2 Managed by UT-Battellefor the U.S. Department of Energy
• 3 major operating sites on theOak Ridge Reservation:– Y-12 National Security Complex
• Defense Program
– East Tennessee Technology Park (ETTP)• D&D to privatize
– Oak Ridge National Laboratory (ORNL)• DOE’s largest and most diversified multi-program national laboratory
– Computing and Computational Sciences
– Energy and Environmental Studies
– Global Security
– Neutron Sciences
– Nuclear Science and Engineering
– Physical Sciences
– Science and Technology Partnerships
– U.S. International Thermonuclear Experimental Reactor (ITER) Project
Oak Ridge National Laboratory (ORNL)
3 Managed by UT-Battellefor the U.S. Department of Energy
Spallation Neutron Source (SNS) Pulsed Neutron Source
Supercomputer Facility
Electron Microscope Laboratory
High Flux Isotope Reactor (HFIR)Continuous Neutron Source
DOE Bioenergy Science Center
Oak Ridge Science and Technology Park
ORNL’ Central Campus Area
ORNL Central Campus Layout/Overview
4 Managed by UT-Battellefor the U.S. Department of Energy
Laboratory Waste Services Division (LWSD)
• Hazardous and Mixed Waste Management• Hazardous Material Spill Response • Operational Planning and Waste Services
Representatives (WSRs)• Pollution Prevention• Radioactive Waste Management• Waste and Materials Disposition• Waste Handling and Facilities and Operations• Analytical Services Program
NOTE: At the end of June, 2014; Environmental Protection and Waste Services Division was split into two divisions – Environmental Protection Services Division (EPSD) and Laboratory Waste Services Division (LWSD).
5 Managed by UT-Battellefor the U.S. Department of Energy
• FY14 – Contracts under ICPT BOA with several full service laboratories
• All offsite analytical support provided by BOA laboratories LWS; 3 Offsite Labs under Contract w/ Limited Onsite Lab Need For
Special Case Issues (e.g. High Rad; Rad Fecal Coliform, etc.) EPS; 4 Offsite Labs under Contract; More Usage of Onsite Lab Due
To Short Analytical Hold Time Requirement Analyses
• Laboratory selection performed and documented on each sample request (lab justification); dependent upon analytical suite.
• Lab Justification Factors considered: Cost (# Samples, Analytical Suite, TAT, Deliverable Requested) Past performance (MAPEP, DOECAP Audits, QA/QC Issues w/ Data
Reviews, Invoicing; Responsiveness; etc.) Other issues (e.g. Sample Volume, NRC license, Facility Safety
Basis, Meeting TAT)
Contracting Analytical Support
6 Managed by UT-Battellefor the U.S. Department of Energy
ID ASP Process Flow Actions
1 Sample Request Received
2 Analytical Services Coordinator (ASC) Assigned
3 Lab Selection/Justification
4Transportation Request Submitted(ORNL-19 or ORNL-28)
5 Transportation Request Approval
6 SP Field Hazard Evaluation (SPFHE)
7Sample Documentation Completed[SPRF, Work Plan (SPFHE), SI, Trans]
8Sample Requestor Reviews/Approves Sample Documentation
9 Sampling Scheduled/Completed
10 Samples Shipped Offsite
Special Project Sample Requests: The Process Flow
SP Field Hazard Evaluation; Safety Aspect Considerations…a) Samplers open waste items and
containers; physically contact waste matrix.
b) Safety Rep walkdown project with Sampler
c) Considerations…• Radiation Work Permit; rad
conditions (dose rates, contamination, etc.)
• Lead• Beryllium• Lock Out/Tag Out; Stored Energy;
electrical, pumps, motors, stored energy of any type
• Chemical Hazards; acids, bases, flammables, shock sensitive, etc.
7 Managed by UT-Battellefor the U.S. Department of Energy
• 39 Routine Special Project (SP) Sample Requests Processed:
146 Samples w/ 363 Analytical Tests consisting of…
149 - Radiological (Gross Alpha/Gross Beta; Gamma; Alpha Spec; etc.)
124 - RCRA components
51 - PCBs
39 - Misc. analyses (pH, Flashpoint, Boiling Point, etc.)
Sample Request Waste Streams Sampled Include:
12 - Used Oil
6 - Glovebox/Hot Cells involving High Rad Contamination
7 - Hazardous Liquids
4 - Personal Protective Equipment (PPE) and Dry Active Waste (DAW)
3 - Sewage Treatment Plant
2 - HEPAs
5 - Misc; solids/liquids
FY14 LWSD ASP Special Project Sampling
8 Managed by UT-Battellefor the U.S. Department of Energy
• Analytical Data Verification and Validation (V&V):
Increased Emphasis on NNSA Disposal in Nevada
Waste Services Rep Identifies Candidate Waste Streams
7 SP’s Identified for V&V…
4500N; Facility; Hood Removal RCRA Char
2521; STP Drying Beds; 20 Bxs Dried Sewage Sludge
7935; LLLW Collection Tank; Tank Contents
3025E; Hot Cells; Facility Rad Distribution
7920; 108; Glovebox 7920-108-1 RCRA/TSCA Char
2521; Sewage Water/Sludge Disposal Endpoint Determination Char
3047B; 109; Hot Cells; Rad Char
FY14 LWSD ASP SP; V&V Activities
9 Managed by UT-Battellefor the U.S. Department of Energy
• Environmental Sampling Activity:
1242 Samples w/ 1916 Analytical Tests consisting of…
NPDES Related (Permit; Rad Monitoring; Water Quality; etc.)
o 791 samples w/ 1179 analytical tests
Surveillance (Food, Groundwater, Air, etc.)
o 422 samples w/ 702 analytical tests
Carbon Fiber Test Facility (CFTF) Permit
o 29 samples w/ 35 analytical tests
FY14 EPSD Environmental Sampling
10 Managed by UT-Battellefor the U.S. Department of Energy
Sampling Improvements…
Innovative Sampling Ideas:
• HEPA Sampling Glovebag:
Portable; allows for sampling at location; do not need to locate vent hood for sampling.
