PRE FEASIBILITY REPORT
For
PROPOSED EXPANSION OF WAX PRODUCTS IN
EXISTING UNIT
OF
M/s. WAXOILS PVT. LTD. PLOT NO. 13, 14, 15, 20, 21 & 22, BHARUCH IND CO. OP.
ESTATE, BHOLAV, TAL. & DIST.– BHARUCH- 392 002 (GUJ.)
2
CONTENTS
Sr. No. Description Page No.
1. Executive Summary 3
2. Introduction of the Project/Background information 9
3. Project Description 10
4. Site Analysis 15
5. Planning Brief 17
6. Proposed Infrastructure 18
7. Rehabilitation and resettlement (R & R) Plan 19
8. Project Schedule & Cost Estimates 20
9. Analysis of Proposal (Final Recommendations) 20
3
1.0 EXECUTIVE SUMMARY
1.1 Company Profile
M/s. Waxoils Pvt. Ltd. proposes to expand manufacturing of Wax Products at Plot No. 13, 14,
15, 20, 21 & 22, Bharuch Ind. Co-Op. Estate, Bholav, Tal. & Dist: BHARUCH-392 002 (Guj.)
1.2 Project Detail
1.2.1 Products along with Production Capacity
SR.
NO. PRODUCT NAME
Existing
Capacity
(MT/Month)
Additional
Capacity
(MT/Month)
Total Capacity
(MT/Month)
CAS Nos. LD50
1 BEES WAX 25 - 8012-89-3 --
2 PETROLIUM JELLY 100 - 8009-03-8 --
3 LIQUID PARAFIN 100 -
8012-95-1 --
4 EMULSIFYING WAX 50 -
8014-38-8
6772-27-0
68439-49-6
9004-99-3
123-94-4
25383-94-7
2197-63-9
9004-95-9
--
5 PETRO WAXES 23 - 6472-61-6 --
6 HARD PARAFFIN
WAX 30 -
8002-74-2 --
7 MICRO
CRYSTALLINE WAX 30 -
63231-60-7 --
8 GLYCERYL MONO
STEARATE 0 25
123-94-4 --
9 GLYCERYL COCOATE 0 25 8033-99-6 --
10 CEATO STEARYL
STEARATE 0 25
93820-97-4 --
11 STEARYL STEARATE 0 25 2778-96-3 --
12 CETYL RICINOELATE 0 25 --
13 CETYL PALMITATE 0 25 540-10-3 --
14 MYRISTRYL
MYRISTATE 0 25
3234-85-3 --
15 CETYL OLEATE 0 25 22393-86-8 --
16
MYRISTYL
STEARATE 0 25
177661-50-
56 --
17 SODIUM STEAROYL 0 25 2583-94-7 --
4
LACTYLATE
18 CANDELILLA WAX 0 15 8006-44-8 --
19. COCOA BUTTER 0 10 8002-31-1 --
20. SHEA BUTTER 0 10 68424-60-2 --
21 CARNAUBA WAX 0 15 8015-86-9 --
22 VEGANCERAS NJ 0 15
8001-21-6
8001-78-3
8001-79-4
--
23 VEGANCERAS SBW 0 25 71243-51-1 --
24 VEGANCERAS DL 0 25 8050-09-7 --
25 OZOKERITE WAX 0 25 84136-31-2 --
26 CERESINE WAX 0 25 84136-31-2 --
27 CHAPSTICK BASE 0 25
63231-60-7
84836-98-6
8015-86-9
8006-44-8
84136312
--
28 HARD FAT 0 25 123-94-4
52622-27-2 --
29 EMULSIFYING
OINTMENT 0 25
8009-03-8
8012-95-1
8014-38-8
--
TOTAL 358 490 848
1.3 Raw Material Requirement
List of Raw Materials and Their Capacity:
Existing
Sr.
No.
Name of the
Products
Capacity
QTY/M
Sr.
