Oak Park . + . River Forest High School Board Report May 17, 2016 3 Options, Summaries, and Cost Long Term Facility Plan

Upload: others

Post on 09-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Oak Park .+.River Forest High School Long Term Facility Plan · 2016. 5. 17. · Long Term Facility Plan. 2 ... Music department that can accommodate enrollment projections 160 Meter

Oak Pa r k .+ .R i v e r Fo r e s t H igh Schoo l

Board Report May 17, 20163 Options, Summaries, and Cost

L o n g Te r m F a c i l i t y P l a n

Page 2: Oak Park .+.River Forest High School Long Term Facility Plan · 2016. 5. 17. · Long Term Facility Plan. 2 ... Music department that can accommodate enrollment projections 160 Meter

2Oak Park and River Forest High School | Legat Architects

South End Option 1 - Summary Chart

Concept Need or Opportunity Dependencies Space Gained/Benefits Space Loss 2016 Cost*

Years 1-5 *add 3.5% per year for inflation

1. Renovate existing pools Need: Warm/Safe/Dry Additional water surface area N/A $22,300,000

2. Expand Music Need: Enrollment, future of learning

Moving indoor track off-site

Music department that can accommodate enrollment projections

160 Meter Indoor Track $5,457,375

3. Expand Music - Black Box Theatre Addition

Opportunity: Expand stu-dio 200 below the driver’s end addition

AdditionAn ADA small performance space and can be used by students and the community

Green Space $1,959,375

4. Move Special Educa-tion on Site

Opportunity: Shared efficiencies

Expanding music in current 160 meter track space

On-site special education for students who have aged out N/A $1,215,000

5. Driver’s Ed Addition/PE Support

Opportunity: Currently separated from PE Addition Closer to other PE spaces Green Space $1,781,250

6. Competition Gym Need: Currently not exis-tent, enrollment

Moving indoor track off-site

A true competition gym, with more seating

160 Meter Indoor Track $11,720,625

7. Update Student Locker Room Facilities

Need: Outdated, height of ceiling

Moving indoor track off-site Updated locker space 160 Meter Indoor

Track $4,242,700

Concept Need or Opportunity Dependencies Space Gained/Benefits Space Loss 2016 Cost*

Years 6-10

8. Cafeteria and Kitchen Rebuild

Need: Enrollment, future of learning Additional dining space N/A $20,682,050

9. Stack Gyms Rebuild Need: Enrollment One PE station (a new gym) N/A $13,365,000

10. Centralize Tutoring Center, Library, and Faculty Offices

Opportunity: Future of learning, capture vertical above cafeteria addition

Infilling the library with 8 classrooms

Shorter average travel distance to receive academic support

N/A $11,072,250

11. Renovate Library to have Science Labs and Classroom Space

Opportunity: Future of learning

Library + learning commons moving

The new classrooms have di-rect access to natural daylight and views

N/A $7,795,875

12. Consolidate Huskie Pups Opportunity: Way-finding Infilling the library

with 5 labs

Way-finding, easier for children to be dropped off by their parents

N/A $1,316,700

13. Move Family and Consumer Sciences to First Floor

Opportunity: Shared efficiencies/adjacencies, welcomes community

Consolidating huskie pups

Larger FCS café, 4 class-rooms, 2 offices N/A $6,469,650

Page 3: Oak Park .+.River Forest High School Long Term Facility Plan · 2016. 5. 17. · Long Term Facility Plan. 2 ... Music department that can accommodate enrollment projections 160 Meter

Oak Park and River Forest High School | Legat Architects

ATT Attendance

FCS Family and consumer sciences

LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.

OFF Office space

PR Practice Room

RC Resource Center, a place for students to go to receive help, study, etc.

Resource (Teacher + Student)Huskie Pups

CafeteriaApplied Arts

Athletics

Special Education

Classroom Space Office Space

Performing Arts

Science

Visual Arts

Addition Perimeter

Welcome/Entry

Existing Envelop Perimeter

Interior Renovations Perimeter

Lens Corridor

Circulation Collaborative Node/Student Breakout Space

ATT Attendance

FCS Family and consumer sciences

LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.

OFF Office space

PR Practice Room

RC Resource Center, a place for students to go to receive help, study, etc.

Resource (Teacher + Student)Huskie Pups

CafeteriaApplied Arts

Athletics

Special Education

Classroom Space Office Space

Performing Arts

Science

Visual Arts

Addition Perimeter

Welcome/Entry

Existing Envelop Perimeter

Interior Renovations Perimeter

Lens Corridor

Circulation Collaborative Node/Student Breakout Space

SCOVILLE

LAKE

ST.

ERIE

CT.

