DESCRIPTION
Objective FCM03. ESSIP Plan 2014. Octavian CIOARA DPS/PEPR 19.09.2014. Objective FCM03. Comprehensive Explanation What is new or has changed since LSSIP 2013 Link to European ATM Master Plan Most important SLoA (s) Finalisation Criteria and Closed Questions ESSIP Report 2013 - PowerPoint PPT PresentationTRANSCRIPT
Objective FCM03
ESSIP Plan 2015
Octavian CIOARADPS/PEPR
01.11.2015
ESSIP Plan 2015 / Objective FCM03 2
Objective FCM03
• Comprehensive Explanation• What is new or has changed since LSSIP 2014• Link to European ATM Master Plan• Most important SLoA(s)• Finalisation Criteria and Closed Questions• ESSIP Report 2014• Objective Coordinator’s Analysis, recommendations, tips & tricks• Links and contacts
Comprehensive Explanation
ESSIP Plan 2015 / Objective FCM033
This ECAC wide objective aims at:
• Improving the collaboration between the NM, ANS providers, airports and airspace users in filing and distributing flight plans,
• Assist airspace users in filing their flight plans and in re-routings according to the airspace availability and ATFM situation.
• Improve flight plan distribution to increase consistency of flight plan data amongst all parties involved (IFPS/ETFMS, ANS Providers).
What is new or has changed since LSSIP 2014
ESSIP Plan 2015 / Objective FCM03 4
One SLoA (ASP04 on “Processing of APL and ACH messages”) has been finalised
2 SLoAs (ASP10 on “Provision of AFP messages in ADEXP format” and ASP11 on “Use of IFPLID in all messages to ETFMS” have been deleted
Explicit requirement for the automation of the AFP message generation in case of change of flight rules or flight type (ASP08) and change of requested cruising flight level (ASP09).
New NM SloA on the integration of received AFP messages New compliance date of 12/2017 for SLoAs and at objective level.
Link to European ATM Master Plan
ESSIP Plan 2015 / Objective FCM03 5
OI Step [IS-0102] - Improved Management of Flight Plan After Departure
Most important SLoA(s)
ESSIP Plan 2015 / Objective FCM036
ASP05 Automatically provide AFP for Missing flight plans,
ASP06 Automatically provide AFP message for Change of route,
ASP07 Automatically provide AFP message for a Diversion,
ASP09 Automatically provide AFP message for a Change of requested cruising level.
Each SLoA should be fulfilled in accordance with the relevant provisions of the CFMU Flight Progress Messages document
Finalisation Criteria and Closed Questions
ESSIP Plan 2015 / Objective FCM03 7
Automatic processing of:• Flight plan messages in ICAO format• FPLs derived from RPLs
ATC system able to receive and process flight plan data from IFPS in ADEXP format
Automatic generation and provision to NM of the AFP messages in ADEXP format for:
• Missing flight plans• Route changes• Diversions• Change of flight rules or flight type • Changes of requested cruising level • Changes of aircraft type• Changes of aircraft equipment
ESSIP Report 2014
ESSIP Plan 2015 / Objective FCM03 8
There is a very slow progress in the implementation of the objective. Compared with the initial Full Operational Capability (FOC) date, the objective is late. However, due to the successive changes of the FCO date (now it is 12/2017), very few States will appear as late.
Objective Coordinator’s Analysis, recommendations, tips & tricks
ESSIP Plan 2015 / Objective FCM03 9
Implement the most important SLoA(s)
Pay attention to the need for automation of the AFP message
Amend the progress status if necessary
For partial completion of the objective be more specific on what has been completed and the prospects for the rest of the SLoAs.
Ensure that there is an effective link with the NM and the information on the implementation originates from a ODSG member.
Links and contacts
ESSIP Plan 2015 / Objective FCM03 10
Objective Coordinator: Octavian Cioara +32 2 729 3282
NMD Objective Expert: TBC (for the time being contact the Objective Coordinator if needed)