off the grid equipment manufacturer 350-1502. 100% of our aluminum tubing is made from captured...
TRANSCRIPT
Equipment Manufacturer
350-1502
Off the Grid
Equipment Manufacturer
350-1502
Off the Grid
TRANSFER
STATION
W/ STEP
0.5 1.0
05'
Meters2.0 3.0
10'
SPIRAL
CLIMBER
HOPSCOTCH
CLIMBER
RUMBLE
SEAT
SLIDE
90°
GLIDE
SLIDE
24" (610mm) RISE
FUNNEL
ADVENTURE
TUBE
HORIZONTAL
LOOP LADDER
W/ ACCESS
LADDER
ACCESSIBLE
DRIVER
PANEL
(ground)
NUVO
SWIRL
ROOF
36"
0,92M
60"
1,53M
LEG
LIFT
THE
GRID
CRATER
ARCH
39'
[11.90M]
28'
[8.54M]
6'-4"
[1.92M]
6'-3"
[1.90M]
6'-6"
[1.97M]
6'-2"
[1.88M]
6'-3"
[1.92M]
6'-4"
[1.93M]
BPaper Size
DATE:
SCALE:PROJECT NO:
*PLAYGROUND SUPERVISION REQUIRED
DRAWN BY:
USER CAPACITY: AGE GROUP:
AREA: PERIMETER:
EQUIPMENT SIZE:
USE ZONE:
FALL HEIGHT:
CPSC #325ASTM F1487-
OFF
TH
E G
RID
CA
TA
LO
G P
RE
-D
ES
IG
N
350-1502C 1/4"=1'-0"
M. MERTZ
20-DEC-17
26'7" x 15'3" x 12'7"8,1M x 4,65M x 3,84M
39'0" x 28'0"11,90M x 8,54M
899 SqFt.83,52 SqM.
111 Ft.33,83M
8 Ft.2,44M
35 5-12
17
Total Elevated Play Activities:
Total Ground-Level Play Activities:
AccessibleElevatedActivities
AccessibleGround-Level
Activities
AccessibleGround-LevelPlay Types
Required
Provided
AD
A S
CH
EDU
LE 6
3
6
4
2
3
2
3
PLAYWORLD SYSTEMS, INC.
1000 Buffalo Road
Lewisburg, PA
17837-9795 USA
0.5 1.0
05'
Meters2.0 3.0
10'
36"
0,92M
60"
1,53M
39'
[11.90M]
28'
[8.54M]
6'-4"
[1.92M]
6'-3"
[1.90M]
6'-6"
[1.97M]
6'-2"
[1.88M]
6'-3"
[1.92M]
6'-4"
[1.93M]
7
8
9
10
11
12
13
14
15
16
17
18
19
20
BPaper Size
DATE:
SCALE:PROJECT NO:
*PLAYGROUND SUPERVISION REQUIRED
DRAWN BY:
USER CAPACITY: AGE GROUP:
AREA: PERIMETER:
EQUIPMENT SIZE:
USE ZONE:
FALL HEIGHT:
CPSC #325ASTM F1487-
OFF
TH
E G
RID
CA
TA
LO
G P
RE
-D
ES
IG
N
350-1502C 1/4"=1'-0"
M. MERTZ
20-DEC-17
26'7" x 15'3" x 12'7"8,1M x 4,65M x 3,84M
39'0" x 28'0"11,90M x 8,54M
899 SqFt.83,52 SqM.
111 Ft.33,83M
8 Ft.2,44M
35 5-12
17
Total Elevated Play Activities:
Total Ground-Level Play Activities:
AccessibleElevatedActivities
AccessibleGround-Level
Activities
AccessibleGround-LevelPlay Types
Required
Provided
AD
A S
CH
EDU
LE 6
3
6
4
2
3
2
3
PLAYWORLD SYSTEMS, INC.
