ns blue scope steel (thailand) ltd

57
NS BLUE SCOPE STEEL (THAILAND) LTD. Preventive Maintenance Fire Protection System April 2021 Takachiho Fire, Security & Services (Thailand) Ltd. 1858/110-111 Interlink Tower 25 Fl., Debaratna Road, Bangna Tai, Bangna, Bangkok 10260, Thailand. Tel : 02-366 -9000 , FAX : 02-366-9090 www.tkfs.co.th Customer : NS Blue Scope Steel Thailand Report Date : 12 May 2021 Inspector By : 1. Subin Kamna Service Leader 2. Wachira Chaiyapan Technician Service 3. Somkid Khamlai Technician Service 4. Anucha Chaisirin Technician Service 5. Anuchit Phoomee Technician Service Takachiho Fire, Security & Services (Thailand) Ltd. INSPECTION, TEST AND PREVENTIVE MAINTENANCE FOR Fire Protection and fire Detection System Reported By Mr. Chalermchai Soontornpanaves Fire Service Manager NSBST Fire Alarm & Fire Suppression Summary Report : April 2021 Pervious month Outstanding update April 2021 Result Item Inspection Description Priority Status 1 Fire alarm M2-12 Smoke detector 2 Ea. CRM Damaged Should replace Low Medium High Cable loop idnet short circuit : Node 4 Cable Admin. Building Short-circuit Should replace Low Medium High Stobe horn Zone 4, 6/1, 6/2, 6/3 Strobe/Horn MCL-2 Damaged Should replace Low Medium High M3-76 Smoke detector 1 Ea. Document store Test Alarm Should replace Low Medium High M2-12 MCL-1, CPL,MCL-2 BLDG Should fix Low Medium High M1-28 COLD ROLL MILL,OPERATION BLDG function Should replace Low Medium High M1-19 CRM BLDG Should replace Low Medium High Control fire alare Node 1 loop PKL Area loop control fire alarm node 1 Pkl area 30 Should replace Low Medium High 2 Inergen system Flexible hose Inergen cylinder CRM Deteriorated Should replace Low Medium High MCL1 Smoke detector 2 Ea Main EER Damaged Should replace Low Medium High 3 Nitrogen MCL-2 Back-up batteries 2 Ea Main EER Coating Pot RM. Battery deteriotration should replace Low Medium High Tank no. 5, 18, 27, 28, 39, 75, 78, 101 Pressure gauge MCL-2 (NCP No. 2) Damaged *by pass* Should replace pressure gauge Low Medium High Tank no. 1, 2, 3, 10, 11, 15 Pressure gauge MCL-2 (NCP No. 3) Damaged *by pass* Should replace pressure gauge Low Medium High Tank no. 18, 27, 28, 39, 49, 75, 78, 101 Pressure gauge MCL-2 (NCP No. 6) Damaged *by pass* Should replace pressure gauge Low Medium High 4 Fire Hydrant and Hose reel system Fire Hydrant No. 17, 20, 28, 31, 32, 34, 35, 36 Hydrant All area F Should install Low Medium High Fire Hose Reel No.17, 23, 24, 25 Support and Rolling hose All area Corrosion Should replace Low Medium High No. 11, 24, 38, 39 and 57 Flexible hose All area hose supply Should replace Low Medium High 5 Automatic sprinkler Control panel releasing reset CPL.PAINT STOR LOWER RM.,CPL.PAINT STORE UPPER reset control Should replace Low Medium High Problem Recomment Location Point / Device 1/2 NSBST Fire Alarm & Fire Suppression Summary Report : April 2021 Pervious month Outstanding update April 2021 Result Item Inspection Description Priority Status Problem Recomment Location Point / Device 6 Fire pump system Engine Fire pump No.1 Pump Room Packing gland Engine pump Should replace Low Medium High Engine Fire pump No.1 Support Pump Room Support control pump no. 1 Should replace Low Medium High Electric motor fire pump Pump Room Packing gland Electric motor Should replace Low Medium High Jockey pump Flexible hose Pump Room Flexible ( Suction) 2" deteriorated Should replace Low Medium High Jockey pump Pipe Pump Room Pipe (Discharge) 2" getting corrosion Should replace Low Medium High Jockey pump Cover Pump Room Cover Jockey pump Should replace Low Medium High 7 Portable Extinguisher Dry No. 104 Dry chemical MCL-1 position's sign is not install Should replace spare part Low Medium High CO2 No. 99, 116, 125, 152, 154, 169, 174 CO2 MCL-1, MCL2 hose crack Should replace spare part Low Medium High CO2 No. 107 CO2 MCL-1 Weight Low should refill Low Medium High CO2 No. 168 CO2 CPL Extinguisher body is corroded Should replace spare part Low Medium High CO2 No. 22 CO2 CRM Exit Door OP35 position's sign is break should replace Low Medium High CO2 No. 96 CO2 MCL-1 position's sign is not install Should replace spare part Low Medium High CO2 No. 64, 118, 134, 163 CO2 MCL-1, MCL2 Carrying handle is corroded. Should replace spare part Low Medium High Reference report: TAKACHIHO's Inspection Monthly report for NS Bluescope Thailand : April 2021 Review By Songpon Soontaros PSV Senior Engineer Date ___________________ Sign Off By Plant Service & Engineering Project Manager Date ___________________ 2/2

Upload: others

Post on 16-Oct-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NS BLUE SCOPE STEEL (THAILAND) LTD

NS BLUE SCOPE STEEL (THAILAND) LTD.

Preventive Maintenance Fire Protection System

April 2021

Takachiho Fire, Security & Services (Thailand) Ltd.

1858/110-111 Interlink Tower 25 Fl.,

Debaratna Road, Bangna Tai, Bangna,

Bangkok 10260, Thailand.

Tel : 02-366 -9000 , FAX : 02-366-9090

www.tkfs.co.th

Customer : NS Blue Scope Steel Thailand Report Date : 12 May 2021

Inspector By : 1. Subin Kamna Service Leader

2. Wachira Chaiyapan Technician Service

3. Somkid Khamlai Technician Service

4. Anucha Chaisirin Technician Service

5. Anuchit Phoomee Technician Service

Takachiho Fire, Security & Services (Thailand) Ltd.

INSPECTION, TEST AND PREVENTIVE MAINTENANCEFOR

Fire Protection and fire Detection System

Reported By

Mr. Chalermchai Soontornpanaves

Fire Service Manager

NSB

ST F

ire A

larm

& F

ire S

uppr

essio

n Su

mm

ary

Repo

rt :

April

202

1Pe

rvio

us m

onth

Out

stan

ding

upd

ate

April

202

1 Re

sult

Item

Insp

ectio

n De

scrip

tion

Prio

rity

Stat

us

1Fi

re a

larm

M2-

12Sm

oke

dete

ctor

2 E

a.CR

MDa

mag

edSh

ould

repl

ace

Low

Me d

ium

Hig h

Cabl

e lo

op id

net

shor

t circ

uit :

N

ode

4Ca

ble

Adm

in. B

uild

ing

Shor

t-ci

rcui

tSh

ould

repl

ace

Low

Me d

ium

Hig h

Stob

e ho

rn Z

one

4, 6

/1, 6

/2, 6

/3St

robe

/Hor

nM

CL-2

Dam

aged

Shou

ld re

plac

e

L o

wM

ediu

mHi

gh

M3-

76Sm

oke

dete

ctor

1 E

a.Do

cum

ent s

tore

Test

Alar

mSh

ould

repl

ace

L ow

Med

ium

High

M2-

12M

CL-1

, CPL

,MCL

-2 B

LDG

Shou

ld fi

x

Lo

wM

e diu

mHi

g h

M1-

28CO

LD R

OLL

M

ILL,

OPE

RATI

ON

BLD

G

func

tion

Sh

ould

repl

ace

Low

Med

ium

High

M1-

19 C

RM B

LDG

Shou

ld re

plac

e

L o

wM

ediu

mHi

gh

Cont

rol f

ire a

lare

Nod

e 1

lo

opPK

L Ar

ea

loop

cont

rol f

ire a

larm

nod

e 1

Pk

l a

rea

30

Shou

ld re

plac

e

L o

wM

e diu

mHi

g h

2In

erge

n sy

stem

Flex

ible

hos

eIn

erge

n cy

linde

rCR

MDe

terio

rate

dSh

ould

repl

ace

Low

Med

ium

High

MCL

1Sm

oke

dete

ctor

2 E

aM

ain

EER

Dam

aged

Shou

ld re

plac

e

L o

wM

e diu

mHi

g h

3N

itrog

enM

CL-2

Back

-up

batt

erie

s 2 E

aM

ain

EER

Coat

ing

Pot R

M.

Batt

ery

dete

riotr

atio

nsh

ould

repl

ace

Low

Me d

ium

Hig h

Tank

no.

5, 1

8, 2

7, 2

8, 3

9, 7

5, 7

8,

101

Pres

sure

gau

ge

MCL

-2 (N

CP N

o. 2

)Da

mag

ed *

by p

ass*

Shou

ld re

plac

e pr

essu

re g

auge

L ow

Me d

ium

Hig h

Tank

no.

1, 2

, 3, 1

0, 1

1, 1

5Pr

essu

re g

auge

M

CL-2

(NCP

No.

3)

Dam

aged

*by

pas

s*Sh

ould

repl

ace

pres

sure

gau

ge

Lo

wM

e diu

mHi

g h

Tank

no.

18,

27,

28,

39,

49,

75,

78,

10

1Pr

essu

re g

auge

M

CL-2

(NCP

No.

6)

Dam

aged

*by

pas

s*Sh

ould

repl

ace

pres

sure

gau

ge

L o

wM

ediu

mHi

gh

4Fi

re H

ydra

nt a

nd

Hose

reel

syst

emFi

re H

ydra

nt

No.

17,

20,

28,

31,

32,

34,

35,

36

Hydr

ant

All a

rea

F

Sh

ould

inst

all

Low

Me d

ium

Hig h

Fire

Hos

e Re

el

No.

17, 2

3, 2

4, 2

5Su

ppor

t and

Rol

ling

hose

All a

rea

Corr

osio

nSh

ould

repl

ace

Low

Med

ium

High

No.

11,

24,

38,

39

and

57Fl

exib

le h

ose

All a

rea

ho

se

su

pply

Sh

ould

repl

ace

L ow

Med

ium

High

5Au

tom

atic

sprin

kler

Cont

rol p

anel

rele

asin

g

rese

tCP

L.PA

INT

STO

R LO

WER

RM

.,CPL

.PAI

NT

STO

RE

UPP

ER

rese

t

cont

rol

Shou

ld re

plac

e

Lo

wM

e diu

mHi

g h

Prob

lem

Reco

mm

ent

Loca

tion

Poin

t /

Devi

ce

1/2 NSB

ST F

ire A

larm

& F

ire S

uppr

essio

n Su

mm

ary

Repo

rt :

April

202

1Pe

rvio

us m

onth

Out

stan

ding

upd

ate

April

202

1 Re

sult

Item

Insp

ectio

n De

scrip

tion

Prio

rity

Stat

usPr

oble

mRe

com

men

tLo

catio

nPo

int

/ De

vice

6Fi

re p

ump

syst

em

Engi

ne F

ire p

ump

No.

1Pu

mp

Room

Pack

ing

glan

d

Engi

ne p

ump

Shou

ld re

plac

e

Lo

wM

ediu

mHi

gh

Engi

ne F

ire p

ump

No.

1Su

ppor

t Pu

mp

Room

Supp

ort

co

ntro

l pum

p no

. 1

Sh

ould

repl

ace

L ow

Med

ium

High

Elec

tric

mot

or fi

re p

ump

Pum

p Ro

omPa

ckin

g gl

and

El

ectr

ic m

otor

Sh

ould

repl

ace

Low

Me d

ium

Hig h

Jock

ey p

ump

Flex

ible

hos

ePu

mp

Room

Flex

ible

( Su

ctio

n) 2

" det

erio

rate

dSh

ould

repl

ace

L ow

Med

ium

High

Jock

ey p

ump

Pipe

Pum

p Ro

omPi

pe (D

ischa

rge)

2" g

ettin

g co

rros

ion

Shou

ld re

plac

e

L o

wM

ediu

mHi

gh

Jock

ey p

ump

Cove

rPu

mp

Room

Cove

r

Jock

ey p

ump

Shou

ld re

plac

e

Lo

wM

ediu

mHi

gh

7Po

rtab

le E

xtin

guish

erDr

y N

o. 1

04Dr

y ch

emic

alM

CL-1

posit

ion'

s sig

n is

not i

nsta

ll Sh

ould

repl

ace

spar

e pa

rt

L o

wM

e diu

mHi

g h

CO2

No.

99,

116

, 125

, 152

, 154

, 16

9, 1

74CO

2M

CL-1

, MCL

2ho

se c

rack

Shou

ld re

plac

e sp

are

part

Low

Med

ium

High

CO2

No.

107

CO2

MCL

-1W

eigh

t Low

shou

ld re

fill

L ow

Med

ium

High

CO2

No.

168

CO2

CPL

Extin

guish

er b

ody

is co

rrod

edSh

ould

repl

ace

spar

e pa

rt

L o

wM

ediu

mHi

gh

CO2

No.

22

CO2

CRM

Exi

t Doo

r OP3

5po

sitio

n's s

ign

is br

eak

shou

ld re

plac

e

L o

wM

ediu

mHi

gh

CO2

No.

96

CO2

MCL

-1po

sitio

n's s

ign

is no

t ins

tall

Shou

ld re

plac

e sp

are

part

L ow

Med

ium

High

CO2

No.

64,

118

, 134

, 163

CO2

MCL

-1, M

CL2

Carr

ying

han

dle

is co

rrod

ed.

Shou

ld re

plac

e sp

are

part

L ow

Med

ium

High

Refe

renc

e re

port

: TAK

ACHI

HO's

Insp

ectio

n M

onth

ly re

port

for N

S Bl

uesc

ope

Thai

land

: Ap

ril 2

021

Revi

ew B

ySo

ngpo

n So

onta

ros

PSV

Seni

or E

ngin

eer

Date

____

____

____

____

___

Sign

Off

By

Plan

t Ser

vice

& E

ngin

eerin

g Pr

ojec

t Man

ager

Date

____

____

____

____

___

2/2

Page 2: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.

1858/110-111 Interlink Tower 25 Fl.,

Debaratna Road, Bangna Tai, Bangna,

Bangkok 10260, Thailand.

Tel : 02-366 -9000 , FAX : 02-366-9090

www.tkfs.co.th

FIRE ALARM SYSTEM

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Tel : 02-366 -9000 , FAX : 02-366-9090www.tkfs.co.th

PM. FIRE ALARM SYSTEM

28 - 30 April 2021

PKL ,W/S,W/H, BLDG SFIP-01 SIMPLEX 4100 ES [NODE 1]

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for FCP

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of FCP

2. Annunciator Panel

2.1 Check condition of fuse control

2.2 Check condition of Lamp & LEDs

2.3 Check power supply for FCP

2.4 Check cable connection / terminal

2.5 Check Alarm Condition / Function Test

2.6 Visual check condition of battery and housing of battery

2.7 Cleaning of Annunciator Panel

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

AC POWER 232.4 VAC

Charger control panel 27.26 VDC

Battery back up 27.25 VDC ( start 25/6/20 ) 12V 18Ah

* loop control fire alarm node 1 Pkl area 30

Y

Y

Client : NS BLUE SCOPE STEEL (THAILAND) LTD.

Preventive Maintenance Check Sheet (Monthly/Quarterly)

REF.Contract NO :

Y

Y

Y

Fire Detection and Alarm System

Subject :

TAKACHIHO

Witness :

Y

Y

Y

Y

SC1000142Inspection Date :

Remark :

Y

Y

Y

Location of fire alarm control panel :

Inspector :

Y

Y

1. Fire Alarm Control Panel

Subin, Wachira, Somkid, Anucha, Anuchit

ResultDescription

Khun Songpon, Khun Sonthaya

CONTROL PANEL FIRE ALARM1

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE ALARM SYSTEM

28 - 30 April 2021

PKL,W/S,W/H, BLDG SFIP-01 SIMPLEX 4100 ES [NODE 1]

1 M1-32 MANUAL Y Y2 M1-34 MANUAL Y Y3 M1-59 SMOKE Y Y4 M1-29 MANUAL Y Y5 M1-21 MANUAL Y Y6 M1-17 MANUAL Y Y7 M1-37 MANUAL Y Y8 M1-39 MANUAL Y Y9 M1-43 MANUAL Y Y10 M1-47 MANUAL Y Y11 M1-54 MANUAL Y Y12 M1-61 SMOKE Y Y13 M1-60 SMOKE Y Y14 M1-63 SMOKE Y Y15 M1-64 SMOKE Y Y16 M1-24 MANUAL Y Y17 M1-6 MANUAL Y Y18 M1-1 MANUAL Y Y19 M1-15 MANUAL Y Y20 M1-15 MANUAL Y Y21 M1-11 IAM-signal alarm Y Y22 M1-12 IAM-signal alarm Y Y23 M1-26 MANUAL Y Y

24 M1-57 SMOKE N/A N/ADisable (

R)

25 M1-57 SMOKE N/A N/ADisable (

R)

26 M1-57 SMOKE N/A N/ADisable (

R)

27 M1-58 MANUAL N/A N/ADisable (

R)

28 M1-58 MANUAL N/A N/ADisable (

R)

29 M1-58 MANUAL N/A N/ADisable (

R)30 M1-62 SMOKE Y Y

* M1-8 Horn

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

PKL Tunnel south( )

PKL Tunnel south( )

PKL Tunnel south( )

W/H Room B

PKL eer room (signal fm 200)

PKL-op/15

PKL-op/4PKL acid tank sm-1

PKL Tunnel south( )

PKL Tunnel south( )

Work shop trainning roomWorke shop office room

PKL-eer room

Ware house room-a

PKL eer room (signal inergen)

PKL Tunnel south( )

PKL-exit pulpitPKL-op/3

PKL-eer room

Worke shop op/12PKL op/16 Silen grid

item LOOP/ Zone.Number

Location of fire alarm control panel :

Ware house

NS BLUE SCOPE STEEL (THAILAND) LTD.

Witness :

Inspection Date :

Preventive Maintenance Check Sheet

Subject : Client :

REF.Contract NO :

Fire Detection and Alarm System

SC1000142

Inspector :

Remark:

Subin, Wachira, Somkid, Anucha, AnuchitKhun Songpon, Khun Sonthaya

PKL-mac-console o-s1

RemarkLocation Inspection ResultType Test Result

PKL mac 03 op/17Ware house op/08

PKL-mac-3PKL-op/5

Ware house room-b

Ware house op/09Worke shop tool room

Function test1

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE ALARM SYSTEM

28 - 30 April 2021

COLD ROLL MILL,OPERATION BLDG SFIP-02 SIMPLEX 4100 ES [ NODE 2 ]

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for FCP

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of FCP

2. Annunciator Panel

2.1 Check condition of fuse control

2.2 Check condition of Lamp & LEDs

2.3 Check power supply for FCP

2.4 Check cable connection / terminal

2.5 Check Alarm Condition / Function Test

2.6 Visual check condition of battery and housing of battery

2.7 Cleaning of Annunciator Panel

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

AC POWER 231.07 VAC

Charger control panel 27.11 VDC

Battery back up 27.08 VDC( start 25/6/20 ) 12V 18Ah

* M1-28 function

Preventive Maintenance Check Sheet (Monthly/Quarterly)

Witness : Khun Songpon, Khun Sonthaya

Inspection Date :

Fire Detection and Alarm System

Subject : Client :

Inspector :

REF.Contract NO : SC1000142NS BLUE SCOPE STEEL (THAILAND) LTD.

Subin, Wachira, Somkid, Anucha, Anuchit

Y

Y

Y

Location of fire alarm control panel :

Description

Y

Y

Result

1. Fire Alarm Control Panel

Y

Y

Y

Y

Y

Y

Y

Y

TAKACHIHO

Y

Remark :

CONTROL PANEL FIRE ALARM2

Page 3: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE ALARM SYSTEM

28 - 30 April 2021

CRO ROLL MILL,OPERATION BLDG SFIP-02 SIMPLEX 4100 ES [NODE 2]

1 M1-1 MANUAL Y2 M1-12 SMOKE Y3 M1-12 SMOKE Y4 M1-14 MANUAL Y5 M1-20 MANUAL Y6 M1-21 MANUAL Y7 M1-17 MANUAL Y8 M1-26 MANUAL Y9 M1-22 MANUAL Y

10 M2-33 MANUAL Y11 M2-30 MANUAL Y12 M2-11 MANUAL Y13 M2-14 MANUAL Y14 M2-25 MANUAL Y15 M2-22 MANUAL Y16 M2-28 MANUAL Y17 M2-8 MANUAL Y18 M1-5 SMOKE Y19 M1-5 SMOKE Y20 M1-5 SMOKE Y21 M1-5 SMOKE Y22 M1-5 SMOKE Y23 M1-5 SMOKE Y24 M1-5 SMOKE Y25 M1-5 SMOKE Y26 M1-5 SMOKE Y27 M1-5 SMOKE Y28 M1-6 SMOKE Y29 M1-6 SMOKE Y30 M1-6 SMOKE Y Y

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Fire Detection and Alarm System

Witness : Khun Songpon, Khun Sonthaya

Subject : Client :

REF.Contract NO : SC1000142Inspection Date :

NS BLUE SCOPE STEEL (THAILAND) LTD.

Subin, Wachira, Somkid, Anucha, Anuchit

Preventive Maintenance Check Sheet

Location of fire alarm control panel :

item Location LOOP/ Zone.Number

Inspector :

Remark

Exit door OP 64 YGrid Y-49 Y

Inspection Result

Grid Y-49 Y

Type

CRM pulpit Y

Test Result

CRM hydr cella( ) YCRM hydr cella( ) Y

CRM YCRM rool shop op/66 Y

CRM YCRM op/20 YCRM op/21 Y

CRM eer.room op/27 YCRM eer.room YCRM eer.room YCRM eer.room YCRM eer.room Y

CRM op/29 YOperation bldg Y

Y

Operation bldg Y

Operation bldg YOperation bldg Y

Y

Operation bldg

Operation bldg YOperation bldg Y

Operation bldg YOperation bldg YOperation bldg Y

Operation bldgOperation bldg YOperation bldg

Function test 2-1

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE ALARM SYSTEM

28 - 30 April 2021

CRO ROLL MILL,OPERATION BLDG SFIP-02 SIMPLEX 4100 ES [NODE 2]

31 M1-6 SMOKE Y32 M1-6 SMOKE Y33 M1-6 SMOKE Y34 M1-6 SMOKE Y35 M1-6 SMOKE Y36 M1-5 SMOKE Y37 M1-5 SMOKE Y38 M1-5 SMOKE Y39 M1-5 SMOKE Y40 M1-7 MANUAL Y41 M1-9 MANUAL Y42 M2-23 MANUAL Y43 M2-24 MANUAL Y44 M2-17 IAM-signal alarm Y45 M2-18 IAM-signal alarm Y46 M1-6 HEAT Y47 M2-12 SMOKE Y48 M2-29 SMOKE Y49 M2-29 SMOKE Y50 M2-29 SMOKE Y51 M2-29 SMOKE Y52 M2-29 SMOKE Y53 M2-12 SMOKE Y54 M2-12 SMOKE Y55 M2-12 SMOKE Y

Fire Detection and Alarm SystemPreventive Maintenance Check Sheet

Inspector :Witness : Khun Songpon, Khun Sonthaya

Subject : NS BLUE SCOPE STEEL (THAILAND) LTD.Client :

REF.Contract NO :Inspection Date :

SC1000142

Subin, Wachira, Somkid, Anucha, Anuchit

Operation bldg Y

Location of fire alarm control panel :

item Location LOOP/ Zone.Number Type Inspection

Result Test Result Remark

Operation bldg YOperation bldg Y

Operation bldg YOperation bldg YOperation bldg YOperation bldg YOperation bldg YOperation bldg YOperation bldg YOperation bldg Y

EER room CRM YEER room CRM Y

CRM EER (Signal Inergen1) YCRM EER (Signal Inergen2) Y

Operation bldg YEER Room Ground YCRM EER Room YCRM EER Room YCRM EER Room YCRM EER Room YCRM EER Room Y

CRM EER Room Ground YCRM EER Room Ground YCRM EER Room Ground Y

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Function test 2-2

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE ALARM SYSTEM

28 - 30 April 2021

1 M3-60 MANUAL Y2 M3-39 MANUAL Y3 M3-38 MANUAL Y4 M3-52 MANUAL Y5 M3-19 MANUAL Y6 M3-22 MANUAL Y7 M3-73 SMOKE Y8 M3-74 SMOKE Y9 M3-26 MANUAL Y

10 M3-35 MANUAL Y11 M3-48 MANUAL Y12 M3-30 SMOKE Y13 M3-31 MANUAL Y14 M3-27 MANUAL Y15 M3-58 MANUAL Y16 M3-76 SMOKE Y17 M3-76 SMOKE Y18 M3-76 SMOKE US Test Alarm19 M3-77 MANUAL Y Y20 M3-78 MANUAL Y21 M3-55 MANUAL Y Y22 M3-96 MANUAL Y Y23 M3-96 MANUAL Y Y24 M3-97 HEAT Y25 M3-97 HEAT Y26 M3-97 HEAT Y27 M3-97 HEAT Y28 M3-97 HEAT Y29 M3-97 HEAT Y30 M3-97 HEAT Y

Remark: * Smoke Detector Point M2-12 Damage 2 Ea.* M2-12 test 4 Ea* Smoke Detector Point M3-76 Test alarm* Hor & Stabe light point M1-19

Canteen

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

CanteenCanteen Y

CanteenCanteen

Y

YYY

Canteen Y

Document store US

CanteenCanteenCanteen

Document storeDocument store Y

ZAL op/34

Y

MCL1 op/32 YDocument store YDocument store Y

MCL1 pulpit room YMCL1 pulpit room Y

MCL1 op/54 Y

MCL1 op/56 YMCL1 op/52 YMCL1 op/49 Y

ZAL op/57 YMaintenance office YMaintenance office Y

MCC.op/51 YZAL op/35 YMCl. op/60 Y

Remark

ZAL op/60 YMCC.op/exit Y

Location of fire alarm control panel : CRM BLDG SFIP-02 SIMPLEX 4100 ES [NODE 2]

item Location LOOP/ Zone.Number Type Inspection

Result Test Result

Inspection Date :Inspector :

Witness : Khun Songpon, Khun Sonthaya

Subject : NS BLUE SCOPE STEEL (THAILAND) LTD.Client :

REF.Contract NO : SC1000142

Subin, Wachira, Somkid, Anucha, Anuchit

Fire Detection and Alarm SystemPreventive Maintenance Check Sheet

Function test 2-3

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE ALARM SYSTEM

28 - 30 April 2021

1 M3-97 HEAT Y2 M3-68 IAM-signal alarm Y3 M3-43 IAM-signal alarm Y4 M3-44 IAM-signal alarm Y5 M3-69 IAM-signal trouble Y6 M3-70 IAM-signal alarm Y7 M3-72 IAM-signal alarm Y

Remark:

Fire Detection and Alarm SystemPreventive Maintenance Check Sheet

Subject : Client : NS BLUE SCOPE STEEL (THAILAND) LTD.

REF.Contract NO : SC1000142Inspection Date :

Inspector : Subin, Wachira, Somkid, Anucha, AnuchitWitness : Khun Songpon, Khun Sonthaya

eer-mcl-1 inergen signal Y

Location of fire alarm control panel : CRM BLDG SFIP-02 SIMPLEX 4100 ES [NODE 2]

item Location LOOP/ Zone.Number Type Inspection

Result Test Result Remark

Canteen YSub 115 kv Y

eer-mcl-1 inergen signal YSupport building YSupport building Y

Support bldg inergen signal Y

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Function test 2-4

Page 4: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE ALARM SYSTEM

28 - 30 April 2021

CPL,MCL-2 BLDG SFIP-03 SIMPLEX 4100 ES [NODE 3]

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for FCP

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of FCP

2. Annunciator Panel

2.1 Check condition of fuse control

2.2 Check condition of Lamp & LEDs

2.3 Check power supply for FCP

2.4 Check cable connection / terminal

2.5 Check Alarm Condition / Function Test

2.6 Visual check condition of battery and housing of battery

2.7 Cleaning of Annunciator Panel

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

AC POWER 231.00 VAC

Charger control panel 27.35 VDC

Battery back up 27.31 VDC

* Battery start 25/6/20 12V 18Ah

TAKACHIHO

Preventive Maintenance Check Sheet (Monthly/Quarterly)Fire Detection and Alarm System

Subject :

Result

Client :REF.Contract NO :

Inspection Date :Inspector :

NS BLUE SCOPE STEEL (THAILAND) LTD.SC1000142

Witness : Khun Songpon, Khun Sonthaya

Location of fire alarm control panel :

Subin, Wachira, Somkid, Anucha, Anuchit

Description

1. Fire Alarm Control Panel

Y

Y

Y

Y

Y

Y

Y

Y

Y

Remark :

Y

Y

Y

Y

Y

CONTROL PANEL FIRE ALARM 3

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE ALARM SYSTEM

28 - 30 April 2021

CPL,MCL-2 BLDG SFIP-03 SIMPLEX 4100 ES [NODE 3]

1 M1-38 MANUAL Y2 M1-46 SMOKE Y3 M1-45 SMOKE Y4 M1-27 MANUAL Y5 M1-14 MANUAL Y6 M1-42 MANUAL Y7 M1-8 MANUAL Y8 M1-5 MANUAL Y9 M1-11 MANUAL Y

10 M1-47 SMOKE Y11 M2-3 MANUAL Y12 M2-2 SMOKE Y13 M2-1 SMOKE Y14 M2-8 MANUAL Y 2 15 M2-7 SMOKE Y16 M2-14 SMOKE Y 2 17 M2-13 MANUAL Y 2 18 M2-11 MANUAL Y19 M2-3 MANUAL Y20 M2-3 MANUAL Y21 M2-3 MANUAL Y22 M2-2 SMOKE Y23 M2-2 SMOKE Y24 M2-2 SMOKE Y25 M1-86 SMOKE Y26 M1-87 SMOKE Y27 M1-88 SMOKE Y28 M2-43 MANUAL Y29 M2-44 SMOKE Y30 M2-45 SMOKE Y

Remark: Point M2-2 by pass 2 (Smoke)Point M2-1 by pass 1 (Smoke)

Inspection Date :

NS BLUE SCOPE STEEL (THAILAND) LTD.

Preventive Maintenance Check Sheet Fire Detection and Alarm System

Subject : Client :

REF.Contract NO : SC1000142

Inspector :Witness : Khun Songpon, Khun Sonthaya

Location of fire alarm control panel :

Subin, Wachira, Somkid, Anucha, Anuchit

CPL-lab room 2 Y

item Location LOOP/ Zone.Number Type Inspection

Result Test Result Remark

CPL op/46 YCPL-lab room 1 Y

CPL - paint line mac-4 YCPL - paint line mac-2 Y

CPL new lab op/37 YCPL packing mac-1 YCPL packing mac-2 Y

CPL-recon area YMCL-inspactor room Y

Service tunnel north mac YService tunnel north smoke YService tunnel north smoke

Air compreeser- mac YAir compreeser- smoke Y

Y

Water treat ment smoke YWater treat ment mac Y

Solid waste YService tunnel north mac YService tunnel north mac YService tunnel north mac Y

Service tunnel north smoke YService tunnel north smoke YService tunnel north smoke Y

MCL_2 exit room YMCL_2 exit room Y

MCL_2 coating pot room Y

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

MCL_2 exit room YMCL_2 coating pot room YMCL_2 coating pot room Y

Function test 3-1

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 TCIF Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE ALARM SYSTEM

28 - 30 April 2021

31 M2-35 S/S V. N/A Main Valve off32 M2-39 S/S V. N/A Main Valve off33 M2-46 MANUAL Y34 M2-48 SMOKE Y35 M2-49 SMOKE Y36 M2-93 SMOKE Y37 M2-94 SMOKE Y38 M2-91 MANUAL Y39 M2-55 S/S V. N/A Main Valve off40 M2-59 S/S V. N/A Main Valve off41 M2-63 S/S V. N/A Main Valve off42 M2-77 S/S V. N/A Main Valve off43 M2-71 S/S V. N/A Main Valve off44 M2-63 S/S V. N/A Main Valve off45 M2-83 S/S V. N/A Main Valve off46 M1-80 MCP-3 N/A47 M1-80 MCP-2 N/A48 M1-80 MCP-1 N/A49 M1-81 S/S V. N/A Main Valve off50 M2-18 MCP-3 N/A51 M1-82 MCP-3 N/A52 M1-82 MCP-2 N/A53 M1-82 MCP-1 N/A54 M1-75 S/S V. N/A Main Valve off55 M1-90 S/S V. N/A Main Valve off56 M1-61 S/S V. N/A Main Valve off57 M1-55 S/S V. N/A Main Valve off58 M1-49 S/S V. N/A Main Valve off59 M1-79 CMA. N/A60 M1-68 MANUAL Y

Remark:

Fire Detection and Alarm System

Witness :

Subject : NS BLUE SCOPE STEEL (THAILAND) LTD.Client :

REF.Contract NO : SC1000142Inspection Date :

Khun Songpon, Khun SonthayaInspector : Subin, Wachira, Somkid, Anucha, Anuchit

Preventive Maintenance Check Sheet

MCL-2 entry meting room Y

Location of fire alarm control panel : MCL-1, CPL,MCL-2 BLDG SFIP-03 SIMPLEX 4100 ES [NODE 3]

item Location LOOP/ Zone.Number Type Inspection

Result Test Result Remark

MCL-2 fire suppression N/AMCL-2 fire suppression N/A

MCL-2 entry meting room YMCL-2 entry meting room Y

MCL-2 entry room YMCL-2 entry room YMCL-2 entry room Y

MCL-2 fire suppression N/AMCL-2 fire suppression N/AMCL-2 fire suppression N/AMCL-2 fire suppression N/AMCL-2 fire suppression N/AMCL-2 fire suppression N/AMCL-2 fire suppression N/AMCL-2 coil and storange N/AMCL-2 pre alarm nitrogen N/AMCL-2 pre alarm nitrogen N/AMCL-2 fire suppression N/A

MCL-2 pre alarm N/AMCL-2 pre alarm N/AMCL-2 pre alarm N/AMCL-2 pre alarm N/A

MCL-2 fire suppression N/AMCL-2 fire suppression N/AMCL-2 fire suppression N/A

MCL-2 disch office Y

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

MCL-2 fire suppression N/AMCL-2 fire suppression N/A

MCL-2 signel alarm N/A

Function test 3-2

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE ALARM SYSTEM

28 - 30 April 2021

61 M1-70 SMOKE Y62 M1-71 SMOKE Y63 M1-68 MANUAL Y64 M1-33 MANUAL Y65 M1-43 SMOKE Y Y66 M1-43 SMOKE Y Y67 M1-43 SMOKE Y Y68 M1-84 MANUAL Y Y69 M1-22 S/SV Y Y70 M1-30 MANUAL Y Y71 M1-1 MANUAL Y Y72 M1-24 MANUAL Y Y73 M2-1 SMOKE Y Y74 M2-1 SMOKE Y Y75 M2-12 HEAT N/A N/A76 M2-12 HEAT N/A77 M2-12 HEAT N/A78 M2-12 HEAT N/A

Remark: * M2-12

Fire Detection and Alarm System

Witness :

Subject : NS BLUE SCOPE STEEL (THAILAND) LTD.Client :

REF.Contract NO : SC1000142Inspection Date :

Khun Songpon, Khun SonthayaInspector : Subin, Wachira, Somkid, Anucha, Anuchit

Preventive Maintenance Check Sheet

Location of fire alarm control panel : MCL-1, CPL,MCL-2 BLDG SFIP-03 SIMPLEX 4100 ES [NODE 3]

item Location LOOP/ Zone.Number Type Inspection

Result Test Result

CPL c2/25 YNew lab roomNew lab room

Remark

MCL-2 disch office YMCL-2 disch office YMCL-2 disch office Y

CPL Paint lineCPL Recon AreaCPL Paint Store

New lab roomExit mcl 2 pulpit

MCL 2 Suppervisory

SOLID WASTE

SERVICE TUNNELSERVICE TUNNEL

SOLID WASTE

SOLID WASTE

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

N/AN/AN/ASOLID WASTE

Function test 3-3

Page 5: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE ALARM SYSTEM

28 - 30 April 2021

MCL-2 BLDG Node 3 Loop M3

1 M3-34 MANUAL S S2 M3-35 MANUAL S S3 M3-36 MANUAL S S Stobe light damage 1 ea

4 M3-37 MANUAL S S5 M3-33 MANUAL S S6 M3-21 MANUAL S S7 M3-23 MANUAL S S8 M3-24 MANUAL S S9 M3-25 MANUAL S S

10 M3-9 MANUAL S S11 M3-27 MANUAL S S12 M3-28 MANUAL S S13 M3-16 MANUAL S S14 M3-17 MANUAL S S15 M3-18 MANUAL S S16 M3-30 MANUAL S S17 M3-1 MANUAL S S18 M3-26 MANUAL S S19 M3-2 MANUAL S S20 M3-31 MANUAL S S21 M3-32 MANUAL S S22 M3-18 MANUAL S S23 M3-48 HEAT S S24 M3-48 HEAT S S25 M3-48 HEAT S S26 M3-48 HEAT S S27 M3-48 HEAT S S28 M3-38 MANUAL S S29 M3-3 IAM S S commons trouble30 M3-48 IAM S S commons alarm

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Fire Detection and Alarm System

Client :REF.Contract NO : SC1000142

Inspection Date :

Subject : NS BLUE SCOPE STEEL (THAILAND) LTD.

Preventive Maintenance Check Sheet

Remark :

Inspector :Witness :

Location of fire alarm control panel :

Khun Songpon, Khun Sonthaya

Mcl-2 coil and storange wast zone 6

Mcl-2 coil and storange east zone 4Mcl-2 coil and storange east zone 4

Mcl-2 coil and storange east zone 4

Mcl-2 Ingot storange Zone 3

Mcl-2 coil and storange east zone 4

Mcl-2 coil and storange central zone 5

Mcl-2 New Chemical Storage Zone 8

item

Subin, Wachira, Somkid, Anucha, Anuchit

Type Inspection Result RemarkTest ResultLOOP/

Zone.NumberLocation

Mcl-2 coil and storange east zone 4

Mcl-2 coil and storange east zone 4MCL-2 entry eer room Zone 2

Mcl-2 Ingot storange Zone 3Mcl-2 Ingot storange Zone 3

Mcl-2 coil and storange wast zone 6 Mcl-2 coil and storange wast zone 6

Mcl-2 New Chemical Storage Zone 8Mcl-2 New Chemical Storage Zone 8

Mcl-2 NCP1 PLC & Com Rm.

Mcl-2 coil and storange wast zone 6Mcl-2 coil and storange central zone 5Mcl-2 coil and storange central zone 5

MCL-2 main eer room Zone1Mcl-2 coil and storange central zone 5

Mcl-2 New Chemical Storage Zone 8Mcl-2 New Chemical Storage Zone 8

Mcl-2 New Chemical Storage Zone 8

Mcl-2 coil and storange central zone 5MCL-2 main eer room Zone1

Mcl-2 coating Pot EER RM Zone 7Mcl-2 NCP1 PLC & Com Rm.

Function test 3-4

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE ALARM SYSTEM

28 - 30 April 2021

MCL-2 BLDG Node 3 Loop M3

31 M3-5 IAM S S commons trouble32 M3-6 IAM S S commons alarm33 M3-39 IAM S S commons trouble34 M3-40 IAM S S commons alarm35 M3-19 IAM S S commons trouble36 M3-20 IAM S S commons alarm37 M3-10 IAM S S commons trouble38 M3-11 IAM S S commons alarm

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Fire Detection and Alarm SystemPreventive Maintenance Check Sheet

Subject : Client : NS BLUE SCOPE STEEL (THAILAND) LTD.

REF.Contract NO : SC1000142Inspection Date :

Inspector : Subin, Wachira, Somkid, Anucha, AnuchitWitness : Khun Songpon, Khun Sonthaya

Location of fire alarm control panel :

item Location LOOP/ Zone.Number Type Test Result Remark

Mcl-2 NCP2 Main Exit EER Rm. Mcl-2 NCP2 Main Exit EER Rm.

Mcl-2 NCP3 Coating Pot EER Rm. Mcl-2 NCP3 Coating Pot EER Rm.

Inspection Result

Mcl-2 NCP4 Premalt EER Rm. Mcl-2 NCP4 Premalt EER Rm. Mcl-2 NCP5 PLC & Comp Rm. Mcl-2 NCP5 PLC & Comp Rm.

Remark :

Function test 3-5

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE ALARM SYSTEM

28 - 30 April 2021

ADMIN STATION BLDG SFIP-04 SIMPLEX 4100 ES [NODE 4]

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for FCP

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of FCP

2. Annunciator Panel

2.1 Check condition of fuse control

2.2 Check condition of Lamp & LEDs

2.3 Check power supply for FCP

2.4 Check cable connection / terminal

2.5 Check Alarm Condition / Function Test

2.6 Visual check condition of battery and housing of battery

2.7 Cleaning of Annunciator Panel

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

AC POWER 231.4 VAC

Charger control panel 27.11 V.dc

Battery back up 27.09 V.dc start using 26/6/20

* Cable loop Idnet out , short CKT

TAKACHIHO

Preventive Maintenance Check Sheet (Monthly/Quarterly)Fire Detection and Alarm System

Subject : Client :

REF.Contract NO :Inspection Date :

Y

NS BLUE SCOPE STEEL (THAILAND) LTD.SC1000142

Y

Y

Y

Inspector :Witness : Khun Songpon, Khun Sonthaya

Location of fire alarm control panel :

Description Result

1. Fire Alarm Control Panel

Subin, Wachira, Somkid, Anucha, Anuchit

Remark :

Y

Y

Y

Y

Y

Y

Y

Y

Y

Y

CONTROL PANEL FIRE ALARM 4

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE ALARM SYSTEM

28 - 30 April 2021

ADMIN STATION BLDG SFIP-04 SIMPLEX 4100 ES [NODE 4]

1 M1-1 SDA Y2 M1-2 SMOKE Y3 M1-2 SMOKE Y4 M1-2 SMOKE Y5 M1-3 SMOKE Y6 M1-3 SMOKE Y7 M1-3 SMOKE Y8 M1-3 SMOKE Y9 M1-3 SMOKE Y

10 M1-3 SMOKE Y11 M1-3 SMOKE Y12 M1-3 SMOKE Y13 M1-4 SMOKE Y14 M1-4 SMOKE Y15 M1-4 SMOKE Y16 M1-4 SMOKE Y17 M1-4 SMOKE Y18 M1-4 SMOKE Y19 M1-4 SMOKE Y20 M1-4 HEAT Y21 M1-4 HEAT Y22 M1-5 MANUAL Y23 M1-6 MANUAL Y24 M1-7 MANUAL Y25 M1-8 IAM Signal Alarm Y

Subin, Wachira, Somkid, Anucha, Anuchit

Fire Detection and Alarm System

Witness :

Preventive Maintenance Check Sheet

SC1000142

Khun Songpon, Khun Sonthaya

Inspection Date :Inspector :

Subject : Client : NS BLUE SCOPE STEEL (THAILAND) LTD.

REF.Contract NO :

Remark

Admin bldg. Y

Ranbuil store YRanbuil store Y

Type Inspection Result Test Result

Location of fire alarm control panel :

item Location LOOP/ Zone.Number

Ranbuil store YAdmin bldg.canteen Y

Admin bldg. YAdmin bldg.office YAdmin bldg.office YAdmin bldg.office YAdmin bldg.office YAdmin bldg.office YAdmin bldg.office Y

Admin bldg. YAdmin bldg. YAdmin bldg. YAdmin bldg. YAdmin bldg. YAdmin bldg. YAdmin bldg. Y

Admin bldg. YAdmin bldg. YAdmin bldg. Y

Admin bldg. exit YAdmin bldg. exit Y

FCP Training School Bld. Y

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Function test panel 4

Page 6: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE ALARM SYSTEM

28 - 30 April 2021

SUPPORT,SAFETY BLDG THORN FIRE QUEST 300

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for FCP

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of FCP

2. Annunciator Panel

2.1 Check condition of fuse control

2.2 Check condition of Lamp & LEDs

2.3 Check power supply for FCP

2.4 Check cable connection / terminal

2.5 Check Alarm Condition / Function Test

2.6 Visual check condition of battery and housing of battery

2.7 Cleaning of Annunciator Panel

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

AC POWER 229.3 VAC

Charger control panel 27.42 VDC

Battery back up 27.40 VDC ( start 28/9/20 )

Subin, Wachira, Somkid, Anucha, Anuchit

TAKACHIHO

Fire Detection and Alarm System

Subject :

Result

Client :REF.Contract NO :

Inspection Date :Inspector :

NS BLUE SCOPE STEEL (THAILAND) LTD.SC1000142

Witness : Khun Songpon, Khun Sonthaya

Preventive Maintenance Check Sheet (Monthly/Quarterly)

Y

Y

Y

Y

Location of fire alarm control panel :

Description

1. Fire Alarm Control Panel

Y

Y

Y

Y

Remark :

Y

Y

Y

Y

Y

Y

CONTROL PANEL FIRE ALARM 5

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE ALARM SYSTEM

28 - 30 April 2021

1 M3-69 Common Trouble Y2 M3-70 (ZONE 2) MANUAL Y3 M3-70 (ZONE 1) SMOKE Y4 M3-70 (ZONE 1) SMOKE Y5 M3-70 (ZONE 1) SMOKE Y6 M3-70 (ZONE 2) MANUAL Y7 M3-70 (ZONE 1) SMOKE Y8 M3-70 (ZONE 1) SMOKE Y9 M3-70 (ZONE 1) SMOKE Y10 M3-70 (ZONE 1) SMOKE Y11 M3-70 (ZONE 2) MANUAL Y12 M3-70 (ZONE 2) SMOKE Y13 M3-70 (ZONE 3) SMOKE Y14 M3-70 (ZONE 3) SMOKE Y15 M3-70 (ZONE 3) MANUAL Y16 M3-70 (ZONE 3) SMOKE Y17 M3-70 (ZONE 3) SMOKE Y18 M3-70 (ZONE 3) SMOKE Y19 M3-70 (ZONE 3) MANUAL Y20 M3-70 (ZONE 3) SMOKE Y21 M3-70 (ZONE 3) SMOKE Y22 M3-70 (ZONE 3) SMOKE Y

23 M3-70 (ZONE 3) SMOKE N/ASmoke project

24 M3-70 (ZONE 3) MANUAL N/A Manual

25 M3-70 (ZONE 1) SMOKE Y26 M3-70 (ZONE 1) SMOKE Y27 M3-70 (ZONE 1) SMOKE Y28 M3-70 (ZONE 1) SMOKE Y29 M3-70 (ZONE 1) SMOKE Y30 M3-70 (ZONE 1) SMOKE Y31 M3-70 (ZONE 2) SMOKE Y

32 M3-70 (ZONE 3) MANUAL N/A Manual project

33 M3-70 (ZONE 3) MANUAL Y34 M3-70 (ZONE 3) MANUAL Y35 M3-70 (ZONE 3) MANUAL Y

Fire Detection and Alarm System

Khun Songpon, Khun Sonthaya

Subject : NS BLUE SCOPE STEEL (THAILAND) LTD.Client :

REF.Contract NO : SC1000142Inspection Date :

Inspector :Witness :

Subin, Wachira, Somkid, Anucha, Anuchit

Preventive Maintenance Check Sheet

Support bldg Y

Location of fire alarm control panel : SUPPORT,SAFETY BLDG THORN FIRE QUEST 300

item Location LOOP/ Zone.Number Type Inspection

Result Test Result Remark

Support bldg YSupport bldg Y

Support bldg YSupport bldg YSupport bldg YSupport bldg YSupport bldg YSupport bldg YSupport bldg Y

Support bldg first aid YSupport bldg first aid Y

Safety bldg. YSafety bldg. YSafety bldg. Y

Safety bldg. locker room YSafety bldg. locker room YSafety bldg. locker room YSafety bldg. locker room YSafety bldg. locker room Y

Trainning room YTrainning room Y

Project EngineeringN/A

Safety bldg. N/A

Support bldg. YSupport bldg. Y

Support bldg. Y

Support bldg. YSupport bldg. First aid Y

Project EngineeringN/A

Support bldg. YSupport bldg. Y

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Support bldg. YSupport bldg. YSupport bldg. Y

Function test 5-1

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE ALARM SYSTEM

28 - 30 April 2021

36 M3-70 (ZONE 2) SMOKE Y37 M3-70 (ZONE 2) SMOKE Y

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Remark

Toilet YToilet Y

Location of fire alarm control panel : SUPPORT,SAFETY BLDG THORN FIRE QUEST 300

item Location LOOP/ Zone.Number Type Inspection

Result Test Result

Subject : Client : NS BLUE SCOPE STEEL (THAILAND) LTD.

REF.Contract NO : SC1000142Inspection Date :

Inspector : Subin, Wachira, Somkid, Anucha, AnuchitWitness : Khun Songpon, Khun Sonthaya

Fire Detection and Alarm SystemPreventive Maintenance Check Sheet

Function test 5-2

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System

28 - 30 April 2021

Training School Building Notifier (SFP-2402)

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for FCP

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of FCP

2. Annunciator Panel

2.1 Check condition of fuse control

2.2 Check condition of Lamp & LEDs

2.3 Check power supply for FCP

2.4 Check cable connection / terminal

2.5 Check Alarm Condition / Function Test

2.6 Visual check condition of battery and housing of battery

2.7 Cleaning of Annunciator Panel

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

Inspection Date :Inspector :

Subject : Client : NS BLUE SCOPE STEEL (THAILAND) LTD.

REF.Contract NO : SC1000142

Subin, Wachira, Somkid, Anucha, Anuchit

Fire Detection and Alarm SystemPreventive Maintenance Check Sheet (Monthly/Quarterly)

Witness : Khun Songpon, Khun Sonthaya

Description Normal Status

Location of fire alarm control panel :

Result

1. Fire Alarm Control Panel

S S

S S

S S

S S

S S

S S

S S

S S

N/A N/A

N/A N/A

N/A N/A

N/A N/A

N/A N/A

N/A N/A

Remark : AC POWER 232.1 VAC

Charger control panel 27.50 Vdc.

Battery back up 27.36 Vdc. (Start 30/9/20) 12V 7.5 Ah.

TAKACHIHO

Page 7: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE ALARM SYSTEM

28 - 30 April 2021

1 Zone 1 Smoke S S2 Zone 1 Smoke S S3 Zone 1 Smoke S S4 Zone 1 Smoke S S5 Zone 1 Manual S S6 Zone 2 Smoke S S7 Zone 2 Smoke S S8 Zone 2 Smoke S S9 Zone 2 Smoke S S

10 Zone 2 Smoke S S11 Zone 2 Smoke S S12 Zone 2 Smoke S S13 Zone 2 Smoke S S14 Zone 2 Smoke S S15 Zone 2 Manual S S16 Zone 2 Manual S S

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

Fire Detection and Alarm SystemPreventive Maintenance Check Sheet

Subject : Client : NS BLUE SCOPE STEEL (THAILAND) LTD.

REF.Contract NO : SC1000142Inspection Date :

Inspector : Subin, Wachira, Somkid, Anucha, AnuchitWitness : Khun Songpon, Khun Sonthaya

Location of fire alarm control panel : Training School Building Notifier (SFP-2402)

item Location LOOP/ Zone.Number Type Inspection

Result Test Result

Smoke No.6 Training

Remark

Smoke No.1 TrainingSmoke No.2 TrainingSmoke No.3 TrainingSmoke No.4 Training

Manual TrainingSmoke No.1 TrainingSmoke No.2 TrainingSmoke No.3 TrainingSmoke No.4 TrainingSmoke No.5 Training

Smoke No.7 TrainingSmoke No.8 TrainingSmoke No.9 TrainingManual No.1 TrainingManual No.2 Training

training school building1

Takachiho Fire, Security & Services (Thailand) Ltd.

1858/110-111 Interlink Tower 25 Fl.,

Debaratna Road, Bangna Tai, Bangna,

Bangkok 10260, Thailand.

Tel : 02-366 -9000 , FAX : 02-366-9090

www.tkfs.co.th

INERGEN SYSTEM

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System

28 - 30 April 2021

Location of fire alarm control panel : PKL- MAIN EER. ROOM POTTER PFC- 2000RC

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for RCP and battery

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of RCP

2. Equipment

2.1 Check condition of all detector and function test zone by zone

2.2 cross zone function test of detector

2.3 Check condition of all manual release

2.4 Check condition of solenoid and function test

2.5 Check condition of all abort switch and function test

2.6 Check cable connection / terminal

2.7 Visual check slector valve and function test

2.8 Check condition of all alarm device and tested

3.Mechanical

3.1 check pipe system and nozzle for physical damage.

3.2 check condition of flexible hose

3.3 check condition of cylinder

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Y Y

Y Y

Y Y

Charger control panel 26.90 Vdc.

