$Respomible
Ref: - E-n-v-1rclnlental Clearance #J.1 0ZJA_ll_dated_ 17.07.2003
Kindly refer altove Environmental Clearance #J.1101117712002_lA.ll dated 1,7.07.2003to our Uni t#1 located at Plot no 11711.18, GIDC Estate, Ankleshw.r:SggOOZl 'D,; ; :Bharuch, Gujarat .
i
\n/e are sending herewith Lhe compliance report along with various other requiredinformation with respect to our unit *1 foiyour kind reference and records. Thedetails given are with respect to the periodlanio Jun2012.
we hope. that the above is in order. In case you neecl anv additional information, wecan provide the same on hearinq from vou._:oft
c.oly 4'tvufo,t it alto favtilAr'r"Cl .Thanking you
Yours faithfufyFor, United {h\sphgzus Ltd\_i..\(
Ut\NVDR P N PARAM"ESWAMNVice President -Environment
United PhosPhorus Limited117, G.|.D.C., Ankleshwar - 393 002' Guiarat' (lndia)
Ph. (02646) 250336, 251223' 251249' 250279 Fax (02646) 250297
Ref: U1/EC-2011112lL August,2OI2
UnitPIot # 117 I l1B, GIDC, Ankleshwar _ 393
Dr. A Mehrotra, Director (S)Ministry of Environment and ForestsWestern Region OfficeKendriya Parvavaran BhavanLink Road # 3, E - 5, Ravi Shankar NaoarBhopal - 462 016 (M.p)
Dear S i r ;
S u b : - C o mp Lta r r _e e 1q_eonditian s of E nviro nme n ta l_G j ea ranc e
eI
ss5ssssss5
5
S
5
b-
5
s5s5
5
D
D
!-
D
D
-
-
Care"
# i00:
- ,-rr','tldi
f :::". .-.*t B'rrril?d!ul"t',.li*,.rr ' , .l/''e+ono'.{ltoot
Encl : a/a\\0'
Mumbal Office:'UNIPHOS" House, C. D. Marg, 11th Road, Khar (W)' Mumbai.Phone: (022) 26040464,26041111' Fax: (022) 26040467
sS
S
s?
o
i\
\.t
\ a
\t
\a
\ -
\t
\t
\t
\t
>o\
t
t
D
t
\a
a- . a
a
a
a
a\
D
t
a
a
a
,
D
t
D
l aI>tI
EnCl : a/a =' :,: -.-.--i-:--:. -:F;-; . '::.-'i r.-- : 'r,' i:-::1-:.;
Copy l.o: The Zonal OfficerCentral Pol lut ion Control BoardParivesh Bhavan
Opp VMC ward Office_I0Subhanpura, Baroda_39002 3
: Mr..l D Kaiyani - Regional OfficerGujarat Pollution Control BoardPio t No1 501, GIDC,Ank leshwar -393002
I
UNITED PHOSPHORUS LIMITED; UNIT # 1 Plot # 117/118; G.I.D.C Estate; Ankleshwar
ENVIRONMENTAL CLEARNACE CONDITIONS COMPLIANCE REPORT JAN-JUN 2012
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 2 of 73
Condition Compliance Status
No Description
Condition Compliance
* The Environmental Clearance is issued for
the following products
Penoxaline @ 150 MT / Month
Cartap @ 50 MT / Month
Metabromuron @ 50 MT / Month
Phosphamidon @ 150 MT / Month
Dichlorovos @ 200 MT / Month; and
Antracol / Mancozeb @ 500 / 800
MT / Month
Environmental Clearance also contains the
following by-products
Hydrated Sodium Sulphate @ 737
MT / Month
Sodium Sulphite Solution @ 298 MT
/ Month
Sodium Bromide Solution @ 95 MT /
Month
Sodium Sulphite Solids @ 31 MT /
Month
Liquefied Methyl Chloride @ 131
MT / Month; and
30 % HCL @ 138 MT / Month
Complied.
Production details are attached for the period of Jan-Jun 2011.
We have Obtained Consent to Establish (NOC) for Product Mix Change
(No. GPCB/BRCH-CCA-158(7)/ ID-15833/106214) in March 2012 and
applied for consent to operate (CC&A) on 17/03/2012. The Details for
the same are provided in Annexure-1
* The land area of the project is 1,36,777 m2. Project does not involve forest land and displacement of people. Water
requirement is 951.1 kl / day. Solid waste in the form of ETP Sludge (30 MT / Month); Incinerator Ash (4.5 MT /
Month) and Inorganic Solids from Monocrotophos Plant (75.6 MT / Month); Solid Salts (82 MT / Month); and Salt from
RO System will be disposed off in the secured landfill facility. NOC from GPCB was obtained on 29.06.2002. Public
Hearing was held on 16.01.2002
* MOEF accords Environmental Clearance to the project under provisions of EIA Notification dated 27.01.1994 as
amended subsequently subject to compliance of various special and general conditions
** We have Obtained Consent to Establish (NOC) for Product Mix Change (No. GPCB/BRCH-CCA-158(7)/ ID-
15833/106214) in March 2012. The Details for the same are provided in Annexure-1
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 3 of 73
No Description Status
A SPECIFIC CONDITIONS
1 Gaseous emissions (SO2, NOX, HCl, HC
and Cl2) and PM from various process units should conform to standards
prescribed by authorities. At no time, emissions to go beyond standards.
During failure of pollution control systems, unit should not be restarted
until measures are rectified to achieve
the efficiency
Complied.
Monitoring done internally and through external agency.
Reports are attached herewith for the period of Jan-Jun 2012
All parameters are within permissible limit. We have also started monitoring PM2.5 parameter for ambient air as per new standards
Flue Gas Stacks Emissions
Parameter Range
SO2 10 -18 mg/nm3
Stack attached to Boilers
NOX 9 – 11 mg/nm3
Stack attached to Boilers
Process Stack Emissions
Parameter Range
HCl 1.8 – 3.1 mg/m3 (PCl3 Plant Stack attached to storage tank)
Cl2 0.5 –1.7 mg/m3 (In PCl3 Plant Stack attached to Storage Tank
SPM 57 - 78 mg/nm3 (SPD of CaCl2 Plant)
NH3 8.4 – 18.3 mg/nm3 (In TMP Plant Stack attached to scrubber)
PM 11.3 mg/nm3 (from Antracol Plant Bag Filter)
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 4 of 73
2 Fugitive emissions in workplace
environment, product, raw material storage areas must be monitored. Flue
gas emissions should conform to standards prescribed by GPCB
Complied.
Emission monitoring at various locations are being carried out by our QA Department.
We are also measuring & keeping a check on the level of CS2, Cl2 & NH3 for ambient conditions around the premises.
3 Process emissions (SPM, HCl, SO2, Methyl Chloride and VOC) should be
scrubbed through caustic ventury
scrubber and conform to standards. Efficiency of scrubber to be improved
and maintained as per best practicable technology. VOC data to be monitored
and submitted to MOEF. Additional ventury scrubber for Mancozeb,
Penoxaline, Phosphamidon plant and a
scrubber for Cartap plant to be installed in addition to process scrubbers already
installed in the unit
Complied.
Air pollution control systems are provided.
VOC Monitoring is done through M/S Bharuch Enviro Infrastructure
Ltd.
The monitoring data is attached herewith.
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 5 of 73
Condition Compliance Status No Description
4 As reflected in EIA / EMP Report, effluent generation should not exceed
195 m3 / day. The waste streams to be segregated into high and low pollution
load streams. Effluent with high organic load to be incinerated and dilute streams
like from R & D, washing, domestic,
dilute streams from process and scrubber blow down, to be given primary,
secondary and tertiary treatment before discharging into GIDC drain. Treated
effluent to conform to standards. Non toxic effluent to be diverted to RO plant
and re cycled to minimize fresh water
consumption
Complied.
Treated effluent is discharged to GIDC drain to final Effluent treatment
plant, NCTL, Ankleshwar for further treatment & disposal to deep sea. Details of quantity discharged are attached herewith.
The permeate from RO System is taken to cooling tower water make up.
5 Waste stream should be treated before
taking into solar evaporation pond. Solvent from effluent to be recovered
before discharging into solar evaporation
pond. As reflected in EIA / EMP Report, Company to install forced
evaporation system for aqueous waste to avoid discharge of effluent into solar
evaporation pond
Complied.
Company has discontinued Solar Evaporation ponds.
Forced Evaporation System is in operation. Details are attached for the
period Jan-Jun 2012
6 Company to recover Methyl Chloride (CH3CL) by installation of CH3CL
recovery plant. Solvent recovery to be improved and attempts to be made to
achieve at least 90 % recovery wherever
possible. Rest solvent which can’t be recovered, to be incineration. Action to
be submitted to Ministry within 3 months
Complied.
Methyl Chloride Plant is in operation.
We have EDC solvent in Monocrotophos & having recovery of @ 97%
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 6 of 73
No Condition Compliance Status
Description
7 Company to up grade existing incinerator for incineration of hazardous
waste. Organic waste, solid waste generated, to be collected and
incinerated for total destruction. As reflected in EIA / EMP Report, solid
waste and ash obtained after incinerator
should be stored in plant premises in a pit with impervious flooring and
leachate collection system. Ash and sludge from ETP to be finally disposed
off in a TSDF of BEIL. Leachate to be sent to ETP for treatment
Complied.
Company has discontinued operation of Incinerator.
Company has taken membership of Common Incinerator at BEIL, Ankleshwar.
Details of incinerable waste send to BEIL, Ankleshwar is attached for
the period Jan-Jun 2012
8 Destruction efficiency of incinerator to be assessed by agency like CPCB and
reported. Company to monitor VOCs
and data submitted t MOEF / CPCB / GPCB regularly
Not Applicable.
Company has discontinued operation of Incinerator. Company has
membership of common facility BEIL, Ankleshwar.
9 As per CREP, bio assay test to be
replaced by Toxicity Factor Test Method developed by CPCB. TF=4 to
be achieved by December 2003 and
TF=2 by July 2006. Action plan to be submitted within 3 months
Complied.
TF factor monitoring results are attached for the period of Jan-Jun 2012
10 Green belt in 0.2 hectors in addition to 3.66 hector to be provided to mitigate
the effect of fugitive emissions in the
plant. Development of green belt along the boundary wall, open space and
avenue roads to be improved in consultation with local DFO as per
CPCB guidelines
Complied.
Green belt area provided approx. 0.5 hector in addition to existing
Green belt area 3.66 hector. This is an on going activity.
During period Jan-Jun 2012 trees planted @ 150 Nos
11 Company to adopt waste minimization / cleaner production techniques to
reduce pollution load and action plan to be submitted to Ministry within 3
months
Complied.
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 7 of 73
No Condition Compliance Status
Description
12 Company to undertake rain water harvesting measures as per action plan
submitted to Ministry
Complied.
Rain water harvesting area = 3070 m2
Rain water is being used in cooling tower.
13 Company to comply with Environmental Protection measures and
safeguards recommended in EIA / EMA / RRA reports as well as
recommendations of Public Hearing panel
Complied.
B GENERAL CONDITIONS
1 Company to adhere to stipulations made by GPCB
Complied.
2 No further expansion / modifications in the plant to be carried out without prior
approval of MOEF. In case of deviations / alterations in the project
proposals from those submitted, a fresh reference to be made to Ministry to
assess adequacy of conditions imposed
and add additional environmental protection measures required, if any
Complied
We have Obtained Consent to Establish (NOC) for Product Mix Change
(No. GPCB/BRCH-CCA-158(7)/ ID-15833/106214) in March 2012 and
applied for Consent to operate (CC&A). The Details for the same are
provided in Annexure-1
3 Company to comply with MSIHC Rules 2000. Prior approvals of Chief Inspector
of Factories, Chief Inspector of
Explosives, Fire Safety Inspectorate etc, to be obtained
Complied.
4 Company to comply with HWM Rules
and authorization from GPCB to be obtained
Complied
Company have Consent & Authorization CC&A #31505 dated
05/06/2010 valid up to 16.06.2013
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 8 of 73
No. Condition Compliance Status
Description
5 Overall noise levels in and around plant area to be kept within the standards (85
dBA) by providing noise control measures including acoustic hoods,
silencers, enclosures etc, on all sources of noise generation. Ambient noise
levels to conform to standards i.e. 75
dBA (day time) and 70 dBA (night time)
Complied.
Noise level monitoring results at different location around Plants area
are attached.
Range
Daytime (Limit: 75 dBA): 57.5 ---- 70.1
Nighttime (Limit: 70 dBA) : 38.7 ---69.2
6 Occupational health surveillance
program to be undertaken as regular exercise for all employees, specifically
for those engaged in handling hazardous
substances. First aid facilities in OHC to be strengthened and medical records of
each employees to be maintained
Regular medical check up of each employee has been conducted.
Premedical employment medical check up was done for 10 new joinees
for the period of Jan-Jun 2012
7 A separate Environment Management Cell with full fledged laboratory to be set
up to carry out the environmental management and monitoring functions
Complied.
Water, Stack Monitoring, Bio Assay Test, Tf Factor Test, Ambient Air
Monitoring, voc monitoring, Solid Waste Analysis, Noise Level Monitoring are carried out. Also, Environmental Audit is being carried
out regularly.
8 Company to provide adequate funds for
recurring and non-recurring expenses to implement the conditions stipulated by
MOEF as well as state government along with implementation schedule for
all conditions stipulated. The funds should not be diverted for any other
purposes
Complied.
The funds are already provided as part of manufacturing activities and operation of ETP, incineration of waste etc. Separate cost codes are
also available.
