nsf astronomy update: the national solar observatory (nso)...

31
NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel K. Inouye Solar Telescope (DKIST)

Upload: others

Post on 20-Aug-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NSF Astronomy Update: The National Solar Observatory (NSO) …sites.nationalacademies.org/cs/groups/ssbsite/documents/... · 2020. 4. 9. · ŠMay 2015: Met with National Solar Observatory

NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel K. Inouye Solar Telescope (DKIST)

Page 2: NSF Astronomy Update: The National Solar Observatory (NSO) …sites.nationalacademies.org/cs/groups/ssbsite/documents/... · 2020. 4. 9. · ŠMay 2015: Met with National Solar Observatory

NSO Transition to DKIST Era

4/25/2016 CSSP Meeting 2

We are here

Page 3: NSF Astronomy Update: The National Solar Observatory (NSO) …sites.nationalacademies.org/cs/groups/ssbsite/documents/... · 2020. 4. 9. · ŠMay 2015: Met with National Solar Observatory

NSO Operations & Maintenance

4/25/2016 CSSP Meeting 3

FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024NSO Base $8.0 $8.0 $7.0 $6.0 $5.0 $4.0 $4.12 $4.24 $4.37 $4.50 $4.64DKIST Ops. $0.0 $5.0 $9.0 $11.5 $14.5 $17.0 $17.51 $18.04 $18.58 $19.13 $19.71Total, NSO $8.0 $13.0 $16.0 $17.5 $19.5 $21.0 $21.63 $22.28 $22.95 $23.64 $24.34

$0.0

$5.0

$10.0

$15.0

$20.0

$25.0

$30.0

$M

Projected NSO Funding Profile

FY16 Estimate = $16M

ó Total R&RA through FY 2024 = $201.84M

ó FY 2016 estimate = $16M + $2.5M (GONG refurb.)

Page 4: NSF Astronomy Update: The National Solar Observatory (NSO) …sites.nationalacademies.org/cs/groups/ssbsite/documents/... · 2020. 4. 9. · ŠMay 2015: Met with National Solar Observatory

NSO Facilities on Sacramento Peakó Recommended for divestment by

the 2012 AST Portfolio Review

ó NSF funding ramping down to the end 2017

ó NSF engineering/environmental feasibility study underway with contractor (CH2M Hill)

◦ Oct. 2015-Feb. 2016: Iteration with contractor over feasibility study

◦ April 2016: Final study expected

4/25/2016 CSSP Meeting 4

Page 5: NSF Astronomy Update: The National Solar Observatory (NSO) …sites.nationalacademies.org/cs/groups/ssbsite/documents/... · 2020. 4. 9. · ŠMay 2015: Met with National Solar Observatory

Partnership Opportunities for Sacramento Peakó May 2015: Met with National Solar Observatory (NSO) and

representatives of universities seeking to create a consortium to operate Sac Peak.

ó February 2016: NM State Legislature failed to fund highly rated NMSU request for funds to enable consortium.

ó April 2016: Expect final feasibility study. Re-plan with NMSU and NSO. Evaluate cost of bridge from NSO to consortium.

ó May-June 2016: Initiate environmental review/alternative consideration.

◦ Needed even for continued consortium operations, since cost reduction may require removal of some structures on Sac Peak site.

ó Summer 2016: Decide on bridge funding.

ó Mid-late 2017: Conclusion of alternative consideration.

