CITY OF SANTA MONICA CITY PLANNING DIVISION
1685 MAIN STREET, ROOM 212 SANTA MONICA, CA 90401
Page 1 of 3
NOTICE OF PREPARATION/NOTICE OF SCOPING MEETING FOR A DRAFT ENVIRONMENTAL IMPACT REPORT
FOR THE 500 BROADWAY MIXED USE HOUSING PROJECT DATE: November 20, 2014 TO: State Clearinghouse, Responsible Agencies, Trustee Agencies, Organizations and
Interested Parties LEAD AGENCY: City of Santa Monica 1685 Main Street, Room 212 Santa Monica, CA 90401 Contact: Steve Mizokami Phone: (310) 458-8341 The City of Santa Monica intends to prepare an Environmental Impact Report (EIR) for a proposed mixed-use development project at 500 Broadway in Downtown Santa Monica. In accordance with Section 15082 of the State CEQA Guidelines, the City of Santa Monica has prepared this Notice of Preparation to provide Responsible Agencies and other interested parties with information describing the proposed project and its potential environmental effects. Environmental factors that would be potentially affected by the proposed project are: • Aesthetics • Neighborhood Effects • Air Quality • Noise • Construction Effects • Population/Housing • Cultural Resources • Public Services • Greenhouse Gas Emissions • Shade/Shadow Effects • Geology/Soils • Traffic and Circulation • Hazards and Hazardous Materials • Utilities and Service Systems • Land Use/Planning • Mandatory Findings of Significance PROJECT APPLICANT: DK Broadway LLC
315 S. Beverly Drive, Suite 201 Beverly Hills, CA 90212
PROJECT LOCATION: 500 Broadway, Santa Monica, California, located on the southeast corner of Broadway and 5th Street (refer to Figures 1 and 2). PROJECT DESCRIPTION: The proposed 500 Broadway Mixed Use Housing Project would involve the demolition of the existing one-story commercial (Fred Segal) building and a 92-space surface parking lot on two contiguous parcels totaling approximately 67,500 square feet (sf) of land area and the construction of 336,630 sf of mixed use development in a 84-foot high building. The building would be divided into four separate building forms above the podium level (refer to Figures 2 and 3). The proposed project would include up to 262 residential units consisting of a mix of studio, one-, two-, and three-bedroom units. In addition to market-rate housing, the project would include deed-restricted affordable housing (either provided on-site, off-
CITY OF SANTA MONICA CITY PLANNING DIVISION
1685 MAIN STREET, ROOM 212 SANTA MONICA, CA 90401
Page 2 of 3
site, or at a combination of on-site and off-site locations). Regardless of where the affordable units are provided, the maximum number of dwellings to be constructed at 500 Broadway will be 262 units. If affordable housing is built off-site as part of this project, the off-site locations would be located in the Downtown area and there would be a maximum of 60 off-site units, all of which would be deed-restricted affordable units, at a maximum of two locations. Thus, if affordable housing is provided off-site, a maximum of up to 322 dwellings would be constructed as a result of this project. The project is designed with approximately 19,500 sf of common residential open space, including shared open courtyards and rooftop recreation spaces divided into four rectangular above-grade structures connected by a system of external pedestrian bridges. The podium level includes approximately 14,700 sf of landscaped courtyards and gardens, and the rooftop deck includes approximately 4,800 sf that would provide gardens, pool/spa, and barbeque amenities. The ground floor of the project would include pedestrian-oriented commercial uses, including retail and restaurant, as well as residential lobbies. The project would also include approximately 5,500 sf of ground floor open space, including a public plaza with seating and landscaping, outdoor seating for dining, and widened sidewalks with new landscaping and decorative paving. The project would also include a shared “Cross Court” vehicular, pedestrian, and bicycle access way to provide a mid-block connection between 5th Street and 5th Court. Vehicular access to the subterranean parking structure would be provided off 5th Street via the proposed Cross Court driveway midway along the block; additional residential and loading access would be provided off of 5th Court via Broadway. The project would include a four-level subterranean parking garage at 500 Broadway providing a total of approximately 577 commercial and residential parking spaces, and 32,800 sf of commercial floor area, potentially including an exercise facility and including 5,480 sf of commercial storage, secured long-term bicycle parking, and bike locker and shower facilities. The 500 Broadway Mixed Use Housing Project would be implemented through a Development Agreement with the City of Santa Monica. The EIR to be prepared will analyze the project related and cumulative environmental impacts of the proposed project. REVIEW PERIOD: As specified by the State CEQA Guidelines, the Notice of Preparation will be circulated for a minimum 30-day review period. The City of Santa Monica welcomes agency and public input during this period regarding the scope and content of environmental information related to your agency’s responsibility that must be included in the Draft EIR. Comments may be submitted, in writing, by 5:30 p.m. on December 22, 2014 and addressed to:
Steve Mizokami City Planning Division
1685 Main Street, Room 212 Santa Monica, CA 90401
E-mail: [email protected] SCOPING MEETING: The City has scheduled a Public Scoping Meeting for the EIR to describe the proposed project, the environmental review process, and to receive your verbal input on the information that should be included in the EIR. The Public Scoping Meeting is scheduled at the following time and location:
CITY OF SANTA MONICA CITY PLANNING DIVISION
1685 MAIN STREET, ROOM 212 SANTA MONICA, CA 90401
Page 3 of 3
Thursday December 4, 2014 6:30 PM – 8:30 PM
Ken Edwards Center 1527 4th Street
Santa Monica, California 90401 ESPAÑOL: Esto es una noticia de la preparación de un reporte sobre los posibles efectos ambientales en referencia a la construcción propuesta de un edifico, lo cual puede ser de interes a usted. Para más información, llame a Carmen Gutierrez, al numero (310) 458-8341. ______________________________ _____________________________ Amanda Schachter Date Planning Manager Figures
1. Project Location Map 2. Project Site Map 3. Project Site Plan 4. Conceptual Project Design
BC
10
10
2
2
1
1
1LINCOLN BOULEVARDLINCOLN BOULEVARD
5TH STREET5TH STREET
6TH STREET6TH STREET
7TH STREET7TH STREET
9TH STREET9TH STREET
10TH STREET10TH STREET
11TH STREET11TH STREET
12TH STREET12TH STREET
EUCLID STREETEUCLID STREET
4TH STREET4TH STREET
MAIN STREETMAIN STREET
MAIN STREETMAIN STREET
BAY
STRE
ETBA
Y ST
REET
PACI
FIC
STRE
ETPA
CIFI
C ST
REET
PACI
FIC
STRE
ETPA
CIFI
C ST
REET
PICO
BO
ULEV
ARD
PICO
BO
ULEV
ARD
3RD STREET3RD STREET
4TH STREET4TH STREET
5TH STREET5TH STREET OCE
AN P
ARK
BOUL
EVAR
D
OCE
AN P
ARK
BOUL
EVAR
D
6TH STREET6TH STREET
7TH STREET7TH STREET
BEVERLY AVENUEBEVERLY AVENUE
NEILSON WAYNEILSON WAY
BARNARD WAYBARNARD WAY
2ND STREET2ND STREET
3RD STREET PROMENADE3RD STREET PROMENADE
OCEAN AVENUEOCEAN AVENUE
WASHING
TON BO
ULEVARDW
ASHINGTO
N BOULEVARD
CALIFORNIA AVENUE
CALIFORNIA AVENUE
WILSHIRE BO
ULEVARDW
ILSHIRE BOULEVARD
SANTA MO
NICA BOULEVARD
SANTA MO
NICA BOULEVARD
BROADW
AYBRO
ADWAY
COLO
RADO AVENUE
COLO
RADO AVENUE
LINCOLN BOULEVARD
5TH STREET
6TH STREET
7TH STREET
9TH STREET
10TH STREET
11TH STREET
12TH STREET
EUCLID STREET
4TH STREET
3RD STREET
MAIN STREET
SANTA MO
NICA PIER
MAIN STREET
BAY
STRE
ET
PACI
FIC
STRE
ET
OCE
AN P
ARK
BOUL
EVAR
D
PACI
FIC
STRE
ET
PICO
BO
ULEV
ARD
3RD STREET
4TH STREET
5TH STREET
6TH STREET
7TH STREET
BEVERLY AVENUE
NEILSON WAY
BARNARD WAY
2ND STREET
3RD STREET PROMENADE
OCEAN AVENUE
OCEAN FRONT WALK
WASHING
TON BO
ULEVARD
CALIFORNIA AVENUE
WILSHIRE BO
ULEVARD
SANTA MO
NICA BOULEVARD
BROADW
AY
COLO
RADO AVENUE
Santa Monica Bay
Santa MonicaSanta MonicaPlacePlace
ShoppingShoppingCenterCenter
CityHall
Santa MonicaPlace
ShoppingCenter
St. Monica’sCatholic Church
and Schools
Santa MonicaHigh School
CountyCourthouse
CivicCenter
IndustrialIndustrialConservationConservation
DistrictDistrict
Beach and Oceanfron DistrictBeach and Oceanfron District
IndustrialConservation
District
Civic CenterSpecific Plan
Area
Beach and Oceanfron District
Palisades Park
Reed Park
Santa Monica State Beach Park
CrescentBay Park
CivicAuditorium
Park
Tongva Parkand
Ken GenserSquare
HotchkissPark
JoslynPark
Barnard WayLinear Park
PROJECTPROJECTLOCATIONLOCATIONPROJECTLOCATION
●
● ●
●
�
C A L I F O R N I A
Santa Barbara
San Francisco
Sacramento
Los Angeles
SantaMonica
710
405
405
5
5
5
1010
210
210
110
110
★★
BurbankBurbank
ClaremontClaremont
ComptonComptonDowneyDowneyInglewoodInglewood
LongLongBeachBeach
LOS ANGELESLOS ANGELES
MontebelloMontebello
PasadenaPasadena
Rancho PalosRancho PalosVerdesVerdes
Santa ClaritaSanta Clarita
WhittierWhittier
Burbank
Claremont
ComptonDowneyInglewood
LongBeach
LOS ANGELES
Montebello
Pasadena
Rancho PalosVerdes
Santa Clarita
SantaMonica
WestlakeVillage
Whittier
PROJECTLOCATION
S O U T H E R NL O S A N G E L E S C O U N T Y
N 0 15
MILES
BC
LEGENDProposed Project Location
Downtown Specific Plan Area
3rd Street Promenade
Park
LUCE Districts
Coastal Zone Boundary
Santa Monica Bike Center
Pending Expo Line
Pending DowntownSanta Monica Station
Sources: Santa Monica GIS 2011; Santa Monica Land Use and Circulation Element 2010; Santa Monica PABD 2008.
