© pH JKR 2012 Sustainable Site Planning and Management SM | 1 ROAD ALIGNMENT To follow closely the contours to minimize high cutting and embankment. To avoid construction of road in sensitive areas such as swampy areas, forest reserved and catchment areas. 1 Point :Less than 6 berms 1 Point :Cut slope less than 1:1.5 1 Point :Fill slope more than 1:2 1 Point :Maximum grade less than 7% 1 Point :Not in Sensitive Area 1 Point :No reclamation involved 1 Point :Provide added uphill lane (climbing lane) where the length of critical grade exceeds 5% A. Design Evaluation Stage i. Copy of final design report which consist of design calculations, taking-off sheet and technical drawings. B. Verification Scoring Stage i. As-built drawings i. Use JKR guidelines and specification ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification OBJECTIVE CREDIT REQUIREMENT SM 1 5 POINTS DOCUMENTATION APPROACHES & STRATEGIES RELATED CREDITS EW 1 – Environmental Management System EW 2 – Stormwater Management EW 3 – Ecological Connectivity AE 1 – Safety Audit AE 4 – Transit Areas AE 5 – Scenic Views CA 1 – Quality Management System MR 2 – Earthwork Balance MR 7 – Life Cycle Assessment BENEFITS Improve the quality and comforts of travelling. Improve local economies.

Upload: others

Post on 10-Apr-2020

11 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Sustainable Site Planning and Management SM | 1

ROAD ALIGNMENT

To follow closely the contours to minimize high cutting and embankment. To avoid construction of road in sensitive areas such as swampy areas, forest reserved and catchment areas.

1 Point :Less than 6 berms

1 Point :Cut slope less than 1:1.5

1 Point :Fill slope more than 1:2

1 Point :Maximum grade less than 7%

1 Point :Not in Sensitive Area

1 Point :No reclamation involved

1 Point :Provide added uphill lane (climbing lane) where the length of critical grade

exceeds 5%

A. Design Evaluation Stage

i. Copy of final design report which consist of design calculations,

taking-off sheet and technical drawings.

B. Verification Scoring Stage

i. As-built drawings

i. Use JKR guidelines and specification

ii. Manual SaliranMesraAlam Malaysia (MASMA)

iii. Use REAM guidelines and specification

OBJECTIVE

CREDIT REQUIREMENT

AHAN

KEPERLUAN PERMARKAHAN

SM 1

5 POINTS

DOCUMENTATION

APPROACHES & STRATEGIES

AHAN

KEPERLUAN PERMARKAHAN

RELATED CREDITS

EW 1 – Environmental Management System

EW 2 – Stormwater Management

EW 3 – Ecological Connectivity

AE 1 – Safety Audit

AE 4 – Transit Areas

AE 5 – Scenic Views

CA 1 – Quality Management System

MR 2 – Earthwork Balance

MR 7 – Life Cycle Assessment

BENEFITS

Improve the quality and comforts of travelling.

Improve local economies.

Page 2: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Sustainable Site Planning and Management SM | 2

EXAMPLE :

Standard Typical Cross-Section, Plan & Longitudinal Profile

Plate 1: Typical cross-section

Plate 2: Plan & Longitudinal Profile

Page 3: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Sustainable Site Planning and Management SM | 3

POTENTIAL ISSUES

i. Combination of geometric design element of roads cannot be fulfilled

(depends on site condition)

ii. Different design software used produce different results. For purposes of this

credit, any software can be used as long as the inputs and results are

justifiable, reasonable and validated by the professional working on the

project.

i. JKR Design Guidelines and Specifications

ii. MASMA iii. REAM

REFERENCES

Page 4: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Sustainable Site Planning and Management SM | 4

SITE VEGETATION

To ensure slope or earth surface covered by vegetation with less maintenance type. Promote sustainable site vegetation on slope/unpaved shoulder that does not require irrigation.

1 Point :Use non-invasive plant species

1 Point :Use native plant species

1 Point :Use of grass/creeper for slope protection/unpaved shoulder.

1 Point :Hydroseeding with recycled local fibro material (example: paddy straw,

coconut husk, rice husk etc.)

1 Point :Preservation of existing vegetation

1 Point :Use bio-engineering techniques (example: vetiver grass, creeper and

regeneration of natural plant species and material )

A. Design Evaluation Stage

i. Spreadsheet listing type of all plants species.

ii. Design Drawing showing the location of all plants to be planted

iii. Bill of Quantities (related items only)

iv. A copy of Enviromental Impact Assessment (EIA) report if required and

Enviromental Management Plan (EMP).

v. A copy of specification sections relating to site vegetation including

planting bed requirements. These are typically found in the

ArahanTeknikJalan 16/03 Pindaan 2008.

B. Verification Scoring Stage

i. As-built drawing

OBJECTIVE

CREDIT REQUIREMENT

AHAN

KEPERLUAN PERMARKAHAN

SM 2

5 POINTS

RELATED CREDITS

EW2 – Stormwater Management

MR6 – Regional Material

BENEFITS

Reduces greenhouse gases.

Increase aesthetics.

Reduce soil erosion.

DOCUMENTATION

Page 5: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Sustainable Site Planning and Management SM | 5

i. Use JKR guidelines and specification.

ii. In the absence of existing guidance, it may be necessary to have an expert

develop an entirely new site-specific vegetation plan.

iii. Long term maintenance plan and goals must be established for the plant

community.

EXAMPLE :

Vetiver grass

Plate 3: Closeturfing

APPROACHES & STRATEGIES

AHAN

KEPERLUAN PERMARKAHAN

Page 6: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Sustainable Site Planning and Management SM | 6

Plate 4: Hydroseeding

Plate 5: Hydroseeding

Page 7: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Sustainable Site Planning and Management SM | 7

POTENTIAL ISSUES

i. Site planting without proper integration with other road activities (eg.

maintenance, roadside safety)

ii. Not considering the suitability of a plant species specific for site condition

salt tolerance and soil pH, pest susceptibility and maintenance requirement.

The roadway environment might be significantly different from surrounding

area, and may not necessarily support its indigenous plant species.

iii. Site vegetation must be considered in the context of soils, compaction,

slopes and hydrology in order to be successful on road projects.

iv. Disturbed soil condition must be modified to create condition that will

sustain native plant growth. Planting beds should be prepared based on

disturbed condition and specified in project documents.

v. There are few current studies on the vegetation of less maintenance that

designer shall refer before choosing the appropriate vegetation.

vi. Hydroseeding with recycled fibro material is relatively costly in comparable

ofhydroseeding alone.

i. ArahanTeknikJalan 16/03 Pindaan 2008.

REFERENCES

Page 8: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Sustainable Site Planning and Management SM | 8

SERVICES FOR DISABLED USERS

Providing dedicated facilities for disabled users.

1 Point : Crossing for disabled users with noise making devices installed.

1 Point : Walkway access for disabled users by providing sidewalks sloped for easy

access.

A. Design Evaluation Stage

i. A copy of approved Development Order (DO) by the local authority.

B. Verification Scoring Stage

i. Photo evidence showing type and location of disabled services provided

vii. Use Uniform Building by Law(UBBL) and MS 1331 & 1184.

