NORTH LANARKSHIRE COUNCIL To: HOUSING AND TECHNICAL Subject: HOUSING CAPITAL MONITORING SERVICES AND PROGRESS STATUS REPORT (CAPITAL PROGRAMME AND From: DIRECTOR OF HOUSING AND PROPERTY SERVICES REPAIRS) SUB-COMMITTEE Date: 4 February 2002 Ref: DMcC/AW/ HOAD00002 REPORT (1 .OO) (1.01) (2.00) (2.01) (3.00) (3.01) INTRODUCTION A copy of the above report is attached for Committee's consideration. The report reviews progress in relation to the implementation of the Housing Capital Programme for 2001/02 as approved by Committee on 29 March 2001 and reviewed at the Housing and Technical Services Committee of 30 August 200 1. RECOMMENDATION Committee is asked to note this report. BACKGROUND Available from the Housing and Property Services Department. A McKenzie Property Services Enc. I \OO\HO\ADO0002\STATUS REPORT DOC

Upload: others

Post on 05-Sep-2019

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: of 29 30 200 - mars.northlanarkshire.gov.uk · Home Safety & Security Door Entry North Phase 5, (5 Closes) Contract 2% complete. Combined contract. Door Entry Phase 4 (15 Closes)

NORTH LANARKSHIRE COUNCIL

To: HOUSING AND TECHNICAL Subject: HOUSING CAPITAL MONITORING SERVICES AND PROGRESS STATUS REPORT (CAPITAL PROGRAMME AND

From: DIRECTOR OF HOUSING AND PROPERTY SERVICES

REPAIRS) SUB-COMMITTEE

Date: 4 February 2002 Ref: DMcC/AW/ HOAD00002

REPORT

(1 .OO)

(1.01)

(2.00)

(2.01)

(3.00)

(3.01)

INTRODUCTION

A copy of the above report is attached for Committee's consideration.

The report reviews progress in relation to the implementation of the Housing Capital Programme for 2001/02 as approved by Committee on 29 March 2001 and reviewed at the Housing and Technical Services Committee of 30 August 200 1.

RECOMMENDATION

Committee is asked to note this report.

BACKGROUND

Available from the Housing and Property Services Department.

A

McKenzie Property Services

Enc.

I \OO\HO\ADO0002\STATUS REPORT DOC

Page 2: of 29 30 200 - mars.northlanarkshire.gov.uk · Home Safety & Security Door Entry North Phase 5, (5 Closes) Contract 2% complete. Combined contract. Door Entry Phase 4 (15 Closes)

Cumbernauld & Kilsyth

Kilsyth - Remedial Work to 31-57 Northfield ~ Contract Ailsa Building

Remedial Work - Insulated Render ' E21,100.38

I 1 H020281

Energy Efficiency Electric Heating Replacement Programme 2001/2002- Combined Area Contract 1

Gas, Electric Wet System and Solid Fuel Heating Pipework - Approx. 345 Houses Various Sz res, North. Central and South Areas

Heating Programme - Gas Mains Infill & Gas Mains Connections -(Cumbernauld/Kilsyth)

The works comprise the installation of extensions to existing gas mains and gas mains connections to individual houses in connection with the heating contracts at Mainhead Terr, Barlandfauld St, Bogside Rd, Donaldson Ave, Edmonstone Di Fisher Ave, Howe Rd, Kirklands Cres, Manse Rd, Balmalloch Rd, Castlehill Vw Crimmond PI, Montrose Gdns

Heating Programme Gas Warm Air Heating Replacement Contract 2A - Kilsyth Area

Heating Replacement Programme, 2001/02 - Replacement of Older/Obsolete Gas Wet & Sol Fuel Heating Systems Contract 1 -North - 102, Contract 2 - Central - 307 Houses (Pipework f327,000 - Lease f655,000) Heating Replacement Programme 2001/2002 Replacement of older/obsolete gas we and solidfuel heating systems

~~

Contract 10% complete. Combined conract. 136 houses north area.

Contract extended to include properties contained within heating programme 20011 2002Combined with Cent(H099124), XCDC(H099 123).

Contract 35% complete. Combined contract.

Letter of Acceptance issued dated 17th January2002 Combined contract. 54 houses C&K area.

D. Campbell

&236,75 1.98

H0812 13

TransCo Connections

&461,3 15.50

H099121

:.F.M Building Services Ltd

E27 1,647.60

H081090

'.F.M Building Services Ltd

E232,895.67

H020288

Reporf printed on 04/02/2002 14:50:35 'from the ClMS Management System (Status Reporf)' Page I Of 3

Page 3: of 29 30 200 - mars.northlanarkshire.gov.uk · Home Safety & Security Door Entry North Phase 5, (5 Closes) Contract 2% complete. Combined contract. Door Entry Phase 4 (15 Closes)

Project Title and Description of Works

Window Replacement Programme 20001/02 - Phase 23 & 24 Kilsyth (55 Houses)

Window Replacement of existing timberlmetal doors and windows. Doors only renewed gfpart of composite type screen. Standalone door not included

Window Replacement Programme 2003/2004 Phase 25 (21 Houses) Kilsyth

Major Repairs & Environmentals Defective Pitched Roofs (Rosemary Tiles), Kilsyth, Phase 17

Re-Roojhg

Defective Pitched Roofs (Rosemary Tiles), Kilsyth, Phase 18

Essential Repairs Tied Houses - Demolition of Janitor's House - St Lucy's Primary School Cumbernauld Demolition ofJanitors House

Re-rendering 2001/2002: Kilsyth, Phase 5

Re-rendering and associated works at Livingstone Park and Arden Grove (19 blocks, 42 dwellings)

Amount

Tender report being prepared. Site start February 2002. J & S McFadyen Ltd

I I &119,027.00

1 H001077

I

Design Brief with Design Services. 200312004 Programme.

I so.00

1 H081011

Contract 40% complete.

Negotiated tender ?

Contract complete.

