NORTH LANARKSHIRE COUNCIL
To: HOUSING AND TECHNICAL Subject: HOUSING CAPITAL MONITORING SERVICES AND PROGRESS STATUS REPORT (CAPITAL PROGRAMME AND
From: DIRECTOR OF HOUSING AND PROPERTY SERVICES
REPAIRS) SUB-COMMITTEE
Date: 4 February 2002 Ref: DMcC/AW/ HOAD00002
REPORT
(1 .OO)
(1.01)
(2.00)
(2.01)
(3.00)
(3.01)
INTRODUCTION
A copy of the above report is attached for Committee's consideration.
The report reviews progress in relation to the implementation of the Housing Capital Programme for 2001/02 as approved by Committee on 29 March 2001 and reviewed at the Housing and Technical Services Committee of 30 August 200 1.
RECOMMENDATION
Committee is asked to note this report.
BACKGROUND
Available from the Housing and Property Services Department.
A
McKenzie Property Services
Enc.
I \OO\HO\ADO0002\STATUS REPORT DOC
Cumbernauld & Kilsyth
Kilsyth - Remedial Work to 31-57 Northfield ~ Contract Ailsa Building
Remedial Work - Insulated Render ' E21,100.38
I 1 H020281
Energy Efficiency Electric Heating Replacement Programme 2001/2002- Combined Area Contract 1
Gas, Electric Wet System and Solid Fuel Heating Pipework - Approx. 345 Houses Various Sz res, North. Central and South Areas
Heating Programme - Gas Mains Infill & Gas Mains Connections -(Cumbernauld/Kilsyth)
The works comprise the installation of extensions to existing gas mains and gas mains connections to individual houses in connection with the heating contracts at Mainhead Terr, Barlandfauld St, Bogside Rd, Donaldson Ave, Edmonstone Di Fisher Ave, Howe Rd, Kirklands Cres, Manse Rd, Balmalloch Rd, Castlehill Vw Crimmond PI, Montrose Gdns
Heating Programme Gas Warm Air Heating Replacement Contract 2A - Kilsyth Area
Heating Replacement Programme, 2001/02 - Replacement of Older/Obsolete Gas Wet & Sol Fuel Heating Systems Contract 1 -North - 102, Contract 2 - Central - 307 Houses (Pipework f327,000 - Lease f655,000) Heating Replacement Programme 2001/2002 Replacement of older/obsolete gas we and solidfuel heating systems
~~
Contract 10% complete. Combined conract. 136 houses north area.
Contract extended to include properties contained within heating programme 20011 2002Combined with Cent(H099124), XCDC(H099 123).
Contract 35% complete. Combined contract.
Letter of Acceptance issued dated 17th January2002 Combined contract. 54 houses C&K area.
D. Campbell
&236,75 1.98
H0812 13
TransCo Connections
&461,3 15.50
H099121
:.F.M Building Services Ltd
E27 1,647.60
H081090
'.F.M Building Services Ltd
E232,895.67
H020288
Reporf printed on 04/02/2002 14:50:35 'from the ClMS Management System (Status Reporf)' Page I Of 3
Project Title and Description of Works
Window Replacement Programme 20001/02 - Phase 23 & 24 Kilsyth (55 Houses)
Window Replacement of existing timberlmetal doors and windows. Doors only renewed gfpart of composite type screen. Standalone door not included
Window Replacement Programme 2003/2004 Phase 25 (21 Houses) Kilsyth
Major Repairs & Environmentals Defective Pitched Roofs (Rosemary Tiles), Kilsyth, Phase 17
Re-Roojhg
Defective Pitched Roofs (Rosemary Tiles), Kilsyth, Phase 18
Essential Repairs Tied Houses - Demolition of Janitor's House - St Lucy's Primary School Cumbernauld Demolition ofJanitors House
Re-rendering 2001/2002: Kilsyth, Phase 5
Re-rendering and associated works at Livingstone Park and Arden Grove (19 blocks, 42 dwellings)
Amount
Tender report being prepared. Site start February 2002. J & S McFadyen Ltd
I I &119,027.00
1 H001077
I
Design Brief with Design Services. 200312004 Programme.
I so.00
1 H081011
Contract 40% complete.
Negotiated tender ?
Contract complete.
Contract 5% complete. Additional 15 blocks to be added to complete re-render spend in C&K area.Committee agreed to negotiation with contractor. Further report to be prepared.
4ilsa Building Ltd
&349,501.12
H020256
go.00
H001067
Angus (Asbestos
LemovaliMetals f6,121.50
H080022
i .C. Whyte & Co. Ltd
2174,087.15
H001081
~ ~~ ~
Report printed on 04/02/2002 14:50:35 'from the ClMS Management System (Status Report)' Page 2 of 3
Re-rendering 2001/2002: Kilsyth, Phase 6 (15 Blocks)
Re - Rendering Ph 6 - Castlehill View, Graham Place, Balmalloch Road, Kilsyth
Re-rendering Phase 7 (15 Blocks)
Home Safety & Security 2001/02 Re-Wiring - Ph 6 & 7 Condorrat & Kilsyth
Re-wire 34 House in Condorrat & kilsyth + 35 Houses in Balmalloch Road
Door Entry North Phase 5, (5 Closes)
New doors, screens and entry system to various locations in North area
(2nd Issue - Title Alteredfiom Central to North)
Rewiring 2001/2002 - North Area Phase 3 - Cumbernauld & Kilsyth (35 Houses)
Letter of Acceptance issued dated 1 1 th December 200 1.