No. Name of the Raw Materials Quantity
1 BEES WAX IP 25 1 Crud Bees Wax 35 MT/Month
2 PETROLIUM JELLY 100
1
2
3
Micro Crystalline Wax
Paraffin Wax
White Oil
10 MT/Month
16 MT/Month
75 MT/Month
3 LIQUID PARAFIN 100 1 Mineral Oil 101 MT/Month
4 EMULSIFYING WAX 50
1
2
3
4
5
Cetearyl Alcohol (Palm Oil
Based)
Sodium Laural Sulphate
Cetearyl Alcohol (Palm Oil
Based) PS Grade
Ceto macrol-1000-500
30 MT/Month
1.6 MT/Month
8 MT/Month
5.5 MT/Month
1.1 MT/Month
2.6 MT/Month
5
6
7
Poly ethiline Glycol – 20 Stearat
Glyceryl mono stearate
Poly ethiline Glycol-100
Stearate
2.6 MT/Month
5 PETRO WAXES 23 1 Slack Wax 26 MT/Month
6 HARD PARAFFIN WAX 30 2 Paraffin Wax 31 MT/Month
7 MICRO CRYSTALLINE
WAX 30
1
2
Micro crystalline wax
Slack Wax
19 MT/Month
12 MT/Month
Proposed
Sr.
No.
Name of the
Products
Capacity
QTY/M Sr. No.
Name of the Raw
Materials Quantity
8 GLYCERYL MONO
STEARATE 25
1
2
3
Hydrogenated Palm
Stearine
Glycerine
Na(OH) Solution
22 MT/Month
3.5 MT/Month
5.0 LTR/MONTH
9 GLYCERYL COCOATE 25
1
2
3
4
Coconut Fatty Acid
Glycerin
Catalyst
Na(OH) Solution
22 MT/Month
3.5 MT/Month
0.75 MT/Month
5.0 LTR/MONTH
10 CEATO STEARYL
STEARATE 25
1
2
3
4
Stearic Acid
Cetostearyl Alcohol
Catalyst (Con. Sulphuric
Acid)
Mono Butyl Tin Oxide
12 MT/MONTH
13 MT/MONTH
1.25 MT/Month
0.75 MT/MONTH
11 STEARYL STEARATE 25
1
2
3
4
Stearic Acid
Stearic Alcohol
Catalyst (Con. Sulphuric
Acid)
Mono Butyl Tin Oxide
13 MT/MONTH
12 MT/MONTH
1.25 LTR /Month
0.75 MT/MONTH
12 CTETYL RICINOELATE 25
1
2
3
4
Cetyl Alcohol
Ricinoelic Acid
Catalyst (Con. Sulphuric
Acid)
Mono Butyl Tin Oxide
13.25 MT/MONTH
12.5 MT/MONTH
1.25 LTR /Month
0.75 MT/MONTH
13 CETYL PALMITATE 25
1
2
3
4
Cetyl Alcohol
Palmitic Acid
Catalyst (Con. Sulphuric
Acid)
Mono Butyl Tin Oxide
12.5 MT/MONTH
12.5 MT/MONTH
1.25 LTR/Month
0.75 MT/MONTH
14 MYRISTRYL
MYRISTATE 25
1
2
3
4
Myristryl Alcohol
Myristic Acid
Catalyst (Con. Sulphuric
Acid)
Mono Butyl Tin Oxide
12.5 MT/MONTH
12.5 MT/MONTH
1.25 LTR /Month
0.75 MT/MONTH
15 CETYL OLEATE 25 1
2
Cetyl Alcohol
Oelic Acid
12.5 MT/MONTH
12.5 LTR /MONTH
6
3
4
Catalyst (Con. Sulphuric
Acid)
Mono Butyl Tin Oxide
1.25 LTR /Month
0.75 MT/MONTH
16 MYRISTYL STEARATE 25 1
2
STEARYL ALCOHOL
Myristic Acid
12.5 MT/MONTH
12.5 MT/MONTH
17 SODIUM STEAROYL
LACTYLATE 25
18 CANDELILLA WAX 25 1 Crude Candelilla wax 27.5MT/MONTH
19 COCOA BUTTER 25 1 Crude Cocoa Butter 27.5MT/MONTH
20 SHEA BUTTER 25 1 Crude Shea Butter 27.5MT/MONTH
21 CARNAUBA WAX 25 1 Crude Carnauba wax 27.5MT/MONTH
22 VEGANCERAS NJ 15 1
2
Vegetable wax
Sunflower Oil
7.5MT/MONTH
7.5MT/MONTH
23 VEGANCERAS SBW 25 1
Ceto Steryl Alcohol
Stearic Acid
Vegetable wax
12.5 MT/MONTH
12.5 MT/MONTH
5.0 MT/MONTH
24 VEGANCERAS DL 25 1
2
Castor oil
SG
12.5MT/MONTH
12.5MT/MONTH
25 OZOKERITE WAX 25 1
