m NNtotl n11nn cm

~~~~~Ttr~ in Httl01llxl nlfM114ta cm

JJN n=-PIW - I- C lbullT rnr nnubullNoXI ffllPI n1 11-amp 11middot 77)111fflffPl~JlaUII

i1JJ n91lbull ti Jnlftbulllll QII

~g=~~~~ir~f~5 =i~=~~ ~=~ ~ ~j====goi H1111t-llll ffo~ ~rn tm111 ta1Vl~ tnar- IVI rm u1i ~ nw ~illl cm 1111 Hltt1H T7U 72w111ll tm UI ftffiH~bull1 naMUlI nlll

lltfll~IOUl rnes~ttlClll

~I~~=~=~~= l3111ratlQOJ121lllll CS u1n-n-a mn-c~11111llllilr ~====m~~ lbulllllr~~Oll~r1111-t~rtRiHa)toI

-~rt~_Utr111tt~USI ~m~i==r~~llfflpound1gtgtMllkllit1U10C011 annrxnbull-TCRL11ai~=~=~g)llllll~--rWltMJtt-8 DR Pl rraquof ntl rim Gllf CCI~~1r~~ liiilllii u- ntlt bull llJ~naJCDI

raquo11NMl10~Ullllcm ntrlnK)fL~nlln-1c lllf ~--TlJaft_Lmc i lbull1 bull l3il0 Nl-197) Ttlll1344 a LbullI 3 l diams 1-111 lflS 1111lOllt ffl- MP PII bullHI lgtl llJI l97Mlt Ian -ti DG llC

111111===-~~~=mg ====~~ tD rlrffllZllIITO-lfllCIIII=~tr~L~~~= - Pl~I llII TD_ ff~ tDII31119NIJMlDffU~~ H CZIII liii~mlt~ D1111nrn11GQ~-CaKftQNJWNczr41140ffnQCUII Jnffnt1JIIIIJunbull~1Qc20lll ~Pllli ll mrnnn lbulltlP 17Jrffdeg-degluoElJIIIQII

~-I-ti _nrna~rlll

a n- 4411 llbullQI 1=40 rt La n- lllf ffrgtn _Jr_~ Ullk ---rr~~ ~=~=tl~~ =1 nttltt nraquo 1nlU as

=-mn--~111DJIDII Ullgt~fflflnanaaJIIJalt55~~EIS~=~~ ~~)1 -11CIJII nn~bullbullbullnaKatt1ta1

JOIT ru~- rf- deg hJIIII r- 111111 ~1111) -1 aJ1 ld t11D1etlll_TalCIS -~-UCV~bullraquootur=~=~I~~=~--~ ~rsrgo_mlaquoshym rs~11flI ~- rnilr==~=~~ ~~r _ ~ atfl ~ rtw Dgtlnn-f-lEllln17n-UIIP

D11 fflXTJ111111 I~~ ar D1Jn4 ~leJJS-OnC111

=====5 middoti SHU=~ 5 ampn iliiiiiIiI11

ngtgtn~1~1tbullubull1rm DH tu~- lt11 rirmU1111 CDIII

~i~i555mi~ ~~ ~m=~==m~g===~~~~ tn1r JtW ~ma- PiOll a CU

~ XNr~t~fDllll1-all~~ m===~~ bullbull~W 111111 ==~~ ampT g~ ru~ =

~lU $Et=ni ~ llll0111ra1Ln~otqC011

H~ g==i =~1 ~

~111111 ~~g~n~a~J))pound11 1=~)6tia

~~ mEfHfH~Si

amp12Ct _ an ~

U N711f21th mM1LU aa o1bull~--117CII in4r ~llllll1Vffl-111Dlr lit~ Hmtlpound1 71 12L I CCIII ---~CUnMIIUOCVf JIHtlnn nl 7r ll4011CIIII

llllDNXCWZflDtlltllCIDCDr

~~=~==~=gnn n1raquoL bullw noanDNt CIJIIi=~ C~middot ~ ~ ~ HnffTI-QIJroQ__111PtlJIIInfflll bullbull1~ aaeIT t-- nrJD nJUntu~CllWI

m ~1 ~ ~~~ ~ ilria~gliiiji~=ir ~lt-OTT gl1raquo ~Iraquou fflllIL nllll 1111111 flC~middotIY_4allCCIIIi l1i5~ ~~11~middot~ ~~ ffll H71W786lll 7P-JOalllllll 2N ~ 1-flllt 7HIJl4- DI ~ ~==~ ~t-tr bullM-

114 Hit71aTra7ririatNOCIIII

llHl1Hf ll~7Dl4fIZIIICIIII 1141ftillf+1DllnTgtlMa~=~bull==~r Lbulll-lllbullbulllJJ

=~~~HR-~a ~ =iEri ~ ~=6

= 1MESE COCIIIOlfAlEi ARC 9~ at AH DISTlfG CONJmOfS AS-alLT FED 5UKiEY Y NORWDal EJICltJIJll(G CD~ IIElMEN ~ 1S 111 DECDaR a 2DII 1)pound OCICIIIDNAlES 5HCflI UIpound IIAID Cit MltSSAOfllffT5 STATE FlJriNII CDCffllNAT smult ~AO leJ (IMIJ 1HE ACQlltACY ltF 1HE COCftDINT[ LDCAnatS Mpound diams- 01 FtU

POINT DESCRIPTION ABBREVIATIONS~-~middotPC Pmlr Of CLIRIJC bullIEllL ClMNpound STilRlS PDC bull PtJtilTIIJOM1poundr ~ [raquo TAHCINiT W(R[ lll[ CURpound uroo Fo F[1NT(1t~tfflvt[ltft1llllIIUlt OMNtilE)PRC ~T oT ~pound ~Vlllrlt

Exhibit D - Photo-Reduced Copy of Activity and Use Limitations Plan of Restricted Areas and Cover Types with Coordinate Table - Sheet 2 of 2

I ~ IHAT nfl PlM MS 81D1 PIIDMQl ~WllTM(llUI MOIIEOIAAlPlllR~Df IIUPS C- lttE ~111 Cl__ HftNMIIIZlt

WWWWJU Cii6 liftitit

ACTIVITY ANI) USE LINTATIONS

PLAN OF RES7RIC1EJJ AREAS ANJJ COlER TYPES

8V CKlJ()RN IJNl()N PflllfpoundCpoundS SlllERFIIMJ SITC

50 HJ S(J11( SmEpoundT llAIPOIL JASS

=r-o ~ ll 2021

~ Engmeer1ng

Hltd ~~ middot~~-=~ra (f~AJ lIQ c- f

a llfEET 2 ltF 6324-02

td ~

w ~ m 0 0

Id Q ii w m

co co m 0 co

Bk 39600 Pg437 88608

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY New England Region

Five Post Office Square - Suite 100 Boston Massachusetts 02109-3912

INSTITUTIONAL CONTROL DESIGN STATEMENT FOR THE BLACKBURN AND UNION PRIVILEGES SUPERFUND SITE - EAST OF SOUTH STREET AREA

1 Introduction