1000 Buffalo Road
Lewisburg, PA
17837-9795 USA
DATE:
SCALE:
DRAWN BY:
SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)
SUPPORT POST FOOTING (DETAIL 1 or 4) INDICATES POST LENGTH)
CANTILEVER, "T" POST, AND COMPONENTPOST FOOTING (DETAIL 2)
(ZZCH1850 INDICATES PART NUMBER)
GROUND ZERO POST FOOTING (DETAIL 2) INDICATES POST LENGTH)
COMPONENT FOOTING (DETAIL 3)
(112"
(144"
T
R
A
N
S
F
E
R
S
T
A
T
I
O
N
T
R
A
N
S
F
E
R
S
T
A
T
I
O
N
1
3
6
"
1
3
6
"
1
4
8
"
1
4
8
"
1
4
8
"
1
4
8
"
1
6
0
"
1
6
0
"
1
6
0
"
1
6
0
"
48"
36"
36"
36"
1
4
8
"
G
Z
72"
9"17"9"
39"
39" 100"
92"
36"36"72"
37"
17"
42"
16"
19"
2"
16"
32"
136"
100"
172"
213"
18"
16"
75"
26"
11"
26"
24"
6"
TRANSFER
STATION
W/ STEP
SPIRAL
CLIMBER
HOPSCOTCH
CLIMBER
RUMBLE
SEAT
SLIDE
90°
GLIDE
SLIDE
24" (610mm) RISE
FUNNEL
ADVENTURE
TUBE
HORIZONTAL
LOOP LADDER
W/ ACCESS
LADDER
THE
GRID
CRATER
ARCH
BPaper Size
DATE:
SCALE:PROJECT NO:
*PLAYGROUND SUPERVISION REQUIRED
DRAWN BY:
FOOTING LEGEND
1
1
2
"
1
8
5
0
Z
Z
C
H
1
4
4
"
G
Z
SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)
SUPPORT POST FOOTING (DETAIL 1 or 4)(112" INDICATES POST LENGTH)
CANTILEVER, "T" POST, AND COMPONENTPOST FOOTING (DETAIL 2)
(ZZCH1850 INDICATES PART NUMBER)
GROUND ZERO POST FOOTING (DETAIL 2)(144" INDICATES POST LENGTH)
COMPONENT FOOTING (DETAIL 3)
OFF
TH
E G
RID
CA
TA
LO
G P
RE
-D
ES
IG
N
350-1502C 1/4"=1'-0"
M. MERTZ
20-DEC-17
PLAYWORLD SYSTEMS, INC.
1000 Buffalo Road
Lewisburg, PA
17837-9795 USA
Posts
ZZCH0028 21 3.5in OD x 136in STEEL POST W/ RIVETED CAP
ZZCH0038 42 3.5in OD x 148in STEEL POST W/ RIVETED CAP
ZZCH0038GZ 13 3.5in OD x 148in GROUND ZERO POST
ZZCH0049 44 3.5in OD x 160in STEEL POST W/O CAP
Decks & Kick Plates
ZZCH0616 15 SQUARE COATED DECK ASSEMBLY
ZZCH0636 16 DOUBLE SLIDE COATED DECK ASSEMBLY
ADA Items
ZZCH2007 17 TRANSFER STATION w/TALL GUARDRAIL (36in DECK)
ZZUN2019 18 APPROACH STEP FOR TRANSFER STATION
Slides
ZZCH2737 19 RUMBLE SEAT (60in DECK)
ZZCH3129 110 90 DEGREE GLIDE SLIDE (36in DECK)
Activity Panels
ZZCH4406 111 ACCESSIBLE DRIVING PANEL
Crawl Tubes
ZZCH5628 112 FUNNEL ADVENTURE TUBE 2ft RISE
Climbers
ZZCH8160 113 SPIRAL CLIMBER (60in DECK)
ZZCH8270 114 HOPSCOTCH CLIMBER (60in DECK)
Ground Zer0 Climbers
ZZCH8408 115 THE GRID
ZZCH8457 116 THE CRATER ARCH
Overhead Events
ZZCH5770 117 LEG LIFT
ZZCH5780 118 6ft HORIZONTAL LOOP LADDER
ZZCH5970 119 OVERHEAD EVENT ACCESS LADDER (36in DECK)
Roofs & Arches
ZZCH9868 120 NUVO SWIRL ROOF
Additional Tool & Maintenance Kits
ZZCHGUID 121 CHALLENGER GUIDELINES
ZZUN9910 122 SURFACING WARNING LABEL KIT
ZZUN9930 123 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
Part No. Description
Design Number: 350-1502C - Bill Of Material
Off the Grid
Ref.No. Quantity
Friday, September 29, 2017 Page of1 1 Playworld.com
CertifiedZZCH00281 3.5in OD x 136in STEEL POST W/ RIVETED CAP
2 87.02 117 0 2.00 0.25 0
CertifiedZZCH00382 3.5in OD x 148in STEEL POST W/ RIVETED CAP
4 188.44 253 0 4.00 0.50 0
CertifiedZZCH0038GZ3 3.5in OD x 148in GROUND ZERO POST1 47.01 63 0 1.00 0.18 0
CertifiedZZCH00494 3.5in OD x 160in STEEL POST W/O CAP4 199.64 254 0 4.00 0.50 0
CertifiedZZCH06165 SQUARE COATED DECK ASSEMBLY 1 54.86 174 3 1.00 0.00 0
CertifiedZZCH06366 DOUBLE SLIDE COATED DECK ASSEMBLY1 63.86 185 3 1.00 0.00 0
CertifiedZZCH20077 TRANSFER STATION w/TALL GUARDRAIL (36in DECK)
1 148.40 310 2 2.00 0.09 0
CertifiedZZUN20198 APPROACH STEP FOR TRANSFER STATION1 35.83 72 1 1.00 0.04 0
