Environmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016 Ecological Development Consultancy Pvt. Ltd. 1 ODISHA MINING CORPORATION LIMITED SOUTH KALIAPANI CHROMITE MINING PROJECT ENVIRONMENTAL MONITORING REPORT FOR THE MONTH OF NOVEMBER 2016 M/s ECOLOGICAL DEVELOPMENT CONSULTANCY PVT.LTD. BHUBANESWAR, ODISHA (An ISO 9001:2008, OHSAS 18001:2007 Certified Organization)

Upload: donhi

Post on 29-May-2019

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ODISHA MINING CORPORATION LIMITED fileEnvironmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016 Ecological Development Consultancy Pvt. Ltd. 1 ODISHA

Environmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016

Ecological Development Consultancy Pvt. Ltd. 1

ODISHA MINING CORPORATION LIMITEDSOUTH KALIAPANI CHROMITE MINING

PROJECT

ENVIRONMENTAL MONITORING REPORT

FOR THE MONTH

OF

NOVEMBER 2016

M/s ECOLOGICAL DEVELOPMENT CONSULTANCY PVT.LTD.

BHUBANESWAR, ODISHA

(An ISO 9001:2008, OHSAS 18001:2007 Certified Organization)

Page 2: ODISHA MINING CORPORATION LIMITED fileEnvironmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016 Ecological Development Consultancy Pvt. Ltd. 1 ODISHA

Environmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016

Ecological Development Consultancy Pvt. Ltd. 2

CONTENTS

Sl. No. Descriptions Page No.

1.

2.

3.

4.

Introduction

Monitoring Description

Methodology

Results & Discussion

03

04-06

07

08-21

Page 3: ODISHA MINING CORPORATION LIMITED fileEnvironmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016 Ecological Development Consultancy Pvt. Ltd. 1 ODISHA

Environmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016

Ecological Development Consultancy Pvt. Ltd. 3

1.0 INTRODUCTION

Odisha Mining Corporation Limited (OMCL), a Government of Odisha undertaking has engaged M/sEcological Development Consultancy Pvt. Ltd. (EDCPL), Bhubaneswar, Odisha for carrying outEnvironmental Monitoring for their different mine leases in the district of Jajpur, Keonjhar andSundergarh.

Environmental Monitoring includes monitoring of various environmental attributes such as AmbientAir Quality, Work Zone Air Quality, Noise Level, Water Quality, Waste Water Quality, VehicularEmission and Soil Quality. Apart from these, various other activities such as suggestions to control thepollution, conducting various kinds of audits are also a part of this programme.

1.1 Present Report

The present report presents the Environmental related data in respect of Meteorology, Ambient AirQuality, Work Zone Air Quality (Fugitive Emission), Noise Level, Surface Water Quality ,Ground WaterQuality, Ground Water Level Monitoring, Flow of Water Measurement, Effluent Treatment PlantWater Analysis, in around the South Kaliapani Mining Project of Jajpur district of Odisha during‘November 2016’

1.2 Scope of the Work

The scope of work for during ‘November 2016’ is as follows;

Table No. 1.1: Scope of Work within the Mine Lease Area

Environmental Attributes No. of Locations

Ambient Air Quality 6 locations

Work Zone Air Quality 6 locations

Ambient Noise Level 6 locations

Work zone Noise Level 3 locations

Surface Water Quality 4 locations

Ground Water Quality 5 locations

Ground Water Level Monitoring 4 locations

Flow of Water Measurement 4 locations

Effluent Treatment Plant(ETP)Water Analysis 2 location

Page 4: ODISHA MINING CORPORATION LIMITED fileEnvironmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016 Ecological Development Consultancy Pvt. Ltd. 1 ODISHA

Environmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016

Ecological Development Consultancy Pvt. Ltd. 4

2.0 MONITORING DESCRIPTION

In order to assess the pollution level in and around the mining lease, different environmental attributessuch as meteorology, air quality, water quality, soil quality and noise level are being monitored. Themonitoring is carried out as per the CPCB guideline and every care has been taken for preservation andtransportation of samples to the respective laboratory. M/s EDCPL has set up a site laboratory equippedwith adequate instruments and equipments to monitor and analyze all the parameters of Air Quality i.e.PM2.5, PM10, SO2, NOX&CO and few physic-chemical parameters ( 10 parameters) of water samples.For other parameters of water& Soil, the samples are sent to EDCPL’s Main Laboratory atBhubaneswar. The locations of monitoring stations are shown in Plate I & II.

2.1 Meteorology

An Automatic Weather Monitoring Station is installed at the rooftop of OMC office (21002’1.09” N;85048’8.46”E) to collect the meteorological data on hourly basis continuously.

The parameters monitored at the meteorological station were Temperature, Relative Humidity, WindSpeed, Wind Direction and Rainfall. These parameters were recorded at weather monitoring stationusing the respective sensors.

2.2 Ambient Air Quality

The prime objective of the ambient air quality study is to establish the existing ambient air quality inand around the mining lease area. The existing ambient air quality was monitored at six (6) locations.The locations were identified after due consultation of the OMCL officials. Monitoring was carried out forParticulate Matter (PM10), Particulate Matter (PM2.5), Sulphur Dioxide (SO2), Oxides of Nitrogen (NOX)and Carbon Monoxide (CO). The PM10 &PM2.5 was monitored for 24 hourly, while SO2 and NOxweremonitored on 4 hourly basis for 24 hours at each sampling location and CO was monitored using the COMonitor for 1 hr in a day in each monitoring station twice in a week, for a month. Details about Air QualityMonitoring locations are given in Table No. 2.1.