2
Paraffin wax
Microcrystalline wax
12.5MT/MONTH
12.5MT/MONTH
26 CERESINE WAX 25 1
2
Paraffin wax
Microcrystalline wax
12.5MT/MONTH
12.5MT/MONTH
27 CHAPSTICK BASE 25 1
2
3
4
5
6
7
Coconut Oil
Microcrystalline Slack
Wax
Paraffin Wax
Ozokerite Wax
Candelilla wax
Carnauba Wax
Sunflower Wax
12.4 MT/MONTH
12.4MT/MONTH
0.05 MT/MONTH
0.05 MT/MONTH
0.05 MT/MONTH
0.05 MT/MONTH
0.05 MT/MONTH
28 HARD FAT 25
1
2
Glyceryl Mono Stearate
Caprilyc Capric
Triglyceride
22.5 MT/MONTH
2.5 MT/MONTH
29 EMULSIFYING
OINTMENT 25
1
2
3
Emulsifying Wax
White Soft Paraffin
Liquid Paraffin
7.5 MT/MONTH
12.5 MT/MONTH
5.0 MT/MONTH
7
1.4 Water Requirement, Waste Water Generation and Treatment
Source of water is met through Industrial Estate Water Supply. Total water requirement is 5.5
m3/day. Total 3.1 m
3/day (2.4 m
3/day Industrial + 0.7 m
3/day domestic) of effluent is generated,
2.4 m3/day effluents is treated in ETP then it is reused for gardening purpose. After proposed
expansion, there will be no change in water consumption and wastewater generation.
Domestic Waste water is disposed by septic tank & soak pit.
1.5 Air Pollution Source and Control Management
1) Flue Gas Stack
Note: Existing utility sufficient for manufacturing additional new products.
* Fuel will be changed from fire wood to agro waste briquette in baby boiler.
2) Process Stack
SR.
NO.
PROCESS
STACK
ATTACHED TO
HEIGHT
FROM
GROUND (m)
DIAMETER
(m)
AIR
POLLUTION
CONTROL
SYSTEM
EXPECTED
POLLUTANTS
N. A.
No process vent is required in existing and proposed scenario.
SR.
NO. STACKS ATTACHED TO
HEIGHT FROM
GROUND LEVEL (m)
CONSUMPTIO
N OF FUEL
(KL/hr)
DIAMETER
(m)
EXPECTED
POLLUTANTS
1 Baby Boiler & Thermic
Fluid Heater
11 4.58 SCM/Hr
Natural Gas
0.2
PM 150
mg/NM3
SO2 100 ppm
NOx 50 ppm
2 Baby Boiler 11 10.41 KG/Hr
Fire Wood*
0.2
3 85 KVA (Stand-by DG set) 9 0.625 Lit/Hr.
Diesel
0.12
8
1.6 Hazardous Waste
1.7 Green Belt
Total 3,767 sq. meter land area is available at site; out of this area about 1,000 sq. meter area
will be developed as greenbelt and other forms of greenery.
1.8 Power & Fuel Requirements
FUEL:
Existing:
Natural Gas: 110 SCM/Day
Fire Wood: 250 Kg/Day
Diesel: 15 Lit/Hr (during emergency)
Proposed:
Natural Gas: 110 SCM/Day
Agro waste briquette: 250 Kg/Day
Diesel: 15 Lit/Hr (during emergency)
ENERGY:
79 HP (DGVCL) (Existing)
1 DG Set = 85 KVA (during emergency)
91 HP (DGVCL) (Proposed)
SR.
NO.
NAME OF
WASTE
WASTE
CATEGORY
EXISTING
CAPACITY
PROPOSED
CAPACITY
TOTAL QTY.
MODE OF DISPOSAL
1 ETP Waste 35.3 6 MTA 0 6 MTA Collection, Storage,
Transportation & disposal in
TSDF of M/s. BEIL.
2 Process Waste 26.1 4.8 MTA 0 4.8 MTA Collection, Storage,
Transportation & incineration
at CHWIF of M/s. BEIL or sent
for co-processing in cement
industries.
