Transit Development and
Coordination Plan
Northwest Georgia Regional Commission
JUNE 2010
www.streetsmarts.us3160 Main St., Suite 100
Duluth, GA 30096Phone: 770.813.0882
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
TABLE OF CONTENTS
INTRODUCTION 1
TASK 1. STUDY AREA INVENTORY 3
Previous Study Review 3
Existing Provider Profiles 5
Transit Service Beyond the Study Area 6
Park N Ride Lots 9
TASK 2. NEEDS ASSESSMENT 10
Demographic Analysis 10
Major Study Area Destinations 22
Employment Commuting Patterns 24
TASK 3. PUBLIC INVOLVEMENT 31
Stakeholder Interviews 31
Public Surveys 32
Public Meetings 34
TASK 4. DEVELOPING COORDINATED ACTIONS-SERVICE STRATEGIES
35
Summary of Transit Potential 35
Potential Demand for Rural Transit Service 36
Transit Needs / Issues 38
Service Options 39
Summary 43
TASK 5. ORGANIZATIONAL AND FUNDING OPTIONS 45
Funding Resources 45
Organizational Issues 49
Implementation Strategies 51
Conclusion 58
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
Figure 2. Transit Service Beyond the Study Area 9
Figure 3. Elderly Population by Density 12
Figure 4. Youth Population by Density 13
Figure 5. Limited Mobility Population by Density 14
Figure 6. Low Income Population by Density 15
Figure 7. Autoless Household Population by Density 16
Figure 8. Elderly Population 17
Figure 9. Youth Population 18
Figure 10. Limited Mobility Population 19
Figure 11. Low Income Population 20
Figure 12. Autoless Household Population 21
Figure 13. Study Area Destinations 23
Figure 14. Out-of-State Working Population 25
Figure 15. In-State, Out-of-County Working Population 26
Figure 16. Bartow County Commuter Population 27
Figure 17. Gordon County Commuter Population 28
Figure 18. Whitfield County Commuter Population 29
Figure 19. Catoosa County Commuter Population 30
TABLES
Table 1. Census Characteristics for the Study Area 11
Table 2. Census Commuter Data-Means of Travel to Work 24
Table 3. Census Commuter Data-Place of Work 24
Table 4. Public Survey Results 33
Table 5. Top Two Employment Destinations 36
Table 6. Estimated Demand for Section 5311 Trips 38
Table 7. FTA Section 5311 Rural Public Transportation 47
Table 8. Implementation Table 52
Table 9. Mobility Manager’s Projected Budget 56
Figure 1. Study Area 2
FIGURES
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
INTRODUCTION
The Northwest Georgia Regional Commission (NWGRC) is a multi-county organization
consisting of fifteen (15) Northwest Georgia counties and forty-nine (49) municipalities.
The NWGRC fosters an atmosphere that encourages these counties and municipalities
to work together to identify common problems and opportunities and to seek
countywide solutions through joint plans. In keeping with this principle, a Transit
Development and Coordination (TDCP) has been developed for the four county area in
the region that contains the I-75 corridor from Chattanooga, Tennessee to Cobb County,
Georgia. Specifically, the study area includes Bartow, Catoosa, Gordon and Whitfield
counties, see Figure 1.
Although numerous studies conducted in the four county area have stressed the lack of
alternative transportation options, particularly for those with special needs, there are
currently no public transportation services linking these four counties and no formal local
efforts to encourage ridesharing or carpooling. Existing park-n-ride lot locations and
operations are not conducive to use by the area’s citizens. Additionally, there is a lack of
transfer lots and coordination for the local 5311 transit operations for movement between
counties.
The goal of the TDCP is to provide a comprehensive and critical evaluation of the vision
and mission of public transit for the counties of Catoosa, Whitfield, Gordon and Bartow
including goals and objectives. Public transportation from a regional standpoint was
examined to recommend inter-county and inter-agency cooperation and coordination
in order to provide improved alternative transportation service between and within the
four county study area. A comprehensive inventory of existing conditions in the area and
previously completed studies was conducted to provide the backbone for the needs
assessment and to identify gaps in existing service. A public involvement effort, including
stakeholder meetings, public surveys and public meetings in each county, was also
conducted to document the public perception of existing service and needed service.
This information was then used to develop coordinated actions and strategies to be
pursued in the region. Lastly, an implementation plan was created for the
recommended actions and strategies.
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
2
Figure 1: Study Area
Study Area Map
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
3
TASK I. STUDY AREA INVENTORY The portion of the Northwest Georgia Regional Commissions (NWGRC) analyzed for this
study includes Bartow, Catoosa, Gordon, and Whitfield counties, which encompass the
I-75 corridor from Chattanooga, Tennessee to Cobb County, Georgia. Some of the
cities within these counties include Cartersville, Emerson, and Euharlee in Bartow County;
Fairmount, Calhoun and Resaca in Gordon County; Fort Oglethorpe, Indian Springs, and
Ringgold in Catoosa County; and Dalton, Tunnell Hill and Cohutta in Whitfield County.
Previous Study Review
A review of existing studies pertaining to the study area was conducted to obtain transit
related points of interest.
ATLANTA-CHATTANOOGA HIGH SPEED RAIL STUDY
Georgia Department of Transportation (2008) - Tier I Environmental Impact Statement,
Atlanta-Chattanooga High Speed Ground Transportation (HSGT) Study
• “…enhance intercity passenger mobility in northwest Georgia, and part of
Tennessee, by expanding passenger transportation capacity, increasing overall
personal and business mobility and providing an alternative to highway and air
travel in a manner that is safe, reliable, and cost-effective while avoiding,
minimizing, and/or mitigating effects on affected neighborhoods and the
environment.”
BARTOW COUNTY
Bartow County Comprehensive Plan 2007-2027, Community Assessment
• “People lack transportation choices for access to housing, jobs, services, goods,
health care and recreation”
• “The county should promote alternative forms of transportation such as Rideshare
and light rail”
• “The county should develop a long-term transportation model for all modes of
transportation, including alternative forms that are pedestrian friendly, using
compatible adjacent transportation corridors.”
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
4
• “Without intervention, these areas are likely to evolve with low pedestrian
orientation, little or no alternative transportation options, high to moderate
degree of building separation, predominantly residential development with
scattered civic buildings and varied non-connecting street patterns, often
curvilinear.”
GORDON COUNTY
Gordon County Comprehensive Plan 2006-2026, Community Assessment
• “Planning of our new and reconstructed roadways will include consideration of
whether the roadways can accommodate multiple functions, including
pedestrian facilities, parking, bicycle, routes, public transit (if applicable) as well
as local vehicular circulation.”
• “Prepare a County-wide transit plan to determine ridership need and funding
sources.”
• “Plan for more senior citizens activities such as health care, nutrition, exercise,
transportation options, emergency services, housing availability and codes,
taxation, workforce development, volunteer opportunities, etc.”
• “Coordinate land use planning with bike, pedestrian and transit opportunities.”
CATOOSA COUNTY
Catoosa County Joint City-County Comprehensive Plan Update 2007-2027, Partial
Update
• “Alternatives to transportation by automobile, including mass transit, bicycle
routes, and pedestrian facilities, should be made available in each community.”
• “Greater use of alternate transportation should be encouraged.”
• “There is an imbalance between auto-dependent transportation projects
alternative transportation projects.”
WHITFIELD COUNTY
Whitfield County Joint Comprehensive Plan Update 2008-2018
• “There are sizable numbers of low-income, elderly, disabled, and minority persons
within the county who need non-automobile options to access jobs, medical
care, and shopping needs.”
• “There is the potential to enhance public transportation, especially for special
needs population, building on the currently underutilized on-call bus system or
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
5
implementing a fixed-route system.”
Existing Provider Profiles
BARTOW COUNTY
Bartow Transit provides limited transit service within Bartow County. Its service includes
transportation for senior citizens throughout the county to local shopping centers and
grocery stores as well as senior citizen centers. There is no intercity bus service in Bartow
County. There is one park-n-ride lot in Bartow County, which is located on SR 3 in
Adairsville. Overall, most Bartow County residents must rely on automobiles for normal
daily transportation needs, although residents in some areas of the city of Cartersville
may be able to walk to many of their most popular destinations.
GORDON COUNTY
Local transit service is provided by a federally-funded public transportation service for
non-urbanized areas that is administered by GDOT. The Section 5311 grant program
facilitates a dial-a-ride bus service that is available to residents for various trip purposes
from their home to their desired location. Trip purposes include medical, nutrition,
shopping, education, and recreation. This 8 vehicle demand responsive transit service
within Gordon County is provided by Mountain Area Transportation Services (MATS),
which is operated by the non-profit North Georgia Community Action Program through
a Third Party Operator agreement with Gordon County.