Table No.2.1: Ambient Air Quality Monitoring Stations

Sl.No. Location Station

CodeCoordinates

Latitude Longitude1 Near Chirigunia Colony A1 21002’28.68”N 850 45’28.62” E2 Near OMC Office A2 21002’1.09” N 85048’8.46”E3 Near COB Plant (Administrative Block) A3 21002’34.74”N 85047’52.09”E4 Near KaliapaniVillage A4 21002’33.66” N 85047’12.42”E5 Near Pump house A5 21002’18.66” N 85046’4.38”E6 Near Office & RS A6 21002’31.38” N 85048’4.02”E

2.3 Work Zone Air Quality (Fugitive Emissions)

To assess the level of fugitive dust due to mining and allied activities, six (6) monitoring stations wereselected within the lease considering the activity area. Fugitive emissions monitoring was carried outonce in a month on 8 hrly basis. The list of fugitive emissions monitoring stations is given inTable 2.2.

Page 5: ODISHA MINING CORPORATION LIMITED fileEnvironmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016 Ecological Development Consultancy Pvt. Ltd. 1 ODISHA

Environmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016

Ecological Development Consultancy Pvt. Ltd. 5

Table No. 2.2: Fugitive Emissions Monitoring Stations

Sl. No. Location StationCode

CoordinatesLatitude Longitude

1 Near F Quarry Haul Road FE1 21002’25.26” N 85048’3.07” E2 Near F Quarry Pump House FE2 21002’24.18” N 85048’4.92” E3 Near D Quarry Haul Road FE3 21002’41.82” N 85046’46.26” E4 D quarry near Weigh bridge FE4 21002’50.22” N 85046’43.26” E5 COB plant near Crusher FE5 21002’35.1” N 85047’50.04” E6 COB plant near Storage Bin FE6 21002’35.76” N 85047’50.04” E

2.4 Noise Level

In order to assess the existing noise levels in and around mining lease area, noise monitoring was carriedout at 6 locations. Details of Noise monitoring stations are given in Table No. 2.3.

Table No. 2.3: Ambient Noise Monitoring Locations

Sl. No. Location Station Code CoordinatesLatitude Longitude

1 Near Chirigunia Colony N1 21002’28.68”N 850 45’28.62” E2 Near OMC Office N2 21002’1.09” N 85048’8.46”E3 Near COB Plant (Administrative Block) N3 21002’34.74”N 85047’52.09”E4 Near KaliapaniVillage N4 21002’33.66” N 85047’12.42”E5 Near Pump house N5 21002’18.66” N 85046’4.38”E6 Near Office & RS N6 21002’31.38” N 85048’4.02”E

Work zone Noise Level

7 Quarry – D (within 30 mtrs.) N7 21002’45.9” N 85046’49.44”E8 Quarry – F (within 30 mtrs.) N8 21002’28.62” N 85048’5.46”E9 COB Plant (within 30 mtrs.) N9 21002’36.12” N 85047’49.8”E

2.5 Surface Water Quality

8 nos. of grab samples were taken from four (04) surface water locations twice in a month. Details aboutsurface water locations are given in Table No. 2.4.

Table No.2.4: Surface Water Sampling Locations

Sl. No. Location Sample code CoordinateLatitude Longitude

1. Meeting point near upstream ofDamsala Nala and D Quarry SW1 21011’5.16” N 85046’29.94” E

2. Meeting point near downstreamof Damsala Nala and D quarry SW2 21002’41.1” N 85045’39.84” E

3.Meeting point near upstream ofDamsala Nala near GurujangpalSchool and F Quarry

SW3 21011’22.02” N 85047’28.74” E

4.Meeting point of downstream ofDamsala Nala nearGurujangOMC Hatting and FQuarry

SW4 21011’22.02” N 85047’24.3” E

Page 6: ODISHA MINING CORPORATION LIMITED fileEnvironmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016 Ecological Development Consultancy Pvt. Ltd. 1 ODISHA

Environmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016

Ecological Development Consultancy Pvt. Ltd. 6

2.6 Ground Water Quality

4 nos. of ground water samples were taken from four (04) ground water location. Details about Ground

water location are given in Table No. 2.5.

Table No. 2.5: Ground Water Sampling LocationsSl.No

Locations Samplecode

CoordinatesLatitude Longitude

Type ofSource

1 Kaliapani village GW1 21º02´39.30´´N 85º46´21.48´´E Open Well2 Chirgunia colony GW2 21º02´29.04´´N 85º45´26.10´´E Open Well3 Gurujang GW3 21º03´27.84´´N 85º46´49.44´´E Open Well4 Kakudia GW4 21º00´23.88´´N 85º46´18.30´´E Open Well

2.7 Ground Water Level Monitoring

3 nos. of ground water level were monitored from three (03) ground water locations. Details aboutGround water level locations are given in Table No. 2.6.

Table No. 2.6: Ground Water Level Locations

2.8 Flow of Water Measurement

To assess the flow of water in and around mining area, 04 locations were selected. The details aboutlocations are given in Table No. 2.7

Table No. 2.7: Flow of Water Locations

Sl. No Locations Sample code CoordinatesLatitude Longitude

1 Kaliapani Village GWL1 21º02´39.30´´N 85º46´21.48´´E2 Gurujang GWL2 21º03´27.84´´N 85º46´49.44´´E3 Kakudia GWL3 21º00´23.88´´N 85º46´18.30´´E

Sl. No. Location Sample code CoordinatesLatitude Longitude

1. Meeting point near upstream ofDamsala Nala and D quarry FW1 21011’5.16" N 85046’29.94” E

2. Meeting point near downstream ofDamsala Nala and D quarry FW2 21002’41.1” N 85045’39.84” E

3.Meeting point near upstream ofDamsala Nala nearGurujangpalSchool and F quarry

FW3 21011’22.02” N 85047’28.74” E

4.Meeting point of downstream ofDamsala Nala near Gurujang OMCHatting and F quarry

FW4 21011’22.02” N 85047’24.3” E

Page 7: ODISHA MINING CORPORATION LIMITED fileEnvironmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016 Ecological Development Consultancy Pvt. Ltd. 1 ODISHA

Environmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016

Ecological Development Consultancy Pvt. Ltd. 7

3.0 METHODOLGY

3.1 Meteorology

The meteorological parameters were monitored on hourly basis continuously by installing a weathermonitoring system at the rooftop of OMC office of M/s OMCL.

