Erik Jacobson Director Regulatory Relations Pacific Gas and Electric Company 77 Beale St., Mail Code B10C P.O. Box 770000 San Francisco, CA 94177 Fax: 415-973-1448 October 7, 2016 Advice 4931-E (Pacific Gas and Electric Company ID U 39 E) Public Utilities Commission of the State of California Subject: Agreement with the City of Oakland and the Board of Port Commissioners for the Oakland Army Base Redevelopment Project in Accordance with General Order 96-B, Section 8.2.3 and General Order 128, Section 15.1 Purpose Pacific Gas and Electric Company (PG&E) hereby submits, in accordance with General Order 96-B, Section 8.2.3 1 and General Order 128, Section 15.1 2 , an Agreement among PG&E, the City of Oakland (The City) and The City of Oakland, a Municipal Corporation, acting by and through its Board of Port Commissioners (the Port). The Port and the City have begun a joint project to redevelop the former Oakland Army Base (Redevelopment Project). The Port and the City have requested that PG&E waive its requirements that (a) the Port not place anything on top of two electric pull boxes recently installed on Port property; and (b) the Port use only PG&E approved lids (covers) for the pull boxes built for and to be deeded to PG&E. PG&E has agreed to accommodate the Port’s request subject to the terms and conditions set forth in the attached Agreement (Attachment 1). 1 CPUC General Order 96-B, section 8.2.3 – At all times, a utility other than a telephone corporation may provide service (other than resale service) to a government agency for free, or at reduced rates and charges, or under terms and conditions otherwise deviating from it tariffs then in effect. 2 General Order 123, section 15.1 – If, in a particular case or a special type of construction, exemption from or modification of any of the requirements herein is desired, the Commission will consider an application for such exemption or modification when accompanied by a full statement of conditions existing and the reasons why such exemption or modification is asked and is believed to be justifiable. It is to be understood that, unless otherwise ordered, any exemption or modification so granted shall be limited to the particular case or special type of construction covered by the application.

Upload: others

Post on 08-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: October 7, 2016 · Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 37604-E Cancelling Revised Cal. P.U.C. Sheet No. 21541-E LIST OF CONTRACTS

Erik Jacobson Director Regulatory Relations

Pacific Gas and Electric Company 77 Beale St., Mail Code B10C P.O. Box 770000 San Francisco, CA 94177 Fax: 415-973-1448

October 7, 2016 Advice 4931-E (Pacific Gas and Electric Company ID U 39 E) Public Utilities Commission of the State of California Subject: Agreement with the City of Oakland and the Board of Port

Commissioners for the Oakland Army Base Redevelopment Project in Accordance with General Order 96-B, Section 8.2.3 and General Order 128, Section 15.1

Purpose Pacific Gas and Electric Company (PG&E) hereby submits, in accordance with General Order 96-B, Section 8.2.31 and General Order 128, Section 15.12, an Agreement among PG&E, the City of Oakland (The City) and The City of Oakland, a Municipal Corporation, acting by and through its Board of Port Commissioners (the Port). The Port and the City have begun a joint project to redevelop the former Oakland Army Base (Redevelopment Project). The Port and the City have requested that PG&E waive its requirements that (a) the Port not place anything on top of two electric pull boxes recently installed on Port property; and (b) the Port use only PG&E approved lids (covers) for the pull boxes built for and to be deeded to PG&E. PG&E has agreed to accommodate the Port’s request subject to the terms and conditions set forth in the attached Agreement (Attachment 1).

1 CPUC General Order 96-B, section 8.2.3 – At all times, a utility other than a telephone

corporation may provide service (other than resale service) to a government agency for free, or at reduced rates and charges, or under terms and conditions otherwise deviating from it tariffs then in effect.

2 General Order 123, section 15.1 – If, in a particular case or a special type of construction, exemption from or modification of any of the requirements herein is desired, the Commission will consider an application for such exemption or modification when accompanied by a full statement of conditions existing and the reasons why such exemption or modification is asked and is believed to be justifiable. It is to be understood that, unless otherwise ordered, any exemption or modification so granted shall be limited to the particular case or special type of construction covered by the application.

