odmp inception report volume 2
TRANSCRIPT
-
8/8/2019 ODMP Inception report Volume 2
1/122
-
8/8/2019 ODMP Inception report Volume 2
2/122
-
8/8/2019 ODMP Inception report Volume 2
3/122
-
8/8/2019 ODMP Inception report Volume 2
4/122
-
8/8/2019 ODMP Inception report Volume 2
5/122
-
8/8/2019 ODMP Inception report Volume 2
6/122
-
8/8/2019 ODMP Inception report Volume 2
7/122
-
8/8/2019 ODMP Inception report Volume 2
8/122
-
8/8/2019 ODMP Inception report Volume 2
9/122
-
8/8/2019 ODMP Inception report Volume 2
10/122
-
8/8/2019 ODMP Inception report Volume 2
11/122
-
8/8/2019 ODMP Inception report Volume 2
12/122
-
8/8/2019 ODMP Inception report Volume 2
13/122
-
8/8/2019 ODMP Inception report Volume 2
14/122
-
8/8/2019 ODMP Inception report Volume 2
15/122
-
8/8/2019 ODMP Inception report Volume 2
16/122
-
8/8/2019 ODMP Inception report Volume 2
17/122
-
8/8/2019 ODMP Inception report Volume 2
18/122
-
8/8/2019 ODMP Inception report Volume 2
19/122
-
8/8/2019 ODMP Inception report Volume 2
20/122
-
8/8/2019 ODMP Inception report Volume 2
21/122
-
8/8/2019 ODMP Inception report Volume 2
22/122
-
8/8/2019 ODMP Inception report Volume 2
23/122
-
8/8/2019 ODMP Inception report Volume 2
24/122
-
8/8/2019 ODMP Inception report Volume 2
25/122
-
8/8/2019 ODMP Inception report Volume 2
26/122
-
8/8/2019 ODMP Inception report Volume 2
27/122
-
8/8/2019 ODMP Inception report Volume 2
28/122
-
8/8/2019 ODMP Inception report Volume 2
29/122
-
8/8/2019 ODMP Inception report Volume 2
30/122
-
8/8/2019 ODMP Inception report Volume 2
31/122
3.4 RESEARCH, DATA MANAGEMENT AND PARTICIPATORY PLANNING COMPONENT EVALUATION PLAN
Table 7 Tracking implementation and production of outputs for the research, data management and participatory planning compone
Major and supporting outputs(deliverable products andservices) expected
Criteria for monitoring quality Main target groups Expected date ofdelivery
Is it deliveredwithin time, budgetand criteria formonitoringquality?
Activity 1. Data Management
1.1 Identify database issues Comprehensive list of issues
Wide stakeholder consultations
ODMP 10/03 Yes
1.2 Identify tasks Comprehensive list of tasks
Wide stakeholder consultations
ODMP 10/03 Yes
1.3 Draw up data-sharingagreements between all institutionsresponsible for project components
Acceptable to all partner institutions Stakeholders Ongoing process Needs
1.4 Obtain equipment quotes Detailed equipment quotations
Acceptable specifications
HOORC 02/04 Yes
1.5 Order and installequipment
Equipment professionally installedand operational
HOORC 06/04 Yes
1.6 Obtain imagery quotes Detailed quotations obtained HOORC Yes
1.7 Order and process remotesensing material, acquire new(2002) aerial photography in digitalrectified format covering NgamilandDistrict.
Imagery and digital photos for theentire Ramsar site acquired,processed and made available topartners on request.
Acceptable standard
HOORC 05/04 Yes
1.8 Inventory existing data Comprehensive detailed inventorydescription and listing of all existingdata.
ODMP 09/04 Yes
-
8/8/2019 ODMP Inception report Volume 2
32/122
Wide stakeholder consultations
1.9 Identify data gaps Comprehensive list of data gaps.
Based on wide stakeholderconsultation
ODMP
1.10 Fill data gaps Plan of operation to acquireadditional data.
Acceptable specifications
1.11 Collect additional data.(TLB, MoA DAHP, NWDC etc) andfrom the private sector.
Additional data acquired and addedto ODMP data base.
ODMP, HOORC,Stakeholders
05/05 Ongoing process
1.12 Design database structure Structure designed in three phases(prototype, provisional, final database)
Based on agreed design principles
ODMP, HOORC 04/04 Yes
1.13 Implement databasestructure.
Structure implemented in threephases.
ODMP, HOORC 09/04 Yes
1.14 Load available data Database populated with availabledata.
ODMP, HOORC 09/04 Yes
1.15 Acquire additional data Additional data acquired throughdigitising and added to HOORCdata bank
ODMP, HOORC 04/05
1.16 Transform data to GIS Data transformed to relevant digitalformat and standardised projection.
ODMP, HOORC 04/05
1.17 Design ODIS ODIS databank designed in severalstages
Compatible with other relevantdatabases
ODMP, HOORC 09/04 Yes
1.18 Develop ODIS ODIS application programmed,
installed and explained to usersMeet data needs of relevant users
Accessible to registered users
Clear updating requirements
ODMP, HOORC 04/05
1.18 Arc-Web-Database link Web-link designed andimplemented.
ODMP, HOORC 05/05 Simplified data
-
8/8/2019 ODMP Inception report Volume 2
33/122
User friendly
Easy access
1.19 Make data available toother project components
Maps and data provided to partnerorganisation on request and timely
Appropriate formatsDatabase interface available atHOORC
ODMP, HOORC,stakeholders
05/05
Activity 2. Library improvements
2.1 Register componentinstitutions as members of the UBlibrary.
ODMP institutions can make use ofthe library service at the HOORC.
Based on UB registration formalities
ODMP partnerinstitutions, districtstake-holders
2.2 Familiarise with existingcollection
Thorough knowledge of what isavailable
Profound advice to users.
HOORC
2.3 Catalogue index and
classify existing and new informationmaterials
Information easily accessible to
ODMP partners.Conform to national cataloguingsystem
ODMP partner
institutions, districtstake-holders
2.4 Analyse activity plans ofthe project participants to developinformation need profiles
Thorough knowledge of informationneeds.
Wide stakeholder consultations
ODMP partnerinstitutions,
2.5 Order publishedinformation materials related to theproject
Relevant published informationmaterials added to the stock.
Acquisition of latest publications
ODMP partnerinstitutions, districtstake-holders
2.6 Acquisition of non-published information material
Relevant non-published materialsadded to the collection.
Acquisition of latest non-publishedinformation
ODMP partnerinstitutions, districtstake-holders
2.7 Provide a tailor madeinformation service to members ofthe project
User satisfaction by the ODMPpartner organisations.
ODMP partnerinstitutions,
2.8 Compilation and updatingof bibliographies
Comprehensive updated librarycatalogue following internationalstandards available to users.
ODMP partnerinstitutions, districtstake-holders
-
8/8/2019 ODMP Inception report Volume 2
34/122
2.9 Maintenance of databases Accurate and searchable databasesavailable to users.
Regularly updated
ODMP
2.10 Teach users in informationacquisition
Information literate ODMP users.
Simple and easy to grasp methods
ODMP partnerinstitutions,
2.11 Management of the librarybudget
Controlled spending and fullaccountability of project funds.
HOORC, UB
2.12 Facilitate the exchange ofinformation between ODMPstakeholders and the main UBLibrary (inter library loans).
ILL and other information sharingarrangements in operation
Easy acquisition of loaned materials
Clear procedures
ODMP partnerinstitutions
2.13 Creation and maintenanceof dissemination tools to facilitatetimely provision of information
Easy to use dissemination tools
Clear maintenance responsibilities
Requested information timelyavailed.
ODMP partnerinstitutions
Activity 3. Research Strategy
3.1 Prepare an OkavangoDelta 5 10 year research strategy
A comprehensive ODMP researchstrategy
Based on agreed structure
Based on wide stakeholderconsultation
Make it available to other projectparticipants and other stakeholders
HOORC, ODMP,stakeholders
30.04. 2005
3.2 Identify research needs A detailed research gap analysis
Discussed with partner institutions
PMG, ODMPpartners, HOORCand other researchinstitutions
30.06.
2005
3.3 Carry out additionalstudies where gaps have beenidentified
Involvement of other researchinstitutions and individualresearchers
HOORC and otherstakeholderinstitutions
Start 1.7.2005throughout theproject
3.4 Make results of ongoingresearch activities and inter-sectordata analysis available to theprocess as they become available.
Research results and findingspublished in refereed journals,articles and books
Disseminated to the public andODMP partners in monthly research
HOORC, ODMPpartner institutionsand otherresearchers
Ongoing throughoutthe project
yes
-
8/8/2019 ODMP Inception report Volume 2
35/122
seminars.
3.5 Publish research,monitoring findings and a researchreport series on Okavango studies
Scientific research reportspublished.
Circulated widely in peer reviewed journals
Okavango research series producedregularly
Regular publications
HOORC and otherresearch institutionsand individualresearchers
Ongoing throughoutthe project
yes
Activity 4. Participatory Planning
4.1 Assist stakeholders toidentify key areas of concern andconflicting issues to be addressed bythe ODMP
Comprehensive reports
Detailed minutes of meetings withstakeholders
PMG, all partnerinstitutions,communities,tourism sector
11-12/
2003
and
2-3/2004
yes
4.2 Analyse the perceptions,expectations and needs of different
land users in and around the Delta.