EAST AVE.

3

EXIT #7

EXIT #8

0 40 80 160N

EXISTING - STUDENTACTIVITY CENTER

8. 9/10 DINING 8. 11/12 DINING8. KITCHEN

9. EXPANDED PESPACE

EXISTING LITTLETHEATRE TO

REMAIN

8. SERVINGEXISTING

BOOKSTORE

STAI

R

STAI

R

8. SPILL OUT DININGABOVE

1. COMPLETE NEW 25 YARDPOOL, DECK & RELATED

EQUIPMENT

1. MENS LOCKERROOMS &SUPPORT

1. C

OAC

HES

LOC

KER

+ O

FFIC

E

1. DRYLAND

1. S

TAIR

1. STORAGE

1. FAMILYCHANGING

1. SCOREKEEPER

1. WOMENSLOCKER ROOMS &

SUPPORT

1. COACHES OFFICE

1. STOR.

CORRIDOR

1. ELEVATOR

8. STAFFDINING

13. FCS LAB

13. FAMILY + CONSUMERSCIENCES CAFE

13. PLTW

12. HUSKIE PUPS

EXISTINGPLAYGROUND

TO REMAIN

AUTO TO REMAIN

ENTRY

13. FCS LAB13. KITCHEN

13. FCS LAB

13. STORAGE13. GROUP

SPACE

2. BANDROOM

PRPR

PRPR

2.STOR.

PRPR

PRPR 2. OFF

4. SPECIALEDUCATION

4. LL 4. LL 4. OFF.

4. STOR.

2. ORCHESTRAROOM

PRPR

PRPR

2.STOR.

PRPR

PRPR

2. OFF

3. BLACK BOX THEATRE -REPLACING STUDIO 200

7. BOY'S LOCKERROOMS

6. COMPETITION GYM

EXISTING GARAGE

Years 1-5 Years 6-10

South End Option 1 - First Floor

Page 4: Oak Park .+.River Forest High School Long Term Facility Plan · 2016. 5. 17. · Long Term Facility Plan. 2 ... Music department that can accommodate enrollment projections 160 Meter

Oak Park and River Forest High School | Legat Architects

ATT Attendance

FCS Family and consumer sciences

LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.

OFF Office space

PR Practice Room

RC Resource Center, a place for students to go to receive help, study, etc.

Resource (Teacher + Student)Huskie Pups

CafeteriaApplied Arts

Athletics

Special Education

Classroom Space Office Space

Performing Arts

Science

Visual Arts

Addition Perimeter

Welcome/Entry

Existing Envelop Perimeter

Interior Renovations Perimeter

Lens Corridor

Circulation Collaborative Node/Student Breakout Space

ATT Attendance

FCS Family and consumer sciences

LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.

OFF Office space

PR Practice Room

RC Resource Center, a place for students to go to receive help, study, etc.

Resource (Teacher + Student)Huskie Pups

CafeteriaApplied Arts

Athletics

Special Education

Classroom Space Office Space

Performing Arts

Science

Visual Arts

Addition Perimeter

Welcome/Entry

Existing Envelop Perimeter

Interior Renovations Perimeter

Lens Corridor

Circulation Collaborative Node/Student Breakout Space

SCOVILLE

LAKE

ST.

ERIE

CT.

EAST AVE.

4

ROOF BELOW

0 40 80 160N

STEM -EXISTING

11. LAB 11. PREP

11. PREP

11. LAB

11. LAB

11. LAB

11.STUDENT

RESOURCE- SCIENCE

11. OFF

11. LAB

11.OFF

OPEN TO BELOW

8. ITSUPPORT

10. TUTORING

8. CAFE

8. OFF

8. DINING SPILL OUT

OPEN TO BELOW OPEN TO BELOW

STAI

R

STAI

R

STAI

R

1. SEATS

1. S

TAIR

1. T

OIL

ETS

1. SUPPORT

1. CLASSROOM

1. CORRIDOR

5. DRIVEREDUCATION

1. ELEVATOR

1. OPEN TOPOOL BELOW

5. PESUPPORT

PRACTICE ROOMS TO REMAIN

2. MUSIC LIBRARY+ STORAGE

2. OFF

2. CHOIR

7. BOY'S LOCKERROOMS

10.OFF

10.MAIL

ROOM

2. LL

6. COMPETITIONGYM BELOW

2. BANDROOM BELOW

EXISTING GARAGE

Years 1-5 Years 6-10

South End Option 1 - Second Floor

Page 5: Oak Park .+.River Forest High School Long Term Facility Plan · 2016. 5. 17. · Long Term Facility Plan. 2 ... Music department that can accommodate enrollment projections 160 Meter

Oak Park and River Forest High School | Legat Architects

ATT Attendance

FCS Family and consumer sciences

LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.