Pursuant to the Comprehensive Environmental Response Compensation and Liability Act 42 USC sect 9601 et seq (CERCLA) and the National Contingency Plan 40 CFR Part 300 (the NCP) this document contains a description of the release events and site history that resulted in the contaminated media that require institutional controls in the fom1 of Activity and Use Limitations the basis for land use restrictions and uses that are consistent and inconsistent with the Selected Remedy ( as described below) This Institutional Control (IC) Design Statement pertains to a portion of the Blackburn and Union Privileges Superfund Site located in the Town of Walpole Massachusetts (the Site) which has been listed on EPAs National Priorities List (NPL) which portion is generally referred to as the East of South Street Area (the EOS Area) The EOS Area is located to the east of South Street in Walpole and is shown on Figure 1 attached hereto

A Notice of Activity and Use Limitation (NAUL) is necessary and appropriate for the EOS Area of the Site based on the fact that pursuant to EPAs risk evaluations asbestos arsenic trichloroethene (TCE) and certain polycyclic aromatic hydrocarbon (PAH) contan1inants remain in place in soils at levels higher than those appropriate for unlimited use or unrestricted exposure groundwater underlying the EOS Area contains hazardous substances at levels that present an unacceptable risk of exposure and remedial measures at the Site must be protected and maintained to ensure that the Selected Remedy remains protective

EPAs Record of Decision (ROD) dated September 30 2008 specified the need for institutional controls such as a NAUL to ensure long-tenn perfonnance and protectiveness of the Selected Remedy The institutional controls described herein are necessary and appropriate to ensure that the Selected Remedy for the Site remains protective of human health and the environment The remedy for the Site as described in the ROD is referred to herein and in the NAUL as the Selected Remedy

Page 1 of7

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 32: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

Bk 39600 Pg437 88608

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY New England Region

Five Post Office Square - Suite 100 Boston Massachusetts 02109-3912

INSTITUTIONAL CONTROL DESIGN STATEMENT FOR THE BLACKBURN AND UNION PRIVILEGES SUPERFUND SITE - EAST OF SOUTH STREET AREA

1 Introduction

Pursuant to the Comprehensive Environmental Response Compensation and Liability Act 42 USC sect 9601 et seq (CERCLA) and the National Contingency Plan 40 CFR Part 300 (the NCP) this document contains a description of the release events and site history that resulted in the contaminated media that require institutional controls in the fom1 of Activity and Use Limitations the basis for land use restrictions and uses that are consistent and inconsistent with the Selected Remedy ( as described below) This Institutional Control (IC) Design Statement pertains to a portion of the Blackburn and Union Privileges Superfund Site located in the Town of Walpole Massachusetts (the Site) which has been listed on EPAs National Priorities List (NPL) which portion is generally referred to as the East of South Street Area (the EOS Area) The EOS Area is located to the east of South Street in Walpole and is shown on Figure 1 attached hereto

A Notice of Activity and Use Limitation (NAUL) is necessary and appropriate for the EOS Area of the Site based on the fact that pursuant to EPAs risk evaluations asbestos arsenic trichloroethene (TCE) and certain polycyclic aromatic hydrocarbon (PAH) contan1inants remain in place in soils at levels higher than those appropriate for unlimited use or unrestricted exposure groundwater underlying the EOS Area contains hazardous substances at levels that present an unacceptable risk of exposure and remedial measures at the Site must be protected and maintained to ensure that the Selected Remedy remains protective

EPAs Record of Decision (ROD) dated September 30 2008 specified the need for institutional controls such as a NAUL to ensure long-tenn perfonnance and protectiveness of the Selected Remedy The institutional controls described herein are necessary and appropriate to ensure that the Selected Remedy for the Site remains protective of human health and the environment The remedy for the Site as described in the ROD is referred to herein and in the NAUL as the Selected Remedy

Page 1 of7

