october 2011 version 1.0
DESCRIPTION
International Coal Conference Presentation by Mr Bradley Green Managing Director Australasian Continental Energy. October 2011 version 1.0. AACE Board and Advisors. Australasian Continental Energy Board Members Domenic Martino Chairman Bradley Green Managing Director - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: October 2011 version 1.0](https://reader035.vdocument.in/reader035/viewer/2022081505/56815a72550346895dc7d6e8/html5/thumbnails/1.jpg)
International Coal Conference Presentationby
Mr Bradley GreenManaging Director
Australasian Continental Energy
October 2011version 1.0
![Page 2: October 2011 version 1.0](https://reader035.vdocument.in/reader035/viewer/2022081505/56815a72550346895dc7d6e8/html5/thumbnails/2.jpg)
AACE Board and Advisors
Australasian Continental Energy Board MembersDomenic Martino ChairmanBradley Green Managing DirectorShane Doherty DirectorLuke Martino DirectorDr Martin Chapman Director
Harry Spindler Company Secretary
Advisors to the BoardColin Roberts AdvisorAhmad Sohail Pakistan Representative / Advisor
![Page 3: October 2011 version 1.0](https://reader035.vdocument.in/reader035/viewer/2022081505/56815a72550346895dc7d6e8/html5/thumbnails/3.jpg)
Domenic Martino
Chairman Resourcehouse LimitedChina First Coal ProjectPartners in this project Metallurgical Corporation of China Limited China Power International Holding Sino-coal International
Cokal LimitedPan Asia Corporation LimitedBlue Energy LimitedSydney Gas Limited
![Page 4: October 2011 version 1.0](https://reader035.vdocument.in/reader035/viewer/2022081505/56815a72550346895dc7d6e8/html5/thumbnails/4.jpg)
Bradley Green
Managing Director of Australasian Continental Energy
Mining Economist
20 years experience in the mining industry
Advisor to several large international mining companies
![Page 5: October 2011 version 1.0](https://reader035.vdocument.in/reader035/viewer/2022081505/56815a72550346895dc7d6e8/html5/thumbnails/5.jpg)
Advisors
Professor Colin Roberts Chartered Mining Engineer Resource Law & Policy Foreign Investment Consul for Australia
Ahmad Sohail Chemical Engineer Multi discipline experience AACE’s representative in Pakistan
![Page 6: October 2011 version 1.0](https://reader035.vdocument.in/reader035/viewer/2022081505/56815a72550346895dc7d6e8/html5/thumbnails/6.jpg)
Why the Thar Coalfields
Largest untapped energy resource in the Asian regionThe value of the Thar coal reserves is estimated to be equivalent to the oil reserves of both Saudi Arabia and Iran and could generate 100,000 MW of power for 300 years.
Export of coal based fuels potentialCoal seam gasCoal to oil
Substantial feasibility and pre development work already undertaken
Power requirements for Pakistan Investment incentives Low sovereign and security risk Technology transfer
![Page 7: October 2011 version 1.0](https://reader035.vdocument.in/reader035/viewer/2022081505/56815a72550346895dc7d6e8/html5/thumbnails/7.jpg)
AACE’s project
Coal Mining on Block IVHas a measured and indicated reserve of 2.4 billion tonnes.Area covered 82.5km2
Initial production rate 6 million tonnes per annum increasing to 18 mtpa in 15 years
Power Station1,100 MW increasing to 3,000 MW in 15 years
Estimated total project cost $US 3 billion
![Page 8: October 2011 version 1.0](https://reader035.vdocument.in/reader035/viewer/2022081505/56815a72550346895dc7d6e8/html5/thumbnails/8.jpg)
AACE’s project
6 million tonne per annum coal mining operation
![Page 9: October 2011 version 1.0](https://reader035.vdocument.in/reader035/viewer/2022081505/56815a72550346895dc7d6e8/html5/thumbnails/9.jpg)
AACE’s project
1,100 MW Power Station
![Page 10: October 2011 version 1.0](https://reader035.vdocument.in/reader035/viewer/2022081505/56815a72550346895dc7d6e8/html5/thumbnails/10.jpg)
Mining equipment
Main mining equipment Bucket wheel excavators. 3 BWE’s are required for the removal of overburden and 1
for the mining operation. Total capital cost of the mining operation - $US1 billion est.
![Page 11: October 2011 version 1.0](https://reader035.vdocument.in/reader035/viewer/2022081505/56815a72550346895dc7d6e8/html5/thumbnails/11.jpg)
Power generating equipment
Main power generating equipment Steam turbines, configuration 3 x 370MW or 2 x 650MW Boilers Water towers Total capital cost for the power station - $US 2 billion est.
![Page 12: October 2011 version 1.0](https://reader035.vdocument.in/reader035/viewer/2022081505/56815a72550346895dc7d6e8/html5/thumbnails/12.jpg)
Project Timeframe