EXAMPLE :

i. Ramp for disable at bus stop

ii. Tact tiles

Plate 6: Ramp for disable at bus stop

OBJECTIVE

CREDIT REQUIREMENT

AHAN

KEPERLUAN PERMARKAHAN

SM 3

2 POINTS

RELATED CREDITS

AE2 – Pedestrian Access

CA5 – Traffic Management Plan

BENEFITS

Improve access.

Improve mobility.

Improve awareness.

DOCUMENTATION

APPROACHES & STRATEGIES

AHAN

KEPERLUAN PERMARKAHAN

Page 9: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Sustainable Site Planning and Management SM | 9

Plate 7: Tact Tiles

POTENTIAL ISSUES

i. Many project locations do not have disabled users infrastructure or master

plans to support the needs of disabled users facilities. Short term and long

term goals, objectives and general disabled users strategies should be

considered when accommodating disabled users within the areas.

i. Uniform Building by Law (UBBL)

ii. MS 1331 & 1184

iii. Local authority’s policy

REFERENCES

Page 10: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Environment and Water EW | 1

ENVIRONMENTAL MANAGEMENT SYSTEM

Improve environmental stewardship by using a contractor that has the formal environmental management process.

3 Point : MS ISO 14001: 2004 certification for the main contractor.

A. Design Evaluation Stage

Nil

B. Verification Scoring Stage

Submit the following item:

i. Copy of the ISO14001:2004 certification for the main contractor.

i. Have a main contractor with ISO 14001:2004.

ii. Have a main contractor with a documented EMS that meets the

requirements of ISO 14001:2004.

EXAMPLE :

i. While it is not possible to present an entire EMS, there is an example of key

EMS documents available on http://www.jkr.gov.my/cast.

POTENTIAL ISSUES

i. Smaller firms may not be able to afford the ISO certification process.

ii. Documentations of an EMS are not the same as having an effective EMS,

however collection of documentations is an efficient way of gathering

evidence of an effective EMS.

i. JKR EMS MS ISO 14001:2004

OBJECTIVE

CREDIT REQUIREMENT

AHAN

KEPERLUAN PERMARKAHAN

REFERENCES

EW 1

3 POINTS

RELATED CREDITS

CA1 – Quality Management System

EW2 – Stormwater Management

BENEFITS

Reduces water use.

Reduces air emission

Reduces water pollution.

Improves human health and safety.

Increases awareness.

DOCUMENTATION

APPROACHES & STRATEGIES

AHAN

KEPERLUAN PERMARKAHAN

Page 11: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Environment and Water EW | 2

STORMWATER MANAGEMENT

To have best management practices for stormwater during construction of road project

1 Point : Develop a stormwater management plan for the site using stormwater best

management practices (BMP) for flow control in conformance to the Stormwater Management Manual for Malaysia (MASMA) and EMS ISO 14001:2004. Demonstrate that the planned BMPs to conform to all applicable 5% above minimum flow control standards set by MASMA and EMS ISO 14001: 2004.

1 Point :Develop a stormwater management plan for the site using stormwater best

management practices (BMP) for water quality control in conformance to the Stormwater Management Manual for Malaysia (MASMA) and EMS ISO 14001:2004. Demonstrate that the planned BMPs to conform to all applicable 5% above minimum water quality standards set by MASMA and EMS ISO 14001: 2004.

A. Design Evaluation Stage

i. Documentation of the Stormwater Management Plan. A copy of the

executive summary of the project drainage design report that includes

supporting calculation for runoff areas and runoff volume (output from

any rainfall modeling software used is adequate).

B. Verification Scoring Stage

Submit the following item: i. A copy of monthly water quality monitoring report.

i. Stormwater Management Manual for Malaysia (MASMA).

ii. Preserve native vegetation.

iii. Protect soil with good infiltration capacity.

OBJECTIVE

CREDIT REQUIREMENT

AHAN

KEPERLUAN PERMARKAHAN

EW 2

2 POINTS

RELATED CREDITS

EW 1 – Environmental Management System

CA1 - QMS BENEFITS

Reduces water pollution.

Avoid flooding/ponding

DOCUMENTATION

APPROACHES & STRATEGIES

AHAN

KEPERLUAN PERMARKAHAN

Page 12: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Environment and Water EW | 3

iv. Assess the feasibility of infiltration and evapotranspiration to reduce the

needs for retention pond outside the right of way.

v. Convey stormwater in swales to promote infiltration.

vi. Consider geometric design for erosion control and flow moderation.

EXAMPLE :

Plate 8: Swale

Plate 9: Swale

Page 13: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Environment and Water EW | 4

Infiltration trench

Plate 10: Silt Trap

Plate 11: Silt Trap

POTENTIAL ISSUES

i. There are numerous methods to calculate runoff volume. Many are

applicable to rainfall of large magnitude and under estimate the runoff

generated by various rainfall intensity.

ii. Any models that are used inherently have some limitations and assumptions.

Some are better than other depending on project location.

Page 14: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Environment and Water EW | 5

iii. Long-term performance data for many low-impact development methods

used for quality control are not available for road project.

i. Stormwater Management Manual for Malaysia (MASMA).

ii. REAM iii. MS ISO 14000

REFERENCES

Page 15: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Environment and Water EW | 6

ECOLOGICAL CONNECTIVITY

Provide and improve wildlife access and mobility across roadways

1 Point : Provide dedicated wildlife crossing structures and protective fencing as

determined by Environmental Impact Assessment (EIA) report

1 Point : Provide sound barrier at sensitive area for wildlife

A. Design Evaluation Stage

i. Submit a copy of approved EIA report.

ii. Related design drawings showing type and location of wildlife access

provided

B. Verification Scoring Stage

i. As-built drawings

ii. Photo evidence of said access

i. Study the animal population in the area, migration pattern, types of animals

and habitual behavior.

ii. Protective fencing

OBJECTIVE

CREDIT REQUIREMENT

AHAN

KEPERLUAN PERMARKAHAN

EW 3

2 POINTS

RELATED CREDITS

EW1 – Environmental Management System

BENEFITS

Restores habitat.

Improves access.

Improves mobility

Improves human health and safety

DOCUMENTATION

APPROACHES & STRATEGIES

AHAN

KEPERLUAN PERMARKAHAN

Page 16: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Environment and Water EW | 7

EXAMPLE :

Plate 12: Animal Viaduct

Plate 13: Animal Viaduct

Page 17: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Environment and Water EW | 8

POTENTIAL ISSUES

i. Lack of ecological or species data.

ii. Prior migration pattern and other animal and aquatic organism behaviors

may be altered by the presence of the road.

iii. Identifying ecological connectivity requirements needs well-designed long-

term studies.

i. Department of Wildlife and National Park.

ii. Department of Forestry iii. World Wildlife Fund (WWF)

REFERENCES

Page 18: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Access and Equity AE | 1

SAFETY AUDIT

Improve road safety through review by an accredited Road Safety Auditor registered with JKR.