Contract 5% complete. Additional 15 blocks to be added to complete re-render spend in C&K area.Committee agreed to negotiation with contractor. Further report to be prepared.

4ilsa Building Ltd

&349,501.12

H020256

go.00

H001067

Angus (Asbestos

LemovaliMetals f6,121.50

H080022

i .C. Whyte & Co. Ltd

2174,087.15

H001081

~ ~~ ~

Report printed on 04/02/2002 14:50:35 'from the ClMS Management System (Status Report)' Page 2 of 3

Page 4: of 29 30 200 - mars.northlanarkshire.gov.uk · Home Safety & Security Door Entry North Phase 5, (5 Closes) Contract 2% complete. Combined contract. Door Entry Phase 4 (15 Closes)

Re-rendering 2001/2002: Kilsyth, Phase 6 (15 Blocks)

Re - Rendering Ph 6 - Castlehill View, Graham Place, Balmalloch Road, Kilsyth

Re-rendering Phase 7 (15 Blocks)

Home Safety & Security 2001/02 Re-Wiring - Ph 6 & 7 Condorrat & Kilsyth

Re-wire 34 House in Condorrat & kilsyth + 35 Houses in Balmalloch Road

Door Entry North Phase 5, (5 Closes)

New doors, screens and entry system to various locations in North area

(2nd Issue - Title Alteredfiom Central to North)

Rewiring 2001/2002 - North Area Phase 3 - Cumbernauld & Kilsyth (35 Houses)

Letter of Acceptance issued dated 1 1 th December 200 1.

Contract now added to Phase 5 contract.

Contractor / Tender Amount

Ailsa Building Ltd

El 11,604.92

HOOlll8

20.00

H08101S

Letter of Acceptance isssued dated 7th January 2002.

Contract 2% complete. Combined contract.

Contract 80% complete. Combined contract. Report prepared requesting authorisation to negotiate additional properties.

Maclin Electrical Ltd

&65,5 18.17

H001116

Bell Security (Scotland) Ltd

&68,295.00

H001024

ordan Electrics Ltd

E98,718.48

H091293

Report printed on 04/02/2002 14:50:35 ‘from the ClMS Management System (Status Report)‘ Page 3 of 3

Page 5: of 29 30 200 - mars.northlanarkshire.gov.uk · Home Safety & Security Door Entry North Phase 5, (5 Closes) Contract 2% complete. Combined contract. Door Entry Phase 4 (15 Closes)

Moodiesburn

Energy Efficiency Heating Replacement Programme, 2001/02 - ' Letter Of Acceptance issued dated 17th 2o02 'C,F,M Building Replacement of Older/Obsolete G~~ Wet & Solid Fuel Heating Systems I

Combined Contract. 14 houses Moodiesburn area. Services Ltd

2232,895.67

I I

I 1 H083014

Window Replacement Programme 2001/02 - Ph 21 & 22 Moodiesburn (68 Houses)

Window Replacement - 68 Houses

Major Repairs & Environmentals Defective Pitched Roofs (Rosemary Tiles), Moodiesburn, Phase 17

The removal of the existing Rosemary tiles or slates to the pitched roofs and the provision of a new concrete tiled roof with associated repairs.

Defective Pitched Roofs (Rosemary Tiles), Moodiesburn, Phase 18 (31 Blocks)

Entrance Canopies - Bridgeburn Drive, Moodiesburn

Fitting of New Group Canopies at Close Entrance

Tender report being prepared. Site start February 2002. J & S McFadyen Ltd

~ 2142,573.94

Contract 60% complete.

2002/2003 Programme

Letter of Acceptance issued dated 17th December 200 1. Additional houses to be added to meet allocation figure. Report prepared requesting authority to negotiate additional properties.

Helforn Ltd

&144,201.86

H020252

20.00

H001137

Fullwood Holdings Ltd

234,089.72

HOOl102

Page 1 of 2 Report printed on 04/02/2002 14:50:46 'from the ClMS Management System (Status Report)'

Page 6: of 29 30 200 - mars.northlanarkshire.gov.uk · Home Safety & Security Door Entry North Phase 5, (5 Closes) Contract 2% complete. Combined contract. Door Entry Phase 4 (15 Closes)

Home Safety & Security Door Entry North Phase 5, (5 Closes) Contract 2% complete. Combined contract.

Door Entry Phase 4 (15 Closes) Contract 3 8% complete.

Door Entry Phase 6 (5 Closes)

Rewiring 2001/2002 - North Area Phase 3 - Moodiesburn (44 Houses)

Electrical Rewiring of Houses

Rewiring, Moodiesburn, Phase 7 (45 Houses)

Brief with Design Services.

Contract 80% complete. Combined contract. Additional 35 houses to be added to contract to complete spend in Moodiesburn area.Report prepared requesting authority to negotiate additional properties.

2002/2003 Programme.

Bell Security (Scotland) Ltd

f68.295.00

H083024

Bell Security (Scotland) Ltd

E108,136.00

H083011

f O . O O

H083012

ordan Electrics Ltd

E98,718.48

H020293

&O.OO

H 0 9 1005

Report printed on 04/02/2002 14:50:46 'from the ClMS Management System (Status Report)' Page 2 of 2

Page 7: of 29 30 200 - mars.northlanarkshire.gov.uk · Home Safety & Security Door Entry North Phase 5, (5 Closes) Contract 2% complete. Combined contract. Door Entry Phase 4 (15 Closes)

Ex CDC

Estate Regeneration Mini Programme, Spruce Road, Abronhill (Ex CDC) Phase 2 (24 Flats)

1 Housing Dept. surveys

I

I 1 H08200S

Mini Programme, Spruce Road, Abronhill (Ex 1 Housing surveys CDC) Phase 3 (18 Flats) i

Energy Efficiency Heating Programme - Gas Mains Infill & Gas Mains Connections (Ex CDC)

The works comprise the installation of extensions to existing gas mains and gas mains connections to individual houses in connection with the heating contracts at Elm Drive, Hornbeam Road, Larch Court, Oak Road, Pine Close

Heating Replacement Programme, 2001/02 - Replacement of Older/Obsolete Gas Wet & Solid Fuel Heating Systems (Ex CDC)

Window Replacement Programme (Ex CDC), Phase 12,51 houses 2002-2003

Replacement oyexisting doors and windows with UPVC units double glazed The works include making goodfinrshings disturbedparticularly plaster, roughcast and smooth cement sand render

Contract extended to include properties contained within heating programme 2001/ 2002Combined with C&K(H09912 l),XCDC(99123)

Letter of Acceptance issued dated 17th January 2002. Combined contract. 33 houses EX CDC area.