Contract now added to Phase 5 contract.
Contractor / Tender Amount
Ailsa Building Ltd
El 11,604.92
HOOlll8
20.00
H08101S
Letter of Acceptance isssued dated 7th January 2002.
Contract 2% complete. Combined contract.
Contract 80% complete. Combined contract. Report prepared requesting authorisation to negotiate additional properties.
Maclin Electrical Ltd
&65,5 18.17
H001116
Bell Security (Scotland) Ltd
&68,295.00
H001024
ordan Electrics Ltd
E98,718.48
H091293
Report printed on 04/02/2002 14:50:35 ‘from the ClMS Management System (Status Report)‘ Page 3 of 3
Moodiesburn
Energy Efficiency Heating Replacement Programme, 2001/02 - ' Letter Of Acceptance issued dated 17th 2o02 'C,F,M Building Replacement of Older/Obsolete G~~ Wet & Solid Fuel Heating Systems I
Combined Contract. 14 houses Moodiesburn area. Services Ltd
2232,895.67
I I
I 1 H083014
Window Replacement Programme 2001/02 - Ph 21 & 22 Moodiesburn (68 Houses)
Window Replacement - 68 Houses
Major Repairs & Environmentals Defective Pitched Roofs (Rosemary Tiles), Moodiesburn, Phase 17
The removal of the existing Rosemary tiles or slates to the pitched roofs and the provision of a new concrete tiled roof with associated repairs.
Defective Pitched Roofs (Rosemary Tiles), Moodiesburn, Phase 18 (31 Blocks)
Entrance Canopies - Bridgeburn Drive, Moodiesburn
Fitting of New Group Canopies at Close Entrance
Tender report being prepared. Site start February 2002. J & S McFadyen Ltd
~ 2142,573.94
Contract 60% complete.
2002/2003 Programme
Letter of Acceptance issued dated 17th December 200 1. Additional houses to be added to meet allocation figure. Report prepared requesting authority to negotiate additional properties.
Helforn Ltd
&144,201.86
H020252
20.00
H001137
Fullwood Holdings Ltd
234,089.72
HOOl102
Page 1 of 2 Report printed on 04/02/2002 14:50:46 'from the ClMS Management System (Status Report)'
Home Safety & Security Door Entry North Phase 5, (5 Closes) Contract 2% complete. Combined contract.
Door Entry Phase 4 (15 Closes) Contract 3 8% complete.
Door Entry Phase 6 (5 Closes)
Rewiring 2001/2002 - North Area Phase 3 - Moodiesburn (44 Houses)
Electrical Rewiring of Houses
Rewiring, Moodiesburn, Phase 7 (45 Houses)
Brief with Design Services.
Contract 80% complete. Combined contract. Additional 35 houses to be added to contract to complete spend in Moodiesburn area.Report prepared requesting authority to negotiate additional properties.
2002/2003 Programme.
Bell Security (Scotland) Ltd
f68.295.00
H083024
Bell Security (Scotland) Ltd
E108,136.00
H083011
f O . O O
H083012
ordan Electrics Ltd
E98,718.48
H020293
&O.OO
H 0 9 1005
Report printed on 04/02/2002 14:50:46 'from the ClMS Management System (Status Report)' Page 2 of 2
Ex CDC
Estate Regeneration Mini Programme, Spruce Road, Abronhill (Ex CDC) Phase 2 (24 Flats)
1 Housing Dept. surveys
I
I 1 H08200S
Mini Programme, Spruce Road, Abronhill (Ex 1 Housing surveys CDC) Phase 3 (18 Flats) i
Energy Efficiency Heating Programme - Gas Mains Infill & Gas Mains Connections (Ex CDC)
The works comprise the installation of extensions to existing gas mains and gas mains connections to individual houses in connection with the heating contracts at Elm Drive, Hornbeam Road, Larch Court, Oak Road, Pine Close
Heating Replacement Programme, 2001/02 - Replacement of Older/Obsolete Gas Wet & Solid Fuel Heating Systems (Ex CDC)
Window Replacement Programme (Ex CDC), Phase 12,51 houses 2002-2003
Replacement oyexisting doors and windows with UPVC units double glazed The works include making goodfinrshings disturbedparticularly plaster, roughcast and smooth cement sand render
Contract extended to include properties contained within heating programme 2001/ 2002Combined with C&K(H09912 l),XCDC(99123)
Letter of Acceptance issued dated 17th January 2002. Combined contract. 33 houses EX CDC area.
Tender report being prepared - 2002103 budget.