OFF Office space

PR Practice Room

RC Resource Center, a place for students to go to receive help, study, etc.

Resource (Teacher + Student)Huskie Pups

CafeteriaApplied Arts

Athletics

Special Education

Classroom Space Office Space

Performing Arts

Science

Visual Arts

Addition Perimeter

Welcome/Entry

Existing Envelop Perimeter

Interior Renovations Perimeter

Lens Corridor

Circulation Collaborative Node/Student Breakout Space

ATT Attendance

FCS Family and consumer sciences

LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.

OFF Office space

PR Practice Room

RC Resource Center, a place for students to go to receive help, study, etc.

Resource (Teacher + Student)Huskie Pups

CafeteriaApplied Arts

Athletics

Special Education

Classroom Space Office Space

Performing Arts

Science

Visual Arts

Addition Perimeter

Welcome/Entry

Existing Envelop Perimeter

Interior Renovations Perimeter

Lens Corridor

Circulation Collaborative Node/Student Breakout Space

SCOVILLE

LAKE

ST.

ERIE

CT.

EAST AVE.

5

0 40 80 160N

11. STUDENT RESOURCE

11. LL

11. OFF

11. OFF11. OFF

11. LL

11. LL 11. LL11. LL11. LL

11.GRAPHICS

LAB

11. LL 11. LL

11.OFF

GREEN ROOF8. DOUBLEHEIGHT PE

SPACE

POTENTIALPE SPACE

8. PE SUPPORT10. OFF

10. OFF

10. LIBRARY +LEARNING COMMONSST

AIR

10. LIBRARYINSTRUCTIONAL

SPACE

6. ATHLETICSTORAGE

6. MECH.

EXISTING GARAGE

Years 1-5 Years 6-10

South End Option 1 - Third Floor

Page 6: Oak Park .+.River Forest High School Long Term Facility Plan · 2016. 5. 17. · Long Term Facility Plan. 2 ... Music department that can accommodate enrollment projections 160 Meter

Oak Park and River Forest High School | Legat Architects

ATT Attendance

FCS Family and consumer sciences

LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.

OFF Office space

PR Practice Room

RC Resource Center, a place for students to go to receive help, study, etc.

Resource (Teacher + Student)Huskie Pups

CafeteriaApplied Arts

Athletics

Special Education

Classroom Space Office Space

Performing Arts

Science

Visual Arts

Addition Perimeter

Welcome/Entry

Existing Envelop Perimeter

Interior Renovations Perimeter

Lens Corridor

Circulation Collaborative Node/Student Breakout Space

ATT Attendance

FCS Family and consumer sciences

LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.

OFF Office space

PR Practice Room

RC Resource Center, a place for students to go to receive help, study, etc.

Resource (Teacher + Student)Huskie Pups

CafeteriaApplied Arts

Athletics

Special Education

Classroom Space Office Space

Performing Arts

Science

Visual Arts

Addition Perimeter

Welcome/Entry

Existing Envelop Perimeter

Interior Renovations Perimeter

Lens Corridor

Circulation Collaborative Node/Student Breakout Space

SCOVILLE

LAKE

ST.

ERIE

CT.

EAST AVE.

6

SOUTH

PE NTHOUS E

001

NORTH

PE NTHOUS E

002

WE S T

003

0 40 80 160N

13. OFF

13. OFF

13. LL

13. LL

13. LL

13. LL

GREEN ROOF BELOW

ADDITIONBELOW

EXISTING GARAGE

Years 1-5 Years 6-10

South End Option 1 - Fourth Floor

Page 7: Oak Park .+.River Forest High School Long Term Facility Plan · 2016. 5. 17. · Long Term Facility Plan. 2 ... Music department that can accommodate enrollment projections 160 Meter

7Oak Park and River Forest High School | Legat Architects

South End Option 2 - Summary Chart

Concept Need or Opportunity Dependencies Space Gained/Benefits Space Loss 2016 Cost*

Years 1-5 *add 3.5% per year for inflation

1. Natatorium and Park-ing Garage Addition Need: Warm/Safe/Dry A new natatorium/additional

instructional space N/A $42,100,000

2. Expand Music Need: Enrollment, future of learning

Natatorium addition

Music department that can accommodate enrollment projections

N/A $5,754,375

3. Move Special Educa-tion on Site

Opportunity: Shared efficiencies

Expanding music in south end

On-site special education for students who have aged out

N/A $1,215,000

5. Update Student Locker Room Facilities

Need: Outdated, height of ceiling

Natatorium addition Updated locker space N/A $5,266,800

Concept Need or Opportunity Dependencies Space Gained/Benefits Space Loss 2016 Cost*