3.2 Air Monitoring

Monitoring was carried out for Particulate Matter (PM2.5), Particulate Matter (PM10), Sulphur Dioxide(SO2), Oxides of Nitrogen (NOX) and Carbon Monoxide (CO). The PM10 &PM2.5 was monitored for 24 hourly,while SO2 and NOX were monitored on 4 hourly basis for 24 hours at each sampling location and CO wasmonitored using the CO Monitor for 1 hr in a day in each monitoring station twice in a week, for a month. Thesampling and analysis of ambient air quality was carried out as per the approved procedures by CPCB.

3.3 Noise MonitoringThe monitoring of noise level was carried out at specified locations. Ambient Noise levels were recorded athourly intervals for 24 hours. And in case of Work zone, noise monitoring was carried out at hourly intervalsfor 11 hours.

3.4 Surface Water MonitoringFor assessing the water quality, surface water samples were collected. Eight (8) water samples from fourlocations (04) were taken in sterilized plastic cans twice a month. The samples were analyzed for essentialphysical, chemical and bacteriological parameters as per the list enclosed in the work order. The sampleswere analyzed as per standard procedure / method mentioned by CPCB/APHA.

3.5 Ground Water MonitoringFor assessing the Ground Water Quality, Ground Water Samples were collected. Five(5) Ground watersamples from five locations (05) were taken in sterilized plastic canes. The samples were analyzed foressential physical, chemical and bacteriologic ally parameters as per list enclosed in the work order. Thesamples were analyzed as per standard procedure/ method mentioned by CPCB/APHA.

3.6 Ground Water Level MonitoringFor assessing the Ground Water level, four(4) ground water level monitoring locations were selected withinthe study area.

3.7 Flow of Water MeasurementThe monitoring of flow of water was carried out monthly once of the springs and perennial analyses presentwithin and adjoining the mining lease area. The flow of water measurement was carried out at 4 specificlocations (04) and is expressed in m3/min.

3.8 ETP Water AnalysisThe Effluent treatment Plant Water Analysis Was Carried out at Southkaliapani and Water Samples werecollected from the D-Quarry and F-quarry and the samples were analyzed for Hexavalent Chromium(Cr+6),TSS, pH as per the guideline mentioned by CPCB.

Page 8: ODISHA MINING CORPORATION LIMITED fileEnvironmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016 Ecological Development Consultancy Pvt. Ltd. 1 ODISHA

Environmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016

Ecological Development Consultancy Pvt. Ltd. 8

4.0 RESULTS AND DISCUSSION

4.1 Meteorology

Summarized meteorological data such as temperature, relative humidity, rainfall, and wind speedand wind direction are given in Table No. 4.1.

Table No. 4.1: Results of Site Specific Meteorological Data

Sl.No. Parameters Month of ‘November 2016’

1 Temperature (0C)Maximum 32.01Minimum 12.67Average 22.76

2 Relative Humidity (%)Maximum 97.57Minimum 30.07Average 70.16

3 Wind Speed(m/s) Maximum 4.9Average 0.99

4 Wind Direction (%)

N 1.94NNE 1.80NE 2.92ENE 4.86E 5.56ESE 2.64SE 2.22SSE 2.64S 2.92SSW 1.66SW 4.50WSW 9.61W 6.11WNW 2.50NW 2.50NNW 2.50CALM 43.12

5 Rainfall(mm) Monthly Total 0No. of rainy days 0

During the month of ‘November 2016’ the temperature varied from 12.670C to 32.010C & RelativeHumidity varied from 30.07% to 97.57%. The maximum wind speed recorded during the month was4.9m/s and overall average wind speed is calculated to be0.99m/s. 43.12% of the time the windremained calm (≤0.5 m/s). The predominant wind direction as observed to be from West-South-West(WSW) during the month. There were no rainfalls during in this month.

Max. And Min. Value of temperature, relative humidity, rainfall, wind speed and wind direction oneach day basis for ‘November 2016’ are given in Table No. 4.2.

Page 9: ODISHA MINING CORPORATION LIMITED fileEnvironmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016 Ecological Development Consultancy Pvt. Ltd. 1 ODISHA

Environmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016

Ecological Development Consultancy Pvt. Ltd. 9

Figure No. 4.1: Wind rose (24 hrly) for the month of ‘November 2016’

WRPLOT View - Lakes Environmental Software

PROJECT NO.:

DATE:

12/2/2013

MODELER:

COMPANY NAME:

COMMENTS:WIND ROSE PLOT:

Station # 02

NORTH

SOUTH

WEST EAST

2%

4%

6%

8%

10%DATA PERIOD:

Start Date: 11/1/2016 - 00:00End Date: 11/30/2016 - 23:00

WIND SPEED(m/s)

>= 11.1

8.8 - 11.1

5.7 - 8.8

3.6 - 5.7

2.1 - 3.6

0.5 - 2.1

Calms: 43.12%

AVG. WIND SPEED:

0.98 m/s

CALM WINDS:

43.12%

TOTAL COUNT:

719 hrs.

DISPLAY:

Wind SpeedDirection (blowing from)

Page 10: ODISHA MINING CORPORATION LIMITED fileEnvironmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016 Ecological Development Consultancy Pvt. Ltd. 1 ODISHA

Environmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016

Ecological Development Consultancy Pvt. Ltd. 10

Table No. 4.2: Max and Min value of Meteorological Data of Month ‘November 2016’

DateTemperature Relative

Humidity (%)Wind Speed

(m/s) Rainfall(mm)Max. Min. Max. Min. Max. Min.

