Desember 2015, Norway Leif Røv Wind Energy Partner - From the mountains, through the North Sea, towards wind energy Operations and Maintenance

Upload: doankhue

Post on 07-Jan-2017

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Nr 13 redigert Leif Rov AAK Presentation_Wind

Å N D A L S N E S B E R G E N S T A V A N G E R K R I S T I A N S U N D V E R D A L

Desember 2015, NorwayLeif Røv

Wind Energy Partner

- From the mountains, through the North Sea, towards wind energy

Operations and Maintenance

Page 2: Nr 13 redigert Leif Rov AAK Presentation_Wind

Å N D A L S N E S B E R G E N S T A V A N G E R K R I S T I A N S U N D V E R D A L

� AAK Mountaineering Center was founded 1987 as a center for mountain guiding, climbing courses and mountaineering

� Expert rope skills and lessons learned from seasonal mountain guiding and rock climbing led AAK into the 24/7/365 oil & energy industry

� AAK was the first company (1990) to introduce rope access techniques in the North Sea and achieved acceptance for its use by authorities and the offshore oil & gas industry.

� Safety and training have always been at the core of our business, as we operate in demanding environments worldwide.

The Start

Page 3: Nr 13 redigert Leif Rov AAK Presentation_Wind

Å N D A L S N E S B E R G E N S T A V A N G E R K R I S T I A N S U N D V E R D A L

Group Structure

AAK ASEngineering, Operations &

Training

AAK IRV ASWorkshop & Fabrication

AAK Safety ASSafety Equipment &

Training

AAK Group AS

Rope AccessInspection &

IntegrityComplex Lifting

& Rigging

RenewablesVerdal

Page 4: Nr 13 redigert Leif Rov AAK Presentation_Wind

Å N D A L S N E S B E R G E N S T A V A N G E R K R I S T I A N S U N D V E R D A L

Today

4

Kristiansund(offices & workshop)

Åndalsnes(offices & course rig)

Tønsberg(course rig)

Bergen(offices, workshop,

course rig & storage)

Stavanger(offices, workshop &

storage)

Verdal(offices)

q Engineering and design

§ Concepts

§ Structures

§ Installation planning

q EPCI project management

§ Project management incl O&M

§ Prefab of modules

q Field services IMR

§ Lifting and rigging ops

§ Installation, inspections,mod and repair

q At height preparedness and response

§ Fixed safety and evacuation systems

§ Training, courses and equipment

…. 160 field proven employees at your disposal!

Page 5: Nr 13 redigert Leif Rov AAK Presentation_Wind

Å N D A L S N E S B E R G E N S T A V A N G E R K R I S T I A N S U N D V E R D A L

AAK – towards wind energy AAK – energy market service provider

”Highly qualified personnel with “hands-on” experience providing the flexible work force for the future…”

Page 6: Nr 13 redigert Leif Rov AAK Presentation_Wind

Å N D A L S N E S B E R G E N S T A V A N G E R K R I S T I A N S U N D V E R D A L

The Alfa Ventus Project 2009

Alfa Ventus – Project Structure

� DOTI Gmbh (EWE Energie AG, E.ON, Vattenfall)

� Norwind

� Tristein AS

� AAK AS

Page 7: Nr 13 redigert Leif Rov AAK Presentation_Wind

Å N D A L S N E S B E R G E N S T A V A N G E R K R I S T I A N S U N D V E R D A L

Alfa Ventus – Project Scope

� Installation of Lifting Beams� Establish Access to jackets structures� Prepare Transition ring� Pre tensioning of bolts

� Installation of Heavy Lift Rigging� Install Heavy Lift wire to Lifting Beams� Install Tugger Lines

� Offshore Work

� Removal of Grouting Hoses� Removal of temporary equipment

Page 8: Nr 13 redigert Leif Rov AAK Presentation_Wind

Å N D A L S N E S B E R G E N S T A V A N G E R K R I S T I A N S U N D V E R D A L Foto: AAK

AAK AS in Verdalq Employees:

q Manager (Leif Røv)q 1 Engineer (Øyvind Risstad)q 1 Project Manager (Håvard Lutdal)q 4 Wind Technician

q Office in Verdal (mid-Norway) VIP-senteret sinceFebruary 1st , 2012. Windcluster Norway

All employees have a broad experience within onshore wind from Scandwind and GE Wind Energy at Hundhammerfjellet Windfarm. See the followingslides reference of experience 1 & 2.

Page 9: Nr 13 redigert Leif Rov AAK Presentation_Wind

Å N D A L S N E S B E R G E N S T A V A N G E R K R I S T I A N S U N D V E R D A L Foto: AAK

Hundhammerfjellet Windfarm

Customer: Nord Trøndelag Energiverk (NTE) Installation: Hundhammerfjellet WindfarmDuration: January 2012 –

q Contract with NTE q Hired personell from GE Offshore Windq Safety & Rescue Trainingq Supplier of equipmentq Maintenance – schedule/non scheduleq Feasibility studies (lagerbytte)q Installation & Lifting Operationsq Inspection (bolt tension & tighting)

Page 10: Nr 13 redigert Leif Rov AAK Presentation_Wind

Å N D A L S N E S B E R G E N S T A V A N G E R K R I S T I A N S U N D V E R D A L

Blade installation performed with custom built winch system.