Years 6-10

6. Cafeteria and Kitchen Rebuild

Need: Enrollment, future of learning Additional dining space N/A $20,682,050

7. Stack Gyms Rebuild Need: Enrollment One PE station (a new gym) N/A $13,365,000

8. Centralize Tutoring Center, Library, and Faculty Offices

Opportunity: Future of learning, capture vertical above cafeteria addition

Infilling the library with 8 classrooms

Shorter average travel dis-tance to receive academic support

N/A $11,072,250

9. Renovate Library to have Science Labs and Classroom Space

Opportunity: Future of learning

Library + learning commons moving

The new classrooms/labs have direct access to natu-ral daylight and views

N/A $7,795,875

10. Consolidate Huskie Pups Opportunity: Way-finding Infilling the library

with 5 labs

Way-finding, easier for children to be dropped off by their parents

N/A $1,316,700

11. Move Family and Consumer Sciences to First Floor

Opportunity: Shared efficiencies/adjacencies, welcomes community

Consolidating huskie pups

Larger FCS café, 4 class-rooms, 2 offices N/A $6,469,650

12. Expand Music - Black Box Theatre Replaces Lecture Halls

Opportunity: Expand studio 200 replacing lecture halls

A small student perfor-mance space

2 Lecture halls, 370/371 $1,687,500

Page 8: Oak Park .+.River Forest High School Long Term Facility Plan · 2016. 5. 17. · Long Term Facility Plan. 2 ... Music department that can accommodate enrollment projections 160 Meter

Oak Park and River Forest High School | Legat Architects

ATT Attendance

FCS Family and consumer sciences

LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.

OFF Office space

PR Practice Room

RC Resource Center, a place for students to go to receive help, study, etc.

Resource (Teacher + Student)Huskie Pups

CafeteriaApplied Arts

Athletics

Special Education

Classroom Space Office Space

Performing Arts

Science

Visual Arts

Addition Perimeter

Welcome/Entry

Existing Envelop Perimeter

Interior Renovations Perimeter

Lens Corridor

Circulation Collaborative Node/Student Breakout Space

ATT Attendance

FCS Family and consumer sciences

LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.

OFF Office space

PR Practice Room

RC Resource Center, a place for students to go to receive help, study, etc.

Resource (Teacher + Student)Huskie Pups

CafeteriaApplied Arts

Athletics

Special Education

Classroom Space Office Space

Performing Arts

Science

Visual Arts

Addition Perimeter

Welcome/Entry

Existing Envelop Perimeter

Interior Renovations Perimeter

Lens Corridor

Circulation Collaborative Node/Student Breakout Space

SCOVILLE

LAKE

ST.

ERIE

CT.

EAST AVE.

8

EXIT #8

0 40 80 160N

EXISTING - STUDENTACTIVITY CENTER

2. BANDROOM

6. 9/10 DINING 6. 11/12 DINING

11. FCS LAB

11. FAMILY +CONSUMER SCIENCES

CAFE

11. PLTW

10. HUSKIE PUPS

EXISTINGPLAYGROUND

TO REMAIN

3. SPECIALEDUCATION

6. KITCHEN

7. EXPANDED PESPACE

1. POOL & DECK1. ELEVATOR

1. CLASSROOM

EXISTING LITTLETHEATRE TO

REMAIN

1. NEW PARKING GARAGE

1. STORAGE 1. DRYLAND

1. COACHESLOCKER +OFFICE

1. FAMILYCHANGING

1. WOMEN'S LOCKERROOMS + SUPPORT

1. MEN'S LOCKERROOM + SUPPORT

6. SERVINGEXISTING

BOOKSTORE

STAI

R

STAI

R

6. SPILL OUT DININGABOVE

PRPR

PRPR

AUTO TO REMAIN

11. ENTRY

2. STOR.PRPR

PRPR

2. ENSEMBLEROOM

2. OFF

2. ORCHESTRAROOM

PRPR

PRPR

2. STOR.PRPR

PRPR

2. OFF

5. BOYS LOCKERROOM

11. FCS LAB11. KITCHEN

11. FCS LAB

11. STORAGE11. GROUP

SPACE

3. LL 3. LL 3. OFF.

3. STOR.

Years 1-5 Years 6-10

South End Option 2 - First Floor

Page 9: Oak Park .+.River Forest High School Long Term Facility Plan · 2016. 5. 17. · Long Term Facility Plan. 2 ... Music department that can accommodate enrollment projections 160 Meter

Oak Park and River Forest High School | Legat Architects

ATT Attendance

FCS Family and consumer sciences

LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.