Page 2: October 7, 2016 · Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 37604-E Cancelling Revised Cal. P.U.C. Sheet No. 21541-E LIST OF CONTRACTS

Advice 4931-E - 2 - October 7, 2016 Safety To ensure continued safe operation of PG&E electric facilities, the Agreement memorializes PG&E’s access and rights to its facilities in an emergency situation. Background As part of the Redevelopment Project, two electric pull boxes3 were recently installed on Port property. PG&E wanted to install bollards to protect PG&E’s access to the two pull boxes. The Port objected to PG&E installing the bollards because the Port wanted to potentially use the area to stack shipping containers on top of the two pull boxes and the Port believed that the bollards would impair the Port’s operations. Under the Agreement, the Port agrees to provide PG&E with unfettered access to the pull boxes upon 24 hours’ notice and, during emergencies, the Port would provide PG&E with unfettered access to the pull boxes as soon as possible not to exceed 4 hours after notice. If the Port fails to comply, the parties will meet and confer to discuss. If the Port fails to comply on a second occasion, PG&E will have the right to install bollards around the two pull boxes and prevent the Port or anyone else from placing shipping containers or other items on top of the boxes. In addition to the unfettered access issue, the Port installed non-standard boxes with 135 KIP rated lids that did not conform to PG&E’s specifications. Rather than delay the project or force the Port to replace the boxes, PG&E has agreed to allow the use of these boxes. However, under the Agreement, if, in PG&E’s opinion, the pull box or lid is damaged by someone other than PG&E such that it cannot be used properly, the Port upon written notice shall either (1) pay PG&E for the cost to (a) replace the existing non-standard box and lid with a standard box and lid and (b) install bollards to protect the new box or (2) reimburse PG&E or pay a contractor of PG&E’s choice to install a replacement box and lid of equal or greater strength to the existing box and lid. To avoid delaying the Redevelopment Project, PG&E energized the subject facilities shortly after the Agreement was signed, as permitted by General Order 96-B, Section 8.2.3. Tariff Revisions Upon CPUC approval, the List of Contracts and Deviations will be revised to reflect the approved Agreement. The filing would not increase any current rate or change, cause the withdrawal of service, or conflict with any rate schedule or rule.

3 The electric pull boxes were installed on Port property located on Maritime Streets and the

locations are shown on Exhibit 1 and 2 of this filing.

Page 3: October 7, 2016 · Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 37604-E Cancelling Revised Cal. P.U.C. Sheet No. 21541-E LIST OF CONTRACTS

Advice 4931-E - 3 - October 7, 2016 Protests Anyone wishing to protest this filing may do so by letter sent via U.S. mail, facsimile or E-mail, no later than October 27, 2016, which is 20 days after the date of this filing. Protests must be submitted to:

CPUC Energy Division ED Tariff Unit 505 Van Ness Avenue, 4th Floor San Francisco, California 94102 Facsimile: (415) 703-2200 E-mail: [email protected]

Copies of protests also should be mailed to the attention of the Director, Energy Division, Room 4004, at the address shown above. The protest shall also be sent to PG&E either via E-mail or U.S. mail (and by facsimile, if possible) at the address shown below on the same date it is mailed or delivered to the Commission:

Erik Jacobson Director, Regulatory Relations c/o Megan Lawson Pacific Gas and Electric Company 77 Beale Street, Mail Code B10C P.O. Box 770000 San Francisco, California 94177 Facsimile: (415) 973-1448 E-mail: [email protected]

Any person (including individuals, groups, or organizations) may protest or respond to an advice letter (General Order 96-B, Section 7.4). The protest shall contain the following information: specification of the advice letter protested; grounds for the protest; supporting factual information or legal argument; name, telephone number, postal address, and (where appropriate) e-mail address of the protestant; and statement that the protest was sent to the utility no later than the day on which the protest was submitted to the reviewing Industry Division (General Order 96-B, Section 3.11). Effective Date PG&E requests that this Tier 2 advice filing become effective pending disposition in accordance with General Order 96-B, Sections 3.6 and 8.2.3.

Page 4: October 7, 2016 · Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 37604-E Cancelling Revised Cal. P.U.C. Sheet No. 21541-E LIST OF CONTRACTS

Advice 4931-E - 4 - October 7, 2016 Notice In accordance with General Order 96-B, Section IV, a copy of this advice letter is being sent electronically and via U.S. mail to parties shown on the attached list. Address changes to the General Order 96-B service list should be directed to PG&E at email address [email protected]. For changes to any other service list, please contact the Commission’s Process Office at (415) 703-2021 or at [email protected]. Send all electronic approvals to [email protected]. Advice letter filings can also be accessed electronically at: http://www.pge.com/tariffs/. /S/ Erik Jacobson Director, Regulatory Relations Attachments cc: J. Christopher Lytle, Executive Director, Port of Oakland Sabrina Landreth, City Administrator, City of Oakland Andy Dashner, Director of Electric Operations, PG&E