01.11.2016 30.29 16.15 95.24 33.75 2.1 0 002.11.2016 29.98 15.88 95.61 30.07 2.6 0 011.11.2016 31.21 15.77 92.97 32.54 2.4 0 004.11.2016 31.04 15.84 88.21 34.95 1.9 0 005.11.2016 27.42 17.86 94.51 64.61 1.7 0 006.11.2016 27.38 17.96 97.36 62.63 3.4 0 007.11.2016 24.41 18.52 97.51 66.19 2.6 0 008.11.2016 28.15 16.62 96.24 51.79 2.7 0 009.11.2016 28.47 16.19 92.08 50.28 2.5 0 010.11.2016 28.57 16.56 95.48 44.31 2.7 0 011.11.2016 29.32 16.54 90.21 52.17 1.9 0 012.11.2016 28.21 19.5 95.84 50.64 2.6 0 013.11.2016 30.25 14.21 93.21 53.21 2.0 0 014.11.2016 29.06 15.89 89.21 49.61 3.2 0 015.11.2016 25.64 12.67 85.61 37.54 3.9 0 016.11.2016 28.92 16.15 90.78 40.32 2.1 0 017.11.2016 27.64 15.88 90.36 39.65 4.9 0.5 018.11.2016 30.15 15.77 95.61 45.71 1.6 0.1 019.11.2016 31.01 15.84 93.29 39.24 1.2 0 020.11.2016 29.65 17.86 88.18 30.07 2.1 0 021.11.2016 29.84 17.96 92.97 40.15 3.9 0.2 022.11.2016 29.61 18.52 88.14 49.39 1.7 0 023.11.2016 30.11 16.62 94.59 59.61 1.5 0 024.11.2016 31.04 16.19 97.31 64.20 3.0 0 025.11.2016 29.54 16.56 97.57 41.65 2.5 0 026.11.2016 32.01 16.54 96.34 49.21 1.8 0 027.11.2016 29.44 21.20 92.94 50.64 1.6 0 028.11.2016 28.67 13.04 95.55 51.39 2.0 0 029.11.2016 27.34 14.25 90.24 56.21 3.1 0 030.11.2016 27.69 15.01 95.84 39.21 4.6 0 0

4.2 Ambient Air Quality Monitoring

The Summarized results of AAQ are given in the Table No. 4.3 and the details of AAQ monitoringduring the month of ‘November 2016’ are given in the Table No. 4.4.

Page 11: ODISHA MINING CORPORATION LIMITED fileEnvironmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016 Ecological Development Consultancy Pvt. Ltd. 1 ODISHA

Environmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016

Ecological Development Consultancy Pvt. Ltd. 11

Table No. 4.3: Summarized Results of Ambient Air Qualities

Sl.No. Locations Co-ordinate Station

CodePM10 PM2.5 SO2 NOX CO

Max. Min. Avg. Max. Min Avg. Max. Min. Avg. Max. Min. Avg. Max Min. Avg.

1. Near ChirguniaColony

21002’28.68”N850 45’28.62”E A1 87 52 66 40 16 26 8.1 4.2 5.7 17.2 9.4 12.3 BDL BDL BDL

2.Near OMCOffice(SouthKaliapani)

21002’1.09” N85048’8.46”E A2 77 50 63 39 14 26 7.3 4.1 5.3 15.2 9.6 11.8 BDL BDL BDL

3.Near COB Plant(AdministrativeBlock)

21002’34.74”N85047’52.09”E A3 88 61 75 43 23 33 8.6 5.5 7.3 17.4 10.7 14.9 BDL BDL BDL

4. NearKaliapaniVillage

21002’33.66”N

85047’12.42”EA4 83 49 69 36 13 27 6.4 4.1 5.5 14.2 9.5 11.9 BDL BDL BDL

5. Near Pumphouse

21011’04.3” N85047’04.6”E A5 81 65 72 41 23 31 8.6 5.2 6.9 16.2 12.1 14.3 BDL BDL BDL

6. Near Office & RS21002’31.38”

N85048’4.02”E

A6 79 46 64 42 16 27 8.9 4.2 6.2 15.6 9.6 12.4 BDL BDL BDL

CPCB Standard 100 µg/m3 60 µg/m3 80 µg/m3 80 µg/m3 4.0 mg/m3

Note: BDL value for NOX -9.0 µg/m3,SO2 - 4.0µg/m3and for CO-0.11 mg/m3.

Page 12: ODISHA MINING CORPORATION LIMITED fileEnvironmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016 Ecological Development Consultancy Pvt. Ltd. 1 ODISHA

Environmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016

Ecological Development Consultancy Pvt. Ltd. 12

Table No. 4.4: The details of AAQ Monitoring during the Month of ‘November 2016’

Station NameStation

Code Date PM10 PM2.5 SO2 NOx CO

Near Chirigunia Colony A1

03.11.2016 55 20 4.4 9.9 BDL07.11.2016 73 33 6.5 13.5 BDL10.11.2016 60 21 4.9 10.2 BDL14.11.2016 78 36 7.2 15.6 BDL17.11.2016 87 40 8.1 17.2 BDL21.11.2016 52 16 4.2 9.4 BDL24.11.2016 63 24 4.8 10.2 BDL28.11.2016 54 17 5.1 11.3 BDL

Near OMC Office(SouthKaliapani)

A2

03.11.2016 50 14 4.1 9.7 BDL07.11.2016 62 26 4.8 10.5 BDL10.11.2016 54 19 4.3 9.6 BDL14.11.2016 69 32 6.9 14.5 BDL17.11.2016 77 39 7.3 15.2 BDL21.11.2016 57 22 4.4 9.8 BDL24.11.2016 59 23 4.8 10.2 BDL28.11.2016 70 27 5.7 13.9 BDL

Near COB Plant(Administrative

Building)

A3

03.11.2016 73 29 6.8 14.7 BDL07.11.2016 80 33 7.8 16.2 BDL10.11.2016 79 31 8.1 15.9 BDL14.11.2016 69 41 8.3 15.6 BDL17.11.2016 84 43 8.6 17.4 BDL21.11.2016 61 23 6.1 14.2 BDL24.11.2016 66 27 5.5 10.7 BDL28.11.2016 88 39 8.1 16.7 BDL