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 33: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

Bk 39600 Pg438 88608

2 Site HistoryBackground

A wide array of industrial and commercial processes operated at the Site Industrial and commercial processes using chromium arsenic and mercury date back to the 1600s In or about 1811 the Blackburn Privilege was established east of South Street and around 1812 the Union Factory Privilege was established west of South Street (The tenn privilege refers to a grant enabling commercial usage of the Neponset River for water supply and power) Water was diverted through a canal into a powerhouse and then through a mill tailrace before it was discharged back into the Neponset River Between 1891 and 1915 the Site was used for the manufacture of tires rubber goods and insulating materials The crushing of asbestos in the manufacture of brake and clutch linings occurred at the Site between 1915 and 1937 The area west of South Street was the site of much of these operations and housed The Standard Woven Fabric Company which was renamed Multibestos Corporation Various cotton and fabric production processes were conducted at the Site from 1937 unti 11985 Part of these operations included discharging treated wastewater through one of two settling basins and then to the Walpole sewer system The fonner mill building located west of South Street had been vacant for many years and has been demolished Industrial buildings fonnerly occupied the EOS Area but those buildings were demolished between 2015 and 2018

Environmental investigations to review possible impacts to the Site engendered by historical industrial activities were initiated in the early to mid-l 980s The presence of elevated concentrations of specific constituents related to the historical property usage was discovered during these environmental investigations which prompted the closure and removal of aboveground and underground storage tanks A removal action was conducted primarily in 1992 to address the presence of asbestos-contaminated soil at the Site EPA added the Site to the NPL in 1994 and in 2007 and 2008 respectively a Remedial Investigation and a Feasibility Study of cleanup options were completed As stated above EPA issued a cleanup decision for the Site in a ROD in 2008

The Constituents of Concern (COCs) identified in the ROD for the EOS Area soil include arsenic asbestos TCE and five PAHs benzo(a)anthracene benzo(a)pyrene benzo(b)fluoranthene dibenzo(ah)anthracene and indeno(l 23-cd) pyrene The COCs are present at levels that present unacceptable risks from the direct contact with soil except for TCE which presents unacceptable risks from inhalation of indoor air in some portions of the Site Further information about contamination present in the EOS area can be found in the ROD and in the Addendum to the Remedial Investigation (December 7 2007)

The remedy selection is documented in the ROD As it pertains to EOS Area the remedy included

1 Excavation and off-site disposal of contaminated soils 2 Establishment of institutional controls to address residual risks from contaminated soils

and groundwater remaining on the Site 3 Long-term monitoring and reviews of the Site at least every five years

Long-tem1 groundwater monitoring for Site COCs is required within a Groundwater Compliance

Page 2 of 7

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 34: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …

Bk 39600 Pg439 88608

Boundary (as defined in the ROD) which includes all of the EOS Area except for the fom1er railroad embankment parcel (Lot 3 3-120) Annual monitoring of groundwater within the Groundwater Compliance Boundary has been conducted from 2011 to the present and has included sampling for volatile organic compounds (VOCs) semi-volatile organic compounds (SVOCs) and metals