Tender report being prepared - 2002103 budget.

TransCo

E461,315.75

H099123

:.F.M Building Services Ltd

f232,895.61

HOS2017

J & S McFadyen Ltd

&123,699.50

H020257

Page 1 o f 3 Report printed on 04/02/2002 14:50:40 'from the ClMS Management System (Status Reporf)'

Page 8: of 29 30 200 - mars.northlanarkshire.gov.uk · Home Safety & Security Door Entry North Phase 5, (5 Closes) Contract 2% complete. Combined contract. Door Entry Phase 4 (15 Closes)

Major Repairs & Environmentals ~

Re-rendering Programme 2001/02, (EX CDC) - Phase 4 (52 Houses) Abronhill

Re - Rendering Ph 4 - 52 Houses Pine Place, Abronhill

Re-rendering Programme 2001/02, (Ex CDC) - Phase 5 (29 Houses)

Re-rendering and associated works to 29 No. Domestic Properties

Re-rendering Programme 2001/02, (Ex CDC) - Phase 6 (36 Houses)

Re-rendering Programme 2001/02, (Ex CDC) - Phase 7 (42 Houses)

Re-rendering Programme 2001/02, (Ex CDC) - Phase 8 (36 Houses)

Contract on site.

Contract 85% complete.

Design Brief with Design Services. 2003/04 Programme.

Design Brief with Design Services. 2004/05 Programme.

Garrett Nicholson

E139.184.94

HOOl 1 I7

Garrett Nicholson

E112,378.46

H001047

EO.00

H082010

EO.00

H082012

Design Brief with Design Services. 2005106 Programme.

I Eo.oo

Page 2 of 3 Report printed on 04/02/2002 14:50:41 'from the ClMS Management System (Status Report)'

Page 9: of 29 30 200 - mars.northlanarkshire.gov.uk · Home Safety & Security Door Entry North Phase 5, (5 Closes) Contract 2% complete. Combined contract. Door Entry Phase 4 (15 Closes)

Home Safety & Security 2001/02 Re-Wiring - Ph 8 ,9 & 10 - (Ex CDC) Abronhill, Cumbernauld

Re-Wire Ph 8, 9 & 10 - 100 Houses - Abronhill, Cumbernauld

Rewiring 2001/2002 - North Area Phase 3 - (Ex CDC) (34 Houses)

Letter of Acceptance issued dated 7th January 2002.

Contract 80% complete. Combined contract. Report prepared requesting authority to negotiate additional properties.

M a c h Electrical Ltd

587,542.74

HOOl115

Jordan Electrics , Ltd

&98,7 18.48

~ H090293

Report printed on 04/02/2002 14:50:41 'from the ClMS Management System (Status Report)' Page 3 of 3

Page 10: of 29 30 200 - mars.northlanarkshire.gov.uk · Home Safety & Security Door Entry North Phase 5, (5 Closes) Contract 2% complete. Combined contract. Door Entry Phase 4 (15 Closes)

Central Project Title and Description of Works

Estate Regeneration Caldercruix - Demolition of 91-113 Main Street Letter of Acceptance issued dated 21st January 2002. Nicholson

(Contracts) Ltd

$35.647.50 Demolition ojHousing

H001112

Estate Regeneration - Calder Street & William Street Coatbridge

Letter of Acceptance issued dated 29th January 2002. Stewart Landscapes Ltd

f403,916.66 External hard and soft landscaping, new fencing and car parking, new lighting

H020244

Estate Regeneration - Refurbishment of Flats Shanks Street & Mill Street, Airdrie

Contract 30% complete. Additional work added to the contract.

Ailsa Building Ltd

2 148,9 18.65

H020241

Re-roofing, re-rendering, installation of door entry system 1

Joseph Leckie & Sons Ltd

1 &30,651.10

Contract 98% complete. Estate Regeneration - Selby Place, Coatbridge

External refurbishment - pathsfencing and associated landscape works

1 H020242

1 PBL 1 Construction

Letter of Acceptance issued dated 30th January 2002. ~~ ~

Estate Regeneration, Clarkston, Airdrie, Phase 2 (3 block)

1 &818,879.92 Improvements to jour storey jlatted development, consisting of poor quality 1960's builtjlat roofed properties. The provision of new pitched roofs, re-rendering ojthe external walls, the enclosure of certain balcony areas, refurbishment of adjacent garages and external works. i H020022

Estate Regeneration, Petersburn, Phase 5, Islay (8 blocks)

Contract 5% complete. G.F. Sharp & Co. Ltd.

246 1,264.00

H099332

Re-rendering of external walls with polymer overcoat system and construction of new pitched roof to two-storey and four- storey dwellings, including the renewalhepair of rainwater goods and minor external works.

Report printed on 04/02/2002 14:50:28 'from the ClMS Management System (Status Report)' Page I of 7

Page 11: of 29 30 200 - mars.northlanarkshire.gov.uk · Home Safety & Security Door Entry North Phase 5, (5 Closes) Contract 2% complete. Combined contract. Door Entry Phase 4 (15 Closes)

Project Title and Description of Works

Estate Regeneration, Sikeside Phase 3

Phase 3 of regeneration proposals. The refurbishment of dwellings.

