NSF Division of Astronomical Sciences (AST) Report
November 17, 2014
Jim Ulvestad, Division Director, MPS/AST
Outline
Why are you here? Highlights, NSF and AST Budgets Progress on Previous AAAC Recommendations Decadal Survey Status Portfolio Review Status Astronomy and Astrophysics Research Grants (AAG)
11/17/2014 2 AAAC-NSF-AST
Why are you here? NSF Authorization Act of 2002, as amended by DOE High-
End Computing Revitalization Act of 2004 Duties:
“assess, and make recommendations regarding, the coordination of astronomy and astrophysics programs of the [NSF, NASA, and DOE]”
“assess, and make recommendations regarding, the status of the activities of [NSF, NASA, and DOE] as they relate to the recommendations contained in the [2001 NRC decadal survey], and the recommendations contained in subsequent [NRC] reports of a similar nature”
“not later than March 15 of each year, transmit a report to [NSF, NASA, DOE, and Congress] on the Advisory Committee’s findings and recommendations”
11/17/2014 3 AAAC-NSF-AST
Highlights,NSF and AST Budgets
11/17/2014 4 AAAC-NSF-AST
ALMA construction nearly completed HL Tau:
• Astonishing detail in planet-forming disk ~235 AU in diameter around a young Sun-like star 450 ly away.
• Planet formation underway at <1 Myr
• Rings may have been created by planet-like bodies and/or resonances.
• λ=1.3 mm, 25-30 antennas, resolution = 35 mas, ~5 AU.
11/17/2014 4 AAAC-NSF-AST
Credit: ALMA (NRAO/ESO/NAOJ); C. Brogan, B. Saxton (NRAO/AUI/NSF)
Massive Black Hole in M60-UCD1
Ultra-Compact Dwarf Galaxy M60-UCD1 observed with Gemini-N AO system, imaged with HST
Spectroscopy shows clear rotation in inner arc-second and high velocity dispersion in inner 0.1 arc-sec
Interpreted as black hole of 20 x 106 MSun in galaxy of total mass only 140 x 106 MSun
11/17/2014 6 AAAC-NSF-AST
Seth et al., 2014, Nature, 513, 398
Credit: University of Utah/Nature
Pleiades Distance Hipparcos “accepted”
distance to Pleiades is 120.2 +/- 1.5 pc closer than previously accepted distances that were >10% larger
VLBI parallax measurements of 5 stars in Pleiades give distance of 136.2 +/- 1.2 pc, consistent with pre-Hipparcos results
Implications for astrophysical models of Pleiades-age stars
11/17/2014 7 AAAC-NSF-AST
Melis et al. 2014, Science 345, 1029
Credit: NOAO/AURA/NSF
PLR/AAGS - Pioneering Astrophysical Research
South Pole Telescope
Researchers operating the South Pole 10m Telescope (SPT) in Antarctica used recent data from a 100 degree-squared patch of the sky to detect for the first time tiny fluctuations in the Cosmic Microwave Background (CMB) - known as the B-mode polarization - that were caused by "gravitational lensing" - the bending of the CMB photon trajectories through the gravitational tug of matter as they travel to Earth through massive galaxy clusters. Also reported by POLARBEAR: ApJ, 794, 171.
Vol. 342, 947, 2013
NSF-funded IceCube Neutrino Observatory at South Pole reported highest energy neutrinos from outside the Solar System
A PeV-energy electron neutrino event superimposed over UW-Madison lakefront
Up to date, over 40 neutrinos with energies above 30 trillion electron volts (TeV) have been spotted. IceCube researchers confirmed that astrophysical neutrinos (green in the figure) remain the dominant component in the Southern sky.
Highlights
ALMA construction completed except for punchlist items Spectacular science results already appearing
Daniel K. Inouye Solar Telescope (DKIST) renamed, construction well on its way
Construction award made for Large Synoptic Survey Telescope (LSST)
Mid-Scale Innovations Program (MSIP) concluded its first round, with new awards
Completed reorganization of grant discipline areas to group Planetary and Exoplanetary Astronomy
11/17/2014 10 AAAC-NSF-AST
Major Construction Projects
11/17/2014 11 AAAC-NSF-AST
ALMA
LSST DKIST
Not-So “High”lights
AST Division budget remains stagnant President’s Budget Request of $236 million for
FY 2015, compared to $246 million appropriated in FY 2010
Astronomy and Astrophysics Research Grants (AAG) budget went from $49.4 million in FY 2010 to $43.7 million in FY 2014, with funding rate falling from 22% to 16%
Ended University Radio Observatories and Telescope Systems Instrumentation Program as standalone activities, folded into MSIP
“Open Access” time headed for reductions in both optical and radio regimes
11/17/2014 12 AAAC-NSF-AST
Issues to Watch
Merit Review oversight by Congress America Competes reauthorization Outcome of FY 2015 appropriations More sequestration in the future?