The soil excavation in the EOS Area was completed in two phases Final excavation limits were documented in a report titled Draft Remedial Construction Report - Soil Remedial Action dated January 14 2016 and conditionally approved by EPA on February 22 2016 (the Soil RA Construction Report) and a report titled Second Revised Draft Remedial Construction Report -Soil Remedial Action - Phase II dated October I 2018 and conditionally approved by EPA on November 27 2018 (the Phase 2 Soil RA Construction Report) The horizontal extent of soil excavation included areas adjacent to and beneath the former buildings in the EOS Area (following their demolition by the Town of Walpole) wetlands located in the southern portion of the EOS Area and portions of the railway embankment located along the eastern portion of the EOS Area

Following the excavation in the EOS Area of approximately 29700 tons of soil soils are present in the Area that contain contaminants at levels that exceed ROD cleanup limits and are at levels higher than those appropriate for unlimited use or unrestricted exposure Areas where postshyexcavation samples exceeded the ROD cleanup limits are documented in the Soil RA Construction Report and the Phase 2 Soil RA Construction Report Details regarding the as-built conditions are described in a Memo from Wilcox and Barton to the Mr James Johnson Town Administrator Town of Walpole dated April 1 2019 titled As-Built Conditions - Soil Management and Cap See Figure 2 (The memo was supplemented by photo documentation provided by the Town on February 4 February 12 and June 23 2020 that can be found in the current EPA records management system as SEMS DOC ID 100012968

3 Summary of Required Institutional Controls

For the Site remedy to be protective for long-term foreseeable uses the following institutional controls need to be established and recorded to limit inappropriate land uses and exposure to soil containing COCs at the EOS Area The boundary of the EOS Area to be subject to the institutional controls is shown on Exhibit C of the NAUL The EOS Area will contain the following four separate Restricted Areas as shown on Exhibit D of the NAUL Paved Areas Building Footprint Areas Landscaped Areas and Unimproved Areas

As used below the term Ground Surface shall mean in Paved Areas and in Building Footprint Areas the uppermost surface of the ground located immediately below any pavement in Paved Areas or under any buildings or structures in Building Footprint Areas and in Landscaped Areas and Unimproved Areas the uppem10st surface of the ground based upon the surface elevations depicted in Exhibit C of the NAUL

a Activities and Uses Consistent with Maintaining the Selected Remedy

1 Any response actions necessary to maintain the Selected Remedy (including

Page 3 of7

Bk 39600 Pg440 88608

without limitation sampling of existing wells and installation and sampling of any new monitoring wells that may be required) as approved by EPA and MassDEP in advance in writing and any necessary and appropriate inspections of the Selected Remedy

2 Commercial industrial and manufacturing uses including without limitation municipal use as a police station and a non-residential senior andor community center and library

3 Non-residential school and day care uses

4 Paving repaving andor maintenance by adult workers of the Paved Areas shown on Exhibit D of the NAUL provided that any such work does not disturb excavate or remove soils or intrude into the Ground Surface below such Paved Areas

5 Maintenance work by adult workers in the Landscaped Areas shown on Exhibit D of the NAUL that may disturb excavate or remove soil or intrude into the Ground Surface provided such work does not extend greater than twelve inches below the Ground Surface or until a geotextile liner or baiTier is reached whichever is less and provided that the original surface elevations are restored Such maintenance work in Landscaped Areas includes routine mowing seeding fertilizing mulching raking weeding and utility maintenance

6 Without limiting Subparagraph 3a5 above soil disturbance excavation or other intrusive activity by adult workers into or beneath the Ground Surface andor any other activity that may result in exposure to soil provided such work is conducted pursuant to a Health and Safety Plan (HSP) and an approved Soil Management Plan (SMP) The SMP must be approved by EPA and MassD EP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work Such work may include without limitation the installation of new utilities and utility maintenance including the maintenance repair and replacement of pipes lines and other appurtenances and facilities for the conveyance andor transmission of water sewerage stom1water gas fuel oil electricity and communications

