Oak Pa r k .+ .R i v e r Fo r e s t H igh Schoo l
Board Report May 17, 20163 Options, Summaries, and Cost
L o n g Te r m F a c i l i t y P l a n
2Oak Park and River Forest High School | Legat Architects
South End Option 1 - Summary Chart
Concept Need or Opportunity Dependencies Space Gained/Benefits Space Loss 2016 Cost*
Years 1-5 *add 3.5% per year for inflation
1. Renovate existing pools Need: Warm/Safe/Dry Additional water surface area N/A $22,300,000
2. Expand Music Need: Enrollment, future of learning
Moving indoor track off-site
Music department that can accommodate enrollment projections
160 Meter Indoor Track $5,457,375
3. Expand Music - Black Box Theatre Addition
Opportunity: Expand stu-dio 200 below the driver’s end addition
AdditionAn ADA small performance space and can be used by students and the community
Green Space $1,959,375
4. Move Special Educa-tion on Site
Opportunity: Shared efficiencies
Expanding music in current 160 meter track space
On-site special education for students who have aged out N/A $1,215,000
5. Driver’s Ed Addition/PE Support
Opportunity: Currently separated from PE Addition Closer to other PE spaces Green Space $1,781,250
6. Competition Gym Need: Currently not exis-tent, enrollment
Moving indoor track off-site
A true competition gym, with more seating
160 Meter Indoor Track $11,720,625
7. Update Student Locker Room Facilities
Need: Outdated, height of ceiling
Moving indoor track off-site Updated locker space 160 Meter Indoor
Track $4,242,700
Concept Need or Opportunity Dependencies Space Gained/Benefits Space Loss 2016 Cost*
Years 6-10
8. Cafeteria and Kitchen Rebuild
Need: Enrollment, future of learning Additional dining space N/A $20,682,050
9. Stack Gyms Rebuild Need: Enrollment One PE station (a new gym) N/A $13,365,000
10. Centralize Tutoring Center, Library, and Faculty Offices
Opportunity: Future of learning, capture vertical above cafeteria addition
Infilling the library with 8 classrooms
Shorter average travel distance to receive academic support
N/A $11,072,250
11. Renovate Library to have Science Labs and Classroom Space
Opportunity: Future of learning
Library + learning commons moving
The new classrooms have di-rect access to natural daylight and views
N/A $7,795,875
12. Consolidate Huskie Pups Opportunity: Way-finding Infilling the library
with 5 labs
Way-finding, easier for children to be dropped off by their parents
N/A $1,316,700
13. Move Family and Consumer Sciences to First Floor
Opportunity: Shared efficiencies/adjacencies, welcomes community
Consolidating huskie pups
Larger FCS café, 4 class-rooms, 2 offices N/A $6,469,650
Oak Park and River Forest High School | Legat Architects
ATT Attendance
FCS Family and consumer sciences
LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.
OFF Office space
PR Practice Room
RC Resource Center, a place for students to go to receive help, study, etc.
Resource (Teacher + Student)Huskie Pups
CafeteriaApplied Arts
Athletics
Special Education
Classroom Space Office Space
Performing Arts
Science
Visual Arts
Addition Perimeter
Welcome/Entry
Existing Envelop Perimeter
Interior Renovations Perimeter
Lens Corridor
Circulation Collaborative Node/Student Breakout Space
ATT Attendance
FCS Family and consumer sciences
LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.
OFF Office space
PR Practice Room
RC Resource Center, a place for students to go to receive help, study, etc.
Resource (Teacher + Student)Huskie Pups
CafeteriaApplied Arts
Athletics
Special Education
Classroom Space Office Space
Performing Arts
Science
Visual Arts
Addition Perimeter
Welcome/Entry
Existing Envelop Perimeter
Interior Renovations Perimeter
Lens Corridor
Circulation Collaborative Node/Student Breakout Space
SCOVILLE
LAKE
ST.
ERIE
CT.
EAST AVE.