TransCo
E461,315.75
H099123
:.F.M Building Services Ltd
f232,895.61
HOS2017
J & S McFadyen Ltd
&123,699.50
H020257
Page 1 o f 3 Report printed on 04/02/2002 14:50:40 'from the ClMS Management System (Status Reporf)'
Major Repairs & Environmentals ~
Re-rendering Programme 2001/02, (EX CDC) - Phase 4 (52 Houses) Abronhill
Re - Rendering Ph 4 - 52 Houses Pine Place, Abronhill
Re-rendering Programme 2001/02, (Ex CDC) - Phase 5 (29 Houses)
Re-rendering and associated works to 29 No. Domestic Properties
Re-rendering Programme 2001/02, (Ex CDC) - Phase 6 (36 Houses)
Re-rendering Programme 2001/02, (Ex CDC) - Phase 7 (42 Houses)
Re-rendering Programme 2001/02, (Ex CDC) - Phase 8 (36 Houses)
Contract on site.
Contract 85% complete.
Design Brief with Design Services. 2003/04 Programme.
Design Brief with Design Services. 2004/05 Programme.
Garrett Nicholson
E139.184.94
HOOl 1 I7
Garrett Nicholson
E112,378.46
H001047
EO.00
H082010
EO.00
H082012
Design Brief with Design Services. 2005106 Programme.
I Eo.oo
Page 2 of 3 Report printed on 04/02/2002 14:50:41 'from the ClMS Management System (Status Report)'
Home Safety & Security 2001/02 Re-Wiring - Ph 8 ,9 & 10 - (Ex CDC) Abronhill, Cumbernauld
Re-Wire Ph 8, 9 & 10 - 100 Houses - Abronhill, Cumbernauld
Rewiring 2001/2002 - North Area Phase 3 - (Ex CDC) (34 Houses)
Letter of Acceptance issued dated 7th January 2002.
Contract 80% complete. Combined contract. Report prepared requesting authority to negotiate additional properties.
M a c h Electrical Ltd
587,542.74
HOOl115
Jordan Electrics , Ltd
&98,7 18.48
~ H090293
Report printed on 04/02/2002 14:50:41 'from the ClMS Management System (Status Report)' Page 3 of 3
Central Project Title and Description of Works
Estate Regeneration Caldercruix - Demolition of 91-113 Main Street Letter of Acceptance issued dated 21st January 2002. Nicholson
(Contracts) Ltd
$35.647.50 Demolition ojHousing
H001112
Estate Regeneration - Calder Street & William Street Coatbridge
Letter of Acceptance issued dated 29th January 2002. Stewart Landscapes Ltd
f403,916.66 External hard and soft landscaping, new fencing and car parking, new lighting
H020244
Estate Regeneration - Refurbishment of Flats Shanks Street & Mill Street, Airdrie
Contract 30% complete. Additional work added to the contract.
Ailsa Building Ltd
2 148,9 18.65
H020241
Re-roofing, re-rendering, installation of door entry system 1
Joseph Leckie & Sons Ltd
1 &30,651.10
Contract 98% complete. Estate Regeneration - Selby Place, Coatbridge
External refurbishment - pathsfencing and associated landscape works
1 H020242
1 PBL 1 Construction
Letter of Acceptance issued dated 30th January 2002. ~~ ~
Estate Regeneration, Clarkston, Airdrie, Phase 2 (3 block)
1 &818,879.92 Improvements to jour storey jlatted development, consisting of poor quality 1960's builtjlat roofed properties. The provision of new pitched roofs, re-rendering ojthe external walls, the enclosure of certain balcony areas, refurbishment of adjacent garages and external works. i H020022
Estate Regeneration, Petersburn, Phase 5, Islay (8 blocks)
Contract 5% complete. G.F. Sharp & Co. Ltd.
246 1,264.00
H099332
Re-rendering of external walls with polymer overcoat system and construction of new pitched roof to two-storey and four- storey dwellings, including the renewalhepair of rainwater goods and minor external works.
Report printed on 04/02/2002 14:50:28 'from the ClMS Management System (Status Report)' Page I of 7
Project Title and Description of Works
Estate Regeneration, Sikeside Phase 3
Phase 3 of regeneration proposals. The refurbishment of dwellings.
External Refurbishment at 23/41 Kippen Street: Airdrie
5 storey block - to be externally refurbished as block in Kennedy Drive & Kippen Street previously
Mini Programme, Langloan, External Improvements, Phase 3
Roof repairs, render repairs, provision of new GRP canopies, landscaping, and sundq associated works
Proposed Demoltion of 1-16 Erskine Court, 1-1f Cameron Court and 1-6 Ogilvie Court, Clarkston, Airdrie Demolition of 3 No. 2,3 & 4 Storey Traditional Housing with Flat Roof Construction - Including Removal of Asbestos
Relocation of CCTV Equipment at Old Monkland Coatbridge
Reinstallation of 12 Nr. Camerasboles with new cabling and sundry civils works.
Energy Efficiency
Progress to Date
zontract 85% complete.
2ontract 2% complete.
Zontract 94% complete.
Zontract 25% complete.
Zontract 40% complete.
