NY-Sun Overview
Houtan MoaveniDeputy Director, NY-Sun
NYS Interconnection Ombudsman
![Page 2: NY-Sun Overview - Hudson Valley...Company 0-50 50-300 300-1000 1000-2000 2000-5000 Total Projects Total kW ... RGE 70 15 4 38 4 131 89,292 PSEG 662 5 - 1 - 668 7,075 ... • NYSERDA](https://reader034.vdocument.in/reader034/viewer/2022042910/5f3ea725963de8766720c093/html5/thumbnails/2.jpg)
2
Agenda• Reforming the Energy Vision (REV)/ Clean Energy
Standards (CES)
• NY-Sun Overview
– MW Block Incentive Program
– Solar Market Acceleration Program
• Interconnection Ombudsmen services
• Local government support
• Phase 1 Order--Value of Distributed Energy Resources
• Q&A
![Page 3: NY-Sun Overview - Hudson Valley...Company 0-50 50-300 300-1000 1000-2000 2000-5000 Total Projects Total kW ... RGE 70 15 4 38 4 131 89,292 PSEG 662 5 - 1 - 668 7,075 ... • NYSERDA](https://reader034.vdocument.in/reader034/viewer/2022042910/5f3ea725963de8766720c093/html5/thumbnails/3.jpg)
3
Reforming the Energy Vision (REV)
Governor Cuomo’s strategy to build a clean, resilient and affordable energy
system for all New Yorkers
Clean Energy Standard
New York will generate 50 percent of its electricity from renewable sources
by 2030
![Page 4: NY-Sun Overview - Hudson Valley...Company 0-50 50-300 300-1000 1000-2000 2000-5000 Total Projects Total kW ... RGE 70 15 4 38 4 131 89,292 PSEG 662 5 - 1 - 668 7,075 ... • NYSERDA](https://reader034.vdocument.in/reader034/viewer/2022042910/5f3ea725963de8766720c093/html5/thumbnails/4.jpg)
4
NY-Sun Initiative
Reduce Soft Costs
Self-
Sustaining
Market
• Significantly expand installed
solar capacity
• Attract private investment
• Enable sustainable
development of a robust
industry
• Create well-paying skilled jobs
• Improve the reliability of the
electric grid
• Reduce air pollution
• Make solar available to all
New Yorkers
Statewide
Goal of 3 GW
by 2023
Approx. $1 Billion Total
Budget
![Page 5: NY-Sun Overview - Hudson Valley...Company 0-50 50-300 300-1000 1000-2000 2000-5000 Total Projects Total kW ... RGE 70 15 4 38 4 131 89,292 PSEG 662 5 - 1 - 668 7,075 ... • NYSERDA](https://reader034.vdocument.in/reader034/viewer/2022042910/5f3ea725963de8766720c093/html5/thumbnails/5.jpg)
5
NY-Sun Incentive Program: MW Block
![Page 6: NY-Sun Overview - Hudson Valley...Company 0-50 50-300 300-1000 1000-2000 2000-5000 Total Projects Total kW ... RGE 70 15 4 38 4 131 89,292 PSEG 662 5 - 1 - 668 7,075 ... • NYSERDA](https://reader034.vdocument.in/reader034/viewer/2022042910/5f3ea725963de8766720c093/html5/thumbnails/6.jpg)
6
NY-Sun Incentive Program: MW BlockCapacity-based cash incentive available to eligible contractors.
Three Regions:
▪ Con Edison (New York City and South Westchester)
▪ Long Island (complete)
▪ Upstate (Rest- of-State or ROS)
Three Sectors:
▪ Residential: up to 25 kW
▪ Small Non-residential: up to 200 kW
▪ Commercial/Industrial: >200 kW
Incentive is available through Dec 29, 2023, or until funds are exhausted.