3
EXIT #7
EXIT #8
0 40 80 160N
EXISTING - STUDENTACTIVITY CENTER
8. 9/10 DINING 8. 11/12 DINING8. KITCHEN
9. EXPANDED PESPACE
EXISTING LITTLETHEATRE TO
REMAIN
8. SERVINGEXISTING
BOOKSTORE
STAI
R
STAI
R
8. SPILL OUT DININGABOVE
1. COMPLETE NEW 25 YARDPOOL, DECK & RELATED
EQUIPMENT
1. MENS LOCKERROOMS &SUPPORT
1. C
OAC
HES
LOC
KER
+ O
FFIC
E
1. DRYLAND
1. S
TAIR
1. STORAGE
1. FAMILYCHANGING
1. SCOREKEEPER
1. WOMENSLOCKER ROOMS &
SUPPORT
1. COACHES OFFICE
1. STOR.
CORRIDOR
1. ELEVATOR
8. STAFFDINING
13. FCS LAB
13. FAMILY + CONSUMERSCIENCES CAFE
13. PLTW
12. HUSKIE PUPS
EXISTINGPLAYGROUND
TO REMAIN
AUTO TO REMAIN
ENTRY
13. FCS LAB13. KITCHEN
13. FCS LAB
13. STORAGE13. GROUP
SPACE
2. BANDROOM
PRPR
PRPR
2.STOR.
PRPR
PRPR 2. OFF
4. SPECIALEDUCATION
4. LL 4. LL 4. OFF.
4. STOR.
2. ORCHESTRAROOM
PRPR
PRPR
2.STOR.
PRPR
PRPR
2. OFF
3. BLACK BOX THEATRE -REPLACING STUDIO 200
7. BOY'S LOCKERROOMS
6. COMPETITION GYM
EXISTING GARAGE
Years 1-5 Years 6-10
South End Option 1 - First Floor
Oak Park and River Forest High School | Legat Architects
ATT Attendance
FCS Family and consumer sciences
LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.
OFF Office space
PR Practice Room
RC Resource Center, a place for students to go to receive help, study, etc.
Resource (Teacher + Student)Huskie Pups
CafeteriaApplied Arts
Athletics
Special Education
Classroom Space Office Space
Performing Arts
Science
Visual Arts
Addition Perimeter
Welcome/Entry
Existing Envelop Perimeter
Interior Renovations Perimeter
Lens Corridor
Circulation Collaborative Node/Student Breakout Space
ATT Attendance
FCS Family and consumer sciences
LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.
OFF Office space
PR Practice Room
RC Resource Center, a place for students to go to receive help, study, etc.
Resource (Teacher + Student)Huskie Pups
CafeteriaApplied Arts
Athletics
Special Education
Classroom Space Office Space
Performing Arts
Science
Visual Arts
Addition Perimeter
Welcome/Entry
Existing Envelop Perimeter
Interior Renovations Perimeter
Lens Corridor
Circulation Collaborative Node/Student Breakout Space
SCOVILLE
LAKE
ST.
ERIE
CT.
EAST AVE.
4
ROOF BELOW
0 40 80 160N
STEM -EXISTING
11. LAB 11. PREP
11. PREP
11. LAB
11. LAB
11. LAB
11.STUDENT
RESOURCE- SCIENCE
11. OFF
11. LAB
11.OFF
OPEN TO BELOW
8. ITSUPPORT
10. TUTORING
8. CAFE
8. OFF
8. DINING SPILL OUT
OPEN TO BELOW OPEN TO BELOW
STAI
R
STAI
R
STAI
R
1. SEATS
1. S
TAIR
1. T
OIL
ETS
1. SUPPORT
1. CLASSROOM
1. CORRIDOR
5. DRIVEREDUCATION
1. ELEVATOR
1. OPEN TOPOOL BELOW
5. PESUPPORT
PRACTICE ROOMS TO REMAIN
2. MUSIC LIBRARY+ STORAGE
2. OFF
2. CHOIR
7. BOY'S LOCKERROOMS
10.OFF
10.MAIL
ROOM
2. LL
6. COMPETITIONGYM BELOW
2. BANDROOM BELOW
EXISTING GARAGE
Years 1-5 Years 6-10
South End Option 1 - Second Floor
Oak Park and River Forest High School | Legat Architects
ATT Attendance
FCS Family and consumer sciences
LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.
OFF Office space
PR Practice Room
RC Resource Center, a place for students to go to receive help, study, etc.