Near Kaliapani Village A4

03.11.2016 49 13 4.1 9.5 BDL07.11.2016 55 20 4.6 9.8 BDL10.11.2016 66 28 5.9 11.3 BDL14.11.2016 76 31 6.4 13.4 BDL17.11.2016 81 33 6.2 14.2 BDL21.11.2016 68 29 5.4 10.8 BDL24.11.2016 79 36 6.1 13.2 BDL28.11.2016 83 33 5.8 13.8 BDL

Near Pump Houseinside Kaliapani

mineA5

03.11.2016 65 30 5.6 12.4 BDL07.11.2016 70 31 6.7 13.6 BDL10.11.2016 81 41 7.3 14.6 BDL14.11.2016 68 26 8.6 16.2 BDL17.11.2016 73 34 8.1 15.6 BDL21.11.2016 70 32 5.2 12.1 BDL24.11.2016 66 23 7.8 15.5 BDL28.11.2016 77 31 6.2 14.7 BDL

Near Office & RS A6

03.11.2016 46 16 4.2 9.6 BDL07.11.2016 61 21 6.5 11.8 BDL10.11.2016 75 42 7.7 15.6 BDL14.11.2016 79 35 8.9 14.9 BDL

Page 13: ODISHA MINING CORPORATION LIMITED fileEnvironmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016 Ecological Development Consultancy Pvt. Ltd. 1 ODISHA

Environmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016

Ecological Development Consultancy Pvt. Ltd. 13

ConclusionParticulate Matter (PM10):

The Value of PM10 ranges between 46µg/m3to 88µg/m3. However, the average value of PM10rangesbetween64µg/m3to75µg/m3. The results of all the monitoring stations are within the prescribed normsof CPCB.

Figure No. 4.2: Graph showing PM10Concentration

Particulate Matter (PM2.5)

The Value of PM2.5 ranges between 14µg/m3 to 43µg/m3. However, the average value of PM2.5 rangesbetween26µg/m3to 33µg/m3. The results are well within the prescribed norms of CPCB.

Figure No. 4.3: Graph showing PM2.5Concentrations

0

20

40

60

80

100

120

A1 A2 A3 A4 A5 A6

PM10 Concentrations(µg/m3)

MAX

MIN

AVG

CPCB STANDARD

0

10

20

30

40

50

60

70

A1 A2 A3 A4 A5 A6

PM2.5 Concentrations(µg/m3)

MAX

MIN

AVG

CPCB STANDARD

17.11.2016 58 18 4.4 10.5 BDL21.11.2016 56 19 4.8 11.6 BDL24.11.2016 69 28 5.4 10.9 BDL28.11.2016 71 35 7.1 14.5 BDL

CPCB Standard8 100 µg/m3 60 µg/m3 80 µg/m3 80 µg/m3 4 mg/m3

Page 14: ODISHA MINING CORPORATION LIMITED fileEnvironmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016 Ecological Development Consultancy Pvt. Ltd. 1 ODISHA

Environmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016

Ecological Development Consultancy Pvt. Ltd. 14

Sulphur Dioxide (SO2):

The Value of SO2 ranges between 4.1µg/m3 to 8.9µg/m3. However, the average value of SO2 rangesbetween 5.3to 7.3µg/m3. The results are well within the prescribed norms of CPCB.

Figure No. 4.4: Graph showing SO2 Concentrations

Oxides of Nitrogen (NOx):

The Value of NOX ranges between 9.4µg/m3 to 17.4µg/m3. However, the average value of NOX rangesbetween 11.8µg/m3to 14.9µg/m3. The results are well within the prescribed norms of CPCB.

Figure No. 4.5: Graph showing NOx Concentrations

Carbon Monoxide (CO):

The Value of CO ranges in between BDL. However the ranges value of CO ranges in between BDL.The results are well within the prescribed norms of CPCB.

0102030405060708090

A1 A2 A3 A4 A5 A6

SO2 Concentrations(µg/m3)

MAX

MIN

AVG

CPCB STANDARD

0102030405060708090

A1 A2 A3 A4 A5 A6

NOX Concentretions(µg/m3)

MAX

MIN

AVG

CPCB STANDARD

Page 15: ODISHA MINING CORPORATION LIMITED fileEnvironmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016 Ecological Development Consultancy Pvt. Ltd. 1 ODISHA

Environmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016

Ecological Development Consultancy Pvt. Ltd. 15

Figure No. 4.6: Graph showing CO Concentrations.

4.3 Fugitive Emissions MonitoringThe results of fugitive emissions are given in Table No. 4.5.

Table No. 4.5: Results of Fugitive Emissions Monitoring

Station code CoordinatesLatitude Longitude Particulate Matter (PM) in µg/m3

FE1 21002’25.26” N; 85048’3.07” E 212

FE2 21002’24.18” N; 85048’4.92” E 208

FE3 21002’41.82” N; 85048’4.92” E 321

FE4 21002’50.22” N; 85046’43.26”E 240

FE5 21002’35.1” N; 85047’50.04”E 251

FE6 21002’35.76” N; 85047’50.04”E 200

Standards 1200 µg/m3

4.4 Noise MonitoringSummarized results of ambient noise monitoring are given in Table No. 4.6. The results have beencompared with the standard specified in schedule III, Rule 3 of Environmental Protection Rulesgiven in Table No. 4.7.

Table No. 4.6: Summarized Results of Noise Monitoring

Sl.No. Location

Results

Type of AreaDay (06:00 – 22:00hrs) Night (22:00 – 06:00hrs)

Min. Max. Mean* Min. Max. Mean1. Near Chirigunia Colony 42.8 53.6 47.9 BDL 41.6 37.9 Residential Area2. Near OMC Office 38.6 50.1 45.3 BDL 39.4 33.2 Residential Area

3. Near COB Plant(Administrative Block) 49.6 65.7 59.2 BDL 44.3 37.1 Industrial Area

4. Near KaliapaniVillage 38.2 52.4 46.7 BDL 40.1 33.8 Residential Area5. Near Pump house 36.8 50.3 42.3 BDL 36.8 31.5 Commercial Area6. Near Office & RS 39.2 54.4 45.7 BDL 42.6 34.2 Industrial Area

*Logarithmic Averages. All Values in dB (A).