Contractor / Tender Amount
Lovell
&396,90 1.63
H020267
PBL Construction
E21 1,945.45
H001050
Stewart Landscapes Ltd
5375,642.79
H020113
Nicholson (Contracts) Ltd
E59,934.00
H001073
Semple & Cochrane Ltd
253,787.17
H001054
Electric Heating Replacement Programme 2001/2002- Combined Area Contract 1
Gas, Electric Wet System and Solid Fuel Heating Pipework - Approx. 345 Houses Various Sites, North, Central and South Areas
Contract 10% complete. Combined conract. 149 houses central area.
D. Campbell
E236,751.98
H020213
Page 2 of 7 Report printed on 04/02/2002 14:50:28 'from the ClMS Management System (Status Report)'
Project Title and Description of Works
Airdrie Auld BraeMack St./Anderson Lane, Chapelside Ph 7 - Refurbishment of Lock-ups
Gas Warm Air Replacement Programme 2001/2002 - Central Area - 183 Houses
Letter of Acceptance issued dated 21st January 2002.Site start in February 2o02.
Heating Programme Gas Warm Air Heating Replacement Contract 2A - Central Area
Heating Replacement Programme, 2001102 - Replacement of Older/Obsolete Gas Wet & Solid Fuel Heating Systems Contract 1 - North - 102, Contract 2 - Central - 307 Houses (Pipework f327,000 - lease $655,000) Heating Replacement Programme 2001/2002 Replacement of older/obsolete gas wet and solidfire1 heating systems
Progress to Date
zontract 90% complete. Gas warm air Cont 2.Combined :ontract.
Zontract 35% complete. Combined contract.
Letter of Acceptance issued dated 16th January 2002. Combined contract. 306 houses Central area.
Refurbishment of78 lock-Ups, New Metal Fencing to Drying Greens
~
Asbestos Removal - Redbridge and Coltswood Towers (Central Area)
Defective Pitched Roofs (Rosemary Tiles), Central, Phase 14 (39 Blocks)
The removal ofthe existing Rosemary tiles or slates to the pitched roofs and the provision o fa new concrete tiled roof with associated repairs.
Tenders returned. Tender to be reported. Site start JanuaryiFebruary 2002.
Contractor / Tender Amount
:.F.M Building Services Ltd
2455,030.16
H091214
2.F.M Building Services Ltd
2271,647.60
H001090
2.F.M Building Services Ltd
2232,895.67
H020289
PBL Construction
&342,2 12.6 1
H001075
Kitsons Environmental Europe Limited 21,241,956.46
H020 10 1
Sontract 50% complete. Helforn Ltd
f364,035.63
H020253
Report printed on 04/02/2002 14:50:28 ’from the ClMS Management System (Status Report)’ Page 3 of 7
Project Title and Description of Works
Defective Pitched Roofs (Rosemary Tiles), Central, Phase 15 (36 Blocks)
Re-roofing
Defective Pitched Roofs (Rosemary Tiles), Central, Re-Roofing Phase 16 (49 Blocks)
Defective Pitched Roofs (Rosemary Tiles), Central, Re-Roofing Phase 17 (47 Blocks)
The removal of the existing Rosemay tiles or slates to the pitched roofs and the provisron of a new concrete tiled roof with associated repairs.
Emergency Lighting Replacement - Whifflet an Calder Courts, Coatbridge
Emergency Lighting Replacement
Environmental Improvements - Addiewell Placc Phase 2
The work comprises hard and soft landscaping around Addiewell Place, Coatbridge.
Lead Water mains Replacement 2001/02
Replacement of Lead Water Mains - Coatbridge & Glenboig
Progress to Date
3riginal contract 90% complete.
Vegotiated tender ?
2002-2003 Programme. Contract documents being xepared.
zontract 2% complete. Committee approval given for 3lairgrove & Menyston to be added into the contract. 'urther report to be prepared.
Letter of Acceptance issued dated 7th January 2002.
Tender reported. Await Letter of acceptance. Site start February 2002.
Contractor / Tender Amount
Ailsa Building Ltd
$895,683.02
H020254
f O . O O
H001091
f O . O O
H001092
Charles McCrea Ltd
E l 11,367.63
HOO 1049
Land Engineering
(Scotland) Ltd E72,556.48
H001155
Morrison Property Care
&35,3 16.75
HOOl154
Page 4 of 7 Report printed on 04/02/2002 14:50:28 'from the ClMS Management System (Status ReportJ'
Project Title and Description of Works
Lift Replacement 2000/01 - Central Area
Lift replacement and associated works.
Lift Replacement 2001/2002 - Dunbeth Court
Major Repairs 2001/2002 - Renewal of Water Pumping Equipment Phase 2
Renewal of waterpumping equipment at Calder, Witchwood, Dunbeth Ct Nth, Dunbeth Ct Sth, Shields, Merryton, Grange & Muirhouse Towers
Re-rendering, Central Area, Phase 4 (22 Blocks:
Re-rendering and insulated re-renderinghe-roofing of various house types
Re-rendering, Central Area, Phase 5
Progress to Date
Contract 90% complete. Combined contract.
Contract 5% complete.
Tender accepted. Work to start on site end of January.
Contract 85% complete. Additional 15 blocks added to contract to complete spend in central area. Report prepared requesting authority to negotiate additional properties.
