Page 1: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

Number Extension

Presentation to Presentation to

PMIPMINJ ChapterNJ Chapter

January 15, 2013

7

Page 2: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

Project Overview

Contract 1 – Running Tunnels

Methods of Excavation and Construction

Concrete Work

AGENDA

Page 3: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

PROJECT OVERVIEW

Page 4: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

No. Project Context7

Page 5: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

34th StreetStation

No. Alignment7

Page 6: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and
Page 7: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

PABTPABTPABT

JJJJJJCCCCCC

414141ststst St.St.St.

424242ndndnd St.St.St.

Site K

Site P

34th Street Station Cavern Length: 1,212’34th Street Station

Cavern Length: 1,212’

Tunnel1.5 mile extension from Times

Square Station

Tunnel1.5 mile extension from Times

Square Station

Tail Track ModificationLength: 275’

Tail Track ModificationLength: 275’

Site J

Site A

Site L

8THA

ve.

9THA

ve.

Dye

r Ave

.

10TH

Ave

.

26th St.

36th St.35th St.

11TH

Ave

.

34th St.

41st St.

Legend:Project SiteStationStation Entrance

Number Subway Line

Extension

Project Scope

Key Plan

7

Page 8: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

No. 7 and Development Sites

Site A

Site L

Site JSite P

Site K

Page 9: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

34th Street Station

Page 10: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

34th Street StationPlatform

Page 11: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

Project FactsLength: 1.5 mile extension34th Street Station: 1,212 ftProject cost: $2.366BCompletion Date: June 2014

City Representative: Hudson Yards Development Corp.

Funding: Hudson Yards Infrastructure Corp.

Design Consultant: PB Team

Consultant Construction Management (CCM):

HLH7Hill International, Inc.LiRo Engineers, Incl.HDR| Daniel Frankfurt

Page 12: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

34th

St.

Sta

tion

Site A

Site L

Site K

Site P

Site J

Construction Contracts

- Running Tunnels (Contract 1)

- Site L Ventilation Building

- Site J Ventilation Building & Station Entrance

- Site K Ventilation Building

- Systems & Finishes

- Secondary Station Entrance(Site P)

Page 13: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

CONTRACT 1 RUNNING TUNNELS

Page 14: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

34th StreetStation

No. Alignment7

Page 15: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

11th Avenue - 25th to 31st Streets

Site A

26th

Stre

et

26th St.30th St.

Eleventh Avenue

Page 16: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

11th Avenue – 31st to 39th Streets

34th St. 38th St.

Site P Site K

Jacob JavitsConvention Center

34th

Stre

et

Page 17: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

41st Street – 11th to 9th Avenues

10th

Ave

nue

Dye

r Ave

.

9thA

venu

e

Site L

41st Street

10th Ave.9th Ave

Site M

Page 18: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

41st Street – 9th to 8th AvenuesPort Authority Bus Terminal

9thA

venu

e

9th Ave8th Ave

8thA

venu

e

Page 19: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

Eighth Avenue Section

No. 7 Flushing Line

Tail Tracks

Page 20: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

11th

AVE

NU

E

10th

AVE

NU

E

DYE

R A

VEN

UE

9thA

VEN

UE

8thA

VEN

UE

41st STREET

SITE ‘L’

RECEIVING PIT

TBM Locations (April 19, 2010)

Page 21: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

METHODS OF EXCAVATION/CONSTRUCTION

Page 22: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and
Page 23: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

LOOKING WEST FROM SITE A

Muck Pile

Adit Mucking

Page 24: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and
Page 25: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

Tunnel Boring Machines (TBMs)

Manufactured in Germany by Herrenknecht.

Two TBM’s arrived job site January/ February 2009.

Lowering of first TBM Cutterhead February 2009.

Assembled in starter tunnels April 2009.

Commenced boring May 2009.

Complete boring June 2010.

Disassembly and removal from site August 2010.

