Hancock Hardin Wyandot Defiance Paulding Putnam VanWert A llen Lima 1 ODOT DISTRICT 1 2019 CONSTRUCTION PROGRAM MIKE DEWINE, GOVERNOR | JACK MARCHBANKS, PH.D., ODOT DIRECTOR | CHRIS HUGHES, P.E., ACTING DISTRICT DEPUTY DIRECTOR SERVING ALLEN, DEFIANCE, HANCOCK, HARDIN, PAULDING, PUTNAM, VAN WERT AND WYANDOT COUNTIES

Upload: others

Post on 24-Feb-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ODOT DISTRICT 1 - Ohio Department of Transportation · 2019. 4. 4. · ODOT Sponsored Projects 6 4/3/2019 Allen County 2019 Construction Projects PID Name PID Name 80441 ALL Lima

Hancock

HardinWyandot

DefiancePaulding PutnamVanWert

Allen Lima

1

ODOT DISTRICT 1 2019 CONSTRUCTION PROGRAM

MIKE DEWINE, GOVERNOR | JACK MARCHBANKS, PH.D., ODOT DIRECTOR | CHRIS HUGHES, P.E., ACTING DISTRICT DEPUTY DIRECTOR

SERVING ALLEN, DEFIANCE, HANCOCK, HARDIN, PAULDING, PUTNAM, VAN WERT AND WYANDOT COUNTIES

Page 2: ODOT DISTRICT 1 - Ohio Department of Transportation · 2019. 4. 4. · ODOT Sponsored Projects 6 4/3/2019 Allen County 2019 Construction Projects PID Name PID Name 80441 ALL Lima

ODOT District 1 Construction Contacts Chris Hughes Acting District Deputy Director 419-999-6804 [email protected]

Chris Hughes Acting Capital Programs Administrator 419-999-6804 [email protected]

Rhonda Pees Public Information Officer 419-999-6803 [email protected]

Scott Mullins District Construction Engineer 419-999-6903 [email protected]

Luke Johansen Area Construction Engineer 419-999-6956 [email protected]

Bashar Kanouh Area Construction Engineer 419-999-7027 [email protected]

Page 3: ODOT DISTRICT 1 - Ohio Department of Transportation · 2019. 4. 4. · ODOT Sponsored Projects 6 4/3/2019 Allen County 2019 Construction Projects PID Name PID Name 80441 ALL Lima

COUNTYNO. OF

PROJECTSESTIMATED COST

NO. OF

PROJECTSESTIMATED COST

NO. OF

PROJECTSESTIMATED COST

DISTRICT WIDE 5 $3,606,523 0 $0 5 $3,606,523

ALLEN 7 $14,388,647 3 $1,453,495 10 $15,842,142

DEFIANCE 1 $8,313,662 0 $0 1 $8,313,662

HANCOCK 4 $3,328,520 2 $2,073,766 6 $5,402,286

HARDIN 3 $3,462,908 0 $0 3 $3,462,908

PAULDING 0 $0 0 $0 0 $0

PUTNAM 1 $2,199,476 1 $1,650,328 2 $3,849,804

VAN WERT 3 $3,784,607 1 $698,244 4 $4,482,851

WYANDOT 4 $7,486,263 0 $0 4 $7,486,263

TOTALS 28 $46,570,606 7 $5,875,833 35 $52,446,439

MILES

RESURFACED /

REPAIRED

---

---

---

115.25

6.85

9.45

DISTRICT ONE STATS (ODOT PROJECTS)

