november 12 green_committee
DESCRIPTION
Presentation for the November 2012 Greens Committee MeetingTRANSCRIPT
![Page 1: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/1.jpg)
Pinehurst Country Club’s Green Committee Meeting
November 8th, 2012
![Page 2: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/2.jpg)
Agenda
Chairperson Report – Erich Tiepel Approval of minutes
General Manager’s Report – Loren Pippin Grounds Report – Steve Sarro
Driving Range Status Water Update
Water Review for 2012 Harriman Construction
In-house construction for 2013 Tee boxes Pfluger putting green presentation Sand replacement in bunkers Revisit compost area
Imprelis Update Bentgrass/poa annua Trials New Business Course Conditions for the 2012 season
![Page 3: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/3.jpg)
Driving Range Research
![Page 4: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/4.jpg)
Tanner Consulting
The only firm to research ball flight for golf courses They find resolutions for golf properties to achieve
goals in regards to safety, playability and aesthetics
Currently working with Vail G.C. Successful projects around the globe.
Our goal is to correct safety issues and provide a cohesive environment
Models and improvement plans will be presented No more than $5,000 was approved for the study
by the board of directors.
![Page 5: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/5.jpg)
Water
Spent $23K on 125 Acre Feet of leased water Harriman reservoir was offline (50 Acre feet) Extreme heat and drought conditions As of October 31, 2012 we pumped 353 AF Our 8 year average is pumping 350 AF annually 73 days of 90 degree heat, 61 days in 2000 Reduced irrigated acreage and turned off
roughs for 3 weeks
![Page 6: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/6.jpg)
Harriman Reservoir
Reservoir is complete, outlet structure is being reconstructed due to a contractor mistake.
New schedule is to be completed by the end of the year.
Once the outlet is complete, the reservoir can begin to fill
Goal is to have 50 Acre feet available again for PCC in 2013.
![Page 7: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/7.jpg)
Repoured transfer pipe. A dam is placed on top of pipe.
Harriman Reservoir
![Page 8: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/8.jpg)
Sediment basin
Harriman Reservoir
![Page 9: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/9.jpg)
Outlet to Johnson lateral
Harriman Reservoir
![Page 10: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/10.jpg)
Johnson Ditch
Harriman Reservoir
![Page 11: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/11.jpg)
#2 Pfluger Forward Tee
![Page 12: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/12.jpg)
Finished #2 Pfluger Forward Tee
![Page 13: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/13.jpg)
#6 Pfluger Forward Tee
![Page 14: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/14.jpg)
Irrigation Upgrades
![Page 15: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/15.jpg)
Pfluger Putting Green Presentation
![Page 16: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/16.jpg)
Upgrade To Presentation
![Page 17: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/17.jpg)
Sand Replacement
![Page 18: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/18.jpg)
Contaminated Sand
![Page 19: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/19.jpg)
Once material is available for appropriate berms to hide the area from the golf course we will then consider moving the compost. Meanwhile, our goal is to maintain the current area in a clean and orderly fashion.
Compost Area
![Page 20: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/20.jpg)
On October 25, 2012 a letter was sent to Dupont from Pickard & Associates. The letter demands an immediate response to our claim rejection and to find an appropriate resolution.
Imprelis
![Page 21: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/21.jpg)
Strong recovery this fall. The spring will lead to one more application of herbicide and aggressive inter-seeding to achieve a consistent stand of turfgrass on approach.
Bentgrass Trial
![Page 22: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/22.jpg)
We have made great strides in 2012 to increase populations of bentgrass on greens.
Grass on Greens
![Page 23: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/23.jpg)
Poa annua Trials
Ridding poa annua from greens is a long term solution.
Short term plan is to initiate aggressive bentgrass seeding on an annual basis.
Once populations increase near to 75-80% bentgrass in greens, then we would explore with products to achieve a higher success rate and reduce impacts to playability.
Currently the Maxwell greens have 15-25% bentgrass populations.
![Page 24: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/24.jpg)
New Business
Tree Care for the winter is a main project Pinehurst spends $35,000-45,000 on tree
care annually Drought conditions impact trees years later. Pruning and removal begins in January Tree removal necessities:
safety concerns turf and tree quality playability
![Page 25: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/25.jpg)
The trees will be removed. New cottonwood trees are blooming strong in this location. This areas is a potential candidate for more trees in the future.
14 Green Dead Cottonwood and Maple
![Page 26: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/26.jpg)
This tree has been declining rapidly. Fighting age and drought conditions. At this time there are plenty of mature trees in the area. Replanting does not make sense at this time.
Dying Ash Tree at 2 Green Maxwell
![Page 27: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/27.jpg)
The left side of 9 on the Maxwell is highly over planted. Ash trees become increasingly difficult to maintain the older they become. Removing older species will help with turf health and provide more room for younger trees to flourish. We battle wet turf in this area due to lack of sunlight.
Remove older Ash trees on #9 Maxwell
![Page 28: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/28.jpg)
No one wants to remove this tree. It might be the most interactive tree with a golfer in a round. However, this is an enormous liability. The tree is completely rotted away inside. Another cottonwood was planted a few years ago to anticipate the removal of the old tree.
#7 Green Maxwell
![Page 29: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/29.jpg)
A stimpmeter is three feet in length. You can determine the hollowness of the cavity.
#7 Green Maxwell
![Page 30: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/30.jpg)
Tree populations are plentiful at this green location. Removing the old cottonwood will assist the other trees to thrive. The green also suffers from invading roots.
#7 Green Maxwell
![Page 31: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/31.jpg)
These trees have no value to the golf course. They are a safety hazard at the pool. We see a lot of traffic from children and members while in bathing suits. The thorns on these trees are highly unfriendly.
Hawthorns at the Snack Bar
![Page 32: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/32.jpg)
The roots of this tree have invaded the surface. The roots compete with the turf for water and nutrients. They cause an uneven surface and unsafe for golfers when they come in contact with a root by a club.
11 Tee Box
![Page 33: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/33.jpg)
These firs have reached their life expectancy. They have suffered from the construction at the entrance over the past few years. I have a lead on replacing them with 25-30 foot Colorado Blue Spruce trees.
Replace Firs at Club Entrance
![Page 34: November 12 green_committee](https://reader036.vdocument.in/reader036/viewer/2022062405/55545e32b4c905aa798b47f5/html5/thumbnails/34.jpg)
2012 Course Conditions
Feedback on course conditions for the 2012 season
Mowing Patterns Firmness of the golf course Turfgrass Quality Sand trap maintenance Miscellaneous