The SMP shaU provide for among other things proper and safe management of soil and other materials including but not limited to excavation storage sampling analysis final disposition restoration of all excavated or affected areas and the protection of the general public and the environment The SMP shall include as applicable and without limitation the following

i Any excavation shall be conducted to minimize the length of time when excavated areas are open andor excavated materials are stored

Page 4 of7

Bk 39600 Pg441 88608

on the property 11 Appropriate measures shall be taken to secure stored soil and to

control erosion dust and runoff Any permanent changes in the surface grade elevation shall require prior approval by EPA and MassDEP

m Groundwater monitoring wells shall be repaired or replaced if damaged

1v Compliance with all applicable laws rules and regulations including without limitation laws rules and regulations regarding soil management disposition and disposal even if more stringent than the requirements of the SMP

v A date on which the SMP expires ifrequired by EPA and MassDEP vi A report to be submitted to MassDEP and EPA at the completion of

the work approved under the SMP showing compliance with the SMP if required by EPA and MassDEP

The HSP shall establish the procedures personnel responsibilities and training necessary to protect the health or safety of all on-site personnel during such work The HSP shall be prepared in accordance with the occupational health and safety provisions of 29 Code of Federal Regulation Section 1910120 otherwise applicable to hazardous waste operations and emergency response as amended relevant OSHA guidance and any other applicable federal state or local law

For routine maintenance and repair that is conducted on a regular basis (for example planting and removal of trees and shrubs) a standardized SMP and HSP may be developed Such SMP must be approved by EPA and MassDEP in writing prior to the initiation of such activities and the HSP shall be submitted to EPA and MassDEP at least 30 days prior to the initiation of work EPA will maintain the standardized SMP and HSP in the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA) Notwithstanding subparagraph 3(a)(6)(vi) above EPA and MassDEP shall not require completion reports for individual routine maintenance and repair tasks conducted pursuant to a standardized SMP described in this subparagraph although EPA and MassDEP may require periodic reporting on such tasks

7 Such other activities and uses not identified in Paragraph 3b below as being activities and uses inconsistent with maintaining the Selected Remedy

b Activities and Uses Inconsistent with Maintaining the Selected Remedy

1 Residential use or activity

Page 5 of7

Bk 39600 Pg442 88608

2 Except as permitted in Paragraph 3a l above (groundwater monitoring) the extraction consumption or utilization of groundwater for any purpose (including without limitation extraction for potable industrial irrigation or agricultural use) and any activities including any excavation that may result in exposure to groundwater

3 Except as pennitted by Paragraph 3a above soil disturbance excavation or other intrusive activity into or beneath the Ground Surface andor any other activity that may result in exposure to soil

4 Agricultural use or activity except for raised garden beds approved in accordance with Section 3a6

5 Construction or installation of a building or structure for human occupancy without prior written approval of EPA

6 Any use or activity that would interfere with or would be reasonably likely to interfere with the implementation effectiveness integrity operation or maintenance of the Selected Remedy

c Obligations and Conditions Necessary to Maintain the Selected Remedy

1 Compliance with all applicable laws rules and regulations regarding soil management disposition and disposal