Battery back up 26.88 Vdc. (start using 25/6/20)

TAKACHIHO

Remark : AC POWER 230.3 VAC

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

1. Releasing Control Panel Y Y

Y Y

Description Status Function test Result

Electrical system

SC1000142Inspection Date :

Inspector :Witness : Khun Songpon, Khun Sonthaya

Subin, Wachira, Somkid, Anucha, Anuchit

Client : NS BLUE SCOPE STEEL (THAILAND) LTD.REF.Contract NO :

Preventive Maintenance Check Sheet Fire suppression system

Subject :

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System

28 - 30 April 2021

Location of fire alarm control panel : PKL- MAIN EER. ROOM POTTER PFC- 2000RC

1 ZONE. 1 SMOKE.1 Y Y cross zone detector discharge 30sec2 ZONE. 2 SMOKE.2 Y Y3 ZONE. 1 SMOKE.1 Y Y4 ZONE. 2 SMOKE.2 Y Y5 ZONE. 1 SMOKE.1 Y Y6 ZONE. 2 SMOKE.2 Y Y7 ZONE. 3 MANAUL1 Y Y to discharge 30 sec8 ZONE. 3 MANAUL2 Y Y to discharge 30 sec9 STOBE light Y Y active pre discharge10 Solenoid Valve Y Y to discharge 11 ABORT.SW 1 Y Y remain 10 sec12 ABORT.SW 2 Y Y

clean and test detector function test o.k* Somke detector cross zone delay times 30 sec.* Abort switch push to remain 10 sec.* Manual release push to delay times 30 sec.* Alarm 1 stobe horn , Alarm 2 stobe light * Manual release stobe horn

Remark :

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

TAKACHIHO

PKL-maln eer.room

Preventive Maintenance Check Sheet Fire suppression system

Inspection Date :

Subject : Client :

item Zone.Number

Khun Songpon, Khun Sonthaya

PKL-maln eer.room

NS BLUE SCOPE STEEL (THAILAND) LTD.

Inspector :Witness :

SC1000142REF.Contract NO :

Subin, Wachira, Somkid, Anucha, Anuchit

PKL-maln eer.roomPKL-maln eer.room

PKL-maln eer.roomPKL-maln eer.room

PKL-maln eer.room

PKL-maln eer.room

PKL-maln eer.room

PKL-maln eer.roomPKL-maln eer.room

PKL-maln eer.room

RemarkTest ResultLocation Test trouble signal FCPType

Page 8: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System

28 - 30 April 2021

Location of fire alarm control panel : CRM- MAIN EER. ROOM POTTER PFC- 2000RC

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for RCP and battery

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of RCP

2. Equipment

2.1 Check condition of all detector and function test zone by zone

2.2 cross zone function test of detector

2.3 Check condition of all manual release

2.4 Check condition of solenoid and function test

2.5 Check condition of all abort switch and function test

2.6 Check cable connection / terminal

2.7 Visual check slector valve and function test

2.8 Check condition of all alarm device and tested

3.Mechanical

3.1 check pipe system and nozzle for physical damage.

3.2 check condition of flexible hose

3.3 check condition of cylinder

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

* Flexible hose of cylinder Inergen deteriorate

Fire suppression systemPreventive Maintenance Check Sheet

Subject : Client :

REF.Contract NO :Inspection Date :

NS BLUE SCOPE STEEL (THAILAND) LTD.SC1000142

Inspector :Witness : Khun Songpon, Khun Sonthaya

Subin, Wachira, Somkid, Anucha, Anuchit

Description Status Function test Result

Electrical system

1. Releasing Control Panel

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y

Y Y

Y

Y Y

Y Y

Y Y

Y

Y Y

Y

Y

Y Y

Y

Y Y

Y Y

Remark : AC POWER 228.9 VAC

TAKACHIHO

Charger control panel 27.09 VDC

Battery back up 27.07 VDC ( start using 25/6/20)

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System

28 - 30 April 2021

Location of fire alarm control panel : CRM- MAIN EER. ROOM POTTER PFC- 2000RC

1 ZONE.1 SMOKE.1 Y Y cross zone detector discharge 30sec2 ZONE.2 SMOKE.2 Y Y3 ZONE.1 SMOKE.1 Y Y4 ZONE.2 SMOKE.2 Y Y5 ZONE.1 SMOKE.1 Y Y6 ZONE.2 SMOKE.2 Y Y7 ZONE.1 SMOKE.1 Y Y8 ZONE.2 SMOKE.2 Y Y9 MANUAL Y Y to discharge 30 sec10 ABORT.SW Y Y remain 10 sec.11 STOBE light Y Y active pre discharge12 Solenoid Y Y to discharge

clean and test detector function test normal* Somke detector cross zone delay times 30 sec.* Abort switch push to remain 10 sec.* Manual release push to delay times 30 sec.

TAKACHIHO

Preventive Maintenance Check Sheet Fire suppression system

Subject :

Khun Songpon, Khun Sonthaya

NS BLUE SCOPE STEEL (THAILAND) LTD.SC1000142

Client :REF.Contract NO :

Inspection Date :Inspector :

Witness :

item Location Zone.Number

Subin, Wachira, Somkid, Anucha, Anuchit

Type Test Result

CRM main eer.room

Remark

CRM main eer.roomCRM main eer.roomCRM main eer.roomCRM main eer.roomCRM main eer.room

Test trouble signal FCP

CRM main eer.roomCRM main eer.roomCRM main eer.roomCRM main eer.roomCRM main eer.room

Remark :

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System

28 - 30 April 2021

Location of fire alarm control panel : CRM SAVER COMPUTOR ROOM POTTER PFC- 2000RC

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for RCP and battery

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of RCP

2. Equipment

2.1 Check condition of all detector and function test zone by zone

2.2 cross zone function test of detector

2.3 Check condition of all manual release

2.4 Check condition of solenoid and function test

2.5 Check condition of all abort switch and function test

2.6 Check cable connection / terminal

2.7 Visual check slector valve and function test

2.8 Check condition of all alarm device and tested

3.Mechanical

3.1 check pipe system and nozzle for physical damage.

3.2 check condition of flexible hose

3.3 check condition of cylinder

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Charger control panel 26.98 VDC

Battery back up 26.95 VDC (start using 25/6/20)

TAKACHIHO

Preventive Maintenance Check Sheet Fire suppression system

Subject : Client :

REF.Contract NO :Inspection Date :

Inspector :Witness : Khun Songpon, Khun Sonthaya

NS BLUE SCOPE STEEL (THAILAND) LTD.SC1000142

Subin, Wachira, Somkid, Anucha, Anuchit

Description Status Function test Result

Electrical system

1. Releasing Control Panel

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Remark :

Y Y

Y Y

AC POWER 228.6 VAC

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System

28 - 30 April 2021

Location of fire alarm control panel : CRM SAVER COMPUTOR ROOM POTTER PFC- 2000RC

1 ZONE.1 SMOKE.1 Y Y cross zone detector discharge 30sec2 ZONE.2 SMOKE.2 Y Y3 ZONE.1 SMOKE.1 Y Y4 ZONE.2 SMOKE.2 Y Y5 ZONE.1 SMOKE.1 Y Y6 ZONE.2 SMOKE.2 Y Y7 ZONE.1 SMOKE.1 Y Y8 ZONE.2 SMOKE.2 Y Y9 MANUAL Y Y to discharge 30 sec10 ABORT.SW Y Y remain 10 sec.11 MANUAL Y Y to discharge 30 sec12 STOBE light Y Y active pre discharge13 Solenoid Valve Y Y to discharge

clean and test detector function test normal* Somke detector cross zone delay times 30 sec.* Abort switch push to remain 10 sec.* Manual release push to delay times 30 sec.

Preventive Maintenance Check Sheet Fire suppression system

Subject :

Remark :

TAKACHIHO

Inspection Date :Inspector :

Witness :

CRM- main eer.server room

REF.Contract NO :

CRM- main eer.server roomCRM- main eer.server roomCRM- main eer.server room

item Location Zone.Number Type RemarkTest Result Test trouble signal FCP

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

CRM- main eer.server roomCRM- main eer.server room

Client :

Khun Songpon, Khun Sonthaya

CRM- main eer.server roomCRM- main eer.server room

CRM- main eer.server room

NS BLUE SCOPE STEEL (THAILAND) LTD.SC1000142

CRM- main eer.server room

Subin, Wachira, Somkid, Anucha, Anuchit

Page 9: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System

28 - 30 April 2021

Location of fire alarm control panel : MCL1- MAIN EER. ROOM POTTER PFC- 2000RC

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for RCP and battery

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of RCP

2. Equipment

2.1 Check condition of all detector and function test zone by zone

2.2 cross zone function test of detector

2.3 Check condition of all manual release

2.4 Check condition of solenoid and function test

2.5 Check condition of all abort switch and function test

2.6 Check cable connection / terminal

2.7 Visual check slector valve and function test

2.8 Check condition of all alarm device and tested

3.Mechanical

3.1 check pipe system and nozzle for physical damage.

3.2 check condition of flexible hose

3.3 check condition of cylinder

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

* Smoke detector zone 1 ( ) detec alarm 2 ea

Fire suppression systemPreventive Maintenance Check Sheet

Subject : Client :

REF.Contract NO :Inspection Date :

NS BLUE SCOPE STEEL (THAILAND) LTD.SC1000142

Inspector :Witness : Khun Songpon, Khun Sonthaya

Subin, Wachira, Somkid, Anucha, Anuchit

Description Status Function test Result

Electrical system

1. Releasing Control Panel

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y

Y Y

Y

Y Y

Y Y

Y Y

Y

Y Y

Y

Y

Y Y

Y

Y Y

Y Y

Remark :

TAKACHIHO

AC POWER 226.9 VAC

Charger control panel 27.58 V.dc

Battery back up 27.56 V.dc Start using (25/6/20)

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System

28 - 30 April 2021

Location of fire alarm control panel : MCL1- MAIN EER. ROOM POTTER PFC- 2000RC

1 ZONE.1 SMOKE.1 Y Y cross zone detector discharge 30sec2 ZONE.2 SMOKE.2 Y Y3 ZONE.1 SMOKE.1 Y Y4 ZONE.2 SMOKE.2 Y Y5 ZONE.1 SMOKE.1 Y Y6 ZONE.2 SMOKE.2 Y Y7 ZONE.1 SMOKE.1 Y Y8 ZONE.2 SMOKE.2 Y Y9 ZONE.1 SMOKE.1 Y Y10 ZONE.2 SMOKE.2 Y Y11 ZONE.1 SMOKE.1 N N ( )12 ZONE.2 SMOKE.2 Y Y13 MANUAL 1 Y Y to discharge 30 sec14 MANUAL 1 Y Y to discharge 30 sec15 Strobe Light Y Y active pre discharge16 Solenoid Valve Y Y to discharge 17 MCL-main eer.room ABORT.SW Y Y remain 10 sec.18 MCL-main eer.room ZONE.1 SMOKE.1 N N ( )19 MCL-main eer.room ZONE.2 SMOKE.2 Y Y

clean and test detector function test normal* Somke detector cross zone delay times 30 sec.* Abort switch push to remain 10 sec.* Manual release push to delay times 30 sec.

Preventive Maintenance Check Sheet Fire suppression system

Subject :

Remark :

TAKACHIHO

Inspection Date :Inspector :

Witness :

Test Result

MCL-main eer.room

Test trouble signal FCP Remark

MCL-main eer.roomMCL-main eer.roomMCL-main eer.roomMCL-main eer.room

MCL-main eer.room

Client :

item Location Zone.Number Type

Khun Songpon, Khun Sonthaya

NS BLUE SCOPE STEEL (THAILAND) LTD.SC1000142REF.Contract NO :

Subin, Wachira, Somkid, Anucha, Anuchit

MCL-main eer.roomMCL-main eer.roomMCL-main eer.roomMCL-main eer.roomMCL-main eer.room

MCL-main eer.roomMCL-main eer.roomMCL-main eer.roomMCL-main eer.roomMCL-main eer.room

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System

28 - 30 April 2021

Location of fire alarm control panel : MCL1-PROGRAM SAVER. ROOM POTTER PFC- 2000RC

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for RCP and battery

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of RCP

2. Equipment

2.1 Check condition of all detector and function test zone by zone

2.2 cross zone function test of detector

2.3 Check condition of all manual release

2.4 Check condition of solenoid and function test

2.5 Check condition of all abort switch and function test

2.6 Check cable connection / terminal

2.7 Visual check slector valve and function test

2.8 Check condition of all alarm device and tested

3.Mechanical

3.1 check pipe system and nozzle for physical damage.

3.2 check condition of flexible hose

3.3 check condition of cylinder

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Fire suppression systemPreventive Maintenance Check Sheet

Subject : Client :

REF.Contract NO :Inspection Date :

NS BLUE SCOPE STEEL (THAILAND) LTD.SC1000142

Inspector :Witness : Khun Songpon, Khun Sonthaya

Subin, Wachira, Somkid, Anucha, Anuchit

Description Status Function test Result

Electrical system

1. Releasing Control Panel

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y

Y Y

Y

Y Y

Y Y

Y Y

Y

Y Y

Y

Y

Y Y

Y

Y Y

Y Y

Remark :

TAKACHIHO

AC POWER 227.6 VAC

Charger control panel 27.32 V.dc

Battery back up 27.31 VDC (start using 25/6/20)

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System

28 - 30 April 2021

Location of fire alarm control panel : MCL1-PREGRAM SAVER. ROOM POTTER PFC- 2000RC

1 ZONE.1 SMOKE.1 Y Y cross zone detector discharge 30sec2 ZONE.2 SMOKE.2 Y Y3 ZONE.1 SMOKE.1 Y Y4 ZONE.2 SMOKE.2 Y Y5 MANUAL Y Y to discharge 30 sec6 STROBE light Y Y active discharge7 Solenoid Valve Y Y to discharge 8 ABORT.SW Y Y remain 10 sec.

* Somke detector cross zone delay times 30 sec.* Abort switch push to remain 10 sec.* Manual release push to delay times 30 sec.

Remark :

TAKACHIHO

Preventive Maintenance Check Sheet Fire suppression system

Subject : Client :

REF.Contract NO :Inspection Date :

NS BLUE SCOPE STEEL (THAILAND) LTD.SC1000142

Inspector :Witness :

item Location Zone.Number

Khun Songpon, Khun SonthayaSubin, Wachira, Somkid, Anucha, Anuchit

Test Result Test trouble signal FCP Remark

MCL-pregram server .roomMCL-pregram server .roomMCL-pregram server .room

Type

MCL-pregram server .roomMCL-pregram server .roomMCL-pregram server .roomMCL-pregram server .roomMCL-pregram server .room

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Page 10: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System

28 - 30 April 2021

Location of fire alarm control panel : MAIN SUB-115 KV POTTER PFC- 2000RC

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for RCP and battery

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of RCP

2. Equipment

2.1 Check condition of all detector and function test zone by zone

2.2 cross zone function test of detector

2.3 Check condition of all manual release

2.4 Check condition of solenoid and function test

2.5 Check condition of all abort switch and function test

2.6 Check cable connection / terminal

2.7 Visual check slector valve and function test

2.8 Check condition of all alarm device and tested

3.Mechanical

3.1 check pipe system and nozzle for physical damage.

3.2 check condition of flexible hose

3.3 check condition of cylinder

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Preventive Maintenance Check Sheet Fire suppression system

Subject : Client :

REF.Contract NO :Inspection Date :

NS BLUE SCOPE STEEL (THAILAND) LTD.SC1000142

Description Status Function test Result

Khun Songpon, Khun SonthayaInspector :

Witness :Subin, Wachira, Somkid, Anucha, Anuchit

Electrical system

1. Releasing Control Panel Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

AC POWER 228.0 VAC

TAKACHIHO

Y Y

Remark :

Charger control panel 27.48 V.dc

Battery back up 27.47 Vdc (start using 25/6/20)

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System

28 - 30 April 2021

Location of fire alarm control panel : MAIN SUB 115 KV POTTER PFC- 2000RC

1 ZONE.1 SMOKE.1 Y Y cross zone detector discharge 30sec2 ZONE.2 SMOKE.2 Y Y3 ZONE.3 MANUAL Y Y to discharge 30 sec4 Strobe Light Y Y active pre discharge5 Solenoid Valve Y Y to discharge 6 ZONE.4 ABORT.SW Y Y remain 10 sec

* Smoke detector cross zone delay times 30 sec.* Abort switch push to remain 10 sec.* Manual release push to delay times 30 sec.

Remark :

TAKACHIHO

Preventive Maintenance Check Sheet Fire suppression system

Subject : Client :

REF.Contract NO :Inspection Date :

NS BLUE SCOPE STEEL (THAILAND) LTD.SC1000142

Inspector :Witness :

item Location Zone.Number

Khun Songpon, Khun SonthayaSubin, Wachira, Somkid, Anucha, Anuchit

Test Result Test trouble signal FCP Remark

115 KV .room115 KV .room115 KV .room

Type

115 KV .room115 KV .room115 KV .room

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System

28 - 30 April 2021

Location of fire alarm control panel : Support Bldg. (server room) Auto

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for RCP and battery

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of RCP

2. Equipment

2.1 Check condition of all detector and function test zone by zone

2.2 cross zone function test of detector

2.3 Check condition of all manual release

2.4 Check condition of solenoid and function test

2.5 Check condition of all abort switch and function test

2.6 Check cable connection / terminal

2.7 Visual check slector valve and function test

2.8 Check condition of all alarm device and tested

3.Mechanical

3.1 check pipe system and nozzle for physical damage.

3.2 check condition of flexible hose

3.3 check condition of cylinder

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Fire suppression systemPreventive Maintenance Check Sheet

Subject : Client : NS BLUE SCOPE STEEL (THAILAND) LTD.

REF.Contract NO : SC1000142Inspection Date :

Inspector :Witness : Khun Songpon, Khun Sonthaya

Subin, Wachira, Somkid, Anucha, Anuchit

Description Status Function test Result

Electrical system

1. Releasing Control Panel

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Remark : AC POWER 228.6 VAC

Charger control panel 27.10 V.dc

Battery back up 27.09 V.dc (Start using 25/6/20)

TAKACHIHO

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System

28 - 30 April 2021

Location of fire alarm control panel : Support Bldg. (server room) Auto

1 ZONE.1 Smoke Detector Y Y cross zone detector discharge 30sec2 ZONE.2 Smoke Detector Y Y3 ZONE.1 Smoke Detector Y Y4 ZONE.2 Smoke Detector Y Y5 ZONE.3 Manual Release Y Y to discharge 30 sec6 ZONE.4 Abort Switch Y Y remain 10 sec7 ZONE.5 Pressure Switch Y Y active alarm bell8 NAC 2 Stobe / horn Y Y active first alarm9 NAC 3 Alarm Bell Y Y active pre discharge10 NAC 1 Solenoid Valve Y Y to discharge 11 NAC 1 Key Switch Y Y

* Smoke detector cross zone delay times 30 sec.* Abort switch push to remain 10 sec.* Manual release push to delay times 30 sec.

Fire suppression systemPreventive Maintenance Check Sheet

Subject : Client : NS BLUE SCOPE STEEL (THAILAND) LTD.

REF.Contract NO : SC1000142

Server Room

Inspection Date :Inspector :

Witness : Khun Songpon, Khun Sonthaya

item Location Zone.Number

Server Room

Subin, Wachira, Somkid, Anucha, Anuchit

Type Test Result Test trouble signal FCP Remark

Server Room

Server RoomServer RoomServer RoomServer RoomServer RoomServer RoomServer RoomServer Room

TAKACHIHO

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Remark :

Page 11: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,

Bangkok 10260, Thailand.

Telephone no. : 02-366 -9000

Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System

28 - 30 April 2021

Location : INERGEN PKL, CRM

1 6610662 6611413 6613624 6611305 6612406 6613007 6613308 6611649 661157

10 661073 Hose worn 11 661136 Hose worn 12 661100 Hose worn 13 661342 Hose worn 14 66121815 661202 Hose worn16 66119717 66113118 66111119 66109120 66116021 66129422 661080 Hose worn 23 66109624 66140425 66106726 66112327 661118 Hose worn

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

REMARK:

CRM EER Room (Computer CRM RM) S 160 bar EER Room (Computer CRM RM) S 170 bar

EER Room (Computer CRM RM) S 170 bar EER Room (Computer CRM RM) S 170 bar

PKL EER Room S 170 bar

EER Room (Computer CRM RM) S 170 bar PKL EER Room S 160 bar

PKL EER Room S 169 bar PKL EER Room S 170 bar

PKL EER Room S 170 bar PKL EER Room S 170 bar

PKL EER Room S 170 bar PKL EER Room S 171 bar

PKL EER Room S 150 barPKL EER Room S 162 bar

CRM EER Room S 150 bar

PKL EER Room S 160 bar

CRM EER Room S 150 barCRM EER Room S 170 bar

CRM EER Room S 170 bar

CRM EER Room S 150 barCRM EER Room S 150 bar

CRM EER Room S 175 bar CRM EER Room 150 barCRM EER Room S 170 bar

S

CRM EER Room S 150 barCRM EER Room S 160 bar

item Location Tank no. Inspect result Pressure tank

Preventive Maintenance Check Sheet

Remark

Inspection Date :Inspector : Subin, Wachira, Somkid, Anucha, Anuchit

Witness : Khun Songpon, Khun Sonthaya

Fire suppression system

Subject : Client : NS BLUE SCOPE STEEL (THAILAND) LTD.

REF.Contract NO : SC1000142

Takachiho fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System

28 - 30 April 2021Subin, Wachira, Somkid, Anucha, Anuchit

Location : INERGEN MCL 1

1 MCL1 EER ROOM 6611162 MCL1 EER ROOM 6611253 MCL1 EER ROOM 6613924 MCL1 EER ROOM 6611835 MCL1 EER ROOM 6614146 MCL1 EER ROOM 6613797 MCL1 EER ROOM 6612118 MCL1 EER ROOM 6612609 MCL1 EER ROOM 661372

10 MCL1 EER ROOM 66119511 MCL1 EER ROOM 66109512 MCL1 EER ROOM 66126213 MCL1 EER ROOM 66108714 MCL1 EER ROOM 66130315 MCL1 EER ROOM 66105116 MCL1 EER ROOM 66126417 MCL1 EER ROOM 66129118 MCL1 EER ROOM 66137719 MCL1 EER ROOM 66126520 MCL1 EER ROOM 66120721 MCL1 EER ROOM 66131522 MCL1 EER ROOM 66122623 MCL1 EER ROOM 66122524 MCL1 EER ROOM 66114725 MCL1 EER ROOM 66129926 MCL1 EER ROOM 66133727 MCL1 EER ROOM 66115028 MCL1 EER ROOM 66116629 MCL1 EER ROOM 66117230 MCL1 EER ROOM 661367

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

REMARK:

S 155 barS 155 barS 155 bar

S 155 barS 150 bar

S 155 bar

S 155 barS 155 barS 155 bar

S 160 bar S 153 barS 150 bar

S 150 barS 150 barS 150 bar

S 155 barS 150 barS 150 bar

S 150 barS 150 barS 150 bar

S 150 barS 150 barS 150 bar

S 150 barS 150 barS 150 bar

Remark

S 160 bar

S 145 barS 155 bar

Inspection Date :Inspector :

Witness : Khun Songpon, Khun Sonthaya

item Location Tank no. Inspect result Pressure tank

REF.Contract NO : SC1000142

Preventive Maintenance Check Sheet Fire suppression system

Subject : Client : NS BLUE SCOPE STEEL (THAILAND) LTD.

Takachiho fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System

28 - 30 April 2021Subin, Wachira, Somkid, Anucha, Anuchit

Location : INERGEN MCL 1

31 MCL1 EER ROOM 66127332 MCL1 EER RM(Computer MCL1) 66126133 66130434 MCL1 S/P135 MCL1 S/P236 MCL1 S/P337 MCL1 S/P438 MCL1 S/P539 MCL1 S/P640 MCL1 S/P741 MCL1 S/P842 MCL1 S/P943 MCL1 S/P1044 MCL1 S/P1145 MCL1 S/P1246 MCL1 S/P1347 MCL1 S/P1448 MCL1 S/P15

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

REMARK: Spare parts Inergen Cylinder S/P1 - S/P15

S 165 bar

S 165 barS 160 barS 165 bar

S 165 barS 160 barS 160 bar

S 160 barS 160 barS 155 bar

S 158 barS 162 barS 155 bar

MCL1 EER RM(EER MCL1) S 160 barS 160 barS 160 bar

Inspect result Pressure tank Remark

S 152 bar S 160 bar

item Location Tank no.

Fire suppression system

Subject : Client : NS BLUE SCOPE STEEL (THAILAND) LTD.

REF.Contract NO : SC1000142Inspection Date :

Inspector :Witness : Khun Songpon, Khun Sonthaya

Preventive Maintenance Check Sheet

Takachiho fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System

28 - 30 April 2021Subin, Wachira, Somkid, Anucha, Anuchit

Location : INERGEN SUB 115KV

1 661074 S2 695829 S3 661185 S

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

REMARK:

Remark

SUB 115KV 160 bar

SUB 115KV 160 barSUB 115KV 160 bar

Inspection Date :Inspector :

Witness : Khun Songpon, Khun Sonthaya

item Location Tank no. Inspect result Pressure tank

REF.Contract NO : SC1000142

Preventive Maintenance Check Sheet Fire suppression system

Subject : Client : NS BLUE SCOPE STEEL (THAILAND) LTD.

Page 12: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System

28 - 30 April 2021Subin, Wachira, Somkid, Anucha, Anuchit

Location : INERGEN Server | Support Building

1 14T0491982 14T050156

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

REMARK:

Server Room S 2175 psi

Inspect result Pressure tank Remark

Server Room S 2175 psi

item Location Tank no.

Fire suppression system

Subject : Client : NS BLUE SCOPE STEEL (THAILAND) LTD.

REF.Contract NO : SC1000142

Preventive Maintenance Check Sheet

Inspection Date :Inspector :

Witness : Khun Songpon, Khun Sonthaya

Takachiho Fire, Security & Services (Thailand) Ltd.

1858/110-111 Interlink Tower 25 Fl.,

Debaratna Road, Bangna Tai, Bangna,

Bangkok 10260, Thailand.

Tel : 02-366 -9000 , FAX : 02-366-9090

www.tkfs.co.th

FM-200 SYSTEM

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System

28 - 30 April 2021

Location of fire alarm control panel : PKL- NEW MAIN EER ROOM. FM 200 FIKE PROTECTION

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for RCP and battery

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of RCP

2. Equipment

2.1 Check condition of all detector and function test zone by zone

2.2 cross zone function test of detector

2.3 Check condition of all manual release

2.4 Check condition of solenoid and function test

2.5 Check condition of all abort switch and function test

2.6 Check cable connection / terminal

2.7 Visual check slector valve and function test

2.8 Check condition of all alarm device and tested

3.Mechanical

3.1 check pipe system and nozzle for physical damage.

3.2 check condition of flexible hose

3.3 check condition of cylinder

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Fire suppression systemPreventive Maintenance Check Sheet

Subject : Client :

REF.Contract NO :Inspection Date :

NS BLUE SCOPE STEEL (THAILAND) LTD.SC1000142

Inspector :Witness : Khun Songpon, Khun Sonthaya

Subin, Wachira, Somkid, Anucha, Anuchit

Description Status Function test Result

Electrical system

1. Releasing Control Panel

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y

Y Y

Y

Y Y

Y Y

Y Y

Y

Y Y

Y

Y

Y Y

Y

Y Y

Y Y

Remark :

TAKACHIHO

AC POWER 228.3 VAC

Charger control panel 27.39 V.dc

Battery back up 27.36 V.dc (start using 25/6/20)

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System

28 - 30 April 2021

Location of fire alarm control panel : PKL- NEW MAIN EER. ROOM FM 200 FIKE PROTECTION

1 ZONE.1 SMOKE.1 Y Y cross zone detector discharge 30sec2 ZONE.2 SMOKE.2 Y Y3 ZONE.1 SMOKE.1 Y Y Alarm 1 Bell4 ZONE.2 SMOKE.2 Y Y Alarm 2 Stobe horn5 ZONE.3 MANUAL Y Y to discharge 6 ZONE.8 HORN&STOBE Y Y active pre alarm7 ZONE.9 Solenoid Valve Y Y to discharge 8 ZONE.4 ABORT.SW Y Y original time

ZONE. 6 Alarm Bell Y Y active first alarm

* Smoke detector cross zone delay times 30 sec.* Abort switch push to Original time delay * Manual release push to discharge gas* Alarm 1 bell , Alarm 2 stobe horn , Release stobe horn, Stobe light * Manual stobe horn, stobe light

TAKACHIHO

Fire suppression system

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Remark :

Subject : Client :

REF.Contract NO :Inspection Date :

NS BLUE SCOPE STEEL (THAILAND) LTD.SC1000142

Inspector :Witness :

item Test trouble signal FCP Remark

Subin, Wachira, Somkid, Anucha, Anuchit

Preventive Maintenance Check Sheet

Zone.Number

Khun Songpon, Khun Sonthaya

Test Result

FM-200 NEW-PKL-main eer .roomFM-200 NEW-PKL-main eer .roomFM-200 NEW-PKL-main eer .roomFM-200 NEW-PKL-main eer .roomFM-200 NEW-PKL-main eer .roomFM-200 NEW-PKL-main eer .room

FM-200 NEW-PKL-main eer .roomFM-200 NEW-PKL-main eer .room

TypeLocation

Page 13: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.

1858/110-111 Interlink Tower 25 Fl.,

Debaratna Road, Bangna Tai, Bangna,

Bangkok 10260, Thailand.

Tel : 02-366 -9000 , FAX : 02-366-9090

www.tkfs.co.th

CO2 SYSTEM

Takachiho fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression CO2 System

28 - 30 April 2021

MCL2 Entry EER. Room / Autopulse 542 R

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for FCP and battery

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of RCP

2. Equipment

2.1 Check condition of all detector and function test zone by zone

2.2 cross zone function test of detector

2.3 Check condition of all manual pull station

2.4 Check condition of solenoid and function test

2.5 Check condition of all abort switch and function test

2.6 Check cable connection / terminal

2.7 Visual check selector valve and function test

2.8 Check condition of all alarm devise and testing

3.Mechanical

3.1 check pipe system and nozzle for physical damage.

3.2 check condition of flexible hose

3.3 check condition of cylinder

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

Remark : AC Power 228.4 VAC

Charger control panel 27.01 VDC

Battery back up 27.00 VDC (Start Using 28/9/20)

S

S S

S S

S S

S S

S S

S S

S S

S S

S

S S

S S

S S

S S

S S

S S

S S

S S

1. Releasing Control Panel

S S

Location of fire alarm control panel :

Description Status Function test Result

Electrical system

Subject :

Client : NS BLUE SCOPE STEEL (THAILAND) LTD.

REF.Contract NO : SC1000142

Inspection Date :

Inspector : Subin, Wachira, Somkid, Anucha, Anuchit

Witness : Khun Songpon, Khun Sonthaya

Fire suppression systemPreventive Maintenance Check Sheet

Takachiho fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tKfs.co.th

PM. Fire Suppression CO2 System

28 - 30 April 2021

MCL2 Entry EER. Room / Autopulse 542 R

1 1 Heat S2 2 Heat S3 3 Manual S4 5 Pressure Switch S5 6 Lock Out Valve S6 NAC 1 Solenoid Valve S7 NAC 2 Strobe / Horn S First alarm active8 NAC 3 Alarm Bell S Second alarm active9 NAC 1 Key SW. S

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

REMARK: * Heat detector cross zone delay time 30 sec to discharge* Manual release delay times 30 sec to discharge* Alarm 1 stobe horn , Alarm 2 bell * Discharge stobe horn, bell

Witness : Khun Songpon, Khun Sonthaya

Remark

Transformer XFHV-12

Transformer XFHV-12Transformer XFHV-12Transformer XFHV-12Transformer XFHV-12Transformer XFHV-12Transformer XFHV-12Transformer XFHV-12

SSS

Transformer XFHV-12

Test Result

SS

SS

SS

Test trouble signal FCPType

REF.Contract NO :Inspection Date :

Inspector :

Fire suppression system

Subject : Client : NS BLUE SCOPE STEEL (THAILAND) LTD.

SC1000142

Subin, Wachira, Somkid, Anucha, Anuchit

item Location Zone.Number

Location of fire alarm control panel :

Preventive Maintenance Check Sheet

Takachiho fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

CARBON DIOXIDE FIRE EXTINGUISHING SYSTEMSSemi-Annual Tests and MaintenanceAREA : Transformer XFHV-12 DATE : 28 - 30 April 2021

Num. AREA Cylinder Number % Lost Total Year

Result

1 Transformer XFHV-12 15K520140 178 lbs 278 lbs 125.88 kg. - kg. 0.4% 10 / 2015 5 Pass

2 Transformer XFHV-12 15K520165 180 lbs 280 lbs 127.06 kg. - kg. 0.13% 10 / 2015 5 Pass

3 Transformer XFHV-12 15K520201 176 lbs 276 lbs 125.80 kg. - kg. 0.1% 10 / 2015 5 Pass

4 Transformer XFHV-12 15K520024 178 lbs 278 lbs 126.04 kg. - kg. 0.9% 10 / 2015 5 Pass

5 Transformer XFHV-12 15K520106 173 lbs 273 lbs 124.18 kg. - kg. 0.2% 10 / 2015 5 Pass

6 Transformer XFHV-12 15K520154 180 lbs 280 lbs 127.30 kg. - kg. 0% 10 / 2015 5 Pass

Takachiho fire, Security & Services (Thailand) Ltd.

Completed By : Witnessed By :

Signature : Signature :

Date : Date :

x 100

( - ) = Lost, Weight the cylinder lost of more than 10 % need to refill

Remark : Lost of more than 10% requires refilling. The hydrostatic test for CO2 cylinder is required every 12 years.

Actual Weight - Full WeightEmpty Weight

Empty Weight Full Weight Actual Weight Date of Manufacture

Page 14: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.

1858/110-111 Interlink Tower 25 Fl.,

Debaratna Road, Bangna Tai, Bangna,

Bangkok 10260, Thailand.

Tel : 02-366 -9000 , FAX : 02-366-9090

www.tkfs.co.th

NITROGEN FIRE SUPPRESSION SYSTEM

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM.NITROGEN FIRE SUPPRESSION SYSTEM

28 - 30 April 2021

Location of fire alarm control panel : MCL-2-MAIN EER SERVER&COMPUTER ROOM NCP NO. 1 SIEMENS CP-2ER

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for RCP and battery

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of RCP

2. Equipment

2.1 Check condition of all detector and function test zone by zone

2.2 cross zone function test of detector

2.3 Check condition of all manual release

2.4 Check condition of solenoid and function test

2.5 Check condition of all abort switch and function test

2.6 Check cable connection / terminal

2.7 Visual check selector valve and function test

2.8 Check condition of all alarm device and tested

3.Mechanical

3.1 check pipe system and nozzle for physical damage.

3.2 check condition of flexible hose

3.3 check condition of cylinder

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Subject :

Preventive Maintenance Check Sheet Fire suppression system

Description Status Function test Result

Client :REF.Contract NO :

Inspection Date :

NS BLUE SCOPE STEEL (THAILAND) LTD.SC1000142

Inspector :Witness : Khun Songpon, Khun Sonthaya

Subin, Wachira, Somkid, Anucha, Anuchit

Electrical system

1. Releasing Control Panel

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y

Y Y

Y

Remark :

TAKACHIHO

AC POWER 230.6 VAC

Charger control panel 27.15 VDC

Battery back up 27.11 VDC ( Replace Battery 28/9/20)

Y

Y Y

Y

Y Y

Y Y

Y Y

Y

Y Y

Y

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM.NITROGEN FIRE SUPPRESSION SYSTEM

28 - 30 April 2021

Location of fire alarm control panel : MCL-2-MAIN EER SERVER&COMPUTTER ROOM NCP NO. 1 SIEMENS CP-2ER

1 ZONE1 SMOKE Y Y cross zone detector discharge 45sec2 ZONE2 SMOKE Y Y3 ZONE1 SMOKE Y Y4 ZONE2 SMOKE Y Y5 ZONE3 MANUAL Y Y to discharge 30sec6 BELL Y Y first alarm7 HORN&STOBE Y Y second alarm8 Solenoid Valve Y Y to discharge 9 ABORT.SW Y Y to reset panel

* Smoke detector cross zone delay times 45 sec.* Abort switch push to reset system to normal* Manual release push to delay times 30 sec.* Alarm 1 Bell * Alarm 2 Bell , stobe/horn * Discharge Bell, stobe/horn (OP85)

TAKACHIHO

Fire suppression system

Remark :

Subject : Client :

REF.Contract NO :Inspection Date :

NS BLUE SCOPE STEEL (THAILAND) LTD.SC1000142

SERVER&COMPUTTER ROOM

Inspector :Witness :

item

Khun Songpon, Khun Sonthaya

Test Result Test trouble signal FCP

Preventive Maintenance Check Sheet

Remark

Subin, Wachira, Somkid, Anucha, Anuchit

SERVER&COMPUTTER ROOM SERVER&COMPUTTER ROOM

Zone.Number TypeLocation

SERVER&COMPUTTER ROOM SERVER&COMPUTTER ROOM SERVER&COMPUTTER ROOM

SERVER&COMPUTTER ROOM SERVER&COMPUTTER ROOM SERVER&COMPUTTER ROOM

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM.NITROGEN FIRE SUPPRESSION SYSTEM

28 - 30 April 2021

Location of fire alarm control panel : MCL-2-MAIN EER SERVER&COMPUTER ROOM NCP NO. 2 SIEMENS CP-2ER

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for RCP and battery

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of RCP

2. Equipment

2.1 Check condition of all detector and function test zone by zone

2.2 cross zone function test of detector

2.3 Check condition of all manual release

2.4 Check condition of solenoid and function test

2.5 Check condition of all abort switch and function test

2.6 Check cable connection / terminal

2.7 Visual check slector valve and function test

2.8 Check condition of all alarm device and tested

3.Mechanical

3.1 check pipe system and nozzle for physical damage.

3.2 check condition of flexible hose

3.3 check condition of cylinder

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

* Selector smoke cross zone

**By pass pressure gauge by tank no5,18,27,28,39,75,78,101

Fire suppression systemPreventive Maintenance Check Sheet

Subject : Client :

REF.Contract NO :Inspection Date :

NS BLUE SCOPE STEEL (THAILAND) LTD.SC1000142

Inspector :Witness : Khun Songpon, Khun Sonthaya

Subin, Wachira, Somkid, Anucha, Anuchit

Description Status Function test Result

Electrical system

1. Releasing Control Panel

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y

Y Y

Y

Y Y

Y Y

Y Y

Y

Y Y

Y

Y

Y Y

Y

Y Y

Y Y

Remark :

TAKACHIHO

Battery back up 26.94 VDC (Replace Battery 28/9/20)

AC POWER 229.3 VAC

Charger control panel 26.95 VDC

Page 15: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM.NITROGEN FIRE SUPPRESSION SYSTEM

28 - 30 April 2021

Location of fire alarm control panel : MCL-2-MAIN EER SERVER&COMPUTTER ROOM NCP NO. 2 SIEMENS CP-2ER

1 ZONE1 SMOKE Y Y cross zone detector discharge 45sec2 ZONE2 SMOKE Y Y3 ZONE1 SMOKE Y Y4 ZONE2 SMOKE Y Y5 ZONE1 SMOKE Y Y6 ZONE2 SMOKE Y Y7 ZONE1 SMOKE Y Y8 ZONE2 SMOKE Y Y9 ZONE1 SMOKE Y Y10 ZONE2 SMOKE Y Y11 ZONE1 SMOKE Y Y12 ZONE2 SMOKE Y Y13 ZONE3 MANUAL Y Y to discharge 30sec14 BELL Y Y first alarm15 HORN&STOBE Y Y second alarm16 Solenoid Valve Y Y to dischage 17 ABORT.SW Y Y to reset panel18 ZONE1 SMOKE Y Y19 ZONE2 SMOKE Y Y

test function and clean detector system is normalNo.5,18,27,28,39,41 pressure gauge was broken* Smoke detector cross zone delay times 45 sec.* Abort switch push to reset system to normal* Manual release push to delay times 30 sec.* Alarm 1, Alarm 2 Bell * Discharge Bell * Stobe/horn alarm 2 * Stobe/horn discharge (OP84)

Subin, Wachira, Somkid, Anucha, Anuchit

Preventive Maintenance Check Sheet

TAKACHIHO

Fire suppression system

Subject : Client :

REF.Contract NO :NS BLUE SCOPE STEEL (THAILAND) LTD.SC1000142

MCL-2 MAIN EER ROOM

Type

Inspection Date :Inspector :

Witness :

item Zone.Number

Khun Songpon, Khun Sonthaya

Test Result Test trouble signal FCP

Remark :

Remark

MCL-2 MAIN EER ROOMMCL-2 MAIN EER ROOM

MCL-2 MAIN EER ROOM

MCL-2 MAIN EER ROOMMCL-2 MAIN EER ROOMMCL-2 MAIN EER ROOMMCL-2 MAIN EER ROOMMCL-2 MAIN EER ROOMMCL-2 MAIN EER ROOMMCL-2 MAIN EER ROOMMCL-2 MAIN EER ROOMMCL-2 MAIN EER ROOMMCL-2 MAIN EER ROOMMCL-2 MAIN EER ROOM

Location

MCL-2 MAIN EER ROOMMCL-2 MAIN EER ROOMMCL-2 MAIN EER ROOMMCL-2 MAIN EER ROOM

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM.NITROGEN FIRE SUPPRESSION SYSTEM

28 - 30 April 2021

Location of fire alarm control panel : MCL-2-MAIN EER COATING POT ROOM EER ROOM NCP NO. 3 SIEMENS CP-2ER

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for RCP and battery

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of RCP

2. Equipment

2.1 Check condition of all detector and function test zone by zone

2.2 cross zone function test of detector

2.3 Check condition of all manual release

2.4 Check condition of solenoid and function test

2.5 Check condition of all abort switch and function test

2.6 Check cable connection / terminal

2.7 Visual check slector valve and function test

2.8 Check condition of all alarm device and tested

3.Mechanical

3.1 check pipe system and nozzle for physical damage.

3.2 check condition of flexible hose

3.3 check condition of cylinder

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

**By pass pressure gauge by tank no. 1,2,3,10,11,15

**Battery back up 2 2

Fire suppression systemPreventive Maintenance Check Sheet

Subject : Client :

REF.Contract NO :Inspection Date :

NS BLUE SCOPE STEEL (THAILAND) LTD.SC1000142

Inspector :Witness : Khun Songpon, Khun Sonthaya

Subin, Wachira, Somkid, Anucha, Anuchit

Y Y

Y Y

Description Status Function test Result

Electrical system

1. Releasing Control Panel Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y

Y Y

Y

Y Y

Y Y

Y Y

Y

Y Y

Y

Y

Y Y

Y

Y Y

Y Y

Remark :

TAKACHIHO

Battery back up 26.94 VDC ( Replace Battery 25/2/2019)

AC POWER 229.2 VAC

Charger control panel 26.95 VDC

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM.NITROGEN FIRE SUPPRESSION SYSTEM

28 - 30 April 2021

Location of fire alarm control panel : MCL-2-MAIN EER COATING POT ROOM NCP NO. 3 SIEMENS CP-2ER

1 ZONE1 SMOKE Y Y cross zone detector discharge 45sec2 ZONE2 SMOKE Y Y3 ZONE3 MANUAL Y Y to discharge 30sec4 BELL Y Y first alarm5 HORN&STOBE Y Y second alarm6 Solenoid Valve Y Y to discharge 7 ABORT.SW Y Y to reset panel

* Smoke detector cross zone delay times 45 sec.* Abort switch push to reset system to normal* Manual release push to delay times 30 sec.* Alarm 1, Alarm 2 Bell * Discharge Bell * Stobe/horn alarm 2 * Stobe/horn discharge

TAKACHIHO

Fire suppression system

Remark :

Subject : Client :

REF.Contract NO :Inspection Date :

NS BLUE SCOPE STEEL (THAILAND) LTD.SC1000142

Khun Songpon, Khun SonthayaInspector :

Witness :Subin, Wachira, Somkid, Anucha, Anuchit

Preventive Maintenance Check Sheet

Test Result Test trouble signal FCP

MAIN EER COATING POT ROOM MAIN EER COATING POT ROOM MAIN EER COATING POT ROOM MAIN EER COATING POT ROOM

MAIN EER COATING POT ROOM

item Remark

MAIN EER COATING POT ROOM MAIN EER COATING POT ROOM

TypeLocation Zone.Number

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM.NITROGEN FIRE SUPPRESSION SYSTEM

28 - 30 April 2021

Location of fire alarm control panel : MCL-2 MAIN EER PREMELT ROOM NCP NO. 4 SIEMENS CP-2ER

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for RCP and battery

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of RCP

2. Equipment

2.1 Check condition of all detector and function test zone by zone

2.2 cross zone function test of detector

2.3 Check condition of all manual release

2.4 Check condition of solenoid and function test

2.5 Check condition of all abort switch and function test

2.6 Check cable connection / terminal

2.7 Visual check slector valve and function test

2.8 Check condition of all alarm device and tested

3.Mechanical

3.1 check pipe system and nozzle for physical damage.

3.2 check condition of flexible hose

3.3 check condition of cylinder

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Subject :

Preventive Maintenance Check Sheet Fire suppression system

Description Status Function test Result

Client :REF.Contract NO :

Inspection Date :

NS BLUE SCOPE STEEL (THAILAND) LTD.SC1000142

Inspector :Witness : Khun Songpon, Khun Sonthaya

Subin, Wachira, Somkid, Anucha, Anuchit

Electrical system

1. Releasing Control Panel

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y

Y Y

Y

Y Y

Y

Y Y

Y

Y

Y Y

YY

Y

Y Y

Remark :

TAKACHIHO

Charger control panel 26.67 VDC

AC POWER 227.9 VAC

Battery back up 26.65 VDC (Replace Battery 28/9/20)

Page 16: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM.NITROGEN FIRE SUPPRESSION SYSTEM

28 - 30 April 2021

Location of fire alarm control panel : MCL-2 PREMALT ROOM NCP NO. 4 SIEMENS CP-2ER

1 ZONE1 SMOKE Y Y cross zone detector discharge 45sec2 ZONE2 SMOKE Y Y3 ZONE3 MANUAL Y Y to discharge 30sec4 BELL Y Y first alarm5 HORN&STOBE Y Y second alarm6 Solenoid Valve Y Y to discharge 7 ABORT.SW Y Y to reset panel

* Smoke detector cross zone delay times 45 sec.* Abort switch push to reset system to normal* Manual release push to delay times 30 sec.* Alarm 1, Alarm 2 discharge bell * Alarm 2 stobe/horn * Discharge stobe/horn

TAKACHIHO

Preventive Maintenance Check Sheet Fire suppression system

Subject : Client :

REF.Contract NO :NS BLUE SCOPE STEEL (THAILAND) LTD.SC1000142

MAIN EER PREMELT ROOM

Inspection Date :Inspector :

Witness :

item Location

Khun Songpon, Khun SonthayaSubin, Wachira, Somkid, Anucha, Anuchit

Test Result Test trouble signal FCP Remark

MAIN EER PREMELT ROOM MAIN EER PREMELT ROOM

TypeZone.Number

MAIN EER PREMELT ROOM MAIN EER PREMELT ROOM MAIN EER PREMELT ROOM MAIN EER PREMELT ROOM

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Remark :

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM.NITROGEN FIRE SUPPRESSION SYSTEM

28 - 30 April 2021

Location of fire alarm control panel : MCL-2 ENTRY MAIN EER ROOM PLC&COMPUTTER ROOM NCP NO. 5 Potter

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for RCP and battery

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of RCP

2. Equipment

2.1 Check condition of all detector and function test zone by zone

2.2 cross zone function test of detector

2.3 Check condition of all manual release

2.4 Check condition of solenoid and function test

2.5 Check condition of all abort switch and function test

2.6 Check cable connection / terminal

2.7 Visual check slector valve and function test

2.8 Check condition of all alarm device and tested

3.Mechanical

3.1 check pipe system and nozzle for physical damage.

3.2 check condition of flexible hose

3.3 check condition of cylinder

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Fire suppression system

Subject :

Preventive Maintenance Check Sheet

Description Status Function test Result

Client :REF.Contract NO :

Inspection Date :

NS BLUE SCOPE STEEL (THAILAND) LTD.SC1000142

Inspector :Witness : Khun Songpon, Khun Sonthaya

Subin, Wachira, Somkid, Anucha, Anuchit

Electrical system

1. Releasing Control Panel

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

TAKACHIHO

Y

Remark :

Battery back up 27.40 VDC (Start using 28/9/20)

Y

Y

Charger control panel 27.41 VDC

AC POWER 227.9 VAC

Y

Y

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM.NITROGEN FIRE SUPPRESSION SYSTEM

28 - 30 April 2021

Location of fire alarm control panel : MCL-2 ENTRY MAIN EER ROOM PLC&COMPUTTER ROOM NCP NO. 5 Potter

1 ZONE1 SMOKE Y Y cross zone detector discharge 45sec2 ZONE2 SMOKE Y Y3 ZONE1 SMOKE Y Y4 ZONE2 SMOKE Y Y5 ZONE3 MANUAL Y Y to discharge 30sec6 BELL Y Y first alarm7 HORN&STOBE Y Y second alarm8 Solenoid Valve Y Y to dischage 9 ABORT.SW Y Y remain 10 sec

* Smoke detector cross zone delay times 45 sec.* Abort switch push to remain 10 sec.* Manual release push to delay times 30 sec.* Alarm 1 bell * Alarm 2 stobe/horn * Discharge bell, stobe/horn

Fire suppression system

Remark :

Subject : Client :

REF.Contract NO :Inspection Date :

NS BLUE SCOPE STEEL (THAILAND) LTD.SC1000142

Inspector :Witness :

item

Khun Songpon, Khun Sonthaya

Test trouble signal FCP Remark

Subin, Wachira, Somkid, Anucha, Anuchit

TAKACHIHO

Preventive Maintenance Check Sheet

ENTRY PLC&COMPUTTER ROOM

Test Result

ENTRY PLC&COMPUTTER ROOM ENTRY PLC&COMPUTTER ROOM ENTRY PLC&COMPUTTER ROOM ENTRY PLC&COMPUTTER ROOM ENTRY PLC&COMPUTTER ROOM

ENTRY PLC&COMPUTTER ROOM ENTRY PLC&COMPUTTER ROOM ENTRY PLC&COMPUTTER ROOM

TypeZone.NumberLocation

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM.NITROGEN FIRE SUPPRESSION SYSTEM

28 - 30 April 2021

Location of fire alarm control panel : MCL-2 ENTRY MAIN EER ROOM NCP NO. 6 SIEMENS CP-2ER

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for RCP and battery

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of RCP

2. Equipment

2.1 Check condition of all detector and function test zone by zone

2.2 cross zone function test of detector

2.3 Check condition of all manual release

2.4 Check condition of solenoid and function test

2.5 Check condition of all abort switch and function test

2.6 Check cable connection / terminal

2.7 Visual check slector valve and function test

2.8 Check condition of all alarm device and tested

3.Mechanical

3.1 check pipe system and nozzle for physical damage.

3.2 check condition of flexible hose

3.3 check condition of cylinder

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

**By pass pressure gauge by tank no18,27,28,39,49,75,78,101

TAKACHIHO

Preventive Maintenance Check Sheet Fire suppression system

Subject :

Witness : Khun Songpon, Khun Sonthaya

NS BLUE SCOPE STEEL (THAILAND) LTD.SC1000142

Client :REF.Contract NO :

Inspection Date :Inspector : Subin, Wachira, Somkid, Anucha, Anuchit

Description Status Function test Result

Electrical system

1. Releasing Control Panel Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Battery back up 26.93 VDC (Replace Battery 28/9/20)

AC POWER 227.8 VAC

Charger control panel 26.95 VDC

Remark :

Y Y

Y Y

Page 17: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM.NITROGEN FIRE SUPPRESSION SYSTEM

28 - 30 April 2021

Location of fire alarm control panel : MCL-2ENTRY MAIN EER.ROOM NCP NO. 6 SIEMENS CP-2ER

1 ZONE1 SMOKE Y Y cross zone detector discharge 45sec2 ZONE2 SMOKE Y Y3 ZONE1 SMOKE Y Y4 ZONE2 SMOKE Y Y5 ZONE1 SMOKE Y Y6 ZONE2 SMOKE Y Y7 ZONE3 MANUAL Y Y to discharge 30sec8 BELL Y Y first alarm9 HORN&STOBE Y Y second alarm10 Solenoid Valve Y Y to discharge 11 ABORT.SW Y Y to reset panel

* Smoke detector cross zone delay times 45 sec.* Abort switch push to reset system to normal* Manual release push to delay times 30 sec.