00.5

11.5

22.5

33.5

44.5

A1 A2 A3 A4 A5 A6

CO Concentrations mg/m3

Max

Min.

Avg.

CPCB STANDARDS(24hrly)

Page 16: ODISHA MINING CORPORATION LIMITED fileEnvironmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016 Ecological Development Consultancy Pvt. Ltd. 1 ODISHA

Environmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016

Ecological Development Consultancy Pvt. Ltd. 16

Table No. 4.7: CPCB Norms in respect of Ambient Noise.

Type of Area Day(06:00 – 22:00hrs)

Night(22:00 – 06:00 hrs)

Industrial Area 75 70Commercial Area 65 55Residential Area 55 45Silence Zone 50 40

The result of work zone noise are given in Table No. 4.8 and compared with OSHA norms whichare mentioned in Table No.4.9.

Table No. 4.8: Results of Work zone Noise Monitoring

Sl.No.

N7 N8 N9Quarry-D(Within 30mtrs) Quarry-F(Within 30mtrs) COB Plant (Within 30mtrs)

Date 16.11.2016 17.11.2016 18.11.2016Time dB(A) Time dB(A) Time dB(A)

1 11:00 AM 61.9 11:00 AM 57.1 11:00 AM 63.32 09:00 AM 62.3 09:00 AM 61..4 09:00 AM 66.93 10:00 AM 70.2 10:00 AM 68.2 10:00 AM 69.54 11:00 AM 68.1 11:00 AM 74.6 11:00 AM 70.75 12:00 NOON 73.5 12:00NOON 75.5 12:00 NOON 72.46 01:00 PM 65.4 01:00 PM 65.8 01:00 PM 61.97 02:00 PM 59.8 02:00 PM 62.3 02:00 PM 57.18 11:00 PM 54.5 11:00 PM 59.0 11:00 PM 52.6

Table No. 4.9: Permissible Sound Pressure Level as per OSHA norms

Duration per day(hour) Sound Pressure Level dB(A) allowed response

8 90

6 92

4 95

3 97

2 100

Conclusion:Noise Level as observed in ambient as well as work zone are well below the standard normsstipulated by OSHA.

Page 17: ODISHA MINING CORPORATION LIMITED fileEnvironmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016 Ecological Development Consultancy Pvt. Ltd. 1 ODISHA

Environmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016

Ecological Development Consultancy Pvt. Ltd. 17

4.5 Surface Water Quality Monitoring

Table No. 4.10: Water Quality Criteria as per CPCB

Sl. No. Parameters Class A Class B Class C Class D Class E

1 PH 6.5-8.5 6.5-8.5 6.0-9.0 6.5-8.5 6.5-8.5

2 Dissolved Oxygen (as O2),mg/l, min 6 5 4 4 -

3 BOD, 3 days at 27⁰C,mg/l, max. 2 3 3 - -

4 Total Coliform Organism,MPN/100ml, max. 50 500 5000 - -

5 Free Ammonia (as N),mg/l, max. - - - 1.2 -

6 Electrical conductivitymmhos/cm, max. - - - - 2250

7 Sodium Absorption Ratio,max. - - - - 26

8 Boron (as B), mg/l, max. - - - - 2

Class A: Drinking water source without conventional treatment but after disinfection

Class B: Outdoor bathing (organized)

Class C: Drinking water source after conventional treatment and after disinfection

Class D: Propagation of Wildlife and Fisheries

Class E: Irrigation, Industrial Cooling and Controlled Waste Disposal

Class F: Not meeting A, B, C, D & E Criteria

The results of analysis of surface water are given in Table No. 4.11 (A) & 4.11(B).

Page 18: ODISHA MINING CORPORATION LIMITED fileEnvironmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016 Ecological Development Consultancy Pvt. Ltd. 1 ODISHA

Environmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016

Ecological Development Consultancy Pvt. Ltd. 18

Table No. 4.11 (A): Results of Surface Water Analysis.

Sl.No Parameters Unit

SW1 SW2 SW3 SW403.11.2016 03.11.2016 03.11.2016 03.11.2016

01 Color, Hazen Colorless Colorless Colorless Colorless02 Odour Unobjectionable U/O U/O U/O U/O11 Suspended Solids mg/l 80 87 79 8504 Turbidity NTU 12 10 08 1605 pH value ---- 6.90 6.94 7.15 6.5907 Temperature 0C 30 34 36 3107 Oil & Grease mg/l <0.1 <0.1 <0.1 <0.109 Ammoniac nitrogen(as N) mg/l 0.34 0.35 0.038 0.04009 Total Kjeidahal

Nitrogen(as NH3)mg/l 3.1 3.6 2.8 3.4

10 Total Hardness (as CaCO3) mg/l 60 71 64 7511 Iron (as Fe) mg/l 0.32 0.50 0.44 0.3612 Chloride (as Cl) mg/l 21 25 20 2713 Fluoride (as F) mg/l <0.001 <0.001 <0.001 <0.00114 Total Dissolved Solids mg/l 68 61 59 6715 Calcium (as Ca) mg/l 16.9 17.9 21.4 18.916 Magnesium (as Mg) mg/l 13.8 15.9 22.2 19.817 Copper(as Cu) mg/l <0.0001 <0.0001 <0.0001 <0.000118 Nickel (as Ni) mg/l 0.015 0.011 0.016 0.01819 Manganese (as Mn) mg/l <0.00001 <0.00001 <0.00001 <0.0000120 Sulfate (as SO4) mg/l 14 16 18 2021 Nitrate (as NO3) mg/l 0.15 0.20 0.022 0.01822 Sulfide (as S) mg/l <1.0 <1.0 <1.0 <1.023 Phenolic Compounds (as