All issues raised by stakeholdergrouped and rated in a hotspot
analysis.Results provided to partnerinstitutions
PMG, all partnerinstitutions,
communities,tourism sector
4-6/2004 yes
4.3 Analyse the participationprocess in the ODMP and adviceand assist partner institutions toimprove stakeholder participation inthe planning process.
Comprehensive analysis ofstakeholder participation
Results from participation processguiding the activity plans of ODMPpartner institutions
PMG, all partnerinstitutions
8-10/2004 yes
4.4 Identify the strength andweaknesses of different stakeholdergroups to participate in naturalresource management
Comprehensive and detailed report
Based on level of understanding ofdifferent stakeholder groups
Discussed with the planning team
and partner institutions.
PMG, all partnerinstitutions
4.5 Channel the needs andservices between the institutionsresponsible for district planning,other ODMP components andHOORC (data bank, library services,mapping and dissemination ofresearch results) and provideassistance and advice on
Participation in ODMP TF groupsand other district planning referencegroups
Professional advice on participatoryplanning given to ODMP partnerinstitutions and district planners.
PMG, all partnerinstitutions,communities,tourism sector ,
District planninginstitutions,
Through-out ongoing
-
8/8/2019 ODMP Inception report Volume 2
36/122
participatory planning methods.
4.6 Capacity building andtraining on participatory techniques
Tailor made PRA/PLA learning forODMP partners
Conducted for representatives of allpartner institutions
Meet the expectations of theparticipants.
All partnerinstitutions,
4/2004 yes
4.7 On request assist relevantgovernment departments with thedesign and implementation of pilotprojects.
Required professional advice giventimely to partner institutions.
Multi-sectoral approach to design ofpilot projects
Consideration of community needs
Interested partnerinstitutions
Throughout
4.8 On request assist infacilitating the conflict resolutionprocess amongst stakeholders in theOkavango Delta.
Effective conflict resolutionmechanisms
Timely action
Holistic approach to conflict
resolution
All stakeholders andpartner institutions,
Through-out
-
8/8/2019 ODMP Inception report Volume 2
37/122
3.5 RESEARCH, DATA MANAGEMENT AND PARTICIPATORY PLANNINGWORKPLAN
37
-
8/8/2019 ODMP Inception report Volume 2
38/122
4 HYDROLOGY AND WATER RESOURCES COMPONENT 4
4.1 INSTITUTION AND FOCAL POINTS
4.1.1 Institution
Department of Water Affairs (DWA)
4.1.2 Focal points
Mr. Kalaote Kalaote Principal Water Resources Engineer I, Hydrology and WaterResources Division, Gaborone
Dr Naidu Kurugundla Senior Botanist, Hydrology and Water Resources Division,
Maun
4.1.3 Background
The DWA falls under the Ministry of Minerals, Energy and Water Affairs (MMEWA). It ismandated with water resources development and management as well as water supplyto some designated villages. As such, DWA is responsible for ground and surface waterutilisation and monitoring.
Botswana has few permanent surface water sources and the largest of them is theOkavango Delta which is at the terminus of the Okavango River. The river arises fromAngola and passes through Namibia before it enters Botswana.
The Hydrology and Water Resources component has been established to addressissues relating to one of the prime resources emanating from the Okavango system,namely its water its occurrence, state, distribution and utilisation within the OkavangoDelta. The component will address all facets of water as a resource.
DWA Gaborone, Hydrology Division is the base for the component. DWA has set up aModelling Unit with staff and computers, currently dedicated to the work of ODMP.
The DWA Maun office has three sections; Operation and Maintenance, Construction
(rural water supply) and Hydrology. The Hydrology Section monitors hydrologicalvariables and oversees protection of surface water through implementation of the WaterAct (1968).
4.2 COMPONENT RATIONALE
4.2.1 Objective
To develop a hydrological model of the Okavango Delta and improve hydrological,
including water quality, monitoring and management, including control of invasiveaquatic weeds and understanding the nature, dynamics and effects of natural channelblockages, in order to enhance understanding of the current situation and to be better
38
-
8/8/2019 ODMP Inception report Volume 2
39/122
able to assess current and future impacts of hydrological change on the entire Deltasystem.
4.2.2 Inputs
Table 8 DWA budget for the hydrology and water resources component
Activity Input Unit Cost (BWP)
Hydrological modelling DWA/Consultant Lump sum 5 604 000Monitoring programmes DWA/ Consultant Lump sum 840 000Office costs Rent and utilities Lump sum 204 000Transport Various Lump sum 498 000Office equipment Various Lump sum 204 000Travel and DSA Lump sum 1 128 000Training and capacity building Lump sum 330 000
TOTAL 8 808 000
4.2.3 Activities
1) Develop an integrated (surface-groundwater) hydrological model and use it topredict impacts of selected water resources interventions and climatic scenarios:
i) Develop a topographical model of the Delta.
ii) Construct and calibrate an integrated hydrological model.
iii) Test selected scenarios using the developed model. Scenarios include:
a) Upstream water resources developments: dams, irrigation, water supply
in Angola and Namibia.b) Surface and ground water abstraction from the Delta.
c) Clearing choked channels and dredging.
d) Regional climate change.
iv) In association with all other ODMP partners, assess general waterrequirements and any associated ecological and other impacts.
2) Design and implement an improved hydrological and climatic monitoringprogramme:
i) Review, assess and recommend improvements to the current monitoringprogramme.
ii) Make and implement specific recommendations on how to improve thequantity and quality of sediment, water flow (surface and ground) andpollution monitoring.
iii) Upgrade the monitoring equipment.
iv) Improve the spatial coverage of the programme.
3) Undertake a training needs assessment by:
i) Assisting the project secretariat in the identification of DWA staff andstakeholders training needs.
39
-
8/8/2019 ODMP Inception report Volume 2
40/122
ii) Assisting the project secretariat in development and implementation ofappropriate training programmes.
4) Undertake a capacity needs assessment by:
i) Assisting the project secretariat in identification of capacity constraints inDWA and its stakeholder organisations.
ii) Assist project secretariat in developing recommendations on, and wherepossible implementation of, capacity building measures.
4.2.4 Outputs
1) A comprehensive integrated hydrological model.
2) An improved hydrological and climatic monitoring programme.
3) DWA staff and stakeholder training programmes.
4) Recommendations on how to undertake capacity building in the DWA and itsstakeholder organisations and, where possible, actual implementation of theserecommendations.
4.2.5 Outcomes
1) Improved knowledge and understanding of the hydrology of the Delta informingplanning, decision making and operations.
2) Reliable data for planning and management of water resources.
3) Improved DWA staff and stakeholder ability and understanding.4) Improved capacity in the DWA and, where possible, its stakeholder organisations.
40
-
8/8/2019 ODMP Inception report Volume 2
41/122
4.3 HYDROLOGY AND WATER RESOURCES COMPONENT MONITORING AND EVALUATION PLAN
Table 9 Tracking implementation and production of outputs for the hydrology and water resources component
Major and supporting outputs(deliverable products andservices) expected
Criteria for monitoring quality Main target groups Expected date ofdelivery
Is it deliveredwithin time, budgetand criteria formonitoringquality?
Idwa
Activity 1. Develop a hydrological model
1.0 Integrated hydrologicmodel for the Okavango Delta
Realistic representation of thecomplex phenomena of the Delta
Based on reliable data andinformation
Simple to understand and use bymajority of stakeholders
Accurate and reliable
Should be adaptable for updates
The ODMP
Stakeholders of theOkavango Delta
April 2005
1.1 Digital topographic (digitalelevation) model
Based on reliable data andinformation
Reflecting seasonal changes
Peer reviewed
October 2004
1.2 Calibrate and constructintegrated hydrological model
Based on comprehensive andreliable data
Acceptable methodology
December 2004
1.3 Test selected scenariosusing developed model (to showimpact of various scenarios)
Reflection of the overall functioningof the Delta
Applicable to other critical planningand management interventions
April 2005
Activity 2. Hydrological monitoring
2.0 Design and implementimproved hydrological and climatic
Simple and adaptable proceduresfor successful monitoring
April 2005
-
8/8/2019 ODMP Inception report Volume 2
42/122
monitoring programme Based on lessons learnt from all theprevious monitoring systems
Realistic and simple to operate
Based on collaborative approachwith Meteorological department andother stakeholders
Clear roles and responsibilities
Affordable
2.1 Review, assess andrecommend improvements to thecurrent monitoring programme
Based on lessons learnt from all theprevious monitoring systems
Feasible and acceptable
Accuracy of survey equipment
April 2004
2.2 Make and implementspecific recommendations onsediment and water quality andpollution monitoring
Feasible and issue specific
Adaptable, affordable andacceptable
Based on acceptable standard andmethods
April 2005
2.3 Upgrade the monitoringequipment
Tested and used with approveddesigns
Appropriate selection of equipmentto local needs
Affordable and easy to use
April 2005
2.4 Increase spatial coverageof the monitoring programme
Representative of the entire Delta
Agreed site selection criteria
Accessible and practical
April 2005
Activity 4. Improved training and institutional & stakeholder capacity
4.1 Staff and otherstakeholder training needsassessment
Done in a participatory mannerUsing standard/ appropriatemethodology
Aimed at meeting needs of thecomponent and the ODMP process
4.2 Institutional & stakeholder As above
-
8/8/2019 ODMP Inception report Volume 2
43/122
capacity needs assessment
4.3 Training and capacitybuilding plans
Relevant to fill the needs identifiedin Training needs assessment andcapacity building
Practical & affordable
Relevant to ODMP
4.4 Trained Staff and otherstakeholders
Training done to meet needsidentified at the training andcapacity needs assessment
-
8/8/2019 ODMP Inception report Volume 2
44/122
4.4 HYDROLOGY AND WATER RESOURCES COMPONENT WORKPLAN
44
-
8/8/2019 ODMP Inception report Volume 2
45/122
5 WILDLIFE MANAGEMENT COMPONENT 5
5.1 INSTITUTION AND FOCAL POINT/S
5.1.1 Institution
Department of Wildlife and National Parks (DWNP)
5.1.2 Focal points
Mr Daniel EC Mughogho Acting Assistant Director, Research Division,Gaborone.