Fire suppression system

Remark :

Subject : Client :

REF.Contract NO :Inspection Date :

NS BLUE SCOPE STEEL (THAILAND) LTD.SC1000142

Inspector :Witness :

item

Khun Songpon, Khun Sonthaya

Test trouble signal FCP Remark

Subin, Wachira, Somkid, Anucha, Anuchit

TAKACHIHO

Preventive Maintenance Check Sheet

ENTRY MAIN EER. ROOM

Test Result

ENTRY MAIN EER. ROOMENTRY MAIN EER. ROOMENTRY MAIN EER. ROOMENTRY MAIN EER. ROOMENTRY MAIN EER. ROOM

ENTRY MAIN EER. ROOMENTRY MAIN EER. ROOMENTRY MAIN EER. ROOM

TypeZone.NumberLocation

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

ENTRY MAIN EER. ROOMENTRY MAIN EER. ROOM

Takachiho fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System

28 - 30 April 2021Subin, Wachira, Somkid, Anucha, Anuchit

Location : NITROGEN MCL 2

1 COATING PORT EER ROOM 1573338 S2 COATING PORT EER ROOM 1573483 S3 COATING PORT EER ROOM 1573557 S4 COATING PORT EER ROOM 1573170 S5 COATING PORT EER ROOM 1573091 S6 COATING PORT EER ROOM 1573185 S7 COATING PORT EER ROOM 1573634 S8 COATING PORT EER ROOM 1573496 S9 COATING PORT EER ROOM 1573503 S

10 COATING PORT EER ROOM 1573379 S11 COATING PORT EER ROOM 1573637 S12 COATING PORT EER ROOM 1571537 S13 COATING PORT EER ROOM 1573166 S14 COATING PORT EER ROOM 1573347 S15 COATING PORT EER ROOM 1573540 S

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

REMARK:

Remark

220 Bar 220 Bar

220 Bar

220 Bar 220 Bar 220 Bar 220 Bar 220 Bar 220 Bar 220 Bar 220 Bar 220 Bar 220 Bar 220 Bar

220 Bar

Inspection Date :Inspector :

Witness : Khun Songpon, Khun Sonthaya

item Location Tank no. Inspect result Pressure tank

REF.Contract NO : SC1000142

Preventive Maintenance Check Sheet Fire suppression system

Subject : Client : NS BLUE SCOPE STEEL (THAILAND) LTD.

Takachiho fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System

28 - 30 April 2021Subin, Wachira, Somkid, Anucha, Anuchit

Location : NITROGEN MCL 2(PLC&COM Room)

1 PLC &COM ROOM 1573508 S2 PLC &COM ROOM 1573673 S3 PLC &COM ROOM 1573669 S4 PLC &COM ROOM 1573518 S5 PLC &COM ROOM 1573604 S6 PLC &COM ROOM 1573425 S7 PLC &COM ROOM 1573564 S8 PLC &COM ROOM 1573568 S

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

REMARK:

Remark

200 Bar 200 Bar

200 Bar 200 Bar 200 Bar 200 Bar 200 Bar

200 Bar

Inspection Date :Inspector :

Witness : Khun Songpon, Khun Sonthaya

item Location Tank no. Inspect result Pressure tank

REF.Contract NO : SC1000142

Preventive Maintenance Check Sheet Fire suppression system

Subject : Client : NS BLUE SCOPE STEEL (THAILAND) LTD.

Takachiho fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System

28 - 30 April 2021Subin, Wachira, Somkid, Anucha, Anuchit

Location : NITROGEN MCL 2

1 Main EER ROOM 1559684 S2 Main EER ROOM 1559786 S3 Main EER ROOM 1559688 S4 Main EER ROOM 1559744 S5 Main EER ROOM 1560120 S6 Main EER ROOM 1559736 S

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

REMARK:

Remark

228 Bar 220 Bar

220 Bar 220 Bar 220 Bar

225 Bar

Inspection Date :Inspector :

Witness : Khun Songpon, Khun Sonthaya

item Location Tank no.Inspect result

Pressure tank

REF.Contract NO : SC1000142

Preventive Maintenance Check Sheet Fire suppression system

Subject : Client : NS BLUE SCOPE STEEL (THAILAND) LTD.

Page 18: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System

28 - 30 April 2021Subin, Wachira, Somkid, Anucha, Anuchit

Location : NITROGEN MCL 2

1 PREMALT ROOM 1573547 S2 PREMALT ROOM 1573604 S3 PREMALT ROOM 1573433 S4 PREMALT ROOM 1573406 S

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

REMARK:

Remark

220 Bar 225 Bar

220 Bar 225 Bar

Inspection Date :Inspector :

Witness : Khun Songpon, Khun Sonthaya

item Location Tank no.Inspect result

Pressure tank

REF.Contract NO : SC1000142

Preventive Maintenance Check Sheet Fire suppression system

Subject : Client : NS BLUE SCOPE STEEL (THAILAND) LTD.

Takachiho fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System

28 - 30 April 2021Subin, Wachira, Somkid, Anucha, Anuchit

Location : NITROGEN MCL 2

1 1573268 S2 1573249 S3 1573088 S4 1559588 S5 1573348 S6 1559993 S7 1560025 S8 1559959 S9 1573333 S

10 1573259 S11 1573145 S12 1573188 S13 1573205 S14 1573087 S15 1573204 S16 1573199 S17 1560141 S18 1559946 S19 1560058 S20 1559915 S21 1559651 S22 1573374 S23 1573355 S24 1573271 S25 1573220 S26 1559934 S27 1560119 S28 1573247 S29 1573331 S30 1560070 S

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

REMARK:

MCL 2 EER ROOM 220 bar MCL 2 EER ROOM 225 bar MCL 2 EER ROOM 215 bar

MCL 2 EER ROOM 240 bar MCL 2 EER ROOM 220 bar

MCL 2 EER ROOM 230 bar

MCL 2 EER ROOM 220 bar MCL 2 EER ROOM 230 bar MCL 2 EER ROOM 230 bar

MCL 2 EER ROOM 220 bar MCL 2 EER ROOM 220 bar MCL 2 EER ROOM 220 bar

MCL 2 EER ROOM 220 bar MCL 2 EER ROOM 220 bar MCL 2 EER ROOM 225 bar

MCL 2 EER ROOM 230 bar MCL 2 EER ROOM 230 bar MCL 2 EER ROOM 230 bar

MCL 2 EER ROOM 230 bar MCL 2 EER ROOM 230 bar MCL 2 EER ROOM 230 bar

MCL 2 EER ROOM 225 bar MCL 2 EER ROOM 230 bar MCL 2 EER ROOM 225 bar

MCL 2 EER ROOM 220 bar MCL 2 EER ROOM 220 bar MCL 2 EER ROOM 220 bar

Remark

MCL 2 EER ROOM 230 bar

MCL 2 EER ROOM 220 bar MCL 2 EER ROOM 220 bar

Inspection Date :Inspector :

Witness : Khun Songpon, Khun Sonthaya

item Location Tank no. Inspect result Pressure tank

REF.Contract NO : SC1000142

Preventive Maintenance Check Sheet Fire suppression system

Subject : Client : NS BLUE SCOPE STEEL (THAILAND) LTD.

Takachiho fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System

28 - 30 April 2021Subin, Wachira, Somkid, Anucha, Anuchit

Location : NITROGEN MCL 2

31 1559711 S32 1558695 S33 1559757 S34 1559701 S35 1559701 S36 1559917 S37 1559699 S38 1573274 S39 1573354 S40 1573312 S41 1573104 S42 1573281 S43 1573657 S44 1573488 S45 1573392 S46 1573379 S47 1573377 S48 1573613 S49 1573441 S50 1573324 S51 1559613 S52 1559941 S53 1559970 S54 1573671 S55 1559830 S56 1560099 S57 1559820 S58 1559977 S59 1559745 S60 1560115 S

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

REMARK:

MCL 2 EER ROOM 195 bar MCL 2 EER ROOM 190 bar MCL 2 EER ROOM 195 bar

MCL 2 EER ROOM 190 bar MCL 2 EER ROOM 190 bar

MCL 2 EER ROOM 200 bar

MCL 2 EER ROOM 200 bar MCL 2 EER ROOM 200 bar MCL 2 EER ROOM 200 bar

MCL 2 EER ROOM 195 bar MCL 2 EER ROOM 190 bar MCL 2 EER ROOM 190 bar

MCL 2 EER ROOM 220 bar MCL 2 EER ROOM 220 bar MCL 2 EER ROOM 220 bar

MCL 2 EER ROOM 220 bar MCL 2 EER ROOM 220 bar MCL 2 EER ROOM 220 bar

MCL 2 EER ROOM 225 bar MCL 2 EER ROOM 220 bar MCL 2 EER ROOM 190 bar

MCL 2 EER ROOM 250 bar MCL 2 EER ROOM 220 bar MCL 2 EER ROOM 225 bar

MCL 2 EER ROOM 220 bar MCL 2 EER ROOM 220 bar MCL 2 EER ROOM 210 bar

Remark

MCL 2 EER ROOM 220 bar

MCL 2 EER ROOM 225 bar MCL 2 EER ROOM 220 bar

Inspection Date :Inspector :

Witness : Khun Songpon, Khun Sonthaya

item Location Tank no. Inspect result Pressure tank

REF.Contract NO : SC1000142

Preventive Maintenance Check Sheet Fire suppression system

Subject : Client : NS BLUE SCOPE STEEL (THAILAND) LTD.

Takachiho fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System

28 - 30 April 2021Subin, Wachira, Somkid, Anucha, Anuchit

Location : NITROGEN MCL 2

61 1573376 S62 1573597 S63 1560006 S64 1559998 S65 1559856 S66 1559939 S67 1573560 S68 1573350 S69 1559717 S70 1559954 S71 1573269 S72 1573210 S73 1573579 S74 1560056 S75 1559686 S76 1573616 S77 1573377 S78 1573402 S79 1573534 S80 1573617 S81 1573666 S82 1560114 S83 1560146 S84 1559843 S85 1560040 S86 1559857 S87 1560003 S88 1559935 S89 1560029 S90 1559690 S

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

REMARK:

MCL 2 EER ROOM 200 bar MCL 2 EER ROOM 210 bar MCL 2 EER ROOM 212 bar

MCL 2 EER ROOM 210 bar MCL 2 EER ROOM 210 bar

MCL 2 EER ROOM 225 bar

MCL 2 EER ROOM 212 bar MCL 2 EER ROOM 210 bar MCL 2 EER ROOM 210 bar

MCL 2 EER ROOM 210 bar MCL 2 EER ROOM 210 bar MCL 2 EER ROOM 210 bar

MCL 2 EER ROOM 190 bar MCL 2 EER ROOM 200 bar MCL 2 EER ROOM 200 bar

MCL 2 EER ROOM 190 bar MCL 2 EER ROOM 190 bar MCL 2 EER ROOM 190 bar

MCL 2 EER ROOM 195 bar MCL 2 EER ROOM 200 bar MCL 2 EER ROOM 190 bar

MCL 2 EER ROOM 200 bar MCL 2 EER ROOM 195 bar MCL 2 EER ROOM 190 bar

MCL 2 EER ROOM 200 bar MCL 2 EER ROOM 190 bar MCL 2 EER ROOM 190 bar

Remark

MCL 2 EER ROOM 200 bar

MCL 2 EER ROOM 195 bar MCL 2 EER ROOM 195 bar

Inspection Date :Inspector :

Witness : Khun Songpon, Khun Sonthaya

item Location Tank no. Inspect result Pressure tank

REF.Contract NO : SC1000142

Preventive Maintenance Check Sheet Fire suppression system

Subject : Client : NS BLUE SCOPE STEEL (THAILAND) LTD.

Page 19: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System

28 - 30 April 2021Subin, Wachira, Somkid, Anucha, Anuchit

Location : NITROGEN MCL 2

91 1559687 S92 1559597 S93 1559713 S94 1559697 S95 1560034 S96 1573039 S97 1573306 S98 1560083 S99 1559800 S

100 1573363 S101 1573102 S102 1573332 S103 1573360 S104 1560106 S105 1559983 S106 1573529 S107 1573377 S108 1573495 S

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

REMARK:

MCL 2 EER ROOM 220 bar

MCL 2 EER ROOM 220 bar

MCL 2 EER ROOM 220 bar

MCL 2 EER ROOM 210 bar

MCL 2 EER ROOM 220 bar

MCL 2 EER ROOM 220 bar

MCL 2 EER ROOM 220 bar

MCL 2 EER ROOM 225 bar

MCL 2 EER ROOM 220 bar

MCL 2 EER ROOM 220 bar

MCL 2 EER ROOM 220 bar

MCL 2 EER ROOM 220 bar

MCL 2 EER ROOM 220 bar

MCL 2 EER ROOM 220 bar

MCL 2 EER ROOM 220 bar

Remark

MCL 2 EER ROOM 220 bar

MCL 2 EER ROOM 220 bar MCL 2 EER ROOM 230 bar

Inspection Date :Inspector :

Witness : Khun Songpon, Khun Sonthaya

item Location Tank no. Inspect result Pressure tank

REF.Contract NO : SC1000142

Preventive Maintenance Check Sheet Fire suppression system

Subject : Client : NS BLUE SCOPE STEEL (THAILAND) LTD.

Takachiho Fire, Security & Services (Thailand) Ltd.

1858/110-111 Interlink Tower 25 Fl.,

Debaratna Road, Bangna Tai, Bangna,

Bangkok 10260, Thailand.

Tel : 02-366 -9000 , FAX : 02-366-9090

www.tkfs.co.th

DELUGE SYSTEM

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, B

angn

a,B

angk

ok 1

0260

, Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

SYST

EM C

OM

PON

ENTS

delu

ge-1

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

1 Spray Nozzle : Note condition of all nozzles. If there is no physical damage, no corrosion, and no mark " S " in block of yes. If not, assure corrections are made and briefly describe under " Remark "

2 Piping : Note condition of all piping. If there is no physical damage, no corrosion, no misaligned. Pipes and there are no external loads, mark " S " in block of yes. If not, assure corrections are made and briefly describe under " Remark "

3 Piping Hangers : Note all pipe hangers. If there is no damage and corrosion, Mark " S " in block of yes. If not, assure corrections are made and briefly describe under " Remark "

4 Gauges : Note condition of gauges. Record water pressure ( PSI )

5 Flow Test : Conduct full flow test. Assure system operates properly and record operation time.

6 Deluge Valve : Internal inspect deluge or preaction valve. Verify that all components operate, properly, move freely and in good condition. If so, mark " S " in block of yes. If not, assure valve is repaired and briefly describe un der " Remark "

7 Control Valve : Operate cach control valve through its full range and return to its normal position.( Seal or relock if appropricate ) If valve operates properly, mark " S " in block of yes. If not, assure valve is repaired and briefly describe under " Remark "

8 Deluge Supervisory Panel and equipments appear operation. Mark " S " in block of yes. If not, assure valve is repaired and briefly describe under " Remark "

9 Control Valve Lubrication : Lubricate all valve systems with graphite in oil. Mark " S " in block of yes. If not, assure valve is repaired and briefly describe under " Remark "

DESCRIPTION OF INSPECTION AND TEST FOR DELUGE SYSTEM

Page 20: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.

1858/110-111 Interlink Tower 25 Fl.,

Debaratna Road, Bangna Tai, Bangna,

Bangkok 10260, Thailand.

Tel : 02-366 -9000 , FAX : 02-366-9090

www.tkfs.co.th

AUTOMATIC SPRINKLER SYSTEM

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

1 Sprinkler nozzle : Note condition of all nozzles. If there is no physical damage, no corrosion, and no obstructions,mark " S " in block of yes. If not, assure corrections are made and briefly describe under " Remark " S

2 Piping : Note condition of all piping. If there is no physical damage, no corrosion, no misaligned. pipes andthere are no external loads, mark " S " in block of yes. If not, assure corrections are made and briefly describe Sunder " Remark "

3 Piping Hangers : Note all pipe hangers. If there is no damage and corrosion, Mark " S " in block of yes. S If not, assure corrections are made and briefly describe under " Remark "

4 Gauges : Note condition of gauges. Record water pressure ( PSI )

5 Flow Test : Conduct full flow test at test valve for ensure alarm gong or pressure switch work properly in alarm function

6 Alarm Valve: Internal inspect alarm valve. Verify that all components to proper operate ,move freely and in good Scondition If so, mark " S " in block of yes. If not, assure valve is repaired and briefly describe under "remark"

7 Control Valve : Operate cach control valve through its full range and return to its normal position.( Seal or relock if appropricate ) If valve operates properly, mark " S " in block of yes. If not, assure valve is Srepaired and briefly describe under " Remark "

8 Main drain valve: check main drain valve are in close position and no leak

9 Control Valve Lubrication : Lubricate all valve systems with graphite in oil. Mark " S " in block of yes. S If not, assure valve is repaired and briefly describe under " Remark "

Inspector By: Subin, Wachira, Somkid, Anucha, Anuchit

DESCRIPTION OF INSPECTION AND TEST FOR AUTOMATIC SPRINKLER SYSTEM(WET PIPE)

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, B

angn

a,B

angk

ok 1

0260

, Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

NS

BLU

E SC

OPE

STE

EL (T

HAI

LAN

D) L

TD.

28 -

30 A

pril

2021

Subi

n, W

achi

ra, S

omki

d, A

nuch

a, A

nuch

it

Loca

tion

: Res

erve

Uni

t

belo

wab

ove

1C

RM

.BLD

GN

/AS

N/A

130

175

N/A

N/A

N/A

SS

SS

N/A

N/A

2C

RM

.BLD

GN

/AS

N/A

150

230

N/A

N/A

N/A

SS

SS

N/A

N/A

3C

RM

.BLD

GN

/AS

N/A

150

175

N/A

N/A

N/A

SS

SS

N/A

N/A

4C

RM

.EXI

T D

UC

TS

N/A

S12

015

5N

/AN

/AS

SS

SS

N/A

N/A

5C

RM

-CE

LLA

SN

/AS

135

140

N/A

N/A

SS

SS

SN

/AN

/A

Con

trol

Pan

el

DV

-LIS

TED

457

.A 2

.5

DV

-LIS

TED

457

.A 2

.5

Ope

ratio

n

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

DV

-LIS

TED

457

.A 2

.6

Rem

ark

:

Pre

viou

s Te

st

Com

men

t :

AV

-LIS

TED

461

A 2

.5

Loca

tion

AV

-LIS

TED

461

A 2

.5

Rem

ark

Lock

Tem

per

Sw

itch

Wat

er P

ress

ure

Air

Pre

ssur

e

Con

trol V

alve

Spr

ay

Noz

zle

Pip

ing

Det

ecto

r C

ondi

tion

Lubr

icat

ion

Ala

rm

Val

ve

Pre

ssur

e R

eadi

ng (P

si)

supe

rvis

ory

syst

em o

f Mai

n V

alve

Witn

ess

:In

spec

tor :

SC10

0014

2

Des

crip

tion

RE

F.C

ontra

ct N

O :

ItemIn

spec

tion

Dat

e : K

hun

Song

pon,

Khu

n

Clie

nt :

Aut

omat

ic s

prin

kler

sys

tem

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, B

angn

a,B

angk

ok 1

0260

, Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

NS

BLU

E SC

OPE

STE

EL (T

HAI

LAN

D) L

TD.

28 -

30 A

pril

2021

Subi

n, W

achi

ra, S

omki

d, A

nuch

a, A

nuch

it

Loca

tion

: Res

erve

Uni

t

belo

wab

ove

6C

RM

.BLD

GN

/AN

/AS

140

160

N/A

N/A

N/A

SS

SS

SS

7C

RM

.BLD

GN

/AN

/AS

140

160

N/A

N/A

N/A

SS

SS

SS

8C

RM

.BLD

GN

/AN

/AS

140

150

N/A

N/A

N/A

SS

SS

SS

9C

RM

.EXI

T D

UC

TN

/AN

/AS

140

150

N/A

N/A

N/A

SS

SS

SS

10M

CL1

cab

le c

ella

N/A

N/A

N/A

150

150

N/A

N/A

N/A

SS

SS

SS

Clie

nt :

Aut

omat

ic s

prin

kler

sys

tem

Des

crip

tion

Insp

ectio

n D

ate

:

supe

rvis

ory

syst

em o

f Mai

n V

alve

Loca

tion

Det

ecto

r C

ondi

tion

Khu

n So

ngpo

n, K

hun

Sont

haya

Rem

ark

Lock

Tem

per

Sw

itch

Wat

er P

ress

ure

Air

Pre

ssur

eO

pera

tion

Con

trol

Pan

elLu

bric

atio

n

Ala

rm

Val

ve

Con

trol V

alve

Pip

ing

Spr

ay

Noz

zle

Pre

ssur

e R

eadi

ng (P

si)

SC10

0014

2

Rem

ark

:C

omm

ent :

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

DV

-LIS

TED

457

.A 2

.5

DV

-LIS

TED

457

.A 2

.5

DV

-LIS

TED

457

.A 2

.6

AV

-LIS

TED

461

A 2

.5

RE

F.C

ontra

ct N

O :

AV

-LIS

TED

461

A 2

.5

Pre

viou

s Te

st

Insp

ecto

r :W

itnes

s :

Item

Page 21: NS BLUE SCOPE STEEL (THAILAND) LTD

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, B

angn

a,B

angk

ok 1

0260

, Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

NS

BLU

E SC

OPE

STE

EL (T

HAI

LAN

D) L

TD.

28 -

30 A

pril

2021

Subi

n, W

achi

ra, S

omki

d, A

nuch

a, A

nuch

it

Loca

tion

: Res

erve

Uni

t

belo

wab

ove

11C

PL-

PA

INT

RO

OM

N/A

SN

/A12

512

5N

/AN

/AN

/AS

SS

SS

S12

CP

L-P

AIN

T R

OO

MN

/AS

N/A

125

125

N/A

N/A

N/A

SS

SS

SS

13M

CL-

2 w

are

hous

eN

/AN

/AN

/AN

/A17

0N

/AN

/AN

/AS

SS

SN

/AN

/Azo

ne1

14M

CL-

2 w

are

hous

eN

/AN

/AN

/AN

/A21

0N

/AN

/AN

/AS

SS

SN

/AN

/Azo

ne8

15M

CL-

2 w

are

hous

eN

/AN

/AN

/AN

/A20

0N

/AN

/AN

/AS

SS

SN

/AN

/Azo

ne9

NO

.13,

14,1

5 D

elug

e va

lve

clos

e to

mcl

-2 p

roce

ss b

ldg.

Zone

1, 8

,9N

O.1

3 ha

ndle

d

rain

val

ve

Clie

nt :

Aut

omat

ic s

prin

kler

sys

tem

Des

crip

tion

Insp

ectio

n D

ate

:

supe

rvis

ory

syst

em o

f Mai

n V

alve

Loca

tion

Det

ecto

r C

ondi

tion

Khu

n So

ngpo

n, K

hun

Sont

haya

Rem

ark

Lock

Tem

per

Sw

itch

Wat

er

Pre

ssur

eA

ir P

ress

ure

Ope

ratio

n

Con

trol

Pan

elLu

bric

atio

n

Ala

rm

Val

ve

Con

trol V

alve

Pip

ing

Spr

ay

Noz

zle

Pre

ssur

e R

eadi

ng (P

si)

SC10

0014

2

Rem

ark

:C

omm

ent :

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

DV

-LIS

TED

457A

2.5

DV

-LIS

TED

457A

2.5

INB

AL

799D

G-0

4A01

4.0

INB

AL

799D

G-0

4A01

4.0

RE

F.C

ontra

ct N

O :

INB

AL

799D

G-0

4A01

4.0

Pre

viou

s Te

st

Insp

ecto

r :W

itnes

s :

Item

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, B

angn

a,B

angk

ok 1

0260

, Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

NS

BLU

E SC

OPE

STE

EL (T

HAI

LAN

D) L

TD.

28 -

30 A

pril

2021

Subi

n, W

achi

ra, S

omki

d, A

nuch

a, A

nuch

it

Loca

tion

: Res

erve

Uni

t

belo

wab

ove

16M

CL-

2 w

are

hous

eN

/AN

/AN

/AN

/A12

0N

/AN

/AN

/AS

SS

SN

/AN

/Azo

ne2

17M

CL-

2 w

are

hous

eN

/AN

/AN

/AN

/A15

0N

/AN

/AN

/AS

SS

SN

/AN

/Azo

ne3

18M

CL-

2 pr

oces

sN

/AN

/AN

/AN

/A17

5N

/AN

/AN

/AS

SS

SN

/AN

/Azo

ne4

19M

CL-

2 pr

oces

sN

/AN

/AN

/AN

/A15

0N

/AN

/AN

/AS

SS

SN

/AN

/Azo

ne5

20M

CL-

2pre

mel

tN

/AN

/AN

/AN

/A15

0N

/AN

/AN

/AS

SS

SN

/AN

/Azo

ne6

**N

O.1

6,17

,18,

19,2

0 D

elug

e va

lve

clos

e to

mcl

-2 p

roce

ss b

ldg.

Z

one

2, 3

, 4, 5

, 6

Clie

nt :

Aut

omat

ic s

prin

kler

sys

tem

Des

crip

tion

Insp

ectio

n D

ate

:

supe

rvis

ory

syst

em o

f Mai

n V

alve

Loca

tion

Det

ecto

r C

ondi

tion

Khu

n So

ngpo

n, K

hun

Sont

haya

Rem

ark

Lock

eTe

mpe

r S

witc

h

Wat

er P

ress

ure

Air

Pre

ssur

eO

pera

tion

Con

trol

Pan

elLu

bric

atio

n

Ala

rm

Val

ve

Con

trol V

alve

Pip

ing

Spr

ay

Noz

zie

Pre

ssur

e R

eadi

ng (P

si)

SC10

0014

2

Rem

ark

:C

omm

ent :

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

INB

AL

799D

G-0

4A01

4.0

INB

AL

799D

G-0

4A01

4.0

INB

AL

799D

G-0

4A01

4.0

INB

AL

799D

G-0

4A01

4.0

RE

F.C

ontra

ct N

O :

INB

AL

799D

G-0

4A01

4.0

Pre

viou

s Te

st

Insp

ecto

r :W

itnes

s :

Item

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, B

angn

a,B

angk

ok 1

0260

, Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

NS

BLU

E SC

OPE

STE

EL (T

HAI

LAN

D) L

TD.

28 -

30 A

pril

2021

Subi

n, W

achi

ra, S

omki

d, A

nuch

a, A

nuch

it

Loca

tion

: Res

erve

Uni

t

belo

wab

ove

21M

CL-

2ent

ryN

/AN

/AN

/AN

/A13

5N

/AN

/AN

/AS

SS

SN

/AN

/Azo

ne7

22M

CL-

2ent

ryN

/AN

/AN

/AN

/A16

5N

/AN

/AN

/AS

SS

SN

/AN

/Azo

ne14

23M

CL-

2ent

ryN

/AN

/AN

/AN

/A20

0N

/AN

/AN

/AS

SS

SN

/AN

/Azo

ne13

24M

CL-

2ing

otN

/AN

/AN

/AN

/A18

0N

/AN

/AN

/AS

SS

SN

/AN

/Azo

ne16

25M

CL-

2 w

orke

sho

pN

/AN

/AN

/AN

/A20

0N

/AN

/AN

/AS

SS

SN

/AN

/Azo

ne15

**N

O.2

1,22

,23,

24,2

5 D

elug

e va

lve

clos

e to

mcl

-2 p

roce

ss b

ldg.

Z

one

7, 1

4, 1

3, 1

6, 1

5

Clie

nt :

Aut

omat

ic s

prin

kler

sys

tem

Des

crip

tion

Insp

ectio

n D

ate

:

supe

rvis

ory

syst

em o

f Mai

n V

alve

Loca

tion

Det

ecto

r C

ondi

tion

Khu

n So

ngpo

n, K

hun

Sont

haya

Rem

ark

Lock

eTe

mpe

r S

witc

h

Wat

er P

ress

ure

Air

Pre

ssur

eO

pera

tion

Con

trol

Pan

elLu

bric

atio

n

Ala

rm

Val

ve

Con

trol V

alve

Pip

ing

Spr

ay

Noz

zie

Pre

ssur

e R

eadi

ng (P

si)

SC10

0014

2

Rem

ark

:C

omm

ent :

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

INB

AL

799D

G-0

4A01

4.0

INB

AL

799D

G-0

4A01

4.0

INB

AL

799D

G-0

4A01

4.0

INB

AL

799D

G-0

4A01

4.0

RE

F.C

ontra

ct N

O :

INB

AL

799D

G-0

4A01

4.0

Pre

viou

s Te

st

Insp

ecto

r :W

itnes

s :

Item

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, B

angn

a,B

angk

ok 1

0260

, Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

NS

BLU

E SC

OPE

STE

EL (T

HAI

LAN

D) L

TD.

28 -

30 A

pril

2021

Subi

n, W

achi

ra, S

omki

d, A

nuch

a, A

nuch

it

Loca

tion

: Res

erve

Uni

t

belo

wab

ove

26M

CL-

2 w

orke

sho

pN

/AN

/AN

/AN

/A17

5N

/AN

/AN

/AS

SS

SN

/AN

/Azo

ne12

27M

CL-

2 pr

oces

sN

/AN

/AN

/AN

/A17

5N

/AN

/AN

/AS

SS

SN

/AN

/Azo

ne11

28M

CL-

2 pr

oces

sN

/AN

/AN

/AN

/A17

5N

/AN

/AN

/AS

SS

SN

/AN

/Azo

ne10

29M

CL-

2gen

arat

orS

N/A

S12

016

0N

/AN

/AS

SS

SS

N/A

N/A

30M

CL-

1gen

arat

orS

N/A

N/A

145

150

N/A

N/A

SS

SS

SN

/AN

/A

NO

.26,

27,2

8 D

elug

e va

lve

clos

e to

mcl

-2 p

roce

ss b

ldg.

Z

one

12, 1

1, 1

0

Clie

nt :

Aut

omat

ic s

prin

kler

sys

tem

Des

crip

tion

Insp

ectio

n D

ate

:

supe

rvis

ory

syst

em o

f Mai

n V

alve

Loca

tion

Det

ecto

r C

ondi

tion

Khu

n So

ngpo

n, K

hun

Sont

haya

Rem

ark

Lock

eTe

mpe

r S

witc

h

Wat

er P

ress

ure

Air

Pre

ssur

eO

pera

tion

Con

trol

Pan

elLu

bric

atio

n

Ala

rm

Val

ve

Con

trol V

alve

Pip

ing

Spr

ay

Noz

zie

Pre

ssur

e R

eadi

ng (P

si)

SC10

0014

2

Rem

ark

:C

omm

ent :

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

INB

AL

799D

G-0

4A01

4.0

INB

AL

799D

G-0

4A01

4.0

INB

AL

799D

G-0

4A01

4.0

AV

-LIS

TED

467

A 4

.0

RE

F.C

ontra

ct N

O :

AV

-LIS

TED

467

A 2

.5

Pre

viou

s Te

st

Insp

ecto

r :W

itnes

s :

Item

Page 22: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE PROTECTION SYSTEM ( Deluge Valve )

28 - 30 April 2021Subin, Wachira, Somkid, Anucha, Anuchit

Location of fire alarm control panel : CRM.CELLA ROOM POTER TFC SERIES

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for FCP and battery

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of FCP

2. Equipment

2.1 Check condition of all detector and function test zone by zone

2.2 cross zone function test of detector

2.3 Check condition of all manual pull station

2.4 Check condition of solinoid and function test

2.5 Check condition of all abort switch and function test

2.6 Check cable connection / terminal

2.7 Visual check selector valve and function test

2.8 Check condition of all alarm devise and testing

3.Mechanical

3.1 check pipe system and nozzle for physical damage.

3.2 checkthe container pressure gauges for operation pressure.

3.3 check agent quantity by weighing the container

3.4 check condition of flexible hose

3.5 check condition of cylinder

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Battery control panel 26.27 vdc. ( Use since 29/10/19) Clean & check system control

control panel system normal

Fire suppression systemPreventive Maintenance Check Sheet

SC1000142

Subject : Client :

REF.Contract NO :Inspection Date :

NS BLUE SCOPE STEEL (THAILAND) LTD.

Inspector :

Remark :

TAKACHIHO

Witness :

Electrical system

Y Y

Y N/A

Y

N/A

Y Y

Status Function test Result

Y Y

Y Y

Y Y

Y

N/A

N/A N/A

N/A N/A

N/A N/A

Y N/A

N/A

Y N/A

Y N/A

N/A N/A

Y

Y N/A

Khun Songpon, Khun Sonthaya

Y Y

Y N/A

Y

Description

1. Fire Control Panel

Y

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE PROTECTION SYSTEM ( Deluge Valve )

28 - 30 April 2021Subin, Wachira, Somkid, Anucha, Anuchit

Location of fire alarm control panel : CRM,PIT#1 ROOM POTER TFC SERIES

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for FCP and battery

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of FCP

2. Equipment

2.1 Check condition of all detector and function test zone by zone

2.2 cross zone function test of detector

2.3 Check condition of all manual pull station

2.4 Check condition of solinoid and function test

2.5 Check condition of all abort switch and function test

2.6 Check cable connection / terminal

2.7 Visual check slector valve and function test

2.8 Check condition of all alarm devise and testing

3.Mechanical

3.1 check pipe system and nozzle for physical damage.

3.2 checkthe container pressure gauges for operation pressure.

3.3 check agent guantity by weighing the container

3.4 check condition of flexible hose

3.5 check condition of cylinder

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Battery control panel 26.18 vdc. ( Use since 29/10/19) Clean & check system control

control panel system normal

Fire suppression systemPreventive Maintenance Check Sheet

Inspector :

Subject : Client :

Witness :

REF.Contract NO :Inspection Date :

SC1000142

Khun Songpon, Khun Sonthaya

NS BLUE SCOPE STEEL (THAILAND) LTD.

Description Status Function test Result

Electrical system

1. Fire Control Panel

Y Y

Y Y

Y Y

Y Y

Y N/A

Y Y

Y Y

Y Y

Y N/A

Y N/A

Y N/A

N/A N/A

N/A N/A

Y N/A

Y N/A

Y N/A

Y Y

N/A N/A

N/A N/A

N/A N/A

Remark :

TAKACHIHO

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE PROTECTION SYSTEM ( Deluge Valve )

28 - 30 April 2021Subin, Wachira, Somkid, Anucha, Anuchit

Location of fire alarm control panel : CRM,PIT#2 ROOM POTER TFC SERIES

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for FCP and battery

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of FCP

2. Equipment

2.1 Check condition of all detector and function test zone by zone

2.2 cross zone function test of detector

2.3 Check condition of all manual pull station

2.4 Check condition of solinoid and function test

2.5 Check condition of all abort switch and function test

2.6 Check cable connection / terminal

2.7 Visual check slector valve and function test

2.8 Check condition of all alarm devise and testing

3.Mechanical

3.1 check pipe system and nozzle for physical damage.

3.2 checkthe container pressure gauges for operation pressure.

3.3 check agent guantity by weighing the container

3.4 check condition of flexible hose

3.5 check condition of cylinder

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Battery control panel 26.47 vdc. ( Use since 29/10/19)Clean & check system control

control panel system normal

Fire suppression systemPreventive Maintenance Check Sheet

Inspector :

Subject : Client :

Witness :

REF.Contract NO :Inspection Date :

SC1000142

Khun Songpon, Khun Sonthaya

NS BLUE SCOPE STEEL (THAILAND) LTD.

Description Status Function test Result

Electrical system

1. Fire Control Panel

Y Y

Y Y

Y Y

Y Y

Y N/A

Y Y

Y Y

Y Y

Y N/A

Y N/A

Y N/A

N/A N/A

N/A Y

Y Y

Y N/A

Y N/A

Y Y

N/A N/A

N/A N/A

N/A N/A

Remark :

TAKACHIHO

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE PROTECTION SYSTEM ( Deluge Valve )

28 - 30 April 2021Subin, Wachira, Somkid, Anucha, Anuchit

Location of fire alarm control panel : CRM,PIT#3 ROOM POTER TFC SERIES

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for FCP and battery

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of FCP

2. Equipment

2.1 Check condition of all detector and function test zone by zone

2.2 cross zone function test of detector

2.3 Check condition of all manual pull station

2.4 Check condition of solinoid and function test

2.5 Check condition of all abort switch and function test

2.6 Check cable connection / terminal

2.7 Visual check slector valve and function test

2.8 Check condition of all alarm devise and testing

3.Mechanical

3.1 check pipe system and nozzle for physical damage.

3.2 checkthe container pressure gauges for operation pressure.

3.3 check agent guantity by weighing the container

3.4 check condition of flexible hose

3.5 check condition of cylinder

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Battery control panel 26.27 vdc ( Use since 29/10/19 ) Clean & check system control

control panel system normal

Fire suppression systemPreventive Maintenance Check Sheet

Inspector :

Subject : Client :

Witness :

REF.Contract NO :Inspection Date :

SC1000142

Khun Songpon, Khun Sonthaya

NS BLUE SCOPE STEEL (THAILAND) LTD.

Description Status Function test Result

Electrical system

1. Fire Control Panel

Y Y

Y Y

Y Y

Y Y

Y N/A

Y Y

Y Y

Y Y

Y N/A

Y N/A

Y N/A

N/A N/A

N/A N/A

Y Y

Y N/A

Y N/A

Y N/A

N/A N/A

N/A N/A

N/A N/A

Remark :

TAKACHIHO

Page 23: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE PROTECTION SYSTEM ( Deluge Valve )

28 - 30 April 2021Subin, Wachira, Somkid, Anucha, Anuchit

Location of fire alarm control panel : MCL-1 MAIN EER.CABEL CELLA ROOM POTER TFC SERIES

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for FCP and battery

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of FCP

2. Equipment

2.1 Check condition of all detector and function test zone by zone

2.2 cross zone function test of detector

2.3 Check condition of all manual pull station

2.4 Check condition of solinoid and function test

2.5 Check condition of all abort switch and function test

2.6 Check cable connection / terminal

2.7 Visual check slector valve and function test

2.8 Check condition of all alarm devise and testing

3.Mechanical

3.1 check pipe system and nozzle for physical damage.

3.2 checkthe container pressure gauges for operation pressure.

3.3 check agent guantity by weighing the container

3.4 check condition of flexible hose

3.5 check condition of cylinder

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Battery control panel 26.45 vdc ( Use since 29/10/19) Clean & check system control

control panel system normal

Fire suppression systemPreventive Maintenance Check Sheet

Inspector :

Subject : Client :

Witness :

REF.Contract NO :Inspection Date :

SC1000142

Khun Songpon, Khun Sonthaya

NS BLUE SCOPE STEEL (THAILAND) LTD.

Description Status Function test Result

Electrical system

1. Fire Control Panel

Y Y

Y Y

Y Y

Y Y

Y N/A

Y Y

Y Y

Y Y

Y N/A

Y Y

Y N/A

Y N/A

Y N/A

N/A N/A

Y N/A

N/A

Y N/A

TAKACHIHO

N/A N/A

N/A N/A

N/A

N/A N/A

Remark :

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE PROTECTION SYSTEM ( Deluge Valve )

28 - 30 April 2021Subin, Wachira, Somkid, Anucha, Anuchit

Location of fire alarm control panel : MCL-1 MAIN EER.CABEL CELLA ROOM POTER TFC SERIES

1 ZONE1 SMOKE DETECTOR N/A N/A cross zone detector discharge 30sec2 ZONE2 SMOKE DETECTOR N/A N/A3 ZONE1 SMOKE DETECTOR N/A N/A4 ZONE2 SMOKE DETECTOR N/A N/A5 ZONE1 SMOKE DETECTOR N/A N/A6 ZONE2 SMOKE DETECTOR N/A N/A7 ZONE1 SMOKE DETECTOR N/A N/A8 ZONE2 SMOKE DETECTOR N/A N/A9 ZONE1 SMOKE DETECTOR N/A N/A10 ZONE2 SMOKE DETECTOR N/A N/A11 ZONE1 SMOKE DETECTOR N/A N/A12 ZONE2 SMOKE DETECTOR N/A N/A13 ZONE1 SMOKE DETECTOR N/A N/A14 ZONE2 SMOKE DETECTOR N/A N/A15 MANUAL N/A N/A to discharge 16 BELL N/A N/A first alarm17 HORN&STOBE N/A N/A second alarm18 Solenoid Valve N/A N/A to discharge

didn't perform function test on detector as it was production area

Subject : Client :

REF.Contract NO :

Remark

Inspection Date :SC1000142

Inspector :Witness :

Zone.Numberitem Location Test Result

Khun Songpon, Khun Sonthaya

NS BLUE SCOPE STEEL (THAILAND) LTD.

Fire suppression systemPreventive Maintenance Check Sheet

TAKACHIHO

MCL-1 main cabel cella

Test trouble signal FCP

MCL-1 main cabel cellaMCL-1 main cabel cella

MCL-1 main cabel cellaMCL-1 main cabel cella

MCL-1 main cabel cella

Type

MCL-1 main cabel cella

Remark :

MCL-1 main cabel cella

MCL-1 main cabel cellaMCL-1 main cabel cella

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

MCL-1 main cabel cellaMCL-1 main cabel cella

MCL-1 main cabel cella

MCL-1 main cabel cella

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE PROTECTION SYSTEM ( Deluge Valve )

28 - 30 April 2021Subin, Wachira, Somkid, Anucha, Anuchit

Location of fire alarm control panel : CPL.PAINT STOR LOWER ROOM POTER TFC SERIES

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for FCP and battery

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of FCP

2. Equipment

2.1 Check condition of all detector and function test zone by zone

2.2 cross zone function test of detector

2.3 Check condition of all manual pull station

2.4 Check condition of solinoid and function test

2.5 Check condition of all abort switch and function test

2.6 Check cable connection / terminal

2.7 Visual check slector valve and function test

2.8 Check condition of all alarm devise and testing

3.Mechanical

3.1 check pipe system and nozzle for physical damage.

3.2 checkthe container pressure gauges for operation pressure.

3.3 check agent guantity by weighing the container

3.4 check condition of flexible hose

3.5 check condition of cylinder

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Battery control panel 26.08 vdc. ( Use since 23/04/20) Clean & check system control

control panel system normal

* reset control

Fire suppression systemPreventive Maintenance Check Sheet

Inspector :

Subject : Client :

Witness :

REF.Contract NO :Inspection Date :

SC1000142

Khun Songpon, Khun Sonthaya

NS BLUE SCOPE STEEL (THAILAND) LTD.

Description Status Function test Result

Electrical system

1. Fire Control Panel

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

N/A

Y Y

TAKACHIHO

N/A N/A

N/A N/A

N/A

N/A N/A

Remark :

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE PROTECTION SYSTEM ( Deluge Valve )

28 - 30 April 2021Subin, Wachira, Somkid, Anucha, Anuchit

Location of fire alarm control panel : CPL.PAINT STOR LOWER ROOM POTER TFC SERIES

1 ZONE1 FLAME DETECTOR N/A N/A cross zone detector discharge 30sec2 ZONE2 FLAME DETECTOR N/A N/A3 ZONE1 FLAME DETECTOR N/A N/A4 ZONE2 FLAME DETECTOR N/A N/A5 MANUAL 1 N/A N/A 30 sec to discharge 6 MANUAL 2 N/A N/A 30 sec to discharge 7 BELL N/A N/A first alarm8 HORN&STOBE N/A N/A second alarm9 Solenoid Valve N/A N/A to discharge 10 MANUAL 3 N/A N/A 30 sec to discharge

Didn't perfrom function test on detector as it was production area

* reset fire release (reset )

NS BLUE SCOPE STEEL (THAILAND) LTD.SC1000142

TAKACHIHO

Preventive Maintenance Check Sheet Fire suppression system

Subject : Client :

REF.Contract NO :Inspection Date :

Inspector :

CPL-LOWER ROOM

Witness :

item Location Zone.Number

CPL-LOWER ROOM

Khun Songpon, Khun Sonthaya

Test Result Test trouble signal FCP Remark

CPL-LOWER ROOM

Type

CPL-LOWER ROOM

Remark :

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Page 24: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE PROTECTION SYSTEM ( Deluge Valve )

28 - 30 April 2021Subin, Wachira, Somkid, Anucha, Anuchit

Location of fire alarm control panel : CPL.PAINT STORE UPPER POTER TFC SERIES

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for FCP and battery

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of FCP

2. Equipment

2.1 Check condition of all detector and function test zone by zone

2.2 cross zone function test of detector

2.3 Check condition of all manual pull station

2.4 Check condition of solinoid and function test

2.5 Check condition of all abort switch and function test

2.6 Check cable connection / terminal

2.7 Visual check slector valve and function test

2.8 Check condition of all alarm devise and testing

3.Mechanical

3.1 check pipe system and nozzle for physical damage.

3.2 checkthe container pressure gauges for operation pressure.

3.3 check agent guantity by weighing the container

3.4 check condition of flexible hose

3.5 check condition of cylinder

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Battery control panel 26.93 vdc. ( Use since 23/04/20) Clean & check system control

control panel system normal

* reset control

SC1000142Client :

REF.Contract NO :Inspection Date :

Inspector :

NS BLUE SCOPE STEEL (THAILAND) LTD.

Fire suppression system

Subject :

Preventive Maintenance Check Sheet

TAKACHIHO

Electrical system

Y Y

Y Y

Y Y

Y Y

Witness :

Description Status Function test Result

Khun Songpon, Khun Sonthaya

1. Fire Control Panel

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

N/A N/A

N/A N/A

Y Y

Y Y

Y Y

Y Y

Y Y

Remark :

N/A N/A

N/A N/A

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE PROTECTION SYSTEM ( Deluge Valve )

28 - 30 April 2021Subin, Wachira, Somkid, Anucha, Anuchit

Location of fire alarm control panel : CPL.PAINT STORE UPPER POTER TFC SERIES

1 ZONE1 FLAME DETECTOR N/A N/A cross zone detector discharge 30sec2 ZONE2 FLAME DETECTOR N/A N/A3 ZONE1 FLAME DETECTOR N/A N/A4 ZONE2 FLAME DETECTOR N/A N/A5 MANUAL 1 N/A N/A 30 sec to discharge 6 BELL N/A N/A first alarm7 HORN&STOBE N/A N/A second alarm8 Solenoid Valve N/A N/A to discharge 9 MANUAL 2 N/A N/A 30 sec to discharge 10 MANUAL 3 N/A N/A 30 sec to discharge

Didn't perfrom function test on detector as it was production area

NS BLUE SCOPE STEEL (THAILAND) LTD.

TAKACHIHO

Preventive Maintenance Check Sheet Fire suppression system

Subject : Client :

CPL.PAINT STORE UPPER RM.

REF.Contract NO :Inspection Date :

Inspector :Witness :

Test Result Test trouble signal FCP Remarkitem Location Zone.Number Type

CPL.PAINT STORE UPPER RM.CPL.PAINT STORE UPPER RM.

CPL.PAINT STORE UPPER RM.CPL.PAINT STORE UPPER RM.

CPL.PAINT STORE UPPER RM.CPL.PAINT STORE UPPER RM.CPL.PAINT STORE UPPER RM.

Remark :

Khun Songpon, Khun Sonthaya

SC1000142

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Takachiho Fire, Security & Services (Thailand) Ltd.

1858/110-111 Interlink Tower 25 Fl.,

Debaratna Road, Bangna Tai, Bangna,

Bangkok 10260, Thailand.

Tel : 02-366 -9000 , FAX : 02-366-9090

www.tkfs.co.th

FIRE HYDRANT SYSTEM

OW

NER

:N

S BL

UE

SCO

PE S

TEEL

(TH

AIL

AND

) LTD

.A

rea

:NS

blue

sco

pe s

teel

Con

tract

or N

ame:

P

M. F

ire P

rote

ctio

n S

yste

mD

ate

:28

- 30

Apr

il 20

21

Site

:R

ayon

g

- Cor

rosi

on

- Gas

ket

- Bol

t&N

ut

- Cor

rosi

on

- Thr

ead

- Lea

kage

- Han

dle

- Lea

kage

- Ste

m P

acki

ng

- Cor

rosi

on

- Sea

l Con

ditio

n

- Lea

kage

- Con

nect

or L

ocke

r

-Cap

Rem

ark:

**no

.5 a

nd n

o.6

canc

el th

is 2

poi

nts

Che

cked

by

:S

ubin

, Wac

hira

, Som

kid,

Anu

cha,

Anu

chit

SS

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

Cou

plin

g

SS

SS

SS

SS

SS

N/A

N/A

S

SS

N/A

N/A

S

S

N/A

N/A

SS

S

SS

SS

SN

/AN

/AS

SS

SS

N/A

SS

S

S SS

S

SS S

Valv

e

SS

SS

N/A

N/A

SS

SS

N/A

N/A

N/A

SS

SS

N/A

SS

SS

N/A

SS

SS

N/A

N/A

SS

S

N/A

N/A

N/A

N/A

N/A

Pipi

ng

SS

SS

N/A

N/A

SS

S

SS

SS

N/A

N/A

SS

S

PK

L.B

LDG

Flan

gs

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Insp

ectio

n R

epor

tFI

RE

HYD

RAN

T

Des

crip

tion

Equi

pmen

t No.

REM

ARK

SN

O.1

NO

.2N

O.3

NO

.4N

O.5

NO

.6N

O.7

NO

.8N

O.9

FIR

E P

UM

P R

OO

MC

PL-

Pan

t Sto

re)

CP

L.B

LDG

MC

L-1

PK

L-O

P15

CH

EM

ICA

L S

TOR

EC

RM

. Coo

ling

fow

erP

KL.

BLD

G

Page 25: NS BLUE SCOPE STEEL (THAILAND) LTD

OW

NE

R:

NS

BLU

E S

CO

PE

STE

EL

(TH

AIL

AN

D) L

TD.

Are

a :

NS

blu

e sc

ope

stee

lC

ontra

ctor

Nam

e:

PM

. Fire

Pro

tect

ion

Sys

tem

Dat

e :

28 -

30 A

pril

2021

Site

:R

ayon

g

- Cor

rosi

on

- Gas

ket

- Bol

t&N

ut

- Cor

rosi

on

- Thr

ead

- Lea

kage

- Han

dle

- Lea

kage

- Ste

m P

acki

ng

- Cor

rosi

on

- Sea

l Con

ditio

n

- Lea

kage

- Con

nect

or L

ocke

r

-Cap

Rem

ark:

** N

o. 1

7 F

Che

cked

by

:S

ubin

, Wac

hira

, Som

kid,

Anu

cha,

Anu

chit

NO

.13

NO

.14

NO

.15

NO

.16

NO

.17

NO

.18

Insp

ectio

n R

epor

tFI

RE

HYD

RAN

T

Des

crip

tion

Equi

pmen

t No.

REM

ARK

SN

O.1

0N

O.1

1N

O.1

2

MC

L1 O

P.5

7O

PE

RA

TIO

N B

LDG

AD

MIN

BLD

G

Flan

gs

N/A

N/A

N/A

N/A

N/A

N/A

Che

mic

al S

tore

STO

RE

PK

L/O

P05

ZAL-

OP

/2C

AN

TEE

NC

RM

OP

61

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Pipi

ng

SS

SS

SS

SS

S

SS

SS

SS

SS

S

SS

S

Valv

e

SS

SS

SS

SS

SS

SS

SS

S

SS

SS

SS

SS

S

SS

SS

SS

SS

S

SS

SS

SS

SS

S

SS

SS

SS

SS

SS

SS

SS

S

S

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

Cou

plin

g

SS

SS

SS

SS

SS

SS

SS

S

SS

SS

S

OW

NE

R:

NS

BLU

E S

CO

PE

STE

EL

(TH

AIL

AN

D) L

TD.

Are

a :

NS

blu

e sc

ope

stee

lC

ontra

ctor

Nam

e:

PM

. Fire

Pro

tect

ion

Sys

tem

Dat

e :

28 -

30 A

pril

2021

Site

:R

ayon

g

- Cor

rosi

on

- Gas

ket

- Bol

t&N

ut

- Cor

rosi

on

- Thr

ead

- Lea

kage

- Han

dle

- Lea

kage

- Ste

m P

acki

ng

- Cor

rosi

on

- Sea

l Con

ditio

n

- Lea

kage

- Con

nect

or L

ocke

r

-Cap

rem

ark:

** N

o. 2

0 F

Che

cked

by

:S

ubin

, Wac

hira

, Som

kid,

Anu

cha,

Anu

chit

Insp

ectio

n R

epor

tFI

RE

HYD

RAN

T

Des

crip

tion

Equi

pmen

t No.

REM

ARK

SN

O.1

9N

O.2

0N

O.2

7

AD

MIN

BLD

G

MC

L-2

OP

/88

MC

L-2

OP

/74

mcl

-2/o

p88

mcl

-2/o

p89

mcl

-2/h

ose

43m

cl-2

/hos

e 44

mcl

-2/h

ose

45m

cl-2

/hos

e 46

NO

.21

NO

.22

NO

.23

NO

.24

N/A

N/A

NO

.25

NO

.26

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Pipi

ng

SS

SS

SS

S

Flan

gs

SS

SS

SS

S

N/A

N/A

N/A

N/A

N/A

N/A

N/A

SS

SS

SS

SS

SS

S

SS

SS S

SS

SS

S

S

S

SS S

SS

Valv

e

SS

SS

S

SS

SS

SS

SS

S

S

S

S

S

SS

S

SS

S

SS

SS

SS

SS

S

SS

S

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

Cou

plin

g

SS

SS

SS

SS

S

S

SS

SS

SS

SS

S

S

S

OW

NE

R:

NS

BLU

E S

CO

PE

STE

EL

(TH

AIL

AN

D) L

TD.