Facility divestment and increasing activities in Chile
Inspector General concerns about NSF construction projects
11/17/2014 13 AAAC-NSF-AST
Progress on Previous AAAC
Recommendations
11/17/2014 14 AAAC-NSF-AST
AAAC 2014 Recommendations to NSF Use newly drafted “Principles for Access to Large Astrophysics
Projects and Facilities” in negotiating future agreements Being used in discussions for DESI, exoplanet programs
Should budget situation improve, make more aggressive progress on decadal survey priorities Awaiting improvement
Pursue divestments in most expedient possible manner to enable decadal survey progress Have started engineering feasibility and baseline
environmental reviews for several telescopes/facilities Where possible, leverage divested facilities for community access
Many ongoing discussions, most in progress AAAC and agencies work together to clarify and quantify
questions related to individual investigator grants and mid-scale programs Ongoing, see separate agenda item
11/17/2014 15 AAAC-NSF-AST
NRC/CAA OIR System Study (AAAC 2013)
“A Strategy to Optimize the U.S. Optical and Infrared System in the Era of the Large Synoptic Survey Telescope (LSST)”
Committee chaired by Debra Elmegreen, Vassar College Three meetings July 31/August 1; October 12-13;
December 2-3 Community input received and under discussion October meeting had presentations from observatory
directors, GMT, TMT, adaptive optics experts, ESO, etc. NSF has noted importance of recommendations in areas
of instrumentation and data management, plus the people/training needs to support these areas
Report expected in Spring 2015 11/17/2014 16 AAAC-NSF-AST
Decadal Survey Status
11/17/2014 17 AAAC-NSF-AST
Decadal Survey (NWNH) Status Funding circumstances are substantially below those
assumed in NWNH
LSST construction approval in MREFC line was secured, with award made on August 1, 2014 (survey begins 2022)
Mid-Scale Innovations Program (MSIP) proposals evaluated, and first awards have been made
NSF and community participating in TMT Board, Science Advisory Committee, via planning award
Only CTA and CCAT opportunities – MSIP “Small” recommendations: TCAN (Theoretical and
Computational Astrophysics Network) started with NASA, no funds available for other recommended increases
CAA O/IR System Study under way Portfolio review carried out in 2011-2012
11/17/2014 18 AAAC-NSF-AST
MSIP Awards 38 pre-proposals, requesting $398 million, 12 full
proposals invited Two full awards in FY 2014
Zwicky Transient Facility – Kulkarni, Caltech, $9.0 million Advanced ACTPol – Staggs, Princeton, $10.0 million
One development award in FY 2014 HERA: Illuminating Our Early Universe – Parsons, Berkeley, $2.1
million
ACTPOL and HERA are within the eight notable areas called out by NWNH, while ZTF is responsive to one of the NWNH “Science Frontier Discovery Areas”
Projected FY 2015 Awards Expect one full award and two partial/co-funded awards to be
made in FY 2015
11/17/2014 19 AAAC-NSF-AST
MSIP Moving Forward MSIP subsumed Telescope Systems Instrumentation
Program (TSIP) and University Radio Observatories (URO) as a component of MSIP program, which also has open access to data as a goal
FY 2013 MSIP solicitation was for FY 2014/15 funds Total AST MSIP budget started at ~$14 million/yr, hence
with ~$27 million available through first solicitation Also attracted several million dollars in co-funding and made
small out-year commitments, for total of ~$35 million
Expect similar FY 2015 solicitation for FY 2016/17 funds Discussing possible modifications regarding the funding levels,
instrumentation details, and open-access (telescopes and data) category
11/17/2014 20 AAAC-NSF-AST
Portfolio Review Status
11/17/2014 21 AAAC-NSF-AST
AST Portfolio Scenarios
11/17/2014 22
AST budget assumption: FY15=Request, 1%/yr growth thereafter
With Max. Divestment
FY19 FY17 0
50
100
150
200
250
300
AST $M
Fiscal Year
Individual Investigator+ Mid-scale DKIST