Ms Mompoloki Lettie Sechele Head, Research Division, Maun.
5.2 BACKGROUND
The Okavango Delta is a very important region for tourism as well as biodiversityconservation. It is one of the few localities on the African continent endowed with largepopulations of buffalo and increasing populations of elephant. The Delta also boastsgood populations of lions and rhino have recently been reintroduced. Leopards are alsofound in the area, although the numbers of these largely nocturnal and cryptic speciesare not well known. The Delta is also home to certain rare and endangered mammalspecies such as Sitatunga and threatened bird species such as wattled cranes and slaty
egret, amongst many others.The DWNP, in the Ministry of Environment Wildlife and Tourism (MEWT), is the primarygovernment institution responsible for wildlife conservation and utilisation in the country.DWNP is, therefore, a very important stakeholder in the management and planning forthe Okavango Delta. Although DWNP is the primary government institution, thedepartment acknowledges that effective management of natural resources can only beachieved with the active engagement of other stakeholders, such as rural communities(especially those on the periphery of the Delta and around protected areas such asMoremi game reserve), as well as the private sector, particularly the tourism industry.The Departments recognition of the importance of stakeholders is manifested in itsactive involvement in the development of the community based natural resourcemanagement (CBRNM) activities and more recently the national CBNRM Policy as wellas its strong links to and frequent consultations with the tourism sector.
About 5.2% of Ngamiland district land is set aside as game reserve, while 13.2% is forCBNRM, which takes place in gazetted wildlife management areas (WMA). 23.7% is forconcessions, 32% purely for communal pastoral activities, 7% for commercial farmingand the remaining 18.8% for pastoral activities with possible CBNRM activities.
The area designated as Moremi game reserve falls squarely in the middle of theOkavango Delta Ramsar site and is thus covered by the ODMP planning process.DWNP is, however, concurrently developing a revised management plan specifically forMoremi. The two initiatives are seeking to work together and have overlapped at least atthe consultation stage. The current modus operandi of the two initiatives seems to bethat where management issues are specific to Moremi, such as provision of facilities,
45
-
8/8/2019 ODMP Inception report Volume 2
46/122
gate opening times etc., they will be dealt with by the Moremi management planwhereas more general issues, e.g. how to manage bigger threats to the whole Deltaarea, will be dealt with by ODMP.
5.3 COMPONENT RATIONALE
5.3.1 Objective
To increase understanding of the numbers, ecology and dynamics of buffalo, slatyegret, African Skimmer, sitatunga, cheetah and leopard populations as well as theinteractions between humans and elephants and predators and livestock in order toprovide suitable information to ensure future sustainable management of the Deltaswildlife populations particularly in relation to the well-being of communities andinteractions with the livestock sector and tourism industry.
5.3.2 Inputs
Table 10 DWNP budget for the wildlife management component
Activity Input Unit Costs (BWP)
Buffalo Survey DWNP Lump sum 270 000Slaty Egret Survey Consultant Lump sum 150 000Predators Survey Consultant Lump sum 190 000Human elephant conflict Consultant Lump sum 300 000Rare species surveys DWNP & consultant Lump sum 350 000Transport and DSA DWNP Lump sum 240 000Office Equipment Lump sum 240 000Training and capacity building Lump sum 180 000
TOTAL 192 0000
5.3.3 Activities
1) Carryout work to reduce human-elephant conflicts by:
i) Analysing existing data on HEC incidents collected from various studies to
date and undertaking some further studies if needs be.ii) Undertaking an analysis of the costs, e.g. crop loss etc., and benefits, e.g.
revenue from tourism etc., suffered and accrued by communities.
iii) Undertaking pilot mitigation measures to test their effectiveness. These couldbe active measures, e.g. bells, rattles etc. designed to scare elephantsaway or passive measures, e.g. different types of land use planning, toprevent, or at least reduce the number of, elephants visiting fields.
iv) Educating stakeholders about elephants.
2) Carryout work required to produce a buffalo management plan:
i) Establishing numbers and distribution patterns.
46
-
8/8/2019 ODMP Inception report Volume 2
47/122
ii) Design and implement monitoring programme where possible involvingstakeholders such as communities and the tourism sector.
iii) Make recommendations on management of buffalo, particularly in relation tosafari hunting, photographic tourism and actual or potential livestockinteraction.
3) Carryout work required to produce a Slaty Egret management plan by:
i) Establishing numbers and distribution patterns.ii) Establishing feeding and breeding ecology.
iii) Designing and implementation of a monitoring programme, where possibleinvolving stakeholders such as communities and the tourism sector.
iv) Development of a species action plan with specific managementrecommendations to ensure survival of the species.
4) Carryout work required to reduce predation of livestock by leopard and cheetahby:
i) Establishing numbers and distribution patterns of leopard and cheetah.ii) Identifying and mapping predation hotspots.
iii) Determining dynamics of predation incidents, e.g. time of day, location,species taken etc.
iv) Designing and implementing conflict resolution and mitigation strategies.
v) Undertaking an analysis of the costs, e.g. livestock loss etc. and benefits,e.g. revenue from tourism etc. suffered and accrued by communities.
vi) Educating stakeholders about leopard and cheetah.
5) Carryout rare species (i.e. sitatunga, reedbuck, African skimmer) baseline surveysby:
i) Establishing numbers and distribution patterns.
ii) Determination of ecological requirements and threats to survival.
iii) Development of a species action plans for each with specific managementrecommendations to ensure survival of the species.
iv) Designing and implementation of a monitoring programme for each wherepossible involving stakeholders such as communities and the tourism sector.
6) Undertake a training needs assessment by:
i) Assisting in the project secretariat in identification of DWNP staff andstakeholders training needs.
ii) Assisting the project secretariat in development and implementation ofappropriate training programmes.
7) Undertake a capacity needs assessment by:
i) Assisting the project secretariat in identification of capacity constraints inDWNP and its stakeholder organisations.
ii) Assist project secretariat in developing recommendations on, and wherepossible implementation of, capacity building measures.
47
-
8/8/2019 ODMP Inception report Volume 2
48/122
5.3.4 Outputs
1) HEC report with recommendations and maps.
2) Buffalo survey report with recommendations and maps.
3) Slaty Egret survey report with recommendations and maps.
4) Predator livestock conflict report with recommendations and maps.
5) Rare species survey report with recommendations and maps.
6) A DWNP staff and stakeholder training programme/s.
7) Recommendations on how to undertake capacity building in the DWNP and itsstakeholder organisations and, where possible, actual implementation of theserecommendations.
5.3.5 Outcomes
1) Reduced human-elephant conflict in and around the Delta.2) Safari tourism, photographic and hunting sectors guided and livestock threats
reduced based on accurate baseline data on buffalo.
3) Improved management of Slaty Egret.
4) Reduced livestock predation by leopard and cheetah.
5) Improved management of rare species.
6) Improved DWNP staff and stakeholder ability and understanding assists inmanagement of the wildlife resource.
7) Improved capacity in the DWNP and, where possible, its stakeholder organisationsassists in management of the wildlife resource.
48
-
8/8/2019 ODMP Inception report Volume 2
49/122
5.4 WILDLIFE MANAGEMENT COMPONENT MONITORING AND EVALUATION PLAN
Table 11 Tracking implementation and production of outputs from the wildlife management component
Major and supporting outputs(deliverable products andservices) expected
Criteria for monitoring quality Main target group Expected date ofdelivery
Is it deliveredwithin time, budgetand criteria formonitoringquality?