Are

a :

NS

blue

sco

pe s

teel

Con

tract

or N

ame:

P

M. F

ire P

rote

ctio

n S

yste

mD

ate

:28

- 30

Apr

il 20

21

Site

:R

ayon

g

- Cor

rosi

on

- Gas

ket

- Bol

t&N

ut

- Cor

rosi

on

- Thr

ead

- Lea

kage

- Han

dle

- Lea

kage

- Ste

m P

acki

ng

- Cor

rosi

on

- Sea

l Con

ditio

n

- Lea

kage

- Con

nect

or L

ocke

r

-Cap

Rem

ark:

** N

o. 2

8, 3

1, 3

2, 3

4, 3

5, 3

6

F

Che

cked

by

:S

ubin

, Wac

hira

, Som

kid,

Anu

cha,

Anu

chit

NO

.31

NO

.32

NO

.33

NO

.34

NO

.35

NO

.36

Insp

ectio

n R

epor

tFI

RE

HYD

RA

NT

Des

crip

tion

Equi

pmen

t No.

REM

ARK

SN

O.2

8N

O.2

9N

O.3

0

mcl

-2/h

ose

53m

cl-2

/hos

e 54

mcl

-2/h

ose

55

Flan

gs

N/A

N/A

N/A

N/A

N/A

N/A

mcl

-2/h

ose

47m

cl-2

/hos

e 48

mcl

-2/h

ose

49m

cl-2

/hos

e 50

mcl

-2/h

ose

51m

cl-2

/hos

e 52

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Pipi

ng

SS

SS

SS

SS

S

SS

SS

SS

SS

S

SS

S

Valv

e

SS

SS

SS

SS

SS

SS

SS

S

SS

SS

SS

SS

S

SS

SS

SS

SS

S

SS

SS

SS

SS

S

SS

SS

SS

SS

SS

SS

SS

S

S

S =

Satis

fact

ory

US

= U

nsat

isfa

ctor

y N

/A =

Not

App

licab

le

Cou

plin

g

SS

SS

SS

SS

SS

SS

SS

S

SS

SS

S

OW

NER

:N

S BL

UE

SCO

PE S

TEEL

(TH

AIL

AND

) LTD

.A

rea

:NS

blue

sco

pe s

teel

Con

tract

or N

ame:

P

M. F

ire P

rote

ctio

n S

yste

mD

ate

:28

- 30

Apr

il 20

21

Site

:R

ayon

g

- Cor

rosi

on

- Gas

ket

- Bol

t&N

ut

- Cor

rosi

on

- Thr

ead

- Lea

kage

- Han

dle

- Lea

kage

- Ste

m P

acki

ng

- Cor

rosi

on

- Sea

l Con

ditio

n

- Lea

kage

- Con

nect

or L

ocke

r

-Cap

Rem

ark:

Che

cked

by

:S

ubin

, Wac

hira

, Som

kid,

Anu

cha,

Anu

chit

Insp

ectio

n R

epor

tFI

RE

HYD

RAN

T

Des

crip

tion

Equi

pmen

t No.

REM

ARK

SN

O.3

7N

O.3

8

mcl

-2/h

ose

56C

RM

N/A

N/A

N/A

N/A

Pipi

ng

SS

Flan

gs

SS

N/A

N/A

SS

SS

Valv

e

SS

SS

SS S

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

Cou

plin

g

SS

SSS S

S

Page 26: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.

1858/110-111 Interlink Tower 25 Fl.,

Debaratna Road, Bangna Tai, Bangna,

Bangkok 10260, Thailand.

Tel : 02-366 -9000 , FAX : 02-366-9090

www.tkfs.co.th

FIRE HOSE CABINET AND HOSE SYSTEM

OW

NE

R:

NS

BLU

E S

CO

PE

STE

EL

(TH

AIL

AN

D) L

TD.

Area

:N

S bl

ue s

cope

ste

elD

ate

:28

- 30

Apr

il 20

21

Pro

ject

nam

e:P

M. F

ire P

rote

ctio

n S

yste

mS

ite :

Ray

ong

- Cor

rosi

on

- Doo

r

- Key

lock

- Cor

rosi

on

Con

ditio

n

Cou

plin

g

Con

nect

or L

ocke

r

Sea

l con

ditio

n

Hyd

rost

atic

test

300

psi

siz

e 1.

5"

Hyd

rost

atic

test

300

psi

siz

e 2.

5"

- Lea

kage

- Con

ditio

n

- Cor

rosi

on

Rem

ark:

Che

cked

by

:Su

bin,

Wac

hira

, Som

kid,

Anu

cha,

Anu

chit

Insp

ectio

n R

epor

tFI

RE

HO

SE C

ABIN

ET A

ND

FIR

E H

OSE

Des

crip

tion

Equi

pmen

t No.

REM

AR

KS

NO

.1N

O,2

NO

.3

STO

RE

CH

EMIC

ALST

OR

E - P

oint

CR

M

SS

S

supp

ort

SS

S

Cab

inet

SS

S

SS

S

hose

SS

S

SS

S

SS

S

SS

S

N/A

N/A

N/A

21

11

1

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

SN

/Ano

zzel

SS

N/A

N/A

SS

S

Takachiho Fire, Security & Services (Thailand) Ltd.

1858/110-111 Interlink Tower 25 Fl.,

Debaratna Road, Bangna Tai, Bangna,

Bangkok 10260, Thailand.

Tel : 02-366 -9000 , FAX : 02-366-9090

www.tkfs.co.th

FIRE HOSE REEL OR STANDPIPE AND HOSE

SYSTEM

OW

NER

:N

S BL

UE

SCO

PE S

TEEL

(TH

AILA

ND

) LTD

.Ar

ea :

NS

blu

e sc

ope

stee

l

Dat

e :2

8 - 3

0 A

pril

2021

Pro

ject

nam

e:P

M. F

ire P

rote

ctio

n S

yste

mSi

te :

Ray

ong

- Cor

rosi

on

- Doo

r

- Key

lock

- Cor

rosi

on

Con

ditio

n

Con

trol v

alve

con

ditio

n

Con

nect

or L

ocke

r

Seal

con

ditio

n

Pipe

sys

tem

is in

goo

d co

nditi

on

all h

ose

and

hose

val

ve is

in g

ood

cond

ition

- Lea

kage

- Con

ditio

n

- Cor

rosi

on

Rem

ark:

Che

cked

by

:S

ubin

, Wac

hira

, Som

kid,

Anu

cha,

Anu

chit

Insp

ectio

n R

epor

tFI

RE

HO

SE R

EEL

OR

STA

ND

PIPE

AN

D H

OSE

SYS

TEM

Des

crip

tion

REM

AR

KS

NO

.1

S S

SS

S

S S S S S

NO

.8N

O.9

MC

L-1C

HE

MIC

AL

CP

L-P

AIN

T S

TOR

E

NO

.2N

O.3

NO

.4N

O.5

NO

.6N

O.7

S S S

N/A

N/A

N/A

N/A

N/A

CP

L-.D

OO

R O

P/4

6C

PL-

.DO

OR

OP

/44

CP

L-.D

OO

R G

2/13

CP

L-.D

OO

R O

P/4

3C

PL-

PA

CK

ING

CP

L-P

AC

KIN

G

SS

SS SS

S

CP

L-P

AC

KIN

G

Cab

inet

SS

N/A

N/A

N/A

N/A

N/A

N/A

N/A

SS

N/A

N/A

N/A

N/A

N/A

SS

SS

N/A

N/A

N/A

N/A

SS

S

SS

SS

S

SS

Supp

ort

SS

SS

SS

SS

SS

SS

Com

pone

nt

S

S

S

S

S

SS

S

SS

SS

SS

SS

S

SS

SS

SS

SS

S

Noz

zel

S

SS

S

Equi

pmen

t No.

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

S

SS

SS

SS

SSS

SS

SS

SS

Page 27: NS BLUE SCOPE STEEL (THAILAND) LTD

OW

NER

:N

S BL

UE

SCO

PE S

TEEL

(TH

AILA

ND

) LTD

.Ar

ea :

NS

blu

e sc

ope

stee

l

Dat

e :2

8 - 3

0 A

pril

2021

Pro

ject

nam

e:P

M. F

ire P

rote

ctio

n S

yste

mSi

te :

Ray

ong

- Cor

rosi

on

- Doo

r

- Key

lock

- Cor

rosi

on

Con

ditio

n

Con

trol v

alve

con

ditio

n

Con

nect

or L

ocke

r

Seal

con

ditio

n

Pipe

sys

tem

is in

goo

d co

nditi

on

all h

ose

and

hose

val

ve is

in g

ood

cond

ition

- Lea

kage

- Con

ditio

n

- Cor

rosi

on

Rem

ark:

* N

o. 1

7 R

oll a

nd s

uppu

rt w

as c

orro

sion

* N

o. 1

1 H

ose

Sup

ply

Che

cked

by

:S

ubin

, Wac

hira

, Som

kid,

Anu

cha,

Anu

chit

N/A S S S S S S S

SS

SS

SS

SS

S

SS

S S

SS

N/A

Com

pone

nt

SS

SS

S

S S S

S

SU

SS

SS

SS

S

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

SS

SS

S

Noz

zle

S

SS

SS

S

SS

SS

S SS

SS

SS

S

SS

SS

SS

SS

S

S SS

Supp

ort

SS

SS

S

Cab

inet

N/A

N/A

N/A US

SS

US

SS

SS

SS

S

N/A

N/A

N/A

N/A

N/A

N/A

N/A

PU

LPIT

RO

OM

CR

M-O

P/2

8C

RM

-OP

/21

PK

L-E

ER

RO

OM

PK

L-O

P/1

6

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

NO

.14

NO

.15

NO

.16

N/A

N/A

N/A

Insp

ectio

n R

epor

tFI

RE

HO

SE R

EEL

OR

STA

ND

PIPE

AN

D H

OSE

SYS

TEM

Des

crip

tion

Equi

pmen

t No.

REM

AR

KS

NO

.10

NO

.11

NO

.12

NO

.13

NO

.17

NO

.18

MC

L-1

SFI

P-4

MC

L-1

N/3

2M

CL-

1 N

/39

MC

L1-N

/43

OW

NER

:N

S BL

UE

SCO

PE S

TEEL

(TH

AILA

ND

) LTD

.Ar

ea :

NS

blu

e sc

ope

stee

l

Dat

e :2

8 - 3

0 A

pril

2021

Pro

ject

nam

e:P

M. F

ire P

rote

ctio

n S

yste

mSi

te :

Ray

ong

- Cor

rosi

on

- Doo

r

- Key

lock

- Cor

rosi

on

Con

ditio

n

Con

trol v

alve

con

ditio

n

Con

nect

or L

ocke

r

Seal

con

ditio

n

Pipe

sys

tem

is in

goo

d co

nditi

on

all h

ose

and

hose

val

ve is

in g

ood

cond

ition

- Lea

kage

- Con

ditio

n

- Cor

rosi

on

Rem

ark:

* N

O.2

3, 2

4, 2

5 su

ppor

t was

cor

rosi

onN

o.24

h

ose

sup

ply

Che

cked

by

:S

ubin

, Wac

hira

, Som

kid,

Anu

cha,

Anu

chit

S S SN/A S S S S S S S

SS

SS

SS

SS

S

SS

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

SS

SS

S

Noz

zel

S

SS

SS

S

SS

SS

SS

Com

pone

nt

SS

SS

SS

S

SS

SS

SS

SU

SS

S S

S SS

SS

SS

S

SS

SS

SS

SS

S

S

N/A

Supp

ort

SS

SS

US

Cab

inet

N/A

N/A

N/A S

US

US

S

SS

SS

US

US

US

N/A

N/A

N/A

N/A

N/A

N/A

N/A

PK

L-O

P/4

PK

L-A

H/4

CR

M-O

P/2

CR

M-A

H/5

1C

RM

-OP

/65

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

NO

.23

NO

.24

NO

.25

N/A

N/A

N/A

Insp

ectio

n R

epor

tFI

RE

HO

SE R

EEL

OR

STA

ND

PIPE

AN

D H

OSE

SYS

TEM

Des

crip

tion

Equi

pmen

t No.

REM

AR

KS

NO

.19

NO

.20

NO

.21

NO

.22

NO

.26

NO

.27

PA

INT

SE

RV

ISE

S S

TOR

E W

/HO

P/9

PK

L- O

P/7

PK

L-O

P/5

Pag

e 10

3

OW

NER

:N

S BL

UE

SCO

PE S

TEEL

(TH

AILA

ND

) LTD

.Ar

ea :

NS

blu

e sc

ope

stee

l

Dat

e :2

8 - 3

0 A

pril

2021

Pro

ject

nam

e:P

M. F

ire P

rote

ctio

n S

yste

mSi

te :

Ray

ong

- Cor

rosi

on

- Doo

r

- Key

lock

- Cor

rosi

on

Con

ditio

n

Con

trol v

alve

con

ditio

n

Con

nect

or L

ocke

r

Seal

con

ditio

n

Pipe

sys

tem

is in

goo

d co

nditi

on

all h

ose

and

hose

val

ve is

in g

ood

cond

ition

- Lea

kage

- Con

ditio

n

- Cor

rosi

on

Rem

ark:

Che

cked

by

:S

ubin

, Wac

hira

, Som

kid,

Anu

cha,

Anu

chit

S S SN/A S S S S S S S

SS

SS

SS

SS

S

SS

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

SS

SS

S

Noz

zel

S

SS

SS

S

SS

SS

SS

Com

pone

nt

SS

SS

SS

S

SS

SS

SS

SS

S

S S

S SS

SS

SS

S

SS

SS

SS

SS

S

S

N/A

Supp

ort

SS

SS

S

Cab

inet

N/A

N/A

N/A S

SS

S

SS

SS

SS

S

N/A

N/A

N/A

N/A

N/A

N/A

N/A

MC

L 1

MC

L 1

MC

L 1

MC

L 1

MC

L 1

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

NO

.32

NO

.33

NO

.34

N/A

N/A

N/A

Insp

ectio

n R

epor

tFI

RE

HO

SE R

EEL

OR

STA

ND

PIPE

AN

D H

OSE

SYS

TEM

Des

crip

tion

Equi

pmen

t No.

REM

AR

KS

NO

.28

NO

.29

NO

.30

NO

.31

NO

.35

NO

.36

CR

M-O

P/6

4M

CL

1-O

P/6

2M

CL

1-O

P/5

9M

CL

1-O

P/5

7

OW

NER

:N

S BL

UE

SCO

PE S

TEEL

(TH

AILA

ND

) LTD

.Ar

ea :

NS

blu

e sc

ope

stee

l

Dat

e :2

8 - 3

0 A

pril

2021

Pro

ject

nam

e:P

M. F

ire P

rote

ctio

n S

yste

mSi

te :

Ray

ong

- Cor

rosi

on

- Doo

r

- Key

lock

- Cor

rosi

on

Con

ditio

n

Con

trol v

alve

con

ditio

n

Con

nect

or L

ocke

r

Seal

con

ditio

n

Pipe

sys

tem

is in

goo

d co

nditi

on

all h

ose

and

hose

val

ve is

in g

ood

cond

ition

- Lea

kage

- Con

ditio

n

- Cor

rosi

on

Rem

ark:

No.

38

hos

e s

uppl

y

No.

39

hos

e s

uppl

y

Che

cked

by

:S

ubin

, Wac

hira

, Som

kid,

Anu

cha,

Anu

chit

S S SN/A S S S S S S S

SS

SS

SS

SS

S

SN

/A

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

SS

SS

S

Noz

zel

S

SS

SS

S

SS

SS

SS

Com

pone

nt

SS

SS

SS

S

SS

SU

SU

SS

SS

S

S S

N/A S

SS

S

N/A

N/A

N/A

SS

SS

SS

SS

S

N/A

N/A

Supp

ort

SS

SS

S

Cab

inet

SN

/AN

/A S

SS

S

SS

SS

SS

S

N/A

SS

SS

S

N/A

AD

MIN

BLD

GA

DM

IN B

LDG

MC

L-2

ingo

tM

CL-

2 IN

GO

TM

CL-

2 E

AS

T ZO

NE

SS

SS

S

SS

SS

S

SN

/A

NO

.41

NO

.42

NO

.43

SN

/AN

/A

Insp

ectio

n R

epor

tFI

RE

HO

SE R

EEL

OR

STA

ND

PIPE

AN

D H

OSE

SYS

TEM

Des

crip

tion

Equi

pmen

t No.

REM

AR

KS

NO

.37

NO

.38

NO

.39

NO

.40

NO

.44

NO

.45

SU

PP

OR

T B

LDG

SA

FETY

SU

PP

OR

T B

LDG

SA

FETY

Page 28: NS BLUE SCOPE STEEL (THAILAND) LTD

OW

NER

:N

S BL

UE

SCO

PE S

TEEL

(TH

AILA

ND

) LTD

.Ar

ea :

NS

blu

e sc

ope

stee

l

Dat

e :2

8 - 3

0 A

pril

2021

Pro

ject

nam

e:P

M. F

ire P

rote

ctio

n S

yste

mSi

te :

Ray

ong

- Cor

rosi

on

- Doo

r

- Key

lock

- Cor

rosi

on

Con

ditio

n

Con

trol v

alve

con

ditio

n

Con

nect

or L

ocke

r

Seal

con

ditio

n

Pipe

sys

tem

is in

goo

d co

nditi

on

all h

ose

and

hose

val

ve is

in g

ood

cond

ition

- Lea

kage

- Con

ditio

n

- Cor

rosi

on

Rem

ark:

Che

cked

by

:S

ubin

, Wac

hira

, Som

kid,

Anu

cha,

Anu

chit

S S SN/A S S S S S S S

SS

SS

SS

SS

S

SS

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

SS

SS

S

Noz

zle

S

SS

SS

S

SS

SS

SS

Com

pone

nt

SS

SS

SS

S

SS

SS

SS

SS

S

S S

S SS

SS

SS

S

SS

SS

SS

SS

S

S

N/A

Supp

ort

SS

SS

S

Cab

inet

N/A

N/A

N/A S

SS

S

SS

SS

SS

S

N/A

N/A

N/A

N/A

N/A

N/A

N/A

MC

L-2

WE

ST

ZON

EM

CL-

2 W

ES

T ZO

NE

MC

L2-C

EN

TRA

L M

CL2

-CE

NTR

AL

MC

L2-M

AIN

EE

R

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

NO

.50

NO

.51

NO

.52

N/A

N/A

N/A

Insp

ectio

n R

epor

tFI

RE

HO

SE R

EEL

OR

STA

ND

PIPE

AN

D H

OSE

SYS

TEM

Des

crip

tion

Equi

pmen

t No.

REM

AR

KS

NO

.46

NO

.47

NO

.48

NO

.49

NO

.53

NO

.54

MC

L-2

EA

ST

ZON

EM

CL2

-CE

NTR

AL

MC

L2-C

EN

TRA

L M

CL-

2 W

ES

T ZO

NE

OW

NER

:N

S BL

UE

SCO

PE S

TEEL

(TH

AILA

ND

) LTD

.Ar

ea :

NS

blu

e sc

ope

stee

l

Dat

e :2

8 - 3

0 A

pril

2021

Pro

ject

nam

e:P

M. F

ire P

rote

ctio

n S

yste

mSi

te :

Ray

ong

- Cor

rosi

on

- Doo

r

- Key

lock

- Cor

rosi

on

Con

ditio

n

Con

trol v

alve

con

ditio

n

Con

nect

or L

ocke

r

Seal

con

ditio

n

Pipe

sys

tem

is in

goo

d co

nditi

on

all h

ose

and

hose

val

ve is

in g

ood

cond

ition

- Lea

kage

- Con

ditio

n

- Cor

rosi

on

rem

ark:

No.

57

hos

e s

uppl

y

Che

cked

by

:S

ubin

, Wac

hira

, Som

kid,

Anu

cha,

Anu

chit

SS

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

SS

SS

Noz

zel

S

SS

SS

SS

S

SS

SS

SS

S

SS

US

SS

SS

Com

pone

nt

SS

SS

SS

SS

SS

S

SS

SS

SS

S

SS

S

SS

SS

SS

S

SS

Supp

ort

SS

SS

S

Cab

inet

SS

SS

SS

S

N/A

N/A

N/A

N/A

N/A

N/A

N/A

S

MC

L Fl

.4M

CL

Fl.5

CR

M-C

AB

LE C

ELL

A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

S

N/A

N/A

N/A

NO

.59

NO

.60

NO

.61

N/A

S

Insp

ectio

n R

epor

tFI

RE

HO

SE R

EEL

OR

STA

ND

PIPE

AN

D H

OSE

SYS

TEM

Des

crip

tion

Equi

pmen

t No.

REM

AR

KS

NO

.55

NO

.56

NO

.57

NO

.58

MC

L-2

EA

ST

ZON

EM

CL-

2 E

AS

T ZO

NE

CR

M-E

AS

T ZO

NE

MC

L-1

Fl.3

Takachiho Fire, Security & Services (Thailand) Ltd.

1858/110-111 Interlink Tower 25 Fl.,

Debaratna Road, Bangna Tai, Bangna,

Bangkok 10260, Thailand.

Tel : 02-366 -9000 , FAX : 02-366-9090

www.tkfs.co.th

FIRE PUMP

PROJECT NAME : BLUE SCOPE STEEL THAILAND LOCATION : RAYONG ,THAILAND.

MODEL SERIAL No. 21246806RATING SPEED RPM.PUMP BRAND MODEL MEGA-2000 SERIAL N FLOW RATE SUCTION DIA. 6" DISCHARGE DIA. 6"DESIGN PRESSURE 120 SPEED RPM.

POWER CONTROL MODEL SERIAL No. 325-102007ELECTRICAL SYSTEM 220 VOLTS. GROUND

ENGINE PUMPITEM DESCRIPTION ITEM DESCRIPTION

1 64 0C 1 VISUAL CHECKED Normal

2 Normal 2 39/41 0C

3 Normal 3 DISCHARGE PRESSURE 125

4 OIL PRESSURE 70 psi 4 SUCTION PRESSURE 0 Psi

5 27.3,27.3 5 NOISE Normal

6 1.5,0.5 6 COUPLING Normal

7 SPEED RUNNING 2740 7 CHECKED FOR WATER LEAKE # Normal

8 HOUR RUNNING test 1686.3 1686.7 8 CHECKED PIPE & CONNECTOR Normal

9 FUEL LEVEL 4 / 4 OR 100% 100% 9 CHECKED PACKING SEAL # Normal

10 BATTERY ELECTROLYTE Normal 10 CHECKED FOR LUBRICATE Normal

11 CHECKED FOR WATER LEAK Normal 11 CHECKED FOR CORROSION Normal

12 CHECKED FOR FUEL LEAK Normal 12 CLEANED Normal

13 CHECKED FOR OIL LEAK Normal

14 CLEANED Normal

CONTROL PANEL CONTROL PANEL(CONTINUE)ITEM DESCRIPTION ITEM DESCRIPTION

1 Normal 5 VOLTS. (CHARGER) BATT.1 / BATT.2 28.0,28.02 Normal 6 AMP.(CHARGER) BATT.1 / BATT.2 1.5/0.53 Normal 7 Normal4 BATTERY CHARGER Normal 8 START AT PRESSURE 90 Psi

RECOMMENDATION Check condition of pump and cleaningFunction test pump manual / auto running time in 30 mins.

The function system working properly* spare part (5/5/64)* Packing gland Engine pump

* Support control pump no. 1

Subin, Wachira, Somkid, Anucha, Anuchit

Takachiho Fire, Security & Services (Thailand) Limited

AMP.(CHARGING ALTERNATOR)

CLEANEDLAMP TESTEDCHECKED POWER SUPPLY

WATER LEVEL BEARING TEMPERATURE

OIL LEVEL

VOLTS. (CHARGING ALTERNATOR)

CHECKED FOR CORROSION

CONTROL PANEL BRAND PC 1000NEG

MONTHLY PREVENTATIVE MAINTENANCE

WATER TEMPERATURE

- 2900KSB AJAX PUMP

750 GPM

MAINTENANCE & INSPECTION CHECKLISTENGINE FIRE PUMP SYSTEM NO.1

ENGINE BRAND CUMMINS 4BT39

Page 29: NS BLUE SCOPE STEEL (THAILAND) LTD

PROJECT NAME : BLUE SCOPE STEEL THAILAND LOCATION : RAYONG ,THAILAND.

MODEL SERIAL No. 8061SR1400DRATING SPEED RPM.PUMP BRAND MODEL CPR 150-300 TAN SERIAL No. 264183-05FLOW RATE SUCTION DIA. 8" DISCHARGE DIA. 8"DESIGN PRESSURE 120 SPEED RPM.

APGO TECH MODEL SERIAL No.ELECTRICAL SYSTEM 230 VOLTS. GROUND

ENGINE PUMPITEM DESCRIPTION ITEM DESCRIPTION

1 82 0C 1 VISUAL CHECKED Normal

2 Normal 2 53/49 0C

3 Normal 3 DISCHARGE PRESSURE 120 Psi

4 OIL PRESSURE 4.8 bar 4 SUCTION PRESSURE N/A

5 13.9,13.9 5 NOISE Normal

6 0,0.1 6 COUPLING Normal

7 SPEED RUNNING 2860 7 CHECKED FOR WATER LEAKE # Normal

8 HOUR RUNNING test 84.1 84.6 8 CHECKED PIPE & CONNECTOR Normal

9 FUEL LEVEL 3 / 4 OR 90% 90% 9 CHECKED PACKING SEAL # Normal

10 BATTERY ELECTROLYTE Normal 10 CHECKED FOR LUBRICATE Normal

11 CHECKED FOR WATER LEAK Normal 11 CHECKED FOR CORROSION Normal

12 CHECKED FOR FUEL LEAK Normal 12 CLEANED Normal

13 CHECKED FOR OIL LEAK Normal 13

14 CLEANED Normal 14

CONTROL PANEL CONTROL PANEL(CONTINUE)ITEM DESCRIPTION ITEM DESCRIPTION

1 Normal 5 VOLTS. (CHARGER) BATT.1 / BATT.2 14.0,14.02 Normal 6 AMP.(CHARGER) BATT.1 / BATT.2 0,0.13 Normal 7 Normal4 BATTERY CHARGER Normal 8 START AT PRESSURE 75 Psi

RECOMMENDATION * Test auto running engine fire pump in 30 minutes* spare part (5/5/64)

Subin, Wachira, Somkid, Anucha, Anuchit

Takachiho Fire, Security & Services (Thailand) Limited

MAINTENANCE & INSPECTION CHECKLISTENGINE FIRE PUMP SYSTEM NO.2

ENGINE BRAND IVECO 966819- -

IDEAL1500 GPM

-CONTROL PANEL BRAND AGT - 03FO

NEG

CHECKED FOR CORROSION

MONTHLY PREVENTATIVE MAINTENANCE

WATER TEMPERATURE

WATER LEVEL BEARING TEMPERATURE

OIL LEVEL

VOLTS. (CHARGING ALTERNATOR)

AMP.(CHARGING ALTERNATOR)

CLEANEDLAMP TESTEDCHECKED POWER SUPPLY

PROJECT NAME : BLUE SCOPE STEEL THAILAND LOCATION : RAYONG ,THAILAND.

MODEL SERIAL No. C50132-1TRATING SPEED RPM.ELECTRICAL SYSTEM 380 VAC VOLTS. 50 Hz. 150 AMP.PUMP BRAND MODEL B42670012P19820 SERIAL No. 9603128FLOW RATE HAED SUCTION DIA. 6" DISCHARGE DIA. 6"DESIGN PRESSURE SPEED RPM.

POWER CONTROL MODEL SERIAL No. 085-102007ELECTRICAL SYSTEM 380 VAC VOLTS. GROUND

MOTOR PUMPITEM DESCRIPTION ITEM DESCRIPTION

1 VISUAL CHECKED Normal 1 VISUAL CHECKED Normal

2 38/39 0C 2 32/32 0C

3 VOLTS 380,399,389 3 DISCHARGE PRESSURE 110 Psi

4 AMP. 178,173,170 4 SUCTION PRESSURE 0 Psi

5 SPEED RUNNING (RPM.) 2980 RPM 5 NOISE Normal

6 MOTOR VENTILATION Normal 6 CLOUPLING Normal

7 LUBRICATING Normal 7 CHECKED FOR WATER LEAK Normal

8 CORROSION Normal 8 CHECKED PIPE & CONNECTOR Normal

9 NOISE Normal 9 CHECKED PACKING SEAL Normal

10 ANTIVIBRATION MOUNTING Normal 10 CHECKED FOR LUBRICATE Normal

11 CLEANED Normal 11 CHECKED FOR CORROSION Normal

12 12 CLEANED Normal

CONTROL PANEL CONTROL PANEL (CONTINUE)ITEM DESCRIPTION ITEM DESCRIPTION

1 Normal 5 Normal2 Normal 6 Normal3 Normal 7 Normal4 CHECKED SIGNAL LAMP Normal 8 START AT PRESSURE 100 Psi

RECOMMENDATION Test auto run electric pump 10 MinCleaned to motor pump and check magnatic terminal* Packing gland Electric motor

Subin, Wachira, Somkid, Anucha, Anuchit

Takachiho Fire, Security & Services (Thailand) Limited

VISUAL CHECK CONTROL SIGNAL TESTEDCLEANED MAGNATIC CONTACTORCHECKED POWER SUPPLY CHECKED FOR CORROSION

NEG

MONTHLY PREVENTATIVE MAINTENANCE

BEARING TEMPERATURE BEARING TEMPERATURE

2955

KSB PUMP

CONTROL PANEL BRAND FC 3000

MAINTENANCE & INSPECTION CHECKLISTELECTRIC MOTOR FIRE PUMP SYSTEM

MOTOR BRAND TECO ELECT & MACH EEB-UC002

PROJECT NAME : BLUE SCOPE STEEL THAILAND LOCATION : RAYONG ,THAILAND.

MODEL SERIAL No. 85815313RATING SPEED RPM.ELECTRICAL SYSTEM 380-415 VOLTS. 50 Hz. 8 AMP.PUMP BRAND MODEL B42670012 P19820 SERIAL No. 9603217FLOW RATE 9.5 M3/H SUCTION DIA. 1 1/2" DISCHARGE DIA. 1 1/2"DESIGN PRESSURE 99.9 M SPEED RPM.

POWER CONTROL MMODEL SERIAL No. 058-102008ELECTRICAL SYSTEM 380-415 VOLTS. GROUND

MOTOR PUMPITEM DESCRIPTION ITEM DESCRIPTION

1 VISUAL CHECKED Normal 1 VISUAL CHECKED Normal

2 32/30 0C 2 34 0C

3 VOLTS 395,399,395 3 DISCHARGE PRESSURE 125

4 AMP 7.8,7.5,7.5 4 SUCTION PRESSURE N/A

5 SPEED RUNNING (RPM.) 2640 5 NOISE Normal

6 MOTOR VENTILATION Normal 6 CLOUPLING Normal

7 LUBRICATING Normal 7 CHECKED FOR WATER LEAK Normal

8 CORROSION Normal 8 CHECKED PIPE & CONNECTOR Normal

9 NOISE Normal 9 CHECKED PACKING SEAL Normal

10 ANTIVIBRATION MOUNTING Normal 10 CHECKED FOR LUBRICATE Normal

11 CLEANED Normal 11 CHECKED FOR CORROSION Normal

12 12 CLEANED Normal

CONTROL PANEL CONTROL PANEL (CONTINUE)ITEM DESCRIPTION ITEM DESCRIPTION

1 Normal 5 Normal2 Normal 6 Normal3 Normal 7 Normal4 CHECKED SIGNAL LAMP Normal 8 START AT PRESSURE 115 Psi

CUT OFF 175 Psi

RECOMMENDATION Cleaned to motor pump and check magnatic terminalFunction tes pump Auto/Manual normal* Flexible ( Suction) 2" deteriorated* Pipe (Discharge) 2" getting corrosion* Cover Jockey pump

Subin, Wachira, Somkid, Anucha, Anuchit

Takachiho Fire, Security & Services (Thailand) Limited

GRUNFOS

2900

BEARING TEMPERATURE BEARING TEMPERATURE

CONTROL PANEL BRAND FC 3000

5.5 HP 2900

MAINTENANCE & INSPECTION CHECKLISTELECTRIC MOTOR JOCKEY PUMP SYSTEM

MOTOR BRAND GRUNFOS TMG.112MB2-MB2-28FT130 C'

CHECKED POWER SUPPLY

VISUAL CHECK CONTROL SIGNAL TESTED

NEG

CLEANEDCHECKED FOR CORROSIONMAGNATIC CONTACTOR

Takachiho Fire, Security & Services (Thailand) Ltd.

1858/110-111 Interlink Tower 25 Fl.,

Debaratna Road, Bangna Tai, Bangna,

Bangkok 10260, Thailand.

Tel : 02-366 -9000 , FAX : 02-366-9090

www.tkfs.co.th

PORTABLE FIRE EXTINGUISHERS SYSTEM

Page 30: NS BLUE SCOPE STEEL (THAILAND) LTD

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, Ba

ngna

,Ba

ngko

k 10

260,

Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

Dry

Che

mic

al P

orta

ble

Fire

Ext

ingu

ishe

r

28 -

30 A

pril

2021

Loca

tion

Bui

ldin

g A

rea

11

Topa

zW

ARE

HO

USE

OP.

11S

SS

N/A

S19

5 PS

I22

/2/2

559

22

Impa

ctW

OR

K SH

OP

OP.

12S

SS

N/A

S19

5 PS

I9/

5/25

54

33

Impa

ctW

OR

K SH

OP

OP.

08S

SS

N/A

S19

5 PS

I31

/4/2

554

44

Impa

ctN

EW

STO

RE

CH

EMIC

ALS

SS

N/A

S19

5 PS

I6/

12/2

550

55

Impa

ctC

HEM

ICAL

STO

RE

SS

SN

/AS

195

PSI

5/5/

1953

66

Dab

fire

WW

TP. 2

8S

SS

N/A

S19

5 PS

I4/

9/25

52

77

Impa

ctW

WTP

.TAN

KS

SS

N/A

S19

5 PS

I7/

1/25

54

88

Dab

fire

WW

TP.O

FFIC

(IN)

SS

SN

/AS

195

PSI

8/6/

2550

99

Impa

ctW

WTP

.OFF

IC(O

UT)

SS

SN

/AS

195

PSI

9/5/

2550

1010

Dab

fire

WW

TP.T

HAK

09

SS

SN

/AS

195

PSI

9/5/

2550

1111

Impa

ctAC

M (O

UT

SID

E)S

SS

N/A

S19

5 PS

I29

/11/

47

1212

Dab

fire

PKL

09S

SS

N/A

S19

5 PS

I13

/6/2

558

1313

Impa

ctPK

L. E

NTR

Y PU

LPIT

SS

SN

/AS

195

PSI

8/2/

2551

1414

Impa

ctPK

L .O

P/05

SS

SN

/AS

195

PSI

8/1/

2551

1515

Impa

ctPK

L.AC

ID T

ANK

FAR

M A

12S

SS

N/A

S19

5 PS

I31

/8/2

557

S =

Satis

fact

ory

US

= U

nsat

isfa

ctor

y N

/A =

Not

App

licab

le

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

fill c

apha

ndle

,she

llG

as c

artr

idge

Dat

e of

M

anuf

actu

re

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Pres

sure

read

ing

dry

pow

der

Rem

ark

Insp

ectio

n D

ate

:In

spec

tor :

Item

Ext.N

o.Ty

peB

rand

Hos

e ,N

ozzl

e

Subi

n, W

achi

ra, S

omki

d, A

nuch

a, A

nuch

it

Clie

nt :

INSP

EC

TIO

N P

OR

TA

BL

E F

IRE

EX

TIN

GU

ISH

ER

S

NS

BLU

E SC

OPE

STE

EL T

HAI

LAN

D

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, Ba

ngna

,Ba

ngko

k 10

260,

Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

Dry

Che

mic

al P

orta

ble

Fire

Ext

ingu

ishe

r

28 -

30 A

pril

2021

Loca

tion

Bui

ldin

g A

rea

1616

Impa

ctPK

L.06

/OP/

O4

SS

SN

/AS

195

PSI

6/12

/255

1717

Dab

fire

PKL.

04/E

ER R

OO

MS

SS

N/A

S19

5 PS

I2/

8/25

51

1818

Aler

tPK

L.EX

IT D

OO

RS

SS

N/A

S19

5 PS

I-

1919

Impa

ctPK

L.05

/OP.

03S

SS

SS

195

PSI

8/11

2020

Impa

ctC

RM

.OP/

01S

SS

N/A

S19

5 PS

I24

/4/2

563

2121

Dab

fire

CR

M.R

SO2

OP

66

SS

SN

/AS

195

PSI

10/4

/201

2

2222

Impa

ctC

RM

.15

SS

SN

/AS

195

PSI

31/8

/201

4

2323

Dab

fire

CEL

A.U

ND

ER G

RO

UN

DS

SS

N/A

S19

5 PS

I8/

5/25

54

2424

Impa

ctC

ELA.

UN

DER

GR

OU

ND

SS

SN

/AS

195

PSI

8/5/

2554

2525

Satv

rnC

ELA.

UN

DER

GR

OU

ND

SS

SN

/AS

195

PSI

-

2626

anti

fire

CEL

A.U

ND

ER G

RO

UN

DS

SS

N/A

S19

5 PS

I8/

5/25

54

2727

Dab

fire

CR

M.1

4S

SS

N/A

S19

5 PS

I6/

12/2

555

2828

Dab

fire

CR

M.O

P/20

SS

SN

/AS

195

PSI

3/9/

2547

Rep

lace

cyl

inde

r

2929

Impa

ctC

RM

.MIL

INLO

SS

SS

N/A

S19

5 PS

I-

3030

Impa

ctC

RM

.OP/

21S

SS

N/A

S13

.5 K

g.-

S =

Satis

fact

ory

US

= U

nsat

isfa

ctor

y N

/A =

Not

App

licab

le

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dat

e of

M

anuf

actu

re

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Hos

e ,N

ozzl

e dr

y po

wde

rPr

essu

rere

adin

g

Dry

che

mic

al

fill c

apha

ndle

,she

llG

as c

artr

idge

Dry

che

mic

al

Co2

Clie

nt :

INSP

EC

TIO

N P

OR

TA

BL

E F

IRE

EX

TIN

GU

ISH

ER

S

NS

BLU

E SC

OPE

STE

EL T

HAI

LAN

D

Rem

ark

Insp

ectio

n D

ate

:In

spec

tor :

Item

Ext.N

o.Ty

peB

rand

Subi

n, W

achi

ra, S

omki

d, A

nuch

a, A

nuch

it

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, Ba

ngna

,Ba

ngko

k 10

260,

Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

Dry

Che

mic

al P

orta

ble

Fire

Ext

ingu

ishe

r

28 -

30 A

pril

2021

Loca

tion

Bui

ldin

g A

rea

3131

Dab

fire

CR

M.O

P/26

SS

SN

/AS

195

PSI

-

3232

Impa

ctC

RM

.OP/

29S

SS

N/A

S19

5 PS

I11

/11/

2551

3333

Dab

fire

CR

M.1

3 D

ELIV

ERY

SS

SN

/AS

195

PSI

31/8

/54

3434

Dab

fire

CR

M.O

FFIC

EXI

TS

SS

N/A

S19

5 PS

I4/

12/1

955

3535

Dab

fire

CR

M. 0

4 V.

48S

SS

N/A

S19

5 PS

I2/

8/25

51

3636

Impa

ctC

RM

.OP/

64S

SS

N/A

S19

5 PS

I8/

11

3737

Dab

fire

CR

M.O

P/63

SS

SN

/AS

195

PSI

31/0

8/25

54

3838

Dab

fire

OPE

RAT

ION

BLD

G.

SS

SN

/AS

195

PSI

31/8

/255

4

3939

Dab

fire

OPE

RAT

ION

BLD

G.

SS

SN

/AS

195

PSI

-

4040

Dab

fire

OPE

RAT

ION

BLD

G.

SS

SN

/AS

195

PSI

10/4

/195

2

4141

Dab

fire

OPE

RAT

ION

BLD

G.

SS

SN

/AS

195

PSI

10/4

/255

2

4242

Impa

ctC

ANTE

ENS

SS

N/A

S19

5 PS

I10

/4/2

552

4343

Hat

ron

SUPP

OR

T.TO

ILET

SS

SN

/AS

195

PSI

31/0

8/25

54

4444

Anti

fire

SUPP

OR

T.FI

RST

AID

SS

SN

/AS

195

PSI

-

4545

Topa

zSU

PPO

RT.

(CAN

TEEN

)S

SS

N/A

S19

5 PS

I-

S =

Satis

fact

ory

US

= U

nsat

isfa

ctor

y N

/A =

Not

App

licab

le

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

fill c

apha

ndle

,she

llG

as

cart

ridge

Dat

e of

M

anuf

actu

re

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Rem

ark

Insp

ectio

n D

ate

:In

spec

tor :

Item

Ext.N

o.Ty

peB

rand

Hos

e ,N

ozzl

e dr

y po

wde

rPr

essu

rer

eadi

ng

Subi

n, W

achi

ra, S

omki

d, A

nuch

a, A

nuch

it

Clie

nt :

INSP

EC

TIO

N P

OR

TA

BL

E F

IRE

EX

TIN

GU

ISH

ER

S

NS

BLU

E SC

OPE

STE

EL T

HAI

LAN

D

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, Ba

ngna

,Ba

ngko

k 10

260,

Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

Dry

Che

mic

al P

orta

ble

Fire

Ext

ingu

ishe

r

28 -

30 A

pril

2021

Loca

tion

Bui

ldin

g A

rea

4646

Impa

ctO

PER

RAT

ION

SS

SN

/AS

195

PSI

-

4747

Impa

ctSU

PPO

RT.

EXIT

SS

SN

/AS

195

PSI

31/8

/255

7

4848

fire

kille

rO

FFIC

SAF

ETY

SS

SN

/AS

195

PSI

30/8

/255

4

4949

fire

kille

rLO

CKE

R.R

OO

MS

SS

N/A

S19

5 PS

I3/

8/25

54

5050

Dab

fire

LOC

KER

.RO

OM

SS

SN

/AS

195

PSI

6/8/

2541

5151

Nip

onM

EETI

NG

.RO

OM

safe

tyS

SS

N/A

S19

5 PS

I-

5252

Impa

ctAD

MIN

MEE

TIN

GS

SS

N/A

S19

5 PS

I9/

5/25

54

5353

Sunc

oAD

MIN

.BLD

G. (

oper

ator

)S

SS

N/A

S19

5 PS

I9/

5/25

54

5454

Nip

onAD

MIN

.BLD

G. (

oper

ator

SS

SN

/AS

195

PSI

9/5/

2554

5555

Impa

ctA

DM

IN.B

LDG

. FIN

AN

CE

exi

tS

SS

N/A

S19

5 PS

I5/

9/25

54

5656

Nip

onAD

MIN

.CAN

TEEN

SS

SN

/AS

195

PSI

5/9/

2554

5757

Impa

ctAD

MIN

.EXI

T D

OO

RS

SS

N/A

S19

5 PS

I5/

9/25

54

5858

Nip

onAD

MIN

.EXI

T O

UTD

OO

RS

SS

N/A

S19

5 PS

I5/

9/25

54

5959

Topa

zAD

MIN

.BLD

G.

SS

SN

/AS

195

PSI

7/25

61

6060

Impa

ctAD

MIN

.BLD

G. E

XIT.

HR

SS

SN

/AS

195

PSI

31/8

/255

4S

= Sa

tisfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

fill c

apha

ndle

,she

llG

as c

artr

idge

Dat

e of

M

anuf

actu

re

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Rem

ark

Insp

ectio

n D

ate

:In

spec

tor :

Item

Ext.N

o.Ty

peB

rand

Hos

e ,N

ozzl

e dr

y po

wde

rPr

essu

rer

eadi

ng

Subi

n, W

achi

ra, S

omki

d, A

nuch

a, A

nuch

it

Clie

nt :

INSP

EC

TIO

N P

OR

TA

BL

E F

IRE

EX

TIN

GU

ISH

ER

S

NS

BLU

E SC

OPE

STE

EL T

HAI

LAN

D

Page 31: NS BLUE SCOPE STEEL (THAILAND) LTD

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, Ba

ngna

,Ba

ngko

k 10

260,

Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

Dry

Che

mic

al P

orta

ble

Fire

Ext

ingu

ishe

r

28 -

30 A

pril

2021

Loca

tion

Bui

ldin

g A

rea

6161

Impa

ctSa

fety

Mee

ting

room

SS

SN

/AS

195

PSI

31/8

/54

6262

Impa

ctO

P-61

SS

SN

/AS

195

PSI

31/8

/54

6363

Dab

fire

OP-

60S

SS

N/A

S19

5 PS

I10

/2/2

550

6464

Dab

fire

MC

L-1

OP/

57S

SS

N/A

S19

5 PS

I3/

8/25

54

6565

Dab

fire

MC

L-1

crm

-13

SS

SN

/AS

195

PSI

6/8/

2541

6666

Nip

onM

CL-

1 K-

46S

SS

N/A

S19

5 PS

I9/

2/25

50

6767

Impa

ctM

CL-

1 O

P/53

SS

SN

/AS

195

PSI

17/7

/201

9

6868

Impa

ctM

CL-

1 O

P/54

SS

SN

/AS

195

PSI

11/8

/255

0

6969

Impa

ctM

CL-

1 O

P/54

SS

SN

/AS

195

PSI

17/7

/201

9

7070

Tyco

MC

L-1

WR

OKE

SH

OP

OP

53S

SS

N/A

S19

5 PS

I9/

4/25

52

7171

Tyco

MC

L-1

CO

NTR

OL

RO

OM

SS

SN

/AS

195

PSI

21/5

/255

2

7272

Dab

fire

MC

L-1

K-33

SS

SN

/AS

196

PSI

31/0

8/25

54

7373

Dab

fire

MC

L-1

OP/

49S

SS

N/A

S19

5 PS

I31

/08/

2554

7474

Dab

fire

MC

L-1

GEN

RO

OM

SS

SN

/AS

195

PSI

31/0

8/25

54

7575

Impa

ctM

CL-

1 SE

RVE

R R

OO

MS

SS

N/A

S19

5 PS

I31

/08/

2554

S =

Satis

fact

ory

US

= U

nsat

isfa

ctor

y N

/A =

Not

App

licab

le

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

fill c

apha

ndle

,she

llG

as c

artr

idge

Dat

e of

M

anuf

actu

re

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Rem

ark

Insp

ectio

n D

ate

:In

spec

tor :

Item

Ext.N

o.Ty

peB

rand

Hos

e ,N

ozzl

e dr

y po

wde

rPr

essu

rer

eadi

ng

Subi

n, W

achi

ra, S

omki

d, A

nuch

a, A

nuch

it

Clie

nt :

INSP

EC

TIO

N P

OR

TA

BL

E F

IRE

EX

TIN

GU

ISH

ER

S

NS

BLU

E SC

OPE

STE

EL T

HAI

LAN

D

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, Ba

ngna

,Ba

ngko

k 10

260,

Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

Dry

Che

mic

al P

orta

ble

Fire

Ext

ingu

ishe

r

28 -

30 A

pril

2021

Loca

tion

Bui

ldin

g A

rea

7676

Nip

onM

CL-

1 O

P/48

LAB

RO

OM

SS

SN

/AS

195

PSI

-

7777

Dab

fire

MC

L-1

CPL

-29

LAB

RO

OM

SS

SN

/AS

195

PSI

31/8

/255

4

7878

Con

voy

CPL

- K2/

25S

SS

N/A

S19

5 PS

I21

/03/

52

7979

Dab

fire

CPL

- OP/

MC

L 46

SS

SN

/AS

195

PSI

10/4

/255

2

8080

Impa

ctC

PL-1

LIN

E PA

CKI

NG

K2-

02S

SS

N/A

S19

5 PS

I9/

4/25

52

8181

Dab

fire

CPL

-1 L

INE

PAC

KIN

G K

2-13

SS

SN

/AS

195

PSI

10/4

/255

2

8282

Dab

fire

CPL

-1 L

INE

PAC

KIN

G K

2-08

SS

SN

/AS

195

PSI

31/8

/255

4

8383

Dab

fire

CPL

-1 O

P/44

SS

SN

/AS

195

PSI

-

8484

Impa

ctC

PL-1

CPL

OVC

N U

PPER

SS

SN

/AS

195

PSI

31/8

/255

4

8585

Dab

fire

CPL

-1 O

P/43

SS

SN

/AS

195

PSI

31/8

/255

4

8686

Dab

fire

CPL

-1 C

PL/0

4S

SS

N/A

S19

5 PS

I24

/01/

49

8787

Impa

ctC

PL-1

LIN

E PA

CKI

NG

SS

SN

/AS

195

PSI

31/8

/255

4

8888

Dab

fire

CPL

-1 L

INE

PAC

KIN

GS

SS

N/A

S19

5 PS

I27

/12/

2559

8989

Dab

fire

CPL

-1 L

INEP

ACKI

NG

SS

SN

/AS

195

PSI

31/8

/255

4

9090

Dab

fire

MC

L-1

SS

SN

/AS

195

PSI

24/4

/256

3S

= Sa

tisfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

fill c

apha

ndle

,she

llG

as c

artr

idge

Dat

e of

M

anuf

actu

re

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Rem

ark

Insp

ectio

n D

ate

:In

spec

tor :

Item

Ext.N

o.Ty

peB

rand

Hos

e ,N

ozzl

e dr

y po

wde

rPr

essu

rer

eadi

ng

Subi

n, W

achi

ra, S

omki

d, A

nuch

a, A

nuch

it

Clie

nt :

INSP

EC

TIO

N P

OR

TA

BL

E F

IRE

EX

TIN

GU

ISH

ER

S

NS

BLU

E SC

OPE

STE

EL T

HAI

LAN

D

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, Ba

ngna

,Ba

ngko

k 10

260,

Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

Dry

Che

mic

al P

orta

ble

Fire

Ext

ingu

ishe

r

28 -

30 A

pril

2021

Loca

tion

Bui

ldin

g A

rea

9191

Impa

ctM

CL-

1 ZA

LS

SS

N/A

S19

5 PS

I31

/8/2

554

9292

Impa

ctM

CL-

1 ZA

L N

-38

SS

SN

/AS

195

PSI

31/8

/255

4

9393

Impa

ctM

CL-

1 ZA

LS

SS

N/A

S19

5 PS

I2/

1/25

50

9494

Impa

ctM

CL-

1 N

-45

SS

SN

/AS

195

PSI

17/0

5/51

9595

Impa

ctM

CL-

1 C

ON

TRO

L R

OO

M e

ntry

SS

SN

/AN

/A13

.2 K

g.4/

9/25

52

9696

Dab

fire

MC

L-1

CO

NTR

OL

RO

OM

ent

ryS

SS

N/A

S19

5 PS

I2/

9/25

50

9797

Nip

onM

CL

1 PP

C R

EQU

IRED

SS

SN

/AS

195

PSI

-

9898

Dab

fire

MC

L 1

POR

T F#

1R

SS

SN

/AS

195

PSI

16/0

8/50

9999

Impa

ctM

CL

1 PO

RT

F# 1

RS

SS

N/A

S19

5 PS

I24

/01/

52

100

100

Nip

onM

CL

1 PO

RT

F# 2

RS

SS

N/A

S19

5 PS

I-

101

101

Nip

onM

CL

1 PO

RT

F# 3

RS

SS

N/A

S19

5 PS

I-

102

102

Dab

fire

MC

L 1

ACC

OM

MU

LATO

R F

#3S

SS

N/A

S19

5 PS

I-

103

103

Impe

rial

MC

L 1

POR

T F#

4R

SS

SN

/AS

195

PSI

-

104

104

Nip

onM

CL

1 PO

RT

F# 5

RS

SS

N/A

S19

5 PS

I-

105

105

alae

rtM

CL

1 PO

RT

F# 6

RS

SS

N/A

S19

5 PS

I31

/8/2

554

S =

Satis

fact

ory

US

= U

nsat

isfa

ctor

y N

/A =

Not

App

licab

le

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

fill c

apha

ndle

,she

llG

as c

artr

idge

Dat

e of

M

anuf

actu

re

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Co2

Rem

ark

Insp

ectio

n D

ate

:In

spec

tor :

Item

Ext.N

o.Ty

peB

rand

Hos

e ,N

ozzl

e dr

y po

wde

rPr

essu

rere

adin

g

Subi

n, W

achi

ra, S

omki

d, A

nuch

a, A

nuch

it

Clie

nt :

INSP

EC

TIO

N P

OR

TA

BL

E F

IRE

EX

TIN

GU

ISH

ER

S

NS

BLU

E SC

OPE

STE

EL T

HAI

LAN

D

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, Ba

ngna

,Ba

ngko

k 10

260,

Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

Dry

Che

mic

al P

orta

ble

Fire

Ext

ingu

ishe

r

28 -

30 A

pril

2021

Loca

tion

Bui

ldin

g A

rea

106

106

-M

CL

1 C

OAT

ER F

#1S

SS

N/A

N/A

13.1

0 Kg

.Au

g-11

107

107

Tyco

MC

L 1

CO

ATER

F#1

SS

SN

/AS

195

PSI

29/0

5/25

52

108

108

Impa

ctM

CL

1 C

OAT

ER F

#1 M

1S

SS

N/A

S19

5 PS

I19

/11/

41

109

109

Tyco

MC

L 1

CO

ATER

F#2

M1

SS

SN

/AS

195

PSI

9/4/

2554

110

110

Tyco

MC

L 1

CO

ATER

F#2

SS

SN

/AS

195

PSI

20/0

3/52

111

111

Tyco

MC

L 1

CO

ATER

F#3

SS

SN

/AS

195

PSI

29/0

5/25

52

112

112

Satu

rnM

CL

1 C

OAT

ER F

#3 M

1S

SS

N/A

S19

5 PS

I-

113

113

s/s

safe

tyM

CL

1 C

OAT

ER F

#4 M

1S

SS

N/A

S19

5 PS

I-

114

114

Nip

onM

CL

1 C

OAT

ER F

#4S

SS

N/A

S19

5 PS

I-

115

115

Impa

ctM

CL

1 C

OAT

ER F

#5S

SS

N/A

S19

5 PS

I31

/08/

2554

116

116

tope

zM

CL

1 C

OAT

ER F

#6 M

1S

SS

N/A

S19

5 PS

I8/

10/2

552

117

117

Nip

onC

PL 1

OVE

N (

UPP

ER)

SS

SN

/AS

195

PSI

4/10

/255

2

118

118

Nip

onC

PL 1

CO

ATER

2S

SS

N/A

S19

5 PS

I5/

10/2

552

119

119

Dab

fire

CPL

1 O

VEN

(CPL

)S

SS

N/A

S19

5 PS

I-

120

120

Impa

ctC

PL 1

CO

ATO

R 1

(CPL

)S

SS

N/A

S19

5 PS

I-

S =

Satis

fact

ory

US

= U

nsat

isfa

ctor

y N

/A =

Not

App

licab

le

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

fill c

apha

ndle

,she

llG

as c

artr

idge

Dat

e of

M

anuf

actu

re

Co2

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Rem

ark

Insp

ectio

n D

ate

:In

spec

tor :

Item

Ext.N

o.Ty

peB

rand

Hos

e ,N

ozzl

e dr

y po

wde

rPr

essu

rere

adin

g

Subi

n, W

achi

ra, S

omki

d, A

nuch

a, A

nuch

it

Clie

nt :

INSP

EC

TIO

N P

OR

TA

BL

E F

IRE

EX

TIN

GU

ISH

ER

S

NS

BLU

E SC

OPE

STE

EL T

HAI

LAN

D

Page 32: NS BLUE SCOPE STEEL (THAILAND) LTD

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, Ba

ngna

,Ba

ngko

k 10

260,

Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

Dry

Che

mic

al P

orta

ble

Fire

Ext

ingu

ishe

r

28 -

30 A

pril

2021

Loca

tion

Bui

ldin

g A

rea

121

121

Dab

fire

PAIN

T ST

OR

E C

HEM

ICAL

SS

SN

/AS

195

PSI

Aug-

11

122

122

Dab

fire

MC

L-2

MEE

TIN

G R

OO

MS

SS

N/A

S19

5 PS

I17

/7/2

019

Rep

lace

cyl

inde

r

123

123

Dab

fire

MC

L-2

SS

SN

/AS

195

PSI

5/3/

2561

124

124

Impe

rine

MC

L-2

P/32

SS

SN

/AS

195

PSI

3/8/

2554

125

125

Impa

ctM

CL-

2 P/

32S

SS

N/A

S13

.2 K

g17

/6/6

2

126

126

Nip

onM

CL-

2 S

SS

N/A

S19

5 PS

I10

/4/2

552

127

127

Impa

ctM

CL-

2 EX

IT P

ULP

ITS

SS

N/A

S19

5 PS

IAu

g-11

128

128

Impa

ctM

CL-

2 LI

NE

PAKI

NG

SS

SN

/AS

195

PSI

3/8/

2554

129

129

Impa

ctM

CL-

2 LI

NE

PAKI

NG

SS

SN

/AS

195

PSI

3/8/

2554

130

130

Impa

ctM

CL-

2 LI

NE

PAKI

NG

SS

SN

/AS

195

PSI

-

131

131

Nip

onM

CL-

2 LI

NE

PAKI

NG

SS

SN

/AS

195

PSI

9/2/

2550

132

132

Impa

ctM

CL-

2 LI

NE

PAKI

NG

SS

SN

/AS

195

PSI

-

133

133

Impa

ctM

CL-

2 O

P/86

SS

SN

/AS

195

PSI

3/8/

2554

134

134

Satv

reM

CL-

2 T1

/23

SS

SN

/AS

195

PSI

3/8/

2554

135

135

Impa

ctPC

L-Fi

re P

ump

Roo

mS

SS

N/A

S19

5 PS

I7/

2561

S =

Satis

fact

ory

US

= U

nsat

isfa

ctor

y N

/A =

Not

App

licab

le

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

fill c

apha

ndle

,she

llG

as c

artr

idge

Dat

e of

M

anuf

actu

re

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

CO

2

Rem

ark

Insp

ectio

n D

ate

:In

spec

tor :

Item

Ext.N

o.Ty

peB

rand

Hos

e ,N

ozzl

e dr

y po

wde

rPr

essu

rere

adin

g

Subi

n, W

achi

ra, S

omki

d, A

nuch

a, A

nuch

it

Clie

nt :

INSP

EC

TIO

N P

OR

TA

BL

E F

IRE

EX

TIN

GU

ISH

ER

S

NS

BLU

E SC

OPE

STE

EL T

HAI

LAN

D

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, Ba

ngna

,Ba

ngko

k 10

260,

Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

Dry

Che

mic

al P

orta

ble

Fire

Ext

ingu

ishe

r

28 -

30 A

pril

2021

Loca

tion

Bui

ldin

g A

rea

136

136

Gua

rdia

nG

amlin

e Bl

dg.