External Refurbishment at 23/41 Kippen Street: Airdrie

5 storey block - to be externally refurbished as block in Kennedy Drive & Kippen Street previously

Mini Programme, Langloan, External Improvements, Phase 3

Roof repairs, render repairs, provision of new GRP canopies, landscaping, and sundq associated works

Proposed Demoltion of 1-16 Erskine Court, 1-1f Cameron Court and 1-6 Ogilvie Court, Clarkston, Airdrie Demolition of 3 No. 2,3 & 4 Storey Traditional Housing with Flat Roof Construction - Including Removal of Asbestos

Relocation of CCTV Equipment at Old Monkland Coatbridge

Reinstallation of 12 Nr. Camerasboles with new cabling and sundry civils works.

Energy Efficiency

Progress to Date

zontract 85% complete.

2ontract 2% complete.

Zontract 94% complete.

Zontract 25% complete.

Zontract 40% complete.

Contractor / Tender Amount

Lovell

&396,90 1.63

H020267

PBL Construction

E21 1,945.45

H001050

Stewart Landscapes Ltd

5375,642.79

H020113

Nicholson (Contracts) Ltd

E59,934.00

H001073

Semple & Cochrane Ltd

253,787.17

H001054

Electric Heating Replacement Programme 2001/2002- Combined Area Contract 1

Gas, Electric Wet System and Solid Fuel Heating Pipework - Approx. 345 Houses Various Sites, North, Central and South Areas

Contract 10% complete. Combined conract. 149 houses central area.

D. Campbell

E236,751.98

H020213

Page 2 of 7 Report printed on 04/02/2002 14:50:28 'from the ClMS Management System (Status Report)'

Page 12: of 29 30 200 - mars.northlanarkshire.gov.uk · Home Safety & Security Door Entry North Phase 5, (5 Closes) Contract 2% complete. Combined contract. Door Entry Phase 4 (15 Closes)

Project Title and Description of Works

Airdrie Auld BraeMack St./Anderson Lane, Chapelside Ph 7 - Refurbishment of Lock-ups

Gas Warm Air Replacement Programme 2001/2002 - Central Area - 183 Houses

Letter of Acceptance issued dated 21st January 2002.Site start in February 2o02.

Heating Programme Gas Warm Air Heating Replacement Contract 2A - Central Area

Heating Replacement Programme, 2001102 - Replacement of Older/Obsolete Gas Wet & Solid Fuel Heating Systems Contract 1 - North - 102, Contract 2 - Central - 307 Houses (Pipework f327,000 - lease $655,000) Heating Replacement Programme 2001/2002 Replacement of older/obsolete gas wet and solidfire1 heating systems

Progress to Date

zontract 90% complete. Gas warm air Cont 2.Combined :ontract.

Zontract 35% complete. Combined contract.

Letter of Acceptance issued dated 16th January 2002. Combined contract. 306 houses Central area.

Refurbishment of78 lock-Ups, New Metal Fencing to Drying Greens

~

Asbestos Removal - Redbridge and Coltswood Towers (Central Area)

Defective Pitched Roofs (Rosemary Tiles), Central, Phase 14 (39 Blocks)

The removal ofthe existing Rosemary tiles or slates to the pitched roofs and the provision o fa new concrete tiled roof with associated repairs.

Tenders returned. Tender to be reported. Site start JanuaryiFebruary 2002.

Contractor / Tender Amount

:.F.M Building Services Ltd

2455,030.16

H091214

2.F.M Building Services Ltd

2271,647.60

H001090

2.F.M Building Services Ltd

2232,895.67

H020289

PBL Construction

&342,2 12.6 1

H001075

Kitsons Environmental Europe Limited 21,241,956.46

H020 10 1

Sontract 50% complete. Helforn Ltd

f364,035.63

H020253

Report printed on 04/02/2002 14:50:28 ’from the ClMS Management System (Status Report)’ Page 3 of 7

Page 13: of 29 30 200 - mars.northlanarkshire.gov.uk · Home Safety & Security Door Entry North Phase 5, (5 Closes) Contract 2% complete. Combined contract. Door Entry Phase 4 (15 Closes)

Project Title and Description of Works

Defective Pitched Roofs (Rosemary Tiles), Central, Phase 15 (36 Blocks)

Re-roofing

Defective Pitched Roofs (Rosemary Tiles), Central, Re-Roofing Phase 16 (49 Blocks)

Defective Pitched Roofs (Rosemary Tiles), Central, Re-Roofing Phase 17 (47 Blocks)

The removal of the existing Rosemay tiles or slates to the pitched roofs and the provisron of a new concrete tiled roof with associated repairs.

Emergency Lighting Replacement - Whifflet an Calder Courts, Coatbridge

Emergency Lighting Replacement

Environmental Improvements - Addiewell Placc Phase 2

The work comprises hard and soft landscaping around Addiewell Place, Coatbridge.

Lead Water mains Replacement 2001/02

Replacement of Lead Water Mains - Coatbridge & Glenboig

Progress to Date

3riginal contract 90% complete.

Vegotiated tender ?

2002-2003 Programme. Contract documents being xepared.

zontract 2% complete. Committee approval given for 3lairgrove & Menyston to be added into the contract. 'urther report to be prepared.

Letter of Acceptance issued dated 7th January 2002.

Tender reported. Await Letter of acceptance. Site start February 2002.

Contractor / Tender Amount

Ailsa Building Ltd

$895,683.02

H020254

f O . O O

H001091

f O . O O

H001092

Charles McCrea Ltd

E l 11,367.63

HOO 1049

Land Engineering

(Scotland) Ltd E72,556.48

H001155

Morrison Property Care

&35,3 16.75

HOOl154

Page 4 of 7 Report printed on 04/02/2002 14:50:28 'from the ClMS Management System (Status ReportJ'

Page 14: of 29 30 200 - mars.northlanarkshire.gov.uk · Home Safety & Security Door Entry North Phase 5, (5 Closes) Contract 2% complete. Combined contract. Door Entry Phase 4 (15 Closes)

Project Title and Description of Works

Lift Replacement 2000/01 - Central Area

Lift replacement and associated works.