Resource (Teacher + Student)Huskie Pups
CafeteriaApplied Arts
Athletics
Special Education
Classroom Space Office Space
Performing Arts
Science
Visual Arts
Addition Perimeter
Welcome/Entry
Existing Envelop Perimeter
Interior Renovations Perimeter
Lens Corridor
Circulation Collaborative Node/Student Breakout Space
ATT Attendance
FCS Family and consumer sciences
LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.
OFF Office space
PR Practice Room
RC Resource Center, a place for students to go to receive help, study, etc.
Resource (Teacher + Student)Huskie Pups
CafeteriaApplied Arts
Athletics
Special Education
Classroom Space Office Space
Performing Arts
Science
Visual Arts
Addition Perimeter
Welcome/Entry
Existing Envelop Perimeter
Interior Renovations Perimeter
Lens Corridor
Circulation Collaborative Node/Student Breakout Space
SCOVILLE
LAKE
ST.
ERIE
CT.
EAST AVE.
5
0 40 80 160N
11. STUDENT RESOURCE
11. LL
11. OFF
11. OFF11. OFF
11. LL
11. LL 11. LL11. LL11. LL
11.GRAPHICS
LAB
11. LL 11. LL
11.OFF
GREEN ROOF8. DOUBLEHEIGHT PE
SPACE
POTENTIALPE SPACE
8. PE SUPPORT10. OFF
10. OFF
10. LIBRARY +LEARNING COMMONSST
AIR
10. LIBRARYINSTRUCTIONAL
SPACE
6. ATHLETICSTORAGE
6. MECH.
EXISTING GARAGE
Years 1-5 Years 6-10
South End Option 1 - Third Floor
Oak Park and River Forest High School | Legat Architects
ATT Attendance
FCS Family and consumer sciences
LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.
OFF Office space
PR Practice Room
RC Resource Center, a place for students to go to receive help, study, etc.
Resource (Teacher + Student)Huskie Pups
CafeteriaApplied Arts
Athletics
Special Education
Classroom Space Office Space
Performing Arts
Science
Visual Arts
Addition Perimeter
Welcome/Entry
Existing Envelop Perimeter
Interior Renovations Perimeter
Lens Corridor
Circulation Collaborative Node/Student Breakout Space
ATT Attendance
FCS Family and consumer sciences
LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.
OFF Office space
PR Practice Room
RC Resource Center, a place for students to go to receive help, study, etc.
Resource (Teacher + Student)Huskie Pups
CafeteriaApplied Arts
Athletics
Special Education
Classroom Space Office Space
Performing Arts
Science
Visual Arts
Addition Perimeter
Welcome/Entry
Existing Envelop Perimeter
Interior Renovations Perimeter
Lens Corridor
Circulation Collaborative Node/Student Breakout Space
SCOVILLE
LAKE
ST.
ERIE
CT.
EAST AVE.
6
SOUTH
PE NTHOUS E
001
NORTH
PE NTHOUS E
002
WE S T
003
0 40 80 160N
13. OFF
13. OFF
13. LL
13. LL
13. LL
13. LL
GREEN ROOF BELOW
ADDITIONBELOW
EXISTING GARAGE
Years 1-5 Years 6-10
South End Option 1 - Fourth Floor
7Oak Park and River Forest High School | Legat Architects
South End Option 2 - Summary Chart
Concept Need or Opportunity Dependencies Space Gained/Benefits Space Loss 2016 Cost*
Years 1-5 *add 3.5% per year for inflation
1. Natatorium and Park-ing Garage Addition Need: Warm/Safe/Dry A new natatorium/additional
instructional space N/A $42,100,000
2. Expand Music Need: Enrollment, future of learning
Natatorium addition
Music department that can accommodate enrollment projections
N/A $5,754,375
3. Move Special Educa-tion on Site
Opportunity: Shared efficiencies
Expanding music in south end
On-site special education for students who have aged out
N/A $1,215,000
5. Update Student Locker Room Facilities
Need: Outdated, height of ceiling
Natatorium addition Updated locker space N/A $5,266,800
Concept Need or Opportunity Dependencies Space Gained/Benefits Space Loss 2016 Cost*