C6H5OH)mg/l <0.0001 <0.0001 <0.0001 <0.0001

24 Mercury (as Hg) mg/l <0.00001 <0.00001 <0.00001 <0.0000125 Cadmium (as Cd) mg/l <0.00001 <0.00001 <0.00001 <0.0000126 Chromium(VI) mg/l 0.030 0.024 0.036 0.01827 Selenium (as Se) mg/l <0.0001 <0.0001 <0.0001 <0.000128 Arsenic (as As) mg/l <0.0001 <0.0001 <0.0001 <0.000129 Cyanide (as CN) mg/l <0.002 <0.002 <0.002 <0.00230 Lead (as Pb) mg/l <0.0001 <0.0001 <0.0001 <0.000131 Zinc (as Zn) mg/l <0.0001 <0.0001 <0.0001 <0.000132 Anionic Detergent as

MBASmg/l <0.01 <0.01 <0.01 <0.01

33 Alkalinity (as CaCO3) mg/l 58 51 49 6434 Free Ammonia (N) mg/l 0.11 0.14 0.15 0.1835 Boron (as B) mg/l <0.0001 <0.0001 <0.0001 <0.000136 Coli form Organism MPN/100ml 140 136 120 13437 Sodium Absorption Ratio ----- 0.26 0.37 0.036 0.03238 Dissolved Oxygen as O2 mg/l 5.6 5.2 5.9 5.839 BOD, 3 days at 270C mg/l 2.8 2.6 3.4 3.140 COD mg/l 5.4 5.9 6.1 5.841 Electrical Conductivity(EC) µmhos/cm 126 121 108 11042 Phosphate mg/l 0.27 0.033 0.030 0.02843 CO2 mg/l 4.9 5.6 6.1 5.3Note: U/O-Un Objectionable

Page 19: ODISHA MINING CORPORATION LIMITED fileEnvironmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016 Ecological Development Consultancy Pvt. Ltd. 1 ODISHA

Environmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016

Ecological Development Consultancy Pvt. Ltd. 19

Table No. 4.11(B): Results of Surface Water Analysis.

Sl.No. Parameters Unit

SW1 SW2 SW3 SW322.11.2016 22.11.2016 22.11.2016 22.11.2016

01 Color Hazen Colorless Colorless Colorless Colorless02 Odour Unobjectionable U/O U/O U/O U/O11 Suspended Solids mg/l 75 73 81 8404 Turbidity NTU 14 12 16 2005 pH value --- 7.66 6.92 7.19 7.7907 Temperature 0C 25 29 32 3407 Oil & Grease mg/l <0.1 <0.1 <0.1 <0.109 Ammonical nitrogen(as N) mg/l 0.024 0.030 0.026 0.04009 Total Kjeidahal Nitrogen(as

NH3) mg/l 2.6 3.6 3.9 3.0

10 Total Hardness (as CaCO3) mg/l 60 70 55 6911 Iron (as Fe) mg/l 0.50 0.54 0.45 0.3812 Chloride (as Cl) mg/l 19 25 24 2113 Fluoride (as F) mg/l <0.0001 <0.0001 <0.0001 <0.0001

14 Total Dissolved Solids mg/l 92 85 81 9815 Calcium (as Ca) mg/l 19.8 14.2 16.8 16.016 Magnesium (as Mg) mg/l 20.4 19.1 18.2 18.617 Copper(as Cu) mg/l <0.0001 <0.0001 <0.0001 <0.000118 Nickel (as Ni) mg/l 0.007 0.011 0.013 0.00819 Manganese (as Mn) mg/l <0.00001 <0.00001 <0.00001 <0.0000120 Sulfate (as SO4) mg/l 24 18 25 2021 Nitrate (as NO3) mg/l 0.034 0.024 0.020 0.03022 Sulfide (as S) mg/l <1.0 <1.0 <1.0 <1.023 Phenolic Compounds (as

C6H5OH) mg/l <0.0001 <0.0001 <0.0001 <0.0001

24 Mercury (as Hg) mg/l <0.00001 <0.00001 <0.00001 <0.0000125 Cadmium (as Cd) mg/l <0.00001 <0.00001 <0.00001 <0.0000126 Chromium(VI) mg/l 0.034 0.026 0.024 0.03827 Selenium (as Se) mg/l <0.0001 <0.0001 <0.0001 <0.000128 Arsenic (as As) mg/l <0.0001 <0.0001 <0.0001 <0.000129 Cyanide (as CN) mg/l <0.002 <0.002 <0.002 <0.00230 Lead (as Pb) mg/l <0.0001 <0.0001 <0.0001 <0.000131 Zinc (as Zn) mg/l <0.0001 <0.0001 <0.0001 <0.000132 Anionic Detergent as MBAS mg/l <0.01 <0.01 <0.01 <0.0133 Alkalinity (as CaCO3) mg/l 54 64 61 6934 Free Ammonia (N) mg/l 0.0.020 0.028 0.024 0.03235 Boron (as B) mg/l <0.0001 <0.0001 <0.0001 <0.000136 Phosphate mg/l 0.022 0.032 0.038 0.04437 Coliform Organism MPN/100ml 134 152 145 14838 Sodium Absorption Ratio ---- 0.24 0.028 0.038 0.03839 Dissolved Oxygen as O2 mg/l 6.6 6.7 6.2 6.340 BOD, 3 days at 270C mg/l 3.6 4.0 3.4 3.541 COD mg/l 5.8 6.0 5.1 5.342 Electrical Conductivity (EC) µmhos/cm 148 136 132 15843 CO2 mg/l 6.0 6.3 6.1 6.8Note: U/O-Un Objectionable

Page 20: ODISHA MINING CORPORATION LIMITED fileEnvironmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016 Ecological Development Consultancy Pvt. Ltd. 1 ODISHA

Environmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016

Ecological Development Consultancy Pvt. Ltd. 20

4.6 Ground Water Quality Monitoring

The results of analysis of ground water are given in Table No. 4.12.