1 Point : Road Safety Audit Stage 1-3 (Design Stage)

1 Point : Road Safety Audit Stage 4 Part I-III (Construction Stage)

1 Point : Road Safety Audit Stage 5 (Operational Stage)

1 Point : Additional Audit For Traffic Management During Construction

A. Design Evaluation Stage

i. Submit a copy of the Road Safety Audit (RSA) Report and Designer’s

Response report for Stage 1 to Stage 4.

ii. Show any exemption of any stages of audit (to be issued only by the

authorized party).

B. Verification Scoring Stage

i. Submit a copy of the Road Safety Audit (RSA) Report and Designer’s

Response report for Stage 5

ii. Submit additional Audit Report for Traffic Management during

construction

i. Follow decision agreed upon RSA Completion Meeting and incorporate in the

design.

OBJECTIVE

CREDIT REQUIREMENT

AHAN

KEPERLUAN PERMARKAHAN

AE 1

4 POINTS

RELATED CREDITS

SM1 – Road Alignment

CA4 – Traffic Management Plan

BENEFITS

Improves Road Users Safety

DOCUMENTATION

APPROACHES & STRATEGIES

AHAN

KEPERLUAN PERMARKAHAN

Page 19: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Access and Equity AE | 2

EXAMPLE :

Plate 14: Road Safety Audit Report Stage 2

Plate 15: Road Safety Audit Report Stage 3

Page 20: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Access and Equity AE | 3

POTENTIAL ISSUES

i. The RSA process allows a design team to respond to Auditor’s comments

depending on the safety issue concerned. Therefore, it is possible, if not

likely, the safety issues are not addressed and the road’s overall safety does

not benefit from the RSA.

ii. RSA is implemented but no corrective action done.

iii. RSA not done at the right time thus producing lock-in situation and benefits

of RSA is not fully achieved.

i. Arahan Teknik Jalan

REFERENCES

Page 21: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Access and Equity AE | 4

PEDESTRIAN ACCESS

Promote walkable communities by providing pedestrian safe and friendly roads.

1 Point : Zebra Crossing, Signalized Pedestrian Crossing and Refuge Island

1 Point : Overhead Pedestrian Bridge

1 Point : Sidewalk / Walkway and Raised Crosswalk

A. Design Evaluation Stage

i. Submit a copy of Road Safety report that focuses on pedestrian facilities

and related drawings.

B. Verification Scoring Stage

i. As-built drawings

i. Consider how a new will impact the existing or planned pedestrian networks

and integrate design elements with other facilities to mitigate overall

impacts. This may mean providing connection or adaptability for future

pathway, sidewalks and crossing within pedestrian networks.

ii. Design the road to accommodate existing new and planned pedestrian

facilities.

OBJECTIVE

CREDIT REQUIREMENT

AHAN

KEPERLUAN PERMARKAHAN

AE 2

3 POINTS

RELATED CREDITS

AE 1 – Safety Audit

SM3 – Services for Disabled Users

BENEFITS

Reduces air emissions

Improves access

Improves mobility

Improves Health & Safety

DOCUMENTATION

APPROACHES & STRATEGIES

AHAN

KEPERLUAN PERMARKAHAN

Page 22: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Access and Equity AE | 5

EXAMPLE :

Plate 16: Pedestrian Bridge

POTENTIAL ISSUES

i. Many rural areas do not have surrounding pedestrian infrastructure or

master plan to support the addition of new pedestrian facilities. Short term

and long term goals, objectives and general pedestrian strategies should be

considered when accommodating pedestrian within the areas.

i. Arahan Teknik Jalan

REFERENCES

Page 23: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Access and Equity AE | 6

MOTORCYLE LANE

Provide safe motorcycle lane within the project right of way.

1 Point : Paved shoulder, non-exclusive motorcycle lane and end treatment at

junction

2 Point : Exclusive motorcycle lane

1 Point : Overhead Motorcycle Bridge

1 Point : Motorcycle shelter

A. Design Evaluation Stage

i. Submit a copy of Road Safety report that focuses on motorcycle lane

facilities.

ii. Design drawings

B. Verification Scoring Stage

i. As-built drawings

i. Consider how a new road projects will impact the existing or planned

motorcycle lane networks and integrate design elements with others

facilities to mitigate overall impacts. This may mean providing connection or

adaptability for future motorcycle lane, crossing or other facilities within

motorcycle lane network.

ii. Design the road to accommodate existing new and planned motorcycle lane

facilities.

OBJECTIVE

CREDIT REQUIREMENT

AHAN

KEPERLUAN PERMARKAHAN

AE 3

5 POINTS

DOCUMENTATION

RELATED CREDITS

AE 1 – Safety Audit

BENEFITS

Improves access

Improves mobility

Improves Health & Safety

APPROACHES & STRATEGIES

AHAN

KEPERLUAN PERMARKAHAN

Page 24: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Access and Equity AE | 7

EXAMPLE :

Plate 17: Non Exclusive Motorcycle Lane

POTENTIAL ISSUES

i. Many rural areas do not have surrounding motorcycle lane infrastructure or

master plan to support the addition of new motorcycle facilities. Short term

and long term goals, objectives and general motorcycle lane strategies

should be considered when accommodating motorcycling within the areas.

i. Arahan Teknik Jalan

REFERENCES

Page 25: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Access and Equity AE | 8

TRANSIT AREA

Promote use of public transit facilities by providing transit shelters and park & ride for carpooling.

1 Point : Provide transit stations or stop amenities along the project location.

1 Point : Improve 20% existing transit station or stop amenities within 200m from

project ROW.

1 Point : Provide access to new park & ride lots in strategic locations.

A. Design Evaluation Stage

i. Submit a copy of transit station and stop amenities layout plan including

detailed drawing.

B. Verification Scoring Stage

i. Related As-built drawings

i. Survey existing routes and ask stakeholders for suggestions on how to

improve access to existing transit facilities during the public involvement

process.

ii. Consider how a new roadway will impact the existing or planned pedestrian

network and integrate design elements with other facilities to mitigate

overall impacts.

iii. Locate enhancements to transit station/stop amenities at more than 20% of

the station/stops along 200m ROW.

iv. Provide extra ROW width to accommodate transit shelters.

OBJECTIVE

CREDIT REQUIREMENT

AHAN

KEPERLUAN PERMARKAHAN

AE 4

3 POINTS

DOCUMENTATION

RELATED CREDITS

SM 1 – Road Alignment

AE 2 – Pedestrian access

AE 3 – Motorcycle Lane

BENEFITS

Reduces air emissions

Improves access

Improves mobility

Reduces Fossil Fuel Use

APPROACHES & STRATEGIES

AHAN

KEPERLUAN PERMARKAHAN

Page 26: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Access and Equity AE | 9

EXAMPLE :

Photos or diagrams

Plate 18: Public transit facilities (PutrajayaSentral)

Plate 19: Park and ride lots (Putrajaya - Presint 7)

Page 27: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Access and Equity AE | 10

POTENTIAL ISSUES

i. Provision of transit shelters and stop amenities often not taken into

consideration due to area and budgetary constraint.

i. Local authority’s policy

REFERENCES

Page 28: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Access and Equity AE | 11

SCENIC VIEWS

Feature scenic, natural and recreational qualities into roadways.

1 Point : Provide at least one access from the project to a designated area for

vehicles to exit the traffic stream.