Years 6-10
6. Cafeteria and Kitchen Rebuild
Need: Enrollment, future of learning Additional dining space N/A $20,682,050
7. Stack Gyms Rebuild Need: Enrollment One PE station (a new gym) N/A $13,365,000
8. Centralize Tutoring Center, Library, and Faculty Offices
Opportunity: Future of learning, capture vertical above cafeteria addition
Infilling the library with 8 classrooms
Shorter average travel dis-tance to receive academic support
N/A $11,072,250
9. Renovate Library to have Science Labs and Classroom Space
Opportunity: Future of learning
Library + learning commons moving
The new classrooms/labs have direct access to natu-ral daylight and views
N/A $7,795,875
10. Consolidate Huskie Pups Opportunity: Way-finding Infilling the library
with 5 labs
Way-finding, easier for children to be dropped off by their parents
N/A $1,316,700
11. Move Family and Consumer Sciences to First Floor
Opportunity: Shared efficiencies/adjacencies, welcomes community
Consolidating huskie pups
Larger FCS café, 4 class-rooms, 2 offices N/A $6,469,650
12. Expand Music - Black Box Theatre Replaces Lecture Halls
Opportunity: Expand studio 200 replacing lecture halls
A small student perfor-mance space
2 Lecture halls, 370/371 $1,687,500
Oak Park and River Forest High School | Legat Architects
ATT Attendance
FCS Family and consumer sciences
LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.
OFF Office space
PR Practice Room
RC Resource Center, a place for students to go to receive help, study, etc.
Resource (Teacher + Student)Huskie Pups
CafeteriaApplied Arts
Athletics
Special Education
Classroom Space Office Space
Performing Arts
Science
Visual Arts
Addition Perimeter
Welcome/Entry
Existing Envelop Perimeter
Interior Renovations Perimeter
Lens Corridor
Circulation Collaborative Node/Student Breakout Space
ATT Attendance
FCS Family and consumer sciences
LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.
OFF Office space
PR Practice Room
RC Resource Center, a place for students to go to receive help, study, etc.
Resource (Teacher + Student)Huskie Pups
CafeteriaApplied Arts
Athletics
Special Education
Classroom Space Office Space
Performing Arts
Science
Visual Arts
Addition Perimeter
Welcome/Entry
Existing Envelop Perimeter
Interior Renovations Perimeter
Lens Corridor
Circulation Collaborative Node/Student Breakout Space
SCOVILLE
LAKE
ST.
ERIE
CT.
EAST AVE.
8
EXIT #8
0 40 80 160N
EXISTING - STUDENTACTIVITY CENTER
2. BANDROOM
6. 9/10 DINING 6. 11/12 DINING
11. FCS LAB
11. FAMILY +CONSUMER SCIENCES
CAFE
11. PLTW
10. HUSKIE PUPS
EXISTINGPLAYGROUND
TO REMAIN
3. SPECIALEDUCATION
6. KITCHEN
7. EXPANDED PESPACE
1. POOL & DECK1. ELEVATOR
1. CLASSROOM
EXISTING LITTLETHEATRE TO
REMAIN
1. NEW PARKING GARAGE
1. STORAGE 1. DRYLAND
1. COACHESLOCKER +OFFICE
1. FAMILYCHANGING
1. WOMEN'S LOCKERROOMS + SUPPORT
1. MEN'S LOCKERROOM + SUPPORT
6. SERVINGEXISTING
BOOKSTORE
STAI
R
STAI
R
6. SPILL OUT DININGABOVE
PRPR
PRPR
AUTO TO REMAIN
11. ENTRY
2. STOR.PRPR
PRPR
2. ENSEMBLEROOM
2. OFF
2. ORCHESTRAROOM
PRPR
PRPR
2. STOR.PRPR
PRPR
2. OFF
5. BOYS LOCKERROOM
11. FCS LAB11. KITCHEN
11. FCS LAB
11. STORAGE11. GROUP
SPACE
3. LL 3. LL 3. OFF.
3. STOR.
Years 1-5 Years 6-10
South End Option 2 - First Floor
Oak Park and River Forest High School | Legat Architects
ATT Attendance
FCS Family and consumer sciences
LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.
OFF Office space
PR Practice Room
RC Resource Center, a place for students to go to receive help, study, etc.