COSTNO. OF PROJECTSPROJECT TYPE

BRIDGE MAINTENANCE &

REPLACEMENT

ODOT PROJECTS LOCAL GOV’T. PROJECTS GRAND TOTALS

DISTRICT ONE SUMMARYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION

DURING CALENDAR YEAR 2019

ODOT AND LOCAL GOVERNMENT PROJECTS

OTHER

RECONSTRUCTION

RESURFACE

PAVEMENT MARKINGS

CULVERTS

$10,607,471

6 $5,355,186

Sold in 2017

$26,819,875

$1,848,169

5

3

9

1

2 $1,939,905

2

Page 4: ODOT DISTRICT 1 - Ohio Department of Transportation · 2019. 4. 4. · ODOT Sponsored Projects 6 4/3/2019 Allen County 2019 Construction Projects PID Name PID Name 80441 ALL Lima

County-Route-

SectionDescription Location

Length

(Miles)

96616 D01-BM-FY18

Perform miscellaneous bridge

maintenance activities on various

structures. Traffic will be maintained at

most locations. Some short term

detours may be necessary.

Various locationss throughout

District OneSpot 3/22/2018

Spring 2018 to

Spring 2019Sold in 2018

96625 D01-PM-FY19

Upgrade existing painted pavement

markings on rural state highway routes.

Traffic will be maintained.

Various routes and sections

throughout District OneVarious SOLD

Spring/Summer/

Fall 2019$1,684,618

103425 D01-HS-FY19

On-Road and guardrail herbicidal

spraying for 4-lane and 2-lane sections

in the district. Traffic will be

maintained.

Various routes and sections

throughout District OneVarious SOLD

Spring/Summer/

Fall 2019$191,693

105653 D01-GR-FY19District wide guardrail repair / upgrade

project. Traffic will be maintained.

Various locations in Defiance,

Van Wert, and Wyandot

counties.

Various SOLD Summer 2019 $1,474,925

98534 D01-RPM-FY20

Replace raised pavement marker casting

and/or lenses as needed on various

routes. Traffic will be maintained.

Various routes and sections

throughout District OneVarious 6/20/2019 Fall 2019 $255,287

$3,606,523DISTRICT WIDE TOTAL

DISTRICT WIDE PROJECTS (No Map)

CONTRACT PROJECTS TO BE UNDER CONSTRUCTION

DURING CALENDAR YEAR 2019

ODOT Projects

PID No.

Project

Sale DateApproximate

DurationEstimated Cost

3

Page 5: ODOT DISTRICT 1 - Ohio Department of Transportation · 2019. 4. 4. · ODOT Sponsored Projects 6 4/3/2019 Allen County 2019 Construction Projects PID Name PID Name 80441 ALL Lima

County-Route-

SectionDescription Location

Length

(Miles)

93756 ALL-103-1.52Replace bridge over Riley Creek in the Village of

Bluffton. Traffic will be detoured.

Approximately 0.2 miles east of Main

Street in the Village of BlufftonSpot SOLD Spring/Summer 2019 $825,401

94206 ALL-75-9.85

Resurface with asphalt concrete. Repair

pavement joints and replace guardrail. Bridge

repair included. Traffic will be maintained.

Temporary lane closures will be required.

From the Strewart Road overpass to the

interchange ramps at Napoleon Road.5.95 SOLD Spring/Summer 2019 $5,688,484

105524ALL-65/117/309-

5.09/19.13/15.98

Resurface with asphalt concrete. Also, on SR 117,

replace curb and gutter and drainage structures.

Traffic will be maintained.

SR 65: From Fourth St. to Elm St.

SR 117: From just east of Greely Chapel to

Bowman Rd.

SR 309: From Devonshire Dr. to the Hardin

county line.

11.53 SOLD Spring/Summer 2019 $4,120,321

102197 ALL-66-Culverts Replace 8 culverts. Traffic will be detoured.Between the Auglaize county line and the

Village of SpencervilleSpot SOLD Spring/Summer 2019 $694,018

98471ALL/HAN-30/235-

1.50/7.20

Resurface SR 103 in Allen County and SR 235 in

Hancock County with asphalt concrete. Traffic

will be maintained.