1 Point : Provide park area for road user to stop and experience the scenic views at

strategic location.

A. Design Evaluation Stage

i. Indicate in the submitted plans where the lookout point or overlook is

drawn and specified.

B. Verification Scoring Stage

i. Provide a photo of the access point and a picture of the related

attraction.

i. Provide locations, such as lookout point or pullouts, where road user can

stop to enjoy a scenic, historic, cultural, natural, recreational or archeological

feature of the roadway area.

OBJECTIVE

CREDIT REQUIREMENT

AHAN

KEPERLUAN PERMARKAHAN

AE 5

2 POINTS

DOCUMENTATION

RELATED CREDITS

SM 1 – Road Alignment

BENEFITS

Increase awareness

Increase Human Safety & Health

APPROACHES & STRATEGIES

AHAN

KEPERLUAN PERMARKAHAN

Page 29: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Access and Equity AE | 12

EXAMPLE :

Plate 20: Look Out Point

POTENTIAL ISSUES

i. Provision of access and parking area to the lookout point often not taken

into consideration due to area and budgetary constraint.

i. Local Authority

ii. Ministry of Tourism

REFERENCES

Page 30: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Construction Activities CA | 1

QUALITY MANAGEMENT SYSTEM

Improve construction quality by using a contractor that has the formal quality management process.

3 Point : MS ISO 9001: 2008 certification for main contractor.

A. Design Evaluation Stage

i. Nil

B. Verification Scoring Stage

Submit the following items:

i. Documentation of the MS ISO 9001:2008 certification for the main

contractor.

i. Have a main contractor with MS ISO 9001:2008 certification.

ii. Have a main contractor with a documented QMS that meets the

requirements of MS ISO 9001:2008.

EXAMPLE :

i. While it is not possible to present an entire QMS, there is an example of key

QMS documents available on http://www.jkr.gov.my/

POTENTIAL ISSUES

i. Smaller firms may not be able to afford the ISO certification process.

ii. Documentations ofQMS are not the same has having an effective QMS,

however collection of documentations is an efficient way of gathering

evidence of an effective QMS.

OBJECTIVE

CREDIT REQUIREMENT

AHAN

KEPERLUAN PERMARKAHAN

CA 1

3 POINTS

DOCUMENTATION

RELATED CREDITS

EW 1 – EMS BENEFITS

Improve Accountability

Increase Awareness

Improves Human Health & Safety

APPROACHES & STRATEGIES

AHAN

KEPERLUAN PERMARKAHAN

Page 31: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Construction Activities CA | 2

i. JKR MS ISO 9001:2008

REFERENCES

Page 32: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Construction Activities CA | 3

FOSSIL FUEL REDUCTION

Reduce the overall consumption of fossil fuels by using alternative fuels/renewable energy sources. To ensure that construction method used is less fuel consumption type.

2 Point : Reduce the fossil fuel requirements by using biodiesel or biodiesel

blends/renewable energy sources as replacement for fossil fuel.

2 Point : Alternative method of construction which require less fuel consumption

A. Design Evaluation Stage

Nil

B. Verification Scoring Stage

i. An evidence documents showing the use of alternative fuels/renewable

energy sources.

ii. Method statement of said alternative construction method

i. Support the environmental and health benefits of biodiesel by providing

economic incentive.

ii. For foundation system, method of pile installation that can be opted are:

a) Use jack in pile which use hydraulic hammer

EXAMPLE :

i. Palm oil bio-diesel (Methylester + diesel + crude palm oil + olein palm oil)

ii. Membina Bangunan Pejabat Lembaga Pelabuhan Johor Di Atas Lot 69989

Dan Lot 69990, Mukim Plentong, Daerah Johor Bahru, Johor

iii. Cadangan Pembinaan Pejabat Dan Setor Pencegahan Kastam Di Ayer

Keroh, Melaka Tengah, Melaka

OBJECTIVE

CREDIT REQUIREMENT

AHAN

KEPERLUAN PERMARKAHAN

CA 2

4 POINTS

DOCUMENTATION

RELATED CREDITS

EW 1 – EMS BENEFITS

Reduces Fossil Fuel Use

Reduces Air Emissions

Reduce Greenhouse Gases

APPROACHES & STRATEGIES

AHAN

KEPERLUAN PERMARKAHAN

Page 33: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Construction Activities CA | 4

POTENTIAL ISSUES

i. There may be a cost premium per liter for biodiesel over that of conventional

diesel fuel.

ii. Biodiesel is currently not produced in sufficient quantities to meet

widespread demand.

iii. Lack of research over the renewable energy sources.

iv. Installation of pile using jack in and hydraulic hammer is relatively costly in

comparable of driving method.

i. Ministry of Natural Resources & Environment ii. Palm Oil Research Institute of Malaysia (PORIM)

REFERENCES

Page 34: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Construction Activities CA | 5

CONSTRUCTION WASTE MANAGEMENT PLAN

Create an accounting and management plan for road construction waste materials.

2 Point : Create, establish, implement and maintain a formal construction waste

management plan during road construction.

A. Design Evaluation Stage

Nil

B. Verification Scoring Stage

Copy of the project construction waste management plan. The plan should identify these items:

a) Type of construction waste b) Expected tonnage c) Related cost of disposal of such waste d) Management strategy for waste generated from site including

household and domestic waste

i. Keep accurate records and retain all waste handling invoice and receipts.

Also, keep records of related saving due to waste handling.

ii. Include the construction waste management plan in agency contract

documents and specifications.

iii. Set waste reduction goals and monitor the progress.

iv. Develop and deliver training to workers to educate them on waste recovery

efforts being implemented onsite and compliance with the construction

waste management plan.

v. Identify local facilities that accept recyclables or salvaged materials.

EXAMPLE :

i. ProjekKompleks KKR, AZRB (sample of waste management plan)

ii. http://www.claycorp.com/sustainable/documents/Clayco_Construction_Wa

ste_Management_Plan.pdf

iii. http://www.epa.gov/rtp/campus/environmental/017419.pdf

OBJECTIVE

CREDIT REQUIREMENT

AHAN

KEPERLUAN PERMARKAHAN

CA 3

2 POINTS

DOCUMENTATION

RELATED CREDITS

EW 1 – Environmental Management System

CA 1- Quality Management System

MR 1 – Pavement Reuse

MR 2 – Earthwork Balance

MR 5 – Recycled Material

MR 7 – Life Cycle Assessment

BENEFITS

Reduce Solid Waste

Reduce Manmade Footprint

Reduce Lifecycle Cost

Improves Accountability

APPROACHES & STRATEGIES

AHAN

KEPERLUAN PERMARKAHAN

Page 35: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Construction Activities CA | 6

POTENTIAL ISSUES

i. Specifying and creating documents for waste management practices may be

unfamiliar to designers and decision-makers.

ii. Careless behavior or lack of stewardship may be an issue that can result in

recyclables being disposed, or vice versa.

iii. Proper handling of recyclable materials is a key safety issue for new and

unfamiliar recycling activities. Communication and training is critical to

minimize risk and preserve safety.

iv. Safety and security considerations should be taken into account relative to

storage on-site of recoverable materials of high value.

i. EQA, 1974

ii. Schedule Waste Regulations, 2005

iii. Arahan Teknik Jalan 16/03 Pindaan 2008

REFERENCES

Page 36: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Construction Activities CA | 7

TRAFFIC MANAGEMENT PLAN

Develop traffic management plan for use during construction.

