office of community investment and infrastructure (ocii), sf

1
Webinar ID: 978 1525 4866 or type in zoom link below or scan QR Code below: https://zoom.us/j/97815254866 1. Scan the QR Code, or 2. Dial in +1(669) 900-6833 enter Meeting ID 97815254866# 第三場社區會議傳單的中文版,請點擊此處瀏覽: hps://www.sfpublicworks.org/Block3Park Para makita ang pagsalin sa Filipino ng Pagpupulong #3 ng Komunidad na flyer, bisitahin ang website: hps://www.sfpublicworks.org/Block3Park Para la traducción de este folleto de la Reunión Comunitaria #3 en español, visite este sio web: hps://www.sfpublicworks.org/Block3Park Photo of Block 3: Closed Temporary Transit Terminal OCII, SF Recreaon & Parks, and Public Works (PW) encourage ideas and informaon on the final conceptual design of the Transbay Block 3 Park with interested community members. PROJECT SITE PROJECT DESCRIPTION HOW TO JOIN THE VIRTUAL MEETING: PARK TOWER SOLAIRE INFINITY LUMINA BLOCK 3 PARK BLOCK 4 BLOCK 2 CLEMENTINA STREET ZENO PLACE FRE BEALE STREET T MAIN STREET T public comment and look forward to sharing HOWARD STREET FOLSOM STREET HARRISON STREET SCAN ME The New Transbay Block 3 Park will be located in San Francisco’s Transbay Redevelopment Project Area. The park site is currently the middle block of San Francisco’s former Temporary Transit Terminal. The project is one of the central features of the Transbay Redevelopment Project Area, which was adopted in 2005 and includes 40 acres of high-density, transit-oriented housing, office and retail in The East Cut, a new neighborhood just south of San Francisco’s Downtown. Contact for more informaon: Kathleen O’Day, Project Manager, Public Works [email protected] or 415-218-7515 49 South Van Ness, 10th Floor, Suite 1000 (presentaon packets can be mailed upon request for those without an email) If you would like to request ASL interpretation services please contact Ms. O'Day 415-218-7515 at least 72 hours in advance of the meeting. Office of Community Investment and Infrastructure (OCII), SF Recreaon & Parks, Public Works New Transbay Block 3 Park Community Meeting 4 Thursday April 29, 2021 at 6 - 7p.m. Please join our Zoom Webinar: FOLSOM STREET

Upload: others

Post on 20-Mar-2022

19 views

Category:

Documents


0 download

TRANSCRIPT

Webinar ID: 978 1525 4866 or type in zoom link below or scan QR Code below: https://zoom.us/j/97815254866

1. Scan the QR Code, or2. Dial in +1(669) 900-6833 enter Meeting

ID 97815254866#

第三場社區會議傳單的中文版,請點擊此處瀏覽: https://www.sfpublicworks.org/Block3ParkPara makita ang pagsalin sa Filipino ng Pagpupulong #3 ng Komunidad na flyer, bisitahin ang website: https://www.sfpublicworks.org/Block3Park

Para la traducción de este folleto de la Reunión Comunitaria #3 en español, visite este sitio web: https://www.sfpublicworks.org/Block3Park

Photo of Block 3: Closed Temporary Transit Terminal

OCII, SF Recreation & Parks, and Public Works (PW)encourage

ideas and information on the final conceptual design of theTransbay Block 3 Park with interested community members.

PROJECT SITE PROJECT DESCRIPTION

HOW TO JOIN THE VIRTUAL MEETING: 3 0 3 2 N D S T

H I L L S P L A Z A

S A L E S F O R C E T O W E R

F O U N D R YS Q U A R E

B AY A R E AM E T R O C E N T E R

O N E R I N C O NH I L L

PA R K T O W E R R I N C O N C E N T E R

G A P H Q

G A P

U S F S C H O O L O FM A N A G E M E N T

1 0 12 N D S T

C O U R T YA R D B YM A R R I O T T

F D I C

S A I L O R SU N I O N O F

T H EPA C I F I C

T H EM E T R O P O L I TA N

J A S P E R

R I N C O N G R E E NA PA R T M E N T S

D I G I TA L R E A L I T YD ATA C E N T E R

P G & E

P O R T S I D E

3 3 3F R E M O N T

3 4 0F R E M O N T

3 9 9F R E M O N T

P G & ES U B S TAT I O N

S O L A I R E

T E R R AG A L L E R Y

G O L D E NG AT E

U N I V E R S I T Y

F E R R YB U I L D I N G

I N F I N I T YL U M I N A

BLOCK 3PARK

BLOCK 4

BLOCK 2

MINNA STREET

NATOMA STREET

MISSION STREET

STEVENSON STREET

ANTHONY STREET

ECKER STREET

JESSIE STREET

ELIM ALLEY

POST STREET

SUTTER STREET

BUSH STREETCALIFORNIA STREET

MONTGOMER

Y STREE

T

SANSO

ME STR

EET

BATTERY

STREE

T

FRONT STREET

DAVIS STREET

DRUMM STREET

RINCON STREET

FEDERAL STREET

STERLING STREET

MALDEN ALLEY

TEHAMA STREET

ECKE

R STR

EET

CLEMENTINA STREET

LANSING STREET

GUY PLACE

ZENO

PLAC

E

BRYANT STREET

STEUART STREET

BAY BRIDGE

2ND STREET

1ST STREET

FREMONT STREET

BEALE STREETT

MAIN STREET

T

public comment and look forward to sharing

HOWARD STREET

FOLSOM STREET

HARRISON STREET

SCAN ME

The New Transbay Block 3 Park will be located in San Francisco’s Transbay Redevelopment Project Area. The park site is currently the middle block of San Francisco’s former Temporary Transit Terminal.

The project is one of the central features of the Transbay Redevelopment Project Area, which was adopted in 2005 and includes 40 acres of high-density, transit-oriented housing, office and retail in The East Cut, a new neighborhood just south of San Francisco’s Downtown.

Contact for more information: Kathleen O’Day, Project Manager, Public Works [email protected] or 415-218-751549 South Van Ness, 10th Floor, Suite 1000 (presentation packets can be mailed upon request for those without an email)

If you would like to request ASL interpretation services please contact Ms. O'Day 415-218-7515 at least 72 hours in advance of the meeting.

Office of Community Investment and Infrastructure (OCII), SF Recreation & Parks, Public Works

New Transbay Block 3 Park Community Meeting 4

Thursday April 29, 2021 at 6 - 7p.m.Please join our Zoom Webinar:

FOLSOM STREET