SR 103: From Main St. to Huber St. in the

Village of Bluffton.0.29 4/4/2019 Summer 2019

See Hancock

County

107684ALL/AUG-30/117-

Various

Resurface US 30 and SR 117 in Allen County. Add

centerline rumble strips on SR 117 in Allen and

Auglaize counties. Traffic will be maintained.

US 30: Pave approx. 1,400 feet of the

outside shoulder, beginning at the

westbound enterence ramp from SR 696.

SR 117 (Allen): From Bowman Rd. to the

Auglaize county line, excluding the Village

of Westminster

SR 117 (Auglaize): From the Allen county

line to the Hardin county line

8.10 6/20/2019 Summer 2019 $2,001,223

105714ALL/HAN-75/30/696-

Various

Erosion repair project on roadway embankments

in Allen and Hancock counties. Traffice will be

maintained.

At various locations along IR 75, US 30 and

SR 696 in Allen County and along IR 75 in

Hancock County.

Spot 6/20/2019 Summer 2019 $1,059,200

$14,388,647ALLEN COUNTY-ODOT LET TOTAL

ALLEN COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION

DURING CALENDAR YEAR 2019

ODOT Projects

PID No.

Project

Sale DateApproximate

DurationEstimated Cost

4

Page 6: ODOT DISTRICT 1 - Ohio Department of Transportation · 2019. 4. 4. · ODOT Sponsored Projects 6 4/3/2019 Allen County 2019 Construction Projects PID Name PID Name 80441 ALL Lima

County-Route-

SectionDescription Location

Length

(Miles)

80441All- Lima RR Grade

Separation

Construct a railroad grade separation of the

Indiana & Ohio railway at Elm Street.

Reconstruct 0.70 miles of pavement along Elm St.

and construct a roundabout at it's intersection of

with Bellefontaine Avenue. Construct a storm

sewer system outletting to the Ottawa River.

On Elm Street from North St. to

Belfontaine AvenueSpot SOLD

Spring 2018 to

Fall 2019Sold in 2018

103412

ALL-Delphos-

1st/3rd/7th St.

Bridges

Replace 2 bridges over Flat Fork Creek in the City

of Delphos. Traffic will be detoured.

On 1st, 3rd and 7th Streets over

Flat Fork Creek in the City of

Delphos.

Spot SOLDSpring / Summer

2019$1,159,893

104252ALL-CR 77-5.50

Grubb Rd

Replace bridge over a tributary of Honey Run.

Traffic will be detoured.

Approximately 1 mile north of SR

81Spot SOLD

Spring / Summer

2019$293,602

$1,453,495

$15,842,142TOTAL ESTIMATED COST FOR ALLEN COUNTY:

(Continued)

ALLEN COUNTY

ALLEN COUNTY-LOCAL GOVERNMENTS TOTAL

CITY OF LIMA

ALLEN COUNTY ENGINEER

Local Governments

PID No.

Project

Sale DateApproximate

DurationEstimated Cost

CITY OF DELPHOS

5

Page 7: ODOT DISTRICT 1 - Ohio Department of Transportation · 2019. 4. 4. · ODOT Sponsored Projects 6 4/3/2019 Allen County 2019 Construction Projects PID Name PID Name 80441 ALL Lima

ELIDA

SPENCERVILLE

BEAVERDAMCAIRO

HARROD

LAFAYETTE

LIMA

DELPHOS

BLUFFTON

75

7530

3030

696

117

501

196

198

81

117

65

65

66

117

309 115

12

81

103

66

309

104252

105714

105524

105714

94206

94206

105524 107684

105524

103412

102197 105714

107684

107684

9375698471

80441

M

ap Pr

oduc

ed by

Cod

y Lap

e

Ohio Department of TransportationDistrict One - Lima

Office of Capital Program1885 N. McCullough

Lima, Ohio 45801

LegendSpotBridge ReplacementBridge Rehab

Local Sponsored ProjectsODOT Sponsored Projects

64/3/2019

Allen County 2019 Construction Projects

PID Name PID Name80441 ALL Lima RR Grade Separation 103412 ALL Delphos 1st/3rd/7th St Brdgs93756 ALL SR 103 1.52 104252 ALL CR 77 5.50 Grubb Road94206 ALL IR 75 9.85 105524 ALL SR 65/117/309 5.09/19.1398471 ALL/HAN SR 103/235 1.50/7.20 105714 ALL/HAN IR75/US30/SR696 3.99102197 ALL SR 66 Culverts 107684 ALL/AUG US 30/SR 117 Var