WHITFIELD COUNTY
Local transit service is provided by a federally-funded public transportation service for
non-urbanized areas that is administered by GDOT. The Section 5311 grant program
facilitates a dial-a-ride bus service that is available to residents for various trip purposes
from their home to their desired location. Trip purposes include medical, nutrition,
shopping, education, and recreation. This demand responsive transit service within
Whitfield County is provided by Mountain Area Transportation Services (MATS), which is
operated by the non-profit North Georgia Community Action Program through a Third
Party Operator agreement Whitfield County. MATS’ major client groups are senior
citizens and those with physical or mental disabilities that inhibit them from using private
transportation. MATS operates a total of eight vehicles, including three ambulatory
vehicles and five ADA-capable vehicles from 8:30 AM to 4:30 PM, Monday through
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
6
Friday with 24 hours notice generally required. Service is provided primarily to shopping
centers and doctors’ offices. Greyhound provides inter-city bus service to Whitfield
County. There are also eleven taxicab services operating within the county.
CATOOSA COUNTY
Catoosa County offers free transportation service to any resident of the county through
the Catoosa Trans-aid program. All transportation must remain in Catoosa County
except for the following: Medical trips are provided to the Chattanooga area
surrounding the three major hospitals. These trips are scheduled between the hours of
9:00 a.m. and 2:00 p.m. Monday thru Friday. Catoosa Trans-aid offers door to door
transportation. This mean that they will come to the passengers door to assist them to
the bus if needed, but will not go inside the home. They will drop the passenger off at
the front entrance of the desired location, but will not go inside the building.
Transit Service Beyond the Study Area
In addition to transit services within the four county study area, there are regional transit
services that are accessible to residents within the study area. The Georgia Regional
Transportation Authority (GRTA) as well as Cobb County Transit (CCT) have bus routes
extending as far north as Cherokee Road (SR 92) in Acworth, Cobb County, Georgia
near the Cobb-Bartow County border. This transit stop also serves as the location of the
Acworth park-n-ride Lot at Lake Acworth Drive. The Chattanooga Area Regional
Transportation Authority (CARTA) has at least two bus routes located within two miles of
the Georgia-Tennessee border. Figure 2 shows the transit service locations beyond the
study area. Details of each existing transit service are as follows:
GEORGIA REGIONAL TRANSPORTATION AUTHORITY (GRTA) XPRESS
GRTA is the State of Georgia authority working to improve Georgia’s mobility, air quality,
and land use practices. One component of this organization is Xpress. Xpress is a public
commuter transportation service, available Monday through Friday, designed to
provide work-day commuters an alternative to driving their vehicles alone to work while
improving air quality and enhancing the quality of life for all of metropolitan Atlanta.
Xpress partners with the following 12 metro Atlanta counties: Cherokee, Clayton, Cobb,
Coweta, Dekalb, Douglas, Fulton, Forsyth, Henry, Gwinnett, Paulding, and Rockdale.
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
7
COBB COMMUNITY TRANSIT (CCT)
Cobb Community Transit provides transit throughout Cobb County and to Downtown
Atlanta via Fixed, Express or Paratransit services. CCT operates from 5 a.m. until mid-to-
late evening Monday through Saturday depending on the route. There is not service on
Sunday or on the following holidays: New Year’s Day, Memorial Day, July 4th, Labor Day,
Thanksgiving Day and Christmas Day. Transfers are valid for up to 3 hours on a different
route than issued. If the rider is using both CCT and MARTA, they pay the one-way CCT
fare and transfer free to MARTA. For the return trip, pay the MARTA fare and transfer free
to CCT.
Curb to curb paratransit service is provided to individuals who cannot use the regular
bus. Passengers must be certified to use paratransit service. CCT also offers the
Guaranteed Ride Home Program, which provides commuters who carpool, vanpool,
walk, bike or take transit to work with up to 5 free rides home or to their car from work
annually. The program is administered under the RideSmart program at the Atlanta
Regional Commission and is open to commuters who use alternative forms of
transportation.
CHATTANOOGA AREA REGIONAL TRANSPORTATION AUTHORITY (CARTA)
CARTA is a public authority which operates the public transportation system providing
fixed route transit to Hamilton County, Tennessee. Additionally, CARTA operates Care-A-
Van (a curb-to-curb service for people with disabilities), a Downtown Electric Shuttle with
one of the largest fleets of electric buses in the United States and parking garages in
Downtown Chattanooga, and the Lookout Mountain Incline Railway (the steepest
passenger railway in the world).
GROOME TRANSPORTATION
Groome Transportation is a professional transportation provider that serves several
regions including Atlanta, GA and Chattanooga, TN. Shuttle service operates nineteen
(19) hourly trips a day between Chattanooga, TN and Atlanta, GA with stops, by
reservation only, in Dalton, GA, Calhoun, GA and Marietta, GA. Fares from
Chattanooga, TN to the Atlanta Airport are $39 one-way and $73 roundtrip.
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
8
GREYHOUND LINES, INC.
Greyhound Lines, Inc. is the largest provider of intercity bus transportation, serving more
than 2,300 destinations with 13,000 departures across North America. Included in these
destinations are three stations in the Atlanta area, one station in Dalton, GA and one
station in Chattanooga, TN.
Park-N-Ride Lots
There are four park-n-ride lots within the study area, all of which are located in Bartow
and Gordon counties. There are no park-n-ride lots in Catoosa and Whitfield Counties
and Chattanooga, TN does not currently offer a rideshare program.
Bartow County has one park-n-ride lot located at SR 3 at milepost 29 in Adairsville,
Georgia. This lot is in the northwest part of the county and is near the Folsom Road (SR
140) exit on I-75. There are twenty (20) spaces located at this lot with 35% being utilized.
Bartow County is also served by three vanpool routes through the RideSmart program.
These routes all travel from Cartersville, GA to Atlanta, GA.
Gordon County has three park-n-ride lots. The first is located at US 41 at SR 136 in the
northwest part of Gordon county in Resaca, Georgia The Resaca lost is near the Resaca
Lafayette Road (SR 136) exit on I-75. There are six (6) spaces located at this lot with 50%
being utilized. The second Gordon county park-n-ride lot is located at the public square
in Fairmount, Georgia. This lost is just under 14 miles to the east of I-75 and is near the
intersection of SR 61 and SR 53 in the southeast part of Gordon County. The Fairmont
Square park-n-ride lot has ten (10) spaces with 30% being utilized. The final Gordon
County park-n-ride lost is located at the courthouse in Calhoun, Georgia. It is
approximately 2.5 miles to the west of I-75 and is near the intersection of US 41 and SR 53
in the central part of Gordon County. The Calhoun park-n-ride lot has forty-seven (47)
spaces with 66% being utilized.
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
9
Figure 2: Transit Service Beyond the Study Area
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
10
TASK II. NEEDS ASSESSMENT
Demographic Analysis
As part of a public transportation study, it is important to develop a geographically-based
understanding of the demographic patterns of the study area. These data are collected
from the 2000 US Census by block group and then mapped using Geographic Information
Systems (GIS) software. This analysis includes a mapping of the population and household
densities, along with demographic attributes that are linked to public transportation
dependency (elderly population, disabled population, low income population, etc.). The
ability to identify higher concentrations of potential public transportation users
geographically allows for the identification of areas where public transportation service
should be focused. These attributes are:
• Elderly Population: The elderly population (persons 65 and over) is a category of
individuals that have a higher dependence on public transportation, as the ability
to drive diminishes as individuals become older. Availability of transportation
services for the elderly is certainly a quality of life issue, as elderly residents who
can access public transportation are able to more fully participate in the
community.
• Youth Population: The youth population (persons 17 and under) is another group
that tend to use public transportation extensively where it is available, as they have
either not yet reached driving age or an automobile is not readily available, and
public transportation offers a degree of independence from parents in accessing
after school programs and recreational activities.
• Persons that fall below the poverty line: Another strong indicator of public
transportation dependency within an area is income, as low-income households
are less able to purchase and maintain an automobile.
• Persons with a mobility limitation: Disabled persons typically rely on a higher number
of public transportation trips, since many persons’ disabilities deny them of the
ability to operate an automobile. In addition, many disabled individuals require
public transportation vehicles with specialized equipment and many require “door-
to-door” service with special assistance.
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
11
• Households with no vehicle available: Autoless households demonstrate a higher
likelihood of using public transportation because of their limited access to private
travel options. It is not uncommon to find the highest concentration of these
households in areas where there are high concentrations of people living below
the poverty line.
Table 1 shows the demographic characteristics for the study area. A number of these
characteristics will help identify populations who are more inclined to use public
transportation.