Address list received. Contract documents being prepared.Tender issue next financial year.
~ ~ - ~ ~ ~ f i ~ ~ ph 2 & Asociated Work at 2/16 & 18/32 William St. Coatbridge
Tender acceptance period elapsed. Contract has been 1 shelved meantime due to problems with owner occupiers.
Contractor / Tender Amount
Lift Maintenance
Ltd ES70,82S.lS
H090027
Lift Maintenance
Ltd &596,816.00
H080019
lames Frew Ltd
&83,412.20
HOO 1098
4ilsa Building Ltd
&343,798.86
H091006
EO.00
H080020
4ilsa Building Ltd
Provision of a Pitched Roof on a Flat Roofed Building - 211 6 18/32 William Street, Coatbridge I
&103,803.26
HOO1088
,
Report printed on 04/02/2002 14:50:28 'from the ClMS Management System (Status Report)' Page 5 of 7
Door Entry, Central, Phase 4. Contract complete.
Project Title and Description of Works Progress to Date Contractor / Tender Amount
. -
Shops at Laidon Road, Airdrie. Contract complete.
fO.OO Works include construction of a pitched roof over the existing jlat roof and the external refurbishment of shop units at Laidon Road. Airdrie.
H099105
Swedish Timber Houses, Clarkston, Airdrie
External refurbishment of timber housing
Survey conducted.
fO.00
H090065
Tower Block Refurbishment 1999/00 - Upgrade Floor Coverings, Jackson Court, Coatbridge
levar Flooring Ltd
Contract 55% complete. Committee approved Devar contract be determined. Negotiation undenvay to complete contract with new contractor. Further report to be prepared
221 8.3 13.86 Replacement ofjloor coverings to landings, common areas and half landings.
H099324
Home Safety & Security 2001/02 Controlled Door Entry Programme Central Phase 5a
Martec Engineering Group Ltd
2 109,397.36
Letter of Acceptance issued dated 28th November 2001.
Door Entry Programme
HOO 1089
I Tender issued. 2001/02 Controlled Door Entry Programme
Central Phase 5b
I EO.00 New Door Entry Systems - Airdrie, Coatbridge, Salsburgh & Chapelhall
HOG1122
Martec Engineering
Group Ltd 2181,458.89 The installation or renewal ofsecure Door Entry systems with
metal screens and assosiated builder works.
H020043
Report printed on 04/02/2002 14:50:28 'from the ClMS Management System (Status Repott)' Page 6 of 7
Project Title and Description of Works
Electric Rewire Programme 2001/2002 - Central Area - Pentland, Merrick & Cheviot Courts, Phase 5, Airdrie Rewiring of 138Jats and communal areas
Electric Rewire Programme 2001/2002 - Central Area - Witchwood Court, Main Switchboard
Re- Wiring Main Switchboard
-
Community Care Street Lighting - Afton Gardens and James' Way, Coatbridge
Replacement, cables, columns, fittings etc
Homeless Initiatives
Progress to Date
Committee approved negotiation with Jordan Electrics. Contract added into Woodside Tower contract. Further report to be prepared.
Letter of Acceptance issued dated 9th January 2002.
Contractor I Tender Amount
ordan Electrics Ltd
5175,000.00
H020299
ackson Rich & Co. Ltd
f76,128.64
H001119
Contract 5% complete. Balfour Beattie Power Networks
1 597,429.94
~ H020298
John Buchanan Shop Fitters
Internal Building Conversion Works I 1 550,36626
~ H001085
Report printed on 04/02/2002 14:50:29 'from the ClMS Management System (Status Report)' Page 7 of 7
Project Title and Description of Works Progress to Date Contractor / Tender
Coltness - Demolition Phase 1 - 3 No. Deck Access Blocks (+2 Block Extension)
Demolition of blocks at 10-28, 30-48 and 50-68 Walkerburn Drive, Coltness.
Contract substantially complete. Central Demolition & Dismantling E121,849.38
H090152
Coltness - Demolition Phase 2 - Demolition Works
49-67 Walkerburn Drive / 36-58 Innerleithan Drive
1 Contract 20% complete. George Hunter (Demolishers)
Ltd f40,545.75
H001145
I
Coltness - Point Block Upgrading Phase 1 ~ Contract 2% complete. ~ Clark :;tracts
Insulated external render; balcony alterations; stairwell curtain walling replacement; stairwell decoration and new floor finish; pram and bin store demolition; provision of bin storage enclosures, drying areas and landscaping.
f660,736.01
H020173
~
Coltness - Relocation of CCTV system Work to be carried out by Housing Dept.
Demolition of 38-44,39-57,46-52 and 56-60 Holm Gardens, Bellshill
~
Demolition 4 No. - 4 Storey High Deck Access Blocks
Contract complete.