Activity 1. Reduce human-elephant conflict
1.1 Analysis and mapping ofexisting information on HECincidents and undertake furtherstudies
Based on sound existing and currentinformation
Based on comprehensive andappropriate method of analysis
Accurate readable and user friendlymaps
Wide stakeholder consultation
November 2005
1.2 Analysis of costs andbenefits suffered and accrued bycommunities
Based on wide stakeholderconsultation
Based on factual information
Use appropriate methods
1.3 Undertake pilot and testmitigation measures
Based on recommendations fromHEC studies
Adaptable and applicablemanagement options whichconsiders both scientific andtraditional methods
Based on wide stakeholderconsultations
Cost-effective and practical
Agreed pilot area
Integrated approach
February 2006
Activity 2. Carry out work to produce buffalo management plan
2.1 Establish numbers and Sound buffalo-specific survey September 2004
-
8/8/2019 ODMP Inception report Volume 2
50/122
distribution patterns method
Clear and useful maps for planning
Accurate readable and user friendlymaps
2.2 Design and implementbuffalo monitoring programme Based on stakeholder consultationViable and practical monitoringprogramme
Simple and tailor-made to the levelof understanding of communities
2.3 Make recommendationsfor management of buffalo
Applicable and affordablemanagement options
Acceptable to stakeholders
Activity 3. Carry out work to produce a Slaty Egret action plan
3.1 Establish numbers anddistribution patterns
Sound Slaty Egret-specific surveymethod and analysis
Clear and useful maps for planningAccurate readable and user friendlymaps
Based on consultations withstakeholders
January 2005
3.2 Establish feeding andbreeding ecology
Detailed maps at convenientresolution to enhance utility
3.3 Design and implement amonitoring programme
Based on stakeholder consultation
Viable and practical monitoringprogramme
Simple and tailor-made to the levelof understanding of communities
3.4 Develop species actionplan for Slaty Egret
As above February 2005
Activity 4. Reduced predation of livestock by leopard and cheetah
4.1 Establish numbers anddistribution patterns of leopard andcheetah
Sound leopard and cheetah specificsurvey method and analysis
Clear and useful maps for planning
Accurate readable and user friendly
February 2005
-
8/8/2019 ODMP Inception report Volume 2
51/122
maps
Based on consultations withstakeholders
4.2 Identify and map predationhotspots
Based on sound existing and currentinformation
Clear and useful maps for planning
Based on consultations withstakeholders
4.3 Determine dynamics ofpredation incidents
Appropriate recording systemspecific to hotspots
Based on consultations withstakeholders
4.4 Design and implementconflict resolution and mitigationstrategies
Applicable measures orinterventions
Recognises both scientific andtraditional methods
Affordable and practicalAcceptable to the stakeholder
March 2005
4.5 Analysis of costs andbenefits suffered and accrued bycommunities
Based on wide stakeholderconsultation
Based on factual information
Based on appropriate methods
Activity 5. Carry out rare species baseline surveys
5.1 Establish numbers anddistribution patterns
Based on sound existing and currentinformation
Species-specific method andanalysis
Accurate readable and user friendlymaps
Wide stakeholder consultation
August 2006
5.2 Determine ecologicalrequirements and threats to survival
Based on sound existing and currentinformation
Clear and useful maps for planning
Based on consultations with
-
8/8/2019 ODMP Inception report Volume 2
52/122
stakeholders
5.3 Develop species actionplans for each
Applicable and affordablemanagement options
Acceptable to stakeholders
5.4 Design and implementmonitoring programme for each
Based on stakeholder consultationViable and practical monitoringprogramme
Simple and tailor-made to the levelof understanding of communities
September 2006
Activity 6. Improved training and institutional & stakeholder capacity
6.1 Staff and otherstakeholder training needsassessment
Done in a participatory manner
Using standard/ appropriatemethodology
Assessment aimed at meetingneeds of the component and theODMP process
6.2 Institutional & stakeholdercapacity needs assessment
As above
6.3 Training and capacitybuilding plans
Relevant to fill the needs identified intraining needs assessment andcapacity building
Practical & affordable
Relevant to ODMP
6.4 Trained Staff and otherstakeholders
Training done to meet needsidentified at the training and capacityneeds assessment
-
8/8/2019 ODMP Inception report Volume 2
53/122
5.5 WILDLIFE MANAGEMENT COMPONENT WORKPLAN
53
-
8/8/2019 ODMP Inception report Volume 2
54/122
-
8/8/2019 ODMP Inception report Volume 2
55/122
6 SUSTAINABLE TOURISM & CBNRM COMPONENT 6
6.1 INSTITUTION AND FOCAL POINTS
6.1.1 Institutions
The Department of Tourism (DoT) within the MEWT and North West District Council(NWDC) will undertake this component. This came about after both DoT and NWDCagreed to merge the two separate components of sustainable tourism and localauthority service provision because of similarities especially in the tourism sectordevelopment, which would otherwise have led to duplication of efforts.
6.1.2 Focal Points
Felicity Rabolo Assistant Tourism Officer (DoT)
Patricia Chilume Regional Tourism Officer (DoT).
Mafila Malesu Tourism Officer, Economic Planning Unit (NWDC).
6.2 BACKGROUND
The DoT, established under the Tourism Act and contained within the MEWT, has amandate to regulate tourism enterprises, set out procedures in respect of applications,undertake inspections and conduct appeals. DoT also serves as secretariat to theNational Council on Tourism (NACT) and Tourism Licensing Board.The Okavango Delta is arguably the single most important tourism destination inBotswana and in order for this to continue and for the benefits of this characteristic to beproperly spread, the local communities' active participation is very crucial for theongoing successful development of tourism in the area.
The DoT is responsible for pursuing the primary Government of Botswana (GoB) policyobjective of maximising utilisation, on a sustainable basis, of existing natural resourcesin order to increase social and economic benefits to Batswana through tourism andCBNRM. Tourism has been identified as one of the economic sectors with the potentialto contribute to the diversification of Botswana's economy and CBNRM has beenidentified as a mechanism to assist with poverty alleviation in the rural areas.The GoBs Tourism Policy guides the operations of the DoT. In support of the policy, aBotswana Tourism Development Programme (BTDP) and a Tourism Master Plan havealso been prepared. The master plan serves as a basic guideline for development oftourism, enabling the decision makers to agree on the principles for the direction oftourism development for the next decade. DoT has put major emphasis on thediversification of the tourism away from wildlife based activities and toward other areasthrough development of a National Ecotourism Strategy.
Work done by the DoT and the NWDC under the auspices of ODMP will concentrate onenvironmentally sound, environment, culture, history, archaeology etc. based tourism;more commonly referred to as ecotourism.The National Tourism Policy framework and implementation is composed of:
55
-
8/8/2019 ODMP Inception report Volume 2
56/122
An institutional and legislative framework, where GoB and business must developinto a stakeholder partnership.
Product development, including consumptive and non-consumptive wildlifeutilisation and diversification into cultural tourism.
Marketing and promotion, primarily through the formation of a National TourismBoard.
Training and education, to focus mainly on the quality and professionalperformance of tourism services, and;
Tourism awareness, to focus the impact of tourism on the economic, cultural andenvironmental aspects.
A CBNRM policy is also in the final stages of development. The overall objective of thepolicy is to enhance the conservation of Botswanas natural resources and economicand social development in rural areas by providing eligible communities withopportunities and incentives to earn direct benefits from natural resource conservation.It is founded on the premise that all members of the community share an interest inconserving their local environment. The policy is needed to facilitate the stimulation andgrowth of community interest and attract investment.The Draft CBNRM Policy framework and implementation is designed to:
Provide for broad stakeholder participation in natural resource management atDistrict and National level.
Give communities incentives to engage in conservation activities leading tosustainable development.
Establish direct links between the reception of benefits and the conservation ofrenewable natural resources.
Strengthen communitys empowerment through programs directed towardscommunity self-reliance.
Promote and ensure responsible, accountable and transparent decision makingprocess in CBNRM, and;
Promote the adoption and use of the IUCN ecosystems approach to CBNRM.
NWDC provides a wide variety of services to communities in the District including thosewithin the Ramsar site. These include social services such as social welfare andcommunity development, remote area development and CBNRM facilitation.
6.2.1 Social welfare services
The main objective of social welfare services is to assist disadvantaged individuals,groups and committees through provision of resources with a view to improving theirquality of life. The department also deals with community development aimed atenhancing local institutions by building leadership capacity and promoting communityparticipation through self-help projects. The department works closely with localinstitutions such as Village Development Committees (VDC) in communitydevelopment.
6.2.2 Remote Area Development
The primary aim of the programme is to integrate remote area communities intomainstream society by providing access to economic opportunities and basic public
56
-
8/8/2019 ODMP Inception report Volume 2
57/122
services. In most instances in Ngamiland, this has been through provision of livestock.This approach excluded communities like Khwai and Mababe because their settlementsare situated inside the buffalo fence; a cattle free zone. Their economic base istherefore dominated by tourism and CBNRM activities.
6.2.3 CBNRM Facilitation
NWDCs involvement in CBNRM has increased with the creation of the position ofTourism Officer. The aim of this post is to facilitate greater uptake of CBNRM activitiesby communities in the district and to maximise benefits to them through the utilisation ofnatural resources for tourism and/or other activities.
NWDC holds the secretariat for the Ngamiland district CBNRM forum. In addition,NWDC will take an increasing role in district tourism planning.
6.3 COMPONENT RATIONALE
6.3.1 Objective
To assess carrying capacity and limits of acceptable change (LAC) for tourismbusinesses, diversify tourism offerings and CBNRM activities, increase citizenengagement in the tourism sector, develop a district tourism development plan andcreate a tourism monitoring and information system in order to create an enablingenvironment for conservation, sustainable utilisation and management of naturalresources for the mutual benefit of local and national economies, livelihoods andpoverty alleviation.