9 Implementation of the project and Environmental Action Plan to be
monitored by MOEF, Regional Office at Bhopal, GPCB / CPCB. A six monthly
compliance report to be submitted to
monitoring agencies
Complied.
Half yearly reports are being sent during first week of February and
August every year to Ministry of Environment and Forests Regional Office, Western Region, Bhopal.
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 9 of 73
10 Company to inform that public that
project has been accorded Environmental Clearance by Ministry
and copies are available with GPCB and may be seen at MOEF’s web site. This
should be advertised within 7 days in
two local news papers and copies to be submitted to RO
Complied.
Published in Gujarati and English news papers; and copies submitted to GPCB and MOEF
11 Company to inform RO as well as Ministry, date of financial closure and
final approval of the project by
concerned authorities and date of commencing the land development
work, if any
Complied.
- Ministry may revoke or suspend the
clearance, if implementation of any of
the conditions is not satisfactory
Noted
- Ministry reserves the right to stipulate
additional conditions if required. Company, in a time bound manner, will
implement the same
Noted
- The above conditions will be enforced inter-alia under provisions of various
acts and rules
Noted
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 10 of 73
STACK MONITORING REPORT
(INTERNAL LAB ANALYSIS REPORT)
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 11 of 73
STACK MONITORING REPORT
MONTH: JAN 2012
PESTICIDES AND PESTICIDE INTERMEDIATES PLANT :
Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2
No. (STACK) SAMPLING
20
mg/Nm3 5 mg/Nm3
30
mg/Nm3
50
mg/Nm3
20
mg/Nm3
100
mg/Nm3
TMP PLANT VENT OF 10.01.12 ------ BDL 6.30 ------ ------ ------
1 SCRUBBER ATTACHED
TO R-901 AND R-902 23.01.12 ------ BDL 8.10 ------ ------ ------
MANCOZEB
PLANT(OLD) 01.01.12 TO 31.01.12 ------ ------ ------ ------ ------ ------
2 WET SCRUBBER SPRAY Not in operation
DRIER ------ ------ ------ ------ ------ ------
MANCOZEB
PLANT(NEW) 01.01.12 TO 31.01.12 ------ ------ ------ ------ ------ ------
3 SPD WET SCRUBBER Not in operation
OUTLET ------ ------ ------ ------ ------ ------
SPRAY DRIER SYSTEM 08.01.12 ------ ------ ------ ------ 15.00 ------
4 OF ANTRACOL PLANT
22.01.12 ------ ------ ------ ------ 17.00 ------
OTHER CHEMICAL PLANT :
Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2
No. (STACK) SAMPLING 20 mg/m3 9 mg/m3
175
mg/m3
50
mg/Nm3
150
mg/m3
100
mg/Nm3
IN PCL3 PLANT STACK 10.01.12 1.50 0.70 ------ ------ ------ ------
5 ATTACHED TO
STORAGE SCRUBBER 23.01.12 1.80 0.50 ------ ------ ------ ------
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 12 of 73
SPRAY DRIER SYSTEM 01.01.12 TO 14.01.12 ------ ------ ------ ------ ------ ------
6 OF CACL2 PLANT Not in operation
26.01.12 ------ ------ ------ ------ 62.00 ------
STACK ATTACHED TO
7 BOILER B5 GT-3138 13.01.12 ------ ------ ------ 10.00 22.00 17.00
8 BOILER B6 GT-3476 22.01.12 ------ ------ ------ 11.00 24.00 13.00
9 BOILER B7 GT-3515 10.01.12 ------ ------ ------ 9.00 28.00 15.00
ALL THE PARAMETERS ARE WITHIN THE LIMITS
(Analyzed by)
Sr.Executive –QA
(Approved by )
HOD -QA
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 13 of 73
STACK MONITORING REPORT
MONTH: FEB 2012
PESTICIDES AND PESTICIDE INTERMEDIATES PLANT :
Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2
No. (STACK) SAMPLING
20
mg/Nm3 5 mg/Nm3
30
mg/Nm3
50
mg/Nm3
20
mg/Nm3
100
mg/Nm3
TMP PLANT VENT OF 09.02.12 ------ BDL 4.30 ------ ------ ------
1 SCRUBBER ATTACHED
TO R-901 AND R-902 20.02.12 ------ BDL 7.20 ------ ------ ------
MANCOZEB PLANT(OLD) 01.02.12 TO 29.02.12 ------ ------ ------ ------ ------ ------
2 WET SCRUBBER SPRAY Not in operation
DRIER ------ ------ ------ ------ ------ ------
MANCOZEB
PLANT(NEW) 01.02.12 TO 29.02.12 ------ ------ ------ ------ ------ ------
3 SPD WET SCRUBBER Not in operation
OUTLET ------ ------ ------ ------ ------ ------
SPRAY DRIER SYSTEM 01.02.12 TO 29.02.12 ------ ------ ------ ------ ------ ------
4 OF ANTRACOL PLANT Not in operation
------ ------ ------ ------ ------ ------
OTHER CHEMICAL PLANT :
Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2
No. (STACK) SAMPLING 20 mg/m3 9 mg/m3 175 mg/m3
50
mg/Nm3 150 mg/m3
100
mg/Nm3
IN PCL3 PLANT STACK 09.02.12 1.90 1.10 ------ ------ ------ ------
5 ATTACHED TO
STORAGE SCRUBBER 20.02.12 2.30 0.70 ------ ------ ------ ------
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 14 of 73
SPRAY DRIER SYSTEM 10.02.12 ------ ------ ------ ------ 73.00 ------
6 OF CACL2 PLANT
21.02.12 ------ ------ ------ ------ 59.00 ------
STACK ATTACHED TO
7 BOILER B5 GT-3138 01.02.12 TO 29.02.12 ------ ------ ------ ------ ------ ------
Not in operation
8 BOILER B6 GT-3476 16.02.12 ------ ------ ------ 9.00 28.00 11.00
9 BOILER B7 GT-3515 18.02.12 ------ ------ ------ 7.00 22.00 14.00
ALL THE PARAMETERS ARE WITHIN THE LIMITS
(Analyzed by)
Sr.Executive –QA
(Approved by )
HOD -QA
STACK MONITORING REPORT
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 15 of 73
MONTH: MARCH 2012
PESTICIDES AND PESTICIDE INTERMEDIATES PLANT :
Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2
No. (STACK) SAMPLING 20 mg/Nm3 5 mg/Nm3 30 mg/Nm3 50 mg/Nm3 20 mg/Nm3 100 mg/Nm3
TMP PLANT VENT OF 11.03.12 ------ BDL 9.60 ------ ------ ------
1 SCRUBBER ATTACHED
TO R-901 AND R-902 23.03.12 ------ BDL 12.80 ------ ------ ------
MANCOZEB PLANT(OLD) 01.03.12 TO 31.03.12 ------ ------ ------ ------ ------ ------
2 WET SCRUBBER SPRAY Not in operation
DRIER ------ ------ ------ ------ ------ ------
MANCOZEB PLANT(NEW) 01.03.12 TO 31.03.12 ------ ------ ------ ------ ------ ------
3 SPD WET SCRUBBER Not in operation
OUTLET ------ ------ ------ ------ ------ ------
SPRAY DRIER SYSTEM 17.03.12 ------ ------ ------ ------ 14.00 ------
4 OF ANTRACOL PLANT
20.03.12 ------ ------ ------ ------ 17.00 ------
OTHER CHEMICAL PLANT :
Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2
No. (STACK) SAMPLING 20 mg/m3 9 mg/m3 175 mg/m3 50 mg/Nm3 150 mg/m3 100 mg/Nm3
IN PCL3 PLANT STACK 11.03.12 2.90 0.80 ------ ------ ------ ------
5 ATTACHED TO
STORAGE SCRUBBER 23.03.12 2.20 1.10 ------ ------ ------ ------
SPRAY DRIER SYSTEM 12.03.12 ------ ------ ------ ------ 57.00 ------
6 OF CACL2 PLANT
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 16 of 73
24.03.12 ------ ------ ------ ------ 64.00 ------
STACK ATTACHED TO
7 BOILER B5 GT-3138 06.03.12 ------ ------ ------ 8.00 18.00 14.00
8 BOILER B6 GT-3476 23.03.12 ------ ------ ------ 10.00 22.00 18.00
9 BOILER B7 GT-3515 23.03.12 ------ ------ ------ 8.00 26.00 15.00
ALL THE PARAMETERS ARE WITHIN THE LIMITS
(Analyzed by)
Sr.Executive –QA
(Approved by )
HOD -QA
STACK MONITORING REPORT
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 17 of 73
MONTH: APRIL 2012
PESTICIDES AND PESTICIDE INTERMEDIATES PLANT :
Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2
No. (STACK) SAMPLING 20 mg/Nm3 5 mg/Nm3 30 mg/Nm3 50 mg/Nm3 20 mg/Nm3 100 mg/Nm3
TMP PLANT VENT OF 08.04.12 ------ BDL 7.30 ------ ------ ------
1 SCRUBBER ATTACHED
TO R-901 AND R-902 24.04.12 ------ BDL 15.60 ------ ------ ------
MANCOZEB
PLANT(OLD) 13.04.12 ------ ------ ------ ------ 19.00 ------
2 WET SCRUBBER SPRAY
DRIER (Mojj) 27.04.12 ------ ------ ------ ------ 18.00 ------
MANCOZEB
PLANT(NEW) 01.04.12 TO 30.04.12 ------ ------ ------ ------ ------ ------
3 SPD WET SCRUBBER Not in operation
OUTLET ( L&T) ------ ------ ------ ------ ------ ------
SPRAY DRIER SYSTEM 01.04.12 TO 30.04.12 ------ ------ ------ ------ ------ ------
4 OF ANTRACOL PLANT Not in operation
------ ------ ------ ------ ------ ------
OTHER CHEMICAL PLANT :
Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2
No. (STACK) SAMPLING 20 mg/m3 9 mg/m3 175 mg/m3 50 mg/Nm3 150 mg/m3 100 mg/Nm3
IN PCL3 PLANT STACK 08.04.12 2.10 1.30 ------ ------ ------ ------
5 ATTACHED TO
STORAGE SCRUBBER 24.04.12 1.80 1.70 ------ ------ ------ ------
SPRAY DRIER SYSTEM 12.04.12 ------ ------ ------ ------ 61.00 ------
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 18 of 73
6 OF CACL2 PLANT
27.04.12 ------ ------ ------ ------ 73.00 ------
STACK ATTACHED TO
7 BOILER B5 GT-3138 06.04.12 ------ ------ ------ 6.00 15.00 12.00
8 BOILER B6 GT-3476 16.04.12 ------ ------ ------ 8.00 20.00 14.00
9 BOILER B7 GT-3515 16.04.12 ------ ------ ------ 9.00 22.00 15.00
ALL THE PARAMETERS ARE WITHIN THE LIMITS
(Analyzed by)
Sr.Executive –QA
(Approved by )
HOD -QA
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 19 of 73
STACK MONITORING REPORT
MONTH: MAY 2012
PESTICIDES AND PESTICIDE INTERMEDIATES PLANT :
Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2
No. (STACK) SAMPLING 20 mg/Nm3 5 mg/Nm3 30 mg/Nm3 50 mg/Nm3 20 mg/Nm3 100 mg/Nm3
TMP PLANT VENT OF 09.05.12 ------ BDL 12.30 ------ ------ ------
1 SCRUBBER ATTACHED
TO R-901 AND R-902 23.05.12 ------ BDL 9.80 ------ ------ ------
MANCOZEB PLANT(OLD) 02.05.12 TO 18.05.12 ------ ------ ------ ------ 15.00 ------
2 WET SCRUBBER SPRAY Not in operation
DRIER (Mojj) 24.05.12 ------ ------ ------ ------ 17.00 ------
MANCOZEB PLANT(NEW) 01.05.12 TO 31.05.12 ------ ------ ------ ------ ------ ------
3 SPD WET SCRUBBER Not in operation
OUTLET ( L&T) ------ ------ ------ ------ ------ ------
SPRAY DRIER SYSTEM 01.05.12 TO 21.05.12 ------ ------ ------ ------ ------ ------
4 OF ANTRACOL PLANT Not in operation
26.05.12 ------ ------ ------ ------ 17.00 ------
OTHER CHEMICAL PLANT :
Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2
No. (STACK) SAMPLING 20 mg/m3 9 mg/m3 175 mg/m3 50 mg/Nm3 150 mg/m3 100 mg/Nm3
IN PCL3 PLANT STACK 09.05.12 2.80 1.60 ------ ------ ------ ------
5 ATTACHED TO
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 20 of 73
STORAGE SCRUBBER 23.05.12 2.30 1.20 ------ ------ ------ ------
SPRAY DRIER SYSTEM 11.05.12 ------ ------ ------ ------ 78.00 ------
6 OF CACL2 PLANT
20.05.12 ------ ------ ------ ------ 63.00 ------
STACK ATTACHED TO
7 BOILER B5 GT-3138 10.05.12 ------ ------ ------ 7.00 17.00 10.00
8 BOILER B6 GT-3476 24.05.12 ------ ------ ------ 8.00 24.00 14.00
9 BOILER B7 GT-3515 24.05.12 ------ ------ ------ 10.00 21.00 16.00
ALL THE PARAMETERS ARE WITHIN THE LIMITS
(Analyzed by)
Sr.Executive –QA
(Approved by )
HOD -QA
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 21 of 73
STACK MONITORING REPORT
MONTH: JUNE 2012
PESTICIDES AND PESTICIDE INTERMEDIATES PLANT :
Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2
No. (STACK) SAMPLING 20 mg/Nm3 5 mg/Nm3 30 mg/Nm3 50 mg/Nm3 20 mg/Nm3 100 mg/Nm3
TMP PLANT VENT OF 08.06.12 ------ BDL 18.40 ------ ------ ------
1 SCRUBBER ATTACHED
TO R-901 AND R-902 23.06.12 ------ BDL 14.20 ------ ------ ------
MANCOZEB PLANT(New) 11.06.12 ------ ------ ------ ------ 18.00 ------
2 WET SCRUBBER SPRAY
DRIER (Mojj) 12.06.12 TO 30.06.12 ------ ------ ------ ------ ------ ------
Not in operation
MANCOZEB PLANT(Old) ------ ------ ------ ------ ------ ------
3 SPD WET SCRUBBER Not in operation
OUTLET ( L&T) ------ ------ ------ ------ ------ ------
SPRAY DRIER SYSTEM 10.06.12 ------ ------ ------ ------ 15.00 ------
4 OF ANTRACOL PLANT
25.06.12 ------ ------ ------ ------ 17.00 ------
OTHER CHEMICAL PLANT :
Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2
No. (STACK) SAMPLING 20 mg/m3 9 mg/m3 175 mg/m3 50 mg/Nm3 150 mg/m3 100 mg/Nm3
IN PCL3 PLANT STACK 08.06.12 3.10 0.80 ------ ------ ------ ------
5 ATTACHED TO
STORAGE SCRUBBER 23.06.12 2.60 1.20 ------ ------ ------ ------
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 22 of 73
SPRAY DRIER SYSTEM 09.06.12 ------ ------ ------ ------ 65.00 ------
6 OF CACL2 PLANT
23.06.12 ------ ------ ------ ------ 78.00 ------
STACK ATTACHED TO
7 BOILER B5 GT-3138 11.06.12 ------ ------ ------ 9.00 17.00 13.00
8 BOILER B6 GT-3476 22.06.12 ------ ------ ------ 11.00 21.00 17.00
9 BOILER B7 GT-3515 22.06.12 ------ ------ ------ 9.00 24.00 15.00
ALL THE PARAMETERS ARE WITHIN THE LIMITS
(Analyzed by)
Sr.Executive –QA
(Approved by )
HOD -QA
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 23 of 73
STACK MONITORING REPORT
(MAHABAL ENVIROENGINEERS ANALYSIS REPORT)
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 24 of 73
STACK MONITORING REPORT: (By MAHABAL ENVIRO ENGINEERS LIMITED)
MONTH: JANUARY 2012
PESTICIDES AND PESTICIDES INTERMEDIATES PLANT:
Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOx SPM SO2
No. (STACK) SAMPLING 20 mg/m3 5 mg/m3 30 mg/m3 50
mg/m3 20 mg/m3 100
mg/m3
TMP PLANT VENT OF
1 SCRUBBER ATTACHED 10.01.2012 …. ….. …. …. …. ….
TO R-901 AND R-902
MANCOZEB PLANT(OLD) …. ….. …. …. …. ….
2 WET SCRUBBER SPRAY 10.01.2012
DRIER …. ….. …. …. …. ….
MANCOZEB PLANT(NEW)
3 SPD WET SCRUBBER 10.01.2012 …. ….. …. …. …. ….
OUTLET
ANTRACOLPLANT (BAG FILTER) …. ….. …. …. …. ….
4 10.01.2012
ANTRACOL PLANT (HOT AIR GENERATOR)
OTHER CHEMICAL PLANT
Sr. AREA IDENTIFICATION DATE OF PCL3 CHLORINE NH3 NOX SPM SO2
No. (STACK) SAMPLING 09 mg/m3 9 mg/m3 175 mg/m3 50 PPM 150 mg/m3 100 PPM
STACK ATTACHED TO
BOILER B5 GT-3138 10.01.2012 ---- ------ ----- ----- ----- -----
5
BOILER B6 GT-3476 10.012012 …. …… ….. …… …… …..
BOILER B7 GT-3515 10.01.2012 …. ….. …… 12.8 BDL BDL
SPRAY DRIER SYSTEM OF CACL2 PLANT
…. …. …. …. …. …. 6 10.01.2012
IN PCL3 PLANT STACK ATTACHED TO STORAGE SCRUBBER
7 10.01.2012 …. …. …. …. …. ….
ALL THE PARAMETERS ARE WITHIN THE LIMITS
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 25 of 73
STACK MONITORING REPORT: (BY MAHABAL ENVIRO ENGINEERS PVT. LTD.)
MONTH: FEBRUARY 2012
PESTICIDES AND PESTICIDES INTERMEDIATES PLANT:
Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOx SPM SO2
No. (STACK) SAMPLING 20 mg/m3 5 mg/m3 30 mg/m3 50
mg/m3 20 mg/m3 100
mg/m3
TMP PLANT VENT OF
1 SCRUBBER ATTACHED 21.02.2012 …. BDL 18.3 ….. ….. ….
TO R-901 AND R-902
MANCOZEB PLANT(OLD)
2 WET SCRUBBER SPRAY 21.02.2012 ….. …… ….. …… ….. ……
DRIER
MANCOZEB PLANT(NEW)
3 SPD WET SCRUBBER 21.02.2012 ….. ….. ….. ….. ….. ……
OUTLET
ANTRACOLPLANT (BAG FILTER)
4 21.02.2012 …. ….. ….. ….. ….. …..
ANTRACOL PLANT (HOT AIR GENERATOR)
OTHER CHEMICAL PLANT
Sr. AREA IDENTIFICATION DATE OF PCL3 CHLORINE NH3 NOX SPM SO2
No. (STACK) SAMPLING 09 mg/m3 9 mg/m3 175 mg/m3 50 PPM 150 mg/m3 100 PPM
STACK ATTACHED TO
BOILER B5 GT-3138 21.02.2012 …. …. ….. ….. ….. …..
5
BOILER B6 GT-3476 21.02.2012 …. ….. ….. 11.4 BDL BDL
BOILER B7 GT-3515 21.02.2012 …. …. ….. 10.3 BDL BDL
SPRAY DRIER SYSTEM OF CACL2 PLANT
… …. …. …. 55.6 …. 6 21.02.2012
IN PCL3 PLANT STACK ATTACHED TO STORAGE SCRUBBER
7 21.02.2012 0.7 BDL … …. …. …..
ALL THE PARAMETERS ARE WITHIN THE LIMITS
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 26 of 73
STACK MONITORING REPORT :(BY MAHABAL ENVIRO ENGINEERS PVT. LTD.)
MONTH: MARCH 2012
PESTICIDES AND PESTICIDES INTERMEDIATES PLANT:
Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOx SPM SO2
No. (STACK) SAMPLING 20 mg/m3 5 mg/m3 30 mg/m3 50
mg/m3 20 mg/m3 100
mg/m3
TMP PLANT VENT OF
1 SCRUBBER ATTACHED 15.03.2012 ….. BDL 9.8 …. …. ….
TO R-901 AND R-902
MANCOZEB PLANT(OLD)
2 WET SCRUBBER SPRAY 15.03.2012 …. ….. ….. ….. ….. ……
DRIER
MANCOZEB PLANT(NEW)
3 SPD WET SCRUBBER 15.03.2012 …. ….. ….. ….. …. …..
OUTLET
ANTRACOLPLANT (BAG FILTER) 15.03.2012 ….. … …. …. …. …..
4
ANTRACOL PLANT (HOT AIR GENERATOR)
OTHER CHEMICAL PLANT
Sr. AREA IDENTIFICATION DATE OF PCL3 CHLORINE NH3 NOX SPM SO2
No. (STACK) SAMPLING 09 mg/m3 9 mg/m3 175 mg/m3 50 PPM 150 mg/m3 100 PPM
STACK ATTACHED TO
BOILER B5 GT-3138 15.03.2012 …. …. …. ….. ….. …..
5
BOILER B6 GT-3476 15.03.2012 …. …. ….. 10.8 BDL BDL
BOILER B7 GT-3515 15.03.2012 …. …. ….. 11.5 BDL BDL
SPRAY DRIER SYSTEM OF CACL2 PLANT
…. …. ….. ….. 73.1 …. 6 15.03.2012
IN PCL3 PLANT STACK ATTACHED TO STORAGE SCRUBBER
7 15.03.2012 0.9 BDL …. …. …. ….
ALL THE PARAMETERS ARE WITHIN THE LIMITS
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 27 of 73
STACK MONITORING REPORT: (BY MAHABAL ENVIRO ENGINEERS PVT. LTD.)
MONTH: APRIL 2012
PESTICIDES AND PESTICIDES INTERMEDIATES PLANT:
Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOx SPM SO2
No. (STACK) SAMPLING 20 mg/m3 5 mg/m3 30 mg/m3 50
mg/m3 20 mg/m3 100
mg/m3
TMP PLANT VENT OF 20.04.2012 … BDL 12.7 … … …
1 SCRUBBER ATTACHED
TO R-901 AND R-902
MANCOZEB PLANT(OLD)
2 WET SCRUBBER SPRAY 20.04.2012 …. ….. ….. ….. ….. …...
DRIER
MANCOZEB PLANT(NEW)
3 SPD WET SCRUBBER 20.04.2012 …. ….. ….. ….. ….. …..
OUTLET
ANTRACOLPLANT (BAG FILTER)
4 20.04.2012 ….. ….. …… ….. …. ….
ANTRACOL PLANT (HOT AIR GENERATOR)
OTHER CHEMICAL PLANT
Sr. AREA IDENTIFICATION DATE OF PCL3 CHLORINE NH3 NOX SPM SO2
No. (STACK) SAMPLING 09 mg/m3 9 mg/m3 175 mg/m3 50 PPM 150 mg/m3 100 PPM
STACK ATTACHED TO
BOILER B5 GT-3138 20.04.2012 …. ….. …. ….. ….. …..
5
BOILER B6 GT-3476 20.04.2012 …. ….. …. 10.7 BDL BDL
BOILER B7 GT-3523 20.04.2012 …. ….. …… 12.1 BDL BDL
SPRAY DRIER SYSTEM OF CACL2 PLANT
20.04.2012
…. …. …. …. 69.3 … 6
IN PCL3 PLANT STACK ATTACHED TO STORAGE SCRUBBER
7 20.04.2012 0.5 BDL …. …. ….
ALL THE PARAMETERS ARE WITHIN THE LIMITS
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 28 of 73
STACK MONITORING REPORT: (BY MAHABAL ENVIRO ENGINEERS PVT. LTD.)
MONTH: MAY 2012
PESTICIDES AND PESTICIDES INTERMEDIATES PLANT:
Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOx SPM SO2
No. (STACK) SAMPLING 20 mg/m3 5 mg/m3 30 mg/m3 50
mg/m3 20 mg/m3 100
mg/m3
TMP PLANT VENT OF
1 SCRUBBER ATTACHED 11.05.2012 …. BDL 18.6 ….. …. ….
TO R-901 AND R-902
MANCOZEB PLANT(OLD)
2 WET SCRUBBER SPRAY 11.05.2012 …. ….. ….. ….. ….. …..
DRIER
MANCOZEB PLANT(NEW)
3 SPD WET SCRUBBER 11.05.2012 ….. ….. ….. ….. … ….
OUTLET
ANTRACOLPLANT (BAG FILTER)
4 11.05.2012 …. ….. …. …. ….. …..
ANTRACOL PLANT (HOT AIR GENERATOR)
OTHER CHEMICAL PLANT
Sr. AREA IDENTIFICATION DATE OF PCL3 CHLORINE NH3 NOX SPM SO2
No. (STACK) SAMPLING 09 mg/m3 9 mg/m3 175 mg/m3 50 PPM 150 mg/m3 100 PPM
STACK ATTACHED TO
BOILER B5 GT-3138 11.05.2012 ….. ….. ….. 13.4 BDL BDL
5
BOILER B6 GT-3476 11.05.2012 ….. ….. …… ….. …. …..
BOILER B7 GT-3515 11.05.2012 …. …. ….. 11.8 BDL BDL
SPRAY DRIER SYSTEM OF CACL2 PLANT
…. …. ….. …. 76.1 ….. 6 11.05.2012
IN PCL3 PLANT STACK ATTACHED TO STORAGE SCRUBBER
7 11.05.2012 0.7 BDL … … …. ….
ALL THE PARAMETERS ARE WITHIN THE LIMITS
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 29 of 73
STACK MONITORING REPORT: (BY MAHABAL ENVIRO ENGINEERS PVT. LTD.)
MONTH: JUNE 2012
PESTICIDES AND PESTICIDES INTERMEDIATES PLANT:
Sr. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOx PM SO2
No. (STACK) SAMPLING 20 mg/m3 5 mg/m3 30 mg/m3 50 mg/m3 20 mg/m3 100
mg/m3
TMP PLANT VENT OF
1 SCRUBBER ATTACHED 13.06.2012 ….. BDL 8.4 …… ….. …..
TO R-901 AND R-902
MANCOZEB PLANT(OLD)
2 WET SCRUBBER SPRAY 13.06.2012 …. …. ….. ….. ….. …..
DRIER
MANCOZEB PLANT(NEW)
3 SPD WET SCRUBBER 13.06.2012 …. ….. ….. …… ….. …..
OUTLET
ANTRACOLPLANT (BAG FILTER)
4 13.06.2012 ….. ….. …… ….. 11.3 ….