3 Discarded
Containers
33.1 12,000
No./Y
0 12,000 No./Y Collection, Storage,
Transportation,
Decontamination & reuse or
given to registered vendors.
9
2.0 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION
2.1 Identification of the project and project proponent. In case of mining project, a copy of
mining lease/letter of intent should be given.
Identification of the project and project proponent
M/s. Waxoils Pvt. Ltd. proposes to expand manufacturing of Wax Products in existing unit
located at Plot No. 13, 14, 15, 20, 21 & 22, Bharuch Ind. Co-Op. Estate, Bholav, Tal. & Dist:
Bharuch-392 002 (Guj.).
List of Directors:
Sr.
No.
Name of Directors
1. Mrs. Pallavi K. Sarvaiya
2. Mr. Priyank Sarvaiya
2.2 Brief description of nature of the Project
Proposed expansion of Wax Products in existing unit.
2.3 Need for the project and its importance to the country and or region
The demand for products intended to be manufacture is increasing in the country by expanding
this unit, Company will be able to meet the demand of various products locally. The project will
save forex as certain products import will be reduced. This will also generate direct and indirect
employment opportunity for various levels of people.
2.4 Demands-Supply Gap
Based on our informal survey of the market with our current customers and various traders, we
have found that there is a big potential for the range of the products we are planning.
2.5 Imports vs. Indigenous production
Based on the current cost of indigenous raw materials and the non availability of some
materials, we will have to import some of the key raw materials as they are not available
indigenously. This will make us very competitive against imported finished products and we will
export of our finished products in the international market.
2.6 Export possibility
We shall explore the possibility of export the products.
10
2.7 Domestic/Export Markets
Our products have good demand in local & international markets. We shall explore the
possibility of export the products.
2.8 Employment Generation (Direct and Indirect) due to project.
M/s. Waxoils Pvt. Ltd. will give direct employment to local people based on qualification and
requirement. In addition to direct employment, indirect employment shall generate ancillary
business to some extent for the local population.
3.0 Project Description
3.1 Type of Project including interlinked and interdependent projects, if any.
No interlinked project has been submitted.
• Location (map showing general location, specific location and project boundary & project
site layout) with coordinates.
Map showing general location.
PROJECT
SITE
11
Specific location and project boundary
• Project Site (Google Map)
12
• Plant Layout
13
3.3 Details of alternate sites considered and the basis of selecting the proposed site,
particularly the environmental considerations gone into should be highlighted.
Looking to the international market demand of the products it was decided by M/s. Waxoils
Pvt. Ltd. to expand this facility.
Major factors involved in the selection of site are listed below:
• Existing operation unit.
• Minor site clearance activities shall be carried out to clear shrubs and weed.
• The project site is located on level ground, which does not require any major land filling
for area grading work.
• Proximity to Raw Material suppliers.
• Site is very well connected by road and railway.
Modern infrastructure support and amenities at par in other global markets, including:
� Efficient transport facilities.
� Environment-friendly zone.
� Uninterrupted power supply.
3.4 Size or Magnitude of Operation
Please refer Section-1.2.1, Page No. 3.
3.5 Project Description with process details (a schematic diagram/flow chart showing the
project layout, components of the project, etc. should be given)
Please refer Please refer Form-I, Annexure-III.
14
3.6 Raw Material required along with estimated quantity, likely source, marketing area of
final product/s, mode of transport of raw material and Finished product.
For raw material required along with quantity; Please refer Section-1.3, Page No. 3. We shall
procure the raw material as much as possible from domestic market and if there is no
availability of any raw material we will import. We shall explore the possibility of export the
finished products.
3.7 Resource optimization/recycling and reuse envisaged in the project, if any, should be
briefly outlined.
Company will explore the possibility of reuse & recycle.
3.8 Availability of water its source, energy/power requirement and source should be
given.
Water Source
Total water requirement is met through Industrial Estate Water Supply.
FUEL:
Existing:
Natural Gas: 110 SCM/Day
Fire Wood: 250 Kg/Day
Diesel: 15 Lit/Hr (during emergency)
Proposed:
Natural Gas: 110 SCM/Day
Agro waste briquette: 250 Kg/Day
Diesel: 15 Lit/Hr (during emergency)
ENERGY:
79 HP (DGVCL) (Existing)
1 DG Set = 85 KVA (during emergency)
91 HP (DGVCL) (Proposed)
3.9 Quantity of wastes to be generated (liquid and solid) and scheme for their
management/disposal.