Table 1: Census Characteristics for the Study Area
There are multiple methods to view and analyze the available census data. For the
purpose of this study, raw population volumes in each geographic area and the density
per square mile of each population type were both used to identify potential public
transportation users. Figures 3 through 7 illustrate the areas with the highest
concentrations of transit-dependent persons, which may be used to identify locations for
fixed-route transit and/or commuter transfer stations. Specifically, clusters consistently
appear around Fort Oglethorpe in Catoosa County, Dalton in Whitfield County, Calhoun
in Gordon County and Cartersville in Bartow County. Additionally, Figures 8 through 12
illustrate areas with high raw populations volumes, which may be used to identify areas
with a more significant need for demand-response service.
Bartow County
% Catoosa County
% Gordon County
% Whitfield County
%
Total Population 76,019 53,282 44,104 - 83,525 - Urban vs. Rural
Urban Population 44,676 59 37,823 71 15,072 34 57,143 68 Rural Population 31,343 41 15,459 29 29,032 66 26,282 32
Age Breakdown Age 17 & younger 21,166 28 13,766 26 11,515 26 22,671 27
Age 18 to 64 47,741 63 33,207 62 27,992 64 52,189 63 Age 65 and over 7,112 9 6,309 12 4,597 10 8,665 10
Other Attributes Persons Below Poverty
Line 6,445 9 4,966 9 4,293 10 9,494 11
Mobility Limited 5,981 8 4,762 9 3,746 9 6,747 8 Autoless Households 1,422 5 804 4 977 6 1,951 7
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
12
Figure 3: Elderly Population
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
13
Figure 4: Youth Population
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
14
Figure 5: Limited Mobility
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
15
Figure 6: Low Income
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
16
Figure 7: Autoless Households
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
17
Figure 8: Elderly Population
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
18
Figure 9: Youth Population
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
19
Figure 10: Limited Mobility
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
20
Figure 11: Low Income
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
21
Figure 12: Autoless Households
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
22
Major Study Area Destinations
Figure 13 illustrates the location of major destinations within the study area. These include:
• Employment
− Major Employers
− Industrial Parks
• Shopping
− Regional Retail (Malls, Wal-Mart, etc.)
− Community Retail (Grocery Stores)
• Medical
− Hospitals
• Public Service
− Human Service Agencies
− Assisted Housing
• Education
− Colleges and Universities
− High Schools
The combination of this information along with the demographic attributes analyzed for
the study area will allow for a determination of where public transportation would operate
best and what could be the most effective type(s) of service.
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
23
Figure 13: Study Area Destinations
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
24
Employment Commuting Patterns
Commuter data was obtained from the 2000 US Census to determine where people
work and how they get to/from work. Currently, only 0.5% of the working population in
the study area use public transportation as a means of getting to/from work while 15.6%
carpooled and 80.1% drove alone. The average travel time to work is about 20-24
minutes. Table 2 shows a comparison of means of travel to work for all workers over 16
years of age. Table 3 shows a comparison of place of work for all workers over the age
of 16 within the four county study area.
Table 2: Census Commuter Data - Means of Travel to Work
Table 3: Census Commuter Data - Place of Work
The data listed in Table 3 was also mapped using Geographic Information Systems (GIS)
software. Figure 14 illustrates the percentage of out-of-state workers in the study area
and Figure 15 illustrates the percentage of in-state, out-of-county workers in the study
area. Figures 16 through 19 further illustrate county commuter data by identifying the
percentage of workers that remain in county, the percentage of workers that travel
outside of the county and the top five commuter destinations by county.
Bartow County
% Catoosa County
% Gordon County
% Whitfield County
%
Drove Alone 28,908 80.4% 22,855 85.6% 17,258 78.4% 29,972 77.0%
Carpooled 5,365 14.9% 3,047 11.4% 3,850 17.5% 7,072 18.2%
Public Trans. 181 0.5% 65 0.2% 163 0.7% 217 0.6%
Other 681 1.9% 374 1.4% 371 1.7% 974 2.5%
Worked at Home
818 2.3% 369 1.4% 375 1.7% 674 1.7%
Bartow County
% Catoosa County
% Gordon County
% Whitfield County
%
Total Working Population
35,953 - 26,710 - 22,017 - 38,909 -
Out of State 347 1% 12,848 48% 196 1% 1,145 3%
In State 35,606 99% 13,862 52% 21,821 99% 37,764 97%
Outside County 14,914 41% 6,695 25% 6,649 30% 3,968 10%
Inside County 20,692 58% 7,167 27% 15,172 69% 33,796 87%
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
25
Figure 14: Out-of-State Working Population
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
26
Figure 15: In-State, Out-of-County Working Population
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
27
Figure 16: Bartow County Commuter Population
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
28
Figure 17: Gordon County Commuter Population
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
29
Figure 18: Whitfield County Commuter Population
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
30
Figure 19: Catoosa County Commuter Population
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
31
TASK III. PUBLIC INVOLVEMENT
Stakeholder Interviews
An important step in determining the need for a public transportation service was to
consult with community stakeholders. Stakeholders interviewed included county and
regional officials and transportation professionals. The discussions provided valuable input
to assessing the issues surrounding the transportation needs and trends in the study area.
STAKEHOLDER SURVEY RESULTS ANALYSIS
Stakeholders had varied responses depending on which city or county they were
representing. In general, most of the stakeholders representing the study area agreed
that:
• Elderly citizens would benefit from public transportation in the region.
• Most users rely on public transportation for medical purposes such as getting to/
from the hospital or doctor visits.
• Public transportation is extremely important to people with disabilities and to senior
citizens, not very important to teenagers, and somewhat to extremely important to
people with limited economic means.
• Their local government should provide matching funds for public and specialized
transportation services.
There were, however, some stakeholders with varying opinions. Some of the various
comments are detailed below:
• The City of Dalton / Whitfield County has a college age population that would
benefit from public transportation, especially between the downtown area and
the college.
• There is a large commuter population that would use transit in North Georgia.
• Transit would be considered more important for teenagers if it was available and
frequently used, but it is not in their mindset.
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
32
Public Surveys
To ensure that the needs and wants of the populace pertaining to public transportation
were addressed, a survey to gather input from the general public was carried out over
the course of several months throughout the study area. The goal of the survey was to
determine the need for public transportation and commuting options within the study
area as well to gather input from the public on the best ways to support such options.
Information was also collected on the potential frequency of use, trip purpose, and key
origin and destination points of public options. Surveys were collected at various events
throughout the four (4) counties as well as at public meetings held in each county. The
key results from the survey are listed in Table 4 below and on the following page.
When respondents were asked to provide what they felt was the greatest transportation
need or problem area in the NWGRC area, a variety of responses were given:
• Rail access to Atlanta
• Rail access between Atlanta and Chattanooga
• Less development
• Extend MARTA service into surrounding counties
• Increased mobility for elderly people
• Increased mobility for disabled people
• Access to public transportation for medical purposes
• Accessibility to buses
• More buses
• Less vehicular traffic, more pedestrian trips
• More sidewalks needed
• HOV lanes north of Atlanta along I-75
The public had a variety of answers as to who should provide the additional public
transportation options, ranging from local governments (cities and counties) to the State
of Georgia, the Federal Government, or private companies. Additionally, several
participants suggested that a public/private partnership could be explored as a potential
means to expand public transportation within the NWGRC area.
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
33
Table 4: Public Survey Results
Data / Question # of Responses %
Employment Status
Employed—Full Time 153 52%
Retired 55 19%
Unemployed 30 10%
Employed—Part Time 21 7%
Work at Home 21 7%
Student 8 3%
Self Employed 3 1%
Primary Means To Get To Work
Drive Alone 235 91%
Drive with Someone Else 10 4%
Walk 5 2%
Ride in Car with Someone Else 5 2%
Other 2 1%
Bicycle 2 1%
Yes 27 9%
No 262 89%
Are there special transportation needs in your household?
How many times in the past year have you needed or wanted some type of public transportation?
Never 177 60%
Weekly 28 10%
More than Twice, less than Monthly 22 8%
Twice 20 7%
Daily 21 7%
Monthly 15 5%
Once 8 3%
Would you be willing to pay a fare to use public transportation?
Yes 261 89%
No 22 8%
What amount would you be willing to pay per trip?
Minimum $1
Maximum $30 *
Average $3.35 *
Note: *The maximum fare includes users willing to pay for transport to/from Atlanta, which was often greater than $20. For
the average though, only fares under $20 were included in the calculations.
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
34
Public Meetings
A series of public meetings, facilitated by NWGRC and Street Smarts staff and local
officials, were held in May 2010. The meetings occurred on May 12th, May 18th, May 19th
and May 26th in Catoosa, Whitfield, Gordon and Bartow Counties respectively. The
purpose of the meetings was to present a summary of existing public transportation
options in the NWGRC area and to determine the level of demand and support for
changes to those options.