Page 8: ODOT DISTRICT 1 - Ohio Department of Transportation · 2019. 4. 4. · ODOT Sponsored Projects 6 4/3/2019 Allen County 2019 Construction Projects PID Name PID Name 80441 ALL Lima

County-Route-

SectionDescription Location

Length

(Miles)

96605 DEF-15-14.77Replace Clinton Street (SR15/18/66) bridge over the

Maumee River. Traffic will be detoured.

Approximately 0.2 miles north of

Second Street in the City of DefianceSpot SOLD

Spring/Summer/Fall

2019$8,313,662

$8,313,662

County-Route-

SectionDescription Location

Length

(Miles)

$0DEFIANCE COUNTY-LOCAL GOVERNMENTS TOTAL

TOTAL ESTIMATED COST FOR DEFIANCE COUNTY: $8,313,662

Local Governments

PID No.

Project

Sale Date Approximate Duration Estimated Cost

DEFIANCE COUNTY-ODOT LET TOTAL

DEFIANCE COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION

DURING CALENDAR YEAR 2019

ODOT Projects

PID No.

Project

Sale Date Approximate Duration Estimated Cost

7

Page 9: ODOT DISTRICT 1 - Ohio Department of Transportation · 2019. 4. 4. · ODOT Sponsored Projects 6 4/3/2019 Allen County 2019 Construction Projects PID Name PID Name 80441 ALL Lima

SHERWOOD

NEY

HICKSVILLEDEFIANCE

127

127

24

24

18

66

49

249

281

2

2

249

2

18

15

111

15

15

49

18

1896605

M

ap Pr

oduc

ed by

Cod

y Lap

e

Ohio Department of TransportationDistrict One - Lima

Office of Capital Program1885 N. McCullough

Lima, Ohio 45801

LegendSpotBridge ReplacementBridge Rehab

Local Sponsored ProjectsODOT Sponsored Projects

84/3/2019

Defiance County 2019 Construction Projects

PID Name96605 DEF SR 15 14.77

Page 10: ODOT DISTRICT 1 - Ohio Department of Transportation · 2019. 4. 4. · ODOT Sponsored Projects 6 4/3/2019 Allen County 2019 Construction Projects PID Name PID Name 80441 ALL Lima

County-Route-

SectionDescription Location

Length

(Miles)

87005 HAN-75-14.39

Major reconstruction and widening of IR 75 through the

City of Findlay. Reconstruct the IR 75/US 68 system

interchange and replace all mainline structures. Traffic will

be maintained during construction.

On IR 75 from approximately 0.8 miles

south of the US68 interchange to just

south of the CR 99 interchange

6.85 SOLDSpring 2017 -

Summer 2020Sold in 2017

107177 HAN-103-8.03Replace and widen paved shoulders. Through traffic will be

detoured and local traffic will be maintained.

From SR 698 to the west corp limit of the

Village of Arlington3.36 SOLD

Spring / Summer

2019$1,120,005

98471ALL/HAN-30/235-

1.50/7.20

Resurface SR 103 in Allen County and SR 235 in Hancock

County with asphalt concrete. Traffic will be maintained.

SR 235: From CR 313 to the Wood county

line, excluding the overlaps with SR 12

and SR 186.

15.37 4/4/2019 Summer 2019 $2,208,515

105714ALL/HAN-

75/30/696-Various

Erosion repair project on roadway embankments in Allen

and Hancock counties. Traffice will be maintained.