SS

SN

/AS

195

PSI

-

137

137

Gua

rdia

nG

amlin

e Bl

dg.

SS

SN

/AS

195

PSI

N/A

138

138

Gua

rdia

nG

amlin

e Bl

dg.

SS

SN

/AS

195

PSI

N/A

139

139

Gua

rdia

nG

amlin

e Bl

dg.

SS

SN

/AS

195

PSI

N/A

140

140

Impa

ctM

CL-

2 O

P/79

SS

SN

/AS

13.3

Kg

141

141

-M

CL-

2 O

P/81

SS

SN

/AS

195

PSI

11/6

/255

0

142

142

-M

CL-

2 O

P/80

SS

SN

/AS

195

PSI

17/7

/201

9R

epla

ce c

ylin

der

143

143

SK F

ireM

CL-

2 O

P/78

SS

SN

/AS

195

PSI

1/8/

2554

144

144

Impa

ctM

CL-

2 O

P/78

SS

SN

/AN

/A14

.6 K

g-

145

145

Impa

ctM

CL-

2 O

P/75

SS

SN

/AS

195

PSI

10/4

/255

2

146

146

Dab

fire

MC

L-2

PRE

MEL

T R

OO

MS

SS

N/A

S19

5 PS

I24

/4/2

563

147

147

Dab

fire

MC

L-2

T1/3

7.1

SS

SN

/AS

195

PSI

-

148

148

Gua

rdia

nG

amlin

g Bl

dg.

SS

SN

/AS

195

PSI

-

149

149

Gua

rdia

nG

amlin

g Bl

dg.

SS

SN

/AS

195

PSI

-

150

150

Dab

fire

MC

L-2

T1A

/49A

SS

SN

/AS

195

PSI

-S

= Sa

tisfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Co2

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

fill c

apha

ndle

,she

llG

as c

artr

idge

Dat

e of

M

anuf

actu

re

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

CO

2

Rem

ark

Insp

ectio

n D

ate

:In

spec

tor :

Item

Ext.N

o.Ty

peB

rand

Hos

e ,N

ozzl

e dr

y po

wde

rPr

essu

rere

adin

g

Subi

n, W

achi

ra, S

omki

d, A

nuch

a, A

nuch

it

Clie

nt :

INSP

EC

TIO

N P

OR

TA

BL

E F

IRE

EX

TIN

GU

ISH

ER

S

NS

BLU

E SC

OPE

STE

EL T

HAI

LAN

D

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, Ba

ngna

,Ba

ngko

k 10

260,

Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

Dry

Che

mic

al P

orta

ble

Fire

Ext

ingu

ishe

r

28 -

30 A

pril

2021

Loca

tion

Bui

ldin

g A

rea

151

151

Impa

ctM

CL-

2 XF

HV-

5S

SS

N/A

S19

5 PS

IAu

g-11

Rep

lace

cyl

inde

r

152

152

Impa

ctM

CL-

2 EX

HV/

4S

SS

N/A

S19

5 PS

IAu

g-11

153

153

Impa

ctM

CL-

2 EX

HV/

1S

SS

N/A

S19

5 PS

IAu

g-11

Rep

lace

cyl

inde

r

154

154

Impa

ctM

CL-

2 G

ENC

RAT

OR

SS

SN

/AS

195

PSI

Aug-

11

155

155

Impa

ctM

CL-

2 G

ENC

RAT

OR

SS

SN

/AS

195

PSI

4/6/

2551

156

156

Impa

ctM

CL-

2 FU

RC

ER/1

SS

SN

/AS

195

PSI

Aug-

11

157

157

Impa

ctM

CL-

2 FU

RC

ER/2

SS

SN

/AS

195

PSI

-

158

158

Impa

ctM

CL-

2 FU

RC

ER/3

SS

SN

/AS

195

PSI

6/3/

2561

159

159

Impa

ctM

CL-

2 FU

RC

ER/4

SS

SN

/AS

195

PSI

6/3/

2561

160

160

Impa

ctM

CL-

2 FU

RC

ER/5

SS

SN

/AS

195

PSI

-

161

161

Impa

ctM

CL-

2 FU

RC

ER/6

SS

SN

/AS

195

PSI

-

162

162

Impa

ctM

CL-

2 FU

RC

ER/7

SS

SN

/AS

195

PSI

Aug-

11

163

163

Impa

ctM

CL-

2 C

OAT

TER

F/3

SS

SN

/AS

195

PSI

13/8

/255

8

164

164

Impa

ctM

CL-

2 C

OAT

TER

F/3

/2S

SS

N/A

S19

5 PS

I-

165

165

Impa

ctM

CL-

2 C

OAT

TER

F/4

SS

SN

/AS

195

PSI

-S

= Sa

tisfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

fill c

apha

ndle

,she

llG

as c

artr

idge

Dat

e of

M

anuf

actu

re

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Rem

ark

Insp

ectio

n D

ate

:In

spec

tor :

Item

Ext.N

o.Ty

peB

rand

Hos

e ,N

ozzl

e dr

y po

wde

rPr

essu

rere

adin

g

Subi

n, W

achi

ra, S

omki

d, A

nuch

a, A

nuch

it

Clie

nt :

INSP

EC

TIO

N P

OR

TA

BL

E F

IRE

EX

TIN

GU

ISH

ER

S

NS

BLU

E SC

OPE

STE

EL T

HAI

LAN

D

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, Ba

ngna

,Ba

ngko

k 10

260,

Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

Dry

Che

mic

al P

orta

ble

Fire

Ext

ingu

ishe

r

28 -

30 A

pril

2021

Loca

tion

Bui

ldin

g A

rea

166

166

Impa

ctM

CL-

2 W

ET R

OLL

ING

SS

SN

/AS

195

PSI

Jul-5

4

167

167

Gua

rdia

nG

amlin

g Bl

dg.

SS

SN

/AS

195

PSI

Jul-5

4

168

168

Gua

rdia

nG

amlin

g Bl

dg.

SS

SN

/AS

195

PSI

Jul-5

4

169

169

Gua

rdia

nG

amlin

g Bl

dg.

SS

SN

/AS

195

PSI

Jul-5

4

170

170

Gua

rdia

nG

amlin

g Bl

dg.

SS

SN

/AS

195

PSI

Jul-5

4

171

171

Tota

l fire

MC

L G

ENS

SS

N/A

S19

5 PS

IJu

l-18

172

172

Impa

ctM

CL-

2 U

nder

Gro

und

Fl.

SS

SN

/AS

195

PSI

-

173

173

Impa

ctM

CL-

2 S

SS

N/A

S19

5 PS

I-

174

174

-TU

LNEL

UPP

ER M

CL-

1S

SS

N/A

S19

5 PS

I-

175

175

-TU

LNEL

UPP

ER M

CL-

1S

SS

N/A

S19

5 PS

I-

176

176

-TU

LNEL

UPP

ER M

CL-

1S

SS

N/A

S19

5 PS

I-

177

177

-TU

LNEL

UPP

ER M

CL-

1S

SS

N/A

S19

5 PS

I-

178

178

Dab

fire

GAS

S ST

ATIO

NS

SS

N/A

S19

5 PS

I13

/09/

47

179

179

Win

ston

GAS

S ST

ATIO

NS

SS

N/A

S19

5 PS

I-

180

180

Nip

pon

GAT

E #1

SS

SN

/AS

195

PSI

11/6

/255

0S

= Sa

tisfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

fill c

apha

ndle

,she

llG

as

cart

ridge

Dat

e of

M

anuf

actu

re

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Rem

ark

Insp

ectio

n D

ate

:In

spec

tor :

Item

Ext.N

o.Ty

peB

rand

Hos

e ,N

ozzl

e dr

y po

wde

rPr

essu

rere

adin

g

Subi

n, W

achi

ra, S

omki

d, A

nuch

a, A

nuch

it

Clie

nt :

INSP

EC

TIO

N P

OR

TA

BL

E F

IRE

EX

TIN

GU

ISH

ER

S

NS

BLU

E SC

OPE

STE

EL T

HAI

LAN

D

Page 33: NS BLUE SCOPE STEEL (THAILAND) LTD

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, Ba

ngna

,Ba

ngko

k 10

260,

Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

Dry

Che

mic

al P

orta

ble

Fire

Ext

ingu

ishe

r

28 -

30 A

pril

2021

Loca

tion

Bui

ldin

g A

rea

181

181

Hat

ron

GAT

E #1

SS

SN

/AS

195

PSI

21/3

/255

2

182

182

Nip

onG

ATE

#2S

SS

N/A

S19

5 PS

I1/

6/25

50

183

183

Nip

onG

ATE

#3S

SS

N/A

S19

5 PS

I3/

8/25

54

184

184

Pyre

neSU

B ST

ATIO

N 1

15 K

V.S

SS

N/A

S19

5 PS

I-

185

185

Pyre

neSU

B ST

ATIO

N 1

15 K

V.S

SS

N/A

S19

5 PS

I-

186

186

-M

CL-

1 S

TOR

E C

HEM

ICAL

DO

CU

N/A

N/A

N/A

N/A

N/A

N/A

N/A

can'

t acc

ess

area

187

187

Hat

ron

MAI

NTE

NAN

CE

OFF

IC R

OO

MS

SS

N/A

S19

5 PS

I11

/6/2

550

188

188

Dab

fire

MC

L-1

TRAN

FOR

MER

BO

WER

RS

SS

N/A

S19

5 PS

I-

189

189

Aigo

MC

L-1

PUM

P C

OO

LIN

G T

OW

ERS

SS

N/A

S19

5 PS

I21

/03/

49

190

190

Dab

fire

MC

L-1

PUM

P C

OO

LIN

G T

OW

ERS

SS

N/A

S19

5 PS

I16

/08/

50

191

191

Impa

ctW

ATER

TAN

KS

SS

N/A

S19

5 PS

I-

192

192

Impa

ctD

ISP

OFF

ICS

SS

N/A

S19

5 PS

I-

193

193

-TR

ANFO

RM

ER C

PLS

SS

N/A

S19

5 PS

IN

/A

194

194

Dab

fire

HAZ

AR D

OU

S W

ASTE

STO

RE

SS

SN

/AS

195

PSI

6/3/

2553

195

195

Hat

ron

GAT

E #1

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Can

cel T

his

Poin

tS

= Sa

tisfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

fill c

apha

ndle

,she

llG

as

cart

ridge

Dat

e of

M

anuf

actu

re

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Rem

ark

Insp

ectio

n D

ate

:In

spec

tor :

Item

Ext.N

o.Ty

peB

rand

Hos

e ,N

ozzl

e dr

y po

wde

rPr

essu

rere

adin

g

Subi

n, W

achi

ra, S

omki

d, A

nuch

a, A

nuch

it

Clie

nt :

INSP

EC

TIO

N P

OR

TA

BL

E F

IRE

EX

TIN

GU

ISH

ER

S

NS

BLU

E SC

OPE

STE

EL T

HAI

LAN

D

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, Ba

ngna

,Ba

ngko

k 10

260,

Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

Dry

Che

mic

al P

orta

ble

Fire

Ext

ingu

ishe

r

28 -

30 A

pril

2021

Loca

tion

Bui

ldin

g A

rea

196

196

-C

RM

-MIN

ILO

SS

SS

N/A

S19

5 PS

I-

197

197

Dab

fire

ACM

-XFH

V-24

(OU

T SI

ZE)

SS

SN

/AS

195

PSI

31/5

/201

1

198

198

Dab

fire

PKL-

XFH

V-14

(O

UT

SIZE

)S

SS

N/A

S19

5 PS

I9/

4/25

52

199

199

Dab

fire

PKL-

XFH

V-15

(O

UT

SIZE

)S

SS

N/A

S19

5 PS

I9/

4/25

52

200

200

Dab

fire

CR

M-X

FHV-

16 (

OU

T SI

ZE)

SS

SN

/AS

195

PSI

31/5

/255

4

201

201

Dab

fire

CR

M-X

FHV-

17 (

OU

T SI

ZE)

SS

SN

/AS

196

PSI

NEW

202

202

Nip

onM

CL-

1 PO

RT

F#7

SS

SN

/AS

195

PSI

12/1

/255

0

203

203

Dab

fire

MC

L-1

ACC

EMM

UTT

OR

F#1

SS

SN

/AS

195

PSI

-

204

204

Dab

fire

MC

L-1

ACC

EMM

UTT

OR

F#2

S

SS

N/A

S19

5 PS

I-

205

205

Impa

ctM

CL-

2 C

OO

LIN

G T

OW

ERS

SS

N/A

S19

5 PS

I-

Rep

lace

cyl

inde

r

206

206

Impa

ctM

CL-

2 R

ECIR

ULA

TNS

SS

N/A

S19

5 PS

I-

207

207

Dab

fire

MC

L-2

XFH

V-7

SS

SN

/AS

195

PSI

10/1

/255

0

208

208

Dab

fire

MC

L-2

XFH

V-8

SS

SN

/AS

195

PSI

9/4/

2552

209

209

-M

CL-

2 G

ENS

SS

N/A

S19

5 PS

I-

210

210

-M

CL-

1 C

OAT

TER

F#3

SS

SN

/AS

195

PSI

NEW

S =

Satis

fact

ory

US

= U

nsat

isfa

ctor

y N

/A =

Not

App

licab

le

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

fill c

apha

ndle

,she

llG

as

cart

ridge

Dat

e of

M

anuf

actu

re

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Rem

ark

Insp

ectio

n D

ate

:In

spec

tor :

Item

Ext.N

o.Ty

peB

rand

Hos

e ,N

ozzl

e dr

y po

wde

rPr

essu

rere

adin

g

Subi

n, W

achi

ra, S

omki

d, A

nuch

a, A

nuch

it

Clie

nt :

INSP

EC

TIO

N P

OR

TA

BL

E F

IRE

EX

TIN

GU

ISH

ER

S

NS

BLU

E SC

OPE

STE

EL T

HAI

LAN

D

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, Ba

ngna

,Ba

ngko

k 10

260,

Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

Dry

Che

mic

al P

orta

ble

Fire

Ext

ingu

ishe

r

28 -

30 A

pril

2021

Loca

tion

Bui

ldin

g A

rea

211

211

Max

imum

MC

L-1

CO

ATTE

R F

#5S

SS

N/A

S19

5 PS

I07

/201

9

212

212

Max

imum

MC

L-1

CO

ATTE

R F

#5S

SS

N/A

S19

5 PS

I07

/201

9

213

213

Max

imum

MC

L-1

CO

ATTE

R F

#5S

SS

N/A

S19

5 PS

I07

/201

9

214

214

Max

imum

MC

L-1

CO

ATTE

R F

#5S

SS

N/A

S19

5 PS

I07

/201

9

215

215

Max

imum

MC

L-1

CO

ATTE

R F

#5S

SS

N/A

S19

5 PS

I07

/201

9

216

216

Max

imum

MC

L-1

CO

ATTE

R F

#5S

SS

N/A

S19

5 PS

I-

217

217

Dab

fire

CR

M-R

S01

OP

65S

SS

N/A

S19

5 PS

I31

/08/

2554

218

218

Impa

ctM

CL

OP5

3S

SS

N/A

S19

5 PS

IAu

g-11

219

219

Impa

ctM

CL

OP5

3S

SS

N/A

S19

5 PS

IAu

g-11

220

220

-M

CL2

OP

80N

/AN

/AN

/AN

/AN

/AN

/AN

/AC

ance

l Thi

s Po

int

221

221

-C

PL O

P 49

SS

SN

/AS

195

PSI

-

222

222

-BL

UE

SCO

PE T

RAI

NG

CEN

TER

SS

SN

/AS

195

PSI

-

223

223

-BL

UE

SCO

PE T

RAI

NG

CEN

TER

SS

SN

/AS

195

PSI

-

224

224

-BL

UE

SCO

PE T

RAI

NG

CEN

TER

SS

SN

/AS

195

PSI

-

225

225

-G

amlin

g Bl

dg.

SS

SN

/AS

195

PSI

-

S =

Satis

fact

ory

US

= U

nsat

isfa

ctor

y N

/A =

Not

App

licab

le

Rem

ark:

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

fill c

apha

ndle

,she

llG

as

cart

ridge

Dat

e of

M

anuf

actu

re

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Rem

ark

Insp

ectio

n D

ate

:In

spec

tor :

Item

Ext.N

o.Ty

peB

rand

Hos

e ,N

ozzl

e dr

y po

wde

rPr

essu

rere

adin

g

Subi

n, W

achi

ra, S

omki

d, A

nuch

a, A

nuch

it

Clie

nt :

INSP

EC

TIO

N P

OR

TA

BL

E F

IRE

EX

TIN

GU

ISH

ER

S

NS

BLU

E SC

OPE

STE

EL T

HAI

LAN

D

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, Ba

ngna

,Ba

ngko

k 10

260,

Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

Dry

Che

mic

al P

orta

ble

Fire

Ext

ingu

ishe

r

28 -

30 A

pril

2021

Loca

tion

Bui

ldin

g A

rea

226

226

Dry

che

mic

alG

uard

ian

Gam

ling

SS

SN

/AS

195

PSI

-

227

227

Dry

che

mic

alD

ab fi

reW

WTP

.28

SS

SN

/AS

195

PSI

-

228

228

Dry

che

mic

alD

ab fi

reM

CL-

1 O

P 55

SS

SN

/AS

195

PSI

31/9

/255

4

229

229

Dry

che

mic

alIm

pact

Wor

ksho

p O

P 8

SS

SN

/AS

195

PSI

12/6

/255

8

230

230

Dry

che

mic

alIm

pact

Wor

ksho

p O

P 8

SS

SN

/AS

195

PSI

12/6

/255

8

231

231

Dry

che

mic

alN

ippo

nM

CL-

1 ZA

LS

SS

N/A

S19

5 PS

I-

232

232

Dry

che

mic

alIm

pact

Can

teen

SS

SN

/AS

195

PSI

Aug-

11

233

233

Dry

che

mic

alIm

pact

MC

L-2

FL3

SS

SN

/AS

195

PSI

-

234

234

Dry

che

mic

alIm

pact

Supp

ort

SS

SN

/AS

195

PSI

-

235

235

Dry

che

mic

alIm

pact

MC

L - 2

FI.

4S

SU

SN

/AS

195

PSI

-

236

236

Dry

che

mic

alIm

pact

MC

L - 2

FI.

5S

SS

N/A

S19

5 PS

I-

237

237

-C

PL S

tore

SS

SN

/AS

100

PSI

-

238

238

Dry

che

mic

al-

PKL

OP/

15S

SS

N/A

S19

5 PS

I1/

4/25

60

239

239

Dry

che

mic

al-

PKL

OP/

07 W

orks

hop

SS

SN

/AS

195

PSI

17/7

/201

9In

stal

l cyl

inde

r new

240

240

Dry

che

mic

al-

Stor

ege

War

ehou

seS

SS

N/A

S19

5 PS

I-

S =

Satis

fact

ory

US

= U

nsat

isfa

ctor

y N

/A =

Not

App

licab

le

Rem

ark:

Foam

Rem

ark

Insp

ectio

n D

ate

:In

spec

tor :

Item

Ext.N

o.Ty

peB

rand

Hos

e ,N

ozzl

e fil

l cap

hand

le,s

hell

Gas

ca

rtrid

geD

ate

of

Man

ufac

ture

dry

pow

der

Pres

sure

read

ing

Subi

n, W

achi

ra, S

omki

d, A

nuch

a, A

nuch

it

Clie

nt :

INSP

EC

TIO

N P

OR

TA

BL

E F

IRE

EX

TIN

GU

ISH

ER

S

NS

BLU

E SC

OPE

STE

EL T

HAI

LAN

D

Page 34: NS BLUE SCOPE STEEL (THAILAND) LTD

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, Ba

ngna

,Ba

ngko

k 10

260,

Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

Dry

Che

mic

al P

orta

ble

Fire

Ext

ingu

ishe

r

28 -

30 A

pril

2021

Loca

tion

Bui

ldin

g A

rea

241

241

Dry

che

mic

al-

Serv

er R

oom

S

SS

N/A

S19

5 PS

I-

242

242

Dry

che

mic

al-

OP

86S

SS

N/A

S19

5 PS

I-

S =

Satis

fact

ory

US

= U

nsat

isfa

ctor

y N

/A =

Not

App

licab

le

Rem

ark:

Clie

nt :

NS

BLU

E SC

OPE

STE

EL T

HAI

LAN

D

INSP

EC

TIO

N P

OR

TA

BL

E F

IRE

EX

TIN

GU

ISH

ER

S

Insp

ectio

n D

ate

:In

spec

tor :

Subi

n, W

achi

ra, S

omki

d, A

nuch

a, A

nuch

it

Item

Ext.N

o.Ty

peB

rand

Hos

e ,N

ozzl

e R

emar

kfil

l cap

hand

le,s

hell

Gas

ca

rtrid

gedr

y po

wde

rPr

essu

rere

adin

gD

ate

of

Man

ufac

ture

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

CO2 Portable Fire ExtinguisherClient :

REF. Contract NO : SC1000142Inspection Date : 28 - 30 April 2021

Inspector :Witness : Khun Songpon, Khun Sonthaya

Location

Building Area

1 Co2 IMPACT WARE HOUSE OP.11 S S S 12.40 12.80 0% Jun-09

2 Co2 IMPACT Worke shop OP.12 S S S 12.40 13.20 0% Jun-11

3 Co2 IMPACT Worke shop OP.08 S S S 12.40 13.10 0% 31/8/2014

4 Co2 IMPACT New Store S S S 13.20 13.10 0% Nov-06

5 Co2 IMPACT Chemical Store S S S 12.60 13.00 0% Nov-06

6 Co2 IMPACT Wwtp.offic S S S 13.00 13.30 0% Nov-06

7 Co2 IMPACT ACM ( Inside) S S S 12.57 13.10 0% Nov-06

8 Co2 IMPACT PKL .OP.09 S S S 13.90 14.70 0% 31/8/2014

9 Co2 IMPACT PKL.ENTRY PULPIT S S S 12.00 13.00 0% 8/2011

10 Co2 IMPACT PKL .OP.05 S S S 13.40 14.20 0% 22/6/2019Replace cylinder

11 Co2 IMPACT PKL .A12 (TNAK FARM) S S S 12.75 12.80 0% 2/4/2010

12 Co2 IMPACT PKL 06/.OP.04 S S S 12.57 12.96 0% 24/4/2020

13 Co2 IMPACT PKL 04/.EER ROOM S S S 12.70 12.80 0% 14/3/2018

14 Co2 IMPACT PKL .EER ROOM S S S 12.50 13.10 0% 31/5/2011

15 Co2 IMPACT PKL .EER ROOM S S S 12.60 13.10 0% 31/5/2011

16 Co2 IMPACT PKL 03/EER ROOM S S S 12.80 13.20 0% 10/4/2009

17 Co2 IMPACT PKL EXIT DOOR S S S 12.50 13.20 0% Nov-11

18 Co2 IMPACT PKL 05/.OP.03 S S S 12.25 13.00 0% 5/5/2016

19 Co2 IMPACT CRM OP.01 S S S 16.8 16.90 0% 22/6/2019Replace cylinder

20 Co2 IMPACT CRM RS01 S S S 12.52 13.60 0% 7/2008

21 Co2 IMPACT CRM RS02 S S S 12.57 12.80 0% 31/8/2554

22 Co2 IMPACT CRM EXIT DOOR OP 65 S S S 12.50 13.50 0% 11-Aug

23 Co2 IMPACT CRM 25 (mill pul pit room) S S S 14.05 15.00 0% 21/2012

24 Co2 IMPACT CRM 15 S S S 13.25 13.00 0% 21/2012

25 Co2 IMPACT CELA (under ground) S S S 21.50 22.20 0% -

26 Co2 IMPACT CELA (under ground) S S S 12.80 13.10 7.9% -

27 Co2 IMPACT CELA (under ground) S S S 12.80 13.10 7.9% -

28 Co2 IMPACT CELA (under ground) S S S 12.80 13.10 6.9% -

29 Co2 IMPACT CRM.14 S S S 12.70 12.90 0% Dec-06

30 Co2 IMPACT CRM OP/20 S S S 12.50 13.50 0% 21/2012S = Satisfactory US = Unsatisfactory N/A = Not Applicable

Remark% Lost Weight

Date of Manufacture

Seal Wire is intact Physical

STD Cylinder Weight

Actual Gross

Weight (Kg)Item Type

CO2 (Kg) BrandHose and Nozzle is

Unobstruct

Subin, Wachira, Somkid, Anucha, Anuchit

NS BLUE SCOPE STEEL THAILAND

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

CO2 Portable Fire ExtinguisherClient :

REF. Contract NO : SC1000142Inspection Date : 28 - 30 April 2021

Inspector :Witness : Khun Songpon, Khun Sonthaya

Location

Building Area

31 Co2 IMPACT CRM milling los S S S N/A 13.50 0% N/A

32 Co2 IMPACT CRM OP/21 S S S 12.50 13.20 0% 3/8/2554

33 Co2 IMPACT CRM OP/22 S S S 12.50 13.00 0% 3/5/2553

34 Co2 IMPACT EER.ROOM (LOWER) S S S 12.50 13.00 0% 6-Dec

35 Co2 IMPACT EER.ROOM OP/27 S S S 20.50 20.50 0% 11-Aug

36 Co2 IMPACT CRM OP/29 S S S 12.70 14.90 0% Nov-06

37 Co2 IMPACT CRM 13 (DELIVERY) S S S 12.70 13.00 0% Nov-11

38 Co2 IMPACT CRM OFFIC (COMPUTTER ROOM) S S S 12.60 12.90 0% 31/5/2553

39 Co2 IMPACT CRM OFFIC (COMPUTTER ROOM) S S S 12.60 12.40 0% 11-Aug

40 Co2 IMPACT CRM EER.ROOM S S S 22.60 23.90 0% Mar-97

41 Co2 IMPACT CRM EER.ROOM S S S 16.10 16.77 0% Mar-97

42 Co2 IMPACT CRM EER.ROOM op/24 S S S 22.60 23.50 0% -

43 Co2 CENTURY CRM OP/25 EER Room S S S 13.02 13.00 0% 5/5/53

44 Co2 IMPACT CRM UPPER EER Room S S S 12.40 13.40 0% May-54

45 Co2 IMPACT CRM 04 V.48 S S S 12.50 13.00 0% May-54

46 Co2 IMPACT CRM OP/64 S S S 12.70 13.20 0% Dec-12

47 Co2 IMPACT CRM OP/63 S S S 12.50 13.44 0% Aug-11

48 Co2 IMPACT CRM OPERATION BLDG. S S S 16.50 19.70 0% -

49 Co2 IMPACT OPERATION BLDG S S S 16.50 19.70 0% -

50 Co2 IMPACT SUPPORT .BLDG(SERVER) S S S 12.50 13.10 0% Nov-06

51 Co2 SANTO ADMIN S S S 12.70 13.70 0% May-54

52 Co2 IMPACT ADMIN (Entry door) S S S 12.50 16.40 0% Jan-11

53 Co2 IMPACT ADMIN (Entry door) S S S 12.30 13.10 0% Jan-11

54 Co2 SANTO ADMIN S S S 12.50 13.70 0% Jan-11

55 Co2 IMPACT ADMIN S S S 12.50 12.50 0% Jan-11

56 Co2 IMPACT ADMIN EXIT DOOR S S S 12.10 13.70 0% Jan-11

57 Co2 IMPACT ADMIN EXIT DOOR S S S 12.50 13.30 0% Jan-11

58 Co2 IMPACT MCL-1 PPE REQUIRCD S S S 13.32 15.10 0% Aug-11

59 Co2 IMPACT MCL-1 PPE OP56 S S S 12.30 13.40 0% Jun-11

60 Co2 IMPACT MCL-1 FORM 1R S S S 14.71 14.70 0% Sep-15S = Satisfactory US = Unsatisfactory N/A = Not Applicable

Item Type CO2 (Kg) Brand

Hose and Nozzle is

Unobstructed

Seal Wire is intact

PhysicalSTD

Cylinder Weight

% Lost Weight

Date of Manufacture

Subin, Wachira, Somkid, Anucha, Anuchit

NS BLUE SCOPE STEEL THAILAND

remarkActual Gross Weight (Kg)

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

CO2 Portable Fire ExtinguisherClient :

REF. Contract NO : SC1000142Inspection Date : 28 - 30 April 2021

Inspector :Witness : Khun Songpon, Khun Sonthaya

Location

Building Area

61 Co2 IMPACT MCL-1 OP/61 S S S 12.5 13.10 0% Dec-06

62 Co2 IMPACT MCL-1 OP/60 S S S 12.67 12.80 0% Dec-06

63 Co2 IMPACT MCL-1 OP/57 S S S 12.57 13.00 0% Dec-06

64 Co2 IMPACT MCL-1 CRM 13 S S S 14.25 14.30 0% 2/5/2552

65 Co2 IMPACT MCL-1 K 46 S S S 12.60 13.32 0% Aug-11

66 Co2 IMPACT MCL-1 OP/56 S S S 12.82 13.10 0% Aug-11

67 Dry IMPACT MCL-1 WORKE SHOP S S S N/A 195 PSI N/A -

68 Co2 IMPACT MCL-1 CONTROL ROOM S S S 13.25 13.40 0% 2/5/2552

69 Co2 IMPACT MCL-1 K-33 S S S 12.60 13.50 0% Aug-11

70 Co2 IMPACT MCL-1 OP/49 S S S 12.60 12.90 0% Nov-11

71 Co2 IMPACT MCL-1 EER. ROOM S S S 14.47 14.30 1.0% Mar-17

72 Co2 CENTURY MCL-1 ERR.ROOM S S S 12.10 14.30 0% Aug-11

73 Co2 IMPACT MCL-1 ZAL ERR.ROOM S S S 13.80 14.40 0% 10/4/2552

74 Co2 IMPACT MCL-1 ZAL OP/52 EER S S S 12.50 13.20 0% Aug-11

75 Co2 IMPACT MCL-1 ZAL ERR. ROOM S S S 12.50 13.50 0% Nov-11

76 Co2 IMPACT MCL-1 ZAL COMPUTER ROOM S S S 12.50 13.50 0% Nov-11

77 Co2 IMPACT MCL-1 K2-25 S S S 14.40 14.50 0% 5/5/2559

78 Co2 IMPACT CPL-1 OP46 S S S 12.60 13.00 0% 10/3/2552

79 Co2 IMPACT CPL -1 LINE PACKING K2 S S S 12.50 13.40 0% 5/5/2559

80 Co2 IMPACT CPL -1 LINE PACKING S S S 14.50 14.50 0% 20/03/2552

81 Co2 IMPACT CPL -1 LINE PACKING S S S 12.60 12.70 0% 25/02/52

82 Co2 IMPACT CPL -1 OP/44 S S S 12.30 13.70 0% 8/9/2556

83 Co2 IMPACT CPL -1 CPL OVCN UPPER ROOM S S S 12.50 13.40 0% 31/8/2554

84 Co2 IMPACT CPL -1 OP/43 S S S 12.70 13.80 0% -

85 Co2 IMPACT CPL -1 CPL/04 S S S 16.50 18.10 0% -

86 Co2 CENTURY CPL -1 LINE PACKING N1-02 S S S 13.00 13.40 0% May-16

87 Co2 IMPACT CPL -1 LINE PACKING N2 S S S 12.30 12.90 0% 31/05/2554

88 Co2 IMPACT CLP -1 LINE PACKING S S S 12.60 13.30 0% 31/5/2552

89 Co2 IMPACT MCL-1 ZAL N-45 S S S 12.80 13.20 0% 10/4/2557

90 Co2 IMPACT MCL-1 ZAL S S S 12.90 13.40 0% 31/05/2554

Subin, Wachira, Somkid, Anucha, Anuchit

Type CO2 (Kg)

NS BLUE SCOPE STEEL THAILAND

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

Remark% Lost Weight

Date of Manufacture

Seal Wire is intact

PhysicalSTD

Cylinder Weight

Actual Gross

Weight (Kg)Item Brand

Hose and Nozzle is

Unobstructed

Page 35: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

CO2 Portable Fire ExtinguisherClient :

REF. Contract NO : SC1000142Inspection Date : 28 - 30 April 2021

Inspector :Witness : Khun Songpon, Khun Sonthaya

Location

Building Area

91 Co2 IMPACT MCL-1 ZAL S S S 12.40 14.20 0% 17/6/2019Replace cylinder

92 Co2 IMPACT MCL-1 ZAL S S S 16.50 17.00 0% 31/05/2554

93 Co2 IMPACT MCL-1 ZAL S S S 12.50 13.30 0% 31/05/2554

94 Co2 IMPACT MCL-1 PORT F#1R S S S 12.60 13.47 0% -

95 Co2 IMPACT MCL-1 PORT F#2R S S S 12.17 13.40 0% Dec-06

96 Co2 IMPACT MCL-1 PORT F#3R S S S 12.50 13.00 0% Dec-06

97 Co2 IMPACT MCL-1 ACCEMMUTATOR F#3 S S S 12.72 13.00 0% Dec-06

98 Co2 IMPACT MCL-1 PORT F#4 S S S 12.50 14.00 0% Dec-06

99 Co2 IMPACT MCL-1 PORT F#5 US S S 12.50 13.10 0% Dec-06

100 Co2 IMPACT MCL-1 PORT F#6 S S S 12.50 13.40 0% Dec-06

101 Co2 IMPACT MCL-1 COATER F#1M.1 S S S 12.80 13.50 0% 31/05/2554

102 Co2 IMPACT MCL-1 COATER F#2M1 S S S 13.40 13.40 0% 07/2019

103 Co2 IMPACT MCL-1 COATER F#2 S S S 13.10 13.10 4.9% 07/2019

104 Co2 IMPACT MCL-1 COATER F#3 S S S 13.20 13.20 0% 07/2019

105 Co2 IMPACT MCL-1 COATER F#3M1 S S S 13.50 13.10 0% 07/2019

106 Co2 IMPACT MCL-1 COATER F#4M1 S S S 14.80 14.80 0% 07/2019

107 Co2 IMPACT MCL-1 COATER F#4 S S S 13.90 10.80 0% -

108 Co2 IMPACT MCL-1 COATER F#5 S S S 14.80 14.80 0% 07/2019

109 Co2 IMPACT MCL-1 COATER F#6M1 S S S 13.50 13.50 0% -

110 Co2 IMPACT CPL-1 OVEN (UPPER) S S S 12.70 13.20 0% Dec-06

111 Co2 IMPACT CPL-1 COATTER 2 S S S 12.70 13.20 0% Dec-06

112 Co2 IMPACT CPL-1 OVEN (CPL) S S S 12.70 13.10 0% 31/08/2554

113 Co2 IMPACT CPL-1 CORTTER 1(CPL) S S S 14.40 15.00 0% 31/08/2554

114 Co2 IMPACT CPL-PAINT STORE S S S 12.50 12.82 0% Dec-06

115 Co2 IMPACT MCL-2 MEETING ROOM S S S 12.60 13.00 0% Nov-06

116 Co2 IMPACT MCL-2 LAB US S S 13.10 13.00 0% 4/6/61

117 Co2 IMPACT MCL-2 P 37 S S S 12.20 13.50 0% Jun-11

118 Co2 Sonjuty MCL-2 EXIT PULPIT S S S 14.00 14.50 0% 5/5/59

119 Co2 IMPACT MCL-2 LINE PACKING S S S 12.80 13.30 0% 31/08/2554

120 Co2 IMPACT MCL-2 LINE PACKING S S S 15.20 15.20 0% Nov-04S = Satisfactory US = Unsatisfactory N/A = Not Applicable

Remark% Lost Weight

Date of Manufacture

Seal Wire is intact

PhysicalSTD

Cylinder Weight

Actual Gross Weight (Kg)Item Type

CO2 (Kg) BrandHose and Nozzle is

Unobstructed

NS BLUE SCOPE STEEL THAILAND

Subin, Wachira, Somkid, Anucha, Anuchit

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

CO2 Portable Fire ExtinguisherClient :

REF. Contract NO : SC1000142Inspection Date : 28 - 30 April 2021

Inspector :Witness : Khun Songpon, Khun Sonthaya

Location

Building Area

121 Co2 IMPACT MCL-2 LINE PACKING S S S 12.90 13.10 0% 31/08/2554

122 Co2 IMPACT MCL-2 LINE PACKING OP89 S S S 13.80 14.40 0% Nov-04

123 Co2 IMPACT MCL-2 LINE PACKING S S S 13.80 14.30 0% Nov-04

124 Co2 IMPACT MCL-2 OP/86 LINE PACKING S S S 12.37 12.70 0% 31/5/54

125 Co2 - MCL-2 T1/23 US S S 12.80 13.30 0% 17/6/2019

126 Co2 IMPACT MCL-2 MAIN EER ROOM 1 S S S 13.80 14.30 0% 21/1/2551

127 Co2 IMPACT MCL-2 MAIN EER ROOM 5 S S S 14.10 14.50 0% Nov-04

128 Co2 IMPACT MCL-2 MAIN EER ROOM 4 S S S 14.10 14.50 0% Nov-04

129 Co2 IMPACT MCL-2 MAIN EER ROOM 3 S S S 14.10 14.10 0% Nov-04

130 Co2 IMPACT MCL-2 MAIN EER ROOM 2 S S S 14.10 14.40 0% Nov-04

131 Co2 IMPACT MCL-2 OP/79 S S S 12.00 12.20 0% -

132 Co2 CENTURY MCL-2 OP/81 S S S 12.50 13.10 0% 2/5/2552

133 Co2 IMPACT MCL-2 OP/80 S S S 12.50 13.40 0% 31/05/2554

134 Co2 IMPACT MCL-2 OP/75 S S S S 15.20 0% 20/03/2552 ,

135 Co2 IMPACT MCL-2 PREMET ROOM S S S 16.00 12.90 0% 5/5/53

136 Co2 IMPACT MCL-2 T1/37 S S S 13.90 14.40 0% Jul-08

137 Co2 IMPACT MCL-2 ENTRY EER ROOM 1 S S S 14.20 14.70 0% Nov-04

138 Co2 IMPACT MCL-2 ENTRY EER ROOM 2 S S S 13.80 14.30 0% Nov-04

139 Co2 IMPACT MCL-2 ENTRY EER ROOM 3 S S S 14.10 14.60 0% Nov-04

140 Co2 IMPACT MCL-2 T1A/43A S S S 13.05 13.10 0% 5/5/59

141 Co2 centrury MCL-2 XFHV-5 (OUT SIZE) S S S 13.20 13.50 0% Jun-11

142 Co2 IMPACT MCL-2 XFHV-4 (OUT SIZE) S S S 12.72 13.20 0% Jun-11

143 Co2 IMPACT MCL-2 XFHV-1 (OUT SIZE) S S S 12.67 13.20 0% Jun-11

144 Co2 IMPACT MCL-2 GENERATOR S S S 14.22 14.60 0% Nov-06Replace cylinder

145 Co2 IMPACT MCL-2 FORNACER FLOOR 1 S S S 12.70 13.30 0% -

146 Co2 IMPACT MCL-2 FORNACER FLOOR 2 S S S 12.70 14.70 0% -

147 Co2 IMPACT MCL-2 FORNACER FLOOR 3 S S S 12.70 14.70 0% Jan-05

148 Co2 IMPACT MCL-2 FORNACER FLOOR 4 S S S 14.10 14.60 0% -

149 Co2 IMPACT MCL-2 FORNACER FLOOR 5 S S S 13.00 13.30 0% -

150 Co2 IMPACT MCL-2 FORNACER FLOOR 6 S S S 14.70 16.70 0% -S = Satisfactory US = Unsatisfactory N/A = Not Applicable

Remark% Lost Weight

Date of Manufacture

Seal Wire is intact

PhysicalSTD

Cylinder Weight

Actual Gross Weight (Kg)Item Type

CO2 (Kg) BrandHose and Nozzle is

Unobstructed

NS BLUE SCOPE STEEL THAILAND

Subin, Wachira, Somkid, Anucha, Anuchit

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

CO2 Portable Fire ExtinguisherClient :

REF. Contract NO : SC1000142Inspection Date : 28 - 30 April 2021

Inspector :Witness : Khun Songpon, Khun Sonthaya

Location

Building Area

151 Co2 IMPACT MCL-2 FORNACER FLOOR 7 S S S 14.10 14.70 0% Jan-05

152 Co2 IMPACT MCL-2 COATTER FLOOR 3 US S S 12.25 13.10 0% 31/8/57

153 Co2 IMPACT MCL-2 COATTER FLOOR 3/2 S S S 12.80 14.60 0% Dec-08

154 Co2 IMPACT MCL-2 COATTER FLOOR 4 US S S 14.10 14.60 0% Mar-05

155 Co2 IMPACT MCL-2 WET ROLLING S S S 14.10 14.70 0% Jan-05

156 Co2 IMPACT MCL-2 COATTING POT EER ROOM S S S 14.10 14.60 0% -

157 Co2 IMPACT MCL-2 COATTING POT EER ROOM S S S 14.10 14.40 0% -

158 Co2 IMPACT MCL-2 UNDER GROUND FLOOR S S S 14.10 13.60 3.5% 2011

159 Co2 IMPACT MCL-2 GASS STATION S S S 12.50 13.20 0% Aug-11

160 Co2 IMPACT MCL-2 GASS STATION S S S 12.50 13.20 0% Aug-11

161 Co2 IMPACT Maintenance Room MCL1 S S S 12.80 13.30 0% Aug-06

162 Co2 IMPACT MCL-1 PUMP COLING TOWER S S S 12.70 13.50 0% Jul-08

163 Co2 IMPACT MCL-1 PUMP COLING TOWER S S S 14.23 15.10 0% Mar-05

164 Co2 IMPACT WATER TANK S S S 12.72 13.30 0% Jul-08

165 Co2 IMPACT MCL-2 DISP OFFIC S S S 12.77 13.50 0% Jul-08

166 Co2 IMPACT CRM MINILOS S S S 13.50 14.50 0% Aug-11

167 Co2 IMPACT MCL-2 GENERATOR ROOM S S S 14.00 14.50 0% Mar-05Replace cylinder

168 Co2 IMPACT CPL-HAZARDOUS WASTE STORE S S S 14.10 14.60 0% Jan-05

169 Co2 IMPACT MCL-1 PORT F#7 US S S 12.57 13.00 0% Dec-06

170 Co2 IMPACT MCL1 ACCEMMUTTOR F#2 S S S 12.57 12.80 0% Dec-06

171 Co2 IMPACT MCL1 ACCEMMUTTOR F#1 S S S 12.57 12.80 0% Dec-08

172 Co2 IMPACT MCL-2 COOLING TOWER S S S 14.30 12.80 0% Mar-05

173 Co2 IMPACT CPL tranformer xfhv-05 S S S 12.04 12.60 0% May-11

174 Co2 IMPACT Passge Way of ACM FHV 24 US S S 12.60 13.00 0% May-11

175 Co2 IMPACT Gamling Bldg N/A N/A N/A N/A N/A - - Cancel

176 Co2 IMPACT MCL 1 OP56 N/A N/A N/A N/A N/A - - Cancel

177 Co2 IMPACT MCL 1 OP59 N/A N/A N/A N/A N/A - -

178 Co2 IMPACT MCL 1-PORT F#1R S S S - 15.40 - -

179 Co2 IMPACT Blue Scope Training Center N/A N/A N/A N/A N/A - -

180 Co2 IMPACT Training Center S S S 12.10 14.70 0% Jan-05S = Satisfactory US = Unsatisfactory N/A = Not Applicable

Remark% Lost Weight

Date of Manufacture

Seal Wire is intact

PhysicalSTD

Cylinder Weight

Actual Gross Weight (Kg)Item Type

CO2 (Kg) BrandHose and Nozzle is

Unobstructed

NS BLUE SCOPE STEEL THAILAND

Subin, Wachira, Somkid, Anucha, Anuchit

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

CO2 Portable Fire ExtinguisherClient :

REF. Contract NO : SC1000142Inspection Date : 28 - 30 April 2021

Inspector :Witness : Khun Songpon, Khun Sonthaya

Location

Building Area

181 Co2 IMPACT Training Center S S S 12.10 13.40 0% Jun-11

182 Co2 IMPACT MCL-2 FI 3' S S S 13.50 14.70 0% Mar-05

183 Co2 IMPACT MCL-2 FI 4' S S S 13.50 13.10 0% Mar-05

184 Co2 IMPACT MCL-2 FI 5' S S S 13.50 14.70 0% Mar-05

185 Co2 IMPACT MCL-1 OP49 S S S 12.70 13.10 0% 31/8/2554

186 Co2 IMPACT MCL-1 N38 S S S 12.10 17.10 0% 31/8/2554

187 Co2 IMPACT MCL-1 ZAL S S S 12.70 13.20 0% 31/8/2554

188 Co2 IMPACT PKL OP/15 S S S 13.70 13.90 0% 5/5/2553

189 Co2 IMPACT PKL OP/07 Workshop S S S 12.70 14.00 0% 3/2005

190 Co2 IMPACT Equipment Storage warehouse S S S 12.60 13.34 0% -

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

NS BLUE SCOPE STEEL THAILAND

Subin, Wachira, Somkid, Anucha, Anuchit

RemarkSTD

Cylinder Weight

Actual Gross Weight (Kg)

% Lost Weight

Date of ManufactureItem Type

CO2 (Kg)

Hose and Nozzle is

UnobstructedPhysicalBrand

Seal Wire is intact

Page 36: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.

1858/110-111 Interlink Tower 25 Fl.,

Debaratna Road, Bangna Tai, Bangna,

Bangkok 10260, Thailand.

Telephone no. : 02-366 -9000

Facsimile no. : 02-366-9090

www.tkfs.co.th

For this project, our company will follow inspection and maintenance procedures of fire

alarm system and fire fighting system by referring to these standards as detail below.

Fire Protection System

Standard Reference

NS BLUE SCOPE STEEL (THAILAND) LTD. ( MCL3 )

Preventive Maintenance Fire Protection System

April 2021

Takachiho Fire, Security & Services (Thailand) Ltd.

1858/110-111 Interlink Tower 25 Fl.,

Debaratna Road, Bangna Tai, Bangna,

Bangkok 10260, Thailand.

Tel : 02-366 -9000 , FAX : 02-366-9090

www.tkfs.co.th

Customer : NS Blue Scope Steel Thailand (MCL 3) Report Date : 12 May 2021

Inspector By : 1. Subin Karnna Service Leader

2. Wachira Chaiyapan Technician Service

3. Somkhid Khamlai Technician Service

4. Anucha Chaisirin Technician Service

5. Anuchit Phoomee Technician Service

Takachiho Fire, Security & Services (Thailand) Ltd.

Mr. Chalermchai Soontornpanaves

Fire Service Manager

INSPECTION, TEST AND PREVENTIVE MAINTENANCEFOR

Fire Protection and fire Detection System

Reported By

NSB

ST (M

CL3)

Fire

Ala

rm &

Fire

Sup

pres

sion

Sum

mar

y Re

port

: Ap

ril 2

021

Perv

ious

mon

th O

utst

andi

ng u

pdat

eAp

ril 2

021

Resu

lt

Item

Insp

ectio

n De

scrip

tion

Prio

rity

Stat

us

Fire

ala

rm c

ontr

ol p

anel

Batt

ery

2 Ea

MCL

3O

ver 2

Yea

rs (1

2V/4

2 Ah

)Sh

ould

repl

ace

Low

Me d

ium

Hi g

h

Loca

l pow

er s

uppl

yBa

tter

y 4

EaM

CL 3

Ove

r 2 Y

ears

(12V

/18

Ah)

Shou

ld re

plac

e

Lo

wM

e diu

mH

i gh

M3-

74Sm

oke

Was

t wat

er tr

eatm

ent

Smok

e N

o. A

nsw

or (เสย

)Sh

ould

repl

ace

Low

Med

ium

Hig

hM

3-3

Hea

tW

ast w

ater

trea

tmen

tH

eat ช

อต

alar

m คาง

(เสย

)Sh

ould

repl

ace

Low

Me d

ium

Hi g

h

MCL

3In

erge

n cy

linde

rEn

try

EER,

Por

t EER

, Exi

t EE

R, M

V EE

R, P

LC &

Co

mpu

tor

Hos

e Br

oken

Shou

ld re

plac

e

Lo

wM

e diu

mH

i gh

no.1

4071

193

Iner

gen

cylin

der

Exit

EER

Low

pre

ssur

eSh

ould

refil

l

Lo

wM

e diu

mH

i gh

DV-3

Cont

rolV

alve

MCL

3ปดเมน

วาลวไว

และปลดส

ายทาการ

by

pas

s ไว

ชวคราว

Shou

ld fi

x

Lo

wM

e diu

mH

i gh

AV-K

UST

ED N

O.6

Entr

y w

ash

MCL

3Al

arm

val

ve N

o. 6

ควรตด

ตง

auto

pre

ssur

e re

lief v

alve

เนองจาก

pres

sure

ในระบบสงเกนม

าตรฐาน

Shou

ld in

stal

l

Lo

wM

ediu

mH

igh

Refe

renc

e re

port

: TAK

ACH

IHO

's In

spec

tion

Mon

thly

repo

rt fo

r NS

Blue

scop

e Th

aila

nd :

Apr

il 20

21

Revi

ew B

ySo

ngpo

n So

onta

ros

PSV

Seni

or E

ngin

eer

Dat

e__

____

____

____

____

_

Sign

Off

By

Plan

t Ser

vice

& E

ngin

eerin

g Pr

ojec

t Man

ager

Dat

e__

____

____

____

____

_

3Au

tom

atic

spr

inkl

er

Fire

ala

rm1

Iner

gen

syst

em2

Reco

mm

ent

Loca

tion

Poin

t /

Devi

cePr

oble

m

1/1

Page 37: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.