Attendees cited several reasons for establishing public transportation service, including
providing travel options for the elderly and disabled, promoting more viable growth
patterns, and to improve air quality in the region.
The attendees gave responses similar to the public survey participants when asked to
name the greatest transportation need in the NWGRC area (access to and from Atlanta
via rail, rail access through Georgia and to Chattanooga, medical transportation, etc.)
and who should provide the service (the county, state, and public/private partnership).
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
35
TASK IV. DEVELOPING COORDINATION ACTIONS-SERVICE
STRATEGIES
This section presents basic service strategies/options based on the analyses documented
in this plan regarding the transit needs and major trip generators in Catoosa, Whitfield,
Gordon, and Bartow Counties. These service options demonstrate a number of potential
structures that link the most likely origin areas with the key destinations. Several service
alternative concepts were initially reviewed by Northwest Georgia Regional Commission
(NWGRC) and presented during a series of public meetings in May. All service strategies
are reviewed below, after a recap of the region’s transit need and potential.
Summary of Transit Potential
The results of the needs analysis and identification of major trips generators were used as
the foundation for developing service options. Several of the key findings of the needs
assessment that affected the development of alternatives are summarized below.
WHERE PEOPLE WHO NEED TRANSIT LIVE
While all each of the county’s needs analysis maps indicated specific high relative transit
need, predominantly the highest concentration of transit-dependent persons clustered
around the Cities of Cartersville, Calhoun, Dalton, and Fort Oglethorpe. These data
included the youth population (persons 17 and under), older persons over age 65, low-
income households, disabled persons, and autoless households.
WHERE PEOPLE NEED TO GO ON TRANSIT
Major trip generators in the region are were also detailed. Services are concentrated
within the same four areas – Dalton, Calhoun, and Cartersville and to a lesser extent Fort
Oglethorpe. The smaller concentration of trip generators around Fort Oglethorpe is due
to its close proximity to Chattanooga.
Additionally, employment commuting patterns were analyzed. A summary of the top two
employment destinations (county to county travel) is displayed in Table 5.
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
36
Table 5: Top Two Employment Destinations
One of the noteworthy findings was that Catoosa County was the only county not to
have intracounty employment trips as the top destination. This information was used to
assist in developing service alternatives to address the most significant trip generators and
employment trip interchanges.
Potential Demand for Rural Transit Service
The idea of new service is a daunting proposal, especially during these tight economic
times. Therefore, an estimate of the potential demand for service would also be needed
to reassure stakeholders that there would be ridership, and to assist in the development of
the plan. Although a wide variety of needs are apparent from the demographic analysis
and the public input, estimating the number of vehicles required and developing an
implementation plan requires some estimate of the potential ridership. The estimated
ridership drives the number of vehicles required, given some assumptions about
productivity. The number of vehicles to be operated is then the key driver of the
operating costs, and cost is generally the first or second question asked when discussing
the potential for regional transportation options. So the next step in the project was the
development of an estimate of ridership.
Fortunately, a rural transit demand model calibrated with data from Georgia’s rural
Section 5311 systems already exists. Previous research in the literature and for the
statewide transportation plan provides us with a rural transit demand model that can be
used to estimate the demand for rural transit service in each county, based on
demographic characteristics. This estimated demand can then be compared to the
actual ridership to estimate the unmet trip demand. The model estimated demand as a
function of:
Major Destination
Bartow County
Catoosa County
Gordon County
Whitfield County
Cobb County
Hamilton County (TN)
Bartow County (35,953) 58% 20%
Catoosa County (26,710) 27% 47%
Gordon County (22,017) 70% 13%
Whitfield County (38,909) 88%
Origin (Total Employed)
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
37
• Population over 60 years of age,
• Persons with a mobility limitation,
• Persons living below the poverty line, and
• Either the statewide average median miles (of transit service provided) per capita
or the statewide average mean miles (of transit service provided) per capita.
The three population categories are summed to provide a total county “transit-
dependent” population, and that number is multiplied by .8983, and then multiplied by
either the mean or median miles per capita raised to the .822 power.
As can be seen, predicted ridership is primarily a function of the number of persons in a
county that are most likely to need some type of transportation and the amount of
service provided, so the model is not reflecting any “choice” ridership from persons who
could use private vehicles, but might choose not to. The model formulation is based on a
national study, but it was calibrated using data on the Georgia systems so it is in effect a
kind of comparison or analogue to other rural counties in Georgia that have Section 5311
systems. Because the model estimates demand in part based on the amount of service
provided, a forecast was developed using the median miles per capital for the existing
rural services.
This model was applied statewide in Technical Memorandum #1: Draft Strategic Plan,
prepared as part of the Evaluation of the Georgia Section 5311 Rural Transportation
Program. In that report, when applied to counties with existing Section 5311 systems, in a
number of individual counties the reported 2002 ridership was greater than the estimated
demand for general public rural trips. The most likely explanation is that the reported data
in those counties includes client trips as well as general public trips, despite the fact that
the model purports to be estimating only general public demand. Further analysis of
GDOT data suggests that the Section 5311 ridership data used to calibrate the model
includes about 50% agency client trips, based on reports by the providers to GDOT. In
addition, subsequent site reviews by the consulting team indicate that many trips coded
as general public may in fact be client trips, as the providers may not be clear on the
definitions. For these reasons, we would interpret the model demand results as estimates
of the demand for Section 5311 trips, rather than specifically as demand for agency trips
or general public trips. The general validity of the demand calibration of the model can
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
38
be seen in Table 6, which compares estimates for the four counties with the actual
ridership on the Section 5311 services.
Table 6: Estimated Demand for Section 5311 Trips
1 Rural trips and unmet demand were solely calculated.
Transit Needs / Issues
The four counties within the study area are predominantly rural. Service is designed to
accommodate a low density environment. Demand-response service is provided within
each county, which is a more costly operation that is appropriate based on the low
number of persons per square mile. As a result, general public capacity can often be an
issue. Additional issues that were raised during the outreach effort were:
• Coordination across county/state lines
• Low-income seniors to congregate meals/services
• Human service capacity was voiced as a problem in Gordon County
Commuter needs surfaced as an area for further analysis through our research.
Interestingly, commuter needs were predominantly from the southernmost and
northernmost counties only. Ultimately their needs were different from one another in that
Bartow County’s commuter needs was for travel to Cobb and Fulton County (service
south) and Catoosa and Whitfield commuter needs was for service to Chattanooga
(north).
County
Estimated De-
mand
Trips / Capita
FY 2009 Total S. 5311 Trips
New Unmet Demand
Bartow County 42,384 0.3 17,257 25,127
Catoosa County 30,143 1.1 17,131 13,012
Gordon County 18,421 0.1 6,132 12,289
Whitfield County 1 38,378 0.3 8,367 30,011
TOTAL 129,326 0.3 48,887 80,439
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
39
The final transit needs assessment centered on local circulation. Only two areas in the
region warrant and justify this potential option – Dalton and Cartersville. This is based on
each localities population density in conjunction with a high number of trip generators.
Service Options
There are two basic considerations in designing an effective and efficient transit system in
the area. The system is effective if it meets the travel needs of the residents. This means
identifying the markets for transit and determining if those markets are served. A system is
efficient if it meets those needs in a manner that maximizes travel while minimizing
resources expended. To the extent possible, services would be scheduled in to maximize
the convenience of transfers between proposed services between counties.
Options for each county and the region have been developed considering the unmet
needs in terms of how well they service under- or un-served areas, major housing origins,
and major employment, medical, educational, human service, and commercial
destinations. The options are focused on the development of services and are presented
in a conceptual way.
OPTIONS FOR CATOOSA COUNTY
This alternative consists of expanding Catoosa Trans-Aid service to address the projected
unmet need for additional rural transit trips. This would require funding for more general
public trips. Potential for expansion of contracted human service trips and potential for
trips outside the County should also be explored.
Additionally, fixed-route, fixed-schedule transit service to Chattanooga may be warranted
based on the population densities, the location of trip generators, and the existences of a
significant number of commuters to Chattanooga. This potential service would travel
along U.S. 27 between Fort Oglethorpe (Hutcheson Medical Center) to Chattanooga.
Another possible corridor for service is between Ringgold at a future park and ride lot on
I-75. This location could serve carpool and vanpool needs, and possible peak-hour
commuter express bus service to the downtown Chattanooga area. A final option for
Catoosa County would be a rideshare program to facilitate car- and van-pool formation
for both Chattanooga-bound commuters and residents headed in other directions for
employment.