![Page 7: NY-Sun Overview - Hudson Valley...Company 0-50 50-300 300-1000 1000-2000 2000-5000 Total Projects Total kW ... RGE 70 15 4 38 4 131 89,292 PSEG 662 5 - 1 - 668 7,075 ... • NYSERDA](https://reader034.vdocument.in/reader034/viewer/2022042910/5f3ea725963de8766720c093/html5/thumbnails/7.jpg)
7
$-
$0.10
$0.20
$0.30
$0.40
$0.50
$0.60
$0.70
$0.80
$0.90
$1.00
$1.10
1 51 101 151 201 251
Example: Upstate Residential MW Block Structure
NY-Sun Incentive Program: MW Block
MW
![Page 8: NY-Sun Overview - Hudson Valley...Company 0-50 50-300 300-1000 1000-2000 2000-5000 Total Projects Total kW ... RGE 70 15 4 38 4 131 89,292 PSEG 662 5 - 1 - 668 7,075 ... • NYSERDA](https://reader034.vdocument.in/reader034/viewer/2022042910/5f3ea725963de8766720c093/html5/thumbnails/8.jpg)
8
Res/Small Commercial MW Dashboard
• Incentives step down over time as capacity goals are achieved
• Real-time dashboard provides transparency and predictability
• Incentives move separately per sector and geographic region, based on actual market activity
Data as of 5/5/2017
![Page 9: NY-Sun Overview - Hudson Valley...Company 0-50 50-300 300-1000 1000-2000 2000-5000 Total Projects Total kW ... RGE 70 15 4 38 4 131 89,292 PSEG 662 5 - 1 - 668 7,075 ... • NYSERDA](https://reader034.vdocument.in/reader034/viewer/2022042910/5f3ea725963de8766720c093/html5/thumbnails/9.jpg)
9
Commercial/Industrial MW DashboardData as of 5/5/2017
![Page 10: NY-Sun Overview - Hudson Valley...Company 0-50 50-300 300-1000 1000-2000 2000-5000 Total Projects Total kW ... RGE 70 15 4 38 4 131 89,292 PSEG 662 5 - 1 - 668 7,075 ... • NYSERDA](https://reader034.vdocument.in/reader034/viewer/2022042910/5f3ea725963de8766720c093/html5/thumbnails/10.jpg)
10
Solar Market Accelerations
![Page 11: NY-Sun Overview - Hudson Valley...Company 0-50 50-300 300-1000 1000-2000 2000-5000 Total Projects Total kW ... RGE 70 15 4 38 4 131 89,292 PSEG 662 5 - 1 - 668 7,075 ... • NYSERDA](https://reader034.vdocument.in/reader034/viewer/2022042910/5f3ea725963de8766720c093/html5/thumbnails/11.jpg)
11
Solar Development Obstacles & Solutions
• Interconnection costs and delays➢ Interconnection Ombudspersons
➢ Interconnection Policy Working Group
➢ Interconnection Technical Working Group
• Local government solar adoption➢ NY-Sun Solar Guidebook for Local Governments
➢ Provide technical assistance
![Page 12: NY-Sun Overview - Hudson Valley...Company 0-50 50-300 300-1000 1000-2000 2000-5000 Total Projects Total kW ... RGE 70 15 4 38 4 131 89,292 PSEG 662 5 - 1 - 668 7,075 ... • NYSERDA](https://reader034.vdocument.in/reader034/viewer/2022042910/5f3ea725963de8766720c093/html5/thumbnails/12.jpg)
12
Trend of Interconnection Applications 2010-2016
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
11000
12000
13000
14000
15000
16000
17000
18000
19000
20000
2010 2011 2012 2013 2014 2015 2016
RGE
ORU
NYSEG
NG
CHGE
CENY
Growth Trend
![Page 13: NY-Sun Overview - Hudson Valley...Company 0-50 50-300 300-1000 1000-2000 2000-5000 Total Projects Total kW ... RGE 70 15 4 38 4 131 89,292 PSEG 662 5 - 1 - 668 7,075 ... • NYSERDA](https://reader034.vdocument.in/reader034/viewer/2022042910/5f3ea725963de8766720c093/html5/thumbnails/13.jpg)
13
New York State Interconnection Queue
SIR Inventory Queue: Number of Projects (PV Only) by kW Range as of December 2016
Company 0-50 50-300 300-1000 1000-2000 2000-5000 Total Projects Total kW
National Grid 1,845 247 60 638 - 2,790 1,344,431
Con Edison 2,514 197 55 7 - 2,773 84,670
Central Hudson 575 17 12 372 1 977 750,957
Orange and Rockland 796 12 12 261 1 1,082 534,228
NYSEG 361 38 22 397 5 823 820,047
RGE 70 15 4 38 4 131 89,292
PSEG 662 5 - 1 - 668 7,075
Total 6,823 531 165 1,714 11 9,244 3,630,700
kW Range
![Page 14: NY-Sun Overview - Hudson Valley...Company 0-50 50-300 300-1000 1000-2000 2000-5000 Total Projects Total kW ... RGE 70 15 4 38 4 131 89,292 PSEG 662 5 - 1 - 668 7,075 ... • NYSERDA](https://reader034.vdocument.in/reader034/viewer/2022042910/5f3ea725963de8766720c093/html5/thumbnails/14.jpg)
14
Interconnection Ombudspersons
• NYSERDA and DPS have a NYS Interconnection Ombudsperson
• Each utility has created an Interconnection Ombudsperson
• Assist DG customer/developers with complaints, questions, or delays on
a project by project basis.