OFF Office space

PR Practice Room

RC Resource Center, a place for students to go to receive help, study, etc.

Resource (Teacher + Student)Huskie Pups

CafeteriaApplied Arts

Athletics

Special Education

Classroom Space Office Space

Performing Arts

Science

Visual Arts

Addition Perimeter

Welcome/Entry

Existing Envelop Perimeter

Interior Renovations Perimeter

Lens Corridor

Circulation Collaborative Node/Student Breakout Space

ATT Attendance

FCS Family and consumer sciences

LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.

OFF Office space

PR Practice Room

RC Resource Center, a place for students to go to receive help, study, etc.

Resource (Teacher + Student)Huskie Pups

CafeteriaApplied Arts

Athletics

Special Education

Classroom Space Office Space

Performing Arts

Science

Visual Arts

Addition Perimeter

Welcome/Entry

Existing Envelop Perimeter

Interior Renovations Perimeter

Lens Corridor

Circulation Collaborative Node/Student Breakout Space

SCOVILLE

LAKE

ST.

ERIE

CT.

EAST AVE.

9

ROOF BELOW

0 40 80 160N

STEM -EXISTING

9. LAB 9. PREP

9. PREP

9. LAB

9. LAB

9. LAB

9.STUDENT

RESOURCE- SCIENCE

9. OFF

9. LAB

9. OFF

1. DRIVEREDUCATION

WEIGHT ROOM

1. T

OIL

ETS

1. CONCESSIONS+ SUPPORT

1. +/-400 SEATS

PRACTICE ROOMS TO REMAIN

2. LL

OPEN TO BELOW

6. ITSUPPORT

8. TUTORING

6. CAFE

8. OFF

6. DINING SPILL OUT

OPEN TO BELOW OPEN TO BELOW

STAI

R

STAI

R

STAI

R

5. EXISTING STAFFDINING TO REMAIN

2. MUSICLIBRARY +STORAGE

2. OFF

1. DRIVEREDUCATION

2. CHOIR

8. MAILROOM

5. GIRL'S PELOCKER ROOM

5. GIRL'SATH.

STOR.5. GIRL'S

ATH.LOCKERROOM

1. PARKING GARAGEBELOW

Years 1-5 Years 6-10

South End Option 2 - Second Floor

Page 10: Oak Park .+.River Forest High School Long Term Facility Plan · 2016. 5. 17. · Long Term Facility Plan. 2 ... Music department that can accommodate enrollment projections 160 Meter

Oak Park and River Forest High School | Legat Architects

ATT Attendance

FCS Family and consumer sciences

LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.

OFF Office space

PR Practice Room

RC Resource Center, a place for students to go to receive help, study, etc.

Resource (Teacher + Student)Huskie Pups

CafeteriaApplied Arts

Athletics

Special Education

Classroom Space Office Space

Performing Arts

Science

Visual Arts

Addition Perimeter

Welcome/Entry

Existing Envelop Perimeter

Interior Renovations Perimeter

Lens Corridor

Circulation Collaborative Node/Student Breakout Space

ATT Attendance

FCS Family and consumer sciences

LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.

OFF Office space

PR Practice Room

RC Resource Center, a place for students to go to receive help, study, etc.

Resource (Teacher + Student)Huskie Pups

CafeteriaApplied Arts

Athletics

Special Education

Classroom Space Office Space

Performing Arts

Science

Visual Arts

Addition Perimeter

Welcome/Entry

Existing Envelop Perimeter

Interior Renovations Perimeter

Lens Corridor

Circulation Collaborative Node/Student Breakout Space

SCOVILLE

LAKE

ST.

ERIE

CT.

EAST AVE.

10

OPEN TO BELOW

OPEN TO BELOW OPEN TO BELOW

0 40 80 160N

9. STUDENT RESOURCE

9. LL

9. OFF

9. OFF9. OFF

9. LL

9. LL 9. LL9. LL9. LL

9.GRAPHICS

LAB

9. LL 9. LL

9.OFF

GREEN ROOF7. DOUBLEHEIGHT PE

SPACE

12. BLACK BOX THEATRE -REPLACING STUDIO 200

7. PE SUPPORT8. OFF

8. OFF

8. LIBRARY + LEARNINGCOMMONSST

AIR

8. LIBRARYINSTRUCTIONAL

SPACE

1. POOL + PARKINGGARAGE BELOW

Years 1-5 Years 6-10

South End Option 2 - Third Floor

Page 11: Oak Park .+.River Forest High School Long Term Facility Plan · 2016. 5. 17. · Long Term Facility Plan. 2 ... Music department that can accommodate enrollment projections 160 Meter

Oak Park and River Forest High School | Legat Architects

ATT Attendance

FCS Family and consumer sciences

LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.