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
40
OPTIONS FOR WHITFIELD COUNTY
This alternative explores expanding Whitfield County Transit Service. Similar to Catoosa
County, additional funding for more general public trips (to meet unmet needs identified
in the rural transit demand estimation), and the potential for expansion of contracted
human service trips would be candidates for new service. Based on the analysis, there is
limited potential need for non-medical trips outside the County.
Local transit service in Dalton and the surrounding area could be feasible, based on the
2006 Public Transportation Needs Study which was adopted by the Dalton-Whitfield
County Metropolitan Planning Organization. Five service option “packages” were
developed as part of this study. Options 1 and 2 were designed as demand-response
options to serve all of Whitfield County (basically expanding upon the existing Whitfield
County Transit Service). Options 3, 4, and 5 were designed to offer various types of
services to serve the urbanized area of Dalton, encompassing a broad range of possible
service levels and their associated costs.
Although there may be limited “rural general public” transportation needs outside the
County, local transit services could provide a connection to the existing intercity services.
A connection to the existing Greyhound services stop at the Pilot Travel Center in Dalton
(142 Carbondale Road Southwest) that provides trips to both Atlanta and Chattanooga
(three departures each way per day). In addition, the Groome Transportation service to
the Atlanta and Chattanooga airports is provided from a stop at Exit 333, which could
also be served by local transit (if implemented). Potential also exists for express bus service
to Chattanooga central business district from a future park and ride facility on I-75 just
north of Dalton.
OPTIONS FOR GORDON COUNTY
Options for Gordon County will look to expand Gordon County Transit, which is operated
under contract by North Georgia Community Action’s Mountain Area Transit System. Like
Whitfield County, one option is providing more funding more general public trips to meet
more local needs (as identified in the rural demand model) and potential for expansion of
contracted human service trips would be explored. Gordon County also exhibits limited
potential need for non-medical related trips outside the County.
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
41
Vanpool options supported by the County should be explored if demand warrants.
Douglas County in Georgia has a well established program that could be modeled.
Douglas County Rideshare is a commuter-oriented service that operates work-trip
vanpools, provides carpool matching assistance, builds and maintains commuter facilities
and participates in transit and public transportation planning and marketing. The Douglas
County Rideshare program also works closely with the Georgia Regional Transportation
Authority (GRTA), which provides express bus service for Douglas County.
OPTIONS FOR BARTOW COUNTY
Not unlike the alternatives for the other counties, Bartow County Transit could provide
more public trips to address the unmet needs identified using the demand model, if
funding was provided, and it could expand to serve more contracted human service trips
if the human service agencies had the funding. It could also address potential needs for
trips outside of the County. Analysis earlier in the report validates future potential for local
route-deviation service in Cartersville – sufficient population density along with a number
of trip generators. Similar to Gordon County, Bartow County should explore administrative
support for vanpool options if demand warrants (see example in Douglas County). Finally,
future potential for extension of GRTA-type express bus service from Cartersville to Atlanta
should be examined. This would require a park and ride facility to group demand.
OPTIONS FOR THE REGION
Though each county has specific needs pertinent solely to that jurisdiction, there are some
regional service options that would benefit from the economies of scale of a regional
approach. To address the regions’ commuters, a regional ride-sharing agency to serve all
four counties could be designed. This would be comparable to the Douglas County
program, but it could serve commuters in all four counties and would spread the
administrative costs over a larger base of trips. Such an agency could also be a potential
focus for initiatives such as Job Access Reverse Commute (JARC) for low-income workers.
JARC is a discretionary grant program of the Federal Transit Administration (FTA) that
provides funds for projects oriented to provide employment transportation, particularly for
low-income workers. In Georgia it is administered by the Georgia Department of
Transportation (GDOT).
A recent national trend is the advent of Regional Mobility Managers. An individual or
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
42
agency would be hired to maintain inventory of services in the region. They would also
be responsible for developing arrangements between existing operators to provide out-of
-county or out-of-region trips. Under their purview they could administer a regional
ridesharing program that would serve each county and trips to Atlanta and
Chattanooga. Funding for the administrative costs of a Mobility Manager might be
obtained through another FTA program called New Freedom, also administered by the
GDOT.
A more basic approach for regional transportation could be enhanced communication
between existing operators for out-of-county or out-of-region trip arrangements. Options
to facilitate this include:
• Developing a procedure for scheduled transfers of riders between systems at the
County line (including processes for recording and billing for such trips), or
• Developing a Memorandum of Understanding (MOU) among providers for
reciprocal services (e.g. Whitfield takes passengers to Catoosa, Catoosa brings
them back), including any needed agreements regarding the netting of costs and
reporting, or
• Developing contracts for specific long-distance trips both ways (e.g. Gordon picks
up Bartow passengers on the way to Marietta, Bartow pays for those trips).
A Regional Mobility Manager could work with the four systems to develop such
arrangements, and then take on the role of brokering trip requests for regional trips to the
appropriate provider(s), and making needed arrangements for cost accounting and
billing (or fare collection).
The final regional option that this study explored is to develop a Regional Provider. There
are two potential alternatives to manage this approach. The first could be an “overlay”
provider to provide cross-county or out-of-region trips solely. Both human service and
commuter trips would be operated. The second alternative could be a regional system
replacing the local county systems with one system. This could potentially lead to a
provider offering a single regional scheduling/dispatch system.
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
43
Based on the identified commuter patterns which show that most work trips are internal to
each county, with the major need for regional work trips from Catoosa to Chattanooga
and Bartow to Cobb and Fulton, and the fact that each of the counties has its own major
medical facility and human service destinations, the potential organizational difficulties,
capital and operating costs of a separate regional system did not seem warranted at this
time. Most of the operating funding for the existing Section 5311 system is provided by
the Georgia Department of Human Services (DHS) Coordinated Transportation program
which has separate contracts for service in each of the four counties, and the operators
did not identify significant unmet needs for regional trips or significant administrative
benefits for a restructuring of the contract administration for these four counties (which
are only a portion of the 15 county DHS regional coordinated structure). Creating a new
four-county contractor would require significant restructuring of existing program
arrangements to separate them from the rest of the region, with little apparent benefit. At
the same time there is an unsubsidized private firm, Groome Transportation, offering
frequent service in the I-75 corridor from Atlanta to Chattanooga that could be utilized by
persons needing the occasional trip. Groome primarily serves an airport market, but it
requires reservations and is willing to serve (at least some) alternative destinations (such as
major hospitals) upon request. For these reasons development of a new regional provider
was not explored further in this study.
Summary
The main issues to consider in comparing the service options are as follows:
• Each option covers the majority of physical origins and destinations that have been
identified as major trip generators.
• The main differences between alternatives involves whether riders would have one-
seat rides from residential areas to certain destinations, or if riders would need to
transfer to another provider.
• Options would be contingent upon each county’s preference in terms of their roles
and responsibilities in providing public transportation.
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
44
• Funding availability at the local, state and federal levels is limited at this time, and
most of the options described would require additional local match funding and or
organizational changes.
These options are meant to be a starting point from which the NWGRC can support future
grant applications and planning efforts to improve existing services, enhance
coordination, or develop new transit services. If and when funding becomes available,
planners and decision-makers may consider these as a menu of transit service
improvements that have been identified as potential options to address the identified
local and regional needs. Certain options may complement each other and fit the needs
of a particular city or county better, and one might develop additional alternatives from
different combinations of the proposed options.
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
45
TASK V. ORANIZATIONAL AND FUNDING OPTIONS
The purpose of this section is to develop and present organizational issues and funding
options that could be used to implement public transit service in the study areas’ four
counties. The previous sections established potential needs for such a service, and
established that there are a number of possible service options. This section begins with
an analysis of the funding resources available within the region. Following the funding
analysis, information is provided regarding the general organizational issues and local
requirements associated with these service options. Key policy questions have yet to be
decided by the study. These questions are presented, requiring resolutions prior to the
next steps in the possible implementation of new service.
Funding Resources
This study presents a number of different conceptual service options. It is likely that the
final choices will be made in a more iterative fashion if this effort progresses to the point of
developing a specific proposed operating budget. Under the S.5311 program, federal
transit funds are potentially available to fund up to 50% of the net operating deficit. The
net operating deficit is calculated by taking the total operating cost (which in the GDOT
program implementation includes both administrative and operating expenses), and
subtracting farebox revenue. Farebox revenue is the cash that general public riders pay
to ride the system. GDOT imposes a performance standard that requires that the farebox
revenue equal at least 10% of the total operating expense. It enforces this requirement by
taking the 10%t “off the top” in the grant application budget development. Thus GDOT
assumes that the farebox revenue will be either 10% or the actual, whichever is higher. If
the actual is less than 10%, then the applicant must make up the difference with local
cash. From the state perspective, this provides local applicants with some incentive to
attract enough general public riders and charge enough in fares to obtain the 10% from
them. So, the net operating deficit is the total operating expense minus either 10%, or the
actual farebox revenue, whichever is greater. In our examples we have assumed the 10%
level.