2 Point : Create, establish and implement a formal traffic management plan during

road construction.

A. Design Evaluation Stage

Copy of the project Traffic Management Plan (TMP).The plan should identify these items:

a) all sequence of construction stage with appropriate traffic control devices

b) Smooth flow of existing traffic connected to project c) Adequate signage and barriers d) Temporary road diversion where necessary e) Adequate flagman and blinkers

B. Verification Scoring Stage

Nil

i. Follow the traffic management plan strictly

ii. Include the traffic management plan in agency contract documents and

specifications.

iii. Keep records of all complaint and incident related to traffic management.

iv. Revise and review traffic management plan to suit project site condition

v. Develop and deliver training to workers to educate them on traffic

management efforts being implemented onsite.

vi. Include itemized quantities in tender documents.

EXAMPLE :

i. All JKR’s road projects (standard template)

OBJECTIVE

CREDIT REQUIREMENT

AHAN

KEPERLUAN PERMARKAHAN

CA 4

2 POINTS

DOCUMENTATION

RELATED CREDITS

SM 1 – Road Alignment

SM 3 – Services for Disabled Users

AE 1 – Safety Audit

AE 2 – Pedestrian Access

AE 3 – Motorcycle Lane

CA 1 – Quality Management System

BENEFITS

Improves Accountability

Improves Human Health & Safety

APPROACHES & STRATEGIES

AHAN

KEPERLUAN PERMARKAHAN

Page 37: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Construction Activities CA | 8

POTENTIAL ISSUES

i. Not following the traffic management plan as required.

ii. Lack of awareness over traffic management practices during construction.

iii. Not following the procedure in reviewing traffic management plan.

iv. Difficulty in design TMP because lack of experience among designers.

v. Traffic management implementation is not workable and suitable for

construction.

vi. Inadequate provision of traffic control devices.

i. REAM

REFERENCES

Page 38: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Material and Resources MR | 1

PAVEMENT REUSE

Reuse existing pavement and structural materials.

3 Point : Reuse at a minimum 5% of existing pavement and structural materials by

estimated volume.

A. Design Evaluation Stage

i. A calculation that shows the computed percent of material reused

including the following items at minimum:

a) Total volume of existing pavement structure.

b) Total volume of reused pavement structure.

c) The computed percentage of the total reused volume.

B. Verification Scoring Stage

i. A short written description of how the structure was reused.

ii. Total volume of reused pavement structure.

i. Use in place recycling technique such as hot in-place recycling, cold in-place

recycling and full depth reclamation. These methods qualify as reuse

because the material has not crossed project boundaries.

ii. Evaluate the structural condition of existing elements such as bridges and

retaining walls. This typically determined by a structural engineer. Do not

reuse elements that have been damaged by corrosion or natural hazards

without review by a structural engineer.

iii. Where structural elements are determined to be inadequate for reuse,

consider salvaging them or deconstructing them for use on another project

or purpose.

OBJECTIVE

CREDIT REQUIREMENT

AHAN

KEPERLUAN PERMARKAHAN

MR 1

3 POINTS

DOCUMENTATION

RELATED CREDITS

SM 1 – Road Alignment

BENEFITS

Improves Accountability

Improves Human Health & Safety

APPROACHES & STRATEGIES

AHAN

KEPERLUAN PERMARKAHAN

Page 39: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Material and Resources MR | 2

EXAMPLE :

Plate 21: Reclamation of Existing Concrete Pavement for Reuse

Plate 22: Use of Existing Subsoil

Page 40: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Material and Resources MR | 3

Plate 23: More Tennant AC pavement grinding behind k-rail barriers

POTENTIAL ISSUES

i. A project may misclassify a material as “reused” instead of “recycled”

ii. Pavement thickness in older road sections may be highly variable, therefore

estimating existing volume may be difficult.

i. http://isddc.dot.gov/OLPFiles/FHWA/011182.pdf

ii. Nota Teknik Jalan

REFERENCES

Page 41: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Material and Resources MR | 4

EARTHWORK BALANCE

Reduce need for transport of earthen materials by balancing cut and fill quantities.

3 Point : Minimize earthwork cut (excavation) and fill (embankment) volumes such

that the percent difference between cut and fill is less than equal to 10% of the average total volume of material moved.

A. Design Evaluation Stage

i. Copy of mass haul diagram showing estimated volume earthwork.

B. Verification Scoring Stage

i. Calculate and report actual construction earthwork volume for the

project. This calculation shall show the following:

a) Actual cut and fill volumes during construction.

b) Actual volume of unused embankment materials (include excess

import and excess cut materials).

c) Actual volume of earthwork material imported to the project site.

d) Actual volume of earthwork material exported from the site.

i. Use design software and computer aided drawing (CAD) to calculate the

design volumes of earthwork to be reported.

ii. Compare percentage difference between actual cut and fill with design cut

and fill.

iii. Improve road alignment design and estimation technique to further balance

of cut and fill.

OBJECTIVE

CREDIT REQUIREMENT

AHAN

KEPERLUAN PERMARKAHAN

MR 2

3 POINTS

DOCUMENTATION

RELATED CREDITS

SM 1 – Road Alignment

BENEFITS

Reduces Fossil Fuel Use

Reduces Air Emissions

Reduces Greenhouse Gases

Reduces Solid Waste

Reduces Lifecycle Costs

Reduce surplus

APPROACHES & STRATEGIES

AHAN

KEPERLUAN PERMARKAHAN

Page 42: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Material and Resources MR | 5

EXAMPLE :

i. Mass haul diagram

Plate 24: Mass haul diagram

Plate 25: Mass haul diagram

Page 43: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Material and Resources MR | 6

Plate 26: Digital map

POTENTIAL ISSUES

i. Subsurface condition may not be well known for the project site. Therefore,

a balanced earthwork design that assumes a certain soil type and

characteristic may not be feasible if, during earthwork, different soil types,

moisture conditions or other characteristics are found.

ii. Contractor familiarity and experience with alternative methods and

materials can be highly variable.

iii. Some roadwork does not lend itself to a balanced earthwork plan. For

instance work in an urban area may not work because the primary concerns

its typically maintaining existing elevation. Therefore, if a thicker pavement

section is placed, some earth must be removed.

iv. Designer may neglect to consider or poorly estimate shrink or swell of soil

material.

v. Earthwork on a phased project may not be completed by the same

contractor.

vi. Efforts across phases may be difficult to coordinate without clear

documentation of intent of stockpiled materials.

i. http://www.in.gov/indot/files/Earthworks_Chapter_06.pdf

REFERENCES

Page 44: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Material and Resources MR | 7

GREEN PRODUCT

Use materials SIRIM certified eco-labelschemes or equivalent (GEN - Global Ecolabelling Network).