Page 26: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

TBM Operations

TUNNEL CC1 HOLEDecember 28, 2009

TUNNEL CC2 TBM CRADLE

Page 27: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

TBM CC2 TRAILING GEAR

Page 28: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and
Page 29: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

Ground Freezing11th Avenue between 26th and 28th Streets

26th St. 30th St. 34th St.

Amtrak Tunnel

No. 7 Tunnel 34th Street StationSite A Adit

Amtrak Tunnel

40’

Approx. Rock Line

Top of Ground

11th Avenue Viaduct

Page 30: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

“Conceptual” Cross SectionGround Freeze Area

11th Avenue

Page 31: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

GROUND FREEZE AREA GROUND FREEZE HEADER PIPING

GROUND FREEZE AREA REPAVED

Page 32: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and
Page 33: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

Eighth Avenue Section

No. 7 Flushing Line

Tail Tracks

Page 34: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

TIMES SQUARE TAIL TRACKS LOOKING WEST

TIMES SQUARE UNDERPINNING

Page 35: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

CONCRETE

Page 36: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

• Precast Tunnel Liners• Grout• Shotcrete• Cast-in-place

Concrete Work

Page 37: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

Precast Tunnel LinersManufacturer Technopref Industries

Royersford, PATotal estimated liners: 9,388 LFDimensions:

Number of planned precast rings: ~1,900Ring width: 5 ftInside diameter: 22.5 ftOne ring: 5 segment + 1 “key” pieceSegment thickness 1 ftWeight: ~ 4-5 tons/piece

~ 2 tons/ “key” pieceConcrete: ~ 12 yds3/ring, or 22,800 yd3 total

Page 38: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

Precast Tunnel Liners – Cont’dStrength

Design mix:

Actual:

8,000 psi (28 days)

8,000 psi (7 days)10,000-12,000 (28 days)

Formwork: Black steel rebarsPolypropylene fibersStripped after 8 hours; 2,500 psi

Gaskets: EDPM – applied 12 hours after initial casting

Hydrophylic – applied with epoxy-like glue within 7 days of tunnel installation

Unique ring and segment identification codeProduction rate: 5 rings/shaft @ 2 shifts/day = 10 rings/dayCareful procedures for each ring segment:

HandlingStorageTransportPlacement

Page 39: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

HANDLING OF SEGMENT IN PLANT

SEGMENTAL LINING RINGS

Segmental Tunnel Lining Rings

PRECAST SEGMENT CONTROL NUMBERS

Page 40: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

TRANSPORT OF ONE RING

LINED TUNNEL

Page 41: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

41

Construction Management Association of America (CMAA)

• Metro NY/NJ Chapter - Honorable Mention Project of the Year

2012

• National - 2012 Project Achievement Award

Colorado School of Mines• Tunnel Achievement Award for Project Excellence

( Best National & International Tunneling Project - 2012)

Engineering News Record New York• Award of Merit (Transportation)

Recognition Awards to Date

41

Page 42: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

• Cost Management

• Schedule Management

• Quality Management

• Safety Management

PROJECT MANAGEMENT AND CONTROLS

42

Page 43: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

43

Page 44: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

Cost Management (Cont’d)

Establish Budget

• $2.1 Billion Subway Program established by MOU

• Breakdown Budget into major categories• Design• Construction• Construction Management • Contingencies

• Further broken down to measurable sub categories.

• Detail bottom up estimation for each budgeted line item

• Categories to remain valid for life of project

44

Page 45: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

Cost Management (Cont’d)Breakdown of Budget

• Construction cost - per contract

• Design cost –- Preliminary Engineering (PE)- Final Design (FD)- Design Support During Construction (DSDC)

• Construction Management (CM) Cost

– In-house CM cost (MTA’s Project team)

– CM Consultant cost (CCM)

– Transit Authority Costo Transit Authority Labor (TA Labor)o Engineering Force Account cost (EFA)

45

Page 46: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

46

Number 7 Line Project Budget

• Subway Related Cost : $2,100 Million• Non-Subway Related Cost: $266 Million

Page 47: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

Cost Management (Cont’d)Monitor Expenditures

•To date Administered $1.5 billion total disbursement

•Timely and prompt payment for every invoice

•Peak monthly payment - $50 millions to Contractors

•Negotiated Changes of total $10.5 million, includes several

millions in credits

•Tunnel contract ($1.1 billion) was completed below budget

•Developed Baseline Budget and Baseline Cash Flow for

each line item separately.