¨ Site management

¨ EHS managment

¨ Operators executing the installation

Hundhammerfjellet Windfarm

Page 11: Nr 13 redigert Leif Rov AAK Presentation_Wind

Å N D A L S N E S B E R G E N S T A V A N G E R K R I S T I A N S U N D V E R D A L

Hundhammerfjellet Windfarm

Page 12: Nr 13 redigert Leif Rov AAK Presentation_Wind

Å N D A L S N E S B E R G E N S T A V A N G E R K R I S T I A N S U N D V E R D A L

Smøla & Hitra, Norway

Client: Statkraft ASProject: Smøla og Hitra wind parksPeriod: 2009 –

q Training and safety equipment

q Delivery and installation of fixed access systems

q Development of procedures for safe access

q NDT and inspections of towers

q Welding works in tower structures

q Hook up of «pitch cabinets»

q Siemens Turbine 2,3 MW

Page 13: Nr 13 redigert Leif Rov AAK Presentation_Wind

Å N D A L S N E S B E R G E N S T A V A N G E R K R I S T I A N S U N D V E R D A L

Wind Energy 2009 - 2015

2009

2009 Smøla&Hitra

2011-

Installation

2011 Smøla

2012-152012- 2013

2012

2011

2012 Smøla

ModificationsO&M Maintenance QHSE and training

2013-2014

2013-2014

2014

2013-20152013

2014-2015

2014-2015

Page 14: Nr 13 redigert Leif Rov AAK Presentation_Wind

Å N D A L S N E S B E R G E N S T A V A N G E R K R I S T I A N S U N D V E R D A L Foto: AAK

Test & Demo WTG Kollnes/Bergen

Customer: SWAY AS Installation: Test & Demo WTG Kollsnes/BergenDuration: January 2012

q Planning of Rigging and Access solutions q Offshore Access Servicesq Lifting & Installation Services q Mechanical & Electrical Services q Testing of Survival & Working Suit

(Hansen Protection)

Page 15: Nr 13 redigert Leif Rov AAK Presentation_Wind

Å N D A L S N E S B E R G E N S T A V A N G E R K R I S T I A N S U N D V E R D A L

Client: Siemens Windpower NorwayLista Vindkraftverk og Høg Jæren

Project: Retrofit Yaw Rubber CollarPeriod: Fall 2014 - 2015

SOW: Project Management and execution

ü Planningü Risk Management (QHSE)ü Methods and Access

Page 16: Nr 13 redigert Leif Rov AAK Presentation_Wind

Å N D A L S N E S B E R G E N S T A V A N G E R K R I S T I A N S U N D V E R D A L

Investing in Competence

Page 17: Nr 13 redigert Leif Rov AAK Presentation_Wind

Å N D A L S N E S B E R G E N S T A V A N G E R K R I S T I A N S U N D VESTFOLD H A U G E S U N D

� Assembly Blaaster Wind Technology test & demo turbine

� Assembly Turbine� Installation on site� Test & Operation� Scheduled Mainetance� Blade Inspection & Repair

http://www.tu.no/energi/article266114.ece

http://www.adressa.no/nyheter/okonomi/article1548121.ece

Project Scope

Page 18: Nr 13 redigert Leif Rov AAK Presentation_Wind

Å N D A L S N E S B E R G E N S T A V A N G E R K R I S T I A N S U N D V E R D A L

Blade Inspection & Repair

Page 19: Nr 13 redigert Leif Rov AAK Presentation_Wind

Å N D A L S N E S B E R G E N S T A V A N G E R K R I S T I A N S U N D V E R D A L

Development

HSE Review - ensure execution of tasks is in accordance to description, processes, and prodcedures in the management system.

The Prosessq Review of relevant and applicable standards and regulations are

implemented in the management system

q Review of work processes and procedures for working at height is in accordance with current standards and regulations

q Review of work processes and procedures for lifting – and rigging operations

q Review of procurement, storage, inspection and training in use of PPE

q Fallen Objects is included in the HSE Review

q Review of unwanted icidents as a foundation for improvment

q Review of the improvment and implementation

q Proposed emergency drills

Page 20: Nr 13 redigert Leif Rov AAK Presentation_Wind

Å N D A L S N E S B E R G E N S T A V A N G E R K R I S T I A N S U N D V E R D A L Foto: AAK

- DolWin Beta

Client: Aibel ASProject: Dolwin Beta HVDC plattformPeriod: 2013-2015

q AAK multidiscipline teamsMechanical, electrical, fabric maintenance, NDT, welding

q AAK methods/planning: Evacuation in transit

ü Design of temporary systemsü Plan and procedures for evacuation of

personnelü Rescue team

Page 21: Nr 13 redigert Leif Rov AAK Presentation_Wind

Å N D A L S N E S B E R G E N S T A V A N G E R K R I S T I A N S U N D V E R D A L

HYWIND – Test & Demonstration Turbine

q Installation and Testing og Limpet q Offshore access of personell q Trainingq Lifting of equipment and minor components

Page 22: Nr 13 redigert Leif Rov AAK Presentation_Wind

Å N D A L S N E S B E R G E N S T A V A N G E R K R I S T I A N S U N D V E R D A L

Wind Energy 2009 - 2015

2009

2009 Smøla&Hitra

2011-

Installation

2011 Smøla

2012-152012- 2013

2012

2011

2012 Smøla

ModificationsO&M Maintenance QHSE and training

2013-2014

2013-2014

2014

2013-20152013

2014-2015

2014-2015

5% 25%10% 15%