2 Point :Any material that SIRIM certified eco-label or GEN and recognized by JKR.

A. Design Evaluation Stage

Nil

B. Verification Scoring Stage

Copy of product certification.

i. Install green labeled product.

ii. Keep records of all expenses related to eco-label product.

iii. Compare savings of eco-label product to conventional ones.

EXAMPLE :

i. Eleven(11) eco-label products:

a) Culvert

b) Precast beam

c) Guardrail

d) Delineator post

e) Road stud

f) Plastic barrier

g) Street lighting (LED light )

h) Soil stabilizer

i) Soil sealant

j) Sound barrier

k) Precast roadside drain

POTENTIAL ISSUES

i. Higher initial cost.

ii. A tradeoff exists between cost and service life of eco-label product.

OBJECTIVE

CREDIT REQUIREMENT

AHAN

KEPERLUAN PERMARKAHAN

MR 3

2 POINTS

DOCUMENTATION

RELATED CREDITS

SM 1 – Road Alignment

BENEFITS

Improves Accountability

Improves Human Health & Safety

APPROACHES & STRATEGIES

AHAN

KEPERLUAN PERMARKAHAN

Page 45: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Material and Resources MR | 8

i. SIRIM

ii. http://www.globalecolabelling.net/

iii. KeTTHA

REFERENCES

Page 46: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Material and Resources MR | 9

REGIONAL MATERIALS

Promote use of locally material to reduce impacts from transportation emissions, reduce fuel costs and support local economies.

2 Point : Use materials or products that have been extracted and manufactured

within the same region of project site.

A. Design Evaluation Stage

i. A map showing the geographical centre of the project. The map must

show:

a) The name and location of the project

b) The geographical center of the project. Show the latitude and

longitude or mile marker.

c) Clearly drawn regional boundaries (i.e. northern, central, southern,

eastern) drawn to scale.

B. Verification Scoring Stage

i. A list of purchased basic materials or products used on the project and

the billing address of the source.

i. Establish a documentation pipeline for materials extraction and fabrication

before construction starts.

ii. Ensure that a local materials clause is written into the special provisions in

the construction contract.

iii. Make sure that the project has local contractors that can perform the work.

OBJECTIVE

CREDIT REQUIREMENT

AHAN

KEPERLUAN PERMARKAHAN

MR 4

2 POINTS

DOCUMENTATION

RELATED CREDITS

MR 1 – Pavement Reuse

MR 2 – Earthwork Balance

MR 5 – Recycle Material

MR 7 – Life Cycle Assessment

BENEFITS

Reduce fossil fuels use.

Reduce air emissions

Reduce greenhouse gases

Improve local economies.

APPROACHES & STRATEGIES

AHAN

KEPERLUAN PERMARKAHAN

Page 47: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Material and Resources MR | 10

EXAMPLE :

Plate 27: Malaysia Map

POTENTIAL ISSUES

i. None availability of regional material or products.

ii. Shortage of supply of regional material or products.

i. IKRAM

REFERENCES

Page 48: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Material and Resources MR | 11

LOCAL PRODUCTS

Emphasizing the use of locally manufactured materials. The use of locally manufactured materials will be able to reduce the impact on environmental issues resulting from transportation.

1 Point : Credit given to any material used that have a minimum 20% of local

material content of its weight

A. Design Evaluation Stage

Nil

B. Verification Scoring Stage

i. Copy of the material certification which shows its content and copies of

their specifications.

ii. Evidence showing that the material used is complied with Senarai Bahan

Binaan Tempatan by IKRAM

i. Ensure that construction materials used originated and manufactured locally.

ii. Exploit more construction material that are available locally through

research and development.

iii. Update agency standard specifications to specify a certain percentage of

local material.

iv. Expand and update the “Senarai Bahan Binaan Tempatan”.

OBJECTIVE

CREDIT REQUIREMENT

AHAN

KEPERLUAN PERMARKAHAN

MR 5

1 POINT

DOCUMENTATION

RELATED CREDITS

MR 1 – Pavement Reuse

MR 2 – Earthwork Balance

MR 5 – Recycle Material

MR 7 – Life Cycle Assessment

BENEFITS

Reduce fossil fuels use.

Reduce air emissions

Reduce greenhouse gases

Improve local economies.

APPROACHES & STRATEGIES

AHAN

KEPERLUAN PERMARKAHAN

Page 49: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Material and Resources MR | 12

EXAMPLE :

Plate 28: Senarai Bahan Binaan Tempatan

POTENTIAL ISSUES

i. None availability of local material or products.

ii. Shortage of supply of local material or products.

iii. Imported material priced cheaper than local products

iv. Quality issues of the local product somewhat not up to international

standard ( not recognized by the ISO Standard )

i. http://www.treasury.gov.my/pekeliling/spp/spp041996.pdf

ii. http://rakan.jkr.gov.my/ckub/a_main/folder/a6/pdf/sbahan.pdf iii. SIRIM iv. IKRAM

REFERENCE

Page 50: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Material and Resources MR | 13

RECYCLED MATERIALS

Promote the use of recycled material.

1 Point : Use recycled materials as a substitute for virgin materials. Credit given to

any material used that have a minimum 5% of recycled material content of its weight.

1 Point : Provide a proper location for collection and storage of recyclable

construction waste

1 Point : Provide several dumpster to segregate construction waste on-site

A. Design Evaluation Stage

i. List of any recycle material to be used.

ii. Drawing showing designated location of collection and storage for

recyclable construction waste

B. Verification Scoring Stage

i. Copies of the specifications for any project material that state its’

minimum recycled content.

ii. Supporting test documents such as plant proportioning records and

manufacturers documentation for products that state the actual

recycled material content.

iii. Photo evidence of on-site recyclable waste collection and storage

i. During construction, keep updated records of all materials and recycled

materials used on the project.

ii. Update agency standard specifications to specify a certain percentage of

recycled material.

OBJECTIVE

CREDIT REQUIREMENT

AHAN

KEPERLUAN PERMARKAHAN

MR 6

3 POINTS

DOCUMENTATION

RELATED CREDITS

EW 1 – EMS BENEFITS

Reduces Raw Materials

Reduces Air Emissions

Reduces Greenhouse Gases

Reduces Solid Waste

APPROACHES & STRATEGIES

AHAN

KEPERLUAN PERMARKAHAN

Page 51: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Material and Resources MR | 14

EXAMPLE :

i. Concrete

ii. Aggregate

iii. Bitumen

iv. Bricks

Plate 29: Recycled Material (Bricks)

Plate 30: General Trash

Page 52: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Material and Resources MR | 15

Plate 31: Recycled Material (Reinforcement Steel)

Plate 32: Recycled Material (Wood)

Page 53: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Material and Resources MR | 16

Plate 33: Segregation containers for recycled materials

Plate 34: Layout plan for environmental site management

Page 54: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Material and Resources MR | 17

POTENTIAL ISSUES

i. Workability, compaction and other performance qualities change as amounts

of recycled material included in the material change.

ii. Additional testing and inspection is often required for higher compositions of

recycled materials for some cases and may represent an added cost.

iii. Weather, performance, location and availability issues may limit the amount

of recycled content that can feasibly be included in project materials.

iv. Transport of recycled materials is sometimes costly, depending on

availability and distance of transport. Occasionally this cost exceeds the total

benefit of using the recycled material.

i. Local authority policy

ii. Ministry of Health

iii. JKR’s EMS

REFERENCES

Page 55: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Material and Resources MR | 18

ENERGY EFFICIENCY

Lower power consumption with higher brightness and longer expected life of lighting system for roadways.