At various locations along IR 75, US 30

and SR 696 in Allen County and along IR

75 in Hancock County.

Spot 6/20/2019 Summer 2019 See Allen County

$3,328,520

County-Route-

SectionDescription Location

Length

(Miles)

99210HAN-CR 304/330-

12.00/4.72

Resurface CR 304 and CR 330 with asphalt concrete. Traffic

will be maintained.

CR 304: From US 68 to the Wyandot

county line

CR 330: From US 224 to SR 12

10.94 SOLD Spring/ Summer 2019 $1,552,945

100185HAN-Resurfacing-

FY2019

Resurface parts of Industrial Dr. and Production Dr. with

asphalt concrete and replace some curbs. Traffic will be

maintained.

Industrial Drive: From Bright Rd. to the

dead end

Production Drive: From Bright Rd. to

Industrial Drive

1.31 SOLD Spring/ Summer 2019 $520,821

$2,073,766

Hancock County Engineer

City of Findlay

HANCOCK COUNTY-LOCAL GOVERNMENTS TOTAL

TOTAL ESTIMATED COST FOR HANCOCK COUNTY: $5,402,286

Local Governments

PID No.

Project

Sale DateApproximate

DurationEstimated Cost

HANCOCK COUNTY-ODOT LET TOTAL

HANCOCK COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION

DURING CALENDAR YEAR 2019

ODOT Projects

PID No.

Project

Sale DateApproximate

DurationEstimated Cost

9

Page 11: ODOT DISTRICT 1 - Ohio Department of Transportation · 2019. 4. 4. · ODOT Sponsored Projects 6 4/3/2019 Allen County 2019 Construction Projects PID Name PID Name 80441 ALL Lima

ARLINGTON

ARCADIA

RAWSON VANLUE

JENERA

MOUNTCORY

BENTON RIDGE

MOUNT BLANCHARD

VAN BUREN

FINDLAY

FOSTORIA

BLUFFTON

MCCOMB

75

75

30

68

224224

30

68

568

37

698

15

186

330

613

103

18

37

103

235

12

235

103

12

235

235

37

613

18

12

613

9847187005

99210

107177

8700599210

98471

98471

87005

105714

100185

Map

Prod

uced

by C

ody L

ape

Ohio Department of TransportationDistrict One - Lima

Office of Capital Program1885 N. McCullough

Lima, Ohio 45801

LegendSpotBridge ReplacementBridge Rehab

Local Sponsored ProjectsODOT Sponsored Projects

104/1/2019

Hancock County 2019 Construction Projects

PID Name87005 HAN-75-14.3998471 ALL/HAN SR 103/235 1.50/7.2099210 HAN CR 304/330 12.00/4.72

100185 HAN Findlay FY2019 Resurfacing105714 ALL/HAN IR75/US30/SR696 3.99107177 HAN SR 103 8.03 Widening

Page 12: ODOT DISTRICT 1 - Ohio Department of Transportation · 2019. 4. 4. · ODOT Sponsored Projects 6 4/3/2019 Allen County 2019 Construction Projects PID Name PID Name 80441 ALL Lima

County-Route-

SectionDescription Location

Length

(Miles)

96800 HAR-67-10.87

Replace culvert and raise roadway profile,

including the intersection with TR 119, to

improve sight distance. Traffic will be detoured.

Approximately 4.2 miles west of the

City of KentonSpot SOLD

Spring / Summer

2019$528,140

103589HAR-701-

0.10/1.35Replace culverts. Traffic will be detoured.

Approximately 0.1 east of SR 309 and

approx. 0.7 miles east of CR 65.Spot SOLD

Spring/Summer

2019$565,932

105525HAR-81/235/701-

2.25/Various

Resurface with ashalt concrete. Traffic will be

maintained.

SR 81: From the west corp limit to the

east corp limit of Ada.

SR 235: From SR 309 to the north corp

limit of Ada.