ANTRACOL PLANT (HOT AIR GENERATOR)
OTHER CHEMICAL PLANT
Sr. AREA IDENTIFICATION DATE OF PCL3 CHLORINE NH3 NOX SPM SO2
No. (STACK) SAMPLING 09 mg/m3 9 mg/m3 175 mg/m3 50 PPM 150 mg/m3 100 PPM
STACK ATTACHED TO
BOILER B5 GT-3138 13.06.2012 ……. …… …… …… …… ……
5
BOILER B6 GT-3476 13.06.2012 ….. ….. …… 12.3 BDL BDL
BOILER B7 GT-3515 13.06.2012 ….. …… …… 10.2 BDL BDL
SPRAY DRIER SYSTEM
6 OF CACL2 PLANT 13.06.2012
…… ……. ……. ….. 62.4 ……
IN PCL3 PLANT STACK
7 ATTACHED TO 13.06.2012 0.9 BDL …. ….. ….. …..
STORAGE SCRUBBER
ALL THE PARAMETERS ARE WITHIN THE LIMITS
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 30 of 73
AMBIENT AIR MONITORING
(OUR INTERNAL LAB ANALYSIS REPORTS)
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 31 of 73
MONTH: JANUARY 2012
AMBIENT AIR MONITORING REPORT
MONTH : JAN-2012
PM 2.5 PM 10 AMMONIA CL2 HCL NOX SO2
LIMITS --> 60 100 400 100 200 80 80
Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3
LOCATION DATE
NEAR MAIN GATE 02.01.12 78 4.0 BDL 2.31 3.00
NEAR MAIN GATE 05.01.12 46 86 6.0 BDL 3.30 4.00
NEAR MAIN GATE 08.01.12 90 4.0 BDL 3.63 4.00
NEAR MAIN GATE 11.01.12 72 2.0 BDL 2.31 5.00
NEAR MAIN GATE 14.01.12 55 69 6.0 BDL 2.64 6.00
NEAR MAIN GATE 17.01.12 76 3.0 BDL 3.63 5.00
NEAR MAIN GATE 20.01.12 83 4.0 BDL 1.65 4.00
NEAR MAIN GATE 23.01.12 52 67 4.0 BDL 2.31 3.00
NEAR MAIN GATE 26.01.12 80 5.0 BDL 2.31 5.00
NEAR MAIN GATE 29.01.12 84 3.0 BDL 3.63 5.00
Maximum 55 90 6 BDL 3.63 6 5
Minimum 46 67 2 BDL 1.65 3 3
Average 51.00 78.50 4.10 BDL 2.77 4.40 4.40
%Deviation Nil Nil Nil Nil Nil Nil Nil
All the parameters are within the limits
( Analyzed by ) Sr.Executive –QA
(Approved by ) HOD -QA
AMBIENT AIR MONITORING REPORT
MONTH : JAN-2012
PM 10 AMMONIA CL2 HCL NOX SO2 LIMITS --> 100 400 100 200 80 80 Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3
LOCATION DATE B/H CACL2 PLANT 02.01.12 82 83.0 BDL 12.54 12.00 B/H CACL2 PLANT 05.01.12 89 78.0 BDL 14.19 10.00 B/H CACL2 PLANT 08.01.12 79 81.0 BDL 14.52 9.00 B/H CACL2 PLANT 11.01.12 93 75.0 BDL 13.53 12.00
B/H CACL2 PLANT 14.01.12 85 78.0 BDL 15.84 10.00
B/H CACL2 PLANT 17.01.12 68 56.0 BDL 11.22 9.00
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 32 of 73
B/H CACL2 PLANT 20.01.12 61 49.0 BDL 9.24 12.00
B/H CACL2 PLANT 23.01.12 73 55.0 BDL 10.23 10.00
B/H CACL2 PLANT 26.01.12 71 57.0 BDL 11.84 8.00 B/H CACL2 PLANT 29.01.12 65 52.0 BDL 12.54 9.00 Maximum 93 83 BDL 15.84 12 12 Minimum 61 49 BDL 9.24 8 9 Average 76.60 66.40 0 12.57 10.20 10.00
%Deviation Nil Nil Nil Nil Nil Nil
All the parameters are within the limits
( Analyzed by )
Sr.Executive –QA (Approved by )
HOD -QA
AMBIENT AIR MONITORING REPORT
MONTH : JAN-2012
SPM AMMONIA CL2 HCL NOX SO2
LIMITS --> 500 400 100 200 80 80
Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3
LOCATION DATE
B/H BREQUATING PLANT 02.01.12 172 61.0 BDL 12.87 11.00
B/H BREQUATING PLANT 05.01.12 156 55.0 BDL 15.18 9.00
B/H BREQUATING PLANT 08.01.12 195 32.0 BDL 14.19 10.00
B/H BREQUATING PLANT 11.01.12 183 43.0 BDL 11.88 8.00
B/H BREQUATING PLANT 14.01.12 189 48.0 BDL 9.90 9.00
B/H BREQUATING PLANT 17.01.12 190 37.0 BDL 10.23 12.00
B/H BREQUATING PLANT 20.01.12 138 45.0 BDL 12.87 11.00 B/H BREQUATING PLANT 23.01.12 146 56.0 BDL 10.56 10.00 B/H BREQUATING PLANT 26.01.12 152 49.0 BDL 12.54 9.00
B/H BREQUATING PLANT 29.01.12 172 42.0 BDL 9.90 8.00 Maximum 195 61 BDL 15.18 11 12
Minimum 138 32 BDL 9.9 9 8
Average: 169.30 46.80 0 12.01 10.00 9.40
%Deviation Nil Nil Nil Nil Nil Nil
All the parameters are within the limits
( Analyzed by )
Sr.Executive –QA
(Approved by )
HOD -QA
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 33 of 73
MONTH: FEBRUARY 2012
AMBIENT AIR MONITORING REPORT
MONTH : FEB-2012
PM 2.5 PM 10 AMMONIA CL2 HCL NOX SO2
LIMITS --> 60 100 400 100 200 80 80
Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3
LOCATION DATE
NEAR MAIN GATE 02.02.12 78 4.0 BDL 3.63 4.00
NEAR MAIN GATE 05.02.12 51 90 6.0 BDL 2.31 2.00
NEAR MAIN GATE 09.02.12 83 2.0 BDL 1.65 5.00
NEAR MAIN GATE 12.02.12 47 73 3.0 BDL 4.29 3.00
NEAR MAIN GATE 15.02.12 93 3.0 BDL 2.97 3.00
NEAR MAIN GATE 19.02.12 85 5.0 BDL 3.63 4.00
NEAR MAIN GATE 22.02.12 81 3.0 BDL 3.30 4.00
NEAR MAIN GATE 24.02.12 54 79 2.0 BDL 2.31 3.00
NEAR MAIN GATE 26.02.12 88 4.0 BDL 3.96 5.00
NEAR MAIN GATE 28.02.12 76 5.0 BDL 3.30 4.00
Maximum 54 93 6 BDL 4.29 5 4
Minimum 47 73 2 BDL 1.65 3 2
Average 50.67 82.60 3.70 BDL 3.14 4.20 3.20
%Deviation Nil Nil Nil Nil Nil Nil Nil
All the parameters are within the limits
( Analyzed by )
Sr.Executive –QA
(Approved by )
HOD -QA
AMBIENT AIR MONITORING REPORT
MONTH : FEB-2012
PM 10 AMMONIA CL2 HCL NOX SO2
LIMITS --> 100 400 100 200 80 80
Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3
LOCATION DATE
B/H CACL2 PLANT 02.02.12 76 72.0 BDL 10.23 11.00
B/H CACL2 PLANT 05.02.12 81 58.0 BDL 8.58 7.00
B/H CACL2 PLANT 09.02.12 79 83.0 BDL 12.21 14.00 B/H CACL2 PLANT 12.02.12 88 64.0 BDL 13.20 12.00 B/H CACL2 PLANT 15.02.12 86 70.0 BDL 7.59 9.00 B/H CACL2 PLANT 19.02.12 63 58.0 BDL 10.89 10.00
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 34 of 73
B/H CACL2 PLANT 22.02.12 78 53.0 BDL 15.84 11.00
B/H CACL2 PLANT 24.02.12 85 71.0 BDL 11.88 13.00
B/H CACL2 PLANT 26.02.12 82 66.0 BDL 14.52 13.00 B/H CACL2 PLANT 28.02.12 73 79.0 BDL 13.20 11.00
Maximum 88 83 BDL 15.84 14 13
Minimum 63 53 BDL 7.59 9 7
Average 79.10 67.40 0 11.81 11.60 10.60
%Deviation Nil Nil Nil Nil Nil Nil
All the parameters are within the limits
( Analyzed by ) Sr.Executive –QA
(Approved by ) HOD -QA
AMBIENT AIR MONITORING REPORT
MONTH : FEB-2012
SPM AMMONIA CL2 HCL NOX SO2 LIMITS --> 500 400 100 200 80 80
Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3
LOCATION DATE
B/H BREQUATING PLANT 02.02.12 158 42.0 BDL 10.56 10.00 B/H BREQUATING PLANT 05.02.12 163 35.0 BDL 14.19 11.00
B/H BREQUATING PLANT 09.02.12 176 28.0 BDL 16.17 12.00
B/H BREQUATING PLANT 12.02.12 180 40.0 BDL 8.25 9.00
B/H BREQUATING PLANT 15.02.12 168 31.0 BDL 9.57 9.00
B/H BREQUATING PLANT 19.02.12 178 26.0 BDL 12.87 13.00
B/H BREQUATING PLANT 22.02.12 132 38.0 BDL 10.56 10.00
B/H BREQUATING PLANT 24.02.12 141 41.0 BDL 7.59 10.00
B/H BREQUATING PLANT
26.02.12 160 33.0 BDL 11.55 8.00
B/H BREQUATING PLANT 28.02.12 178 29.0 BDL 12.21 9.00
Maximum 180 42 BDL 16.17 12 13
Minimum 132 26 BDL 7.59 8 9
Average: 163.40 34.30 0 11.35 9.80 10.40
%Deviation Nil Nil Nil Nil Nil Nil
All the parameters are within the limits
( Analyzed by )
Sr.Executive –QA
(Approved by )
HOD -QA
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 35 of 73
MONTH: MARCH 2012
AMBIENT AIR MONITORING REPORT
MONTH : MAR-2012
PM 2.5 PM 10 AMMONIA CL2 HCL NOX SO2
LIMITS --> 60 100 400 100 200 80 80
Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3
LOCATION DATE
NEAR MAIN GATE 02.03.12 84 5.0 BDL 3.30 3.00
NEAR MAIN GATE 05.03.12 55 78 3.0 BDL 2.97 4.00
NEAR MAIN GATE 08.03.12 89 7.0 BDL 2.31 5.00
NEAR MAIN GATE 10.03.12 91 4.0 BDL 3.96 4.00
NEAR MAIN GATE 12.03.12 49 75 6.0 BDL 1.98 2.00
NEAR MAIN GATE 15.03.12 83 3.0 BDL 2.31 3.00
NEAR MAIN GATE 18.03.12 76 8.0 BDL 2.64 4.00
NEAR MAIN GATE 21.03.12 89 5.0 BDL 3.30 2.00
NEAR MAIN GATE 25.03.12 43 81 4.0 BDL 2.64 3.00
NEAR MAIN GATE 28.03.12 76 3.0 BDL 2.31 3.00
Maximum 55 91 8 BDL 3.96 5 4
Minimum 43 75 3 BDL 1.98 2 2
Average 49.00 82.20 4.80 BDL 2.77 3.40 3.20
%Deviation Nil Nil Nil Nil Nil Nil Nil
All the parameters are within the limits
( Analyzed by ) Sr.Executive –QA
(Approved by ) HOD -QA
AMBIENT AIR MONITORING REPORT
MONTH : MAR-2012
PM 10 AMMONIA CL2 HCL NOX SO2
LIMITS --> 100 400 100 200 80 80
Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3
LOCATION DATE
B/H CACL2 PLANT 02.03.12 85 61.0 BDL 11.88 13.00
B/H CACL2 PLANT 05.03.12 72 57.0 BDL 7.59 9.00
B/H CACL2 PLANT 08.03.12 90 70.0 BDL 14.52 15.00
B/H CACL2 PLANT 10.03.12 83 65.0 BDL 13.20 11.00
B/H CACL2 PLANT 12.03.12 92 51.0 BDL 8.58 8.00
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 36 of 73
B/H CACL2 PLANT 15.03.12 87 58.0 BDL 11.55 10.00
B/H CACL2 PLANT 18.03.12 90 71.0 BDL 13.86 11.00
B/H CACL2 PLANT 21.03.12 78 81.0 BDL 9.57 12.00 B/H CACL2 PLANT 25.03.12 83 68.0 BDL 10.89 13.00 B/H CACL2 PLANT 28.03.12 90 70.0 BDL 10.23 10.00
Maximum 92 81 BDL 14.52 15 12
Minimum 72 51 BDL 7.59 8 9
Average 85.00 65.20 0 11.19 12.00 10.40 %Deviation Nil Nil Nil Nil Nil Nil
All the parameters are within the limits
( Analyzed by )
Sr.Executive -QA
(Approved by )
HOD -QA
AMBIENT AIR MONITORING REPORT
MONTH : MAR-2012
SPM AMMONIA CL2 HCL NOX SO2
