CHANGES TO THE WAY YOU TRAVELFRANKSTON & STONY POINT LINES
DISRUPTIONS TO LOCAL ROUTE BUS SERVICESBetween 9pm on Friday 24 June and the last service on Sunday 31 July 2016 local route bus services will be diverted at times due to road closures at the North, McKinnon and Centre road level crossings. For details visit ptv.vic.gov.au or call 1800 800 007.
ALTERNATIVE WAYS OF TRAVELLINGDuring this period, station customers are encouraged to plan their travel and consider alternative public transport.
TICKETINGCustomers should touch on and off at the beginning and end of their journey. When catching train replacement buses, touch on and off at your connecting train station.
Customers who use the following stations can touch on and off at Caulfield or Moorabbin stations when travelling to and from the city:
> Glenhuntly > Ormond > McKinnon > Bentleigh > Patterson > Highett.
MCKINNON STATION OPENINGOn Monday 1 August, normal train services will resume on the Frankston line with trains stopping at the new McKinnon Station.
The new McKinnon Station will be operational for rail customers, but works will continue around the station to complete the new modern transport interchange.
The new McKinnon Station will feature:
> New station concourse over the rail line at road level > Stair, ramp and lift access to the platforms > CCTV and Protective Service Officer facilities > Public toilets > Reinstatement of the station facilities including the car park, taxi rank, bus stop, Kiss ‘N’ Ride and bike facilities
> Bicycle connectivity from Murray Road to McKinnon Road.
ORMOND AND BENTLEIGH STATION OPENINGSOrmond and Bentleigh stations are planned to open in late August. Until the new stations open, services will run express through Ormond and Bentleigh stations and buses will operate between Caulfield and Moorabbin to service the closed stations. Train services will continue to stop at Patterson, McKinnon and Glenhuntly stations. There will be no change to timetabled services on the rest of the line.
To plan your journey before you travel visit ptv.vic.gov.au or call 1800 800 007.
605
64
3
623
64
64
64
623
67
67
3
623
623
630
630
822
822822
822
767
708
823
823
811
812
811812
823823
822
822
708
825
825
823823
824
824
824
822
767
767767
900
900
626
624624
624
624
62
16
3a
3a
767
624
625
625
625
625
625
626
626
626
623
64
67
3 3a
630
625
625
625
626
626
626
Nor
thRd
RdTucker
Koornang Rd
Grange
Oak
leig
h Rd
Booran Rd
Woo
dville
Ave
Leila
Rd
Coo
rigil
Rd
Eum
eral
la R
d
Mar
ara
Rd
Dov
er S
t
Rd
Gardeners Rd
Cen
tre
Nepean Hwy
Rd
Cen
treRd
Maw
byRd
Ross
town
Rd
East Boundary Rd
McK
nnon
i
Nor
thRd
StThomas
701
701
701
701
703
979
979
703
703
979
979
978
978
703
605
64
3
623
64
64
64
623
67
67
3
623
623
630
630
703
822
822822
822
767
823
823
701
701
811
812
811812
823823
822
822
708
825
823823
824
824
824
822
701
701
703
767
767767
900
900
626
624624
624
624
62
16
3a
3a
767
701
624
900
825
823
625
625
625
625
626
626
626
626
623
64
67
3 3a
Caulfield
East
Mal
vern
Carnegie
Glenhuntly
Murrumbeena
Patterson
Sandringham Line
Moorabbin
Dandenong LineNORTH
811
701 824
812
823
Ormond
McKinnonBentleigh
Train
stat
ions
Buses r
eplacing
train
s
Bus route
s
Night Bus
Tram
route
BURKE - NORTH - MCKINNON - CENTRE
Frankston Line: planned disruptions to train servicesFrom 9pm on Friday 24 June – Sunday 31 July 2016*
Stony Point Line: planned disruptions to train services Saturday 25 June – Sunday 31 July 2016* *Normal train services will resume Monday 1 August
McKinnon StationOPENS in early August 2016
Ormond and Bentleigh stationsOPEN in late August 2016
BIKES, PETS AND ANIMALSUnfortunately, bicycles and surfboards are not allowed on train replacement buses.
In accordance with the Victorian Fares & Ticketing Manual 2016, bicycles (except folding bicycles), surfboards and dogs and other pets are not permitted to travel on buses, with the exception of guide dogs, hearing guide dogs, guide dogs in training, animals identified by an Assistance Animal Pass and small animals if they are suitably contained.
NIGHT NETWORKCatch the Frankston line train to Caulfield Station to connect with all Night Network train replacement buses.
Major construction is now underway to remove the level crossings at North, Centre and McKinnon roads as part of the State Government’s commitment to remove 50 of the most dangerous and congested level crossings across Melbourne.The works include removing the level crossings by lowering the rail line below the roads, reconstructing Ormond, McKinnon and Bentleigh stations, and introducing improvements to the road and public transport connections. This will improve safety, reduce congestion and provide improved station facilities.