ALMA
Existing Facilities Assumes 2.5% inflation/yr for existing facilities
Facility Budget Reductions, FY10-FY13
LSST enters here
FY10 FY13 FY16 FY19
Assuming No Divestment
AAAC-NSF-AST
Portfolio Review Status AST issued Dear Colleague Letter NSF 14-022 on
December 20, 2013 Lays out future steps for all telescopes that were either
recommended for divestment in the near term or for future consideration
NSF has begun engineering/environmental feasibility studies for a number of telescopes, while consideration of some others awaits specific external milestones
Expect next steps of environmental review to begin in FY 2015, as appropriate
Achieved schedule will be slower than hoped
11/17/2014 23 AAAC-NSF-AST
Facility Futures-I
Kitt Peak 2.1m open availability ended in FY 2014 Proposals to take over 2.1m under evaluation
Mayall 4m leaves NOAO base budget after FY 2015 Continued operation for special projects funded outside
NOAO base Expect some community access continuing during 2016-
2018 transition to DOE DESI project
NOAO share in WIYN 3.5m telescope Joint NASA/NSF exoplanet program is under development Includes development of Extreme Precision Doppler
Spectrograph under NASA solicitation
11/17/2014 24 AAAC-NSF-AST
Facility Futures-2 GBT and VLBA partitioned from NRAO management
competition Engineering and environmental baseline review taking
place for both Similar to NOAO Kitt Peak, these are outside NRAO base
budget in competition, with any operations to be funded separately
Partnerships under development
DKIST will supplant open-access NSO observatories Partnership discussions for GONG, Sac Peak, McMath-
Pierce
Arecibo undergoing baseline review similar to GBT Will lead to decision about status post-2016
11/17/2014 25 AAAC-NSF-AST
Astronomy and Astrophysics
Research Grants (AAG)
11/17/2014 26 AAAC-NSF-AST
AAG Global Budget Breakdown
Indirect Costs
Other Direct
Fringe
Personnel
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13Indirect Costs Other Direct Participant Support Travel and Equipment Fringe Personnel
Travel and Equipment
Approximately 15% Senior Personnel, 10% Postdocs, 15% Students
11/17/2014 27 AAAC-NSF-AST
18 12 13 19 41 33 36 43 41 38 32 40 31 48 64 44 60 66 57 58 52 54 60 90
136 80 89 126 134 108 126 96
112 104 119 113 104 100 112 105
115 113
135 148 160 200
227 274 239 143
62 59
49 58 50 52
73 82
58 48 41
76 107 72 74 91 122
124 91 96
91
107
102 118
145
78 88 78
87 76 72 96
119 134 128
131 124
122 138 136 170
219
223 259 242 243
270
280 311
308
1 9 9 0 1 9 9 1 1 9 9 2 1 9 9 3 1 9 9 4 1 9 9 5 1 9 9 6 1 9 9 7 1 9 9 8 1 9 9 9 2 0 0 0 2 0 0 1 2 0 0 2 2 0 0 3 2 0 0 4 2 0 0 5 2 0 0 6 2 0 0 7 2 0 0 8 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 2 0 1 4
PLA SAAGAL EXC
# Proposals in AAG 732
238
1990 2014
11/17/2014 29 AAAC-NSF-AST
50.4 48.0
45.1
29.5
45.1
29.3 24.9
31.2 27.6 26.7
31.2 34.3
38.1 36.8
28.8 28.5 24.4 23.9
20.7
36.3
22.4 19.9
14.8 15.4 16.7
1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
Proposal Success Rate, %
16.2 17.0 18.2 17.1 20.2 18.6 17.5 19.3 19.7 18.8 20.9 22.7 29.4 32.4 30.7 34.0
38.9 41.5 42.1
79.6
49.4 48.1 44.5 42.4 43.7
1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
AAG Budget, $M
1
10
100
1000
1 2 3 4 5
Number of submissions per PI in FY14
Multiple Submissions in FY14
11/17/2014 30 AAAC-NSF-AST
AAG Now and Future FY14 funding rate was 16%
Higher than expected rate of ~13%, because co-funding contributions from elsewhere enabled AST to release the entire year-end reserve to AAG
Proposers reduced budgets where possible without impacting scope
Changes needed to achieve best review, reduce workload Under consideration: reducing frequency of AAG calls,
restricting numbers of proposals per investigator/institution
Strongly encouraging investigators to restrict themselves to 1 AAG proposal in FY 2015
AST needs to develop strategy for what to do when funding rates hit 12%, 10%, 8%
11/17/2014 31 AAAC-NSF-AST
Questions/Discussion