OFF Office space

PR Practice Room

RC Resource Center, a place for students to go to receive help, study, etc.

Resource (Teacher + Student)Huskie Pups

CafeteriaApplied Arts

Athletics

Special Education

Classroom Space Office Space

Performing Arts

Science

Visual Arts

Addition Perimeter

Welcome/Entry

Existing Envelop Perimeter

Interior Renovations Perimeter

Lens Corridor

Circulation Collaborative Node/Student Breakout Space

ATT Attendance

FCS Family and consumer sciences

LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.

OFF Office space

PR Practice Room

RC Resource Center, a place for students to go to receive help, study, etc.

Resource (Teacher + Student)Huskie Pups

CafeteriaApplied Arts

Athletics

Special Education

Classroom Space Office Space

Performing Arts

Science

Visual Arts

Addition Perimeter

Welcome/Entry

Existing Envelop Perimeter

Interior Renovations Perimeter

Lens Corridor

Circulation Collaborative Node/Student Breakout Space

SCOVILLE

LAKE

ST.

ERIE

CT.

EAST AVE.

11

DN

SOUTH

PE NTHOUS E

001

NORTH

PE NTHOUS E

002

WE S T

PE NTHOUS E

0 40 80 160N

11. OFF

11. OFF

11. LL

11. LL

11. LL

11. LL

GREEN ROOF BELOW

1. POOL + PARKINGGARAGE BELOW

Years 1-5 Years 6-10

South End Option 2 - Fourth Floor

Page 12: Oak Park .+.River Forest High School Long Term Facility Plan · 2016. 5. 17. · Long Term Facility Plan. 2 ... Music department that can accommodate enrollment projections 160 Meter

12Oak Park and River Forest High School | Legat Architects

South End Option 3 - Summary Chart

Concept Need or Opportunity Dependencies Space Gained/Benefits Space Loss 2016 Cost*

Years 1-5 *add 3.5% per year for inflation

1. Natatorium Need: Warm/Safe/Dry A new 40-meter pool N/A Price included in 200 Meter Track Concept

2. Move Special Educa-tion on Site

Opportunity: Shared efficiencies

Expanding music in South End

On-site special education for students who have aged out

N/A $1,215,000

3. Expand Music Need: Enrollment, future of learning Natatorium Addition

Music department that can accommodate enrollment projections

N/A Price included in 200 Meter Track Concept

3a. Expand Music - Black Box Theatre Addition

Opportunity: Expand stu-dio 200 below the driver’s end addition

Addition A small student perfor-mance space N/A Price included in 200 Meter

Track Concept

4. 200 Meter Track + New Gyms Need: 200 Meter Track Tear down south end

and rebuild 200-meter track *1 PE station $90,199,579

Concept Need or Opportunity Dependencies Space Gained/Benefits Space Loss 2016 Cost*

Years 6-10

5. Cafeteria and Kitchen Rebuild

Need: Enrollment, future of learning Additional dining space N/A $20,682,050

6. Stack Gyms Rebuild Need: Enrollment *Replaces PE Station lost in the plan for Years 1 to 5 N/A $13,365,000

7. Centralize Tutoring Center, Library, and Faculty Offices

Opportunity: Future of learning, capture vertical above cafeteria addition

Infilling the library with 8 classrooms

Shorter average travel dis-tance to receive academic support

N/A $11,072,250

8. Renovate Library to have Science Labs and Classroom Space

Opportunity: Future of learning

Library + learning commons moving

The new classrooms have direct access to natural daylight and views

N/A $7,795,875

9. Consolidate Huskie Pups Opportunity: Way-finding Infilling the library

with 5 labs

Way-finding, easier for children to be dropped off by their parents

N/A $1,316,700

10. Move Family and Consumer Sciences to First Floor

Opportunity: Shared efficiencies/adjacencies, welcomes community

Consolidating huskie pups

Larger FCS café, 4 class-rooms, 2 offices N/A $6,469,650

Page 13: Oak Park .+.River Forest High School Long Term Facility Plan · 2016. 5. 17. · Long Term Facility Plan. 2 ... Music department that can accommodate enrollment projections 160 Meter

Oak Park and River Forest High School | Legat Architects

ATT Attendance

FCS Family and consumer sciences

LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.

OFF Office space

PR Practice Room

RC Resource Center, a place for students to go to receive help, study, etc.