LIMITS --> 500 400 100 200 80 80
Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3
LOCATION DATE
B/H BREQUATING PLANT 02.03.12 131 38.0 BDL 9.57 10.00
B/H BREQUATING PLANT 05.03.12 140 26.0 BDL 12.87 8.00
B/H BREQUATING PLANT 08.03.12 152 31.0 BDL 11.55 11.00
B/H BREQUATING PLANT 10.03.12 170 42.0 BDL 10.56 10.00
B/H BREQUATING PLANT 12.03.12 178 21.0 BDL 7.92 7.00
B/H BREQUATING PLANT 15.03.12 122 24.0 BDL 8.91 12.00
B/H BREQUATING PLANT 18.03.12 145 31.0 BDL 13.86 9.00
B/H BREQUATING PLANT 21.03.12 152 29.0 BDL 6.27 7.00
B/H BREQUATING PLANT 25.03.12 160 35.0 BDL 9.57 11.00
B/H BREQUATING PLANT 28.03.12 148 40.0 BDL 10.56 8.00
Maximum 178 42 BDL 13.86 11 12
Minimum 122 21 BDL 6.27 7 7
Average: 149.80 31.70 0 10.16 9.60 9.00
%Deviation Nil Nil Nil Nil Nil Nil
All the parameters are within the limits
( Analyzed by )
Sr.Executive -QA
(Approved by )
HOD -QA
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 37 of 73
MONTH: APRIL 2012
AMBIENT AIR MONITORING REPORT
MONTH : APR-2012
PM 2.5 PM 10 AMMONIA CL2 HCL NOX SO2
LIMITS --> 60 100 400 100 200 80 80
Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3
LOCATION DATE
NEAR MAIN GATE 02.04.12 77 4.0 BDL 2.31 4.00
NEAR MAIN GATE 05.04.12 51 81 6.0 BDL 3.30 3.00
NEAR MAIN GATE 09.04.12 72 3.0 BDL 3.30 3.00
NEAR MAIN GATE 13.04.12 86 3.0 BDL 2.31 4.00
NEAR MAIN GATE 16.04.12 46 92 5.0 BDL 2.64 5.00
NEAR MAIN GATE 19.04.12 85 7.0 BDL 3.63 5.00
NEAR MAIN GATE 22.04.12 71 4.0 BDL 1.65 2.00
NEAR MAIN GATE 24.04.12 76 3.0 BDL 3.63 4.00
NEAR MAIN GATE 27.04.12 49 73 4.0 BDL 2.31 5.00
NEAR MAIN GATE 30.04.12 91 4.0 BDL 3.63 5.00
Maximum 51 92 7 BDL 3.63 5 5
Minimum 46 71 3 BDL 1.65 2 3
Average 48.67 80.40 4.30 BDL 2.87 3.80 4.20
%Deviation Nil Nil Nil Nil Nil Nil Nil
All the parameters are within the limits
( Analyzed by )
Sr.Executive –QA
(Approved by )
HOD -QA
AMBIENT AIR MONITORING REPORT
MONTH : APR-2012
PM 10 AMMONIA CL2 HCL NOX SO2 LIMITS --> 100 400 100 200 80 80
Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3
LOCATION DATE
B/H CACL2 PLANT 02.04.12 68 57.0 BDL 9.57 12.00
B/H CACL2 PLANT 05.04.12 70 54.0 BDL 10.89 8.00
B/H CACL2 PLANT 09.04.12 84 68.0 BDL 13.20 14.00
B/H CACL2 PLANT 13.04.12 89 61.0 BDL 9.57 11.00
B/H CACL2 PLANT 16.04.12 94 49.0 BDL 8.58 9.00
B/H CACL2 PLANT 19.04.12 85 56.0 BDL 13.86 8.00
B/H CACL2 PLANT 22.04.12 65 74.0 BDL 11.55 10.00
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 38 of 73
B/H CACL2 PLANT 24.04.12 72 83.0 BDL 9.57 10.00
B/H CACL2 PLANT 27.04.12 81 70.0 BDL 10.23 12.00
B/H CACL2 PLANT 30.04.12 76 78.0 BDL 8.58 11.00
Maximum 94 83 BDL 13.86 14 11
Minimum 65 49 BDL 8.58 9 8
Average 78.40 65.00 0 10.56 11.40 9.60
%Deviation Nil Nil Nil Nil Nil Nil
All the parameters are within the limits
( Analyzed by )
Sr.Executive –QA
(Approved by )
HOD -QA
AMBIENT AIR MONITORING REPORT
MONTH : APR-2012
SPM AMMONIA CL2 HCL NOX SO2
LIMITS --> 500 400 100 200 80 80
Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3
LOCATION DATE
B/H BREQUATING PLANT 02.04.12 134 23.0 BDL 8.91 8.00
B/H BREQUATING PLANT 05.04.12 158 30.0 BDL 10.56 11.00
B/H BREQUATING PLANT 09.04.12 147 29.0 BDL 9.57 10.00 B/H BREQUATING PLANT 13.04.12 172 18.0 BDL 10.56 9.00 B/H BREQUATING PLANT 16.04.12 165 24.0 BDL 7.92 7.00 B/H BREQUATING PLANT 19.04.12 117 26.0 BDL 6.27 10.00 B/H BREQUATING PLANT 22.04.12 132 29.0 BDL 10.56 8.00
B/H BREQUATING PLANT 24.04.12 140 23.0 BDL 8.91 8.00
B/H BREQUATING PLANT 27.04.12 163 31.0 BDL 10.89 7.00
B/H BREQUATING PLANT 30.04.12 143 27.0 BDL 11.22 10.00
Maximum 172 31 BDL 11.22 10 11 Minimum 117 18 BDL 6.27 7 8
Average: 147.10 26.00 0 9.54 8.00 9.60
%Deviation Nil Nil Nil Nil Nil Nil
All the parameters are within the limits
( Analyzed by ) Sr.Executive –QA
(Approved by ) HOD -QA
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 39 of 73
MONTH: MAY 2012
AMBIENT AIR MONITORING REPORT
MONTH : MAY-2012
PM 2.5 PM 10 AMMONIA CL2 HCL NOX SO2
LIMITS --> 60 100 400 100 200 80 80
Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3
LOCATION DATE
NEAR MAIN GATE 03.05.12 83 4.0 BDL 2.31 4.00
NEAR MAIN GATE 05.05.12 48 71 6.0 BDL 3.30 3.00
NEAR MAIN GATE 08.05.12 78 3.0 BDL 3.30 3.00
NEAR MAIN GATE 12.05.12 80 3.0 BDL 2.31 4.00
NEAR MAIN GATE 14.05.12 42 94 5.0 BDL 2.64 5.00
NEAR MAIN GATE 17.05.12 84 7.0 BDL 3.63 5.00
NEAR MAIN GATE 20.05.12 91 4.0 BDL 1.65 2.00
NEAR MAIN GATE 22.05.12 89 3.0 BDL 3.63 4.00
NEAR MAIN GATE 25.05.12 52 92 4.0 BDL 2.31 5.00
NEAR MAIN GATE 27.05.12 84 4.0 BDL 3.63 5.00
Maximum 52 94 7 BDL 3.63 5 5
Minimum 42 71 3 BDL 1.65 2 3
Average 47.33 84.60 4.30 BDL 2.87 3.80 4.20
%Deviation Nil Nil Nil Nil Nil Nil Nil
All the parameters are within the limits
( Analyzed by )
Sr.Executive –QA
(Approved by )
HOD -QA
AMBIENT AIR MONITORING REPORT
MONTH : MAY-2012
PM 10 AMMONIA CL2 HCL NOX SO2
LIMITS --> 100 400 100 200 80 80 Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3
LOCATION DATE
B/H CACL2 PLANT 03.05.12 68 57.0 BDL 9.57 12.00
B/H CACL2 PLANT 05.05.12 70 54.0 BDL 10.89 8.00
B/H CACL2 PLANT 08.05.12 84 68.0 BDL 13.20 14.00
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 40 of 73
B/H CACL2 PLANT 12.05.12 89 61.0 BDL 9.57 11.00
B/H CACL2 PLANT 14.05.12 94 49.0 BDL 8.58 9.00
B/H CACL2 PLANT 17.05.12 85 56.0 BDL 13.86 8.00
B/H CACL2 PLANT 20.05.12 65 74.0 BDL 11.55 10.00
B/H CACL2 PLANT 22.05.12 72 83.0 BDL 9.57 10.00
B/H CACL2 PLANT 25.05.12 81 70.0 BDL 10.23 12.00
B/H CACL2 PLANT 27.05.12 76 78.0 BDL 8.58 11.00
Maximum 94 83 BDL 13.86 14 11
Minimum 65 49 BDL 8.58 9 8
Average 78.40 65.00 0 10.56 11.40 9.60
%Deviation Nil Nil Nil Nil Nil Nil
All the parameters are within the limits
AMBIENT AIR MONITORING REPORT
MONTH : MAY-2012
SPM AMMONIA CL2 HCL NOX SO2
LIMITS --> 500 400 100 200 80 80
Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3
LOCATION DATE
B/H BREQUATING PLANT 03.05.12 134 23.0 BDL 8.91 8.00
B/H BREQUATING PLANT 05.05.12 158 30.0 BDL 10.56 11.00
B/H BREQUATING PLANT 08.05.12 147 29.0 BDL 9.57 10.00
B/H BREQUATING PLANT 12.05.12 172 18.0 BDL 10.56 9.00
B/H BREQUATING PLANT 14.05.12 165 24.0 BDL 7.92 7.00
B/H BREQUATING PLANT 17.05.12 117 26.0 BDL 6.27 10.00
B/H BREQUATING PLANT 20.05.12 132 29.0 BDL 10.56 8.00
B/H BREQUATING PLANT 22.05.12 140 23.0 BDL 8.91 8.00
B/H BREQUATING PLANT 25.05.12 163 31.0 BDL 10.89 7.00
B/H BREQUATING PLANT 27.05.12 143 27.0 BDL 11.22 10.00
Maximum 172 31 BDL 11.22 10 11
Minimum 117 18 BDL 6.27 7 8
Average: 147.10 26.00 0 9.54 8.00 9.60
%Deviation Nil Nil Nil Nil Nil Nil
All the parameters are within the limits
( Analyzed by )
Sr.Executive –QA
(Approved by )
HOD -QA
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 41 of 73
MONTH: JUNE 2012
AMBIENT AIR MONITORING REPORT
MONTH : JUN-2012
PM 2.5 PM 10 AMMONIA CL2 HCL NOX SO2
LIMITS --> 60 100 400 100 200 80 80
Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3
LOCATION DATE
NEAR MAIN GATE 02.06.12 81 5.0 BDL 3.30 3.00
NEAR MAIN GATE 07.06.12 44 74 4.0 BDL 2.31 4.00
NEAR MAIN GATE 10.06.12 89 4.0 BDL 3.30 4.00
NEAR MAIN GATE 13.06.12 79 5.0 BDL 2.31 2.00
NEAR MAIN GATE 16.06.12 51 83 3.0 BDL 2.31 2.00
NEAR MAIN GATE 19.06.12 76 4.0 BDL 2.64 4.00
NEAR MAIN GATE 22.06.12 85 3.0 BDL 3.63 3.00
NEAR MAIN GATE 25.06.12 48 72 5.0 BDL 1.65 2.00
NEAR MAIN GATE 27.06.12 81 4.0 BDL 3.30 2.00
NEAR MAIN GATE 29.06.12 75 5.0 BDL 2.97 3.00
Maximum 51 89 5 BDL 3.63 4 4
Minimum 44 72 3 BDL 1.65 2 2
Average 47.67 79.50 4.20 BDL 2.77 2.80 3.00
%Deviation Nil Nil Nil Nil Nil Nil Nil
All the parameters are within the limits
( Analyzed by ) Sr.Executive –QA
(Approved by ) HOD -QA
AMBIENT AIR MONITORING REPORT
MONTH : JUN-2012
PM 10 AMMONIA CL2 HCL NOX SO2
LIMITS --> 100 400 100 200 80 80
Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3
LOCATION DATE
B/H CACL2 PLANT 02.06.12 85 56.0 BDL 13.86 10.00
B/H CACL2 PLANT 07.06.12 65 74.0 BDL 11.55 8.00
B/H CACL2 PLANT 10.06.12 94 49.0 BDL 8.58 9.00 B/H CACL2 PLANT 13.06.12 81 70.0 BDL 9.57 10.00
B/H CACL2 PLANT 16.06.12 78 62.0 BDL 11.55 12.00 B/H CACL2 PLANT 19.06.12 87 58.0 BDL 10.23 11.00 B/H CACL2 PLANT 22.06.12 90 64.0 BDL 9.57 9.00
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 42 of 73
B/H CACL2 PLANT 25.06.12 83 53.0 BDL 10.23 10.00
B/H CACL2 PLANT 27.06.12 79 57.0 BDL 7.92 7.00
B/H CACL2 PLANT 29.06.12 75 61.0 BDL 8.91 9.00
Maximum 94 74 BDL 13.86 12 11
Minimum 65 49 BDL 7.92 7 8
Average 81.70 60.40 0 10.20 9.40 9.60
%Deviation Nil Nil Nil Nil Nil Nil
All the parameters are within the limits