• Assist DG customer/developers, primarily in solar PV, better understand
the process and timeline for interconnection on the electrical system per
the State’s Standardized Interconnection Requirements (SIR).
• Publish queue information and develop a reporting mechanism
![Page 15: NY-Sun Overview - Hudson Valley...Company 0-50 50-300 300-1000 1000-2000 2000-5000 Total Projects Total kW ... RGE 70 15 4 38 4 131 89,292 PSEG 662 5 - 1 - 668 7,075 ... • NYSERDA](https://reader034.vdocument.in/reader034/viewer/2022042910/5f3ea725963de8766720c093/html5/thumbnails/15.jpg)
15
Interconnection Ombudspersons
• NYSERDA and DPS have a NYS Interconnection Ombudsperson
• Each utility has created an Interconnection Ombudsperson
• Assist DG customer/developers with complaints, questions, or delays on
a project by project basis
• Assist DG customer/developers, primarily in solar PV, better understand
the process and timeline for interconnection on the electrical system per
the State’s Standardized Interconnection Requirements (SIR)
• Publish queue information and develop a reporting mechanism
![Page 16: NY-Sun Overview - Hudson Valley...Company 0-50 50-300 300-1000 1000-2000 2000-5000 Total Projects Total kW ... RGE 70 15 4 38 4 131 89,292 PSEG 662 5 - 1 - 668 7,075 ... • NYSERDA](https://reader034.vdocument.in/reader034/viewer/2022042910/5f3ea725963de8766720c093/html5/thumbnails/16.jpg)
16
DER System Indicator Map• Illustrate the areas/circuits where DERs have a greater likelihood of not
being easily accommodated on the distribution system
![Page 17: NY-Sun Overview - Hudson Valley...Company 0-50 50-300 300-1000 1000-2000 2000-5000 Total Projects Total kW ... RGE 70 15 4 38 4 131 89,292 PSEG 662 5 - 1 - 668 7,075 ... • NYSERDA](https://reader034.vdocument.in/reader034/viewer/2022042910/5f3ea725963de8766720c093/html5/thumbnails/17.jpg)
17
Interconnection Policy Working Group
• Goal: develop consensus-based solutions and recommendations on policy issues
related to the interconnection of DG
• Includes representatives from utilities, DG developers, trade associations, non-
governmental organizations, and customer representatives
• Developed a queue management proposal– Manage the backlog of applications
– Interim cost sharing methodology
• Developed a Monetary Remote Net Metering Grandfathering proposal– Extend in-service deadline for certain projects
• More information on IPWG at: http://www3.dps.ny.gov/W/PSCWeb.nsf/All/0D7596DBBEF0380885257FD90048ADFA?OpenDocument
![Page 18: NY-Sun Overview - Hudson Valley...Company 0-50 50-300 300-1000 1000-2000 2000-5000 Total Projects Total kW ... RGE 70 15 4 38 4 131 89,292 PSEG 662 5 - 1 - 668 7,075 ... • NYSERDA](https://reader034.vdocument.in/reader034/viewer/2022042910/5f3ea725963de8766720c093/html5/thumbnails/18.jpg)
18
Cost Allocation Mechanism
![Page 19: NY-Sun Overview - Hudson Valley...Company 0-50 50-300 300-1000 1000-2000 2000-5000 Total Projects Total kW ... RGE 70 15 4 38 4 131 89,292 PSEG 662 5 - 1 - 668 7,075 ... • NYSERDA](https://reader034.vdocument.in/reader034/viewer/2022042910/5f3ea725963de8766720c093/html5/thumbnails/19.jpg)
19
Interconnection Technical Working Group
• Goal: identify, discuss, and resolve technical barriers and challenges affecting the
interconnection of distributed generation
• Includes representatives from State Agencies, Utilities, and DG developers
• Technical consultant (NREL) to assist evaluation process and technical document
development
• Technical consultant (EPRI) to support effort to streamline aspects of the interconnection
process
• Initial Topics: Substation Back-feeding / Anti-Islanding Protections / Control & Monitoring