SR 701: From SR 309 to US 68.

13.93 SOLDSpring / Summer

2019$2,368,836

$3,462,908

County-Route-

SectionDescription Location

Length

(Miles)

$0

HARDIN COUNTY-ODOT LET TOTAL

HARDIN COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION

DURING CALENDAR YEAR 2019

ODOT Projects

PID No.

Project

Sale DateApproximate

DurationEstimated Cost

TOTAL ESTIMATED COST FOR HARDIN COUNTY: $3,462,908HARDIN COUNTY-LOCAL GOVERNMENTS TOTAL

Local Governments

PID No.

Project

Sale DateApproximate

DurationEstimated Cost

11

Page 13: ODOT DISTRICT 1 - Ohio Department of Transportation · 2019. 4. 4. · ODOT Sponsored Projects 6 4/3/2019 Allen County 2019 Construction Projects PID Name PID Name 80441 ALL Lima

FOREST

DUNKIRK

RIDGEWAY

MOUNT VICTORY

ALGER

MCGUFFEY

PATTERSON

KENTON

ADA

68

68

68

67

309

292

235

701

31

385

309

309

195

8181

117

273

117

67

53

235

37

88848

105525

103589

96800

103589105525

Map

Prod

uced

by C

ody L

ape

Ohio Department of TransportationDistrict One - Lima

Office of Capital Program1885 N. McCullough

Lima, Ohio 45801

LegendSpotBridge ReplacementBridge Rehab

Local Sponsored ProjectsODOT Sponsored Projects

124/1/2019

Hardin County 2019 Construction Projects

PID Name96800 HAR SR 67 10.87

103589 HAR SR 701 0.10/1.35105525 HAR SR 81/235/701 2.25/15.99/0.0

Page 14: ODOT DISTRICT 1 - Ohio Department of Transportation · 2019. 4. 4. · ODOT Sponsored Projects 6 4/3/2019 Allen County 2019 Construction Projects PID Name PID Name 80441 ALL Lima

County-Route-

SectionDescription Location

Length

(Miles)

$0

County-Route-

SectionDescription Location

Length

(Miles)

$0

PAULDING COUNTY-ODOT LET TOTAL

PAULDING COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION

DURING CALENDAR YEAR 2019

ODOT Projects

PID No.

Project

Sale DateApproximate

DurationEstimated Cost

TOTAL ESTIMATED COST FOR PAULDING COUNTY: $0PAULDING COUNTY-LOCAL GOVERNMENTS TOTAL

Local Governments

PID No.

Project

Sale DateApproximate

DurationEstimated Cost

13

Page 15: ODOT DISTRICT 1 - Ohio Department of Transportation · 2019. 4. 4. · ODOT Sponsored Projects 6 4/3/2019 Allen County 2019 Construction Projects PID Name PID Name 80441 ALL Lima

County-Route-

SectionDescription Location

Length

(Miles)

98467PUT-224/114-

0.00/2.86

Resurface with asphalt concrete. Traffic

will be maintained.

US 224: From the Van Wert

county line to the bridge just east

of TR25-Q;

US 224: From the east corp limit

of Ottoville to Ralph Street in the

Village of Kalida;

SR 114: From the north corp limit

of Kalida to US 224

12.24 SOLDSpring / Summer

2019$2,199,476

$2,199,476

PID No. Project Sale DateApproximate

DurationEstimated Cost

County-Route-

SectionDescription Location

Length

(Miles)

96835 PUT-CR 19-8.50Replace bridge over the Blanchard River.

Traffic will be detoured.

Approximately 0.9 miles north of

SR 694Spot SOLD

Spring / Summer

2019$1,650,328

$1,650,328

TOTAL ESTIMATED COST FOR PUTNAM COUNTY: $3,849,804

PUTNAM COUNTY-ODOT LET TOTAL

Local Governments

Putnam County Engineer

PUTNAM COUNTY-LOCAL GOVERNMENTS TOTAL

PUTNAM COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION

DURING CALENDAR YEAR 2019

ODOT Projects

PID No.