6.3.2 Inputs
Table 12 DoT/NWDC budget for the sustainable tourism and CBNRM component
Activity Input Unit Cost (BWP)
Carrying capacity and LAC Consultant 12 months 696 000Tourism monitoring and information system and database Consultant 6 months 580 000District tourism development plan Consultant 6 months 360 000Diversifying tourism offerings & increase citizen engagement Consultant 6 months 348 000CBNRM diversification Consultant 4 months 120 000Training and capacity building Lump sum 360 000Local transport and DSA Lump sum 330 000Office equipment Lump sum 120 000CBNRM forum Lump sum 90 000CBNRM newsletter Lump sum 30 000
TOTAL 3 394 000
6.3.3 Activities
1) Conduct carrying capacity and LAC studies within and outside WildlifeManagement Areas in and around the Okavango Delta. The following tasks shouldbe undertaken:
57
-
8/8/2019 ODMP Inception report Volume 2
58/122
i) General tasks:
a) Conduct a desktop study to ascertain all existing information and the fullbackground to this area of work.
b) Undertake fieldwork to collect and verify information.
ii) Carrying capacity work:
a) Synthesise and harmonise existing systems of ecologicalzonation/sensitivity for the Delta.
b) In close association with the ODMP Land Use Planning Componentbeing run by the Tawana Land Board (TLB), analyse existing tourismissues in all existing land use and management plans.
c) Compare different existing management systems in controlled huntingareas (CHAs) and analyse their effectiveness in relation to sustainableuse, conservation and delivery of benefits to Botswana.
d) Interview DWNP, TLB officials, tourism operators and any otherrelevant stakeholders regarding carrying capacity and its enforcementin Delta tourism.
e) In close association with the ODMP Land Use Planning Component(TLB) conduct an analysis of how effectively any current carryingcapacity regulations are implemented and enforced.
f) Digitise and create a base map for tourism carrying capacity planning.
g) Compile a report on carrying capacity models, their assumptions,strengths, weaknesses and, if necessary other relevant planningregulations.
iii) LAC work:
a) Conduct a review of existing LAC models, especially those used inother wetlands and areas similar to the Delta as well as that applied inthe Central Kalahari Game Reserve.
b) Establish guidelines and prepare an action plan to implement a LACstudy for the Okavango Delta Ramsar site.
c) Conduct stakeholder meetings to clarify issues, set goals, debatestandards.
d) Set standards and develop questionnaire.
e) Survey attitudes, expectations and perceptions of stakeholders andanalyse data.
f) Compile report that harmonises old carrying capacity assumptions andplanning regulations with the new LAC model.
2) Create a plan for tourism diversification and citizen empowerment, through:
i) Inventory and assessment of the current range of tourism offerings in andaround the Okavango Delta and make recommendations for diversificationaway from the existing reliance on and desire for wildlife based tourismventures. Specific tasks include:
a) Undertake fieldwork to collect and verify information.
b) Conduct a desktop study to ascertain all existing information and the fullbackground to this area of work.
58
-
8/8/2019 ODMP Inception report Volume 2
59/122
c) Undertake a survey of existing tourism industry offerings (private sectorand community based) and their seasonal pattern of visitation.
d) Assess impact of current type of tourism, its level of marketing and itsseasonality, on the economy and the environment.
e) Conduct a SWOT (strengths, weaknesses, opportunities, threats)analysis of existing commercial and community-based tourism
enterprises.f) Conduct a gap analysis to determine possible areas and activities for
expansion and diversification.
g) Compile draft development and marketing plan that incorporatesfindings of the inventory, gap and SWOT analyses and determinespossible areas and activities for expansion and diversification,concentrating on recommendations for where, when and how specificnew, especially community based ecotourism, activities should bedeveloped.
ii) Assessing the current extent to which Batswana participate in the tourismindustry at all levels (from seasonal employment, to management, toownership etc.) and make recommendations on how to improve the currentsituation. Specific tasks include:
a) Review and assess existing government policies, programmes andincentives to promote citizen participation and investment in the tourismsector.
b) Conduct a desktop study to ascertain all existing information anddevelop a full background to this area of work. This should include thework done by Mbaiwa, Bernard etc. at HOORC.
c) Conduct a survey of reasons for low investment rates by Batswana inthe tourism sector (investment risks, investor profiles).
d) Conduct a survey on the current levels of citizen and non-citizenengagement (employment at all levels, as well as whole or partownership) in the tourism sector.
e) Undertake a study on the existing demography (age, sex, race, skills,qualifications, job title, work experience etc) of tourism employees at alllevels and explore the reasons for the findings.
f) Undertake a study on Batswana aims and desires in relation toinvolvement in the tourism sector; both within those already involved inthe tourism sector, in other industries and more generally.
g) Analyse the existing skill requirements in tourism sector and locallyavailable training opportunities.
h) Develop a plan and make recommendations (based on the above) onhow to engage more Batswana in the tourism sector.
i) Input plan for citizen engagement into District Tourism DevelopmentStrategy.
3) Assess the Ngamiland District CBNRM sector by investigating current CBNRMactivities with the purpose of determining their effectiveness and performance andmaking recommendations for diversification of the sector, with particular emphasison non-tourism CBNRM activities. Tasks should include:
59
-
8/8/2019 ODMP Inception report Volume 2
60/122
i) Conduct a desktop survey of all available pertinent literature on CBNRM,especially that specific to Ngamiland and including the 2003 national CBNRMreview and the draft CBNRM policy.
ii) Undertake an inventory of existing tourism and non-tourism based CBNRMactivities in Ngamiland. The non-tourism work should be done after andinformed by the work of ODMP component 8 on Vegetation Resourcescomponent that will:
a) Assess vegetation resource use.
b) Identify vegetation resource users.
c) Identify vegetation use conflicts.
d) Conduct stakeholder consultation.
e) Identify an appropriate pilot CBNRM project.
iii) Undertake a gap analysis of existing CBNRM activities.
iv) Undertake a SWOT analysis of b).
v) Assess the reasons why there is currently so few non-tourism based CBNRMactivities.
vi) Make recommendations on financially and technically viable methods ofdiversifying, especially non-tourism, CBNRM activities.
vii) Propose suitable pilot projects to test the viability of recommendations madein f). Such pilot projects should be developed in collaboration with those to bedeveloped by ODMP component 8 on Vegetation Resources.
4) Produce a comprehensive District Tourism Strategy containing an ecotourismaction plan. Specific tasks include:
i) Determine existence and usefulness of other regional tourism developmentstrategies, e.g. in Namibia, South Africa etc.
ii) Ascertain all existing relevant information and conduct a desktop study todevelop a full understanding and detailed background to tourism strategydevelopment. This should include but not be limited to information ontourism, the ecosystem approach and planning relevant to Ramsar sites.
iii) Draw up participatory plan to engage stakeholders.
iv) Undertake wide consultation with the DoT, NWDC and all other relevanttourism based or related stakeholders to determine their aspirations andexplain the information and plans collected and developed in the tourism andCBNRM diversification, citizen engagement, carrying capacity and LAC workundertaken as other activities in this component.
v) Achieve consensus on overall aims and objectives of strategy.
vi) Develop draft District Plan and Ecotourism Action Plan
vii) Consult widely on f) and review and revise as appropriate.
viii) Finalise district plan and action plan.
5) Develop a tourism (including ecotourism) monitoring programme and associatedinformation system and database. Specific tasks include:
i) Determine existence and usefulness of other regional tourism andecotourism monitoring programmes, e.g. in Namibia, South Africa etc. and
60
-
8/8/2019 ODMP Inception report Volume 2
61/122
familiarise with any World Tourism Organisation and Ramsar guidelines fordata collection and analysis.
ii) Assess types and quality of tourism data currently held by DoT, NWDC andother bodies, e.g. immigration, HOORC, HATAB, private sector etc.
iii) Undertake gap analysis on b) and make recommendations.
iv) Consult DoT, NWDC staff and other stakeholders, e.g. private sector,HATAB, CBOs, on what they want to monitor and why.
v) Determine, in consultation with stakeholders, symptomatic environmental,socio-economic, institutional and market indicators to systematically monitorand determine required frequency of any such monitoring.
vi) Harmonise determined indicators with carrying capacity and LAC limits andwith the aims and objectives of the District Tourism Development Strategyand Ecotourism Action Plan.
vii) Determine who will record what, how often etc. This should ensure aparticipatory element to monitoring, i.e. that the private sector, CBOs, HATAB
etc. are integrally involved in the monitoring programme.viii) Write guidelines for recording and reporting.
ix) Choose or create appropriate database/information system that holdscollected data and allows easy reporting.
x) Train DoT and NWDC staff in operation and maintenance of thedatabase/information system.
xi) Create clear reporting programme (structure, schedule etc.) from monitoringprogramme.
xii) Determine possible risks to monitoring and reporting programme and developrisk management strategies.
xiii) Develop draft tourism monitoring programme.
xiv) Consult widely on i) and m), review and revise as appropriate.
xv) Pilot test system, including reporting.
xvi) Finalise monitoring programme and implement.
6) Undertake a training needs assessment by:
i) Assisting the project secretariat in the identification of DoT/NWDC staff andstakeholders training needs.
ii) Assisting the project secretariat in development and implementation ofappropriate training programmes.
7) Undertake a capacity needs assessment by:
i) Assisting the project secretariat in identification of capacity constraints inDoT/NWDC and its stakeholder organisations.
ii) Assist project secretariat in developing recommendations on, and wherepossible implementation of, capacity building measures.
61
-
8/8/2019 ODMP Inception report Volume 2
62/122
6.3.4 Outputs
1) A comprehensive report on carrying capacity and LAC in the tourism andecotourism sector with clear recommendations on setting limits.
2) A comprehensive report on tourism and ecotourism diversification, as well ascitizen participation, engagement and employment with recommendations onareas for new tourism development and changes required to improve citizeninvolvement.