• More information on ITWG at: http://www3.dps.ny.gov/W/PSCWeb.nsf/All/DEF2BF0A236B946F85257F71006AC98E?OpenDocument
![Page 20: NY-Sun Overview - Hudson Valley...Company 0-50 50-300 300-1000 1000-2000 2000-5000 Total Projects Total kW ... RGE 70 15 4 38 4 131 89,292 PSEG 662 5 - 1 - 668 7,075 ... • NYSERDA](https://reader034.vdocument.in/reader034/viewer/2022042910/5f3ea725963de8766720c093/html5/thumbnails/20.jpg)
20
NY-Sun Solar Guidebook for Local Governments
• Real Property Tax Law Section 487• Highlights pertinent information for local governments considering opting out of RPTL § 487
• Land Lease Considerations• Assists in identifying key questions and potential impacts of leasing land for solar projects
• Decommissioning Fact Sheet• Assists in identifying key questions and potential impacts of leasing land for solar projects
• Free Technical Assistance to Local government officials and authorities
having jurisdiction (AHJs)
• Additional Resources
• Land Use Planning for Solar Energy
• NYS Model Solar Energy Law Toolkit
![Page 21: NY-Sun Overview - Hudson Valley...Company 0-50 50-300 300-1000 1000-2000 2000-5000 Total Projects Total kW ... RGE 70 15 4 38 4 131 89,292 PSEG 662 5 - 1 - 668 7,075 ... • NYSERDA](https://reader034.vdocument.in/reader034/viewer/2022042910/5f3ea725963de8766720c093/html5/thumbnails/21.jpg)
21
Community Solar: How it Works
![Page 22: NY-Sun Overview - Hudson Valley...Company 0-50 50-300 300-1000 1000-2000 2000-5000 Total Projects Total kW ... RGE 70 15 4 38 4 131 89,292 PSEG 662 5 - 1 - 668 7,075 ... • NYSERDA](https://reader034.vdocument.in/reader034/viewer/2022042910/5f3ea725963de8766720c093/html5/thumbnails/22.jpg)
22
Value of Distributed Energy Resources
Phase 1 Order
![Page 23: NY-Sun Overview - Hudson Valley...Company 0-50 50-300 300-1000 1000-2000 2000-5000 Total Projects Total kW ... RGE 70 15 4 38 4 131 89,292 PSEG 662 5 - 1 - 668 7,075 ... • NYSERDA](https://reader034.vdocument.in/reader034/viewer/2022042910/5f3ea725963de8766720c093/html5/thumbnails/23.jpg)
23
Context of Order
• As part of Reforming the Energy Vision (REV), NYS is
transitioning away from net energy metering (NEM)
• NYS’ Public Service Commission (PSC) recently released
an order to start this transition
− Phase One (issued March 9, 2017)
− Phase Two (to come)
![Page 24: NY-Sun Overview - Hudson Valley...Company 0-50 50-300 300-1000 1000-2000 2000-5000 Total Projects Total kW ... RGE 70 15 4 38 4 131 89,292 PSEG 662 5 - 1 - 668 7,075 ... • NYSERDA](https://reader034.vdocument.in/reader034/viewer/2022042910/5f3ea725963de8766720c093/html5/thumbnails/24.jpg)
24
Net Energy Metering - How to Qualify
• All projects already interconnected or completed as of 3/9/2017 will retain
NEM for the life of the system
− Must have notified utilities of
finished projects by 3/17/2017
• No action is required for already-interconnected projects to keep NEM
![Page 25: NY-Sun Overview - Hudson Valley...Company 0-50 50-300 300-1000 1000-2000 2000-5000 Total Projects Total kW ... RGE 70 15 4 38 4 131 89,292 PSEG 662 5 - 1 - 668 7,075 ... • NYSERDA](https://reader034.vdocument.in/reader034/viewer/2022042910/5f3ea725963de8766720c093/html5/thumbnails/25.jpg)
25
Phase One Net Energy Metering – How to Qualify
Mass Market
• Projects installed between 3/9/2017 and 1/1/2020
are eligible for Phase One NEM
• Subject to MW allocation, limits specified by order
Commercial
• A non-grandfathered RNM, large-scale, onsite, CDG project (subject to
capacity limits) is eligible Phase One NEM if makes payment of at least
25% of interconnection upgrade costs, or have executed an
interconnection contract (SIR) by July 17th 2017.