( Analyzed by )
Sr.Executive –QA
(Approved by )
HOD -QA
AMBIENT AIR MONITORING REPORT
MONTH : JUN-2012
SPM AMMONIA CL2 HCL NOX SO2
LIMITS --> 500 400 100 200 80 80
Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3 Microg/m3
LOCATION DATE
B/H BREQUATING PLANT 02.06.12 117 26.0 BDL 6.27 9.00
B/H BREQUATING PLANT 07.06.12 140 23.0 BDL 8.91 11.00
B/H BREQUATING PLANT 10.06.12 163 31.0 BDL 10.89 7.00
B/H BREQUATING PLANT 13.06.12 160 29.0 BDL 6.27 9.00
B/H BREQUATING PLANT 16.06.12 171 22.0 BDL 10.56 9.00
B/H BREQUATING PLANT 19.06.12 160 27.0 BDL 7.92 12.00 B/H BREQUATING PLANT 22.06.12 188 32.0 BDL 6.27 8.00 B/H BREQUATING PLANT 25.06.12 145 30.0 BDL 10.56 11.00 B/H BREQUATING PLANT 27.06.12 171 21.0 BDL 7.59 6.00
B/H BREQUATING PLANT 29.06.12 168 18.0 BDL 8.25 10.00 Maximum 188 32 BDL 10.89 9 12 Minimum 117 18 BDL 6.27 6 9 Average: 158.30 25.90 0 8.35 7.80 10.60 %Deviation Nil Nil Nil Nil Nil Nil
All the parameters are within the limits
( Analyzed by ) Sr.Executive –QA
(Approved by ) HOD -QA
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 43 of 73
AMBIENT AIR ANALYSIS REPORT
(BY MAHABAL ENVIRO ENGINEERS PVT. LTD)
JAN-JUN 2012
MONTH
LOCATION DATE OF RSPM SOx NOx HCL NH3 H.C. CHLORI
NE H2S P2O5 CO
SAMPLING 100 µg
/m3
120
µg
/m3
120
µg
/m3
200
µg
/m3
850
µg
/m3
160
µg
/m3
100 µg
/m3
400 µg
/m3
30
µg
/m3
5000
µg
/m3
JAN
Near
TMP/Boile
r area
10.01.2012 79.4 19.4 21.6 27.2 32.8 BDL BDL BDL BDL 1145
FEB
Near
TMP/Boile
r area
21.02.2012 84.7 20.5 24.7 37.6 27.5 BDL BDL BDL BDL 1031
MAR
Near
TMP/Boile
r area
15.03.2012 74.2 17.3 20.4 25.2 24.6 BDL BDL BDL BDL 1145
APR
Near
TMP/Boile
r area
19.04.2012 69.3 19.8 20.6 27.2 29.4 BDL BDL BDL BDL 1145
MAY
Near
TMP/Boile
r area
11.05.2012 79.4 18.7 22.4 34.6 46.8 BDL BDL BDL BDL 1031
JUN
Near
TMP/Boile
r area
13.06.2012 86.9 12.5 15.9 19.3 92.2 BDL BDL BDL BDL 916
AMBIENT AIR POLLUTION MONITORING REPORT
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 44 of 73
(MAHABAL ENVIROENGINEERS LIMITED)
JAN TO JUNE 2012
Sr. LOCATION MONTH DATE OF TIME OF PARAMETER RESULTS
No. SAMPLING SAMPLING
AT
MANCOZEB
PLANT JAN 10.01.2012
9.30 to 13.30
(4 hrs) 0.144 mg/m3
1 CS2
13.35 to 17.35
(4 hrs) 0.183 mg/m3
AT
MANCOZEB
PLANT FEB 21.02.2012
9.30 to 13.30
(4 hrs) 0.138 mg/m3
2 CS2
13.35 to 17.35
(4 hrs) 0.173 mg/m3
AT
MANCOZEB
PLANT MAR 15.03.2012
9.30 to 13.30
(4 hrs) 0.060 mg/m3
3 CS2
13.35 to 17.35
(4 hrs) 0.071 mg/m3
AT
MANCOZEB
PLANT APR 19.04.2012
9.30 to 13.30
(4 hrs) 0.102 mg/m3
4 CS2
13.35 to 17.35
(4 hrs) 0.074 mg/m3
AT
MANCOZEB
PLANT MAY 11.05.2012
9.30 to 13.30
(4 hrs) 0.137 mg/m3
5 CS2
13.35 to 17.35
(4 hrs) 0.129 mg/m3
AT
MANCOZEB
PLANT JUN 13.06.2012
9.30 to 13.30
(4 hrs) 0.112 mg/m3
6 CS2
13.35 to 17.35
(4 hrs) 0.119 mg/m3
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 45 of 73
TOXICITY FACTOR
(OUR INTERNAL LAB ANALYSIS REPORTS)
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 46 of 73
TOXICITY FACTOR
MONTH: JANUARY 2012
DATE Parts of Ratio of Dilution FISH FISH ANALYSIS OF FIISH
AFTER HRS. TOXICITY
OF Dilution Waste
Factor
(T) TYPE NO. FINAL OUTLET 2 HRS 6 HRS 24 HRS 48 HRS FACTOR
EXP. Water Water Tf
Tobe To test PH COD
Added Water PPM
To one (by
Part of Volume)
Waste
Water
(by
volume)
02.01.12 3 1:4 4 ZEBRA 5 7.45 80 5 5 5 5 Tf =4
05.01.12 1 1:2 2 ZEBRA 5 7.90 88 5 5 5 5 Tf =2
08.01.12 3 1:4 4 ZEBRA 5 7.55 92 5 5 5 5 Tf =4
11.01.12 1 1:2 2 ZEBRA 5 7.69 72 5 5 5 5 Tf =2
15.01.12 3 1:4 4 ZEBRA 5 7.35 92 5 5 5 5 Tf =4
18.01.12 3 1:4 4 ZEBRA 5 7.37 80 5 5 5 5 Tf =4
21.01.12 1 1:2 2 ZEBRA 5 7.72 84 5 5 5 5 Tf =2
24.01.12 3 1:4 4 ZEBRA 5 7.55 88 5 5 5 5 Tf =4
26.01.12 1 1:2 2 ZEBRA 5 7.40 84 5 5 5 5 Tf =2
29.01.12 3 1:4 4 ZEBRA 5 7.67 84 5 5 5 5 Tf =4
Remark : All parameter passes as per requirement.
( Analyzed by )
Sr. Executive
(Approved by)
HOD - QA
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 47 of 73
TOXICITY FACTOR
MONTH: FEBRUARY 2012
DATE Parts of Ratio of Dilution FISH FISH ANALYSIS OF
FIISH AFTER HRS.
TOXICITY
OF Dilution Waste Factor (T) TYPE NO. FINAL OUTLET 2 HRS 6 HRS 24 HRS 48 HRS FACTOR
EXP. Water Water Tf
Tobe To test PH COD
Added Water PPM
To one (by
Part of Volume)
Waste
Water
(by volume)
01.02.12 1 1:2 2 ZEBRA 5 7.47 81 5 5 5 5 Tf =2
04.02.12 1 1:2 2 ZEBRA 5 7.38 81 5 5 5 5 Tf =2
07.02.12 3 1:4 4 ZEBRA 5 7.37 68 5 5 5 5 Tf =4
10.02.12 3 1:4 4 ZEBRA 5 7.01 96 5 5 5 5 Tf =4
13.02.12 3 1:4 4 ZEBRA 5 7.10 92 5 5 5 5 Tf =4
17.02.12 1 1:2 2 ZEBRA 5 7.43 64 5 5 5 5 Tf =2
19.02.12 1 1:2 2 ZEBRA 5 7.46 64 5 5 5 5 Tf =2
23.02.12 3 1:4 4 ZEBRA 5 7.38 80 5 5 5 5 Tf =4
25.02.12 1 1:2 2 ZEBRA 5 7.50 48 5 5 5 5 Tf =2
27.02.12 3 1:4 4 ZEBRA 5 8.03 48 5 5 5 5 Tf =4
Remark : All parameter passes as per requirement.
( Analyzed by )
Sr. Executive
(Approved by)
HOD - QA
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 48 of 73
TOXICITY FACTOR
MONTH: MARCH 2012
DATE Parts of Ratio of Dilution FISH FISH ANALYSIS OF
FIISH AFTER
HRS. TOXICITY
OF Dilution Waste
Factor
(T) TYPE NO. FINAL OUTLET 2 HRS 6 HRS 24 HRS 48 HRS FACTOR
EXP. Water Water Tf
Tobe To test PH COD
Added Water PPM
To one (by
Part of Volume)
Waste
Water
(by volume)
02.03.12 3 1:4 4 ZEBRA 5 7.70 64 5 5 5 5 Tf =4
05.03.12 1 1:2 2 ZEBRA 5 7.45 64 5 5 5 5 Tf =2
08.03.12 3 1:4 4 ZEBRA 5 7.42 80 5 5 5 5 Tf =4
11.03.12 1 1:2 2 ZEBRA 5 7.17 80 5 5 5 5 Tf =2
14.03.12 3 1:4 4 ZEBRA 5 7.10 80 5 5 5 5 Tf =4
16.03.12 1 1:2 2 ZEBRA 5 7.08 96 5 5 5 5 Tf =2
19.03.12 1 1:2 2 ZEBRA 5 7.10 48 5 5 5 5 Tf =2
24.03.12 3 1:4 4 ZEBRA 5 7.00 48 5 5 5 5 Tf =4
27.03.12 1 1:2 2 ZEBRA 5 7.04 80 5 5 5 5 Tf =2
29.03.12 3 1:4 4 ZEBRA 5 7.17 82 5 5 5 5 Tf =4
Remark : All parameter passes as per requirement.
( Analyzed by ) Sr. Executive
(Approved by) HOD - QA
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 49 of 73
TOXICITY FACTOR
MONTH: APRIL 2012
DATE Parts of Ratio of Dilution FISH FISH ANALYSIS OF
FIISH AFTER HRS.
TOXICITY
OF Dilution Waste
Factor
(T) TYPE NO. FINAL OUTLET 2 HRS 6 HRS 24 HRS 48 HRS FACTOR
EXP. Water Water Tf
Tobe To test PH COD
Added Water PPM
To one (by
Part of Volume)
Waste
Water
(by volume)
02.04.12 1 1:2 2 ZEBRA 5 7.40 80 5 5 5 5 Tf =2
05.04.12 1 1:2 2 ZEBRA 5 6.85 64 5 5 5 5 Tf =2
08.04.12 3 1:4 4 ZEBRA 5 7.20 80 5 5 5 5 Tf =4
11.04.12 3 1:4 4 ZEBRA 5 7.24 64 5 5 5 5 Tf =4
15.04.12 3 1:4 4 ZEBRA 5 7.60 64 5 5 5 5 Tf =4
18.04.12 1 1:2 2 ZEBRA 5 7.32 64 5 5 5 5 Tf =2
21.04.12 1 1:2 2 ZEBRA 5 6.92 96 5 5 5 5 Tf =2
25.04.12 3 1:4 4 ZEBRA 5 7.00 80 5 5 5 5 Tf =4
27.04.12 1 1:2 2 ZEBRA 5 7.05 80 5 5 5 5 Tf =2
29.04.12 3 1:4 4 ZEBRA 5 7.04 64 5 5 5 5 Tf =4
Remark : All parameter passes as per requirement.
( Analyzed by ) Sr. Executive
(Approved by) HOD - QA
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 50 of 73
TOXICITY FACTOR
MONTH: MAY 2012
DATE Parts of Ratio of Dilution FISH FISH ANALYSIS OF FIISH AFTER HRS. TOXICITY
OF Dilution Waste
Factor
(T) TYPE NO. FINAL OUTLET 2 HRS 6 HRS 24 HRS 48 HRS FACTOR
EXP. Water Water Tf
Tobe To test PH COD
Added Water PPM
To one (by
Part of Volume)
Waste
Water
(by
volume)
02.05.12 1 1:2 2 ZEBRA 5 7.03 48 5 5 5 5 Tf =2
05.05.12 1 1:2 2 ZEBRA 5 7.03 32 5 5 5 5 Tf =2
07.05.12 1 1:2 2 ZEBRA 5 7.20 48 5 5 5 5 Tf =2
10.05.12 1 1:2 2 ZEBRA 5 6.80 32 5 5 5 5 Tf =2
13.05.12 1 1:2 2 ZEBRA 5 7.55 32 5 5 5 5 Tf =2
17.05.12 1 1:2 2 ZEBRA 5 7.17 32 5 5 5 5 Tf =2
19.05.12 1 1:2 2 ZEBRA 5 7.08 48 5 5 5 5 Tf =2
22.05.12 1 1:2 2 ZEBRA 5 7.20 48 5 5 5 5 Tf =2
25.05.12 1 1:2 2 ZEBRA 5 7.65 64 5 5 5 5 Tf =2
28.05.12 1 1:2 2 ZEBRA 5 7.88 64 5 5 5 5 Tf =2
Remark : All parameter passes as per requirement.
( Analyzed by ) Sr. Executive
(Approved by) HOD - QA
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 51 of 73
TOXICITY FACTOR
MONTH: JUNE 2012
DATE Parts of Ratio of Dilution FISH FISH ANALYSIS OF FIISH AFTER HRS. TOXICITY
OF Dilution Waste Factor (T) TYPE NO. FINAL OUTLET 2 HRS 6 HRS 24 HRS 48 HRS FACTOR
EXP. Water Water Tf
Tobe To test PH COD
Added Water PPM
To one (by
Part of Volume)
Waste
Water
(by volume)
03.06.12 1 1:2 2 ZEBRA 5 7.80 64 5 5 5 5 Tf =2
06.06.12 1 1:2 2 ZEBRA 5 7.45 64 5 5 5 5 Tf =2
09.06.12 1 1:2 2 ZEBRA 5 7.34 64 5 5 5 5 Tf =2
11.06.12 1 1:2 2 ZEBRA 5 7.33 32 5 5 5 5 Tf =2
14.06.12 1 1:2 2 ZEBRA 5 7.42 64 5 5 5 5 Tf =2
17.06.12 1 1:2 2 ZEBRA 5 7.00 64 5 5 5 5 Tf =2
20.06.12 1 1:2 2 ZEBRA 5 7.25 64 5 5 5 5 Tf =2
23.06.12 1 1:2 2 ZEBRA 5 7.46 80 5 5 5 5 Tf =2
26.06.12 1 1:2 2 ZEBRA 5 7.52 64 5 5 5 5 Tf =2
28.06.12 1 1:2 2 ZEBRA 5 7.62 68 5 5 5 5 Tf =2
Remark : All parameter passes as per requirement.