Lift Replacement 2001/2002 - Dunbeth Court

Major Repairs 2001/2002 - Renewal of Water Pumping Equipment Phase 2

Renewal of waterpumping equipment at Calder, Witchwood, Dunbeth Ct Nth, Dunbeth Ct Sth, Shields, Merryton, Grange & Muirhouse Towers

Re-rendering, Central Area, Phase 4 (22 Blocks:

Re-rendering and insulated re-renderinghe-roofing of various house types

Re-rendering, Central Area, Phase 5

Progress to Date

Contract 90% complete. Combined contract.

Contract 5% complete.

Tender accepted. Work to start on site end of January.

Contract 85% complete. Additional 15 blocks added to contract to complete spend in central area. Report prepared requesting authority to negotiate additional properties.

Address list received. Contract documents being prepared.Tender issue next financial year.

~ ~ - ~ ~ ~ f i ~ ~ ph 2 & Asociated Work at 2/16 & 18/32 William St. Coatbridge

Tender acceptance period elapsed. Contract has been 1 shelved meantime due to problems with owner occupiers.

Contractor / Tender Amount

Lift Maintenance

Ltd ES70,82S.lS

H090027

Lift Maintenance

Ltd &596,816.00

H080019

lames Frew Ltd

&83,412.20

HOO 1098

4ilsa Building Ltd

&343,798.86

H091006

EO.00

H080020

4ilsa Building Ltd

Provision of a Pitched Roof on a Flat Roofed Building - 211 6 18/32 William Street, Coatbridge I

&103,803.26

HOO1088

,

Report printed on 04/02/2002 14:50:28 'from the ClMS Management System (Status Report)' Page 5 of 7

Page 15: of 29 30 200 - mars.northlanarkshire.gov.uk · Home Safety & Security Door Entry North Phase 5, (5 Closes) Contract 2% complete. Combined contract. Door Entry Phase 4 (15 Closes)

Door Entry, Central, Phase 4. Contract complete.

Project Title and Description of Works Progress to Date Contractor / Tender Amount

. -

Shops at Laidon Road, Airdrie. Contract complete.

fO.OO Works include construction of a pitched roof over the existing jlat roof and the external refurbishment of shop units at Laidon Road. Airdrie.

H099105

Swedish Timber Houses, Clarkston, Airdrie

External refurbishment of timber housing

Survey conducted.

fO.00

H090065

Tower Block Refurbishment 1999/00 - Upgrade Floor Coverings, Jackson Court, Coatbridge

levar Flooring Ltd

Contract 55% complete. Committee approved Devar contract be determined. Negotiation undenvay to complete contract with new contractor. Further report to be prepared

221 8.3 13.86 Replacement ofjloor coverings to landings, common areas and half landings.

H099324

Home Safety & Security 2001/02 Controlled Door Entry Programme Central Phase 5a

Martec Engineering Group Ltd

2 109,397.36

Letter of Acceptance issued dated 28th November 2001.

Door Entry Programme

HOO 1089

I Tender issued. 2001/02 Controlled Door Entry Programme

Central Phase 5b

I EO.00 New Door Entry Systems - Airdrie, Coatbridge, Salsburgh & Chapelhall

HOG1122

Martec Engineering

Group Ltd 2181,458.89 The installation or renewal ofsecure Door Entry systems with

metal screens and assosiated builder works.

H020043

Report printed on 04/02/2002 14:50:28 'from the ClMS Management System (Status Repott)' Page 6 of 7

Page 16: of 29 30 200 - mars.northlanarkshire.gov.uk · Home Safety & Security Door Entry North Phase 5, (5 Closes) Contract 2% complete. Combined contract. Door Entry Phase 4 (15 Closes)

Project Title and Description of Works

Electric Rewire Programme 2001/2002 - Central Area - Pentland, Merrick & Cheviot Courts, Phase 5, Airdrie Rewiring of 138Jats and communal areas

Electric Rewire Programme 2001/2002 - Central Area - Witchwood Court, Main Switchboard

Re- Wiring Main Switchboard

-

Community Care Street Lighting - Afton Gardens and James' Way, Coatbridge

Replacement, cables, columns, fittings etc

Homeless Initiatives

Progress to Date

Committee approved negotiation with Jordan Electrics. Contract added into Woodside Tower contract. Further report to be prepared.

Letter of Acceptance issued dated 9th January 2002.

Contractor I Tender Amount

ordan Electrics Ltd

5175,000.00

H020299

ackson Rich & Co. Ltd

f76,128.64

H001119

Contract 5% complete. Balfour Beattie Power Networks

1 597,429.94

~ H020298

John Buchanan Shop Fitters

Internal Building Conversion Works I 1 550,36626

~ H001085

Report printed on 04/02/2002 14:50:29 'from the ClMS Management System (Status Report)' Page 7 of 7

Page 17: of 29 30 200 - mars.northlanarkshire.gov.uk · Home Safety & Security Door Entry North Phase 5, (5 Closes) Contract 2% complete. Combined contract. Door Entry Phase 4 (15 Closes)

Project Title and Description of Works Progress to Date Contractor / Tender

Coltness - Demolition Phase 1 - 3 No. Deck Access Blocks (+2 Block Extension)

Demolition of blocks at 10-28, 30-48 and 50-68 Walkerburn Drive, Coltness.

Contract substantially complete. Central Demolition & Dismantling E121,849.38

H090152

Coltness - Demolition Phase 2 - Demolition Works

49-67 Walkerburn Drive / 36-58 Innerleithan Drive

1 Contract 20% complete. George Hunter (Demolishers)

Ltd f40,545.75

H001145

I

Coltness - Point Block Upgrading Phase 1 ~ Contract 2% complete. ~ Clark :;tracts

Insulated external render; balcony alterations; stairwell curtain walling replacement; stairwell decoration and new floor finish; pram and bin store demolition; provision of bin storage enclosures, drying areas and landscaping.

f660,736.01

H020173

~

Coltness - Relocation of CCTV system Work to be carried out by Housing Dept.