This leaves 90% of the operating cost to be funded from other sources. Some portion of it
will be funded with S.5311 dollars at the ratio described above: up to 50% of the net
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
46
operating deficit. However, there may be other sources of income for the system if it
provides services to other entities. Under the S.5311 guidelines, S.5311 systems can count
income from providing transportation to human service agency clients as either revenue
or match. The expenses of providing this service are included in the system operating
budget. Under the current GDOT S.5311 program, this additional income to the transit
operation for providing agency transportation is considered “Purchase of Service”, or
POS. Currently, all POS for Georgia S.5311 systems is obtained under contracts with
human service agencies. The income from the contract with the human service agency
can be considered as either local operating match, or as revenue.
CAPITAL FUNDING
Federal capital funding, including S.5311 funding, can pay up to 80% of the cost of such
capital items. In Georgia, GDOT matches this federal amount with 15% state funding, so
the local cash contribution for vehicles is only 5%. Under the current GDOT S.5311
program, facilities are not considered an eligible expense, only buses, computers, and
incidental capital. Because these services have always been demand-responsive, only
recently has the state permitted the purchase of fareboxes under this program. Typically
GDOT does the vehicle procurement for all S.5311 systems under a statewide contract,
and the local systems simply select the type of vehicle desired from those available under
the state contract. In all of the cases presented here there is an assumption that the
vehicles for the City/County services would be obtained under the GDOT state contract
at the 95% federal/state match.
FUNDING ISSUES AND STRATEGIES
Transit is funded with a combination of limited user fees, federal funds from several sources
(all requiring local match dollars), and local government funding of the match. As noted
above, human service contract income can be used as either match or revenue under
Georgia’s S.5311 program. The state of Georgia does not provide any operating
assistance, but does provide 10% (of the local 20%) for vehicle capital. Table 7 displays
the current S.5311 operating cost for the four counties in the region and their associated
federal and local funds.
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
47
Table 7: FTA Section 5311 Rural Public Transportation
OTHER FEDERAL SOURCES
Other federal funding sources have been discussed as a means of supporting the service
options. Some of these funding programs are competitive discretionary programs. Thus
the continuity of the funding is not assured, but they can be a good source of funding for
capital (vehicles, park and ride lots, etc.) or to initiate service and demonstrate a
program’s potential. However, if used for operating assistance or administrative costs
additional local funding is likely to be needed to maintain the program once the initial
grant period has ended. Other federal sources include:
• Congestion Mitigation and Air Quality (CMAQ) is a potential funding source in
non-attainment areas in the region (Catoosa and Bartow Counties). This program
could be used to fund capital that reduces single-occupant auto use (park and
ride lots, transit vehicles, etc.). It can also be used to fund operating deficits on
commuter services for up to three years.
• Federal Transit Administration (FTA) Section 5307 transit funding for small urban ar-
eas (currently Dalton-Whitfield is eligible) is a second potential funding source. This
program allows eligible recipients the opportunity to use funds to buy vehicles (or
other capital including preventive maintenance) up to 80% of costs, or to fund up
to 50% of their net operating deficit. The Fiscal Year 2010 apportionment for Dalton
-Whitfield is $255,346, though there may be unspent previous apportionments
available as well. GDOT administers this program in Georgia.
County
Total
Operating Cost
Farebox Revenue (at 10%)*
Net
Operating Deficit
Federal Share
(at 50%)
Current Local
Match (County)
Bartow County
$473,710 $47,371 $426,339 $213,170 $123,170 $90,000
Catoosa County
$449,936 $44,994 $404,942 $202,471 $172,471 $30,000
Gordon County
$187,070 $18,707 $168,363 $84,182 $54,182 $30,000
Whitfield County
$417,970 $41,797 $376,173 $188,087 $15,287 $172,800
Current DHS Coordinated
Funding
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
48
• Federal Transit Administration (FTA) Section 5307 formula transit funding for large
urban areas (currently the portion of Catoosa County within the Chattanooga
Urbanized Area is eligible). This federal funding source can be used for capital at
up to 80% federal share. It is allocated directly to a recipient in the Urbanized Area,
and the amount is based on a formula. CARTA, Chattanooga’s transit system, is
the designated recipient for the area, so it is receiving funding in part based on the
inclusion of Catoosa’s population in the formula allocation. However, there are no
CARTA services in Catoosa County.
• FTA Section 5316 (JARC) and Section 5317 (New Freedom) Programs. These two
programs are more supportive of human service transportation. JARC funds can be
used for employment transportation and related trips (to training, day-care, etc.).
New Freedom funds can be used for transportation service above and beyond
that required by the American with Disabilities Act (ADA). Both can be used for
capital, operating, as well as funding of Mobility Managers. Currently New
Freedom is being used in the region to provide additional trips on the DHS
coordinated system by purchase of additional trips (including trips on Section 5311
providers).
• Rideshare receives funding from several different sources. Typically, commuters
who participate in the vanpool program pay a monthly fare that covers costs such
as fuel, maintenance and repairs, insurance and van replacement. Douglas
County, for example, provides funding for administrative costs, and many other
county departments, such as Finance, Purchasing and Personnel, assist Rideshare.
Douglas County, the Federal Transit Administration and Georgia Department of
Transportation share costs of capital projects. Passenger fares will make up about
62% of that amount, with the remainder coming from Douglas County funds.
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
49
Organizational Issues
To this point it has been assumed that any public transit system developed or modified
would be funded in part with federal transit operating and capital funding from the FTA
S.5311 program of transit assistance for rural areas, which is already utilized in each of the
four counties in the study area. However, to implement many of the proposed options
there would need to be organizational changes or recognition of organizational barriers.
NEED FOR CATOOSA COUNTY TO JOIN CHATTANOOGA AREA REGIONAL TRANS-
PORTATION AUTHORITY (CARTA) TO ACCESS FTA FUNDING
Much of Catoosa County is part of the Chattanooga Urbanized Area. This is significant
since Federal transit funds are apportioned to that region which includes Catoosa,
however Catoosa County is not part of CARTA. In order to access this funding source,
which could be used to fund the proposed transit service from Catoosa to Chattanooga,
Catoosa County would have to join CARTA, which could entail a County commitment to
fund an allocated portion of CARTA’s local costs. If Catoosa were to gain enough
service, this could potentially be worthwhile, and should be investigated to determine
how the transit agency would allocate non-operating and non-capital costs
(administrative) to its members. Not all the eligible Tennessee counties have joined
CARTA, and it may be that there are allocation issues that discourage membership of
suburban communities that may be receiving limited services.
LACK OF A REGIONAL RIDESHARE PROGRAM FOR THE CHATTANOOGA AREA
Ridesharing for commuters in the Atlanta region is well established, with many resources
available to tap into. Bartow County is just outside the Atlanta region and is not a
member jurisdiction of GRTA. However, it is covered by Ridesmart ridesharing program for
the Atlanta region. Unfortunately this is not the case to the north around Chattanooga.
To date, there is no Chattanooga area ridesharing program (or broader Transportation
Demand Management (TDM) program) to support the development of carpools and/or
vanpools (or other transportation options), particularly for commuters into the
Chattanooga area. This lack of an organization typically found in many urban areas
means that any effort to develop ridesharing from the four Georgia counties in the study
area would require a new organizational structure. That is the reason that the Douglas
County program model has been suggested, as it is an example of a rural/exurban
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
50
County that took on the responsibility of addressing the commuter needs of residents in a
cost-effective, responsive manner (not depending on a distant regional organization).
EXISTING DHS COORDINATED TRANSPORTATION ARRANGEMENTS
Several of the potential options that involve creating a regional transit system serving all
four counties (either as an overlay for regional service or absorbing the four County
systems) would require dismantling the existing contract/funding structure of the DHS
Coordinated Transportation program in DHS Region I. All four of the counties in the study
area are part of DHS Region I, which includes fifteen counties altogether. Separating
these four counties from the DHS region to carve-out a new regional provider would
involve restructuring the layers of program contracts and subcontracts already in place,
many of which involve agencies that service multiple counties outside this four-county
study area. In the absence of identified inefficiencies or problems with the current
coordinated structure, and without significant needs for regional trips (crossing county
lines), the major justification for such a reorganization might be achieving economies of
scale (spreading administrative costs over four systems, rather than each having its own).