2 If EPA has provided written notice that EPA has determined that the parties responsible under the Site Operations and Maintenance Plan and Environmental Monitoring Work Plan approved by EPA (the OampM Plan) are no longer able to submit an annual compliance letter regarding this NAUL the owner of the EOS Area shall submit an annual compliance letter to EPA and MassDEP no later than June I of each calendar year that shall (a) describe generally the activities and uses that have occurred on the EOS Area during the past calendar year and (b) certify compliance with the NAUL such certification to include any supporting information upon which such certifications are based The OampM Plan can be accessed via the current EPA records management system (eg EPAs Superfund Enterprise Management System (SEMS) database or any successor records system maintained by EPA)

Page 6 of 7

Bk 39600 Pg443 88608

4 Implementation of NAUL

For the reasons described above and in relevant EPA decision documents a Notice of Activity and Use Limitation should be implemented and recorded in the land records for the Site pursuant to CERCLA the NCP and regulations set forth in the Massachusetts Contingency Plan at 310 Code of Massachusetts Regulations Sections 400111(8) 401070(4) and (as applicable) 401074

Date Bryan Olson Director Superfund and Emergency Management Division (SEMD) US Environmental Protection Agency Region I

Figures

Figure 1 - Site Plan Figure 2 - Memo regarding As-Built Conditions

Page 7 of7

Bk

3

96

00

P

g4

44

88

60

8

S1111S3H 3NN

C w

wom

bull 1 lJj3RJJH

OO

Nfld 311S

lt

( 0

wo

middotun

1M1U

IJGG

MM

M IH

Zll~

~lll

II~ 3

70

dlIM

1uawa1e1s u61saa s10J1uoi reuo1n19su1

_IW

0 Y

il NO

lUI

3llS

aN

nd

Eld

nS

~

m

31m J1Jll1 Illi T

IYW

l ~

13

3H

1S

Hln

os 10 lS

l3

S3

~3

llfllld N

OIN

n l1 N

ln9

(lflEl

0 z ~

il

Q

0

Q

0 N

LJ

_ ~ i

il z

Cl

uJ U

I-~

l-

0

I l (middot

I ----+ I

~

~ I I

~_I

---

O

--

I l

II

[] I

I

I t_

J

I

I

I I

II

-~

---~

cl

--~

-

---middot

---

I --

l I

I

I I ----

-~

--

I II

i I I

IIshyI

I-T

~-

[I -

iI

i --I

_ 1

i

I I

I

1--

---1 I

I - I I

I I

I I

I I

i

C

J2 0 Q

) t= (I)

(1) C

)

LL

Bk 39600 Pg445 88608

Figure 2 -WilcoxampBarton Ne Memo Regarding As-Built Conditions CIVILmiddot ENVIRONMENTALmiddot GEOTECHNICAL

MEMORANDUM

TO Mr James Johnson Town Administrator

FROM David JP Foss CPG LSP

SUBJECT As-Built Conditions- Soil Management and Cap Blackbum amp Union Privi1eges Superfund Site East of South Street Walpole Massachusetts

DATE April 1 2019

This memorandum has been prepared by Wilcoxamp Barton Inc on beha1fofthe Town ofWalpo1e to provide confirmation that the earthwork and installation of final capping layers at the site was performed in accordance with project design documents and United Stated Environmental Protection Agency (EPA) approvals The locations and cap alternatives are depicted on the attached survey plan titled Summa1y ofConstructed Cap Alternatives As-Built Site Plan

This memorandum applies to the construction of the Police Station and the South Street Center Council on Aging (COA) facility building The combined project area is referred to as the East of South Street (EOS) portion of the Blackbum amp Union Privileges Superfund Site

Earthwork excavation grading installation of geotechnical ground improvements placement of imported fill and construction were performed in accordance with the following EPA Approved Soil Management Plans (SMP) and Conditional Approval Letters (CAL)

EOS - SMP Addendum November 23 2015 CAL-November 27 2015 EOS - SMP Addendum March 30 2017 CAL - March 30 2017 EOS - SMP September 20 2017 Conditional Approval via email - September 20 2017

The SMPs listed above and EPA approvals incorporated revisions to approach and implementation per electronic mail communication between the following members of the project team

Town of Walpole bull Robin Chapell Health Director bull Bryan Jarvis Owners Project Manager Compass Project Management bull David Foss Environmental Consu1tant

US Environmental Protection Agency bull Rich Fisher Remedial Project Manager bull Lisa Thuot Remedial Project Manager

I01111111111111111111111111111111111110111118111111