Project

Sale DateApproximate

Duration

Estimated

Cost

14

Page 16: ODOT DISTRICT 1 - Ohio Department of Transportation · 2019. 4. 4. · ODOT Sponsored Projects 6 4/3/2019 Allen County 2019 Construction Projects PID Name PID Name 80441 ALL Lima

LEIPSIC

KALIDA

GLANDORF

PANDORA

DUPONT

OTTOVILLE

CONTINENTAL

COLUMBUS GROVE

BELMORE

CLOVERDALE

FORTJENNINGS

MILLER CITY

WEST LEIPSIC

GILBOAOTTAWA224

224

224

224

613

115

694

109

65

12

108

190

634

634

114

634

63465

189

11515

190

66

613

189

613

114

12

15

15 65

696

30

98467

98467

98467

96835

Map

Prod

uced

by C

ody L

ape

Ohio Department of TransportationDistrict One - Lima

Office of Capital Program1885 N. McCullough

Lima, Ohio 45801

LegendSpotBridge ReplacementBridge Rehab

Local Sponsored ProjectsODOT Sponsored Projects

154/1/2019

Putnam County 2019 Construction Projects

PID Name96835 PUT CR 19-8.5098467 PUT US 224/SR 114 0.00/2.86

Page 17: ODOT DISTRICT 1 - Ohio Department of Transportation · 2019. 4. 4. · ODOT Sponsored Projects 6 4/3/2019 Allen County 2019 Construction Projects PID Name PID Name 80441 ALL Lima

County-Route-

SectionDescription Location

Length

(Miles)

95500 VAN-81-13.65

Replace twin culverts with a new culvert.

Regrade ditch on the north side of the roadway

for 0.60 miles. Install new drainage along 0.77

miles on the south side of the roadway with

new culverts. Traffic will be maintained.

From approximately 0.09 miles west of

to approximately 0.34 miles east of TR

109 (Brown Rd.)

Spot SOLDSpring / Summer

2019$626,011

100378 VAN-697-0.00

Replace and widen paved shoulders. Through

traffic will be detoured and local traffic will be

maintained.

From SR 116 to Jennings-Delphos Rd. 6.09 SOLDSpring / Summer

2019$1,249,363

92692 VAN-116-0.00/2.51Resurface with asphalt concrete. Traffic will be

maintained.

From the Auglaize county line to Middle

Point Rd., excluding the SR 117 overlap17.65 SOLD

Spring / Summer

2019$1,909,233

$3,784,607

County-Route-

SectionDescription Location

Length

(Miles)

CITY OF VAN WERT

101085 VAN-Jefferson StReplace Jefferson Street bridge over Town

Creek. Traffic will be detoured.

In the City of Van Wert, between Main

St. and Crawford St.Spot SOLD

Spring / Summer

2019$698,244

$698,244

TOTAL ESTIMATED COST FOR VAN WERT COUNTY: $4,482,851

PID No.

Project

Sale DateApproximate

DurationEstimated Cost

VAN WERT COUNTY-LOCAL GOVERNMENTS TOTAL

Local Governments

VAN WERT COUNTY-ODOT LET TOTAL

VAN WERT COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION

DURING CALENDAR YEAR 2019

ODOT Projects

PID No.