Table No. 4.12: Results of Ground Water Analysis

Sl.No. Parameter Unit Permissible

LimitGW1 GW2 GW3 GW4

22.11.2016 22.11.2016 22.11.2016 22.11.20161 pH --- 6.5-8.5 7.28 7.45 7.61 7.872 Odour --- Agreeable AL AL AL AL3 Color Hazen 5 (Max) CL CL CL CL4 Taste --- Agreeable AL AL AL AL5 Turbidity NTU 1 (Max0 0.55 0.49 0.54 0.426 Chloride (as C1) mg/1 250 (Max) 2.1 3.0 2.8 3.67 Residual free

Chlorine mg/1 0.2 (Min) ND ND ND ND

8 Total DissolvedSolid mg/1 500 (Max) 114 122 147 151

9 Total Hardness (asCaCO3) mg/1 200 (Max) 47 67 72 64

10 Iron (as Fe) mg/1 0.3 (Max0 0.21 0.30 0.35 0.3611 Calcium (as Ca) mg/1 75 (Max) 22.5 27.1 20.1 17.512 Magnesium (as Mg) mg/1 30 (Max) 14.2 15.8 11.7 15.013 Sulfate (as SO4) mg/1 200 (Max) 1.2 2.5 2.8 3.114 Manganese(as Mn) mg/1 0.10 (Max) <0.00001 <0.00001 <0.00001 <0.0000115 Nitrate (as NO3) mg/1 45 (Max) 3.3 2.2 3.2 2.416 Alkalinity (as

CaCO3) mg/1 200 (Max) 28 31 25 3617 Aluminum (as Al) mg/1 0.03 (Max) <0.0001 <0.0001 <0.0001 <0.000118 Fluoride (as F) mg/1 1.0(Max) <0.001 <0.001 <0.001 <0.00119 Anionic Detergent mg/1 0.2 (Max) <0.01 <0.01 <0.01 <0.0120 Cadmium (as Cd) mg/1 0.003 (Max) <0.00001 <0.00001 <0.00001 <0.0000121 Copper (as Cu) mg/1 0.05 (Max) <0.0001 <0.0001 <0.0001 <0.000122 Zinc (as Zn) mg/1 5 (Max) 0.11 0.14 0.19 0.2323 Lead (as Pb) mg/1 0.01 (Max) <0.0001 <0.0001 <0.0001 <0.000124 Selenium (as Se) mg/1 0.01(Max) <0.0001 <0.0001 <0.0001 <0.000125 Phenolic Compound

(as C6H5OH) mg/1 0.001 (Max) <0.001 <0.001 <0.001 <0.00126 Mineral Oil mg/1 0.5 (Max) ND ND ND ND

27HexavalentChromium (asCr+6)

mg/1 $ 0.002 0.014 0.006 0.010

28 Mercury (as Hg) mg/1 0.001 (Max) <0.00001 <0.00001 <0.00001 <0.0000129 Cyanide (as CN) mg/1 0.05 (Max) <0.002 <0.002 <0.002 <0.00230 Boron (as B) mg/1 0.5 (Max) <0.0001 <0.0001 <0.0001 <0.000131 Arsenic (as As) mg/1 0.01(Max) <0.0001 <0.0001 <0.0001 <0.000132 Nickel (as Ni) mg/1 0.02(Max) 0.002 0.014 0.010 0.00633 Molybdenum (as

Mo) mg/1 0.07(Max) ND ND ND ND

34 Total Chromium (asCr) mg/1 0.05(Max) 0.018 0.032 0.021 0.028

35 Total Coliform MPN/100ml $ NIL NIL NIL NIL

36Polynucleararomatichydrocarbons ( asPAH)

mg/1 0.0001(Max) ND ND ND ND

Note: CL-Colorless, AL-Agreeable, ND-Not Detected, $-Not Specified

Page 21: ODISHA MINING CORPORATION LIMITED fileEnvironmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016 Ecological Development Consultancy Pvt. Ltd. 1 ODISHA

Environmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016

Ecological Development Consultancy Pvt. Ltd. 21

4.6 Ground Water Level Monitoring

The results of Ground Water Level Monitoring are given in Table No. 4.13Table No. 4.13 Ground Water Level Results

Sl. No. Locationcode

CoordinatesLatitude Longitude

Water Level(Below groundlevel, in meters)

1 GWL1 21º02´39.3″N 85º46´21.48″E 1.272 GWL2 21º03´27.84″N 85º46´49.44″E 5.393 GWL3 21º0´23.88″N 85º46´18.3″E 3.71

4.7 Flow of Water Measurement

The results of flow of water are given in Table No. 4.14

Table No. 4.14 Result of Flow of Water Measurement

Sl. No Stationcode

CoordinatesLatitude Longitude Flow of water in m3/min

1 FW1 21011’5.16” N 85046’29.94” E 38.122 FW2 21002’41.1” N 85045’39.84” E 44.693 FW3 21011’22.02” N 85047’28.74” E 39.244 FW4 21011’22.02” N 85047’24.3” E 55.67

4.8 Effluent Plant (ETP) Water Analysis

Table No. 4.15: Result of Waste Water Quality

Sl.No. Location Concentration of Cr+6Result(mg/l)

CPCB Standard

01 D-Quarry 0.004-0.0460.1mg/l02 F-Quarry 0.002-0.044

Page 22: ODISHA MINING CORPORATION LIMITED fileEnvironmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016 Ecological Development Consultancy Pvt. Ltd. 1 ODISHA

Environmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016

Ecological Development Consultancy Pvt. Ltd. 22

Page 23: ODISHA MINING CORPORATION LIMITED fileEnvironmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016 Ecological Development Consultancy Pvt. Ltd. 1 ODISHA

Environmental Monitoring Report for South Kaliapani Chromite Mining Project November 2016

Ecological Development Consultancy Pvt. Ltd. 23