• Metal Punch for Coupon Sampling:
Easily produce punchout of up to ½” steel for TCLP RCRA Metals sample.
11 Managed by UT-Battellefor the U.S. Department of Energy
Oak Ridge National LaboratoryFY14 Decade of Waste Generation*
* Does not include waste from ARRA Funded Projects.
12 Managed by UT-Battellefor the U.S. Department of Energy
• 77 waste shipments to off-site TSDFs
Zero shipment issues during transport or acceptance at the disposal endpoint.
• Waste Management software change over from commercial to ORNL developed software.
• April 8, 2011… First use of “item level certification”
• FY11… Implemented waste chargeback model [Treatment and Disposal (T&D) cost].
• Effective and efficient management of waste inventory.
Full waste shipments, small amount of waste in storage.
• RCRA Permitted Waste Storage Facility at ORNL
Provide capability for ORNL to store waste for longer than 90 days (up to 1 year).
Improve lab packing efficiency; combine items from different onsite generators into same labpack thereby reducing disposal costs.
FY 2014 Waste Management Highlights
13 Managed by UT-Battellefor the U.S. Department of Energy
FY 2014 - The Tale of Two Projects…Campus Modernization: New Shipping and Receiving Facility; Site Preparation
• Old Facility Demolition
Bldg. 7005; Lead Shop Bldg. 7018; Bulk Receiving/Stores
• Facility Characterization
Bldg. 7005; Sampling…
- 1 Sample Project; 20 samples with 55 analytical tests
- Media sampled: Metal I-beams, Concrete, Soil
- Contaminates;Uranium (U); K-25 Structural SteelLead (Pb); Smelting Operations
Bldg. 7018; Process Knowledge... No Rad and No Hazardous
• Facility Demolition Disposition
• New Facility Site Characterization
1 Sample Project; 37 samples with 51 analytical tests
- Media sampled: Soil Corings- Analytes;
Gross Alpha/Gross Beta (No Rad Added)TCLP RCRA Metals (include Mercury)TCLP VOAsPCBs
14 Managed by UT-Battellefor the U.S. Department of Energy
FY 2014 - The Tale of Two Projects (cont’d)…Sewage Treatment Plant (STP); Disposition Endpoint Determination
• Disposition Issue: Non-Hazardous Low Levels of Radionuclide Contamination
• Possible Endpoints
Oak Ridge City Sewage Treatment Plant
- Digester Outlet; Liquid w/ High Solids Content
- Tanker Truck- Sample For OR STP Acceptance Criteria
Y-12 Landfill
- Fan Press (Centrifuge) Outlet; Solid- Waste Box- ResRad Model to Determine Dose
Commitment Acceptability
Commercial Low-Level Radioactive Waste Disposal Facility
- Dryer Outlet; Pathogen Acceptance Requirement
NNSA (Nevada)
- Fan Press (Centrifuge) Outlet; Solid- Moisture Content Requirements
• Sampling Requests
4 Sample Projects; 11 samples with 67 analytical tests
- Inlet Water BoxMercury Testing
- Digester Outlet/Centrifuge OutletScoping Analysis
- Fan Press OutletMoisture Testing; Freeze/Thaw, Shaker, and Oven Drying
- Digester Outlet/Fan Press OutletFull Analytical Suite for Possible Endpoints
15 Managed by UT-Battellefor the U.S. Department of Energy
ORNL Cleanup Projects• Transuranic Waste Processing Project
• Building 3026 and Hot Cell Demolition• Miscellaneous Facilities Demolition (34 Facilities and Structures on Central Campus Area)• Tank W-1A Removal and Melton Valley Wells• Building 3038 Legacy Materials Removal and Demolition Preparation• Bethel Valley Burial Grounds• ORNL Waste Operations (Liquid, Gaseous, and Process Waste Treatment)• Building 4500 Stack Removal• 2000 Complex Demolition• Isotope Row Char and Legacy Material Removal• Building 2026 Legacy Material Removal• Beta 3 Characterization• West Quad Soil Remediation• National Priority List Site Boundary
ORNL Related ARRA Projects Overview
16 Managed by UT-Battellefor the U.S. Department of Energy
FY14 ORNL DOECAPTSDF and Laboratory Auditors
• 3 DOECAP TSDF auditors qualified in following disciplines: 1 Lead; Non-Rad TSDF 1 Waste Operations 3 Radiological Control 2 Transportation Management
• 1 DOECAP Laboratory auditor qualified in following discipline: 1 Haz & Rad Material Management
• FY14 Audit Participation: 2 TSDF Audits supporting following disciplines:
1 – Transportation Management2 – Radiological Control
Lab Audit supporting following discipline:None
17 Managed by UT-Battellefor the U.S. Department of Energy
Future of ORNL with DOECAP
• ORNL is committed to:Continue using DOECAP and Mixed Analyte
Performance Evaluation Program (MAPEP) resourcesContinue supporting DOECAP on TSDF and Lab
AuditsLWS Management committed to identify additional
potential auditors to support DOECAP