•Track Actual against Plan each month and review trend

47

Page 48: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

Cost Management (Cont’d)

Cost Control

• Perform Trend Analysis• Based on the trend, revise budget allocation, i.e. Re-

baseline• Forecast “Estimate-At-Completion” (EAC)• Look for Opportunities

48

Page 49: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

49

Page 50: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

34th

St. S

tatio

n

Site A

Site L

Page 51: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

Cost Performance To-Date

• Project Budget ………………. $2,366 million

• Construction Contracts…….. $1,972 million

• Construction Completed …... $1,535 million (78%)

• Remaining Construction …... $437 million (22%)

• Contingency Budget ……….. $100 million• Contingency Spent …………. $10.5 million

(0.53% of Construction Cost)

• Number of Contracts Completed...………..........3 out of 6

• Contingency spent on Completed Contracts ….0.22%

• Estimate-At-Completion (EAC)………………….$2,366 million

Cost Management (Cont’d)

51

Page 52: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

52

Page 53: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

SCHEDULE MANAGEMENT

53

Page 54: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

Schedule Management (Cont’d)

Vision

• Revenue Service by June 2014

• Dignitary Train by December 2013

• Achieve Project Completion by June 2016

54

Page 55: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

Schedule Management (Cont’d)

• Overall Integrated Project Schedule (IPS)

• Include all aspects of work

• Detailed schedule for each construction contract

• Each Detailed schedules has more than 1000 activities

• Largest schedule has more than 7000 activities

• Update the schedule on monthly basis, review/analyze

• Identify Critical path and near critical paths

• Identify delays and potential delays, discuss mitigation

measures and implement

• Identify Opportunities and Implement55

Page 56: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

Integrated Project Schedule

56

Page 57: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

57

Page 58: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

58

Page 59: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

59

Page 60: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

60

Page 61: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

61

Page 62: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

62

Page 63: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

Some unique steps taken for this project

• Implementing Guaranteed Maximum Price (GMP) Contract

for Design Support During Construction services.

• Added Bonus sharing feature for accelerated completion.

• Transferred Scope among Contracts, to expedite the work

• Ensured follow-on Systems and Finishes Contractor had

on-time or early access.

• Minimized changes

• Dispute Resolution Board (DRB) for Tunnel Contract.

• Developed “What-if” contracting and construction scenarios

63

Page 64: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

Impact Due To Hurricane Sandy

Short Term• Impact on material supply chain• Time lost in review of Submittals due to 2 Broadway

closing

Long Term• Industry wide shortage of construction materials

• Potential damages to materials on hand

• Diversion of TA resources

• Availability of resources for Testing & Commissioning

64

Page 65: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

QUALITY MANAGEMENT

65

Page 66: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

Quality Control

Phase QC Performed By

Design Engineer of Record

Construction Each Respective Contractor

66

Page 67: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

Quality Assurance

Phase QA Performed By

Design MTACCe.g., Semi-annual Performance EvaluationsMTACC and Consultant Construction Manager (CCM)e.g., Spot Check Programs (applicable design standards, Co-ordination of drawings, etc.)

Construction MTACC and Consultant Construction Management (CCM)e.g., Semi-annual Performance EvaluationsConsultant Construction Managere.g., Quarterly Quality Audits and Spot Check

Programs (i.e., Material Certifications, Witness Tests, Tunnel Leaks, etc.) 67

Page 68: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

SAFETY MANAGEMENT

68

Page 69: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

69

Page 70: Number 7 Extension Presentation to PMI NJ Chapter · Presentation to PMI NJ Chapter January 15, 2013 7. zProject Overview zContract 1 – Running Tunnels zMethods of Excavation and

Thank you