OE/AAA Processes & E-Filing
Presented:October 15, 2015
By: Tracey McInnis (FAA)
& Rita Castonguay Hunt
(NHDOT)
Objectives Overview of Obstruction Evaluation and
Airport Airspace Analysis (OE/AAA)
Frequently Asked Questions
Demonstration of E-filing System
Why? FAR Part 77 - Sharing Airspace
Who? Everyone
Criteria for FilingYou must file with the FAA at least 45 days prior to construction if your structure:
Will exceed 200ft above ground level
Will be in proximity to an airport and will exceed the slope ratio listed in part 77.9(b)
Criteria for Filing continued… Involves construction of a traverse way (i.e.
highway, railroad, waterway etc...) and once adjusted upward with the appropriate vertical distance would exceed a standard of part 77.9(a) or (b)
Will emit frequencies, and does not meet the conditions of the FAA Co-location Policy
Will be in an instrument approach area and might exceed part 77 Subpart C
Will be in proximity to a navigation facility and may impact the assurance of navigation signal reception
Will be on an airport or heliport Filing has been requested by the FAA
Notice Criteria Tool
https://oeaaa.faa.gov/oeaaa/external/gisTools/gisAction.jsp?action=showNoNoticeRequiredToolForm
Categories of Cases NRA Cases (Non-Rulemaking Airspace)
On Airport Airport Division/NHDOT are leads Final determination by Airports Division
OE Cases (Obstruction Evaluation) Off Airport Final Determination by Air Traffic Division
Paper Copies 7480-1 (NHDOT) Filed for:
New Landing Areas Runway or Threshold Changes VRF and IFR Changes Deactivation and Activation of Runways or
Taxiways Changes to Traffic Pattern
Types of Cases E-Filed 7460-1 Planning Studies/Approvals Airport Events
All cases are electronically filed with the appropriate FAA Divisions and NHDOT for comment…
Types of Cases Buildings Hangars Poles Fences Solar Arrays Wind Turbine Any other
permanent fixture
Types of Cases Towers Antennas NAVAIDS Mitigation and
Lighting Windsocks
Types of Cases ALPs Planning Studies CSPP Mods to Standards
Types of Cases Temporary
Equipment Construction
Equipment Stock Piles Access/Haul
Routes
What Information is Required?Be sure to include the follow with your case: Map, Sketch, or Drawing Visual Representation Proposed Location Coordinates from Highest Point to
Runway Distances from Rwy Centerline (out &
over) Glare Analysis (solar array)
Solar Array Solar project proposal boundary corner
points and design plan Vertical tilt Horizontal Azimuth/Bearing the structure is
facing Solar Panel Manufacturer/Type/Specifications Mechanics of the structure FAA approved Solar Glare Study as requested
ALP Depict all existing/future proposed
structures and equipment Include any and all approved pen and
ink changes Depict all NAS facility critical areas Upload electronic copy of
proposed/revised ALP for review ALP Checklist ARP SOP 2.00http://www.faa.gov/airports/resources/sops/media/arp-SOP-200-ALP-Review.pdf
Buildings Site plan with footprint and
latitude/longitude location If available, site plan with airport layout
showing orientation to runway(s) Physical building dimensions Vertical profile drawing for each building side Roof construction with vertical profile Material Composition Identify any additional exterior metallic
accessories
Fences and Powerlines General site plan and latitude/longitude
coordinates Power Lines/Utility Lines Pole or tower design detail for each structure Capacity of each line run Number of lines with tower-to-tower point-to-
point line details (i.e. straight run, twisted configuration, etc.)
MSL/AGL/AMSL of each pole/tower
Wind Turbines All proposals for wind turbines and met
towers regardless of whether they are on airport property or not should be filed as Off Airport Construction filings so they can be processed by the FAA's Obstruction Evaluation Group.
https://oeaaa.faa.gov/oeaaa/external/searchAction.jsp?action=showWindTurbineFAQs
Miscellaneous Bridges will require site plan, dimensions,
vertical profile drawing, and construction details and coordinate locations. In addition, reference to either True North or Airport layout depicting runway configuration.
Stadium Lighting will require site plan, dimensions, vertical profile drawing, and construction details and coordinate locations. In addition, reference to either True North or Airport layout depicting runway configuration. Orientation of lighting is required to assess potential visibility blockage and possible glare for ATCT.
Miscellaneous Bill Board Structures will require site plan,
dimensions, and construction details and coordinate locations, and an identification if bill board is digital. In addition, reference to either True North or Airport layout depicting runway configuration.
Flagpoles will require a site plan, coordinates, and elevation data, dimensions and materials. Actual flag dimensions will be required to assess potential visibility obstruction for ATCT.
Smoke Stacks will require site plan, dimensions, vertical profile drawing, construction details, and materials and coordinate locations. In addition, expected smoke plumes will need to be addressed to assess potential visibility obstruction for ATCT.
What is Evaluated by FAABefore issuing a determination the FAA Divisions will review: Part 77 TERPS Airport Design Standards Electromagnetic Interference Frequency Interference Line of Site for Airports with Control
Towers
FAA Divisions
Terminology Proposed – Case has been submitted
and FAA analysis has begun.
Circularized – Case has been found to be a penetration and is being disseminated for public comment.
Determined – Case is complete.
Determinations Check back for
determination on OE/AAA website
Email Correspondence Only
7480-1 New Landing Areas will be mailed
Frequently Asked Questions
OE/AAA Desk Reference Guide
http://www.nh.gov/dot/org/aerorailtransit/aeronautics/documents.htm
Refiling or Changing the Case Once you have filed an NRA case, the
only way to change data is to refile. If you need to change dates of
construction, FAA or NHDOT can update that information.
Searching for a Case
Searching for a Case
Demonstrations
Planning Airport Layout
Plan
Construction Hangar Construction
equipment
ContactsRita Castonguay HuntNHDOT - [email protected]
Steve Barker [email protected]
Electronic Filing System: https://oeaaa.faa.gov/oeaaa/external/portal.jsp