Resource (Teacher + Student)Huskie Pups
CafeteriaApplied Arts
Athletics
Special Education
Classroom Space Office Space
Performing Arts
Science
Visual Arts
Addition Perimeter
Welcome/Entry
Existing Envelop Perimeter
Interior Renovations Perimeter
Lens Corridor
Circulation Collaborative Node/Student Breakout Space
ATT Attendance
FCS Family and consumer sciences
LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.
OFF Office space
PR Practice Room
RC Resource Center, a place for students to go to receive help, study, etc.
Resource (Teacher + Student)Huskie Pups
CafeteriaApplied Arts
Athletics
Special Education
Classroom Space Office Space
Performing Arts
Science
Visual Arts
Addition Perimeter
Welcome/Entry
Existing Envelop Perimeter
Interior Renovations Perimeter
Lens Corridor
Circulation Collaborative Node/Student Breakout Space
SCOVILLE
LAKE
ST.
ERIE
CT.
EAST AVE.
9
ROOF BELOW
0 40 80 160N
STEM -EXISTING
9. LAB 9. PREP
9. PREP
9. LAB
9. LAB
9. LAB
9.STUDENT
RESOURCE- SCIENCE
9. OFF
9. LAB
9. OFF
1. DRIVEREDUCATION
WEIGHT ROOM
1. T
OIL
ETS
1. CONCESSIONS+ SUPPORT
1. +/-400 SEATS
PRACTICE ROOMS TO REMAIN
2. LL
OPEN TO BELOW
6. ITSUPPORT
8. TUTORING
6. CAFE
8. OFF
6. DINING SPILL OUT
OPEN TO BELOW OPEN TO BELOW
STAI
R
STAI
R
STAI
R
5. EXISTING STAFFDINING TO REMAIN
2. MUSICLIBRARY +STORAGE
2. OFF
1. DRIVEREDUCATION
2. CHOIR
8. MAILROOM
5. GIRL'S PELOCKER ROOM
5. GIRL'SATH.
STOR.5. GIRL'S
ATH.LOCKERROOM
1. PARKING GARAGEBELOW
Years 1-5 Years 6-10
South End Option 2 - Second Floor
Oak Park and River Forest High School | Legat Architects
ATT Attendance
FCS Family and consumer sciences
LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.
OFF Office space
PR Practice Room
RC Resource Center, a place for students to go to receive help, study, etc.
Resource (Teacher + Student)Huskie Pups
CafeteriaApplied Arts
Athletics
Special Education
Classroom Space Office Space
Performing Arts
Science
Visual Arts
Addition Perimeter
Welcome/Entry
Existing Envelop Perimeter
Interior Renovations Perimeter
Lens Corridor
Circulation Collaborative Node/Student Breakout Space
ATT Attendance
FCS Family and consumer sciences
LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.
OFF Office space
PR Practice Room
RC Resource Center, a place for students to go to receive help, study, etc.
Resource (Teacher + Student)Huskie Pups
CafeteriaApplied Arts
Athletics
Special Education
Classroom Space Office Space
Performing Arts
Science
Visual Arts
Addition Perimeter
Welcome/Entry
Existing Envelop Perimeter
Interior Renovations Perimeter
Lens Corridor
Circulation Collaborative Node/Student Breakout Space
SCOVILLE
LAKE
ST.
ERIE
CT.
EAST AVE.
10
OPEN TO BELOW
OPEN TO BELOW OPEN TO BELOW
0 40 80 160N
9. STUDENT RESOURCE
9. LL
9. OFF
9. OFF9. OFF
9. LL
9. LL 9. LL9. LL9. LL
9.GRAPHICS
LAB
9. LL 9. LL
9.OFF
GREEN ROOF7. DOUBLEHEIGHT PE
SPACE
12. BLACK BOX THEATRE -REPLACING STUDIO 200
7. PE SUPPORT8. OFF
8. OFF
8. LIBRARY + LEARNINGCOMMONSST
AIR
8. LIBRARYINSTRUCTIONAL
SPACE
1. POOL + PARKINGGARAGE BELOW
Years 1-5 Years 6-10
South End Option 2 - Third Floor
Oak Park and River Forest High School | Legat Architects
ATT Attendance
FCS Family and consumer sciences
LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.
OFF Office space
PR Practice Room
RC Resource Center, a place for students to go to receive help, study, etc.