SEMS Doc ID 100012968 WWWWILCOXANDBARTONCOM 1 B Commons Drive Unit l 2B Londonderry NH 03053 bull Ph (603) 369-4190 I 1888 777-5805 bull Fax (603) 369-6639

Offlclaquon In New Hampshire bull Vermont bull Mossochusetls bull Connecficu bull Hawaii

Bk 39600 Pg446 88608

Wil~_oxampJarton CIYll bull IWmCMMEbullIbullbull bull GIOHCH~l(AL

On November 13 2018 EPA conducted a site inspection at the COA construction project The observations made during that inspection are documented in the Walpole COA Final EPA Site Inspection Report dated December I8 20 I 8

Soil Management

Fol1owing remedy implementation performed by the Responsible Parties no soil (backfill) above the approved vertical limits exceeded the numeric criteria set forth in the Record of Decision (ROD) There were instances where soil remaining in place did exceed the numeric criteria TI1e vertical limits were established as

a The depth of excavation was 10 feet or greater below grade b The depth of excavation was at or below the average seasonal Jow groundwater

elevation (1592 feet NGVD29) and c The excavation extent was Jimited due to the proximity of any public roadway

specifically South Street

During site preparation and construction by the Town of Walpole and its contractors site soil was managed in accordance with the SMP At the completion of construction all subgrade soil has been capped with hardscape (asphalt or concrete pavement) or a I-foot minimum ofclean fill underlain by a geotextile fabric as a visual marker layer Each cap area is depicted on the attached figure and any changes in the configuration of the capping relative to the layout proposed in project design documents the SMP were made to address architectural and engineering design requirements and not as a result of a change in subsurface conditions It is noted that grading and earthwork included the management of soiJ from the northern portion (Police Station) of the site to the southern portion COA) It was not feasible to segregate fill material that was imported following remediation activities conducted by the Superfund Responsible Parties from soil sourced at the site The soil beneath the constructed caps may contain COCs in excess of the numeric ROD values (eg see Table 4-1 of the Revised Draft Remedial Construction Report - Soil Remedial Action - Phase 2) As such all soil located beneath the constructed caps at the site is considered to be of quality and condition consistent with non-backfill soil Thus except as detailed in the utility trench section below soil beneath the constructed caps may contain constituents of concern at levels less than the site-specific criteria set forth in the EPA Record of Decision (ROD)

Utility Trenches

During the insta11ation of below grade utilities all utility trenches were backfilled with granular fill in accordance with the project specifications Granular fill as defined in the project specifications is an imported clean material The purpose of backfilling utility trenches and corridors with imported material was to minimize the potential for a future utility repair contractor to have direct contact with non-backfill soil Each utility trench was excavated to the depth specified for each utility in accordance with the project design documents and building code requirements The width of each utility trench was equal to or greater than two times the diameter of the utility pipe or conduit at the depth ofpipe installation

2

Bk 39600 Pg447 88608

WiJco~ampn~rton ~ Vilmiddot EIIIWUOfilUNl-lbull (ipound0H(WtjtClll

Sub-slab Vapor Barrier

During the construction ofboth the Police Station and COA buildings a vapor barrier was installed beneath the slab-on-grade foundation in accordance with the project design documents The vapor barriers were designed to facilitate passive venting through stacks to the building roofs No data exists suggesting an historic or on-going source of volatiles in soil or groundwater beneath the Police Station and COA building footprints therefore the sub-slab ventilation components are only planned to operate passively

NAUL