Please refer Please refer Form-I, Annexure-IV & VI.
15
3.10 Schematic representations of the feasibility drawing which give information of EIA
purpose.
4.0 Site Analysis
4.1 Connectivity
• Site is very well connected by road
• Availability of fuel, power, CHWIF, TSDF, etc. in nearby estate.
4.2 Land Form, Land Use and Land Ownership
Land Use will be incorporated in the EIA Study.
4.4 Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including
area under CRZ)), shortest distances from the periphery of the project to periphery of the
forests, national park, wild life sanctuary, eco sensitive areas, water bodies (distance from
RECONNAISSANCE SURVEY OF EXISTING PLANT ANNUAL REPORT
MARKET ASSESSMENT
FINANCIAL REPORT
PROJECT REPORT
INTRODUCTION
MONITORING OF AIR, WATER & SOIL QUALITY & NOISE
LEVELS. DATA ON METEOROLOGY SOCIO-ECONOMIC
STATUS & BASIC AMENITIES. SITE VISITS BY AND
INTERVIEWS WITH LOCALS
BASELINE
ENVIRONMENTAL
STATUS
ENVIRONMENTAL INFORMATION CENTRE
CENTRAL GROUND WATER BOARD
GUJARAT POLLUTION CONTROL BOARD (GPCB)
PUBLIC HEALTH ENGINEERING DEPT.
AGRICULTURE DEPARTMENT
FOREST DEPARTMENT
IRRIGATION DEPARTMENT
EMPLOYMENT EXCHANGE
HEALTH CENTER
CENSUS DEPT.
INDIAN METEOROLOGICAL DEPT.
SOCIOECONOMIC
STATUS &
INFRASTRUCTURE
PROPOSED
PLANT
FACILITY DESCRIPTION
IMPACTS
METHODOLOGY OF
IMPACT
ASSESSMENT
IDENTIFICATION & ASSESSMENT OF IMPACTS
EVALUATION OF IMPACTS BY MATRIX METHOD
SOURCE OF INFORMATION OVERVIEW OF
E. I. A. STUDIES
ACTIVITIES
ENVIRONMENTAL
MANAGEMENT
PLAN
DESCRIPTION OF EFFLUENT TREATMENT PLAN, AIR
POLLUTION CONTROL, HAZARDOUS WASTE
MANAGEMENT, GREEN BELT DEVELOPMENT
MONITORING PROGRAM
RISK ANALYSIS
STUDIES &
DISASTER
MANAGEMENT PLAN
SAFETY, HEALTH & ENVIRONMENTAL POLICY, GUIDELINES BY
DIRECTOR GENERAL OF FACTORY SAFETY, MINISTRY OF LABOR. CONSEQUENCE ANALYSIS
PREPARATION OF DISASTER MANAGEMENT PLAN
16
HFL of the river), CRZ. In case of the notified industrial area, a copy of the Gazette
notification should be given.
Existing land use pattern will be incorporated in the EIA Study. CRZ Clearance is not
applicable.
4.5 Existing Infrastructure
Processing Area (Plant facilities, ETP Area and Utility Services) = 1195.66 m2
Non Processing Area (Raw material storage area, finished storage area, Workshop and Engg.
Store, Canteen, security cabin, green belt and open area) = 1571.72 m2
4.6 Soil Classification
Soil Classification will be incorporated in the EIA Study.
4.7 Climatic data from secondary sources.
Climatic data from primary & secondary sources will be incorporated in the EIA Study.
4.8 Social infrastructure available.
Various Programs/ Projects related to Social & Economic development of surrounded area
has been planned, which are as follows.
A) Natural Resource Management – The main focus of this program will be to maximize the
yield returns of the farmers through efficient management of existing resources &
extension of new agricultural practices.
1) Integrated Agricultural Growth Project – For improvement and use of the modern
techniques and thereby would certainly contribute to prosperity in the agriculture
sector and reduce the rural poverty by programs like Farmers Training, Nursery
Growing Trainings, Modern agriculture equipment distribution programs etc.
2) Animal Husbandry Projects – Various programs like health checkups & treatment,
vaccination program, Anti sterility camps, breed improvement etc. will be carried
out.
B) Income Generation Program -
1) Establishment of Self help groups.