Project

Sale DateApproximate

DurationEstimated Cost

16

Page 18: ODOT DISTRICT 1 - Ohio Department of Transportation · 2019. 4. 4. · ODOT Sponsored Projects 6 4/3/2019 Allen County 2019 Construction Projects PID Name PID Name 80441 ALL Lima

SCOTT

CONVOY

WREN

OHIO CITY

MIDDLE POINT

ELGIN

WILLSHIRE

VENEDOCIA

VAN WERT

DELPHOS

30

33

224

224

127

224

127

81

709

697

116

118

116

116

117

49

49

81

49

118

66

637

30

92692

92692 100378

101085

92692

95500

M

ap Pr

oduc

ed by

Cod

y Lap

e

Ohio Department of TransportationDistrict One - Lima

Office of Capital Program1885 N. McCullough

Lima, Ohio 45801

LegendSpotBridge ReplacementBridge Rehab

Local Sponsored ProjectsODOT Sponsored Projects 17

4/3/2019

Van Wert County 2019 Construction Projects

PID Name92692 VAN SR 116 0.00/2.5195500 VAN SR 81 13.65100378 VAN SR 697 0.00101085 VAN Jefferson St

Page 19: ODOT DISTRICT 1 - Ohio Department of Transportation · 2019. 4. 4. · ODOT Sponsored Projects 6 4/3/2019 Allen County 2019 Construction Projects PID Name PID Name 80441 ALL Lima

County-Route-

SectionDescription Location

Length

(Miles)

88832 WYA-23-15.89

Resurface with asphalt concrete and

repair paveemnt joints. Includes some

repair on the bridge over the Sandusky

River. Traffic will be maintained.

Temporary lane closures will be

required.

From the US23 / US 30 interchange

to CR 97 near the Village of Carey6.17 SOLD

Spring / Summer

2019$3,236,775

102664 WYA-67-26.80

Replace bridge deck and approach slabs,

repair bridge foundations and paint

steel beams. Traffic will be detoured.

In the Village of Sycamore,

approximately 0.2 miles south of SR

231.

Spot SOLDSpring / Summer

2019$902,476

105526WYA-67/103/231-

25.86/Various

Resurface with asphalt concrete. Traffic

will be maintained.

SR 67: From SR 103 to the north

corp limit of Sycamore

SR 103: From SR 199 in Carey to the

Seneca county line, excluding the SR

53 overlap section.

SR 231: From CR 330 to the Seneca

county line.

24.02 SOLDSpring / Summer

2019$3,087,012

108861 WYA-23-12.80

Eliminate the intersection of US 23 with

CR 50 in Wyandot County. Traffic on US

23 will be maintained.

CR 50 intersection with US 23 SPOT 8/8/2019 Fall 2019 $260,000

$7,486,263

County-Route-

SectionDescription Location

Length

(Miles)

$0WYANDOT COUNTY-LOCAL GOVERNMENTS TOTAL

TOTAL ESTIMATED COST FOR WYANDOT COUNTY: $7,486,263

Local Governments

PID No.

Project

Sale DateApproximate

DurationEstimated Cost

WYANDOT COUNTY-ODOT LET TOTAL

WYANDOT COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION

DURING CALENDAR YEAR 2019

ODOT Projects

PID No.

Project

Sale DateApproximate

DurationEstimated Cost

18

Page 20: ODOT DISTRICT 1 - Ohio Department of Transportation · 2019. 4. 4. · ODOT Sponsored Projects 6 4/3/2019 Allen County 2019 Construction Projects PID Name PID Name 80441 ALL Lima

HARPSTER

NEVADA

WHARTON

SYCAMORE

KIRBY

MARSEILLES

UPPER SANDUSKY

CAREY

FOREST

23

30

23

23

30

231

294

53

103

199

293

231

103

67

53

15

568

231

231

53

67

67

37

67

53

103

294

105526

88832

108861

88832

105526105526

105526

102664

Map

Prod

uced

by C

ody L

ape

Ohio Department of TransportationDistrict One - Lima

Office of Capital Program1885 N. McCullough

Lima, Ohio 45801

LegendSpotBridge ReplacementBridge Rehab

Local Sponsored ProjectsODOT Sponsored Projects

194/1/2019

Wyandot County 2019 Construction Projects

PID Name88832 WYA US 23 15.89

102664 WYA SR 67 26.80105526 WYA SR 67/103/231 25.86/7.62/12.108861 WYA US 23 12.80