( Analyzed by ) Sr. Executive
(Approved by) HOD - QA
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 52 of 73
NOISE MONITORING REPORT
(OUR INTERNAL LAB ANALYSIS REPORTS)
SOUND LEVEL MONITORING REPORT : JAN-2012
SR.NO. LOCATIONS OF MONITORING SOUND LEVEL SOUND LEVEL
DAY TIME NIGHT TIME
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 53 of 73
Day Time : 6 AM to 10 PM Day Time : 10 PM to 6 AM
Limit : 75 DBA Limit : 70 DBA
Date : 11.01.12 Date : 22.01.12
Time : 12.00 hrs Time : 02.00 hrs
1 MAIN GATE 63.1 45.3
2 WORK SHOP (ENGG.) 68.2 40.1
3 MANCOZEB SOLID (SPD CONTROL ROOM) Not in operation Not in operation
4 NEAR BOILER B5 Not in operation 67.5
5 NEAR BOILER B6 73.2 68.9
6 NEAR BOILER B7 72.5 69.1
7 TMP PLANT (Gr..FLOOR) 66.3 64.5
8 TMP PLANT ( UTILITY) 72.9 68.8
9 MCP PLANT (SCREW COMPRESSOR) 73.0 68.4
10 MCP PLANT (COMPRESSOR HOUSE) 73.9 68.8
11 MCP PLANT ( UTILITY KC 93 D&E) 71.9 68.1
12 AMMONIA PLANT( AIR COMPRESSOR) 72.8 Not in operation
13 MANCOZEB LIQ.( UTILITY) Not in operation Not in operation
14 DG SET- 125O KVA ( EDG-1001) 73.9 68.6
15 DG SET- 500 KVA ( EDG-1002) 73.2 68.0
Remarks : All Parameters passes as per requirements.
( Analyzed by ) (Approved by)
(Sr.Executive) (HOD -Q.A.)
SOUND LEVEL MONITORING REPORT : FEB-2012
SR.NO. LOCATIONS OF MONITORING SOUND LEVEL SOUND LEVEL
DAY TIME NIGHT TIME
Day Time : 6 AM to 10 PM Day Time : 10 PM to 6 AM
Limit : 75 DBA Limit : 70 DBA
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 54 of 73
Date : 06.02.12 Date : 18.02.12
Time : 10.00 hrs Time : 01.00 hrs
1 MAIN GATE 68.3 41.6
2 WORK SHOP (ENGG.) 65.2 38.7
3 MANCOZEB SOLID (SPD CONTROL ROOM) Not in operation Not in operation
4 NEAR BOILER B5 Not in operation Not in operation
5 NEAR BOILER B6 Not in operation 68.2
6 NEAR BOILER B7 73.2 69.3
7 TMP PLANT (Gr..FLOOR) Not in operation 65.3
8 TMP PLANT ( UTILITY) Not in operation 68.1
9 MCP PLANT (SCREW COMPRESSOR) 72.8 68.2
10 MCP PLANT (COMPRESSOR HOUSE) 73.6 68.5
11 MCP PLANT ( UTILITY KC 93 D&E) 71.5 67.8
12 AMMONIA PLANT( AIR COMPRESSOR) Not in operation 66.9
13 MANCOZEB LIQ.( UTILITY) Not in operation Not in operation
14 DG SET- 125O KVA ( EDG-1001) 73.5 68.4
15 DG SET- 500 KVA ( EDG-1002) 73.7 69.0
Remarks : All Parameters passes as per requirements.
( Analyzed by ) (Approved by)
(Sr.Executive) (HOD -Q.A.)
SOUND LEVEL MONITORING REPORT : MAR-2012
SR.NO. LOCATIONS OF MONITORING SOUND LEVEL SOUND LEVEL
DAY TIME NIGHT TIME
Day Time : 6 AM to 10 PM Day Time : 10 PM to 6 AM
Limit : 75 DBA Limit : 70 DBA
Date : 08.03.12 Date : 03.03.12
Time : 15.00 hrs Time : 02.00 hrs
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 55 of 73
1 MAIN GATE 65.4 39.8
2 WORK SHOP (ENGG.) 61.3 40.2
3 MANCOZEB SOLID (SPD CONTROL ROOM) Not in operation Not in operation
4 NEAR BOILER B5 Not in operation Not in operation
5 NEAR BOILER B6 73.1 69.2
6 NEAR BOILER B7 73.5 69.5
7 TMP PLANT (Gr..FLOOR) 65.2 64.1
8 TMP PLANT ( UTILITY) 71.6 68.5
9 MCP PLANT (SCREW COMPRESSOR) 73.0 68.7
10 MCP PLANT (COMPRESSOR HOUSE) 73.8 69.0
11 MCP PLANT ( UTILITY KC 93 D&E) 70.3 67.2
12 AMMONIA PLANT( AIR COMPRESSOR) 72.6 68.7
13 MANCOZEB LIQ.( UTILITY) Not in operation Not in operation
14 DG SET- 125O KVA ( EDG-1001) 73.9 68.5
15 DG SET- 500 KVA ( EDG-1002) 73.5 69.4
Remarks : All Parameters passes as per requirements.
( Analyzed by ) (Approved by)
(Sr.Executive) (HOD -Q.A.)
SOUND LEVEL MONITORING REPORT : APR-2012
SR.NO. LOCATIONS OF MONITORING SOUND LEVEL SOUND LEVEL
DAY TIME NIGHT TIME
Day Time : 6 AM to 10 PM Day Time : 10 PM to 6 AM
Limit : 75 DBA Limit : 70 DBA
Date : 15.04.12 Date : 03.04.12
Time : 16.00 hrs Time : 00.30 hrs
1 MAIN GATE 69.3 46.8
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 56 of 73
2 WORK SHOP (ENGG.) 63.2 41.2
3 MANCOZEB SOLID (SPD CONTROL ROOM) Not in operation Not in operation
4 NEAR BOILER B5 Not in operation 68.8
5 NEAR BOILER B6 72.1 68.0
6 NEAR BOILER B7 72.5 68.4
7 TMP PLANT (Gr..FLOOR) 67.2 65.1
8 TMP PLANT ( UTILITY) 72.8 68.9
9 MCP PLANT (SCREW COMPRESSOR) Not in operation Not in operation
10 MCP PLANT (COMPRESSOR HOUSE) Not in operation Not in operation
11 MCP PLANT ( UTILITY KC 93 D&E) Not in operation Not in operation
12 AMMONIA PLANT( AIR COMPRESSOR) 73.1 67.3
13 MANCOZEB LIQ.( UTILITY) 70.9 66.9
14 DG SET- 125O KVA ( EDG-1001) 74.0 68.3
15 DG SET- 500 KVA ( EDG-1002) 73.2 69.1
Remarks : All Parameters passes as per requirements.
( Analyzed by ) (Approved by)
(Sr.Executive) (HOD -Q.A.)
SOUND LEVEL MONITORING REPORT : MAY-2012
SR.NO. LOCATIONS OF MONITORING SOUND LEVEL SOUND LEVEL
DAY TIME NIGHT TIME
Day Time : 6 AM to 10 PM Day Time : 10 PM to 6 AM
Limit : 75 DBA Limit : 70 DBA
Date : 23.05.12 Date : 03.05.12
Time : 10.00 hrs Time : 02.30 hrs
1 MAIN GATE 65.1 46.8
2 WORK SHOP (ENGG.) 58.9 41.2
3 MANCOZEB SOLID (SPD CONTROL ROOM) 71.8 Not in operation
4 NEAR BOILER B5 73.8 Not in operation
5 NEAR BOILER B6 72.9 68.8
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 57 of 73
6 NEAR BOILER B7 73.2 69.1
7 TMP PLANT (Gr..FLOOR) 67.9 65.3
8 TMP PLANT ( UTILITY) 72.5 69.0
9 MCP PLANT (SCREW COMPRESSOR) 73.5 68.6
10 MCP PLANT (COMPRESSOR HOUSE) 71.8 68.2
11 MCP PLANT ( UTILITY KC 93 D&E) 71.5 68.5
12 AMMONIA PLANT( AIR COMPRESSOR) 72.9 69.1
13 MANCOZEB LIQ.( UTILITY) 70.6 66.3
14 DG SET- 125O KVA ( EDG-1001) 73.8 68.5
15 DG SET- 500 KVA ( EDG-1002) 73.1 68.8
Remarks : All Parameters passes as per requirements.
( Analyzed by ) (Approved by)
(Sr.Executive) (HOD -Q.A.)
SOUND LEVEL MONITORING REPORT : JUN-2012
SR.NO. LOCATIONS OF MONITORING SOUND LEVEL SOUND LEVEL
DAY TIME NIGHT TIME
Day Time : 6 AM to 10 PM Day Time : 10 PM to 6 AM
Limit : 75 DBA Limit : 70 DBA
Date : 18.06.12 Date : 22.06.12
Time : 12.00 hrs Time : 00.45 hrs
1 MAIN GATE 67.9 48.3
2 WORK SHOP (ENGG.) 62.1 45.2
3 MANCOZEB SOLID (SPD CONTROL ROOM) Not in operation Not in operation
4 NEAR BOILER B5 73.6 69.3
5 NEAR BOILER B6 74.0 68.9
6 NEAR BOILER B7 73.7 69.1
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 58 of 73
7 TMP PLANT (Gr..FLOOR) 67.5 65.6
8 TMP PLANT ( UTILITY) 72.2 68.3
9 MCP PLANT (SCREW COMPRESSOR) 73.3 68.8
10 MCP PLANT (COMPRESSOR HOUSE) 72.1 68.5
11 MCP PLANT ( UTILITY KC 93 D&E) 71.8 67.7
12 AMMONIA PLANT( AIR COMPRESSOR) 72.6 68.8
13 MANCOZEB LIQ.( UTILITY) 69.5 67.3
14 DG SET- 125O KVA ( EDG-1001) 73.6 68.4
15 DG SET- 500 KVA ( EDG-1002) 72.9 68.7
Remarks : All Parameters passes as per requirements.
( Analyzed by ) (Approved by)
(Sr.Executive) (HOD -Q.A.)
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 59 of 73
FUGITIVE EMISSIONS REPORT
(OUR INTERNAL LAB ANALYSIS REPORTS)
FUGITIVE EMISSIONS REPORT
Date : 08.01.2012
MONTH : JAN-2012 Time : 15.15 hrs
SR. AREA CHLORINE
CARBON
DISULPHIDE AMMONIA
NO. IDENTIFICATION TLV-0.5 PPM TLV-10 PPM TLV-25 PPM
1 MCP Plant
A. Near Chlorine Tonner Area BDL -- --
2 NH3 Plant
A. RVDF Gfloor Area -- -- 2.00
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 60 of 73
B. High way side(Near boundry) -- -- BDL
C. Behind Cacl2 plant -- -- 2.00
3 Mancozeb Plant
A. During Cs2 Tanker unloading -- Plant under shut down --
B. Near ST-702A -- Plant under shut down --
C. Near D-14 Tank -- BDL --
D. Near P-14 Tank -- BDL --
E. Mancozeb Packing Area -- BDL --
F. Mancozeb Storage Godown -- BDL --
Remark : All parameter passes as per requirement.
( Analyzed by ) (Approved by)
(Sr.Executive) (HOD -Q.A.)
FUGITIVE EMISSIONS REPORT
Date : 08.02.2012
MONTH : FEB-2012 Time : 11.15 hrs
SR. AREA CHLORINE
CARBON
DISULPHIDE AMMONIA
NO. IDENTIFICATION TLV-0.5 PPM TLV-10 PPM TLV-25 PPM
1 MCP Plant
A. Near Chlorine Tonner Area BDL -- --
2 NH3 Plant
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 61 of 73
A. RVDF Gfloor Area -- -- 3.00
B.
High way side(Near boundry) -- -- BDL
C. Behind Cacl2 plant -- -- 2.00
3 Mancozeb Plant
A. During Cs2 Tanker unloading -- Plant under shut down --
B. Near ST-702A -- Plant under shut down --
C. Near D-14 Tank -- Plant under shut down --
D. Near P-14 Tank -- Plant under shut down --
E. Mancozeb Packing Area -- BDL --
F. Mancozeb Storage Godown -- BDL --
Remark : All parameter passes as per requirement.
( Analyzed by ) (Approved by)
(Sr.Executive) (HOD -Q.A.)
FUGITIVE EMISSIONS REPORT
Date : 13.03.12
MONTH : MAR-2012 Time : 15.10 hrs
SR. AREA CHLORINE
CARBON
DISULPHIDE AMMONIA
NO. IDENTIFICATION TLV-0.5 PPM TLV-10 PPM TLV-25 PPM
1 MCP Plant
A. Near Chlorine Tonner Area BDL -- --
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 62 of 73
2 NH3 Plant
A. RVDF Gfloor Area -- -- 8.00
B. High way side(Near boundry) -- -- 1.00
C. Behind Cacl2 plant -- -- 3.00
3 Mancozeb Plant
A. During Cs2 Tanker unloading -- Plant under shut down --
B. Near ST-702A -- Plant under shut down --
C. Near D-14 Tank -- Plant under shut down --
D. Near P-14 Tank -- Plant under shut down --
E. Mancozeb Packing Area -- BDL --
F. Mancozeb Storage Godown -- BDL --
Remark : All parameter passes as per requirement.
( Analyzed by ) (Approved by)
(Sr.Executive) (HOD -Q.A.)