Resource (Teacher + Student)Huskie Pups
CafeteriaApplied Arts
Athletics
Special Education
Classroom Space Office Space
Performing Arts
Science
Visual Arts
Addition Perimeter
Welcome/Entry
Existing Envelop Perimeter
Interior Renovations Perimeter
Lens Corridor
Circulation Collaborative Node/Student Breakout Space
ATT Attendance
FCS Family and consumer sciences
LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.
OFF Office space
PR Practice Room
RC Resource Center, a place for students to go to receive help, study, etc.
Resource (Teacher + Student)Huskie Pups
CafeteriaApplied Arts
Athletics
Special Education
Classroom Space Office Space
Performing Arts
Science
Visual Arts
Addition Perimeter
Welcome/Entry
Existing Envelop Perimeter
Interior Renovations Perimeter
Lens Corridor
Circulation Collaborative Node/Student Breakout Space
SCOVILLE
LAKE
ST.
ERIE
CT.
EAST AVE.
11
DN
SOUTH
PE NTHOUS E
001
NORTH
PE NTHOUS E
002
WE S T
PE NTHOUS E
0 40 80 160N
11. OFF
11. OFF
11. LL
11. LL
11. LL
11. LL
GREEN ROOF BELOW
1. POOL + PARKINGGARAGE BELOW
Years 1-5 Years 6-10
South End Option 2 - Fourth Floor
12Oak Park and River Forest High School | Legat Architects
South End Option 3 - Summary Chart
Concept Need or Opportunity Dependencies Space Gained/Benefits Space Loss 2016 Cost*
Years 1-5 *add 3.5% per year for inflation
1. Natatorium Need: Warm/Safe/Dry A new 40-meter pool N/A Price included in 200 Meter Track Concept
2. Move Special Educa-tion on Site
Opportunity: Shared efficiencies
Expanding music in South End
On-site special education for students who have aged out
N/A $1,215,000
3. Expand Music Need: Enrollment, future of learning Natatorium Addition
Music department that can accommodate enrollment projections
N/A Price included in 200 Meter Track Concept
3a. Expand Music - Black Box Theatre Addition
Opportunity: Expand stu-dio 200 below the driver’s end addition
Addition A small student perfor-mance space N/A Price included in 200 Meter
Track Concept
4. 200 Meter Track + New Gyms Need: 200 Meter Track Tear down south end
and rebuild 200-meter track *1 PE station $90,199,579
Concept Need or Opportunity Dependencies Space Gained/Benefits Space Loss 2016 Cost*
Years 6-10
5. Cafeteria and Kitchen Rebuild
Need: Enrollment, future of learning Additional dining space N/A $20,682,050
6. Stack Gyms Rebuild Need: Enrollment *Replaces PE Station lost in the plan for Years 1 to 5 N/A $13,365,000
7. Centralize Tutoring Center, Library, and Faculty Offices
Opportunity: Future of learning, capture vertical above cafeteria addition
Infilling the library with 8 classrooms
Shorter average travel dis-tance to receive academic support
N/A $11,072,250
8. Renovate Library to have Science Labs and Classroom Space
Opportunity: Future of learning
Library + learning commons moving
The new classrooms have direct access to natural daylight and views
N/A $7,795,875
9. Consolidate Huskie Pups Opportunity: Way-finding Infilling the library
with 5 labs
Way-finding, easier for children to be dropped off by their parents
N/A $1,316,700
10. Move Family and Consumer Sciences to First Floor
Opportunity: Shared efficiencies/adjacencies, welcomes community
Consolidating huskie pups
Larger FCS café, 4 class-rooms, 2 offices N/A $6,469,650
Oak Park and River Forest High School | Legat Architects
ATT Attendance
FCS Family and consumer sciences
LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.
OFF Office space
PR Practice Room
RC Resource Center, a place for students to go to receive help, study, etc.
Resource (Teacher + Student)Huskie Pups
CafeteriaApplied Arts
Athletics
Special Education
Classroom Space Office Space
Performing Arts
Science
Visual Arts
Addition Perimeter
Welcome/Entry
Existing Envelop Perimeter
Interior Renovations Perimeter
Lens Corridor
Circulation Collaborative Node/Student Breakout Space
ATT Attendance
FCS Family and consumer sciences
LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.