3) An assessment of, and report on, the existing Ngamiland CBNRM sector withrecommendations for diversification, especially into new, non-tourism basedactivities.
4) A District Tourism Strategy and an Ecotourism Action Plan.
5) A tourism and ecotourism monitoring programme built on and developedsimultaneously with a functioning and user friendly database and informationsystem that can be used to assess industry performance, trends and impacts.
6) DoT/NWDC staff and stakeholder training programme/s.
7) Recommendations on how to undertake capacity building in the DoT/NWDC andits stakeholder organisations and, where possible, actual implementation of theserecommendations.
6.3.5 Outcomes
1) Improved understanding of tourism carrying capacity and the LAC related totourism, including ecotourism, allowing establishment and setting of limits.
2) Tourism and ecotourism diversified away from the existing reliance on and desirefor more wildlife based tourism ventures, e.g. camps and lodges, and thatdemonstrates and delivers comprehensive participation, engagement and fairemployment of citizens, particularly from local communities, thereby improvingeconomic standing.
3) Improved and enhanced management of natural resources by communitiesthrough activities and programmes that ensure and promote their economicempowerment, as well as the future stability and transparency of such anapproach.
4) Improved planning, development and management of tourism and ecotourism in
the district such that it doesnt create new (and reduces existing) conflicts, avoidsinappropriate development and does not degrade the resource base that drawstourists to the Delta and surrounding areas.
5) Creation of the ability to monitor tourism and ecotourism activities and impacts,founded on a state of the art information system and database, designed to assistimplement and further develop the District Tourism Plan and Ecotourism ActionPlan.
6) Improved DoT/NWDC staff and stakeholder ability and understanding assist inmanagement of the tourism and CBNRM.
7) Improved capacity in the DoT/NWDC and, where possible, its stakeholderorganisations assists in management of the tourism sector.
62
-
8/8/2019 ODMP Inception report Volume 2
63/122
6.4 SUSTAINABLE TOURISM AND CBNRM COMPONENT MONITORING AND EVALUATION PLAN
Table 13 Tracking implementation and production of outputs for the sustainable tourism and CBNRM component
Major and supporting outputs(deliverable products andservices) expected
Criteria for monitoring quality Main targetgroups
Expected date ofdelivery
Is it deliveredwithin time,budget andcriteria formonitoringquality?
If devwhaabo
Activity 1. Carrying capacity guidelines and LAC model
1.1 Ecological zonation andsensitivity maps
Accurate and based on relevantinformation
Clear, usable and acceptable to all
DoT, NWDC,ODMP stakeholders
Dec 2005
1.1.1 Synthesis of existingsystems of ecologicalzonation/sensitivity for the Delta
Level of detail, based on relevantinformation As above Dec 2005
1.1.2 Gap Analysis report ofEcological zonation systems
Comprehensive, clear
Based on stakeholder consultation.
1.1.3 Digitised base map fortourism carrying capacity planning
Accurate and based on relevantinformation
Clear, usable and acceptable to allstakeholders/users
As above Dec 2005
1.2 Inventory of carryingcapacity guidelines and otherplanning regulations and theirenforcement
Comprehensive to include allknown guidelines & regulations
Based on current information
As above Nov 2005
1.2.1 Report of interviews withrelevant sectors & tourismoperators regarding carryingcapacity and its enforcement inDelta tourism
Report covers all pertinent issuesfrom stakeholder interviews
Report is clear and based onrelevant information
Report must capturerecommendations from interviews
As above Nov 2005
1.2.2 Review of carrying Comprehensive review of all known As above Nov 2005
-
8/8/2019 ODMP Inception report Volume 2
64/122
capacity models, assumptions,strengths and weaknesses
models
Practicability and applicability ofthe preferred models
1.3 Findings of the LACstudy for the Okavango Delta andenvirons
Takes account of ecologicalzonation and existing carryingcapacity guidelines
findings are clear and based onrelevant information
use of appropriate methodologies
As above Nov 2005
1.3.1 Review report of LACapplied in the Central KalahariGame Reserve (CKGR)
Thorough review based on agreedterms of reference
In-depth understanding of LACmodel used at CKGR
As above Jan 2006
1.3.2 LAC Guidelines Clear, usable and based onrelevant information
Acceptable to all stakeholders
As above Jan 2006
1.3.3 LAC Action plan Clearly stipulates actions, timingand cost
Allocates responsibilities
Clear, usable and relevant
Acceptable to all stakeholders
DoT, NWDC,ODMP stakeholders
Jan 2006
1.3.4 Report of the survey ofstakeholders attitudes,expectations and perceptions
Consultation based on atransparent process
Relevant stakeholders consulted
Proceedings well captured
Appropriate consultationmethodologies
As above Jan 2006
1.4 Guidelines on planningand management based on LACmodel
Clear, usable and relevant
Acceptable to allstakeholders/users
As above Apr 2006
1.4.1 Report that harmonisescarrying capacity assumptions andplanning regulations with LACmodel
Report is clear, accurate, usableand relevant
Captures the interests of allrelevant stakeholders
As above Apr 2006
-
8/8/2019 ODMP Inception report Volume 2
65/122
Activity 2 To develop a tourism monitoring programme and associated database / information system for assessment and monitoring of Okavango Delta tourism industry peand impacts.
2.1 To develop a tourism monitoring programme
2.1.1 Tourism monitoringprogramme
Includes symptomaticenvironmental, socio-economic,institutional, and market indicatorsfor systematic monitoring
Indicators harmonised with LACand other district tourism strategyelements and especially withecotourism guidelines
Clearly identifies key feedbackloops to institutional, regulatory,and management systems.
Includes a risk management andrisk reduction strategies
Clear, well understood and userfriendly
DoT, NWDC,ODMP stakeholders
2.1.2 Plan for theimplementation of the tourismmonitoring programme
Designed with full participation ofstakeholders expected toparticipate in monitoring.
Practical & affordable by relevantstakeholders
Adapt to changes
As above
2.1.3 Inventory of studies anddata sources on photographic,overlander, self-drive and safarihunting tourism in the OkavangoDelta
Inventory based on standardaccepted methodology
Report is clear and captures allissues
Report contains usablerecommendations
Inventory compile with input fromall operators
NWDC, DoT,ODMP stakeholders
Sep 2006
2.1.4 Updated bibliographyand reviewed reports
Relevant, clear and usable
Comprehensive
As above Sep 2006
2.1.5 Inventory of data sources Accurate and relevant
Comprehensive
As above Sep 2006
-
8/8/2019 ODMP Inception report Volume 2
66/122
2.1.6 Reliability assessmentreports
Clear and based on standardacceptable methodologies
As above As above
2.1.7 Gap analysis report withrecommendations
Recommendations based on clearfindings (thus report links issues torecommendations)
Practical usable recommendations
As above As above
2.1.8 Determine andincorporate World TourismOrganisation (WTO) and Ramsardata standards
WTO standards incorporated
Clear, relevant and achievablestandards
2.1.9 Comprehensive,integrated computerised tourismdatabase
Compatible with other data basesin the District especially those inthe ODMP planning process
Can be operated by DoT & NWDCstaff and other stakeholders
Database is clear, functional andcontains instructions for updates
Accessible to relevant users
DoT, NWDC,ODMP
As above
2.1.10 Synthesis of WTOstandards and Ramsar planningguidelines for data analysis
Standards adaptable to localsituations
2.1.11 Guidelines for reportingand recording data
Guidelines are clear, usable andrelevant
Acceptable by allstakeholders/users
As above
2.1.12 Feasibility study forimplementing information system
The study is based on acceptedstandard methodology
Report is clear, usable, accurateand precise
Based on stakeholder consultation
As above
2.1.13 Database softwareadopted
Software is user-friendly andrelevant
Compatible with other users
As above
2.1.14 System pilot testingresults and report
Results are accurate and precise
Report is clear.
As above
-
8/8/2019 ODMP Inception report Volume 2
67/122
2.1.15 Electronic and paperversions of data reporting system
Both versions of the system areclear, user-friendly and reliable
Availability to all users
As above
2.1.16 Geographic InformationSystem (GIS) for tourism in theOkavango Delta
GIS is clear, accurate, relevant andcompatible with other GIS in thedistrict
Can be easily used by layman
As above
Activity 3. Tourism diversification and citizen engagement
3.1 Inventory of currentrange of tourism offerings andseasonality in the Okavango Deltaand environs
Inventory takes into account allexisting tourism offerings inNgamiland
Covers all seasons
DoT, NWDC,ODMP stakeholders
3.1.1 Survey Report of tourismofferings and seasonal patterns ofvisitation
Report is clear and accurate
Based on standard acceptedmethodology
As above
3.1.2 Assessment of impact ofcurrent level of marketing andseasonality on the economy andthe environment of the OkavangoDelta
Explores all marketing strategies
Cover all aspects of tourism(nonwildlife tourism)
Based on stakeholderconsultations
As above
3.2 Gap analysis of tourismofferings and recommendations onnew eco- and cultural tourismactivity should be developed
Recommendations are clear andpractical
Based on stakeholderconsultations
3.2.1 Report of a preliminaryEnvironmental Impact Assessment(EIA)
Consultation & participation of allrelevant stakeholder institutions &groups
Clear and accurate
Based on standard acceptedmethodologies
As above
3.2.2 Report of an analysis ofcomparative investment risks andopportunities in tourism sector
As above As above
3.3 Action plan for increased Consultation & participation of all As above
-
8/8/2019 ODMP Inception report Volume 2
68/122
engagement of Batswana in thetourism sector of the OkavangoDelta
relevant stakeholders, institutions &groups
Clear and practical
3.3.1 Report on determininglevels of managerial positions bycitizens in tourism operations(effectiveness, socio-economic, &ecological impacts)
Covers all existing manageriallevels,
Clear and accurate
Provides recommendations forcitizen involvement at manageriallevels
As above
3.3.2 Assessment ofopportunities for increasing theparticipation of Batswana in thetourism sector of the OkavangoDelta
Consultation with relevantstakeholders
Provide recommendations
As above
Activity 4. Tourism and non-tourism CBNRM review and diversification
4.1 Report of the review andassessment of CBNRM tourism &
non-tourism sector in theOkavango Delta and environs
Report takes into account allexisting literature on CBNRM in the
district and nationwideShould document existinginformation on non-tourismCBNRM
Clear and relevant
DoT, NWDC,ODMP stakeholders
4.2 Report of the analysis ofstrengths and weaknesses ofCBOs in sustainable managementof their enterprises
Thorough consultation with allrelevant stakeholders, CBOs,NGOs, Govt sectors, ODMP etc.