H084021
George Hunter (Demolishers)
Ltd 559,535.00
1 H001013
Report piintea' on 04/02/2002 1 I 25 02 'from the CiMS MaiiagemefJt System (Statiis Repor?)' Page f of 70
Project Title and Description of Works
~ i ~ i programme spruce way, Holytown R ~ - rendering and Back Court Improvements
Progress to Date
CCTV to progress as an extension to Tannochside CCTV
~
(ADT)
20.00
Contractor / Tender Amount
Refurbishment of Garage lock Ups
Mini - Programme - Watling StreeUHotatius Street, Renovation and Back Court Improvements Re-roofing, replacement rainwater goods, re-rendering, cavity insiallation, installaiion door entry system, erection of entrance canopies, balcony infilling, plaser finish, extension of power/lighting andplastic windows, soft and hard landscaping to back court area
Construction.
Contract 25% complete. Fullwood Holdings Ltd
(Blacktop f204,5 15.92
H020174
Mini Programme - 13-47 Maryknowe Road, Carfin - External Landscaping to Rear Garden
Soft and hard landscaping to back court areas; timber boundary fencing and bin store re-roofing.
Letter of acceptance issued 29 January 2002. I Stone3
E131,201.64
Mini Programme 1998/99 - Thomson Avenue, Netherton (South)
The works comprise the application of an insulated over render, rewiring of the houses, levellingfloors, new curtain walling to stair wells, re-roofing bin stores.
Contract 88% complete. 5 Blocks handed over. Mackenzie Construction
Ltd l E1,596,887.26
H098089
Motherwell - Refurbishment of Gas Flats, 519- 593 Merry Street, Motherwell
Re roofing and external reji4rbishment of 4 blocks of 5 storey flats, Merry Street, Motherwell
Contract 15% complete. PBL ~ Construction
1 E393,822.56
i H001036
Repori printer! on 04/02/2002 I 1 25 02 'from the CIMS Management Systeni (SfafilS %?pod)' Page 2 of 10
Amount
' Tannochside 2001/02 - Extend External CCTV System
40% Report to extend to Housing Office, Spruce Way, Holytown and digital recording at Motherwell Police Station.
Muirhouse Environmentals Phase 4
A.D T. Fire & Security
, Contract 99% complete. Planting in progress.
West Crindledyke, ~~~~~i~~ Demolition of 55- 73 Isla Avenue.
I Stone3
Letter of Acceptance issued. To commence on completion I
of new Housing Office. E
~ Demolition Ltd
The work comprises hard and soft landscaping around Dalziel, Barons and Netherwood Towers, Muirhouse, Motherwell.
West Crindledyke, Newmains - Relocation of Housing Office
1 E433,505.40
Contract 75% complete.
Electric Heating Replacement Programme Contract 10% complete. Combined conract. 60 houses
Installation of I0 No. fully firnctionable colour cameras, controlled at Motherwell Police Station
Campbell
I i 5146,178.96
The workcomprises the Demolition of thepoint blockat 55-73 Isla Avenue, levelling over the area with a suitable granular material, and soiling and seeding the site
' 1 523,852.06
Provision of new offstreetparking together with new access roads, hard and soft landscaping to 2 blocks ofjlats and footpath realignment, street lighting and soft landscaping works to open area betweenjlats
~
1 50.00
~ H020172
Erect new Housing Ofjce on site of former Community Centre, Newmains.
50.00
H020177
1 H084020
~~
Repoi: printed or1 04/02/2002 7 I 25 02 'from the CiMS Mariagernent Systenr (Siatiis Report)' Page 3 of 70
Amount
Contract 90% complete. Gas warm air Cont 2.Combined contract. Spend may need to be adjusted.
Gas Warm Air Replacement Programme 2001/2002 - South Area - 210 Houses
C,F,M Building Services Ltd
Gas ducted warm air in Airdrie, Coatbridge, Bellshill, Newarthill, Motherwell and Wishaw
Heating Programme 2001/2002 Wet
1 E455,030.16
I
' H020214
Contract 2% complete. Spend may need to be adjusted.
I The works comprise the installation of extensions to existing gas mains and gas mains connections to individual houses
Replacement of Old/Obsolete Gas Wet/Solid Fuel Heating Systems - South Area Replacement of old central heating with new to 403 Houses
f270,291.00
Services Ltd
E295,185 24
I H020018
Contract 35% complete. Combined contract. Spend may need to be adjusted.
C,F,M Building Services Ltd
E271,647.60
Heating Programme Gas Warm Air Heating Replacement Contract 2A - South Area
installed.
All windows fitted; porches to be fitted to approx 6 houses i
Window Replacement Programme 2000/01-
Tower Block Refurbishment - Leasing Pilot Scheme, Flemington
Walker Profiles
Rainscreen cladding to Burnside, Doonside, Lodge and Glassford Towers. Includes cladding, window pods to previously installed windows, curtain walling to common areas, new roof and groundfloor facade improvements. Lodge Tower requires concrete repairs before Rainscreen cladding is
1 H084090
Tender to be issued in February.
~ EO.00
~ H099345
Replacement of existing timberhetal windows with associated jnishings and repairs to I 7 houses.
E42,3 15.62
H020087
Report pnflted or1 04/02/2002 1 I 25 03 'from the CiMS Mariageinent System (Status Repor?)' Page 4 of 10
Project Title and Description of Works Progress to Date
South Area Priority M56-M57 - 153 Houses at HawthornIBeechwood, Wishaw.