FUGITIVE EMISSIONS REPORT
Date : 09.04.12
MONTH : APR-2012 Time : 11.30 hrs
SR. AREA CHLORINE
CARBON
DISULPHIDE AMMONIA
NO. IDENTIFICATION TLV-0.5 PPM TLV-10 PPM TLV-25 PPM
1 MCP Plant
A. Near Chlorine Tonner Area BDL -- --
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 63 of 73
2 NH3 Plant
A. RVDF Gfloor Area -- -- 6.00
B. High way side(Near boundry) -- -- 1.00
C. Behind Cacl2 plant -- -- 4.00
3 Mancozeb Plant
A. During Cs2 Tanker unloading -- 1.00 --
B. Near ST-702A -- 1.00 --
C. Near D-14 Tank -- BDL --
D. Near P-14 Tank -- Plant under shut down --
E. Mancozeb Packing Area -- BDL --
F. Mancozeb Storage Godown -- BDL --
Remark : All parameter passes as per requirement.
( Analyzed by ) (Approved by)
(Sr.Executive) (HOD -Q.A.)
FUGITIVE EMISSIONS REPORT
Date : 13.05.12
MONTH : MAY-2012 Time : 14.30 HRS
SR. AREA CHLORINE
CARBON
DISULPHIDE AMMONIA
NO. IDENTIFICATION TLV-0.5 PPM TLV-10 PPM TLV-25 PPM
1 MCP Plant
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 64 of 73
A. Near Chlorine Tonner Area BDL -- --
2 NH3 Plant
A.
RVDF Gfloor Area -- -- 5.00
B. High way side(Near boundry) -- -- BDL
C. Behind Cacl2 plant -- -- 3.00
3 Mancozeb Plant
A. During Cs2 Tanker unloading -- BDL --
B. Near ST-702A -- BDL --
C. Near D-14 Tank -- BDL --
D. Near P-14 Tank -- Plant under shut down --
E. Mancozeb Packing Area -- BDL --
F. Mancozeb Storage Godown -- BDL --
Remark : All parameter passes as per requirement.
( Analyzed by ) (Approved by)
(Sr.Executive) (HOD -Q.A.)
FUGITIVE EMISSIONS REPORT
Date : 10.06.2012
MONTH : JUN-2012 Time : 10.00 HRS
SR. AREA CHLORINE
CARBON
DISULPHIDE AMMONIA
NO. IDENTIFICATION TLV-0.5 PPM TLV-10 PPM TLV-25 PPM
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 65 of 73
1 MCP Plant
A. Near Chlorine Tonner Area BDL -- --
2 NH3 Plant
A. RVDF Gfloor Area -- -- 5.00
B. High way side(Near boundry) -- -- BDL
C. Behind CaCl2 plant -- -- 3.00
3 Mancozeb Plant
A. During Cs2 Tanker unloading -- BDL --
B. Near ST-702A -- BDL --
C. Near D-14 Tank -- BDL --
D. Near P-14 Tank -- BDL --
E. Mancozeb Packing Area -- BDL --
F. Mancozeb Storage Godown -- BDL --
Remark : All parameter passes as per requirement.
( Analyzed by ) (Approved by)
(Sr.Executive) (HOD -Q.A.)
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 66 of 73
VOC MONITORING DATA
Sub: Total VOC monitoring analysis data.
Date of Monotoring 13.02.2012
Time 14.00 to 15.15 hrs.
Location Different Plant & Locaton at UPL-1
Instrument used On line digital VOC monitoring Instrument of BEIL
Instrument operation Operated by Mr. Nitin (BEIL) / H.J.Patel (Q.A)
Sr.No. Location Parameter Findings
1 TMP Plant - Drum Filling Area Total VOC BDL
2 TMP Plant - Ground Floor area Total VOC BDL
3 TMP Plant - First Floor area Total VOC BDL
4 TMP Plant - Near Solvent storage tank Total VOC BDL
5 MCP Plant - Entrance, Near Drum filling area Total VOC BDL
6 MCP Plant - Ground floor , Centre Total VOC BDL
7 MCP Plant - First floor , Centre Total VOC BDL
8 MCP Plant - Second floor , Centre Total VOC BDL
9 ETP Plant - Near Aer-2 & Aer-3 area Total VOC BDL
10 ETP Plant - Haz.Drum storage area Total VOC BDL
11 Drum storage area, Behind ETP Plant Total VOC BDL
12 Raw material Drum storage area - Pond site Total VOC BDL
13 Pilot plant - Ground floor area Total VOC BDL
14 Pilot plant - First floor area Total VOC BDL
15 Pilot plant - Second floor area, Methanol reflux area Total VOC BDL
16 Pilot plant - Ground floor area, Methanol Feeding pump Total VOC BDL
17 FG storage godown Total VOC BDL
18 Drum storage area- Opposite FG godown, near parking Total VOC BDL
19 Main gate Total VOC BDL
20 On Road, Near Boiler Total VOC BDL
21 On Road, Between Antracol plant & Electrical Dept. Total VOC BDL
22 R & D Lab Total VOC BDL
23 Q.A.Lab Total VOC BDL
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 67 of 73
PRODUCTION DETAILS
MONTH
MONOCROTOPHOS
TRI-METHYL
PHOSPHITE
MANCOZEB
ANTRACOL
DICHLOROVOS
TRI-ETHYL PHOSPHITE
Quantity in MT
JAN.’12 0 541.345 9.967 318.3 136 0.337
FEB' 12 146.05 652.75 3.323 2.51 115.08 0
MAR' 12 0 938.83 0 165.5 194.5 0
APR’ 12 203.029 781.094 0 0 151.98 0
MAY’ 12 592.25 1105.62 1.651 49 163.001 0
JUN’ 12 614.1 1058.1 174 137.6 142 0
MONTH
PRODUCTION (MT)
PHOSPHAMIDON
CARTAP
PENOXALINE
METABROMURON
IKI (Flocinamide)
JAN.’12 28.8 0 140 0
0
FEB' 12 36.78 0.45 15.6 0
0
MAR' 12 0 0 0 0
0
APR’ 12 0 0 0 0 0
MAY’ 12 0 0 0 0 1.149
JUN’ 12 0 0 0 0 11.688
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 68 of 73
DETAILS OF WATER CONSUMPTION/ WASTE WATER DISPOSAL (INDUSTRIAL + DOMESTIC)
MONTH
WATER
CONSUMPTION
TREATED
EFFLUENT
DISCHARGE
QUANTITY TO
FETP,NCTL
KL/MONTH
JAN.’12 24219
6710
FEB' 12
21519
5404
MAR' 12
26332
5479
APR’ 12 29252
3879
MAY’ 12 29159
4069
JUN’ 12 21115
4678
TOTAL 151596 30219
KL/DAY 837.54 165.6
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 69 of 73
DETAILS OF TREATMENT FOR HIGH TDS EFFLUENT WASTE WATER IN EVAPORATION SYSTEM
MONTH
FORCED EVAPORATION SYSTEM:
High TDS (NaCl) from Plants and from
RO system in KL
(Feed Qty)
REUSABLE PERMEATE
GENERATED
(RO Plant) –KL
JAN’ 12 856.0 251.25
FEB’ 12 930.7 371.25
MAR’ 12 809.4 429.75
APR’ 12 460.9 48.0
MAY’ 12 990.7 0.0
JUN’12 1022.0 175.0
TOTAL
5069.7 1275.25
DETAILS OF INCINERABLE WASTE - MT
MONTH
OPENING
STOCK (MT)
GENERATION
CONTAMINATED
PLASTIC &
OTHER WASTE
DISPOSAL
(Total Sent
to BEIL)
CLOSING
STOCK
ORGANIC AQUEOUS
JAN’ 12 7.84 85.39 271.1 9.52
369.51 4.34
FEB’ 12 4.34 44.79 117.74 2.25 159.78 9.34
MAR’ 12 9.34 13.99 90.83 3.4 113.62 3.94
APR’ 12 3.94 31.09 48.08 0.46 79.63 3.94
MAY’ 12
3.94
55.41
7.23
3.57
66.21
3.94 4.98
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 70 of 73
JUN’12 3.94 27.99 0 2.27 29.22
HAZARDOUS WASTE TO LANDFILL DETAILS
MONTH
OPENING
STOCK
GENERATION
SOLID
DISPOSAL
TO BEIL
(ETP
SLUDE +
SALT)*
CLOSING
STOCK
ETP
SALT
TOTAL
(ETP
SLUDGE+
SALT)
ALL FIGURES IN MT
JAN’ 12 10.44 18.99 68 86.99 88.74 8.69
FEB’ 12 8.69 20.2 59.22 79.42 84.42 3.69
MAR’ 12 3.69 14.12 80.93 95.05 95.05 3.69
APR’ 12 3.69 12.26 76.4 88.66 88.66 3.69
MAY’ 12 3.69 29.52 139.42 168.94 168.94 3.69
JUN’12 3.69 21.50 139.45 160.95 159.45 5.19
TOTAL LANDFILL WASTE DETAILS –MT
MONTH
(ETP SLUDGE +
SALT)*
DCP
SLUDGE**
NON-RECYCLABLE
PLASTIC
WASTE/INSULATION
WASTE
TOTAL
JAN’ 12 88.74 171.75 4.89 265.38 FEB’ 12 84.42 122.53 4.56 211.51 MAR’ 12 95.05 310.96 10.75 416.76 APR’ 12 88.66 122.5 7.26 218.42 MAY’ 12 168.94 154.08 5.43 328.45 JUN’ 12 159.45 178.24 9.86 347.55
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 71 of 73
DETAILS OF DCP SLUDGE (BY-PRODUCT / SOLD AS SOIL CONDITIONER)
MONTH
OPENING
STOCK (MT)
GENERATION
(MT)
DISPATCH (MT)
CLOSING
STOCK
(MT)
PARTY*
BEIL**
JAN’ 12 0.246 300 110.46 171.75 18.036 FEB’ 12 18.036 300 76.37 122.53 119.14 MAR’ 12 119.136 555 260.21 310.96 102.97 APR’ 12 102.966 955* 752.74 122.5 182.726 MAY’ 12 182.726 420.12 243.62 154.08 205.146 JUN’ 12 205.146 470.00 423.18 178.24 73.726
* Clarifier, Pit cleaned & accumulated sludge taken out resulted in higher generation for the month of April
(*) Sold as Soil Conditioner to end user M/S U S Fertilizer (Dhan Varsha Fertilizer), Behind High School, At post
Poicha, Vaya Nandesari Chokadi, Dist : Vadodara, Gujarat
(2) Ambic Organic ,Plot No 17,Nalia Kharkhana compound,Dhulia Charrasta ,At and post Isorli,
Ta : Bardoli,Dist –Surat, Gujarat
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 72 of 73
Annexure-1:
Consent to Establish (NOC) for Product Mix Change (No. GPCB/BRCH-CCA-158(7)/ ID-15833/106214) and
applied for consent to operate (CC&A) on 17.03.2012.
PRODUCT DETAILS – Existing and After product mix change
Sr. No.
Existing Quantity As per Consent After Product Mix Change
Existing Products Capacity, (MT/M)
Proposed Products
Capacity, (MT/M)
Pesticide products
1 Penoxaline 150 Penoxaline .
NIL,
2 Phosphamidon 150 Phosphamidon NIL
3 Cartap 50 Cartap NIL
4 Metabromuron 50 Metabromuron NIL
5 Mancozeb OR Antracol (Combine capacity)
750 OR 750
Mancozeb OR Antracol OR Maneb OR Zineb OR Ziram (combined capacity)
650 OR 650 OR 650 OR 650 OR 650
6 Monocrotophos 270 Monocrotophos OR Dichlorovos (DDVP) (combined)
760 OR 760 7
Dichlorovos (DDVP)
200
8 -- -- Flonicamide (IK) 50
9 -- --
Tebuconazole OR Fen 04 OR Sulfosulfuran (Combined
60 OR 60
OR 60
Compliance Report for the conditions in the Environmental Clearance # J.11011/117/2002-IA.II dated 17.07.2003
issued by Ministry of Environment and Forests, New Delhi
for expansion of pesticide unit by United Phosphorus Ltd., Unit # 1, Ankleshwar, Gujarat
Period Jan-Jun 2012
Page 73 of 73
capacity)
TOTAL 1620 TOTAL 1520
Intermediates products –no change –MT/M
10 Tri Methyl
Phosphite /Tri Ethyl Phosphite
1120/1000 Tri Methyl
Phosphite /Tri Ethyl Phosphite
1120/1000
By-products details –MT/M
1 Fuesed/Anhydrous
Calcium Chloride
1800 Fused/Anhydrous
Calcium Chloride
1800
2 Di- Calcium
phosphate sludge
600 Di- Calcium
phosphate sludge
600
3 An hydrous
Ammonia
425 An hydrous
Ammonia
425
4 30% Calcium
Chloride
5000 30% Calcium
Chloride
5000
5 Methyl Chloride 131 Methyl Chloride 175
6 Ammonium
Chloride
873 Ammonium
Chloride 873
7
Hydrated sodium
Sulphate(Na2SO4,H
2O)
737 Hydrated sodium
Sulphate(Na2SO4,H
2O) 737
8 30% HCL 138 30% HCL 138
9 Sodium Sulphite
liquid (Na2SO3)
298 Sodium Sulphite
liquid (Na2SO3) NIL
10 Sodium Bromide
Liquid
95 Sodium Bromide
Liquid NIL
11 Sodium
Sulphate(100%)
31 Sodium
Sulphate(100%) 31
12 Ethanol Nil Ethanol 11.5
13 NaSH NIL NaSH 3.5
14 Sodium Bi Sulpite NIL Sodium Bi Sulpite 9
15 MeOH NIL MeOH 11