Demolition of 38-44,39-57,46-52 and 56-60 Holm Gardens, Bellshill

~

Demolition 4 No. - 4 Storey High Deck Access Blocks

Contract complete.

H084021

George Hunter (Demolishers)

Ltd 559,535.00

1 H001013

Report piintea' on 04/02/2002 1 I 25 02 'from the CiMS MaiiagemefJt System (Statiis Repor?)' Page f of 70

Page 18: of 29 30 200 - mars.northlanarkshire.gov.uk · Home Safety & Security Door Entry North Phase 5, (5 Closes) Contract 2% complete. Combined contract. Door Entry Phase 4 (15 Closes)

Project Title and Description of Works

~ i ~ i programme spruce way, Holytown R ~ - rendering and Back Court Improvements

Progress to Date

CCTV to progress as an extension to Tannochside CCTV

~

(ADT)

20.00

Contractor / Tender Amount

Refurbishment of Garage lock Ups

Mini - Programme - Watling StreeUHotatius Street, Renovation and Back Court Improvements Re-roofing, replacement rainwater goods, re-rendering, cavity insiallation, installaiion door entry system, erection of entrance canopies, balcony infilling, plaser finish, extension of power/lighting andplastic windows, soft and hard landscaping to back court area

Construction.

Contract 25% complete. Fullwood Holdings Ltd

(Blacktop f204,5 15.92

H020174

Mini Programme - 13-47 Maryknowe Road, Carfin - External Landscaping to Rear Garden

Soft and hard landscaping to back court areas; timber boundary fencing and bin store re-roofing.

Letter of acceptance issued 29 January 2002. I Stone3

E131,201.64

Mini Programme 1998/99 - Thomson Avenue, Netherton (South)

The works comprise the application of an insulated over render, rewiring of the houses, levellingfloors, new curtain walling to stair wells, re-roofing bin stores.

Contract 88% complete. 5 Blocks handed over. Mackenzie Construction

Ltd l E1,596,887.26

H098089

Motherwell - Refurbishment of Gas Flats, 519- 593 Merry Street, Motherwell

Re roofing and external reji4rbishment of 4 blocks of 5 storey flats, Merry Street, Motherwell

Contract 15% complete. PBL ~ Construction

1 E393,822.56

i H001036

Repori printer! on 04/02/2002 I 1 25 02 'from the CIMS Management Systeni (SfafilS %?pod)' Page 2 of 10

Page 19: of 29 30 200 - mars.northlanarkshire.gov.uk · Home Safety & Security Door Entry North Phase 5, (5 Closes) Contract 2% complete. Combined contract. Door Entry Phase 4 (15 Closes)

Amount

' Tannochside 2001/02 - Extend External CCTV System

40% Report to extend to Housing Office, Spruce Way, Holytown and digital recording at Motherwell Police Station.

Muirhouse Environmentals Phase 4

A.D T. Fire & Security

, Contract 99% complete. Planting in progress.

West Crindledyke, ~~~~~i~~ Demolition of 55- 73 Isla Avenue.

I Stone3

Letter of Acceptance issued. To commence on completion I

of new Housing Office. E

~ Demolition Ltd

The work comprises hard and soft landscaping around Dalziel, Barons and Netherwood Towers, Muirhouse, Motherwell.

West Crindledyke, Newmains - Relocation of Housing Office

1 E433,505.40

Contract 75% complete.

Electric Heating Replacement Programme Contract 10% complete. Combined conract. 60 houses

Installation of I0 No. fully firnctionable colour cameras, controlled at Motherwell Police Station

Campbell

I i 5146,178.96

The workcomprises the Demolition of thepoint blockat 55-73 Isla Avenue, levelling over the area with a suitable granular material, and soiling and seeding the site

' 1 523,852.06

Provision of new offstreetparking together with new access roads, hard and soft landscaping to 2 blocks ofjlats and footpath realignment, street lighting and soft landscaping works to open area betweenjlats

~

1 50.00

~ H020172

Erect new Housing Ofjce on site of former Community Centre, Newmains.

50.00

H020177

1 H084020

~~

Repoi: printed or1 04/02/2002 7 I 25 02 'from the CiMS Mariagernent Systenr (Siatiis Report)' Page 3 of 70

Page 20: of 29 30 200 - mars.northlanarkshire.gov.uk · Home Safety & Security Door Entry North Phase 5, (5 Closes) Contract 2% complete. Combined contract. Door Entry Phase 4 (15 Closes)

Amount

Contract 90% complete. Gas warm air Cont 2.Combined contract. Spend may need to be adjusted.

Gas Warm Air Replacement Programme 2001/2002 - South Area - 210 Houses

C,F,M Building Services Ltd

Gas ducted warm air in Airdrie, Coatbridge, Bellshill, Newarthill, Motherwell and Wishaw

Heating Programme 2001/2002 Wet

1 E455,030.16

I

' H020214

Contract 2% complete. Spend may need to be adjusted.

I The works comprise the installation of extensions to existing gas mains and gas mains connections to individual houses

Replacement of Old/Obsolete Gas Wet/Solid Fuel Heating Systems - South Area Replacement of old central heating with new to 403 Houses

f270,291.00

Services Ltd

E295,185 24

I H020018

Contract 35% complete. Combined contract. Spend may need to be adjusted.

C,F,M Building Services Ltd

E271,647.60

Heating Programme Gas Warm Air Heating Replacement Contract 2A - South Area

installed.

All windows fitted; porches to be fitted to approx 6 houses i

Window Replacement Programme 2000/01-

Tower Block Refurbishment - Leasing Pilot Scheme, Flemington

Walker Profiles

Rainscreen cladding to Burnside, Doonside, Lodge and Glassford Towers. Includes cladding, window pods to previously installed windows, curtain walling to common areas, new roof and groundfloor facade improvements. Lodge Tower requires concrete repairs before Rainscreen cladding is

1 H084090

Tender to be issued in February.