OFF Office space
PR Practice Room
RC Resource Center, a place for students to go to receive help, study, etc.
Resource (Teacher + Student)Huskie Pups
CafeteriaApplied Arts
Athletics
Special Education
Classroom Space Office Space
Performing Arts
Science
Visual Arts
Addition Perimeter
Welcome/Entry
Existing Envelop Perimeter
Interior Renovations Perimeter
Lens Corridor
Circulation Collaborative Node/Student Breakout Space
SCOVILLE
LAKE
ST.
ERIE
CT.
EAST AVE.
13
EXIT #7
EXIT #8
0 40 80 160N
EXISTING - STUDENTACTIVITY CENTER
3. BAND ROOM
5. 9/10 DINING 5. 11/12 DINING
FCS LAB
10. FAMILY + CONSUMERSCIENCES CAFE
10. PLTW
9. HUSKIE PUPS
EXISTINGPLAYGROUND
TO REMAIN
2. SPECIALEDUCATION
5. KITCHEN
6. EXPANDED PESPACE
1. POOL & DECKBELOW
EXISTING LITTLETHEATRE TO
REMAIN
5. SERVINGEXISTING
BOOKSTORE
STAI
R
STAI
R
5. SPILL OUT DININGABOVE
PR
AUTO TO REMAIN
ENTRY
3. STOR.3.
OFF
FCS LAB10. KITCHEN
FCS LAB
STORAGE10. GROUP
SPACE
2. LL 2. LL 2. OFF.
2. STOR.
PRPR
PR
PR
PR
PR
PR
1. BALCONY - SPECTATORS
1. POOLSUPPORT -LOCKERSBELOW
3. ORCHESTRAROOM
PR
3. STOR.
3. OFF
PR
PR
PR
PR
PR
PR
PR
3a. BLACK BOX THEATRE -REPLACING STUDIO 200
4. PE/ATHLETIC OFFICES +CLASSROOMS
4. GYM
4. GYM
STAI
RST
AIR
4. GIRL'S LOCKERROOM
4. BOY'S LOCKERROOM
EXISTING GARAGE
Years 1-5 Years 6-10
South End Option 3 - First Floor
Oak Park and River Forest High School | Legat Architects
ATT Attendance
FCS Family and consumer sciences
LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.
OFF Office space
PR Practice Room
RC Resource Center, a place for students to go to receive help, study, etc.
Resource (Teacher + Student)Huskie Pups
CafeteriaApplied Arts
Athletics
Special Education
Classroom Space Office Space
Performing Arts
Science
Visual Arts
Addition Perimeter
Welcome/Entry
Existing Envelop Perimeter
Interior Renovations Perimeter
Lens Corridor
Circulation Collaborative Node/Student Breakout Space
ATT Attendance
FCS Family and consumer sciences
LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.
OFF Office space
PR Practice Room
RC Resource Center, a place for students to go to receive help, study, etc.
Resource (Teacher + Student)Huskie Pups
CafeteriaApplied Arts
Athletics
Special Education
Classroom Space Office Space
Performing Arts
Science
Visual Arts
Addition Perimeter
Welcome/Entry
Existing Envelop Perimeter
Interior Renovations Perimeter
Lens Corridor
Circulation Collaborative Node/Student Breakout Space
SCOVILLE
LAKE
ST.
ERIE
CT.
EAST AVE.
14
ROOF BELOW
0 40 80 160N
STEM -EXISTING
8. LAB 8. PREP
8. PREP
8. LAB
8. LAB
8. LAB
8.STUDENT
RESOURCE- SCIENCE
8. OFF
8. LAB
8. OFF
PRACTICE ROOMS TO REMAIN
3. LL
OPEN TO BELOW
5. ITSUPPORT
7. TUTORING
5. CAFE
7. OFF
5. DINING SPILL OUT
OPEN TO BELOW OPEN TO BELOW
STAI
R
STAI
R
STAI
R
5. EXISTING STAFFDINING TO REMAIN -
RENOVATE
3. MUSICLIBRARY +STORAGE
3. OFF
3. CHOIR
7. MAILROOM
4. 200 METER TRACK + 3COURTS
STAI
RST
AIR
4. MECH.
4. GYM
4. GYM
4. GYM
4. WEIGHTROOM
4. MULTI-PURPOSE
4. DRIVEREDUCATION
EXISTING GARAGE
Years 1-5 Years 6-10
South End Option 3 - Second Floor
Oak Park and River Forest High School | Legat Architects
ATT Attendance
FCS Family and consumer sciences
LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.