0 1,000
SCALE IN FEET
N
1FIGUREProject Vicinity
5TH STREET5TH STREET
6TH STREET6TH STREET
4TH STREET4TH STREET
BROADW
AYBRO
ADWAY
COLO
RADO AVENUE
COLO
RADO AVENUE
5TH STREET
6TH STREET
4TH STREET
BROADW
AY
COLO
RADO AVENUE
Project SiteProject SiteProject Site
12
5 4 3
Big Blue BusBig Blue BusMaintenance YardMaintenance Yard
PendingPendingExpoExpo
DowntownDowntownStationStation
PendingPendingHampton InnHampton Innand Suitesand Suites
PendingPendingCourtyardCourtyardby Marriottby Marriott
UmamiUmamiBurgerBurger
Fred SegalFred SegalRetail StoresRetail Stores
LidoLidoHotelHotel Bay Builder’sBay Builder’s
ExchangeExchange
Fred SegalRetail Stores Umami
Burger
Big Blue BusMaintenance Yard
PendingHampton Innand Suites
PendingCourtyardby Marriott
PendingExpo
DowntownStation
LidoHotel Bay Builder’s
Exchange
LEGEND
Tall Buildings in the Project Vicinity
Proposed Project Location
Pending Expo Line
Colorado Esplanade Project
Aerial Source: Google 2013.
2FIGUREProject Location
1
2
3
4
5
Step Up on Fifth
6-story Silvercrest Senior Citizens Residence
6-story Luxe@1548 residential complex
5-story apartments/condos
6-story office/professional building
PROPOSEDPROPOSEDHOTELHOTEL
DRIVEWAYDRIVEWAYOUTDOOR DININGOUTDOOR DINING
RAMP DOWN TORAMP DOWN TOCOMMERCIALCOMMERCIAL
PARKINGPARKING
RAMP DOWN TORAMP DOWN TORESIDENTIALRESIDENTIAL
PARKINGPARKING CR
OSS
CR
OSS C
OU
RC
OU
RTOUTDOOROUTDOOR
DININGDINING
OUTDOOROUTDOORDININGDININGPUBLIC PLAZAPUBLIC PLAZA LOBBYLOBBY
FIREFIRECOMMANDCOMMAND
SIX-STORY OFFICE BUILDING FIVE-STORY MULTI-FAMILY RESIDENTIAL BUILDING
PROPOSEDSIX-STORY
HOTEL
PROPOSEDHOTEL
DRIVEWAY
JUICE/ SNACK BAR
RAMP DOWN TOCOMMERCIAL
PARKING
RAMP DOWN TORESIDENTIAL
PARKING
OUTDOOR DINING
OUTDOORDINING
OUTDOORDININGPUBLIC PLAZA
LOBBY
LOADING
ONE WAY
LOADING
LOADING
LOBBY
OFFICE
RES.TRASH
COMM.TRASH
COMM.TRASH
RES.TRASH
MECH.ROOM
TXF 1 TXF 2 ELEC.
FIRECOMMAND
5TH COURT
5TH STREET
BROADW
AY
CR
OSS C
OU
RT
TOTAL GROUND FLOOR COMMERCIAL
39,600 SF
1
1
1
12
2
2 2
2
2
3 33
44
4
3
33
2
24
4
3
3
3
1
LEGENDProposed Hard SurfaceLandscape
Existing Tree
Existing Parking
Proposed Parking
Existing Street Light
Stairway
Elevator
Entry/Exit
Bicycle Parking/ Bicycle Share
1
2
3
4
0 55
SCALE IN FEET
N
3FIGURE
Ground Floor Site Plan
4FIGURE
Conceptual Design