However, it is possible that a similar or greater loss of scale would occur by undoing the
existing arrangements. Finally, as can be seen above, the four counties in the study area
all contribute local funding for match for their systems. Whether they would continue to
provide that level of match for a new separate system is questionable, though it has
happened in similar situations elsewhere. For all these reasons, options calling for a new
regional system were not developed at this time.
MULTIPLE REGIONAL PLANNING ORGANIZATIONS
This region is now served by three separate regional planning organizations that include
transportation as a planning function: one for the Chattanooga Urbanized Area, one for
the Dalton-Whitfield Urbanized Area, and one for the nonurbanized portions of Catoosa
plus Gordon and Bartow. This situation is linked to funding, but it means that any effort to
develop or address transportation needs across the region will be more complicated than
if a single planning organization could address the issue.
Implementation Strategies
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
51
Implementation of the strategies presented previously is obviously dependent on the
actions of numerous organizations over a period of several years. So an implementation
plan that specifies in detail who should do what and when, is not going to be realistic.
However, it is possible to lay out a basic menu of the service options, the likely
implementation party, the possible funding source, and the approximate sequence and
timing that might be required. Table 8 presents a summary of these elements and the
likely actors and funding source. It is recognized that the current economic situation is
having major effects on the ability of state and local governments to address new issues,
and that implementation of any of these projects will be dependent on the ability to
obtain funding. However, most of these elements are potentially funded jointly by users,
federal funds, and limited local match. Also, this plan has been developed to build upon
services in place, assist persons needing transportation with information, and grow
transportation services incrementally in response to demand when it is possible. A key
element in initiating this plan is the development of a Mobility Management program for
the region, and that is discussed below.
MOBILITY MANAGEMENT
This project has reviewed the need for public transportation services in the four-county
region, provided an inventory of existing services, identified near-term unmet needs, and
developed options for meeting these needs using identified funding sources. However,
this region, although linked by I-75, has needs that are more local to each area, and are
potentially addressed by different funding sources. Maintaining information on existing
resources, developing regional rideshare options, promoting additional funding for transit,
and coordinating existing providers to meet regional trip needs are all functions that
could be performed by a regional transportation demand management program.
Currently there is no single organization that could be charged with these functions. So,
one possible implementation option is to apply for funding under the New Freedom
program for a Mobility Manager, to be housed initially in a regional planning agency.
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
Proj
ect D
escr
iptio
n Lo
catio
n Pa
rtici
patin
g A
genc
ies
Likel
y
App
lican
t/O
pera
tor
Fund
ing
Sour
ces
Estim
ated
Cos
ts
Estim
ated
A
dditi
onal
Ri
ders
hip
Fixed
-Rou
te, F
ixed
-Sc
hedu
le U
rban
Tra
n-sit
serv
ice
from
For
t O
glet
horp
e to
C
hatta
noog
a
Cat
oosa
C
ount
y,
Cha
ttano
oga
CA
RTA
, Ca-
toos
a C
ount
y,
Cha
ttano
oga
MPO
CA
RTA
Ex
istin
g FT
A S
.530
7/9
fund
ing
for
Cha
ttano
oga
Ur
bani
zed
Are
a, l
oca
l sh
are
for o
pera
ting
from
C
atoo
sa C
ount
y
Ann
ual O
pera
ting
Cos
ts: $
366,
840,
Lo
cal S
hare
of
thre
e tra
nsit
coa
ches
: $30
0,00
0
50,0
00-
65,0
00
Peak
-Hou
r Com
mut
er
Expr
ess B
us S
ervi
ce
from
Rin
ggol
d,
Geo
rgia
to d
ownt
own
Cha
ttano
oga
, via
I-75
Cat
oosa
C
ount
y,
Cha
ttano
oga
CA
RTA
, Ca-
toos
a C
ount
y,
Cha
ttano
oga
MPO
CA
RTA
Ex
istin
g FT
A S
.530
7/9
fund
ing
for
Cha
ttano
oga
Ur
bani
zed
Are
a, l
oca
l sh
are
for o
pera
ting
from
C
atoo
sa C
ount
y
Ann
ual O
pera
ting
Cos
ts: $
183,
000,
Lo
cal S
hare
of t
wo
trans
it co
ache
s: $2
00,0
00
25,0
00-
38,0
00
Park
and
Rid
e Lo
t at
Ring
gold
C
atoo
sa
Cou
nty
CA
RTA
, Ca-
toos
a C
ount
y,
Cha
ttano
oga
MPO
, GD
OT
GD
OT
CM
AQ
, Exis
ting
FTA
S.
5307
/9 fu
ndin
g fo
r C
hatta
noog
a Ur
ban-
ized
Are
a, h
ighw
ay
fund
ing
Estim
ated
Cap
ital
Cos
t for
100
spac
e lo
t (ex
clus
ive
of
land
) at $
10,0
00
per s
pace
: $1
,000
,000
25,0
00-
38,0
00
Expa
nded
gen
era
l pu
blic
rura
l tra
nsit
ser-
vice
by
Cat
oosa
C
ount
y Tr
ans-
Aid
Cat
oosa
C
ount
y C
atoo
sa
Cou
nty,
G
DO
T, D
HS
Cat
oosa
C
ount
y Tr
ans-
Aid
FTA
/GD
OT
S. 5
311
Loca
l Ope
ratin
g Sh
are
for 1
3,10
2 ad
ditio
nal t
rips a
t $2
6.26
ea
ch:
$188
,000
; plu
s lo-
cal s
hare
of
vehi
-cl
e ca
pita
l for
two
smal
l bus
es:
$18,
000
13,0
00
Tab
le 8
: Im
ple
me
nta
tio
n T
ab
le
52
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
53
Impl
emen
tatio
n of
Lo
cal O
ptio
n 4
from
th
e Pu
blic
Tra
nspo
rta-
tion
Nee
ds S
tudy
, in-
clud
es lo
cal f
ixed
-ro
ute
in D
alto
n, A
DA
se
rvic
e, a
nd c
ount
y-w
ide
dem
and
re
spon
se, o
r
Whi
tfiel
d C
ount
y W
hitfi
eld
Cou
nty,
City
of
Dal
ton,
G
DO
T,
Dal
ton-
Whi
tfiel
d M
PO
New
, or
Whi
tfiel
d C
ount
y Tr
ansit
Se
rvic
e
FTA
/GD
OT
S.53
07
and
S.5
311
Fund
ing
Ann
ual T
otal
Ope
rat-
ing
Cos
t: $1
,060
,000
(le
ss fe
dera
l ope
ratin
g fu
nds)
; Ini
tial c
apita
l co
st:
$1,6
10,0
00—
loca
l sha
re $
241,
500
220,
000
Expa
nded
rura
l ge
nera
l pub
lic tr
ansit
by
Whi
tfiel
d C
ount
y Tr
ansit
Ser
vice
(if n
o ad
diti
onal
Dal
ton
ser-
vice
)
Whi
tfiel
d C
ount
y W
hitfi
eld
Cou
nty,
G
DO
T
Whi
tfiel
d C
ount
y Tr
ansit
Se
rvic
e
FTA
/GD
OT
S.53
11
Fund
ing
Loca
l Ope
ratin
g Sh
are
for 3
0,00
0 a
ddi-
tiona
l trip
s at $
25 p
er
trip
(est
imat
ed)
413,
000;
plu
s loc
al
sha
re fo
r veh
icle
ca
pi-
tal f
or se
ven
smal
l b
uses
: $63
,000
30,0
00
Park
and
Rid
e Lo
t at
Dal
ton
Whi
tfiel
d C
ount
y W
hitfi
eld
Cou
nty,
D
alto
n-W
hitfi
eld
MPO
, GD
OT
GD
OT
high
way
fund
ing
Estim
ated
Cap
ital
Cos
t for
50
spac
e lo
t (e
xclu
sive
of la
nd) a
t $1
0,00
0 pe
r sp
ace
: $5
0,00
00
6,40
0
Expa
nded
rura
l ge
nera
l pub
lic tr
ansit
by
Gor
don
Cou
nty
Tran
sit
Gor
don
C
ount
y G
ord
on
Cou
nty,
G
DO
T
Gor
don
C
ount
y Tr
ansit
(M
ount
ain
Are
a
Tran
sit
Syst
em)
FTA
/GD
OT
S.53
11
Fund
ing
Loca
l Ope
ratin
g Sh
are
for 1
2,00
0 a
ddi-
tiona
l trip
s at $
30 p
er
trip
$198
,000
; plu
s lo-
cal s
hare
for v
ehic
le
capi
tal f
or th
ree
smal
l b
uses
: $27
,000
12,0
00
Tab
le 8
: Im
ple
me
nta
tio
n T
ab
le,
co
n’t
.
