november 3, 2015 project status update · coop coop comed trans. library servi 0m wpowerfee for...

7
November 3, 2015 Project Status Update DeKalb County Jail Expansion

Upload: others

Post on 29-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: November 3, 2015 Project Status Update · coop coop comed trans. library servi 0m wpowerfee for cell t o pole county parking, utility alt route comed itch (alt. new4"pu h for cou

November 3, 2015 Project Status UpdateDeKalb County Jail Expansion

Page 2: November 3, 2015 Project Status Update · coop coop comed trans. library servi 0m wpowerfee for cell t o pole county parking, utility alt route comed itch (alt. new4"pu h for cou

• Construction Documents

• The purpose is to document the design intent for bidding & construction.

• Bidding

Activity Timeline

Construction Documents August 10  – January, 2016

Bid Packages #1

‐ Site Utility‐ Structural Foundation‐ Structural Steel‐ Precast Concrete

Issue: December 7, 2015Bid Date: January 13, 2016

Bid Package #2

‐ Balance of Building Issue: February 16, 2016Bid Date: March 17, 2016

Issue for I.D.O.T. Permit(3 Month Review)

November 6, 2015

Issue for final I.D.O.C. Review End of January

Construction May 2016 – TBD

Page 3: November 3, 2015 Project Status Update · coop coop comed trans. library servi 0m wpowerfee for cell t o pole county parking, utility alt route comed itch (alt. new4"pu h for cou

Project Status

• The Project Team has met and continues to meet to review the following:• Meeting with COMED, Frontier and Comcast to review utility routing• Revised Site Plan for secure parking area.• Potential cost savings for third floor east pod• Reviewed site and fire protection requirements with City of Sycamore

and Sycamore Fire Department. A permit review will be required for each Bid Package.

• IDOT approval letter received• HVAC System redundancy• Dewberry responded to B&F preliminary code review comments.• Baxter & Woodman to submit IDOT Permit this week.• MEP, FP and Structural Design continue to be coordinated.

Page 4: November 3, 2015 Project Status Update · coop coop comed trans. library servi 0m wpowerfee for cell t o pole county parking, utility alt route comed itch (alt. new4"pu h for cou

Site Utilities Routing Meeting

Page 5: November 3, 2015 Project Status Update · coop coop comed trans. library servi 0m wpowerfee for cell t o pole county parking, utility alt route comed itch (alt. new4"pu h for cou

Site Plan Design

Page 6: November 3, 2015 Project Status Update · coop coop comed trans. library servi 0m wpowerfee for cell t o pole county parking, utility alt route comed itch (alt. new4"pu h for cou

Third Floor Plan

Page 7: November 3, 2015 Project Status Update · coop coop comed trans. library servi 0m wpowerfee for cell t o pole county parking, utility alt route comed itch (alt. new4"pu h for cou

Questions?