Page 5: October 7, 2016 · Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 37604-E Cancelling Revised Cal. P.U.C. Sheet No. 21541-E LIST OF CONTRACTS

CALIFORNIA PUBLIC UTILITIES COMMISSION ADVICE LETTER FILING SUMMARY

ENERGY UTILITY

MUST BE COMPLETED BY UTILITY (Attach additional pages as needed)

Company name/CPUC Utility No. Pacific Gas and Electric Company (ID U39 E)

Utility type: Contact Person: Kingsley Cheng

ELC GAS Phone #: (415) 973-5265

PLC HEAT WATER E-mail: [email protected] and [email protected]

EXPLANATION OF UTILITY TYPE

ELC = Electric GAS = Gas PLC = Pipeline HEAT = Heat WATER = Water

(Date Filed/ Received Stamp by CPUC)

Advice Letter (AL) #: 4931-E Tier: 2 Subject of AL: Agreement with the City of Oakland and the Board of Port Commissioners for the Oakland Army Base

Redevelopment Project in Accordance with General Order 96-B, Section 8.2.3 and General Order 128, Section 15.1

Keywords (choose from CPUC listing): Agreements

AL filing type: Monthly Quarterly Annual One-Time Other _____________________________

If AL filed in compliance with a Commission order, indicate relevant Decision/Resolution #: N/A

Does AL replace a withdrawn or rejected AL? If so, identify the prior AL: No

Summarize differences between the AL and the prior withdrawn or rejected AL: ____________________

Is AL requesting confidential treatment? If so, what information is the utility seeking confidential treatment for: No

Confidential information will be made available to those who have executed a nondisclosure agreement: N/A

Name(s) and contact information of the person(s) who will provide the nondisclosure agreement and access to the confidential information: __________________________________________________________________________________________________

Resolution Required? Yes No Requested effective date: October 7, 2016 No. of tariff sheets: 3

Estimated system annual revenue effect (%): N/A

Estimated system average rate effect (%): N/A

When rates are affected by AL, include attachment in AL showing average rate effects on customer classes (residential, small commercial, large C/I, agricultural, lighting). Tariff schedules affected: List of Contracts and Deviations

Service affected and changes proposed: N/A

Pending advice letters that revise the same tariff sheets: N/A

Protests, dispositions, and all other correspondence regarding this AL are due no later than 20 days after the date of this filing, unless otherwise authorized by the Commission, and shall be sent to:

California Public Utilities Commission Pacific Gas and Electric Company

Energy Division EDTariffUnit 505 Van Ness Ave., 4th Flr. San Francisco, CA 94102 E-mail: [email protected]

Attn: Erik Jacobson Director, Regulatory Relations c/o Megan Lawson 77 Beale Street, Mail Code B10C P.O. Box 770000 San Francisco, CA 94177 E-mail: [email protected]

Page 6: October 7, 2016 · Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 37604-E Cancelling Revised Cal. P.U.C. Sheet No. 21541-E LIST OF CONTRACTS

Advice 4931-E October 7, 2016

Attachment 1

Port of Oakland and Oakland Army Base Redevelopment Agreement

Page 7: October 7, 2016 · Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 37604-E Cancelling Revised Cal. P.U.C. Sheet No. 21541-E LIST OF CONTRACTS
Page 8: October 7, 2016 · Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 37604-E Cancelling Revised Cal. P.U.C. Sheet No. 21541-E LIST OF CONTRACTS
Page 9: October 7, 2016 · Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 37604-E Cancelling Revised Cal. P.U.C. Sheet No. 21541-E LIST OF CONTRACTS
Page 10: October 7, 2016 · Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 37604-E Cancelling Revised Cal. P.U.C. Sheet No. 21541-E LIST OF CONTRACTS
Page 11: October 7, 2016 · Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 37604-E Cancelling Revised Cal. P.U.C. Sheet No. 21541-E LIST OF CONTRACTS
Page 12: October 7, 2016 · Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 37604-E Cancelling Revised Cal. P.U.C. Sheet No. 21541-E LIST OF CONTRACTS
Page 13: October 7, 2016 · Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 37604-E Cancelling Revised Cal. P.U.C. Sheet No. 21541-E LIST OF CONTRACTS
Page 14: October 7, 2016 · Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 37604-E Cancelling Revised Cal. P.U.C. Sheet No. 21541-E LIST OF CONTRACTS

ATTACHMENT 2 Advice 4931-E

Cal P.U.C. Sheet No. Title of Sheet

Cancelling Cal P.U.C. Sheet No.