1858/110-111 Interlink Tower 25 Fl.,

Debaratna Road, Bangna Tai, Bangna,

Bangkok 10260, Thailand.

Tel : 02-366 -9000 , FAX : 02-366-9090

www.tkfs.co.th

FIRE ALARM SYSTEM

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Tel : 02-366 -9000 , FAX : 02-366-9090www.tkfs.co.th

PM. FIRE ALARM SYSTEM

MCL 3 , SIMPLEX 4100 ES [NODE 5]

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for FCP

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function.nn

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of FCP

2. Annunciator Panel

2.1 Check condition of fuse control

2.2 Check condition of Lamp & LEDs

2.3 Check power supply for FCP

2.4 Check cable connection / terminal

2.5 Check Alarm Condition / Function Test

2.6 Visual check condition of battery and housing of battery

2.7 Cleaning of Annunciator Panel

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

AC POWER 225.9 VAC

Charger control panel 26.53 VDC

Battery back up 26.07 VDC ( start 30 Mar 18 )

* Power supply panel box no.1 * Power supply panel box no.2

AC power supply : 230.3 VAC AC power supply : 230.6 VAC

Battery back up : 24.25 Vdc. Battery back up : 24.22 Vdc.

Charge control : 24.23 Vdc. Charge control : 24.21 Vdc.

* Battery back up อายการใชงานเกนมาตราฐาน 2 ป ควรเปลยน

* Smoke point M3-74 No. Answor (เสย)

* Heat pint M3-3 ชอต alarm คาง (เสย)

Y

Y

Client : NS BLUE SCOPE STEEL (THAILAND) LTD. ( MCL3 )

Preventive Maintenance Check Sheet (Monthly/Quarterly)

REF.Contract NO :

Y

Y

Y

Fire Detection and Alarm System

Subject :

TAKACHIHO

Witness : Khun Songpon, Khun Sonthaya

Y

Y

Y

Y

24 time / 2 yearInspection Date :

Remark :

Y

Y

Y

1 - 4 May 2021

Location of fire alarm control panel :

Inspector :

Y

Y

1. Fire Alarm Control Panel

Subin, Wachira, Somkid, Anucha, Anuchit

ResultDescription

CONTROL PANEL FIRE ALARM1 MCL-3

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE ALARM SYSTEM

MCL 3 , SIMPLEX 4100 ES [NODE 5]

1 M3-76 IAM(Inergen Alarm) Y Y2 M3-77 IAM(Inergen Discharge) Y Y3 M3-78 IAM(Inergen Trouble) Y Y4 M3-71 IAM(Inergen Alarm) Y Y5 M3-72 IAM(Inergen Discharge) Y Y6 M3-73 IAM(Inergen Trouble) Y Y7 M3-83 IAM(Inergen Alarm) Y Y8 M3-84 IAM(Inergen Discharge) Y Y9 M3-85 IAM(Inergen Trouble) Y Y10 M3-79 MANUAL Y Y11 M3-81 SMOKE Y Y12 M3-82 SMOKE Y Y13 M3-66 MANUAL Y Y14 M3-65 SMOKE Y Y15 M3-64 SMOKE Y Y16 M3-63 SMOKE Y Y17 M3-68 SMOKE Y Y18 M3-61 MANUAL Y Y19 M3-69 SMOKE Y Y20 M3-75 SMOKE Y Y21 M3-74 SMOKE Y Y22 M3-48 IAM(Inergen Trouble) Y Y23 M3-46 IAM(Inergen Alarm) Y Y24 M3-47 IAM(Inergen Discharge) Y Y25 M3-45 SMOKE Y Y26 M3-44 SMOKE Y Y27 M3-42 MANUAL Y Y28 M3-31 IAM(Inergen Alarm) Y Y29 M3-32 IAM(Inergen Discharge) Y Y30 M3-33 IAM(Inergen Trouble) Y Y

Remark:

Subin, Wachira, Somkid, Anucha, AnuchitKhun Songpon, Khun Sonthaya

MCL-3 EXIT EER. Z1. NO. 1

MCL-3 EXIT EER. Z1. INERGEN

MCL-3 MV EER. Z1 INERGEN ALARM

MCL-3 MV EER. Z1. INERGEN DISCHARGE

MCL-3 MV EER. Z1. INERGEN TROUBLE

MCL-3 EXIT EER. Z1. NO. 2

PLC EER. INERGEN DISCHARGE

PLC EER. INERGEN TROUBLE

Witness :

MCL-3 EXIT EER. Z1. INERGEN

MCL-3 EXIT EER. Z1. INERGEN

item RemarkLocation Inspection ResultType Test ResultLOOP/

Zone.Number

NS BLUE SCOPE STEEL (THAILAND) LTD. ( MCL3 )

Preventive Maintenance Check Sheet

Subject : Client :

REF.Contract NO :

Fire Detection and Alarm System

24 time / 2 year

Inspector :Inspection Date : 1 - 4 May 2021

Location of fire alarm control panel :

MCL-3 PLC EER. Z1. INERGEN

MCL-3 PLC EER. Z1. NO. 1

MCL-3 POT EER. Z7. INERGEN

MCL-3 MV EER. Z1.

MCL-3 MV EER. Z1. NO. 1

MCL-3 POT EER. Z7. NO.2

MCL-3 MV EER. Z1. NO. 2

MCL-3 EXIT EER. Z1. NO. 2

MCL-3 EXIT EER. Z1. NO. 5

MCL-3 EXIT EER. Z1. NO. 3

MCL-3 POT EER. Z7. INERGEN

MCL-3 POT EER. Z7. INERGEN

MCL-3 EXIT EER. Z1. NO. 4

MCL-3 EXIT EER. Z1. NO. 1

MCL-3 PLC EER. Z1. NO. 2

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

MCL-3 POT EER. Z7. NO.1

MCL-3 POT EER. Z7.

MCL-3 ENTRY EER. Z2.

MCL-3 ENTRY EER. Z2.

MCL-3 ENTRY EER. Z2.

Function test1

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE ALARM SYSTEM

MCL 3 , SIMPLEX 4100 ES [NODE 5]

31 M3-29 MANUAL Y32 M3-21 SMOKE DETECTOR Y33 M3-22 SMOKE DETECTOR Y34 M3-23 SMOKE DETECTOR Y35 M3-19 MANUAL Y36 M3-8 MANUAL Y37 M1-1 MANUAL Y38 M1-10 MANUAL Y39 M1-49 MANUAL Y40 M1-45 MANUAL Y41 M1-19 MANUAL Y42 M1-23 MANUAL Y43 M1-29 MANUAL Y44 M3-118 MANUAL Y45 M1-39 MANUAL Y46 M3-86 MANUAL Y47 M3-60 SMOKE DETECTOR Y48 M3-59 SMOKE DETECTOR Y49 M1-77 MANUAL Y50 M1-75 MANUAL Y51 M1-41 MANUAL Y52 M3-100 MANUAL Y53 M2-1 MANUAL Y54 M2-22 MANUAL Y55 M2-10 MANUAL Y56 M2-14 MANUAL Y57 M2-60 MANUAL Y58 M2-61 SMOKE DETECTOR Y59 M2-30 MANUAL Y60 M2-38 MANUAL Y Y

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Remark:

YMCL-3 MANUAL Z. 4 Y

MCL-3 POT PUPIT Z5.MCL-3 CHEMICAL AREA YMCL-3 COATING OP114

MCL-3 MANUAL Z. 4 YMCL-3 MANUAL Z. 4

MCL-3 EXIT PULPIT Z. 4 YMCL-3 EXIT PULPIT Z. 4 Y

MCL-3 MANUAL Z. 4 YMCL-3 MANUAL Z. 4

MCL-3 POT PUPIT Z5. YMCL-3 POT PUPIT Z5. Y

Y

MCL-3 POT PUPIT Z5. YMCL-3 POT PUPIT Z5. Y

Y

MCL-3 Z7 MANUAL (GRID 17/BC) YMCL-3 Z5 MANUAL (GRID 13/BC) Y

MCL-3 POT PUPIT Z5. Y

MCL-3 Z6 MANUAL (GRID 26/BC) YMCL-3 Z6 MANUAL (GRID 21/BC) YMCL-3 Z5 MANUAL (GRID 18/BC) Y

MCL-3 Z6 MANUAL (GRID 31/BC) YMCL-3 Z6 MANUAL (GRID 31/BC) YMCL-3 Z6 MANUAL (GRID 34/BC) Y

MCL-3 WATER TREATMENT Z8. YMCL-3 WATER TREATMENT Z8. YMCL-3 Z6 MANUAL (GRID 34/BC) Y

MCL-3 ENTRY EER. Z2. NO.2 Y

Type

MCL-3 ENTRY EER. Z2. NO.3 Y

Test Result Remark

MCL-3 ENTRY EER. Z2. NO.2 YMCL-3 ENTRY EER. Z2. NO.1 Y

Inspection Result

Location of fire alarm control panel :

item Location LOOP/ Zone.Number

Inspector :

Preventive Maintenance Check Sheet Fire Detection and Alarm System

Witness : Khun Songpon, Khun Sonthaya

Subject : Client :

REF.Contract NO : 24 time / 2 yearInspection Date :

NS BLUE SCOPE STEEL (THAILAND) LTD. ( MCL3 )

Subin, Wachira, Somkid, Anucha, Anuchit1 - 4 May 2021

Function test 2

Page 38: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE ALARM SYSTEM

MCL 3 , SIMPLEX 4100 ES [NODE 5]

61 M2-44 MANUAL Y62 M2-41 SMOKE DETECTOR Y63 M2-40 MANUAL Y64 M1-83 MANUAL Y65 M3-57 MANUAL Y66 M3-55 MANUAL Y67 M1-12 MANUAL Y68 M1-53 MANUAL Y69 M1-55 MANUAL Y70 M1-56 SMOKE DETECTOR Y71 M1-65 MANUAL Y72 M1-67 MANUAL Y73 M2-56 MANUAL Y74 M2-57 SMOKE DETECTOR Y75 M2-58 MANUAL Y76 M2-59 SMOKE DETECTOR Y77 M2-54 MANUAL Y78 M2-50 MANUAL Y79 M2-28 MANUAL Y80 M2-29 SMOKE DETECTOR Y81 M1-63 SMOKE DETECTOR Y82 M1-64 SMOKE DETECTOR Y83 M3-53 SMOKE DETECTOR Y84 M3-54 SMOKE DETECTOR Y85 M2-52 SMOKE DETECTOR Y86 M2-53 SMOKE DETECTOR Y87 M3-4 HEAT DETECTOR Y88 M3-5 HEAT DETECTOR Y89 M3-11 HEAT DETECTOR Y90 M3-12 HEAT DETECTOR Y

Remark:

MCL-3 pit 7 somke 2 YWast water treatment 4 YWast water treatment 5 Y

Wast water treatment 10 Y

MCL-3 pit 7 somke 1 Y

Wast water treatment 9 Y

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

MCL-3 Meeting room YMCL-3 pit 6 somke 1 YMCL-3 pit 6 somke 2 Y

MCL-3 packing pulpit YMCL-3 packing pulpit YMCL-3 Meeting room Y

MCL-3 PAINT COATER FL.2 YMCL-3 PIT 7 Z. 12 YMCL-3 PIT 7 Z. 12 Y

MCL-3 PAINT COATER FL.1 YMCL-3 PAINT COATER FL.1 YMCL-3 PAINT COATER FL.2 Y

MCL-3 ENTRY PULPIT Z. 6 YMCL-3 MANUAL Z. 6 YMCL-3 MANUAL Z. 6 Y

MCL-3 MANUAL Z. 6 YMCL-3 MAMUAL Z. 6 Y

MCL-3 ENTRY PULPIT Z. 6 Y

MCL-3 MANUAL Z. 5 YMCL-3 PIT 6 Z. 11 YMCL-3 PIT 6 Z. 11 Y

Remark

MCL-3 MANUAL Z. 5 YMCL-3 WET LAB Z. 5 YMCL-3 WET LAB Z. 5 Y

Location of fire alarm control panel :

item Location LOOP/ Zone.Number Type Inspection

Result Test Result

Inspector :Witness : Khun Songpon, Khun Sonthaya

Subject : NS BLUE SCOPE STEEL (THAILAND) LTD. ( MCL3 )Client :

REF.Contract NO :Inspection Date :

24 time / 2 year

Subin, Wachira, Somkid, Anucha, Anuchit1 - 4 May 2021

Fire Detection and Alarm SystemPreventive Maintenance Check Sheet

Function test 3

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE ALARM SYSTEM

MCL 3 , SIMPLEX 4100 ES [NODE 5]

91 M3-13 HEAT DETECTOR Y92 M3-16 HEAT DETECTOR Y93 M3-124 SMOKE DETECTOR Y94 M3-125 MANUAL Y95 M3-126 SMOKE DETECTOR Y96 M3-127 MANUAL Y97 M3-7 HEAT DETECTOR Y98 M3-3 HEAT DETECTOR N Damage99 M3-17 HEAT DETECTOR Y

100 M3-18 HEAT DETECTOR Y101 M1-87 MANUAL Y102 M1-90 MANUAL Y103 M3-49 HEAT DETECTOR Y104 M3-50 HEAT DETECTOR Y105 M3-94 HEAT DETECTOR Y106 M3-95 HEAT DETECTOR Y107 M3-96 HEAT DETECTOR Y108 M3-97 HEAT DETECTOR Y109 M3-98 HEAT DETECTOR Y110 M3-99 HEAT DETECTOR Y111 M3-87 HEAT DETECTOR Y112 M3-88 HEAT DETECTOR Y113 M3-89 HEAT DETECTOR Y114 M3-90 MANUAL Y115 M1-57 HEAT DETECTOR Y116 M1-58 HEAT DETECTOR Y117 M2-48 HEAT DETECTOR Y118 M2-49 HEAT DETECTOR Y119 M2-24 HEAT DETECTOR Y120 M2-25 HEAT DETECTOR Y

Remark:

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

MCL3 Fire pump house YMCL3 Toilet 1 Y

MCL3 Toilet 2 Y

MCL3 Toilet 3 YMCL3 Toilet 3 Y

MCL3 Fire pump house YMCL3 Fire pump house Y

MCL3 Toilet 2 Y

MCL3 Toilet 1 Y

MCL-3 Chemical area YMCL-3 Chemical area Y

MCL3 Fire pump house Y

MCL-3 Chemical area YMCL-3 Chemical area YMCL-3 Chemical area Y

MCL-3 Generator z. 7 heat 1 YMCL-3 Generator z. 7 heat 2 Y

MCL-3 Chemical area Y

Wast water treatmentYMCL-3 pit 5 Zone 10 manual

MCL-3 pit 5 Zone 10 manual Y

Y

Wast water treatment YWast water treatment NWast water treatment Y

WWT LAB pulpit YWWT LAB CTRL pulpit YWWT LAB CTRL pulpit Y

Wast water treatment 12 YWWT LAB pulpit Y

Remark

Wast water treatment 11 Y

Type Inspection Result Test Result

Location of fire alarm control panel :

item Location LOOP/ Zone.Number

Inspection Date :Inspector : Subin, Wachira, Somkid, Anucha, Anuchit

Witness : Khun Songpon, Khun Sonthaya

1 - 4 May 2021

Subject : Client : NS BLUE SCOPE STEEL (THAILAND) LTD. ( MCL3 )

REF.Contract NO : 24 time / 2 year

Fire Detection and Alarm SystemPreventive Maintenance Check Sheet

Function test 4

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE ALARM SYSTEM

MCL 3 , SIMPLEX 4100 ES [NODE 5]

121 M1-5 Supervisory valve Y122 M1-48 Supervisory valve Y

123 M1-9 Supervisory valve N/A main valve (DV3) by pass

124 M1-52 Supervisory valve Y125 M1-15 Supervisory valve Y126 M1-62 Supervisory valve Y127 M1-26 Supervisory valve Y128 M1-70 Supervisory valve Y129 M1-28 Supervisory valve Y130 M1-74 Supervisory valve Y131 M1-38 Supervisory valve Y132 M1-82 Supervisory valve Y133 M1-44 Supervisory valve Y134 M2-86 Supervisory valve Y135 M2-9 Supervisory valve Y136 M2-37 Supervisory valve Y137 M2-13 Supervisory valve Y138 M2-35 Supervisory valve Y139 M2-17 Supervisory valve Y140 M2-33 Supervisory valve Y141 M2-21 Supervisory valve Y142 M3-121 Supervisory valve Y143 M3-123 Supervisory valve Y144 M3-15 Supervisory valve Y145 M3-52 Supervisory valve Y146 M3-129 Supervisory valve Y147 M3-24 MANUAL Y148 M3-26 SMOKE DETECTOR Y149 M3-27 SMOKE DETECTOR Y150 M3-28 SMOKE DETECTOR Y

Remark:

Subject : Client : NS BLUE SCOPE STEEL (THAILAND) LTD. ( MCL3 )

REF.Contract NO : 24 time / 2 year

Fire Detection and Alarm SystemPreventive Maintenance Check Sheet

Subin, Wachira, Somkid, Anucha, AnuchitWitness : Khun Songpon, Khun Sonthaya

1 - 4 May 2021Inspection Date :Inspector :

Location of fire alarm control panel :

item Location LOOP/ Zone.Number

MCL3 DV-LISTED ZONE 2MCL3 DV-LISTED ZONE 1

Y

RemarkType Inspection Result Test Result

Y

MCL3 DV-LISTED ZONE 3 N/A

MCL3 DV-LISTED ZONE 4 YMCL3 DV-LISTED ZONE 5 YMCL3 DV-LISTED ZONE 6 YMCL3 DV-LISTED ZONE 7 YMCL3 DV-LISTED ZONE 8 YMCL3 DV-LISTED ZONE 9 Y

MCL3 DV-LISTED ZONE 10 YMCL3 DV-LISTED ZONE 11 YMCL3 DV-LISTED ZONE 12 YMCL3 DV-LISTED ZONE 13 YMCL3 DV-LISTED ZONE 14 YMCL3 DV-LISTED ZONE 15 YMCL3 DV-LISTED ZONE 16 YMCL3 DV-LISTED ZONE 17 YMCL3 DV-LISTED ZONE 18 YMCL3 DV-LISTED ZONE 19 YMCL3 DV-LISTED ZONE 20 YMCL3 DV-LISTED ZONE 21 YMCL3 DV-LISTED ZONE 22 Y

MCL3 AV-LISLED 03 Y

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

MCL3 DV-LISTED ZONE 23 YMCL3 AV-LISLED 01 YMCL3 AV-LISLED 02 Y

MCL-3 ENTRY EER. Z2. NO.1 YMCL-3 ENTRY EER. Z2. NO.4 YMCL-3 ENTRY EER. Z2. NO.5 Y

MCL-3 ENTRY EER. Z2. NO.6 Y

Function test 5

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE ALARM SYSTEM

MCL 3 , SIMPLEX 4100 ES [NODE 5]

151 M2-5 Supervisory valve Y152 M2-63 Supervisory valve Y153 M1-60 Supervisory valve Y154 M2-43 Supervisory valve Y155 M2-27 Supervisory valve Y Y156 M3-132 Supervisory valve Y Y157 M1-58 HEAT DETECTOR Y Y158 M3-131 Supervisory valve Y Y159 M3-117 Supervisory valve Y Y160 M3-110 Supervisory valve Y Y161 M3-109 Supervisory valve Y Y162 M3-111 Supervisory valve Y Y163 M3-114 Supervisory valve Y Y164 M3-1 HEAT DETECTOR Y Y

Remark: M3-1 heat detector damage ( , boomlift, skyjack)

Fire Detection and Alarm SystemPreventive Maintenance Check Sheet

Subject : Client : NS BLUE SCOPE STEEL (THAILAND) LTD. ( MCL3 )

REF.Contract NO : 24 time / 2 yearInspection Date :

Inspector : Subin, Wachira, Somkid, Anucha, AnuchitWitness : Khun Songpon, Khun Sonthaya

1 - 4 May 2021

RemarkType Inspection Result Test Result

Location of fire alarm control panel :

item Location LOOP/ Zone.Number

MCL3 AV-LISLED 05 YMCL3 AV-LISLED 06 YMCL3 AV-LISLED 07 Y

MCL3 PUMP HOUSE SUP/SW

MCL3 AV-LISLED 09MCL3 TOILET 1-Z6

MCL3 PUMP HOUSE M/VMCL3 PUMP HOUSE M/V

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

MCL3 AV-LISLED 04 Y

MCL3 PUMP HOUSE SUP/SWWast water treatment 14

MCL3 AV-LISLED 08

MCL3 PUMP HOUSE SUP/SWMCL3 PUMP HOUSE SUP/SW

Function test 6

Page 39: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE ALARM SYSTEM

MCL-3 GAMLING, NOTIFIER ( RP-1001 )

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for FCP

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of FCP

2. Annunciator Panel

2.1 Check condition of fuse control

2.2 Check condition of Lamp & LEDs

2.3 Check power supply for FCP

2.4 Check cable connection / terminal

2.5 Check Alarm Condition / Function Test

2.6 Visual check condition of battery and housing of battery

2.7 Cleaning of Annunciator Panel

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

Fire Detection and Alarm SystemPreventive Maintenance Check Sheet (Monthly/Quarterly)

Subject : Client : NS BLUE SCOPE STEEL (THAILAND) LTD. ( MCL3 )

REF.Contract NO : 24 time / 2 yearInspection Date :

Inspector : Subin, Wachira, Somkid, Anucha, AnuchitWitness : Khun Songpon, Khun Sonthaya

1 - 4 May 2021

Description Normal Status Result

1. Fire Alarm Control Panel

Location of fire alarm control panel :

S S

S S

S S

S S

S S

S S

S S

N/A N/A

N/A

N/A N/A

N/A N/A

N/A N/A

N/A N/A

TAKACHIHO

Remark : AC Power 228.1 VAC

Charger control panel 27.44 V.dc (Start 1/10/20)

Battery back up 27.43 V.dc

N/A N/A

N/A

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. FIRE ALARM SYSTEM

MCL-3 GAMLING, NOTIFIER ( RP-1001 )

1 Zone 1 Manual Y2 Zone 1 Manual Y3 Zone 1 Manual Y4 Zone 1 Manual Y5 Zone 1 Manual Y6 Zone 1 Manual Y7 Zone 1 Manual Y8 Zone 1 Manual Y

Remark:

Fire Detection and Alarm SystemPreventive Maintenance Check Sheet

Subject : Client : NS BLUE SCOPE STEEL (THAILAND) LTD. ( MCL3 )

REF.Contract NO : 24 time / 2 yearInspection Date :

Inspector : Subin, Wachira, Somkid, Anucha, AnuchitWitness : Khun Songpon, Khun Sonthaya

1 - 4 May 2021

Location of fire alarm control panel :

item Location LOOP/ Zone.Number Remark

Manual No.1 Y

Manual No.3 YManual No.2 Y

Type Inspection Result Test Result

Manual No.4 YManual No.5 YManual No.6Manual No.7Manual No.8

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

YYY

Gamlin Function test 1

Takachiho Fire, Security & Services (Thailand) Ltd.

1858/110-111 Interlink Tower 25 Fl.,

Debaratna Road, Bangna Tai, Bangna,

Bangkok 10260, Thailand.

Tel : 02-366 -9000 , FAX : 02-366-9090

www.tkfs.co.th

INERGEN SYSTEM

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System (Inergen)

Location of fire alarm control panel : MCL-3 ENTRY EER. ROOM AUTOPLUS 542R (RCP-01)

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for RCP and battery

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of RCP

2. Equipment

2.1 Check condition of all detector and function test zone by zone

2.2 cross zone function test of detector

2.3 Check condition of all manual release

2.4 Check condition of solenoid and function test

2.5 Check condition of all abort switch and function test

2.6 Check cable connection / terminal

2.7 Visual check slector valve and function test

2.8 Check condition of all alarm device and tested

3.Mechanical

3.1 check pipe system and nozzle for physical damage.

3.2 check condition of flexible hose

3.3 check condition of cylinder

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Inspection Date :

Client : NS BLUE SCOPE STEEL (THAILAND) LTD. ( MCL3 )REF.Contract NO :

Preventive Maintenance Check Sheet Fire suppression system

24 time / 2 year1 - 4 May 2021

Subject :

Inspector :Witness : Khun Songpon, Khun Sonthaya

Subin, Wachira, Somkid, Anucha, Anuchit

Description Status Function test Result

Electrical system

1. Releasing Control Panel Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Charger control panel 27.22 V.dc

Battery back up 27.19 V.dc (Start using 31/5/2019)

TAKACHIHO

Remark : AC Power 225.6 VAC

Page 40: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System (Inergen)

Location of fire alarm control panel : MCL-3 ENTRY EER. ROOM AUTOPLUS 542R (RCP-01)

1 ZONE.1 SMOKE.1 Y Y cross zone detector to discharge 60 sec.2 ZONE.2 SMOKE.2 Y Y3 ZONE.1 SMOKE.1 Y Y4 ZONE.2 SMOKE.2 Y Y5 ZONE.1 SMOKE.1 Y Y6 ZONE.2 SMOKE.2 Y Y7 ZONE.1 SMOKE.1 Y Y8 ZONE.2 SMOKE.2 Y Y9 ZONE.1 SMOKE.1 Y Y10 ZONE.2 SMOKE.2 Y Y11 ZONE.1 SMOKE.1 Y Y12 ZONE.2 SMOKE.2 Y Y13 ZONE.3 MANUAL.1 Y Y Immediately14 ZONE.3 MANUAL.2 Y Y "15 ZONE.3 MANUAL.3 Y Y "16 ZONE.4 ABORT SW.1 Y Y Original time17 ZONE.4 ABORT SW.2 Y Y "18 ZONE.4 ABORT SW.3 Y Y "19 NAC.1 KEY SW. Y Y20 NAC.2 ALARM BELL Y Y21 NAC.3 STROBE/HORN Y Y22 ZONE.5 PRESSURE SW. Y Y23 NAC.1 SOLENOID VALVE Y Y24 SHUTDOWN AIR Y Y First alarm to shutdown air

* Somke detector cross zone delay times 60 sec.* Abort switch push to original time 60 sec. * Manual release push to immediately

RemarkTest ResultLocation Test trouble signal FCPType

ENTRY eer.roomENTRY eer.room

ENTRY eer.roomENTRY eer.room

ENTRY eer.roomENTRY eer.room

ENTRY eer.room

ENTRY eer.room

ENTRY eer.room

ENTRY eer.room

ENTRY eer.roomENTRY eer.roomENTRY eer.room

ENTRY eer.room

Inspector :Witness :

24 time / 2 yearREF.Contract NO :

Subin, Wachira, Somkid, Anucha, Anuchit1 - 4 May 2021

ENTRY eer.room

Preventive Maintenance Check Sheet Fire suppression system

Inspection Date :

Subject : Client :

item Zone.Number

Khun Songpon, Khun Sonthaya

ENTRY eer.room

NS BLUE SCOPE STEEL (THAILAND) LTD. ( MCL3 )

ENTRY eer.room

ENTRY eer.roomENTRY eer.room

Remark :

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

TAKACHIHO

The function test detector system working is properly

ENTRY eer.roomENTRY eer.room

ENTRY eer.room

ENTRY eer.roomENTRY eer.room

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System (Inergen)

Location of fire alarm control panel : MCL-3 POT EER. ROOM AUTOPLUS 542R (RCP-02)

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for RCP and battery

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of RCP

2. Equipment

2.1 Check condition of all detector and function test zone by zone

2.2 cross zone function test of detector

2.3 Check condition of all manual release

2.4 Check condition of solenoid and function test

2.5 Check condition of all abort switch and function test

2.6 Check cable connection / terminal

2.7 Visual check slector valve and function test

2.8 Check condition of all alarm device and tested

3.Mechanical

3.1 check pipe system and nozzle for physical damage.

3.2 check condition of flexible hose

3.3 check condition of cylinder

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Remark : AC Power 228.3 VAC

TAKACHIHO

Charger control panel 26.95 VDC

Battery back up 26.88 VDC (Start using 26/2/21)

Y

Y Y

Y

Y Y

Y Y

Y Y

Y

Y Y

Y

Y

Y Y

Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Description Status Function test Result

Electrical system

1. Releasing Control Panel

Y Y

Inspector :Witness : Khun Songpon, Khun Sonthaya

Subin, Wachira, Somkid, Anucha, Anuchit

Subject : Client :

REF.Contract NO :Inspection Date :

NS BLUE SCOPE STEEL (THAILAND) LTD. ( MCL3 )24 time / 2 year1 - 4 May 2021

Fire suppression systemPreventive Maintenance Check Sheet

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System (Inergen)

Location of fire alarm control panel : MCL-3 POT EER. ROOM AUTOPLUS 542R (RCP-02)

1 ZONE.1 SMOKE.1 Y Y cross zone detector discharge 60 sec.2 ZONE.2 SMOKE.2 Y Y3 ZONE.1 SMOKE.1 Y Y4 ZONE.2 SMOKE.2 Y Y5 ZONE.3 MANUAL.1 Y Y Immediately6 ZONE.3 MANUAL.2 Y Y Immediately

7 ZONE.4 ABORT SW.1 Y Y Original time 60 sec.8 ZONE.4 ABORT SW.2 Y Y "9 NAC.1 KEY SW. Y Y10 NAC.2 ALARM BELL Y Y11 NAC.3 STROBE/HORN Y Y12 ZONE.5 PRESSURE SW. Y Y13 NAC.1 SOLENOID VALVE Y Y14 SHUTDOWN AIR. Y Y First alarm to shutdown air

The function test detector system working is properly* Somke detector cross zone delay times 60 sec.* Abort switch push to original time 60 sec.* Manual release push to discharge.

item

POT EER. ROOMPOT EER. ROOMPOT EER. ROOMPOT EER. ROOM

Location

POT EER. ROOMPOT EER. ROOMPOT EER. ROOM

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Fire suppression system

Subject :

Khun Songpon, Khun Sonthaya

NS BLUE SCOPE STEEL (THAILAND) LTD. ( MCL3 )24 time / 2 year

Client :REF.Contract NO :

Inspection Date :Subin, Wachira, Somkid, Anucha, AnuchitInspector :

Witness :

1 - 4 May 2021

Preventive Maintenance Check Sheet

Type

TAKACHIHO

Test Result

POT EER. ROOM

Remark

POT EER. ROOMPOT EER. ROOMPOT EER. ROOMPOT EER. ROOMPOT EER. ROOM

Test trouble signal FCP

POT EER. ROOM

Zone.Number

Remark :

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System (Inergen)

Location of fire alarm control panel : MCL-3 EXIT EER. ROOM AUTOPLUS 542R (RCP-03)

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for RCP and battery

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of RCP

2. Equipment

2.1 Check condition of all detector and function test zone by zone

2.2 cross zone function test of detector

2.3 Check condition of all manual release

2.4 Check condition of solenoid and function test

2.5 Check condition of all abort switch and function test

2.6 Check cable connection / terminal

2.7 Visual check slector valve and function test

2.8 Check condition of all alarm device and tested

3.Mechanical

3.1 check pipe system and nozzle for physical damage.

3.2 check condition of flexible hose

3.3 check condition of cylinder

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Remark :

Y Y

Y Y

AC Power 229.4 VAC

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Electrical system

1. Releasing Control Panel

Description Status Function test Result

Inspector :Witness : Khun Songpon, Khun Sonthaya

NS BLUE SCOPE STEEL (THAILAND) LTD. ( MCL3 )24 time / 2 year

Subin, Wachira, Somkid, Anucha, Anuchit1 - 4 May 2021

Charger control panel 27.02 VDC

Battery back up 27.01 VDC (Start using 26/2/21)

TAKACHIHO

Preventive Maintenance Check Sheet Fire suppression system

Subject : Client :

REF.Contract NO :Inspection Date :

Page 41: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System (Inergen)

Location of fire alarm control panel : MCL-3 EXIT EER. ROOM AUTOPLUS 542R (RCP-03)

1 ZONE.1 SMOKE.1 Y Y cross zone detector discharge 60 sec.2 ZONE.2 SMOKE.2 Y Y3 ZONE.1 SMOKE.1 Y Y4 ZONE.2 SMOKE.2 Y Y5 ZONE.1 SMOKE.1 Y Y6 ZONE.2 SMOKE.2 Y Y7 ZONE.3 MANUAL 1 Y Y Immediately8 ZONE.3 MANUAL 2 Y Y Immediately9 ZONE.3 MANUAL 3 Y Y "10 ZONE.4 ABORT.SW 1 Y Y original time 60 sec.11 ZONE.4 ABORT.SW 2 Y Y "12 ZONE.4 ABORT.SW 3 Y Y "13 NAC.1 KEY SW. Y Y14 NAC.2 ALARM BELL Y Y Alarm 215 NAC.3 STROBE/HORN Y Y Alarm 116 ZONE.5 PRESSURE SW. Y Y17 NAC.1 SOLENOID VALVE Y Y18 SHUTDOWN AIR. Y Y First alarm to shutdown19 ZONE.1 SMOKE.1 Y Y20 ZONE.2 SMOKE.2 Y Y

The function test detector system working is properly* Somke detector cross zone delay times 60 sec.* Abort switch push to original time 60 sec.* Manual release push to discharge.

Client :

Khun Songpon, Khun Sonthaya

EXIT EER.ROOMEXIT EER.ROOM

EXIT EER.ROOM

NS BLUE SCOPE STEEL (THAILAND) LTD. ( MCL3 )24 time / 2 year

EXIT EER.ROOM

Subin, Wachira, Somkid, Anucha, Anuchit1 - 4 May 2021

EXIT EER.ROOMEXIT EER.ROOM

EXIT EER.ROOMEXIT EER.ROOMEXIT EER.ROOM

EXIT EER.ROOMEXIT EER.ROOM

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

EXIT EER.ROOMEXIT EER.ROOMEXIT EER.ROOM

item Location Zone.Number Type RemarkTest Result Test trouble signal FCP

Subject :

Remark :

TAKACHIHO

Inspection Date :Inspector :

Witness :

EXIT EER.ROOM

REF.Contract NO :

EXIT EER.ROOM

EXIT EER.ROOMEXIT EER.ROOMEXIT EER.ROOM

EXIT EER.ROOM

Preventive Maintenance Check Sheet Fire suppression system

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System (Inergen)

Location of fire alarm control panel : MCL-3 PLC EER. ROOM AUTOPLUS 542R (RCP-04)

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for RCP and battery

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of RCP

2. Equipment

2.1 Check condition of all detector and function test zone by zone

2.2 cross zone function test of detector

2.3 Check condition of all manual release

2.4 Check condition of solenoid and function test

2.5 Check condition of all abort switch and function test

2.6 Check cable connection / terminal

2.7 Visual check slector valve and function test

2.8 Check condition of all alarm device and tested

3.Mechanical

3.1 check pipe system and nozzle for physical damage.

3.2 check condition of flexible hose

3.3 check condition of cylinder

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Remark :

TAKACHIHO

AC Power 228.3 VAC

Charger control panel 27.03 Vdc.

Battery back up 27.00 Vdc. (Start using 26/2/21)

Y

Y Y

Y

Y Y

Y Y

Y Y

Y

Y Y

Y

Y

Y Y

Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Description Status Function test Result

Electrical system

1. Releasing Control Panel

Y Y

Inspector :Witness : Khun Songpon, Khun Sonthaya

Subin, Wachira, Somkid, Anucha, Anuchit

Subject : Client :

REF.Contract NO :Inspection Date :

NS BLUE SCOPE STEEL (THAILAND) LTD. ( MCL3 )24 time / 2 year1 - 4 May 2021

Fire suppression systemPreventive Maintenance Check Sheet

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System (Inergen)

Location of fire alarm control panel : MCL-3 PLC EER. ROOM AUTOPLUS 542R (RCP-04)

1 ZONE.1 SMOKE.1 Y Y cross zone detector discharge 60 sec.2 ZONE.2 SMOKE.2 Y Y3 ZONE.1 SMOKE.1 Y Y4 ZONE.2 SMOKE.2 Y Y5 ZONE.3 MANUAL. Y Y Immediately6 ZONE.4 ABORT.SW Y Y original time 60 sec.7 NAC.1 KEY SW. Y Y8 NAC.2 ALARM BELL Y Y Alarm 29 NAC.3 STROBE/HORN Y Y Alarm 110 ZONE.5 PRESSURE SW. Y Y11 NAC.1 SOLENOID VALVE Y Y12 SHUTDOWN AIR. Y Y First alarm to shutdown

The function test detector system working is properly* Somke detector cross zone delay times 60 sec.* Abort switch push to original time 60 sec.* Manual release push to discharge.

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

PLC EER.ROOMPLC EER.ROOMPLC EER.ROOMPLC EER.ROOMPLC EER.ROOM

PLC EER.ROOMPLC EER.ROOM

Client :

item Location Zone.Number Type

Khun Songpon, Khun Sonthaya

NS BLUE SCOPE STEEL (THAILAND) LTD. ( MCL3 )24 time / 2 yearREF.Contract NO :

Subin, Wachira, Somkid, Anucha, Anuchit1 - 4 May 2021

Remark :

TAKACHIHO

Inspection Date :Inspector :

Witness :

Test Result

PLC EER.ROOM

Test trouble signal FCP Remark

PLC EER.ROOMPLC EER.ROOMPLC EER.ROOMPLC EER.ROOM

Preventive Maintenance Check Sheet Fire suppression system

Subject :

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System (Inergen)

Location of fire alarm control panel : MCL-3 MV switch ROOM. AUTOPLUS 542R (RCP-05)

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for RCP and battery

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of RCP

2. Equipment

2.1 Check condition of all detector and function test zone by zone

2.2 cross zone function test of detector

2.3 Check condition of all manual release

2.4 Check condition of solenoid and function test

2.5 Check condition of all abort switch and function test

2.6 Check cable connection / terminal

2.7 Visual check slector valve and function test

2.8 Check condition of all alarm device and tested

3.Mechanical

3.1 check pipe system and nozzle for physical damage.

3.2 check condition of flexible hose

3.3 check condition of cylinder

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

Remark :

TAKACHIHO

AC Power 228.8 VAC

Charger control panel 27.31 Vdc.

Battery back up 27.26 V.dc (Start using 25/7/20)

Y

Y Y

Y

Y Y

Y Y

Y Y

Y

Y Y

Y

Y

Y Y

Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Description Status Function test Result

Electrical system

1. Releasing Control Panel

Y Y

Inspector :Witness : Khun Songpon, Khun Sonthaya

Subin, Wachira, Somkid, Anucha, Anuchit

Subject : Client :

REF.Contract NO :Inspection Date :

NS BLUE SCOPE STEEL (THAILAND) LTD. ( MCL3 )24 time / 2 year1 - 4 May 2021

Fire suppression systemPreventive Maintenance Check Sheet

Page 42: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

PM. Fire Suppression System (Inergen)

Location of fire alarm control panel : MCL-3 MV switch ROOM. AUTOPLUS 542R (RCP-05)

1 ZONE.1 SMOKE.1 Y Y cross zone detector discharge 60 sec.2 ZONE.2 SMOKE.2 Y Y3 ZONE.1 SMOKE.1 Y Y4 ZONE.2 SMOKE.2 Y Y5 ZONE 3 MANUAL Y Y Immediately 6 ZONE 3 MANUAL Y Y7 ZONE 4 ABORT.SW Y Y original time 60 sec.8 ZONE 4 ABORT.SW Y Y9 NAC.1 KEY SW. Y Y10 NAC.2 ALARM BELL Y Y11 NAC.3 STROBE/HORN Y Y12 ZONE.5 PRESSURE SW. Y Y13 NAC.1 SOLENOID VALVE Y Y14 SHUTDOWN AIR. Y Y First alarm to shutdown

The function test detector system working is properly* Somke detector cross zone delay times 60 sec.* Abort switch push to original time 60 sec.* Manual release push to discharge.

Y = Satisfactory N = Unsatisfactory N/A = Not Applicable

MV switch room.MV switch room.MV switch room.MV switch room.MV switch room.

MV switch room.

Test Result Test trouble signal FCP Remark

MV switch room.MV switch room.MV switch room.

Type

MV switch room.MV switch room.MV switch room.MV switch room.MV switch room.

24 time / 2 year

Inspector :Witness :

item Location Zone.Number

Khun Songpon, Khun SonthayaSubin, Wachira, Somkid, Anucha, Anuchit1 - 4 May 2021

Remark :

TAKACHIHO

Preventive Maintenance Check Sheet Fire suppression system

Subject : Client :

REF.Contract NO :Inspection Date :

NS BLUE SCOPE STEEL (THAILAND) LTD. ( MCL3 )

Takachiho Fire, Security & Services (Thailand) Ltd.

1858/110-111 Interlink Tower 25 Fl.,

Debaratna Road, Bangna Tai, Bangna,

Bangkok 10260, Thailand.

Tel : 02-366 -9000 , FAX : 02-366-9090

www.tkfs.co.th

INERGEN CYLINDER SYSTEM

Takachiho fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tKfs.co.th

1 141039662 141039493 141039334 141045375 141041686 141039577 141040268 141040209 14104100

10 1410419611 1410399812 1410401413 1410401514 1410410815 1410401316 1410424017 1410421518 1410420219 1410418820 1410412621 1410400822 1410475423 1410398724 1410411025 1410395126 1410407927 1410412928 1410412429 1410416630 14103941

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

REMARK: Hose Inergen Cylinder

MCL-3 ENTRY EER ROOM S 4350 Psi MCL-3 ENTRY EER ROOM S 4350 Psi

MCL-3 ENTRY EER ROOM S 4350 Psi MCL-3 ENTRY EER ROOM S 4350 Psi

MCL-3 ENTRY EER ROOM S 4350 Psi MCL-3 ENTRY EER ROOM S 4350 Psi

MCL-3 ENTRY EER ROOM S 4350 Psi MCL-3 ENTRY EER ROOM S 4350 Psi

MCL-3 ENTRY EER ROOM S 4350 Psi MCL-3 ENTRY EER ROOM S 4350 Psi

MCL-3 ENTRY EER ROOM S 4350 Psi MCL-3 ENTRY EER ROOM S 4350 Psi

MCL-3 ENTRY EER ROOM S 4350 Psi MCL-3 ENTRY EER ROOM S 4350 Psi

MCL-3 ENTRY EER ROOM S 4350 Psi MCL-3 ENTRY EER ROOM S 4350 Psi

MCL-3 ENTRY EER ROOM S 4350 Psi MCL-3 ENTRY EER ROOM S 4350 Psi

MCL-3 ENTRY EER ROOM S 4350 Psi MCL-3 ENTRY EER ROOM S 4350 Psi

MCL-3 ENTRY EER ROOM S 4350 Psi MCL-3 ENTRY EER ROOM S 4350 Psi

MCL-3 ENTRY EER ROOM S 4350 Psi MCL-3 ENTRY EER ROOM S 4350 Psi

MCL-3 ENTRY EER ROOM S 4350 Psi MCL-3 ENTRY EER ROOM S 4350 Psi

MCL-3 ENTRY EER ROOM S 4350 Psi MCL-3 ENTRY EER ROOM S 4350 Psi

Remark

MCL-3 ENTRY EER ROOM S 4350 Psi MCL-3 ENTRY EER ROOM S 4350 Psi

item Location Tank no. Inspect result Pressure tank

Preventive Maintenance Check Sheet

PM. Inergen systemNS BLUE SCOPE STEEL (THAILAND) LTD. ( MCL3 )

Location : MCL-3 Entry EER Inergen Room

Inspection Date :Inspector :

Witness : Khun Songpon, Khun Sonthaya

Fire suppression system

Subject : Client :

REF.Contract NO : 24 time / 2 year

Subin, Wachira, Somkid, Anucha, Anuchit1 - 4 May 2021

Takachiho fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tKfs.co.th

31 1418395432 1410456933 1410452934 1410458335 1410456836 1410401637 1410402438 1410425339 1410424840 1410426841 1410427342 1410416043 1407191244 1410478645 1410408446 1410429447 1410425248 1410410149 1410424150 1410403551 1410414252 1410403253 1410413854 1410415755 1410426456 1410400257 1410397758 13607784 over pressure

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

REMARK:

MCL-3 ENTRY EER ROOM S 4350 PsiMCL-3 ENTRY EER ROOM S 112 Psi (Pilot)

MCL-3 ENTRY EER ROOM S 4350 PsiMCL-3 ENTRY EER ROOM S 4350 Psi

MCL-3 ENTRY EER ROOM S 4350 PsiMCL-3 ENTRY EER ROOM S 4350 Psi

MCL-3 ENTRY EER ROOM S 4350 PsiMCL-3 ENTRY EER ROOM S 4350 Psi

MCL-3 ENTRY EER ROOM S 4350 PsiMCL-3 ENTRY EER ROOM S 4350 Psi

MCL-3 ENTRY EER ROOM S 4350 PsiMCL-3 ENTRY EER ROOM S 4350 Psi

MCL-3 ENTRY EER ROOM S 4350 PsiMCL-3 ENTRY EER ROOM S 4350 Psi

MCL-3 ENTRY EER ROOM S 4350 PsiMCL-3 ENTRY EER ROOM S 4350 Psi

MCL-3 ENTRY EER ROOM S 4350 PsiMCL-3 ENTRY EER ROOM S 4350 Psi

MCL-3 ENTRY EER ROOM S 4350 PsiMCL-3 ENTRY EER ROOM S 4350 Psi

MCL-3 ENTRY EER ROOM S 4350 PsiMCL-3 ENTRY EER ROOM S 4350 Psi

MCL-3 ENTRY EER ROOM S 4350 PsiMCL-3 ENTRY EER ROOM S 4350 Psi

MCL-3 ENTRY EER ROOM S 4350 PsiMCL-3 ENTRY EER ROOM S 4350 Psi

Remark

MCL-3 ENTRY EER ROOM S 4350 PsiMCL-3 ENTRY EER ROOM S 4350 Psi

item Location Tank no. Inspect result Pressure tank

Preventive Maintenance Check Sheet

PM. Inergen systemNS BLUE SCOPE STEEL (THAILAND) LTD. ( MCL3 )

MCL-3 Entry EER Inergen RoomLocation :

Inspection Date :Inspector :

Witness : Khun Songpon, Khun Sonthaya

Fire suppression system

Subject : Client :

REF.Contract NO :

Subin, Wachira, Somkid, Anucha, Anuchit

24 time / 2 year1 - 4 May 2021

Page 43: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tKfs.co.th

1 141040372 141040363 141042704 141042815 141039806 141040817 141042878 141045449 14104210

10 1410428411 1410425412 1410416413 1410401214 1410406015 1410413916 1410400417 1410401018 1410400419 1410408020 1410475221 1410391522 1410478523 13688607

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

REMARK: Hose Inergen Cylinder

MCL 3 PORT EER ROOM S 4350 PsiMCL 3 PORT EER ROOM S 100 bar (Pilot)

MCL 3 PORT EER ROOM S 4350 PsiMCL 3 PORT EER ROOM S 4350 Psi

MCL 3 PORT EER ROOM S 4350 PsiMCL 3 PORT EER ROOM S 4350 Psi

MCL 3 PORT EER ROOM S 4350 PsiMCL 3 PORT EER ROOM S 4350 Psi

MCL 3 PORT EER ROOM S 4350 PsiMCL 3 PORT EER ROOM S 4350 Psi

MCL 3 PORT EER ROOM S 4350 PsiMCL 3 PORT EER ROOM S 4350 Psi

MCL 3 PORT EER ROOM S 4350 PsiMCL 3 PORT EER ROOM S 4350 Psi

MCL 3 PORT EER ROOM S 4350 PsiMCL 3 PORT EER ROOM S 4350 Psi

MCL 3 PORT EER ROOM S 4350 PsiMCL 3 PORT EER ROOM S 4350 Psi

MCL 3 PORT EER ROOM S 4350 PsiMCL 3 PORT EER ROOM S 4350 Psi

MCL 3 PORT EER ROOM S 4350 PsiMCL 3 PORT EER ROOM S 4350 Psi

Inspect result Pressure tank Remark

MCL 3 PORT EER ROOM S 4350 Psi

Witness : Khun Songpon, Khun Sonthaya

Location : MCL-3 Port EER Inergen Room

item Location Tank no.

REF.Contract NO :Inspection Date :

Inspector : Subin, Wachira, Somkid, Anucha, Anuchit

24 time / 2 year1 - 4 May 2021

Fire suppression system

Subject : PM. Inergen systemClient : NS BLUE SCOPE STEEL (THAILAND) LTD. ( MCL3 )

Preventive Maintenance Check Sheet

Takachiho fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tKfs.co.th

1 141041492 141040213 141040994 141040075 141042026 141042897 141040438 141041939 14104028

10 1410403111 1410401912 1407113913 1407114814 1405661115 1410457716 1407180017 1410479718 1410490519 1410490920 1405683721 1407119222 1405646923 1410493424 1410402725 1410402526 1410398127 1410404528 1410401729 1410426730 14071913

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

REMARK: Hose Inergen Cylinder

Fire suppression system

Subject : PM. Inergen systemClient : NS BLUE SCOPE STEEL (THAILAND) LTD. ( MCL3 )

Preventive Maintenance Check Sheet

Witness : Khun Songpon, Khun Sonthaya

Location : MCL-3 Exit EER Inergen Room

item Location Tank no.

REF.Contract NO :Inspection Date :

Inspector : Subin, Wachira, Somkid, Anucha, Anuchit

24 time / 2 year1 - 4 May 2021

MCL 3 EXIT EER ROOM S 4350 PsiMCL 3 EXIT EER ROOM S 4350 Psi

Inspect result Pressure tank Remark

MCL 3 EXIT EER ROOM S 4350 Psi

MCL 3 EXIT EER ROOM S 4350 PsiMCL 3 EXIT EER ROOM S 4350 Psi

MCL 3 EXIT EER ROOM S 4350 PsiMCL 3 EXIT EER ROOM S 4350 Psi

MCL 3 EXIT EER ROOM S 4350 PsiMCL 3 EXIT EER ROOM S 4350 Psi

MCL 3 EXIT EER ROOM S 4350 PsiMCL 3 EXIT EER ROOM S 4350 Psi

MCL 3 EXIT EER ROOM S 4350 PsiMCL 3 EXIT EER ROOM S 4350 Psi

MCL 3 EXIT EER ROOM S 4350 PsiMCL 3 EXIT EER ROOM S 4350 Psi

MCL 3 EXIT EER ROOM S 4350 PsiMCL 3 EXIT EER ROOM S 4350 Psi

MCL 3 EXIT EER ROOM S 4350 PsiMCL 3 EXIT EER ROOM S 4350 Psi

MCL 3 EXIT EER ROOM S 4350 PsiMCL 3 EXIT EER ROOM S 4350 Psi

MCL 3 EXIT EER ROOM S 4350 PsiMCL 3 EXIT EER ROOM S 4350 Psi

MCL 3 EXIT EER ROOM S 4350 PsiMCL 3 EXIT EER ROOM S 4350 Psi

MCL 3 EXIT EER ROOM S 4350 PsiMCL 3 EXIT EER ROOM S 4350 Psi

MCL 3 EXIT EER ROOM S 4350 Psi

MCL 3 EXIT EER ROOM S 4350 PsiMCL 3 EXIT EER ROOM S 4350 Psi

Takachiho fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tKfs.co.th

31 1410490232 1410408533 1410400134 1410455235 1407198036 14071193 Low pressure37 1410421138 1410421639 1410423040 1410415541 1410425942 1410423543 1410411144 1410413045 13607776

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

REMARK:

Fire suppression system

Subject : PM. Inergen systemClient : NS BLUE SCOPE STEEL (THAILAND) LTD. ( MCL3 )

Preventive Maintenance Check Sheet

Witness : Khun Songpon, Khun Sonthaya

Location : MCL-3 Exit EER Inergen Room

item Location Tank no.