2) Rural Entrepreneurship Development Program
3) Handcrafts Development Program
17
4) Vocational Training
5) Business process outsourcing
C) Health, Education & Infrastructure
1) Aids Awareness Program
2) General Health Camps
3) Innovative Teaching Methods
4) Adult Education
5) Sanitation
6) Infrastructure Development Projects
5.0 Planning Brief
5.1 Planning Concept (type of industries, facilities, transportation etc) Town and Country
planning/Development authority classification.
Type of Industry: Proposed expansion of Wax Products in existing unit.
5.2 Population Projection
Population Projection will be incorporated in the EIA Study.
5.3 Land use planning (breakup along with green belt etc.)
SR.
NO.
LAND USE PROPOSED AREA
(SQ. MT.)
1 Production Plants 663.37
2 Parking 70.90
3 Security Building 18
4 Effluent Treatment plant 12.92
5 Utility 136.36
6 Raw Material and Finished Products Storage 166.92
7 Gas Tonner Storage NA
8 Tank Farm Area 29.40
9 Green Belt 210.72
10 Road & open area 983.26
18
5.4 Assessment of Infrastructure Demand (Physical & Social)
• Employment would be as per prevailing norms of state government for skilled and
unskilled people for the proposed activity.
• Social Welfare
• Cordial relation with the villages shall be established and representation shall be made
to villagers for help for creation of facilities related to health, education, etc.
5.5 Amenities/Facilities
Details of amenities available in study area
Population Projection will be incorporated in the EIA Study.
6.0 Proposed Infrastructure
6.1 Industrial Area (Processing Area)
Processing Area (Plant facilities, ETP Area and Utility Services) = 1195.66 m2
6.2 Residential Area (Non Processing Area)
Non Processing Area (Raw material storage area, finished storage area, Workshop and Engg.
Store, Canteen, security cabin, green belt and open area) = 1571.72 m2
Green Belt: 1000 m2
6.3 Green Belt
Total 3767 sq. meter land area is available at site; out of this area about 1000 sq. meter area
will be developed as greenbelt and other forms of greenery.
6.4 Social Infrastructure
• Water requirement will be met through industrial estate Water Supply.
• Power supply by DGVCL.
6.5 Connectivity (Traffic and Transportation Road/ Rail/Metro/ Water ways etc)
Major factors involved in the selection of site are listed below:
• Site is very well connected by road
19
• Proximity to Raw Material suppliers
• Availability of sufficient land free from cultivation
• Availability of power facilities
• Availability of fuel
6.6 Drinking water Management (Source & Supply of water)
Total water requirement is met through industrial estate Water Supply.
6.7 Sewerage System
Sewage pipes are laid in entire company for the removal and disposal of mainly non-
harmful liquid wastes from the offices, canteen and domestic waste coming from different
section of industry. These liquid wastes are sent to septic tank & soak pit.
6.8 Solid Waste Management
Please refer Form-I, Annexure-VI.
6.9 Power Requirement & Supply/Source
Please refer Section 1.8, Page No. 5 of this report.
7.0 Rehabilitation and Resettlement (R & R) Plan
7.1 Policy to be adopted (central/state) in respect of the project affected including home
oustees, land oustees and landless laborers (a brief outline to be given)
There is no habitation on the proposed project activity area and it is open industrial land, so
R & R policy is not applicable to this project.
There shall not be displacement of any population in project area. Any major activity that
may lead to resettlement of the people is considered as permanent impact. Hence, there is
no permanent impact on this account. The increasing industrial activity will boost the
commercial and economical status of the locality up to some extent.
20
8. Project Schedule & Cost Estimates
8.1 Likely date of start of construction and likely date of completion (Time schedule for
the project to be given).
We shall start construction of proposed project after getting EC and we shall start
production after applying for CCA.
8.2 Estimated Project cost along with analysis in terms of economic viability of the
project.
Total Project Cost for proposed project activity is Rs. 10 Lakh.
9. Analysis of Proposal (Final Recommendations)
9.1 Financial and social benefits with special emphasis on the benefit to be local people
including tribal population, if any, in the area.
• Employment would be as per prevailing norms of state government for skilled and
unskilled people for the proposed project.
• Social Welfare shall be done.
• Cordial relation with the industry shall be established and representation shall be made
to villagers for help for creation of facilities related to health, education, etc.