Page 1 of 1

37604-E LIST OF CONTRACTS AND DEVIATIONS (Continued) Sheet 3

21541-E

37605-E ELECTRIC TABLE OF CONTENTS Sheet 1

37583-E

37606-E ELECTRIC TABLE OF CONTENTS MAPS, CONTRACTS AND DEVIATIONS Sheet 22

35709-E

Page 15: October 7, 2016 · Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 37604-E Cancelling Revised Cal. P.U.C. Sheet No. 21541-E LIST OF CONTRACTS

Pacific Gas and Electric Company San Francisco, California U 39

Revised Cal. P.U.C. Sheet No. 37604-E Cancelling Revised Cal. P.U.C. Sheet No. 21541-E

LIST OF CONTRACTS AND DEVIATIONS Sheet 3

(Continued)

(Continued)

Advice Letter No: 4931-E Issued by Date Filed October 7, 2016Decision No. Steven Malnight Effective October 7, 2016 Senior Vice President Resolution No. 3C7 Regulatory Affairs

Name and Location of Customer

Most Comparable Regular Tariff

PG&E Installation Reference No.

Type or Class of ___Service___

Execution and Expiration Dates

Commission Authorization

Number and Date Schedule or Rule No.

Contract Difference

EAST BAY REGION (Cont’d.) Counties and Cities City of Livermore and Roger L. Shaheen Research Drive Assessment District Livermore

Coml/Ind 08-22-79---

G.O.96-A,X.B.4-2-80

Elec. Rule 15.2 Gas Rule 15

Cost of Ownership Charge

Assessment District

City of Livermore Coml/Ind 03-13-81

---Res. G-2458

3-2-82Rule 15.2 Cost of Ownership

Charge County of Alameda Coml/Ind 12-22-93

12-22-03-- Rule 15 Exceptional Case

Line Extension County of Alameda Flood Control and Water

Construction 03-11-04 G.O.96-A,X.B.Advice 2492-E

Elec. Rule 15.L.1 Project Cost Allocation

City of Oakland and the City of Oakland, a Municipal Corporation, acting by and through its Board of Port Commissioners

Governmental Entity

10-07-16 Ref. Advice Letter 4931-E

--- Ref. Advice Letter 4931-E

(N)I I I

(N) _______________

*1 to *4 See last page of Electric Contracts and Deviations Section for explanation of footnotes.

Page 16: October 7, 2016 · Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 37604-E Cancelling Revised Cal. P.U.C. Sheet No. 21541-E LIST OF CONTRACTS

Pacific Gas and Electric Company San Francisco, California U 39

Revised Cal. P.U.C. Sheet No. 37605-E Cancelling Revised Cal. P.U.C. Sheet No. 37583-E

ELECTRIC TABLE OF CONTENTS Sheet 1

(Continued)

Advice Letter No: 4931-E Issued by Date Filed October 7, 2016Decision No. Steven Malnight Effective October 7, 2016 Senior Vice President Resolution No. 1H7 Regulatory Affairs

TABLE OF CONTENTS

SCHEDULE TITLE OF SHEET

CAL P.U.C.SHEET NO.

Title Page ...............................................................................................................................................37605-ERate Schedules ............................................... 37584,32585,37586,37587,37588,37589,35088,31541,36584-E Preliminary Statements .............................................. 37590,32706,35423,35049,34357,34358,35454,35630-E Rules ................................................................................................................................ 36586,35401,37442-E Maps, Contracts and Deviations ............................................................................................................. 37606-E Sample Forms ................ 32777,32429,37022,35301,32504,35767,35796,36052,36053,32437,32508,32439-E

(T)

(T)

Page 17: October 7, 2016 · Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 37604-E Cancelling Revised Cal. P.U.C. Sheet No. 21541-E LIST OF CONTRACTS

Pacific Gas and Electric Company San Francisco, California U 39

Revised Cal. P.U.C. Sheet No. 37606-E Cancelling Revised Cal. P.U.C. Sheet No. 35709-E

ELECTRIC TABLE OF CONTENTS Sheet 22

MAPS, CONTRACTS AND DEVIATIONS

(Continued)

Advice Letter No: 4931-E Issued by Date Filed October 7, 2016Decision No. Steven Malnight Effective October 7, 2016 Senior Vice President Resolution No. 22H7 Regulatory Affairs

TITLE OF SHEET

CAL P.U.C.SHEET NO.