Resource (Teacher + Student)Huskie Pups

CafeteriaApplied Arts

Athletics

Special Education

Classroom Space Office Space

Performing Arts

Science

Visual Arts

Addition Perimeter

Welcome/Entry

Existing Envelop Perimeter

Interior Renovations Perimeter

Lens Corridor

Circulation Collaborative Node/Student Breakout Space

ATT Attendance

FCS Family and consumer sciences

LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.

OFF Office space

PR Practice Room

RC Resource Center, a place for students to go to receive help, study, etc.

Resource (Teacher + Student)Huskie Pups

CafeteriaApplied Arts

Athletics

Special Education

Classroom Space Office Space

Performing Arts

Science

Visual Arts

Addition Perimeter

Welcome/Entry

Existing Envelop Perimeter

Interior Renovations Perimeter

Lens Corridor

Circulation Collaborative Node/Student Breakout Space

SCOVILLE

LAKE

ST.

ERIE

CT.

EAST AVE.

13

EXIT #7

EXIT #8

0 40 80 160N

EXISTING - STUDENTACTIVITY CENTER

3. BAND ROOM

5. 9/10 DINING 5. 11/12 DINING

FCS LAB

10. FAMILY + CONSUMERSCIENCES CAFE

10. PLTW

9. HUSKIE PUPS

EXISTINGPLAYGROUND

TO REMAIN

2. SPECIALEDUCATION

5. KITCHEN

6. EXPANDED PESPACE

1. POOL & DECKBELOW

EXISTING LITTLETHEATRE TO

REMAIN

5. SERVINGEXISTING

BOOKSTORE

STAI

R

STAI

R

5. SPILL OUT DININGABOVE

PR

AUTO TO REMAIN

ENTRY

3. STOR.3.

OFF

FCS LAB10. KITCHEN

FCS LAB

STORAGE10. GROUP

SPACE

2. LL 2. LL 2. OFF.

2. STOR.

PRPR

PR

PR

PR

PR

PR

1. BALCONY - SPECTATORS

1. POOLSUPPORT -LOCKERSBELOW

3. ORCHESTRAROOM

PR

3. STOR.

3. OFF

PR

PR

PR

PR

PR

PR

PR

3a. BLACK BOX THEATRE -REPLACING STUDIO 200

4. PE/ATHLETIC OFFICES +CLASSROOMS

4. GYM

4. GYM

STAI

RST

AIR

4. GIRL'S LOCKERROOM

4. BOY'S LOCKERROOM

EXISTING GARAGE

Years 1-5 Years 6-10

South End Option 3 - First Floor

Page 14: Oak Park .+.River Forest High School Long Term Facility Plan · 2016. 5. 17. · Long Term Facility Plan. 2 ... Music department that can accommodate enrollment projections 160 Meter

Oak Park and River Forest High School | Legat Architects

ATT Attendance

FCS Family and consumer sciences

LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.

OFF Office space

PR Practice Room

RC Resource Center, a place for students to go to receive help, study, etc.

Resource (Teacher + Student)Huskie Pups

CafeteriaApplied Arts

Athletics

Special Education

Classroom Space Office Space

Performing Arts

Science

Visual Arts

Addition Perimeter

Welcome/Entry

Existing Envelop Perimeter

Interior Renovations Perimeter

Lens Corridor

Circulation Collaborative Node/Student Breakout Space

ATT Attendance

FCS Family and consumer sciences

LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.

OFF Office space

PR Practice Room

RC Resource Center, a place for students to go to receive help, study, etc.

Resource (Teacher + Student)Huskie Pups

CafeteriaApplied Arts

Athletics

Special Education

Classroom Space Office Space

Performing Arts

Science

Visual Arts

Addition Perimeter

Welcome/Entry

Existing Envelop Perimeter

Interior Renovations Perimeter

Lens Corridor

Circulation Collaborative Node/Student Breakout Space

SCOVILLE

LAKE

ST.

ERIE

CT.

EAST AVE.

14

ROOF BELOW

0 40 80 160N

STEM -EXISTING

8. LAB 8. PREP

8. PREP

8. LAB

8. LAB

8. LAB

8.STUDENT

RESOURCE- SCIENCE

8. OFF

8. LAB

8. OFF

PRACTICE ROOMS TO REMAIN

3. LL

OPEN TO BELOW

5. ITSUPPORT

7. TUTORING

5. CAFE

7. OFF

5. DINING SPILL OUT

OPEN TO BELOW OPEN TO BELOW

STAI

R

STAI

R

STAI

R

5. EXISTING STAFFDINING TO REMAIN -

RENOVATE

3. MUSICLIBRARY +STORAGE

3. OFF

3. CHOIR

7. MAILROOM

4. 200 METER TRACK + 3COURTS

STAI

RST

AIR

4. MECH.

4. GYM

4. GYM

4. GYM

4. WEIGHTROOM

4. MULTI-PURPOSE

4. DRIVEREDUCATION

EXISTING GARAGE

Years 1-5 Years 6-10

South End Option 3 - Second Floor

Page 15: Oak Park .+.River Forest High School Long Term Facility Plan · 2016. 5. 17. · Long Term Facility Plan. 2 ... Music department that can accommodate enrollment projections 160 Meter

Oak Park and River Forest High School | Legat Architects

ATT Attendance

FCS Family and consumer sciences

LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.