CertifiedZZCH27379 RUMBLE SEAT (60in DECK)1 201.86 762 4 3.00 0.06 1
CertifiedZZCH312910 90 DEGREE GLIDE SLIDE (36in DECK)1 96.73 418 2 2.00 0.03 1
CertifiedZZCH440611 ACCESSIBLE DRIVING PANEL 1 24.07 202 1 0.50 0.00 1
CertifiedZZCH562812 FUNNEL ADVENTURE TUBE 2ft RISE1 138.56 992 4 2.00 0.00 1
CertifiedZZCH816013 SPIRAL CLIMBER (60in DECK)1 92.33 207 2 1.00 0.03 1
CertifiedZZCH827014 HOPSCOTCH CLIMBER (60in DECK)1 77.90 154 2 2.00 0.06 1
CertifiedZZCH840815 THE GRID 1 103.67 219 3 0.75 0.00 1
CertifiedZZCH845716 THE CRATER ARCH 1 79.50 407 2 1.00 0.03 1
CertifiedZZCH577017 LEG LIFT 1 6.76 30 1 0.50 0.00 1
CertifiedZZCH578018 6ft HORIZONTAL LOOP LADDER 1 55.72 124 4 1.00 0.00 1
CertifiedZZCH597019 OVERHEAD EVENT ACCESS LADDER (36in DECK)
1 25.12 71 1 1.50 0.06 0
CertifiedZZCH986820 NUVO SWIRL ROOF 1 80.33 482 0 1.00 0.00 0
N/AZZCHGUID21 CHALLENGER GUIDELINES 1 0.00 1 0 0.25 0.00 0
CertifiedZZUN991022 SURFACING WARNING LABEL KIT 1 0.05 1 0 0.25 0.00 0
N/AZZUN993023 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
1 90
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 350-1502C - Compliance and Technical Data
Off the Grid
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
250 472 5,586 35 32.75 1.831,807.66 10Totals:
Friday, September 29, 2017 Page of1 3 Playworld.com
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 350-1502C - Compliance and Technical Data
Off the Grid
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
Friday, September 29, 2017 Page of2 3 Playworld.com
6 Metric Tons212 Kg113 Kg813.45 Kg 1.39 m3
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 350-1502C - Compliance and Technical Data
Off the Grid
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
The lay-out for this custom playscape, design number 350-1502C, has been configured to meet the requirements of the ASTM F1487 standard. In addition, each of the above components listed as "Certified" have been tested and are IPEMA certified. Components listed as "Not Applicable" do not fall within the scope of the ASTM F1487 standard and have not been tested. IPEMA certification can be verified on the IPEMA website, www.ipema.org. In the interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance.
The CO2e (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 2050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle.
The lay-out was also designed to meet the 2010 Standards published 15-Sep-2010, by the Department of Justice when installed over a properly maintained surfacing material that is in compliance with ASTM F1951 "Accessibility of Surface Systems Under and Around Playground Equipment" as well as ASTM F1292, "Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment", appropriate for the fall height of the structure.
Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working 1/3 of the given hours. [Eg. Installation Time = 30 hours. For a crew of three, each member will work 10 hours on the installation for a total of 30 hours on the project.]
A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels.
A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **20% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product.** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel.
ASTM F1487
2010 ADA Standards for Accessible Design
Installation Times
Carbon Footprint
Pre-Consumer Recycle Content
Post-Consumer Recycle Content
Friday, September 29, 2017 Page of3 3 Playworld.com