Contractor / Tender
Phase 21 and 22 contract.
Window Replacement Programme 2000/01- South Priority M48-M50 (280 Houses)
uPVC Window Replacement of existing timberhetal doors and windows. Doors only renewed ifpart of composite type screen. Standalone' doors not included.
Contract complete. I h g l i a n Windows
$467,578.41
H020186
Window Replacement Programme 2001/02 - South Area Priority M51-M53 - 259 Houses, Bells hill. Replacement of existing doors and windows with UPVC units double glazed. The works include making goodjnishings disturbedparticularly plaster, roughcast and smooth cement sand render
Work due to start 7 January 2002 - now delayed until end February..
Walker Profiles
E45 5,705.52
H020259
Window Replacement Programme 2001/02 - South Area Priority M54 - Wishaw
Replacement of existing doors and windows with UPVC units double glazed The works include making goodjnishings distrubedparticularly plaster, roughcast and smooth cement sand render
Work due to start 7 January 2002 - now delayed until end February..
Walker Profiles
$249,040.61
H020258
Co. Ltd. Cleland - External Refurbishment of Two blocks 1 Contract 5% of Flatted properties, Nith Path, Cleland
Cavity insulation, polymer altered over render, installation of new pitched roof over monopitch rooj associated drainage, and the installation of an integrated T. K reception system, tojlatted properties
E268,5 14.87
H020272
Defective Pitched Roofs (Rosemary Tiles), South Phase 25 - 17 Blocks
The removal of the existing Rosemary tiles or slates to the pitched rooh and the provision of a new concrete tiled roof with associated repairs at
Contract complete. Ailsa Building Ltd
2354,096.92
I H099327 ' i
Repoli pmtetl or1 04/02/2002 1 1 25 03 'fforn ?he ClMS Mdrjagement System (Status Repofl)' Page 5 of 10
Project Title and Description of Works
I
Defective Pitched Roofs (Rosemary Tiles), South Contract 20%
Progress to Date
H099342
Ailsa Building
Contractor / Tender Amount
Lift Replacement 2001/2002 - South Area l Contract 5% complete.
Defective Pitched Roofs (Rosemary Tiles), South ~ Contract Phase 28 - 26 Blocks I
Llft
Re-roofing of 15 blocks in Bellshill and 11 blocks in Viewpark. ~
I Helforn Ltd
1 2256,714.92
H099341
~
Defective Pitched Roofs (Rosemary Tiles), South Phase 29 - 25 Blocks
Re-roofing of2 blocks in Wishaw, 9 blocks in Overtown, 2 blocks in Newmains, 1 block in Netherton, 2 blocks in Cleland and 5 blocks in Craigneuk.
Contract complete. 1 Helforn Ltd
1 2262,272.15
Phase 30 - 25 Blocks
Re-roofing of 25 No. Blocks
Ltd
1 2175,714.18
Defective Pitched Roofs (Rosemary Tiles), South Phase 31 and 32 - 25 + 41 Blocks
Contract 7% I
Re-Roofing of 2.5 No. Blocks. I
1 Helforn Ltd
1 2615,196.90
, H020198
Lift Replacement 2000/2001 - South Area
L$t replacement and associated works.
l Contract 90% complete. Combined contract. ~ Lift
Maintenance Ltd
Lifl replacement with associated gear and builderwork at Airbles Tower Motherwell.
1 2596,816.00
I , H090002
Report prmtec! or1 04/02/2002 11.25'03 'from the CIMS Management System jStaii!s Report}' Page G of 10
Major Repairs 2001/2002 26 Sandyhill Avenue, Shotts.
Demolition at 24 &
Demolition o f2 houses in a block of5 terraced houses, the re- instatement o fa gable wall and the formation of a carpark over the demolition area. i
Nicholson (Contracts) Ltd
Letter Of acceptance issued. Start on site mid February.
f 52,224.22
Major Repairs 2001/2002 at 130-160 & 162-192 Linghope Place -
Demolition of ~ l ~ ~ h George Hunter (Demolishers)
Pre Start meeting held. Awaiting decant Of tenants.
I ' H001108
Peter Johnston Construction
Ltd
Major Repairs 2001/2002 - Harthill - Retaining Wall - Murdostoun Crescent
Start On site for 1 2o02.
1 HOOlllO
Newarthill and Carfin The replacement offlat porch roofs withpitched, together with Associated Drainage alterations
J.B Bennett ~ (Contracts) Ltd
Major Repairs 2001/2002 - Homeless Unit West Hamilton Street, Motherwell, New Build
Grant ofE350k f h n RSI and 5150k in Programme. ~ Contract 75% complete.
€0.00
New building to form brick built construction with pitched roof 1 1 €494,949.81
H090314
Major Repairs 2001/2002 - Ministry Houses South Phase 4 - Mossend
40%
I
ReJurbishment ofMrnistry Houses at Mossend, comprising replacement of existing roof slates with new concrete roof tiles, repairs to roof timbers, repairs to rainwater goods, and application of insulated render system.