![Page 26: NY-Sun Overview - Hudson Valley...Company 0-50 50-300 300-1000 1000-2000 2000-5000 Total Projects Total kW ... RGE 70 15 4 38 4 131 89,292 PSEG 662 5 - 1 - 668 7,075 ... • NYSERDA](https://reader034.vdocument.in/reader034/viewer/2022042910/5f3ea725963de8766720c093/html5/thumbnails/26.jpg)
26
Phase One Value Stack - How to Qualify
• Projects that do not receive NEM or Phase One NEM will receive the
Value Stack
• Avoided D – avoided
demand
• E – environmental benefit
• Capacity – ICAP
• LBMP – energy
commodity
• MTC – market transition
credit for CDG
Base Retail
Rate (NEM)Value Stack
Value Stack +
MTC
![Page 27: NY-Sun Overview - Hudson Valley...Company 0-50 50-300 300-1000 1000-2000 2000-5000 Total Projects Total kW ... RGE 70 15 4 38 4 131 89,292 PSEG 662 5 - 1 - 668 7,075 ... • NYSERDA](https://reader034.vdocument.in/reader034/viewer/2022042910/5f3ea725963de8766720c093/html5/thumbnails/27.jpg)
27
CDG Tranche Design
Add a new bar at same height as Tranche 1. Label NEM, $0.15
• MTC = Difference between Base Retail Rate and Estimated Value Stack
• Intended to make estimated CDG compensation…− equal to Base Retail Rates (NEM) in Tranche 1
− 5% less than NEM in Tranche 2
− 10% less than NEM in Tranche 3
• MTC reflects values not yet identified or calculable, especially value of D
![Page 28: NY-Sun Overview - Hudson Valley...Company 0-50 50-300 300-1000 1000-2000 2000-5000 Total Projects Total kW ... RGE 70 15 4 38 4 131 89,292 PSEG 662 5 - 1 - 668 7,075 ... • NYSERDA](https://reader034.vdocument.in/reader034/viewer/2022042910/5f3ea725963de8766720c093/html5/thumbnails/28.jpg)
28
NY-Sun Progress to Date
![Page 29: NY-Sun Overview - Hudson Valley...Company 0-50 50-300 300-1000 1000-2000 2000-5000 Total Projects Total kW ... RGE 70 15 4 38 4 131 89,292 PSEG 662 5 - 1 - 668 7,075 ... • NYSERDA](https://reader034.vdocument.in/reader034/viewer/2022042910/5f3ea725963de8766720c093/html5/thumbnails/29.jpg)
29
NY-Sun Progress to Date
• Unprecedented solar growth: 800% capacity growth from 2012 to 2017
• 814 MW installed – enough to power more than 120,000 homes
• 64,926 solar projects installed in 2016
• Strong job growth – over 8,100 employed in solar industry in 2016 –
New York ranked 6th in the U.S. for number of solar workers
![Page 30: NY-Sun Overview - Hudson Valley...Company 0-50 50-300 300-1000 1000-2000 2000-5000 Total Projects Total kW ... RGE 70 15 4 38 4 131 89,292 PSEG 662 5 - 1 - 668 7,075 ... • NYSERDA](https://reader034.vdocument.in/reader034/viewer/2022042910/5f3ea725963de8766720c093/html5/thumbnails/30.jpg)
30
NY-Sun Program Activity to Date
• 814 MW installed statewide with NYSERDA support
• 483MW of residential PV (64,144 projects)
• 331MW of non-residential PV (4,682 projects)
• 1,143MW currently in NY-Sun pipeline
• Installations all 62 counties and in 1,658 different zip codes
Completions by County, 4/30/2017
![Page 31: NY-Sun Overview - Hudson Valley...Company 0-50 50-300 300-1000 1000-2000 2000-5000 Total Projects Total kW ... RGE 70 15 4 38 4 131 89,292 PSEG 662 5 - 1 - 668 7,075 ... • NYSERDA](https://reader034.vdocument.in/reader034/viewer/2022042910/5f3ea725963de8766720c093/html5/thumbnails/31.jpg)
31
MW Installed Statewide by Year, as of 4/30/2017