4/25/2016 CSSP Meeting 5

Page 6: NSF Astronomy Update: The National Solar Observatory (NSO) …sites.nationalacademies.org/cs/groups/ssbsite/documents/... · 2020. 4. 9. · ŠMay 2015: Met with National Solar Observatory

NSO Facilities on Kitt Peak

ó Recommended for divestment by the 2012 AST Portfolio Review

ó NSF minimal operations funding ramping down to 2017

ó NSF engineering/environmental feasibility study underway with contractor (CH2M Hill)

◦ February 2016: Draft study received

ó Still open to partnerships

4/25/2016 CSSP Meeting 6

Page 7: NSF Astronomy Update: The National Solar Observatory (NSO) …sites.nationalacademies.org/cs/groups/ssbsite/documents/... · 2020. 4. 9. · ŠMay 2015: Met with National Solar Observatory

NSO Integrated Synoptic Program

ó Consists of SOLIS and GONG

ó Recommended for 50% ($2M/year) divestment by the 2012 AST Portfolio Review

ó External Federal stakeholders: NOAA-SWPC, AFWA, NASA

ó Increased Federal awareness (i.e. NSWS and SWAP) of space weather assets like GONG

ó Result: program to “operationalize” GONG in the FY2016 appropriation

◦ $2.5M addition to NSF (through AST) for refurbishment

◦ $1M/year addition to NOAA for operations

ó April 2016: Expect NSF – NOAA MOU to be signed

4/25/2016 CSSP Meeting 7

Page 8: NSF Astronomy Update: The National Solar Observatory (NSO) …sites.nationalacademies.org/cs/groups/ssbsite/documents/... · 2020. 4. 9. · ŠMay 2015: Met with National Solar Observatory

DKIST Will Replace Current National Solar O/IR Facilities

4/25/2016 CSSP Meeting 8

Dunn Solar TelescopeEvans Solar FacilitySacramento Peak, NM

McMath-Pierce, Kitt Peak, AZ

Page 9: NSF Astronomy Update: The National Solar Observatory (NSO) …sites.nationalacademies.org/cs/groups/ssbsite/documents/... · 2020. 4. 9. · ŠMay 2015: Met with National Solar Observatory

CSSP: April 2015

CSSP Meeting4/25/2016 9

Page 10: NSF Astronomy Update: The National Solar Observatory (NSO) …sites.nationalacademies.org/cs/groups/ssbsite/documents/... · 2020. 4. 9. · ŠMay 2015: Met with National Solar Observatory

CSSP: October 2015

CSSP Meeting4/25/2016 10

Page 11: NSF Astronomy Update: The National Solar Observatory (NSO) …sites.nationalacademies.org/cs/groups/ssbsite/documents/... · 2020. 4. 9. · ŠMay 2015: Met with National Solar Observatory

CSSP: March 2016

CSSP Meeting4/25/2016 11

Page 12: NSF Astronomy Update: The National Solar Observatory (NSO) …sites.nationalacademies.org/cs/groups/ssbsite/documents/... · 2020. 4. 9. · ŠMay 2015: Met with National Solar Observatory

DKIST Current Site Construction

4/25/2016 CSSP Meeting 12

• Support & Operations building foundation completedó Enclosure and S&O Building

◦ Some adverse weather this Winter

◦ S&O building interior outfitting

◦ Upper enclosure nearing completion

ó Construction moving inside

◦ Coude platform

◦ TMA

ó On schedule for a 2019 completion Photo credit: Scott Lacasse

Page 13: NSF Astronomy Update: The National Solar Observatory (NSO) …sites.nationalacademies.org/cs/groups/ssbsite/documents/... · 2020. 4. 9. · ŠMay 2015: Met with National Solar Observatory

M1 Mirror Polishing Completion: Dec 2015

4/25/2016 CSSP Meeting 13

Page 14: NSF Astronomy Update: The National Solar Observatory (NSO) …sites.nationalacademies.org/cs/groups/ssbsite/documents/... · 2020. 4. 9. · ŠMay 2015: Met with National Solar Observatory

Work Beginning Inside Enclosure

4/25/2016 CSSP Meeting 14

Page 15: NSF Astronomy Update: The National Solar Observatory (NSO) …sites.nationalacademies.org/cs/groups/ssbsite/documents/... · 2020. 4. 9. · ŠMay 2015: Met with National Solar Observatory

DKIST Project Execution Plan and Construction Status Reviewó Panel took place Dec. 7 – 9, 2015 in Tucson, AZ.