REF.Contract NO :Inspection Date :

Inspector : Subin, Wachira, Somkid, Anucha, Anuchit

24 time / 2 year1 - 4 May 2021

MCL 3 EXIT EER ROOM S 4350 PsiMCL 3 EXIT EER ROOM S 4350 Psi

Inspect result Pressure tank Remark

MCL 3 EXIT EER ROOM S 4350 Psi

MCL 3 EXIT EER ROOM US 0 PsiMCL 3 EXIT EER ROOM S 4350 Psi

MCL 3 EXIT EER ROOM S 4350 PsiMCL 3 EXIT EER ROOM S 4350 Psi

MCL 3 EXIT EER ROOM S 4350 PsiMCL 3 EXIT EER ROOM S 4350 Psi

MCL 3 EXIT EER ROOM S 4350 PsiMCL 3 EXIT EER ROOM S 4350 Psi

MCL 3 EXIT EER ROOM S 4350 PsiMCL 3 EXIT EER ROOM S 100 (Pilot)

MCL 3 EXIT EER ROOM S 4350 PsiMCL 3 EXIT EER ROOM S 4350 Psi

Takachiho fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tKfs.co.th

1 141039232 141039283 141039504 140718615 141039296 141039347 141041028 141039209 14104557

10 1410454211 1410456112 1405646613 1410451714 1405663615 1407149316 U8/1UT

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

REMARK: Hose Inergen Cylinder

Fire suppression system

Subject : PM. Inergen systemClient : NS BLUE SCOPE STEEL THAILAND(MCL3)

Preventive Maintenance Check Sheet

Witness : Khun Songpon, Khun Sonthaya

Location : MCL-3 MV EER Inergen Room

item Location Tank no.

REF.Contract NO : 24 time / 2 yearInspection Date :

Inspector : Subin, Wachira, Somkid, Anucha, Anuchit1 - 4 May 2021

MCL 3 MV EER ROOM S 4350 PsiMCL 3 MV EER ROOM S 4350 Psi

Inspect result Pressure tank Remark

MCL 3 MV EER ROOM S 4350 Psi

MCL 3 MV EER ROOM S 4350 PsiMCL 3 MV EER ROOM S 4350 Psi

MCL 3 MV EER ROOM S 4350 PsiMCL 3 MV EER ROOM S 4350 Psi

MCL 3 MV EER ROOM S 4350 PsiMCL 3 MV EER ROOM S 4350 Psi

MCL 3 MV EER ROOM S 4350 PsiMCL 3 MV EER ROOM S 4350 Psi

MCL 3 MV EER ROOM S 4350 PsiMCL 3 MV EER ROOM S 4350 Psi

MCL 3 MV EER ROOM S 4350 PsiMCL 3 MV EER ROOM S 4350 Psi

MCL 3 MV EER ROOM S 100 bar(Pilot)

Page 44: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tKfs.co.th

1 141039882 141047663 141047574 141049075 141047586 U8/2UT

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

REMARK: Hose Inergen Cylinder

Fire suppression system

Subject : PM. Inergen systemClient : NS BLUE SCOPE STEEL (THAILAND) LTD. ( MCL3 )

Preventive Maintenance Check Sheet

Witness : Khun Songpon, Khun Sonthaya

Location : MCL-3 PLC & Computor Inergen Room

item Location Tank no.

REF.Contract NO :Inspection Date :

Inspector : Subin, Wachira, Somkid, Anucha, Anuchit

24 time / 2 year1 - 4 May 2021

MCL 3 PLC & COMPUTOR ROOM S 4350 PsiMCL 3 PLC & COMPUTOR ROOM S 4350 Psi

Inspect result Pressure tank Remark

MCL 3 PLC & COMPUTOR ROOM S 4350 Psi

MCL 3 PLC & COMPUTOR ROOM S 100 bar(Pilot)

MCL 3 PLC & COMPUTOR ROOM S 4350 PsiMCL 3 PLC & COMPUTOR ROOM S 4350 Psi

Takachiho Fire, Security & Services (Thailand) Ltd.

1858/110-111 Interlink Tower 25 Fl.,

Debaratna Road, Bangna Tai, Bangna,

Bangkok 10260, Thailand.

Tel : 02-366 -9000 , FAX : 02-366-9090

www.tkfs.co.th

DELUGE SYSTEM

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, B

angn

a,B

angk

ok 1

0260

, Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

SYST

EM C

OM

PON

ENTS

delu

ge-1

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

1 Spray Nozzle : Note condition of all nozzles. If there is no physical damage, no corrosion, and no mark " S " in block of yes. If not, assure corrections are made and briefly describe under " Remark "

2 Piping : Note condition of all piping. If there is no physical damage, no corrosion, no misaligned. Pipes and there are no external loads, mark " S " in block of yes. If not, assure corrections are made and briefly describe under " Remark "

3 Piping Hangers : Note all pipe hangers. If there is no damage and corrosion, Mark " S " in block of yes. If not, assure corrections are made and briefly describe under " Remark "

4 Gauges : Note condition of gauges. Record water pressure ( PSI )

5 Flow Test : Conduct full flow test. Assure system operates properly and record operation time.

6 Deluge Valve : Internal inspect deluge or preaction valve. Verify that all components operate, properly, move freely and in good condition. If so, mark " S " in block of yes. If not, assure valve is repaired and briefly describe un der " Remark "

7 Control Valve : Operate cach control valve through its full range and return to its normal position.( Seal or relock if appropricate ) If valve operates properly, mark " S " in block of yes. If not, assure valve is repaired and briefly describe under " Remark "

8 Deluge Supervisory Panel and equipments appear operation. Mark " S " in block of yes. If not, assure valve is repaired and briefly describe under " Remark "

9 Control Valve Lubrication : Lubricate all valve systems with graphite in oil. Mark " S " in block of yes. If not, assure valve is repaired and briefly describe under " Remark "

DESCRIPTION OF INSPECTION AND TEST FOR DELUGE SYSTEM

Page 45: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.

1858/110-111 Interlink Tower 25 Fl.,

Debaratna Road, Bangna Tai, Bangna,

Bangkok 10260, Thailand.

Tel : 02-366 -9000 , FAX : 02-366-9090

www.tkfs.co.th

AUTOMATIC SPRINKLER SYSTEM

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

1 Sprinkler nozzle : Note condition of all nozzles. If there is no physical damage, no corrosion, and no obstructions,mark " S " in block of yes. If not, assure corrections are made and briefly describe under " Remark " S

2 Piping : Note condition of all piping. If there is no physical damage, no corrosion, no misaligned. pipes andthere are no external loads, mark " S " in block of yes. If not, assure corrections are made and briefly describe Sunder " Remark "

3 Piping Hangers : Note all pipe hangers. If there is no damage and corrosion, Mark " S " in block of yes. S If not, assure corrections are made and briefly describe under " Remark "

4 Gauges : Note condition of gauges. Record water pressure ( PSI )

5 Flow Test : Conduct full flow test at test valve for ensure alarm gong or pressure switch work properly in alarm function

6 Alarm Valve: Internal inspect alarm valve. Verify that all components to proper operate ,move freely and in good Scondition If so, mark " S " in block of yes. If not, assure valve is repaired and briefly describe under "remark"

7 Control Valve : Operate cach control valve through its full range and return to its normal position.( Seal or relock if appropricate ) If valve operates properly, mark " S " in block of yes. If not, assure valve is Srepaired and briefly describe under " Remark "

8 Main drain valve: check main drain valve are in close position and no leak

9 Control Valve Lubrication : Lubricate all valve systems with graphite in oil. Mark " S " in block of yes. S If not, assure valve is repaired and briefly describe under " Remark "

Inspector By:

DESCRIPTION OF INSPECTION AND TEST FOR AUTOMATIC SPRINKLER SYSTEM(WET PIPE)

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, B

angn

a,B

angk

ok 1

0260

, Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

NS

BLU

E SC

OPE

STE

EL (T

HAI

LAN

D) L

TD. (

MC

L3 )

Khu

n So

ngpo

n, K

hun

Sont

haya

Loca

tion

: MC

L-3

belo

wab

ove

1M

CL

3 . B

C33

N/A

SS

150

160

N/A

N/A

N/A

SS

SS

SN

/A2

MC

L 3.

BE

33N

/AS

S14

015

5N

/AN

/AN

/AS

SS

SS

N/A

3M

CL

3 .B

C31

N/A

SS

150

175

N/A

N/A

N/A

US

US

SS

SN

/A4

MC

L 3

.BE

29N

/AS

S14

515

0N

/AN

/AN

/AS

SS

SS

N/A

5M

CL

3 .B

C27

N/A

SS

150

155

N/A

N/A

N/A

SS

SS

SN

/A

Clie

nt :

Aut

omat

ic s

prin

kler

sys

tem

Witn

ess

:In

spec

tor :

24 ti

me

/ 2 y

ear

Des

crip

tion

RE

F.C

ontra

ct N

O :

ItemIn

spec

tion

Dat

e : Su

bin,

Wac

hira

, Som

kid,

Anu

cha,

Anu

chit

1 - 4

May

202

1

Rem

ark

Lock

Tem

per

Sw

itch

Wat

er P

ress

ure

Air

Pre

ssur

e

Con

trol V

alve

Spr

ay

Noz

zie

Pip

ing

Det

ecto

r C

ondi

tion

Lubr

icat

ion

Ala

rm

Val

ve

Pre

ssur

e R

eadi

ng (P

si)

supe

rvis

ory

syst

em o

f Mai

n V

alve

Con

trol

Pan

el

DV

-LIS

TED

ZO

NE

. 1

DV

-LIS

TED

ZO

NE

. 2

Ope

ratio

n

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

DV

-LIS

TED

ZO

NE

. 3

Rem

ark

:

Pre

viou

s Te

st

Com

men

t :

DV

-LIS

TED

ZO

NE

. 5

Loca

tion

DV

-LIS

TED

ZO

NE

. 4 DV-

3

by

pass

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, B

angn

a,B

angk

ok 1

0260

, Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

NS

BLU

E SC

OPE

STE

EL (T

HAI

LAN

D) L

TD. (

MC

L3 )

Loca

tion

: MC

L-3

belo

wab

ove

6M

CL

3 .B

E26

N/A

SS

145

155

N/A

N/A

N/A

SS

SS

SN

/A7

MC

L 3

.BC

21N

/AS

S15

015

0N

/AN

/AN

/AS

SS

SS

N/A

8M

CL

3 .B

E21

N/A

SS

145

155

N/A

N/A

N/A

SS

SS

SN

/A9

MC

L 3

.BC

19N

/AS

S15

016

0N

/AN

/AN

/AS

SS

SS

N/A

10M

CL

3 .B

E19

N/A

SS

145

155

N/A

N/A

N/A

SS

SS

SN

/A

24 ti

me

/ 2 y

ear

Rem

ark

:C

omm

ent :

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

DV

-LIS

TED

ZO

NE

. 6

DV

-LIS

TED

ZO

NE

. 7

DV

-LIS

TED

ZO

NE

. 8

DV

-LIS

TED

ZO

NE

. 9

RE

F.C

ontra

ct N

O :

DV

-LIS

TED

ZO

NE

. 10

Pre

viou

s Te

st

Insp

ecto

r :W

itnes

s :

Item

Rem

ark

Lock

Tem

per

Sw

itch

Wat

er P

ress

ure

Air

Pre

ssur

eO

pera

tion

Con

trol

Pan

elLu

bric

atio

n

Ala

rm

Val

ve

Con

trol V

alve

Pip

ing

Spr

ay

Noz

zie

Pre

ssur

e R

eadi

ng (P

si)

Des

crip

tion

Insp

ectio

n D

ate

:

supe

rvis

ory

syst

em o

f Mai

n V

alve

Loca

tion

Det

ecto

r C

ondi

tion

Subi

n, W

achi

ra, S

omki

d, A

nuch

a, A

nuch

itK

hun

Song

pon,

Khu

n So

ntha

ya

1 - 4

May

202

1

Clie

nt :

Aut

omat

ic s

prin

kler

sys

tem

Page 46: NS BLUE SCOPE STEEL (THAILAND) LTD

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, B

angn

a,B

angk

ok 1

0260

, Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

NS

BLU

E SC

OPE

STE

EL (T

HAI

LAN

D) L

TD. (

MC

L3 )

Loca

tion

: MC

L 3

belo

wab

ove

11M

CL

3 .B

C13

N/A

SS

145

155

N/A

N/A

N/A

SS

SS

SN

/A12

MC

L 3

.BE

12N

/AS

S15

016

0N

/AN

/AN

/AS

SS

SS

N/A

13M

CL

3 .B

C10

N/A

SS

150

160

N/A

N/A

N/A

SS

SS

SN

/A14

MC

L 3

.BE

10N

/AS

S15

016

0N

/AN

/AN

/AS

SS

SS

N/A

15M

CL

3 .B

C5

N/A

SS

145

160

N/A

N/A

N/A

SS

SS

SN

/A

24 ti

me

/ 2 y

ear

Rem

ark

:C

omm

ent :

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

DV

-LIS

TED

ZO

NE

. 11

DV

-LIS

TED

ZO

NE

. 12

DV

-LIS

TED

ZO

NE

. 13

DV

-LIS

TED

ZO

NE

. 14

RE

F.C

ontra

ct N

O :

DV

-LIS

TED

ZO

NE

. 15

Pre

viou

s Te

st

Insp

ecto

r :W

itnes

s :

Item

Rem

ark

Lock

Tem

per

Sw

itch

Wat

er

Pre

ssur

eA

ir P

ress

ure

Ope

ratio

n

Con

trol

Pan

elLu

bric

atio

n

Ala

rm

Val

ve

Con

trol V

alve

Pip

ing

Spr

ay

Noz

zie

Pre

ssur

e R

eadi

ng (P

si)

Des

crip

tion

Insp

ectio

n D

ate

:

supe

rvis

ory

syst

em o

f Mai

n V

alve

Loca

tion

Det

ecto

r C

ondi

tion

Subi

n, W

achi

ra, S

omki

d, A

nuch

a, A

nuch

itK

hun

Song

pon,

Khu

n So

ntha

ya

1 - 4

May

202

1

Clie

nt :

Aut

omat

ic s

prin

kler

sys

tem

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, B

angn

a,B

angk

ok 1

0260

, Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

NS

BLU

E SC

OPE

STE

EL (T

HAI

LAN

D) L

TD. (

MC

L3 )

Loca

tion

: MC

L 3

belo

wab

ove

16M

CL

3 .B

F5N

/AS

S15

015

5N

/AN

/AN

/AS

SS

SS

N/A

17M

CL

3 .B

D4

N/A

SS

150

165

N/A

N/A

N/A

SS

SS

SN

/A18

MC

L 3

.BH

5N

/AS

S15

015

5N

/AN

/AN

/AS

SS

SS

N/A

19M

CL

3 .B

H4

N/A

SS

140

160

N/A

N/A

N/A

SS

SS

SN

/A20

MC

L 3

.BI5

N/A

SS

145

160

N/A

N/A

N/A

SS

SS

SN

/A

24 ti

me

/ 2 y

ear

Rem

ark

:C

omm

ent :

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

DV

-LIS

TED

ZO

NE

. 16

DV

-LIS

TED

ZO

NE

. 17

DV

-LIS

TED

ZO

NE

. 18

DV

-LIS

TED

ZO

NE

. 19

RE

F.C

ontra

ct N

O :

DV

-LIS

TED

ZO

NE

. 20

Pre

viou

s Te

st

Insp

ecto

r :W

itnes

s :

Item

Rem

ark

Lock

eTe

mpe

r S

witc

h

Wat

er P

ress

ure

Air

Pre

ssur

eO

pera

tion

Con

trol

Pan

elLu

bric

atio

n

Ala

rm

Val

ve

Con

trol V

alve

Pip

ing

Spr

ay

Noz

zie

Pre

ssur

e R

eadi

ng (P

si)

Des

crip

tion

Insp

ectio

n D

ate

:

supe

rvis

ory

syst

em o

f Mai

n V

alve

Loca

tion

Det

ecto

r C

ondi

tion

Subi

n, W

achi

ra, S

omki

d, A

nuch

a, A

nuch

itK

hun

Song

pon,

Khu

n So

ntha

ya

1 - 4

May

202

1

Clie

nt :

Aut

omat

ic s

prin

kler

sys

tem

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, B

angn

a,B

angk

ok 1

0260

, Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

NS

BLU

E SC

OPE

STE

EL (T

HAI

LAN

D) L

TD. (

MC

L3 )

Loca

tion

: Res

erve

Uni

t

belo

wab

ove

21M

CL

3 .B

I4N

/AS

S15

016

0N

/AN

/AN

/AS

SS

SS

N/A

22M

CL

3 .O

P10

5N

/AS

S15

016

0N

/AN

/AN

/AS

SS

SS

N/A

23M

CL

3 .O

P10

9N

/AS

S15

015

5N

/AN

/AN

/AS

SS

SS

N/A

24W

ES

T W

ATE

RN

/AS

S15

016

0N

/AN

/AN

/AS

SS

SS

N/A

25E

GD

.& P

OT

PU

LPIT

N/A

SS

150

160

N/A

N/A

N/A

SS

SS

SN

/A

24 ti

me

/ 2 y

ear

Rem

ark

:C

omm

ent :

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

DV

-LIS

TED

ZO

NE

. 21

DV

-LIS

TED

ZO

NE

. 22

DV

-LIS

TED

ZO

NE

. 23

AV

-LIS

LED

NO

.1

RE

F.C

ontra

ct N

O :

AV

-LIS

LED

NO

.2

Pre

viou

s Te

st

Insp

ecto

r :W

itnes

s :

Item

Rem

ark

Lock

eTe

mpe

r S

witc

h

Wat

er P

ress

ure

Air

Pre

ssur

eO

pera

tion

Con

trol

Pan

elLu

bric

atio

n

Ala

rm

Val

ve

Con

trol V

alve

Pip

ing

Spr

ay

Noz

zie

Pre

ssur

e R

eadi

ng (P

si)

Des

crip

tion

Insp

ectio

n D

ate

:

supe

rvis

ory

syst

em o

f Mai

n V

alve

Loca

tion

Det

ecto

r C

ondi

tion

Subi

n, W

achi

ra, S

omki

d, A

nuch

a, A

nuch

itK

hun

Song

pon,

Khu

n So

ntha

ya

1 - 4

May

202

1

Clie

nt :

Aut

omat

ic s

prin

kler

sys

tem

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, B

angn

a,B

angk

ok 1

0260

, Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

NS

BLU

E SC

OPE

STE

EL (T

HAI

LAN

D) L

TD. (

MC

L3 )

Loca

tion

: Res

erve

Uni

t

belo

wab

ove

26C

OA

TOR

PU

LPIT

N/A

SS

145

175

N/A

N/A

N/A

SS

SS

SN

/A27

Gam

ling

area

N/A

SS

150

160

N/A

N/A

N/A

SS

SS

SN

/A28

Gam

ling

area

N/A

SS

155

175

N/A

N/A

N/A

SS

SS

SN

/A29

EN

TRY

WA

SH

N/A

SS

140

175

N/A

N/A

N/A

SS

SS

SN

/A30

LAB

&P

RO

CE

SS

N/A

SS

150

165

N/A

N/A

N/A

SS

SS

SN

/A

* Ala

rm v

alve

No.

6

aut

o pr

essu

re re

lief v

alve

p

ress

ure

24 ti

me

/ 2 y

ear

Rem

ark

:C

omm

ent :

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

AV

-LIS

TED

NO

. 3

AV

-LIS

TED

NO

. 4

AV

-LIS

TED

NO

. 5

AV

-LIS

TED

NO

. 6

RE

F.C

ontra

ct N

O :

AV

-LIS

TED

NO

. 7

Pre

viou

s Te

st

Insp

ecto

r :W

itnes

s :

Item

Rem

ark

Lock

eTe

mpe

r S

witc

h

Wat

er P

ress

ure

Air

Pre

ssur

eO

pera

tion

Con

trol

Pan

elLu

bric

atio

n

Ala

rm

Val

ve

Con

trol V

alve

Pip

ing

Spr

ay

Noz

zie

Pre

ssur

e R

eadi

ng (P

si)

Des

crip

tion

Insp

ectio

n D

ate

:

supe

rvis

ory

syst

em o

f Mai

n V

alve

Loca

tion

Det

ecto

r C

ondi

tion

Subi

n, W

achi

ra, S

omki

d, A

nuch

a, A

nuch

itK

hun

Song

pon,

Khu

n So

ntha

ya

1 - 4

May

202

1

Clie

nt :

Aut

omat

ic s

prin

kler

sys

tem

Page 47: NS BLUE SCOPE STEEL (THAILAND) LTD

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, B

angn

a,B

angk

ok 1

0260

, Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

NS

BLU

E SC

OPE

STE

EL (T

HAI

LAN

D) L

TD. (

MC

L3 )

Loca

tion

: Res

erve

Uni

t

belo

wab

ove

31M

CL

3 .O

P 1

22N

/AS

N/A

145

165

N/A

N/A

N/A

SS

SS

SN

/A R

elie

f V

alve

32M

CL

3 .F

ire P

ump

N/A

SN

/A17

0n

N/A

N/A

N/A

SS

SS

SN

/A

Witn

ess

:

Auto

mat

ic s

prin

kler

sys

tem

Clie

nt :

RE

F.C

ontra

ct N

O :

24 ti

me

/ 2 y

ear

Insp

ectio

n D

ate

:In

spec

tor :

Subi

n, W

achi

ra, S

omki

d, A

nuch

a, A

nuch

itK

hun

Song

pon,

Khu

n So

ntha

ya

1 - 4

May

202

1

Item

Des

crip

tion

Loca

tion

Pre

viou

s Te

st

supe

rvis

ory

syst

em o

f Mai

n V

alve

Rem

ark

Lock

eTe

mpe

r S

witc

h

Wat

er P

ress

ure

Air

Pre

ssur

eO

pera

tion

Lubr

icat

ion

Ala

rm

Val

ve

Con

trol V

alve

Pip

ing

Spr

ay

Noz

zie

Con

trol

Pan

elD

etec

tor

Con

ditio

n

Pre

ssur

e R

eadi

ng (P

si)

Rem

ark

:C

omm

ent :

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

AV

-LIS

TED

NO

. 8

AV

-LIS

TED

NO

. 9

Takachiho Fire, Security & Services (Thailand) Ltd.

1858/110-111 Interlink Tower 25 Fl.,

Debaratna Road, Bangna Tai, Bangna,

Bangkok 10260, Thailand.

Tel : 02-366 -9000 , FAX : 02-366-9090

www.tkfs.co.th

FIRE HYDRANT SYSTEM

OW

NER

:N

S BL

UE

SCO

PE S

TEEL

(TH

AILA

ND

) LTD

. ( M

CL3

)Ar

ea :

NS

blue

sco

pe s

teel

Con

tract

or N

ame:

P

M. F

ire P

rote

ctio

n S

yste

mD

ate

:1

- 4 M

ay 2

021

Site

:R

ayon

g

- Cor

rosi

on

- Gas

ket

- Bol

t&N

ut

- Cor

rosi

on

- Thr

ead

- Lea

kage

- Han

dle

- Lea

kage

- Ste

m P

acki

ng

- Cor

rosi

on

- Sea

l Con

ditio

n

- Lea

kage

- Con

nect

or L

ocke

r

-Cap

Rem

ark:

Che

cked

by

:S

ubin

, Wac

hira

, Som

kid,

Anu

cha,

Anu

chit

Insp

ectio

n R

epor

tFI

RE

HYD

RAN

T

Des

crip

tion

Equi

pmen

t No.

REM

ARK

SN

O.1

NO

.2N

O.3

NO

.4N

O.5

NO

.6N

O.7

NO

.8

MC

L-3

MC

L-3

MC

L-3

MC

L-3

MC

L-3

MC

L-3

MC

L-3

Gam

ling

MC

L-3

Gam

ling

Flan

gs

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Pipi

ng

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

Valv

e

SS

SS

SS

SS

SS

SS S

SS

SS

S

SS

SS

S

SS

S SSS

S SS

S

SS

SS

SS

SS

S

SS

S

S

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

Cou

plin

g

SS

S

SS

SS

SS

SS

S

SS

SS

S

S

Takachiho Fire, Security & Services (Thailand) Ltd.

1858/110-111 Interlink Tower 25 Fl.,

Debaratna Road, Bangna Tai, Bangna,

Bangkok 10260, Thailand.

Tel : 02-366 -9000 , FAX : 02-366-9090

www.tkfs.co.th

FIRE HOSE REEL OR STANDPIPE AND HOSE

SYSTEM

Page 48: NS BLUE SCOPE STEEL (THAILAND) LTD

OW

NER

:N

S BL

UE

SCO

PE S

TEEL

(TH

AILA

ND

) LTD

. ( M

CL3

)Ar

ea :

NS

blu

e sc

ope

stee

l

Dat

e :1

- 4

May

202

1

Pro

ject

nam

e:P

M. F

ire P

rote

ctio

n S

yste

mS

ite :

Ray

ong

- Cor

rosi

on

- Doo

r

- Key

lock

- Cor

rosi

on

Con

ditio

n

Con

trol v

alve

con

ditio

n

Con

nect

or L

ocke

r

Seal

con

ditio

n

Pipe

sys

tem

is in

goo

d co

nditi

on

all h

ose

and

hose

val

ve is

in g

ood

cond

ition

- Lea

kage

- Con

ditio

n

- Cor

rosi

on

Rem

ark:

Che

cked

by

:S

ubin

, Wac

hira

, Som

kid,

Anu

cha,

Anu

chit

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

S

SS

SS

SS

S

SS

SS

SS

S

Noz

zel

S

SS

S

Equi

pmen

t No.

SS

Com

pone

nt

S

S

S

S

S

SS

S

SS

SS

SS

SS

Supp

ort

SS

SS

SS

SS

SS

SS

SS

S

SS

SS

S

SS

SS

S

S S

SS

SS

SS

S

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Cab

inet

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

NO

.7

S S S

N/A

N/A

N/A

N/A

N/A

MC

L-3

BC

20M

CL-

3 B

C13

MC

L-3

BC

8M

CL-

3 B

C4

MC

L-3

BI4

MC

L-3

BE

8

SS

SS SS

MC

L-3

BE

16

Insp

ectio

n R

epor

tFI

RE

HO

SE R

EEL

OR

STA

ND

PIPE

AN

D H

OSE

SYS

TEM

Des

crip

tion

REM

AR

KS

NO

.1

S S

SS

S

S S S S S

NO

.8N

O.9

MC

L-3

BC

30M

CL-

3 B

C25

NO

.2N

O.3

NO

.4N

O.5

NO

.6

OW

NER

:N

S BL

UE

SCO

PE S

TEEL

(TH

AILA

ND

) LTD

. ( M

CL3

)Ar

ea :

NS

blu

e sc

ope

stee

l

Dat

e :1

- 4

May

202

1

Pro

ject

nam

e:P

M. F

ire P

rote

ctio

n S

yste

mS

ite :

Ray

ong

- Cor

rosi

on

- Doo

r

- Key

lock

- Cor

rosi

on

Con

ditio

n

Con

trol v

alve

con

ditio

n

Con

nect

or L

ocke

r

Seal

con

ditio

n

Pipe

sys

tem

is in

goo

d co

nditi

on

all h

ose

and

hose

val

ve is

in g

ood

cond

ition

- Lea

kage

- Con

ditio

n

- Cor

rosi

on

Rem

ark:

Che

cked

by

:S

ubin

, Wac

hira

, Som

kid,

Anu

cha,

Anu

chit

NO

.14

NO

.15

NO

.16

N/A

N/A

N/A

Insp

ectio

n R

epor

tFI

RE

HO

SE R

EEL

OR

STA

ND

PIPE

AN

D H

OSE

SYS

TEM

Des

crip

tion

Equi

pmen

t No.

REM

AR

KS

NO

.10

NO

.11

NO

.12

NO

.13

NO

.17

NO

.18

MC

L-3

BE

25M

CL-

3 B

E34

MC

L-3

Wes

t wat

erM

CL-

3 w

est w

ater

N/A

N/A

N/A

N/A

N/A

N/A

N/A

MC

L-3

Gam

ling

MC

L-3

gam

ling

MC

L-3

Gam

ling

MC

L-3

Gam

ling

MC

L-3

Gam

ling

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A S

SS

S

SS

SS

SS

SSu

ppor

tS

SS

SS

Cab

inet

N/A

N/A

S SS

SS

SS

S

SS

SS

SS

SS

S

S SS

S

Noz

zle

S

SS

SS

S

SS

SS

Com

pone

nt

SS

SS

S

S S S

S

SS

SS

SS

S

S

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

SS

SS

N/A S S S S S S S

SS

SS

SS

SS

S

SS

S S

SS

N/A

OW

NER

:N

S BL

UE

SCO

PE S

TEEL

(TH

AILA

ND

) LTD

. ( M

CL3

)Ar

ea :

NS

blu

e sc

ope

stee

l

Dat

e :1

- 4

May

202

1

Pro

ject

nam

e:P

M. F

ire P

rote

ctio

n S

yste

mS

ite :

Ray

ong

- Cor

rosi

on

- Doo

r

- Key

lock

- Cor

rosi

on

Con

ditio

n

Con

trol v

alve

con

ditio

n

Con

nect

or L

ocke

r

Seal

con

ditio

n

Pipe

sys

tem

is in

goo

d co

nditi

on

all h

ose

and

hose

val

ve is

in g

ood

cond

ition

- Lea

kage

- Con

ditio

n

- Cor

rosi

on

Rem

ark:

Che

cked

by

:S

ubin

, Wac

hira

, Som

kid,

Anu

cha,

Anu

chit

Insp

ectio

n R

epor

tFI

RE

HO

SE R

EEL

OR

STA

ND

PIPE

AN

D H

OSE

SYS

TEM

Des

crip

tion

Equi

pmen

t No.

REM

AR

KS

NO

.19

NO

.20

NO

.21

NO

.22

NO

.23

NO

.24

NO

.25

MC

L-3

FL.1

MC

L-3

FL.2

MC

L-3

FL.3

MC

L-3

FL.4

MC

L-3

FL.5

MC

L-3

FL.6

MC

L-3

FL.7

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

SS

SS

SS

S

SS

SS

SS

S

Cab

inet

N/A

N/A

N/A

Com

pone

nt

SS

SS

Supp

ort

N/A

N/A

N/A

N/A

SS

SS

SS

S

SS

SS

SS

S

SS

S

SS S

SS

SS

SS

S

SS

SS

SS

S

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

SS

SS

SS

Noz

zle

SS

SS

SS

S

SS

SS

S

Takachiho Fire, Security & Services (Thailand) Ltd.

1858/110-111 Interlink Tower 25 Fl.,

Debaratna Road, Bangna Tai, Bangna,

Bangkok 10260, Thailand.

Tel : 02-366 -9000 , FAX : 02-366-9090

www.tkfs.co.th

FIRE PUMP

Page 49: NS BLUE SCOPE STEEL (THAILAND) LTD

PROJECT NAME : BLUE SCOPE STEEL THAILAND (MCL 3) LOCATION : RAYONG ,THAILAND.

MODEL SERIAL No. RG6090L130015RATING SPEED RPM.PUMP BRAND MODEL 8-491-18A 17-2508720FLOW RATE SUCTION DIA. 12" DISCHARGE DIA. 8"DESIGN PRESSURE 125 SPEED RPM.

FIRE TROL MODEL SERIAL No. 1546968-01REELECTRICAL SYSTEM AC VOLTS. GROUND NEG

ENGINE PUMPITEM DESCRIPTION ITEM DESCRIPTION

1 70 C 1 VISUAL CHECKED Normal

2 Normal 2 46/52 C

3 Normal 3 DISCHARGE PRESSURE 140 Psi

4 OIL PRESSURE 42 Psi 4 SUCTION PRESSURE 0.4 Psi

5 14.5/14.5 5 NOISE Normal

6 2.2/2.4 6 COUPLING Normal

7 SPEED RUNNING 1745 7 CHECKED FOR WATER LEAKE # Normal

8 HOUR RUNNING 13.9 8 CHECKED PIPE & CONNECTOR Normal

9 FUEL LEVEL 3 / 4 OR 80% 90% 9 CHECKED PACKING SEAL # Normal

10 BATTERY ELECTROLYTE Normal 10 CHECKED FOR LUBRICATE Normal

11 CHECKED FOR WATER LEAK Normal 11 CHECKED FOR CORROSION Normal

12 CHECKED FOR FUEL LEAK Normal 12 CLEANED Normal

13 CHECKED FOR OIL LEAK Normal

14 CLEANED Normal

CONTROL PANEL CONTROL PANEL(CONTINUE)ITEM DESCRIPTION ITEM DESCRIPTION

1 Normal 5 14.1/14.62 Normal 6 2.2/2.43 Normal 7 Normal4 BATTERY CHARGER Normal 8 START AT PRESSURE 120 Psi

RECOMMENDATION *Check condition of pump and cleaning*function test manual/auto the pump is working properly

Subin, Wachira, Somkid, Anucha, Anuchit

Takachiho Fire, Security & Services (Thailand) Limited

SERIAL No.

MAINTENANCE & INSPECTION CHECKLISTENGINE FIRE PUMP SYSTEM NO.1

ENGINE BRAND JOHN DEERE 6090HFC47- 1760

PENTAIR3000 GPM

1760CONTROL PANEL BRAND FTA1100-JL12N

220

MONTHLY PREVENTATIVE MAINTENANCE

WATER TEMPERATURE

WATER LEVEL BEARING TEMPERATURE

OIL LEVEL

VOLTS. (CHARGING ALTERNATOR)

AMP.(CHARGING ALTERNATOR)

CLEANED VOLTS. (CHARGER) BATT.1 / BATT.2LAMP TESTED AMP.(CHARGER) BATT.1 / BATT.2CHECKED POWER SUPPLY CHECKED FOR CORROSION

PROJECT NAME : BLUE SCOPE STEEL THAILAND (MCL3) LOCATION : RAYONG ,THAILAND.

MODEL SERIAL No. WAA111229RATING SPEED RPM.ELECTRICAL SYSTEM AC VOLTS. 380 Hz. 50 AMP. 410PUMP BRAND MODEL 10-471-20B SERIAL No. 17-2517080FLOW RATE 3000 GPM SUCTION DIA. 12" DISCHARGE DIA. 10"DESIGN PRESSURE SPEED RPM.

FIRE TROL MODEL SERIAL No. 1547587-01REELECTRICAL SYSTEM AC VOLTS. GROUND NEG.

MOTOR PUMPITEM DESCRIPTION ITEM DESCRIPTION

1 VISUAL CHECKED Normal 1 VISUAL CHECKED Normal

2 33/33 oC 2 34/33 oC3 VOLTS 392/392/389 3 DISCHARGE PRESSURE 150 Psi

4 AMP. 308/314/281 4 SUCTION PRESSURE 0.4 Psi

5 SPEED RUNNING (RPM.) 1492 5 NOISE Normal

6 MOTOR VENTILATION Normal 6 CLOUPLING Normal

7 LUBRICATING Normal 7 CHECKED FOR WATER LEAK Normal

8 CORROSION Normal 8 CHECKED PIPE & CONNECTOR Normal

9 NOISE Normal 9 CHECKED PACKING SEAL Normal

10 ANTIVIBRATION MOUNTING Normal 10 CHECKED FOR LUBRICATE Normal

11 CLEANED Normal 11 CHECKED FOR CORROSION Normal

12 12 CLEANED Normal

CONTROL PANEL CONTROL PANEL (CONTINUE)ITEM DESCRIPTION ITEM DESCRIPTION

1 Normal 5 Normal2 Normal 6 Normal3 Normal 7 Normal4 CHECKED SIGNAL LAMP Normal 8 START AT PRESSURE 130 Psi

RECOMMENDATION Check condition of pump and cleaning*function test manual/auto the pump is working properly

Subin, Wachira, Somkid, Anucha, Anuchit

Takachiho Fire, Security & Services (Thailand) Limited

MAINTENANCE & INSPECTION CHECKLISTELECTRIC MOTOR FIRE PUMP SYSTEM

MOTOR BRAND MARATHON SF 449TSTFS14542AA W.1485

PENTAIR

CONTROL PANEL BRAND FTA1300-AM300FZ380

MONTHLY PREVENTATIVE MAINTENANCE

BEARING TEMPERATURE BEARING TEMPERATURE

VISUAL CHECK CONTROL SIGNAL TESTEDCLEANED MAGNATIC CONTACTORCHECKED POWER SUPPLY CHECKED FOR CORROSION

PROJECT NAME : BLUE SCOPE STEEL THAILAND (MCL 3) LOCATION : RAYONG ,THAILAND.

MODEL SERIAL No. 1035756327RATING SPEED RPM.ELECTRICAL SYSTEM AC VOLTS. 380 Hz. 50 AMP. 8.18PUMP BRAND MODEL PVMI5-22-F-TI1-50 SERIAL No. 211000275-1/1FLOW RATE 2.5-8.5 m3/h SUCTION DIA. 1 1/2" DISCHARGE DIA. 1 1/2"DESIGN PRESSURE 142-69 m SPEED RPM.

FIRE TROL MODEL SERIAL No.ELECTRICAL SYSTEM AC VOLTS. GROUND NEG

MOTOR PUMPITEM DESCRIPTION ITEM DESCRIPTION

1 VISUAL CHECKED Normal 1 VISUAL CHECKED Normal

2 31/32 oC 2 32 oC3 VOLTS 398/402/400 3 DISCHARGE PRESSURE 160 Psi

4 AMP 5.7/6.0/6.2 4 SUCTION PRESSURE 0.4 Psi

5 SPEED RUNNING (RPM.) 2970 5 NOISE Normal

6 MOTOR VENTILATION Normal 6 CLOUPLING Normal

7 LUBRICATING Normal 7 CHECKED FOR WATER LEAKE Normal

8 CORROSION Normal 8 CHECKED PIPE & CONNECTOR Normal

9 NOISE Normal 9 CHECKED PACKING SEAL Normal

10 ANTIVIBRATION MOUNTING Normal 10 CHECKED FOR LUBRICATE Normal

11 CLEANED Normal 11 CHECKED FOR CORROSION Normal

12 12 CLEANED Normal

CONTROL PANEL CONTROL PANEL (CONTINUE)ITEM DESCRIPTION ITEM DESCRIPTION

1 Normal 5 Normal2 Normal 6 Normal3 Normal 7 Normal4 CHECKED SIGNAL LAMP Normal 8 START AT PRESSURE 135 Psi

CUT OFF 150 Psi

RECOMMENDATION Check condition of pump and cleaning*function test manual/auto the pump is working properly

Subin, Wachira, Somkid, Anucha, Anuchit

Takachiho Fire, Security & Services (Thailand) Limited

2870

MAINTENANCE & INSPECTION CHECKLISTELECTRIC MOTOR JOCKEY PUMP SYSTEM

MOTOR BRAND WEG W21-AL112M-02

CHECKED POWER SUPPLY

VISUAL CHECK CONTROL SIGNAL TESTED

380

CLEANEDCHECKED FOR CORROSIONMAGNATIC CONTACTOR

PENTAIR

2900

BEARING TEMPERATURE BEARING TEMPERATURE

CONTROL PANEL BRAND

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,

Bangkok 10260, Thailand.

Tel : 02-366 -9000 , FAX : 02-366-9090

www.tkfs.co.th

PORTABLE FIRE EXTINGUISHERS SYSTEM

Page 50: NS BLUE SCOPE STEEL (THAILAND) LTD

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, B

angn

a,B

angk

ok 1

0260

, Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

Dry

Che

mic

al P

orta

ble

Fire

Ext

ingu

ishe

r Loca

tion

Bui

ldin

g Ar

ea

11

Sun

toM

CL3

OP

122

/BJ

4S

SS

N/A

S19

5 P

SI

2018

/01

22

Sun

toM

CL3

BH

4S

SS

N/A

S19

5 P

SI

2018

/01

33

Sun

toM

CL3

BG

4S

SS

N/A

S19

5 P

SI

2018

/01

44

Sun

toM

CL3

BE

4S

SS

N/A

S19

5 P

SI

2018

/01

55

Sun

toM

CL3

OP

126/

BJ

5S

SS

N/A

S19

5 P

SI

2018

/01

66

Sun

toM

CL3

BH

5S

SS

N/A

S19

5 P

SI

2018

/01

77

Sun

toM

CL3

BE

6S

SS

N/A

S19

5 P

SI

2018

/01

88

Sun

toM

CL3

WE

ST

LAB

RO

OM

SS

SN

/AS

195

PS

I20

18/0

1

99

Sun

toM

CL3

BE

8S

SS

N/A

S19

5 P

SI

2018

/01

1010

Sun

toM

CL3

OP

127

/BE

10

SS

SN

/AS

195

PS

I20

18/0

1

1111

Sun

toM

CL3

BE

11

/ OP

129

SS

SN

/AS

195

PS

I20

18/0

1

1212

Sun

toM

LC3

PO

RT

PS

/ P

IT R

M.

SS

SN

/AS

195

PS

I20

18/0

1

1313

Sun

toM

CL3

BE

12

SS

SN

/AS

195

PS

I20

18/0

1

1414

Sun

toM

CL3

BE

16

SS

SN

/AS

195

PS

I20

18/0

1

1515

Sun

toM

CL3

PO

T C

ELL

AR

SS

SN

/AS

195

PS

I20

18/0

1

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

Clie

nt :

NS

BLU

E S

CO

PE

STE

EL

THA

ILA

ND IN

SPE

CT

ION

PO

RT

AB

LE

FIR

E E

XT

ING

UIS

HE

RS

Insp

ectio

n D

ate

:In

spec

tor :

Sub

in, W

achi

ra, S

omki

d, A

nuch

a,A

nuch

it

Item

Ext.N

o.Ty

pe/lb

Bra

ndH

ose

,Noz

zle

1 - 4

May

202

1

Dry

che

mic

al/1

0 lb

fill c

apha

ndle

,she

llG

as c

artr

idge

dry

pow

der

Rem

ark

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Pres

sure

read

ing

Dat

e of

M

anuf

actu

re

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, B

angn

a,B

angk

ok 1

0260

, Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

Dry

Che

mic

al P

orta

ble

Fire

Ext

ingu

ishe

r Loca

tion

Bui

ldin

g Ar

ea

1616

Sun

toM

CL3

OP

131

SS

SN

/AS

195

PS

I20

18/0

1

1717

Sun

toM

CL3

BE

19

SS

SN

/AS

195

PS

I20

18/0

1

1818

Sun

toM

CL3

OP

132

SS

SN

/AS

195

PS

I20

18/0

1

1919

Sun

toM

CL3

BE

24

SS

SN

/AS

195

PS

I20

18/0

1

2020

Sun

toM

CL3

ME

ETI

NG

Roo

m.

SS

SN

/AS

195

PS

I20

18/0

1

2121

Sun

toM

CL3

BE

27

SS

SN

/AS

195

PS

I20

18/0

1

2222

Sun

toM

CL3

EN

TRY

PU

LPIT

SS

SN

/AS

195

PS

I20

18/0

1

2323

Sun

toM

CL3

OP

134

SS

SN

/AS

195

PS

I20

18/0

1

2424

Sun

toM

CL3

BE

31

SS

SN

/AS

195

PS

I20

18/0

1

2525

Sun

toM

CL3

BE

32

SS

SN

/AS

195

PS

I20

18/0

1

2626

Sun

toM

CL3

OP

135

/BE

34

SS

SN

/AS

195

PS

I20

18/0

1

2727

Sun

toM

CL3

OP

136

/ OP

94

SS

SN

/AS

195

PS

I20

18/0

1

2828

Sun

toM

CL3

BC

34

/ OP

95

SS

SN

/AS

195

PS

I20

18/0

1

2929

Sun

toM

CL3

BC

32

SS

SN

/AS

195

PS

I20

18/0

1

3030

Sun

toM

CL3

BC

31

SS

SN

/AS

195

PS

I20

18/0

1

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Rem

ark

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Pres

sure

read

ing

Dat

e of

M

anuf

actu

re

Dry

che

mic

al/1

0 lb

fill c

apha

ndle

,she

llG

as c

artr

idge

dry

pow

der

Insp

ectio

n D

ate

:In

spec

tor :

Sub

in, W

achi

ra, S

omki

d, A

nuch

a,A

nuch

it

Item

Ext.N

o.Ty

pe/lb

Bra

ndH

ose

,Noz

zle

1 - 4

May

202

1C

lient

:N

S B

LUE

SC

OP

E S

TEE

L TH

AIL

AN

D INSP

EC

TIO

N P

OR

TA

BL

E F

IRE

EX

TIN

GU

ISH

ER

S

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, B

angn

a,B

angk

ok 1

0260

, Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

Dry

Che

mic

al P

orta

ble

Fire

Ext

ingu

ishe

r

Loca

tion

Bui

ldin

g Ar

ea

3131

Sun

toM

CL3

WW

T / B

C 2

8S

SS

N/A

S19

5 P

SI

2018

/01

3232

Sun

toM

CL3

AIR

CO

M /

BC

26

SS

SN

/AS

195

PS

I20

18/0

1

3333

Sun

toM

CL3

WW

T /

TK 2

SS

SN

/AS

195

PS

I20

18/0

1

3434

Sun

toM

CL3

WE

ST

WA

TER

SS

SN

/AS

195

PS

I20

18/0

1

3535

Sun

toM

CL3

WE

ST

WA

TER

SS

SN

/AS

195

PS

I20

18/0

1

3636

Sun

toM

CL3

WE

ST

WA

TER

SS

SN

/AS

195

PS

I20

18/0

1

3737

Sun

toM

CL3

WE

ST

WA

TER

SS

SN

/AS

195

PS

I20

18/0

1

3838

Sun

toM

CL3

WE

ST

WA

TER

SS

SN

/AS

195

PS

I20

18/0

1

3939

Sun

toM

CL3

WE

ST

WA

TER

SS

SN

/AS

195

PS

I20

18/0

1

4040

Sun

toM

CL3

BC

24

SS

SN

/AS

195

PS

I20

18/0

1

4141

Sun

toM

CL3

OP

98

SS

SN

/AS

195

PS

I20

18/0

1

4242

Sun

toM

CL3

TX-

02 T

rans

form

erS

SS

N/A

S19

5 P

SI

2018

/01

4343

Sun

toM

CL3

TX-

01 T

rans

form

erS

SS

N/A

S19

5 P

SI

2018

/01

4444

Sun

toM

CL3

TX-

01 T

rans

form

erS

SS

N/A

S19

5 P

SI

2018

/01

4545

Sun

toM

CL3

BC

20

SS

SN

/AS

195

PS

I20

18/0

1

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Rem

ark

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Pres

sure

read

ing

Dat

e of

M

anuf

actu

re

Dry

che

mic

al/1

0 lb

fill c

apha

ndle

,she

llG

as c

artr

idge

dry

pow

der

Insp

ectio

n D

ate

:In

spec

tor :

Sub

in, W

achi

ra, S

omki

d, A

nuch

a,A

nuch

it

Item

Ext.N

o.Ty

pe/lb

Bra

ndH

ose

,Noz

zle

1 - 4

May

202

1C

lient

:N

S B

LUE

SC

OP

E S

TEE

L TH

AIL

AN

D INSP

EC

TIO

N P

OR

TA

BL

E F

IRE

EX

TIN

GU

ISH

ER

S

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, B

angn

a,B

angk

ok 1

0260

, Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

Dry

Che

mic

al P

orta

ble

Fire

Ext

ingu

ishe

r Loca

tion

Bui

ldin

g Ar

ea

4646

MC

L3 B

C 2

0S

SS

N/A

S19

5 P

SI

2018

/01

4747

Sun

toM

CL3

BC

18

SS

SN

/AS

195

PS

I20

18/0

1

4848

Sun

toM

CL3

OP

102

SS

SN

/AS

195

PS

I20

18/0

1

4949

Sun

toM

CL3

OP

104

SS

SN

/AS

195

PS

I20

18/0

1

5050

Sun

toM

CL3

IN G

OT/

BC

15

SS

SN

/AS

195

PS

I20

18/0

1

5151

Sun

toM

CL3

IN G

OT/

BC

14

SS

SN

/AS

195

PS

I20

18/0

1

5252

Sun

toM

CL3

IN G

OT/

OP

109

SS

SN

/AS

195

PS

I20

18/0

1

5353

Sun

toM

CL3

IN G

OT/

OP

106

SS

SN

/AS

195

PS

I20

18/0

1

5454

Sun

toM

CL3

IN G

OT/

OP

105

SS

SN

/AS

195

PS

I20

18/0

1

5555

Sun

toM

CL3

Mai

n P

ot C

alla

SS

SN

/AS

195

PS

I20

18/0

1

5656

Sun

toM

CL3

Mai

n P

ot C

alla

SS

SN

/AS

195

PS

I20

18/0

1

5757

Sun

toM

CL3

Gen

erat

or ro

omS

SS

N/A

S19

5 P

SI

2018

/01

5858

Sun

toM

CL3

Gen

erat

or ro

omS

SS

N/A

S19

5 P

SI

2018

/01

5959

Sun

toM

CL3

TX-

07 T

rans

form

erS

SS

N/A

S19

5 P

SI

2018

/01

6060

Sun

toM

CL3

C

hem

ical

sto

reS

SS

N/A

S19

5 P

SI

2018

/01

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Rem

ark

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Pres

sure

read

ing

Dat

e of

M

anuf

actu

re

Dry

che

mic

al/1

0 lb

fill c

apha

ndle

,she

llG

as c

artr

idge

dry

pow

der

Insp

ectio

n D

ate

:In

spec

tor :

Sub

in, W

achi

ra, S

omki

d, A

nuch

a,A

nuch

it

Item

Ext.N

o.Ty

pe/lb

Bra

ndH

ose

,Noz

zle

1 - 4

May

202

1C

lient

:N

S B

LUE

SC

OP

E S

TEE

L TH

AIL

AN

D INSP

EC

TIO

N P

OR

TA

BL

E F

IRE

EX

TIN

GU

ISH

ER

S

Page 51: NS BLUE SCOPE STEEL (THAILAND) LTD

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, B

angn

a,B

angk

ok 1

0260

, Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

Dry

Che

mic

al P

orta

ble

Fire

Ext

ingu

ishe

r Loca

tion

Bui

ldin

g Ar

ea

6161

Sun

toM

CL3

C

hem

ical

sto

reS

SS

N/A

S19

5 P

SI

2018

/01

6262

Sun

toM

CL3

BC

10

SS

SN

/AS

195

PS

I20

18/0

1

6363

Sun

toM

CL3

CO

ATO

R F

L.G

SS

SN

/AS

195

PS

I20

18/0

1

6464

Sun

toM

CL3

CO

ATO

R F

L.1

SS

SN

/AS

195

PS

I20

18/0

1

6565

Sun

toM

CL3

STS

FL.

3S

SS

N/A

S19

5 P

SI

2018

/01

6666

Sun

toM

CL3

STS

FL.

4S

SS

N/A

S19

5 P

SI

2018

/01

6767

Sun

toM

CL3

STS

FL.

5S

SS

N/A

S19

5 P

SI

2018

/01

6868

Sun

toM

CL3

STS

FL.

5S

SS

N/A

S19

5 P

SI

2018

/01

6969

Sun

toM

CL3

STS

FL.

6S

SS

N/A

S19

5 P

SI

2018

/01

7070

Sun

toM

CL3

STS

FL.

7S

SS

N/A

S19

5 P

SI

2018

/01

7171

Sun

toM

CL3

STS

FL.

8S

SS

N/A

S19

5 P

SI

2018

/01

7272

Sun

toM

CL3

Exi

t FL.

5S

SS

N/A

S19

5 P

SI

2018

/01

7373

Sun

toM

CL3

Exi

t FL.