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
54
Expa
nded
rura
l gen
-er
al p
ublic
tran
sit b
y Ba
rtow
Cou
nty
Tran
sit
Barto
w C
ount
y Ba
rtow
C
ount
y,
GD
OT
Barto
w C
ount
y Tr
ansit
FT
A/G
DO
T S.
5311
Fu
ndin
g
Loca
l Ope
ratin
g Sh
are
for 2
5,00
0
addi
tiona
l trip
s at
$27.
50 p
er tr
ip-
$378
,125
; plu
s loc
al
sha
re fo
r veh
icle
ca
pita
l for
six
smal
l b
uses
: $54
,000
25,0
00
Park
and
Rid
e Lo
t at
Car
tersv
ille
Barto
w C
ount
y G
RTA
, Bar
tow
C
ount
y, A
RC
or fu
ture
M
PO, G
DO
T
GD
OT
CM
AQ
, hi
ghw
ay
fund
ing
Estim
ated
Cap
ital
Cos
t for
100
spac
e lo
t (ex
clus
ive
of
land
) at $
10,0
00 p
er
spa
ce: $
1,00
0,00
0
25,0
00-
38,0
00
Regi
onal
Mob
ility
M
anag
emen
t/Ri
des
hare
Pro
gram
All f
our c
ount
ies,
Cha
ttano
oga
, C
obb,
Fu
lton
All f
our c
oun-
ties,
citie
s, th
ree
MPO
’s
New
age
ncy,
or
hous
ed in
MPO
(p
erha
ps N
WG
RC)
CM
AQ
, JA
RC, N
ew
Free
dom
$120
,000
per
yea
r fo
r ful
l pro
gram
im-
ple
men
tatio
n
Dep
end
s on
ut
ilizat
ion
Tab
le 8
: Im
ple
me
nta
tio
n T
ab
le,
co
n’t
.
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
55
This Mobility Manager would be charged with creating a new transportation demand
management organization for the region, coordinating efforts with all three regional
planning organizations, to develop a regional rideshare program, initiate planning for park
and ride lots and other facilities, promoting transit development and funding to
implement the programs with available funding. Such a program could be modeled on
the Douglas County rideshare program, but in this case also including the role of
supporting transportation services for the elderly and disabled, and transportation options
for employment for the low-income workers. Ideally it would also be supported by
additional funds for rideshare programs generally. This Mobility Manager could also
involve the private for-profit carriers (local taxis, Groome Transportation, the Greyhound
agency), providing information about their services to users in the region and directing
trips best served by them to those operators. Other transportation resources, including
volunteer driver programs, or transportation provided by faith-based organizations would
be identified, and the Mobility Manager would be able to link persons with mobility needs
to any of these options if it appeared that the need would best be met by something
other than the current transportation providers. With an advocacy role, such an
organization might well be able to assist with efforts to initiate local transit in Dalton, or
implement transit services in Catoosa, by providing information, finding contract
operators, and developing public interest.
In the near term these efforts could be initiated by the Northwest Georgia Regional
Commission, and it potentially could house the Mobility Management program. Table 9
presents a draft budget for such a program.
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
56
Table 9: Mobility Manager’s Projected Budget
IMPLEMENTATION TIMETABLE
Because of the fact that this plan involves many separate decision-making and funding
entities, and the uncertainties regarding funding, only a generalized phasing of the overall
schedule can be provided at this time. A tentative timeline might be:
• FY 2011 or 2012:
− Mobility Management/Rideshare program decisions made, grant applications.
− Dalton-Whitfield decisions on implementation of fixed-route transit plans, grant
applications, organizational structure.
− County decisions regarding incremental expansion for general public trips on
Section 5311 systems as part of annual grant application process.
− Chattanooga-Hamilton County/North Georgia TPO/CARTA planning work on
routing, scheduling and refining cost estimates for a Fort Oglethorpe fixed-route.
− Public presentations and outreach to see if there is public interest and support.
• FY 2012-13:
− Start-up of Mobility Management/Rideshare office—hiring, development of
matching programs, database of providers, initial activities including working
out participation agreements with existing providers and human service
agencies.
Project Element Description / Equipment
Cost Local Share (20%)
Federal Share (80%)
Source of Funding
Mobility Manager (12 months salary and benefits @ 25%)
$65,000 $13,000 $52,000
Communications: Blackberry (or similar) and data plan; Landline, 800 number
for regional coverage
$8,500 $1,700 $6,800
Workstation: Desk, Chair, Laptop, Printer, Digital Camera, Landline /
Telephone
$5,500 $1,000 $4,000
Marketing Materials: Brochures, posters, website
$25,000 $5,000 $20,000
Training and Travel Expenses $5,000 $1,000 $4,000
Totals: $108,500 $21,700 $86,800 Local Match Counties
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
57
− County decisions regarding incremental expansion for general public trips on
Section 5311 systems as part of annual grant application process.
− Initiate implementation for Dalton-Whitfield expansion—order vehicles, finalize
routes and schedules.
− Presentation of plans for transit expansion in Catoosa County to local
decision-makers and CARTA Board for consideration, discussion.
• FY 2014-2015:
− Development of JARC vanpool services by Mobility Manager/Rideshare
program.
− Promotion and growth of rideshare options by Mobility Manager/Rideshare
program (potential expansion to cover Chattanooga area?)
− County decisions regarding incremental expansion for general public trips on
Section 5311 systems as part of annual grant application process.
− Initiation of services for Dalton-Whitfield.
− Planning for development of route deviation services or fixed-routes in
Cartersville (linked with possible MPO designation following 2010 Census)
− Decision on initial transit route in Catoosa, implementation steps if needed to
include vehicle purchase, location of stops, marketing.
− Chattanooga-Hamilton County/North Georgia TPO/CARTA planning work on
routing, scheduling and refining cost estimates for commuter express service
from Ringgold area to Chattanooga. Public presentations and outreach to see
if there is public interest and support. Assessment of potential interim and final
park and ride locations.
• FY 2015-2016:
− Planning work on additional park and ride locations in Cartersville and Dalton
area to be supported by growth of ridesharing. Mobility Manager/Rideshare
program to work with GDOT.
− Evaluation of GRTA expansion to Cartersville, linked to park and ride availability.
− Mobility Manager/Rideshare program to transition funding to ongoing sources.
− Presentation of plans for Ringgold commuter express transit expansion in
Catoosa County to local decision-makers and CARTA Board for consideration,
discussion.
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
58
• FY 2017-2018:
− Construction of new park and ride facilities in Cartersville and Dalton.
− If Ringgold commuter express service initiated, using interim park and ride or
construct park and ride lot.
− Update regional transit plan.
The effort to implement the vision included in this plan could be done in five years, or it
could spread over a decade or longer. Parts of it may occur quickly, particularly where
there has already been planning and public discussion and there is some funding
available (such as Dalton and Whitfield County). Much depends on economic recovery,
and it is likely that public interest and support would increase dramatically if the cost of
vehicle fuel rises in real terms.
ADDITIONAL LOCAL INPUT WILL BE NEEDED
The most prominent issue requiring local input is that all additional services will require
local match from the Counties (or Cities), as well as additional state and federal funding.
An initial effort to present this vision to local decision-makers might focus on getting
agreement on a vision for non-auto transportation in the region, rather than on funding for
specific projects. This role might well be taken on by the Mobility Manager/Ridesharing
agency. Depending upon the options that move forward, local buy-in to create or
modify existing organizational arrangements is a likely requirement. Finally, continued
coordination between the DHS Coordinated system and the S.5311 providers is critical.
Clearly the final decisions regarding the institutional roles of the major stakeholders remain
to be worked out. It is likely that any funding plan will also affect the final organizational
structure as well.
Conclusion
Following a review of unmet needs and opportunities for improved public transportation in
the region, a number of specific projects have been identified for implementation by the
different jurisdictions and agencies. Needs for regional commuter trips would be ad-
dressed by the creation of a regional Mobility Management/Rideshare program, which
would work with existing providers to meet gaps in regional connectivity, while supporting
the development of car- and vanpool operations to meet longer-distance work trip
TRANSIT DEVELOPMENT AND COORDINATION PLAN NORTHWEST GEORGIA REGIONAL COMMISSION
59
needs. At the local level there is a need for additional public transportation, with
fixed-route transit services in specific locations in Catoosa County, the City of Dalton, and
Whitfield County.
This plan provides a vision of improved transportation throughout the region, and it
includes plans for both the organizational and physical infrastructure to begin that
improvement. Subsequent development will depend on external events (economic
recovery, population growth, energy prices), and the success of the projects listed in this
plan. Larger and more costly transit visions for the region are possible, but they are not
likely without starting at the beginning to build demand and public support. This plan
provides a place to start.