1 Point: All systems should be designed to minimized energy use, while meeting lighting requirement as per MS 825 part 1:2007. To achieve an effective energy-efficient design, first select proper lamp/ballast combination that produces high lumens per watt, then select fixtures with high efficiency and proper light distribution, and properly space the fixtures to meet design requirements without glare, light trepass, or light pollution.

A. Design Evaluation Stage

Provide a copy of the specification and/or cut sheet of the luminaries to be

installed on the project. Show that these are MS 825 Part 1: 2007

compliance. Show that the lighting design complies with all applicable safety

regulations for the project.

B. Verification Scoring Stage

As-built drawings

i. Install luminaries that are MS 825 Part 1: 2007 complaint.

ii. Use light emitting diode (LED) lamp technologies.

iii. Consider not installing lighting system where average daily traffic counts do

not warranty lighting installation for a particular road configuration, or

where pedestrian safety is not an issue.

EXAMPLE :

i. KARAK Highway and MRR2

OBJECTIVE

CREDIT REQUIREMENT

AHAN

KEPERLUAN PERMARKAHAN

MR 7

1 POINTS

DOCUMENTATION

RELATED CREDITS

EW 1 – EMS BENEFITS

Improves Accountability

Improves Human Health & Safety

APPROACHES & STRATEGIES

AHAN

KEPERLUAN PERMARKAHAN

Page 56: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Material and Resources MR | 19

POTENTIAL ISSUES

i. A tradeoff exists between providing enough luminance for safety, limiting

light pollution, and reducing or conserving energy.

ii. Compliance with veiling luminance ratios may also be required in some

jurisdictions.

iii.

i. MS 825 Part 1: 2007

REFERENCES

Page 57: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Material and Resources MR | 20

LIFE CYCLE ASSESSMENT

Create new lifecycle assessment information for road project

3 Point : Conduct a detailed process-based lifecycle assessment according to the

Total Asset Management Manual frameworks for the final road design.

A. Design Evaluation Stage

Nil

B. Verification Scoring Stage

Copy of the completed LCA. This document should include the following

information :

a) Name and contact information of person(s) who conducted the LCA.

b) A list of all data sources used and the input data used.

c) List any material inputs.

d) Detailed results of life cycle inventory

e) Life cycle impact assessment results showing a minimum of three

impact categories. List sources of equivalency factors used.

f) The data quality score of final alternative.

g) A list of the top three contributing processes to the impact

categories.

h) A list of all limitations and assumptions of the study scope and data

used.

i. Create a spreadsheet to capture all of the processes for production of the

road project an LCA in accordance with the manual.

ii. Use an open source software program for LCA.

iii. Use data that is current, local or otherwise project specific to improve data

quality for the project LCA model.

POTENTIAL ISSUES

i. Missing or otherwise unavailable data.

ii. Professional lifecycle assessment may incur an added cost to the project.

OBJECTIVE

CREDIT REQUIREMENT

AHAN

KEPERLUAN PERMARKAHAN

MR 8

3 POINTS

DOCUMENTATION

RELATED CREDITS

EW 1 – EMS BENEFITS

Improves Accountability

Increases Awareness

APPROACHES & STRATEGIES

AHAN

KEPERLUAN PERMARKAHAN

Page 58: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Material and Resources MR | 21

iii. Data management in process-based LCAs can require much manpower, be

time consuming and also high cost.

iv. All products and processes are more complicated than humans could ever

conceive. The goal is that the LCA model is realistic and representative, not

exact.

v. Any uncertainties or assumptions made in the LCA must be clearly specified

or documented. Additionally, any substitutions or generic data used must be

explicitly stated.

vi. Comprehensive lifecycle assessments require detailed attention to data

quality.

i. Total Asset Management Manual

ii. http://lcamalaysia.sirim.my/

iii. http://www.mapma.org.my/wp-content/uploads/2009/08/PAPER-2-TOTAL-

ASSET-MANAGEMENT-IN-THE-PUBLIC-SECTOR.pdf

REFERENCES

Page 59: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Pavement Technologies PT | 1

PERMEABLE PAVEMENT

Improve flow control and quality of stormwater runoff through use of permeable pavement

1 Point : Use of permeable (porous) pavement mix design with higher range of air

void (18 -25%)

1 Point : Drainability shall be sufficient to allow satisfactory drainage of drain water

during heavy rainfall

1 Point : Drainability shall not be less than 10 litre/minute for 54cm2 area , 50mm

thickness

A. Design Evaluation Stage

Copy of the permeable pavement mix design. The mix design should have

the following items highlighted :

a) Name of permeable technology

b) Tonnage of pavement on the project

c) Tonnage of permeable pavement to be used

B. Verification Scoring Stage

i. Photo of the permeable pavement installed (processes) on the project

ii. Tonnage of actual permeable pavement used

Following some of the key design and maintenance elements will promote maximum

performance of permeable pavements:

i. Design Elements

ii. Clog Prevention Maintenance

iii. Maintenance Repairs

Design Elements

i. Use mix design for the pavement with significant permeability 10 litre/minute for 54cm2area, 50mm thickness.

ii. Use open graded wearing course with range of air void (18 -25%)

OBJECTIVE

CREDIT REQUIREMENT

AHAN

KEPERLUAN PERMARKAHAN

PT 1

3 POINTS

DOCUMENTATION

RELATED CREDITS

EW 1 – EMS BENEFITS

Reduce Water Pollution

Reduces Manmade Footprint

APPROACHES & STRATEGIES

AHAN

KEPERLUAN PERMARKAHAN

Page 60: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Pavement Technologies PT | 2

iii. Permeable should be laid on impermeable and relatively even bituminous surface with adequate cross fall (minimum 2.5%)

iv. Existing cracks and depression shall be sealed and patched prior to application of porous asphalt.

v. Only used static steel wheel tandem roller to compact porous asphalt pavement layer.

vi. Attempt to make periodic maintenance easy for owners in the design process. Pavement areas should be accessible and slope gradually to accommodate standard maintenance vehicles.

EXAMPLE :

i. Porous Asphalt

ii. Porous Concrete

iii. Block Pavers

iv. Open graded aggregate

Plate 35: Porous Asplhalt

Page 61: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Pavement Technologies PT | 3

Plate 36: Porous Asplhalt

Plate 37: Polymer modified asphalt

POTENTIAL ISSUES

i. Clogging of voids in the pavement. Routine maintenance is required to

prevent clogging and optimize infiltration rates.

ii. Quality control and familiarity varies.

