nsnfp technical exchange meeting bethesda, md april 14, 2005
DESCRIPTION
Savannah River Site Spent Fuel Program Status. NSNFP Technical Exchange Meeting Bethesda, MD April 14, 2005. L-Basin. Receipts Since Last Meeting. Foreign: 5 casks from Japan Domestic: 7 casks HFIR/MURR/MIT. Work in Process. L-Area Storage Racks (temp. hold) - PowerPoint PPT PresentationTRANSCRIPT
NSNFP TechnicalExchange Meeting
Bethesda, MDApril 14, 2005
Savannah River SiteSpent Fuel Program
Status
L-Basin
ReceiptsSince Last Meeting
Foreign: 5 casks from Japan
Domestic: 7 casks HFIR/MURR/MIT
Work in Process
• L-Area Storage Racks (temp. hold)
• RBOF Cask Pad Cleanup
• Treatment and Storage Facility
02 04 06 08 10 12 14 16 18 20 22 24 26
5000
10000
15000
20000
25000
30000
Fiscal Year
Eq
uiv
alen
t M
TR
Es
Capacity with LASR ~ 19000 MTRE
L-Basin Inventory – Without TSF
LASR = L-Area Storage Rack project (FY00-06)MTRE = Material Test Reactor Equivalent
L-Basin HFIR Projection – Without TSF
02 04 06 08 10 12 14 16 18 20 22 24 26
50
100
150
200
250
300
Fiscal Year
HF
IR C
ore
s
Capacity After LASR 208 cores
350
LASR = L-Area Storage Rack project (FY00-06)HFIR = High Flux Isotope Reactor (Oak Ridge)
Work in Process
• L-Area Storage Racks (temp. hold)
• RBOF Cask Pad Cleanup
• Treatment and Storage Facility
RBOF Cask Pad
Work in Process
• L-Area Storage Racks (temp. hold)
• RBOF Cask Pad Cleanup
• Treatment and Storage Capability
Status:SNF Treatment and Storage Facility
• CD-O package in approval process
04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Spent Nuclear Fuel Program Schedule
Final closure/Disposition
Basin Operations
TSF Project
Foreign SNF Receipt Program
Domestic SNF Receipt Program
TSC Operations
Shipments to Repository
Deactivate
(By FY)
Issues
• Lack of formal, written program direction
• No TSF funding Identified
• Global Threat Reduction Initiative impacts
• Potential receipt of INEEL FRR shipments
• H-Canyon processing – near term decision