ntpc rough editing

Upload: anudeepkomma

Post on 05-Apr-2018

223 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/31/2019 NTPC Rough Editing

    1/22

    Click to edit Master subtitle style

    8/17/12

    Maharatna

    Company

    Presentation by

    G Jaya Subhash - 50Mohammed Irfan- 59

    Mohammed Intequab- 60

    Monali Mohapatra 61

  • 7/31/2019 NTPC Rough Editing

    2/22

    8/17/12

    HistoryCurrent ScenarioBoard of DirectorsMinistry it belongs toShareholding patternProducts and ServicesObjectives pertaining to NTPC Future projects

    Agenda

  • 7/31/2019 NTPC Rough Editing

    3/22

    8/17/12

    History

    NTPC Limited (formerly National ThermalPower Corporation) was setup on 7thNovember 1975

    Ministry of Power(July 1992)

    Prior to that NTPC was in the Ministry ofPower, Coal and Non-Conventional

    Energy Sources

    Largest thermal power generating companyof India

  • 7/31/2019 NTPC Rough Editing

    4/22

    8/17/12

    Major Milestones at aglance

  • 7/31/2019 NTPC Rough Editing

    5/22

    8/17/12

    Current Scenario

    Power sector is one of the criticalgrowth drivers for the country

    Projected power generation capacityto increase by an annual averagerate of 6.76% which is ~ 1316 TWhof power generation during 2011-2016Power consumption is expected toreach 1021 TWh by 2016For India to maintain its plus 8%growth rate until 2030 it requires its

    power supply to be ramped up bymore than four times of its currentlevels.

  • 7/31/2019 NTPC Rough Editing

    6/22

    Click to edit Master subtitle style

    8/17/12

    Sources of Power

    Generation

  • 7/31/2019 NTPC Rough Editing

    7/22

    8/17/12

    Due to various issues, capacity addition target was revisedfrom 78,700 MW to 62,374 MW The final capacity addition further stands much lower thanthe revised target at 54,000 MW

  • 7/31/2019 NTPC Rough Editing

    8/22

    8/17/12

    Major Reasons for Slippages

    Lack of fuel security: Shortage of coal supply is hard hittingthe operation of power plants. Delay in order placements for main plant in thermal projects Delay in order placements for civil works for thermal and hydro

    projects

    At present the coal demand-supply gap continues to increase and islikely to reach 137.03MT by this plan(XI:07-12) Coal shortage is likely to hit 46, 000 MW power projects Costly imported fuel is eroding the profit margins of the

    producers SEBs are unwilling to accommodate high priced electricity Supply security from domestic sources yet not ensured

  • 7/31/2019 NTPC Rough Editing

    9/22

    8/17/12

    Shri Arup Roy Choudhury: Chairman & Managing Director since

    September 01, 2010Shri A.K. Singhal: Director (Finance) since August 2005Sh. I.J.Kapoor:Director (Commercial)Sri B.P. Singh: Director(Projects)Shri S. P. Singh: Director(HR)Shri N.N.Misra: Director (Operations)Shri A.K. Jha: Director(Technical)

    Shri S. B. Ghosh Dastidar: Member of Board of DirectorsShri Rajib Sekhar Sahoo: DirectorDr. M. Govinda Rao: He has been on the Board of the Company with effect from August 26,2008 as a non-official part - time directorShri I.C.P. Keshari :Government nominee DirectorShri Rakesh Jain: Government Nominee DirectorShri Ajit M. Nimbalkar:Non-Official Part-time Director on the Board of NTPCShri S.R. Upadhyay : Non-Official Part-time Director on the Board of NTPCMs. Homai A. Daruwalla: Member of BoardShri Anol Nath Chatterji: Member of BoardShri Sushil Khanna: Member of BoardShri T. Venkatesh: Chief Vigilance Officer since October, 2009.

    Board of Directors

  • 7/31/2019 NTPC Rough Editing

    10/22

    8/17/12

    SHAREHOLDING PATTERN

  • 7/31/2019 NTPC Rough Editing

    11/22

    8/17/12

  • 7/31/2019 NTPC Rough Editing

    12/22

    8/17/12

    Products and Services

    Power Plants:

    Thermal Power Plants-15 coal based

    Gas based power plants-7 Hydel Power Plant Nuclear Power: A Joint Venture Company "Anushakti Vidhyut

    Nigam Ltd." has been formed (with 51% stake of NPCIL and 49%stake of NTPC)

    Coal mining:To meet about 20% of its coal requirement from itscaptive mines by 2017 Power trading: 'NTPC Vidyut Vyapar Nigam Ltd.' (NVVN), awholly owned subsidiary was created for trading power leading tooptimal utilization of NTPCs assets In order to facilitate power trading in the country, National Power

    Exchange Ltd., a JV of NTPC, NHPC, PFC and TCS has beenformed for operating a Power Exchange

  • 7/31/2019 NTPC Rough Editing

    13/22

    8/17/12

    Equipment Manufacturing: NTPC has formed JVs with BHEL andBharat Forge Ltd. for power plant equipment manufacturing.