Page 62: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Pavement Technologies PT | 4

iii. Permeable pavement may not be suitable for high volume traffic loads or

arterials. However, shoulder areas may be appropriate applications to

consider.

i. Specification For Road Works Section 4 : Flexible Pavement JKR/SPJ/2008-S4

REFERENCES

Page 63: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Pavement Technologies PT | 5

QUIET PAVEMENT

Improve human health by reducing tire-pavement noise

2 Point : The pavement mix design able to reduce tire noise to not more than 80dBA

A. Design Evaluation Stage

i. Drawing showing the location of the proposed quiet pavement.

ii. Quiet pavement design mix.

B. Verification Scoring Stage

i. A list of pavement sections built and their associated surface material

type and surface areas.

ii. Drawing and photo showing the location of quiet pavement.

iii. Quietness test result

i. Overview of quiet pavement options, fundamentals and research, including

pavement design guidelines for reducing tire-pavement noise.

EXAMPLE :

i. Porous Asphalt

ii. Hot Mix Asphalt

iii. Open-Graded Friction Course

POTENTIAL ISSUES

i. Without adequate prior testing on the surface course mix design, there is

some risk that the constructed surface course will not meet the required

limit noise level.

ii. Life-cycle costing of the road surface using quiet pavement should be

considered.

OBJECTIVE

CREDIT REQUIREMENT

AHAN

KEPERLUAN PERMARKAHAN

PT 2

2 POINTS

DOCUMENTATION

RELATED CREDITS

EW 1 – EMS

PT1 – Permeable Pavement

BENEFITS

Improve Human Health & Safety

APPROACHES & STRATEGIES

AHAN

KEPERLUAN PERMARKAHAN

Page 64: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Pavement Technologies PT | 6

i. Arahan Teknik Jalan

ii. Standard Specification For Road Works Section 4 : Flexible Pavement

JKR/SPJ/2008-S4

iii. http://www.quietpavement.com/

REFERENCES

Page 65: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Pavement Technologies PT | 7

PAVEMENT PERFORMANCE TRACKING

Allow for more thorough performance tracking by integrating construction quality and pavement performance data.

2 Point : Use a process that allows construction quality measurements and long-

term pavement performance measurements to be spatially located and correlated to one another. This implies four requirements:

i. Construction quality measurements must be spatially located such that the location of the quality measurement is known

ii. Pavement condition measurements must be taken at least every 2 years and must be spatially located to a specific portion of roadway or location within roadway

iii. An operational system, computer based or otherwise that is capable of storing construction quality measurements, pavement condition measurement and their spatial locations.

iv. The designated system must be demonstrated in operation, be capable of updates and have written plans for its maintenance in perpetuity.

Details This generally means spatially location construction quality measurement in a permanent location system and maintaining those records indefinitely. Examples of construction quality records include but not limited to:

i. Density test ii. Water content test

iii. Bitumen content test iv. Gradation test v. Slump test

vi. Air content test vii. Compressive Strength test

viii. Thickness test Examples of pavement condition measurement include, but not limited to the extent and severity of:

i. Cracking ii. Permanent deformation (rutting)

iii. Bleeding iv. Faulting v. Joint Spalling

OBJECTIVE

CREDIT REQUIREMENT

AHAN

KEPERLUAN PERMARKAHAN

PT 3

2 POINTS

RELATED CREDITS

EW 1 – EMS

MR7 - LCA BENEFITS

Increases Service Life

Reduce Lifecycle Cost

Improves Accountability

Page 66: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Pavement Technologies PT | 8

A. Design Evaluation Stage

i. Pavement structure design

B. Verification Scoring Stage

i. Pavement performance tracking system that is operational and has

been populated with the required data.

i. Develop and implement a pavement tracking system.

EXAMPLE :

i. HMA view

ii. Pavement Interactive (PI) Maps

iii. HDM-4

POTENTIAL ISSUES

i. The general trend in road construction is to dispose of construction records

after a prescribed amount of time set by legal obligations.

ii. It is difficult to define the concepts of performance and quality in simple

terms.

iii. It is difficult to trace pavement performance issues back to construction

quality due to lack of integration between construction quality control data

with long-term pavement performance data.

DOCUMENTATION

REFERENCES

APPROACHES & STRATEGIES

AHAN

KEPERLUAN PERMARKAHAN

Page 67: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Pavement Technologies PT | 9

LONG-LIFE PAVEMENT

Minimize life cycle costs by promoting design of long-lasting pavement structures.

1 Point : Meet the requirements of long-life pavement design graph.

1 Point : Pavement design is in accordance with a design procedure that is formally

recognized, adopted and documented by the agency.

1 Point : Rigid Pavement

1 Point : Flexible Pavement :> 10 Years

A. Design Evaluation Stage

i. A list of pavement sections to be built and their associated pavement

material type, surface areas, ESALs, design thickness and subgrade

CBR.

ii. A calculation to indicate the total percentage of trafficked lane

pavement areas that are designed for long-life.

iii. Drawing showing locations of pavement sections designed for long-life.

B. Verification Scoring Stage

i. As-built drawings

ii. Photos of installed long-life pavement

i. Consider designing long-lasting pavement that meets the requirement of this

credit.

EXAMPLE :

i. HMA Pavements

ii. PCC Pavements

OBJECTIVE

CREDIT REQUIREMENT

AHAN

KEPERLUAN PERMARKAHAN

PT 4

4 POINTS

DOCUMENTATION

RELATED CREDITS

EW 1 – EMS BENEFITS

Reduce Raw Material

Reduce Lifecycle Cost

Reduced Fossil Fuel Use

Increase Service Life

Improves Accountability

APPROACHES & STRATEGIES

AHAN

KEPERLUAN PERMARKAHAN

Page 68: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Pavement Technologies PT | 10

Plate 38: Long-life pavement (HMA Pavement)

POTENTIAL ISSUES

i. Some commonly used pavement design methods may produce pavement

thicknesses that do not meet the requirements of this graph. No credit given

to such designs.

i. http://www.transport-

links.org/transport_links/filearea/publications/1_764_PA3736_2001.pdf ii. http://www.acpa.org/Downloads/LLCP.pdf

REFERENCES

Page 69: OBJECTIVE 5 POINTSepsmg.jkr.gov.my/images/8/88/Manual_Jalan_Lestari_KJ1.pdf · 2014-08-26 · ii. Manual SaliranMesraAlam Malaysia (MASMA) iii. Use REAM guidelines and specification

© pH JKR 2012 Innovation IN | 1

INNOVATION

Recognize innovation sustainable road design and construction practices.

5 Point : Come up with an idea for a design or construction best practice for road

that is not currently included in Jalan Lestari Manual and is more sustainable than standard or conventional practices.

A. Design Evaluation Stage

Nil

B. Verification Scoring Stage

i. A copy the specification an innovative idea and photos.

i. Explain approaches and strategies in achieving the said innovation (e.g.

processes, system, material and plan).

ii. Conduct comprehensive research if required.

EXAMPLE :

i. Case study or calculation.

POTENTIAL ISSUES

i. Explanation of another potential issue if any.

i. List of references used.

OBJECTIVE

CREDIT REQUIREMENT

AHAN

KEPERLUAN PERMARKAHAN

IN

5 POINTS

DOCUMENTATION

REFERENCES

RELATED CREDITS

BENEFITS

Increases Alternative

APPROACHES & STRATEGIES

AHAN

KEPERLUAN PERMARKAHAN