Over five weeks, large scale construction will be undertaken to remove the level crossings and rebuild the stations. Works include:
> Bulk earthworks to excavate the rail corridor > Build the new stations at Ormond, McKinnon and Bentleigh, with McKinnon Station to be operational for rail customers at the end of the 37 days
> Constructing the new rail line > Completing the installation of overhead structures and wiring
> Installing new signalling equipment and removing redundant equipment
> Relocating the water main on Centre Road.
To allow these works to be carried out safely, disruptions to train services on the Frankston line are planned between 9pm on Friday 24 June to the last service on Sunday 31 July 2016, and on the Stony Point line from Saturday 25 June to Sunday 31 July 2016.
Some nights and weekend road closures will be required, with local bus diversions in place when necessary.
The businesses on North, McKinnon and Centre roads will remain OPEN at all times during works.
There will be additional planned disruptions to trains on the Frankston line in 2016.
CONTACT DETAILSPLANNING YOUR JOURNEY
We are here to help you travel during major construction and to get you to and from your destination as quickly and easily as possible. We will continue to keep you updated of all the changes to your station and advise you of the best way to travel.
Do you know of a neighbour or nearby resident who has special needs when taking public transport? They may be vision or hearing impaired and need this information in another format, or have a mobility aid and require additional assistance. Please contact PTV and we will be able to assist you.
To plan your journey visit ptv.vic.gov.au or call 1800 800 007.
You can also download the PTV app for journey planning or metroNotify for live updates pushed to your device directly from Metro’s control room.
FOR INFORMATION ON THE PROJECT
Please contact the North McKinnon Centre Level Crossing Removal Team by:Email: [email protected]: 9915 4788 (business hours – Monday to Friday and during out of hours works)Web: levelcrossings.vic.gov.au
For languages other than English, please call 9280 0780.Please contact us via these details to register for email updates.
Authorised and published by the Victorian Government, 1 Treasury Place, Melbourne
X
BUSBUSBUS BUS BUS BUSBUS
X
BUSBUSBUS BUS BUS BUSBUS
X
BUSBUSBUS BUS BUS BUSBUS BUS
BUS BUSBUSBUS BUS BUS BUSBUS BUS
TRAIN TRAINTRAIN TRAINTRAINTRAINTRAINTRAIN
Aspendale Edithvale Chelsea Bonbeach Carrum Seaford Kananook FrankstonMcKinnonOrmondGlenhuntlyCaulfield Bentleigh Patterson
TRAIN
Moorabbin Highett Cheltenham Mentone Parkdale Mordialloc
BUS BUS
BUS
CITY
CHANGES TO YOUR FRANKSTON LINE SERVICE
While works take place as part of the North McKinnon Centre Level Crossing Removal Project, buses will replace all Frankston line trains between Caulfield and Moorabbin stations. Customers should allow up to an extra 45 minutes travel time.
Normal train services will resume on Monday 1 August, with trains to stop at the new McKinnon Station. Trains will continue to express through the closed Bentleigh and Ormond stations.
9pm Friday 24 June – Sunday 31 July 2016
CHANGES TO YOUR STONY POINT LINE SERVICE
Saturday 25 June – Sunday 31 July 2016
While works take place as part of the North McKinnon Centre Level Crossing Removal Project, buses will replace trains between Caulfield and Frankston stations from 9pm until the last service each night between Sunday 26 June and Wednesday 29 June 2016. Customers should allow up to an extra 45 minutes travel time.
Before you travel, please familiarise yourself with your local train replacement bus stops. Bus stop location information is available at your station.
Buses will replace trains between Frankston and Stony Point stations, stopping all stations. Customers should allow up to 15 minutes extra travel time.
Sunday 26 June – Wednesday 29 June 2016 (From 9pm to the last service each night)
Stopping all stations from Caulfield to Moorabbin
Stopping all stations from Caulfield to Frankston
Stopping all stations between Frankston and Stony Point stations
Express from Caulfield to Moorabbin
Limited express from Caulfield to Moorabbin and Mordialloc , then stopping all stations
FRANKSTONMalvernArmadale
TRAINTRAIN
CITY
X
BUSBUSBUS BUS BUS BUS
McKinnonOrmondGlenhuntlyCaulfield Bentleigh Patterson
TRAINTRAINTRAINTRAINTRAINTRAIN TRAINBUS
Moorabbin Highett Cheltenham Mentone Parkdale Mordialloc Aspendale
OPEN LATE AUGUST
OPENLATE AUGUST
OPEN 1 AUGUST
BUS BUS BUS BUS
BitternHastingsTyabbSomervilleBaxterLeawarraFRANKSTON Morradoo Crib Point
BUS
Stony Point
BUS BUS BUS BUS