3S

SS

N/A

S19

5 P

SI

2018

/01

7474

Sun

toM

CL3

OP

116

SS

SN

/AS

195

PS

I20

18/0

1

7575

Sun

toM

CL3

OP

117

SS

SN

/AS

195

PS

I20

18/0

1

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/5

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/5

0 lb

Dry

che

mic

al/5

0 lb

Dry

che

mic

al/5

0 lb

Dry

che

mic

al/1

0 lb

Rem

ark

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Pres

sure

read

ing

Dat

e of

M

anuf

actu

re

Dry

che

mic

al/1

0 lb

fill c

apha

ndle

,she

llG

as c

artr

idge

dry

pow

der

Insp

ectio

n D

ate

:In

spec

tor :

Sub

in, W

achi

ra, S

omki

d, A

nuch

a,A

nuch

it

Item

Ext.N

o.Ty

pe/lb

Bra

ndH

ose

,Noz

zle

1 - 4

May

202

1C

lient

:N

S B

LUE

SC

OP

E S

TEE

L TH

AIL

AN

D INSP

EC

TIO

N P

OR

TA

BL

E F

IRE

EX

TIN

GU

ISH

ER

S

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, B

angn

a,B

angk

ok 1

0260

, Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

Dry

Che

mic

al P

orta

ble

Fire

Ext

ingu

ishe

r

Loca

tion

Bui

ldin

g Ar

ea

7676

Sun

toM

CL3

RTO

SS

SN

/AS

195

PS

I20

18/0

1

7777

Sun

toM

CL3

TX-

05 T

rans

form

erS

SS

N/A

S19

5 P

SI

2018

/01

7878

Sun

toM

CL3

Exi

t Ine

rgen

Tan

kS

SS

N/A

S19

5 P

SI

2018

/01

7979

Sun

toM

CL3

Exi

t Ine

rgen

Tan

kS

SS

N/A

S19

5 P

SI

2018

/01

8080

Sun

toM

CL3

OP

120

SS

SN

/AS

195

PS

I20

18/0

1

8181

Sun

toM

CL3

Fire

Pum

pS

SS

N/A

S19

5 P

SI

2018

/01

8282

Sun

toM

CL3

Fire

Pum

pS

SS

N/A

S19

5 P

SI

2018

/01

8383

Sun

toM

CL3

AP

C S

ectio

n FL

.2S

SS

N/A

S19

5 P

SI

2018

/01

8484

Sun

toM

CL3

AP

C S

ectio

n FL

.3S

SS

N/A

S19

5 P

SI

2018

/01

8585

Sun

toM

CL3

AP

C S

ectio

n FL

.4S

SS

N/A

S19

5 P

SI

2018

/01

8686

Sun

toM

CL3

AP

C S

ectio

n FL

.5S

SS

N/A

S19

5 P

SI

2018

/01

8787

Sun

toM

CL3

AP

C S

ectio

n FL

.6S

SS

N/A

S19

5 P

SI

2018

/01

8888

Sun

toM

CL3

AP

C S

ectio

n FL

.7S

SS

N/A

S19

5 P

SI

2018

/01

8989

Sun

toM

CL3

AP

C S

ectio

n FL

.8S

SS

N/A

S19

5 P

SI

2018

/01

9090

Sun

toM

CL3

Fur

nace

Sec

tion

FL.2

SS

SN

/AS

195

PS

I20

18/0

1

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Rem

ark

Dry

che

mic

al/5

0 lb

Dry

che

mic

al/5

0 lb

Dry

che

mic

al/5

0 lb

Dry

che

mic

al/1

0 lb

Pres

sure

read

ing

Dat

e of

M

anuf

actu

re

Dry

che

mic

al/1

0 lb

fill c

apha

ndle

,she

llG

as c

artr

idge

dry

pow

der

Insp

ectio

n D

ate

:In

spec

tor :

Sub

in, W

achi

ra, S

omki

d, A

nuch

a,A

nuch

it

Item

Ext.N

o.Ty

pe/lb

Bra

ndH

ose

,Noz

zle

1 - 4

May

202

1C

lient

:N

S B

LUE

SC

OP

E S

TEE

L TH

AIL

AN

D INSP

EC

TIO

N P

OR

TA

BL

E F

IRE

EX

TIN

GU

ISH

ER

S

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, B

angn

a,B

angk

ok 1

0260

, Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

Dry

Che

mic

al P

orta

ble

Fire

Ext

ingu

ishe

r

Loca

tion

Bui

ldin

g Ar

ea

9191

Sun

toM

CL3

Fur

nace

Sec

tion

FL.2

SS

SN

/AS

195

PS

I20

18/0

1

9292

Sun

toM

CL3

Fur

nace

Sec

tion

FL.2

SS

SN

/AS

195

PS

I20

18/0

1

9393

Sun

toM

CL3

Cle

anin

g F

L.2

SS

SN

/AS

195

PS

I20

18/0

1

9494

Sun

toM

CL3

Cle

anin

g F

L.2

SS

SN

/AS

195

PS

I20

18/0

1

9595

Sun

toM

CL3

Fur

nace

Sec

tion

FL.2

SS

SN

/AS

195

PS

I20

18/0

1

9696

Sun

toM

CL3

Fur

nace

Sec

tion

FL.2

SS

SN

/AS

195

PS

I20

18/0

1

9797

Sun

toM

CL3

Fur

nace

Sec

tion

FL.2

SS

SN

/AS

195

PS

I20

18/0

1

9898

Sun

toM

CL3

Cle

anin

g F

L.1

SS

SN

/AS

195

PS

I20

18/0

1

9999

Sun

toM

CL3

Ent

ry S

ectio

n S

SS

N/A

S19

5 P

SI

2018

/01

100

100

Sun

toM

CL3

Ent

ry S

ectio

n S

SS

N/A

S19

5 P

SI

2018

/01

101

101

Sun

toM

CL3

STS

FL.

GS

SS

N/A

S19

5 P

SI

2018

/01

102

102

Sun

toM

CL3

STS

FL.

GS

SS

N/A

S19

5 P

SI

2018

/01

103

103

Sun

toM

CL3

Exi

t Pul

Pit

SS

SN

/AS

195

PS

I20

18/0

1

104

104

Sun

toM

CL3

Coo

ling

SS

SN

/AS

195

PS

I20

18/0

1

105

105

Sun

toM

CL3

Gam

ling

SS

SN

/AS

195

PS

I20

18/0

1

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/5

0 lb

Dry

che

mic

al/5

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

fill c

apTy

pe/lb

Bra

ndH

ose

,Noz

zle

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/5

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/1

0 lb

Dry

che

mic

al/5

0 lb

Dry

che

mic

al/1

0 lb

INSP

EC

TIO

N P

OR

TA

BL

E F

IRE

EX

TIN

GU

ISH

ER

S

Clie

nt :

NS

BLU

E S

CO

PE

STE

EL

THA

ILA

ND

Rem

ark

hand

le,s

hell

Gas

car

trid

gedr

y po

wde

rPr

essu

rere

adin

gD

ate

of

Man

ufac

ture

28 -

29 J

anua

ry 2

021

Insp

ectio

n D

ate

:In

spec

tor :

Sub

in, W

achi

ra, S

omki

d, A

nuch

a,A

nuch

it

Item

Ext.N

o.

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, B

angn

a,B

angk

ok 1

0260

, Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

Dry

Che

mic

al P

orta

ble

Fire

Ext

ingu

ishe

r

Loca

tion

Bui

ldin

g Ar

ea

106

106

Sun

toM

CL3

STS

FL.

2S

SS

N/A

S19

5 P

SI

2018

/01

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

Clie

nt :

NS

BLU

E S

CO

PE

STE

EL

THA

ILA

ND IN

SPE

CT

ION

PO

RT

AB

LE

FIR

E E

XT

ING

UIS

HE

RS

Insp

ectio

n D

ate

:28

- 29

Jan

uary

202

1In

spec

tor :

Sub

in, W

achi

ra, S

omki

d, A

nuch

a,A

nuch

it

Item

Ext.N

o.Ty

pe/lb

Bra

ndH

ose

,Noz

zle

fill c

apha

ndle

,she

llG

as c

artr

idge

dry

pow

der

Rem

ark

Dry

che

mic

al/1

0 lb

Pres

sure

read

ing

Dat

e of

M

anuf

actu

re

Page 52: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

CO2 Portable Fire ExtinguisherClient :

REF. Contract NO : SC1000142Inspection Date :

Inspector :Witness : Khun Songpon, Khun Sonthaya

Location

Building Area

1 Co2/4.5 Sunto MCL3 OP122/ BJ4 S S S 12.5 Kg 12.5 Kg 0% Jan-18

2 Co2/4.5 Sunto MCL3 BHG 4 S S S 12.5 Kg 12.5 Kg 0% Jan-18

3 Co2/4.5 Sunto MCL3 BE 4 S S S 12.5 Kg 12.4 Kg 0% Jan-18

4 Co2/4.5 Sunto MCL3 BH 4 S S S 12.5 Kg 12.6 Kg 0% Jan-18

5 Co2/4.5 Sunto MCL3 OP126/ BJ 5 S S S 12.5 Kg 12.8 Kg 0% Jan-18

6 Co2/4.5 Sunto MCL3 BH 5 S S S 12.5 Kg 12.1 Kg 0% Jan-18

7 Co2/4.5 Sunto MCL3 BE 6 S S S 12.5 Kg 12.5 Kg 0% Jan-18

8 Co2/4.5 Sunto MCL3 WEST LAB ROOM S S S 12.5 Kg 12.4 Kg 0% Jan-18

9 Co2/4.5 Sunto MCL3 BE 8 S S S 12.5 Kg 12.6 Kg 0% Jan-18

10 Co2/4.5 Sunto MCL3 OP 127/BE 10 S S S 12.5 Kg 12.7 Kg 0% Jan-18

11 Co2/4.5 Sunto MCL3 BE 11 / OP 129 S S S 12.5 Kg 13.1 Kg 0% Jan-18

12 Co2/4.5 Sunto MCL3 PORT PU / PIT RM. S S S 12.5 Kg 12.2 Kg 0% Jan-18

13 Co2/4.5 Sunto MCL3 BE 12 S S S 12.5 Kg 12.5 Kg 0% Jan-18

14 Co2/4.5 Sunto MCL3 BE 16 S S S 12.5 Kg 12.5 Kg 0% Jan-18

15 Co2/4.5 Sunto MCL3 POT CELLAR S S S 12.5 Kg 12.6 Kg 0% Jan-18

16 Co2/4.5 Sunto MCL3 OP 131 S S S 12.5 Kg 12.7 Kg 0% Jan-18

17 Co2/4.5 Sunto MCL3 BE 19 S S S 12.5 Kg 12.5 Kg 0% Jan-18

18 Co2/4.5 Sunto MCL3 OP 132 S S S 12.5 Kg 12.6 Kg 0% Jan-18

19 Co2/4.5 Sunto MCL3 BE 24 S S S 12.5 Kg 12.3 Kg 0% Jan-18

20 Co2/4.5 Sunto MCL3 MEETING Room. S S S 12.5 Kg 12.5 Kg 0% Jan-18

21 Co2/4.5 Sunto MCL3 BE 27 S S S 12.5 Kg 12.5 Kg 0% Jan-18

22 Co2/4.5 Sunto MCL3 ENTRY PULPIT S S S 12.5 Kg 12.6 kg 0% Jan-18

23 Co2/4.5 Sunto MCL3 OP 134 S S S 12.5 Kg 12.5 Kg 0% Jan-18

24 Co2/4.5 Sunto MCL3 BE 31 S S S 12.5 Kg 12.6 Kg 0% Jan-18

25 Co2/4.5 Sunto MCL3 BE 32 S S S 12.5 Kg 12.4 Kg 0% Jan-18

26 Co2/4.5 Sunto MCL3 OP 135/BE 34 S S S 12.5 Kg 12.5 Kg 0% Jan-18

27 Co2/4.5 Sunto MCL3 OP 136/ OP 94 S S S 12.5 Kg 12.5 Kg 0% Jan-18

28 Co2/4.5 Sunto MCL3 BC 34 / OP 95 S S S 12.5 Kg 12.8 Kg 0% Jan-18

29 Co2/4.5 Sunto MCL3 BC 32 S S S 12.5 Kg 12.5 Kg 0% Jan-18

30 Co2/4.5 Sunto MCL3 BC 31 S S S 12.5 Kg 12.5 Kg 0% Jan-18

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

NS BLUE SCOPE STEEL THAILAND

Subin, Wachira, Somkid, Anucha,Anuchit

Item Type CO2 (Kg) Brand

Hose and Nozzle is Unobstruc

t d

Seal Wire is intact

PhysicalSTD

Cylinder Weight

(K )

Actual Gross Weight

(K )

% Lost Weight

Date of Manufacture Remark

28 - 29 January 2021

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

CO2 Portable Fire ExtinguisherClient :

REF. Contract NO : SC1000142Inspection Date :

Inspector :Witness : Khun Songpon, Khun Sonthaya

Location

Building Area

31 Co2/4.5 Sunto MCL3 WWT / BC 25 S S S 12.5 Kg 12.6 Kg 0% Jan-18

32 Co2/4.5 Sunto MCL3 AIR COM / BC 26 S S S 12.5 Kg 12.5 Kg 0% Jan-18

33 Co2/4.5 Sunto MCL3 WWT / TK 2 S S S 12.5 Kg 12.4 Kg 0% Jan-18

34 Co2/4.5 Sunto MCL3 WEST WATER S S S 12.5 Kg 12.6 Kg 0% Jan-18

35 Co2/4.5 Sunto MCL3 WEST WATER S S S 12.5 Kg 12.7 Kg 0% Jan-18

36 Co2/4.5 Sunto MCL3 WEST WATER S S S 12.5 Kg 12.3 Kg 0% Jan-18

37 Co2/4.5 Sunto MCL3 WEST WATER S S S 12.5 Kg 12.4 Kg 0% Jan-18

38 Co2/4.5 Sunto MCL3 WEST WATER S S S 12.5 Kg 12.5 Kg 0% Jan-18

39 Co2/4.5 Sunto MCL3 WEST WATER S S S 12.5 Kg 12.5 Kg 0% Jan-18

40 Co2/4.5 Sunto MCL3 EER Rm. WWT S S S 12.5 Kg 12.7 Kg 0% Jan-18

41 Co2/4.5 Sunto MCL3 BC 24 S S S 12.5 Kg 12.5 Kg 0% Jan-18

42 Co2/4.5 Sunto MCL3 OP 98 S S S 12.5 Kg 12.5 Kg 0% Jan-18

43 Co2/4.5 Sunto MCL3 Entry EER Rm. S S S 12.5 Kg 12.5 Kg 0% Jan-18

44 Co2/4.5 Sunto MCL3 Entry EER Rm. S S S 12.5 Kg 12.6 Kg 0% Jan-18

45 Co2/4.5 Sunto MCL3 Entry EER Rm. S S S 12.5 Kg 12.6 Kg 0% Jan-18

46 Co2/4.5 Sunto MCL3 Nitrogen Tank S S S 12.5 Kg 11.7 Kg -6.4% Jan-18

47 Co2/4.5 Sunto MCL3 tx-02 transformer S S S 12.5 Kg 12.6 Kg 0% Jan-18

48 Co2/4.5 Sunto MCL3 BC 20 S S S 12.5 Kg 12.7 Kg 0% Jan-18

49 Co2/4.5 Sunto MCL3 BC 20 S S S 12.5 Kg 12.5 Kg 0% Jan-18

50 Co2/4.5 Sunto MCL3 BC 18 S S S 12.5 Kg 12.4 Kg 0% Jan-18

51 Co2/4.5 Sunto MCL3 OP 102 S S S 12.5 Kg 12.5 Kg 0% Jan-18

52 Co2/4.5 Sunto MCL3 OP 104 S S S 12.5 Kg 12.5 Kg 0% Jan-18

53 Co2/4.5 Sunto MCL3 IN GOT/BC 15 S S S 12.5 Kg 12.6 Kg 0% Jan-18

54 Co2/4.5 Sunto MCL3 IN GOT/BC 14 S S S 12.5 Kg 12.6 Kg 0% Jan-18

55 Co2/4.5 Sunto MCL3 IN GOT/OP 109 S S S 12.5 Kg 12.6 Kg 0% Jan-18

56 Co2/4.5 Sunto MCL3 IN GOT/OP 106 S S S 12.5 Kg 12.7 Kg 0% Jan-18

57 Co2/4.5 Sunto MCL3 IN GOT/OP 105 S S S 12.5 Kg 12.4 Kg 0% Jan-18

58 Co2/4.5 Sunto MCL3 Main Pot S S S 12.5 Kg 12.5 Kg 0% Jan-18

59 Co2/4.5 Sunto MCL3 Main Pot S S S 12.5 Kg 12.5 Kg 0% Jan-18

60 Co2/4.5 Sunto MCL3 Pot EER Room. S S S 12.5 Kg 12.6 Kg 0% Jan-18

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

NS BLUE SCOPE STEEL THAILAND

Subin, Wachira, Somkid, Anucha,Anuchit

Item Type CO2 (Kg) Brand

Hose and Nozzle is Unobstruc

t d

Seal Wire is intact

PhysicalSTD

Cylinder Weight

(K )

Actual Gross Weight

(K )

% Lost Weight

Date of Manufacture Remark

28 - 29 January 2021

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

CO2 Portable Fire ExtinguisherClient :

REF. Contract NO : SC1000142Inspection Date :

Inspector :Witness : Khun Songpon, Khun Sonthaya

Location

Building Area

61 Co2/4.5 Sunto MCL3 Pot EER Room. S S S 12.5 Kg 12.7 Kg 0% Jan-18

62 Co2/4.5 Sunto MCL3 Generator room S S S 12.5 Kg 12.6 Kg 0% Jan-18

63 Co2/4.5 Sunto MCL3 Generator room S S S 12.5 Kg 12.6 Kg 0% Jan-18

64 Co2/4.5 Sunto MCL3 tx-07 transformer S S S 12.5 Kg 12.6 Kg 0% Jan-18

65 Co2/4.5 Sunto MCL3 Chemical Store S S S 12.5 Kg 12.7 Kg 0% Jan-18

66 Co2/4.5 Sunto MCL3 Chemical Store S S S 12.5 Kg 13.0 Kg 0% Jan-18

67 Co2/4.5 Sunto MCL3 BC 10 S S S 12.5 Kg 12.7 Kg 0% Jan-18

68 Co2/4.5 Sunto MCL3 COATOR Room. S S S 12.5 Kg 12.5 Kg 0% Jan-18

69 Co2/4.5 Sunto MCL3 COATOR Room. S S S 12.5 Kg 12.5 Kg 0% Jan-18

70 Co2/4.5 Sunto MCL3 STS FL.3 S S S 12.5 Kg 12.5 Kg 0% Jan-18

71 Co2/4.5 Sunto MCL3 STS FL.4 S S S 12.6 Kg 12.6 Kg 0% Jan-18

72 Co2/4.5 Sunto MCL3 STS FL.5 S S S 12.5 Kg 12.6 Kg 0% Jan-18

73 Co2/4.5 Sunto MCL3 STS FL.8 S S S 12.5 Kg 12.5 Kg 0% Jan-18

74 Co2/4.5 Sunto MCL3 Exit FL.5 S S S 12.5 Kg 12.5 Kg 0% Jan-18

75 Co2/4.5 Sunto MCL3 Exit FL.3 S S S 12.5 Kg 12.4 Kg 0% Jan-18

76 Co2/4.5 Sunto MCL3 OP 116 S S S 12.5 Kg 12.5 Kg 0% Jan-18

77 Co2/4.5 Sunto MCL3 OP 117 S S S 12.5 Kg 12.5 Kg 0% Jan-18

78 Co2/4.5 Sunto MCL3 Exit EER S S S 12.5 Kg 12.8 Kg 0% Jan-18

79 Co2/4.5 Sunto MCL3 Exit EER S S S 12.5 Kg 12.6 Kg 0% Jan-18

80 Co2/4.5 Sunto MCL3 OP 118 S S S 12.5 Kg 12.5 kg 0% Jan-18

81 Co2/4.5 Sunto MCL3 Exit PLC room S S S 12.5 Kg 12.4 Kg 0% Jan-18

82 Co2/4.5 Sunto MCL3 Exit PLC room S S S 12.5 Kg 12.6 Kg 0% Jan-18

83 Co2/4.5 Sunto MCL3 Exit PLC room S S S 12.5 Kg 12.5 Kg 0% Jan-18

84 Co2/4.5 Sunto MCL3 RTO S S S 12.5 Kg 12.5 Kg 0% Jan-18

85 Co2/4.5 Sunto MCL3 tx-05 transformer S S S 12.5 Kg 12.5 Kg 0% Jan-18

86 Co2/4.5 Sunto MCL3 OP 120 S S S 12.5 Kg 12.3 Kg 0% Jan-18

87 Co2/4.5 Sunto MCL3 Fire Pump S S S 12.5 Kg 12.4Kg 0% Jan-18

88 Co2/4.5 Sunto MCL3 Fire Pump S S S 12.5 Kg 12.5 Kg 0% Jan-18

89 Co2/4.5 Sunto MCL3 APC Section FL.2 S S S 12.5 Kg 12.6 Kg 0% Jan-18

90 Co2/4.5 Sunto MCL3 APC Section FL.3 S S S 12.5 Kg 12.5 Kg 0% Jan-18

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

28 - 29 January 2021

NS BLUE SCOPE STEEL THAILAND

Subin, Wachira, Somkid, Anucha,Anuchit

Item Type CO2 (Kg) Brand

Hose and Nozzle is Unobstruc

t d

Seal Wire is intact

PhysicalSTD

Cylinder Weight

(K )

Actual Gross Weight

(K )

% Lost Weight

Date of Manufacture Remark

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

CO2 Portable Fire ExtinguisherClient :

REF. Contract NO : SC1000142Inspection Date :

Inspector :Witness : Khun Songpon, Khun Sonthaya

Location

Building Area

91 Co2/4.5 Sunto MCL3 APC Section FL.4 S S S 12.5 Kg 12.5Kg 0% Jan-18

92 Co2/4.5 Sunto MCL3 APC Section FL.5 S S S 12.5 Kg 12.6Kg 0% Jan-18

93 Co2/4.5 Sunto MCL3 APC Section FL.6 S S S 12.5 Kg 12.6Kg 0% Jan-18

94 Co2/4.5 Sunto MCL3 APC Section FL.7 S S S 12.5 Kg 12.6Kg 0% Jan-18

95 Co2/4.5 Sunto MCL3 APC Section FL.8 S S S 12.5 Kg 12.8Kg 0% Jan-18

96 Co2/4.5 Sunto MCL3 FURNACE FL.2 S S S 12.5 Kg 12.6Kg 0% Jan-18

97 Co2/4.5 Sunto MCL3 FURNACE FL.2 S S S 12.5 Kg 12.4Kg 0% Jan-18

98 Co2/4.5 Sunto MCL3 FURNACE FL.2 S S S 12.5 Kg 12.5Kg 0% Jan-18

99 Co2/4.5 Sunto MCL3 CLEANING FL.2 S S S 12.5 Kg 12.6Kg 0% Jan-18

100 Co2/4.5 Sunto MCL3 CLEANING FL.2 S S S 12.5 Kg 12.5Kg 0% Jan-18

101 Co2/4.5 Sunto MCL3 FURNACE FL.2 S S S 12.5 Kg 12.4Kg 0% Jan-18

102 Co2/4.5 Sunto MCL3 FURNACE FL.2 S S S 12.5 Kg 12.7Kg 0% Jan-18

103 Co2/4.5 Sunto MCL3 FURNACE FL.2 S S S 12.5 Kg 12.4Kg 0% Jan-18

104 Co2/4.5 Sunto MCL3 CLEANING FL.1 S S S 12.5 Kg 12.3Kg 0% Jan-18

105 Co2/4.5 Sunto MCL3 ENTRY Section S S S 12.5 Kg 12.6Kg 0% Jan-18

106 Co2/4.5 Sunto MCL3 ENTRY Section S S S 12.5 Kg 12.5Kg 0% Jan-18

107 Co2/4.5 Sunto MCL3 STS FL.G S S S 12.5 Kg 12.6Kg 0% Jan-18

108 Co2/4.5 Sunto MCL3 STS FL.G S S S 12.5 Kg 12.4Kg 0% Jan-18

109 Co2/4.5 Sunto MCL3 Exit PulPit S S S 12.5 Kg 12.6Kg 0% Jan-18

110 Co2/4.5 Sunto MCL3 Cooling S S S 12.5 Kg 12.4Kg 0% Jan-18

111 Co2/4.5 Sunto MCL3 Pulpit Gamling S S S 12.5 Kg 12.4Kg 0% Jan-18

112 Co2/4.5 Sunto MCL3 STS FL.2 S S S 12.5 Kg 12.5Kg 0% Jan-18

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

28 - 29 January 2021

NS BLUE SCOPE STEEL THAILAND

Subin, Wachira, Somkid, Anucha,Anuchit

Item Type CO2 (Kg) Brand

Hose and Nozzle is Unobstruc

t d

Seal Wire is intact

PhysicalSTD

Cylinder Weight

(K )

Actual Gross Weight

(K )

% Lost Weight

Date of Manufacture Remark

Page 53: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.

1858/110-111 Interlink Tower 25 Fl.,

Debaratna Road, Bangna Tai, Bangna,

Bangkok 10260, Thailand.

Telephone no. : 02-366 -9000

Facsimile no. : 02-366-9090

www.tkfs.co.th

For this project, our company will follow inspection and maintenance procedures of fire

alarm system and fire fighting system by referring to these standards as detail below.

Fire Protection System

Standard Reference

BLUESCOPE BUILDING (THAILAND) LTD.

Preventive Maintenance Fire Protection System

April 2021

Clien

t:BL

UES

COPE

BU

ILDI

NG

(THA

ILAN

D) L

TD.

Proje

ct na

me:

Insp

ectio

n Fi

re P

rote

ctio

n Sy

stem

Date

of vi

sit :

Syst

emRe

com

men

datio

n

Fire a

larm

syste

m-

-Sh

ould

repl

ace

2).

Smok

e de

tect

or p

oint

M1-

18 a

t the

bui

ldin

g da

mag

ed 2

ea

--

Shou

ld re

plac

e

3).

Car

d 4

RS23

2 m

issi

ng c

ard

--

Shou

ld re

plac

e

4).

Car

d 11

24I

O m

issi

ng c

ard

--

Shou

ld re

plac

e

5).

Man

ual M

D09

, MD

10, M

D11

, MD

12 p

oint

M1-

19 d

amag

e 4

ea-

-Sh

ould

repl

ace

6).

Mod

ule

Man

ual N

o. M

D5

- MD

10 P

oint

M1-

19

--

Shou

ld re

plac

e

7).

Smok

e D

etec

tor P

oint

M1-

26

Build

ing

() 3

ea

(SD

-22,

23, 2

4)-

-Sh

ould

repl

ace

Fire H

ydran

t Sys

tem-

-Sh

ould

inst

all

2).

Hyd

rant

No.

9 -

-Sh

ould

repl

ace

Porta

ble Fi

reEx

tingu

isher

1).

Dry

low

pre

ssur

e n

o. 1

3, 1

4 =

2 e

a-

-Sh

ould

refil

l

2).

Dry

car

ryin

g ha

ndle

is ru

sty

no. 3

2 =

1 ea

--

Shou

ld re

plac

eCo

21)

. C

o2 w

eigh

t los

s n

o. 5

, 7, 9

, 10,

11,

19,

23

=

7 e

a-

-Sh

ould

refil

l

2).

Co2

no

fire

hose

no.

5

= 1

ea

--

Shou

ld re

plac

e

3).

Co2

hos

e br

oken

no.

17,

23

=

2 e

a-

-Sh

ould

repl

ace

4).

Co2

car

ryin

g ha

ndle

is ru

sty

no. 1

7 =

1

ea

--

Shou

ld re

plac

e

5).

Co2

no

seal

lock

no.

23

=

1 e

a-

-Sh

ould

repl

ace

Rem

ark:

Prep

are by

:

TK

TK

TK

1).

FHD

No.

4 F

TK

TK

TK

Reco

mmen

d She

et

TK

Des

crip

tion

Bran

d / P

art n

o.

1).

Con

trol p

anel

trou

ble

inpu

t pos

itive

ear

th fa

ult

TK

TK

Actio

n pl

anRe

spon

sibl

e pa

rty

April

-21

Ack

nowle

dg by

:

TK

TK

Dry

TK

TK

TK

TK

TK

FM-S

V-04

Rev

.00

Takachiho Fire, Security & Services (Thailand) Ltd.

1858/110-111 Interlink Tower 25 Fl.,

Debaratna Road, Bangna Tai, Bangna,

Bangkok 10260, Thailand.

Tel : 02-366 -9000 , FAX : 02-366-9090

www.tkfs.co.th

FIRE PROTECTION SYSTEM

Page 54: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for FCP

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of FCP

2. Annunciator Panel

2.1 Check condition of fuse control

2.2 Check condition of Lamp & LEDs

2.3 Check power supply for FCP

2.4 Check cable connection / terminal

2.5 Check Alarm Condition / Function Test

2.6 Visual check condition of battery and housing of battery

2.7 Cleaning of Annunciator Panel

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

AC Power 229.6 Vac.

Battery Charger 25.91 Vdc. 26/6/19

Battery Back up 25.83 Vdc.

* Control panel trouble input positive earth fault

* Smoke Detector Point M1-18 Building ( ) 2

* Card 4, RS232 Missing Card

* Card 4, 24IO Missing Card

* Point M1-19 manual MD09, MD10, MD11, MD12 No. 9 building ( ) 4

* Module Manual No. MD5 - MD10 Point M1-19

* Smoke Detector Point M1-26 Building ( ) 3 ea (SD-22,23, 24)

Remark :

PEB BLDG SIMPLEX 4010

S

S

S

S

S

S

S

S

S

S

S

S

S

Location of fire alarm control panel :

REF.Contract NO : 12 Times / YearInspection Date : 30 April 2021

Inspector :Witness : Khun Songpon, Khun Sonthaya

Description Result

1. Fire Alarm Control Panel

S

Preventive Maintenance Check Sheet (Monthly/Quarterly)

Subin, Wachira, Somkid, Anucha, Anuchit

Fire Detection and Alarm System

Subject : PM. Fire Alarm systemClient : BLUESCOPE BUILDING (THAILAND) LTD.

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

1 M1-19 MANUAL S2 M1-19 MANUAL US Manual 3 M1-19 MANUAL US Manual 4 M1-11 MANUAL S5 M1-17 SMOKE S6 M1-17 SMOKE S7 M1-17 SMOKE S8 M1-17 SMOKE S9 M1-17 SMOKE S

10 M1-17 SMOKE S11 M1-17 SMOKE S12 M1-17 SMOKE S13 M1-17 SMOKE S14 M1-17 SMOKE S15 M1-17 SMOKE S16 M1-17 SMOKE S17 M1-17 SMOKE S18 M1-17 SMOKE S19 M1-17 SMOKE S20 M1-17 SMOKE S21 M1-17 HEAT S22 M1-17 HEAT S23 M1-17 HEAT S24 M1-18 MANUAL S25 M1-18 MANUAL S26 M1-18 MANUAL S27 M1-18 MANUAL S28 M1-19 MANUAL S29 M1-19 MANUAL S30 M1-19 MANUAL S

SSS

SSSSS

PEB.MD-2 Training RoomPEB.MD-3 QC. room

PEB.MD-4 Looker roomPEB-MD-5 corri doorPEB-MD-6corri door

USUS

SSS

SS

SSSS

PEB-MD-7 corri door

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

SSSSSSPEB.SD-16 QC.room

PEB.SD-15 corri door

S

PEB HD-1 SPEB HD-2 PEB HD-3 PEB.MD-1 office room

PEB.SD-7 office room

PEB.SD-13 Training RoomPEB.SD-14 Training Room

SS

PEB.SD-9 toletPEB.SD-8 office room

PEB.SD-10 corri doorPEB.SD-11 store roomPEB.SD-12 corri door

PEB.SD-6 outlet room

PEB.MD-13 corri doorPEB.MD-11 corri door

PEB.SD-1 manager room.

PEB.MD-12 corri doorPEB.MD-14 corri door

PEB.SD-5 office room

PEB.SD-3 Jusmin roomPEB.SD-4 office room

PEB.SD-2 meeting room

S

Remark

Location of fire alarm control panel : PEB BLDG SIMPLEX 4010

item Location LOOP/ Zone.Number Type Inspection

Result Test Result

Inspection Date : 30 April 2021Inspector : Subin, Wachira, Somkid, Anucha, Anuchit

Witness : Khun Songpon, Khun Sonthaya

REF.Contract NO :

Preventive Maintenance Check Sheet Fire Detection and Alarm System

Subject : PM. Fire Alarm systemClient : BLUESCOPE BUILDING (THAILAND) LTD.

12 Times / Year

Function PEB

Takachiho Fire, Security & Services (Thailand) Ltd1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

31 M1-19 MANUAL S32 M1-19 MANUAL US Manual 33 M1-19 MANUAL US Manual 34 M1-21 BEAM N/A N/A35 M1-22 BEAM N/A N/A36 M1-23 BEAM N/A N/A37 M1-24 BEAM N/A N/A38 M1-24 BEAM N/A N/A39 M1-26 SMOKE S40 M1-26 SMOKE US Smoke 41 M1-26 SMOKE US Smoke 42 M1-26 SMOKE US Smoke 43 M1-26 MANUAL S44 M1-33 MANUAL S45 M1-33 MANUAL S46 M1-33 MANUAL S47 M1-25 MANUAL S48 M1-25 MANUAL S49 M1-25 MANUAL S50 M1-25 MANUAL S51 M1-32 MANUAL S52 M1-32 SMOKE S53 M1-32 SMOKE S54 M1-33 MANUAL S55 M1-41 BEAM S56 M1-42 BEAM S57 M1-43 HEAT S58 M1-43 HEAT S59 M1-18 SMOKE US Smoke 60 M1-18 SMOKE US Smoke

SUSUSUSS

S

Blue scope building

PEB MD 18 mantenncePEB MD 19 mantenncePEB MD 20 mantennce

SSS

SSSSS

PEB.BEAM

Blue scope buildingBlue scope buildingBlue scope building

Peb office corridor

PEB.BEAMPEB.BEAM

PEB.SD-23 mantenncePEB.SD-24 mantenncePEB.MD-17 mantennce

PEB.BEAMPEB.SD-21 mantenncePEB.SD-22 mantennce

EER-RM (MD-16)EER-RM (SD-19)

Peb office corridor

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

EER-RM (SD-20) SPEB Corridor (MD15) S

Bluescope Buld Beam #1 SBluescope Buld Beam #2 SPEB Canteen (HD1-HD2) S

USUS

PEB Canteen (HD1-HD2) S

PEB-MD-9 corri doorPEB-MD-10 corri door

PEB.BEAM

PEB-MD-8 corri door

Test Result

SUSUS

Remark

Witness : Khun Songpon, Khun Sonthaya

Location of fire alarm control panel : PEB BLDG SIMPLEX 4010

item Location LOOP/ Zone.Number Type Inspection

Result

REF.Contract NO :Inspection Date : 30 April 2021

Inspector : Subin, Wachira, Somkid, Anucha, Anuchit

12 Times / Year

Fire Detection and Alarm System

Subject : PM. Fire Alarm systemClient : BLUESCOPE BUILDING (THAILAND) LTD.

Preventive Maintenance Check Sheet

Takachiho Fire, Security & Services (Thailand) Ltd1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

61 M1-18 SMOKE S

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

Test Result Remark

Peb office corridor S

Witness : Khun Songpon, Khun Sonthaya

Location of fire alarm control panel : PEB BLDG SIMPLEX 4010

item Location LOOP/ Zone.Number Type Inspection

Result

REF.Contract NO : 12 Times / YearInspection Date : 30 April 2021

Inspector : Subin, Wachira, Somkid, Anucha, Anuchit

Fire Detection and Alarm System

Subject : PM. Fire Alarm systemClient : BLUESCOPE BUILDING (THAILAND) LTD.

Preventive Maintenance Check Sheet

Page 55: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

Location of fire alarm control panel : PEB MAIN EER. ROOM FIKE PROTECTION MODEL 10-063 Serics

Remark

1.1 Check condition of fuse control

1.2 Check condition of Lamp & LEDs

1.3 Check power supply for FCP and battery

1.4 Check cable connection / terminal

1.5 Check Alarm Condition / Function Test

1.6 Visual check condition of battery and housing of battery

1.7 Cleaning of RCP

2. Equipment

2.1 Check condition of all detector and function test zone by zone

2.2 cross zone function test of detector

2.3 Check condition of all manual pull station

2.4 Check condition of solinoid and function test

2.5 Check condition of all abort switch and function test

2.6 Check cable connection / terminal

2.7 Visual check slector valve and function test

2.8 Check condition of all alarm devise and testing

3.Mechanical

3.1 check pipe system and nozzle for physical damage.

3.2 check condition of flexible hose

3.3 check condition of cylinder

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

AC Power 228.6 Vac.

Battery Charger 27.54 Vdc.

Battery Back up 27.51 Vdc. (26/6/19)

S

S

S S

S S

S

S S

S S

S

S S

Remark :

S S

S

S

S S

S S

S S

S S

S S

S S

S S

S S

Description Status Function test Result

Electrical system

1. Releasing Control Panel

S S

Subject : Client :

REF.Contract NO :Inspection Date : 30 April 2021

Inspector : Subin, Wachira, Somkid, Anucha, AnuchitWitness : Khun Songpon, Khun Sonthaya

PM. FM-200 SystemBLUESCOPE BUILDING (THAILAND) LTD.12 Times / Year

Fire suppression systemPreventive Maintenance Check Sheet

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

Location of fire alarm control panel : PEB MAIN EER. ROOM FIKE PROTECTION MODEL 10-063 Serics

1 ZONE1 SMOKE S S cross zone 60 sec.2 ZONE2 SMOKE S S3 ZONE1 SMOKE S S4 ZONE2 SMOKE S S5 ZONE4 Abort Switch S S6 ZONE3 MANUAL S S7 ZONE6 BELL S S8 ZONE7 HORN&STOBE S S9 ZONE9 Solenoid Valve S S1 Shut Down Air S S

11 Damper S S

REMARK: Smoke Detector cross zone delay times 60 sec.Abort switch push to original times delayManual Release push to immedately discharged.

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

PEB-MAIN EER

Test Result Test trouble signal FCP Remark

PEB-MAIN EER PEB-MAIN EER

PEB-MAIN EER PEB-MAIN EER

PEB-MAIN EER PEB-MAIN EER

PEB-MAIN EER

PEB-MAIN EER

item Location Zone.Number Type

Client :REF.Contract NO :

Inspector : Subin, Wachira, Somkid, Anucha, AnuchitWitness : Khun Songpon, Khun Sonthaya

12 Times / Year

PM. FM-200 systemBLUESCOPE BUILDING (THAILAND) LTD.

Inspection Date : 30 April 2021

Fire suppression system

Subject :

Preventive Maintenance Check Sheet

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

1 Sprinkler nozzle : Note condition of all nozzles. If there is no physical damage, no corrosion, and no obstructions,mark " S " in block of yes. If not, assure corrections are made and briefly describe under " Remark " N/A

2 Piping : Note condition of all piping. If there is no physical damage, no corrosion, no misaligned. pipes andthere are no external loads, mark " S " in block of yes. If not, assure corrections are made and briefly describe N/Aunder " Remark "

3 Piping Hangers : Note all pipe hangers. If there is no damage and corrosion, Mark " S " in block of yes. If not, assure corrections are made and briefly describe under " Remark " N/A

4 Gauges : Note condition of gauges. Record water pressure ( PSI )

5 Flow Test : Conduct full flow test at test valve for ensure alarm gong or pressure switch work properly in alarm function

6 Alarm Valve: Internal inspect alarm valve. Verify that all components to proper operate ,move freely and in good condition If so, mark " S " in block of yes. If not, assure valve is repaired and briefly describe under "remark" N/A

7 Control Valve : Operate cach control valve through its full range and return to its normal position. N/A( Seal or relock if appropricate ) If valve operates properly, mark " S " in block of yes. If not, assure valve is repaired and briefly describe under " Remark "

8 Main drain valve: check main drain valve are in close position and no leak

9 Control Valve Lubrication : Lubricate all valve systems with graphite in oil. Mark " S " in block of yes. N/A If not, assure valve is repaired and briefly describe under " Remark "

Inspector By:

DESCRIPTION OF INSPECTION AND TEST FOR AUTOMATIC SPRINKLER SYSTEM(WET PIPE)

Takachiho Fire, Security & Services (Thailand) Ltd.

1858/110-111 Interlink Tower 25 Fl.,

Debaratna Road, Bangna Tai, Bangna,

Bangkok 10260, Thailand.

Tel : 02-366 -9000 , FAX : 02-366-9090

www.tkfs.co.th

FIRE HYDRANT SYSTEM

Page 56: NS BLUE SCOPE STEEL (THAILAND) LTD

OW

NER

:B

LUES

CO

PE B

UIL

DIN

G (T

HAI

LAN

D) L

TD.

Are

a :

BLU

E S

CO

PE

BU

ILD

ING

Pro

ject

nam

e:P

M. F

IRE

HYD

RA

NT

SYS

TEM

Site

:R

AYO

NG

- Cor

rosi

on

- Gas

ket

- Bol

t&N

ut

- Cor

rosi

on

- Thr

ead

- Lea

kage

- Han

dle

- Lea

kage

- Ste

m P

acki

ng

- Cor

rosi

on

- Sea

l Con

ditio

n

- Lea

kage

- Con

nect

or L

ocke

r

-Cap

rem

ark:

1. F

HD

NO

.4

F

2.

Hyd

rant

No.

9

Che

cked

by

:Su

bin,

Wac

hira

, Som

kid,

Anu

cha,

Anu

chit

S

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

Cou

plin

g

SS

SS

SS

SS

SS

SS

SS

S

SS

SS

SS

S

SS

SS

SS

SS

SS

SS

S

SS

SS

SS

SS

S

SS

SS

SS

SS

SS

SUS

Valv

e

SS

SS

SS

SS

SS

SS

SS

S

SS

SS

SS

S

N/A

N/A

N/A

Pipi

ng

SS

SS

SS

SS

S

SS

SS

SS

SS

S

SS

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Flan

gs

N/A

N/A

N/A

N/A

N/A

N/A

PE

B B

LDG

.LP

21P

EB

BLD

G.L

P20

PE

B B

LDG

.LP

23P

EB

BLD

G.L

P25

PE

B B

LDG

.LP

26P

EB

BLD

G.L

P28

N/A

N/A

N/A

N/A

N/A

N/A

NO

.4N

O.5

NO

.6N

O.7

NO

.8N

O.9

Insp

ectio

n R

epor

tFI

RE

HYD

RAN

T

Des

crip

tion

Equi

pmen

t No.

REM

AR

KS

NO

.1N

O.2

NO

.3

PE

B B

LDG

.LP

33P

EB

BLD

G.L

P37

PE

B B

LDG

.LP

39

OW

NER

:B

LUES

CO

PE B

UIL

DIN

G (T

HAI

LAN

D) L

TD.

Area

:BL

UE

SCO

PE B

UIL

DIN

G

Proj

ect n

ame:

PM. F

IRE

HYD

RAN

T SY

STEM

Site

:R

AYO

NG

- Cor

rosi

on

- Gas

ket

- Bol

t&N

ut

- Cor

rosi

on

- Thr

ead

- Lea

kage

- Han

dle

- Lea

kage

- Ste

m P

acki

ng

- Cor

rosi

on

- Sea

l Con

ditio

n

- Lea

kage

- Con

nect

or L

ocke

r

-Cap

rem

ark:

Che

cked

by

:Su

bin,

Wac

hira

, Som

kid,

Anu

cha,

Anu

chit

SS

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

SS

Cou

plin

g

SS

SS

SS

SS

Valv

e

SS

SS

SS

Pipi

ng

SS

SS

N/A

N/A

Flan

gs

N/A

N/A

PE

B B

LDG

.LP

41P

EB

BLD

G.L

P18

N/A

N/A

Insp

ectio

n R

epor

tFI

RE

HYD

RAN

T

Des

crip

tion

Equi

pmen

t No.

REM

AR

KS

NO

.10

NO

.11

OW

NER

:B

LUES

CO

PE B

UIL

DIN

G (T

HAI

LAN

D) L

TD.

Are

a :B

LUE

SC

OP

E B

UIL

DIN

G

Pro

ject

nam

e:P

M. F

IRE

HO

SE

RE

EL

Site

:R

AYO

NG

- Cor

rosi

on

- Doo

r

- Key

lock

- Cor

rosi

on

Con

ditio

n

Con

trol v

alve

con

ditio

n

Con

nect

or L

ocke

r

Sea

l con

ditio

n

Pip

e sy

stem

is in

goo

d co

nditi

on

all h

ose

and

hose

val

ve is

in g

ood

cond

ition

- Lea

kage

- Con

ditio

n

- Cor

rosi

on

Rem

ark:

Insp

ectio

n b

y :

Subi

n, W

achi

ra, S

omki

d, A

nuch

a, A

nuch

it

SS

SS

SS

SS

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

Noz

zel

SS

SS

S

SS

SS

SS

SS

SS

SS

S

Com

pone

nt

SS

S

S

S

SS

SS

SS

SS

S

SS

SS

SS

SS

SS

SS

SS

SS

S

SS

SS

S

SS

SS

SS S

SS

SS

S

SS

SS

S

N/A

N/A

N/A

N/A

supp

ort

SS

SS

N/A

N/A

N/A

N/A

N/A S

SS

SS

SS

PE

B.B

LDG

.B17

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Cab

inet

N/A

N/A

N/A

N/A

N/A

N/AInsp

ectio

n R

epor

tFI

RE

HO

SE R

EEL

OR

STA

ND

PIPE

AN

D H

OSE

SYS

TEM

Des

crip

tion

Equi

pmen

t No.

REM

AR

KS

NO

.1N

O.2

NO

.4N

O.5

PE

B.B

LDG

.B10

PE

B.B

LDG

.B03

NO

.6N

O.7

NO

.8

PE

B.B

LDG

.E18

NO

.9

PE

B.B

LDG

.E03

PE

B.B

LDG

.E10

PE

B.B

LDG

.E25

NO

.3

PE

B.B

LDG

.B31

PE

B.B

LDG

.B25

OW

NER

:B

LUES

CO

PE B

UIL

DIN

G (T

HAI

LAN

D) L

TD.

Are

a :B

LUE

SC

OP

E B

UIL

DIN

G

Pro

ject

nam

e:P

M. F

IRE

HO

SE

RE

EL

Site

:R

AYO

NG

- Cor

rosi

on

- Doo

r

- Key

lock

- Cor

rosi

on

Con

ditio

n

Con

trol v

alve

con

ditio

n

Con

nect

or L

ocke

r

Sea

l con

ditio

n

Pip

e sy

stem

is in

goo

d co

nditi

on

all h

ose

and

hose

val

ve is

in g

ood

cond

ition

- Lea

kage

- Con

ditio

n

- Cor

rosi

on

Rem

ark:

Insp

ectio

n b

y :

Subi

n, W

achi

ra, S

omki

d, A

nuch

a, A

nuch

it

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

SS

SS

Noz

zel

SS

SS

SS

SS

Com

pone

nt

SS

S

SS

SS

SS

SS

SS

SS

SS

SSS

SS

SS

supp

ort

SS

SS

Cab

inet

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Insp

ectio

n R

epor

tFI

RE

HO

SE R

EEL

OR

STA

ND

PIPE

AN

D H

OSE

SYS

TEM

Des

crip

tion

Equi

pmen

t No.

REM

AR

KS

NO

.10

NO

.11

NO

.12

NO

.13

PE

B.B

LDG

.E31

PE

B.B

LDG

.F34

PE

B.B

LDG

.F38

PU

RLI

N.L

P20

Page 57: NS BLUE SCOPE STEEL (THAILAND) LTD

Takachiho Fire, Security & Services (Thailand) Ltd.

1858/110-111 Interlink Tower 25 Fl.,

Debaratna Road, Bangna Tai, Bangna,

Bangkok 10260, Thailand.

Tel : 02-366 -9000 , FAX : 02-366-9090

www.tkfs.co.th

PORTABLE FIRE EXTINGUISHERS SYSTEM

Taka

chih

o Fi

re, S

ecur

ity &

Ser

vice

s (T

haila

nd) L

td.

1858

/110

-111

Inte

rlink

Tow

er 2

5 Fl

.,D

ebar

atna

Roa

d, B

angn

a Ta

i, B

angn

a,B

angk

ok 1

0260

, Tha

iland

.Te

leph

one

no. :

02-

366

-900

0Fa

csim

ile n

o. :

02-3

66-9

090

ww

w.tk

fs.c

o.th

Dry

Che

mic

al P

orta

ble

Fire

Ext

ingu

ishe

rB

LUE

SC

OP

E B

UIL

DIN

G T

HAI

LA

ND

Loca

tion

Bui

ldin

g Ar

ea

13

Impa

ctP

eb O

ffice

Are

aN

/AN

/AN

/AN

/A-

N/A

24

Impa

ctM

eetin

g R

oom

SS

SN

/AJu

n-06

195

Psi

313

Impa

ctP

eb C

orrid

or B

3U

SU

SU

SN

/AJu

n-06

0 P

siLo

w P

ress

ure

414

Impa

ctP

eb C

orrid

or B

3U

SU

SU

SN

/AJa

n-12

0 P

siLo

w P

ress

ure

515

Impa

ctP

aint

Sto

reS

SS

N/A

Aug

-57

195

Psi

616

Impa

ctP

eb C

orrid

or E

3S

SS

S8/

6/19

5719

5 P

si

732

Impa

ctP

eb O

utsi

te G

as S

tatio

nS

SU

SN

/A-

195

Psi

833

Impa

ctP

eb O

utsi

te G

as S

tatio

nS

SS

N/A

-19

5 P

si

934

Impa

ctS

tore

Oil

Die

sel

SS

SS

3/20

1619

5 P

si

Clie

nt :

INSP

EC

TIO

N P

OR

TA

BL

E F

IRE

EX

TIN

GU

ISH

ER

S

Dry

Pow

der

Rem

ark

Insp

ectio

n D

ate

:In

spec

tor :

Item

Ext.N

o.Ty

peB

rand

Hos

e ,

Noz

zle

Sub

in, W

achi

ra, S

omki

d, A

nuch

a, A

nuch

it30

Apr

il 20

21

Dry

che

mic

al

Fill

cap

Han

dle,

Sh

ell

Gas

C

artr

idge

Dat

e of

M

anuf

actu

re

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

S =

Sat

isfa

ctor

y U

S =

Uns

atis

fact

ory

N/A

= N

ot A

pplic

able

Dry

che

mic

al

Dry

che

mic

al

Dry

che

mic

al

Takachiho Fire, Security & Services (Thailand) Ltd.1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,Bangkok 10260, Thailand.Telephone no. : 02-366 -9000Facsimile no. : 02-366-9090www.tkfs.co.th

CO2 Portable Fire ExtinguisherClient :

REF. Contract NO : SC1000142Inspection Date :

Inspector :Witness :

Location

Building Area

1 Co2 No.1 Santo Peb Office Area S S S 12.5 Kg 13.5 Kg 0% Jan-13

2 Co2 No.2 Santo Canteen S S S 12.5 Kg 13.5 Kg 0% Jan-13

3 Co2 No.5 Impact Peb Corri Dor B31 US US US 12.5 Kg 0 Kg 0% Mar-16Weight loss,

4 Co2 No.6 Impact Peb Corri Dor B27 S S S 12.5 Kg 12.4 Kg 0% Mar-06

5 Co2 No.7 Impact Peb Corri Dor B23 US US US 12.5 Kg 0 Kg 0% Mar-16 Weight loss

6 Co2 No.8 Impact Peb Corri Dor B19 S S S 12.5 Kg 13.4 Kg 0% Aug-08

7 Co2 No.9 Impact Peb Corri Dor B15 US US US 12.5 Kg 9.9 Kg 0% Mar-16 Weight loss

8 Co2 No.10 Impact Peb Corri Dor B11 US S S 12.5 Kg 10.5 Kg 0% Mar-16 Weight loss

9 Co2 No.11 Impact Peb Corri Dor B7 S S US 12.5 Kg 9.9 Kg 0% - Weight loss

10 Co2 No.12 Impact Peb Paint Line S S US 12.5 Kg 15.0 Kg 0% Oct-07

11 Co2 No.17 Impact Peb LP35 Forklift Parking E5 US S US 12.5 Kg 14.8 Kg 0% Oct-07,

12 Co2 No.18 Impact Peb Corridor E12 S S S 12.5 Kg 12.6 Kg 0% Sep-07

13 Co2 No.19 Impact Peb Corridor E16 US US US 12.5 Kg 8.9 Kg 0% Aug-08 Weight loss

14 Co2 No.20 Impact Peb Corridor E20 S S S 12.5 Kg 12.6 Kg 0% Aug-06

15 Co2 No.21 Impact Peb Corridor E24 S S S 12.5 Kg 12.7 Kg 0% Mar-06

16 Co2 No.22 Impact Peb Main EER Room S S S 12.5 Kg 14.6 Kg 0% -

17 Co2 No.23 Impact Peb Corridor E29 US US US 12.5 Kg 8.9 Kg 0% Aug-06, ,

Weight loss

18 Co2 No.24 Impact Peb Work Shop LP42 S S S 12.5 Kg 13.5 Kg 0% Aug-06

19 Co2 No.25 Impact Peb Door LP43 S S S 12.5 Kg 14.5 Kg 0% Oct-07

20 Co2 No.26 Impact Peb Corridor E34 S S S 12.5 Kg 13.1 Kg 0% Oct-06

21 Co2 No.27 Impact Peb Corridor F38 S S S 12.5 Kg 13.3 Kg 0% Aug-06

22 Co2 No.28 Impact Peb Corridor C38 S S S 12.5 Kg 13.4 Kg 0% Feb-09

23 Co2 No.29 Impact Peb Corridor A6 S S S 12.5 Kg 13.6 Kg 0% Aug-06

24 Co2 No.30 Impact New Building M/R24 N/A N/A N/A N/A N/A N/A -

25 Co2 No.31 Impact New Building M/R24 N/A N/A N/A N/A N/A N/A -

S = Satisfactory US = Unsatisfactory N/A = Not Applicable

PhysicalSTD

Cylinder Weight

Actual Gross Weight

% Lost Weight

Date of Manufactur

eRemark

BLUE SCOPE BUILDING THAI LAND

30 April 2021Subin, Wachira, Somkid, Anucha,AnuchitKhun Songpon, Khun Sonthaya

Item Type CO2 (Kg) Brand

Hose and Nozzle is Unobstruc

Seal Wire is intact

Takachiho Fire, Security & Services (Thailand) Ltd.

1858/110-111 Interlink Tower 25 Fl.,Debaratna Road, Bangna Tai, Bangna,

Bangkok 10260, Thailand.

Telephone no. : 02-366 -9000

Facsimile no. : 02-366-9090

www.tkfs.co.th

For this project, our company will follow inspection and maintenance procedures of fire

alarm system and fire fighting system by referring to these standards as detail below.

Fire Protection System

Standard Reference