    Renewable Energy: NTPC has plan capacity addition of about 1,000MW through renewable resources by 2017

    Hydro Power: NTPC Hydro Ltd., is setting up hydro projects of

    capacities up to 250 MW in addition to 800 MW Koldam hydro projectin Himachal Pradesh.

    Power Distribution: NTPC Electric Supply Company Ltd. (NESCL) isactively engaged in Rajiv Gandhi Gramin Vidyutikaran

    Yojanaprogramme for rural electrification.

    Ash Business: Joint ventures with cement companies are being plannedto set up cement grinding units in the vicinity of NTPC stations

  • 7/31/2019 NTPC Rough Editing

    14/22

    8/17/12

    Since inception NTPC has formulated specific guidelines for the

    welfare of Project Affected Persons (PAP's).

    One of the first in the corporate sector to formulate comprehensive

    resettlement and rehabilitation policy for addressing the issue of PAPs

    Empowering People: NTPC has marked 15-20% of its CSR-CD budget

    for education to individual stations

    ITI Adoption: NTPC Partners with the State and Central Government to

    improve the quality of skilled workforce Scholarships Programme: NTPC has started a scholarship scheme to

    promote the educational interests of the Scheduled Caste/Scheduled

    Tribe/Physically Challenged students

    Social Objectives

    R i l D l t

  • 7/31/2019 NTPC Rough Editing

    15/22

    8/17/12

    Regional Development

  • 7/31/2019 NTPC Rough Editing

    16/22

    8/17/12

  • 7/31/2019 NTPC Rough Editing

    17/22

  • 7/31/2019 NTPC Rough Editing

    18/22

    8/17/12

    Increase National Self Sufficiency

    NTPC generates power from Coal and Gas, diversified into

    hydro power, coal mining, power equipment manufacturing,oil & gas exploration, power trading & distribution With an

    increasing presence in the power value chain, NTPC is well

    on its way to becoming an Integrated Power Major.

    Present installed capacity is 39174 MW

    additional 16638 MW capacity is under construction

    NTPC has plans to become 128000 MW company by 2032.

    Implement Govt Policies

    To promote solar power, GOI has allocated 105 MW of comparatively cheaper power from

    the Governments unallocated quota in the upcoming coal based power projects for bundling

    with solar power.

    On behalf of Government of India, NTPC is involved in preparation of Detailed Project

    Report for Amochhu HEP in Bhutan.

    Profit For F rther In estment

  • 7/31/2019 NTPC Rough Editing

    19/22

    8/17/12

    Profit For Further Investment

    business plan of capacity addition of about 1,000 MW through

    renewable resources by 2017.

    capacity addition of 301 MW through Solar PV and Thermal by 2014

    Capacity Addition Programme MW

    Capacity at end of 10th Plan 27404

    Capacity Added during 2007-08 1740

    Capacity Added during 2008-09 1000

    Capacity Added during 2009-10 1560

    Capacity Added during 2010-11 2490

    Capacity added during 2011-12 2820

    Capacity added during 2012-13 2160

    Total as on Today 39174

    Capacity Under Construction 16638

    Capacity Under Bidding 12941

    FR Approved 12111

    Oth S i & I iti ti

  • 7/31/2019 NTPC Rough Editing

    20/22

    8/17/12

    Other Service & Initiatives

    Consultancy: NTPC extends consultancy services to various

    organisations in the area of Power Plant constructions and Power

    Generation.

    Power Management Institute: NTPC runs a state-of-the-art Power

    Management Institute, at NOIDA. The institute is fully equipped toprovide training in all aspects of power plant

    NETRA(NTPC Energy Technology Research Alliance) NTPCS wing

    of research technology development & scientific services in domain of

    electric power generation located at Greater Noida (UP)

  • 7/31/2019 NTPC Rough Editing

    21/22

    8/17/12

    Objective type NTPC

    Provide public service Y

    Increase Employment Y

    Reduce Income Inequality Y

    Promote personal development Y

    Stabilize prices ?

    Subsidize essential commodities ?

    Earn/Save foreign Exchange Y

    Promote exports NIncrease National Self sufficiency Y

    Implement Govt. policies Y

    Achieve Socialism Y

    Earn Profits for further Investments Y

    Objectives of Public Sector Enterprises

  • 7/31/2019 NTPC Rough Editing

    22/22

    8/17/12