It is anticipated that a Notice of Activity and Use Limitation (NAUL) will be recorded for the site and the attached figure (or equivalent) wilI be incorporated into the NAUL Consistent with the requirements set forth in MassDEP regulations the NAUL wil1 place restrictions on and detail response actions necessary if the implementation of future utility repair or construction work requires the penetration of the existing cap All cap layers shall be repaired to maintain the effectiveness of the visual and physical barriers consistent with current conditions to isolate subsurface soil from direct contact at the surface

Conclusion

The following conclusion is based on observations made by Wilcox amp Barton Inc Compass Project Management and Town of Walpole personnel and qualified professionals on the Town of Walpole project design team Wilcox amp Barton Inc is relying on the certifications of the professional engineers that have inspected the project work and confirmed completion of the work in accordance with the project design documents and specifications

It is the conclusion of WiJcox amp Barton Inc that soil management and insta1lation of final capping layers at the site was performed in accordance with project design documents and EPAshyapproved SMPs The locations of cap alternatives are depicted on the attached survey plan titled Summary ofConstructed Cap Alternatives As-Built Site Plan The attached figure documents the following capped areas of the site

bull Landscaped Area with Cap Thickness ltl OFeet bull Landscaped Area with Cap Thicknessgt10 Feet

(or Outside Area of known Contamination) bull Pavement and Concrete Cap Area bull Building Cap Area

As noted on the Summmy ofConstructed Cap Alternatives As-BuUt Site Plan the thickness of final cap construction may be less than 10 feet in close proximity to the Neponset River and South Street road shoulder where construction limitations restricted excavation work as approved in the ROD

3

Bk

3

96

00

P

g4

48

88

60

8

middot~ ---

-

I ~11

I E

bull

~ ___ gt--J C

)

VJ

~

t~ r i f

Li

1 ~

0

h ________

j

1fl middot

il ~

~--r

I_--

---i

1

Bk 39600 Pg450 88608

Exhibit F

Copy of Vote of Town of Walpole

Bk 39600 Pg451 88608

Walpole Town Hall TOWN OF WALPOLE 135 School Street Walpole MA 02081COMMONWEALTH OF MASSACHUSETTS

Phone (508) 660-7300 Fax (508) 660-7303

May 13 2021 Commonwealth of Massachusetts Executive Office of Energy amp Environmental Affairs Massachusetts Department of Environmental Protection Office of Genera Counsel One Winter Street Boston MA 02108

Subject Signatory Authorization Notice of Activity and Use Limitation Documents Blackburn amp Union Privileges Superfund Site South Street Walpole Massachusetts EPA Site Identification Number MAD982191363 MassDEP Release Tracking Number 4-300060

Dear Sir or Madam

I Elizabeth Gaffey Town Clerk of the Town of Walpole hereby certify that

bull Jim Johnson is the Town Administrator of the Town of Walpole

bull The following vote was taken unanimously by the Select Board of the Town of Walpole on April 06 2021

To authorize the Town Administrator Jim Johnson to sign on behalf of the Town a Notice of Activity and Use Limitation with respect to the property identified by Town of Walpole tax ID number 046-001-334 such Notice intended to implement a portion of the selected remedy at the Blackburn and Union Superfund Site

bull Town Administrator Jim Johnson is authorized pursuant to said vote by the Select Board to execute on behalf of the Town said Notice of Activity and Use Limitation

ow lerk May 13 2021

  1. barcode 100018386
  2. barcodetext SEMS Doc ID 100018386
Page 35: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …
Page 36: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …
Page 37: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …
Page 38: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …
Page 39: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …
Page 40: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …
Page 41: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …
Page 42: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …
Page 43: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …
Page 44: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …
Page 45: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …
Page 46: NOTICE OF ACTIVITY AND USE LIMITATION (NAUL) - TOWN …