OFF Office space
PR Practice Room
RC Resource Center, a place for students to go to receive help, study, etc.
Resource (Teacher + Student)Huskie Pups
CafeteriaApplied Arts
Athletics
Special Education
Classroom Space Office Space
Performing Arts
Science
Visual Arts
Addition Perimeter
Welcome/Entry
Existing Envelop Perimeter
Interior Renovations Perimeter
Lens Corridor
Circulation Collaborative Node/Student Breakout Space
ATT Attendance
FCS Family and consumer sciences
LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.
OFF Office space
PR Practice Room
RC Resource Center, a place for students to go to receive help, study, etc.
Resource (Teacher + Student)Huskie Pups
CafeteriaApplied Arts
Athletics
Special Education
Classroom Space Office Space
Performing Arts
Science
Visual Arts
Addition Perimeter
Welcome/Entry
Existing Envelop Perimeter
Interior Renovations Perimeter
Lens Corridor
Circulation Collaborative Node/Student Breakout Space
SCOVILLE
LAKE
ST.
ERIE
CT.
EAST AVE.
15
OPEN TO BELOW
0 40 80 160N
8. STUDENTRESOURCE
8. LL
8. OFF
8. OFF8. OFF
8. LL
8. LL 8. LL8. LL8. LL
8.GRAPHICS
LAB
8. LL 8. LL
8. O
FF
5. GREEN ROOF6. DOUBLEHEIGHT PE
SPACE
6. PE SUPPORT7. OFF
7. OFF
7. LIBRARY + LEARNINGCOMMONSST
AIR
7. LIBRARYINSTRUCTIONAL
SPACE
4. FIELD HOUSEOPEN TO BELOW
EXISTING GARAGE
Years 1-5 Years 6-10
South End Option 3 - Third Floor
Oak Park and River Forest High School | Legat Architects
ATT Attendance
FCS Family and consumer sciences
LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.
OFF Office space
PR Practice Room
RC Resource Center, a place for students to go to receive help, study, etc.
Resource (Teacher + Student)Huskie Pups
CafeteriaApplied Arts
Athletics
Special Education
Classroom Space Office Space
Performing Arts
Science
Visual Arts
Addition Perimeter
Welcome/Entry
Existing Envelop Perimeter
Interior Renovations Perimeter
Lens Corridor
Circulation Collaborative Node/Student Breakout Space
ATT Attendance
FCS Family and consumer sciences
LL Learning Lab, ie flexible classroom space, combined with an office make up a Classroom Block.
OFF Office space
PR Practice Room
RC Resource Center, a place for students to go to receive help, study, etc.
Resource (Teacher + Student)Huskie Pups
CafeteriaApplied Arts
Athletics
Special Education
Classroom Space Office Space
Performing Arts
Science
Visual Arts
Addition Perimeter
Welcome/Entry
Existing Envelop Perimeter
Interior Renovations Perimeter
Lens Corridor
Circulation Collaborative Node/Student Breakout Space
SCOVILLE
LAKE
ST.
ERIE
CT.
EAST AVE.
16
DN
SOUTH
PE NTHOUS E
001
NORTH
PE NTHOUS E
002
WE S T
PE NTHOUS E
003
0 40 80 160N
10. OFF
10. OFF
10. LL
10. LL
10. LL
10. LL
GREEN ROOF BELOW
EXISTING GARAGE
Years 1-5 Years 6-10
South End Option 3 - Fourth Floor
17Oak Park and River Forest High School | Legat Architects
Recommendations- Year 1
OPEN TO BELOW OPEN TO BELOW
0 40 80 160N
1. LL
1. LL
2. LL
2. LL
3. LL 3. LL
2. OFF
1. OFF
3. O
FFWhere the Design of Future Learning Environments can be Tested
Associated Costs:
1. $570,000
2. $660,000
3. $350,000