DoT, NWDC,CBOs, NGOs, etc
4.3 Report of the trainingneeds for CBOs needed forprofitable and sustainablemanagement of their enterprises
Training needs determined throughconsultation with CBOs, DoT,NWDC, ODMP stakeholders
DoT, NWDC, CBOs& ODMP
4.4 Plan for the engagementof CBOs in tourism & non-tourismCBNRM and for ensuring betterspread of benefits to membershipof CBOs
Plan is practical
Clearly identifies relevant groups
Plan is acceptable by users
Specific guidelines on non-tourismCBNRM
DoT, NWDC,ODMP stakeholdersCBOs
Activity 5. To produce a comprehensive district tourism strategy that lays the foundation for an eco tourism action plan for the Okavango Delta
-
8/8/2019 ODMP Inception report Volume 2
69/122
5.1 Develop draft districttourism strategy with an ecotourism action plan
The strategy is practical & clear
Should show elements of sectoralintegration
Based upon LAC model andknowledge gained from informationsystems, product diversification,CBNRM, and citizen participationsubcomponents
DoT, NWDC ODMPstakeholders
5.2 Stakeholders inputs intothe tourism strategy
Based on a transparentconsultation process usingappropriate communicationmethodologies
Representative cross section oftourism stakeholders consulted andinput captured and fed back intothe draft strategy
As above
5.3 Develop final districttourism strategy
Based on draft and inclusive ofmaps of planning zones andguidelines for Ecotourism
Includes cost estimates andidentification of responsible parties
As above
Activity 6. To Improve training and institutional & stakeholder capacity
6.1 Staff and otherstakeholder training needsassessment
Done in a participatory mannerUsing standard/ appropriatemethodologyAssessment aimed at meetingneeds of the component and theODMP process
As above
6.2 Institutional &stakeholder capacity needsassessment
As above As above
6.3 Training and capacitybuilding plans
Relevant to fill the needs identifiedin Training needs assessment andcapacity buildingPractical & affordableRelevant to ODMP
As above
6.4 Trained Staff and otherstakeholders (esp. CBOs)
Training done to meet needsidentified at the training andcapacity needs assessment
As above
-
8/8/2019 ODMP Inception report Volume 2
70/122
6.5 SUSTAINABLE TOURISM AND CBNRM COMPONENT WORKPLAN
70
-
8/8/2019 ODMP Inception report Volume 2
71/122
7 SUSTAINABLE FISHERIES UTILISATION &MANAGEMENT COMPONENT 7
7.1 INSTITUTION AND FOCAL POINT
7.1.1 Institution
Division of Fisheries, Maun
7.1.2 Focal point
Shaft Nengu Senior Scientific Officer
7.2 BACKGROUND
The Okavango Delta, being the largest natural water body in Botswana, is endowedwith an abundance of fish and other aquatic resources. If managed responsibly, the fishresources in the Delta can provide considerable potential in terms of income generation,employment creation and high quality protein to local citizens.
The Division of Fisheries is housed in the DWNP in the MEWT and the DWNP isinvolved in the utilisation, conservation and protection of the natural resources throughtheir programs and extension services.
The Division of Fisheries is involved in extension, production and research specificallyon Botswanas fish resources, of which the Okavango Deltas are of great significance.The promotion and implementation of income generating and job creation projects in thefisheries sector is one of its major activities. The Division of Fisheries is furthermoreinvolved in assessment of the fish resource, ensuring its sustainable utilisation and theapplication of regulatory measures.
The Division of Fisheries also has an aquaculture component that promotespropagation of fish in ponds. This is seen as a vital way of releasing fish exploitationpressure that is currently being exerted on the natural fisheries
The Okavango Delta fishery is comprised of 71 known fish species. Of these, only a fewcontribute to the commercial fishery. These are predominantly cichlid species (bream),followed by the clariids (catfish), Hydrocynus vittatus (tigerfish) and Schilbe (silvercatfish or butter barbel). Fishers are made up of subsistence, commercial and sportfishers, with the traditional subsistence fishers being the most numerically dominant.Most commercial projects were funded through the Financial Assistance Policy (FAP)but the phasing out of the FAP grant scheme by government in June 2001 resulted inquite a number of these financially assisted projects gradually dying out as they werenteconomically viable without assistance.
The Division of Fisheries frame surveys of September 1997 to March 1998 indicatedthat there were 3243 fishers in the Okavango Delta of all categories although thenumbers of active fishers was marginal.
71
-
8/8/2019 ODMP Inception report Volume 2
72/122
7.3 COMPONENT RATIONALE
7.3.1 Objective
To revise and implement the draft Fisheries Act and fisheries regulations, improveunderstanding of fish resource dynamics via rigorous scientific monitoring, betterplanning, practical field interventions, greater stakeholder participation and appropriate
conflict resolution mechanisms to ensure sustainable use and management of theOkavango Deltas fish resource.
7.3.2 Inputs
Table 14 Division of Fisheries budget for the sustainable fisheries management andutilisation component
Activity Input Unit Costs (BWP)
Socio-economic study Fisheries/Consultant 3.5 months 175 000Fish stock assessment Fisheries/Consultant On-going 65 000Management Plan Consultant 5 months 60 000Office Equipment Lump sum 30 000Local transport and DSA Lump sum 75 000Training and capacity building Lump sum 180 000
TOTAL 585 000
7.3.3 Activities
1) Design and implement an appropriate fish stock assessment programme:
i) Perform fish stock analysis.
ii) Present results to stakeholder workshop.
iii) Monitor fish resources.
2) Carry out a socio-economic survey:
i) Undertake desktop study.
ii) Carry out a field survey to determine the socio-economic status of the fishery
on households.3) Carry out a fish frame survey.
4) Carry out creel surveys at two sites yet to be selected.
5) Formulate a long-term fisheries management plan:
i) Assess traditional user right and access to fisheries resources.
ii) Conduct a stakeholder workshop to assess the current conflicts.
iii) Develop appropriate fisheries conflict resolution mechanism.
iv) Facilitate the re-vitalisation of the Okavango Fishery Management Committee
(OFMC).v) Investigate the possibility of adoption of the CBNRM model.
72
-
8/8/2019 ODMP Inception report Volume 2
73/122
vi) Develop sustainable use guidelines.
6) Undertake a training needs assessment by:
i) Assisting the project secretariat in the identification of Division of Fisheriesstaff and stakeholders training needs.
ii) Assisting the project secretariat in development and implementation ofappropriate training programmes.
7) Undertake a capacity needs assessment by:
i) Assisting the project secretariat in identification of capacity constraints inDivision of Fisheries and its stakeholder organisations.
ii) Assist project secretariat in developing recommendations on, and wherepossible implementation of, capacity building measures.
7.3.4 Outputs
1) Report on status of the fish stock.2) Socio economic study report.
3) Fishery frame survey report.
4) Fishery creel survey report.
5) Fisheries management plan.
6) Division of Fisheries staff and stakeholder training programme/s.
7) Recommendations on how to undertake capacity building in the Division ofFisheries and its stakeholder organisations and, where possible, actual
implementation of these recommendations.
7.3.5 Outcomes
1) Enhanced understanding of the Delta fish stocks and dynamics in relation tonatural pressures (changes in hydrology etc.) and anthropogenic pressures(fishing, pollution etc.).
2) Enhanced participation of communities in management of fisheries resources andequitable distribution of benefits to improve their livelihoods.
3) Improved understanding of the fishery structure.
4) Improved understanding of the traditional fishery.
5) Long-term sustainable planning and management of the Delta fishery and fishstocks.
6) Improved Division of Fisheries staff and stakeholder ability and understandingassist in management of the fish resource.
7) Improved capacity in the Division of Fisheries and, where possible, its stakeholderorganisations assists in management of the fish resource.
73
-
8/8/2019 ODMP Inception report Volume 2
74/122
7.4 SUSTAINABLE FISHERIES UTILISATION AND MANAGEMENT COMPONENT MONITORING AN
Table 15 Tracking implementation and production of outputs from the sustainable fisheries utilisation and management component
Major and supporting outputs(deliverable products andservices) expected
Criteria for monitoring quality Main target groups Expected date ofdelivery
Is it deliveredwithin time, budgetand criteria formonitoringquality?