~ EO.00

~ H099345

Replacement of existing timberhetal windows with associated jnishings and repairs to I 7 houses.

E42,3 15.62

H020087

Report pnflted or1 04/02/2002 1 I 25 03 'from the CiMS Mariageinent System (Status Repor?)' Page 4 of 10

Page 21: of 29 30 200 - mars.northlanarkshire.gov.uk · Home Safety & Security Door Entry North Phase 5, (5 Closes) Contract 2% complete. Combined contract. Door Entry Phase 4 (15 Closes)

Project Title and Description of Works Progress to Date

South Area Priority M56-M57 - 153 Houses at HawthornIBeechwood, Wishaw.

Contractor / Tender

Phase 21 and 22 contract.

Window Replacement Programme 2000/01- South Priority M48-M50 (280 Houses)

uPVC Window Replacement of existing timberhetal doors and windows. Doors only renewed ifpart of composite type screen. Standalone' doors not included.

Contract complete. I h g l i a n Windows

$467,578.41

H020186

Window Replacement Programme 2001/02 - South Area Priority M51-M53 - 259 Houses, Bells hill. Replacement of existing doors and windows with UPVC units double glazed. The works include making goodjnishings disturbedparticularly plaster, roughcast and smooth cement sand render

Work due to start 7 January 2002 - now delayed until end February..

Walker Profiles

E45 5,705.52

H020259

Window Replacement Programme 2001/02 - South Area Priority M54 - Wishaw

Replacement of existing doors and windows with UPVC units double glazed The works include making goodjnishings distrubedparticularly plaster, roughcast and smooth cement sand render

Work due to start 7 January 2002 - now delayed until end February..

Walker Profiles

$249,040.61

H020258

Co. Ltd. Cleland - External Refurbishment of Two blocks 1 Contract 5% of Flatted properties, Nith Path, Cleland

Cavity insulation, polymer altered over render, installation of new pitched roof over monopitch rooj associated drainage, and the installation of an integrated T. K reception system, tojlatted properties

E268,5 14.87

H020272

Defective Pitched Roofs (Rosemary Tiles), South Phase 25 - 17 Blocks

The removal of the existing Rosemary tiles or slates to the pitched rooh and the provision of a new concrete tiled roof with associated repairs at

Contract complete. Ailsa Building Ltd

2354,096.92

I H099327 ' i

Repoli pmtetl or1 04/02/2002 1 1 25 03 'fforn ?he ClMS Mdrjagement System (Status Repofl)' Page 5 of 10

Page 22: of 29 30 200 - mars.northlanarkshire.gov.uk · Home Safety & Security Door Entry North Phase 5, (5 Closes) Contract 2% complete. Combined contract. Door Entry Phase 4 (15 Closes)

Project Title and Description of Works

I

Defective Pitched Roofs (Rosemary Tiles), South Contract 20%

Progress to Date

H099342

Ailsa Building

Contractor / Tender Amount

Lift Replacement 2001/2002 - South Area l Contract 5% complete.

Defective Pitched Roofs (Rosemary Tiles), South ~ Contract Phase 28 - 26 Blocks I

Llft

Re-roofing of 15 blocks in Bellshill and 11 blocks in Viewpark. ~

I Helforn Ltd

1 2256,714.92

H099341

~

Defective Pitched Roofs (Rosemary Tiles), South Phase 29 - 25 Blocks

Re-roofing of2 blocks in Wishaw, 9 blocks in Overtown, 2 blocks in Newmains, 1 block in Netherton, 2 blocks in Cleland and 5 blocks in Craigneuk.

Contract complete. 1 Helforn Ltd

1 2262,272.15

Phase 30 - 25 Blocks

Re-roofing of 25 No. Blocks

Ltd

1 2175,714.18

Defective Pitched Roofs (Rosemary Tiles), South Phase 31 and 32 - 25 + 41 Blocks

Contract 7% I

Re-Roofing of 2.5 No. Blocks. I

1 Helforn Ltd

1 2615,196.90

, H020198

Lift Replacement 2000/2001 - South Area

L$t replacement and associated works.

l Contract 90% complete. Combined contract. ~ Lift

Maintenance Ltd

Lifl replacement with associated gear and builderwork at Airbles Tower Motherwell.

1 2596,816.00

I , H090002

Report prmtec! or1 04/02/2002 11.25'03 'from the CIMS Management System jStaii!s Report}' Page G of 10

Page 23: of 29 30 200 - mars.northlanarkshire.gov.uk · Home Safety & Security Door Entry North Phase 5, (5 Closes) Contract 2% complete. Combined contract. Door Entry Phase 4 (15 Closes)

Major Repairs 2001/2002 26 Sandyhill Avenue, Shotts.

Demolition at 24 &

Demolition o f2 houses in a block of5 terraced houses, the re- instatement o fa gable wall and the formation of a carpark over the demolition area. i

Nicholson (Contracts) Ltd

Letter Of acceptance issued. Start on site mid February.

f 52,224.22

Major Repairs 2001/2002 at 130-160 & 162-192 Linghope Place -

Demolition of ~ l ~ ~ h George Hunter (Demolishers)

Pre Start meeting held. Awaiting decant Of tenants.

I ' H001108

Peter Johnston Construction

Ltd

Major Repairs 2001/2002 - Harthill - Retaining Wall - Murdostoun Crescent

Start On site for 1 2o02.

1 HOOlllO

Newarthill and Carfin The replacement offlat porch roofs withpitched, together with Associated Drainage alterations

J.B Bennett ~ (Contracts) Ltd

Major Repairs 2001/2002 - Homeless Unit West Hamilton Street, Motherwell, New Build

Grant ofE350k f h n RSI and 5150k in Programme. ~ Contract 75% complete.

€0.00

New building to form brick built construction with pitched roof 1 1 €494,949.81

H090314

Major Repairs 2001/2002 - Ministry Houses South Phase 4 - Mossend

40%

I

ReJurbishment ofMrnistry Houses at Mossend, comprising replacement of existing roof slates with new concrete roof tiles, repairs to roof timbers, repairs to rainwater goods, and application of insulated render system.