OFF Office space

PR Practice Room

RC Resource Center, a place for students to go to receive help, study, etc.

Resource (Teacher + Student)Huskie Pups

CafeteriaApplied Arts

Athletics

Special Education

Classroom Space Office Space

Performing Arts

Science

Visual Arts

Addition Perimeter

Welcome/Entry

Existing Envelop Perimeter

Interior Renovations Perimeter

Lens Corridor

Circulation Collaborative Node/Student Breakout Space

ATT Attendance

FCS Family and consumer sciences

LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.

OFF Office space

PR Practice Room

RC Resource Center, a place for students to go to receive help, study, etc.

Resource (Teacher + Student)Huskie Pups

CafeteriaApplied Arts

Athletics

Special Education

Classroom Space Office Space

Performing Arts

Science

Visual Arts

Addition Perimeter

Welcome/Entry

Existing Envelop Perimeter

Interior Renovations Perimeter

Lens Corridor

Circulation Collaborative Node/Student Breakout Space

SCOVILLE

LAKE

ST.

ERIE

CT.

EAST AVE.

15

OPEN TO BELOW

0 40 80 160N

8. STUDENTRESOURCE

8. LL

8. OFF

8. OFF8. OFF

8. LL

8. LL 8. LL8. LL8. LL

8.GRAPHICS

LAB

8. LL 8. LL

8. O

FF

5. GREEN ROOF6. DOUBLEHEIGHT PE

SPACE

6. PE SUPPORT7. OFF

7. OFF

7. LIBRARY + LEARNINGCOMMONSST

AIR

7. LIBRARYINSTRUCTIONAL

SPACE

4. FIELD HOUSEOPEN TO BELOW

EXISTING GARAGE

Years 1-5 Years 6-10

South End Option 3 - Third Floor

Page 16: Oak Park .+.River Forest High School Long Term Facility Plan · 2016. 5. 17. · Long Term Facility Plan. 2 ... Music department that can accommodate enrollment projections 160 Meter

Oak Park and River Forest High School | Legat Architects

ATT Attendance

FCS Family and consumer sciences

LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.

OFF Office space

PR Practice Room

RC Resource Center, a place for students to go to receive help, study, etc.

Resource (Teacher + Student)Huskie Pups

CafeteriaApplied Arts

Athletics

Special Education

Classroom Space Office Space

Performing Arts

Science

Visual Arts

Addition Perimeter

Welcome/Entry

Existing Envelop Perimeter

Interior Renovations Perimeter

Lens Corridor

Circulation Collaborative Node/Student Breakout Space

ATT Attendance

FCS Family and consumer sciences

LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.

OFF Office space

PR Practice Room

RC Resource Center, a place for students to go to receive help, study, etc.

Resource (Teacher + Student)Huskie Pups

CafeteriaApplied Arts

Athletics

Special Education

Classroom Space Office Space

Performing Arts

Science

Visual Arts

Addition Perimeter

Welcome/Entry

Existing Envelop Perimeter

Interior Renovations Perimeter

Lens Corridor

Circulation Collaborative Node/Student Breakout Space

SCOVILLE

LAKE

ST.

ERIE

CT.

EAST AVE.

16

DN

SOUTH

PE NTHOUS E

001

NORTH

PE NTHOUS E

002

WE S T

PE NTHOUS E

003

0 40 80 160N

10. OFF

10. OFF

10. LL

10. LL

10. LL

10. LL

GREEN ROOF BELOW

EXISTING GARAGE

Years 1-5 Years 6-10

South End Option 3 - Fourth Floor

Page 17: Oak Park .+.River Forest High School Long Term Facility Plan · 2016. 5. 17. · Long Term Facility Plan. 2 ... Music department that can accommodate enrollment projections 160 Meter

17Oak Park and River Forest High School | Legat Architects

Recommendations- Year 1

OPEN TO BELOW OPEN TO BELOW

0 40 80 160N

1. LL

1. LL

2. LL

2. LL

3. LL 3. LL

2. OFF

1. OFF

3. O

FFWhere the Design of Future Learning Environments can be Tested

Associated Costs:

1. $570,000

2. $660,000

3. $350,000