Activity 1 To ensure that effective community participation in planning, implementation and monitoring of the fish resources exists and that adequate data on fisheries is aplanning
1.1 Inventory of fish resourcesand long term monitoring of fishstocks commenced
Data obtained from current surveysusing accepted scientificmethodologies.
Results and recommendations
accepted by all stakeholdersDatabase compatible with local andregional databases and useful formanagement and planningprocesses.
Continuous
1.2 Socio-economic report Study findings based upon up-to-date scientific and sound socio-economic methodologies whichrecognise traditional knowledge.
Reports acceptable with practicaland useful recommendations
End ofFebruary2005
1.3 Fish Frame Survey report Based on up-to-date scientificfisheries frame survey
methodologiesReports acceptable with practicaland useful recommendations
End of PY2
1.4 Creel surveys report Based on up-to-date scientificfisheries creel surveymethodologies
sEnd of PY2
Reports acceptable with practicaland useful recommendations
-
8/8/2019 ODMP Inception report Volume 2
75/122
1.5 Capacity building andtraining programme developed
Staff practically trained on fishidentification site using locallycaught fish species
Staff trained by a well qualified fishtaxonomist
Community trained on fish recordingand management practices
Adequate training materials availed
October 2004
Activity 2. To address land and water use conflicts in relation to fisheries
2.1 Traditional user rights andaccess to fish resources describedand users effectively participating inconflict resolution
Based on transparent consultations
Use of appropriate and effectivemethods of stakeholder discussions
Stakeholders recommendations fromwell captured and considered
End of PY2
2.2 Okavango Fisheries
Management Committee (OFMC)functioning
Effective, functional and
representative managementstructure
End of PY2
2.3 CBNRM model tried Model based on relevant inputs fromexisting CBNRM bodies
Activity 3. Fisheries management plan drafted
3.1 Draft FisheriesManagement Guidelines
Based on the findings of theoutcomes preceding it, thus linked toissues raised by stakeholders
Clearly defined, practical, feasible,implementable and affordable
End of PY3
Activity 4. To Improve training and institutional & stakeholder capacity
4.1 Staff and otherstakeholder training needsassessment
Done in a participatory manner
Using standard/ appropriatemethodology
Assessment aimed at meetingneeds of the component and theODMP process
As above
4.2 Institutional & stakeholdercapacity needs assessment
As above As above
-
8/8/2019 ODMP Inception report Volume 2
76/122
4.3 Training and capacitybuilding plans
Relevant to fill the needs identified inTraining needs assessment andcapacity building
Practical & affordable
Relevant to ODMP
As above
4.4 Trained Staff and otherstakeholders (esp. CBOs)
Training done to meet needsidentified at the training and capacityneeds assessment
As above
-
8/8/2019 ODMP Inception report Volume 2
77/122
7.5 SUSTAINABLE FISHERIES UTILISATION AND MANAGEMENTCOMPONENT WORKPLAN
77
-
8/8/2019 ODMP Inception report Volume 2
78/122
78
-
8/8/2019 ODMP Inception report Volume 2
79/122
8 VEGETATION RESOURCES MANAGEMENT COMPONENT 8
8.1 INSTITUTION AND FOCAL POINT
8.1.1 Institutions
The Division of Range Ecology in the Ministry of Agriculture (MoA), the Division ofForestry and the Agricultural Resources Board (ARB) in the MEWT.
8.1.2 Focal points
Mr Kealeboga Kemoreile Regional Forestry Officer (Division of Forestry)
Mr Boikago Maswabi Conservation Officer (Agricultural Resources Board)
8.2 BACKGROUND
Vegetation resources in the Delta provide various goods and services such as grazingfodder and veld products (building material, fodder, medicines, crafts, mokoros etc.).These support the tourism and livestock industries and provide environmental servicessuch as vegetation cover preventing soil erosion and contributing to the stabilisation ofthe local environment and climate conditions.
Data and information on the Deltas vegetation resources is needed to enable soundplanning and economic development through monitoring and assessment of carryingcapacities for grazing, sustainable use and harvest levels of veld products, as well as tosupport decision making on the use of natural resources in general.
This and other ODMP components need to be based on proper inventory andmonitoring of the vegetation resource. Such work can be undertaken using a range ofdifferent methodologies, technologies and field experiments and requiring the servicesof botanists, taxonomists, rangeland ecologists, remote sensing experts, geographicinformation systems (GIS) and database managers.
8.2.1 Component rationale
8.2.2 Objective
To determine accurate ecological data and information on local user demands, developvegetation and fire management plans through the use of localised managementstructures to ensure sustainable management of vegetation resources and resolution ofvegetation management conflicts.
79
-
8/8/2019 ODMP Inception report Volume 2
80/122
-
8/8/2019 ODMP Inception report Volume 2
81/122
i) Assisting the project secretariat in the identification of Division of Forestry,ARB and Range Ecology staff and stakeholders training needs.
ii) Assisting the project secretariat in development and implementation ofappropriate training programmes.
8) Undertake a capacity needs assessment by:
i) Assisting the project secretariat in identification of capacity constraints in theDivision of Forestry, ARB and Range Ecology and its stakeholderorganisations.
ii) Assist project secretariat in developing recommendations on, and wherepossible implementation of, capacity building measures.
8.2.5 Outputs
1) A report and maps on carrying capacity and stocking rates.
2) Vegetation profiles and maps (types, composition and condition).3) Vegetation Resources Management Plan.
4) Fire Management Plan.
5) Division of Forestry, ARB and Range Ecology staff and stakeholder trainingprogramme/s.
6) Recommendations on how to undertake capacity building in the Division ofForestry, ARB and Range Ecology and its stakeholder organisations and, wherepossible, actual implementation of these recommendations.
8.2.6 Outcomes
1) Improved access to accurate data on vegetation and biomass production allowingfor better analysis, planning and management.
2) Description and harmonisation of resource user needs and resolution of vegetationmanagement conflicts.
3) Improved fire management strategies that will lead to reduced land degradation.
4) Zoning recommendations and management interventions based on the ecological
conditions (fragility, biodiversity, distribution of rare and endangered species) anduser needs.
5) Improved Division of Forestry, ARB and Range Ecology staff and stakeholderability and understanding assist in management of the vegetation resource.
6) Improved capacity in the Division of Forestry, ARB and Range Ecology and, wherepossible, its stakeholder organisations assists in management of the vegetationresource.
81
-
8/8/2019 ODMP Inception report Volume 2
82/122
8.3 VEGETATION RESOURCES MANAGEMENT COMPONENT MONITORING AND EVALUATION PL
Table 16 Tracking implementation and production of outputs for the vegetation resources component
Major and supporting outputs(deliverable products andservices) expected
Criteria for monitoring quality Main target groups Expected date ofdelivery
Is it deliveredwithin time, budgetand set criteria
Activity 1. Carry capacity & stocking rates report and maps
1.1 Biomass assessment infour planning zones
Accepted sampling & assessmentmethods
Enumerators, GISspecialist and dataanalysts
July 2005
1.2 Selection of sampling sites Representative Enumerators, GISspecialist and dataanalysts
July 2005
1.3 Selection samplingmethods
Accepted data analysismethodologies
Cost effectiveness
Stakeholder input (local knowledge)
Accepted mapping standards
Maps accurate, readable and userfriendly
Enumerators, GISspecialist and dataanalysts
July 2005
1.4 Vegetation profile andmaps (Types) Composition andCondition)
As above Enumerators, GISSpecialist and dataanalysts
December 2004
Activity 2. Carry out classification of vegetation
2.1 Review of existinginformation
Accepted sampling & assessmentmethods
2.2 Undertake field surveys Representative
Agreed site selection criteria
2.3 Recommend classificationsystem
Accepted data analysismethodologies
Wide stakeholder consultations and
-
8/8/2019 ODMP Inception report Volume 2
83/122
-
8/8/2019 ODMP Inception report Volume 2
84/122
Well proven methodology
4.1.2 Work plan and schedule ofactivities to complete the project
Clear timelines and activities
Realistic and practical
Tally with overall project time line
January 2005
4.2 Report of survey Based on wide stakeholderconsultations
April 2005
4.2.1 Identification and mapoccurrence of threatened andendangered plant species
Based on field surveys
Conform to TOR
Clear and valid methods of study
Accepted mapping standards
Maps accurate, readable and userfriendly
April 2005
4.2.2 Recommend strategies formanagement action
Based on wide stakeholderconsultations
Feasible and affordable
Clear roles and responsibilities
Recognise input from traditionalknowledge
April 2005
Activity 5. Vegetation Resources Management Plan
5.1 Assess vegetationresource use
Based on wide stakeholderconsultation
Based on existing information
Based on appropriate consultationmethods
Type of feedback mechanisms used
May 2005
5.2 Identify vegetationresources As above May 2005
5.3 Identify vegetationresource use conflicts
As above May 2005
5.4 Develop managementoptions for vegetation resources
Based on the findings of the aboveactivities and all other relevantinformation
Feasible and affordable
-
8/8/2019 ODMP Inception report Volume 2
85/122
Clear roles and responsibilities
Recognise input from traditionalknowledge
Flexible and dynamic to changes
Conform to adopted guidelines andprotocols
Aligned to national policies andprogrammes
5.5 Identify additionalvegetation resource monitoring sitesand monitoring programme