Maps, Contracts and Deviations

SERVICE AREA MAPS Boundary Lines…………………………………………………………………………………………. 10534-E

Map A Lassen Municipal Utility District/Surprise Valley………………………………. 10423-E Map B Sacramento Municipal Utility District…………………………………………… 4524-E Map C Modesto Irrigation/Turlock Irrigation District…………………………………… 4525-E Map D SoCalEdison………………………………………………………………………. 4671-E Map E Palo Alto…………………………………………………………………………… 4672-E Map F Redding…………………………………………………………………………….. 13310-E Map G Healdsburg………………………………………………………………………… 13079-E Map H Lompoc……………………………………………………………………………. 13372-E Map I Gridley……………………………………………………………………………… 13780-E Map J Presidio of Monterey, Monterey County……………………………………….. 21634-E

LIST OF CONTRACTS AND DEVIATIONS 13819, 13794, 37604, 35042, 12000, 12001, 13672, 12003, 19350, 11435, 12004, 20977,

19351, 12006, 21635, 21636, 29591, 34524, 11191, 12010, 11193, 11194, 11195, 12969, 31155, 12012, 29592, 33251, 29670, 13296, 12955, 19353, 12018, 12019, 12020, 12021, 12022, 12023, 30666, 17259, 12026, 13092, 11211, 12027, 12028, 16703, 12030, 12031, 14035, 29593, 12032, 23621, 11219, 12034, 20831, 12036, 11223, 11986, 11987, 35706, 16898, 11227-E

(T)

Page 18: October 7, 2016 · Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 37604-E Cancelling Revised Cal. P.U.C. Sheet No. 21541-E LIST OF CONTRACTS

PG&E Gas and Electric Advice Filing List General Order 96-B, Section IV

AT&T Division of Ratepayer Advocates OnGrid Solar Albion Power Company Don Pickett & Associates, Inc. Pacific Gas and Electric Company Alcantar & Kahl LLP Douglass & Liddell Praxair Anderson & Poole Downey & Brand Regulatory & Cogeneration Service, Inc. Atlas ReFuel Ellison Schneider & Harris LLP SCD Energy Solutions BART Evaluation + Strategy for Social

Innovation SCE

Barkovich & Yap, Inc. G. A. Krause & Assoc. SDG&E and SoCalGas Bartle Wells Associates GenOn Energy Inc. SPURR Braun Blaising McLaughlin & Smith, P.C. GenOn Energy, Inc. San Francisco Water Power and Sewer Braun Blaising McLaughlin, P.C. Goodin, MacBride, Squeri, Schlotz &

Ritchie Seattle City Light

CENERGY POWER Green Charge Networks Sempra Energy (Socal Gas) CPUC Green Power Institute Sempra Utilities California Cotton Ginners & Growers Assn Hanna & Morton SoCalGas California Energy Commission International Power Technology Southern California Edison Company California Public Utilities Commission Intestate Gas Services, Inc. Spark Energy California State Association of Counties Kelly Group Sun Light & Power Calpine Ken Bohn Consulting Sunshine Design Casner, Steve Leviton Manufacturing Co., Inc. Tecogen, Inc. Center for Biological Diversity Linde TerraVerde Renewable Partners City of Palo Alto Los Angeles County Integrated Waste

Management Task Force TerraVerde Renewable Partners, LLC

City of San Jose Los Angeles Dept of Water & Power Tiger Natural Gas, Inc. Clean Power MRW & Associates TransCanada Clean Power Research Manatt Phelps Phillips Troutman Sanders LLP Coast Economic Consulting Marin Energy Authority Utility Cost Management Commercial Energy McKenna Long & Aldridge LLP Utility Power Solutions Cool Earth Solar, Inc. McKenzie & Associates Utility Specialists County of Tehama - Department of Public Works

Modesto Irrigation District Verizon

Crossborder Energy Morgan Stanley Water and Energy Consulting Crown Road Energy, LLC NLine Energy, Inc. Wellhead Electric Company Davis Wright Tremaine LLP NRG Solar Western Manufactured Housing

Communities Association (WMA) Day Carter Murphy Nexant, Inc. YEP Energy Defense Energy Support Center ORA Dept of General Services Office of Ratepayer Advocates