ó Final Report

◦ received Dec. 15, 2015, a month ahead of schedule

ó From the Executive Summary:

◦ “The Panel finds DKIST’s budget, schedule and scope performance against plan to be excellent, and the project office appears well-supported by a first-class set of tools covering all areas of project needs.”

◦ “We find the DKIST Project Office is doing an outstanding job managing the construction process, and we have confidence in this team being able to successfully execute the remainder of the project.”

4/25/2016 CSSP Meeting 15

Page 16: NSF Astronomy Update: The National Solar Observatory (NSO) …sites.nationalacademies.org/cs/groups/ssbsite/documents/... · 2020. 4. 9. · ŠMay 2015: Met with National Solar Observatory

PEP Review: Findings/Recommendations

4/25/2016 CSSP Meeting 16

ó There were

◦ 27 FINDINGS

◦ 16 RECOMMENDATIONS

ó AURA’s response

◦ received Jan. 31, 2016

ó The Panel encouraged the project to consider “black swans” (i.e. low probability/high impact events)

Page 17: NSF Astronomy Update: The National Solar Observatory (NSO) …sites.nationalacademies.org/cs/groups/ssbsite/documents/... · 2020. 4. 9. · ŠMay 2015: Met with National Solar Observatory

DKIST Construction Fundingó DKIST Re-baselined Total Project Cost = $344.13M

ó ARRA ($146M) expired Sept. 30, 2015, spend-out completed!

ó MREFC FY 2016 estimate = $20M

4/25/2016 CSSP Meeting 17

FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019Original $20.00 $17.00 $20.00 $25.00 $20.00 $20.00 $20.00 $9.93 $0.00 $0.00Updated $20.00 $5.00 $10.00 $25.00 $36.88 $25.12 $20.00 $20.00 $20.00 $16.13

$0.00

$5.00

$10.00

$15.00

$20.00

$25.00

$30.00

$35.00

$40.00

$M

MREFC Funding Profile for DKIST

FY16 Estimate = $20M

Page 18: NSF Astronomy Update: The National Solar Observatory (NSO) …sites.nationalacademies.org/cs/groups/ssbsite/documents/... · 2020. 4. 9. · ŠMay 2015: Met with National Solar Observatory

New Flagship Astronomy Capabilities Recently Highlighted by the NSF Director

4/25/2016 CSSP Meeting 18

Page 19: NSF Astronomy Update: The National Solar Observatory (NSO) …sites.nationalacademies.org/cs/groups/ssbsite/documents/... · 2020. 4. 9. · ŠMay 2015: Met with National Solar Observatory

NSO/DKIST Roadshow: Raising Community Awareness

4/25/2016 CSSP Meeting 19

Page 20: NSF Astronomy Update: The National Solar Observatory (NSO) …sites.nationalacademies.org/cs/groups/ssbsite/documents/... · 2020. 4. 9. · ŠMay 2015: Met with National Solar Observatory

Community Research Opportunities

4/25/2016 CSSP Meeting 20

Efforts by Mark Rast on behalf of DKIST SWG:

• Multiple talks in 2015 (TESS/SPD, IRIS 4 workshop, IAU, etc.)

• Coordinating proposals to the Astronomy Division’s Astronomy and Astrophysics Research Grants (AAG) program

• More proposals with DKIST in the title than ALMA

• Result: First-ever solar physics panel in AST

Planned: DKIST CSP workshops

• A series of community workshops to examine and develop Science Use Cases

• in conjunction with SPD 2016 in Boulder, CO• in conjunction with SPD 2017 in Jackson Hole, WY• series of workshops during summers 2018 and 2019

Page 21: NSF Astronomy Update: The National Solar Observatory (NSO) …sites.nationalacademies.org/cs/groups/ssbsite/documents/... · 2020. 4. 9. · ŠMay 2015: Met with National Solar Observatory

AST Budget within MPS and NSF

ó FY 2017 Request Released on February 9, 2016

ó DKIST Construction from MREFC line

ó DKIST Operations funding must come from AST line

4/25/2016 CSSP Meeting 21

$M FY15 Actual

FY16 Request

FY16 Estimate

FY17 Request Total

FY17Request Disc.