I Helfom Ltd
f270,539.16
~ H098365
I H020178
~ i
~~~
Repor? pripieci on 04/02/2002 I I 25 03 'from ?fie CAMS Mmagement System (Status Rep@' Page 7 of 10
Project Title and Description of Works
Non Trad Houses - VCB Houses, Pather
Progress to Date
Contract 70% complete. Ailsa Building
Contractor / Tender Amount
Major Repairs 2001/2002 - Re-Surfacing Access Decks / Balconies - 2-24 Arcadia Street, Bellshill
Removal ofexisting asphalt and application of new asphalt and associated concrete repairs
Tender report being prepared. Scottish Roofing Services
~ E68,373.25
1 H001103
Major Repairs 2001/2002 - Renewal of Water Pumping Equipment Phase 2
Renewal of water pumping equipment at Calder, Witchwood, Dunbeth Ct Nth, Dunbeth Ct Sth, Shields, Meryton, Grange & Muirhouse Towers
Major Repairs 2001/2002 -Glencairn Tower, Motherwell - Work to Fire Doors
New Ironmongery to Fire Doors
Major Repairs 2001/2002 -Removal/ Encapsulation of SE Ducts to 5 No. Tower Blocks
removal of air and room heaters and encapsulation of SE ducts to 7 No. Towers in Motherwell(Flemington) and Coatbridge
Tender accepted. Work to start on site end of January. Jmes Frew Ltd
1 E83,412.20
I H001098
Being billed.
I EO.00
, H001123
Letter of acceptance issued; awaiting Contractors programme.
Kitsons Environmental Europe Limited E1,241,956.46
H020285
Major Repairs 2002/2003 - 24 Limegrove Street / 2-24 Bellshill New Asphalt Surfacing To Existing
. Balcony Walkways 2- Shirrell Avenue,
Concrete Access Decks
Tenders due to be returned by 15 February 2002.
EO.00
H001160
Re-roofing, application of external render to non-traditional houses (coupled with formation of entrance canopies)
1 E268,836.21
1 H020300
Report printeci or? 01/02/2002 11 25 03 ?row the ClMS Mariagement Syatem (Statiis Repor?)' Page 8 of 70
Project Title and Description of Works Progress to Date
Re-rendering 2001/2002 South Area Phase 12 - 18 blocks, Tinto Crescent, Wishaw
20%
Contractor / Tender Amount
A.C. Whyte & Co. Ltd
Re-rendering 2000/2001 South Area Phase 10 - 89 Houses Newarthill
Re-rendering 2001/2002 South Area Phase 15 -
Polymer over render to existing 2 storey housing
I
Tenders being checked.
Contract substantially complete. A.C. Whyte & Co. Ltd
f245,788.34
~ H020179
Re-rendering 2001/2002 South Area Phase 11 - Vennacher Street, Shotts
Polymer over render and replacement ofjlat porch roojs to I7 blocks of terraced and semi detachedproperties in Shotts
~
Contract 40% complete. ~ Ailsa Building
Ltd
1 E204,985.76
Polymer altered over render system, to I 8 blocks of two storey houses.
1 E174,004.61
I H020274 I
Re-rendering 2001/2002 South Area Phase 13 - 78 Houses, Viewpark
Re-rendering to 78 No 2 storey terraced type housing including re-rendering to chimneys, also includes paintenvork
Contract 12% complete. ~ PBL , Construction
f299,052.00
1 H001030
Re-rendering 2001/2002 South Area Phase 14 - 88 Houses Bellshill and Motherwell.
Polymer over render to 69 No. two storey houses 1
Letter of acceptance issued 18 January 2002. Garrett ~ Nicholson
1 f198,240.24
~ H001031
Polymer over render to 69 No. two storey houses fO.OO
H001032
Repoiipiinted ori 04/02/2002 I 1 25 03 !from the ClMS Mariagement Systen? (Statiis Report)' Page 9 of ?0
Project Title and Description of Works
CCTV and Controlled Door Entry Systems at Contract 90%
Progress to Date
Semple &
Contractor I Tender Amount
Re-roofing (Flat Roofs etc), Merry StLeslie St, Motherwell
Construction of a pitched roof over the existingflat roof together with associated drainage works etc. Top floor offlats to have insulated render system applied andfloors below to be cavityfilled; construct bin stores to rear yard, and re-roof stores to shops.
Contract 55% complete. 1 Helfom Ltd
E427,395.36
1 H099086
The work comprises the upgrading of the existing CCTVand secure door entry systems in the Jewel Scheme, Bellshill.
, f128,945.32
1 H099027
Door Entry 2001/2002 (South Area) - Batch D (22 closes)
Installation of new door entry systems at 22 locations throughout the south District of North Lanarkshire
Contract 20% complete. Martec Engineering Group Ltd
f234J59.42
H020278
First Stop Shop - Upgrade to Shotts Housing Office
Extension and internal alterations to housing oflce to include works to form wheelchair accessible areas
Contractor started on site 14 January 2002. J Grant (Builders) Ltd
1 f185,908.97
l H020202
Repofi punted or? 04/02/2002 I 7 25 03 'from the CiMS Mariageinent Systevr (Statiis Repof?)' Page 10 of 10