I Helfom Ltd

f270,539.16

~ H098365

I H020178

~ i

~~~

Repor? pripieci on 04/02/2002 I I 25 03 'from ?fie CAMS Mmagement System (Status Rep@' Page 7 of 10

Page 24: of 29 30 200 - mars.northlanarkshire.gov.uk · Home Safety & Security Door Entry North Phase 5, (5 Closes) Contract 2% complete. Combined contract. Door Entry Phase 4 (15 Closes)

Project Title and Description of Works

Non Trad Houses - VCB Houses, Pather

Progress to Date

Contract 70% complete. Ailsa Building

Contractor / Tender Amount

Major Repairs 2001/2002 - Re-Surfacing Access Decks / Balconies - 2-24 Arcadia Street, Bellshill

Removal ofexisting asphalt and application of new asphalt and associated concrete repairs

Tender report being prepared. Scottish Roofing Services

~ E68,373.25

1 H001103

Major Repairs 2001/2002 - Renewal of Water Pumping Equipment Phase 2

Renewal of water pumping equipment at Calder, Witchwood, Dunbeth Ct Nth, Dunbeth Ct Sth, Shields, Meryton, Grange & Muirhouse Towers

Major Repairs 2001/2002 -Glencairn Tower, Motherwell - Work to Fire Doors

New Ironmongery to Fire Doors

Major Repairs 2001/2002 -Removal/ Encapsulation of SE Ducts to 5 No. Tower Blocks

removal of air and room heaters and encapsulation of SE ducts to 7 No. Towers in Motherwell(Flemington) and Coatbridge

Tender accepted. Work to start on site end of January. Jmes Frew Ltd

1 E83,412.20

I H001098

Being billed.

I EO.00

, H001123

Letter of acceptance issued; awaiting Contractors programme.

Kitsons Environmental Europe Limited E1,241,956.46

H020285

Major Repairs 2002/2003 - 24 Limegrove Street / 2-24 Bellshill New Asphalt Surfacing To Existing

. Balcony Walkways 2- Shirrell Avenue,

Concrete Access Decks

Tenders due to be returned by 15 February 2002.

EO.00

H001160

Re-roofing, application of external render to non-traditional houses (coupled with formation of entrance canopies)

1 E268,836.21

1 H020300

Report printeci or? 01/02/2002 11 25 03 ?row the ClMS Mariagement Syatem (Statiis Repor?)' Page 8 of 70

Page 25: of 29 30 200 - mars.northlanarkshire.gov.uk · Home Safety & Security Door Entry North Phase 5, (5 Closes) Contract 2% complete. Combined contract. Door Entry Phase 4 (15 Closes)

Project Title and Description of Works Progress to Date

Re-rendering 2001/2002 South Area Phase 12 - 18 blocks, Tinto Crescent, Wishaw

20%

Contractor / Tender Amount

A.C. Whyte & Co. Ltd

Re-rendering 2000/2001 South Area Phase 10 - 89 Houses Newarthill

Re-rendering 2001/2002 South Area Phase 15 -

Polymer over render to existing 2 storey housing

I

Tenders being checked.

Contract substantially complete. A.C. Whyte & Co. Ltd

f245,788.34

~ H020179

Re-rendering 2001/2002 South Area Phase 11 - Vennacher Street, Shotts

Polymer over render and replacement ofjlat porch roojs to I7 blocks of terraced and semi detachedproperties in Shotts

~

Contract 40% complete. ~ Ailsa Building

Ltd

1 E204,985.76

Polymer altered over render system, to I 8 blocks of two storey houses.

1 E174,004.61

I H020274 I

Re-rendering 2001/2002 South Area Phase 13 - 78 Houses, Viewpark

Re-rendering to 78 No 2 storey terraced type housing including re-rendering to chimneys, also includes paintenvork

Contract 12% complete. ~ PBL , Construction

f299,052.00

1 H001030

Re-rendering 2001/2002 South Area Phase 14 - 88 Houses Bellshill and Motherwell.

Polymer over render to 69 No. two storey houses 1

Letter of acceptance issued 18 January 2002. Garrett ~ Nicholson

1 f198,240.24

~ H001031

Polymer over render to 69 No. two storey houses fO.OO

H001032

Repoiipiinted ori 04/02/2002 I 1 25 03 !from the ClMS Mariagement Systen? (Statiis Report)' Page 9 of ?0

Page 26: of 29 30 200 - mars.northlanarkshire.gov.uk · Home Safety & Security Door Entry North Phase 5, (5 Closes) Contract 2% complete. Combined contract. Door Entry Phase 4 (15 Closes)

Project Title and Description of Works

CCTV and Controlled Door Entry Systems at Contract 90%

Progress to Date

Semple &

Contractor I Tender Amount

Re-roofing (Flat Roofs etc), Merry StLeslie St, Motherwell

Construction of a pitched roof over the existingflat roof together with associated drainage works etc. Top floor offlats to have insulated render system applied andfloors below to be cavityfilled; construct bin stores to rear yard, and re-roof stores to shops.

Contract 55% complete. 1 Helfom Ltd

E427,395.36

1 H099086

The work comprises the upgrading of the existing CCTVand secure door entry systems in the Jewel Scheme, Bellshill.

, f128,945.32

1 H099027

Door Entry 2001/2002 (South Area) - Batch D (22 closes)

Installation of new door entry systems at 22 locations throughout the south District of North Lanarkshire

Contract 20% complete. Martec Engineering Group Ltd

f234J59.42

H020278

First Stop Shop - Upgrade to Shotts Housing Office

Extension and internal alterations to housing oflce to include works to form wheelchair accessible areas

Contractor started on site 14 January 2002. J Grant (Builders) Ltd

1 f185,908.97

l H020202

Repofi punted or? 04/02/2002 I 7 25 03 'from the CiMS Mariageinent Systevr (Statiis Repof?)' Page 10 of 10