NSF Total 7344 7724 7464 7964 7564

NSF R&RA 5934 6186 6034 6425 6079

MPS 1337 1366 1349 1436 1355

AST 245.2 246.5 246.7 262.6 247.7

MREFC 200.8 200.3 200.3 193.1 193.1

Page 22: NSF Astronomy Update: The National Solar Observatory (NSO) …sites.nationalacademies.org/cs/groups/ssbsite/documents/... · 2020. 4. 9. · ŠMay 2015: Met with National Solar Observatory

AST Projection through 2023: Hypothetical “Constant”Individual Investigator Program

1995 2008 202320102000 2005 2015 2020

GBO+VLBA

GeminiDKIST

NOAO+NSO NOAO

EVLA

0

50

100

150

200

250

300

350

$M

AST=0.0%/yr

2009 ARRA

This is what the 2017-2023 budget distribution would look like under the assumptions that (1) there is no additional facility divestment beyond that already planned, and (2) the Mid-Scale + Individual Investigator Programs grow by 2.5%/yr(≈inflation)

LSST

Mid-scale+IIA

ALMAGBO+VLBA

NRAOAO Gemini

DKISTNSONOAO+NSO NOAO

EVLA

4/25/2016 CSSP Meeting 22

Page 23: NSF Astronomy Update: The National Solar Observatory (NSO) …sites.nationalacademies.org/cs/groups/ssbsite/documents/... · 2020. 4. 9. · ŠMay 2015: Met with National Solar Observatory

Transformation of NSO

4/25/2016 CSSP Meeting 23

2010 2020 2030 2040

You are here

SOLIS relocation & DKIST support

GONG & SOLIS replaced by SPRING network

DKIST Operations & data distribution

GONG Refurbishment

Synoptic Heliosphericmission at L5

Solar Cycle

Page 24: NSF Astronomy Update: The National Solar Observatory (NSO) …sites.nationalacademies.org/cs/groups/ssbsite/documents/... · 2020. 4. 9. · ŠMay 2015: Met with National Solar Observatory

NSO and the NSWS/SWAP

ó NSF’s National Solar Observatory can contribute to the National Space Weather Strategy and Action Plan through:

◦ space weather observations (5.3)

◦ forecasting improvement (5.4)

◦ enhancing fundamental understanding of space weather (5.5)

◦ international cooperation (6.2)

ó See NSO White Paper at:

◦ http://www.nso.edu/node/1290

4/25/2016 CSSP Meeting 24

Page 25: NSF Astronomy Update: The National Solar Observatory (NSO) …sites.nationalacademies.org/cs/groups/ssbsite/documents/... · 2020. 4. 9. · ŠMay 2015: Met with National Solar Observatory

DKIST: SWAP 5.3.9, 5.4.2, 5.5.2, 6.2.2ó The Daniel K. Inouye Solar Telescope (DKIST) will

host new sensor technologies (5.3.9, 5.4.2) and support basic research opportunities (5.5.2) through international partnerships (6.2.2)

ó Key challenges:

◦ Construction completion

◦ Transition to operations

◦ Big Data

4/25/2016 CSSP Meeting 25

Page 26: NSF Astronomy Update: The National Solar Observatory (NSO) …sites.nationalacademies.org/cs/groups/ssbsite/documents/... · 2020. 4. 9. · ŠMay 2015: Met with National Solar Observatory

Back-up Slides

4/25/2016 CSSP Meeting 26

Page 27: NSF Astronomy Update: The National Solar Observatory (NSO) …sites.nationalacademies.org/cs/groups/ssbsite/documents/... · 2020. 4. 9. · ŠMay 2015: Met with National Solar Observatory

NISP: SWAP 5.3.4ó The NSO Integrated Synoptic Program

(NISP) contributes to a sustained or enhanced ground-based solar imaging including solar magnetic field and H-alpha data (5.3.4)

ó Key challenges:

◦ 2012 Portfolio Review recommended partial divestment

◦ U.S. Air Force withdrawal of support for GONG operations

◦ Need to integrate SOLIS vector-magnetograms into space weather models

ó NSF – NOAA partnership for robust GONG operations

4/25/2016 CSSP Meeting 27

Page 28: NSF Astronomy Update: The National Solar Observatory (NSO) …sites.nationalacademies.org/cs/groups/ssbsite/documents/... · 2020. 4. 9. · ŠMay 2015: Met with National Solar Observatory

SPRING: SWAP 5.3.9, 5.4.2, 6.2.2ó NSO will contribute to the development and deployment of new

operational space weather assets (5.3.9) and novel sensor technologies (5.4.2) leveraging international partnerships (6.2.2).

ó Key challenges:

◦ The Solar Physics Research Integrated Network Group (SPRING) is an international project currently led by the Kiepenheuer Institutfür Sonnenphysik (KIS) in Germany, where science requirements are being written and instrument concepts being developed

◦ The U.S. participation is through the NSO as a consultant on the European-led project

◦ SPRING is in the conceptual stage and currently has no Federal funding.

4/25/2016 CSSP Meeting 28

Page 29: NSF Astronomy Update: The National Solar Observatory (NSO) …sites.nationalacademies.org/cs/groups/ssbsite/documents/... · 2020. 4. 9. · ŠMay 2015: Met with National Solar Observatory

DKIST Instrumentation

4/25/2016 CSSP Meeting 29

ó Visible Broadband Imager (VBI)

ó Visible Spectropolarimeter (ViSP)

ó Visible Tunable Filter (VTF); Being constructed by Kiepenheuer-Institut fuerSonnenphysik, Germany

ó Diffraction-Limited Near-Infrared Spectropolarimeter (DL-NIRSP)

ó Cryogenic Near-Infrared Spectropolarimeter (Cryo-NIRSP)

ó Visible cameras 4k x 4k, 30 Hz; Being developed by UK consortium led by Queen’s University, Belfast

ViSP

Cryo-NIRSP

DL-NIRSP

VTFVBI

Page 30: NSF Astronomy Update: The National Solar Observatory (NSO) …sites.nationalacademies.org/cs/groups/ssbsite/documents/... · 2020. 4. 9. · ŠMay 2015: Met with National Solar Observatory

Instrument Data Volume

Daily (TB) Annually(PB)

VBI (reconstructed) 0.3 0.6

VTF 12 4.4

ViSP 7.4 2.6

DL-NIRSP 3 1.1

Cryo-NIRSP 0.6 0.2

Lossless Compression x 0.5 x 0.5

Estimated Totals 12 TB 4.5 PB

• Volume, Velocity, Variety, Veracity, Value• Calibrated data sets via robust pipelines: Image reconstruction, spectropolarimetry• Instrument partners to provide prototype code for pipelines• Metadata: Instrument, Telescope, Thermal, Electrical, AO performance• Manage data lifecycle: Archival, retention, what to keep? how to keep it?• Provide search & discovery: Context data (NSO’s synoptic program)

DKIST is Big Data

4/25/2016 CSSP Meeting 30

Page 31: NSF Astronomy Update: The National Solar Observatory (NSO) …sites.nationalacademies.org/cs/groups/ssbsite/documents/... · 2020. 4. 9. · ŠMay 2015: Met with National Solar Observatory

• Set of observations that take advantage of the DKIST uniquecapabilities

• Address critical compelling science: continuously evolving• Discussed at the DKIST SWG: open to the community• Outcome: PI led Observing Proposals and publication of first light

results• CSP Feedback: helps DKIST to develop essential operations and data

management tools

DKIST Critical Science Plan (CSP)

4/25/2016 CSSP Meeting 31